KR20110010247A - 교량공사용 멀티유헤드 서포트장치 - Google Patents
교량공사용 멀티유헤드 서포트장치 Download PDFInfo
- Publication number
- KR20110010247A KR20110010247A KR1020090067701A KR20090067701A KR20110010247A KR 20110010247 A KR20110010247 A KR 20110010247A KR 1020090067701 A KR1020090067701 A KR 1020090067701A KR 20090067701 A KR20090067701 A KR 20090067701A KR 20110010247 A KR20110010247 A KR 20110010247A
- Authority
- KR
- South Korea
- Prior art keywords
- head
- support device
- screw thread
- support
- thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (5)
- 교량의 슬래브 거푸집 공사를 위한 멍에재를 받치는 서포트장치에 있어,상기 서포트장치는 중앙에 높이조절바(12)가 고정되어 형성되고, 상기 높이조절바(12)를 기준으로 상부와 하부의 외주면에 각각 반대방향의 나사산이 형성된 상부나사산(14)과 하부나사산(16)으로 구성되는 수나사봉(10);상기 상부나사산(14)과 하부나사산(16)에 각각 체결되는 두 개의 고정너트(18);상부가 개방된 ㄷ형상의 유헤드채널(22) 및 파이프 형상으로 상기 유헤드채널(22)의 하부에 상단이 접합되며 파이프 내부에 암나사가 형성되어 상기 수나사봉(10)의 상부나사산(14)이 체결되는 체결파이프(24)로 구성되는 상부유헤드(20); 및,상부면에 나사구멍이 천공되어 상기 나사구멍에 상기 수나사봉(10)의 하부나사산(16)이 결합되고, 하부가 개방된 ㄷ형상의 유헤드채널(22)로 구성되는 하부유헤드(30);를 포함하여 구성되는 것을 특징으로 하는 교량공사용 멀티유헤드 서포트장치.
- 제1항에서,상기 상부유헤드(20) 또는 하부유헤드(30)는,상기 상부유헤드(20) 또는 하부유헤드(30)의 한쪽 또는 양쪽 측면에 나사구멍이 형성되고, 상기 나사구멍에 체결되는 체결볼트가 더 추가되어 구성되는 것을 특징으로 하는 교량공사용 멀티유헤드 서포트장치.
- 제1항 또는 제2항에서,상부 및 하부가 개방된 수평방향의 각재의 형상으로, 상기 하부나사산(16)이 각재의 상부에서 하부로 관통하여 상기 하부유헤드(30)가 상부에 밀착되어 결합되는 수평지지대(40);를 더 포함하여 구성되는 것을 특징으로 하는 교량공사용 멀티유헤드 서포트장치.
- 제3항에서,상기 수평지지대(40)는,양단부가 개방된 각관의 형태로써 상기 수평지지대(40)의 일단 또는 양단에 결합되는 한 개 내지 두 개의 보조지지대(50)가 더 추가되어 구성되는 것을 특징으로 하는 교량공사용 멀티유헤드 서포트장치.
- 제4항에서,상기 수평지지대(40)의 보조지지대(50)는,상기 보조지지대(50)의 한쪽 또는 양쪽 측면에 나사구멍이 형성되고, 상기 나사구멍에 체결되는 체결볼트가 더 추가되어 구성되는 것을 특징으로 하는 교량공사용 멀티유헤드 서포트장치.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020090067701A KR101131079B1 (ko) | 2009-07-24 | 2009-07-24 | 교량공사용 멀티유헤드 서포트장치 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020090067701A KR101131079B1 (ko) | 2009-07-24 | 2009-07-24 | 교량공사용 멀티유헤드 서포트장치 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20110010247A true KR20110010247A (ko) | 2011-02-01 |
| KR101131079B1 KR101131079B1 (ko) | 2012-03-30 |
Family
ID=43770812
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020090067701A Expired - Fee Related KR101131079B1 (ko) | 2009-07-24 | 2009-07-24 | 교량공사용 멀티유헤드 서포트장치 |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR101131079B1 (ko) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103075002A (zh) * | 2013-02-04 | 2013-05-01 | 焦作建工集团有限公司 | 适用多种模板龙骨的早拆模板支撑头 |
| KR101654545B1 (ko) * | 2015-10-20 | 2016-09-06 | 유림건설(주) | 공중비계용 합판조립체 |
| CN114657883A (zh) * | 2022-03-28 | 2022-06-24 | 姚平 | 一种桥梁工程领域的桥梁施工用支撑设备 |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101322839B1 (ko) | 2012-03-08 | 2013-10-29 | 주식회사 거산시스템 | 시스템 서포트에 설치되는 보 받침 구조물 |
| CN103556818A (zh) * | 2013-10-31 | 2014-02-05 | 林德亮 | 建筑模板楼面快拆系统 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200209565Y1 (ko) | 2000-07-20 | 2001-01-15 | 주식회사우림엔지니어링건축사사무소 | 건축용 동바리 |
-
2009
- 2009-07-24 KR KR1020090067701A patent/KR101131079B1/ko not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103075002A (zh) * | 2013-02-04 | 2013-05-01 | 焦作建工集团有限公司 | 适用多种模板龙骨的早拆模板支撑头 |
| CN103075002B (zh) * | 2013-02-04 | 2015-04-08 | 焦作建工集团有限公司 | 适用多种模板龙骨的早拆模板支撑头 |
| KR101654545B1 (ko) * | 2015-10-20 | 2016-09-06 | 유림건설(주) | 공중비계용 합판조립체 |
| CN114657883A (zh) * | 2022-03-28 | 2022-06-24 | 姚平 | 一种桥梁工程领域的桥梁施工用支撑设备 |
| CN114657883B (zh) * | 2022-03-28 | 2024-04-09 | 姚平 | 一种桥梁工程领域的桥梁施工用支撑设备 |
Also Published As
| Publication number | Publication date |
|---|---|
| KR101131079B1 (ko) | 2012-03-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4929331B2 (ja) | 鉄骨露出型柱脚部の施工方法 | |
| KR101011417B1 (ko) | 에프에스엠 공법용 시스템 거푸집 설비 | |
| KR101131079B1 (ko) | 교량공사용 멀티유헤드 서포트장치 | |
| KR20110010248A (ko) | 교량공사용 멀티유헤드 브래킷장치 | |
| KR20120003729U (ko) | 시스템서포트 헤드 | |
| CN110725525A (zh) | 一种装配式悬挑脚手架的支承装置及其施工方法 | |
| KR200226626Y1 (ko) | 교량상판 거푸집을 지지하기 위한 브래킷 | |
| KR20200092593A (ko) | 방호벽일체형 프리캐스트 캔틸레버슬래브로 제작된 교량슬래브 및 그 시공방법 | |
| CN106906996A (zh) | 可重复使用的预埋环 | |
| JP2007169886A (ja) | 主桁とプレキャスト床版の合成構造 | |
| KR101181493B1 (ko) | 개선된 시스템 서포터 | |
| KR100696677B1 (ko) | 피시빔 작업로 구축용 설치구 | |
| JP4436149B2 (ja) | 鉄骨露出型柱脚構造 | |
| CN108797381B (zh) | 一种吊杆拆除更换方法 | |
| KR100840279B1 (ko) | 슬래브거푸집 현수용 행거장치 | |
| KR100469638B1 (ko) | 피.에스.씨-빔 교량의 상판 슬래브 지지용 가시설 구조물 | |
| KR101257823B1 (ko) | 곡선빔용 전도방지장치 | |
| KR100903442B1 (ko) | 안전 난간의 지지 구조물 | |
| JP7192153B1 (ja) | アンカーボルトの施工方法、および、レベル調整部材 | |
| KR20020001480A (ko) | 피씨빔 공법 또는 스틸 박스 공법에 적용되는 슬라브콘크리트 타설용 거푸집 | |
| KR200392341Y1 (ko) | 공중비계용 고정장치 | |
| CN115681620A (zh) | 一种综合支架承重预埋件的安装方法 | |
| JPH10311045A (ja) | 柱を建込むための定盤の施工方法および装置 | |
| KR102059081B1 (ko) | 강교용 가설 브래킷 및 이를 이용한 비계 설치공법 | |
| KR100433700B1 (ko) | 교량용 슬라브 콘크리트 타설을 위한 거푸집 시스템 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| FPAY | Annual fee payment |
Payment date: 20160218 Year of fee payment: 5 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| LAPS | Lapse due to unpaid annual fee | ||
| PC1903 | Unpaid annual fee |
St.27 status event code: A-4-4-U10-U13-oth-PC1903 Not in force date: 20180322 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| PC1903 | Unpaid annual fee |
St.27 status event code: N-4-6-H10-H13-oth-PC1903 Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20180322 |