KR20090099937A KR1020080025245A KR20080025245A KR20090099937A KR 20090099937 A KR20090099937 A KR 20090099937A KR 1020080025245 A KR1020080025245 A KR 1020080025245A KR 20080025245 A KR20080025245 A KR 20080025245A KR 20090099937 A KR20090099937 A KR 20090099937A
Authority
KR
South Korea
Prior art keywords
reinforcing bar
network
main
reinforcing
concrete pile
Prior art date
Application number
KR1020080025245A
Other languages
Korean (ko)
Inventor
김근호
Original Assignee
주식회사 종합건축사사무소근정
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 종합건축사사무소근정 filed Critical 주식회사 종합건축사사무소근정
Priority to KR1020080025245A priority Critical patent/KR20090099937A/en
Publication of KR20090099937A publication Critical patent/KR20090099937A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D11/00Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Abstract

PURPOSE: A reinforcement mesh structure and a pile construction method pouring the concrete using the same are provided to maintain the coating thickness of the concrete by separating the side of a casing from the inside of a pipe casing. CONSTITUTION: A reinforcement mesh structure comprises a main reinforcement(12), a reinforcement mesh(10), a side filler(20), and a lower filler(30). The main reinforcement is extended to the longitudinal direction. The reinforcement mesh is made of a reinforcement hoop(14). The reinforcement hoop is arranged at the outer circumference of the main reinforcement to the axial direction. The side filler is made of wire. The lower side filler has the cylindrical lower part.

Description

철근망 구조체 및 이를 이용한 현장 타설 콘크리트 말뚝 시공방법{cast in place concrete pile construction technique for which a reinforcing rod net structure and this were used}Reinforcing rod structure and this were used {cast in place concrete pile construction technique for which a reinforcing rod net structure and this were used}
본 발명은 철근망 구조체 및 이를 이용한 현장 타설 말뚝 시공방법에 관한 것이다.The present invention relates to a reinforcing bar network structure and a method for constructing a site pile using the same.
일반적으로 현장 타설 콘크리트 말뚝공법은 현장에서 말뚝 형성을 위한 지반굴착시 수직굴착을 위하여 스탠드파이프를 먼저 설치하고, 공벽의 붕괴를 방지하기 위해 벤토나이트 또는 청수를 이용하여 공벽에 소정의 정수압을 작용시키고, 굴착공 내부에 삽입시킨 드릴 비트에 의하여 굴착을 진행시키면서 굴착된 토사 등은 물과 함께 드릴비트 중앙에 설치된 드릴파이프로 외부로 배출시키며, 소정의 깊이까지 굴착이 완료되면, 굴착공 내부에 철근망 구조체를 삽입한 후, 트레미관을 이용하여 굴착공 하부에서부터 콘크리트 등을 압입시켜 굴착공에 현장 타설 콘크리트 말뚝을 형성시키는 공법이다.In general, in-situ concrete pile method is to install the standpipe first for vertical excavation in the ground excavation for pile formation in the field, and to apply a predetermined hydrostatic pressure to the empty wall using bentonite or fresh water to prevent the collapse of the empty wall, The excavated soil, etc., while being excavated by the drill bit inserted into the excavation hole, is discharged to the outside with the drill pipe installed in the center of the drill bit together with water, and when excavation is completed to a predetermined depth, the rebar net After inserting the structure, it is a method of forming a site-cast concrete pile in the excavation hole by injecting concrete, etc. from the bottom of the excavation hole by using the tremi tube.
이와 같은 공법은 굴착공 주위지반에 투수층이 형성된 경우에는 벤토나이트 또는 청수가 굴착공 외부로 배수될 여지가 있으므로 정수압에 의한 공벽의 붕괴방 지 효과가 없어지며, 이때는 부득이하게 공벽의 붕괴를 방지하기 위해 공벽 내에 강관 케이싱을 압입시킨 후 굴착을 진행시키며, 이러한 강관 케이싱은 굴착공 내부에 콘크리트 타설이 완료되기 전에 강관 케이싱을 인발해야 하는데, 이와 같이 강관 케이싱을 인발하는 과정에서 강관 케이싱 내부에 배치된 철근망 구조체와 함께 강관 케이싱이 인발되는 문제점이 있다.In this method, when a permeable layer is formed in the ground around the excavation hole, bentonite or fresh water may drain to the outside of the excavation hole, and thus, there is no effect of preventing the collapse of the empty wall by hydrostatic pressure. The steel pipe casing is pushed into the hollow wall and excavation is carried out. The steel pipe casing should be pulled out of the steel pipe casing before the concrete is placed in the excavation hole. There is a problem that the steel pipe casing is drawn together with the network structure.
이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로서, 강관 케이싱 인발시 강관 케이싱과 철근망 구조체가 쉽게 분리될 뿐만 아니라 철근망 구조체의 강성 및 강도가 개선시켜, 지지력이 향상된 현장 타설 콘크리트 말뚝을 시공할 수 있도록 한 철근망 구조체 및 이를 이용한 현장 타설 콘크리트말뚝 시공방법을 제공하는데 그 목적이 있다. Accordingly, the present invention has been made to solve the problems described above, the steel pipe casing and the reinforcing bar structure when the steel pipe casing is not only easily separated, but also improves the rigidity and strength of the reinforcing bar structure, the site has improved bearing capacity The purpose of the present invention is to provide a reinforcement network structure for constructing concrete piles and a construction method for on-site concrete piles using the same.
상기한 목적을 달성하기 위한 본 발명에 따른 철근망 구조체는 종방향으로 길게 길이가 연장되며 다수 개가 배치되는 주철근과, 상기 주철근의 외주면에 축방향으로 다수 개가 배치되는 띠철근으로 이루어지는 철근망과; 상기 철근망의 상부측 띠철근에 일측이 고정됨과 동시에 주철근에 타측이 고정되며, 가늘고 긴 선재로 이루어진 측면간격재와; 상기 철근망의 하단부 띠철근에 일정한 원주 간격으로 다수 개가 종방향으로 길게 길이가 연장되도록 다수 개가 배치됨과 하부가 원통 형상으로 이루어진 하부간격재로 구성됨을 특징으로 한다.Reinforcing bar network structure according to the present invention for achieving the above object is a reinforcing bar consisting of a reinforcing bar extending in length in the longitudinal direction and a plurality of reinforcing bars, and a band reinforcing bars are arranged in the axial direction on the outer circumferential surface of the reinforcing bar; One side is fixed to the upper side of the reinforcing bar of the reinforcing bar and the other side is fixed to the main reinforcing bar, and the side spacing member made of a long thin wire; A plurality of dogs are arranged so that the length is extended in the longitudinal direction at a constant circumferential interval in the lower band strip of the reinforcing bar and characterized in that the lower portion consisting of a lower spacer made of a cylindrical shape.
또한, 상기한 목적을 달성하기 위한 본 발명에 따른 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법은 강관 케이싱을 지중에 항타하여 삽입하는 단계; 상기 지중에 설치된 강관 케이싱의 내부를 굴토하는 단계; 상기 강관 케이싱에 삽입되는 철근망 구조체를 조립하는 단계; 상기 조립된 철근망 구조체를 크레인을 이용하여 강관 케이싱 내에 삽입하는 단계; 상기 철근망 구조체가 삽입된 강관 케이싱 내에 콘크리트를 타설하면서 강관 케이싱을 인발하는 단계를 순차적으로 시행하여 현장 타설 콘크리트 말뚝을 시공함을 특징으로 한다.In addition, on-site placing concrete pile construction method using the reinforcing bar network structure according to the present invention for achieving the above object comprises the steps of inserting the steel pipe casing in the ground; Excavating the inside of the steel pipe casing installed in the ground; Assembling a reinforcing bar structure inserted into the steel pipe casing; Inserting the assembled reinforcing steel structure into a steel pipe casing using a crane; It is characterized by constructing the site-casting concrete piles by sequentially performing the step of drawing the steel pipe casing while placing concrete in the steel pipe casing in which the reinforcing steel structure is inserted.
이상에서 설명한 바와 같이, 본 발명에 따른 철근망 구조체 및 이를 이용한 현장타설 콘크리트말뚝 시공방법은 다음과 같은 효과가 있다.As described above, the reinforcing steel network structure according to the present invention and the construction method of the cast-in-place concrete pile using the same has the following effects.
첫째, 본 발명은 주철근과 띠철근으로 이루어진 철근망 구조체를 굴착공 내에 삽입된 강관 케이싱 내측에서 강관 케이싱의 측벽과 직접 닿지않고 이격시켜 콘크리트 타설시 일정한 콘크리트의 피복두께를 유지할 수 있는 이점이 있다.First, the present invention has the advantage that it is possible to maintain a constant coating thickness of the concrete when placing the reinforcing steel bar structure consisting of cast steel and strip reinforcement is not directly in contact with the side wall of the steel pipe casing inside the steel pipe casing inserted into the excavation hole.
둘째, 본 발명은 측면간격재의 돌출부의 일측에 후크부를 형성하고, 타단부에 결합부를 형성하여, 상기 후크부를 띠철근의 주철근 위치에 설치하고, 결합부를 햄머 등으로 쳐서 주철근에 고정하기 때문에 철근망에 간격재를 용접하지 않고 부착이 가능하고, 용접 결합에 의한 강도저하를 해소할 수 있으며, 궁극적으로 강도저하가 없는 콘크리트 말뚝을 형성할 수 있다. Secondly, the present invention forms a hook portion on one side of the protrusion of the lateral spacer, and forms a coupling portion at the other end, installs the hook portion at the position of the main reinforcing bar of the band reinforcing bar, and hits the coupling portion with a hammer or the like to fix the reinforcing steel bars It is possible to attach without welding the spacer to, to reduce the strength decrease by welding, and ultimately to form a concrete pile without the strength decrease.
셋째, 본 발명은 측면간격재를 시간과 비용이 많이 드는 용접방식에서 탈피하여, 단순한 햄머 항타에 의한 결합으로 단시간에 설치할 수 있고 비용을 절감할 수 있는 장점이 있다.Third, the present invention has the advantage that it can be installed in a short time by the combination of a simple hammer drive and the cost can be avoided by removing the lateral spacers from the time and costly welding method.
넷째, 본 발명은 하부간격재의 길이를 변화시켜 철근망 구조체의 길이를 조정할 수 있고, 철근망 구조체 하부 또는 다단에 별도의 슬라임 처리장치나 프리로드 장치 등을 굴착공 바닥에 밀착시켜 설치할 수 있는 이점이 있다.Fourth, the present invention can adjust the length of the reinforcing bar structure by changing the length of the lower spacer, there is an advantage that can be installed in close contact with the bottom of the excavation hole in the bottom or multi-stage separate slime treatment device or preload device have.
이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.
도 1은 본 발명에 따른 철근망 구조체를 도시한 사시도이고, 도 2는 본 발명에 따른 철근망 구조체를 도시한 정면도이다.1 is a perspective view showing a reinforcing bar network structure according to the present invention, Figure 2 is a front view showing a reinforcing bar network structure according to the present invention.
이들 도면에 도시된 바와 같이, 본 발명에 따른 철근망 구조체(M)는 종방향으로 길게 길이가 연장되며 다수 개가 배치되는 주철근(12)과, 상기 주철근(12)의 외주면에 축방향으로 다수 개가 배치되는 띠철근(14)으로 이루어지는 철근망(10)과; 상기 철근망(10)의 상부측 띠철근(14)에 일측이 고정됨과 동시에 주철근(12)에 타측이 고정되며, 가늘고 긴 선재로 이루어진 측면간격재(20)와; 상기 철근망(10)의 하단부 띠철근(14)에 일정한 원주 간격으로 다수 개가 종방향으로 길게 길이가 연장되도록 다수 개가 배치됨과 하부가 원통 형상으로 이루어진 하부간격재(30)로 구성된다.As shown in these figures, the reinforcing bar network structure (M) according to the present invention is extended in length in the longitudinal direction and the main reinforcing bars 12 are arranged in plurality, and a plurality of axial direction in the outer peripheral surface of the main reinforcing bars 12 A reinforcing bar network 10 formed of a band reinforcing bar 14 arranged; One side is fixed to the upper side band reinforcing bar (14) of the reinforcing bar 10, and the other side is fixed to the main reinforcing bar 12, and the side gap 20 made of a long thin wire; The lower band member of the reinforcing bar 10 is arranged in a plurality of longitudinally extending in the longitudinal direction at a constant circumferential interval of the reinforcing bar 14 is composed of a plurality of lower intervals 30 made of a cylindrical shape and the lower portion.
즉, 본 발명에 따른 철근망 구조체(M)는 철근망(10)과 측면간격재(20) 및 하부간격재(30)가 유기적으로 결합되어 이루어진 구조이다That is, the reinforcing bar network structure M according to the present invention is a structure in which the reinforcing bar 10, the side spacer 20, and the lower spacer 30 are organically combined.
여기서, 상기 철근망(10)은 도 1 및 도 2에 도시된 바와 같이, 원주방향으로 일정한 간격을 두고 평행하게 다수 개가 배치된 주철근(12)과, 상기 주철근(12)의 외주면에 축방향으로 소정의 간격을 두고 다수 개가 배치되는 띠철근(14)으로 구성되어 콘크리트 말뚝의 골조가 형성된다.Here, the reinforcing bar 10 is shown in Figure 1 and 2, a plurality of the main reinforcing bars 12 are arranged in parallel at regular intervals in the circumferential direction, and in the axial direction on the outer peripheral surface of the main reinforcing bars 12 Frames of concrete piles are formed by being composed of band reinforcing bars 14 arranged in a plurality at predetermined intervals.
또한, 상기 측면간격재(20)는 도 1에 도시된 바와 같이, 철근망(10)의 외측에 설치되며 가늘고 긴 선재로, 철근망(10)의 주철근(12) 방향에 따라 철근망(10)의 외측을 향해서 돌출 형성되는 돌출부(22)와; 상기 돌출부(22)의 주철근(12) 축방향의 일단부에 철근망(10)의 띠철근(14)에 걸이식으로 고정 설치되는 후크부(24)와; 상기 돌출부(22)의 주철근(12) 축방향의 타단부에 주철근(12)에 직각방향으로 결합되는 결합부(26)로 구성되고, 상기 결합부(26)는 주철근(12)에 끼워지게 좌우 한 쌍의 고정편(27)으로 구성되며, 상기 고정편(27)에는 내주면에 일정한 피치를 갖는 쐐기(28)가 형성된 구조이다.In addition, as shown in Figure 1, the side spacer 20 is installed on the outer side of the reinforcing bar 10, a long thin wire, the reinforcing bar 10 according to the direction of the main reinforcing bars 12 of the reinforcing bar 10 A protrusion 22 protruding toward the outer side of the upper side; A hook portion 24 fixedly installed to a band reinforcing bar 14 of the reinforcing bar 10 at one end of the main reinforcing bar 12 in the axial direction of the protrusion 22; Composed part 26 is coupled to the other end in the axial direction of the main reinforcing bars 12 of the protrusion 22 in a direction perpendicular to the main reinforcing bars 12, the coupling part 26 is left and right to fit the main reinforcing bars 12 Consists of a pair of fixing pieces 27, the fixing piece 27 is a structure formed with a wedge 28 having a constant pitch on the inner peripheral surface.
이와 같은 측면간격재(20)는 주철근(12)과 띠철근(14)으로 이루어진 철근망(10)에 상기 측면간격재(20)의 돌출부(22)의 일측인 후크부(24)는 철근망(10)의 띠철근(14)에 걸어서 고정하고, 타측인 결합부(26)는 햄머 등으로 쳐서 주철근(12)에 고정하기 때문에 철근망(10)에 간격재(20)를 용접하지 않고 부착할 수 있다.This side spacer 20 is a reinforcing bar (12) of the reinforcing bar (10) consisting of the main reinforcing bars 12 and the band reinforcing bars (14) of the protrusions 22 of the side spacing (20) is a rebar network It is fixed to the reinforcing bar 14 of (10) and the coupling part 26 on the other side is fixed to the main reinforcing bar 12 by hitting with a hammer or the like, so that the spacer 20 is attached to the reinforcing bar 10 without welding. can do.
즉, 측면간격재(20)의 상부인 후크부(24)가 주철근(12)의 외주면에 배치된 교차부인 띠철근(14)에 걸어서 고정되고, 하부인 결합부(26)는 한 쌍의 고정편(27)이 주철근(12)에 끼워지게 햄머 등으로 쳐서 고정편(27)을 주철근(12)에 밀착시킨다.That is, the hook portion 24, which is the upper portion of the side spacer 20, is fixed to the band reinforcing bars 14, which are intersecting portions disposed on the outer circumferential surface of the main reinforcing rod 12, and the coupling portion 26, which is the lower portion, is fixed in a pair. The piece 27 is pressed by a hammer or the like so that the piece 27 fits in the main reinforcing bar 12, and the fixing piece 27 is brought into close contact with the main reinforcing bar 12.
여기서, 상기 고정편(27)은 그 내면에 쐐기(28)가 형성됨으로 주철근(12)을 좌우에서 견고하게 밀착 지지된다.Here, the fixing piece 27 is firmly supported by the main reinforcing bar 12 from side to side because the wedge 28 is formed on the inner surface.
이상과 같은 철근간격재(20)를 철근망 구조체(M)의 강관 케이싱(C)내 삽입 전에 철근망(10)의 외주면에 주철근(12) 및 띠철근(14)에 설치할 수 있다.The reinforcing bar 20 as described above may be installed on the main reinforcing bar 12 and the strip reinforcing bar 14 on the outer circumferential surface of the reinforcing bar 10 before insertion into the steel pipe casing C of the reinforcing bar structure M. As shown in FIG.
따라서, 굴착공(H) 내에 삽입된 강관 케이싱(C) 내측에서 강관 케이싱(C)의 측벽과 직접 닿지않고 이격된 상태로 콘크리트가 타설됨으로 일정한 콘크리트의 피복두께를 유지할 수 있다.Therefore, since the concrete is poured in spaced state without directly contacting the side wall of the steel pipe casing C inside the steel pipe casing C inserted into the excavation hole H, it is possible to maintain a constant coating thickness of the concrete.
그리고 상기 하부간격재(30)는 도 1 및 도 2에 도시된 바와 같이, 띠철근(14)의 하단부에 일정한 원주 간격으로 다수 개가 종방향으로 길게 길이가 연장되도록 다수 개가 배치되는 이음철근(32)과; 상기 이음철근(32)과 일체로 결합됨과 동시에 일정한 두께를 가지며 원통 형상으로 이루어진 블록(34)으로 구성되고, 상기 이음철근(32)은 전체적으로 이형철근으로 이루어지되, 상단부는 일정한 곡률을 갖도록 절곡 형성되는 후크부(33)로 구성되며, 상기 블록(34)에는 내외가 관통되게 다수 개의 통공(35)이 형성된 구조이다.1 and 2, the lower spacer 30 is a plurality of joints 32 are arranged so that a plurality of lengths extending in the longitudinal direction at a constant circumferential interval at the lower end of the band reinforcing bars 14 )and; The joint reinforcing bar 32 is integrally coupled with a certain thickness at the same time composed of a block 34 made of a cylindrical shape, the joint reinforcing bar 32 is made of a deformed bar as a whole, the upper end is formed to have a constant curvature Is composed of a hook portion 33, the block 34 is a structure in which a plurality of through holes 35 are formed so as to pass through.
이와 같은 하부간격재(30)는 철근망(10)의 길이가 짧을 경우에는 하부간격재의 이음철근(32)의 일측에 형성된 후크부(33)를 걸어서 용이하게 철근망(10)의 길이를 조정할 수 있을 뿐만 아니라 통공(35)을 통해 콘크리트 타설을 용이하게 하며, 나아가 별도의 슬라임 처리장치나 프리로드 장치 등을 굴착공(H) 바닥에 밀착시킬 수 있다.When the length of the reinforcing bar 10 is short, the lower gap member 30 easily adjusts the length of the reinforcing bar 10 by hooking the hook 33 formed on one side of the joint reinforcing bar 32 of the lower gap. Not only can facilitate the concrete pouring through the through hole 35, and further can be in close contact with the slime processing device or preload device to the bottom of the excavation hole (H).
또한, 철근망 구조체(M)를 강관 케이싱(C) 내에 삽입시 하부간격재(30)에 의해서 철근망 구조체(M)의 무게중심을 잡을 수 있어서, 시공이 보다 간편해 진다.In addition, when the reinforcing bar structure (M) is inserted into the steel pipe casing (C), the center of gravity of the reinforcing bar structure (M) can be grasped by the lower spacing material (30), thereby making construction easier.
이하, 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공에 대해 설명한다.Hereinafter, the site-pouring concrete pile construction using the reinforcing bar network structure according to the present invention having the configuration as described above will be described.
도 3(a) 내지 3(e)은 본 발명에 따른 철근망 구조체를 이용하여 현장 타설 콘크리트 말뚝을 시공하는 과정을 도시한 공정도이다.3 (a) to 3 (e) is a process chart showing a process of constructing a site-cast concrete pile using a reinforcing bar network structure according to the present invention.
이들 도면에 도시된 바와 같이, 본 발명에 따른 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법은 강관 케이싱(C)을 지중에 항타하여 삽입하는 단계; 상기 지중에 설치된 강관 케이싱(C)의 내부를 굴토하는 단계; 상기 강관 케이싱(C)에 삽입되는 철근망 구조체(M)를 조립하는 단계; 상기 조립된 철근망 구조체(M)를 크레인을 이용하여 강관 케이싱(C)내에 삽입하는 단계; 상기 철근망 구조체(M)가 삽입된 강관 케이싱(C)내에 콘크리트를 타설하면서 강관 케이싱(C)을 인발하는 단계를 순차적으로 시행하여 현장 타설 콘크리트 말뚝을 시공한다.As shown in these drawings, the site-pouring concrete pile construction method using the reinforcing bar network structure according to the present invention comprises the steps of inserting the steel pipe casing (C) in the ground; Excavating the inside of the steel pipe casing (C) installed in the ground; Assembling the reinforcing steel bar structure (M) inserted into the steel pipe casing (C); Inserting the assembled reinforcing bar network structure (M) into a steel pipe casing (C) using a crane; While placing concrete in the steel pipe casing (C) into which the reinforcing steel network structure (M) is inserted, the steel pipe casing (C) is sequentially carried out to construct a site-cast concrete pile.
즉, 본 발명에 따른 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법은 지반(G)에 강관 케이싱(C)을 항타하여 삽입하고, 상기 강관 케이싱(C)의 내부의 토사를 굴착한 후, 철근망 구조체(M)를 조립하되,That is, in the site-pouring concrete pile construction method using the reinforcing bar network structure according to the present invention is inserted into the ground (G) by driving the steel pipe casing (C), after excavating the soil inside the steel pipe casing (C), Assemble the network structure (M),
상기 철근망 구조체(M)는 종방향으로 길게 길이가 연장되며 다수 개가 배치되는 주철근(12)과, 상기 주철근(12)의 외주면에 축방향으로 다수 개가 배치되는 띠철근(14)으로 이루어지는 철근망(10)과; 상기 철근망(10)의 상부측 띠철근(14)에 일측이 고정됨과 동시에 주철근(12)에 타측이 고정되며, 가늘고 긴 선재로 이루어진 측면간격재(20)와; 상기 철근망(10)의 하단부 띠철근(14)에 일정한 원주 간격으로 다수 개가 종방향으로 길게 길이가 연장되도록 다수 개가 배치됨과 하부가 원통 형상으로 이루어진 하부간격재(30)로 구성되고, 상기 측면간격재(20)는 철근망(10)의 외측에 설치되며 가늘고 긴 선재로, 철근망(10)의 주철근(12) 방향에 따라 철근망(10)의 외측을 향해서 돌출 형성되는 돌출부(22)와; 상기 돌출부(22)의 주철근(12) 축방향의 일단부에 철근망(10)의 띠철근(14)에 후크식으로 고정 설치되는 후크부(24)와; 상기 돌출부(22)의 주철근(12) 축방향의 타단부에 주철근(12)에 직각방향으로 결합되는 결합부(26)로 구성되며, 상기 결합부(26)는 주철근(12)에 끼워지게 좌우 한 쌍의 고정편(27)으로 구성되는 한편 상기 고정편(27)에는 내주면에 일정한 피치를 갖는 쐐기(28)가 형성되고, 상기 하부간격재(30)는 띠철근(14)의 하단부에 일정한 원주 간격으로 다수 개가 종방향으로 길게 길이가 연장되도록 다수 개가 배치되는 이음철근(32)과; 상기 이음철근(32)과 일체로 결합됨과 동시에 일정한 두께를 가지며 원통 형상으로 이루어진 블록(34)으로 구성되며, 상기 이음철근(32)은 전체적으로 이형철근으로 이루어지되, 상단부는 일정한 곡률을 갖도록 절곡 형성되는 후크부(33)로 구성되며, 상기 블록(34)에는 내외가 관통되게 다수 개의 통공(35)이 형성되며, The reinforcing bar network structure (M) is a reinforcing bar consisting of a main reinforcing bar 12, the length of which is extended in the longitudinal direction and is arranged a plurality, and a band reinforcing bar 14 is arranged in the axial direction on the outer peripheral surface of the main reinforcing bars 12 10; One side is fixed to the upper side band reinforcing bar (14) of the reinforcing bar 10, and the other side is fixed to the main reinforcing bar 12, and the side gap 20 made of a long thin wire; The lower portion of the reinforcing bar 10 of the reinforcing bar 14 is arranged in a plurality of longitudinally extending in the longitudinal direction at a constant circumferential interval is arranged a plurality of dogs and the lower portion consisting of a lower spacer 30 made of a cylindrical shape, the side Spacer 20 is installed on the outer side of the reinforcing bar 10 and is a long thin wire, protruding portion 22 is formed to protrude toward the outside of the reinforcing bar 10 in accordance with the direction of the main reinforcing bar 12 of the reinforcing bar 10 Wow; A hook part (24) fixed to the band reinforcing bar (14) of the reinforcing bar (10) at one end in the axial direction of the main reinforcing bar (12) of the protrusion (22); Composed part 26 is coupled to the other end in the axial direction of the main reinforcing bars 12 of the protrusion 22 in a direction perpendicular to the main reinforcing bars 12, the coupling part 26 is left and right to fit the main reinforcing bars 12 Consisting of a pair of fixing pieces 27, the fixing piece 27 is formed with a wedge 28 having a constant pitch on the inner peripheral surface, the lower spacer 30 is fixed to the lower end of the band reinforcement 14 A plurality of joint reinforcing bars 32 disposed so that a plurality of longitudinally extending lengths thereof are circumferentially spaced; The joint reinforcing bar 32 is integrally combined with a certain thickness and is composed of a block 34 made of a cylindrical shape, the joint reinforcing bar 32 is made of a deformed bar as a whole, the upper end is formed to have a constant curvature Is composed of a hook portion 33, the block 34 is formed with a plurality of through holes 35 so that the inside and outside through,
이와 같이 형성된 철근망 구조체(M)를 조립하여 상기 강관 케이싱(C) 내의 굴착공(H)에 삽입한 후, 상기 철근망 구조체(M)에 콘크리트를 타설하면서 강관 케이싱(C)을 인발하면 하부에 해당되는 콘크리트는 양생되고, 상부는 미경화 콘크리트상태로 되며, 강관 케이싱(C)이 완전히 굴착공(H)으로부터 인발되면 미경화 콘크리트도 양생되어, 지중에 현장 타설 콘크리트 말뚝이 형성된다.Assembling the reinforcing steel bar structure (M) formed as described above and inserted into the excavation hole (H) in the steel pipe casing (C), and when drawing the steel pipe casing (C) while placing concrete in the reinforcing steel bar structure (M) lower Corresponding concrete is cured, the upper portion is in the uncured concrete state, when the steel pipe casing (C) is completely drawn from the excavation hole (H), the uncured concrete is also cured, the site-cast concrete pile is formed in the ground.
상기한 바와 같은 구성 및 시공으로 이루어진 본 발명에 따른 철근망 구조체 를 이용한 현장 타설 콘크리트 말뚝 시공방법은 철근망(10)과 측면간격재(20) 및 하부간격재(30)으로 이루어진 철근망 구조체)M)를 굴착공(H) 내에 삽입된 강관 케이싱(C) 내측에 삽입됨으로써 강관 케이싱(C)의 측벽과 철근망 구조체(M)가 직접 닿지않고 이격시킨 상태가 유지되어 콘크리트 타설시 일정한 콘크리트의 피복두께를 유지할 수 있다.Reinforced concrete pile construction method using the reinforcing steel network structure according to the present invention made of the configuration and construction as described above, the reinforcing steel network structure consisting of the reinforcing bar 10, the side spacer 20 and the lower spacer 30) M) is inserted into the steel pipe casing (C) inserted into the excavation hole (H), so that the side wall of the steel pipe casing (C) and the reinforcing bar structure (M) are kept in direct contact with each other. The coating thickness can be maintained.
또한, 상기 철근망 구조체(M) 조립시 측면간격재(20)의 돌출부(22)의 일측에 후크부(24)가 형성되고, 타단부에 결합부(26)가 형성된 상태에서 상기 후크부(24)를 주철근(12)이 위치된 띠철근(14)에 설치하고, 결합부(26)를 햄머 등으로 쳐서 주철근(12)에 고정하기 때문에 철근망(10)에 측면간격재(20)를 용접하지 않고 부착이 가능하고, 용접 결합에 의한 강도저하를 해소할 수 있으며, 궁극적으로 강도저하가 없는 콘크리트 말뚝을 형성할 수 있다. In addition, when assembling the reinforcing bar network structure (M), the hook portion 24 is formed on one side of the protruding portion 22 of the lateral spacer 20, and the hook portion (2) is formed at the other end thereof. 24 is installed on the band reinforcing bar 14 in which the main reinforcing bars 12 are positioned, and the side spacer 20 is attached to the reinforcing bar 10 because the coupling unit 26 is fixed to the main reinforcing bars 12 by hammering or the like. It can be attached without welding, can reduce the strength reduction by welding, and ultimately can form a concrete pile without strength reduction.
그리고, 하부간격재(30)의 길이를 변화시켜 철근망(10)의 길이를 조정할 수 있다. In addition, the length of the rebar network 10 may be adjusted by changing the length of the lower spacer 30.
도 1은 본 발명에 따른 철근망 구조체를 도시한 사시도,1 is a perspective view showing a reinforcing bar network structure according to the present invention,
도 2는 본 발명에 따른 철근망 구조체를 도시한 정면도,2 is a front view showing a reinforcing bar network structure according to the present invention,
도 3(a) 내지 3(e)은 본 발명에 따른 철근망 구조체를 이용하여 현장 타설 콘크리트 말뚝을 시공하는 과정을 도시한 공정도.3 (a) to 3 (e) is a process chart showing a process of constructing a site-cast concrete pile using the reinforcing bar network structure according to the present invention.
-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing
10: 철근망 12: 주철근10: rebar network 12: cast bar
14: 띠철근 20: 측면간격재14: strip rebar 20: side spacers
22: 돌출부 24: 후크부22: protrusion 24: hook
26: 결합부 27: 고정편26: engaging portion 27: fixing piece
28: 쐐기 30: 하부간격재28: wedge 30: lower spacer
32: 이음철근 33: 후크부32: reinforcing bar 33: hook portion
34: 블록 35: 통공34: Block 35: through hole
C: 강관 케이싱 G: 지반C: steel pipe casing G: ground
H: 굴착공 M: 철근망 구조체H: Excavator M: Reinforcing bar structure

Claims (15)

  1. 종방향으로 길게 길이가 연장되며 다수 개가 배치되는 주철근(12)과, 상기 주철근(12)의 외주면에 축방향으로 다수 개가 배치되는 띠철근(14)으로 이루어지는 철근망(10)과; 상기 철근망(10)의 상부측 띠철근(14)에 일측이 고정됨과 동시에 주철근(12)에 타측이 고정되며, 가늘고 긴 선재로 이루어진 측면간격재(20)와; A reinforcing bar 10 made of a main reinforcing bar 12 extending in length in a longitudinal direction and arranged in a plurality of bands, and a band reinforcing bar 14 arranged in a axial direction on an outer circumferential surface of the main reinforcing bar 12; One side is fixed to the upper side band reinforcing bar (14) of the reinforcing bar 10, and the other side is fixed to the main reinforcing bar 12, and the side gap 20 made of a long thin wire;
    상기 철근망(10)의 하단부 띠철근(14)에 일정한 원주 간격으로 다수 개가 종방향으로 길게 길이가 연장되도록 다수 개가 배치됨과 하부가 원통 형상으로 이루어진 하부간격재(30)로 구성됨을 특징으로 하는 철근망 구조체. A plurality of dogs are arranged in the lower end band reinforcing bar 14 of the reinforcing bar 10 at a constant circumferential interval in the longitudinal direction, and a plurality of dogs are arranged in the lower portion, characterized in that the lower portion consisting of a lower gap 30 made of a cylindrical shape. Rebar network structure.
  2. 제 1항에 있어서,The method of claim 1,
    상기 측면간격재(20)는 철근망(10)의 외측에 설치되며 가늘고 긴 선재로, 철근망(10)의 주철근(12) 방향에 따라 철근망(10)의 외측을 향해서 돌출 형성되는 돌출부(22)와; 상기 돌출부(22)의 주철근(12) 축방향의 일단부에 철근망(10)의 띠철근(14)에 후크식으로 고정 설치되는 후크부(24)와; 상기 돌출부(22)의 주철근(12) 축방향의 타단부에 주철근(12)에 직각방향으로 결합되는 결합부(26)로 구성됨을 특징으로 하는 철근망 구조체.The lateral spacing 20 is installed on the outside of the reinforcing bar 10 and a long thin wire, protruding portion protruding toward the outside of the reinforcing bar 10 according to the direction of the main reinforcing bar 12 of the reinforcing bar 10 ( 22); A hook part (24) fixed to the band reinforcing bar (14) of the reinforcing bar (10) at one end in the axial direction of the main reinforcing bar (12) of the protrusion (22); Reinforcing bar network structure, characterized in that it consists of a coupling portion (26) coupled to the other end of the main reinforcement (12) in the axial direction of the protrusion (22) at right angles.
  3. 제 2항에 있어서,The method of claim 2,
    상기 결합부(26)는 주철근(12)에 끼워지게 좌우 한 쌍의 고정편(27)으로 구 성됨을 특징으로 하는 철근망 구조체.The coupling part 26 is a rebar network structure, characterized in that composed of a pair of left and right fixing pieces (27) to be fitted to the main reinforcing bars (12).
  4. 제 3항에 있어서,The method of claim 3, wherein
    상기 고정편(27)에는 내주면에 일정한 피치를 갖는 쐐기(28)가 형성됨을 특징으로 하는 철근망 구조체.Reinforcing bar network structure, characterized in that the fixing piece (27) is formed with a wedge (28) having a constant pitch on the inner peripheral surface.
  5. 제 1항에 있어서,The method of claim 1,
    상기 하부간격재(30)는 띠철근(14)의 하단부에 일정한 원주 간격으로 다수 개가 종방향으로 길게 길이가 연장되도록 다수 개가 배치되는 이음철근(32)과; 상기 이음철근(32)과 일체로 결합됨과 동시에 일정한 두께를 가지며 원통 형상으로 이루어진 블록(34)으로 구성됨을 특징으로 하는 철근망 구조체.The lower spacer 30 includes a plurality of joint reinforcing bars 32 arranged at a lower end portion of the band reinforcing bar 14 so that a plurality of lengths thereof extend in the longitudinal direction at regular circumferential intervals; Reinforcing bar network structure, characterized in that consisting of a block 34 made of a cylindrical shape coupled to the joint at the same time and integrally with the reinforcing bar (32).
  6. 제 5항에 있어서,The method of claim 5,
    상기 이음철근(32)은 전체적으로 이형철근으로 이루어지되, 상단부는 일정한 곡률을 갖도록 절곡 형성되는 후크부(33)로 구성됨을 특징으로 하는 철근망 구조체.The joint reinforcing bar 32 is made of a deformed bar as a whole, the upper end is a reinforcing bar network structure, characterized in that consisting of a hook portion 33 is formed to have a certain curvature.
  7. 제 5항에 있어서,The method of claim 5,
    상기 블록(34)에는 내외가 관통되게 다수 개의 통공(35)이 형성됨을 특징으로 하는 철근망 구조체.Reinforcing bar network structure, characterized in that the block 34 is formed with a plurality of through holes 35 so as to pass through.
  8. 강관 케이싱(C)을 지중에 항타하여 삽입하는 단계;Inserting the steel pipe casing C into the ground;
    상기 지중에 설치된 강관 케이싱(C)의 내부를 굴토하는 단계;Excavating the inside of the steel pipe casing (C) installed in the ground;
    상기 강관 케이싱(C)에 삽입되는 철근망 구조체(M)를 조립하는 단계;Assembling the reinforcing steel bar structure (M) inserted into the steel pipe casing (C);
    상기 조립된 철근망 구조체(M)를 크레인을 이용하여 강관 케이싱(C)내에 삽입하는 단계;Inserting the assembled reinforcing bar network structure (M) into a steel pipe casing (C) using a crane;
    상기 철근망 구조체(M)가 삽입된 강관 케이싱(C)내에 콘크리트를 타설하면서 강관 케이싱(C)을 인발하는 단계를 순차적으로 시행하여 현장 타설 콘크리트 말뚝을 시공함을 특징으로 하는 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법.Using the reinforcing steel network structure characterized in that the construction of the cast-in-place concrete pile by sequentially performing the step of drawing the steel pipe casing (C) while placing concrete in the steel pipe casing (C) into which the reinforcing steel network structure (M) is inserted Site-cast concrete pile construction method.
  9. 제 8항에 있어서,The method of claim 8,
    상기 철근망 구조체(M)는 종방향으로 길게 길이가 연장되며 다수 개가 배치되는 주철근(12)과, 상기 주철근(12)의 외주면에 축방향으로 다수 개가 배치되는 띠철근(14)으로 이루어지는 철근망(10)과; 상기 철근망(10)의 상부측 띠철근(14)에 일측이 고정됨과 동시에 주철근(12)에 타측이 고정되며, 가늘고 긴 선재로 이루어진 측면간격재(20)와; 상기 철근망(10)의 하단부 띠철근(14)에 일정한 원주 간격으로 다수 개가 종방향으로 길게 길이가 연장되도록 다수 개가 배치됨과 하부가 원통 형상으로 이루어진 하부간격재(30)로 구성됨을 특징으로 하는 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법. The reinforcing bar network structure (M) is a reinforcing bar consisting of a main reinforcing bar 12, the length of which is extended in the longitudinal direction and is arranged a plurality, and a band reinforcing bar 14 is arranged in the axial direction on the outer peripheral surface of the main reinforcing bars 12 10; One side is fixed to the upper side band reinforcing bar (14) of the reinforcing bar 10, and the other side is fixed to the main reinforcing bar 12, and the side gap 20 made of a long thin wire; A plurality of dogs are arranged in the lower end band reinforcing bar 14 of the reinforcing bar 10 at a constant circumferential interval in the longitudinal direction, and a plurality of dogs are arranged in the lower portion, characterized in that the lower portion consisting of a lower gap 30 made of a cylindrical shape. Construction method of cast-in-place concrete pile using reinforcing bar structure.
  10. 제 1항에 있어서,The method of claim 1,
    상기 측면간격재(20)는 철근망(10)의 외측에 설치되며 가늘고 긴 선재로, 철근망(10)의 주철근(12) 방향에 따라 철근망(10)의 외측을 향해서 돌출 형성되는 돌출부(22)와; 상기 돌출부(22)의 주철근(12) 축방향의 일단부에 철근망(10)의 띠철근(14)에 후크식으로 고정 설치되는 후크부(24)와; 상기 돌출부(22)의 주철근(12) 축방향의 타단부에 주철근(12)에 직각방향으로 결합되는 결합부(26)로 구성됨을 특징으로 하는 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법.The lateral spacing 20 is installed on the outside of the reinforcing bar 10 and a long thin wire, protruding portion protruding toward the outside of the reinforcing bar 10 according to the direction of the main reinforcing bar 12 of the reinforcing bar 10 ( 22); A hook part (24) fixed to the band reinforcing bar (14) of the reinforcing bar (10) at one end in the axial direction of the main reinforcing bar (12) of the protrusion (22); Cast-in-place concrete pile construction method using a reinforcing bar network structure, characterized in that it consists of a coupling part 26 coupled to the main reinforcing bars 12 at right angles to the other end of the main reinforcing bar 12 axial direction of the protrusion (22).
  11. 제 10항에 있어서,The method of claim 10,
    상기 결합부(26)는 주철근(12)에 끼워지게 좌우 한 쌍의 고정편(27)으로 구성됨을 특징으로 하는 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법.The coupling part 26 is a site-cast concrete pile construction method using a reinforcing bar network structure, characterized in that composed of a pair of left and right fixing pieces 27 to be fitted to the main reinforcing bars (12).
  12. 제 11항에 있어서,The method of claim 11,
    상기 고정편(27)에는 내주면에 일정한 피치를 갖는 쐐기(28)가 형성됨을 특징으로 하는 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법.The fixed piece 27 is a cast-in-place concrete pile construction method using a reinforcing bar network structure, characterized in that the wedge 28 having a predetermined pitch on the inner peripheral surface is formed.
  13. 제 10항에 있어서,The method of claim 10,
    상기 하부간격재(30)는 띠철근(14)의 하단부에 일정한 원주 간격으로 다수 개가 종방향으로 길게 길이가 연장되도록 다수 개가 배치되는 이음철근(32)과; 상 기 이음철근(32)과 일체로 결합됨과 동시에 일정한 두께를 가지며 원통 형상으로 이루어진 블록(34)으로 구성됨을 특징으로 하는 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법.The lower spacer 30 includes a plurality of joint reinforcing bars 32 arranged at a lower end portion of the band reinforcing bar 14 so that a plurality of lengths thereof extend in the longitudinal direction at regular circumferential intervals; The site-cast concrete pile construction method using a reinforcing bar network structure, characterized in that it is combined with the joint reinforcement 32 and at the same time having a certain thickness and consisting of a block 34 made of a cylindrical shape.
  14. 제 13항에 있어서,The method of claim 13,
    상기 이음철근(32)은 전체적으로 이형철근으로 이루어지되, 상단부는 일정한 곡률을 갖도록 절곡 형성되는 후크부(33)로 구성됨을 특징으로 하는 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법.The joint reinforcement 32 is made of a deformed reinforcement as a whole, the upper end portion of the construction site cast concrete pile construction method using a reinforcing bar network structure, characterized in that consisting of a hook portion 33 is formed to have a certain curvature.
  15. 제 13항에 있어서,The method of claim 13,
    상기 블록(34)에는 내외가 관통되게 다수 개의 통공(35)이 형성됨을 특징으로 하는 철근망 구조체를 이용한 현장 타설 콘크리트 말뚝 시공방법.The block 34 is a cast-in-place concrete pile construction method using a reinforcing bar network structure, characterized in that a plurality of through-holes 35 are formed to pass through the inside and outside.
KR1020080025245A 2008-03-19 2008-03-19 Cast in place concrete pile construction technique for which a reinforcing rod net structure and this were used KR20090099937A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080025245A KR20090099937A (en) 2008-03-19 2008-03-19 Cast in place concrete pile construction technique for which a reinforcing rod net structure and this were used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080025245A KR20090099937A (en) 2008-03-19 2008-03-19 Cast in place concrete pile construction technique for which a reinforcing rod net structure and this were used

Publications (1)

Publication Number Publication Date
KR20090099937A true KR20090099937A (en) 2009-09-23

Family

ID=41358377

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080025245A KR20090099937A (en) 2008-03-19 2008-03-19 Cast in place concrete pile construction technique for which a reinforcing rod net structure and this were used

Country Status (1)

Country Link
KR (1) KR20090099937A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101119829B1 (en) * 2011-01-31 2012-03-09 (주)리치이엔씨 Method for cast-in-place pile construction using punctured couplers
KR101314080B1 (en) * 2011-12-27 2013-10-04 (주)하경엔지니어링 Constructing method of cast-in-place concrete pile using mold case tremi
KR101349297B1 (en) * 2012-03-08 2014-01-13 (주)한맥기술 Concrete Strengthening Steel Tube Pile and Manufacturing Method thereof
KR101664368B1 (en) 2016-04-27 2016-10-24 박을재 A cast-in place pile arrangement method for head of concrete pile exposed to outside using geo tube
KR101710363B1 (en) 2015-09-11 2017-02-27 박을재 Geo tube for Concrete Pile driven in field and the seaming method
KR101878832B1 (en) 2018-06-05 2018-07-17 대림산업 주식회사 Tremie Plate Having a Crane Function of Reinforcing Bar and Verticality Maintaining Method for Reinforcing Bar of the Reinforced Concrete Pile Using the Same
KR101965703B1 (en) 2018-08-31 2019-04-04 박재홍 Concrete pile driven in field using geo tube and construction method thereof
KR101951684B1 (en) * 2018-12-27 2019-05-21 에스오씨기술지주 주식회사 Expandable cast-in-place pile construction method
CN110243429A (en) * 2019-07-25 2019-09-17 张含明 A method of for installing hydrological observation water gauge
KR102065448B1 (en) 2019-08-30 2020-01-13 박정기 Cast-in-place concrete pile using concrete precast block pipe and Construction method of concrete pile there of
KR102123543B1 (en) * 2019-11-20 2020-06-16 (주)에스앤피이엔씨 Top-down method using center post pile
KR102123542B1 (en) * 2019-08-26 2020-06-16 (주)에스앤피이엔씨 Construction method of cast-in-placed-pile using steel rebar banding
KR102230953B1 (en) * 2019-10-24 2021-03-24 현대건설주식회사 Cast in place concrete pile using styrofoam

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101119829B1 (en) * 2011-01-31 2012-03-09 (주)리치이엔씨 Method for cast-in-place pile construction using punctured couplers
KR101314080B1 (en) * 2011-12-27 2013-10-04 (주)하경엔지니어링 Constructing method of cast-in-place concrete pile using mold case tremi
KR101349297B1 (en) * 2012-03-08 2014-01-13 (주)한맥기술 Concrete Strengthening Steel Tube Pile and Manufacturing Method thereof
KR101710363B1 (en) 2015-09-11 2017-02-27 박을재 Geo tube for Concrete Pile driven in field and the seaming method
KR101664368B1 (en) 2016-04-27 2016-10-24 박을재 A cast-in place pile arrangement method for head of concrete pile exposed to outside using geo tube
KR101878832B1 (en) 2018-06-05 2018-07-17 대림산업 주식회사 Tremie Plate Having a Crane Function of Reinforcing Bar and Verticality Maintaining Method for Reinforcing Bar of the Reinforced Concrete Pile Using the Same
KR101965703B1 (en) 2018-08-31 2019-04-04 박재홍 Concrete pile driven in field using geo tube and construction method thereof
KR101951684B1 (en) * 2018-12-27 2019-05-21 에스오씨기술지주 주식회사 Expandable cast-in-place pile construction method
CN110243429A (en) * 2019-07-25 2019-09-17 张含明 A method of for installing hydrological observation water gauge
KR102123542B1 (en) * 2019-08-26 2020-06-16 (주)에스앤피이엔씨 Construction method of cast-in-placed-pile using steel rebar banding
KR102065448B1 (en) 2019-08-30 2020-01-13 박정기 Cast-in-place concrete pile using concrete precast block pipe and Construction method of concrete pile there of
KR102230953B1 (en) * 2019-10-24 2021-03-24 현대건설주식회사 Cast in place concrete pile using styrofoam
KR102123543B1 (en) * 2019-11-20 2020-06-16 (주)에스앤피이엔씨 Top-down method using center post pile

Similar Documents

Publication Publication Date Title
KR101302743B1 (en) Phc pile and its using the same soil cement wall construction methode
KR100866162B1 (en) Chair-type self-supported earth retaining wall constructing method
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
KR100951097B1 (en) Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket
US3431736A (en) Method of constructing underground concrete walls
KR100884289B1 (en) Composite type steel temporary construction and construction method thereof
JP3180817U (en) Building structure without formwork removal
KR100851356B1 (en) Retaining wall structure and construnction method of the retaining wall structure
KR100913569B1 (en) Phc pile for retaining wall
KR100756680B1 (en) Wall using precast concrete building material and construction method therefor
KR100782007B1 (en) Construction method of a earth-protection walls
US10000903B1 (en) Casing assembly for forming CIP retaining wall and method for forming CIP retaining walls using the casing assembly
JP4079975B2 (en) Retaining wall construction method
KR20170005991A (en) soil retaining wall using PHC pile and its construction method
JP2005120663A (en) Structure of earth retaining wall
JP6762800B2 (en) Reinforcement method and structure of existing pile foundation
JP2007126846A (en) Reinforcing cage, construction method for cast-in-place concrete pile, and cast-in-place concrete pile
JP5033068B2 (en) Pile head treatment method in cast-in-place concrete pile method
KR101176592B1 (en) Earth retaining wall structure constructing method using prestressed tendon
KR100910576B1 (en) Embed anchor and construction method of composite basement wall using the same
JP2005264446A (en) Method of joining cast-in place pile and steel pipe column
KR100618597B1 (en) Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
JP2012037161A (en) Method of executing heat gathering piping
JP4623574B2 (en) How to build a pile
JP6539566B2 (en) Construction method of cast-in-place concrete pile

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application