KR20070004162A - Project management information system - Google Patents

Project management information system Download PDF

Info

Publication number
KR20070004162A
KR20070004162A KR1020050059527A KR20050059527A KR20070004162A KR 20070004162 A KR20070004162 A KR 20070004162A KR 1020050059527 A KR1020050059527 A KR 1020050059527A KR 20050059527 A KR20050059527 A KR 20050059527A KR 20070004162 A KR20070004162 A KR 20070004162A
Authority
KR
South Korea
Prior art keywords
work
construction
contract
statement
management
Prior art date
Application number
KR1020050059527A
Other languages
Korean (ko)
Inventor
심영호
Original Assignee
심영호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 심영호 filed Critical 심영호
Priority to KR1020050059527A priority Critical patent/KR20070004162A/en
Publication of KR20070004162A publication Critical patent/KR20070004162A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

A method for constructing an integrated management database of construction status information with a schedule management program is provided to offer a common language for a structure and work range of construction particulars, offer a real-time construction status, integrally manage/automate a construction management process, and offer/store process records and management registers. A hierarchical construction particular table is formed by using a WBS(Work Breakdown Structure), a visual system for a completed or constructing state of a construction object is formed, and the completed or constructing state of the construction object, and an element corresponding to a lower level of the WBS are displayed if the element is selected. If a selected object is executed, data of a corresponding range is accessed. When a part or a lower element of entire object is displayed as a lower menu, each element is arranged in enumeration or work order, or PERT(Program Evaluation and Review Technique) correlation. If the element of the lower menu is selected, the completed or constructing state of the element or the work is displayed together with the lower menu.

Description

일정관리프로그램을 이용한 건설공사현황정보의 통합관리데이터베이스 구축방법{Project Management Information System} Construction method of integrated management database of construction status information using schedule management program {Project Management Information System}

도 1은 본 발명에 따른 건설공사 통합관리시스템의 개략구성도이다. 1 is a schematic diagram of a construction integrated management system according to the present invention.

도 2는 종래의 일정관리프로그램의 사용자 인터페이스이다.2 is a user interface of a conventional schedule management program.

도 3a은 종래의 시공현황파악을 위한 현장업무수행 프로세스 흐름도이다.Figure 3a is a flow chart of the field work performance for the conventional construction status grasping.

도 3b는 종래의 도급계약 및 공사비관리의 현장업무수행 프로세스 흐름도이다.Figure 3b is a flow chart of the field service performance of the conventional contract and construction cost management.

도 3c는 종래의 실행예산 및 실투입비관리의 현장업무수행 프로세스 흐름도이다.Figure 3c is a flow chart of the field work performance of the conventional execution budget and actual input cost management.

도 3d는 종래의 하도급계약관리의 현장업무수행 프로세스 흐름도이다Figure 3d is a flow chart of the field work performance of the conventional subcontract management

도 3e는 종래의 자재관리의 현장업무수행 프로세스 흐름도이다.Figure 3e is a flow chart of the field work performance of the conventional material management.

도 3f는 종래의 노무관리의 현장업무수행 프로세스 흐름도이다.Figure 3f is a flow chart of the field work performance of the conventional labor management.

도 3g는 종래의 중기관리의 현장업무수행 프로세스 흐름도이다.Figure 3g is a flow chart of the field service performance of the conventional medium-term management.

도 3h는 종래의 현장경비집행관리의 현장업무수행 프로세스 흐름도이다.Figure 3h is a flow chart of the field service performance of the conventional field security execution management.

도 3i는 종래의 품질관리의 현장업무수행 프로세스 흐름도이다.3i is a flowchart of a field service performance process of conventional quality control.

도 3j는 종래의 안전관리의 현장업무수행 프로세스 흐름도이다.Figure 3j is a flow chart of the field work performance of the conventional safety management.

도 4는 작업분류체계의 전형적인 형태이다.4 is a typical form of a WBS.

도 5는 작업분류체계에 따른 각 작업별 공사개요를 그래픽 개체로 표시한 사용자 인터페이스의 모식도이다.5 is a schematic diagram of a user interface displaying a construction overview for each job according to the work classification system as a graphic object.

도 6은 시공현황관리모듈의 시스템 구성도이다.6 is a system configuration diagram of the construction status management module.

도 7은 도급계약관리모듈의 시스템 구성도이다.7 is a system configuration diagram of a contract management module.

도 8은 실행예산관리모듈의 시스템 구성도이다.8 is a system configuration diagram of an execution budget management module.

도 9는 하도급계약관리모듈의 시스템 구성도이다.9 is a system configuration diagram of a subcontract management module.

도 10은 자재관리모듈의 시스템 구성도이다.10 is a system configuration diagram of a material management module.

도 11은 노무관리모듈의 시스템 구성도이다.11 is a system configuration diagram of the labor management module.

도 12은 중기관리모듈의 시스템 구성도이다.12 is a system configuration diagram of the medium-term management module.

도 13은 현장경비관리모듈의 시스템 구성도이다.13 is a system configuration diagram of the site security management module.

도 14은 품질관리모듈의 시스템 구성도이다.14 is a system configuration diagram of the quality control module.

도 15은 안전관리모듈의 시스템 구성도이다.15 is a system configuration diagram of the safety management module.

본문에 기술한 용어의 정의Definition of terms described in the text

1. 관리분야 : 건설공사관리를 위한 관리자의 임무별 특성을 지칭하며 도급계약(계약 공사비)관리, 실행예산(실투입공사비)관리, 하도급계약(하도급 공사비)관리, 자재관리, 노무관리, 중기관리, 품질관리, 안전관리 등으로 구분한다.1. Management field: Refers to the characteristics of managers for the management of construction work, subcontract contract (contract cost) management, execution budget (actual input cost) management, subcontract contract (subcontract construction cost) management, material management, labor management, mid-term It is divided into management, quality control and safety management.

2. 일정관리(Schedule) : 건설분야에서는 공정으로 표현되며 작업(Activity)의 시작, 종료, 작업기간, 작업간 연결관계 등을 의미하며 일정관리(=공정관리)란 각 작업의 일정을 계획하고 실적을 업데이트하는 업무2. Schedule: In the construction field, it is expressed as a process. It means the start of work, the end, the work period, the connection between work, and the schedule management (= process management) is to schedule each work. Update your performance

3. 공사내역서 : 당해 공사의 공사목적물 또는 목적물을 시공하기 위한 재료와 작업명 등으로 구성한 공사비 명세서이며 산출내역서라고도 함3. Construction Statement: Construction cost statement composed of materials and work names for constructing the construction object or object of the relevant construction, also called the statement of calculation.

4. 작업분류체계 : WBS(Work Breakdown Structure)라고도 하며 건설공사의 경우 시설의 범위 및 구성요소, 임무 또는 작업(Activity)의 묶음들을 계층적 구조(Hierarchical Structure)로 표기한 가계계보(Family Tree) 형식의 챠트4. Work Breakdown Structure: Also known as WBS (Work Breakdown Structure). In construction, the Family Tree is a hierarchical structure that describes the scope and components of a facility, and the bundles of tasks or activities. Form chart

5. 작업분류체계의 레벨 : 작업분류체계의 계층적 구조에서 각 계층을 레벨로 표현5. Level of work breakdown structure: Representation of each hierarchy in level in hierarchical structure of work breakdown structure

6. 기성 : 건설공사 진척도에 따라 공정 또는 공정율을 산출하여 현재 시공된 부분 또는 물량6. Ready-made: The part or quantity currently constructed by calculating the process or process rate according to the construction progress

7. 기성고 : 기성부분에 대한 대가를 산정하기 위하여 산출된 기성내역서7. A ready-made notice: A ready-made statement calculated to calculate the cost for a ready-made part.

8. 작업(Activity) : 공사목적물을 건설하기 위한 일련의 과정 또는 임무 8. Activity: A series of processes or tasks for constructing a construction object

9. 공종(Commodity) : 공사의 내역을 구성하는 주요한 공사 종목. 예> 토공, 콘크리트공9. Commodity: Major construction items that make up the details of the construction. Example> Earthwork, Concrete Work

10. 도급계약 : 사업시행자(공사발주자)와 시공계약자(건설회사)간에 체결한 계약10. Contract contract: Contract signed between the project operator (contractor) and the construction contractor (construction company)

11. 하도급계약 : 사업원도급계약자가 공사의 일부분을 하도급하기위한 계약11. Subcontracting contract: Contract for subcontracting by subcontractors

12. EVM : 북미주(U.S.A.)에서의 건설공사 공정/공사비의 계획 대비 실적의 분석기법12. EVM: Analytical Method of Performance vs. Plan of Construction Process / Cost in North America (U.S.A.)

13. 지급자재 : 본 공사의 시설물을 구성하는 자재로서 사업시행자가 지급하는 자재13. Material for payment: Material that constitutes the facilities of the Corporation and materials paid by the project operator.

14. 사급자재 : 본 공사의 시설물을 구성하는 자재로서 시공계약자가 구매하는 자재14. Subsidiary Materials: Materials that make up the facilities of this construction, purchased by construction contractors.

15. 가시설재 : 작업을 위하여 임시로 설치하고 작업완료후 철거, 재사용하는 자재15. Provisional materials: Materials that are temporarily installed for work and removed and reused after work is completed.

건설공사를 수행하는데 있어 핵심적인 업무들은 각 작업들의 일정관리와 품질/안전관리 외에도 도급공사비/하도급공사비/직영공사비 등의 청구ㆍ수령ㆍ지급에 따른 회계관리, 자재/노무/중기 등의 투입자원에 대한 계약ㆍ사용기록ㆍ비용지급에 따른 회계관리, 도급 및 하도급계약의 계약변경관리 등의 업무가 수행되어야 한다. The core tasks in carrying out construction work include not only schedule management and quality / safety management of each operation, but also input resources such as accounting management according to billing, receipt, and payment of subcontracting, subcontracting, and direct construction costs, and materials, labor, and medium-term. Accounting management, contract change management of subcontracting and subcontracting, etc. shall be carried out in accordance with contract, record of use and payment of expenses.

각 분야별 관리업무들은 고유의 업무영역을 갖고 있지만, 공사 목적물을 시공하는 단계별 작업들이 계획되고 실행되는 과정으로부터 그 업무가 생성되어지므로 작업의 진척도는 공사관리의 중심에 있게 되는 것이다. 공사착수 전에 전체공사의 일정관리계획을 수립하여 공사를 관리하는 주된 이유다.The management tasks of each field have their own work areas, but the work progress is at the center of construction management because the work is generated from the process of planning and executing the construction work for each stage of construction. This is the main reason for managing the construction by establishing a schedule management plan for the entire construction before commencement of construction.

일반적으로 건설공사의 일정관리란, 건설공사계약을 위한 공사내역을 실제 시행할 작업(Activity)들로 분류, 정의하고 그 정의된 작업들이 주어진 기간 내에 주어진 목표를 달성할 수 있도록 관리하는 기법으로서 PERT/CPM기법의 일정관리를 지칭하며 이러한 일정관리를 쉽게 할 수 있도록 지원해주는 상용패키지가 많이 개발, 보급되고 있는 추세이다. In general, the schedule management of a construction project is a technique that classifies and defines the construction details for the construction contract as activities to be actually implemented, and manages the defined tasks to achieve a given goal within a given period of time. It refers to the schedule management of / CPM technique, and a lot of commercial packages that support such schedule management are being developed and spread.

대부분의 건설공사 일정관리시스템들은 건설공사 구성작업들의 일정정보, 각 작업들 간의 관계정보 및 공사수행을 위해 계획된 자원의 수량에 관한 정보 등만 관리함으로서 특정 작업의 소요자원 또는 작업의 진행현황을 파악하고 일정조정 등을 가능하게 하지만 공사 진행 도중 발생하는 품질ㆍ안전관리업무의 계획 및 실적, 공사기성을 포함한 회계업무의 관련대장(Log) 생성 및 저장, 자재ㆍ인력ㆍ건설기계 등의 관리문서 등을 생성, 관리하는 기능은 포함되어있지 않다.Most construction schedule management systems only manage the schedule information of construction work, the relationship information between each work, and the information on the quantity of resources planned for the construction work. Plan and results of quality and safety management work, log generation and storage of accounting work including construction work, management documents such as materials, personnel, construction machinery, etc. The ability to create and manage them is not included.

첨부한 도 2.는 현재 사용 중인 대부분의 일정관리프로그램이 갖고 있는 그래픽 사용자 인터페이스이다.Attached Figure 2 is a graphical user interface of most calendar programs currently in use.

이러한 일정관리프로그램의 최대 취약점은 각 작업(Activity)들의 명칭과 그 작업들이 갖는 과업의 범위에 대해 공사 참여자들로 하여금 공통된 인식을 갖도록 하는 것이 어렵다는 것이다.The main weakness of such a schedule program is that it is difficult for the construction participants to have a common awareness of the names of the activities and the scope of their tasks.

일정관리프로그램의 사용이 능숙한 사용자라도 해당 건설공사의 작업분류체계(Work Breakdown Structure) 구성기준과 작업(Activity)의 명칭, 그리고 각각의 작업들이 갖는 과업범위에 대해 충분한 이해(공통된 인식)가 없으면 공사현황의 파악이 쉽지 않다. Even users skilled in the use of schedule management programs do not have sufficient understanding (common perception) of the work breakdown structure, the name of the activity, and the scope of work of each work. It is not easy to grasp the status

즉, 당해공사의 내역을 일정프로그램에 입력할 수 있도록 분류체계를 구성하고 추진일정을 계획한 사용자 또는 장기간의 집중적인 사용으로 당해 공사내역과 추진계획이 숙지된 사용자만이 시스템에 입력이 가능하고 또 시스템으로부터 산츨되는 데이터의 해석 및 가공이 가능하다는 것을 의미한다. That is, only the user who has composed the classification system so that the details of the construction can be entered into the schedule program and planned the promotion schedule or the user who has been familiar with the construction details and the promotion plan through long-term intensive use can enter the system. It also means that data from the system can be interpreted and processed.

상기의 작업명과 과업범위를 사용자 전원이 충분히 숙지하는 것도 어렵지만, 숙지했다 하더라도 설계변경 또는 계획변경 등으로 인한 작업명이 변경되었을 때 사용자 전원이 다시 이를 학습하여 대처한다는 것은 현실적으로 어려운 일이다. Although it is difficult for all the users to fully understand the above work name and task range, it is practically difficult for all the users to learn and cope with it again when the work name is changed due to a design change or a plan change.

뿐만 아니라, 대부분의 건설공사는 현장에 주재하면서 당해 현장만 관리하는 사용자만 있는 것이 아니고 본사 등에서 다수의 공사를 관리하는 사용자도 있으므로 현재와 같은 문자 또는 아이콘 등에 의한 작업명과 과업범위를 정의하는 사용자 인터페이스는 한계가 있을 수밖에 없고, 바로 이 점이 공사관리의 정보화를 저해하는 주 원인이 된다.In addition, most construction work is not only for the user who manages the site but also manages a large number of construction work in the head office, so the user interface that defines the work name and scope of work by the current letter or icon There is a limit to this problem, and this is the main cause that hinders the informatization of construction management.

건설공사를 수행하는데 있어 핵심적인 관리업무들은 일정관리 외에도 도급공사비/하도급공사비/직영공사비의 회계관리, 설계변경관리, 품질관리, 안전관리, 노무관리, 자재관리, 중기관리 등의 업무가 수행되어야 하며, 각 분야별 업무들은 고유의 업무영역을 갖고 있어 담당자를 따로 두거나 따로 두지 않더라도 업무수행결과와 산출물들은 각각으로 분류, 보존되어야 한다.In addition to the schedule management, the core management tasks in carrying out the construction work include accounting management, design change management, quality control, safety management, labor management, material management, and medium-term management of subcontracting / subcontracting / directed construction costs. The tasks in each field have their own work areas, so even if the person in charge is separated or not, the work performance results and outputs must be classified and preserved separately.

따라서 건설현장의 공사관리자들은 실제 공사관리업무에서 수행하여야하는 상기 각 분야별 관리업무를 수행함에 있어 개별적인 수작업에 의존하거나, 컴퓨터를 사용한다하여도 분야별로 별개의 시스템으로 업무를 수행하고 있다.Therefore, the construction managers in the construction site rely on individual manual work in performing the management tasks for each field that should be performed in the actual construction management work, or perform tasks in separate systems for each field even by using a computer.

또한 상기업무의 수행결과로 산출되는 문서 및 도면들은 종이문서, CD 등의 하드카피로 출력, 보관하거나 별도의 문서/도면관리시스템을 이용, 관리되어지고 있다.In addition, the documents and drawings calculated as a result of the performance of the work is being managed and printed or stored in a hard copy of paper documents, CDs, or using a separate document / drawing management system.

현재 건설현장에서 시행되어지고 있는 분야별 공사관리업무의 수행방법은 다음과 같다.The following is the method of performing the construction management work by field, which is being implemented at the construction site.

도 3a.는 일일작업현황을 파악하는 업무와 작업일정(Schedule)을 관리하는 업무 그리고 공사현황에 대한 정량적인 파악의 과정을 나타낸 것이다. 작업현황파악 및 보고는 담당자가 작업장소에서 확인한 내용을 구두로 전달하고 이를 일일작업종료시에 작업일보로 작성, 결재권자에게 보고한다. 작업일정의 관리는 대부분 일정관리프로그램에서 출력한 종이문서를 열람하므로서 공사관련자간의 공종별 일정정보를 공유하는 실정이며 일정관리프로그램을 관련자 각자의 컴퓨터 단말기에 현시되어질 수 있도록 하는 경우는 극소수이다. 또한 정량적인 공사현황을 파악하기위해서는 매회 공종별 진척도를 조사하고 수작업으로 진척도별 수량을 계산하여 집계하는 과정을 가진다. 이러한 과정에서 컴퓨터의 이용도는 엑셀 등의 스프레드쉬트를 사용하여 단순계산에 대한 편익 정도이다. Figure 3a. Shows the process of grasping the daily work status, the task of managing the work schedule (Schedule) and the quantitative grasp of the construction status. The work status and report is orally communicated by the person in charge at the place of work and reports it to the payment right holder at the end of the daily work. Most of the work schedule management is to read the paper documents output from the schedule management program and share the schedule information by construction related person. There are very few cases in which the schedule management program can be displayed on the respective computer terminals. In addition, in order to grasp the quantitative construction status, there is a process of investigating the progress of each work type and counting and counting the quantity by progress. In this process, the utilization of the computer is the benefit of simple calculation using a spreadsheet such as Excel.

도 3b.는 사업시행자와 공사를 도급받은 시공계약자와의 계약관리업무중 도급계약을 변경하는 과정과 도급기성의 청구과정을 나타낸 것이다. 도급계약을 변경하는 과정은 변경내역서를 스프레드쉬트로 작성하는 외에는 변경의 전과정이 수작업이며, 도급기성의 청구과정 역시도 다르지 않다.Figure 3b. Shows the process of changing the subcontracting contract and the billing process of the contractor during the contract management work between the contractor and the contractor who received the construction contract. The process of changing a contract is not the same as writing a statement of change in a spreadsheet, and the process of change is manual.

도 3c.는 건설공사의 시공계약자가 실제투입비용에 대한 예산변경 및 현장자금청구과정을 나타낸 것으로 변경예산서의 작성과정은 수작업에 의한 계산이며, 실투입금액 및 현장자금청구과정 역시 수작업으로 이루어지며 처리과정은 종이문서에 의하거나 스프레드쉬트로 작성한 문서의 인트라넷 결재를 이용하는 정도이다. 3c. Shows the construction contractor of the construction work for the budget change and the on-site billing process for the actual input cost. The process of preparing the change budget is a manual calculation, and the actual input amount and the on-site billing process are also done manually. The process is to use intranet payment of paper documents or spreadsheets.

도 3d.는 시공계약자가 하도급계약을 관리하는 과정을 나타낸 것으로서 하도급계약변경을 물론 하도급기성을 산출, 지급하는 과정도 도급계약과 마찬가지로 수작업에 의한 수량산출과 종이문서에 의한 문서의 유통 및 보존이 주종이며 이 과정에서 컴퓨터의 이용은 스프레드쉬트에 의한 문서의 작성과 보관이 시행되고있다.Figure 3d shows the process of the construction contractor managing the subcontract, and the process of calculating and paying the subcontracting period as well as the subcontracting change is similar to the contract of quantity calculation by manual labor and distribution and preservation of documents by paper documents. In this process, the use of a computer is in the process of creating and archiving documents by spreadsheets.

도 3e.는 당해 현장에 반입된 자재의 불출을 관리하는 과정으로서 자재의 입고는 송장 또는 입고전표를 작성하여 입고처리하고 불출 즉 사용량은 출고담당자가 출고량을 확인하고 출고전표를 발행하거나 재고조사에 의해 확인, 관리되고 있다. 대부분 수작업에 의한다.Figure 3e. Is a process of managing the delivery of the material brought into the site, the receipt of the material to the receipt of the invoice or receipt of the goods receipt by filling out the processing and receipt, that is, the usage is confirmed by the issuer to issue the goods receipt or inventory check It is confirmed and managed by. Mostly by hand.

도 3f.는 노무관리의 과정을 나타낸 것이며, 2005. 6. 현재 가장 전산화가 많이 진행된 분야이나 그 방법은 출역을 확인하는 과정을 근로자 개인에게 ID카드를 지급하고 카드에 의한 출역현황을 체크하는 형태이며 출역현황을 작업별 실투입비 산출 및 자금청구와 연계시키는 경우는 없다.Figure 3f. Shows the process of labor management, which is the most computerized field as of June 2005, but the method is to check the service status by paying the ID card to individual workers and checking the service status by the card. It is not possible to link the service status with the calculation of actual input costs and billing.

도 3g.는 당해 현장에 투입된 중기(건설기계)관리업무의 처리과정을 나타낸 것이며 중기임대계약 및 사용시간의 집계나 중기사용료 지급 등이 모두 수작업으로 처리되고있다.Figure 3g. Shows the process of the management of the medium-term (construction machinery) put into the site, and all of the medium-term lease contracts, use time counting and payment of the medium-term fees are all processed manually.

도 3h.는 현장에서 지출되는 비용중 경비지출에 관한 업무처리과정을 나타낸 것으로서 전산화한 장부를 사용하는 경우도 있으나 이 장부는 공사전체의 실투입비산출이나 자금청구와는 연계되지 않는 형태이다.Figure 3h. Shows the process of the expenditure on the expense expenditures in the field, and may use a computerized book, but this book is not related to the actual input cost calculation or billing of the whole construction.

도 3i.는 건설현장의 품질관리업무인 시공계획서, 기계제작승인도서, 자재공급원승인원 등의 작성/제출이 검측이나 시험과 서로 분리되어 시행되고있는 것을 보여준다. 품질관리업무의 계획은 건설공사의 일정과 작업공정(Process)에 연계하여 계획되어져야하므로 항상 일정계획에 근거하여 작성되어져야 한다. 현재는 이러한 품질관리계획이 담당자의 수작업에 의해 각각의 업무가 분리되어 시행될 뿐 만 아니라 모든 절차가 종이문서로만 진행되어진다.Fig. 3i shows that the preparation / submission of construction plan, machine production approval book, and material supply source approval personnel, which are quality control services at the construction site, is carried out separately from the inspection and testing. The quality control work should be planned based on the schedule, as it should be planned in connection with the construction schedule and process. At present, this quality control plan is carried out not only by separate tasks by manual personnel but also by all paper procedures.

도 3j.는 건설현장의 안전관리업무의 일반적인 시행과정을 보여준다. 총괄안전관리업무와 안전교육, 안전점검 등은 종이문서에 의존하는 것은 물론 각 업무들이 일정이나 공정계획과의 연계없이 독립적으로 수행되어진다.Figure 3j. Shows the general implementation of the safety management work at the construction site. Overall safety management, safety training, and safety inspections are not only dependent on paper documents, but are also performed independently of each other, without regard to schedules or process plans.

위에 거론한 종래의 건설공사 관리방법들의 특징과 문제점은 다음과 같이 표현되어질 수 있다.The characteristics and problems of the conventional construction management methods discussed above can be expressed as follows.

첫째, 일정관리프로그램을 사용하여 공사관리의 정보화를 계획한다하더라도 당해 공사가 포함하는 각 작업들의 명칭 및 작업범위에 대한 공통된 인식이 용이하지 않다.First, even when planning the informatization of construction management using a schedule management program, common recognition of the name and scope of each task included in the construction is not easy.

둘째, 현장의 작업진척도 파악이 종이문서나 구두로 전달될 수 밖에 없고 공사관련자간의 정보공유에 시간적, 공간적인 한계가 있다.Second, the grasp of work progress on the site can only be delivered by paper documents or verbally, and there is a temporal and spatial limitation in the sharing of information among construction personnel.

셋째, 공사관리 각 분야는 상호 연계되어 관리되지 못하고 별개로 수행되어진다.Third, each field of construction management cannot be managed in connection with each other, but is carried out separately.

넷째, 종이문서에 결재란이 있다 하더라도 업무처리과정이 체계적이지 못할 수가 있으며 담당자의 고의 또는 실수에 의하여 업무가 실행되지 않거나 비정상적으로 실행되어도 일정시간이 경과하면 이의 파악이 쉽지않게 된다. 뿐 만 아니라 각 업무수행과정에서 생성되어지는 성과품의 작성과정이 수작업으로 이루어지며 종이문서에 의한 보존을 위주로 함에 따라 담당자의 교체시 업무의 연속성이 어렵게 된다.Fourth, even if there is a settlement column in the paper document, the work process may not be systematic, and if a certain time passes even if the work is not executed or is abnormally executed due to the intention or mistake of the person in charge, it is difficult to grasp it. In addition, the process of creating the achievements generated by each task is performed by hand, and the continuity of work is difficult when the staff is replaced due to preservation by paper documents.

본 발명은 상술한 종래의 문제점을 해결하기 위하여 제안된 것으로서, 그 목적은 다음과 같다.The present invention has been proposed in order to solve the above-mentioned conventional problems, the object of which is as follows.

- 공사내역의 구조 및 작업범위에 대한 공통언어의 제공-Provide a common language for the structure and scope of work

당해 건설공사의 목적물을 형상화한 그래픽 사용자 인터페이스를 통해 공사내역을 관리할 수 있도록 함으로써 작업들에 대한 시각적인 공통언어(Common Language)를 제공하여 사용자들에게 공사내역구성과 해당 작업의 과업범위를 쉽게 전달하는 방법The project history can be managed through a graphical user interface that is designed for the purpose of the construction project, providing users with a visual common language for the work, making it easier for users to organize the construction history and the scope of the work. How to pass

- 실시간 공사현황제공-Real time construction status

당해 건설공사의 시공현황 및 공사관리현황을 작업분류체계와 관리분야별 담당자의 단말기를 통하여 작업일보에 입력되고 금일작업현황으로 현시되어질 수 있도록 함으로써 금일작업 뿐 만 아니라 공사의 현재 진척도에 따른 정량적인 정보를 실시간으로 제공한다.The construction status and construction management status of the construction work can be entered through the work breakdown structure and the terminal of the person in charge of management by the terminal, and can be displayed as the current work status, thereby quantitative information according to the current progress of the construction as well as today's work. Provides in real time.

- 공사관리업무의 통합관리 및 업무자동화-Integrated management and task automation of construction management work

작업분류체계(WBS)의 작업들을 일정관리프로그램의 작업(Activity)단위로 설정하고 공사관리 항목들을 일정관리프로그램과 연계시키므로서 공사관리 전분야의 정보가 통합관리되어질 수 있도록 하고, 따라서 작업일보를 통한 진척도 입력은 작업일정의 업데이트는 물론 각 관리분야별 실적을 업데이트하게 됨으로서 공사관리의 통합관리를 용이하게 한다. 또한 통합된 데이터베이스로 인한 제반 업무의 연계는 각각의 관리분야별 공사기록대장이 자동 생성되고 보존되어질 수 있도록 한다.By setting the work classification system (WBS) as the activity unit of the schedule management program and associating the construction management items with the schedule management program, information of all areas of construction management can be integrated and managed. Progress progress input facilitates integrated management of construction management by updating the work schedule as well as the performance of each management field. In addition, the linkage of all the tasks due to the integrated database allows the construction records of each management field to be automatically generated and preserved.

- 책임과 권한을 명확히 한 업무수행기록과 각종 관리대장의 제공 및 보존-Provision and preservation of work performance records and management ledgers with clear responsibilities and authorities

일일실적 업데이트 및 기성(도급, 하도급, 직영)확정, 그리고 품질/안전관리의 계획 및 실적확인 등 제반 공사관리현황 데이터베이스가 기구조직내의 승인단계를 거쳐 업데이트될 수 있도록 함으로써 담당자별 권한과 책임이 명시된 처리과정의 기록이 보존됨에 따라 업무수행결과에 대한 감사는 물론 담당자의 교체시 업무의 연속성이 보장된다. The authority and responsibilities of each person in charge are specified by ensuring that the construction management status database, including daily performance updates, established (contract, subcontract, and management) and quality / safety management plans and performance checks, can be updated through the approval stage within the organization. Keeping records of the process ensures the continuity of work as well as the audit of results and the replacement of personnel.

건설공사의 관리분야별 데이터들은 작업(Activity)을 중심으로 작업의 진척도에 따라 데이터가 생성되고 가공되어지는 특성을 가진다. The data for each management field of construction have characteristics that data is generated and processed according to the progress of work centered on activity.

이러한 건설공사의 특성에 따라 공사내역을 구분하고 공사의 진척도를 계량할 수 있도록 작업(Activity)을 설정하여 시공계획을 수립, 실행하고 모니터링하는 공사관리기법은 미국의 건설분야를 중심으로 발전된 프로젝트관리기법으로서 국내에도 잘 알려져 있다. According to the characteristics of the construction work, the construction management technique that establishes, executes and monitors the construction plan by setting the activity to measure the progress of construction and quantifying the progress of the construction is a project management developed around the US construction field. It is well known in Korea as a technique.

작업(Activity)을 도출하는 과정은, 작업분류체계(WBS)라고 호칭되는 기법을 적용하여 전체공사를 관리목적에 부합하는 시설 또는 구역으로 구분하고, 그 하위 관리단위로서 건설기술기준의 공종(Commodity)으로 분류한다. 공종(Commodity)은 다시 작업(Activity)들로 분류함으로써 전체공사의 내역을 계층적인 관계를 가진 요소들의 집합체로 구성한다. 이 기법은 PERT/CPM형식의 일정관리 및 실적관리체계(EVMS)를 구축하는 기반으로서 각 작업들의 자원할당 및 실적집계를 가능하게 한다. 도 4.는 작업분류체계의 일반적인 구성을 보여준다.The process of deriving the activity is divided into facilities or zones that meet the management objectives by applying a technique called a work breakdown structure (WBS). Classify as) Commodity is again classified into activities to organize the details of the entire construction into a collection of hierarchical elements. This technique is the basis for establishing a schedule and performance management system (EVMS) in the form of PERT / CPM, enabling resource allocation and performance accounting for each task. 4 shows the general structure of the WBS.

본 공사현황정보통합관리 데이터베이스의 기본적인 구성은 당해 건설공사의 내역을 구분하는 작업분류체계(WBS)를 구성하여 도 2.에서 보는 바와 같이 각각의 작업들에게 작업기간 및 작업순서 등의 일정계획이 입력된 일정관리프로그램을 관리분야 별 파일로 구성, 연결하고 작업의 진척도 입력(업데이트)을 위하여 별도의 입력창(작업일보)을 구성하여 각 관리분야 별 일정관리프로그램 파일들의 진척도가 모두 업데이트될 수 있도록 함과 동시에 입력창의 기록이 보존될 수 있도록 하는 것이다. The basic structure of this construction status information integrated management database consists of a work breakdown structure (WBS) to distinguish the details of the construction work, as shown in Figure 2. Each work has a schedule such as work period and work order The progress schedule of each schedule management program file can be updated by configuring and connecting the input schedule management program into files for each management field and configuring a separate input window (working daily report) for input (update) of work progress. At the same time, the record of the input window can be preserved.

이를 위해서 일정관리프로그램의 각 작업(Activity)들에 도급공사비내역, 실행예산내역, 하도급내역, 자재내역, 품질관리항목, 안전관리항목들을 자원(Resource)으로 할당하고 공사일정의 진척도 업데이트를 통하여 공정실적, 도급 및 실투입 공사비의 실적, 품질관리실적, 안전관리실적 등이 업데이트될 수 있도록 함으로써, 공사의 진척도 및 관리현황이 실시간으로 제공될 수 있도록 한다. To this end, subcontracting cost, execution budget, subcontracting, material, quality control and safety management items are assigned to each activity of the schedule management program as resources, and the process is updated by updating the progress of the construction schedule. The progress, subcontracting, and actual cost of construction cost, quality management performance, and safety management performance can be updated, so that the progress and management status of the construction can be provided in real time.

또한 위의 기본적 기능으로부터 산출되어지는 건설공사관리를 위한 도급기성, 자금 및 하도급기성 등의 청구 및 수령현황을 제공하고 설계변경, 계약변경 등의 원본데이터 변경과정과 기록보존을 지원한다. 그밖에도 일정관리프로그램의 작업순서로부터 품질관리 특성요인도를 작성할 수 있도록 하고 각 과업수행결과가 현시되는 기능, 안전관리계획을 시설별로 현시되어지도록 하는 기능을 부가하여 작업일보 작성을 위한 사용자의 편의를 지원한다. In addition, it provides the status of billing and receipt of contracting, funding and subcontracting for construction management, which is calculated from the above basic functions, and supports the original data change process such as design change, contract change, and record keeping. In addition, the user's convenience for writing work schedules can be prepared by creating a quality control characteristic factor map from the work schedule of the schedule management program, and the function to display the results of each task and the safety management plan to be displayed for each facility. Support.

더하여 관리 분야별 사용자 지정과 승인과정을 설정하므로서 일일 입력사항 및 공사추진현황(Log)을 확정, 기록, 보존할 수 있도록 한다. In addition, by setting up customizing and approval process for each management field, it is possible to confirm, record, and preserve daily inputs and log.

이러한 기능의 구현을 위하여 도 1.에서 보는 바와 같이 시공현황모듈, 도급계약모듈, 실행예산모듈, 하도급계약모듈, 자재관리모듈, 노무관리모듈, 중기관리모듈, 현장경비현황모듈, 품질관리모듈, 안전관리모듈로 관리분야별 모듈을 설정하고 각 모듈은 공사비내역과 자원내역 및 관리업무내역 등 하위의 내역을 갖도록 구성한다.For the implementation of such a function as shown in Figure 1. Construction status module, subcontracting module, execution budget module, subcontracting module, material management module, labor management module, medium-term management module, field security status module, quality control module, Set up modules for each management field as safety management modules, and each module should be configured to have subordinate details such as construction cost details, resource details, and management work details.

데이터베이스의 기본이 되는 작업분류체계(WBS)의 계층적 구조를 시각적인 형상 및 작업별 순서도로 구성함으로써 단위 공종의 입력 및 현황을 보다 용이하게 한다. The hierarchical structure of the WBS, which is the basis of the database, is organized into visual shapes and task-specific flowcharts to facilitate the input and current status of unit types.

각 모듈별 구성과 작용은 다음과 같다.The composition and operation of each module is as follows.

가. 공사현황end. Construction Status

공사현황관리 모듈은 도 6.에서 보는 바와 같이 작업분류체계(WBS)에 따라 각 작업별 시공범위를 정의하고, 각 작업들의 진척도 및 과업수행결과에 대한 실적입력 및 입력절차(전자결재 등)를 관리하는 기능과 결재후 결과물의 저장/검색을 담당하는 기능을 가진다. 더하여 각 분야별 모듈, 즉 일정계획, 품질관리, 안전관리, 도급계약관리, 실행예산관리, 하도급관리, 자재관리, 노무관리, 중기관리 등의 모듈로부터 계획 및 실적들을 연계 또는 가공하여 요약/챠트/상세현황 등으로 계획 대비 실적을 현시한다. 실적입력의 결재절차를 결정하는 기능과 각 실적들의 입력시 직영, 하도급계약, 직영과 하도급의 혼용 등에 따른 실투입비용의 계산방식을 결정하는 기능도 갖는다. As shown in Fig. 6, the construction status management module defines the construction scope for each work according to the work breakdown structure (WBS), and records the performance input and input procedures (electronic approval, etc.) on the progress and task performance results of each work. It has the function of managing and storing / retrieving the result after payment. In addition, the summary / chart / The results are compared to the plan due to the detailed status. It also has the function of determining the settlement procedure of performance input and the method of calculating actual input cost according to direct management, subcontracting, and direct and subcontracting.

공사개요 Construction Outline

전술한 바와 같이 건설공사의 관리분야별 데이터들은 작업(Activity)을 중심으로 작업의 진척도에 따라 데이터가 생성되고 가공되어지는 특성을 가진다. As described above, the data for each management field of the construction work has the characteristic that data is generated and processed according to the progress of the work based on the activity.

작업분류체계(WBS)를 구성하여 도출된 작업(Activity)들은 도 2.에서 보는 바와 같이 문자나 숫자로 표현될 수 밖에 없고 이러한 표현이 공사참여자 모두에게 동일한 의미로 전달되는 것은 한계가 있다. 즉, 작업분류체계의 각 계층별 요소들이 갖는 명칭이 작업범위나 작업방법 등에 대해 사용자들의 공통된 이해를 도출하기 어렵다는 의미이다. Activities derived from constructing WBS can only be expressed in letters or numbers as shown in FIG. 2. There is a limitation that these expressions are transmitted to all the participants in the same meaning. In other words, the names of the elements of each hierarchy of the WBS make it difficult to derive a common understanding among users about the scope of work and work methods.

이 문제점을 해결하고자 작업분류체계를 당해 공사의 공사목적물을 건설중이거나 완공후 또는 양자의 복합적인 형태로 표현한 사용자 인터페이스를 사용함으로서 사용자들이 작업분류체계의 구성에 대해 쉽게 이해할 수 있고 더하여 시설별 공종의 정의와 작업순서 및 시공방법에 대한 정보를 공유하는 방법으로 구성한다. In order to solve this problem, users can easily understand the composition of the WBS by using the user interface that expresses the WBS in construction, after construction, or in a combination of both. Organize by sharing information about definition, work order and construction method.

도 5.에서 보는 바와 같이 작업분류체계(WBS)의 계층적 구조(Hierarchical Structure)를 단계별로 설명과 함께 하위메뉴로 현시되도록 한다.As shown in FIG. 5, the hierarchical structure of the work breakdown structure (WBS) is described as a submenu with a step-by-step description.

이러한 작업분류체계의 표현방법은 시설 또는 구역에 해당하는 부분들을 공사 완성물의 형상으로 구성한 작업분류체계와의 주된 사용자 인터페이스를 구성하고 각 시설 또는 구역들을 형상화한 개체를 지정할 경우 해당 레벨의 작업분류체계 구성요소와 연결되도록 설정하고 이 개체의 외곽부분 또는 공사전체를 의미하는 특정부위를 지정할 경우 이는 공사전체 즉 최상위 레벨을 선택하는 것이 된다.The method of expressing the WBS consists of the main user interface with the WBS, which consists of the parts corresponding to the facilities or zones in the shape of the finished product, and designates the objects that shape each facility or zone. If it is set to be connected with a component and designates a specific part that means the outer part of the object or the whole construction, this means selecting the whole construction or the top level.

각 시설 또는 설정된 구역에 해당하는 부분을 지정할 경우, 작업분류체계의 제1단계(Level-1)인 해당 시설물의 독립적인 형태와 함께 이를 구성하는 직하위의 공종 또는 시설부위들과의 관계를 표기한 2단계(Level-2) 사용자 인터페이스(2단계 메뉴)로 현시되며, 다시 2단계 사용자 인터페이스(2단계 메뉴)상의 공종 또는 시설부위를 지정할 경우 그 하위의 작업 또는 세부 공종들이 작업순서 및 연결관계를 도식화하여 3단계 사용자 인터페이스(3단계 메뉴)로 현시된다. 각 사용자 인터페이스(각 메뉴)상에서 특정 항목을 선택할 경우 작업분류체계의 해당 요소로 연결되어지도록 한다. 사용자 인터페이스의 단계설정은 작업분류체계의 레벨수에 따라 증감되어질 수 있다. 각 메뉴는 확대/축소할 수도 있다.In the case of designating a part corresponding to each facility or a designated area, indicate the independent type of the facility, which is the first level (Level-1) of the WBS, and the relationship with the works or parts of the plant below it. It is manifested as a level-2 user interface (two-level menu), and when the work or facility part is designated on the two-level user interface (two-level menu), the work or subordinate works of the subordinate work are related to the work order and connection. It is represented by a three-level user interface (three-level menu). Selecting a particular item on each user interface (each menu) links to the corresponding element of the WBS. The level setting of the user interface can be increased or decreased depending on the number of levels of the WBS. Each menu may be zoomed in or out.

요약하면 도6의 공사개요(20102)는 작업분류체계(WBS)의 구성요소 즉 작업(Activity)설명에 대한 데이터로서 작업범위와 작업방법, 작업조건, 작업명세서, 작업에 대한 이미지 등의 데이터를 가지며 전체 공사내역 중 특정작업의 내역검색을 위한 사용자 인터페이스의 단계로서 각 메뉴가 갖는 데이터테이블에서 작업의 범위에 해당하는 데이터를 지정하는 인덱스이다. In summary, the construction outline 20102 of FIG. 6 is a component of the work breakdown structure (WBS), that is, the data of the activity description, and includes data such as the scope of work, work method, work condition, work specification, and image of the work. It is an index that designates the data corresponding to the scope of the work in the data table of each menu as a step of the user interface for retrieving the details of a specific work among all construction details.

금일작업현황Today's work status

금일작업현황(20101)은 금일 현장에서 진행되는 각 작업들의 현황을 현시하는 단계로서 공사개요(20102)에서 지정된 각 작업에 대해 PC 또는 이동통신장비로부터 금일 작업일보(20103)에 입력된 사항을 현시 Today's work status (20101) is a step to present the status of each work that is going on at the site today, and the information inputted in today's work report (20103) from PC or mobile communication equipment for each work specified in the construction overview (20102).

- 작업일보(20103)로부터 각 작업별 공사량/전일 실적/실적총계/금일투입자원-The amount of work by each work / previous day's results / total performance / today's investor source from the work daily report (20103)

- 작업일보(20103)로부터 금일 입력된 작업별 작업장 사진-Photo of workplace by work entered today from Work Daily (20103)

- 공종별 품질관리현황(20901)으로부터 품질시험/검측 등 예정사항을 현시하고 금일 시행여부를 입력/현시-Present the planned matters such as quality test / detection from the quality control status (20901) by type and enter / exact whether or not to implement today

- 총괄안전관리현황(21013)으로부터 안전교육, 안전점검 등의 예정사항을 현시하고 시행여부를 입력/현시-Present the planned matters such as safety education, safety check, etc. from the general safety management status (21013) and input / declare whether

- 권한이 부여된 사용자가 입력하고 작업일보(20103)에 기록되어지는 텍스트(특기사항/지시사항) 입력창-Text input window (Special notes / instructions) input by authorized user and recorded in the work report (20103)

- 작업별 인력/장비 등 투입자원의 금일 출역/가동현황-Today's service / operation status of human resources and equipment

- 작업별 지급자재, 사급자재 및 가시설재의 금일 소요/사용/재고현황-Today's requirements / usage / stock status of payment materials, subsidiary materials and temporary materials

공사일정현황Construction Schedule

공사일정현황(20105)은 작업별 PERT/CPM 기법에 의한 착수일/종료일 등의 일정에 대한 정보를 제공하는 단계이며 공사개요(20102)와 일정관리프로그램(20208)으로부터 각 작업별 작업기간/시작일/종료일/조기 및 지연 착수종료일 등에 관한 일정정보를 계획대비 실적으로 현시The construction schedule status (20105) is a step of providing information on the schedule such as the start date and end date by the PERT / CPM technique for each work. Schedule information about the end date, early and late start date, etc.

시공현황 Construction Status

시공현황(20106)은 공사개요(20102)에서 지정된 각 작업의 진척도를 계획 대비 실적현황으로 현시The construction status (20106) shows the progress of each work specified in the construction overview (20102) as the performance status compared to the plan.

- 도급계약내역(20204)과 도급기성내역(20205)으로부터 계획대비 실적을 그래픽챠트 또는 테이블로 현시-Display the performance of the contract against the plan from the contract contract (20204) and the contract contract (20205) as a graphic chart or table.

- 도급계약내역(20205)과 도급기성내역(20206)으로부터 EVM 기준에 따른 분석 및 예측치를 계산하여 그래픽챠트 또는 테이블로 현시-From the contract contract history (20205) and the contract history (20206), the analysis and prediction values according to the EVM standards are calculated and displayed as graphic charts or tables.

- 실행예산내역(20305)과 자금집행내역(20306)으로부터 계획대비 실적을 그래픽챠트 또는 테이블로 현시-Display performance against plans from execution budget (20305) and fund execution (20306) as graphic charts or tables.

- 실행예산내역(20305)과 자금집행내역(20306)으로부터 EVM 기준에 따른 분석 및 예측치를 계산하여 그래픽챠트 또는 테이블로 현시-From the execution budget (20305) and the fund execution history (20306), the analysis and forecasts according to the EVM criteria are calculated and displayed as graphic charts or tables.

- 자금집행내역(20306)으로부터 EVM 기준에 따른 총 공사비의 예측치 계산하여 그래픽챠트 또는 테이블로 현시-Calculate the forecast of total construction cost according to EVM standard from the fund execution history (20306) and present it as a graphic chart or table

- 도급계약내역(20205)과 실행예산내역(20305)으로부터 추정손익계획을 그래픽챠트 또는 테이블로 현시-Display estimated profit and loss plan in graphic charts or tables from contract contracts (20205) and execution budgets (20305).

- 도급계약내역(20205)과 자금집행내역(20306)으로부터 계획대비 실적을 그래픽챠트 또는 테이블로 현시-Display the performance of the plan against graphic charts or tables from the contract contracts (20205) and the fund executions (20306).

- 도급계약내역(20205)과 자금집행내역(20306)으로부터 EVM 기준에 따른 분석 및 예측치를 계산하여 그래픽챠트 또는 테이블로 현시-Based on EVM standards, analysis and forecasts are calculated from contract contracts (20205) and fund executions (20306) and displayed as graphic charts or tables.

작업일보Working day

각 작업의 실적데이터 입력을 위한 폼으로서, 공사개요(20102)에서 지정된 각 작업에 대해 PC 또는 이동통신장비로부터 입력, As a form for inputting performance data of each job, input from a PC or a mobile communication device for each job specified in the construction overview (20102),

- 전일의 작업일보(20104)로부터 전일의 실적 및 누계실적을 현시하고 금일의 진척도 및 자원투입실적을 입력, -The previous day's work report (20104) shows the previous day's performance and cumulative results, and inputs the day's progress and resource input.

- 자원투입실적의 입력은 최근에 입력된 투입자원의 리스트를 현시(드롭다운 등의 방법)-Input of resource input results shows the list of recently inputted input resources (such as drop down).

- 공종별 품질관리현황(20901)으로부터 품질시험/검측예정사항을 현시하고 실적을 입력 -Display the quality test / detection expected items from the quality control status (20901) by type and enter the performance

- 총괄안전관리계획(21013)업무의 안전교육, 안전점검 등의 예정사항을 현시하고 금일 실적을 입력-Present the results of the comprehensive safety management plan (21013), including safety training and safety checks, and input the results today.

- 하도급계약변경/신규계약(20402), 자재입고(20508,20511), 신규 근로계약(20607), 신규 중기임차계약(20707), 선금 및 기성수령(20206), 자금수령(20306), 외주지급(20406), 설계변경결재(20202), 자금청구(20309), 기성청구(20207)의 승인단계를 수행-Subcontract Contract Changes / New Contracts (20402), Goods Receipts (20508,20511), New Labor Contracts (20607), New Medium-Term Lease Contracts (20707), Down Payments and Ready-to-Receipts (20206), Receipt of Funds (20306), Outsourcing Payments (20406), approval of design change settlement (20202), billing (20309), ready billing (20207)

- 승인 후에는 제 입력사항을 이미지파일 또는 텍스트 테이블로 저장(20104)-After approval, save my input as an image file or text table (20104)

나. 도급계약관리I. Contract Contract Management

도 7.은 도급계약관리의 모듈구성을 나타내는 것으로서 최종 변경승인된 도급계약내역을 작업분류체계의 단계(Level)별로 현시하는 기능과 계약변경작업을 자동화하는 기능, 계약변경예정인 항목들을 잠재적인 계약변경으로 저장한 후 결재과정을 최종 변경계약으로 전환하고 직전계약을 저장하는 기능, 이전 계약변경에 대해 회수별로 검색하는 기능을 가진다.Figure 7 shows the module configuration of contract management, which shows the contractual information of the last approved contract for each level of the work breakdown structure, the function of automating contract change work, and the potential contract items. After saving as a change, it converts the payment process into a final change contract, saves the previous contract, and retrieves the number of previous contract changes by the number of times.

도급계약에 따른 기성관련 업무처리에 있어 금회기성물량 및 금액을 자동계산하는 기능과 결재를 통한 확정, 확정 후 저장하는 기능, 그리고 이전 기성분에 대한 연혁 및 회수별 상세기성내역을 검색하는 기능을 가진다. The function to automatically calculate the amount and amount of current stocks, and to confirm, store after confirmation, and to retrieve the details of previous components by history and number of times. Have

현재 계약Current contract

현재 도급계약(20205)은 계약내역 즉, 비용항목별 규격, 단위, 수량, 단가, 금액 등의 데이터를 가지는 테이블이며 최종 승인된 도급계약내역서를 현시한다. 도급계약변경예정(20202)으로부터 승인된 변경도급계약은 현재도급계약(20205)으로 교체되고 직전 도급계약내역(20204)은 저장되는 단계를 가진다.The current contract 20205 is a table having data of contract details, that is, specifications, unit, quantity, unit price, and amount for each cost item, and present a final contract statement. The change contract contract approved from the contract contract change schedule 20202 is replaced with the current contract contract 20205 and the previous contract contract history 20204 has a stage of being stored.

도급기성 현황 Contractor Status

도급기성현황(20206)은 금회 도급기성내역 비목별 규격, 단위, 수량, 단가, 금액 등의 데이터를 가지는 테이블이며 기성을 확정, 수령한 연혁이 회수별로 요약, 현시되고, 각 회수별로 상세내역은 기성신청/결재후 저장된 전회의 기성테이블(20207)과 연결/현시 The contract status (20206) is a table with data such as specification, unit, quantity, unit price, and amount for each contract detail item, and the history of confirming and receiving the summary is summarized and displayed by the number of times. Connection / presentation with the previous ready-made table (20207) stored after the ready-made application / payment

도급기성 청구 Subcontractor claim

도급기성청구(20209)는 금회의 기성청구절차로서 작업일보(20103)로부터 업데이트되는 일정관리프로그램(20208)의 비용데이터에서 현재기성총액을 복사하여 총액을 구성하고 이로부터 전회까지의 기성(20206)을 감하여 금회 실기성액을 구하고 실기성액으로부터 선금급(20210)에 대한 공제율을 계산하는 단계, 그리고 안전관리비집행현황(21011)으로부터 이의 합을 구하여 금회 기성예정내역을 구성하여 기성승인 테이블을 생성, 승인을 요청하는 단계이며 승인과정에서 기성내역 및 금액수정을 할 수 있고 수정된 금액에 따라 선금급에 대한 공제율은 자동계산/수정되어지며, 승인후에는 도급계약기성현황(20206)을 구성하며 최종기성내역의 이미지파일 또는 텍스트테이블로 저장(20207)The contract for out-of-service contract 20209 forms the total amount by copying the current total amount from the cost data of the schedule management program 20208, which is updated from the work daily report 20103, as the current off-the-shelf procedure. Calculate the deduction rate for the advance payment (20210) from the actual amount, and obtain the sum of the sum from the current status of safety management expenses (21011) to create the ready-made table of approval for the current period, and create the approval table. It is in the stage of requesting, and it is possible to amend the details and amount in the approval process, and the deduction rate for the down payment is automatically calculated / modified according to the amended amount.After approval, the contract status is established (20206) and the final Save as image file or text table (20207)

도급계약변경 현황Contract Contract Status

도급계약변경현황(20203)은 도급계약내역의 변경연혁을 검색하는 단계로서 회수별 계약변경목록이 현시되고 각 회수별로 상세내역(20204)은 변경요청/결재후 저장된 이미지와 링크The contract change status (20203) is a step of searching the history of contract contracts. The list of contract changes by number is displayed, and the details (20204) by number of times are stored and linked after request for change / approval.

도급계약변경 예정Contract contract scheduled

도급계약변경예정(20202)은 최종설계변경 이후의 설계변경예정인 사안들의 목록을 요약을 현시하는 단계로서 설계변경(20201)으로부터 저장된 요약내역의 목록을 현시하고 상세내역은 설계변경(20201)의 내역서를 현시Subcontract contract change schedule 20202 is a step of presenting a summary of the list of issues that are due to the design change after the final design change, and the list of summary contents stored from the design change 20201 is presented. Manifestation

설계변경예정사안들의 결재과정에 삭제 또는 수정이 가능하며 최종결제 후 현재계약(20205)으로 대체되는 기능It is possible to delete or revise the settlement process of design changes and replace it with the current contract (20205) after the final settlement.

설계변경Design change

설계변경(20201)은 당해 공사의 설계변경을 위한 변경내역서의 작성단계로서 현재도급계약(20205)으로부터 변경대상 작업(20102)의 계약내역을 추출하여 별도의 테이블을 생성하고 이 테이블의 비목별 수량증감 및 비목의 신설, 삭제 등의 내역수정을 지원하는 단계와 이의 임시저장, 승인요청, 승인후 변경사안별 요약목록과 변경내역서를 저장하는 기능을 가지며, 매회의 설계변경은 변경예정(20202)의 목록으로 등록되는 단계The design change (20201) is a stage of drafting a change statement for the design change of the construction work, and extracts the contract details of the change target work (20102) from the current contract (20205) to create a separate table, and the number of items for each item. It has the function of supporting revision of details such as increase and decrease, new item, deletion, temporary storage, request for approval, summary list of each change after approval and change history, and every design change is scheduled to be changed (20202). Steps to be listed as

수량변경은 실행예산변경의 변경예정(20302)에 자동등록하는 기능을 부여할 수 있다.The quantity change can be given a function of automatically registering in the scheduled change 20302 of execution budget change.

다. 실행예산관리All. Execution Budget Management

도 8.은 실행예산관리모듈의 구성을 표기한 것으로 최종 변경승인된 실행예산내역을 작업분류체계의 단계(Level)별로 현시하는 기능과 실행예산변경작업을 자동화하는 기능, 실행예산변경예정인 항목들을 잠재적인 실행예산변경으로 저장한 후 결재과정을 최종 변경실행예산으로 전환하고 직전 실행예산을 저장하고 이전 변경분에 대해 변경 회수별로 검색하는 기능을 가진다.8 is a diagram showing the configuration of the execution budget management module. The function of presenting the final approved execution budget details by level of the work breakdown structure, the function of automating the execution budget change operation, and the items that are scheduled to be changed After saving as a potential execution budget change, it converts the payment process to the final change execution budget, saves the previous execution budget and retrieves the previous change by the number of changes.

공사비지급관련 업무처리에 있어 금회 자금청구금액을 직영 및 하도급계약건별로 구분하여 자동계산하는 기능과 결재를 통한 확정, 확정 후 저장하는 기능, 그리고 공사비지급의 연혁 및 회수별 상세지급내역을 검색하는 기능을 가진다. Function to automatically calculate the current amount of funds billed by direct management and subcontracting contracts, to confirm, confirm and save after payment, and to search the details of each payment by history and collection Has

현재 실행예산Current budget

현재실행(20305)은 실행예산내역의 비목별 규격, 단위, 수량, 단가, 금액 등의 데이터를 가지는 테이블이며 최종 승인된 실행예산 내역서를 현시한다. 실행예산변경예정(20302)으로부터 승인된 변경실행예산은 현재실행예산(20305)으로 교체되고 직전 실행예산내역(20304)은 저장되는 단계를 가진다.The current execution 20305 is a table having data such as specification, unit, quantity, unit price, and amount of each item of the execution budget, and shows the final approved execution budget statement. The change execution budget approved from the execution budget change schedule 20302 is replaced with the current execution budget 20305 and the previous execution budget 20304 has a stage of being stored.

실행예산집행현황Execution Budget Execution Status

자금집행현황(20306)은 회수별 자급집행내역의 비목별 규격, 단위, 수량, 단가, 금액 등의 데이터를 가지는 테이블이며 자금을 집행한 연혁이 회수별로 요약, 현시되고, 각 회수별로 상세내역은 자금청구/결재후 저장된 각 회의 집행내역(20307)과 연결/현시The status of fund execution (20306) is a table with data such as specification, unit, quantity, unit price, and amount of each item of self-sustainment execution by collection, and the history of executing the funds is summarized and displayed by collection, and the details of each collection are Linking / presentation of each meeting execution history (20307) saved after billing / payment

현장자금청구Field Funding

자금청구(20309)는 직전의 자금집행이후 현재까지의 실투입비용을 지급하기위한 소요자금을 산출하는 단계로서 하도급기성지급(20409)으로부터 각 하도급기성금액을 집계하여 계상하고 자재관리의 사급자재(20506) 사용량에 해당하는 금액 및 작업일보로부터 입력된 직영분의 실투입비용 즉, 중기사용료(20704), 직영노임(20604), 경비-1(20802), 경비-2(20804)를 더하여 자금청구내역을 구성하고 승인과정을 위한 임시저장단계를 가진다. 임시저장된 자금청구내역(20309)으로 승인을 요청하는 동안 삭제, 추가 또는 금액변경을 할 수 있고 승인후에는 각각의 하도급기성금액들은 하도급기성현황(20407)을 구성하고 직영 공사분은 직영노임지급현황(20605)/직영중기비지급현황(20705)/사급자재현황(20506)/경비지출현황(20805)의 비용지급대장으로 저장The request for fund (20309) is a step of calculating the necessary funds for paying actual input costs up to the present after the previous execution of funds, and counts each subcontracted amount from subcontracted payments (20409) and supplies the subsidiary materials of material management ( 20506) Claims are made by adding the actual input costs of the direct management input from the amount corresponding to the amount used and the working day, that is, the medium-term fee (20704), direct labor (20604), expenses-1 (20802), and expenses-2 (20804). Organize details and have temporary storage steps for approval process. You can delete, add, or change the amount while requesting approval to the temporarily stored billing statement (20309), and after approval, each subcontracted amount constitutes subcontracted state (20407), and direct management pays the status of direct labor. (20605) / Managed Heavy Expenses (20705) / Federal Materials (20506) / Expenses (20805)

실행예산변경현황Status of execution budget change

실행예산변경 현황(20303)은 실행예산내역의 변경연혁을 검색하는 단계로서 회수별 실행예산변경목록이 현시되고 각 회수별로 상세내역(20304)은 변경요청/결재후 저장된 이미지와 링크The execution budget change status (20303) is a step of retrieving the change history of the execution budget. The execution budget change list for each retrieval is displayed, and the detail for each retrieval (20304) is the image and link stored after the change request / approval.

실행예산변경예정Execution budget scheduled to change

실행예산변경예정(20302)은 최종 실행예산변경 이후의 실행예산변경예정인 사안들의 목록을 현시하고 상세내역은 실행예산변경(20303)의 내역서를 현시The execution budget change schedule 20302 presents a list of issues that are expected to change the execution budget after the final execution budget change, and the details show the statement of the execution budget change 20303.

실행예산변경예정사안들의 결재과정에 삭제 또는 수정이 가능하며 최종결제 후 현재실행예산(20305)으로 대체되는 기능The execution budget can be changed or deleted in the settlement of the budgeted matters, and the function is replaced by the current execution budget (20305)

실행예산변경Execution Budget Change

실행예산변경(20301)은 공사개요의 각 작업별 계약내역을 현시하여 실행예산내역의 비목별 수량증감 및 비목의 신설, 삭제 등의 내역변경작업을 지원하고 이의 임시저장, 결재요청, 결재완료후 변경사안별 목록과 변경내역서를 저장하는 기능을 가지며, 매회의 실행예산변경은 변경예정(20302)의 목록으로 등록되는 단계Execution budget change (20301) displays contract details for each work in the construction summary to support changes in details such as increase and decrease of the quantity per item of the budget and establishment of new items, deletion of items, and temporary storage, payment request, and completion of payment. It has a function of storing a list of changes and a change history, and each execution budget change is registered as a list of scheduled changes (20302).

도급계약의 설계변경(20201)으로부터 자동등록되는 기능을 부여할 수 있고 하도급설계변경(20401)과 연계할 수 있다.It can be given a function that is automatically registered from the design change (20201) of the subcontract and can be associated with the subcontract design change (20401).

라. 하도급계약관리la. Subcontract Contract Management

하도급계약관리의 구성을 나타낸 것이 도 9.이다. 실행예산을 구성하는 하위 테이블이며 최종 변경승인된 하도급계약별 계약내역을 작업분류체계의 단계(Level)별로 현시하는 기능과 신규 하도급계약을 작성, 결재, 등록하는 기능을 가진다. Figure 9 shows the structure of subcontract management. It is a sub table constituting the execution budget and has the function of presenting the contract details for each subcontract that was finally approved by each level of the WBS, and the function of creating, approving, and registering new subcontracts.

더하여 계약변경작업을 자동화하는 기능, 계약변경예정인 항목들을 잠재적인 계약변경으로 저장한 후 결재과정을 최종 변경계약으로 전환하고 직전계약을 저장하는 기능, 이전 계약변경에 대해 회수별로 검색하는 기능을 가진다.In addition, it has the function of automating the contract change operation, saving the prospective contract items as potential contract changes, converting the payment process to the final contract, saving the previous contract, and retrieving the previous contract changes by the number of times. .

하도급계약에 따른 공사비지급관련 업무처리에 있어 하도급 및 직영+하도급의 실투입비 산출방식을 결정하는 기능을 가지며 금회 지급액을 자동계산하는 기능과 결재를 통한 확정, 확정 후 저장하는 기능, 그리고 이전 기성분에 대한 연혁 및 회수별 상세기성내역을 검색하는 기능을 가진다. It has the function to determine the actual input cost calculation method of subcontracting and direct + subcontracting in the processing of construction expenses payment under subcontracting contract, and it automatically calculates the current payment amount, and confirms, saves after confirmation, and transfers components. It has the function to search the history for each history and the detailed history by number.

하도급 현재계약Subcontract Current Contract

하도급 현재계약은 당해 건설공사의 특정작업들에 대해 체결한 하도급계약의 현재계약(20406)을 현시하는 단계로서 실행예산(20305) 비목중 한 개 이상의 비목으로 구성된 실행예산 테이블의 하위 테이블로 등록되며 검색단계는 하도급계약현황(20405) 중에서 선택하는 단계를 가진다. 하도급계약현황(20405)은 계약명/계약내용설명/업체명/계약금액/계약일의 요약형태로 현시하고 각각의 요약은 변경예정(20402)으로부터 교체된 최종 하도급계약의 상세내역과 연결되어있다.The subcontract current contract is a sub-table of the execution budget table consisting of one or more items of the execution budget (20305), which manifests the current contract (20406) of the subcontracting contract concluded for specific works of the construction. The search step has a step of selecting from the subcontracting status (20405). The subcontracting status (20405) is presented in the form of contract name, contract description, company name, contract amount, contract date, and each summary is linked to the details of the final subcontract that was replaced from the planned change (20402).

하도급기성지급현황Status of subcontracting payment

하도급기성지급현황(20407)은 하도급계약현황(20405)에서 선택되어진 하도급계약의 현재계약(20406)과 회수별 하도급기성(20408)으로부터 현재계약 대비 직전까지의 기성지급합계를 계산, 현시하고 당해계약의 각 회수별 상세내역(20408)과 연계(링크)한다. The subcontracted payment status (20407) calculates, displays, and displays the existing sum of payments from the current contract (20406) and subcontracting by subcontracting (20408) selected by the subcontracting contract (20405) to the previous contract. Linkage (link) with the details 20408 of each number of times.

하도급계약 기성청구Subcontract Contract

하도급계약의 기성청구(20409)는 하도급계약현황(20405) 중에서 선택되어진 실행예산(20305)과 실행예산의 일정/비용계산(20308)으로부터 현재기성액수를 복사하여 당해 하도급계약의 전체 기성금액을 구성하고 전회까지의 누적 기성(20407)을 감한 금액에 기성율에 따른 선금급(20410) 공제액을 감하여 금회 기성을 계산한 후 승인을 요청하는 단계와 승인과정에서 삭제, 추가 또는 금액수정을 할 수 있는 단계를 가진다.The subcontracted request for subcontracting (20409) copies the current amount from the execution budget (20305) selected from the subcontracting contract status (20405) and the schedule / cost calculation of the execution budget (20308) to form the total amount of the subcontracting contract. And after subtracting the prepayment (20410) deduction according to the established rate to the amount subtracted from the previous period (20407) up to the last time to calculate the current period and request for approval and the step to delete, add or modify the amount during the approval process Has

승인 후에는 실행예산집행을 위한 자금청구(20309)의 비용계산에 등록하는 단계를 가지며 자금청구의 승인후에는 금회분의 하도급 기성내역(20408)으로 저장하는 단계 After approval, there is a step of registering in the cost calculation of the claim 20309 for executing the execution budget, and after approval of the claim, storing the current subcontracted history 20408 for this time.

하도급계약 변경현황Subcontract Contract Change Status

하도급계약의 변경현황(20403)은 계약별 변경연혁을 요약, 현시하는 단계이며 하도급계약현황(20405) 으로부터 당해 하도급계약의 회수별 변경(20404)의 변경연혁을 요약, 현시하고 각 회수별로 당해 회수의 하도급계약변경 상세내역(20404)을 링크The change status of subcontracting contract (20403) is the stage of summarizing and presenting the change history of each contract. Link to subcontracting change details of the company (20404)

하도급계약 변경예정Subcontracting Coming Soon

하도급계약 변경예정(20402)은 변경계약승인 전까지 작업별 변경사항들을 임시저장하고 변경승인절차를 수행하는 단계로서, 하도급계약현황(20405)으로부터 당해 하도급계약의 변경예정(20402)이 선택되어지며 직전 하도급계약변경 이후의 변경예정인 사안들 즉, 하도급계약변경/신규(20401)로부터 저장된 변경예정 작업들의 요약 및 상세내역을 현시한다. 하도급계약변경예정작업들의 승인을 수행하는 단계와 승인과정에 삭제 또는 수정을 하는 단계 및 승인 후 현재 하도급계약(20406)으로 대체되는 단계를 가진다.The subcontract scheduled change (20402) is a step of temporarily storing the work-specific changes until the approval of the change contract and performing the change approval procedure. The subcontract scheduled change (20402) is selected from the subcontract status (20405). A summary and details of the upcoming changes after subcontract change, namely, the upcoming changes to be saved from subcontract change / new 20401, are presented. There is a step of performing approval of subcontract change scheduled work, a step of deleting or modifying the approval process, and a step of replacing the current subcontract with the current subcontract (20406).

하도급계약변경/신규계약Subcontract Contract Change / New Contract

하도급계약변경/신규계약(20401)은 하도급계약을 신규등록하거나 기 등록된 계약의 변경을 지원하는 단계이다. 신규등록은 실행예산내역(20305)에서 하도급계약내역(20406)을 발췌, 구성하여 신규하도급계약내역으로 등록요청 및 승인하는 단계이며, 신규계약 승인 후 하도급계약현황(20405)에 등록하는 단계를 가진다. 이 단계에서 자금청구(20309)를 위한 실투입비계산을 하도급, 직영+하도급으로 구분 설정하는 단계를 가진다. Subcontract contract change / new contract 20401 is a step of newly registering a subcontract or supporting a change of a pre-registered contract. The new registration is a step of extracting and configuring subcontracting contracts 20406 from the execution budget 20305, requesting and approving them as new subcontracting contracts, and registering the subcontracting contract status 20405 after approval of the new contract. . At this stage, the actual input cost calculation for the claim 20309 is divided into subcontracting and direct + subcontracting.

하도급계약의 계약변경(20401)은 현재계약(20406)으로부터 변경내역(20402)을 구성하여 승인요청하는 하는 단계를 가지며 변경예정의 변경항목을 구성한다.The contract change 20401 of the subcontract has a step of requesting approval by constructing the change history 20402 from the current contract 20406 and constitutes a change item that is scheduled to be changed.

마. 자재관리hemp. materials management

자재관리 모듈의 구성은 도 10.과 같으며 지급자재, 사급자재, 가시설재에 대해 작업분류체계의 단계(Level)별로 소요량을 현시하고 해당 자재의 입고등록과 관련 작업의 진척도에 따라 사용량을 자동계산하는 기능을 가진다. 더하여 입고시 계상된 자재단가에 근거하여 사용량에 해당하는 금액이 실행예산 모듈의 실적으로 이채되어 투입원가를 구성한다.The composition of the material management module is as shown in FIG. 10. It shows the requirements for each of the work classification system for payment materials, subsidiary materials, and provisional materials, and automatically uses the amount according to the receipt of the material and the progress of related work. Has the function to calculate In addition, based on the unit cost of goods received at the time of goods receipt, the amount corresponding to the amount used is transferred to the performance of the execution budget module to form input costs.

지급자재현황Payment Status

지급자재현황(20502)은 각 지급자재들의 입고량 및 사용량의 집계현황을 데이터로 하는 테이블로서 지급자재 입고대장(20512)과 품목별 사용기록(20503)으로부터 지급자재의 품목별 입고/출고/재고현황을 계산하는 단계를 가진다. The payment material status (20502) is a table that shows the aggregated status of the amount and amount of goods used for each payment material. It calculates the goods receipt / outgoing / stock status of each item of payment material from the payment materials receipt book (20512) and the usage record for each item (20503). Has a step.

지급자재입고대장(20512)은 지급자재 입고시 작업일보(20103)로부터 작성되어지며, 품목별 사용기록(20503)은 지급자재내역(20501)과 연계된 일정/비용계산프로그램(20504)으로부터 작업별 진척도에 따라 자동 계산되는 단계를 가진다. The payment material stock register (20512) is prepared from the work day (20103) when the payment material is received, and the item-specific usage record (20503) is the progress by job from the schedule / cost calculation program (20504) associated with the payment material (20501). According to the steps that are automatically calculated.

지급자재내역(20501)은 작업별(20102), 일정비용계산(20504)의 자원으로 등록되며 지급자재현황(20502)에서 작업별 소요량 및 사용량을 계산하고 현시한다.The payment material 20501 is registered as a resource for each task (20102) and a schedule cost calculation (20504), and calculates and displays the requirements and usage for each task in the payment material status (20502).

사급자재현황Status of Qualified Materials

사급자재현황(20506)은 각 사급자재들의 입고량 및 사용량의 집계현황을 데이터로 하는 테이블로서 사급자재 입고대장(20511)과 품목별 사용기록(20507)으로부터 사급자재의 품목별 입고/출고/재고현황을 산출하는 단계를 가진다. The status of subsidy materials (20506) is a table that shows the aggregated status of the quantity and amount of use of each subsidiaries, and calculates the receipt / outgoing / inventory status of each subsidiaries from the supervision materials receipt book (20511) and the usage records by items (20507). Has a step.

사급자재입고대장(20511)은 사급자재 입고시 작업일보(20103)로부터 작성되어지며, 품목별 사용기록(20507)은 사급자재내역(20505)과 연계된 일정/비용계산프로그램(20504)으로부터 작업별 진척도에 따라 자동 계산되는 단계를 가진다. The master materials stocking register (20511) is prepared from the work daily report (20103) when receiving the master materials, and the usage record for each item (20507) is the progress of each task from the schedule / cost calculation program (20504) linked with the master materials (20505). According to the steps that are automatically calculated.

사급자재내역(20505)은 작업별(20102) 일정비용계산(20504)의 자원으로 등록되며 사급자재현황(20506)에서 작업별 소요량 및 사용량을 계산하고 현시하는 단계와 자금청구(20309)시 금회 사용량과 금액을 계산하는 단계를 가진다.The paid material history (20505) is registered as a resource for the calculation of the schedule cost (20504) by job (20102), and the current amount used during the billing (20309) and the step of calculating and presenting the requirements and consumption by job in the paid material status (20506). And calculating the amount of money.

가시설재현황Refurbishment Status

가시설재현황(20508)은 각 가시설재들의 입고량 및 감모량의 집계현황을 데이터로 하는 테이블로서 가시설재 입고대장(20510)과 품목별 감모량산출(20509)로부터 가시설재의 품목별 입고/감모량/잔존가치현황을 산출하는 단계를 가진다. The temporary goods status (20508) is a table that shows the aggregated status of the amount of goods and the amount of wear of each household goods. Calculate the value status.

가시설재입고대장(20510)은 가시설재 입고시 작업일보(20103)로부터 작성되어지며, 품목별 감모량산출(20509)은 가시설재소요량(20513)과 연계된 일정/비용계산프로그램(20504)으로부터 작업별 진척도에 따라 자동 계산되는 단계를 가진다. The temporary restocking register (20510) is prepared from the working daily report (20103) when the temporary restocking stock is received, and the item-based weight loss calculation (20509) is the progress of each job from the schedule / cost calculation program (20504) associated with the temporary restocking requirements (20513). According to the steps that are automatically calculated.

가시설재소요량(20513)은 작업별(20102) 일정비용계산(20504)의 자원으로 등록되며 가시설재현황(20508)에서 작업별 소요량 및 감모량을 계산하고 현시하는 단계와 감모량의 금액을 경비-2(20804)로 이채하는 단계를 가진다.The provisional provisions demand (20513) is registered as a resource for the calculation of a certain cost (20504) for each task (20102), and the steps for calculating and presenting the requirements and the amount of reduction for each task in the provisional status (20508) 2 (20804).

바. 노무관리bar. Labor Management

도 11.은 노무관리모듈의 구성을 도식화한 것이다. 작업일보를 거쳐 입력된 근로자의 근로계약을 생성, 결재, 검색하고 날짜별, 작업분류체계의 단계(Level)별로 근로자 출역 테이블을 구성하는 기능과 근로자별 노임 및 노임부대비용을 산출하고 노임지급현황을 작성, 결재, 저장, 검색하는 기능을 가진다. 11 is a diagram illustrating the configuration of a labor management module. Create, pay, and search labor contracts of workers entered through the working day, and organize workers' service tables by date and level of the work classification system, calculate wages and wages for each employee, and pay the status of wages. It has the function to create, approve, save and search.

더하여 실투입비를 산출하는 절차를 지원하기 위하여 직영에 종사한 인력과 하도급에 종사한 인력을 구분하는 기능을 가진다.In addition, to support the process of calculating the actual input cost, it has the function of distinguishing manpower engaged in direct management from manpower working in subcontracting.

직영공사 출역현황Management Status

직영공사 출역현황(20604)은 직영작업의 날짜별, 작업별 근로자출역현황을 데이터로 하는 테이블이며 작업일보(20103)로부터 입력된 직영근로자 출역대장(20603)으로부터 일별, 월별, 작업별, 근로자 출역데이터를 집계, 현시하는 단계이다.The management status of direct management (20604) is a table that shows the status of workers' service by date and job of direct operation, and is based on daily, monthly, job, and workers from the direct-employee employee account book (20603). It is the stage to aggregate and display the area data.

노임지급을 위한 현재 노임계산을 위해 근로자 출역일수를 제공한다. Provide worker service days for calculating current wages for pay.

하도급계약 출역현황Subcontract Contract Status

하도급계약 근로자출역현황(20602)은 하도급계약된 작업의 날짜별, 작업별 근로자출역현황을 데이터로 하는 테이블이며 작업일보(20103)로부터 입력된 직영근로자 출역대장(20603)으로부터 일별, 월별, 작업별, 근로자 출역데이터를 집계, 현시하는 단계이다. 하도급계약의 기성산출과 연계하거나 또는 별도로 집계하는 단계로 설정할 수 있다.The subcontract worker's service status (20602) is a table that shows the workers' service status by date and job of subcontracted work, and the daily, monthly, and work from the direct worker's service register (20603) input from the work report (20103). It is the stage of collecting and presenting star data for workers. It can be set up in conjunction with the off-the-shelf output of the subcontract or aggregated separately.

직영공사 노임지급현황Status of wages for direct management

노임지급현황(20605)은 실투입비를 산출하기위한 자금청구(20309) 시 직영근로자 지급예정노임을 산출하는 단계이며 직영근로자 출역현황(20604)으로부터 작성되어지는 근로자별 노임총액과 근로자별 노임지급대장(20606)에 저장된 직전까지의 지급액을 감하여 금회 노임을 계산하고 이를 승인하는 단계이며 승인과정에 금회 지급금액을 수정하는 단계를 가진다. 승인후 근로자별 노임지급대장(20606)에 저장한다.The wage payment status (20605) is a step of calculating the expected wages for direct workers when requesting funds (20309) to calculate actual input costs, and the total amount of wages for each worker and the payroll for each worker prepared from the status of direct workers (20604). It is a step of calculating and approving this wage by subtracting the amount of payment up to the date stored in (20606) and modifying the amount of payment in the approval process. After approval, it is stored in the payroll for each worker (20606).

근로계약현황Status of Labor Contract

근로계약현황(20608)은 당해 현장에 1회이상 출역한 근로자의 총괄목록이며 작업일보(20103)에서 작성된 근로자별 근로계약(20607)으로부터 근로자의 명세서를 현시한다.The labor contract status (20608) is a comprehensive list of workers who have worked at the site more than once and expresses the employee's specifications from the labor contract (20607) for each worker prepared in the work report (20103).

필요시 하도급계약도 동일한 방법으로 추가할 수 있다.If necessary, subcontracts can be added in the same way.

사. 중기관리four. Medium term management

도 12.는 현장에 투입된 중기관리모듈의 구성을 보여준다. 작업일보를 거쳐 입력된 건설장비의 장비임차계약을 생성, 결재, 검색하고 날자별, 작업분류체계의 단계(Level)별로 건설장비 가동일보 테이블을 구성하는 기능과 장비별 임대료 및 임대료 부대비용을 산출하고 임대료 지급현황을 작성, 결재, 저장, 검색하는 기능을 가진다. 12. shows the configuration of the medium-term management module put into the field. Generate, approve, and retrieve equipment lease contracts of construction equipment entered through working day and calculate construction equipment operation daily table by date and level of work classification system, and calculate rent and lease surcharges by equipment It has the function to create, pay, save and search rent payment status.

더하여 실투입비를 산출하는 절차를 지원하기 위하여 직영장비와 외부임차장비의 구분 및 사용료 산출을 위한 사용기간단위를 결정하는 기능을 가진다.In addition, in order to support the procedure for calculating the actual input cost, it has the function of distinguishing between the direct management equipment and the external lease equipment and determining the period of use for calculating the royalties.

직영중기 사용현황Current Status of Direct Management

직영중기사용현황(20704)은 날짜별, 작업별 중기사용현황을 데이터로 하는 테이블이며 작업일보(20103)로부터 입력된 직영일별 중기가동일보(20703)으로부터 일별, 월별, 작업별, 중기사용시간 데이터를 집계, 현시하는 단계이다.Medium-term use status (20704) is a table of medium-term use status by date and job, and daily, monthly, job, and medium-hour usage data from the medium-term movement daily report (20703), which is entered from the work report (20103). It is a step to aggregate and manifest.

하도급계약 중기사용현황Subcontract Contract Medium-Term Use Status

하도급계약 중기사용현황(20702)은 하도급계약된 작업의 날짜별, 작업별 중기사용시간을 데이터로 하는 테이블이며 작업일보(20103)로부터 입력된 하도급계약중기사용대장(20603)으로부터 일별, 월별, 작업별, 중기사용시간데이터를 집계, 현시하는 단계이다. 하도급계약의 기성산출과 연계하거나 또는 별도로 집계하는 단계로 설정할 수 있다.The subcontracted medium term use status (20702) is a table with data on the medium-term use time by date and task of subcontracted work, and is based on daily, monthly, and job from the subcontracted medium term use register (20603). It is a step of aggregating and presenting stars and medium-term use time data. It can be set up in conjunction with the off-the-shelf output of the subcontract or aggregated separately.

중기사용료지급Medium-term fee payment

중기사용료지급(20705)은 실투입비를 산출하기위한 자금청구(20309) 시 직영공사의 중기사용료 지급예정금액을 산출하는 단계이며 직영중기사용현황(20704)으로부터 작성되어지는 중기별 사용료총액과 중기별 사용료지급대장(20706)에 저장된 직전까지의 지급액을 감하여 금회 중기 사용료를 계산하고 이를 승인하는 단계이며 승인과정에 금회 지급금액을 수정하는 단계를 가진다. 승인후 중기별별 사용료지급대장(20706)에 저장한다.Medium-term royalty payment (20705) is a step of calculating the expected amount of mid-term royalties paid by a direct management corporation when requesting funds (20309) to calculate the actual input cost. Calculate and approve the current medium-term royalty fee by subtracting the payment amount up to the date stored in the royalties payment book 20706 and modifying the current payment amount in the approval process. After approval, it is stored in the medium-term fee book book (20706).

중기임차계약Medium term lease agreement

중기임차계약현황(20708)은 당해 현장에 1회이상 투입한 중기의 총괄목록이며 작업일보(20103)에서 작성된 중기별 임차계약(20707)으로부터 중기의 명세서를 현시한다.The medium term lease contract (20708) is a comprehensive list of the medium term that has been put into the field at least once. The medium term lease contract (20708) shows the medium term specifications from the medium term lease contract (20707).

필요시 하도급계약도 동일한 방법으로 중기사용 임차계약모듈을 추가할 수 있다.If necessary, subcontracting agreements can be added in the same way.

아. 현장경비Ah. Field expenses

도 13.은 현장경비관리 모듈의 구성이다. 현장에서 집행되는 경비의 지출 및 전도금을 관리하는 회계장부의 기능을 가지며 자금청구와 실투입비산출을 지원한다. Figure 13 is a configuration of the site security management module. It has the function of accounting book to manage expenses and conduct of expenses executed in the field and supports billing and actual input cost calculation.

경비-1Expense-1

경비-1지출현황(20802)은 현장에서 지출되는 현장사무실 운영비, 비목별 요약목록으로서 작업일보(20103)에서 입력된 현장지출 경비-1 명세서(20801)로부터 일별, 월별, 작업별, 경비-1 비용 데이터를 집계, 현시하는 단계이다.Expenses-1 Spending Status (20802) is a summary list of on-site office operating expenses and expenditures that are spent on site. Daily, monthly, work, expenses-1 from the field expenditure expenses-1 statement (20801) entered in the working day (20103). It is a step to aggregate and present cost data.

비목구성은 다음의 예시를 참조할 수 있다.See the following example for non-wood construction.

- 현장직원급여-Field employee benefits

- 현장사무실 임대료/감가상각비On-site office rent / depreciation

- 집기 및 비품 감가상각비-Depreciation cost of equipment and fixtures

- 사무실 운영비Office costs

- 기타 공사관리업무 수행상 현장에서 지출되어야 할 비목-Items to be expended on site for the performance of other construction management tasks

경비-2Expense-2

경비-2지출현황(20804)은 직원급여 등 본사에서 지원/지출되는 제비용의 비목별 요약목록으로서 작업일보(20103)에서 입력된 본사지출 경비-2 명세서(20803)로부터 일별, 월별, 작업별, 경비-2 비용 데이터를 집계, 현시하는 단계이다.Expenditure-2 Expenditure Status (20804) is a summary list of expenditures supported / expensed by the head office, such as employee salaries, from daily, monthly, work, Expense-2 It is a step to aggregate and present expense data.

비목구성은 다음의 예시를 참조할 수 있다.See the following example for non-wood construction.

- 본지사 관리비 이체분-Transfer of administrative expenses

- 본사지원부서 직원급여 이체분-Transfer of employee salary

- 본사지원후생복지비용-Welfare and welfare costs

- 제세공과금-Utility bills

- 기타 공사관리업무 수행상 본사에서 지출되어야 할 비목-Other expenses to be spent at the head office for the performance of other construction management tasks

자. 품질관리character. Quality Management

품질관리 모듈의 구성은 도 14.와 같다. 일정관리프로그램과 연계하여 공종별 품질관리 특성요인도를 작성, 현시하는 기능과 공종별 시공계획서ㆍ기계제작승인도서ㆍ자재공급원승인원 등의 작성, 저장, 현시, 검색하는 기능을 가지며 공종별 세부작업들에 대한 체크리스트를 작성, 저장, 검색하는 기능을 가진다. 더하여 품질시험의 실시빈도를 자동계산하여 작업진척도에 따라 품질시험일정을 현시하고 품질시험결과를 작성, 저장, 검색하는 기능을 가진다.The configuration of the quality management module is shown in FIG. 14. In conjunction with the schedule management program, it has the function of creating and presenting quality control characteristic factor diagrams for each type of work, and the function of creating, storing, presenting, and retrieving construction plans, machine manufacturing approval books, and materials supply source approval numbers for each work type. Has the ability to create, save and retrieve checklists. In addition, it automatically calculates the frequency of conducting quality tests, displays quality test schedules according to work progress, and creates, stores and retrieves quality test results.

중점품질관리항목Key Quality Management Items

중점품질관리항목은 당해 공사의 공종 또는 작업 중 특히 중점적으로 관리되어야 할 항목들에 대한 품질관리업무의 수행 및 품질관리현황을 현시하는 단계로서 품질관리현황(20901)에서 구성된 공종 또는 작업중 중점관리공종으로 지정된 작업만으로 별도의 테이블을 구성하고 이의 품질관리업무의 빈도 및 지정된 작업의 진척도 및 시공계획서/기계제작승인도서/자재공급원승인원/검측/시험계획 등의 일정을 집중관리할 수 있는 단계The key quality control items are the phases of performing quality control work and presenting quality control status for items that should be managed in particular during the construction or work of the construction. It is a step to construct a separate table with only the designated work and to intensively manage the schedule of the quality control work, the progress of the designated work, and the schedule of construction work, machine production approval book, material supply approval, inspection, and test plan.

공종별 품질관리현항Quality Control Status by Work Type

품질관리현황(20901)은 공사개요의 공종별 또는 작업별 품질관리 특성요인도를 구성하고 특성요인 작업들의 품질관리업무수행계획을 수립하며 품질관리실적을 작성, 저장, 검색, 현시하는 기능을 가진다. Quality control status (20901) has the function of constructing quality control characteristic factor diagram of construction outline by work type or task, establishing quality control work execution plan of characteristic factor work, and creating, storing, retrieving and presenting quality control results.

품질관리계획의 수립은 공사개요(20102)에서 선정된 공종에 대해 타 공종 또는 하위작업을 특성요인으로 구성하고 구성된 작업에 대해 일정/비용계산(20912)으로부터 작업의 일정 및 진척도에 관한 정보를 현시하는 단계, 앞서 작성, 저장된 시공계획서(20903)/기계제작승인도서(20905)/자재공급원승인원(20907)/검측목록(20909)/품질시험목록(20911) 등의 서식 또는 탬플릿을 제공하는 단계를 가지며, 선택된 템플릿으로 계획을 작성한 후 당해 작업의 품질관리계획으로 등록하는 단계이다.The establishment of the quality control plan consists of the characteristics of other works or sub-work for the selected work in the construction overview (20102), and the information on the schedule and progress of the work is displayed from the schedule / cost calculation (20912) for the composed work. Providing a form or template such as a construction plan (20903), a machine manufacturing approval book (20905), a material supply approval person (20907), a detection list (20909), and a quality test list (20911). It is a step that creates a plan with the selected template and registers it as a quality control plan of the work.

특성요인이 되는 각 작업의 시공계획서(20903)/기계제작승인도서(20905)/자재공급원승인원(20907)/검측목록(20909)/품질시험목록(20911) 등은 작업일보(20103)에서 입력되는 진척도에 따라 일정/비용계산(20912) 프로그램의 "알림"기능에 의해 금일작업(20101)의 예정사항으로 현시되는 단계와 각 항목의 성과작성은 품질관리현황(20901)에서 시공계획서(20903)/기계제작승인도서(20905)/자재공급원승인원(20907)/검측목록(20909)/품질시험목록(20911) 등에 의해 제공된 템플릿에 의해 작성되어지고 작성된 실적은 작업일보를 통하여 승인을 득한 후 시공계획서(20902) / 기계제작승인도서(20904) / 자재공급원승인원(20906) / 검측목록(20908) / 품질시험(20910) 에 목록을 구성하고 시공계획서(20903)/기계제작승인도서(20905)/자재공급원승인원(20907)/검측(20909)/시험(20911) 등에 저장하는 단계를 가지며 품질관리현황(20901)의 특성요인도에 각 작업의 품질관리과업수행여부 및 성과를 현시한다.The construction plan (20903), machine manufacturing approval book (20905), material supply approval person (20907), inspection list (20909), quality test list (20911), etc. of each work that are characteristic factors are entered in the work day report (20103). According to the progress of the schedule / cost calculation (20912) program, the step that is shown as the schedule of today's work (20101) by the "notification" function and the performance of each item are written in the quality management status (20901) and the construction plan (20903). / The results of the work prepared and prepared by the template provided by the machine manufacturing approval book (20905) / material supply approval person (20907) / inspection list (20909) / quality test list (20911), etc. Construct a list in the plan (20902) / machine production approval book (20904) / material supply approval person (20906) / inspection list (20908) / quality test (20910) and construction plan (20903) / machine production approval book (20905) Storing the material supplier approval person (20907) / detection (20909) / test (20911), etc. The quality factor (20901) characteristic factor shows the quality control task performance and performance of each work.

시공계획서Construction plan

시공계획서목록(20902)은 작업별 시공계획서의 작성계획 및 제출 목록을 현시하는 단계이며 각 리스트는 품질관리현황(20901)과 시공계획서(20903)로부터 당해 공종의 시공착수예정일/종료예정일/기간/현재진척도/제출일자/제출여부/상세검색 등의 데이터로 구성되며 각 목록의 상세검색은 당해 시공계획서의 작성후 저장된 이미지파일 또는 텍스트테이블로 작성된 시공계획서(20903)로 이동, 현시The construction plan list (20902) is a stage of presenting the preparation plan and submission list of construction plans by work, and each list is based on the quality management status (20901) and construction plan (20903). It consists of data such as current progress, date of submission, submission / detailed search, and detailed search of each list to move to the construction plan (20903) made up of stored image files or text tables after creation of the construction plan.

기계제작승인도서Mechanical production approval book

기계제작승인도서목록(20904)은 작업(설비)별 기계제작승인도서의 작성계획 및 제출/승인 목록을 현시하는 단계이며 각 목록은 품질관리현황(20901)과 기계제작승인도서(20905)로부터 제공된 당해 공종의 시공착수예정일/종료예정일/기간/현재진척도/제출일자/제출여부/상세검색 등의 데이터로 구성되며 각 목록의 상세검색은 당해 시공계획서의 작성후 저장된 이미지 또는 텍스트로 작성된 기계제작승인도서(20905)로 이동, 현시The mechanical production approval list (20904) is a step of presenting the planning and submission / approval list of the mechanical production approval books for each operation (equipment), and each list is provided from the quality control status (20901) and the mechanical production approval book (20905). It consists of data such as scheduled start date of construction start / end date / time / current progress / submission date / submission / detailed search, etc., and detailed search of each list consists of the approval of machine manufacturing written in the saved image or text after the construction plan. Go to Book (20905), manifest

자재공급원 승인원Source of Approval

자재공급원승인원 목록(20906)은 작업별 소요자재중 공급원 승인원의 계획 및 실적목록을 현시하는 단계이며 각 목록은 품질관리현황(20901)과 기계제작승인도서(20905)로부터 제공된 당해 공종의 시공착수예정일/종료예정일/기간/현재진척도/제출일자/제출여부/상세검색 등의 데이터로 구성되며 각 목록의 상세검색은 당해 자재공급원 승인원의 작성후 저장된 이미지 또는 텍스트로 작성된 자재공급원 승인원(20907)로 이동, 현시The material supply source approval list (20906) is a phase of presenting the plan and performance list of the source approval sources in the required materials by job, and each list is the construction of the corresponding work provided from the quality control status (20901) and the machine manufacturing approval book (20905). It is composed of data such as start date / scheduled date / time / current progress / submission date / submission / detailed search. Go to 20907)

검측Detection

검측 목록(20908)은 작업별 검측계획서 및 실적 목록을 현시하는 단계이며 각 목록은 품질관리현황(20901)과 검측통보서(20909)로부터 제공된 당해 공종의 시공착수예정일/종료예정일/기간/현재진척도/제출일자/제출여부/상세검색 등의 데이터로 구성되며 각 목록의 상세검색은 당해 검측통보서의 작성후 저장된 이미지 또는 텍스트로 작성된 검측통보서(20903)로 이동, 현시The inspection list (20908) is a step of presenting the inspection plan and the performance list for each work. Each list includes the expected date of commencement of construction start / end of schedule / period / current progress / provided from the quality control status (20901) and the inspection notice (20909). It consists of data such as submission date / submission / detailed search, and detailed search of each list is moved to the detection notification (20903) made with the stored image or text after the preparation of the detection notification.

품질시험Quality test

품질시험 목록(20910)은 작업별 시험계획서 및 시험결과에 대한 목록을 현시하는 단계이며 각 목록은 품질관리현황(20901)과 품질시험성적서(20911)로부터 제공된 당해 공종의 시공착수예정일/종료예정일/기간/현재진척도/제출일자/제출여부/상세검색 등의 데이터로 구성되며 각 목록의 상세검색은 당해 공종의 시험성적서의 작성 후 저장된 이미지 또는 텍스트로 작성된 시험성적서(20911)로 이동, 현시The quality test list (20910) is a step of presenting a list of test plans and test results for each work, and each list is expected to start / end date of construction start / end of the corresponding work provided from the quality control status (20901) and the quality test report (20911). It consists of data such as period / current progress / submission date / submission / detailed search, and detailed search of each list is moved to the test report (20911) made of the stored image or text after the test report of the relevant work is made.

차. 안전관리car. safety management

안전관리모듈의 구성은 도 15.와 같다. 공종별 안전시설설치, 안전점검, 안전교육의 계획된 일정을 현시하는 기능이 있고 안전관리활동의 결과물인 안전시설 설치보고서, 안전점검 체크리스트, 안전교육 시행보고서 등을 작성, 결재, 저장, 검색하는 기능을 가진다. 더하여 공사비 집행항목 중 사용된 안전관리비대장을 작성, 결재, 저장, 검색하는 기능을 가진다.The configuration of the safety management module is shown in FIG. Function to present safety facility installation, safety inspection, and safety training schedule by type of work, and prepare, approve, save and search safety facility installation report, safety inspection check list, safety education execution report, etc. Has In addition, it has the function of creating, paying, storing, and retrieving the safety management ledger used among the construction cost execution items.

총괄안전관리계획Overall Safety Management Plan

총괄안전관리계획(21013)은 안전관리조직 및 안전관리계획/실적의 현황을 현시하는 단계로서 안전관리조직을 구성하고 작업일보를 통한 승인을 거쳐 저장하는 단계, 공사개요(20102)와 일정비용계산(21012)으로부터 안전시설계획(21001), 안전점검계획(21002), 안전교육계획(21003) 의 목록을 생성하고 요약을 현시하는 단계를 가지며, 안전시설실적(21004), 안전점검실적(21006), 안전교육실적(21008)을 생성하는 단계를 가진다.The overall safety management plan (21013) is a step to present the status of the safety management organization and the safety management plan / performance, constructing the safety management organization, and storing it after approval through the work report, construction overview (20102), and calculating the schedule cost. (21012) has the steps of creating a list of safety facility plans (21001), safety check plans (21002), safety education plans (21003) and presenting summaries, safety facility records (21004), safety check records (21006). In addition, the step of generating safety education results (21008).

안전관리시설현황(21005), 안전점검실적현황(21007), 안전교육실적현황(21009)으로부터 총괄안전관리 요약을 구성하고 현시하는 단계를 가진다.The overall safety management summary is composed and presented from the status of safety management facilities (21005), the results of safety inspection (21007), and the status of safety education (21009).

안전관리비집행현황(21011)로부터 안전관리비집행요약을 현시한다.The summary of safety management execution is revealed from the current status of safety management execution.

안전시설현황Safety Facility Status

안전시설현황(21005)은 작업별 안전시설계획 및 실적을 현시하는 단계이며 각 현시항목은 일정비용계산(21012)프로그램과 작업별 안전시설실적(21004)으로부터 제공된 당해 작업의 시공착수예정일/종료예정일/기간/현재진척도/시설명/설치여부 등의 데이터로 구성되는 단계를 가진다. 각 목록은 당해 작업의 설치계획서 또는 설치를 입증하는 문서의 작성후 저장된 시설설치실적(21004)으로 이동, 현시하는 단계를 가진다.The status of safety facility (21005) is the stage of presenting the safety facility plan and performance by task, and each manifestation item is the scheduled start / end date for the start of the work provided from the schedule cost calculation (21012) program and the safety facility performance by task (21004). It has a step composed of data such as / period / current progress / facility name / installation status. Each list has a stage of moving and presenting the stored facility installation results (21004) after the preparation of the installation plan or document certifying the installation.

안전점검현황Safety Check Status

안전점검현황(21007)은 작업별 안전점검계획 및 실적을 현시하는 단계이며 각 현시항목은 일정비용계산(21012)프로그램과 작업별 안전점검실적(21006)으로부터 제공된 당해 작업의 시공착수예정일/종료예정일/기간/현재진척도/점검일자/문제점 등의 데이터로 구성되는 단계를 가진다. 각 목록은 당해 작업의 점검체크리스트 또는 점검보고서를 작성후 저장된 안전점검실적(21006)으로 이동, 현시하는 단계를 가진다.The status of safety inspection (21007) is the stage of presenting the safety inspection plan and performance for each task, and each manifestation item is the scheduled start / end date for the start of the start of the work provided from the schedule cost calculation (21012) program and the safety inspection results for each task (21006). Steps consist of data such as / period / current progress / check date / problem. Each list has a step of creating and checking a checklist or inspection report of the work and moving it to the stored safety check records (21006).

안전교육현황Status of safety education

안전교육현황(21009)은 작업별 안전교육계획 및 실적을 현시하는 단계이며 각 현시항목은 일정비용계산(21012)프로그램과 작업별 안전교육실적(21008)으로부터 제공된 당해 교육의 교육명/교육예정일/교육대상/교육인원/교육담당자 등의 데이터로 구성되는 단계를 가진다. 각 목록은 당해 교육의 교육계획서 또는 교육시행보고서를 작성후 저장된 안전교육실적(21008)으로 이동, 현시하는 단계를 가진다.The status of safety education (21009) is the phase of presenting the safety education plan and performance for each task, and each manifest item is the name of the education / scheduled date / date of education provided from the schedule cost calculation (21012) program and the results of safety education for each task (21008). It has a stage that consists of data such as education target / training staff / education staff. Each list has the steps of preparing and presenting the education plan or education execution report of the relevant education to the saved safety education results (21008).

안전관리비Safety fee

안전관리비현황(21011)은 안전관리비의 집행계획 및 실적을 현시하는 단계로서 작업일보에서 입력된 안전관리비 전표(21010)를 데이터로 하는 테이블을 구성하는 단계를 가진다.The status of safety management expenses 21011 is a step of presenting the execution plan and performance of the safety management expenses and has a step of constructing a table with data on the safety management expenses slips 21010 inputted from the work report.

안전관리비 전표(21010)를 연계, 현시하는 단계를 가진다.Linkage and manifestation of the safety management expenses slip (21010).

안전관리비현황은 도급기성청구(20209)시 전체 안전관리비를 제공하는 단계를 가진다.The status of the safety management cost has a step of providing a total safety management fee at the time of contracting the contract 20209.

본 발명은 당해 건설공사의 목적물을 형상화한 그래픽 사용자 인터페이스를 통해 공사내역을 관리할 수 있도록 함으로써 건설공사의 특성상 매 프로젝트마다 달라질 수 있는 공종명과 과업범위로 인한 공사관리자의 혼선을 방지하고 각 공종별 작업별 과업범위에 대해 공통된 인식을 도출하며, 해당 건설공사에 대한 내역분류체계(WBS)의 구조를 쉽게 이해할 수 있게 한다. 특히 이러한 사용자 인터페이스는 당해 건설공사의 추진계획에 대한 상세한 지식이 없는 외부 사용자도 쉽게 사용할 수 있도록 함으로써 건설공사의 외부 홍보 및 공사추진현황의 전달에 탁월한 효과가 있다.The present invention enables to manage the construction history through the graphical user interface of the object of the construction work to prevent the confusion of the construction manager due to the construction name and the scope of work that can vary from project to project due to the nature of the construction work and work for each construction type Common perceptions on the scope of work for each task are derived and the structure of the WBS for the construction can be easily understood. In particular, such a user interface can be easily used by an external user who does not have detailed knowledge of the construction plan of the relevant construction, and thus has an excellent effect on the external promotion of construction and delivery of construction promotion status.

현재 공사관리에 적용되는 각종의 프로그램들이 시스템 사용자가 아니면 접근하기 어려운 공사내역 검색을 쉽게 할 뿐 만 아니라, 각 관리분야 별로 수행되어지는 공사관리업무를 통합관리될 수 있도록 개선하며 공사 진척도의 현황을 신속하고 정량적으로 제공한다.Various programs applied to the current construction management not only make it easy to search the construction history which is difficult to access by the system user, but also improve the status of the progress of the construction by integrating and managing the construction management tasks performed by each management field. Provided quickly and quantitatively.

특히 본 발명은 건설공사수행을 위한 제반 관리업무 즉, 일일작업현황 제공 및 공사기록 저장, 도급공사비관리, 실투입공사비관리, 하도급관리, 자재관리, 중기관리, 노무관리 등을 통합관리함으로서 단순한 업무의 통합이 아니라 건설공사의 일정관리시스템을 구동엔진으로하여 각 관리분야들이 통합관리가 가능토록 할 수 있으며, 모든 관리업무의 수행을 기구조직 및 업무분장에 따라 책임과 권한이 명확한 업무수행을 지원하고, 항목별 공사현황 및 관리기록과 대장을 제공, 보존되도록 한 것이다.In particular, the present invention provides a simple operation by providing integrated management of all management tasks for construction work, that is, providing daily work status and storing construction records, subcontracting cost management, actual input construction cost management, subcontracting management, materials management, medium-term management, labor management, etc. It is possible to enable integrated management of each management field by using the schedule management system of construction works as the driving engine, and to support the performance of duties with clear responsibility and authority depending on the organization and division of work. The construction status, management records and account book for each item are provided and preserved.

Claims (8)

- 작업분류체계(도 4.) 기법을 적용하여 작성된 계층적구조의 공사내역 테이블을 구성하고 이 작업분류체계의 각 단계(Level) 별 요소(작업:Activity)에 접근하는 수단으로 작업분류체계의 특정단계(Level)에 해당하는 요소들의 일부 또는 전체를 공사목적물의 완성상태 또는 건설 중인 상태 등의 조감도, 사진, 설계도면, 3D 그래픽화면 및 동영상 등의 시각적 개체로 구성하고 이 개체들 중 특정 개체를 선택하면 당해 요소의 시설명 또는 작업명과 공사범위 그리고 당해 요소의 시설구조 또는 작업의 완성상태 또는 건설중인 상태 등의 조감도, 사진, 설계도면, 3D 그래픽화면 및 동영상 등을 현시함과 동시에 작업분류체계(WBS)의 하위 특정단계(Level)에 해당하는 요소를 하위메뉴로 현시하는 단계와, 선택된 특정 개체를 실행하면 해당범위의 데이터에 접근하는 단계-Construct a hierarchical structure of the work breakdown structure by applying the work breakdown structure (Fig. 4) technique, and access the elements of each breakdown structure (level of activity) of the work breakdown structure. Some or all of the elements corresponding to a specific level are composed of visual objects such as bird's eye view, photograph, design drawing, 3D graphic screen and video such as completion status of construction object or under construction, and specific object among these objects. If you select, the bird's eye view, photographs, design drawings, 3D graphic screen and video, etc. of the facility name or work name of the element and the scope of construction and the completion or construction of the facility structure or work of the element are displayed and the work classification. Presenting the element corresponding to the lower level of the system (WBS) as a submenu, and executing the selected specific object to access the data of the corresponding range. Total - 상기 단계중 전체개체에서 특정시설로 표현된 부분 또는 개체의 하위 요소가 하위메뉴로 현시될 때 각 요소들은 나열형식 또는 작업순서 또는 PERT의 연결관계로 현시되어질 수 있고 하위 메뉴의 특정요소가 선택되면 당해 요소의 시설구조 또는 작업의 완성상태 또는 건설중인 상태 등의 조감도, 사진, 설계도면, 3D 그래픽화면 및 동영상 등을 하위메뉴와 함께 현시하고 실행할 경우 해당범위의 데이터에 연결하는 단계-When the sub-elements of the part or individual expressed as a specific facility in the whole object are displayed as sub-menus, each element can be expressed in the form of a list or a work order or a connection of PERT, and a specific element of the sub-menu is selected. When the bird's eye view, photographs, design drawings, 3D graphic screens and videos, etc. with sub-menus are displayed and executed, the connection to the data of the relevant range - 이하 작업분류체계(WBS)의 단계(Level) 수에 따라 하위메뉴의 구성을 상기 단계의 반복으로 구성하는 데이터베이스 색인하는 방법(도 5.)A method of indexing a database in which the submenu is composed of repetition of the above steps according to the number of levels of the WBS (WBS) (FIG. 5.) - 작업분류체계(도 4.) 기법을 적용하여 작성된 계층적구조의 공사내역 테이블을 구성하고, 당해 건설공사의 도급계약내역서(공사비 명세서)를 작업분류체계(도 4.) 테이블의 하위테이블로 하여 작업분류체계의 작업(Activity)에 도급계약내역의 비용항목들이 자원(Resource)으로 할당되어지도록 함으로써 각 작업의 진척도에 따라 비용항목의 수량과 금액을 산출하는 단계-Construct a hierarchical structure of the construction history table prepared by applying the work breakdown structure (Fig. 4) technique, and subcontract the contract details (construction cost statement) of the construction work as a subtable of the work breakdown structure (Fig. 4.) table. Calculating the quantity and amount of the cost item according to the progress of each work by assigning the cost items of the contract contract as resources to the activity of the work breakdown structure. - 상기 단계에 의해 작업별 진척도에 따라 산출되는 도급계약내역의 비용항목별 수량과 금액에 별도의 실비정산항목(예: 안전관리비 등) 테이블로부터 비용항목, 수량, 금액을 합산하고 총계약금액 대비 선금의 비율에 따른 선금공제액을 감하여 금회 기성청구명세서 테이블을 생성하는 단계와, 두번째 이후의 기성청구명세서 산출은 총 기성청구명세서로부터 전회까지 기성청구명세서의 비용항목별 누적금액을 감하여 금회 기성청구명세서 테이블이 생성되는 단계-The cost items, quantities and amounts are added up from the separate actual cost settlement items (e.g., safety management expenses, etc.) to the quantity and amount for each cost item of the contract contract, which is calculated according to the progress of each work by the above steps, and compared to the total contract amount. Generating the current billing statement table by subtracting the prepayment deduction according to the ratio of the down payment, and calculating the billing statement after the second time by subtracting the cumulative amount by the expense item of the billing statement from the previous billing statement to the previous one. Steps in which the table is created - 기성청구명세서의 승인과정에서 비용항목, 수량, 금액은 수정될 수 있고 수정에 따른 기성청구액의 변경에 따라 선금공제액이 자동 산출되는 단계와 승인 후 회수별 기성청구명세서목록 테이블을 생성하고 저장, 검색하는 단계 -In the process of approval of the existing bill, the cost item, quantity and amount can be modified, and the prepaid deduction is automatically calculated according to the change of the established bill according to the amendment. Step to search - 도급계약내역서의 변경(설계변경)이 필요할 경우 해당 도급계약내역서의 변경되는 부분이 포함된 작업분류체계테이블의 작업(Activity)을 실행하여 당해 작업에 할당된 도급계약내역서 테이블의 비용항목과 수량, 금액 등을 수정한 테이블을 생성하고 저장하였다가 승인을 거친 후 당초 도급계약내역서 테이블과 교체되도록 하고 당초 테이블은 따로 저장되며, 변경회수별 목록(연혁) 테이블을 구성, 저장하고 검색할 수 있는 단계 -If a contract contract statement needs to be changed (design change), it executes the activity of the work breakdown structure table including the changed part of the contract contract statement, and the cost items and quantity of the contract contract statement table assigned to the work. After creating and storing a table that modified the amount of money, the amount, etc., it is replaced with the original contract statement table after the approval, and the original table is stored separately, and it is possible to compose, save and search the list table by the number of changes. step - 작업분류체계(도 4.) 기법을 적용하여 작성된 계층적구조의 공사내역 테이블을 구성하고, 당해 건설공사의 공사실행예산서(실투입공사비 명세서)를 작업분류체계(도 4.) 테이블의 하위테이블로 하여 작업분류체계의 작업(Activity)에 공사실행예산서의 비용항목들이 자원(Resource)으로 할당되어지도록 함으로써 각 작업의 진척도에 따라 비용항목의 수량과 금액을 산출하는 단계-Construct a hierarchical structure of the construction history table created by applying the work breakdown structure (Fig. 4) technique, and subcontract the work execution system (figure of actual input cost) from the work breakdown structure (Fig. 4) table. Calculating the quantity and amount of cost items according to the progress of each work by assigning the cost items of the construction execution budget as resources to the activity of the work breakdown structure as a table. - 공사실행예산서는 특정 비용항목별로 그룹화하여 하도급계약내역서 테이블을 생성할 수 있고 이의 승인과정을 거치면 당초 공사실행예산서의 해당 비용항목으로 대체하는 단계-The construction execution budget can be grouped by specific cost items to create a subcontract statement table, and after the approval process, the construction execution budget is replaced with the corresponding cost items in the construction execution budget. - 상기 단계에 의해 공사실행예산서의 비용항목별 실투입비용청구(자금청구)명세서 산출은 작업별 진척도에 따라 산출되는 사급자재 사용량에 따른 금액과 하도급계약의 금회 지급승인된 금액 그리고 실집행비용이 계상되는 비용테이블(예: 직영작업의 근로자임금, 직영작업의 중기사용료, 경비 등)로부터 산출된 금액을 합산하여 금회 실투입비용명세서 테이블을 생성하는 단계-According to the above steps, the calculation of the actual input cost billing (billing) statement for each expense item in the construction execution budget is based on the amount of subsidiary materials calculated according to the progress of work, the amount approved for the subcontracting contract, and the execution cost. Generating the actual input cost statement table by summing the amounts calculated from the calculated cost tables (for example, worker wages for direct operations, medium-term royalties for direct operations, expenses, etc.) - 실투입비용청구명세서의 승인과정에서 비용항목, 수량, 금액은 수정될 수 있고 승인 후 회수별 실투입비용청구명세서목록 테이블을 생성하고 저장, 검색하는 단계 -In the process of approving the actual input bill, the cost items, quantity, and amount can be modified, and after the approval, the table for creating, storing, and retrieving the actual input cost bill list table by collection - 공사실행예산서의 변경(설계변경)이 필요할 경우 해당 공사실행예산서의 변경되는 부분이 포함된 작업분류체계테이블의 작업(Activity)을 실행하여 당해 작업에 할당된 공사실행예산서 테이블의 비용항목과 수량, 금액 등을 수정한 테이블을 생성하고 저장하였다가 승인을 거친 후 당초 공사실행예산서 테이블과 교체되도록 하고 당초 테이블은 따로 저장되며, 변경회수별 목록(연혁) 테이블을 구성, 저장하고 검색할 수 있는 단계 -If it is necessary to change the construction execution budget (design change), execute the activity of the work breakdown structure table including the changed part of the construction execution budget, and the cost items and quantity of the construction execution budget table allocated to the work. After creating and storing a table that modified the amount of money, the amount, etc., after approval, the table is replaced with the original construction execution budget table, and the original table is stored separately, and the list (historical) table by change count can be configured, stored, and retrieved. step - 작업분류체계(도 4.) 기법을 적용하여 작성된 계층적구조의 하도급공사내역 테이블을 구성하고, 당해 하도급계약내역서(하도급공사비 명세서)를 작업분류체계(도 4.) 테이블의 하위테이블로 하여 작업분류체계의 작업(Activity)에 하도급계약내역의 비용항목들이 자원(Resource)으로 할당되어지도록 함으로써 각 작업의 진척도에 따라 비용항목의 수량과 금액을 산출하는 단계-Construct a subcontract history table with hierarchical structure created by applying the WBS method, and use the subcontract statement (subcontract statement) as a sub-table of the WBS table. Calculating the quantity and amount of cost items according to the progress of each work by assigning the cost items of subcontracting contracts to resources in the activity of the work breakdown structure. - 상기 단계에 의해 작업별 진척도에 따라 산출되는 하도급계약내역의 비용항목별 수량과 금액에 총계약금액 대비 선금의 비율에 따른 선금공제액을 감하여 금회 하도급기성지급명세서 테이블을 생성하는 단계와, 두번째 이후의 하도급기성지급명세서 산출은 작업별 진척도에 따라 산출되는 하도급계약내역의 비용항목별 수량과 금액으 로부터 전회까지 지급된 하도급기성의 비용항목별 누적금액과 선금공제액을 감하여 금회 하도급기성지급명세서 테이블을 생성하는 단계-Subtracting the down payment deduction according to the ratio of the down payment to the total contract amount to the quantity and amount of the subcontracting contract details calculated according to the progress of each work by the above steps to generate the current subcontracting payment statement table; The subcontracting statement of subcontracting is calculated by subtracting the cumulative amount and prepayment amount of subcontracting expenditure of subcontractings paid up to the previous time from the quantity and amount of subcontracting contract details calculated according to the progress of each work, Steps to generate - 하도급기성지급명세서의 승인과정에서 비용항목, 수량, 금액은 수정될 수 있고 수정에 따른 기성지급예정액의 변경에 따라 선금공제액이 자동산출되는 단계와 승인 후 회수별 하도급기성지급명세서목록 테이블을 생성하고 저장, 검색하는 단계 -In the process of approving the subcontracted payment statement, the cost items, quantity, and amount can be modified, and the prepayment deduction is automatically calculated in accordance with the change in the estimated amount of the subcontracted payment, and the subcontracting statement list table for each collection after approval is created. , Store and retrieve - 하도급계약내역서의 변경(설계변경)이 필요할 경우 해당 하도급계약내역서의 변경되는 부분이 포함된 작업분류체계테이블의 작업(Activity)을 실행하여 당해 작업에 할당된 하도급계약내역서 테이블의 비용항목과 수량, 금액 등을 수정한 테이블을 생성하고 저장하였다가 승인을 거친 후 당초 하도급계약내역서 테이블과 교체되도록 하고 당초 테이블은 따로 저장되며, 변경회수별 목록(연혁) 테이블을 구성, 저장하고 검색할 수 있는 단계 -If the subcontracting statement needs to be changed (design change), the cost of items and quantities in the subcontracting statement table assigned to the work are executed by executing the activity of the work breakdown structure table containing the changed part of the subcontracting statement. After creating and storing a table that modified the amount of money, the amount, etc., after approval, the table is replaced with the original subcontract statement table, and the original table is stored separately, and the list (historical) table by the number of changes can be configured, stored, and retrieved. step - 청구항 2.의 도급계약내역서와 도급기성명세서로부터 도급계약기성계획과 기성수령현황을 추출하는 쿼리를 구성하고 작업분류체계의 단계(Level)별, 작업별로 계획대비 실적현황을 그래픽챠트 또는 테이블로 현시하는 단계-Construct a query to extract the contract contract established plan and the received receipt status from the contract contract statement and contract statement of claim 2, and display the performance status against the plan by level and task in the work breakdown structure as graphic charts or tables. Manifestation - 상기 단계 중 도급계약내역서와 도급기성명세서로부터 도급계약기성계획과 기성수령현황을 추출하는 쿼리를 구성하고 작업분류체계의 단계(Level)별, 작업별로 EVM 기준에 따른 분석 및 예측치를 계산하여 그래픽챠트 또는 테이블로 현시하는 단계-Compose a query that extracts contract contract establishment plan and existing receipt status from contract contract statement and contract statement in the above stages, and calculates analysis and forecast value according to EVM standard by level and task of classification system. Steps to Present as a Chart or Table - 청구항 3.의 공사실행예산서와 실투입비용청구(자금청구)명세서로부터 공사실행예산집행계획과 실투입비용지급(자금청구)실적을 추출하는 쿼리를 구성하고 작업분류체계의 단계(Level)별, 작업별로 계획대비 실적현황을 그래픽챠트 또는 테이블로 현시하는 단계-Construct a query to extract the construction execution budget execution plan and the actual input cost payment (billing) performance from the construction execution budget and the bill for actual input (billing) of claim 3. , Presenting the performance against plan by graphic chart or table - 상기 단계 중 공사실행예산서와 실투입비용청구(자금청구)명세서로부터 공사실행예산집행계획과 실투입비용지급(자금청구)실적을 추출하는 쿼리를 구성하고 작업분류체계의 단계(Level)별, 작업별로 EVM 기준에 따른 분석 및 예측치를 계산하여 그래픽챠트 또는 테이블로 현시하는 단계-Construct a query that extracts the construction execution budget execution plan and actual input cost payment (billing) performance from the construction execution budget and the actual input billing (billing) statement, and by level of the work classification system, Calculate analysis and forecasts according to EVM criteria for each task and present them as graphic charts or tables - 청구항 2.의 도급계약내역서와 청구항 3.의 공사실행예산서로부터 추정손익계획을 추출하는 쿼리를 구성하고 작업분류체계의 단계(Level)별, 작업별로 도급계약공사비 대비 공사실행예산서를 그래픽챠트 또는 테이블로 현시하는 단계-Construct a query that extracts the estimated profit and loss plan from the contract contract statement of claim 2 and the project execution budget of claim 3, and compare the construction execution budget against the contract contract cost by level and by job classification system. Steps to manifest as a table - 청구항 2.의 도급기성명세서와 청구항 3.의 실투입비용청구(자금청구)명세서로부터 현금흐름을 추출하는 쿼리를 구성하고 작업분류체계의 단계(Level)별, 작업별로 도급기성현황 대비 실투입비용현황을 그래픽챠트 또는 테이블로 현시하는 단계-Construct a query to extract cash flows from the contract statement of contract 2. and the bill of actual input cost (billing) statement of claim 3. The actual input against the contractor's actual status by level and task of the WBS. Presenting cost status as graphic chart or table - 청구항 2.의 도급기성명세서와 청구항 3.의 실투입비용청구(자금청구)명세서로부터 EVM 기준에 따른 분석 및 예측치를 계산하는 쿼리를 구성하고 작업분류체계의 단계(Level)별, 작업별로 그래픽챠트 또는 테이블로 현시하는 단계-Construct a query to calculate the analysis and forecast according to the EVM criteria from the contractor statement of claim 2 and the actual input billing statement of claim 3. Steps to Present as a Chart or Table - 작업분류체계(도 4.) 기법을 적용하여 작성된 계층적구조의 공사내역 테이블을 구성하고, 당해 건설공사에 포함된 공종별 품질관리업무수행항목들을 작업분류체계(도 4.) 테이블의 하위테이블로 하여 작업분류체계의 작업(Activity)에 품질관리업무수행항목(시공계획서/기계제작승인도서/자재공급원승인원/검측/시험 등)들이 자원(Resource)으로 할당되어지도록 함으로써 각 작업의 진척도에 따라 품질관리업무수행항목들의 목록 및 시행일정을 통보하고 실적을 저장, 현시, 검색하는 단계-Construct a hierarchical structure of the construction history table created by applying the work breakdown structure (Fig. 4) technique, and sub-table of the work breakdown structure (Fig. 4) table for the quality management work items for each industry included in the construction. Therefore, the quality control task items (construction plan / machine production approval book / material supply source approval person / detection / testing, etc.) are assigned to resources in the activity of the work breakdown structure. According to the list of the quality management tasks performed and the schedule of execution, and to store, display and retrieve the results - 상기 단계 중 작업분류체계의 작업(Activity)에 할당된 품질관리업무수행항목들은 작업일정에 따라 시각적 특성요인도를 구성하고 특성요인작업에 대해 일정관리프로그램으로부터 작업의 일정 및 진척도에 관한 정보를 일일실적업데이트 폼에 현시하는 단계-The quality control task items assigned to the activity of the work breakdown structure in the above stages constitute a visual characteristic factor diagram according to the task schedule and provide information on the schedule and progress of the task from the schedule management program for the characteristic factor task. Steps to Appear on Daily Performance Update Form - 상기 단계 중 선택된 작업은 승인과정을 거쳐 중점품질관리공종으로 지정하고 별도 메뉴에서 현시하는 단계-The work selected from the above steps is designated as the key quality control work after the approval process and manifested in a separate menu. - 특성요인으로 지정된 작업의 특성에 따라 저장된 시공계획서/기계제작승인도서/자재공급원승인원/검측/시험 등의 서식 또는 탬플릿을 제공하는 단계와 계획서를 작성한 후 당해 작업의 품질관리계획으로 등록 및 검색, 현시하는 단계-Provides the form and template of the construction plan, machine manufacturing approval book, material supply approval, inspection, test, etc. according to the characteristics of the work designated as the characteristic factor, and prepares the step and plan and registers it as the quality control plan of the work. Search, step to manifest - 특성요인이 되는 각 작업의 시공계획서/기계제작승인도서/자재공급원승인원/검측/시험 등은 일정관리프로그램과 연동하여 작업의 진척도업데이트 폼에 예정사항으로 현시하는 단계-The construction plan / machine production approval book / material supply source applicator / detection / test for each work that is a characteristic factor is displayed in the progress update form of the work in conjunction with the schedule management program. - 각 품질관리항목의 성과품인 시공계획승인서/기계제작승인도서/자재공급원승인서/검측결과통보서/시험성적서 등의 목록을 각 특성요인도의 품질관리업무수행항목별 실적으로 저장하고 과업수행여부를 현시하는 단계-The list of construction plan approvals, machine production approval reports, material supply source approvals, test result notification reports, and test reports, which are the performance products of each quality control item, is stored as the performance of each quality factor for each characteristic factor and whether the task is performed or not. Manifestation - 작업분류체계(도 4.) 기법을 적용하여 작성된 계층적구조의 공사내역 테이블을 구성하고, 당해 건설공사에 포함된 공종별 안전관리업무수행항목들을 작업분류체계(도 4.) 테이블의 하위테이블로 하여 작업분류체계의 작업(Activity)에 안전관리업무수행항목(안전시설계획, 안전점검계획, 안전교육계획 등)들이 자원(Resource)으로 할당되어지도록 함으로써 각 작업의 진척도에 따라 안전관리업무수행항목들의 목록 및 시행일정을 통보하고 실적을 저장, 현시, 검색하는 단계-Construct a hierarchical structure of the construction history table created by applying the work classification system (Fig. 4) technique, and subordinate the work classification system (Fig. 4.) table to list the safety management tasks performed by the type of construction included in the construction. The safety management task items (safety facility plan, safety inspection plan, safety education plan, etc.) are allocated to the resources of the work breakdown structure activity according to the progress of each task. Notify list of items and schedule, and save, display and search performance. - 작성된 안전시설계획, 안전점검계획, 안전교육계획의 각 항목들은 안전관리계획의 목록을 생성하고 작업분류체계의 작업들이 갖는 일정계획에 따라 목록을 현시하는 단계-Each item of the prepared safety facility plan, safety inspection plan, and safety education plan generates a list of safety management plans and presents the list according to the schedule of work in the WBS. - 안전관리과업의 수행결과인 안전시설설치보고서, 안전교육실시보고서, 안전점검체크리스트 등의 성과품목록을 작업의 진척도업데이트 폼에 제공하고 승인 후 안전관리실적으로 저장되는 단계-Provides a list of achievements such as safety facility installation report, safety education implementation report, safety inspection checklist, etc., as a result of the safety management task, on the progress progress update form, and is stored as safety management records after approval. - 청구항 2.에서 입력된 현장경비 중 안전관리비로 지정된 비목의 전표를 안전관리비 테이블의 데이터로 생성하고 목록을 현시하는 단계-Creating a document of the item designated as the safety management expenses among the field expenses inputted in claim 2 as data in the safety management expenses table and displaying the list. - 안전관리비로 지정된 비목의 지출목록은 도급기성청구시 합산되는 단계-Expenditure list of items designated as safety management expenses are summed up when requesting contract - 일일작업진척도 업데이트를 위한 입력폼(작업일보)을 별도로 구성하고 작업분류체계의 요소(작업)들에 대한 진척도 입력으로부터 계약관리모듈의 도급기성, 지급자재의 사용량, 하도급기성, 사급자재의 사용량 등이 추출, 저장, 현시되어지며 전일의 입력사항을 검색하는 단계-Separate input form (working daily report) for daily work progress update and input of progress on elements (work) of work breakdown structure from contract management module contracting use, payment material usage, subcontracting material, and subsidiary materials usage Etc. are extracted, stored, and displayed and the previous day's input is retrieved. - 현장의 사용자가 이동통신기기 또는 시스템단말기를 사용, 작업분류체계의 작업별로 접속하여 해당 작업의 현장사진을 전송하고 저장, 현시되어지며 전일의 입력사항을 검색하는 단계-The user in the field uses a mobile communication device or a system terminal to access the work classification system for each task and transmits, stores, and displays the field photo of the task and retrieves the previous day's inputs. - 현장의 사용자가 이동통신기기 또는 시스템단말기를 사용, 작업분류체계의 작업별로 접속하여 해당 작업의 근로자 출역명부, 중기의 사용시간, 지출된 경비 등을 입력하고 저장되어 현시되어지며 전일의 입력사항을 검색하는 단계-Users on site use mobile communication devices or system terminals to access the work classification system for each job, enter the worker's service list, the medium-term use time, and the expenditures, etc. Steps to Retrieve - 일정관리프로그램으로부터 제공된 품질관리, 안전관리 과업의 성과를 현시하고 성과품을 링크하는 단계-Displaying the performance of quality control and safety management tasks provided by the schedule management program and linking the products - 권한이 부여된 사용자가 입력하고 작업일보화면에 현시되는 텍스트(특기사항/지시사항) 입력창을 구성하는 단계-Configure the input window for texts (specials / instructions) inputted by the authorized user and displayed on the work daily report screen. - 상기 단계 중 일일작업진척도 업데이트를 위한 입력 폼(작업일보)의 작성후 최종 승인자가 로그온하여 승인하면 해당 작업일보의 기재사항들이 별도의 테이블을 생성하고 저장되는 단계와 생성된 작업일보의 데이터가 익일의 작업일보 작성을 위한 각 실적창에 전일실적으로 현시되는 단계 -If the final approver logs on and approves after filling out an input form (working daily report) for updating the daily working progress level, the items of the working daily report create and store a separate table and the data of the generated working daily report are stored. Steps to be realistically displayed in each performance window for the next working day report
KR1020050059527A 2005-07-04 2005-07-04 Project management information system KR20070004162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050059527A KR20070004162A (en) 2005-07-04 2005-07-04 Project management information system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050059527A KR20070004162A (en) 2005-07-04 2005-07-04 Project management information system

Publications (1)

Publication Number Publication Date
KR20070004162A true KR20070004162A (en) 2007-01-09

Family

ID=37870447

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050059527A KR20070004162A (en) 2005-07-04 2005-07-04 Project management information system

Country Status (1)

Country Link
KR (1) KR20070004162A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100789252B1 (en) * 2007-04-26 2008-01-02 주식회사 유미드시스템 Base for project management support and control system and method
KR100844467B1 (en) * 2007-10-22 2008-07-07 주식회사 디디알소프트 A simulation system and method for construction progression state with 3d
KR100927953B1 (en) * 2007-12-13 2009-11-24 대림산업 주식회사 Project-wide integrated project management system using integrated process cost management
KR100945523B1 (en) * 2007-06-22 2010-03-09 (주)이든넷 On-line construction management method
KR100968708B1 (en) * 2010-04-08 2010-07-06 지에스건설 주식회사 System and method to creation of the construction project schedule
WO2011091158A2 (en) * 2010-01-20 2011-07-28 Edward Ruben Mislavsky System and method for performing project management attendant to any of various types of projects
WO2015141871A1 (en) * 2014-03-17 2015-09-24 경상대학교 산학협력단 Method for managing active multi-dimensional construction process
KR20160041281A (en) * 2014-10-07 2016-04-18 현대건설주식회사 Construction work management system based on BIM and management method of the same
KR20180130310A (en) * 2017-05-29 2018-12-07 (주)누리인포스 Method and apparatus for automating inspection plan for equipment of entire facilities
KR20190040848A (en) * 2017-10-11 2019-04-19 양경옥 Method and Apparatus for Safety Information Generation by Reading Schedule Bar Charts in Construction and Industrial Project
KR101976514B1 (en) * 2018-11-21 2019-05-10 조광익 Providing method of building cost estimate
KR102065507B1 (en) 2018-12-28 2020-01-13 이지연 Realtime construction work management apparatus
CN110889751A (en) * 2018-08-16 2020-03-17 北京京东金融科技控股有限公司 Enterprise fund pool management method, device and system, electronic equipment and readable medium
CN111428965A (en) * 2020-02-27 2020-07-17 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111476550A (en) * 2020-05-13 2020-07-31 陕西铁路工程职业技术学院 Engineering cost auditing system
KR102244587B1 (en) * 2020-08-12 2021-04-23 송미라 Method and System for Managing Work Daily Report in Construction Filed
KR102316815B1 (en) * 2020-12-23 2021-10-25 주식회사 영신 Smart construction safety monitering integrated control system for ordering organization
KR102481223B1 (en) * 2022-05-12 2022-12-26 주식회사 위솔루션 A smart integrated safety management system that can support various safety management, including safety inspection and education, using digital technology
CN116109091A (en) * 2023-02-07 2023-05-12 四川省蜀顺工程建设咨询有限公司 Engineering supervision information management system
CN117151617A (en) * 2023-07-31 2023-12-01 北京梦诚科技有限公司 Method and system for checking work receiving party based on part attribute
CN117371954A (en) * 2023-10-30 2024-01-09 常瑞君 Method and system for managing civil engineering construction process
CN110889751B (en) * 2018-08-16 2024-04-19 京东科技控股股份有限公司 Enterprise fund pool management method, device, system, electronic equipment and readable medium

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100789252B1 (en) * 2007-04-26 2008-01-02 주식회사 유미드시스템 Base for project management support and control system and method
KR100945523B1 (en) * 2007-06-22 2010-03-09 (주)이든넷 On-line construction management method
KR100844467B1 (en) * 2007-10-22 2008-07-07 주식회사 디디알소프트 A simulation system and method for construction progression state with 3d
KR100927953B1 (en) * 2007-12-13 2009-11-24 대림산업 주식회사 Project-wide integrated project management system using integrated process cost management
WO2011091158A2 (en) * 2010-01-20 2011-07-28 Edward Ruben Mislavsky System and method for performing project management attendant to any of various types of projects
WO2011091158A3 (en) * 2010-01-20 2011-11-10 Edward Ruben Mislavsky System and method for performing project management attendant to any of various types of projects
KR100968708B1 (en) * 2010-04-08 2010-07-06 지에스건설 주식회사 System and method to creation of the construction project schedule
WO2015141871A1 (en) * 2014-03-17 2015-09-24 경상대학교 산학협력단 Method for managing active multi-dimensional construction process
KR20160041281A (en) * 2014-10-07 2016-04-18 현대건설주식회사 Construction work management system based on BIM and management method of the same
KR20180130310A (en) * 2017-05-29 2018-12-07 (주)누리인포스 Method and apparatus for automating inspection plan for equipment of entire facilities
KR20190040848A (en) * 2017-10-11 2019-04-19 양경옥 Method and Apparatus for Safety Information Generation by Reading Schedule Bar Charts in Construction and Industrial Project
KR20210154794A (en) * 2017-10-11 2021-12-21 양경옥 Method for Safety Information Generation by Reading Schedule Bar Charts in Construction and Industrial Project
KR20210154793A (en) * 2017-10-11 2021-12-21 양경옥 Apparatus for Safety Information Generation by Reading Schedule Bar Charts in Construction and Industrial Project
CN110889751B (en) * 2018-08-16 2024-04-19 京东科技控股股份有限公司 Enterprise fund pool management method, device, system, electronic equipment and readable medium
CN110889751A (en) * 2018-08-16 2020-03-17 北京京东金融科技控股有限公司 Enterprise fund pool management method, device and system, electronic equipment and readable medium
KR101976514B1 (en) * 2018-11-21 2019-05-10 조광익 Providing method of building cost estimate
KR20200083256A (en) 2018-12-28 2020-07-08 장효수 Construction management system for real-time construction inspection and evaluation
KR102065507B1 (en) 2018-12-28 2020-01-13 이지연 Realtime construction work management apparatus
CN111428965A (en) * 2020-02-27 2020-07-17 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111428965B (en) * 2020-02-27 2023-11-03 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111476550A (en) * 2020-05-13 2020-07-31 陕西铁路工程职业技术学院 Engineering cost auditing system
CN111476550B (en) * 2020-05-13 2023-08-25 陕西铁路工程职业技术学院 Engineering cost audit system
KR102244587B1 (en) * 2020-08-12 2021-04-23 송미라 Method and System for Managing Work Daily Report in Construction Filed
KR102316815B1 (en) * 2020-12-23 2021-10-25 주식회사 영신 Smart construction safety monitering integrated control system for ordering organization
KR102481223B1 (en) * 2022-05-12 2022-12-26 주식회사 위솔루션 A smart integrated safety management system that can support various safety management, including safety inspection and education, using digital technology
CN116109091A (en) * 2023-02-07 2023-05-12 四川省蜀顺工程建设咨询有限公司 Engineering supervision information management system
CN117151617A (en) * 2023-07-31 2023-12-01 北京梦诚科技有限公司 Method and system for checking work receiving party based on part attribute
CN117371954A (en) * 2023-10-30 2024-01-09 常瑞君 Method and system for managing civil engineering construction process
CN117371954B (en) * 2023-10-30 2024-04-05 常瑞君 Method and system for managing civil engineering construction process

Similar Documents

Publication Publication Date Title
KR20070004162A (en) Project management information system
CN112950164B (en) Information system engineering supervision working hour recording information system based on standardized rules
CN111815283B (en) Information system engineering supervision enterprise business management system
CN111815168B (en) Information system engineering supervision project quality management system
CN111815424B (en) Information system engineering supervision project cost accounting management system
US8341089B2 (en) Real estate management system and method
US20160048785A1 (en) A computer implemented system and method for project controls
CN115983803A (en) Cost subject dictionary setting method and system
Ball et al. Lean management of environmental consulting
JP2005216013A (en) Integrated job management system
Altekar Enterprisewide resource planning: theory and practice
JPH113376A (en) Enterprise fund plan simulation system
AU2021107090A4 (en) Computer implemented system and method for vendor invoice management in integrated enterprise environment for construction companies
Harman The extent and limitations of managerial accounting function within ERP systems
Salmon Controlling with SAP: Practical guide
Veeriah Customizing Financial Accounting in SAP
JP2006134002A (en) Construction industry accounting device, method and program
Mosbah SAP S/4HANA financial closing cockpit
Sarferaz Industry Solutions
Kuznetsova Budgeting automation in construction companies
Bertolini Information flow between estimating and job cost accounting
Turner Scope definition for bidding project-control services
CN113409017A (en) Laboratory management system based on budget project pool overall planning
Heinze Cost Control
Arif et al. Integrating SAP ERP Financials