KR20060010696A - Fabricated hollow precast concrete slab - Google Patents

Fabricated hollow precast concrete slab Download PDF

Info

Publication number
KR20060010696A
KR20060010696A KR1020050002456A KR20050002456A KR20060010696A KR 20060010696 A KR20060010696 A KR 20060010696A KR 1020050002456 A KR1020050002456 A KR 1020050002456A KR 20050002456 A KR20050002456 A KR 20050002456A KR 20060010696 A KR20060010696 A KR 20060010696A
Authority
KR
South Korea
Prior art keywords
slab
hollow
unit
precast concrete
units
Prior art date
Application number
KR1020050002456A
Other languages
Korean (ko)
Other versions
KR100681849B1 (en
Inventor
채성태
Original Assignee
채성태
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 채성태 filed Critical 채성태
Priority to KR1020050002456A priority Critical patent/KR100681849B1/en
Publication of KR20060010696A publication Critical patent/KR20060010696A/en
Application granted granted Critical
Publication of KR100681849B1 publication Critical patent/KR100681849B1/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A45HAND OR TRAVELLING ARTICLES
    • A45CPURSES; LUGGAGE; HAND CARRIED BAGS
    • A45C11/00Receptacles for purposes not provided for in groups A45C1/00 - A45C9/00
    • AHUMAN NECESSITIES
    • A45HAND OR TRAVELLING ARTICLES
    • A45CPURSES; LUGGAGE; HAND CARRIED BAGS
    • A45C13/00Details; Accessories
    • A45C13/02Interior fittings; Means, e.g. inserts, for holding and packing articles
    • AHUMAN NECESSITIES
    • A45HAND OR TRAVELLING ARTICLES
    • A45CPURSES; LUGGAGE; HAND CARRIED BAGS
    • A45C13/00Details; Accessories
    • A45C13/30Straps; Bands
    • AHUMAN NECESSITIES
    • A45HAND OR TRAVELLING ARTICLES
    • A45CPURSES; LUGGAGE; HAND CARRIED BAGS
    • A45C11/00Receptacles for purposes not provided for in groups A45C1/00 - A45C9/00
    • A45C2011/003Receptacles for purposes not provided for in groups A45C1/00 - A45C9/00 for portable computing devices, e.g. laptop, tablet, netbook, game boy, navigation system, calculator
    • AHUMAN NECESSITIES
    • A45HAND OR TRAVELLING ARTICLES
    • A45CPURSES; LUGGAGE; HAND CARRIED BAGS
    • A45C13/00Details; Accessories
    • A45C13/02Interior fittings; Means, e.g. inserts, for holding and packing articles
    • A45C2013/025Interior fittings; Means, e.g. inserts, for holding and packing articles for holding portable computers or accessories therefor
    • AHUMAN NECESSITIES
    • A45HAND OR TRAVELLING ARTICLES
    • A45CPURSES; LUGGAGE; HAND CARRIED BAGS
    • A45C2200/00Details not otherwise provided for in A45C
    • AHUMAN NECESSITIES
    • A45HAND OR TRAVELLING ARTICLES
    • A45FTRAVELLING OR CAMP EQUIPMENT: SACKS OR PACKS CARRIED ON THE BODY
    • A45F2200/00Details not otherwise provided for in A45F
    • A45F2200/05Holder or carrier for specific articles
    • A45F2200/0525Personal portable computing devices, e.g. laptop, tablet, netbook, game boy, navigation system, calculator

Abstract

본 발명은 슬래브 교량 등을 구성하는 콘크리트 슬래브 구조물을 제작함에 있어서, 슬래브 내부에 중공을 형성하며 슬래브를 소정 폭을 가지도록 프리캐스트로 제작하여 조립한 후 표면 슬래브를 타설하여 완성하는 구조를 가지는 새로운 방식의 중공형 프리캐스트 콘크리트 슬래브 구조물에 관한 것이다. In the present invention, when manufacturing a concrete slab structure constituting the slab bridge, etc., forming a hollow inside the slab and prefabricated to produce a slab having a predetermined width after assembling the new structure having a structure to finish by pouring the surface slab Hollow type precast concrete slab structure.

본 발명에서는 중공형 프리캐스트 콘크리트 슬래브 구조물(100)로서, 횡방향으로 소정 폭을 가지도록 사전 제작된 다수개의 프리캐스트 콘크리트 중공 슬래브 유닛(10)이 조립된 구조를 가지며; 상기 슬래브 유닛(10) 내에는 중공 형성을 위한 중공관(11)이 매립되어 배치되고; 상기 슬래브 유닛(10) 간의 횡방향 연결 조립시 슬래브 유닛(10) 사이에 현장 타설 콘크리트에 의한 전단키가 형성될 수 있도록 상기 슬래브 유닛(10)의 측면에는 오목부(12)가 형성되어 있으며; 상기 슬래브 유닛(10)의 측면에는 관통공(14)이 형성되고; 상기 관통공(14)에는 프리스트레스를 도입하여 상기 슬래브 유닛(10) 간의 횡방향 연결 및 보강하는 긴장재(13)가 배치되는 구조를 가지는 것을 특징으로 하는 중공형 프리캐스트 콘크리트 슬래브 구조물이 제공된다. In the present invention, as a hollow precast concrete slab structure 100, a plurality of precast concrete hollow slab unit 10 prefabricated to have a predetermined width in the transverse direction is assembled; A hollow tube (11) for filling the hollow is embedded in the slab unit (10); Concave portions 12 are formed on the side surfaces of the slab unit 10 so that a shear key can be formed between the slab units 10 during the lateral connection assembly between the slab units 10; A through hole 14 is formed at a side surface of the slab unit 10; The through hole 14 is provided with a hollow precast concrete slab structure, which has a structure in which a tension member 13 for introducing a prestress and transversely connecting and reinforcing the slab units 10 is disposed.

슬래브, 중공, 중공관, 교량, 긴장재, 전단키Slab, hollow, hollow tube, bridge, tension material, shear key

Description

조립 후 분할타설 방식의 중공형 프리캐스트 콘크리트 슬래브 구조물{Fabricated Hollow Precast Concrete Slab} Fabricated Hollow Precast Concrete Slab}             

도 1은 본 발명에 따른 중공형 프리캐스트 콘크리트 슬래브 구조물을 분해하여 도시한 개략적인 분해사시도이다. 1 is a schematic exploded perspective view showing an exploded hollow precast concrete slab structure according to the present invention.

도 2a는 도 1의 선A-A에 따른 개략적인 단면도이고, 도 2b는 도 1의 선B-B에 따른 개략적인 단면도이다. FIG. 2A is a schematic cross sectional view along line A-A of FIG. 1, and FIG. 2B is a schematic cross sectional view along line B-B of FIG. 1.

도 3a는 본 발명에 따른 중공형 프리캐스트 콘크리트 슬래브 구조물의 또다른 실시예의 개략적인 분해사시도이다. Figure 3a is a schematic exploded perspective view of another embodiment of a hollow precast concrete slab structure according to the present invention.

도 3b는 도 3a의 선C-C에 따른 개략적인 단면도이다. FIG. 3B is a schematic cross-sectional view taken along the line C-C of FIG. 3A.

도 3c는 도 3a의 선D-D에 따른 개략적인 단면도이다. 3C is a schematic cross-sectional view taken along the line D-D of FIG. 3A.

* 도면의 주요부분에 대한 부호의 설명** Explanation of symbols for the main parts of the drawings *

10 슬래브 유닛 11 중공관 10 Slab Unit 11 Hollow Tube

12 오목부 13 긴장재 12 Concave 13 Tension

본 발명은 조립 후 분할타설 방식의 중공형 프리캐스트 콘크리트 슬래브 구조물에 관한 것으로서, 슬래브 교량 등을 구성하는 콘크리트 슬래브 구조물을 제작함에 있어서, 1개 내지 복수개의 중공관을 이용하여 슬래브 내부에 중공을 형성하며 소정 폭을 가지도록 프리캐스트방식으로 슬래브 유닛을 제작하고, 이를 일체로 조립하여 이루어지는 구조를 가지는 새로운 방식의 중공형 프리캐스트 콘크리트 슬래브 구조물에 관한 것이다. The present invention relates to a hollow precast concrete slab structure of a split casting method after assembling. In manufacturing a concrete slab structure constituting a slab bridge or the like, a hollow is formed in the slab using one or more hollow tubes. And it relates to a new type hollow precast concrete slab structure having a structure made by manufacturing a slab unit in a precast method to have a predetermined width, and integrally assembled it.

거더 등의 주형을 설치하지 아니하고, 슬래브만으로 상부 구조를 형성하는 슬래브 교량은, 구조가 간단하고 시공비가 적게 소요되므로 통상 10-15m 지간의 교량에 많이 사용되고 있다. 교량의 지간이 약 20m를 초과하는 경우에는 슬래브 구조물의 단면 두께가 커져 자중이 크게 증가되고, 매스 콘크리트로 인한 수화열이 발생하여 균열 발생가능성이 높아지게 될 뿐만 아니라, 시공비도 많이 소요된다. Slab bridges that form an upper structure with only slabs without providing molds such as girders are commonly used for bridges between 10-15 m in length because of their simple structure and low construction cost. If the span of the bridge exceeds about 20m, the cross-sectional thickness of the slab structure is increased, the self weight is greatly increased, the heat of hydration caused by the mass concrete is generated not only increases the probability of cracking, but also requires a large construction cost.

이러한 한계를 극복하기 위하여 종래에는, 슬래브 구조물의 내부에 원형 관 등을 매립하여 슬래브 구조물의 내부에 공동을 형성한 "중공슬래브"가 제안되었다. 그러나, 이러한 중공슬래브의 경우에는 여전히 현장타설 방식에 의하여 시공되었으므로, 수화열 발생의 조절에 어려움이 있으며, 현장타설을 위하여 거푸집, 동바리 등을 설치하여야 하므로, 그에 따른 시공성 저하, 시공비의 증가 등의 단점이 있었다. In order to overcome this limitation, conventionally, a "hollow slab" in which a circular tube or the like is embedded in the slab structure to form a cavity in the slab structure has been proposed. However, in the case of such hollow slab is still constructed by the field casting method, there is a difficulty in controlling the generation of hydration heat, and since the formwork, copper bar, etc. must be installed for the site casting, the disadvantages such as decrease in workability, increase in construction cost There was this.

특히, 슬래브 구조물 단면에서 중공이 형성되어 있는 부분 간의 사이에 종방 향 즉, 교축 방향으로 균열이 발생하게 되는 문제점이 있었다. In particular, there is a problem that cracks are generated in the longitudinal direction, that is, the axial direction, between the portions in which the hollow is formed in the cross section of the slab structure.

본 발명은 위와 같이 종래의 중공슬래브 구조물이 가지는 문제점과 단점을 극복하기 위하여 개발된 것으로서, 구체적으로는 중공 콘크리트 슬래브 구조물로서, 거푸집, 동바리 등의 설치가 필요 없어 시공이 간편하여 신속한 가설이 가능하며, 횡방향의 보강을 더 구비하므로써 종방향 균열 발생을 방지할 수 있는 새로운 방식의 중공형 프리캐스트 콘크리트 슬래브 구조물을 제공하는 것을 발명의 목적으로 한다. The present invention was developed in order to overcome the problems and disadvantages of the conventional hollow slab structure as described above, specifically, as a hollow concrete slab structure, it is not necessary to install the formwork, copper bars, etc. It is an object of the invention to provide a new type of hollow precast concrete slab structure which can further prevent longitudinal cracking by further providing transverse reinforcement.

또한, 본 발명에서는, 분할 타설에 의하여 슬래브 유닛에 바닥판을 형성함으로써 횡방향 연결시에 발생할 수 있는 누수, 염화물의 침투 등에 의한 구조물의 손상을 방지하여 내구성을 증진시킬 수 있는 새로운 방식의 중공형 프리캐스트 콘크리트 슬래브 구조물을 제공하는 것을 목적으로 한다.
In addition, in the present invention, by forming a bottom plate in the slab unit by split-pouring, a new type of hollow type which can improve the durability by preventing damage to the structure due to leakage, penetration of chloride, etc., which may occur in the lateral connection. It is an object to provide a precast concrete slab structure.

이러한 목적을 달성하기 위하여, 본 발명에서는 중공형 프리캐스트 콘크리트 슬래브 구조물로서, 횡방향으로 소정 폭을 가지도록 사전 제작된 다수개의 프리캐스트 콘크리트 중공 슬래브 유닛이 조립된 구조를 가지며; 상기 슬래브 유닛 내에는 중공 형성을 위한 중공관이 매립되어 배치되고; 상기 슬래브 유닛 간의 횡방향 연결 조립시 슬래브 유닛 사이에 현장 타설 콘크리트에 의한 전단키가 형성될 수 있도록 상기 슬래브 유닛의 측면에는 오목부가 형성되어 있으며; 상기 슬래브 유닛의 측면에는 관통공이 형성되고; 상기 관통공에는 프리스트레스를 도입하여 상기 슬래브 유닛 간의 횡방향 연결 및 보강하는 긴장재가 배치되는 구조를 가지는 것을 특징으로 하는 중공형 프리캐스트 콘크리트 슬래브 구조물이 제공된다. In order to achieve this object, the present invention is a hollow precast concrete slab structure, a plurality of precast concrete hollow slab unit pre-fabricated to have a predetermined width in the transverse direction is assembled; A hollow tube for forming a hollow is embedded in the slab unit; Concave portions are formed on the side surfaces of the slab unit so that a shear key can be formed between the slab units during the lateral connection assembly between the slab units; A through hole is formed in a side surface of the slab unit; The through hole is provided with a hollow precast concrete slab structure, characterized in that the prestress is introduced to have a structure in which a tension member for lateral connection and reinforcement between the slab units is disposed.

또한, 본 발명에서는 상기한 중공형 프리캐스트 콘크리트 슬래브 구조물의 또다른 실시예로서, 상기 슬래브 유닛의 제작시에 상기 중공관은 그 일부가 노출된 상태로 매립되며; 상기 슬래브 유닛의 조립 후에 현장 타설 콘크리트에 의하여 중공관의 노출된 일부가 콘크리트에 매립되는 것을 특징으로 하는 중공형 프리캐스트 콘크리트 슬래브 구조물이 제공된다. In addition, in the present invention, as another embodiment of the hollow precast concrete slab structure described above, the hollow tube is embedded with its part exposed when the slab unit is manufactured; After the assembly of the slab unit is provided a hollow precast concrete slab structure, characterized in that the exposed portion of the hollow tube is embedded in the concrete by the site-pouring concrete.

본 발명에 있어서, 상기한 슬래브 구조물의 또다른 실시예로서, 종방향 긴장재가 구비되어 종방향 프리스트레스에 의하여 더욱 보강된 중공형 프리캐스트 콘크리트 슬래브 구조물이 제공된다.  In the present invention, as another embodiment of the above-described slab structure, there is provided a hollow precast concrete slab structure which is provided with a longitudinal tension member and further reinforced by a longitudinal prestress.

이하, 첨부도면을 참조하여 본 발명의 구성과 작용효과에 대하여 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration and effect of the present invention.

도 1은 본 발명에 따른 중공형 프리캐스트 콘크리트 슬래브 구조물(100)을 분해하여 도시한 개략적인 분해사시도이다. 도 2a는 도 1의 선A-A에 따른 개략적인 단면도이고, 도 2b는 도 1의 선B-B에 따른 개략적인 단면도이다. 1 is a schematic exploded perspective view showing an exploded hollow precast concrete slab structure 100 according to the present invention. FIG. 2A is a schematic cross sectional view along line A-A of FIG. 1, and FIG. 2B is a schematic cross sectional view along line B-B of FIG. 1.

본 발명에 따른 중공형 프리캐스트 콘크리트 슬래브 구조물(100)은 횡방향(교량의 경우, 교량 길이방향에 수직한 방향)으로 소정 폭을 가지는 다수개의 프리캐스트 중공 슬래브 유닛(10)(이하, 본 명세서에서는 "슬래브 유닛"으로 약칭한다) 의 조립으로 구성된다. 상기 슬래브 유닛(10)은 프리캐스트 방식에 의하여 콘크리트로 공장에서 사전에 제작된다. 상기 슬래브 유닛(10) 내에는 중공 형성을 위한 중공관(11)이 전부 또는 일부 매립되어 배치된다. 도 1에 도시된 실시예는 슬래브 유닛(10)을 프리캐스트로 제작할 때, 중공관(11) 전체가 슬래브 유닛(10)의 콘크리트(16) 내에 매립된 것으로서, 프리캐스트로 슬래브 유닛(10)을 제작할 때 중공관(11)의 일부만이 매립되어 중공관(11)의 일부가 노출되는 실시예에 대해서는 후술한다. Hollow precast concrete slab structure 100 according to the present invention is a plurality of precast hollow slab unit 10 having a predetermined width in the transverse direction (in the case of a bridge, perpendicular to the bridge longitudinal direction) (hereinafter, the present specification) Is abbreviated as "slab unit". The slab unit 10 is made in advance in the factory of concrete by the precast method. In the slab unit 10, all or part of the hollow tube 11 for hollow formation is disposed. 1 shows that when the slab unit 10 is precast, the entire hollow tube 11 is embedded in the concrete 16 of the slab unit 10, and the slab unit 10 is precast. An embodiment in which only a part of the hollow tube 11 is embedded and a part of the hollow tube 11 is exposed when fabricating the same will be described later.

본 발명에 있어서 상기 중공관(11)은 일반 강관으로 구성되는데, 콘크리트와의 결합력을 증진시키기 위해서 주름 강관을 이용하는 것이 더 바람직하다. 본 발명에 있어서 하나의 슬래브 유닛(10)에는 그 폭에 맞추어 상기 중공관(11)이 하나 또는 2 이상의 복수개로 배치될 수 있다. 도 1에서는 편의상 종방향으로 2개의 중공관(11)이 매립되어 있는 실시예를 도시하였으나, 종방향 길이에 맞추어 더 많은 개수의 중공관(11)을 매립할 수도 있다. In the present invention, the hollow tube 11 is composed of a general steel pipe, it is more preferable to use a corrugated steel pipe in order to enhance the bonding force with the concrete. In the present invention, one slab unit 10 may be arranged in one or two or more plural hollow tubes 11 in accordance with its width. 1 illustrates an embodiment in which two hollow tubes 11 are embedded in the longitudinal direction for convenience, but a larger number of hollow tubes 11 may be embedded in the longitudinal direction.

본 발명에서는 위와 같이 프리캐스트로 공장에서 제작된 다수개의 슬래브 유닛(10)을 현장으로 이송한 후, 슬래브 유닛(10)을 횡방향으로 연결하여 전체 슬래브 구조물을 형성하게 되는데, 슬래브 유닛(10) 간의 횡방향 연결시 슬래브 유닛(10) 사이에 현장 타설 콘크리트에 의한 전단키가 형성될 수 있도록 상기 슬래브 유닛(10)의 측면에는 오목부(12)가 형성된다. In the present invention, after transporting a plurality of slab units 10 manufactured in the factory as a precast as described above, by connecting the slab unit 10 in the transverse direction to form the entire slab structure, the slab unit 10 A recess 12 is formed on the side surface of the slab unit 10 so that a shear key can be formed between the slab units 10 during the lateral connection between the slab units 10.

한편, 슬래브 유닛(10) 간의 횡방향 연결 및 보강을 위하여 긴장재(13)를 배치할 수 있도록 상기 슬래브 유닛(10)의 측면에는 관통공(14)이 형성된다. 도 2a 에서 부재번호 15는 슬래브 유닛(10)의 콘크리트(16)를 보강하기 위하여 배치되는 보강철근(15)이다. On the other hand, the through hole 14 is formed on the side surface of the slab unit 10 so that the tension member 13 can be disposed for the lateral connection and reinforcement between the slab units (10). In FIG. 2A, reference numeral 15 denotes a reinforcing bar 15 arranged to reinforce the concrete 16 of the slab unit 10.

종방향의 보강을 위하여 상기 슬래브 유닛(10)에는 길이방향으로 종방향 긴장재(17)를 배치하여 슬래브 유닛(10)의 단부에서 정착하여 종방향으로 프리스트레스를 도입할 수 있다. 도 1에서는 편의상, 최우측의 슬래브 유닛(10)에만 종방향 긴장재(17)의 배치상태를 도시하였고, 나머지 슬래브 유닛(10)에서는 종방향 긴장재(17) 배치상태의 도시를 생략하였다. In order to reinforce the longitudinal direction, the longitudinal tension member 17 is disposed in the longitudinal direction in the slab unit 10 to fix at the end of the slab unit 10 to introduce the prestress in the longitudinal direction. In FIG. 1, the arrangement state of the longitudinal tension members 17 is illustrated only in the slab unit 10 on the rightmost side, and the illustration of the arrangement states of the longitudinal tension members 17 is omitted in the remaining slab units 10.

다음에서는 위와 같은 구성을 가지도록 프리캐스트 방식으로 사전 제작된 다수개의 슬래브 유닛(10)에 의하여 본 발명의 중공형 프리캐스트 콘크리트 슬래브 구조물(100)을 이루게 되는 구조를 설명한다.Next will be described the structure to form the hollow precast concrete slab structure 100 of the present invention by a plurality of pre-fabricated slab units 10 to have a configuration as described above.

우선, 내부에 중공관(11) 전부를 매립하고 종방향 긴장재(17)를 배치하여 긴장한 상태로 공장에서 사전 제작된 슬래브 유닛(10)을 현장으로 이송하여, 그 측면이 소정 간격으로 나란하게 놓이도록 배치한다. 나란히 배치된 슬래브 유닛(10)들의 관통공(14)에 횡방향 긴장재(13)를 관통, 삽입하여, 슬래브 유닛(10)의 횡방향으로 횡방향 긴장재(13)를 배치한다(도 2a 참조). 나란하게 배치된 슬래브 유닛(10) 사이의 간격에 현장 콘크리트(16)를 타설한다. 슬래브 유닛(10)의 측면에는 오목부(12)가 형성되어 있으므로, 현장 타설 콘크리트(16)에 의하여 전단에 저항하게 되는 전단키가 슬래브 유닛(10) 사이에 형성된다. First, the entire hollow tube 11 is buried inside and the longitudinal tension member 17 is disposed and the slab unit 10 prefabricated in the factory is transferred to the site in a tense state, and the side surfaces thereof are arranged side by side at predetermined intervals. To be placed. The transverse tension member 13 is penetrated and inserted into the through holes 14 of the slab units 10 arranged side by side, so that the transverse tension member 13 is disposed in the transverse direction of the slab unit 10 (see FIG. 2A). . In-situ concrete 16 is poured at intervals between the slab units 10 arranged side by side. Since the recessed part 12 is formed in the side surface of the slab unit 10, the shear key which resists a shear by the site-pouring concrete 16 is formed between the slab units 10. As shown in FIG.

후속하여, 횡방향 긴장재(13)를 긴장, 정착하므로써, 슬래브 유닛(10)의 측면으로 긴장력이 도입되도록 하여, 나란한 슬래브 유닛(10)들이 서로 구조적인 일 체를 이루도록 한다. 횡방향 긴장재(13)는 슬래브 유닛(10) 사이에 현장 타설 콘크리트(16)를 타설한 후에 관통공(14)에 삽입되도록 배치한 후 긴장할 수도 있다. 물론, 이 경우 현장 타설 콘크리트(16)가 형성되는 부분에는 나중에 횡방향 긴장재(13)가 관통하도록 튜브 등과 같은 것을 이용하여 구멍이 형성되도록 하여야 한다. Subsequently, by tensioning and fixing the transverse tension member 13, tension force is introduced into the side of the slab unit 10, so that the side by side slab units 10 form a structural unit with each other. The transverse tension member 13 may be tensioned after being placed so as to be inserted into the through hole 14 after pouring the site-pouring concrete 16 between the slab units 10. Of course, in this case, the portion where the cast-in-place concrete 16 is to be formed later, so that the hole is formed by using a tube or the like so that the transverse tension member 13 penetrates.

도 3a 내지 도 3c에는 본 발명의 변형 실시예로서, 슬래브 유닛(10)을 구성함에 있어서, 중공관(11)을 일부만 매립하고 일부는 노출시킨 후, 현장에서 중공관(11)의 노출된 부분이 매립되도록 현장 콘크리트를 타설하여 슬래브 구조물을 완성하는 구조를 가지는 실시예가 도시되어 있는데, 도 3a는 상기한 실시예의 개략적인 사시도이고, 도 3b는 도 3a의 선C-C에 따른 단면도이며, 도 3c는 도 3a의 선D-D에 따른 단면도이다. 도 3a에서 현장에서 타설되는 콘크리트 부분은 점선으로 도시되어 있다. 3A to 3C, as a modified embodiment of the present invention, in constructing the slab unit 10, after partially filling and partially exposing the hollow tube 11, the exposed portion of the hollow tube 11 in the field is exposed. 3 is a schematic perspective view of the above-described embodiment, FIG. 3b is a cross-sectional view taken along the line CC of FIG. 3a, and FIG. 3c is shown. It is sectional drawing along the line DD of FIG. 3A. In FIG. 3a the concrete part that is poured in situ is shown in dashed lines.

위 실시예에서는 슬래브 유닛(10)을 프리캐스트 방식으로 제작할 때, 도 3a 내지 도 3c에 도시된 것처럼, 중공관(11)의 일부가 외부에 노출되도록 중공관(11)을 매립한다. 즉, 슬래브 유닛(10)을 프리캐스트로 제작할 때, 중공관(11)의 상부 일부가 노출되도록 슬래브 유닛(10)의 두께를 목적하는 설계 두께 이하로 제작하는 것이다. 이렇게 제작된 슬래브 유닛(10)을 현장에서 서로 나란하게 배치하고, 상부에 콘크리트를 현장에서 타설하여 노출되었던 중공관(11)이 슬래브 콘크리트 내에 완전히 매립되도록 하여 전체 슬래브 구조물(100)을 이루게 된다. 이와 같은 방식에 의하면, 예를 들어 슬래브 유닛(10)의 상부에 현장 타설 콘크리트를 부어 슬래브 유닛(10) 사이를 메꾸는 동시에 상부 바닥판을 일체로 형성할 수 있는 것이 다. In the above embodiment, when the slab unit 10 is manufactured in a precast manner, the hollow tube 11 is embedded so that a part of the hollow tube 11 is exposed to the outside, as shown in FIGS. 3A to 3C. That is, when manufacturing the slab unit 10 by precast, the thickness of the slab unit 10 is manufactured to be less than the desired design thickness so that the upper portion of the hollow tube 11 is exposed. The slab units 10 manufactured in this way are arranged side by side with each other in the field, and the hollow pipe 11 that is exposed by placing concrete on the site is completely embedded in the slab concrete to form the entire slab structure 100. According to this method, for example, it is possible to pour the field-pouring concrete on the upper portion of the slab unit 10 to fill the space between the slab unit 10 and at the same time to form the upper bottom plate integrally.

이와 같이, 상부 콘크리트를 타설할 때에는, 경우에 따라서는 미리 횡방향 긴장재를 배치하여 상부 콘크리트가 경화된 후 상기 횡방향 긴장재를 긴장, 정착하여 추가적인 횡방향 프리스트레스를 가할 수도 있다. 물론, 횡방향 긴장재가 배치될 수 있도록 쉬스관 등을 설치한 후, 추후 횡방향 긴장재를 배치하여 긴장, 정착할 수도 있다.   As such, when placing the upper concrete, in some cases, the transverse tension member may be disposed in advance, and after the upper concrete is cured, the transverse tension member may be tensioned and fixed to apply additional transverse prestress. Of course, after the sheath tube is installed so that the transverse tension member can be arranged, the transverse tension member may be arranged later to be tensioned and settled.

위 실시예에도 프리캐스트로 제작되는 슬래브 유닛(10) 측면의 오목부, 관통공, 횡방향 긴장재 관통 및 긴장/정착, 종방향 긴장재의 설치/긴장/정착 등의 구성은 앞서 도 1에서 살펴본 실시예와 동일하게 적용되므로, 이에 대한 반복 설명은 생략한다. Even in the above embodiment, the configuration of the concave portion, the through hole, the transverse tension member through and tension / settlement, the installation / tension / settlement of the longitudinal tension member, etc., which are manufactured by precast, are described above. Since the same applies to the example, a repeated description thereof will be omitted.

상기한 실시예에서는 프리캐스트로 제작된 슬래브 유닛(10)을 횡방향으로 나란하게 배치한 후 횡방향으로 전체 슬래브 유닛(10)의 상부에 콘크리트를 타설하게 되므로, 횡방향으로 연겨로디는 슬래브 유닛(10) 사이의 틈으로 누수 또는 염화물의 침투 등이 일어나는 것을 방지하며, 그에 따른 균열이나 긴장재의 부식 등의 현상이 발생하는 것을 방지할 수 있어 내구성이 높은 슬래브 구조물을 완성할 수 잇게 된다. 특히, 상부의 콘크리트를 타설할 때, 이미 프리캐스트로 제작된 슬래브 유닛(10)이 횡방향으로 나란하게 서로 잇대어 배치되어 있으므로, 상부 콘크리트 타설을 위한 별도의 하부 동바리, 거푸집 등을 설치할 필요가 없어 시공이 간편하고 시공비를 줄일 수 있게 된다. In the above embodiment, since the slab units 10 made of precast are arranged side by side in the lateral direction, concrete is poured on top of the entire slab unit 10 in the lateral direction, so that the slab unit is rolled in the horizontal direction. The gap between (10) prevents leakage or infiltration of chlorides, and prevents the occurrence of cracks and corrosion of the tension material, thereby completing a highly durable slab structure. In particular, when placing the upper concrete, since the slab units 10 made of precast are arranged side by side next to each other, there is no need to install a separate lower clubs, formwork, etc. for placing the upper concrete Construction is simple and construction cost can be reduced.

본 발명은 중공 슬래브 구조물이므로, 종래의 중공 슬래브 구조물이 가지는 여러 가지 장점, 즉 자중의 경감 등의 유리한 효과를 모두 발휘할 수 있음은 물론, 위와 같은 구성상의 특징을 통하여 다음에서 살펴 보는 바와 같이 종래 기술과 차별되는 여러 가지 우수한 효과를 발휘한다.Since the present invention is a hollow slab structure, it can exhibit all the advantages of the conventional hollow slab structure, that is, advantageous effects such as reduction of self-weight, of course, as will be described in the following through the configuration features as described above It has a number of excellent effects that are different from the others.

본 발명의 슬래브 구조물에서는, 소정 폭을 가지는 슬래브 유닛을 프리캐스트 방식으로 사전 제작한 후, 이를 현장에서 결합하여 전체 구조물을 이루게 된다. 따라서, 현장에서 모든 콘크리트를 타설하여 슬래브 부구조물을 시공하는 종래의 기술에 비하여, 시공기간을 줄일 수 있으며, 동바리, 현장 거푸집 설치 등이 필요하지 아니하므로, 시공이 간편하게 된다. In the slab structure of the present invention, after pre-fabricating the slab unit having a predetermined width in a precast manner, it is combined in the field to form the entire structure. Therefore, the construction period can be reduced, compared to the conventional technology of constructing the slab substructures by placing all concrete in the field, and construction is simplified because it does not require the installation of copper bars and field formwork.

특히, 슬래브 유닛을 프리캐스트 방식으로 제작하게 되고, 그 횡방향 폭이 전체 슬래브 구조물보다 작으므로, 콘크리트의 수화열에 대한 제어가 용이하며, 그에 따라 종래 기술에서 문제점으로 지적되어 왔던 수화열로 인한 균열 등의 발생을 방지할 수 있게 되어 시공품질이 향상된다. In particular, since the slab unit is manufactured by a precast method, and the width of the slab unit is smaller than that of the entire slab structure, it is easy to control the heat of hydration of concrete, and thus cracks due to the heat of hydration, which has been pointed out as a problem in the prior art. It is possible to prevent the occurrence of the construction quality is improved.

또한, 본 발명에서는 슬래브 유닛의 조립시에 횡방향으로 긴장재에 의한 긴장력을 도입하여 보강하게 되므로, 종래의 중공슬래브 구조물에서 문제가 되었던 종방향의 균열 발생도 억제할 수 있는 효과가 있다. In addition, in the present invention, since the tension force by the tension member in the transverse direction during the assembly of the slab unit is reinforced to introduce, there is an effect that can suppress the occurrence of cracks in the longitudinal direction, which was a problem in the conventional hollow slab structure.

이상에서는 본 발명의 실시예에 대하여 설명하였으나, 본 발명은 설명된 실시예에 한정되지 아니하며, 본 발명의 기술적 사상 및 실용신안등록청구범위 내에서 자유로운 변형과 개선이 이루어질 수 있다.Although the embodiments of the present invention have been described above, the present invention is not limited to the described embodiments, and free modifications and improvements can be made within the spirit and utility model registration claims of the present invention.

Claims (3)

중공형 프리캐스트 콘크리트 슬래브 구조물(100)로서, As a hollow precast concrete slab structure 100, 횡방향으로 소정 폭을 가지도록 사전 제작된 다수개의 프리캐스트 콘크리트 중공 슬래브 유닛(10)이 횡방향으로 나란하게 배치되어 조립된 구조를 가지며; A plurality of precast concrete hollow slab units 10 prefabricated to have a predetermined width in the transverse direction are arranged side by side in the transverse direction and assembled; 상기 슬래브 유닛(10) 내에는 중공 형성을 위한 중공관(11)이 매립되어 배치되고; A hollow tube (11) for filling the hollow is embedded in the slab unit (10); 상기 슬래브 유닛(10) 간의 횡방향 연결 조립시 슬래브 유닛(10) 사이에 현장 타설 콘크리트에 의한 전단키가 형성될 수 있도록 상기 슬래브 유닛(10)의 측면에는 오목부(12)가 형성되어 있으며; Concave portions 12 are formed on the side surfaces of the slab unit 10 so that a shear key can be formed between the slab units 10 during the lateral connection assembly between the slab units 10; 상기 슬래브 유닛(10)의 측면에는 관통공(14)이 형성되고; A through hole 14 is formed at a side surface of the slab unit 10; 상기 관통공(14)에는, 상기 슬래브 유닛(10) 간의 횡방향 연결 및 보강하는 횡방향 긴장재(13)가 배치되어 상기 슬래브 유닛(10)들이 일체 구조를 이루도록 횡방향 프리스트레스가 가해지는 것을 특징으로 하는 중공형 프리캐스트 콘크리트 슬래브 구조물. In the through hole 14, a transverse tension member 13 for connecting and reinforcing the lateral connection between the slab units 10 is disposed so that the transverse prestress is applied such that the slab units 10 form an integral structure. Hollow precast concrete slab structure. 제1항에 있어서, The method of claim 1, 상기 슬래브 유닛(10)에서, 상기 중공관(11)은 그 일부가 노출된 상태로 매립되어 있으며; In the slab unit (10), the hollow tube (11) is embedded with a portion thereof exposed; 상기 슬래브 유닛(10)의 횡방향 조립 후에 상기 슬래브 유닛(10) 위에 타설되는 현장 타설 콘크리트에 의하여 중공관(11)의 노출된 일부가 콘크리트에 매립됨과 동시에 나란하게 배치된 슬래브 유닛(10)들에 걸쳐서 일체로 결합되는 것을 특징으로 하는 중공형 프리캐스트 콘크리트 슬래브 구조물. Slab units 10 arranged side by side at the same time the exposed portion of the hollow tube 11 is embedded in the concrete by the site-pouring concrete poured on the slab unit 10 after the transverse assembly of the slab unit 10 Hollow precast concrete slab structure characterized in that integrally coupled over. 제1항 또는 제2항에 있어서, The method according to claim 1 or 2, 상기 슬래브 유닛(10)에는 종방향 긴장재(17)가 구비되어, 종방향의 프리스트레스가 도입되므로써 보강되는 것을 특징으로 하는 중공형 프리캐스트 콘크리트 슬래브 구조물. The slab unit (10) is provided with a longitudinal tension member (17), hollow precast concrete slab structure, characterized in that the reinforcement by introducing the pre-stress in the longitudinal direction.
KR1020050002456A 2005-01-11 2005-01-11 Fabricated Hollow Precast Concrete Slab KR100681849B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050002456A KR100681849B1 (en) 2005-01-11 2005-01-11 Fabricated Hollow Precast Concrete Slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050002456A KR100681849B1 (en) 2005-01-11 2005-01-11 Fabricated Hollow Precast Concrete Slab

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0021503U Division KR200365445Y1 (en) 2004-07-28 2004-07-28 Fabricated Hollow Precast Concrete Slab

Publications (2)

Publication Number Publication Date
KR20060010696A true KR20060010696A (en) 2006-02-02
KR100681849B1 KR100681849B1 (en) 2007-02-15

Family

ID=37120968

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050002456A KR100681849B1 (en) 2005-01-11 2005-01-11 Fabricated Hollow Precast Concrete Slab

Country Status (1)

Country Link
KR (1) KR100681849B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100793158B1 (en) * 2006-12-21 2008-01-10 주식회사 포스코 Construction method of girder bridge with later-tension precast plate
KR100922875B1 (en) * 2008-12-19 2009-10-20 아주대학교산학협력단 Soundpr00f wall structure
KR101036755B1 (en) * 2009-02-23 2011-05-24 박승우 Precast upper plates, lower plates and columns for bridges, and method for manufacturing bridges using the same
KR101998394B1 (en) * 2018-10-16 2019-07-09 김석희 Precast concrete girder composed of upper structure and bridge containing girder and method for constructing this bridge

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101024369B1 (en) 2008-04-11 2011-03-23 주식회사 아이비엘이앤씨 Construction method of hollow slab bridge
KR101442021B1 (en) * 2012-09-25 2014-09-24 한국건설기술연구원 Precast modulor making method for hollow slab, hollow precast modulor therewith, bridge construction method
KR101341760B1 (en) * 2013-07-19 2013-12-13 주식회사 디에스글로벌이엔씨 Construction method of eco bridge and superstructure thereof
KR102343409B1 (en) * 2020-02-06 2021-12-24 서울대학교 산학협력단 Modular PC slab for vibration reduction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100793158B1 (en) * 2006-12-21 2008-01-10 주식회사 포스코 Construction method of girder bridge with later-tension precast plate
KR100922875B1 (en) * 2008-12-19 2009-10-20 아주대학교산학협력단 Soundpr00f wall structure
KR101036755B1 (en) * 2009-02-23 2011-05-24 박승우 Precast upper plates, lower plates and columns for bridges, and method for manufacturing bridges using the same
KR101998394B1 (en) * 2018-10-16 2019-07-09 김석희 Precast concrete girder composed of upper structure and bridge containing girder and method for constructing this bridge

Also Published As

Publication number Publication date
KR100681849B1 (en) 2007-02-15

Similar Documents

Publication Publication Date Title
KR100681849B1 (en) Fabricated Hollow Precast Concrete Slab
KR100920204B1 (en) Constructing method of precast pier footing for bridge
KR100696441B1 (en) Precast Prestressed reinforced concrete bottom plate, bridge having the same, and construction method for the bridge
KR100631807B1 (en) Hollow Concrete Steel Pipe Girder and Girder Bridge using Hollow Pipe Girder
KR101482522B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR102000534B1 (en) Construction method using textile reinforcing panel of high durability for combined usage of permanent form
KR101263370B1 (en) Precast end-block with girder connection member and bridge construction method using ths same
KR200365445Y1 (en) Fabricated Hollow Precast Concrete Slab
KR20120140386A (en) Composite girder using inner molding member and bridge construction method therwith
KR20060028828A (en) Precast concrete girder having integrated slab
KR101582599B1 (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
KR20140125754A (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
KR20090068536A (en) Concrete-composite crossbeam and construction methods of slab structure using the same
KR100787119B1 (en) Pier having Precast Concrete Pipe
KR100582563B1 (en) Construction method for bridges and bridges production it
KR101229263B1 (en) Slab-type box girder with a vertical connecting structure made by precast concrete and method constructing the bridge thereof
KR101034973B1 (en) Bridge and its construction method using tide arch hybrid girders by connecting precast blocks
KR102327700B1 (en) Girder structure and construction method for continuity of supporting portion of girder using the same
KR20090043625A (en) Method for constructing underground slabs using asymmetric girder
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR101723847B1 (en) Steel-concrete composite bridge construction method using prestress introduction during erection of bridge
KR200375130Y1 (en) Precast Prestressed reinforced concrete bottom plate, and bridge having the same
KR100694762B1 (en) Method for constructing underground slabs and walls without preliminary wall-attached supports
JP3418606B2 (en) Girder members for PC bridge
KR101442021B1 (en) Precast modulor making method for hollow slab, hollow precast modulor therewith, bridge construction method

Legal Events

Date Code Title Description
A108 Dual application of patent
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20100805

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee