KR200475667Y1 - Leak test device and method for close torque control moter operated parallel gate valve - Google Patents

Leak test device and method for close torque control moter operated parallel gate valve Download PDF

Info

Publication number
KR200475667Y1
KR200475667Y1 KR2020130001104U KR20130001104U KR200475667Y1 KR 200475667 Y1 KR200475667 Y1 KR 200475667Y1 KR 2020130001104 U KR2020130001104 U KR 2020130001104U KR 20130001104 U KR20130001104 U KR 20130001104U KR 200475667 Y1 KR200475667 Y1 KR 200475667Y1
Authority
KR
South Korea
Prior art keywords
gate valve
air
leakage
torque control
test
Prior art date
Application number
KR2020130001104U
Other languages
Korean (ko)
Other versions
KR20140004740U (en
Inventor
신영하
방희송
Original Assignee
한전케이피에스 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한전케이피에스 주식회사 filed Critical 한전케이피에스 주식회사
Priority to KR2020130001104U priority Critical patent/KR200475667Y1/en
Publication of KR20140004740U publication Critical patent/KR20140004740U/en
Application granted granted Critical
Publication of KR200475667Y1 publication Critical patent/KR200475667Y1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • G01M3/28Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K17/00Safety valves; Equalising valves, e.g. pressure relief valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K37/00Special means in or on valves or other cut-off apparatus for indicating or recording operation thereof, or for enabling an alarm to be given
    • F16K37/0075For recording or indicating the functioning of a valve in combination with test equipment
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • G01M13/003Machine valves
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S251/00Valves and valve actuation

Abstract

본 고안은, 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치를 개시한다. 본 고안의 일 실시예에 따른 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치는, 유로에 복수개가 설치되며, 하부에 드레인 플러그를 구비한 닫힘 토크제어 모터구동 평형게이트 밸브의 누설을 검사하기 위한 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치에 있어서, 상기 닫힘 토크제어 모터구동 평형게이트 밸브의 상기 드레인 플러그 위치에 체결되고, 오링을 구비하는 누설시험용 플러그와, 상기 누설 시험용 플러그에 결합되며, 드레인밸브 및 테스트 게이지가 구비된 검사유체 공급라인, 및 상기 검사유체 공급라인에 결합되는 검사유체 공급부를 포함한다.The present invention discloses a leakage test apparatus for a closed torque control motor drive balanced gate valve. A leakage test apparatus for a closed torque control motor drive balanced gate valve according to an embodiment of the present invention is characterized in that a plurality of leak test apparatuses for a motorized balanced gate valve are provided for checking the leakage of a closed torque control motor drive balanced gate valve provided with a drain plug at a lower portion thereof A leakage inspection apparatus for a motor-driven balanced gate valve, comprising: a leakage testing plug, which is fastened to the drain plug position of the closing torque control motor drive balanced gate valve and has an O-ring, A test fluid supply line provided with a drain valve and a test gauge, and a test fluid supply unit coupled to the test fluid supply line.

Description

닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치 및 검사방법{Leak test device and method for close torque control moter operated parallel gate valve}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a leakage test apparatus and method for a balanced gate valve,
본 고안은 산업계 및 발전소에 설치되는 닫힘 토크제어 모터구동 평형게이트 밸브에 있어서, 복수개의 닫힘 토크제어 모터구동 평형게이트 밸브의 누설여부를 동시에 확인할 수 있는 누설검사 장치 및 검사방법에 관한 것이다.The present invention relates to a leakage inspection apparatus and an inspection method for simultaneously confirming leakage of a plurality of closed torque control motor drive balanced gate valves in a closed torque control motor drive balanced gate valve installed in industry and a power plant.
일반적으로, 원자력 발전소를 포함한 발전시설 또는 산업체에 배관 도중에 설치하여 유로를 차단하는 목적으로 모터 구동형 평형게이트 밸브가 설치되어 있으며, 이러한 모터구동 평형게이트 밸브는 제어 및 구동방법에 따라 일반 모터구동 평형게이트 밸브와, 닫힘 토크제어 모터구동 평형게이트 밸브로 구분된다. Generally, a motor-driven balanced gate valve is installed for the purpose of shutting off a flow path by installing it in a pipe or a power generation facility including an atomic power plant or an industry. Such a motor-driven balanced gate valve is a general motor drive- A gate valve, and a closed torque control motor drive balanced gate valve.
이때, 일반 모터구동 평형게이트 밸브는 유로를 차단시키는 경우 모터를 구동시켜 밸브 내부에 형성된 디스크를 하강시키며, 하강되는 디스크가 일정위치에 도달시 리미트스위치에 의해 모터의 구동을 정지하는 제어 및 구동방식에 의해 유로를 차단한다.In this case, when the flow path is shut off, the general motor-driven balanced gate valve lowers the disk formed inside the valve by driving the motor, and stops the driving of the motor by the limit switch when the falling disk reaches a predetermined position. Thereby blocking the flow path.
한편, 닫힘 토크제어 모터구동 평형게이트 밸브는 유로를 차단시키는 경우 토크의 힘에 의해 2개의 디스크를 입구측 및 출구측으로 벌려(밀어) 밀봉하는 제어 및 구동방식에 의해 유로를 차단한다. 또한, 상기 닫힘 토크제어 모터구동 평형게이트 밸브의 경우에는 일반 모터구동 평형게이트 밸브와 달리 2개의 디스크에 의해 유로의 입구측과 출구측이 차단되는 구조임에 따라, 유로를 차단한 상태에서 밸브 내부의 정비가 가능하도록 하단부에 밸브 내부의 유체를 외부로 배출시킬 수 있는 드레인 플러그가 구비되어 있다.On the other hand, the closed torque control motor drive balanced gate valve cuts off the flow path by a control and drive method in which two disks are opened (pushed) to the inlet side and the outlet side by the torque force when shutting off the flow path. Further, in the case of the closed torque control motor drive balanced gate valve, the inlet side and the outlet side of the oil passage are blocked by two discs, unlike the general motor drive balanced gate valve. Therefore, A drain plug capable of discharging the fluid inside the valve to the outside is provided at the lower end so as to enable maintenance of the valve.
상기와 같은 모터구동 평형게이트 밸브는 내외부의 누설이 발생하지 않도록 엄격하게 관리해야하며, 이를 위한 다양한 장치 및 방법이 사용되고 있다. The above-mentioned motor-driven balanced gate valve must be strictly controlled in order to prevent internal and external leakage, and various devices and methods are used for this purpose.
그러나, 상기 닫힘 토크제어 모터구동 평형게이트 밸브의 경우 2개의 디스크가 입구측과 출구측을 밀봉하는 구조임에 따라, 누설검사 시, 밸브자체의 누설검사를 실시하지 못하고, 유로에 설치된 닫힘 토크제어 모터구동 평형게이트 밸브를 모두 닫힌 상태로 유지한 다음 밸브와 밸브 사이의 유로에 검사 유체를 공급하여 채운 후에, 유로 내부의 압력변화를 측정하는 방식으로 닫힘 토크제어 모터구동 평형게이트 밸브의 누설검사를 실시해 왔었다.However, since the two discs seal the inlet side and the outlet side in the case of the closed torque control motor drive balanced gate valve, leakage inspection of the valve itself can not be performed at the time of leakage inspection, Motor drive Balance Gate valve is closed, then the test fluid is supplied to the flow path between the valve and the valve, and the pressure change inside the flow path is measured. .
그러나, 상기와 같은 누설검사 방법의 경우, 밸브와 밸브 사이의 유로의 압력변화를 측정하여 압력변화가 발생하는 경우, 유로 양측의 어느 밸브에서 누설이 발생하는지 판단하기가 매우 어려운 문제점이 있었다.However, in the case of the leakage testing method as described above, there is a problem that it is very difficult to determine which valve on both sides of the flow path causes leakage when the pressure change of the flow path between the valve and the valve is measured.
또한, 유로에 검사 유체를 공급함에 따라, 유로 내부에 검사 유체가 채워지는 시간 및 배출되는 시간이 상당히 소요되어 전반적인 누설 검사 시간이 길어지는 문제점이 있었다. Further, since the inspection fluid is supplied to the flow path, the time required for filling the inspection fluid with the inspection fluid and the time required for discharging the inspection fluid are considerably required, and the overall leakage inspection time is long.
아울러, 밸브와 밸브 사이에 형성되는 유로에는 별도의 차단 부재가 없고, 또한 다수로 분기되는 구조를 형성하는 유로가 존재하기 때문에, 특정 밸브의 누설검사가 원천적으로 수행되지 못하는 경우가 발생하였다.
In addition, there is no separate shut-off member in the flow path formed between the valve and the valve, and there is a flow path forming a structure in which a large number of flow paths are branched.
본 고안은, 유로에 설치된 복수개의 닫힘 토크제어 모터구동 평형게이트 밸브의 누설검사에 있어서, 유로를 사용하지 않고, 복수개의 닫힘 토크제어 모터구동 평형게이트 밸브 자체의 누설검사를 수행함으로써, 각각의 닫힘 토크제어 모터구동 평형게이트 밸브의 누설여부를 즉각적으로 판단할 수 있으며, 누설검사 시간 또한 단축할 수 있는 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치 및 방법을 제공하고자 한다.
The present invention proposes a method of performing leakage inspection of a plurality of closed-loop-torque-control-motor-driven balanced gate valves provided in a flow path, without using a flow path, The present invention provides an apparatus and method for leakage test for a closed-loop torque-controlled motor-driven balanced gate valve that can instantly determine whether leakage of a torque-controlled motor-driven balanced gate valve can be detected,
본 고안의 일 실시예에 따르면, 유로에 복수개가 설치되며, 유로에 복수개가 설치되며, 하부에 드레인 플러그를 구비한 닫힘 토크제어 모터구동 평형게이트 밸브의 누설을 검사하기 위한 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치에 있어서, 상기 닫힘 토크제어 모터구동 평형게이트 밸브의 상기 드레인 플러그 위치에 체결되고, 오링을 구비하는 누설시험용 플러그와, 상기 누설 시험용 플러그에 결합되며, 드레인밸브 및 테스트 게이지가 구비된 검사유체 공급라인, 및 상기 검사유체 공급라인에 결합되는 검사유체 공급부를 포함하는 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치가 제공될 수 있다. According to an embodiment of the present invention, a plurality of valves are provided in a flow path, a plurality of valves are provided in the flow path, and a closing torque control motor drive balance valve A leak test apparatus for a gate valve, comprising: a leakage test plug, which is tightened to the drain plug position of the closed torque control motor drive balanced gate valve and has an O-ring, and a drain valve and a test gauge There is provided a leakage inspection apparatus for a closed torque control motor driven balanced gate valve including a check fluid supply line provided therein and an inspection fluid supply unit coupled to the inspection fluid supply line.
이때, 상기 검사유체 공급부는, 상기 검사유체 공급라인과 연결되어 상기 누설시험용 플러그를 통해 상기 닫힘 토크제어 모터구동 평형게이트 밸브의 내부로 공기를 공급하는 공압공급부와, 상기 검사유체 공급라인과 연결되어 상기 누설시험용 플러그를 통해 상기 닫힘 토크제어 모터구동 평형게이트 밸브의 내부로 공기 및 물을 공급하는 수압공급부를 포함하여 구성되는 것을 특징으로 할 수 있다.The inspection fluid supply unit may include a pneumatic supply unit connected to the inspection fluid supply line and supplying air into the closed torque control motor drive balanced gate valve through the leakage test plug, And a water pressure supply unit for supplying air and water into the closed torque control motor drive balanced gate valve through the leakage test plug.
또한, 상기 공압공급부는, 에어탱크 또는 에어컴프레서 중 어느 하나로 형성되는 공기 공급장치와, 상기 에어탱크와 플랙시블 호스로 연결되고, 에어필터, 니들밸브, 압력게이지 및 압력 레귤레이터가 형성된 공압공급라인을 포함하는 것을 특징으로 할 수 있다. The pneumatic supply unit may include an air supply device formed of any one of an air tank and an air compressor, and a pneumatic supply line connected to the air tank by a flexible hose and having an air filter, a needle valve, a pressure gauge and a pressure regulator And the like.
또한, 상기 수압공급부는, 에어필터, 에어레귤레이터, 에어게이지 및 니들밸브가 형성된 서비스 공기공급부와, 상기 서비스 공기공급부와 연결되는 펌프와, 상기 펌프와 연결되는 물탱크와, 상기 펌프와 연결되고, 압력레귤레이터 및 다수의 니들밸브가 형성된 수압공급라인을 포함하여 구성되는 것을 특징으로 할 수 있다.The hydraulic pressure supply unit may include a service air supply unit having an air filter, an air regulator, an air gauge and a needle valve, a pump connected to the service air supply unit, a water tank connected to the pump, A pressure regulator, and a water pressure supply line formed with a plurality of needle valves.
본 고안의 다른 실시예에 따르면, 유로에 복수개가 설치되며, 하부에 드레인 플러그를 구비한 닫힘 토크제어 모터구동 평형게이트 밸브의 누설을 검사하기 위한 닫힘 토크제어 모터구동 평형게이트 밸브의 누설검사 방법에 있어서, 닫힘 토크제어 모터구동 평형게이트 밸브를 닫힘 위치로 구동하고, 드레인 플러그를 제거하여 밸브 내부의 유체를 배출하는 누설검사 준비단계; 상기 드레인 플러그를 제거한 위치에, 오링이 구비되고 검사유체의 유동이 가능한 별도의 누설검사용 플러그를 결합하는 누설검사용 플러그 설치단계; 상기 누설검사용 플러그를 통해 상기 닫힘 토크제어 모터구동 평형게이트 밸브 내부로 검사유체를 공급하는 검사유체 공급단계; 상기 검사유체의 공급이 완료된 후, 상기 닫힘 토크제어 모터구동 평형게이트 밸브 내부의 압력변화를 측정하는 압력 측정단계; 상기 닫힘 토크제어 모터구동 평형게이트 밸브에 공급된 검사유체를 배출시킨 후, 설치된 누설검사용 플러그를 제거하고 드레인 플러그를 재설치하여 누설검사를 완료하는 드레인 플러그 재설치단계;를 포함하는 닫힘 토크제어 모터구동 평형게이트 밸브의 누설검사 방법이 제공될 수 있다.According to another embodiment of the present invention, there is provided a leakage test method for a closed torque control motor drive balanced gate valve for inspecting leakage of a closed torque control motor drive balanced gate valve provided with a plurality of flow paths and a drain plug at a lower portion thereof A leakage test preparation step of driving the closed torque control motor drive balanced gate valve to the closed position and removing the drain plug to discharge the fluid inside the valve; Inserting a leakage inspection plug into a leakage inspection plug at a position where the drain plug is removed, the leakage inspection plug being provided with an O-ring and capable of flowing the inspection fluid; A test fluid supply step of supplying a test fluid into the closed torque control motor drive balanced gate valve through the leakage test plug; A pressure measuring step of measuring a pressure change inside the closed torque control motor drive balanced gate valve after the supply of the inspection fluid is completed; And a drain plug re-installation step of discharging the inspection fluid supplied to the closed-loop torque control motor drive balanced gate valve and then removing the installed leakage inspection plug and re-installing the drain plug to complete the leakage inspection A method of inspecting leakage of an equilibrium gate valve can be provided.
이때, 상기 압력 측정단계에 있어서, 상기 닫힘 토크제어 모터구동 평형게이트 밸브 내부의 압력변화가 발생하는 경우, 내부 압력변화가 발생하는 닫힘 토크제어 모터구동 평형게이트 밸브를 정비하는 누설밸브 정비단계;를 더 포함하는 것을 특징으로 할 수 있다.
In this case, in the pressure measuring step, a leak-valve maintenance step of servicing a closed-torque-control-motor-driving balanced gate valve in which a change in internal pressure occurs in the inside of the closed- And further comprising
본 고안은, 각각의 닫힘 토크제어 모터구동 평형게이트 밸브자체에 검사유체를 공급하고, 다수의 밸브의 누설검사가 동시에 수행될 수 있음에 따라, 누설되는 닫힘 토크제어 모터구동 평형게이트 밸브를 즉각적으로 확인할 수 있으며, 검사 시간 또한 비약적으로 단축할 수 있다.The present invention provides a method and system for supplying a test fluid to each closed torque control motor drive balanced gate valve itself and allowing the leaked closed torque control motor drive balanced gate valve to be immediately And the inspection time can be drastically shortened.
또한, 검사유체를 유로에 공급하지 않고, 닫힘 토크제어 모터구동 평형게이트 밸브자체에 공급함에 따라 검사유체의 공급량이 유로에 공급하는 것보다 상대적으로 적어 사용되는 검사유체의 양과, 검사유체를 공급 및 배출을 위한 전반적인 작업시간이 단축될 수 있다.In addition, the amount of the inspection fluid to be used is relatively smaller than the supply amount of the inspection fluid supplied to the flow path as the inspection fluid is supplied to the closed torque control motor drive balanced gate valve itself without supplying the inspection fluid, The overall working time for the discharge can be shortened.
아울러, 닫힘 토크제어 모터구동 평형게이트 밸브의 누설검사 시, 닫힘 토크제어 모터구동 평형게이트 밸브에 형성된 드레인 플러그 대신 누설시험용 플러그를 설치하여 누설검사가 이루어짐에 따라 닫힘 토크제어 모터구동 평형게이트 밸브의 분해 및 조립을 하는 작업수가 감소되고, 초보 작업자라도 누설검사를 용이하게 수행할 수 있다.Closed Torque Control Motor Closed Torque Control for Leakage Test of Balanced Gate Valve Motor Driven Closed Torque Control by Leakage Test Plug Installed Instead of Drain Plug on Gate Valve Disassembly of Balanced Gate Valve And the number of assembling operations can be reduced, and even a novice operator can easily perform leakage inspection.
도 1은 본 고안의 일 실시예에 따른 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치를 개략적으로 나타내는 회로도이다.
도 2는 도 1의 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치의 공압공급부를 통한 누설검사를 개략적으로 나타내는 부분 회로도이다.
도 3은 도 1의 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치의 수압공급부를 통한 누설검사를 개략적으로 나타내는 부분 회로도이다.
도 4는 본 고안의 다른 실시예에 따른 닫힘 토크제어 모터구동 평형게이트 밸브의 검사 단계를 순차적으로 나타낸 순서도이다.
도 5는 일반적인 닫힘 토크제어 모터구동 평형게이트 밸브의 설치 상태를 보여주는 도면이다.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a circuit diagram schematically showing a leakage test apparatus for a closed torque control motor drive balanced gate valve according to an embodiment of the present invention; FIG.
Fig. 2 is a partial circuit diagram schematically showing a leakage test through the pneumatic supply portion of the leakage test apparatus for the closed-torque control motor-driven balanced gate valve of Fig. 1; Fig.
Fig. 3 is a partial circuit diagram schematically showing leakage inspection through a hydraulic pressure supply of the leak test apparatus for a closed-torque control motor-driven balanced gate valve of Fig. 1; Fig.
FIG. 4 is a flowchart sequentially illustrating inspection steps of a closed torque control motor drive balanced gate valve according to another embodiment of the present invention. FIG.
5 is a view showing the installation state of a general closing torque control motor drive balanced gate valve.
도 1은 본 고안의 일 실시예에 따른 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치를 개략적으로 나타내는 회로도이다. 도 2는 도 1의 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치의 공압공급부(30)를 통한 누설검사를 개략적으로 나타내는 부분 회로도이다. 도 3은 도 1의 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치의 수압공급부(40)를 통한 누설검사를 개략적으로 나타내는 부분 회로도이다.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a circuit diagram schematically showing a leakage test apparatus for a closed torque control motor drive balanced gate valve according to an embodiment of the present invention; FIG. Fig. 2 is a partial circuit diagram schematically showing leakage inspection through the pneumatic supply portion 30 of the leakage test apparatus for the closed-torque control motor-driven balanced gate valve of Fig. Fig. 3 is a partial circuit diagram schematically showing a leakage test through the hydraulic pressure supply portion 40 of the leakage test apparatus for a closed-torque control motor-driven balanced gate valve of Fig.
도 1 내지 도 3을 참고하면, 본 고안의 일 실시예에 따른 닫힘 토크제어 모터구동 평형게이트 밸브(이하 '평형게이트 밸브'로 약칭함)용 누설검사 장치는 누설시험용 플러그(10)와, 상기 누설시험용 플러그(10)와 결합하는 검사유체 공급라인(20)과, 상기 검사유체 공급라인(20)에 결합되는 검사유체 공급부(30, 40)를 포함한다.1 to 3, a leakage testing apparatus for a closed torque control motor drive balanced gate valve (hereinafter abbreviated as "balanced gate valve") according to an embodiment of the present invention includes a leakage test plug 10, An inspection fluid supply line 20 for coupling with the leak test plug 10 and an inspection fluid supply unit 30 and 40 connected to the inspection fluid supply line 20.
상기 누설시험용 플러그(10)는, 상기 평형게이트 밸브(1)의 하단에 결합된 드레인 플러그(3)를 제거한 위치에 결합되는 것으로, 상기 검사유체 공급라인(20)과 결합되어 상기 평형게이트 밸브(1)의 내부로 검사유체(F)가 유입될 수 있는 구조로 형성될 수 있다. 이때, 상기 누설검사용 플러그(10)는 상기 평형게이트 밸브(1)의 하단과 결합되어 평형게이트 밸브(1) 외부로 검사유체(F)의 누설을 방지하기 위한 오링과 같은 별도의 가스켓이 구비될 수 있다.The leakage test plug 10 is coupled to a position at which the drain plug 3 coupled to the lower end of the balance gate valve 1 is removed and is connected to the inspection fluid supply line 20, 1 through which the inspection fluid F can be introduced. The leakage inspection plug 10 is connected to the lower end of the balance gate valve 1 and has a separate gasket such as an O-ring for preventing leakage of the inspection fluid F to the outside of the balance gate valve 1. [ .
상기 검사유체 공급라인(20)은, 상기 누설검사용 플러그(10) 및 상기 검사유체 공급부(30, 40)와 결합하여 상기 검사유체 공급부(30, 40)로부터 공급되는 검사유체(F)를 상기 평형게이트 밸브(1)에 공급되기 위한 유동 통로 역할을 할 수 있다. The inspection fluid supply line 20 is connected to the leakage inspection plug 10 and the inspection fluid supply units 30 and 40 to connect the inspection fluid F supplied from the inspection fluid supply units 30 and 40 It can serve as a flow passage for supplying to the balance gate valve 1.
또한, 상기 검사유체 공급라인(20)에는 테스트 게이지(21)가 구비되어 상기 평형게이트 밸브(1) 내부의 압력을 전체적으로 측정할 수 있으며, 상기 누설검사용 플러그(10)와 대응되는 수만큼 형성됨으로써, 각각의 평형게이트 밸브(1)별로 내부압력을 측정할 수도 있다. The test fluid supply line 20 may be provided with a test gauge 21 to measure the pressure inside the balance gate valve 1 as a whole. , It is also possible to measure the internal pressure of each of the balance gate valves 1.
또한, 상기 검사유체 공급라인(20)에는 드레인 밸브(22)가 구비되어 있으며, 상기 드레인 밸브(22)를 통해 상기 평형게이트 밸브(1)로 공급된 검사유체(F)를 외부로 배출시킬 수 있다.The inspection fluid supply line 20 is provided with a drain valve 22 for discharging the inspection fluid F supplied to the balance gate valve 1 through the drain valve 22 to the outside have.
상기 검사유체 공급부(30, 40)는, 상기 평형게이트 밸브(1)에 공급되는 검사유체(F)를 생성 및 공급하는 것으로, 공기를 생성하여 공압을 공급하는 공압공급부(30)와, 공기와 함께 물을 공급하여 수압을 공급하는 수압공급부(40)를 포함할 수 있다.The inspection fluid supply part 30 and 40 generates and supplies inspection fluid F supplied to the balance gate valve 1 and includes a pneumatic supply part 30 for generating air and supplying pneumatic pressure, And a hydraulic pressure supply unit 40 for supplying water together with water.
상기 공압공급부(30)는, 공기공급장치(31)와, 일단이 공기공급장치(31)와 플랙시블한 호스(32)로 연결되고, 타단은 상기 검사유체 공급라인(20)과 연결되는 공압공급라인(33)으로 구성될 수 있다. The pneumatic supply part 30 is connected to the air supply device 31 and one end of the air supply device 31 is connected to the air supply device 31 by a flexible hose 32, And a supply line 33.
이때, 상기 공기공급장치(31)는, 에어탱크 또는 에어컴프레서 중 어느 하나로 형성되어 고압의 공기를 생성 또는 공급할 수 있다.At this time, the air supply device 31 may be formed of any one of an air tank and an air compressor to generate or supply high-pressure air.
또한, 상기 공압공급라인(33)에는, 에어필터(34), 압력레귤레이터(37), 압력게이지(36) 및 다수의 니들밸브(35)가 구비될 수 있으며, 상기 공기공급장치(31)로부터 공급되는 에어의 정화, 압력조절 및 공기의 공급량의 조절이 이루어질 수 있다.The pneumatic supply line 33 may be provided with an air filter 34, a pressure regulator 37, a pressure gauge 36 and a plurality of needle valves 35, The purge of the supplied air, the pressure control, and the adjustment of the air supply amount can be performed.
한편, 상기 수압공급부(40)는, 서비스 공기공급부(45)와, 상기 서비스 공기공급부(45)와 함께 물을 공급하기 위한 펌프(46), 상기 펌프(46)와 연결되는 물탱크(47) 및, 상기 펌프(47)와 연결되는 수압공급라인(48)을 포함할 수 있다.The water pressure supply unit 40 includes a service air supply unit 45, a pump 46 for supplying water together with the service air supply unit 45, a water tank 47 connected to the pump 46, And a water pressure supply line 48 connected to the pump 47.
상기 서비스 공기공급부(45)는, 상기 펌프(46)에 의해 공급되는 물의 공급과 함께 공기를 공급하여 평형게이트 밸브(1)에 공급되는 검사유체(F)의 압력을 증가시키기 위한 구성으로, 에어필터(41)와, 에어레귤레이터(42), 에어게이지(43) 및 니들밸브(44)로 구성될 수 있다. 이때, 상기 서비스 공급부(45)에 공기를 공급하는 구성으로는 에어탱크 또는 에어컴프레서가 구성될 수 있으며, 발전소 또는 산업체 내에서 설치된 별도의 공기 공급라인일 수 있다. The service air supply unit 45 is configured to increase the pressure of the inspection fluid F supplied to the balance gate valve 1 by supplying air with the supply of water supplied by the pump 46, A filter 41, an air regulator 42, an air gauge 43, and a needle valve 44. At this time, an air tank or an air compressor may be configured to supply air to the service supply unit 45, or may be a separate air supply line installed in a power plant or an industry.
상기 펌프(46)는, 상기 서비스 공기공급부(45)와 연결되어 공급되는 공기와 함께 상기 물탱크(47)로부터 물을 펌핑하여 수압을 생성할 수 있다.The pump 46 may generate water pressure by pumping water from the water tank 47 together with air supplied in connection with the service air supply unit 45.
상기 수압공급라인(48)은, 상기 검사유체 공급라인(20)과 연결되어 상기 펌프(46)에서 생성되는 수압을 공급하기 위한 구성으로, 압력레귤레이터 및 다수의 니들 밸브가 형성될 수 있다. The hydraulic pressure supply line 48 is connected to the inspection fluid supply line 20 to supply a hydraulic pressure generated by the pump 46. A pressure regulator and a plurality of needle valves may be formed.
이하에서는 본 고안의 다른 실시예에 따른 닫힘 토크제어 모터구동 평형게이트 밸브(이하 '평형게이트 밸브'로 약칭함)의 누설검사 방법에 대해 구체적으로 설명하기로 한다.
Hereinafter, a leakage inspection method for a closed torque control motor drive balanced gate valve (hereinafter abbreviated as a 'balanced gate valve') according to another embodiment of the present invention will be described in detail.
도 4는 본 고안의 다른 실시예에 따른 닫힘 토크제어 모터구동 평형게이트 밸브(1)의 검사 단계를 순차적으로 나타낸 순서도이다.
FIG. 4 is a flowchart sequentially showing inspection steps of a closed torque control motor drive balanced gate valve 1 according to another embodiment of the present invention.
도 4를 참고하면, 평형게이트 밸브(1)의 누설검사 방법은, 누설검사 준비단계(S100)와, 누설검사용 플러그 설치단계(S200)와, 검사유체 공급단계(S300)와, 압력측정 단계(S400) 및 드레인 플러그 재설치단계(S500)를 포함한다. 4, the leakage inspection method of the balance gate valve 1 includes a leakage inspection preparation step (S100), a leakage inspection plug installation step (S200), an inspection fluid supply step (S300), a pressure measurement step (S400) and a drain plug reinstallation step (S500).
우선, 평형게이트 밸브(1)의 누설을 검사하기 위한 초기 단계로 누설검사 준비단계(S100)가 이루어진다, 상기 누설검사 준비단계(S100)는, 평형게이트 밸브(1)를 닫힘 위치로 구동하고, 드레인 플러그(3)를 제거하여 평형게이트 밸브(1) 내부에 존재하는 유체의 배출이 이루어지는 과정을 포함한다.First, a leak test preparation step (S100) is performed as an initial step for inspecting leakage of the balance gate valve (1). In the leak test preparation step (S100), the balance gate valve (1) is driven to a closed position, And removing the drain plug 3 to discharge the fluid existing in the balance gate valve 1. [
누설검사용 플러그 설치단계(S200)는, 상기 누설검사 준비단계(S100) 이후에 수행되는 것으로, 상기 평형게이트 밸브(1) 내부의 유체가 모두 배출되면, 평형게이트 밸브(1) 하부의 드레인 플러그(3)를 제거한 위치에 결합이 가능하고, 검사유체(F)의 유동이 가능하며, 오링을 구비하는 누설검사용 플러그(10)를 설치하는 과정을 포함한다.The leakage inspecting plug installation step (S200) is performed after the leak test preparation step (S100). When the fluid inside the balance gate valve (1) is exhausted, the drain plug And a leakage checking plug (10) capable of being coupled to the position where the probe (3) is removed and capable of flowing the inspection fluid (F) and having an O - ring.
상기 검사유체 공급단계(S300)는, 상기 누설검사용 플러그 설치단계(S200) 이후에 수행되는 것으로, 상기 평형게이트 밸브(1) 하부에 설치된 누설검사용 플러그(10)에 검사유체 공급부(30, 40)가 결합된 검사유체 공급라인(20)을 결합하여 공압 또는 수압이 평형게이트 밸브(1) 내부로 공급되는 과정을 포함한다. The inspection fluid supply step S300 is performed after the leakage inspection plug installation step S200 and the inspection fluid supply part 30, 40 to the test fluid supply line 20 to supply the pneumatic or hydraulic pressure to the inside of the balance gate valve 1.
상기 압력측정 단계(S400)는, 상기 검사유체 공급단계(S300) 이후에 수행되는 것으로, 상기 평형게이트 밸브(1) 내부로 검사유체(F)의 공급이 완료된 후, 상기 평형게이트 밸브(1)의 내부 압력 변화를 측정하는 과정을 포함한다. The pressure measurement step S400 is performed after the inspection fluid supply step S300. After the supply of the inspection fluid F is completed into the balance gate valve 1, the balance gate valve 1, And measuring a change in the internal pressure of the valve.
이때, 압력측정 단계(S400)에서 평형게이트 내부(1)에 압력변화가 발생하는 경우, 압력변화가 측정되는 평형게이트 밸브(1), 즉, 누설이 이루어지는 평형게이트 밸브(1)를 정비하는 누설밸브 정비단계(S410)를 더 포함할 수 있다. At this time, when a pressure change occurs in the inside of the balanced gate in the pressure measuring step (S400), the leakage of the balance gate valve (1) in which the pressure change is measured, that is, And a valve maintenance step (S410).
상기 드레인 플러그 재설치단계(S500)는, 상기 압력측정 단계(S400) 이후에 수행되는 것으로, 누설되는 평형게이트 밸브(A)가 존재하지 않거나, 누설 밸브 정비단계(S410)를 거친 이후에 검사유체 공급라인(20)의 드레인 밸브(22)를 통해 검사유체(F)를 외부로 배출시킨 후, 누설검사용 밸브(10)를 제거하고, 다시 드레인 밸브(3)를 재설치하는 과정을 통해 평형게이트 밸브(1)의 누설검사를 완료하는 과정을 포함한다.
The drain plug re-installation step (S500) is performed after the pressure measurement step (S400). If the leaked equilibrium gate valve (A) does not exist, or after the leakage valve maintenance step (S410) The test fluid F is discharged to the outside through the drain valve 22 of the line 20 and then the leakage inspection valve 10 is removed and the drain valve 3 is re- (1).
이상 상기에서 상술한 본 고안의 실시예들에 따른 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치 및 방법을 통한 누설검사는, 각각의 평형게이트 밸브(1) 자체에 검사유체(F)를 공급하고, 다수의 평형게이트 밸브(1)의 누설검사가 동시에 수행될 수 있음에 따라, 누설되는 평형게이트 밸브(1)를 즉각적으로 확인할 수 있으며, 검사 시간 또한 비약적으로 단축할 수 있다.As described above, according to the embodiments of the present invention described above, the leak test by the apparatus and method for leakage test for a motor-driven balanced gate valve of a closed torque control system is performed by supplying the test fluid F to each of the balance gate valves 1 themselves And the leak check of a plurality of balance gate valves 1 can be performed at the same time, the leaked balance gate valve 1 can be immediately confirmed, and inspection time can also be drastically shortened.
또한, 검사유체(F)를 유로(2)에 공급하지 않고, 평형게이트 밸브(1) 자체에 공급함에 따라 검사유체(F)의 공급량이 기존의 유로(S)에 공급하여 검사하는 방식보다 상대적으로 적어 사용되는 검사유체(F)의 양과, 전반적인 검사유체(F)의 공급 및 배출 시간이 단축될 수 있다.It is more preferable that the supply amount of the inspection fluid F is supplied to the existing flow path S and is inspected relative to the method of supplying the inspection fluid F to the balance valve 1 without supplying the inspection fluid F to the flow path 2 The amount of the inspection fluid F that is used in a small amount and the supply and discharge time of the overall inspection fluid F can be shortened.
아울러, 평형게이트 밸브(1)의 누설검사 시, 드레인 플러그(3) 대신 누설시험용 플러그(10)를 설치하여 누설검사가 이루어짐에 따라 평형게이트 밸브(1)의 분해 및 조립을 하는 작업수가 감소되고, 초보 작업자라도 누설검사를 용이하게 수행할 수 있다.In addition, the leak test plug 10 is provided in place of the drain plug 3 to inspect the leakage of the balance gate valve 1, and the number of operations for disassembling and assembling the balance gate valve 1 is reduced , Even a novice worker can easily perform leakage inspection.
이상, 본 고안의 다양한 실시예에 대하여 설명하였으나, 해당 기술 분야에서 통상의 지식을 가진 자라면 실용신안청구범위에 기재된 본 고안의 사상으로부터 벗어나지 않는 범위 내에서, 구성 요소의 부가, 변경, 삭제 또는 추가 등에 의해 본 고안을 다양하게 수정 및 변경시킬 수 있을 것이며, 이 또한 본 고안의 권리범위 내에 포함된다고 할 것이다.
It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the inventive concept as set forth in the appended claims. It will be understood that various changes and modifications may be made therein without departing from the spirit and scope of the invention.
1: 닫힘 토크제어 모터구동 평형게이트 밸브
2: 유로 3: 드레인 플러그
10: 누설시험용 플러그 20: 검사유체 공급라인
21: 테스트 게이지 22: 드레인 밸브
30: 공압공급부 40: 수압공급부
D: 디스크 F: 검사유체
1: Closed Torque Control Motor Driven Balanced Gate Valve
2: flow path 3: drain plug
10: Leak test plug 20: Inspection fluid supply line
21: Test gauge 22: Drain valve
30: pneumatic supply part 40: hydraulic pressure supply part
D: Disk F: Inspection fluid

Claims (6)

  1. 유로에 복수개가 설치되며, 하부에 드레인 플러그를 구비한 닫힘 토크제어 모터구동 평형게이트 밸브의 누설을 검사하기 위한 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치에 있어서,
    상기 닫힘 토크제어 모터구동 평형게이트 밸브의 상기 드레인 플러그를 제거한 위치에 체결되고, 오링을 구비하는 복수 개의 누설시험용 플러그와,;
    상기 복수 개의 누설 시험용 플러그에 각각 결합되며, 검사유체(F)를 외부로 배출하는 드레인밸브 및 각각의 평형게이트 밸브 내부의 압력을 측정하는 테스트 게이지가 구비된 검사유체 공급라인, 및
    상기 검사유체 공급라인에 결합되는 검사유체 공급부를 포함하며,
    상기 검사유체 공급부는,
    상기 검사유체 공급라인과 연결되어 상기 누설시험용 플러그를 통해 상기 닫힘 토크제어 모터구동 평형게이트 밸브의 내부로 공기를 공급하는 공압공급부; 및,
    상기 검사유체 공급라인과 연결되어 상기 누설시험용 플러그를 통해 상기 닫힘 토크제어 모터구동 평형게이트 밸브의 내부로 공기 및 물을 공급하는 수압공급부;를 포함하고,
    상기 공압공급부는,
    에어탱크 또는 에어컴프레서 중 어느 하나로 형성되는 공기 공급장치와,
    상기 에어탱크와 플랙시블 호스로 연결되고, 에어필터, 니들밸브, 압력게이지 및 압력 레귤레이터가 형성된 공압공급라인을 포함하며,
    상기 수압공급부는,
    에어필터, 에어레귤레이터 에어게이지 및 니들밸브가 형성된 서비스 공기공급부와,
    상기 서비스 공기공급부와 연결되는 펌프와,
    상기 펌프와 연결되는 물탱크와,
    상기 펌프와 연결되고, 압력레귤레이터 및 다수의 니들밸브가 형성된 수압공급라인을를 포함하는 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치.
    CLAIMS 1. A leakage test apparatus for a motor-driven balanced gate valve, the apparatus comprising: a plurality of flow-path control motors;
    A plurality of leakage testing plugs, which are fastened at positions where the drain plugs of the closing torque control motor drive balanced gate valve are removed, and which have O-rings;
    A test fluid supply line coupled to each of the plurality of leakage test plugs and having a drain valve for discharging the test fluid F to the outside and a test gauge for measuring the pressure inside each balance gate valve,
    And an inspection fluid supply unit coupled to the inspection fluid supply line,
    Wherein the inspection fluid supply unit includes:
    A pneumatic supply unit connected to the inspection fluid supply line to supply air into the closed torque control motor drive balanced gate valve via the leakage test plug; And
    And a hydraulic pressure supply unit connected to the inspection fluid supply line and supplying air and water into the closed torque control motor drive balanced gate valve through the leakage test plug,
    The pneumatic-
    An air supply device formed of any one of an air tank and an air compressor,
    A pneumatic supply line connected to the air tank by a flexible hose and formed with an air filter, a needle valve, a pressure gauge, and a pressure regulator,
    The pressure-
    An air filter, an air regulator air gauge, and a needle valve,
    A pump connected to the service air supply unit,
    A water tank connected to the pump,
    And a hydraulic pressure supply line connected to the pump and including a pressure regulator and a plurality of needle valves.
  2. 삭제delete
  3. 삭제delete
  4. 삭제delete
  5. 삭제delete
  6. 삭제delete
KR2020130001104U 2013-02-14 2013-02-14 Leak test device and method for close torque control moter operated parallel gate valve KR200475667Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020130001104U KR200475667Y1 (en) 2013-02-14 2013-02-14 Leak test device and method for close torque control moter operated parallel gate valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020130001104U KR200475667Y1 (en) 2013-02-14 2013-02-14 Leak test device and method for close torque control moter operated parallel gate valve

Publications (2)

Publication Number Publication Date
KR20140004740U KR20140004740U (en) 2014-08-22
KR200475667Y1 true KR200475667Y1 (en) 2014-12-19

Family

ID=52445976

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020130001104U KR200475667Y1 (en) 2013-02-14 2013-02-14 Leak test device and method for close torque control moter operated parallel gate valve

Country Status (1)

Country Link
KR (1) KR200475667Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160093883A (en) * 2015-01-30 2016-08-09 한국가스공사 Test Apparatus for Relief Valve
KR20170052160A (en) * 2015-11-04 2017-05-12 김윤진 Suppling apparatus for ultra high pressure water for crack test of engine block

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105588688A (en) * 2014-10-22 2016-05-18 广东万锦科技股份有限公司 Polyethylene gas valve detection device
KR101497922B1 (en) * 2014-11-11 2015-03-03 윤중호 Gas Leak Detector
CN105181316B (en) * 2015-09-11 2017-11-03 杭州欣卓科技有限公司 A kind of PE ball valves test machine
CN108444643B (en) * 2018-02-28 2020-07-17 北京联合大学 O-shaped ring dynamic sealing performance test equipment
CN110926796A (en) * 2019-12-04 2020-03-27 福建省特种设备检验研究院 Measuring device for discharge capacity and no-load steam leakage of drain valve hot condensed water and using method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100913276B1 (en) * 2009-02-19 2009-08-21 황창성 Performance tester for safety valve

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100913276B1 (en) * 2009-02-19 2009-08-21 황창성 Performance tester for safety valve

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160093883A (en) * 2015-01-30 2016-08-09 한국가스공사 Test Apparatus for Relief Valve
KR101667475B1 (en) 2015-01-30 2016-10-18 한국가스공사 Test Apparatus for Relief Valve
KR20170052160A (en) * 2015-11-04 2017-05-12 김윤진 Suppling apparatus for ultra high pressure water for crack test of engine block
KR101923422B1 (en) * 2015-11-04 2018-11-29 김윤진 Suppling apparatus for ultra high pressure water for crack test of engine block

Also Published As

Publication number Publication date
KR20140004740U (en) 2014-08-22

Similar Documents

Publication Publication Date Title
KR200475667Y1 (en) Leak test device and method for close torque control moter operated parallel gate valve
KR101107037B1 (en) Apparatus for end-loading test of active power operated valves
KR101951540B1 (en) Valve leakage test equipment
KR101192205B1 (en) A Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It
KR101467744B1 (en) A Test Block Apparatus For Valve And A Test Method Using Of It
KR101551761B1 (en) Butterfly Valve impulse pressure testing apparatus
KR101284359B1 (en) Butterfly Valve Life Test Equipment
JP2011021672A (en) Ball valve, and method of inspecting leakage in the same
KR101221631B1 (en) Apparatus of performance testing console for the Pilot Operated Check Valve
KR20180066016A (en) Gas Leakage Sensing System of 3-Way
CN103493033A (en) Wellhead hips with automatic testing and self-diagnostics
KR200463038Y1 (en) Appratus for checking gas pressure regulator
US10400933B2 (en) Pipe connection
RU2518798C1 (en) Method for leakproofness test of pipeline fitting gate (wedge gate valve) and device for its implementation
RU2580560C1 (en) Method of determining air-tightness of gate of pipeline valves and device therefor
RU2478860C2 (en) Method to diagnose tightness of stop pipeline valves gate and device for its realisation
KR101495033B1 (en) A Test Block Apparatus For Solenoid Valve And A Test Method Using Of It
US9714852B2 (en) Gas flow test apparatus and method
KR101418370B1 (en) A Test Block Apparatus For Solenoid Valve And A Test Method Using Of It
RU145179U1 (en) Stand for testing and setting the cutting device
KR20080083555A (en) A method for leakage test on the laying pipe
KR102159629B1 (en) Remote signal check attachment for AUMA MOV and actuator remote signal detection method of motor drive valve using the same
KR102259556B1 (en) Test equipment for checking solenoid valve
CN209446237U (en) The water plate tightness test system of dish-washing machine
JP4254961B2 (en) Overflow check valve operation inspection method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20171124

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20181115

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20191125

Year of fee payment: 6