KR200463389Y1 - Maker indicate staff - Google Patents
Maker indicate staff Download PDFInfo
- Publication number
- KR200463389Y1 KR200463389Y1 KR2020120000962U KR20120000962U KR200463389Y1 KR 200463389 Y1 KR200463389 Y1 KR 200463389Y1 KR 2020120000962 U KR2020120000962 U KR 2020120000962U KR 20120000962 U KR20120000962 U KR 20120000962U KR 200463389 Y1 KR200463389 Y1 KR 200463389Y1
- Authority
- KR
- South Korea
- Prior art keywords
- marker
- staff
- spray
- detachable
- marker spray
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H7/00—Marking-out or setting-out work
- B25H7/04—Devices, e.g. scribers, for marking
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/10—Devices for levelling, e.g. templates or boards
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a marker spray staff, the scale is marked staff body 10; A laser detector 20 installed at the staff body 10 to generate a light receiving signal when receiving the laser R; A detachable part (30) (130) installed on the staff body (10) of the lower side of the laser detector (20); A marker spray 40 that is attached to and detached from the detachable parts 30 and 130 and sprays a marker for displaying a leader line L; And as installed on the removable portion 30, 130, the operation unit 50 for pressing the push button 41 of the marker spray 40; characterized in that it comprises a.
Description
The present invention relates to a marker spray staff, and more particularly, to a marker spray staff for displaying a leader line so as to be aligned with the laser beam irradiated from the laser leveler so that the construction floor surface is aligned with the correct horizontal level.
In general, the laser leveler is used to adjust the horizontal level so that the construction floor surface is horizontal. Such a laser level is irradiated with a laser in one direction or 360 ㅀ direction, wherein the laser is irradiated in the horizontal direction to be a reference for adjusting the horizontal level of the construction floor.
1 is a view for explaining a method for adjusting the horizontal level of the construction floor using a conventional laser level.
As shown in the figure, the operator has to the construction floor surface B1 to be cast in concrete on the basis of the laser (R) irradiated in the horizontal direction from the laser level (RL) supported by the tripod on the floor (B) Predetermined the distance (D), the distance (D) based on the laser (R) in the state in which the staff (1) to the formwork to form a reinforcement structure (S) or a wall or retaining wall forming a column The indicator (L) is displayed on the corresponding reinforcing structure (S) or formwork by using the marker (M) on the scale portion of the corresponding staff (1). After the concrete is poured to the indicator line (L) to complete the construction floor (B1). In this way, the separation distance D is determined in advance by using the laser R and the staff 1 irradiated in the horizontal direction, and the marker (for the reinforcing structure S or the form of the portion indicating the separation distance D) The indicator L is indicated by M).
However, since the reinforcing structure and the formwork are complicatedly installed in the construction site, it was very difficult to accurately display the leader line L on the reinforcing structure S or the formwork corresponding to the scale portion of the staff 1. In particular, when the indicator (L) is inserted between the reinforcing structures (S) to display the leader line (L), the leader line (L) is often skewed, and thus an error occurs frequently between several leader lines. In general, in the construction site, since the pillars should be constructed in units of 20 to 30 m 2, there are many reinforcing bar structures (S), and many formwork are installed, and the indicators are displayed on the bar or frame. When this skew or error occurs when the concrete is placed to the leader line (L), the construction floor (B1), which is eventually constructed, is not able to achieve a horizontal level.
In addition, in order to display the leader line (L), the operator had to hold the staff (1) and the other operator had to display the leader line (L) with a marker (M) in a place corresponding to the specific scale of the staff (1), Several operators had to move together to mark L).
In addition, the display of the leader line L proceeds while visually confirming visually, and efforts are required to insert and display markers between the complex reinforcing bar structures S. Consequently, a lot of time and effort are required to display the leader line. . This caused the air to increase.
The present invention has been devised to solve the above problems, it is possible to accurately display the indicator line for displaying the construction floor surface, to accurately match the horizontal level of the construction floor surface, it is possible to quickly display the indicator line air An object of the present invention is to provide a marker spray staff that can shorten the time required.
Another object of the present invention is to provide a marker spray staff that can maximize utility by using a commercially available marker spray.
In order to achieve the above object, the marker spray staff according to the present invention, the scale is marked, the
In the present invention, the
In the present invention, the
In the present invention, the marker spray (40) includes an extension member (42) extending from the push button (41) to the bottom and a nozzle (43) provided at the end of the extension member (42); The
In the present invention, the
In the present invention, the
delete
delete
delete
According to the present invention, when the laser (R) irradiated from the laser leveler (RL) is received by the
In addition, since the leader line L can be displayed by the worker alone, the number of workers who display the leader line L can be reduced, thereby reducing the construction cost.
In addition, the indicator L can be displayed accurately without visual confirmation, so that the indicator L can be displayed in a short time, thereby reducing the air.
And you can use commercially available marker sprays to maximize their utilization.
1 is a view for explaining a method for adjusting the horizontal level of the construction floor using a conventional laser leveler,
2 is a view for explaining a method for adjusting the horizontal level of the construction floor using the marker spray staff in the present invention,
3 is a view for explaining the configuration of the first embodiment of the detachable portion in the marker spray staff according to the present invention shown in FIG.
Figure 4 is an exploded perspective view of the removable portion and the marker spray of Figure 3,
5 is a view for explaining that the marker spray is coupled to the removable portion of FIG.
6 is a view for explaining the configuration of a second embodiment of the detachable portion in the marker spray staff according to the present invention,
7 is a view for explaining that the marker spray is coupled to the detachable portion of FIG.
Hereinafter, the marker spray staff according to the present invention will be described in detail with reference to the accompanying drawings.
Figure 2 is a view for explaining a method for adjusting the horizontal level of the construction floor using the marker spray staff in the present invention, Figure 3 is a marker spray staff according to the present invention shown in Figure 2, detachable It is a figure for demonstrating the structure of a negative 1st Example. 4 is an exploded perspective view of the detachable portion and the marker spray of FIG. 3, and FIG. 5 is a view for explaining that the marker spray is coupled to the detachable portion of FIG. 4.
Marker spray staff according to the present invention, in conjunction with the laser (R) irradiated in the horizontal direction from the laser level (RL) supported by a tripod on the floor (B), for example, the construction floor surface is cast in concrete The indicator line L enabling the horizontal level of B1 can be displayed accurately and easily.
The marker spray staff, which is marked with a scale, is provided with a
The
The
Marker
Marker
In addition, the
As shown in FIGS. 4 and 5, the first embodiment of the
The
The
The lifting
The
6 is a view for explaining the configuration of the second embodiment of the marker spray staff according to the present invention, Figure 7 is a view for explaining that the marker spray is coupled to the detachable portion of FIG.
As shown, the second embodiment of the
The
The
The
The
The
5 and 7, the operating
In addition, the
delete
The
As shown in FIG. 3, the
Due to the structure of the
At this time, since the
The
Next, the operation of the marker spray staff will be described.
The operator distances D from the laser leveler RL supported by the tripod to the floor B to the construction floor B1 to be placed in concrete on the basis of the laser R irradiated in the horizontal direction. Set in advance. The separation distance D is determined by elevating the
Thereafter, the worker moves the
Thereafter, when the
Alternatively, when the
And when the marker solution is exhausted in the
As such, according to the present invention, when the laser R emitted from the laser leveler RL is received by the
In addition, since the leader line L can be displayed by the worker alone, the number of workers who display the leader line L can be reduced, thereby reducing the construction cost.
In addition, the indicator L can be displayed accurately without visual confirmation, so that the indicator L can be displayed in a short time, thereby reducing the air.
And the
While the present invention has been described with reference to exemplary embodiments thereof, it will be understood by those of ordinary skill in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention.
10 ...
30 ...
32 ...
34 ... lifting
36 ... bolt
130 ...
132 ...
134 ... lifting
136 ...
40 ...
42 ...
44 ...
51 ... geared
53 ...
60 ... Alarm unit L ... Leader
R ... Laser RL ... Laser Leveler
Claims (11)
A detachable part (30) (130) installed on the staff body (10) of the lower side of the laser detector (20);
A marker spray 40 that is attached to and detached from the detachable parts 30 and 130 and sprays a marker for displaying a leader line L; And
Marker spray staff, characterized in that it is installed on the removable portion 30, 130, the operation unit 50 for pressing the push button 41 of the marker spray (40).
Marker spray staff further comprises an alarm generator for generating an alarm light or an alarm sound when the laser detector 20 generates a light receiving signal.
And a detachable body 31 coupled to the staff body 10 and an upper bracket 32 for fixing the upper side of the marker spray 40 to an upper side of the detachable body 31. Marker spray staff characterized in that.
Further comprising a lower bracket 33 formed on the lower side of the upper bracket 32, and the lifting support 34 for supporting the bottom of the marker spray 40, which is installed to be lifted on the lower bracket 33 Marker spray staff characterized in that.
The marker spray (40) includes an extension member (42) extending from the push button (41) to a lower portion and a nozzle (43) provided at an end of the extension member (42);
The detachable part (30), the marker spray staff characterized in that it further comprises a nozzle fixing portion (35) for fixing the nozzle (43) on the lower side of the detachable part (30).
Detachable body 131 is coupled to the staff body 10, and a lower bracket 132 for fixing the upper side of the marker spray 40 to the lower side of the removable body 131 Marker spray staff characterized in that.
It further comprises an upper bracket 133 formed on the upper side of the lower bracket 132, and an elevating support 134 supporting the bottom of the marker spray 40 as being mounted on the upper bracket 133 to be elevated. Marker spray staff characterized in that.
The marker spray (40) includes a second nozzle (44) provided in the push button (41);
The detachable portion 130 is a marker spray staff, characterized in that further comprises a nozzle fixing portion (135) for fixing the second nozzle (44) on the lower side of the detachable portion (30).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020120000962U KR200463389Y1 (en) | 2012-02-08 | 2012-02-08 | Maker indicate staff |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020120000962U KR200463389Y1 (en) | 2012-02-08 | 2012-02-08 | Maker indicate staff |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200463389Y1 true KR200463389Y1 (en) | 2012-11-05 |
Family
ID=47565842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020120000962U KR200463389Y1 (en) | 2012-02-08 | 2012-02-08 | Maker indicate staff |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200463389Y1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758351A (en) * | 2013-12-28 | 2014-04-30 | 于海 | Concrete laser leveling machine |
KR20160042550A (en) * | 2014-10-10 | 2016-04-20 | 노희아 | Staff Cradle |
US11280607B2 (en) | 2016-03-08 | 2022-03-22 | Staff Holdings Pty Ltd | Laser level checking |
KR102520270B1 (en) | 2022-05-23 | 2023-04-12 | 대한민국 | Staff Apparatus |
KR102686553B1 (en) | 2023-04-21 | 2024-07-19 | 대한민국 | Staff Assembly For Water Level Having Buoys |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200448246Y1 (en) | 2009-09-16 | 2010-03-29 | 김봉열 | Concrete Leveling Rod |
-
2012
- 2012-02-08 KR KR2020120000962U patent/KR200463389Y1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200448246Y1 (en) | 2009-09-16 | 2010-03-29 | 김봉열 | Concrete Leveling Rod |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758351A (en) * | 2013-12-28 | 2014-04-30 | 于海 | Concrete laser leveling machine |
CN103758351B (en) * | 2013-12-28 | 2015-12-02 | 于海 | Laser concrete leveling machine |
KR20160042550A (en) * | 2014-10-10 | 2016-04-20 | 노희아 | Staff Cradle |
KR101628794B1 (en) * | 2014-10-10 | 2016-06-21 | 노희아 | Staff Cradle |
US11280607B2 (en) | 2016-03-08 | 2022-03-22 | Staff Holdings Pty Ltd | Laser level checking |
KR102520270B1 (en) | 2022-05-23 | 2023-04-12 | 대한민국 | Staff Apparatus |
KR102686553B1 (en) | 2023-04-21 | 2024-07-19 | 대한민국 | Staff Assembly For Water Level Having Buoys |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR200463389Y1 (en) | Maker indicate staff | |
KR20140131755A (en) | staff for level measurement | |
CN105484500A (en) | Concrete night construction elevation control device and construction method thereof | |
EP2779899B1 (en) | Height measuring device | |
KR101747021B1 (en) | Laser level support | |
JP2007138427A (en) | Tunnel support erection method and tunnel support erection system | |
CN209416230U (en) | Floor thickness measuring device | |
CN103967041A (en) | Construction method of fan foundation ring | |
CN105569276A (en) | Construction method capable of achieving double control on thickness of cast-in-situ concrete plate | |
JP2006274635A (en) | Pile driving posture monitoring device and pile driving posture monitoring method | |
CN210508449U (en) | On-site projection construction device | |
JP2006274634A (en) | Pile driving posture monitoring device and pile driving posture monitoring method | |
KR200462961Y1 (en) | Maker spray indicator for staff | |
KR20210041369A (en) | Leveling rod for concrete pouring | |
KR101726220B1 (en) | Staff Cradle | |
CN205778823U (en) | Auxiliary device measured by a kind of vertical shaft | |
CN111322999B (en) | Turnover assembly type positioning device based on infrared sensor and use method thereof | |
KR101151716B1 (en) | maker indicate staff | |
KR20130067198A (en) | Maker indicate staff | |
CN110849242A (en) | Concrete floor pours thickness measurement device | |
CN211396736U (en) | Dual-purpose supporting device for leveling instrument erection and concrete pouring | |
CN201561756U (en) | Assistant alignment device for construction setting-out | |
CN110080587B (en) | Arc template positioning adjusting device and method for positioning template | |
CN104596488B (en) | Support device for building construction measurement and method for controlling vertical direction of wall | |
KR102170676B1 (en) | Control point for surveying |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
AMND | Amendment | ||
E902 | Notification of reason for refusal | ||
AMND | Amendment | ||
E601 | Decision to refuse application | ||
X70R | Decision of rejection after re-examination | ||
AMND | Amendment | ||
GRNO | Decision to grant (after opposition) | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20151016 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20160628 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20171122 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20181108 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20191119 Year of fee payment: 8 |