KR200443038Y1 - Removable Earth Anchor - Google Patents
Removable Earth Anchor Download PDFInfo
- Publication number
- KR200443038Y1 KR200443038Y1 KR2020070010541U KR20070010541U KR200443038Y1 KR 200443038 Y1 KR200443038 Y1 KR 200443038Y1 KR 2020070010541 U KR2020070010541 U KR 2020070010541U KR 20070010541 U KR20070010541 U KR 20070010541U KR 200443038 Y1 KR200443038 Y1 KR 200443038Y1
- Authority
- KR
- South Korea
- Prior art keywords
- earth anchor
- split
- support
- wedge
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/02—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/14—Geometrical or physical properties resilient or elastic
- E02D2200/146—Springs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0001—Rubbers
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Piles And Underground Anchors (AREA)
Abstract
본 고안은 제거식 어스앵커에 관한 것으로,팽창제가 굴토 작업 공사 현장의 절토면에 뚫은 지지구멍 속에 삽입 설치되어 시멘트 그라우팅에 의해 고정 지지되면서, 그라우팅 속에 삽입 설치되는 강선이 내장된 주름관의 선단에 지지콘이 설치되고, 상기 지지콘에 다수개의 분할 쐐기가 설치되어 있으며, 상기 각각의 분할 쐐기에 어스 앵커용 지지 강선이 끼워져 지지되어 있는 한편, 상기 분할 쐐기와 지지콘 사이에 탄력 스프링이 설치되고, 상기 분할 쐐기의 원주면에 고정용 고무링이 설치되어 이루어진 어스앵커에서, 상기 주름관의 내부에 입구에서부터 지지콘의 뒤쪽까지 직경이 작은 보조관이 설치되고, 상기 보조관의 내부에 지지 강선의 개수와 일치하는 다수개의 견인용 철선이 내장되어 있으며, 상기 견인용 철선의 선단이 분할 쐐기의 원주면에 설치된 고정 고무링과 연결된 구조로 되어 있다. 이러한 구조로 이루어진 본 고안의 제거식 어스 앵커는 공사가 끝난 후에 절토면의 바깥에서 어스 앵커용 강선을 지지하고 있는 쐐기를 해체시킨 다음, 상기 견인용 철선을 잡아당기면 어스 앵커용 강선 내부에서 지지하고 있는 분할 쐐기가 지지콘에서 빠져나오게 함으로써, 어스 앵커용 강선의 체결이 해체되게 하여 간단하게 손으로 잡아당기면 지하에서 끌어내 제거할 수 있게 한다. 따라서 본 고안의 어스 앵커는 어스 앵커용 강선을 내부에서 조여 물고 있는 분할 쐐기를 견인용 철선을 사용하여 직접 잡아 당겨 해체함으로써, 정확하고 간단하게 어스 앵커용 강선의 물림 상태를 해제할 수 있게 하는 효과를 얻을 수 있다.
어스 앵커, 제거, 분할 쐐기
The present invention relates to a removable earth anchor, in which an expanding agent is inserted into a support hole drilled in a cut surface of a pit work site and is fixed and supported by cement grouting, and a support cone at the end of a corrugated pipe having a steel wire inserted into the grouting is installed. And a plurality of split wedges are installed on the support cones, and support steel wires for earth anchors are supported by the respective split wedges, while an elastic spring is installed between the split wedges and the support cones. In the earth anchor, which is provided with a fixing rubber ring on the circumferential surface of the split wedge, an auxiliary pipe having a small diameter is installed in the corrugated pipe from the inlet to the back of the support cone, and the number of supporting steel wires is provided in the auxiliary pipe. A plurality of matching towing wires are built in, the leading end of the towing wire being the circumference of the split wedge It is fixed with a rubber ring and associated structure is installed on. The removable earth anchor of the present invention having such a structure dismantles the wedge supporting the earth anchor steel wire from the outside of the cut surface after the construction is completed, and then pulls the towing wire to support the inside of the earth anchor steel wire. By letting the split wedge out of the support cone, the fastening of the earth anchor steel wire can be dismantled and simply pulled by hand to remove it from the basement. Therefore, the earth anchor of the present invention pulls and disassembles the split wedges which fasten the earth anchor steel wires inside by using the towing iron wires, thereby releasing the bite state of the earth anchor steel wires accurately and simply. Can be obtained.
Earth anchor, remove, split wedge
Description
도 1은 본 고안에 따른 어스 앵커를 사용하여 굴착면에 설치한 상태를 나타낸 예의 단면도,1 is a cross-sectional view showing an example installed on the excavation surface using the earth anchor according to the present invention,
도 2는 도면 1의 선단부에 대한 확대 단면도,2 is an enlarged cross-sectional view of the distal end of FIG. 1;
도 3은 본 고안에 따른 제거식 어스 앵커의 선단부 결합 상태를 나타낸 내부 단면도,Figure 3 is an internal cross-sectional view showing the front end coupled state of the removable earth anchor according to the present invention,
도 4는 본 고안에 따른 제거식 어스 앵커의 선단부 결합구조를 나타내 분리사시도,Figure 4 is an exploded perspective view showing the distal end coupling structure of the removable earth anchor according to the present invention,
도 5는 본 고안에 따른 제거식 어스 앵커에 사용되는 분할쐐기에 견인용 철선이 연결된 상태를 나타낸 사시도,5 is a perspective view showing a state in which a wire for traction is connected to the split wedge used in the removable earth anchor according to the present invention,
도 6은 본 고안에 따른 제거식 어스 앵커에 사용되는 분할쐐기에 견인용 철선이 120도의 간격을 두고 균등하게 배치 연결된 상태를 나타낸 평면도이다.Figure 6 is a plan view showing a state in which the traction iron wire is evenly arranged at intervals of 120 degrees to the split wedge used in the removable earth anchor according to the present invention.
*도면의 주요 부분에 대한 부호 설명** Description of symbols on the main parts of the drawings *
1 - 어스 앵커 2 - 절토면1-Earth Anchor 2-Cut Face
3 - 지지구멍 4 - 시멘트 그라우팅3-support hole 4-cement grouting
5 - 주름관 6 - 지지콘5-corrugated pipe 6-support cone
7 - 분할쐐기 8 - 강선7-Split Wedge 8-Liner
9 - 탄력 스프링 10 - 고정용 고무링9-Resilient Spring 10-Retaining Rubber Ring
11 - 보조관 12 - 견인용 철선11-Auxiliaries 12-Towing Wires
13 - 분할대 14 - 통과홈13-Partition 14-Passing Groove
15 - 보호캡 16 - 쐐기홈15-Protective cap 16-Wedge
17 - 지지 벽체판 18 - 지지 철판17-support wall plate 18-support iron plate
19 - 쐐기 20 - 마감 캡19-wedge 20-closing cap
본 고안은 흙막이 공사에 사용하는 어스 앵커에 관한 것으로, 특히 공사가 끝난 후에 간단하고 확실하게 제거할 수 있게 한 어스 앵커에 관한 것이다.The present invention relates to an earth anchor for use in earthquake construction, and more particularly, to an earth anchor that can be easily and reliably removed after construction.
일반적으로 터파기, 흙막이, 철도 및 도로에 인접한 자연 및 인공 사면의 보강, 또는 지기 구조물 및 터널 등과 같은 토목 공사를 할 때 흙이 무너져 내리리 않게 막아 주는 흙막이 공사가 필수적인 바, 이러한 흙막이 공사의 방법으로서 소일 네일링(soil nailing)공법과 어스 앵커(earth anchor) 공법을 많이 주로 많이 사용하고 있다.In general, it is necessary to construct a block to prevent the soil from falling down when reinforcing natural and artificial slopes adjacent to trenches, blocks, railroads and roads, or civil works such as keeper structures and tunnels. Soil nailing and earth anchor are used a lot.
이러한 어스 앵커 공법과 소일 네일링 공법은 각각 그 장단점이 있지만, 공 사 현장의 특성에 따라서 적절한 방법을 선택하여 사용하고 있다.Although the earth anchor method and the soil nailing method have advantages and disadvantages, they are selected and used according to the characteristics of the project site.
네일링 공법은 절토면에 콘크리트를 뿜어 보강한 상태에서 설치구멍을 뚫고, 상기 설치구멍속에 철근으로 이루어진 네일과 시멘트 그라우팅을 삽입 설치하여, 상기 네일이 시멘트 그라우팅에 의해 고정 지지되게 하며, 상기 절토면의 바깥으로 노출된 네일의 선단에 압력판과 고정너트를 설치하여 절토면이 무너져 내리지 않게 지지하게 되어 있다.Nailing method is to drill the installation hole in the state of reinforcement by spraying concrete on the cut surface, and insert the nail and cement grout made of reinforcing bars into the installation hole, the nail is fixed and supported by cement grouting, the outside of the cut surface The pressure plate and the fixing nut are installed at the tip of the exposed nail so that the cut surface does not collapse.
한편, 어스 앵커 공법은 경사 절토면에 형성시킨 설치구멍 속에 여러 가닥의 강선과 시멘트 그라우팅을 삽입하여 강선이 시멘트 그라우팅에 의해 부착, 지지되어지게 하면서, 경사 절토면의 바깥으로 노출된 강선의 선단에 압력판과 지지빔을 연결하여, 상기 압력판과 지지빔이 강선에 의해 지지되게 함으로써, 경사면의 토사가 무너져 내리지 않게 하고 있다.On the other hand, the earth anchor method inserts several strands of steel wire and cement grouting into the installation hole formed on the inclined cut surface, so that the steel wire is attached and supported by the cement grouting, while the pressure plate and the end of the exposed steel wire are exposed to the outside of the inclined cut surface. By connecting the support beams, the pressure plate and the support beams are supported by steel wires so that the soil on the inclined surface does not collapse.
그런데, 이러한 어스 앵커 공법과 소일 네일 공법에 따라 절토면에 삽입 설치되는 철선과 철근 네일은 각각 수직 방향의 절토면에 대하여 지층 내부에 경사방향으로 뚫린 설치구멍 속에 설치되기 때문에, 공사장에서 인접한 다른 토지의 밑으로 뚫고 들어가 설치되게 된다.However, the iron wire and the reinforcing nail inserted into the cut surface according to the earth anchor method and the soil nail method are respectively installed in the installation holes drilled in the inclined direction with respect to the vertical cut surface. It will be drilled into and installed.
이러한 문제는 시가지나 사람이 많이 사는 곳에서 다른 사람의 토지 밑으로 어스 앵커나 소일 네일이 설치되어 있으면 토지 소유권이 지상과 지하에도 미친다는 법리 때문에, 다른 사람의 사유재산을 침해하는 문제가 발생할 수 있게 된다.This problem may be a violation of other people's private property because of the law that land ownership extends to the ground and underground if earth anchors or soil nails are installed under other people's land in urban areas or in places where many people live. Will be.
그러나, 특히 건물을 세우기 위해 지하에 수직 방향으로 땅을 파는 경우에 주변의 건물보호나 절토면의 보호 및 공사 현장의 안전을 위해 흙막이 공사가 필수 적이므로, 상기한 바와 같은 어스 앵커공법 또는 소일 네일 공법이 필수적으로 사용되고 있다.However, especially in the case of digging the ground in the vertical direction underground to build a building, the earthquake construction is essential for the protection of the surrounding buildings, the protection of the cut surface, and the safety of the construction site. Essentially used.
이러한 공사현장의 필수적인 문제와 사유 재산의 침해 문제를 동시에 해결하는 방법으로서, 공사를 할 때는 다른 사람의 토지 밑으로 어스 앵커나 소일 네일을 설치하여 안전하게 흙막이가 이루어지게 하고, 공사가 끝난 다음에는 소일 네일 또는 어스 앵커를 제거함으로써 타인의 재산을 침해한다는 문제를 해결하고 있다.As a way to solve the essential problems of the construction site and infringement of private property at the same time, earth anchor or soil nail is installed under other people's land when construction is done, and the soil is secured after construction is completed. Eliminating nails or earth anchors solves the problem of infringing others' property.
이와 같이 어스 앵커를 제거할 수 있게 하는 여러 가지 방법이 제안되어 있는데, 예컨대 실용신안등록 20-344971호의 “어스 앵커의 강선 제거장치”에 따른 고안은 강선에 용접부재와 인장기를 설치하여, 강선을 제거하여야 할 때 용접부재에 전원을 인가하여 강선을 전기적으로 용융시킴으로써, 팽팽하게 당겨져 있는 상태에서 해체하고, 해체된 강선을 인장기가 잡아당겨서 제거하게 하고 있다.In this way, various methods for removing the earth anchor have been proposed. For example, the design according to the “wire anchor removal device of the earth anchor” of Utility Model Registration No. 20-344971 has provided a welding member and a tensioner to the steel wire, When it is necessary to remove the steel wire by applying power to the welding member to electrically melt the steel wire, the steel wire is dismantled in the stretched state, and the tensioner pulls the removed steel wire to remove it.
그런나, 이러한 장치는 어스 앵커를 설치할 때 용접부재와 인장기를 설치하여야 하며, 또 용접 부재를 작동시키기 위한 전원이 필요할 뿐만 아니라, 전류의 공급으로 용접부재를 용융시켜야 하기 때문에 시간이 많이 걸리는 등의 문제가 있었다.However, such a device requires a welding member and a tensioner to install the earth anchor, requires a power source to operate the welding member, and takes a long time because the welding member must be melted by supply of current. There was a problem.
또 다른 방법으로서, 특허 등록 10-403280호의 “스프링 내장 제거형 어스 앵커”에 따른 발명은 설치구멍의 선단에서 강선을 지지하고 있는 쐐기가 스프링을 압축시킨 상태로 설치하고, 상기 스프링의 다른 한쪽 선단을 절토면의 설치구멍 바깥으로 인출하여, 공사가 끝난 다음에 절토면의 설치구멍 바깥으로 노출된 스프링의 선단을 잡아당기면, 스프링이 쐐기를 강제적으로 잠김 상태에서 빠져나가게 한 구조로 되어 있다.As another method, the invention according to the "spring built-in removal earth anchor" of Patent Registration No. 10-403280 is installed with the wedge supporting the steel wire at the tip of the installation hole compressed with the spring, and the other end of the spring. Is pulled out of the installation hole of the cut surface, and after completion of construction, the spring is pulled out of the exposed hole to the outside of the installation hole of the cut surface, and the spring is forced out of the locked state.
그런데 이러한 종래의 제거형 어스앵커는 앵커 강선의 인장력이 강할수록 스프링 좌우측이 받는 압력이 커져서 원형의 스프링형상이 타원형으로 찌그러지면서 제거시 스프링 선단이 잡아 당겨지지 않고 자주 끊어지는 단점이 있다However, the conventional removal type earth anchor has a disadvantage in that, as the tensile force of the anchor steel wire increases, the pressure applied to the left and right sides of the spring increases, so that the circular spring shape is deformed in an elliptical shape, and the spring tip is not pulled out when removed.
따라서, 상기한 바와 같은 종래의 장치는 공사가 끝난 후에 어스 앵커용 강선을 정확하게 제거하게 하기가 어렵고, 스프링선이 끊기는 경우가 자주 일어나고 있기 때문에 지하에 묻힌 강선을 완전하게 제거하지 못하는 문제가 있게 된다. Therefore, the conventional apparatus as described above has a problem that it is difficult to accurately remove the earth anchor steel wire after the construction is completed, and the spring wire is often broken, so that the steel wire buried underground can not be completely removed. .
이에 본 고안은 상기한 바와 같은 종래의 어스 앵커에 따른 문제를 해결하여, 지하에 매설된 어스 앵커용 강선을 정확하고 확실하게 제거할 수 있을 뿐만 아니라, 구조가 간단한 제거식 어스 앵커를 제공하는데 그 목적이 있다.Accordingly, the present invention solves the problem of the conventional earth anchor as described above, and can accurately and reliably remove the steel anchor wire buried underground, and provides a simple earth anchor removable structure. There is a purpose.
상기한 바의 목적을 달성하기 위한 본 고안의 어스 앵커는 굴토 작업 공사 현장의 절토면에 뚫은 지지구멍 속에 삽입 설치되어 시멘트 그라우팅에 의해 고정 지지되면서, 그라우팅 속에 삽입 설치되는 강선이 내장된 주름관의 선단에 지지콘이 설치되고, 상기 지지콘에 다수개의 분할 쐐기가 설치되어 있으며, 상기 각각의 분할 쐐기에 어스 앵커용 지지 강선이 끼워져 지지되어 있는 한편, 상기 분할 쐐기와 지지콘 사이에 탄력 스프링이 설치되고, 상기 분할 쐐기의 원주면에 고정용 고무링이 설치되어 이루어진 어스앵커에서, 상기 주름관의 내부에 입구에서부터 지지콘의 뒤쪽까지 직경이 작은 보조관이 설치되고, 상기 보조관의 내부에 지지 강선의 개수와 일치하는 다수개의 견인용 철선이 내장되어 있으며, 상기 견인용 철선의 선단이 분할 쐐기의 원주면에 설치된 고정 고무링과 연결된 구조로 되어 있다. Earth anchor of the present invention for achieving the purpose of the bar is inserted into the support hole drilled in the cut surface of the pit work construction site is fixed and supported by cement grouting, at the end of the corrugated pipe with a steel wire inserted into the grouting A support cone is installed, and a plurality of split wedges are installed in the support cone, and a support steel wire for earth anchors is supported by each split wedge, while an elastic spring is installed between the split wedge and the support cone. In the earth anchor is formed on the circumferential surface of the split wedge is provided with a fixing rubber ring, an auxiliary pipe having a small diameter from the inlet to the back of the support cone is installed inside the corrugated pipe, the supporting steel wire of the auxiliary pipe A plurality of towing wires corresponding to the number are built-in, and the tip of the towing wire is divided into wedges. It has a structure associated with the fixed rubber ring provided on the peripheral surface.
그리고 상기 보조관의 선단에 견인용 철선이 각각의 분할 쐐기 쪽으로 나누어지게 하는 분할대를 설치할 수도 있고, 상기 분할 쐐기의 선단 가장자리에 견인용 철선이 쉽게 통과할 수 있게 하는 통과홈이 형성된 구조로 할 수도 있다. And the front end of the auxiliary pipe may be provided with a splitting table for dividing the traction iron wire toward each split wedge, or a structure in which a through groove is formed in the leading edge of the split wedge so that the traction iron wire can easily pass. It may be.
이러한 구조로 이루어진 본 고안의 제거식 어스 앵커는 공사가 끝난 후에 절토면의 바깥에서 어스 앵커용 강선을 지지하고 있는 쐐기를 해체시킨 다음, 상기 견인용 철선을 잡아당기면 어스 앵커용 강선을 내부에서 지지하고 있는 분할 쐐기가 지지콘에서 빠져나오게 함으로써, 어스 앵커용 강선의 체결이 해체되게 하여 간단하게 손으로 잡아당겨 천공 구멍 속에서 끌어내 제거할 수 있게 한다. The removable earth anchor of the present invention having such a structure dismantles the wedge supporting the earth anchor steel wire from the outside of the cut surface after construction, and then pulls the towing wire to support the earth anchor steel wire from the inside. By letting the split wedge out of the support cone, the earth anchor steel wire is dismantled so that it can be simply pulled out by hand and removed from the drilled hole.
따라서 본 고안의 어스 앵커는 어스 앵커용 강선을 내부에서 조여 물고 있는 분할 쐐기를 견인용 철선을 사용하여 직접 잡아당겨 해체함으로써, 정확하게 어스 앵커용 강선의 물림 상태를 해제할 수 있게 하는 효과를 통해 공사기간의 단축과 공사비를 저렴하게 할 수 있는 등의 효과를 얻을 수 있다.Therefore, the earth anchor of the present invention is constructed by the effect of releasing the bite state of the earth anchor steel wire accurately by pulling and dismantling the split wedge that fastens the earth anchor steel wire inside using a towing iron wire. This can shorten the period and reduce the construction cost.
이하 본 고안에 따른 장치를 첨부한 예시도면을 참조하여 자세히 설명한다.Hereinafter, with reference to the accompanying drawings, an apparatus according to the present invention will be described in detail.
도면 1은 본 고안에 따른 어스 앵커를 사용하여 굴착면에 설치한 상태를 나타낸 예의 단면도이고, 도면 2는 도면 1의 선단부에 대한 확대 단면도이며, 도면 3은 본 고안에 따른 제거식 어스 앵커의 선단부 결합 상태를 나타낸 내부 단면도, 도면 4는 본 고안에 따른 제거식 어스 앵커의 선단부 결합구조를 나타내 분리사시도이다.1 is a cross-sectional view of an example showing a state installed on the excavation surface using the earth anchor according to the present invention, Figure 2 is an enlarged cross-sectional view of the front end of Figure 1, Figure 3 is a front end of the removable earth anchor according to the
이들 도면에 도시한 바와 같이, 본 고안에 따른 어스 앵커(1)는 굴토 작업 공사 현장의 절토면(2)에 뚫은 지지구멍(3) 속에 삽입 설치되어 시멘트 그라우팅(4)에 의해 고정 지지되는 구조로 되어 있다.As shown in these drawings, the
그리고 상기 지지 구멍(3)속에 삽입 설치되는 주름관(5)의 선단에 지지콘(6)이 연결되고, 상기 지지콘(6)에 다수개의 분할 쐐기(7)가 설치되어 있으며, 상기 각각의 분할 쐐기(7)에 지지콘(6)을 관통하여 삽입된 어스 앵커용 지지 강선(8)이 끼워져 지지되어 있다.And a
또한, 상기 분할 쐐기(7)와 지지콘(6) 사이에 탄력 스프링(9)이 설치되고, 상기 분할 쐐기(7)의 원주면에 고정용 고무링(10)이 설치되어 있다.In addition, an
그리고 도면 3과 도면 4에 도시한 바와 같이, 상기 주름관(5)의 내부에 입구에서부터 지지콘(6)의 뒤쪽까지 직경이 작은 보조관(11)이 설치되고, 상기 보조관(11)의 내부에 지지 강선(8)의 개수와 일치하는 다수개의 견인용 철선(12)이 내장되어 있으며, 상기 견인용 철선(12)의 선단이 분할 쐐기(7)의 원주면에 설치된 고정 고무링(10)과 연결된 구조로 되어 있다. 3 and 4, an
또, 상기 보조관(11)의 선단에 견인용 철선(12)을 각각의 분할 쐐기 쪽으로 나누어주게 하는 분할대(13)를 설치할 수도 있다.In addition, a split table 13 may be provided at the tip of the
또한, 상기 분할 쐐기(7)의 선단 가장자리에 견인용 철선(12)이 쉽게 통과하여 고무링(10)까지 도달할 수 있게 하기 위한 통과홈(14)을 형성시켜 사용할 수도 있다.In addition, it is also possible to form and use a
그리고 상기 분할쐐기(7)가 결합된 지지콘(6)의 선단에 보호캡(15)을 설치하여 분할쐐기(7)와 지지콘(6) 및 지지관(5)의 내부에 그라우팅이 스며들어가지 않게 한다.And the
이러한 구조로 이루어진 본 고안의 장치를 설치하기 위한 상기 절토면(2)은 건물을 지을 때 지하로 땅을 파고 내려가거나 또는 도로 등의 토목 작업을 할 때 수직 또는 경사면으로 형성되는 부분으로서, 이 부분을 그대로 두면 붕괴될 위험이 있기 때문에 공사 현장의 보존이 이루어지지 않을 뿐만 아니라 지하 굴착 작업을 하는 작업자의 안전을 보장하기 위해서도 흙이 무너져 내리지 않게 하기 위해 절토면(2)에 절대적으로 흙막이 공사를 하여야 한다.The cut surface (2) for installing the device of the present invention made of such a structure is a part which is formed as a vertical or inclined surface when digging down to the ground when building a building or when performing civil works such as a road, If it is left as it is, there is a risk of collapse, so the construction site must not be preserved, and in order to ensure the safety of the workers in the underground excavation work, the earthwork should be absolutely cut to the cut surface (2).
따라서 흙을 파내려 갈 때 소정의 깊이마다 전용 천공기기를 사용하여, 소정의 각도로 경사지게 지지구멍(3)을 뚫고, 이 구멍(3) 속에 본 고안에 따른 어스 앵커(1)를 설치한다.Therefore, when digging out the soil, using a dedicated drilling machine for every predetermined depth, drills the
본 고안에 따른 어스 앵커는 기본적으로 주름관(5)의 내부에 여러 가닥의 강선(8)이 내장 설치되고, 상기 강선(8)의 선단이 지지콘(6)을 관통 삽입한 상태에서 분할쐐기(7)에 의해 고정 지지된 구조로 되어 있다.Earth anchor according to the present invention is basically a plurality of strands of steel wire (8) is built in the interior of the corrugated pipe (5), the split wedge in the state where the front end of the steel wire (8) is inserted through the support cone (6) The structure is fixed and supported by 7).
상기 지지콘(6)은 주름관(5)의 선단에 삽입되어 고정 연결되어 있고, 지지콘(6)의 쐐기홈(16)에 분할쐐기(7)가 삽입되어 상기 분할쐐기(7)에 물어 잡힌 강선(8)의 한쪽 선단을 고정 지지해 주게 된다.The
상기 주름관(5)을 따라 배치된 보조관(11)은 값이 싸고 다루기 쉬운 플라스 틱 재질로 이루어진 직경이 작은 재질로 이루어져 있고, 다수개의 강선(8) 사이를 통하여 배치되어 있으면서, 상기 지지콘(6)을 관통하여 분할쐐기(7)의 뒤쪽으로 연장 설치되어 있다.The
그리고, 상기 지지콘(6)의 선단에 설치하는 분할대(13)는 보조관(11)의 선단을 벌려서 형성시킬 수도 있고 별도의 나팔형 부재를 설치하여 사용할 수도 있는데, 상기 분할대(13)는 보조관(11)을 통하여 삽입된 견인용 철선(12)이 도면 6에 도시한 바와 같이 120도의 간격으로 균등하게 나누어져 벌려지도록 도와주는 역할을 한다.In addition, the split table 13 installed at the tip of the
상기한 바와 같이 보조관(11)을 통하여 삽입된 견인용 철선(12)은 도면 5와 도면 6에 도시한 바와 같이, 3조각으로 나누어진 분할쐐기(7)의 분할면에 각각 형성된 통과홈(14)을 통하여 고무링(10)에 연결되어 있는데, 상기 보조관(11)에서 인출되어 나온 하나의 견인용 철선(12)이 3가닥으로 나누어져 도면 6에 도시한 바와 같이 하나의 고무링(10)에 120도의 간격으로 연결된 구조로 되어 있다.As described above, the
따라서, 나중에 설명하는 바와 같이 견인용 철선(12)이 당겨지면 분할쐐기(7)의 바깥 원주면에 끼워져 있는 고무링(10)이 한 번의 동작으로 쉽게 빠져나올 수 있게 한다.Therefore, as described later, when the
이와 같이 주름관(5)의 선단에 분할쐐기(7)를 통하여 앵커용 강선(8)을 고정함과 더불어, 상기 분할 쐐기(7)의 고무링(10))에 견인용 철선(12)을 연결 설치하고, 상기 지지콘(6)의 선단에 보호캡(15)을 씌운 다음, 도면 1에 도시한 바와 같이 지지구멍(3) 속에 집어넣은 후, 주름관(5)과 지지구멍(3)의 내벽 사이에 시멘트 그 라우팅을 채워 넣는다.In this way, while fixing the anchor steel wire (8) through the split wedge (7) at the distal end of the corrugated pipe (5), connecting the traction iron wire (12) to the rubber ring (10) of the split wedge (7) The
그 다음, 시멘트 그라우팅이 완전히 응고되면, 절토면(2)의 바깥에 지지 벽체판(17) 또는 지지철판(18)을 설치하고, 상기 지지 벽체판(17)의 바깥에서 앵커용 강선(8)을 인장기를 사용하여 잡아당긴 후, 상기 강선(8)의 선단에 쐐기(19)와 마감캡(20)을 설치하여 강선(8)이 절토면(2)을 튼튼하게 지지해 주게 한다.Then, when the cement grouting is completely solidified, the supporting
이때 상기 보조관(11)속에 삽입된 견인용 철선(12)의 선단도 절토면(2)의 바깥으로 인출되어 함께 묶이게 한다.At this time, the tip of the
이와 같이 본 고안에 따른 어스 앵커를 설치하여 본 공사가 완전하게 끝나고, 설치된 어스 앵커를 제거해 주고자 할 때는 먼저 절토면(2)에서 강선(8)의 선단을 조여 물고 있는 쐐기(19)를 해제시킨다.Thus, this construction is completed by installing the earth anchor according to the present invention, when you want to remove the installed earth anchor, first release the wedge (19) by tightening the tip of the steel wire (8) in the cut surface (2). .
이와 같이 바깥쪽에서 강선(8)이 해제되면, 상기 지지콘(6)에 대하여 분할쐐기(7)를 탄력지지하고 있는 스프링(9)의 복원력에 의해 상기 분할쐐기(7)가 뒤쪽으로 물어난 상태가 되지만, 분할쐐기(7)의 원주면에 설치된 고무링(10)의 결속력 때문에 분할쐐기(7)가 완전하게 빠져나가서 강선(8)의 결속이 완전하게 해제시킨 상태로는 되지 않는다.As such, when the
이러한 상태에서, 상기 절토면(2)의 바깥으로 인출되어 있는 견인용 철선(12)을 잡아당기면, 상기에서 설명한 바와 같이 강선(8)의 선단을 조여 물고 있는 분할쐐기(7)의 고무링(10)을 벗겨내게 되고, 상기 고무링(10)이 벗겨지면 분할쐐기(7)가 경사진 쐐기홈(16)에서 완전하게 빠져나오게 되므로 강선(8)을 물어 잡고 있는 힘이 사라지게 된다.In this state, when pulling the pulling
이렇게 분할쐐기(7)가 쐐기홈(16)에서 완전하게 빠져나오고 나면, 절단면(2)쪽에서 강선(8)을 그냥 잡아당기기만 하면, 쉽게 빠져나오게 된다. 이렇게 하여 어스 앵커용 강선(8)을 손쉽게 제거할 수가 있는 것이다. After the split wedge (7) is completely out of the wedge groove (16), simply pull out the steel wire (8) on the cutting surface (2), it will come out easily. In this way, the
이상에서 설명한 바와 같이, 본 고안에 따른 제거식 어스 앵커는 어스 앵커용 철선을 물어 잡는 분할 쐐기(7)의 고무링(10)에 견인용 철선(12)을 연결시켜 두고, 상기 견인용 철선(12)을 보조관(11)의 내부에 설치하여 절토면(2)의 바깥으로 인출하여 설치해 둠으로써, 공사가 끝난 후에 어스 앵커용 강선(8)을 제거하고자 할 때, 바깥쪽에서 강선(8)의 쐐기를 제거함과 더불어, 견인용 철선(12)을 잡아당기면 내부 분할 쐐기(7)의 조여 물림상태가 해제되어 강선(8)을 쉽게 잡아당겨 빼낼 수 있게 한다.As described above, the removable earth anchor according to the present invention is connected to the
따라서, 본 고안에 따른 어스 앵커장치는 간단한 구조로 이루어지면서, 간단하게 강선(8)의 잠금 상태를 확실하게 해제할 수가 있고, 강선이 지하에 일부 매설되어 잔류하는 등의 문제가 발생하지 않게 할 수가 있다.Therefore, while the earth anchoring device according to the present invention is made of a simple structure, it is possible to reliably release the locked state of the steel wire (8) easily, so that the problem that the steel wire is partially buried underground and does not occur. There is a number.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR2020070010541U KR200443038Y1 (en) | 2007-06-27 | 2007-06-27 | Removable Earth Anchor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR2020070010541U KR200443038Y1 (en) | 2007-06-27 | 2007-06-27 | Removable Earth Anchor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20080006693U KR20080006693U (en) | 2008-12-31 |
| KR200443038Y1 true KR200443038Y1 (en) | 2009-01-07 |
Family
ID=44480013
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR2020070010541U Expired - Fee Related KR200443038Y1 (en) | 2007-06-27 | 2007-06-27 | Removable Earth Anchor |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR200443038Y1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101039063B1 (en) | 2009-02-17 | 2011-06-03 | 강명석 | Retractable anchor assembly |
| KR101074765B1 (en) | 2008-12-11 | 2011-10-19 | 강명석 | Anchor assembly for retrieval |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111501779B (en) * | 2020-05-06 | 2021-06-08 | 南昌工程学院 | An integrated construction method of composite flexible support for building deep foundation pit engineering |
| CN115637922B (en) * | 2022-10-31 | 2023-09-01 | 湖北广元岩土工程有限公司 | Anchor rod drilling machine for side slope support |
| CN116357364A (en) * | 2023-05-05 | 2023-06-30 | 中铁二十局集团第二工程有限公司 | Retrievable Prestressed Anchor Cable |
-
2007
- 2007-06-27 KR KR2020070010541U patent/KR200443038Y1/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101074765B1 (en) | 2008-12-11 | 2011-10-19 | 강명석 | Anchor assembly for retrieval |
| KR101039063B1 (en) | 2009-02-17 | 2011-06-03 | 강명석 | Retractable anchor assembly |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20080006693U (en) | 2008-12-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101510297B1 (en) | A removable prestressing steel pipe soil nailing structure | |
| KR200443038Y1 (en) | Removable Earth Anchor | |
| KR101743758B1 (en) | Downward construction method for vertical extension of building using base block | |
| KR100966148B1 (en) | Ground adhering soil nailing structure and ground reinforcement method using the same | |
| KR20090101045A (en) | Pretension Soil Nail and Construction Method Using the Same | |
| KR200370652Y1 (en) | nailing nut for steel reinforcement | |
| KR100862387B1 (en) | Top down construction method of tension kit for top down construction of acupressure permanent anchor | |
| KR200426634Y1 (en) | Permanent anchor structure | |
| KR100483011B1 (en) | locking and dismantling equipment of tension member for anchor method | |
| KR101605012B1 (en) | Retaining wall construction method using backward tension | |
| KR20160131742A (en) | An anchor body | |
| KR200308379Y1 (en) | Dismemberment removal type nail composition | |
| KR100882558B1 (en) | Small nail anchor for slope reinforcement | |
| KR101735816B1 (en) | Soil-nail for reinforcing a slope | |
| KR20060100790A (en) | Screw anchor structure for slope reinforcement and construction method using the same | |
| KR100799328B1 (en) | Removable nail structure and rebar recovery method using the same | |
| KR100697001B1 (en) | Multi way protectors | |
| KR101132809B1 (en) | Anchor body and construction method | |
| KR102485680B1 (en) | Complex underground anchor with removal function | |
| JP3813781B2 (en) | Anchor device installation method | |
| KR101244992B1 (en) | The ground anchor and the anchor construct method therewith | |
| KR100612731B1 (en) | Removable anchor bolts | |
| KR100989923B1 (en) | Nail collecting type soil nai-nailing | |
| KR200382605Y1 (en) | Nailing Structure for Civil Engineering Works | |
| KR200346125Y1 (en) | Removable lock bolt serving as anchor |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| UA0108 | Application for utility model registration |
St.27 status event code: A-0-1-A10-A12-nap-UA0108 |
|
| UA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-UA0201 |
|
| E701 | Decision to grant or registration of patent right | ||
| UE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-UE0701 |
|
| REGI | Registration of establishment | ||
| UR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-UR0701 |
|
| UR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-UR1002 Fee payment year number: 1 |
|
| UG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-UG1501 |
|
| UG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-UG1601 |
|
| UN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-UN2301 St.27 status event code: A-5-5-R10-R11-asn-UN2301 |
|
| UN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-UN2301 St.27 status event code: A-5-5-R10-R11-asn-UN2301 |
|
| UN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-UN2301 |
|
| UN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-UN2301 |
|
| FPAY | Annual fee payment |
Payment date: 20120119 Year of fee payment: 4 |
|
| UR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-UR1001 Fee payment year number: 4 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| P16-X000 | Ip right document amended |
St.27 status event code: A-5-5-P10-P16-nap-X000 |
|
| Q16-X000 | A copy of ip right certificate issued |
St.27 status event code: A-4-4-Q10-Q16-nap-X000 |
|
| LAPS | Lapse due to unpaid annual fee | ||
| UC1903 | Unpaid annual fee |
St.27 status event code: A-4-4-U10-U13-oth-UC1903 Not in force date: 20121224 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE |
|
| UC1903 | Unpaid annual fee |
St.27 status event code: N-4-6-H10-H13-oth-UC1903 Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20121224 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
