KR200414315Y1 - Culvert joint installation structure of water and sewage pipe for using drainage, waterworks, road, causeway and landfill seepage water drain work - Google Patents
Culvert joint installation structure of water and sewage pipe for using drainage, waterworks, road, causeway and landfill seepage water drain work Download PDFInfo
- Publication number
- KR200414315Y1 KR200414315Y1 KR2020060002613U KR20060002613U KR200414315Y1 KR 200414315 Y1 KR200414315 Y1 KR 200414315Y1 KR 2020060002613 U KR2020060002613 U KR 2020060002613U KR 20060002613 U KR20060002613 U KR 20060002613U KR 200414315 Y1 KR200414315 Y1 KR 200414315Y1
- Authority
- KR
- South Korea
- Prior art keywords
- water
- sewage pipe
- sewage
- binding
- mortar
- Prior art date
Links
- 239000010865 sewage Substances 0.000 title claims abstract description 71
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 65
- 238000009434 installation Methods 0.000 title description 3
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 34
- 239000000149 chemical water pollutant Substances 0.000 claims abstract description 21
- 238000002347 injection Methods 0.000 claims abstract description 5
- 239000007924 injection Substances 0.000 claims abstract description 5
- 230000008878 coupling Effects 0.000 claims abstract description 3
- 238000010168 coupling process Methods 0.000 claims abstract description 3
- 238000005859 coupling reaction Methods 0.000 claims abstract description 3
- 238000000034 method Methods 0.000 claims 2
- 239000012530 fluid Substances 0.000 abstract description 5
- 239000003673 groundwater Substances 0.000 abstract description 4
- 239000002352 surface water Substances 0.000 abstract description 4
- 238000003912 environmental pollution Methods 0.000 abstract description 3
- 230000000903 blocking effect Effects 0.000 abstract 1
- 230000002093 peripheral effect Effects 0.000 abstract 1
- 239000002689 soil Substances 0.000 description 7
- 238000010276 construction Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L21/00—Joints with sleeve or socket
- F16L21/06—Joints with sleeve or socket with a divided sleeve or ring clamping around the pipe ends
- F16L21/065—Joints with sleeve or socket with a divided sleeve or ring clamping around the pipe ends tightened by tangentially-arranged threaded pins
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sewage (AREA)
- Revetment (AREA)
Abstract
본 고안은 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조에 관한 것으로서, 특히 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 상하수관에 있어서, 이음부 일단의 테두리에 복수의 결속봉이 일정 간격으로 설치되고, 이음부 타단에 상기 결속봉과 대응되는 위치에 복수의 제 1결속홀이 형성되는 상하수관과; 상기 상하수관의 결속봉과 대응되는 위치에 복수의 제 2결속홀이 형성되어 상기 상하수관과 상하수관 사이에 설치되는 개스킷과; 원형으로 형성되데, 양단이 절곡되어 볼트홀이 각각 형성되고, 상면에 일정 간격으로 와이어 고리가 돌출 형성되며, 각각의 상기 상하수관의 이음부 전단에 결합되는 체결링과; 상기 체결링의 와이어 고리에 체결되어 상기 상하수관과 상하수관을 결속시키는 결속 와이어; 및 일측이 절개된 원통형으로 형성되데, 중앙부가 만곡된 형태로 형성되고, 절개 부위에 복수의 볼트홀이 형성되며, 측면에 몰탈 주입구가 형성되어 내부에 몰탈이 주입되는 몰탈 커버를 포함하는 것을 특징으로 한다.The present invention relates to a conduit joint structure used for sewage, waterworks, roads, river dikes and landfill leachate drainage works, and particularly in water and sewage pipes used for sewage, waterworks, roads, river dikes and landfill leachate drainage works. A water and sewage pipe having a plurality of binding rods installed at regular intervals at one end thereof and having a plurality of first binding holes formed at positions corresponding to the binding rods at the other end of the joint; A gasket having a plurality of second binding holes formed at a position corresponding to the binding rod of the water and sewage pipe and installed between the water and sewage pipe and the water and sewage pipe; Is formed in a circular shape, both ends are bent to form a bolt hole, respectively, the upper surface is formed with a wire ring protruding at a predetermined interval, the coupling ring coupled to the front end of each of the water and sewage pipe; A binding wire fastened to the wire ring of the fastening ring to bind the upper and lower pipes; And it is formed in a cylindrical shape cut one side, the center portion is formed in a curved shape, a plurality of bolt holes are formed in the incision site, a mortar injection hole is formed on the side comprises a mortar cover is injected mortar inside It is done.
상기와 같은 본 고안에 따르면 상하수관을 개스킷을 통해 서로 연결한 후 체결링으로 상호 결속시킨 상태에서 이음부위의 외주면을 몰탈로 채움으로써 이음부위가 이격되는 것을 차단하여 다량의 유체가 외부로 유출되어 누수로 인해 지표수와 지하수의 심각한 환경오염을 미연에 방지할 수 있다.According to the present invention as described above, by connecting the water and sewage pipes through the gaskets and filling the outer peripheral surface of the joint with mortar in the state of mutually binding with the fastening ring, a large amount of fluid is leaked to the outside by blocking the space between the joints. Leakage can prevent serious environmental pollution of surface and groundwater.
하수도, 상수도, 도로, 하천 제방, 매립장 침출수 배수공사, 상하수관, 관거, 이음 Sewer, water supply, road, river bank, landfill leachate drainage, water and sewage pipe, conduit, joint
Description
도 1은 본 고안에 따른 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조의 구성을 나타낸 분해 사시도,1 is an exploded perspective view showing the configuration of the conduit joint structure used for sewage, waterworks, roads, river banks and landfill leachate drainage construction according to the present invention,
도 2는 본 고안에 따른 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조의 설치 상태에서의 측면도.Figure 2 is a side view in the installation state of the conduit joint structure used for sewage, waterworks, roads, river banks and landfill leachate drainage construction according to the present invention.
<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>
1 : 지반 101 : 볼트1: Ground 101: Bolt
110 : 상하수관 120 : 개스킷110: water and sewage pipe 120: gasket
130 : 체결링 140 : 결속 와이어130: fastening ring 140: binding wire
150 : 몰탈 커버 160 : 몰탈150: mortar cover 160: mortar
본 고안은 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조에 관한 것으로서, 상세하게는 경사면에 설치되는 상하수관의 미끄럼을 방지하여 이음부가 이탈되는 것을 차단하도록 하는 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조에 관한 것이다.The present invention relates to a conduit joint structure used for sewage, waterworks, roads, river banks, and landfill leachate drainage works, and in detail, sewage to prevent slipping of the joints by preventing slippage of water pipes installed on a slope. It relates to a conduit joint structure used for waterworks, roads, river dikes and landfill leachate drainage works.
일반적으로 내부에 유체가 흐르는 상하수관은 그 길이가 한정되어 있어 소망하는 길이를 갖도록 하기 위해서는 이음수단을 사용하여 관과 관을 서로 연결하여야 한다.In general, the water and sewage pipes through which fluid flows are limited in length, and in order to have a desired length, pipes and pipes should be connected to each other by using joint means.
그리고, 이러한 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 설치된다.And it is installed in such sewage, waterworks, roads, river banks and landfill leachate drainage work.
이와 같은 상하수관은 시공되는 위치의 토질(경질토, 보통토, 연질토, 극연질토로 구분)에 따라 실제로는 관부식과 부등침하를 방지하기 위하여 각각의 기초(모래 또는 쇄석 그리고 콘크리트 기초)를 달리 조합하여 시공한다.Such water and sewage pipes are actually divided into foundations (sand, crushed stone, and concrete foundations) to prevent pipe corrosion and inequality depending on the soil (divided into hard soil, ordinary soil, soft soil, and soft soil). Construct in different combinations.
즉, 터파기된 지반 내에 토질의 상태에 따라 길이방향으로 모래 또는 쇄석을 깔거나 기초받침 PC 콘크리트를 연접 설치한 후 이 상부에 관거를 이음 연결하고, 다시 되메우기하여 시공을 이루게 되는 것이다.In other words, the sand or crushed stone in the longitudinal direction in accordance with the state of the soil in the dug soil, or the foundation PC concrete joints are installed after connecting the conduit to the upper joint, and then backfilled to achieve the construction.
그러나, 이와 같은 방법으로 시공되는 종래의 상하수관이 연약지반 또는 경사면에 설치되는 경우 지반이 침하 또는 밀림 현상이 발생하면 상하수관의 이음부가 상호 이격되고, 이격부위를 통해 다량의 유체가 외부로 유출되고, 하수나 폐수인 경우 누수로 인해 지표수와 지하수의 심각한 환경오염을 야기하는 문제점이 있다.However, when the conventional water and sewage pipes constructed in this way are installed on the soft ground or inclined surface, if the ground subsides or falls, the joints of the water and sewage pipes are spaced apart from each other, and a large amount of fluid flows out through the spaced parts. In the case of sewage or wastewater, there is a problem that causes serious environmental pollution of surface water and groundwater due to leakage.
본 고안은 상기와 같은 문제점을 해결하기 위한 것으로, 상하수관을 개스킷을 통해 서로 연결한 후 체결링으로 상호 결속시킨 상태에서 이음부위의 외주면을 몰탈로 채움으로써 이음부위가 이격되는 것을 차단하여 다량의 유체가 외부로 유출되어 누수로 인해 지표수와 지하수의 심각한 환경오염을 미연에 방지하도록 하는 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조를 제공하는데 그 목적이 있다.The present invention is to solve the problems as described above, by connecting the water and sewage pipes through the gaskets, and filling the outer circumferential surface of the joints with mortar in the state of mutually binding with a fastening ring to prevent the joints from being spaced apart. The objective is to provide a conduit joint structure used for sewage, waterworks, roads, river dikes and landfill leachate drainage works to prevent serious leakage of surface and groundwater due to leakage of fluid.
상기와 같은 목적을 달성하기 위한 본 고안의 특징은,Features of the present invention for achieving the above object,
하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 상하수관에 있어서, 이음부 일단의 테두리에 복수의 결속봉이 일정 간격으로 설치되고, 이음부 타단에 상기 결속봉과 대응되는 위치에 복수의 제 1결속홀이 형성되는 상하수관과; 상기 상하수관의 결속봉과 대응되는 위치에 복수의 제 2결속홀이 형성되어 상기 상하수관과 상하수관 사이에 설치되는 개스킷과; 원형으로 형성되데, 양단이 절곡되어 볼트홀이 각각 형성되고, 상면에 일정 간격으로 와이어 고리가 돌출 형성되며, 각각의 상기 상하수관의 이음부 전단에 결합되는 체결링과; 상기 체결링의 와이어 고리에 체결되어 상기 상하수관과 상하수관을 결속시키는 결속 와이어; 및 일측이 절개된 원통형으로 형성되데, 중앙부가 만곡된 형태로 형성되고, 절개 부위에 복수의 볼트홀이 형성되며, 측면에 몰탈 주입구가 형성되어 내부에 몰탈이 주입되는 몰탈 커버를 포함하는 것을 특징으로 한다.In the water and sewage pipes used for sewerage, waterworks, roads, river dikes and landfill leachate drainage works, a plurality of binding rods are provided at the edges of one end of the joint at regular intervals, and a plurality of binding rods are disposed at the other end of the joint at a position corresponding to the binding rod. A water and sewage pipe in which a first binding hole is formed; A gasket having a plurality of second binding holes formed at a position corresponding to the binding rod of the water and sewage pipe and installed between the water and sewage pipe and the water and sewage pipe; Is formed in a circular shape, both ends are bent to form a bolt hole, respectively, the upper surface is formed with a wire ring protruding at a predetermined interval, the coupling ring coupled to the front end of each of the water and sewage pipe; A binding wire fastened to the wire ring of the fastening ring to bind the upper and lower pipes; And it is formed in a cylindrical shape cut one side, the center portion is formed in a curved shape, a plurality of bolt holes are formed in the incision site, a mortar injection hole is formed on the side comprises a mortar cover is injected mortar inside It is done.
여기에서, 상기 체결링은 상기 상하수관의 외경보다 넓은 지름을 가지고, 상기 상하수관의 이음부보다 작은 지름을 갖는다.Here, the fastening ring has a diameter larger than the outer diameter of the water pipe, and has a diameter smaller than the joint of the water pipe.
여기에서 또한, 상기 몰탈 커버는 그 중앙부가 상기 상하수관의 이음부를 커버할 수 있도록 만곡부를 구비하고, 내부에 충진된 몰탈이 유출되는 것을 차단하도록 양단이 상기 상하수관의 측면을 감싸도록 연장부가 형성된다.Here, the mortar cover has a curved portion so that the central portion thereof can cover the joint of the water supply and drainage pipe, and an extension portion is formed so that both ends surround the side surface of the water supply and drainage pipe so as to prevent the mortar filled therein from flowing out. do.
이하, 본 고안에 따른 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조의 구성을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the configuration of the conduit joint structure used for sewage, waterworks, roads, river banks and landfill leachate drainage according to the present invention will be described in detail.
도 1은 본 고안에 따른 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조의 구성을 나타낸 분해 사시도이고, 도 2는 본 고안에 따른 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조의 설치 상태에서의 측면도이다.1 is an exploded perspective view showing the constitution of the conduit joint structure used for sewage, waterworks, roads, river banks and landfill leachate drainage according to the present invention, Figure 2 is a sewage, waterworks, roads, river banks and Side view of the installation of the conduit joint structure used for landfill leachate drainage work.
도 1 및 도 2를 참조하면, 본 고안에 따른 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조(100)는, 상하수관(110)과, 개스킷(120)과, 체결링(130)과, 결속 와이어(140)와, 몰탈 커버(150)로 구성된다.1 and 2, the
먼저, 상하수관(110)은 이음부(111) 일단의 테두리에 복수의 결속봉(113)이 일정 간격으로 설치되고, 이음부(111) 타단에 결속봉(113)과 대응되는 위치에 복수의 제 1결속홀(115)이 형성된다.First, the water and
그리고, 개스킷(120)은 상하수관(110)의 결속봉(113)과 대응되는 위치에 복 수의 제 2결속홀(121)이 형성되어 제 2결속홀(121)이 상하수관(110)의 결속봉(113)에 결속되어 상하수관(110)과 상하수관(110) 사이에 설치된다.In addition, the
또한, 체결링(130)은 원형으로 형성되데, 양단이 절곡되어 볼트홀(131)이 각각 형성되고, 상면에 일정 간격으로 와이어 고리(133)가 돌출 형성되며, 각각의 상하수관(110)의 이음부(111) 전단에 결합된다. 여기에서, 체결링(130)은 상하수관(110)의 외경보다 넓은 지름을 가지고, 상하수관(110)의 이음부(111)보다 작은 지름을 갖는다.In addition, the
또, 결속 와이어(140)는 체결링(130)의 와이어 고리(133)에 체결되어 상하수관(110)과 상하수관(110)을 결속시킨다.In addition, the
한편, 몰탈 커버(150)는 일측이 절개된 원통형으로 형성되데, 중앙부가 만곡된 형태로 형성되고, 절개 부위에 복수의 볼트홀(151)이 형성되며, 측면에 몰탈 주입구(153)가 형성되어 내부에 몰탈(160)이 주입된다. 여기에서, 몰탈 커버(150)는 그 중앙부가 상하수관(110)의 이음부(111)를 커버할 수 있도록 만곡부(155)를 구비하고, 내부에 충진된 몰탈(160)이 유출되는 것을 차단하도록 양단이 상하수관(110)의 측면을 감싸도록 연장부(157)가 형성된다.On the other hand, the
이하, 본 고안에 따른 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조의 작용을 도 1 및 도 2를 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, the operation of the conduit joint structure used for sewage, waterworks, roads, river dikes and landfill leachate drainage works according to the present invention will be described in detail with reference to FIGS. 1 and 2.
먼저, 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사의 지반(1)을 터파기한다.First, the ground 1 of sewage, waterworks, roads, river banks, and landfill leachate drainage works are destroyed.
그리고, 터파기된 지반(1)에 상하수관(110)을 설치하는 데, 이때, 상하수관(110)의 결속봉(113)에 개스킷(120)을 삽입하고, 결속봉(113)이 이웃하는 상하수관(110)의 제 1결속홀(115)에 삽입시켜 상하수관(110)의 이음부를 연결시킨다.And, install the water and
그런 다음, 각각의 상하수관(110)의 외측면에 체결링(130)을 체결한 다음, 체결링(130)의 볼트홀(131)에 볼트(101)를 체워 체결링(130)을 고정시킨 다음, 체결링(130)의 와이어 고리(133)에 결속 와이어(140)를 지그지그로 결속시킨다.Then, the
결속 와이어(140)의 결속이 완료되면, 몰탈 커버(150)를 상하수관(110)의 이음부(111)에 결합시킨 다음, 몰탈 커버(150)의 절개 부위에 형성된 볼트홀(151)에 각각 볼트(101)를 체워 몰탈 커버(150)를 상하수관(110)에 고정시킨다.When the binding of the
그리고, 몰탈 커버(150)의 몰탈 주입구(153)를 통해 몰탈(160)을 몰탈 커버(150) 내로 주입하여 상하수관(110)이 이음부가 몰탈(160)에 의해 고정되도록 한다.Then, the
따라서, 상하수관을 체결링과 결속 와이어를 통해 결속시킨 다음, 이음부의 외측면에 몰탈을 타설함으로써 이음부가 파손되거나 이격되는 것을 방지할 수 있다.Therefore, after binding the water and sewage pipe through the fastening ring and the binding wire, it is possible to prevent the joints from being damaged or spaced by placing mortar on the outer surface of the joint.
상기와 같이 구성되는 본 고안인 하수도, 상수도, 도로, 하천 제방 및 매립장 침출수 배수공사에 사용되는 관거 이음 구조에 따르면, 상하수관을 개스킷을 통해 서로 연결한 후 체결링으로 상호 결속시킨 상태에서 이음부위의 외주면을 몰탈로 채움으로써 이음부위가 이격되는 것을 차단하여 다량의 유체가 외부로 유출되어 누수로 인해 지표수와 지하수의 심각한 환경오염을 미연에 방지할 수 있는 이점이 있다.According to the conduit joint structure used for sewage, water supply, road, river dike and landfill leachate drainage construction of the present invention configured as described above, after connecting the water and sewage pipes to each other through a gasket, the joints are joined with a fastening ring. Filling the outer circumferential surface of the mortar with the mortar prevents the joint from being spaced apart, and a large amount of fluid is leaked to the outside to prevent serious environmental pollution of surface water and groundwater due to leakage.
본 고안은 특정한 실시예에 관련하여 도시하고 설명하였지만, 이하의 실용신안등록청구범위에 의해 제공되는 본 고안의 정신이나 분야를 벗어나지 않는 한도내에서 본 고안이 다양하게 개량 및 변화될 수 있다는 것을 당업계에서 통상의 지식을 가진자는 용이하게 알수 있음을 밝혀 두고자 한다.While the present invention has been shown and described with respect to specific embodiments, it should be understood that the present invention may be variously modified and changed without departing from the spirit or the scope of the present invention provided by the following utility model registration claims. It will be clear to those skilled in the art that they can easily know.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020060002613U KR200414315Y1 (en) | 2006-01-27 | 2006-01-27 | Culvert joint installation structure of water and sewage pipe for using drainage, waterworks, road, causeway and landfill seepage water drain work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020060002613U KR200414315Y1 (en) | 2006-01-27 | 2006-01-27 | Culvert joint installation structure of water and sewage pipe for using drainage, waterworks, road, causeway and landfill seepage water drain work |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200414315Y1 true KR200414315Y1 (en) | 2006-04-18 |
Family
ID=49296672
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020060002613U KR200414315Y1 (en) | 2006-01-27 | 2006-01-27 | Culvert joint installation structure of water and sewage pipe for using drainage, waterworks, road, causeway and landfill seepage water drain work |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200414315Y1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101326657B1 (en) * | 2011-07-14 | 2013-11-08 | 진용환 | Cover device for pipe connecting part |
KR102473452B1 (en) | 2022-06-22 | 2022-12-05 | 주식회사서인산업 | Pipe assembly for drain |
-
2006
- 2006-01-27 KR KR2020060002613U patent/KR200414315Y1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101326657B1 (en) * | 2011-07-14 | 2013-11-08 | 진용환 | Cover device for pipe connecting part |
KR102473452B1 (en) | 2022-06-22 | 2022-12-05 | 주식회사서인산업 | Pipe assembly for drain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR200413252Y1 (en) | Manhole leak prevention structure used for sewer, road, river, environmental facility construction | |
KR200414315Y1 (en) | Culvert joint installation structure of water and sewage pipe for using drainage, waterworks, road, causeway and landfill seepage water drain work | |
KR100922622B1 (en) | Expandable storage tank | |
JP2013253444A (en) | Multilayer sewerage pipe | |
KR200413250Y1 (en) | Structure for installing anchor to prevent departure from sewage, waterworks, roads, river dikes and landfill leachate drainage works | |
KR100982819B1 (en) | A prefabricated drain-road | |
KR100924794B1 (en) | Influent treatment method of connection structure of underground structure and underground tunnel structure | |
KR100672237B1 (en) | Slope sewer pipe binding structure | |
KR100611678B1 (en) | End connection of sewer pipe installed in slope in apartment complex | |
KR100649104B1 (en) | Eco-Friendly River Dike Structure | |
KR100808574B1 (en) | Fixing means of pipelines formed in the ground | |
KR200413616Y1 (en) | Conduit freeze protection mat installation structure used for sewage, water supply, road, river dike and landfill leachate drainage | |
CN201034222Y (en) | Conduit interface structure | |
KR200413254Y1 (en) | Derailment prevention device used for sewage, water supply, road, river dike and landfill leachate drainage work | |
KR100623930B1 (en) | Sewage pipe connection structure with tight coupling | |
KR200265335Y1 (en) | Underwater outflow part sewer structure for a soft ground | |
KR200413255Y1 (en) | Pipeline protection structure installed in sewage, water supply, road, river and landfill leachate drainage works | |
KR102326135B1 (en) | Direction conversion socket of bench flume channel | |
KR100546240B1 (en) | Sewage pipe sedimentation prevention structure | |
KR200184230Y1 (en) | A supporting device of undergraund pipe | |
KR100677904B1 (en) | Eco-friendly soft ground sewage culvert structure | |
KR200462219Y1 (en) | Constructing device for hume pipe underground | |
KR100698885B1 (en) | Anti-skid facility structure of slope sewage pipe | |
KR101653722B1 (en) | A structure for drainage and this method using the same | |
KR101175907B1 (en) | Supporting construct for hume pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
UA0108 | Application for utility model registration |
Comment text: Application for Utility Model Registration Patent event code: UA01011R08D Patent event date: 20060127 |
|
REGI | Registration of establishment | ||
UR0701 | Registration of establishment |
Patent event date: 20060412 Patent event code: UR07011E01D Comment text: Registration of Establishment |
|
UR1002 | Payment of registration fee |
Start annual number: 1 End annual number: 1 Payment date: 20060131 |
|
UG1601 | Publication of registration | ||
T201 | Request for technology evaluation of utility model | ||
UT0201 | Request for technical evaluation |
Patent event date: 20060510 Comment text: Request for Technology Evaluation of Utility Model Patent event code: UT02011R01D |
|
T701 | Written decision to grant on technology evaluation | ||
UT0701 | Decision on maintenance of utility model |
Patent event date: 20061201 Comment text: Written Decision on Result of Technology Evaluation Patent event code: UT07011S01D |
|
UR1001 | Payment of annual fee |
Payment date: 20070403 Start annual number: 2 End annual number: 3 |
|
UR1001 | Payment of annual fee |
Payment date: 20090403 Start annual number: 4 End annual number: 4 |
|
UR1001 | Payment of annual fee |
Payment date: 20100402 Start annual number: 5 End annual number: 5 |
|
UR1001 | Payment of annual fee |
Payment date: 20110405 Start annual number: 6 End annual number: 6 |
|
UR1001 | Payment of annual fee |
Payment date: 20120404 Start annual number: 7 End annual number: 7 |
|
FPAY | Annual fee payment |
Payment date: 20130424 Year of fee payment: 8 |
|
UR1001 | Payment of annual fee |
Payment date: 20130424 Start annual number: 8 End annual number: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140408 Year of fee payment: 9 |
|
UR1001 | Payment of annual fee |
Payment date: 20140408 Start annual number: 9 End annual number: 9 |
|
EXPY | Expiration of term | ||
UC1801 | Expiration of term |
Termination category: Expiration of duration Termination date: 20160727 |