KR200398533Y1 - Pile for using construction - Google Patents

Pile for using construction Download PDF

Info

Publication number
KR200398533Y1
KR200398533Y1 KR20-2005-0022437U KR20050022437U KR200398533Y1 KR 200398533 Y1 KR200398533 Y1 KR 200398533Y1 KR 20050022437 U KR20050022437 U KR 20050022437U KR 200398533 Y1 KR200398533 Y1 KR 200398533Y1
Authority
KR
South Korea
Prior art keywords
pile
guide
construction
ground
coupling portion
Prior art date
Application number
KR20-2005-0022437U
Other languages
Korean (ko)
Inventor
김형태
Original Assignee
다우씨엔디(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 다우씨엔디(주) filed Critical 다우씨엔디(주)
Priority to KR20-2005-0022437U priority Critical patent/KR200398533Y1/en
Application granted granted Critical
Publication of KR200398533Y1 publication Critical patent/KR200398533Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/08Locking forms; Edge joints; Pile crossings; Branch pieces
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • E02D5/12Locking forms; Edge joints; Pile crossings; Branch pieces

Abstract

본 고안은 건설시공용 파일에 관한 것으로서, 천공 로드에 의해 지반에 천공된 파일공에 설치되는 파일에 있어서, 삽입되는 경로를 천공하기 위해 천공 로드가 삽입되도록 중공으로 형성되는 몸체(13)와, 몸체(13)의 외측면 양측에 길이방향을 따라 각각 형성되는 제 1 및 제 2 가이드결합부(11,12)를 포함하고, 제 1 가이드결합부(11)는 지반에 삽입 후 이웃하는 지점에 타입되는 다른 파일의 제 2 가이드결합부와 슬라이딩 결합됨으로써 다른 파일이 나란하게 밀착되도록 가이드한다. 따라서, 본 고안은 파일공의 천공 및 파일의 항타 작업이 동시에 실시되는 장치에 사용되어 지반내에 연속적으로 설치시 상호간에 슬라이딩 결합을 통해 밀착도 및 수직도를 향상시키는 효과를 가지고 있다.The present invention relates to a pile for construction, in the pile installed in the pile drilled in the ground by the drilling rod, the body 13 is formed in a hollow so that the drilling rod is inserted to drill the path to be inserted; First and second guide coupling portions 11 and 12 are formed on both sides of the outer surface of the body 13 in the longitudinal direction, respectively, and the first guide coupling portion 11 is inserted into the ground and then adjacent to the point. By slidingly engaging with the second guide engaging portion of the other pile to be type, the other pile is guided to closely contact side by side. Therefore, the present invention has the effect of improving the closeness and verticality through the sliding coupling between each other when continuously installed in the ground used in the device that the drilling and pile driving operation of the pile is carried out at the same time.

Description

건설시공용 파일{PILE FOR USING CONSTRUCTION}Construction file {PILE FOR USING CONSTRUCTION}

본 고안은 건설시공용 파일에 관한 것으로서, 보다 상세하게는 파일공의 천공 및 파일의 항타 작업이 동시에 실시되는 장치에 사용되어 지반내에 연속적으로 설치시 밀착도 및 수직도를 향상시킬 수 있는 건설시공용 파일에 관한 것이다.The present invention relates to a pile for construction, and more particularly, it is used in a device in which pile drilling and pile driving are performed at the same time, so that the construction can improve the closeness and verticality when continuously installed in the ground. It's about public files.

일반적으로 철근 콘크리트 구조물이나 그 밖의 건축물 등을 축조할 경우에 축조되는 지반의 기초를 견고하게 하기 위하여 지반에 PHC 및 강관파일이나 H형 빔을 박아서 매설하는 방법으로 기초공사를 실시하고 있으며, 이러한 파일 등의 시공은 구조물 및 건축물 등을 축조하는데 있어서 매우 중요하다.In general, when constructing reinforced concrete structures or other buildings, foundation works are constructed by embedding PHC and steel pipe piles or H-beams in the ground to strengthen the foundation of the ground. Construction of piles is very important in constructing structures and buildings.

기초공사에서 파일을 시공하는 방법으로 타설시공법과 굴삭시공법 등이 사용되고 있는데, 타설시공법은 기중기에 수직으로 설치한 리이더의 상부에 설치된 권양로우프를 이용하여 중량체의 해머를 상승시켰다가 낙하시켜서 파일을 타설하거나 컴프레셔의 압축공기를 이용하여 해머를 상승시켰다가 하강시키면서 파일을 타설하여 지반에 삽입 설치하는 공법이며, 굴삭시공법은 오거(Auger) 머신에 장착된 스크류 로드를 회전시켜서 지반을 굴삭하여 파일공을 형성시킨 후 스크류 로드를 역회전시켜서 굴삭된 파일공에서 빼낸 다음 파일공에 파일을 삽입시키는 방법이다.As a method for constructing piles in foundation works, pour construction methods and excavation construction methods are used.The pour construction method uses a lifting rope installed on the upper part of a reader installed vertically in a crane to raise and drop the hammer of a heavy body. This is a method of placing piles and inserting them into the ground while raising or lowering the hammer using compressed air of the compressor, and the excavation method is to excavate the ground by rotating the screw rod mounted on the auger machine. After the ball is formed, the screw rod is rotated in reverse to remove it from the excavated pile ball, and then the pile is inserted into the pile ball.

그리고, 이외에도 파일 시공법중에서 중공 파일을 회전에 의해 지반에 삽입 후 삽입된 중공 파일 내부에 철근 콘크리트 파일을 형성시키는 CIP(Cast In concrete Pile) 공법이 있다.In addition, there is a CIP (Cast In Concrete Pile) method for forming a reinforced concrete pile in the hollow pile inserted after the hollow pile is inserted into the ground by the pile construction method.

종래의 CIP 공법을 첨부된 도면을 참조하여 설명하면 다음과 같다. 도 1은 종래의 CIP 공법을 설명하기 위한 도면이다. 도시된 바와 같이, 오거 머신을 사용하여 중공파일 1, 2, 3을 순서대로 하나씩 건너 뛰어서 천공 후 삽입한 다음 중공파일(1,2,3)내에 철근이나 철근망 등을 배근하고, 콘크리트를 타설하여 양생을 마치면 중공파일 1, 2, 3 사이의 공간을 오거 머신으로 천공 후 파일 4, 5, 6을 순차적으로 삽입한 다음 중공파일(4,5,6) 내에 철근 콘트리트를 형성시킨다. Referring to the conventional CIP method with reference to the accompanying drawings as follows. 1 is a view for explaining a conventional CIP method. As shown, using the auger machine to jump through the hollow pile 1, 2, 3 one by one in order to insert and then reinforce the reinforcing bars or reinforcing bars in the hollow pile (1, 2, 3), and cast concrete When the curing is completed, the space between the hollow piles 1, 2, and 3 is drilled with an auger machine, and then the piles 4, 5, and 6 are sequentially inserted, and then the reinforced concrete is formed in the hollow piles 4, 5 and 6.

이와 같은 종래의 CIP 공법에서 중공파일(1,2,3,4,5,6)들을 격공으로 삽입하는 이유는 중공파일(1,2,3,4,5,6)을 삽입시 회전시켜야 하는데, 먼저 삽입 설치된 중공파일에 이웃하는 지점에 파일을 설치할 때 나중에 삽입되는 파일의 클램핑되는 부분이 먼저 삽입 설치된 중공파일과 간섭되지 않도록 하기 위해서 깊게 삽입시킬 수 없기 때문에 중공파일을 일렬로 연속적으로 설치할 경우 도 2에 도시된 바와 같이, 진행될수록 지반으로 노출되는 길이는 길어질 수 밖에 없다. 따라서, CIP 공법에서는 중공파일(1,2,3,4,5,6)을 격공으로 삽입 설치하게 된다.The reason for inserting the hollow piles (1,2,3,4,5,6) into the gaps in the conventional CIP method is to rotate when the hollow piles (1,2,3,4,5,6) are inserted. When installing the piles in a line adjacent to the hollow file installed first, when the hollow file is installed in a row because the clamping part of the file inserted later cannot be inserted deep so as not to interfere with the hollow file installed first. As shown in FIG. 2, the length exposed to the ground becomes long as it progresses. Therefore, in the CIP method, the hollow piles 1, 2, 3, 4, 5, and 6 are inserted into the gaps.

그러므로, 종래의 CIP 공법은 중공파일(1,2,3,4,5,6)의 회전으로 인해 주변 지반을 교란시켜서 악영향을 미치고, 파일공의 천공과 파일의 항타 작업이 별개로 진행됨으로써 시공에 소요되는 시간은 물론 비용을 증가시키는 문제점을 가지고 있었다.Therefore, the conventional CIP method is adversely affected by disturbing the surrounding ground due to the rotation of the hollow piles (1, 2, 3, 4, 5, 6), and the construction of the pile by drilling and pile driving proceed separately The time required, of course, had the problem of increasing costs.

또한, 격공으로 시공함으로써 도 1에 도시된 바와 같이, 항타기 수직도 및 토질이 불량할 경우 중공 파일(3,5)간에 유격(d)이 발생함으로써 시공 불량을 초래하며, 이로 인해 CIP 시공 이후 이러한 유격(d)으로 인해 별도의 차수 공사를 실시해야 함으로써 시간 및 비용의 낭비를 초래하는 문제점을 가지고 있었다.In addition, as shown in Figure 1 by the construction by the hole, when the anti-taking verticality and soil quality is poor, the gap (d) occurs between the hollow pile (3, 5), resulting in poor construction, which is the reason after this CIP construction Due to the clearance (d) had to be carried out a separate order construction had a problem that wastes time and money.

그러므로, 해머로서 파일 상단을 타설시 타격음과 진동이 크게 발생하는 문제점을 가지는 타설시공법과 굴삭된 파일공에서 오거 머신의 스크류 로드를 빼낼 때 파일공 주변의 흙이 붕괴되면서 파일공을 메우게 될 뿐만 아니라 파일공의 천공과 파일의 항타 작업이 별개로 진행됨으로써 공기를 증가시키게 되는 문제점을 가지는 굴삭시공법과 상기한 문제점을 가지는 CIP 시공법의 단점을 해결하기 위하여 파일공의 천공과 파일의 항타 작업이 동시에 진행됨으로써 파일 시공에 소요되는 시간을 단축시킴과 아울러 천공된 파일공에 파일을 회전시키지 않은 상태에서 항타에 의해 삽입시킴으로써 주변 지변 교란 및 소음 발생을 최소화하는 파일 시공장치가 개발되고 있으며, 이러한 파일 시공장치에 사용되어 격공방식이 아닌 연속적으로 지반에 삽입 설치되며, 수직도가 뛰어남과 아울러 상호간에 유격을 발생시키지 않도록 밀착도를 높일 수 있는 파일의 개발이 필요하게 되었다.Therefore, when placing the upper end of the pile as a hammer, the impact sound and vibration are largely generated, and when the screw rod of the auger machine is removed from the excavated pile hole, the soil around the pile hole collapses to fill the pile hole. However, in order to solve the shortcomings of the excavation method having the problem of increasing the air by drilling the pile hole and the piling operation of the pile separately and the CIP construction method having the above problems, the drilling and pile driving of the pile are simultaneously performed. As a result, a pile construction device has been developed that reduces the time required for construction of the pile and minimizes the disturbance of disturbances and noise by inserting the pile into the perforated pile without rotating the pile. It is used in the equipment and inserted into the ground continuously, not in a perforated manner. In addition, it is necessary to develop a pile file that can increase the degree of closeness so that the verticality is excellent and mutual play does not occur.

본 고안은 상술한 종래의 문제점을 해결하기 위한 것으로서, 본 고안의 목적은 파일공의 천공 및 파일의 항타 작업이 동시에 실시되는 장치에 사용되어 지반내에 연속적으로 설치시 상호간에 슬라이딩 결합을 통해 밀착도 및 수직도를 향상시키는 건설시공용 파일을 제공하는데 있다. The present invention is to solve the above-mentioned problems, the object of the present invention is to be used in the device that is carried out at the same time the drilling of the pile hole and the pile driving operation of the pile, the degree of adhesion through the sliding coupling between each other when continuously installed in the ground And to provide a construction construction pile to improve the verticality.

이와 같은 목적을 실현하기 위한 본 고안은, 천공 로드에 의해 지반에 천공된 파일공에 설치되는 파일에 있어서, 삽입되는 경로를 천공하기 위해 천공 로드가 삽입되도록 중공으로 형성되는 몸체와, 몸체의 외측면 양측에 길이방향을 따라 각각 형성되는 제 1 및 제 2 가이드결합부를 포함하고, 제 1 가이드결합부는 지반에 삽입 후 이웃하는 지점에 타입되는 다른 파일의 제 2 가이드결합부와 슬라이딩 결합됨으로써 다른 파일이 나란하게 밀착되도록 가이드하는 것을 특징으로 한다.The present invention for realizing the above object, in the pile installed in the pile hole drilled in the ground by the drilling rod, the body is formed in a hollow so that the drilling rod is inserted to drill the path to be inserted, and the outside of the body First and second guide coupling portions are formed on both sides of the side along the longitudinal direction, respectively, the first guide coupling portion is inserted into the ground and slidingly coupled with the second guide coupling portion of the other pile type at the neighboring point, the other pile It is characterized in that the guide to be in close contact with each other.

이하, 본 고안의 가장 바람직한 실시예를 첨부한 도면을 참조하여 본 고안의 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 더욱 상세히 설명하기로 한다.Hereinafter, with reference to the accompanying drawings, the most preferred embodiment of the present invention will be described in more detail so that those skilled in the art can easily practice.

도 3은 본 고안에 따른 건설시공용 파일을 도시한 사시도이다. 도시된 바와 같이, 본 고안에 따른 건설시공용 파일(10)은 중공으로 형성되는 몸체(13)와, 몸체(13)의 양측에 길이방향을 따라 각각 형성되는 제 1 및 제 2 가이드(11,12)를 포함한다.Figure 3 is a perspective view showing a construction pile according to the present invention. As shown, the construction pile 10 according to the present invention is the body 13 is formed in a hollow, the first and second guides 11, respectively formed in the longitudinal direction on both sides of the body 13, 12).

몸체(13)는 항타수단(130: 도 4 및 도 5에 도시)에 의해 가해지는 상하 진동에 의해 삽입시 이와 동시에 삽입되는 경로를 미리 천공할 수 있게 천공 로드(120: 도 5 및 도 6에 도시)가 삽입되도록 중공으로 형성되며, 외측면의 양측에 길이방향을 따라 제 1 및 제 2 가이드결합부(11,12)가 각각 형성된다. 한편, 몸체(13)는 본 실시예에서 원형관으로 형성되나, 이에 한하지 않고 다각형의 단면 등 여러 가지 형상의 단면을 가질 수 있다. The body 13 is a drill rod 120 (Figs. 5 and 6) in order to be able to pre-drill the path inserted at the same time when inserted by the vertical vibration applied by the driving means 130 (shown in Figures 4 and 5). It is formed in a hollow so as to be inserted, and the first and second guide coupling portions 11 and 12 are formed on both sides of the outer surface along the longitudinal direction, respectively. On the other hand, the body 13 is formed as a circular tube in this embodiment, but is not limited to this may have a cross-section of various shapes, such as a cross-section of the polygon.

제 1 가이드결합부(11)는 몸체(13)와 함께 지반에 삽입된 상태에서 이웃하는 지점에 타입되는 다른 파일의 제 2 가이드결합부에, 또는 제 2 가이드결합부(12)는 이웃하는 지점에 타입되는 다른 파일의 제 1 가이드결합부에 각각 슬라이딩 결합됨으로써 타입되는 다른 파일이 나란하게 밀착되도록 가이드한다. The first guide coupling portion 11 is inserted into the ground together with the body 13, the second guide coupling portion of the other pile type to the neighboring point, or the second guide coupling portion 12 is the adjacent point Slidingly coupled to the first guide coupling portion of the other pile to be type to guide the other pile to be in close contact side by side.

제 1 및 제 2 가이드결합부(11,12)는 서로 결합될 수 있는 구조를 가지기 위해 제 1 가이드결합부(11)는 “ㄱ”자 형상의 단면을 가지면서 몸체(13)의 외주면에 서로 마주 보면서 나란하게 형성되는 한 쌍의 제 1 가이드돌기로 이루어지고, 제 2 가이드결합부(12)는 제 1 가이드돌기(11)사이에 끼워지도록 “ㄱ”자 형상의 단면을 가지면서 몸체(13) 외주면에 대향되면서 나란하게 형성되는 한 쌍의 제 2 가이드돌기로 이루어진다. In order to have a structure in which the first and second guide coupling portions 11 and 12 can be coupled to each other, the first guide coupling portion 11 has a cross section of a “-” shape and is arranged on the outer circumferential surface of the body 13. Comprising a pair of first guide protrusions formed side by side facing each other, the second guide coupling portion 12 has a "b" shaped cross-section so as to fit between the first guide protrusions 11 body 13 ) Consists of a pair of second guide protrusions formed side by side facing the outer peripheral surface.

한편, 본 고안에 따른 파일(10)이 사용되는 파일 시공장치(100)는 도 4 내지 도 6에 도시된 바와 같이, 기중기(200)에 의해 상하로 이동하도록 설치되는 싱글 오거(110)와, 싱글 오거(110)에 수직되게 연결되는 천공 로드(120)와, 기중기(200)에 의해 상하로 이동하도록 싱글 오거(110)에 인접하여 설치되는 항타수단(130)과, 항타수단(130)에 결합되는 파일 클램프(140)를 포함한다.On the other hand, the pile construction apparatus 100 using the pile 10 according to the present invention is a single auger 110 is installed to move up and down by the crane 200, as shown in Figure 4 to 6, Perforated rod 120 vertically connected to the single auger 110, the driving means 130 is installed adjacent to the single auger 110 to move up and down by the crane 200, and the driving means 130 The pile clamp 140 is coupled.

싱글 오거(110)는 기중기(200)에 수직되게 설치되는 리이더(210)에 오거 하우징(111) 일측이 상하로 슬라이딩 가능하게 결합되고, 기중기(200)의 권양로우프(220)에 오거 하우징(111) 상부의 로우프 연결부(113)가 연결되며, 내장된 모터와 감속기에 의해 하부에 회전 가능하게 결합되는 회전체(112)를 회전시킨다. Single auger 110 is coupled to the reader 210 is installed vertically to the crane 200, one side of the auger housing 111 is slidable up and down, the auger housing (220) on the lifting rope 220 of the crane (200) 111, the upper rope connecting portion 113 is connected, and rotates the rotating body 112 is rotatably coupled to the lower portion by the built-in motor and the reducer.

천공 로드(120)는 상단이 싱글 오거(110)의 회전체(112)에 플랜지 결합되고, 하단에 굴삭을 위해 고강도 재질의 비트부(121)가 마련되며, 싱글 오거(110)의 구동에 의해 지반에 파일공을 천공시 굴삭토를 지상으로 배출시키는 가이드스크류(122)가 외주면에 길이방향을 따라 형성된다. The perforated rod 120 is flanged to the rotating body 112 of the single auger 110, the lower end is provided with a bit portion 121 of a high-strength material for excavation, by driving the single auger 110 A guide screw 122 for discharging the excavated soil to the ground during drilling the pile hole in the ground is formed along the longitudinal direction on the outer circumferential surface.

항타수단(130)은 본체(131)의 일측이 기중기(200)의 리이더(210)에 상하로 슬라이딩 가능하도록 결합됨과 아울러 상부의 로우프 연결부(135)가 기중기(200)의 권양로우프(230)에 연결되고, 본체(131)의 중심에 천공 로드(120)가 수직으로 관통하도록 로드통과홀(133)이 형성되며, 로드통과홀(133) 양측에 천공 로드(120)를 사이에 두고 한 쌍의 바이브로 해머(132) 각각이 장착되는 해머장착공간(134)이 형성되고, 천공 로드(120)의 가이드스크루(122)에 의해 이송되는 굴삭토를 배출하는 배출구(136)가 마련된다. The driving means 130 is coupled to one side of the main body 131 so as to slide up and down to the reader 210 of the crane 200, and the upper rope connection portion 135 of the lifting rope 230 of the crane 200 A rod through hole 133 is formed in the center of the body 131 so that the perforated rod 120 vertically penetrates, and a pair of the perforated rod 120 is disposed between both sides of the rod through hole 133. A hammer mounting space 134 to which each of the hammers 132 is mounted is formed in the vibrator of the vibrator, and an outlet 136 for discharging the excavated soil transported by the guide screw 122 of the punching rod 120 is provided.

파일 클램프(140)는 파일(10)이 항타수단(130)의 진동에 의해 천공 로드(120)에 의해 굴삭되는 파일공에 굴삭과 동시에 삽입되기 위해 파일(10)을 천공 로드(120) 주위에 수직되게 위치하도록 클램핑하는데 이를 위해 항타수단(130)의 본체(131) 하측에 결합되는 클램프 하우징(141)과, 클램프 하우징(141)에 힌지 결합되는 하나 이상의 클램프(142)와, 클램프(142) 각각을 회전시키는 하나 이상의 실린더(143)를 포함한다.Pile clamp 140 has pile 10 around perforated rod 120 so that pile 10 can be inserted simultaneously with excavation into pile drilled by drill rod 120 by vibration of driving means 130. It clamps to be positioned vertically for this purpose, the clamp housing 141 is coupled to the lower side of the main body 131 of the driving means 130, one or more clamps 142 hinged to the clamp housing 141, and the clamp 142 One or more cylinders 143 that rotate each.

클램프 하우징(141)은 천공 로드(120)가 관통하도록 관통홀(144)이 형성되고, 관통홀(144)이 항타수단(130)의 본체(131)에 형성되는 로드통과홀(133)이 수직으로 연결되도록 본체(131) 하측에 결합되며, 하부 외측에 파일(10) 상단이 위치하여 클램핑되도록 고정부(145)가 마련된다. The clamp housing 141 is formed with a through hole 144 through which the punching rod 120 penetrates, and a rod through hole 133 having a through hole 144 formed in the main body 131 of the driving means 130 is vertical. It is coupled to the lower side of the main body 131 to be connected to, and the fixing part 145 is provided so that the upper end of the pile 10 is located and clamped.

클램프(142)는 본 실시예에서 “ㄱ”자 형상을 가지고 두 개로 이루어져서 클램프 하우징(141)의 외주면 양측에 상하로 회전 가능하도록 각각 힌지 결합되며, 하측으로 회전함으로써 그 끝단이 클램프 하우징(141)의 고정부(145)와 함께 파일(10) 상단을 클램핑한다. 또한, 클램프(142)는 파일(10)을 클램핑시 파일(10)을 가압하는 끝단에 파일(10)과 접촉되는 가압팁(146)을 힌지 결합시킴으로써 가압팁(146)이 클램프(142)로부터 상하 회전이 가능하도록 하여 파일(10)을 클램핑시 파일(10)과의 밀착 면적이 최대가 되도록 한다. 또한, 가압팁(146)은 도 7에서 도시된 바와 같이, 파일(10)의 몸체(13) 외주면과 접하는 면이 몸체(13)와의 밀착력을 높이기 위하여 몸체(13)의 외주면에 상응하는 아크 형상을 가진다.The clamp 142 has a shape of “a” in this embodiment and is hinged to each of the two outer peripheral surfaces of the clamp housing 141 so as to be rotatable up and down, and by rotating downward, the ends thereof are clamp housing 141. Clamping the upper end of the pile 10 together with the fixing portion 145 of the. In addition, the clamp 142 hinges the pressing tip 146 in contact with the pile 10 at the end pressurizing the pile 10 when clamping the pile 10, the pressing tip 146 from the clamp 142 By allowing vertical rotation, the contact area with the pile 10 is maximized when the pile 10 is clamped. In addition, as shown in FIG. 7, the pressing tip 146 has an arc shape corresponding to an outer circumferential surface of the body 13 in order to increase adhesion between the outer circumferential surface of the body 13 of the pile 10 and the body 13. Has

실린더(143)는 클램프(142)의 상단과 클램프 하우징(141) 외측면에 양단이 각각 힌지 결합됨으로써 압축행정과 팽창행정에 의해 클램프(142)를 상하 양방향으로 회전시킴으로써 가압팁(146)이 파일(10)을 고정부(145) 외측면에 클램핑하거나 클램핑을 해제하도록 한다.Both ends of the cylinder 143 are hinged to the upper end of the clamp 142 and the outer surface of the clamp housing 141, respectively, and the pressing tip 146 rotates the clamp 142 vertically by a compression stroke and an expansion stroke. 10) to clamp or release the clamping on the outer surface of the fixing portion (145).

클램프 하우징(141)은 클램프(142)에 의해 클램핑된 파일(10) 파일이 설치하고자 하는 방향으로 회전할 수 있도록 항타수단(130)으로부터 길이방향을 중심축으로 하여 회전할 수 있게 하기 위하여 상부에 회전 가능하게 결합되는 회전연결부(147)가 마련된다. 클램프 하우징(141)은 회전연결부(147)가 마련되기 위하여 외주면을 따라 결합돌기(147a)가 형성되는 상부몸체(141a)와, 결합돌기(147a)가 위치하는 결합홈(147b)이 내주면을 따라 형성됨과 아울러 클램프(142)와 실린더(143)가 설치되는 하부몸체(141b)로 분할되고, 하부몸체(141b)의 결합홈(147b)에 상부몸체(141a)의 결합돌기(147a)가 놓여진 상태에서 상부몸체(141a)가 끼워지는 중공의 커버(148)가 하부몸체(141b) 상단에 볼트로 고정됨으로써 하부몸체(141b)는 상부몸체(141a)로부터 회전할 수 있게 된다.The clamp housing 141 is provided at the top to allow the pile 10 clamped by the clamp 142 to rotate about the longitudinal direction from the driving means 130 so that the pile can rotate in the direction to be installed. A rotatable connector 147 is rotatably coupled. The clamp housing 141 has an upper body 141a in which a coupling protrusion 147a is formed along an outer circumferential surface of the rotary housing 147, and a coupling groove 147b in which the coupling protrusion 147a is located along an inner circumferential surface thereof. In addition, the clamp 142 and the cylinder 143 is divided into the lower body 141b is installed, the coupling protrusion 147a of the upper body 141a is placed in the coupling groove 147b of the lower body 141b. In the hollow cover 148 to which the upper body 141a is fitted is fixed to the upper end of the lower body 141b by bolts so that the lower body 141b can rotate from the upper body 141a.

이와 같은 구조로 이루어진 건설시공용 파일의 동작은 다음과 같이 이루어진다.The operation of the construction pile consisting of such a structure is made as follows.

기중기(200)를 시공하자 하는 지점으로 이동시킨 다음 권양로우프(220,230)의 감기 및 풀기를 통해서 시공하고자 하는 본 고안에 따른 파일(10) 내측에 천공 로드(120)가 위치하도록 한 다음 파일(10) 상단을 클램프 하우징(141)의 고정부(145)에 끼우고 나서 실린더(143)를 작동하여 클램프(142)를 하측으로 회전시킴으로써 도 7에서 도시된 바와 같이, 가압팁(146)이 파일(10) 상단을 고정부(145)에 밀착시켜서 클램핑하도록 한다.Move the crane 200 to the point to be constructed, and then the drilling rod 120 is located inside the pile 10 according to the present invention to be constructed by winding and unwinding the hoisting ropes 220 and 230, and then the pile 10 As shown in FIG. 7, the upper end is inserted into the fixing part 145 of the clamp housing 141, and then the cylinder 143 is operated to rotate the clamp 142 downward. 10) to clamp the upper end in close contact with the fixing portion (145).

파일(10)의 클램핑이 완료되면 권양로우프(220)를 풀어서 싱글 오거(110)를 리이더(210)를 따라 하강시키면서 싱글 오거(110)의 구동에 의해 천공 로드(120)를 회전시켜서 파일공을 굴삭함과 동시에 항타수단(130)을 지지하는 권양로우프(230)를 함께 풀어서 항타수단(130) 역시 리이더(210)를 따라 하강시키면서 바이브로 해머(132)를 구동시킴으로써 천공 로드(120)에 의해 굴삭되는 파일공으로 파일(10)이 삽입되도록 한다.When the clamping of the pile 10 is completed, the lifting rod 220 is released to rotate the drilling rod 120 by driving the single auger 110 while lowering the single auger 110 along the reader 210. And excavating the lifting rope 230 supporting the driving means 130 at the same time by driving the hammer 132 with the vibrator while lowering the driving means 130 along the reader 210 as well. The pile 10 is to be inserted into the pile hole to be excavated by.

이와 같이 파일공의 천공과 파일(10)의 항타 작업을 동시에 실시하면서 하나의 파일(10)이 설치되면 도 8에서 도시된 바와 같이, 설치된 파일(10)에 접하도록 일렬로 연속적으로 파일(20,30,40)들을 같은 방법으로 설치한다. 설치된 파일(10)에 접하도록 파일(20,30,40)들을 연속적으로 시공시 이들의 제 1 가이드돌기(21,31,41)들은 미리 설치된 파일(10,20,30)의 제 2 가이드돌기(12,22,31)에 끼워져서 슬라이딩 결합됨으로써 미리 설치된 파일(10)을 기준으로 연속 설치되는 파일(20,30,40)들은 서로 밀착되며, 이들 파일(10,20,30,40)간에 유격이 발생하지 않게 되어 밀착도를 높임으로써 유격으로 인한 별도의 차수공사를 요하지 않게 된다. As described above, if one file 10 is installed while simultaneously drilling the file hole and driving the file 10, the file 20 may be continuously arranged in line to contact the installed file 10. Install 30, 40 in the same way. The first guide protrusions 21, 31, and 41 are second guide protrusions of the pre-installed files 10, 20, and 30 when the files 20, 30, and 40 are continuously installed to contact the installed file 10. Slidingly coupled to (12, 22, 31), the pile (20, 30, 40) continuously installed on the basis of the pre-installed pile 10 is in close contact with each other, between the pile (10, 20, 30, 40) Since the play does not occur, and the degree of adhesion is increased, no separate work due to the play is required.

또한, 기준이 되는 파일(10)을 정확하게 한번 설치하기만 하면 이 후의 파일(20,30,40)들을 설치시 수직도를 유지하기 위해 항타를 멈추거나 속도를 줄이지 않아도 되므로 시공에 소요되는 시간을 크게 단축시키며, 수직도 등의 시공 품질을 향상시킬 수 있다.In addition, once the file 10 as a reference is installed exactly once, the time required for construction is not required to stop driving or reduce the speed in order to maintain the verticality when installing the subsequent files 20, 30, and 40. It can greatly shorten and improve construction quality such as verticality.

상술한 바와 같이, 본 고안에 따른 건설시공용 파일은 파일공의 천공 및 파일의 항타 작업이 동시에 실시되는 장치에 사용되어 지반내에 연속적으로 설치시 상호간에 슬라이딩 결합을 통해 밀착도 및 수직도를 향상시키는 효과를 가지고 있다. As described above, the construction pile according to the present invention is used in a device in which the drilling of the pile hole and the pile driving operation are performed at the same time, thereby improving the closeness and verticalness through the sliding coupling between each other when continuously installed in the ground. Has the effect of letting.

이상에서 설명한 것은 본 고안에 따른 건설시공용 파일을 실시하기 위한 하나의 실시예에 불과한 것으로서, 본 고안은 상기한 실시예에 한정되지 않고, 이하의 실용신안등록청구범위에서 청구하는 바와 같이 본 고안의 요지를 벗어남이 없이 당해 고안이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변경 실시가 가능한 범위까지 본 고안의 기술적 정신이 있다고 할 것이다.What has been described above is just one embodiment for carrying out the construction pile according to the present invention, the present invention is not limited to the above embodiment, as claimed in the utility model registration claims below Without departing from the gist of the present invention, any person having ordinary knowledge in the field to which the present invention belongs will have the technical spirit of the present invention to the extent that various modifications can be made.

도 1 및 도 2는 종래의 CIP 공법에 대한 문제점을 설명하기 위한 도면이고,1 and 2 are views for explaining the problem with the conventional CIP method,

도 3은 본 고안에 따른 건설시공용 파일을 도시한 사시도이고,3 is a perspective view showing a construction file according to the present invention,

도 4는 본 고안에 따른 건설시공용 파일의 시공장치를 도시한 측면도이고,Figure 4 is a side view showing the factory value of the construction pile for construction according to the present invention,

도 5는 본 고안에 따른 건설시공용 파일의 시공장치를 도시한 정면도이고,Figure 5 is a front view showing the factory value of the construction pile for construction according to the present invention,

도 6은 도 5의 요부를 도시한 도면이고,FIG. 6 is a view illustrating main parts of FIG. 5;

도 7은 본 고안에 따른 건설시공용 파일이 클램핑된 모습을 도시한 단면도이고,Figure 7 is a cross-sectional view showing a state in which the construction pile clamped in accordance with the present invention,

도 8은 본 고안에 따른 건설시공용 파일이 설치되는 모습을 도시한 사시도이다.8 is a perspective view showing a state in which the pile for construction according to the present invention is installed.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

10,20,30,40 : 파일 11,21,41 : 제 1 가이드부10,20,30,40: File 11,21,41: First guide part

12,32 : 제 2 가이드부 13 : 몸체12,32: second guide portion 13: body

Claims (2)

천공 로드에 의해 지반에 천공된 파일공에 설치되는 파일에 있어서,In the pile installed in the pile hole drilled in the ground by the drilling rod, 삽입되는 경로를 천공하기 위해 상기 천공 로드가 삽입되도록 중공으로 형성되는 몸체와, 상기 몸체의 외측면 양측에 길이방향을 따라 각각 형성되는 제 1 및 제 2 가이드결합부를 포함하고,It includes a body formed in a hollow so that the perforated rod is inserted to drill the path to be inserted, and the first and second guide coupling portion formed in the longitudinal direction on both sides of the outer surface of the body, 상기 제 1 가이드결합부는 지반에 삽입 후 이웃하는 지점에 타입되는 다른 파일의 제 2 가이드결합부와 슬라이딩 결합됨으로써 상기 다른 파일이 나란하게 밀착되도록 가이드하는 것The first guide coupling portion is inserted into the ground and slidingly coupled with the second guide coupling portion of the other pile type to the adjacent point to guide the other pile to be in close contact with each other side by side 을 특징으로 하는 건설시공용 파일.Construction file, characterized in that. 제 1 항에 있어서, The method of claim 1, 상기 제 1 가이드결합부는 “ㄱ”자 형상의 단면을 가지면서 상기 몸체의 외주면에 서로 마주 보면서 나란하게 형성되는 한 쌍의 제 1 가이드돌기로 이루어지고,The first guide coupling portion is formed of a pair of first guide protrusions formed side by side facing each other on the outer peripheral surface of the body having a cross section of the "b" shape, 상기 제 2 가이드결합부는 상기 제 1 가이드돌기사이에 끼워지도록 “ㄱ”자 형상의 단면을 가지면서 상기 몸체 외주면에 대향되면서 나란하게 형성되는 한 쌍의 제 2 가이드돌기로 이루어지는 것The second guide coupling portion is composed of a pair of second guide protrusions formed side by side facing the outer peripheral surface of the body having a "-" shaped cross section so as to fit between the first guide projections. 을 특징으로 하는 건설시공용 파일.Construction file, characterized in that.
KR20-2005-0022437U 2005-08-02 2005-08-02 Pile for using construction KR200398533Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2005-0022437U KR200398533Y1 (en) 2005-08-02 2005-08-02 Pile for using construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2005-0022437U KR200398533Y1 (en) 2005-08-02 2005-08-02 Pile for using construction

Publications (1)

Publication Number Publication Date
KR200398533Y1 true KR200398533Y1 (en) 2005-10-13

Family

ID=43699597

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0022437U KR200398533Y1 (en) 2005-08-02 2005-08-02 Pile for using construction

Country Status (1)

Country Link
KR (1) KR200398533Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100837182B1 (en) * 2007-01-26 2008-06-13 다우씨엔디(주) Pile construction method for drilling and piling at a time without rotating a pile
KR101878837B1 (en) * 2018-01-17 2018-07-16 윤학수 Construction method of underground structure wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100837182B1 (en) * 2007-01-26 2008-06-13 다우씨엔디(주) Pile construction method for drilling and piling at a time without rotating a pile
KR101878837B1 (en) * 2018-01-17 2018-07-16 윤학수 Construction method of underground structure wall

Similar Documents

Publication Publication Date Title
KR100716132B1 (en) Pile construction apparatus capable of drilling and piling at a time
KR101243928B1 (en) Pile construction method using two excavating equipments and non welding type linked casing
KR101723512B1 (en) Pile construction apparatus for drilling and piling
KR100733263B1 (en) Guide frame apparatus for piling of casing and construction of inserting inconcrete pile on the sea or on the river
KR101414756B1 (en) Non welding type linked casing
CN201169773Y (en) Construction apparatus for clearing away underground original stakes
JP2015504123A (en) Pile driving device and method for installing pile material assembly
KR200398533Y1 (en) Pile for using construction
KR102299439B1 (en) File construction apparatus capable of simultaneous achievement of hole-boring work and vibrating
KR101042271B1 (en) Connector of boring casings pipe for micro-pile
JP4478348B2 (en) Steel pipe pile driving method and apparatus
KR102178354B1 (en) Pile pullout apparatus
KR102637552B1 (en) File construction apparatus capable of simultaneous achievement of hole-boring and vibrating
KR100255423B1 (en) Method and apparatus of pipe for foundation construction
JPH07145616A (en) Cast-in-place concrete piling method
KR101615810B1 (en) Sheet Pile Construction Apparatus For Perforating and Pile Driver Work
CN111155513B (en) Full-slewing drilling machine and hydraulic vibration hammer cooperative well drilling method
KR101263944B1 (en) boring equipment
JP4635725B2 (en) Pile construction system
KR20080010177A (en) In-casing rotary drill
KR101345457B1 (en) Driving piles pressure device and using the device driving pile method
KR100592041B1 (en) Press-fitting Apparatus Stitcher for Casing for Constructing Foundation Pile on Soft Soil Ground and Pile Construction MethodAugeo Pile Method Using the Same
KR101044485B1 (en) Casing for deep depth filing hole
KR100837182B1 (en) Pile construction method for drilling and piling at a time without rotating a pile
JP2001182060A (en) Pile press-in system and pile press-in method

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20111130

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20120928

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee