KR200354669Y1 - A concrete pile in the shape of atop - Google Patents
A concrete pile in the shape of atop Download PDFInfo
- Publication number
- KR200354669Y1 KR200354669Y1 KR20-2004-0008179U KR20040008179U KR200354669Y1 KR 200354669 Y1 KR200354669 Y1 KR 200354669Y1 KR 20040008179 U KR20040008179 U KR 20040008179U KR 200354669 Y1 KR200354669 Y1 KR 200354669Y1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- concrete
- formwork
- ring
- body portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000009415 formwork Methods 0.000 claims abstract description 20
- 230000008878 coupling Effects 0.000 claims abstract description 10
- 238000010168 coupling process Methods 0.000 claims abstract description 10
- 238000005859 coupling reaction Methods 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 17
- 230000003014 reinforcing effect Effects 0.000 abstract description 5
- 230000032258 transport Effects 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 description 10
- 238000003860 storage Methods 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000000593 degrading effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000010297 mechanical methods and process Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/54—Piles with prefabricated supports or anchoring parts; Anchoring piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
본 고안은 연약지반에 지반 보강용으로 설치하는 콘크리트 팽이파일에 관한 것으로, 팽이파일의 상부인 몸체부를 거푸집을 이용하여 현장에서 콘크리트 타설 구성할 수 있도록 함으로 해서 팽이파일의 제조, 운반, 보관 및 시공의 편의성을 두루 제공코자 한 것이다.The present invention relates to a concrete top pile installed for reinforcing ground on a soft ground, and manufactures, transports, stores, and constructs the top pile by enabling the concrete part to be placed in the field using formwork. It is intended to provide convenience throughout.
즉, 본 고안은 몸체부(11)와 고리(14)가 매설된 파일부(12)로 구성되는 콘크리트 팽이파일(10)을 구성함에 있어서, 아래측으로 끼움공(13a)이 형성된 상광하협형의 거푸집(13)에 고리(14)가 매설된 파일부(12)의 파일(12a)을 끼움하여 파일(12a) 상단에 형성된 확장걸림부(12b)를 거푸집(13) 내면에 안치하되, 거푸집(13)에는 콘크리트를 충진하여 파일부(12)와 일체 구성된 몸체부(11)가 형성되게 하거나, 파일부(12)의 확장걸림부(12b)에는 고리(14) 외주연에 적어도 한 개 이상의 결합봉(15)을 매설하여 몸체부(11)와 파일부(12)의 결합력을 높일 수 있게 한 것으로서, 공장에서 제작하는 파일부(12) 및 거푸집(13)의 경우 무게가 가벼우며, 특히 거푸집(13)의 경우 적층 상태로 보관 및 운반할 수 있어 물류비용을 크게 절감할 수 있고, 파일 정렬의 정확도를 기할 수 있고 굴삭기 등의 중장비 없이도 신속한 작업을 보장할 수 있으며, 시공상태에서는 몸체부(11)와 파일부(12)가 일체형으로 구성되므로 내구성을 높일 수 있고, 팽이파일(10)의 파손율도 획기적으로 줄일 수 있는 것이다.That is, the present invention in the construction of the concrete top pile 10 consisting of the pile portion 12, the body portion 11 and the ring 14 is embedded, the upper and lower narrow type of the fitting hole 13a is formed Insert the pile 12a of the pile portion 12 in which the ring 14 is embedded in the die 13, and the expansion catching portion 12b formed at the top of the pile 12a is placed on the inner surface of the form 13, 13 is filled with concrete so that the body portion 11 integrally formed with the pile portion 12 is formed, or at least one coupling to the outer periphery of the ring 14 to the expansion engaging portion 12b of the pile portion 12 In order to increase the coupling force of the body portion 11 and the pile portion 12 by embedding the rod 15, in the case of the pile portion 12 and the formwork 13 manufactured in the factory, the weight is light, especially the formwork In case of (13), it can be stored and transported in the stacked state, which can greatly reduce the logistics cost, ensure the accuracy of the file alignment, and the excavator Fast operation can be guaranteed even without heavy equipment, and in the construction state, the body part 11 and the pile part 12 are integrally formed, thereby increasing durability, and reducing the breakage rate of the top pile 10. .
Description
본 고안은 연약지반에 지반 보강용으로 설치하는 콘크리트 팽이파일에 관한 것으로, 보다 상세하게는 팽이파일의 상부인 몸체부를 거푸집을 이용하여 현장에서 콘크리트 타설 구성할 수 있도록 함으로 해서 팽이파일의 제조, 운반, 보관 및 시공의 편의성을 두루 제공코자 한 것이다.The present invention relates to a concrete top pile installed for reinforcing ground on a soft ground, and more specifically, to manufacture and transport a top pile by allowing the body part, which is the upper part of the top pile, to be constructed in the field using formwork. It is intended to provide convenience of storage, construction and construction.
종래 연약한 지반을 보강할 목적으로 사용하는 팽이파일은 그 형태가 팽이와 같이 형성되어 이를 시공 시에 기계적인 방법으로 파일을 땅속에 타압하는 방식과 달리 다수의 팽이파일을 지면에 평면상으로 배열하여 자갈 등의 골재로서 공간을 메우고 곧바로 건축물의 기초지반으로 이용할 수 있도록 함으로써 기초공사의 능률성과 경제성을 도모할 수 있도록 한 것이다.The top pile used for the purpose of reinforcing conventional soft ground is formed like a top, and unlike the method of tapping the pile into the ground by a mechanical method during construction, a plurality of top piles are arranged in the plane on the ground. By filling the space with aggregates such as gravel and immediately using it as the foundation ground of the building, it is possible to promote the efficiency and economic efficiency of the foundation construction.
이러한 목적으로 사용하는 종래의 팽이파일(1)은 도 1에 도시된 바와 같이 상측으로 고리(4)가 매설된 몸체부(2)와 지반에 매설 시 중심을 잡아주는 파일부(3)가 일체로 형성되고 있어 비교적 부피가 크고 중량체인 관계로 운반 시 파손율이 높고 보관상의 비능률성과, 시공면에 있어서도 인력으로 팽이파일(1)의 운반 및 타설이 어려워 굴삭기 등을 동원해서 파일작업을 행해야 하는 등 작업 능률성이 저조하였다. 또한 시공 시에 파일부(3)를 정확한 위치에 정렬하는 정확도를 기하기가 어려웠다.The conventional top pile 1 used for this purpose has a body portion 2 having a ring 4 embedded thereon as shown in FIG. 1 and a pile portion 3 for holding the center when buried in the ground. Due to its relatively bulky and heavy chain, it has a high breakage rate during transportation and inefficiency in storage, and it is difficult to transport and pour the top pile 1 by manpower even on the construction surface. The work efficiency was low. In addition, it was difficult to determine the accuracy of aligning the pile part 3 in the correct position during construction.
이에 본 고안자는 상기한 바와 같은 종래 팽이파일(1)이 갖는 제반 문제점을일소코자 실용신안 등록(20-0183184호) 한바 있으며, 이의 구성은 도 2와 같이 팽이파일(1)의 몸체부(2)와 파일부(3)를 따로 제작하여 현장에서 조립 사용할 수 있게 한 것이다. 이와 같이 몸체부(2)와 파일부(3)를 별도로 제작 구성할 경우 운반, 보관 등에 있어서 매우 유리하다. 그러나 파일 시공상의 문제점 즉, 중량체이므로 굴삭기 등을 이용해야 하는 불편을 해소키가 어려웠고, 또한 분리된 몸체부(2)와 파일부(3)에 각각 고리(4)를 형성해야 하는 제조상의 번거로움이 있었으며, 팽이파일(1)이 설치된 상태에서 지반침하 등으로 인해 몸체부(2)와 파일부(3)가 이완되는 경우가 많아 팽이파일(1) 기능성을 저하시키게 되는 문제점도 있었던 것이다.Thus, the present inventor has described the utility model registration (20-0183184) to solve all the problems of the conventional top pile 1 as described above, the configuration of which is the body portion 2 of the top pile 1 as shown in FIG. ) And pile parts (3) are manufactured separately so that they can be used in the field. As such, when the body portion 2 and the pile portion 3 are separately manufactured, it is very advantageous in transportation, storage, and the like. However, it was difficult to solve the problem of pile construction, that is, the heavy body, so that the inconvenience of using an excavator, etc., and also the cumbersome manufacturing steps that must form the loops 4 on the separate body portion 2 and the pile portion 3, respectively. There was a problem that the body portion 2 and the pile portion 3 are often relaxed due to ground subsidence in the state in which the top pile 1 is installed, and the top pile 1 has a problem of degrading the functionality of the top pile 1.
이에 본 고안자는 상기한 바와 같은 종래 팽이파일이 갖는 제반 문제점을 일소코자 본 고안을 안출한 것으로서,The present inventors have devised the present invention to solve the problems of the conventional top pile as described above.
본 고안에서는 파일부는 공장에서 제작하고, 몸체부는 현장에서 거푸집에 콘크리트 타설하는 방법으로 구성하여 몸체부와 파일부가 일체로 구성되게 함으로써, 팽이파일의 생산, 운반, 보관 및 시공상의 편의성 등의 여러 가지 장점을 발휘할 수 있도록 함에 고안의 기술적 과제를 두고 본 고안을 완성한 것이다.In the present invention, the pile part is manufactured at the factory, and the body part is formed in the form of concrete in the form of the site, so that the body part and the pile part are integrally formed, so that the convenience of the production, transportation, storage and construction of the top pile The present invention has been completed with the technical problem of devising in order to show the advantages.
도 1,2는 종래 팽이파일 단면 구성도1,2 is a conventional top pile cross-sectional configuration diagram
도 3은 본 고안의 팽이파일 제조를 위한 거푸집과 파일부 결합상태 사시도Figure 3 is a perspective view of the formwork and pile portion combined state for manufacturing the top pile of the present invention
도 4는 도 3의 분해 사시도4 is an exploded perspective view of FIG.
도 5는 본 고안으로 팽이파일을 제조한 상태 단면도5 is a cross-sectional view of manufacturing a top pile with the present invention
도 6은 본 고안의 파일부의 다른 실시예를 보인 단면도6 is a cross-sectional view showing another embodiment of the pile unit of the present invention
도 7a, 7b는 본 고안의 사용상태 예시도Figure 7a, 7b is an exemplary state of use of the present invention
■ 도면의 주요부분에 사용된 부호의 설명 ■■ Explanation of symbols used in main part of drawing ■
10:팽이파일 11:몸체부10: Top pile 11: Body part
12:파일부 12a:파일12: file section 12a: file
12b:확장걸림부 13:거푸집12b: Expansion latch 13:
13a:끼움공 14:고리13a: 14 holes: ring
15:결합봉15: binding rod
도 3은 본 고안의 팽이파일 제조를 위한 거푸집과 파일부 결합상태 사시도를 도시한 것이고, 도 4는 도 3의 분해 사시도, 도 5는 본 고안으로 팽이파일을 제조한 상태 단면도 등을 도시한 것으로서, 이하에서 본 고안의 구성을 설명하기로 한다.Figure 3 is a perspective view of the formwork and pile portion combined state for manufacturing a top pile of the present invention, Figure 4 is an exploded perspective view of Figure 3, Figure 5 shows a cross-sectional view of the manufacturing state of the top pile according to the present invention, etc. Hereinafter, the configuration of the present invention will be described.
본 고안에서 제공하는 콘크리트로 제조되는 팽이파일(10)은 고리(14)가 매설된 파일부(12)는 공장에서 제조토록 하고, 몸체부(11)는 현장에서 거푸집(13)에 콘크리트를 타설하여 파일부(12)와 일체형이 되게 한 것이다.The top pile 10 is made of concrete provided by the present invention is the pile portion 12 is embedded with the ring 14 is to be manufactured in the factory, the body portion 11 is cast concrete in the formwork 13 in the field This is to be integrated with the pile unit 12.
즉, 본 고안은 몸체부(11)와 고리(14)가 매설된 파일부(12)로 구성되는 콘크리트 팽이파일(10)을 구성함에 있어서, 아래측으로 끼움공(13a)이 형성된 상광하협형의 거푸집(13)에 고리(14)가 매설된 파일부(12)의 파일(12a)을 끼움하여 파일(12a) 상단에 형성된 확장걸림부(12b)를 거푸집(13) 내면에 안치하되, 거푸집(13)에는 콘크리트를 충진하여 파일부(12)와 일체 구성된 몸체부(11)가 형성되게 한 구성이다.That is, the present invention in the construction of the concrete top pile 10 consisting of the pile portion 12, the body portion 11 and the ring 14 is embedded, the upper and lower narrow type of the fitting hole 13a is formed Insert the pile 12a of the pile portion 12 in which the ring 14 is embedded in the die 13, and the expansion catching portion 12b formed at the top of the pile 12a is placed on the inner surface of the form 13, 13 is a configuration in which the body part 11 integrally formed with the pile part 12 is formed by filling concrete.
상기 거푸집(13)은 얇은 철판, 합성수지 등으로 제조되며, 파일부(12)의 파일(12a) 길이는 지반의 상태에 따라서 길이를 가감하여 제작한다.The formwork 13 is made of a thin iron plate, synthetic resin, etc., the length of the pile 12a of the pile portion 12 is produced by adding or subtracting the length according to the state of the ground.
그리고 상기 고리(14)는 거푸집(13)의 상단으로 조금 노출되도록 길게 형성되며, 파일부(12)의 확장걸림부(12b)에는 도 6에 도시된 바와 같이 고리(14) 외주연에 적어도 한 개 이상의 결합봉(15)을 매설하여 몸체부(11)와 파일부(12)의 결합력을 높일 수 있게 하고, 거푸집(13)의 내측으로 다수개의 결합돌기(미도시)를 형성하여 거푸집(13)과 몸체부(11)의 결속력을 높일 수 있게 한다.And the ring 14 is formed long to expose a little to the top of the formwork 13, the extension catching portion 12b of the pile portion 12 as shown in Figure 6 at least one outer peripheral edge By embedding one or more coupling rods 15 to increase the coupling force of the body portion 11 and the pile portion 12, and forming a plurality of coupling protrusions (not shown) inside the form 13 (13) ) And to increase the binding force of the body portion (11).
본 고안에서 제시하는 팽이파일(10)에 있어서 파일부(12) 및 거푸집(13) 형상은 원형인 경우를 도시하고 있지만, 그 형상은 사각형, 육각형 등 다양한 형상으로 실시할 수 있음은 물론이다.Although the shape of the pile part 12 and the form | mold 13 is shown in the top pile 10 proposed by this invention, the shape can be implemented in various shapes, such as a rectangle and a hexagon.
도면중 미설명 부호 16은 기초철근, 17은 쇄석, 18은 연결철근을 각각 도시한 것이다.In the drawings, reference numeral 16 denotes the basic rebar, 17 represents the crushed stone, and 18 represents the connecting rebar.
상기와 같이 다양하게 실시될 수 있는 본 고안의 콘크리트 팽이파일(1)은 지반구축용으로 사용되는 것으로서, 이하에서 본 고안의 생산 및 사용에 따른 작용 등을 설명한다.Concrete top pile 1 of the present invention, which can be variously implemented as described above, is used for ground construction, and will be described below in accordance with the production and use of the present invention.
본 고안은 공장에서 제품 생산 시에는 파일부(12)와 거푸집(13)을 별도 생산하고 현장에서 이들을 조립 후 콘크리트 타설하여 파일부(12)와 일체 구성되는 몸체부(11)를 형성토록 한 것으로서, 제품의 보관 및 운반이 용이하다.The present invention is to produce the pile part 12 and the formwork (13) separately when the production in the factory and to assemble them in the field after the concrete pouring to form the body portion 11 is integrally formed with the pile part 12 as It is easy to store and transport the product.
즉, 상기 파일부(12)의 경우 긴 막대형으로 형성되므로 제조가 쉽고 취급이 용이하며, 거푸집(13)의 경우 상광하협형으로 형성되므로 적층하여 보관 및 이동할 수 있는바 부피를 획기적으로 줄일 수 있어 물류비용을 대폭적으로 절감할 수 있는 것이다.That is, in the case of the pile part 12 is formed in a long rod shape is easy to manufacture and easy to handle, in the case of the die 13 is formed in the upper and lower narrow type can be laminated and stored and move the bar volume can be significantly reduced Therefore, the logistics cost can be greatly reduced.
한편 본 고안의 팽이파일(1)을 시공코자 할 시에는 도 7a,7b와 같이 정리된 지반면에 기초철근(16)을 배열하고 타설 위치에 거푸집(13)을 배열한 상태에서 각 거푸집(13)의 내측으로 파일부(12)의 파일(12a)을 끼움 타설한 상태에서 거푸집(13) 바깥 측으로 쇄석(17)을 채움하고, 거푸집(13) 상측으로 노출되어 있는 고리(14)에 연결철근(18)을 결속한 상태에서 거푸집(13)에 콘크리트를 타설 양생하면 팽이파일(10)의 시공이 이루어지는 것으로서, 본 고안은 종래와 같이 굴삭기 등을 이용하지 않고도 인력으로 용이하게 시공할 수 있어 시공 능률을 높일 수 있고, 위치 정렬의 정확도도 기할 수 있으며, 시공상태에서는 파일부(12)와 거푸집(13)에 의해 형성되는 몸체부(11)가 일체형으로 구성되므로 견고한 내구성을 제공하는 팽이파일(10)을 제공할 수 있는 것이다. 이때 거푸집(13)은 분리하지 않고 지하에 매설된다.On the other hand, when constructing the top pile 1 of the present invention, each form 13 in a state in which the basic reinforcing bar 16 is arranged on the ground surface arranged as shown in Figs. 7a and 7b and the form 13 is arranged at the placing position. Fill the crushed stone 17 to the outside of the form 13 in the state of fitting the pile (12a) of the pile portion 12 into the inner side of the pile portion, and connects the reinforcing bar to the ring 14 exposed to the upper side of the form 13 ( When the concrete is poured into the formwork 13 in the state of binding 18), the construction of the top pile 10 is made, and the present invention can be easily carried out by manpower without using an excavator as in the prior art, thus improving construction efficiency. It is possible to increase the accuracy of the position alignment, and in the construction state, the pile portion (10) formed by the pile portion 12 and the formwork (13) is composed of a one-piece top pile (10) to provide a solid durability ) Can be provided. At this time, the formwork 13 is buried underground without separation.
상기와 같이 팽이파일(10)을 구성 및 시공할 경우 도 6과 같이 확장걸림부(12b) 상에 결합봉(15)을 매설하고 거푸집(13)의 내측으로 결합돌기를 형성할 경우 몸체부(11)와 파일부(12) 및 거푸집(13)간의 결합력 및 내구성을 높일 수 있다.In the case of constructing and constructing the top pile 10 as described above, when the coupling rod 15 is embedded on the extension engaging portion 12b as shown in FIG. 6, and the coupling protrusion is formed inside the form 13, the body portion ( 11) and the coupling force and durability between the pile portion 12 and the formwork 13 can be increased.
이상과 같이 구성 및 작용되는 본 고안은 파일부(12)는 공장에서 제작하고, 몸체부(11)는 현장에서 거푸집(13)에 콘크리트 타설하는 방법으로 구성하여 몸체부(11)와 파일부(12)가 일체형이 되게 구성한 것으로서, 본 고안에 의하면 상기에서 언급한 바와 같이 공장에서 제작하는 파일부(12) 및 거푸집(13)의 경우 무게가 가볍고, 특히 거푸집(13)의 경우 적층 상태로 보관 및 운반할 수 있어 물류비용을 크게 절감할 수 있으며, 시공상에 있어서도 거푸집(13)을 배열한 상태에서 경량인 파일부(12)를 타설하면 되는바, 파일 정렬의 정확도를 기할 수 있고 굴삭기 등의 중장비 없이도 신속한 작업을 보장할 수 있으며, 시공상태에서는 몸체부(11)와 파일부(12)가 일체형으로 구성되므로 내구성을 높일 수 있고, 팽이파일(10)의 파손율도 획기적으로 줄일 수 있는 등 기대 이상의 효과를 제공하는 실용성 있는 매우 유용한 고안이다.The present invention is constructed and operated as described above, the pile portion 12 is manufactured in the factory, the body portion 11 is configured by the method of placing concrete on the formwork 13 in the field body portion 11 and the pile portion ( 12) is configured to be integral, according to the present invention, as described above, the pile portion 12 and the formwork 13 manufactured in the factory is light in weight, especially the formwork 13 is stored in a stacked state And it can carry and greatly reduce the logistics cost, and even in construction, the lightweight pile portion 12 is to be placed in the form of arranging the formwork 13, the accuracy of the file alignment can be ensured, such as an excavator Fast operation can be ensured even without heavy equipment, and in the construction state, the body part 11 and the pile part 12 are integrally formed to increase durability, and the breakage rate of the top pile 10 can be drastically reduced. Expectation It is a very useful utility designed to provide on that effect.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0008179U KR200354669Y1 (en) | 2004-03-24 | 2004-03-24 | A concrete pile in the shape of atop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0008179U KR200354669Y1 (en) | 2004-03-24 | 2004-03-24 | A concrete pile in the shape of atop |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040077265A Division KR100483437B1 (en) | 2004-09-24 | 2004-09-24 | A concrete pile in the shape of atop |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200354669Y1 true KR200354669Y1 (en) | 2004-07-01 |
Family
ID=49347561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0008179U Ceased KR200354669Y1 (en) | 2004-03-24 | 2004-03-24 | A concrete pile in the shape of atop |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200354669Y1 (en) |
-
2004
- 2004-03-24 KR KR20-2004-0008179U patent/KR200354669Y1/en not_active Ceased
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101842475B1 (en) | Monolithically poured top pile foundation with cast-in-placed lower reinforced part and construction method thereof | |
KR20110008752A (en) | Precast Segment with Reinforced Concrete Hole and Its Application | |
KR101753743B1 (en) | Structure and Constructing Method of Integrated Pier-Base | |
KR102060746B1 (en) | Stackable Concrete Block and Formwork for the Same | |
JP2002242157A (en) | Tire form coating block | |
KR200424776Y1 (en) | Concrete pier using precast concrete hollow tube formwork | |
KR101250385B1 (en) | Pier with Vertical Split type Precast Concrete Units and Constructing Method thereof | |
KR100483437B1 (en) | A concrete pile in the shape of atop | |
KR101614833B1 (en) | Mold and manufacturing method for concrete structure | |
KR200374652Y1 (en) | Top file with jammed connection to file | |
KR200354669Y1 (en) | A concrete pile in the shape of atop | |
KR101319517B1 (en) | Rahmen structure with concrete hinge and the construction method therefor | |
KR101753744B1 (en) | Structure and Constructing Method of Integrated Pier-Base | |
KR101329483B1 (en) | joint structure of precast concrete column and beam by using One Unit beam | |
KR200366899Y1 (en) | A mould for concrete pile in the shape of atop | |
KR101086885B1 (en) | How to make a large number of large concrete blocks | |
CN206635802U (en) | A kind of assembled fast-assembling basis | |
KR101068857B1 (en) | Conical Foundation Container | |
KR200183184Y1 (en) | A concrete pile in the shape of a top | |
KR100994398B1 (en) | Manufacturing method of steel pipe pile and tofu reinforcement for the purpose of strengthening the ground | |
CN212715010U (en) | Low tenon foundation gravity retaining wall | |
KR200461591Y1 (en) | Retaining wall with formative stone and formative stone | |
KR200461055Y1 (en) | Retaining wall with formative stone and formative stone | |
KR101395662B1 (en) | Concret pavement public prefab dice | |
KR100469143B1 (en) | A mould for concrete pile in the shape of atop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
UA0108 | Application for utility model registration |
Comment text: Application for Utility Model Registration Patent event code: UA01011R08D Patent event date: 20040324 |
|
REGI | Registration of establishment | ||
UR0701 | Registration of establishment |
Patent event date: 20040617 Patent event code: UR07011E01D Comment text: Registration of Establishment |
|
UR1002 | Payment of registration fee |
Start annual number: 1 End annual number: 1 Payment date: 20040325 |
|
UG1601 | Publication of registration | ||
T201 | Request for technology evaluation of utility model | ||
UT0201 | Request for technical evaluation |
Patent event date: 20040707 Comment text: Request for Technology Evaluation of Utility Model Patent event code: UT02011R01D |
|
UR1001 | Payment of annual fee |
Payment date: 20040713 Start annual number: 2 End annual number: 3 |
|
O032 | Opposition [utility model]: request for opposition | ||
UO0301 | Opposition |
Comment text: Request for Opposition Patent event code: UO03011R01D Patent event date: 20040903 |
|
O121 | Withdrawal of opposition [utility model] | ||
UO1201 | Withdrawal of opposition |
Comment text: Withdrawal of Opposition Patent event date: 20041227 Patent event code: UO12011R01D |
|
T601 | Decision to invalidate utility model after technical evaluation | ||
UT0601 | Decision on revocation of utility model registration |
Comment text: Notice of Reason for Refusal during Technology Evaluation Patent event date: 20050202 Patent event code: UT06011S01I |
|
EXTG | Ip right invalidated | ||
UC2102 | Extinguishment |
Termination category: Others Termination date: 20051118 Termination category: Others Termination date: 20050406 |