KR200308379Y1 - Dismemberment removal type nail composition - Google Patents

Dismemberment removal type nail composition Download PDF

Info

Publication number
KR200308379Y1
KR200308379Y1 KR20-2002-0031733U KR20020031733U KR200308379Y1 KR 200308379 Y1 KR200308379 Y1 KR 200308379Y1 KR 20020031733 U KR20020031733 U KR 20020031733U KR 200308379 Y1 KR200308379 Y1 KR 200308379Y1
Authority
KR
South Korea
Prior art keywords
nail
hole
anchor
circumferential surface
tube
Prior art date
Application number
KR20-2002-0031733U
Other languages
Korean (ko)
Inventor
이광재
Original Assignee
이광재
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이광재 filed Critical 이광재
Priority to KR20-2002-0031733U priority Critical patent/KR200308379Y1/en
Application granted granted Critical
Publication of KR200308379Y1 publication Critical patent/KR200308379Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • E02D5/765Anchorings for bulkheads or sections thereof in as much as specially adapted therefor removable
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/805Ground anchors with deformable anchoring members
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Abstract

본 고안은, 측벽에 구멍을 길게 천공하고 그 천공된 구멍으로 네일을 삽입한 후, 콘크리트 몰탈을 충진 그라우팅시켜 네일을 고정하여 굴착공사시 그 주변의 토사, 암반등의 붕괴를 방지하기 위한 네일 장착 구조에 있어서, 하단부측으로 숫나사부를 갖는 네일과, 중앙으로 천공된 홀(hole) 내주면으로 상기 네일의 숫나사부와 나사 결합되기 위한 암나사부를 형성하고, 상부로 연장 돌출되는 결합구의 외주면으로 숫나사부를 갖는 앵커몸체부와, 중앙으로 내주면이 절곡 형성되며 관통되는 통공 하단측 내주면으로 암나사부가 형성되며 그 상부측으로 패킹을 개재하기 위한 단턱이 형성되는 앵커커버체로 되는 앵커체와, 상기 네일 외주면을 커버하며 끼워지기 위한 제1관체와, 상기 제1관체 외측으로 이격되며 끼워지는 제2관체로 구성되는 것을 특징으로 하여,The present invention drills a long hole in the side wall and inserts a nail into the drilled hole, and then nails to prevent the collapse of soil and rock around the excavation work by fixing the nail by filling and grouting concrete mortar. In the structure, a nail having a male thread portion on the lower end side, and a female screw portion for screwing the male screw portion of the nail with a hole inner circumferential surface centered in the center, and an anchor having a male thread portion on the outer circumferential surface of the coupling tool extending upwardly An anchor body formed of an anchor cover body having a body portion, an inner thread surface formed by bending an inner circumferential surface in the center, and a through-hole lower side inner circumferential surface, and a stepped portion for interposing a packing on its upper side, and covering the nail outer circumferential surface Characterized in that it consists of a first tube and a second tube to be spaced apart from the outside of the first tube. And,

네일링 공법후 매입된 네일을 제거할 때 비교적 용이하면서 신속하게 네일을 굴착면이나 사면등에 천공되어 있는 구멍으로부터 뽑아내어 제거 하는 작업과정을 매우 빠르게 진행할 수 있도록 하여 공사의 공기를 현저하게 줄일 수 있는 효과 및 이에 따른 작업 생산성의 향상 및 그 공사가를 현저하게 절감할 수 있는 효과를 기대하는 회수가 용이한 해체 제거식 네일 장치에 관한 것이다.When removing nails after nailing method, it is relatively easy and quick to remove the nail from the hole drilled on the excavation surface or slope and to remove the nail very quickly. The present invention relates to an easy-to-remove dismantled nail device that is expected to have an effect, thereby improving work productivity and significantly reducing the cost of construction.

Description

회수가 용이한 해체 제거식 네일 장치{Dismemberment removal type nail composition}Removal removal type nail composition which is easy to collect {Dismemberment removal type nail composition}

본 고안은 토목·건축의 각종 터파기 공사에서 지반의 굴착벽면이나 사면등을 안정시키기 위한 흙막이 공법의 한 종류인 소일네일링 공법(soil-nailing method)에서 사용하는 소일네일 장치에 관한 것으로, 굴착면을 자립할 수 있도록 숏크리트로 표면보호면을 시공할 때 네일의 지지력을 극대화시키고 시공 완료 후에 네일을 간편하며 신속하게 제거할 수 있도록 하는 회수가 용이한 해체 제거식 네일 장치에 관한 것이다.The present invention relates to a soil nailing device used in the soil-nailing method, which is a kind of earthquake method for stabilizing excavation walls or slopes of ground in various excavation works of civil engineering and construction, The present invention relates to an easy-to-remove dismantled nail device for maximizing the bearing capacity of the nail when constructing the surface protection surface with shotcrete so that the surface can be self-supporting, and to easily and quickly remove the nail after completion of the construction.

일반적으로 터파기, 흙막이, 철도 및 도로등에 인접한 자연 및 인공사면의 보강, 지하구조물 및 터널 등과 같은 토목 관련 건축물의 축조에 필요한 굴착 지보체계, 기존 옹벽의 보수 및 옹벽을 설치하는 공사에서, 그 굴착면이 붕괴되는 것을 방지하기 위해 보강공법이 적용되는바 흙막이 공사, 어스앵커(earth anchor) 및 소일네일(soil nail)의 세가지 공법이 주로 이용되고 있다.In general, the excavation support system required for the construction of civil engineering-related structures such as reinforcement of natural and artificial slopes, construction of underground structures and tunnels adjacent to trenches, masonry, railways and roads, repair of existing retaining walls, and installation of retaining walls The reinforcement method is applied to prevent the surface from collapsing. Three methods are mainly used, namely, earthen construction, earth anchor, and soy nail.

상기의 흙막이 공사는 엄지말뚝, 횡널말뚝, 쉬트파일(sheet pile) 등을 이용한 버팀공법이지만 이런 공법은 대형 천공장비를 사용하기 때문에 말뚝 등을 설치하는데 수반되는 소음과 진동이 문제되고 있으며 또한 버팀대가 시공 공간을 좁게 만들어 굴토토사의 운반이 용이하지 못하는 문제가 있고, 상기 어스 앙카(earth anchor) 공법은 굴토공사 자체가 용이하기는 하나 시공시간이 오래 걸리는 단점과 아울러 앙카의 길이가 매우 길어 대상부지 밖으로 가시설 구조체가 형성되는 경우가 있어 분쟁의 소지를 항상 안고 있는 문제점이 있다.The earthen block construction is a support method using a thumb pile, a cross pile, a sheet pile, etc., but since such a method uses a large drilling equipment, the noise and vibration associated with installing a pile are problematic. There is a problem that the construction space is narrowed, so that it is not easy to carry the gulto earth yarn, and the earth anchor method is easy for the pit earth work itself, but the construction time is long, and the length of the anchor is very long. There is a problem that the temporary structure is sometimes formed out there is always the subject of dispute.

따라서 근래에는 소일네일링(soil-nailing) 공법이 널리 사용되고, 이 소일네일링 공법은 상기와 같이 경사면이나 건물의 지하굴착시 단계별로 굴착과 함께 보강재로서 이형철근인 네일과 전면판(shotcrete 또는 concrete facing)으로만 굴착사면을 보강하여 흙막이 가시설을 하는 방식으로 비교적 경량장비를 사용하므로 저소음, 저진동 등으로 굴착공사를 수행할 수 있으며, 어스 앙카 공법에 비하여 보강영역을 위한 천공깊이가 매우 짧아 인접대지의 경계를 침범하는데 따른 분쟁발생의 감소 및 도심지 공사에 매우 유리한 공법으로 현재 외국에서는 물론이거니와 국내에서도 활발하게 건설공사 현장에서 적용, 실시되고 있으며 이에 대한 연구와 독점적 권리획득을 각종 출원이 활발하게 이루어지고 있다.Therefore, in recent years, the soil-nailing method is widely used, and the soil-nailing method is a reinforcing nail and a front plate (shotcrete or concrete) as a reinforcing material, along with excavation step by step during the underground excavation of slopes or buildings as described above. Because it uses relatively light weight equipment by reinforcing excavation slopes only by facing), excavation work can be carried out with low noise and low vibration, and the drilling depth for reinforcement area is very short compared to earth anchor method. It is a method that is very advantageous for the reduction of disputes caused by violating the boundaries of the city and for the construction of downtown areas. Currently, it is actively applied and implemented in the construction site not only in foreign countries but also in Korea, and various applications have been actively applied for research and acquisition of exclusive rights. ought.

이와같은 소일네일링(soil-nailing method) 공법은 굴토 또는 절토 과정을 통하여 일련의 보강작업이 이루어지는 것으로 비탈면이나 터파기 굴착면을 자립할 수 있는 안정높이로 굴착함과 동시에 숏크리트(shotcrete)로 표면보호면을 시공하고 굴착배면을 천공하여 네일(nail)을 삽입한 후 이를 그라우팅 처리하여 소일네일 앵커체를 조성하는 공법으로 그 시공과정을 간략히 살펴보면, 도 1에서 보는바와같이 흙막이벽(1)의 지반내에 하향 경사지게 깊게 구멍을 천공하고, 그 천공된 구멍내로 이형철근인 보강용 네일(2)을 삽입한 후 몰탈 등의 그라우트재를 주입·경화시켜 그라우트 고결체(3)를 형성한 후 지상으로 노출된 이형철근인 보강용 네일(2)의 끝단을 지압판(4)과 고정너트(5)등을 이용하여 흙막이벽(1)에 고정시키는 작업을 통해 경사말뚝 형태의 소일네일 앵커체를 형성하게 된다.This soil-nailing method is a series of reinforcement work through the process of excavation or cutting, and excavates to a stable height that can stand the slope or excavation surface at the same time and at the same time shotcrete surface When constructing the protective surface and drilling the excavation back, inserting a nail (nail) and then grouting it to look at the construction process as a method of forming a nail nail anchor body, as shown in Figure 1 of the earth wall (1) Drill the hole deeply inclined downward in the ground, insert the reinforcing nail (2), which is a deformed steel into the drilled hole, and inject and harden the grout material such as mortar to form the grout solidified body (3). Small nails in the form of sloped piles by fixing the ends of the reinforcing nails (2), which are exposed deformed rebars, to the retaining wall (1) by using a pressure plate (4) and fixing nuts (5). An anchor body is formed.

이와같은 소일네일 앵커체는 그라우트 고결체의 주면 마찰저항과 삽입된 이형철근인 보강용 네일의 인발저항을 통해 굴착벽면의 방향, 즉 흙막이벽쪽으로 작용하는 토압에 대항하여 원지반의 강성을 키워줌으로써 자립지지가 될 수 있도록 하고 있어 인장력, 전단력 및 휨모멘트에 저항할 수 있는 보강재인 네일을 프리 스트레싱 없이 비교적 촘촘한 간격으로 형성하여, 원지반의 전체적인 전단강도를 증가시키고 발생 변위를 억제하여 굴착도중 및 굴착완료 후에 예상되는 지반의 이완을 억제하게 된다.Such small nail anchors are self-supporting by increasing the stiffness of the base against the earth pressure acting in the direction of the excavation wall, that is, the earth wall, through the frictional resistance of the main surface of the grout consolidation and the pull-out resistance of the reinforcement nail, which is the inserted rebar. Nails, which are reinforcement materials that can resist tensile, shear and bending moments, are formed at relatively tight intervals without prestressing, increasing overall shear strength and restraining displacement during excavation and excavation. After completion, it is possible to suppress the ground loosening expected.

그러나, 상기한 방식에 의해 시설되는 소일네일 앵커체는 지중에 매설되는 보강용 네일이 인접 대지경계선을 침범하여 시공되는 것이 보통이어서 철근을 제거하지 않고 지중에 그대로 잔류시킬 경우 민원에 따른 분쟁과 협의에 따른 공기지연, 토지점용료의 지불, 추후 인접지역 공사시 장애요인은 물론 부식으로 인한 환경오염을 야기하는 등의 문제점이 지적되고 있다.However, the small nail anchor body installed by the above-described method is usually constructed by reinforcing nails embedded in the ground invading adjacent land boundary lines. Has been pointed out such as air delay, payment of land use fee, obstacles in construction of neighboring areas, and environmental pollution due to corrosion.

따라서 상기한 문제점등을 해결하기 위해 이형철근인 보강네일의 설치 후, 보강네일등을 해체하여 완전히 탈거시키기 위한 여러가지 방안들이 제시되고 있는바, 도 2에서 보듯이 대한민국 특허청에 기출원되어 선등록된 실용신안 등록제283304호의 경우 케이스(12)의 내부 아래쪽에 이형철근(11)의 돌기(14)와 맞는 홈(13)을 돌기(14)와 동일한 간격으로 형성하고 케이스의 외부에는 그라우트(41)와의 마찰을 증가시키기 위해 일정간격으로 외부마찰돌기(17)를 형성하여, 케이스(12)의 홈(13)에 돌기(14)가 들어가게 이형철근(11)을 넣은 다음, 압축재(16)를 위에 올리고, 압축재(16) 위에 제거용강선(15)을 올린 후 덮개(21)를 덮고 상기 덮개(21)의 이탈을 방지하기 위하여 결속선을 이용, 일정간격으로 묶어줘 그 설치를 완료하고, 제거시에는 먼저 제거용 강선(15)을 외부로 잡아당겨 케이스(12) 밖으로 뽑아 제거하고 이형철근(11)의 끝을 잡아 당겨 제거하는 일련의 과정을 거치게 된다.Therefore, in order to solve the above problems, various methods for dismantling the reinforcement nail after dismantling the reinforcement nail, etc., have been proposed. As shown in FIG. In the case of Utility Model Registration No. 283304, grooves 13 matching the protrusions 14 of the deformed reinforcing bar 11 are formed at the same interval as the protrusions 14 on the inner bottom of the case 12, and the grout 41 is disposed on the outside of the case 12. In order to increase the friction, the external friction protrusions 17 are formed at regular intervals, the reinforcing bar 11 is inserted into the grooves 13 of the case 12 so that the protrusions 14 enter, and then the compressive material 16 is placed on the top. Raise, the lifting steel wire 15 is placed on the compressive material 16 and then the cover 21 is closed and tied at a predetermined interval by using a binding line to prevent the cover 21 from being detached. When removing, first remove the removal steel wire (15) Pull out to remove the case (12) to remove and go through a series of steps to remove the pull out of the reinforcing bar (11).

그러나, 상기한 경우 이형철근 이외에 이형철근을 고정하기 위한 압축재와 제거용 강선등을 필수적 구성요소로 요구하고 있어 이형철근을 고정하는 작업이 번잡하고, 작업이 완료된 후에도 순차적으로 압축재와 제거용 강선을 제거하고, 이형철근을 제거하여야 하므로 해체에 따른 시간이 상당히 소요되는 문제점이 있다.However, in the case described above, the compression material and removal steel wire for fixing the deformed steel in addition to the deformed steel are required as essential components, and the work for fixing the deformed steel is complicated. There is a problem in that it takes a considerable amount of time due to the dismantling of steel wire, and remove the rebar.

한편 이와는 달리 대한민국 특허청에 기출원되어 등록된 특허등록 제266391호의 경우, 외주면을 따라 숫나사산을 형성한 네일에 암나사산이 형성된 쉽게 파괴될 수 있는 합성수지·요기·철금속·비철금속등 강도가 다소 약한 고정봉과 나사결합한 상태에서 미리 지반에 천공된 구멍으로 삽입 한 후, 상기 고정봉 주위에 끼워진 호스를 통하여 콘크리트 몰탈등을 충진 그라우팅시킨 다음 일정시간 경과 후 상기 고정봉으로부터 네일을 빼내어 제거하는 구성을 제공하고 있다.On the other hand, Patent Registration No. 266391, filed and registered with the Korean Intellectual Property Office, has a weak strength, such as synthetic resins, yogis, ferrous metals, and non-ferrous metals, which can easily be broken with female threads formed on male threads formed along the outer circumference. After inserting into a hole previously drilled into the ground in the state of screwing the rod, and filling grouting concrete mortar, etc. through a hose fitted around the fixing rod and after a period of time to remove the nail from the fixing rod to provide a configuration have.

그러나 이와같은 구성의 경우, 네일과 고정봉이 전체적으로 그 길이만큼 나사 결합되어 있어 작업자가 상기 고정봉으로부터 네일을 제거할 때 작업자가 네일을 잡은 상태에서 나사산을 따라 끝까지 돌려야 하므로 그 네일의 제거 작업 시간이 상당히 소요되는 문제점이 있다.However, in such a configuration, the nail and the fixing rod are screwed as much as the entire length, so that when the worker removes the nail from the fixing rod, the worker must hold the nail and turn it all the way along the thread to remove the nail. There is a significant problem.

따라서 본 고안은 상기한 문제점을 해결하기 위해 안출한 것으로서,Therefore, the present invention has been devised to solve the above problems,

터파기 등을 이용하여 지반 굴착공사시 그 굴착벽면이나 사면이 붕괴 되는 것등을 방지하기 위한 보강작업으로서, 그 지면으로 비스듬하게 구멍을 천공하고 천공된 구멍으로 이형철근을 삽입, 콘크리트 등의 몰탈을 충진·그라우팅 시켜 보강하는 네일링 공법을 실시할 때, 그 경화 과정이 완료된 후 상기 네일을 보다 손쉬우며 신속하게 상기 구멍으로부터 탈거 가능하도록 하는데 그 목적이 있다.As a reinforcement work to prevent the collapse of the excavated wall or slope during the ground excavation work using a trench, etc., drill a hole diagonally into the ground and insert a deformed steel into the perforated hole, mortar such as concrete When the nailing method of filling and grouting to reinforce is carried out, the purpose of the nail is more easily and quickly removed after the curing process is completed.

상기한 목적을 달성하기 위한 본 고안은,The present invention for achieving the above object,

측벽에 구멍(H)을 길게 천공하고 그 천공된 구멍(H)으로 네일(100)을 삽입한 후, 콘크리트 몰탈을 충진 그라우팅시켜 네일(100)을 고정하여 굴착공사시 그 주변의 토사, 암반등의 붕괴를 방지하기 위한 네일 장착 구조에 있어서,After drilling the hole (H) in the side wall long and inserting the nail (100) into the perforated hole (H), and then grouting the concrete mortar to fix the nail (100) to secure the nail (earth, rock, etc. around the excavation work) In the nail mounting structure for preventing the collapse of

하단부측으로 숫나사부(110)를 갖는 네일(100)과,Nail 100 having a male thread portion 110 to the lower end side,

중앙으로 천공된 홀(hole)(211) 내주면으로 상기 네일(100)의 숫나사부(110)와 나사 결합되기 위한 암나사부(212)를 형성하고, 상부로 연장 돌출되는 결합구(213)의 외주면으로 숫나사부(214)를 갖는 앵커몸체부(210)와, 중앙으로 내주면이 절곡 형성되며 관통되는 통공(221) 하단측 내주면으로 암나사부(222)가 형성되며 그 상부측으로 패킹(224)을 개재하기 위한 단턱(223)이 형성되는 앵커커버체(220)로 되는 앵커체(200)와,An outer circumferential surface of the coupler 213 protruding upwardly is formed by forming an internal thread portion 212 for screwing into the male screw portion 110 of the nail 100 as an inner circumferential surface of the hole 211 bored to the center. Anchor body portion 210 having a male thread portion 214 and an inner circumferential surface are bent to the center and a female thread portion 222 is formed on the inner circumferential surface of the lower side of the through-hole 221 through which the packing 224 is interposed. An anchor body 200 to be an anchor cover body 220 is formed with a stepped 223 for

상기 네일(100) 외주면을 커버하며 끼워지기 위한 제1관체(300)와, 상기 제1관체(300) 외측으로 이격되며 끼워지는 제2관체(400)로 구성되는 것을 특징으로 한다.Covering the outer peripheral surface of the nail 100 is characterized in that it is composed of a first tubular body 300, and the second tubular body 400 is spaced apart and fitted to the outside of the first tubular body 300.

도 1은 종래의 네일 공법에 의한 네일 앵커체 장착 구조를 도시한 도면이고,1 is a view showing a nail anchor body mounting structure by a conventional nail method,

도 2는 종래의 해체 가능한 네일 앵커체 장착 구조를 도시한 도면이며,Figure 2 is a view showing a conventional removable anchor anchor mounting structure,

도 3은 본 고안에 의한 해체 제거식 네일 장치의 분리 사시도이고,Figure 3 is an exploded perspective view of the dismantling nail device according to the present invention,

도 4는 구멍으로 콘크리트 몰탈을 충진하는 것을 도시한 개략적 단면도이며,4 is a schematic cross-sectional view showing the filling of mortar with concrete into a hole,

도 5는 네일 상단부측을 다른 수단을 이용하여 커버하는 것을 도시한 개략적 단면도이고,5 is a schematic cross-sectional view showing covering of the nail upper end side using another means,

도 6은 본 고안의 앵커 몸체부 외측면으로 요홈을 형성한 상태를 도시한 사시도이고,Figure 6 is a perspective view showing a state in which a groove is formed in the outer surface of the anchor body portion of the present invention,

도 7은 본 고안의 앵커 커버체에 단턱을 형성한 사시도와, 이를 이용하여 네일링을 실시한 상태의 요부 확대 단면도이다.Figure 7 is a perspective view of the step formed in the anchor cover body of the present invention, and enlarged cross-sectional view of the main portion in the nailing state using the same.

※ 도면 중 주요부호에 대한 간단한 설명※ Brief description of the main symbols in the drawings

100; 네일 110; 숫나사부 200; 앵커체100; Nail 110; Male thread 200; Anchor

210; 앵커몸체부 211; 홀 212; 암나사부210; Anchor body portion 211; Hole 212; Female thread

213; 결합구 214; 숫나사부 220; 앵커커버체213; Coupler 214; Male thread portion 220; Anchor cover

221; 통공 222; 암나사부 223; 단턱221; Through 222; Female thread portion 223; Step

300; 제1관체 400; 제2관체300; First tube 400; Second body

이하 본 고안의 바람직한 실시예를 첨부한 도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described in detail.

첨부한 도면에서 보듯이 본 고안은, 건축 지반공사등의 굴착면 또는 비탈진 사면등에 무수하게 천공된 구멍(H)으로 삽입되기 위한 네일(100)과 상기 네일(100) 하단부와 결합되어 상기 구멍(H)에 매입되는 앵커체(200)와, 상기 네일(100) 외주면을 커버하는 제1관체(300) 및 상기 제1관체(300) 외측으로 커버되는 제2관체 (400)로 구성된다.As shown in the accompanying drawings, the present invention is coupled to the nail (100) and the lower end of the nail (100) to be inserted into the hole (H) innumerably perforated in the excavation surface or non-development slope, such as construction ground work, the hole ( It consists of an anchor body 200 embedded in H), the first tube 300 to cover the outer peripheral surface of the nail 100 and the second tube 400 to be covered outside the first tube (300).

상기 네일(100)은 통상의 이형철근을 지칭하는 것으로 네일(100) 하단부측에 나사를 가공하여 숫나사부(110)를 형성한다. 이와같은 숫나사부(110)는 후술하는 앵커체(200)의 앵커몸체부(210) 결합구(213) 내주면으로 형성되는 암나사부(212)와나사 결합되도록 하기 위한 것이다.The nail 100 refers to a general deformed reinforcing bar and forms a male thread part 110 by processing a screw on a lower end side of the nail 100. The male screw portion 110 is intended to be coupled to the female screw portion 212 formed by the inner peripheral surface of the anchor body portion 210 coupling hole 213 of the anchor body 200 to be described later.

상기 앵커체(200)는 네일(100) 하단부와 나사결합되어 굴착면 또는 사면등에 무수히 천공된 구멍(H)에 매입되기 위한 금속재의 구조체로서, 도면에서 보듯이 앵커몸체부 (210)와 앵커커버체(220)로 구성되어 나사 결합된다.The anchor body 200 is a metal structure to be screwed into the nail 100, the lower end portion is embedded in the hole (H) perforated in the excavation surface or slope, etc., the anchor body portion 210 and the anchor cover as shown in the drawing It is composed of a sieve 220 is screwed.

상기 앵커몸체부(210)는 하부측이 만곡되며 반구형상의 둥근 돔(Dome)형상으로 이루어지고, 상방 중앙측으로 관통되지 않는 홀(211)이 천공되되 상기 홀(211)로부터 연장되며 일체로 입설되는 결합구(213)를 형성한다. 이와같은 결합구(213)의 내주면으로 형성된 암나사부(212)와 상기한 네일(100) 하단부측의 숫나사부 (110)가 나사결합되어 고정되도록 하고 있다.The anchor body portion 210 is bent in the lower side is made of a semi-spherical round dome (Dome) shape, the hole 211 that does not penetrate to the upper center side is perforated but extending from the hole 211 and integrally entered The coupling sphere 213 is formed. The female screw portion 212 formed by the inner circumferential surface of the coupler 213 and the male screw portion 110 at the lower end side of the nail 100 are screwed to be fixed.

상기의 결합구(213) 외주면으로는 숫나사부(214)를 형성하게 되는데, 후술하는 앵커커버체(220)와 나사 결합되기 위한 것이다.The outer peripheral surface of the coupler 213 is to form a male screw portion 214, which is to be screwed with the anchor cover body 220 to be described later.

이때, 도 6에서 보는바와 같이 앵커몸체부(210) 외주면측을 따라 등간격 이격되는 요홈(215)을 형성할 수도 있는데 이와같은 요홈(215)의 형성에 의해 후술하는 콘크리트 몰탈등의 충진 및 경화에 따른 그라우팅시 충진재가 상기 요홈(215)을 따라 유입 되도록 하여 충진재의 원할한 충진이 가능하도록 하고, 충진재와 앵커체(200)간의 접촉면적 증가에 따른 접착력을 상승시켜 더욱 견고하게 상기 앵커체(200)가 콘크리트 몰탈등의 그라우팅재에 의해 고정될 수 있다.At this time, as shown in Figure 6 may be formed grooves 215 spaced at equal intervals along the outer peripheral surface side of the anchor body 210, the filling and curing of concrete mortar, etc. to be described later by the formation of such grooves 215 When grouting according to the filling material to be introduced along the groove 215 to enable a smooth filling of the filler, and to increase the adhesive force according to the increase in the contact area between the filler and the anchor body 200 more firmly the anchor body ( 200 may be fixed by a grouting material such as concrete mortar.

상기 앵커커버체(220)는 네일(100)의 하단부 숫나사부(110)를 가이드하며 앵커몸체부(210)와 나사결합되기 위한 것으로, 앵커커버체(220)를 관통하는 통공 (221)을 형성하여 네일(100)이 관통될 수 있도록 하고, 하단부측 내주면으로 단턱 (223)을 형성하여 패킹(224)이 개재될 수 있도록 한다.The anchor cover body 220 guides the male threaded portion 110 of the lower end of the nail 100 and is screwed with the anchor body 210 to form a through hole 221 penetrating the anchor cover body 220. The nail 100 can be penetrated, and a step 223 is formed on the lower inner side of the inner circumferential surface so that the packing 224 can be interposed therebetween.

이와같은 패킹(224)은 이후 상기 구멍(H)을 통하여 콘크리트 몰탈등으로 그라우팅 시킬 때 콘크리트 몰탈이 앵커커버체(220)와 앵커몸체부(210)측으로 유입되는 것을 방지하여 기밀성 및 수밀성을 유지하기 위한 것이다.Such packing 224 to prevent the concrete mortar from entering the anchor cover body 220 and the anchor body portion 210 when grouting to the concrete mortar through the hole (H) to maintain the airtightness and water tightness It is for.

한편 단턱(223) 하단 내주면으로는 암나사부(222)를 형성하여 앵커몸체부 (210)의 결합구(213) 외주면으로 형성된 숫나사부(214)와 나사 결합 가능하도록 한다.On the other hand, the inner circumferential surface of the lower end of the step 223 is formed with a female screw portion 222 so that the male screw portion 214 formed with the outer circumferential surface of the coupler 213 of the anchor body portion 210 can be screwed.

이때 상기 통공(221)의 상단측 내주면으로는 나사 가공등이 되어 있지 않는바, 앵커커버체(220)와 앵커몸체부(210)간의 결합상태는 상기한 결합구(213)의 숫나사부(214)와 앵커커버체(220) 하단 내주면의 암나사부(212)에 의해서만 결합되도록 하고 있다.At this time, the inner peripheral surface of the upper end of the through hole 221 is not threaded, etc., the engagement state between the anchor cover body 220 and the anchor body portion 210 is the male screw portion 214 of the coupling sphere 213 described above. And the female screw portion 212 of the lower inner circumferential surface of the anchor cover body 220.

즉 상기 네일(100) 하단부의 숫나사부(214)측과 앵커몸체부(210) 결합구(213) 내주면으로 형성된 암나사부(212)와만 결합된 상태에서 구멍(H)으로 삽입되어져, 후술하는 제1관체(300)에 의해 네일(100)의 외측면이 보호되며 제2관체 (400)를 통해 콘크리트 몰탈등의 타설에 의해 그라우팅되어 경화된 후, 네일(100)만 잡아 상기 네일(100)과 앵커체(200)의 앵커몸체부(210)와의 나사 결합 상태를 해제한 후 네일(100)을 잡아당기면 간단하게 네일(100)의 인출이 가능하도록 하고 있다.That is, the nail 100 is inserted into the hole H in a state in which only the male screw portion 214 side of the lower portion of the nail 100 and the female screw portion 212 formed as the inner circumferential surface of the coupling body 213 of the anchor body 210 are inserted into the hole H, which will be described later. After the outer surface of the nail 100 is protected by the first pipe 300 and is grouted and cured by pouring, such as concrete mortar through the second pipe 400, the nail 100 and the nail 100 are held. After releasing the screw coupling state with the anchor body portion 210 of the anchor body 200, the nail 100 can be easily pulled out by pulling the nail 100.

따라서 콘크리트 몰탈등의 그라우팅에 의해 앵커체(200)는 견고하게 고정된 상태를 유지하게 되는데, 이때 네일(100)과 그라우팅재간의 간섭등이 전혀 이루어지지 않으므로 이 상태에서 네일(100)을 돌리게 되면 손쉽게 네일(100)과 앵커몸체부(210)간의 나사결합 상태가 해제되어 네일(100)을 손쉬우며 빠르게 인출할 수 있게 된다.Therefore, the anchor body 200 is maintained firmly fixed by grouting such as concrete mortar. At this time, since the interference between the nail 100 and the grouting material is not made at all, the nail 100 is turned in this state. The screw 100 is easily released from the screw coupling state between the anchor body 210 and the nail 100 can be easily and quickly withdrawn.

한편, 상기 앵커커버체(220) 상단부측으로 도7에서 보는바와 같이 절곡부(226)를 형성할 수도 있는데, 최상면 즉 절곡부(226)의 외경을 제1관체(300)의 외경과 동일하게 하거나 또는 약간 크게 형성하여 상기 절곡부(226)의 최상면측으로는 제1관체(300)가 실링부(310)에 의해 실링처리되며 위치ㆍ고정될 수 있도록 하고, 제2관체(400)는 상기 절곡부(226)를 에워싸며 제1관체(300)를 커버할 수 있도록 하여 후술하는 바와 같이 콘크리트 몰탈 등의 충진시 제2관체(400)에 의해 충진재가 제1관체(300)로 유입되더라도, 절곡부(226)에 의해 1차 제어되도록 하고, 제1관체(300)와 앵커커버체(220) 상면부간의 실링부(310)에 의해 2차 제어되도록 하여, 네일(100)측으로의 충진재 유입을 불가능하게 하므로서 네일링 처리과정이 완료된 후 구멍(H)으로부터 네일(100)을 취출할 때 단순하게 네일(100)의 숫나사부(110)와 앵커몸체부(210)의 암나사부(212)간 해제만에 의해서도 그 제거가 용이하며 신속하게 할 수 있다.Meanwhile, the bent portion 226 may be formed as shown in FIG. 7 toward the upper end of the anchor cover body 220. The outer diameter of the uppermost surface, that is, the bent portion 226 may be the same as the outer diameter of the first tubular body 300. Alternatively, the first tube 300 may be sealed by the sealing unit 310 and positioned and fixed to the uppermost side of the bent portion 226, and the second tube 400 may be formed to be slightly larger. The bent part may be surrounded by the 226 and cover the first pipe 300 so that the filler may be introduced into the first pipe 300 by the second pipe 400 when the concrete mortar is filled, as described below. Primary control by the (226) and secondary control by the sealing portion 310 between the upper surface portion of the first tube 300 and the anchor cover body 220, it is impossible to enter the filler 100 to the nail (100) side. When the nail 100 is taken out from the hole H after the nailing process is completed, Only by releasing between the male thread portion 110 of the nail 100 and the female thread portion 212 of the anchor body portion 210 can be easily removed quickly.

상기 제1관체(300)는 도면에서 보듯이 네일(100)을 감싸며 끼워지는 합성수지재 등으로 되는 관체로서, 앵커체(200)의 앵커커버체(220) 상단 주연부측과 당접되는 제1관체(300) 하단부를 실링처리하여 실링부(310)를 형성하므로써 콘크리트 몰탈등이 타설, 충진될 때 그 충진물이 네일(100) 및 앵커체(200)측으로 유입되는 것을 미연에 방지할 수 있도록 한다.As shown in the drawing, the first pipe body 300 is a pipe body made of a synthetic resin material that is wrapped around the nail 100, and the first pipe body abutting the upper edge portion of the anchor cover body 220 of the anchor body 200 ( 300) By sealing the lower end portion to form a sealing portion 310 when the concrete mortar, etc. is poured, the filling to prevent the inflow into the nail 100 and the anchor body 200 in advance.

상기 제2관체(400)는 제1관체(300) 외주측을 재차 커버하며 끼워지는 합성수지재등으로 되는 관체로서, 제2관체(400) 외주면으로 적정 간격 이격되며 환설되는 공간이격유지구(410)를 형성하여, 구멍(H)으로 삽입된 길이가 상당한 네일(100) 및 제1관체(300)와 제2관체(400)등이 상기 구멍(H) 내주벽과 균일한 간격을 유지할 수 있도록 함과 동시에, 콘크리트 몰탈등의 충진이 용이할 수 있도록 한다.The second pipe 400 is a pipe made of synthetic resin, etc., which covers the outer circumferential side of the first pipe 300 again, and is spaced apart and spaced apart from the outer circumferential surface of the second pipe 400 at an appropriate interval. ) So that the nail 100, the first tube 300, the second tube 400, etc., having a considerable length inserted into the hole H, can be maintained at a uniform distance from the inner circumferential wall of the hole H. At the same time, to facilitate the filling of concrete mortar.

상기한 구성을 갖는 네일장치를 이용하여 토목·건축의 각종 터파기 공사에서 지반의 굴착벽면이나 사면등을 안정시키기 위한 작업과정을 설명한다.The work process for stabilizing the excavated wall surface or slope of the ground in various excavation works of civil engineering and construction using the nail device having the above configuration will be described.

먼저 안정시키기 위한 상기의 지반 굴착벽면이나 사면등에 일정 경사각을 이루며 상당한 깊이를 갖는 구멍(H)을 무수하게 천공한 후, 앵커몸체부(210)의 결합구(213) 외주면에 형성된 숫나사부(214)와 앵커커버체(220)의 통공(221) 하단에 형성된 암나사부(222)를 이용하여 나사결합 한 상태에서, 네일(100)의 하단부를 앵커커버체(220)를 관통 삽입하며 그 하단부측에 형성된 숫나사부(214)와 앵커몸체부(210) 결합구(213) 내주면으로 형성된 암나사부(212)간을 나사결합하여, 네일(100) 하단부측에 앵커체(200)가 결합되도록 한다.First, to make a predetermined inclination angle to the ground drilling wall surface or slope to stabilize the hole (H) having a considerable depth and then drilled numerous times, and then the male thread portion 214 formed on the outer peripheral surface of the engaging hole 213 of the anchor body portion 210 ) And the lower end of the nail 100 is inserted through the anchor cover body 220 while being screwed using the female threaded portion 222 formed at the bottom of the through hole 221 of the anchor cover body 220. The male screw portion 214 and the anchor body portion 210 formed in the coupling screw 213 between the female screw portion 212 formed in the inner peripheral surface, so that the anchor body 200 is coupled to the lower end of the nail (100).

그런 다음, 네일(100) 외주면을 커버하기 위한 제1관체(300)를 끼우게 되는데 제1관체(300) 하단부측과 당접되는 상기 앵커커버체(220) 상면부간을 실링부(310)에 의해 실링처리 하여 네일(100)측으로 이물질이나 불순물등이 유입되는 것이 차단될 수 있도록 한다.Then, the first tube 300 to cover the outer circumferential surface of the nail 100 is inserted into the upper surface portion of the anchor cover body 220 which is in contact with the lower end side of the first tube 300 by a sealing unit 310. Sealing treatment to prevent the inflow of foreign matter or impurities to the nail (100) side.

이와같이 네일(100)에 끼워진 제1관체(300) 외측면을 또다시 커버하는 제2관체(400)를 끼우게 되는데, 상기 제2관체(400) 외주면을 따라 적정간격 이격되는 공간이격유지구(410)를 다수개 환설하여, 상기 구멍(H)내에서 네일(100) 및 각 관체 (300,400)가 구멍(H) 내주면과 적정 간격을 이루며 구멍(H) 중심측에 네일(100)이 위치될 수 있도록 한다.In this way, the second tube 400 which covers the outer surface of the first tube 300 inserted in the nail 100 is inserted again, and the spaced apart spaces spaced at appropriate intervals along the outer circumferential surface of the second tube 400 ( The nail 100 and each of the tubular bodies 300 and 400 in the hole H may be spaced apart from the inner circumferential surface of the hole H, and the nail 100 may be positioned at the center of the hole H. To help.

상기와 같이 네일(100) 외측으로 각각 제1관체(300)와 제2관체(400)가 끼워지고, 하단부측으로 앵커체(200)가 나사 결합된 상태의 네일(100)을 상기 구멍(H)으로 삽입한 후, 지반 굴착면이나 사면등으로 돌출된 네일(100) 상단부측과 상기 각각의 제1,2관체(300,400) 상단부를 덮개부(230)를 이용, 커버하여 콘크리트 몰탈재등의 충진재가 유입될 때 네일(100)측으로 충진재가 유입되는 것을 방지토록 하여, 상기 충진재의 경화후 네일(100)을 앵커체(200)로부터 빼낼 때 용이하도록 한다.As described above, the first pipe 300 and the second pipe 400 are fitted to the outside of the nail 100, and the nail 100 in a state where the anchor body 200 is screwed to the lower end thereof is formed in the hole H. After inserting into the cover, the upper end of the nail (100) protruding into the ground excavation surface or slope, and the upper end of each of the first and second tubular bodies (300, 400) using the cover portion 230 to fill the filler such as concrete mortar When the filler is introduced to prevent the filler from flowing into the nail 100, it is easy to remove the nail 100 from the anchor body 200 after curing of the filler.

그런 다음, 별도의 호스(500)등을 상기 구멍(H)측으로 투입하고 외부의 콘크리트 몰탈 주입장치(미도시)를 이용하여 상기 호스(500)를 통해 구멍(H)측으로 충진 처리하게 되는바, 제1,2관체(300,400)와 제1관체(300) 및 앵커커버체(220)간 실링처리등에 의해 충진재가 네일(100)측으로 접근되는 것을 완전히 차단할 수 있다.Then, a separate hose 500, etc. are put into the hole (H) side and the filling process to the hole (H) side through the hose 500 using an external concrete mortar injection device (not shown), The sealing material between the first and second pipe bodies 300 and 400 and the first pipe body 300 and the anchor cover body 220 may completely block access to the nail 100.

상기와 같은 작업과정을 통해 상기 구멍(H)내에 충진된 콘크리트 몰탈 등이 완전하게 경화되어 그라우팅 되면 작업자는 네일(100) 상단을 커버하고 있는 덮개부(230)를 개방한 후, 네일(100)을 잡아 나사 반대방향으로 회전시켜 상기 네일(100) 하단부의 숫나사부(110)와 앵커몸체부(210)의 결합구(213) 내주면에 형성된 암나사부(212)간의 나사 결합상태를 간단하게 해제토록 한 후 네일(100)을 간단하게 잡아 당기게 되면 네일(100)이 구멍(H) 내부의 아무런 저항 없이 제1관체(300)를 따라 가이드되며 손쉽게 구멍(H) 및 제1관체(300)로부터 토출되어 앵커체(200)로부터 해체ㆍ제거 될 수 있게 된다.When the concrete mortar filled in the hole (H) through the above working process is completely hardened and grouted, the worker opens the cover portion 230 covering the top of the nail 100, the nail 100 Grasp and rotate in the opposite direction to the screw to easily release the screw engagement state between the male thread portion 110 of the lower end of the nail 100 and the female thread portion 212 formed on the inner peripheral surface of the coupling hole 213 of the anchor body portion 210. After the nail 100 is simply pulled out, the nail 100 is guided along the first tube 300 without any resistance inside the hole H and is easily discharged from the hole H and the first tube 300. It can be dismantled and removed from the anchor body 200.

한편 이와는 달리 상기와 같이 그라우팅이 완료된 후 도 5에서 보는바와 같이 네일(100) 상단부를 다른 구성에 의해 커버할 수 있는바, 본원 출원인에 의해 특허청에 선출원된 실용신안등록출원된 제2002-27558호의 "사면보강장치"를 이용하여 커버할 수 있다.On the other hand, after the grouting is completed as described above, as shown in Figure 5 can cover the upper part of the nail 100 by a different configuration, the utility model registration application filed 2002-27558 filed in advance to the Patent Office by the applicant It can be covered using a "slope reinforcement device".

즉, 도면에서 보는바와 같이 구멍이 천공되어 있는 플레이트(a)를 네일(100)을 관통하여 끼우고, 반구너트(b)와 상기 네일(100)을 견고하게 결착하여 고정될 수 있도록 하기 위한 탄성체결구(c)를 끼운 후 탄성링(d) 및 체결너트(e)에 의해 마감 처리하여 커버한 후, 콘크리트 몰탈이 완전하게 경화되는 일정시간 경과 후 상기한 구성을 분리한 다음, 네일(100)을 반시계방향으로 돌려 네일(100) 하단부의 숫나사부(110)가 앵커몸체부(210)의 암나사부(212)로부터 해체 되도록 한 상태에서 네일(100)을 잡아당기면 간편하며 신속하게 구멍(H)으로부터 상기 네일(100)을 인출 할 수 있게 되는 것이다.That is, as shown in the figure, the plate (a) is punched through the nail 100 and inserted through the elastic body for firmly fixing the hemisphere nut (b) and the nail (100) After inserting the joint (c) and covered by the finishing treatment by the elastic ring (d) and the fastening nut (e), after the predetermined time after the concrete mortar is completely cured, the above configuration is separated, and then the nail (100) Turn the counterclockwise to pull the nail 100 in a state where the male portion 110 of the lower portion of the nail 100 is dismantled from the female thread portion 212 of the anchor body portion 210, and then the hole (H) is quickly and easily. Will be able to withdraw the nail (100).

따라서 본 고안에 의하면 건축물 축조 공사시 수반되는 지반 굴착공사에 따른 굴착면의 지지 보강작업이나, 사면등 비탈진면의 지지 보강 작업등을 수행할 때 행하여지는 네일링 공법에 있어서, 상기 네일링 공법후 매입된 네일을 제거할 때 비교적 용이하면서 신속하게 네일을 굴착면이나 사면등에 천공되어 있는 구멍으로부터 뽑아내어 제거 할 수 있으므로 그 작업과정을 매우 빠르게 진행할 수 있어 공사의 공기를 현저하게 줄일 수 있는 효과는 물론, 이에 따른 작업 생산성의 향상 및 그 공사가를 현저하게 절감할 수 있는 효과를 기대하게 되는 매우 유용한 고안인 것이다.Therefore, according to the present invention, in the nailing method performed when carrying out the support reinforcement work of the excavation surface or the support reinforcement work of the sloped surface such as the slope according to the ground excavation work accompanying the building construction, the purchase after the nailing method When removing old nails, the nails can be removed relatively easily and quickly from the holes drilled on the excavation or slope, so that the work process can be carried out very quickly. Therefore, it is a very useful design that expects the effect of improving work productivity and significantly reducing the construction cost.

또한 본 고안에 따르면 건축물의 축조가 완료 된 후 근접 대지에 타 건물의 축조에 따른 심굴작업에 방해되는 현상을 완벽하게 제거할 수 있으므로 각종 민원 및 소송으로부터 자유로울 수 있는 효과를 기대할 수 있다.In addition, according to the present invention, since the construction of the building is completed, it is possible to completely eliminate the phenomenon that interferes with the digging work due to the construction of another building on the adjacent site, and thus can be expected to be free from various complaints and lawsuits.

Claims (3)

측벽에 구멍(H)을 길게 천공하고 그 천공된 구멍(H)으로 네일(100)을 삽입한 후, 콘크리트 몰탈을 충진 그라우팅시켜 네일(100)을 고정하여 굴착공사시 그 주변의 토사, 암반등의 붕괴를 방지하기 위한 네일 장착 구조에 있어서,After drilling the hole (H) in the side wall long and inserting the nail (100) into the perforated hole (H), and then grouting the concrete mortar to fix the nail (100) to secure the nail (earth, rock, etc. around the excavation work) In the nail mounting structure for preventing the collapse of 하단부측으로 숫나사부(110)를 갖는 네일(100)과,Nail 100 having a male thread portion 110 to the lower end side, 중앙으로 천공된 홀(hole)(211) 내주면으로 상기 네일(100)의 숫나사부(110)와 나사 결합되기 위한 암나사부(212)를 형성하고, 상부로 연장 돌출되는 결합구 (213)의 외주면으로 숫나사부(214)를 갖는 앵커몸체부(210)와, 중앙으로 내주면이 절곡 형성되며 관통되는 통공(221) 하단측 내주면으로 암나사부(222)가 형성되며 그 상부측으로 패킹(224)을 개재하기 위한 단턱(223)이 형성되는 앵커커버체(220)로 되는 앵커체(200)와,An outer circumferential surface of the coupler 213 protruding upwardly is formed by forming an internal thread portion 212 for screwing into the male screw portion 110 of the nail 100 as an inner circumferential surface of the hole 211 bored to the center. Anchor body portion 210 having a male thread portion 214 and an inner circumferential surface are bent to the center and a female thread portion 222 is formed on the inner circumferential surface of the lower side of the through-hole 221 through which the packing 224 is interposed. An anchor body 200 to be an anchor cover body 220 is formed with a stepped 223 for 하단부가 상기 앵커커버체(220) 상면과 실링처리되며 상기 네일(100) 외주면을 커버하여 끼워지기 위한 제1관체(300)와, 상기 제1관체(300) 외측으로 이격되며 끼워지는 제2관체(400)로 구성되는 것을 특징으로 하는 회수가 용이한 해체 제거식 네일 장치.A lower end portion is sealed with the upper surface of the anchor cover body 220 and the first tube 300 to be fitted to cover the outer peripheral surface of the nail 100, and the second tube body is spaced apart and fitted outside the first tube body 300. Easy disassembly removal nail device, characterized in that consisting of (400). 제 1 항에 있어서,The method of claim 1, 상기 앵커몸체부(210) 외주면으로 등간격 이격되는 요홈(215)을 형성하는 것을 포함하는 회수가 용이한 해체 제거식 네일 장치.Easy disassembly-removable nail device comprising forming a groove 215 spaced at equal intervals to the outer peripheral surface of the anchor body (210). 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 앵커커버체(220) 상단으로 이중턱을 형성하기 위한 절곡부(226)를 갖는 것을 포함하는 회수가 용이한 해체 제거식 네일 장치.Easy disassembly removal nail device including a having a bent portion 226 for forming a double jaw to the top of the anchor cover body 220.
KR20-2002-0031733U 2002-10-24 2002-10-24 Dismemberment removal type nail composition KR200308379Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2002-0031733U KR200308379Y1 (en) 2002-10-24 2002-10-24 Dismemberment removal type nail composition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2002-0031733U KR200308379Y1 (en) 2002-10-24 2002-10-24 Dismemberment removal type nail composition

Publications (1)

Publication Number Publication Date
KR200308379Y1 true KR200308379Y1 (en) 2003-03-28

Family

ID=49403490

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2002-0031733U KR200308379Y1 (en) 2002-10-24 2002-10-24 Dismemberment removal type nail composition

Country Status (1)

Country Link
KR (1) KR200308379Y1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100690359B1 (en) 2004-09-17 2007-03-09 홍원국 Soil nail fixing device of exclusion spiral style wrinkles tube
KR100797818B1 (en) 2007-07-09 2008-02-01 (주)서림건설 Fixing device of removal rock-bolt
KR101134167B1 (en) 2011-06-30 2012-04-09 전영달 The nailing device
KR101280494B1 (en) * 2012-07-17 2013-07-01 이충호 Remove the nail
CN107304565A (en) * 2016-04-19 2017-10-31 郑州大学 A kind of recoverable soil nail bar construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100690359B1 (en) 2004-09-17 2007-03-09 홍원국 Soil nail fixing device of exclusion spiral style wrinkles tube
KR100797818B1 (en) 2007-07-09 2008-02-01 (주)서림건설 Fixing device of removal rock-bolt
KR101134167B1 (en) 2011-06-30 2012-04-09 전영달 The nailing device
KR101280494B1 (en) * 2012-07-17 2013-07-01 이충호 Remove the nail
CN107304565A (en) * 2016-04-19 2017-10-31 郑州大学 A kind of recoverable soil nail bar construction

Similar Documents

Publication Publication Date Title
KR100740200B1 (en) Tunnelling method using pre-support concept and an adjustable apparatus thereof
KR100964796B1 (en) Method for constructing the steel pipe-concrete composite pile structurized of burying and unifying into the bedrock, and a pile construction
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
KR100618597B1 (en) Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
KR100505329B1 (en) Tension nail method of construction
KR101510297B1 (en) A removable prestressing steel pipe soil nailing structure
KR101191289B1 (en) The method of a dual helical pile according to the subsidence for decreasing negative friction
KR100914158B1 (en) Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut
KR101141526B1 (en) Pressure Grouting Method
KR20140013497A (en) Method for constructing block type reinforced retaining wall in cut site
KR200308379Y1 (en) Dismemberment removal type nail composition
KR100799328B1 (en) Extractable nail structure and reinforce steel-bar extraction method using the same
JP5773755B2 (en) Pile foundation structure of exterior structure and construction method of pile foundation structure of exterior structure
KR101241351B1 (en) The nail with high anchorage and the nailing construction method thereof
KR100862387B1 (en) Tensional kit for top-down constructing of acupressure lasting anchor and top-down constructing method of acupressure lasting anchor using this
KR102113291B1 (en) Soil retaining wall using phc pile and construction method thererof
KR100795849B1 (en) Nature stone engineering method use self drilling nail
KR101260292B1 (en) Grouting device and tunnel reinforce method
KR100313721B1 (en) Method for designing synthetic underground retaining wall by temporary soil protection structure and working process of underground retaining wall of structure
JP2003286720A (en) Settlement inhibiting structure, method for constructing it and settlement inhibiting pile
KR101131764B1 (en) Extractable nail structure and reinforce steel-bar extraction method using the same
KR100266391B1 (en) Nail removal type nailling method in digging work
KR100951927B1 (en) Removable nail structure and reinforce steel-bar extraction method using the same
KR200263626Y1 (en) Sturcture NAIL for Constructing SOIL-NAIL
CN113356289B (en) Deep foundation pit brick chimney reinforcing method

Legal Events

Date Code Title Description
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee