KR20030068732A - A Set Establish Form Method for Upper Slab of Bridge - Google Patents

A Set Establish Form Method for Upper Slab of Bridge Download PDF

Info

Publication number
KR20030068732A
KR20030068732A KR1020020008329A KR20020008329A KR20030068732A KR 20030068732 A KR20030068732 A KR 20030068732A KR 1020020008329 A KR1020020008329 A KR 1020020008329A KR 20020008329 A KR20020008329 A KR 20020008329A KR 20030068732 A KR20030068732 A KR 20030068732A
Authority
KR
South Korea
Prior art keywords
formwork
bridge
upper slab
bolt
hanger
Prior art date
Application number
KR1020020008329A
Other languages
Korean (ko)
Inventor
김용기
Original Assignee
김용기
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김용기 filed Critical 김용기
Priority to KR1020020008329A priority Critical patent/KR20030068732A/en
Publication of KR20030068732A publication Critical patent/KR20030068732A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

PURPOSE: A structure of installing forms for the upper slab of a bridge is provided to shorten the term of work and the cost of construction, also to cut down on time, materials and manpower by the improved way of form installation. CONSTITUTION: The structure of installing forms for the upper slab of a bridge is composed of: the hanger(21) of a bracket(20) is hung on the stud bolt(101) of a steel box(100); fixing the vertical part or the supporting of the bracket to the end face of a main beam(12) by a bolt(50) and a nut(51), therefore the weight of the main beam makes the bracket naturally fixed; putting crossing timber beams(13) perpendicularly on the main beam at regular distances, and a screw-type height control unit(15) properly supports the crossing timber beams by adjusting the screw(15a) joined to a lock nut(15b), according to the height of an upper steel plate(11); putting an upper steel plate(11) on the crossing timber beam.

Description

교량용 상부 슬라브 거푸집 설치구조{A Set Establish Form Method for Upper Slab of Bridge}A Set Establish Form Method for Upper Slab of Bridge

본 발명은 교량의 상부 슬라브 구축에 관한 것으로서, 구체적으로는 교량의 상부 슬라브 콘크리트 타설을 위한 스틸박스 홀에 설치되는 거푸집의 설치 구조를 개선하여 자재 및 인력과 시간을 현저히 감축시킴과 아울러 시공비용과 공기를 획기적으로 단축토록 하며 안전시공을 기하도록 하는 교량용 상부 슬라브 거푸집 설치구조에 관한 것이다.The present invention relates to the construction of the upper slab of the bridge, specifically, to improve the installation structure of the formwork installed in the steel box hole for the concrete slab of the upper slab of the bridge to significantly reduce the material, manpower and time, and also the construction cost and The present invention relates to a structure for installing an upper slab formwork for a bridge that significantly shortens the air and ensures safety construction.

일반적으로 교량은 하천 또는 저지의 다른 교통로나 구축물 위를 건너갈 수있도록 건설되는 고가구조물이다.In general, bridges are high-rise structures that can be constructed to cross rivers or other lowway traffic or structures.

교량의 상부 구조물은 교각 상에 가장 상부에 설치되는 구조물로서, 상부 구조물 위에 아스콘이 포장되어 자동차가 주행할 수 있도록 하여 주는 일종의 지지물이다.The upper structure of the bridge is a structure that is installed at the top of the pier, a kind of support that allows the ascon is wrapped on the upper structure to enable the vehicle to drive.

교량의 상부 구조물 시공법에 있어서 다수의 교각 상에 일정한 규격의 스틸박스를 서로 연결시켜 정렬하고 이와 같이 서로 연결된 스틸박스의 상부에 콘크리트를 타설함으로써 상부 슬라브를 완성하는 스틸박스 공법이 널리 실시되고 있다.Steel box construction method for completing the upper slab by connecting the steel box of a certain standard on a plurality of bridges to align each other and aligning the steel box of the steel box connected to each other in this way in the construction of the upper structure of the bridge is widely practiced.

슬라브 콘크리트가 타설되는 스틸박스(100)는 도 1에 그 평면도가 도시된 바와 같이 상부 수평면 상에 사각 형상으로 규칙성을 가지고 배열된 다수개의 홀(102)이 형성되어 있는데 이러한 스틸박스(100)의 상부에 슬라브 콘크리트를 타설하기 위해서는 각각의 홀(102)에 대응되는 다수의 거푸집(10)이 설치되게 된다.Steel box 100 in which slab concrete is poured is formed with a plurality of holes 102 arranged regularly in a square shape on the upper horizontal plane as shown in the plan view in FIG. In order to pour the slab concrete on top of the plurality of formwork 10 corresponding to each hole 102 is installed.

이러한 스틸박스 공법에 사용되는 거푸집(10)은 상기 사각홀에 거푸집의 지지기반이 되기 위하여 소정 간격으로 배열되는 멍에빔(12)과 상기 멍에빔 상에 콘크리트 타설 바닥면이 되기 위한 상판(11)이 설치되되, 상기 상판(11)은 목재 합판으로 상면의 사각 평판(11a)과 상기 사각 평판(11a)의 각 변에 경사 형성되는 경사부(11b)와 상기 경사부의 가자장리를 형성하는 평탄 마감부(11c)로 구성되어 있다.Formwork 10 used in the steel box method is a yoke beam 12 is arranged at a predetermined interval in order to become a support base of the formwork in the square hole and the top plate 11 to be a concrete placing bottom surface on the yoke beam. Is installed, the top plate 11 is made of wood plywood flat finish to form the inclined portion (11b) and the edge of the inclined portion inclined on each side of the square plate (11a) and the square plate (11a) of the top surface It is comprised by the part 11c.

이러한 상판을 상기 멍에빔(12) 상에 그 높이를 맞추어 탑재하기 위해서 상기 멍에빔(12)과 상판(11) 사이에는 소정 간격으로 고임 각재(13)가 부여된다.In order to mount such a top plate on the yoke beam 12 at a height thereof, a stiffener material 13 is provided between the yoke beam 12 and the top plate 11 at predetermined intervals.

도 2는 스틸박스 공법에서의 콘크리트 거푸집 설치 구조를 보이는 일부 발췌 일측 단면도이며, 도 3은 도 2의 평면도이다.2 is a partial cross-sectional side view showing a concrete formwork installation structure in the steel box method, Figure 3 is a plan view of FIG.

도 2 및 도 3에 도시된 바와 같이, 종래 기술에 따른 스틸박스 공법에서의 거푸집(10)의 설치는 스틸박스(100)에 고정된 지지판(210)에 너트(220)를 용접 고정하고, 상기 너트(220)에 체결되는 볼트(230)에 ㄷ채널(240)을 개구부가 대향되도록 고정 설치하여 이 대향하는 ㄷ채널(240) 사이에 상기 거푸집의 기반이 되는 멍에빔(12)이 설치되며, 상기 멍에빔(12)의 상부에 고임 각재(13)가 전후방향으로 걸쳐 설치되고 그 위에 콘크리트의 바닥면이 되는 상판(11)을 위치시키는 것이다.As shown in Figures 2 and 3, the installation of the formwork 10 in the steel box method according to the prior art welding and fixing the nut 220 to the support plate 210 fixed to the steel box 100, The yoke beam 12 serving as the base of the formwork is installed between the opposing c-channels 240 by fixing the c-channel 240 so that the opening is opposed to the bolt 230 fastened to the nut 220. In the upper part of the yoke beam 12, the stiffeners 13 are installed in the front and rear directions, and the upper plate 11 serving as the bottom surface of the concrete is positioned thereon.

이렇게 설치된 거푸집(10)은 콘크리트 타설, 양생 후 상기 볼트(230)를 풀어내고 상기 멍에빔(12), 각재(13) 및 상판(11)을 해체하게 된다.The formwork 10 installed in this way releases the bolts 230 after concrete pouring and curing, and dismantles the yoke beam 12, the lumber 13 and the upper plate 11.

그러나 이와 같이 너트(220) 및 볼트(230)를 이용한 거푸집의 설치구조는 지지판(210)에 너트(220)를 일일히 용접(250) 고정해야 함으로써 인력과 시간이 막대하게 소요되고, 별도의 ㄷ채널이 요구되며, ㄷ채널(240)의 설치 높낮이 위치가 볼트(230)의 체결 상태에 따라 좌우됨으로 결국 거푸집이 설치되는 높낮이 정밀도가 떨어지며, 고소에서 ㄷ채널의 좁은 하부공(241)을 통한 볼트 체결은 작업성이 저하되어 많은 인력이 소요되고 시간이 많이 소요되는 문제점이 있었다.However, as described above, the installation structure of the formwork using the nut 220 and the bolt 230 requires a large amount of manpower and time because the nut 220 is fixed to the support plate 210 by welding 250. The channel is required, because the height of the height of the installation of the channel 240 is dependent on the fastening state of the bolt 230, the height of the formwork is finally lowered, the bolt through the narrow lower hole 241 of the channel at height Fastening has a problem that the workability is degraded, which requires a lot of manpower and time.

한편, 거푸집의 해체시에는 고소에서 상기 ㄷ채널(240)에 형성된 하부공(241)을 통하여 볼트(230)를 일일히 풀어주어야 하는데 그 위치상 작업자세가 불안정하고 위험이 따라 안전사고가 발생되며, 작업성이 떨어져 인력과 시간이 막대하게 소요되는 문제점이 있었다.Meanwhile, when dismantling the formwork, the bolt 230 must be loosened through the lower hole 241 formed in the c-channel 240 at a height. However, there was a problem in that workability was excessively consumed due to poor workability.

또한 상기 거푸집의 고임 각재(13)는 목재로서 상판의 높낮이를 맞추기 위하여 여러개를 쌓아 조정하고 못을 박아 고정함으로써 높낮이 정확도가 떨어져 시공품질이 저하되고, 못질이 되어 있어서 거푸집이 해체되면 손상을 입게 됨으로 재사용이 되지 못하는 문제점이 있었다.In addition, the sill lumber 13 of the formwork by stacking and adjusting several pieces to adjust the height of the top plate as a timber and fixed by nailing the height of the lowering of the construction quality is lowered, the nails are damaged to be damaged when the formwork is dismantled There was a problem that can not be reused.

거푸집 해체 후에는 상기 볼트(230)자리 구멍을 콘크리트로 다시 메워 주는 후속 공정이 따라야 하며, 메운 뒤에도 그 자리가 드러나 보여 외관상 미려함이 떨어지게 한다.After dismantling the form, the subsequent process of refilling the bolt 230 seat hole with concrete should be followed, and the seat is exposed after being filled to make the appearance beautiful.

이와 같이, 종래 기술에 따른 거푸집의 설치구조는 너트(220) 용접 공정, ㄷ채널(240)을 볼트(230)를 이용하여 고소에서 체결하는 공정, 해체시의 볼트(230) 풀어내기 공정 등 수반되는 많은 공정들이 각각 인력과 시간, 자재를 낭비하고, 아울러 막대한 시공비용의 낭비 및 공기 지연을 초래하며, 시공 정밀도 및 미관도 떨어지는 문제점이 있었다.As such, the installation structure of the formwork according to the prior art is accompanied by a process of welding the nut 220, the process of fastening the c-channel 240 at the height using the bolt 230, the process of unpacking the bolt 230 at the time of dismantling Many of the processes are waste of manpower, time and materials, respectively, waste a lot of construction costs and air delays, and the construction precision and aesthetics are also poor.

본 발명은 상기한 문제점을 해소하기 위하여 안출된 것으로서,The present invention has been made to solve the above problems,

본 발명의 목적은 스틸박스의 스터드볼트에 걸어져 고정되는 간단한 구조의 걸개를 채용하여 종래 기술에서의 문제점이었던 너트와 이에 체결되는 볼트 및 ㄷ채널 설치에 따랐던 용접작업 등 인력과 시간이 낭비되는 과정이 배제되어 간단히 거푸집이 설치되도록 하고, 상판의 높낮이 조정도 용이토록 함으로써,An object of the present invention is a process that wastes manpower and time by adopting a simple hanger fixed to the stud bolt of the steel box and the welding work according to the nut and bolts and c-channel installation that were problems in the prior art By eliminating this, simply formwork is installed, and also to facilitate the height adjustment of the top plate,

인력과 시간, 자재를 획기적으로 감축하게 하고 이에 따른 대폭적인 시공비 용의 절감, 공기의 단축, 안전시공, 정밀도 향상 및 외관도 미려하도록 하는 교량용 상부 슬라브 거푸집 설치구조를 제공함에 있다.It is to provide an upper slab formwork for bridges that can drastically reduce manpower, time, and materials, thereby significantly reducing construction costs, shortening air, safety construction, improving precision, and beautiful appearance.

도 1은 스틸박스의 평면 구성도.1 is a plan view of a steel box.

도 2는 종래 기술의 거푸집 설치구조를 보이는 일부 발췌 일측 단면도.Figure 2 is a partial cross-sectional side view showing a formwork installation structure of the prior art.

도 3은 도 2의 평면도.3 is a plan view of FIG.

도 4는 본 발명에 따른 일 실시예의 구성을 보이는 일부 발췌 일측 단면도.Figure 4 is a partial cross-sectional side view showing the configuration of an embodiment according to the present invention.

도 5는 도 4의 평면도.5 is a plan view of FIG. 4.

도 6은 본 발명에 따른 일 실시예의 걸개 브라켓의 구성을 보이는 사시도.Figure 6 is a perspective view showing the configuration of the hanging bracket of an embodiment according to the present invention.

도 7은 본 발명에 따른 다른 일 실시예의 구성을 보이는 일측 단면도.Figure 7 is a side cross-sectional view showing the configuration of another embodiment according to the present invention.

도 8은 도 7에 적용된 걸개 브라켓의 구성을 보이는 사시도.8 is a perspective view showing the configuration of the hanging bracket applied to FIG.

도 9는 본 발명에 따른 다른 실시예의 구성도.9 is a block diagram of another embodiment according to the present invention.

*도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

10: 거푸집 11: 상판10: Die 11: Tops

12: 멍에빔 12a: 마구리12: yoke beam 12a: copper

12b: 볼트공 12c: 스크류공12b: bolt hole 12c: screw hole

13: 고임 각재 15: 스크류식 높낮이 조절수단13: boiled lumber 15: screw type height adjusting means

15a: 스크류 15b: 로크너트15a: screw 15b: lock nut

15c: 탑재부 20: 걸개 브라켓15c: mounting portion 20: hanging bracket

21: 행거부 22: 수직부21: hanger part 22: vertical part part

23: 받침부 24: 볼트공23: base 24: bolt hole

25: 절단부 50: 볼트25: cut 50: bolt

51: 너트 100: 스틸박스51: nut 100: steel box

101: 스터드 볼트 210: 지지판101: stud bolt 210: support plate

220: 너트 230: 볼트220: nut 230: bolt

240: ㄷ채널 241: 하부공240: channel 241: lower hole

250: 용접부250: weld

상기한 목적을 달성하는 본 발명에 따른 교량용 상부 슬라브 거푸집 설치구조는,Bridge top slab formwork installation structure according to the present invention for achieving the above object,

스틸박스 공법으로 시공되는 교량의 상부 슬라브 시공을 위하여 거푸집의 기반인 멍에빔 상에 상판을 받혀주기 위한 고임 각재가 설치되고 상기 고임 각재의 상부에 콘크리트 바닥면이 되기 위한 상판이 설치되어 이루어지는 거푸집을 스틸박스의 홀에 설치함에 있어서,For the construction of the upper slab of the bridge that is constructed by the steel box method, the slab is installed to support the top plate on the yoke beam, the base of the formwork, and the top plate is installed on the top of the slab to be the concrete floor surface. In installing in the hole of the steel box,

스틸박스에 고정되는 스터드볼트에 걸어지기 위한 행거부와 거푸집 상판의 지지기반인 멍에빔을 고정하기 위한 빔고정부를 구비하는 걸개 브라켓을 채용하여,By adopting a hanger bracket with a hanger for hanging on the stud bolt fixed to the steel box and a beam fixing part for fixing the yoke beam that is the support base of the formwork top plate,

상기 걸개 브라켓에 의하여 상기 멍에빔이 지지되고 거푸집이 설치되도록 함을 특징으로 한다.The yoke beam is supported by the hanging bracket and the formwork is installed.

본 발명의 일 실시예로서,In one embodiment of the present invention,

상기 걸개 브라켓의 빔고정부는 상기 행거부의 일측 하방으로 구비되는 수직부에 다수의 볼트공을 형성하여 이루어지고,Beam fixing part of the hanging bracket is made by forming a plurality of bolt holes in the vertical portion provided on one side of the hanger,

상기 멍에빔의 단부에 볼트공이 형성된 마구리를 부여하여 상기 걸개 브라켓의 빔고정부에 볼트 체결됨을 특징으로 한다.The yoke beam is provided with a bolt hole formed at the end of the yoke beam, characterized in that the bolt is fastened to the beam fixing portion of the hanging bracket.

본 발명의 일 실시예로서,In one embodiment of the present invention,

상기 걸개 브라켓의 빔고정부는 행거부의 일측 하방으로 형성되는 수직부와 상기 수직부에 직각 방향으로 구비되는 받침부에 볼트공이 형성되어 이루어지고,Beam fixing part of the hanging bracket is made of a bolt hole is formed in the vertical portion formed in one side of the hanger portion and the support portion provided in a perpendicular direction to the vertical portion,

상기 멍에빔의 단부에 볼트공을 형성하여 상기 걸개 브라켓의 빔고정부에 볼트 체결됨을 특징으로 한다.Forming a bolt hole at the end of the yoke beam is characterized in that the bolt is fastened to the beam fixing part of the hanging bracket.

본 발명의 일 실시예로서,In one embodiment of the present invention,

상기 걸개에는 가격 절단부를 부여하여 상기 걸개를 가격함으로 거푸집이 낙하되는 구조로 이루어짐을 특징으로 한다.The hanger is characterized in that it is made of a structure in which the formwork is dropped by hitting the hanger by giving a price cut.

본 발명의 일 실시예로서,In one embodiment of the present invention,

상기 고임 각재에는 그 높낮이 조절을 위하여,In order to adjust the height of the lumber,

상기 멍에빔에 스크류공을 관통 형성하고 상기 스크류공 상에 록크너트를 고정하며,Forming a screw hole through the yoke beam and fixing the lock nut on the screw hole;

상기 로크너트에 체결되는 스크류와 상기 스크류 상에 부여되는 고임 각재 탑재부를 포함하는 스크류식 높낮이 조절수단이 구비됨을 특징으로 한다.Screw type height adjustment means comprising a screw fastened to the lock nut and a ridge angle mounting portion provided on the screw is provided.

본 발명의 일 실시예로서,In one embodiment of the present invention,

상기 걸개 브라켓에는 ㄷ채널을 대향하여 고정하고, 상기 ㄷ채널 사이에 멍에빔이 설치 고정될 수도 있다.The hanging bracket may be fixed to the channel opposite to each other, and a yoke beam may be installed and fixed between the channels.

이하, 본 발명의 교량용 상부 슬라브 거푸집 설치구조에 대한 바람직한 실시예를 첨부도면을 참조하여 보다 상세히 설명한다.Hereinafter, a preferred embodiment of the upper slab formwork installation structure for bridges of the present invention will be described in more detail with reference to the accompanying drawings.

도 4는 본 발명에 따른 교량용 상부 슬라브 거푸집(10) 설치구조를 보이는 일부 발췌 일측 단면 구성도이며, 도 5는 도 4의 평면도, 도 6은 본 발명에 따른 일 실시예의 걸개 브라켓(20)의 사시도이다.4 is a partial cross-sectional side view showing a part of the upper slab formwork 10 installation structure for the bridge according to the present invention, Figure 5 is a plan view of Figure 4, Figure 6 is a hook bracket 20 of an embodiment according to the present invention Perspective view.

도 4 내지 도 6에 도시된 바와 같이, 본 발명에 따른 바람직한 실시예의 교량용 상부 슬라브 거푸집(10) 설치구조는,As shown in Figures 4 to 6, the installation structure of the upper slab formwork 10 for the bridge of the preferred embodiment according to the present invention,

스틸박스 공법으로 시공되는 교량의 상부 슬라브 시공을 위하여 거푸집의 기반인 멍에빔(12) 상에 상판(11)을 받혀주기 위한 고임 각재(13)가 설치되고 상기 고임 각재(13)의 상부에 콘크리트 바닥면이 되기 위한 상판(11)이 설치되어 이루어지는 거푸집(10)을 스틸박스(100)의 홀에 설치함에 있어서,For the construction of the upper slab of the bridge that is constructed by the steel box method for the construction of the top plate 11 on the yoke beam 12, which is the base of the formwork, the stiffeners 13 are installed and concrete on the top of the stiffeners 13 In installing the formwork 10 formed by the top plate 11 to be the bottom surface in the hole of the steel box 100,

스틸박스(100)에 고정되는 스터드볼트(101)에 걸어지기 위한 행거부(21)와 거푸집 상판의 지지기반인 멍에빔(12)을 고정하기 위한 빔고정부를 구비하는 걸개 브라켓(20)을 채용하여,A hanger bracket (20) having a beam fixing part for fixing a hanger part (21) to be hooked on the stud bolt (101) fixed to the steel box (100) and a yoke beam (12) which is a support base of the formwork top plate is adopted. So,

상기 걸개 브라켓(20)에 의하여 상기 멍에빔(12)이 지지되고 거푸집(10)이 설치되도록 하는 것이다.The yoke beam 12 is supported by the hanging bracket 20 and the formwork 10 is installed.

본 발명의 일 실시예로서,In one embodiment of the present invention,

상기 걸개 브라켓(20)의 빔고정부는 상기 행거부(21)의 일측 하방으로 구비되는 수직부(22)에 다수의 볼트공(24)을 형성하여 이루어지고,Beam fixing part of the hanging bracket 20 is formed by forming a plurality of bolt holes 24 in the vertical portion 22 provided below one side of the hanger 21,

상기 멍에빔(12)의 단부에 볼트공(12b)이 형성된 마구리(12a)를 부여하여 상기 걸개 브라켓의 빔고정부인 수직부(22)에 볼트(50) 체결됨이 바람직하다.It is preferable that the bolt 50 is fastened to the vertical portion 22, which is the beam fixing part of the hanging bracket, by providing a flange 12a having a bolt hole 12b formed at an end of the yoke beam 12.

본 발명의 일 실시예에 따른 상기 걸개(20)는 철편을 이용하여 행거부(21)는 입구가 터진 형태로 스틸박스(100)의 스터드볼트(101)에 걸어지게 형성되며, 상기 행거부(21) 일측에 수직 하향으로 소정 길이로 형성되는 수직부(22)를 형성하고, 상기 수직부(22)의 소정 위치에는 가격 절단부(25)를 부여하여 그 하방을 가격함으로써 거푸집(10)이 낙하되는 구조로 이루어진다.The hanger 20 according to the embodiment of the present invention is formed to hang on the stud bolt 101 of the steel box 100 in the form of the hanger portion 21 is an inlet is exploded, the hanger ( 21) forming a vertical portion 22 formed in a predetermined length vertically downward on one side, and the price cut portion 25 is provided at a predetermined position of the vertical portion 22 to hit the lower portion of the die 10 falls It is made of a structure.

상기 절단부(25)는 콘크리트 타설 바닥면과 수평위치가 되도록 구성됨이 바람직하다.The cutting portion 25 is preferably configured to be in a horizontal position with the concrete placing bottom surface.

도 7은 본 발명에 따른 다른 일 실시예의 거푸집 설치 구조를 보이는 일측 단면도이며, 도 8은 도 7에 적용된 걸개 브라켓의 사시도이다.7 is a side cross-sectional view showing a formwork installation structure of another embodiment according to the present invention, Figure 8 is a perspective view of the hanging bracket applied to FIG.

본 발명의 일 실시예로서, 도 7 및 도 8에 도시된 바와 같이As an embodiment of the present invention, as shown in Figures 7 and 8

상기 걸개 브라켓(20)의 빔고정부는 행거부(21)의 일측 하방으로 형성되는 수직부(22)와 상기 수직부(22)에 직각 방향으로 구비되는 받침부(23)에 볼트공(24)이 형성되어 이루어지고,The beam fixing part of the hanging bracket 20 is bolted to the vertical part 22 formed at one side of the hanger part 21 and the support part 23 provided at right angles to the vertical part 22. Is formed and made,

상기 멍에빔(12)은 단부에 볼트공(24)을 형성하여 상기 걸개 브라켓의 빔고정부인 받침부(23)에 볼트(50) 체결될 수도 있다.The yoke beam 12 may be fastened to the bolt 50 by forming a bolt hole 24 at an end thereof to the support 23 of the beam fixing part of the hanging bracket.

미설명 부호(26)은 강도보강을 위한 엠보싱 리브이다.Reference numeral 26 is an embossing rib for strength reinforcement.

본 발명의 일 실시예로서,In one embodiment of the present invention,

상기 고임 각재(13)에는 그 높낮이 조절을 위하여 상기 멍에빔(12)에 스크류공(12c)을 관통 형성하고 상기 스크류공(12c) 상에 록크너트(15b)를 용접 고정하며, 상기 로크너트(15b)에 체결되는 스크류(15a)와 상기 스크류(15a) 상에 부여되는 각재 탑재부(15c)를 포함하는 스크류식 높낮이 조절수단(15)이 구비되었다.The yoke beam member 13 has a screw hole 12c formed in the yoke beam 12 to adjust its height. The lock nut 15b is welded and fixed on the screw hole 12c. Screw-type height adjusting means 15 including a screw 15a fastened to 15b) and a shell material mounting portion 15c provided on the screw 15a is provided.

상기 스크류(15a)에는 돌리개 손잡이가 부여되어도 무방하다.The screw 15a may be provided with a twirl handle.

본 발명의 일 실시예로서, 도 9에 도시된 바와 같이, 상기 걸개(20)에는 ㄷ채널(60)이 대향하여 고정되고 상기 ㄷ채널(60)에 좌우방향빔이 걸쳐 고정되어도 무방하다.As an embodiment of the present invention, as shown in FIG. 9, the d channel 60 may be fixed to the hanging 20 so that the left and right beams may be fixed to the d channel 60.

상기한 본 발명에 따른 교량용 상부 슬라브 거푸집 설치구조의 작용상태를 살펴 본다.Look at the working state of the upper slab formwork installation structure for bridges according to the present invention.

교량의 상부 슬라브 시공을 위하여 스틸박스(100)에 거푸집(10)을 설치함에 있어서, 본 발명은 거푸집(10)의 기반이 되는 멍에빔(12)을 스틸박스(100)에 고정설치하기 위한 걸개 브라켓(20)을 채용하여 간단히 시공되도록 하는 것이다.In installing the formwork 10 in the steel box 100 for the upper slab construction of the bridge, the present invention is a hook for fixing the yoke beam 12 that is the base of the formwork 10 to the steel box 100 The bracket 20 is to be simply installed.

걸개 브라켓(20)의 행거부(21)를 스틸박스(100)의 스터드볼트(101)에 걸어 내린 상태에서 빔고정부인 수직부(22) 또는 받침부(23)에 직접 상기 멍에빔(12)의 마구리(12a) 또는 단부를 볼트(50)와 너트(51)를 이용 체결하면 상기 멍에빔(12)의 하중으로 인하여 상기 걸개 브라켓(20)은 자연스럽게 고정이 이루어진다.The yoke beam 12 is directly attached to the vertical part 22 or the support 23 of the beam fixing part while the hanger part 21 of the hanging bracket 20 hangs on the stud bolt 101 of the steel box 100. The fastener 12a or the end of the bolt 50 and the nut 51 are fastened using the yoke beam 12 due to the load of the hanging bracket 20 is naturally fixed.

상기 멍에빔(12)이 걸개 브라켓(20)에 고정되면 그 위에 소정 간격으로 고임각재(13)가 배열 설치된다.When the yoke beam 12 is fixed to the hanging bracket 20, the stump material 13 is arranged at a predetermined interval thereon.

이 때, 상기 스크류식 높낮이 조절수단(15)은 멍에빔(12)에 용접 고정된 로크너트(15b)에 체결된 스크류(15a)를 상승 또는 하강 조정하여 줌으로 상대적으로 높낮이가 높은 상판(11)의 중앙 사각부(11a)를 용이하게 단일 각재를 이용하여 고여주게 된다.At this time, the screw height adjustment means 15 by adjusting the lifting or lowering the screw (15a) fastened to the lock nut (15b) fixed to the yoke beam 12, the upper plate 11 having a relatively high height The center square part 11a of) is easily collected using a single square material.

이렇게 상기 멍에빔(12) 위에 고임 각재(13)가 설치된 후 콘크리트 타설 바닥면이 되는 상판(11)을 위치시켜 거푸집(10)의 설치가 이루어진다.Thus, the yoke beam 12 is installed on the yoke beam 12, and then the top plate 11, which becomes the bottom surface of the concrete, is placed to install the formwork 10.

즉, 본 발명에 따른 교량용 상부 슬라브 스틸박스 거푸집 설치구조에서는 상기 걸개 브라켓(20)을 스틸박스의 스터드볼트(101)에 걸어주기만 하고, 빔고정부와 상기 멍에빔(12)에 형성된 볼트공(24)에 볼트(50)를 체결하는 간단한 작업으로 거푸집의 설치 고정이 이루어지는 것이다.That is, in the upper slab steel box formwork installation structure for bridges according to the present invention, only the hook bracket 20 is hooked to the stud bolt 101 of the steel box, and the bolt hole formed in the beam fixing part and the yoke beam 12 ( Installation of the formwork is made by a simple operation of fastening the bolt 50 to 24).

또한, 콘크리트 타설, 양생 후 거푸집의 해체시에는 상기 걸개의 절단부(25)이하 부분을 가격해 주면 절단부(25)가 파단되어 상기 빔고정부(22)(23)에 체결된 멍에빔(12)과 여기에 지지되었던 고임 각재(13) 및 상판(13)이 함께 낙하된다.In addition, during the disassembly of the formwork after concrete pouring and curing, the cutting part 25 is broken when the cutting part 25 is hitted below the yoke beam 12 fastened to the beam fixing parts 22 and 23, and The ridged beam member 13 and the upper plate 13 which were supported here fall together.

이렇게 한꺼번에 낙하된 거푸집(10)에서 걸개 브라켓(20)에서 파단되어 나간 절단부(25) 이하 부분을 체결볼트(50)를 풀어내고 거푸집을 각각의 부재로 해체하여 재사용하게 되는데 이러한 해체작업이 안전한 평지에서 이루어짐으로 안전성과 작업성을 향상시키게 된다.In this way, the mold 10 which is dropped at the same time from the hanger bracket 20 breaks out of the cutting section 25, which is broken out of the fastening bolt 50, and the formwork is dismantled to each member and reused. By improving the safety and workability.

아울러 걸개의 절단부(25) 위치가 콘크리트 바닥면 상에 수평을 이루도록 함으로써 슬라브 하방에는 걸개 브라켓(20)으로 인한 요철이 발생되지 않으며 외관상으로도 미려함을 잃지 않게 된다.In addition, the cutting unit 25 position of the hook is made to be horizontal on the concrete floor so that the unevenness caused by the hook bracket 20 does not occur below the slab and does not lose its beauty in appearance.

한편, 상기 고임 각재(13)는 종래 기술에서와 같이 여러개 쌓지 않고, 스크류 높낮이 조절수단을 이용하여 단일 부재로 고여지므로 자재가 절감되고 높낮이 정확성이 향상되며, 해체시에도 각재의 손상이 방지되어 재사용이 가능하게 된다.On the other hand, the ridged timber 13 is not piled up as in the prior art, but is raised as a single member by using the screw height adjustment means, the material is saved, the height and accuracy is improved, and even when dismantled is prevented damage It can be reused.

이와 같은 본 발명은 종래 기술에서 수반되었던 지지판에의 너트 용접고정, 별도 구비되는 ㄷ채널, 볼트 체결을 통한 ㄷ채널 설치, 고소에 위치한 볼트를 ㄷ채널의 좁은 통공을 통하여 풀어내는 어려운 해체작업 등 막대한 인력과 시간, 자재의 낭비를 야기하는 과정들이 배제됨으로써 획기적으로 시공비용을 절감하고 공기를 단축하며 자재를 절감하고 안전시공이 이루어지게 하며, 시공품질을 향상시키고 고임 각재의 재활용을 가능하게 한다.The present invention is enormous in the nut welding fixing to the support plate, which is provided in the prior art, the separate channel is provided, the installation of the channel through the fastening bolts, difficult dismantling work to release the bolt located in the height through the narrow hole of the channel By eliminating manpower, time, and waste of materials, it dramatically reduces construction costs, shortens air, saves materials, ensures safe construction, improves construction quality, and enables recycling of slag materials.

본 발명은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어 본 발명의 기술적 사상을 벗어나지 않는 범위내에서 여러 가지 치환, 변형 및 변경이 가능하므로, 전술한 실시예 및 도면에 한정되는 것은 아니다.As those skilled in the art to which the present invention pertains, various permutations, modifications, and changes can be made without departing from the spirit and scope of the present invention. no.

이상에서 상세히 살펴 본 바와 같이, 본 발명에 따른 교량용 상부 슬라브 거푸집 설치구조는,As described in detail above, the upper slab formwork installation structure for bridges according to the present invention,

스틸박스의 스터드볼트에 걸어주는 것으로 고정이 이루어지고 ㄷ채널 개재 없이, 멍에빔을 직접 고정하는 걸개 브라켓을 채용함으로써,It is fixed by hanging on the stud bolt of the steel box, and by adopting the hanging bracket to fix the yoke beam directly without the opening of the channel,

거푸집을 획기적으로 간편하게 설치토록 하고 해체작업도 능률적으로 수행되도록 함으로써 종래 기술에 비하여 자재와 인력을 대폭 절감하고 이에 따라 막대한 공비를 절감시키며, 공기를 단축토록 하고, 안전시공을 수행토록 하는 한편,By greatly simplifying the installation of the formwork and performing the dismantling operation efficiently, the material and manpower are greatly reduced compared to the prior art, thereby reducing enormous cost, shortening the air, and safe construction.

고임 각재의 높낮이 조정이 용이토록하여 시공 품질을 향상시키고 자재의 재활용도 가능토록 하는 매우 획기적인 기술이다.It is a very innovative technology that makes it easy to adjust the height of the raised slab to improve the construction quality and to recycle the materials.

Claims (6)

스틸박스 공법으로 시공되는 교량의 상부 슬라브 시공을 위하여 거푸집의 기반인 멍에빔 상에 상판을 받혀주기 위한 고임 각재가 설치되고 상기 고임 각재의 상부에 콘크리트 바닥면이 되기 위한 상판이 설치되어 이루어지는 거푸집을 스틸박스의 홀에 설치함에 있어서,For the construction of the upper slab of the bridge that is constructed by the steel box method, the slab is installed to support the top plate on the yoke beam, the base of the formwork, and the top plate is installed on the top of the slab to be the concrete floor surface. In installing in the hole of the steel box, 스틸박스에 고정되는 스터드볼트에 걸어지기 위한 행거부와 거푸집 상판의 지지기반인 멍에빔을 고정하기 위한 빔고정부를 구비하는 걸개 브라켓을 채용하여,By adopting a hanger bracket with a hanger for hanging on the stud bolt fixed to the steel box and a beam fixing part for fixing the yoke beam that is the support base of the formwork top plate, 상기 걸개 브라켓에 의하여 상기 멍에빔이 지지되고 거푸집이 설치되도록 함을 특징으로 하는 교량용 상부 슬라브 거푸집 설치구조.The yoke beam is supported by the hanging bracket and the upper slab formwork installation structure for the bridge, characterized in that the formwork is installed. 제 1항에 있어서,The method of claim 1, 상기 걸개 브라켓의 빔고정부는 상기 행거부의 일측 하방으로 구비되는 수직부에 다수의 볼트공을 형성하여 이루어지고,Beam fixing part of the hanging bracket is made by forming a plurality of bolt holes in the vertical portion provided on one side of the hanger, 상기 멍에빔의 단부에 볼트공이 형성된 마구리를 부여하여 상기 걸개 브라켓의 빔고정부에 볼트 체결됨을 특징으로 하는 교량용 상부 슬라브 거푸집 설치구조.The upper slab formwork for the bridge, characterized in that the bolt is formed on the end of the yoke beam bolted to the beam fixing portion of the hanging bracket. 제 1항에 있어서,The method of claim 1, 상기 걸개 브라켓의 빔고정부는 행거부의 일측 하방으로 형성되는 수직부와 상기 수직부에 직각 방향으로 구비되는 받침부에 볼트공이 형성되어 이루어지고,Beam fixing part of the hanging bracket is made of a bolt hole is formed in the vertical portion formed in one side of the hanger portion and the support portion provided in a perpendicular direction to the vertical portion, 상기 멍에빔의 단부에 볼트공을 형성하여 상기 걸개 브라켓의 빔고정부에 볼트 체결됨을 특징으로 하는 교량용 상부 슬라브 거푸집 설치구조.The upper slab formwork for the bridge, characterized in that the bolt hole is formed at the end of the yoke beam bolted to the beam fixing part of the hanging bracket. 제 1항에 있어서,The method of claim 1, 상기 걸개에는 가격 절단부를 부여하여 상기 걸개를 가격함으로 거푸집이 낙하되는 구조로 이루어짐을 특징으로 하는 교량용 상부 슬라브 거푸집 설치구조.The upper slab formwork installation structure for the bridge, characterized in that the form is made by dropping the formwork by giving a price cut portion to the hanger. 제 1항에 있어서,The method of claim 1, 상기 고임 각재에는 그 높낮이 조절을 위하여,In order to adjust the height of the lumber, 상기 멍에빔에 스크류공을 관통 형성하고 상기 스크류공 상에 록크너트를 고정하며,Forming a screw hole through the yoke beam and fixing the lock nut on the screw hole; 상기 로크너트에 체결되는 스크류와 상기 스크류 상에 부여되는 고임 각재 탑재부를 포함하는 스크류식 높낮이 조절수단이 구비됨을 이 특징으로 하는 교량용 상부 슬라브 거푸집 설치구조.The upper slab formwork for the bridge, characterized in that the screw-type height adjustment means including a screw fastened to the lock nut and a ridge angle mounting portion provided on the screw. 제 1항에 있어서,The method of claim 1, 상기 걸개 브라켓에는 ㄷ채널을 대향하여 고정하고, 상기 ㄷ채널 사이에 멍에빔이 설치 고정됨을 특징으로 하는 교량용 상부 슬라브 거푸집 설치구조.The hook bracket is fixed to the channel opposite to, and the upper slab formwork installation structure for the bridge, characterized in that the yoke beam is installed and fixed between the c channel.
KR1020020008329A 2002-02-16 2002-02-16 A Set Establish Form Method for Upper Slab of Bridge KR20030068732A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020020008329A KR20030068732A (en) 2002-02-16 2002-02-16 A Set Establish Form Method for Upper Slab of Bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020020008329A KR20030068732A (en) 2002-02-16 2002-02-16 A Set Establish Form Method for Upper Slab of Bridge

Publications (1)

Publication Number Publication Date
KR20030068732A true KR20030068732A (en) 2003-08-25

Family

ID=32221576

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020020008329A KR20030068732A (en) 2002-02-16 2002-02-16 A Set Establish Form Method for Upper Slab of Bridge

Country Status (1)

Country Link
KR (1) KR20030068732A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100755188B1 (en) * 2007-04-13 2007-09-03 김창수 Bracket for form
CN103088751A (en) * 2012-11-08 2013-05-08 北京工业大学 Replaceable limiting and locking damping energy consumption device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990022194U (en) * 1999-03-15 1999-06-25 김남식 A Clamp for Construction
KR200226626Y1 (en) * 2000-12-26 2001-06-15 주식회사제일설치 Bracket for Supporting Flooring Slab Form of Bridge
KR200226627Y1 (en) * 2000-12-26 2001-06-15 주식회사제일설치 Sleeper for Flooring Slab Form of Bridge
KR20010106901A (en) * 2000-05-24 2001-12-07 김남식 support clamp structure for upper board
KR200275849Y1 (en) * 2002-02-16 2002-05-17 김용기 A Apparatus for Set Establish Form for Upper Slab of Bridge
KR200276908Y1 (en) * 2002-02-16 2002-05-27 김용기 A Apparatus for Set Establish Form for Upper Slab of Bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990022194U (en) * 1999-03-15 1999-06-25 김남식 A Clamp for Construction
KR20010106901A (en) * 2000-05-24 2001-12-07 김남식 support clamp structure for upper board
KR200226626Y1 (en) * 2000-12-26 2001-06-15 주식회사제일설치 Bracket for Supporting Flooring Slab Form of Bridge
KR200226627Y1 (en) * 2000-12-26 2001-06-15 주식회사제일설치 Sleeper for Flooring Slab Form of Bridge
KR200275849Y1 (en) * 2002-02-16 2002-05-17 김용기 A Apparatus for Set Establish Form for Upper Slab of Bridge
KR200276908Y1 (en) * 2002-02-16 2002-05-27 김용기 A Apparatus for Set Establish Form for Upper Slab of Bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100755188B1 (en) * 2007-04-13 2007-09-03 김창수 Bracket for form
CN103088751A (en) * 2012-11-08 2013-05-08 北京工业大学 Replaceable limiting and locking damping energy consumption device
CN103088751B (en) * 2012-11-08 2015-06-17 北京工业大学 Replaceable limiting and locking damping energy consumption device

Similar Documents

Publication Publication Date Title
CN109707173B (en) Construction method of assembly type laminated beam plate installation auxiliary device
EP2261430B1 (en) Constructing an overhang
KR20180045140A (en) The structure of non-binding dismantling formwork beams and deck plates without the need to secure jobs
JP2994222B2 (en) Construction method of cast-in-place slab of precast concrete girder and its formwork
KR100310619B1 (en) Cast support structure of top plate of reinforced concrete building
JP2004183232A (en) Reinforcing method and reinforcement structure of steel structural material of construction structure
KR20030068732A (en) A Set Establish Form Method for Upper Slab of Bridge
CN209397515U (en) Deck form support device and cantilever bridge floor auxiliary device
KR200276908Y1 (en) A Apparatus for Set Establish Form for Upper Slab of Bridge
JPH05287901A (en) Construction of stairs
CN214006651U (en) Elevation control support or height-span formwork support for PC (polycarbonate) component
KR200298117Y1 (en) framable set mold for construction
KR200275849Y1 (en) A Apparatus for Set Establish Form for Upper Slab of Bridge
KR200222611Y1 (en) Steel form for slab concrete applicable to P.C. beam or Steel Box methods
KR200405229Y1 (en) Clamp for fixing an angle pipe for supporting a panel for a concrete slab foundation
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
KR20090095736A (en) Apparatus for removing and coupling forms
KR20020053795A (en) A mold supporting device of slab
KR100715695B1 (en) Slab formwork for PC beam bridge
KR20030068731A (en) A Set Establish Form Method for Upper Slab of Bridge
KR100339440B1 (en) Construction method using mold equipped with shape steel and plywood
KR20100057991A (en) Concrete slab mold assembly and method for constructing slab
KR200163444Y1 (en) Device for horizontal support bar of a mold
KR200349973Y1 (en) Support for yoke of mold
JPH11117226A (en) Form device for forming overhang part at head of bridge pier

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
NORF Unpaid initial registration fee