KR200289055Y1 - Construction form tie bolt for underground breast wall - Google Patents

Construction form tie bolt for underground breast wall Download PDF

Info

Publication number
KR200289055Y1
KR200289055Y1 KR2020020019718U KR20020019718U KR200289055Y1 KR 200289055 Y1 KR200289055 Y1 KR 200289055Y1 KR 2020020019718 U KR2020020019718 U KR 2020020019718U KR 20020019718 U KR20020019718 U KR 20020019718U KR 200289055 Y1 KR200289055 Y1 KR 200289055Y1
Authority
KR
South Korea
Prior art keywords
formwork
screw
tie bolt
retaining wall
wall
Prior art date
Application number
KR2020020019718U
Other languages
Korean (ko)
Inventor
문대근
Original Assignee
문대근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 문대근 filed Critical 문대근
Priority to KR2020020019718U priority Critical patent/KR200289055Y1/en
Application granted granted Critical
Publication of KR200289055Y1 publication Critical patent/KR200289055Y1/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은, 거푸집과 이격되는 토류벽간을 횡단 연결 고정한 후 그 사이의 공간부에 콘크리트를 타설, 양생하여 지하옹벽을 형성할 수 있도록 하기 위한 지하 옹벽 구축용 거푸집 타이볼트에 있어서, 선단부측으로 스크류나사부가 형성되고 그 후단으로 길게 일체로 연장되는 연결봉과, 상기 연결봉 후단측으로 사다리꼴나사 형상으로 되는 너트체결부가 형성되고, 상기 너트체결부 후단측으로 다각형상의 공구연결부가 일체로 연결 형성되어, 상기 토류벽 및 거푸집의 설치시공을 먼저 완료한 후 선정된 각각의 위치에 거푸집을 관통시켜 스크류나사부측이 토류벽과 나사결합 체결 고정토록 하는 것을 구성상 특징으로 하여, 옹벽을 타설하기 위한 거푸집을 고정시키는 타이볼트를 거푸집 외측으로부터 관통하여 굴착부위의 토류를 막아주기 위한 각목등을 수평 적층한 토류벽에 간편하며 용이하게 고정설치 가능함은 물론 해체가 용이하도록 하는 지하 옹벽 구축용 타이볼트에 관한 것이다.The present invention, in the form of a tie bolt for the construction of underground retaining wall for forming the underground retaining wall by placing and curing concrete in the space between them after fixing the cross between the formwork and the earth wall spaced apart, the screw screw portion to the tip side Is formed and a connecting rod extending integrally to the rear end thereof, and a nut coupling portion having a trapezoidal screw shape toward the rear end of the connecting rod is formed, and a polygonal tool connecting portion is integrally connected to the rear end of the nut coupling portion to form the earth wall and the formwork. After the installation construction of the first, and then through the formwork to each selected position, the screw screw side is characterized in that the fastening of the earth wall and the screw-coupling fastening, characterized in that the configuration, the tie bolt fixing the formwork for placing the retaining wall Angle to penetrate from the outside and prevent earth of excavation site Horizontal stacking to install simple and easily fixed to the toryubyeok the like are possible, as well as relates to a tie bolts for building retaining walls, basement dismantling is intended to facilitate.

Description

지하 옹벽 구축용 거푸집 타이볼트{Construction form tie bolt for underground breast wall}Formwork bolts for underground retaining wall construction

본 고안은 콘크리트 구조물등의 건축물 공사에 있어서 구조물의 기초가 되는 지하 옹벽 공사시 지하 옹벽의 붕괴를 방지하기 위한 수단인 거푸집을 고정시키기 위한 지하 옹벽 거푸집 타이볼트에 관한 것으로, 옹벽을 타설하기 위한 거푸집을 고정시키는 타이볼트를 거푸집 외측으로부터 관통하여 굴착부위의 토류를 막아주기 위한 각목등을 수평 적층한 토류벽에 간편하며 용이하게 고정설치 가능함은 물론 해체가 용이하도록 하는 지하 옹벽 구축용 타이볼트에 관한 것이다.The present invention relates to an underground retaining wall formwork tie bolt for fixing the formwork, which is a means for preventing the collapse of the underground retaining wall during the construction of the underground retaining wall, which is the foundation of the structure, in the construction of a concrete structure, etc. This invention relates to a tie bolt for building an underground retaining wall, which can be easily and easily fixed and installed on a horizontally stacked earth wall through which a tie bolt for fixing the wire is penetrated from the outside of the formwork to prevent the earth at the excavation site. .

일반적으로 콘크리트 구조물의 건축물 공사를 실시할 때 먼저 구조물의 기초가 되는 지하옹벽을 구축하게 되는데, 이와같은 옹벽을 형성하는 방법에는 H 빔(H-beam)을 지면에 박은 후 H 빔과 H 빔 사이에 각목을 수평상으로 적층 삽입하여 끼워 조립되므로서 토류의 붕괴를 막아주기 위한 토류벽을 형성하는 방법과, 지면을 굴착하기 이전에 지면을 일정깊이로 연속, 천공한 후 철근을 삽입하고 콘크리트를 타설·양생하여 콘크리트 기둥을 형성하는 방법등이 있다.In general, when constructing a concrete structure, the underground retaining wall, which is the foundation of the structure, is first constructed. In the method of forming the retaining wall, an H-beam is put on the ground, and the H-beam is separated from the H-beam. It is assembled by inserting each piece of wood horizontally into the pipe to form the earth wall to prevent the collapse of the earth, and inserts the reinforcing bars and concrete after drilling the ground continuously to a certain depth before drilling the ground. · There are ways to cure and form concrete columns.

상기의 토류벽을 형성하는 옹벽시공에 있어서는 상기 토류벽에 화살과 같은 형상으로 된 고정구를 고정시키며, 토류벽에 대응되는 거푸집은 상기 고정구의 연결고리에 묶인 철사를 이용하여 고정시키거나 또는 플렛타이(Flat tie)를 이용하여 고정시키는 방법이 주로 사용되고 있다.In the retaining wall construction that forms the earth wall, the fasteners having the shape of arrows are fixed to the earth wall, and the formwork corresponding to the earth wall is fixed by using a wire tied to the connection ring of the fastener, or a flat tie. The method of fixing using) is mainly used.

상기에서 철사를 이용한 전자의 공법은, 고정구의 화살촉부분에 해당되는 삽입철편은 토류벽을 구성하고 있는 각목 사이를 통해 삽입되어 토류벽 이면측에 고정되는 것이고, 상기 고정구의 화살대부분에 해당되는 연결봉 후단에 형성된 연결고리에 묶어준 철사는 거푸집에 고정시킨 다음 토류벽과 거푸집 사이에 콘크리트를 타설하게 되어 지하 옹벽을 구축하는 것인데, 상기의 공법은 타설된 콘크리트가 경화된 후 거푸집을 철거할 때 거푸집을 고정시킬 때 사용했던 철사가 지하옹벽에서 돌출된 상태가 되므로 이를 제거하여야 하는 번거롭고 힘든 작업이 수반되기 때문에 철사를 제거하는데 소요되는 시간이 상당하여 공기의 지연 및 이로인한 공사비가 상당하게 소요되는 등의 문제점이 있었다.In the former method using the wire, the insertion iron piece corresponding to the arrowhead portion of the fixture is inserted through the corners constituting the earth wall and fixed to the back side of the earth wall, and is connected to the rear end of the connecting rod corresponding to the arrow portion of the fixture. The wire tied to the formed linkage is fixed to the formwork and then the concrete is placed between the earth wall and the formwork to build the retaining wall. The above method is to fix the formwork when the formwork is demolished after the cast concrete is cured. Since the used wire is protruded from the basement retaining wall, it is cumbersome and difficult to remove it, so the time required to remove the wire is considerable, which leads to the delay of air and the significant construction cost. there was.

또한 플렛타이(Flat tie)를 이용한 후자의 공법은 고정구의 화살대 부분에 해당되는 연결봉 후단에 플렛타이를 바르게 용접 하여야 하므로, 용접시공에 따른시간 및 전문인력을 요구하게 되어 시공작업이 어렵고 공기가 상당히 지연되는 등의 문제점이 있다. 특히 고정구의 연결봉에 용접된 플렛타이는 철제거푸집에 고정시킬 수 있는 구조로 되어 있으므로 타설된 콘크리트의 경화 후 철제거푸집을 철거할때 철제거푸집에 고정시켰던 부분이 지하옹벽으로부터 돌출된 상태를 유지하게 되므로 그 돌출된 부분을 제거하는데 많은 시간과 인력등이 소요되어, 지하옹벽 시공의 공기 지연 및 이로인한 공사비 등의 상승되는 등의 문제점이 지적되어 왔다.In addition, the latter method using a flat tie requires the flat tie to be properly welded to the rear end of the connecting rod corresponding to the shaft part of the fastener. Therefore, the construction work is difficult and the air is considerably difficult because it requires time and professional manpower. There is a problem such as delay. Particularly, the flat tie welded to the connecting rod of the fixture has a structure that can be fixed to the iron removing die. Therefore, when the iron removing die is removed after hardening of the poured concrete, the part fixed to the iron removing die keeps protruding from the underground retaining wall. It takes a lot of time and manpower to remove the protruding portion, has been pointed out problems such as the delay of the construction of the underground retaining wall construction and the resulting increase in construction cost.

도 8은 상기한 종래의 문제점을 해결하기 위한 실시를 도시한 도면으로, 옹벽을 형성하기 위한 거푸집(D)을 고정하기 위해 사전작업으로 지하옹벽이 무너지지 않도록 하기 위해 H 빔(H) 사이에 다수의 각목을 적층하여 토류벽(F)을 형성한 상태에서 화살촉 형상을 갖는 걸림핀(B)이 형성된 고정구(A)를 상기 토류벽(F)에 삽입하여 가고정한 상태에서, 거푸집(D)을 형성한 후 거푸집(D) 외측에서 타이볼트(E)를 관통시켜 타이볼트(E) 단부측이 상기 고정구(A) 후단에 고정된 너트(C)측과 고정 결합되도록 하여 거푸집(D)을 고정시킨 후, 콘크리트 타설을 하여 지하옹벽을 시공하여 왔었다.8 is a view showing an implementation for solving the above-described conventional problems, a plurality of H beams (H) between the H beam (H) in order to prevent the underground retaining wall to collapse in advance to fix the form (D) for forming the retaining wall Forming the die (D) in the state of temporarily fixing by inserting the fastener (A) formed with the engaging pin (B) having an arrowhead shape in the state of forming the earth wall (F) by laminating each wood of the earth wall (F) After fixing the form (D) by penetrating the tie bolt (E) from the outside of the form (D) so that the end of the tie bolt (E) is fixed to the nut (C) side fixed to the rear end of the fixture (A). In addition, the base retaining wall has been constructed by concrete pouring.

그러나, 상기의 방법에 의하면, H 빔에 토류벽등을 형성한 상태에서 고정구를 각각의 토류벽에 타격하여 적정한 간격으로 무수하게 1차 고정하는 작업을 수행 한 후, 거푸집을 설치 시공한 상태에서, 상기 고정구의 후단측 너트와 타이볼트를 체결하여야 되는데, 집 외측면에서 거푸집을 관통한 상태에서 타이볼트 단부가 정확하게 상기 너트측과 결합시키는 작업 자체가 상당히 어렵고 또한 무수한 고정구에 일일이 타이볼트와 고정구의 너트간 체결작업을 2차에 걸쳐 수행하여야 하므로작업공기가 상당히 지연되는 문제점이 심각하게 제기되고 있다.However, according to the above method, in the state in which the earth wall or the like is formed in the H beam, the fixture is hit by each earth wall, and after numerous primary fixing operations are performed at appropriate intervals, the form is installed in the above state. It is necessary to fasten the tie bolt with the nut of the rear end of the fixture, and it is very difficult for the tie bolt end to be precisely combined with the nut side in the state of penetrating the formwork from the outer side of the house. Since the fastening work has to be performed in two stages, there is a serious problem that the work air is considerably delayed.

또한 거푸집 최하단측 부위에 형성되는 고정구와 타이볼트간의 체결작업시 그 체결상태 및 고정구의 너트와 타이볼트간 연결 과정을 직접 확인하는 것 자체가 불가능하여 작업자의 감각 또는 오랜 경험등에 의한 숙련성에 의존되어야 하므로, 작업성이 현저히 저하되는 등 여러 문제점이 지적되고 있으며, 거푸집의 고정에 따른 부품의 수 즉, 고정구와 타이볼트 등을 각기 따로 구비하여야 하므로 소모폼에 해당되는 부품의 증가에 따른 시공가 및 작업공기의 지연등에 따른 문제 등 경제성에 있어서도 낙후성을 피할 수 없었다.In addition, it is impossible to directly check the connection status between the fasteners and tie bolts formed at the bottom of the formwork and the connection process between the nuts and the tie bolts of the fasteners. Therefore, various problems have been pointed out such that the workability is remarkably deteriorated, and the number of parts according to the fixing of the formwork, that is, the fixtures and tie bolts must be provided separately, so that the construction cost and the work according to the increase of the parts corresponding to the consumption foam In terms of economics, such as problems caused by delays in the air, backwardness was inevitable.

또한 상기 고정구를 토류벽의 각목재와 각목재 사이에 타격, 삽입하여 고정하는 작업을 수행하므로, 타격하는 과정에서 작업자의 손에 상처를 입히거나 고정되는 부위 즉 각목재와 각목재 배면부측에 바위 등이 존재하게 될 경우 고정구가 쉽게 박혀지지 못하거나 또는 작업자의 신체에 상해를 입히게 되는 등의 안전상의 문제는 물론, 수평상으로 고정구를 설치하여야 함에도 불구하고 정확한 수평선상을 유지하며 고정되지 못하는 경우가 비일비재하여 재삽입 고정 또는 보정작업을 수행하여야 하는 등의 여러 문제점이 지적되고 있다.In addition, since the fastener is to be blown, inserted and fixed between the lumber and the timber of the earth wall, so as to hurt or fix the worker's hand in the process of striking, that is, the rock on the side of the lumber and the back of the timber If there is a safety problem, such as the fasteners are not easily embedded or injuries to the worker's body, and even if the fixtures must be installed horizontally, they cannot be fixed and kept on the correct horizontal line. Many problems have been pointed out such as the need to perform reinsertion fixation or correction.

따라서 상기한 문제점등을 해결하고 옹벽 거푸집에 고정되는 타이볼트등을 좀더 용이하게 고정설치함과 동시에, 옹벽의 설치가 완료된 후 타이볼트를 제거할 때 용이한 제거가 가능하도록 하여, 공기의 단축 및 이로인한 시공비의 절감 등을 이루기 위해, 상기한 여러 문제점을 해결하기 위한 수단으로 대한민국 특허청에 기출원되어 다수의 기술내용이 공개되어 있다.Therefore, the above-mentioned problems are solved and the tie bolts fixed to the retaining wall formwork are more easily installed, and at the same time, after the installation of the retaining wall is completed, it is possible to easily remove the tie bolts, thereby shortening the air and In order to achieve such a reduction in construction costs, a number of technical contents have been disclosed to the Korean Intellectual Property Office as a means for solving the various problems described above.

도 9는 상기한 문제점 등을 해결하기 위해 대한민국 특허청에 기출원되어 공개된 실용신안 공개 실1998-017205호 등이 있다. 상기 기술은 상기한 문제점 중에서 특히 토류벽의 각목과 각목사이에 고정구를 타격 삽입하여 돌리는 작업을 배제하기 위한 것으로, 도면에서 보는바와 같은 형상을 갖는 고정구(20)를 사용하여 고정구(20) 양측방으로 볼트결합구(21a)가 천공되며 절곡 활개된 고정부(21)를 먼저 토류벽에 고정시키고, 고정부(21)와 연설되며 일정길이 돌출되는 연결부(22) 단부측으로 암나사가 형성된 결합부(23)로, 거푸집을 관통하는 타이볼트의 단부가 나사 결합 체결되도록 하고 있다.9 is a Utility Model Publication No. 1998-017205 and the like filed with the Republic of Korea Patent Office to solve the above problems and the like. The above technique is to exclude the operation of hitting and turning the fixture between the wood and the wood of the earth wall, especially in the above problems, by using a fastener 20 having a shape as shown in the drawing to both sides of the fastener 20 Bolting hole (21a) is punched and bent open fastening portion 21 is fixed to the earth wall first, the coupling portion 23 is formed with a female screw toward the end of the connection portion 22 protruding a fixed length and protruded a fixed length 21 The end of the tie bolt penetrating the formwork is screwed and fastened.

이와같은 경우에도 토류벽에 먼저 고정구를 고정시킨 후 거푸집을 형성한 다음, 거푸집을 관통하는 타이볼트의 단부를 상기 고정구(20)의 결합부(23)내에 삽입 체결하여야 하므로, 선작업에 의해 고정구를 토류벽에 고정하고 거푸집을 형성하는 번잡한 공정이 뒤따르고, 상기 고정구와 타이볼트간의 정확한 연결 및 결합을 용이하게 확인할 수 없다는 문제점이 있으며, 작업공기등의 지연에 따른 생산비용이 상승되는 등의 문제점이 지적되고 있다.Even in such a case, the fixture is first fixed to the earth wall, and then a form is formed. Then, the end of the tie bolt penetrating the form must be inserted into the engaging portion 23 of the fixture 20. There is a problem that a complicated process of fixing the formwork and forming the formwork on the earth wall is followed, and it is not possible to easily check the exact connection and coupling between the fixture and the tie bolts, and the production cost increases due to the delay of working air. This is being pointed out.

또한 도 10은 대한민국 특허청에 기출원되어 공개된 실용신안등록 공개 실1999-006010으로서, 도면에서 보듯이 일단으로 화살촉 형상의 삽입철편(5)이 형성되고 후단으로 연결봉(2) 및 재차 그 연결봉(2) 후단측으로 조정나사부(3)가 형설되고, 상기 조정나사부(3)와 체결되는 소켓부재(4)로 되는 고정구(1)와, 상기 소켓부재(4)에 나사 체결되기 위한 타이볼트(6) 즉 일단으로 소켓부재(4)와 나사결합되는 연결나사부(7)가 있고 후단으로 원추형상으로 되는 원추형삽입부(8)가 일체 형성되고 후방으로 조임나사부(9) 및 회전가압부(10)가 형성되는 타이볼트(6)를 제공하고 있다.10 is a Utility Model Registration Publication No. 1999-006010 previously filed and published by the Korean Intellectual Property Office, as shown in the drawing, an arrowhead-shaped insertion iron piece 5 is formed at one end, and a connecting rod 2 and a connecting rod at the rear end thereof ( 2) The fixing screw part 3 is formed in the rear end side, the fixture 1 which becomes the socket member 4 which is fastened with the said adjusting screw part 3, and the tie bolt 6 for screwing into the said socket member 4 That is, there is a connection screw portion 7 which is screwed into the socket member 4 at one end, and a conical insert 8 having a conical shape at the rear end is integrally formed, and the tightening screw portion 9 and the rotary pressing portion 10 are rearwardly formed. Provided is a tie bolt 6 is formed.

이와같은 구성에 의해 거푸집(13)과 토류벽(11)간을 횡단 고정하는 고정구(1)를 설치하기 위해, 토류벽(11)에 고정구(1)의 삽입철편(5)이 삽입 되도록 때려 박은 후 콘크리트 타설에 의해 형성되는 옹벽의 폭 두께에 따라 짧거나 긴 소켓부재(4)를 고정구(1) 타단의 고정나사부(3)와 체결시킨 다음, 거푸집(13)을 설치 시공하고 상기 타이볼트(6)의 단부를 거푸집(13)을 관통시켜 상기 소켓부재(4)와 나사 체결토록 하여, 거푸집(13)내 콘크리트의 타설작업 후 양생이 완료되어 완전한 옹벽을 얻게 되면, 거푸집(13)의 탈거 및 상기 타이볼트(6)의 분리가 용이하도록 하고 있다. 따라서 상기 구성에 의해서는 타이볼트의 회수등을 용이하게 할 수 있는 장점은 있으나, 상술한 문제점 즉 거푸집의 설치 이전에 먼저 각목등으로 적층되어 형성되는 토류벽에 고정구를 관통시켜 체결시킨 다음 고정구 타단으로 형설되는 소켓부재에 거푸집을 관통하는 타이볼트를 맞추어 체결하여야 하므로 소켓부재와 타이볼트간의 정확한 결합 및 연결작업에 따른 확인이 어렵고, 숙련된 작업자의 오랜 경험 등에 의존하여 작업하게 되므로 그 작업 능률에 따른 생산성이 저하되는 등의 문제점은 극복될 수 없다.In order to install the fastener 1 for transversal fixing between the formwork 13 and the earth wall 11 by such a configuration, the earth wall 11 is punched so that the insertion iron piece 5 of the fastener 1 is inserted into the concrete. The socket member 4 is short or long according to the width of the retaining wall formed by the casting, and the fixing screw part 3 at the other end of the fastener 1 is installed. Then, the formwork 13 is installed and the tie bolt 6 is installed. When the end of the through the die 13 to screw the socket member 4 and the screw, the curing after the casting work of the concrete in the die 13 is completed to obtain a complete retaining wall, remove the form 13 and the The tie bolts 6 are easily separated. Therefore, the above configuration has an advantage of facilitating the recovery of the tie bolts, but before the installation of the formwork, the fasteners are fastened to the earth wall formed by being laminated with wood, etc., and then fastened to the other end of the fixture. Tie bolts that pass through the formwork must be fitted and fastened to the socket member to be installed. Therefore, it is difficult to check the correct coupling and connection work between the socket member and the tie bolts, and work depends on the long experience of a skilled worker. Problems such as reduced productivity cannot be overcome.

즉, 거푸집 내측면으로 돌출어 고정되어 있는 상태의 소켓부재 암나사부측과타이볼트 단부측 숫나사부측을 거푸집 내측과 토류벽측과의 공간측에서 맞추는 작업을 수행하게 되므로 그 연결작업이 상당히 어렵고 번잡하게 되는 등의 문제점이 있게 되는 것이고, 고정구를 선작업에 의해 먼저 토류벽에 무수하게 고정 설치하는 작업을 수행한 후, 거푸집을 설치한 다음에 재차 타이볼트를 상기 각각의 고정구측 소켓부재와 연결하는 과정을 수행하게 되므로 2중의 작업에 따른 작업공기 등의 지연 및 생산성 저하, 인건비 상승등의 중요한 문제점은 해결할 수 없는 것이다.That is, since the socket member female thread side and the tie bolt end side male thread side in the state of being protruded and fixed to the inner side of the form is performed at the space side between the form inner side and the earth wall side, the connection work becomes quite difficult and complicated. After fixing the fixture to the earth wall first by the line work, and then install the formwork, the process of connecting the tie bolt to the respective socket side socket member again Since it is performed, important problems such as delay in work air, productivity decrease, and labor cost due to the double work cannot be solved.

따라서 본 고안은 상기한 문제점을 해결하기 위해 안출한 것으로서, 종래의 타이볼트와 고정구로 분리되는 것을 하나의 타이볼트로 되는 부재로 형성하여 옹벽을 설치 시공하기 위해 토류벽을 형성한 후 일정간격 이격 형성되어 거푸집을 형성하여, 상기 토류벽과 거푸집간의 간격 유지 및 거푸집이 콘크리트 타설 및 양생과정에서 분리되거나 또는 훼손 내지 타설과정에서의 휨현상, 비틀림 및 볼록하게 양생면이 형성되는 등의 현상을 방지하기 위한 상기 타이볼트를 거푸집을 관통하여 토류벽에 고정시키는 작업과정을 하나의 과정으로 축소 시공될 수 있도록 함은 물론, 타이볼트의 고정작업을 간단하며 용이하게 시공할 수 있도록 하고, 숙련된 작업자가 아니더라도 용이하게 시공가능하고, 타이볼트의 시공시간을 단축시켜 전체적 시공가를 절감하도록 하는데 그 목적이 있다.Therefore, the present invention was devised to solve the above problems, and formed by a member consisting of one tie bolt separated from the conventional tie bolt and the fastener to form a earth wall to install the retaining wall, and then form a predetermined interval. To form the formwork, the gap between the earth wall and the formwork and the formwork to prevent the phenomenon such as separation or damage in the concrete casting and curing process, such as bending or twisting and convex curing surface is formed during The process of fixing the tie bolts to the earth wall through the formwork can be reduced to a single process, and the fixing work of the tie bolts can be easily and easily installed. It is possible to construct and reduce the overall construction cost by shortening the construction time of tie bolts. So to have that purpose.

도 1은 본 고안에 의한 거푸집 타이볼트의 사시도이고,1 is a perspective view of a die tie bolt according to the present invention,

도 2는 옹벽을 형성하기 위해 H빔을 형성하고 각각의 H 빔 사이에 각목을 수평선산으로 적층하여 토류벽을 형성하는 과정을 도시한 사시도이고,FIG. 2 is a perspective view illustrating a process of forming an earth wall by forming an H beam to form a retaining wall and stacking lumbers with horizontal lines between each H beam;

도 3은 도 2에 의해 형성된 토류벽과 이격되는 상태로 거푸집을 형성한 상태를 도시한 단면도이며,3 is a cross-sectional view showing a state in which formwork is formed in a state spaced apart from the earth wall formed by FIG.

도 4는 도 3에 의해 형성된 거푸집과 토류벽간을 관통하여 토류벽에 본 고안의 거푸집 타이볼트 단부에 형성된 스크류부가 타단의 공구연결부와 연결되는 공구등에 의해 고정 체결된 상태를 도시한 단면도이고,4 is a cross-sectional view showing a state in which the screw portion formed at the formwork tie bolt end of the present invention through the formwork and the earth wall formed by FIG.

도 5는 도 4에 의해 체결되는 상태의 타이볼트 나사부에 나비너트 등을 체결 고정한 상태의 단면도이고,5 is a cross-sectional view of the fastening and fixing the butterfly nut and the like to the tie bolt screw portion in the state fastened by FIG.

도 6은 콘크리트를 타설하여 양생이 완료된 후 거푸집을 탈거한 상태에서 옹벽 외표면으로 돌출된 너트체결부를 절단한 것을 도시한 단면도이며,6 is a cross-sectional view showing the cutting of the nut fastening portion projecting to the outer surface of the retaining wall in the state of removing the formwork after the curing is completed by pouring concrete,

도 7은 거푸집에 파이프를 고정시키고 본 고안을 이용, 거푸집을 고정시킨 후 상기 파이프를 고정하기 위한 파이프고정구를 사용한 것을 도시한 사시도이며,7 is a perspective view showing the use of the pipe fixture for fixing the pipe after fixing the formwork using the present invention to fix the formwork,

도 8 내지 도 10은 종래의 기술을 도시한 도면이다.8 to 10 are diagrams showing a conventional technology.

※ 도면 중 주요부호에 대한 간단한 설명※ Brief description of the main symbols in the drawings

100; 타이볼트 110; 스크류나사부100; Tiebolt 110; Screw thread

120; 연결봉 130; 너트체결부120; Connecting rod 130; Nut tightening part

131; 너트 140; 공구연결부131; Nut 140; Tool connection

150; 거푸집 160; 토류벽150; Formwork 160; Earth wall

170; H-빔170; H-beam

상기한 목적을 달성하기 위한 본 고안은,The present invention for achieving the above object,

거푸집(150)과 이격되는 토류벽(160)간을 횡단 관통하여 연결 고정한 후 그 사이의 공간부에 콘크리트를 타설, 양생하여 지하옹벽을 형성할 수 있도록 하기 위한 지하 옹벽 구축용 거푸집 타이볼트에 있어서,In the formwork tie bolt for the construction of underground retaining wall to form a basement retaining wall to form and cure concrete through the connection between the formwork 150 and spaced apart between the earth wall 160 spaced apart and then placed in the space therebetween,

선단부측으로 스크류나사부(110)가 형성되고 그 후단으로 길게 일체로 연장되는 연결봉(120)과, 상기 연결봉(120) 후단측으로 사다리꼴나사 형상으로 되는 너트체결부(130)가 형성되고, 상기 너트체결부(130) 후단측으로 다각형상의 공구연결부(140)가 일체로 연결 형성되어, 상기 토류벽(160) 및 거푸집(150)의 설치시공을 먼저 완료한 후 선정된 각각의 위치에 거푸집(150)을 관통시켜 스크류나사부(110)측이 토류벽(160)과 나사결합 체결 고정토록 하는 것을 구성상 특징으로 한다.A screw rod 110 is formed at the tip end side, and a connecting rod 120 integrally extended to the rear end thereof and a nut coupling portion 130 formed in a trapezoidal screw shape at the rear end of the connecting rod 120 are formed. (130) the polygonal tool connecting portion 140 is formed integrally connected to the rear end side, and completes the installation of the earth wall 160 and the formwork 150, and then passes through the formwork 150 at each selected position. The screw screw unit 110 is characterized in that the earth wall 160 and the screw coupling fastening to be fixed.

이하 상기한 구성에 의한 본 고안의 바람직한 실시예를 첨부한 도면을 참조하여 더욱 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention by the above configuration will be described in more detail.

도 1은 본 고안에 의한 거푸집 타이볼트의 사시도이고, 도 2는 옹벽을 형성하기 위해 H빔을 형성하고 각각의 H 빔 사이에 각목을 수평선산으로 적층하여 토류벽을 형성하는 과정을 도시한 사시도이고, 도 3은 도 2에 의해 형성된 토류벽과 이격되는 상태로 거푸집을 형성한 상태를 도시한 단면도이며, 도 4는 도 3에 의해 형성된 거푸집과 토류벽간을 관통하여 토류벽에 본 고안의 거푸집 타이볼트 단부에 형성된 스크류부가 타단의 공구연결부와 연결되는 공구등에 의해 고정 체결된 상태를 도시한 단면도이고, 도 5는 도 4에 의해 체결되는 상태의 타이볼트 나사부에 나비너트 등을 체결 고정한 상태의 단면도이고, 도 6은 콘크리트를 타설하여 양생이 완료된 후 거푸집을 탈거한 상태에서 옹벽 외표면으로 돌출된 너트체결부를 절단한 것을 도시한 단면도이며, 도 7은 거푸집에 파이프를 고정시키고 본 고안을 이용, 거푸집을 고정시킨 후 상기 파이프를 고정하기 위한 파이프고정구를 사용한 것을 도시한 사시도이다.Figure 1 is a perspective view of the formwork tie bolt according to the present invention, Figure 2 is a perspective view showing a process of forming the earth wall by forming the H beam to form the retaining wall and laminated each tree in the horizontal line between each H beam 3 is a cross-sectional view showing a state in which formwork is formed in a state spaced apart from the earth wall formed by FIG. 2, and FIG. 4 is a formwork tie bolt end of the present invention penetrating between the formwork and the earth wall formed by FIG. 5 is a cross-sectional view showing a state in which the screw portion formed in the state is fixedly fastened by a tool or the like connected to the other end of the tool connection, Figure 5 is a cross-sectional view of fastening and fixing the butterfly nut and the like to the tie bolt screw in the state of the fastening by Figure 4, 6 is a cross-sectional view showing the cutting of the nut fastening portion projecting to the outer surface of the retaining wall in the state of removing the formwork after the curing is completed by pouring concrete. Said, Figure 7 is a perspective view showing the use of the invented secure the pipe in the mold, then the mold with the fixed pipe fastener for securing the pipe.

첨부한 도면에서 보듯이 본 고안은, 건축물등의 축조시 지하 지반 공사 등을 수행할 때 시공되는 옹벽시공 공사에서 옹벽의 원할한 시공 및 거푸집(150)과 토류벽(160)간을 관통 체결하여 상기 거푸집(150)을 토류벽(160)으로부터 적정 간격 이격시키며 견고하게 고정, 유지하기 위한 타이볼트(100)를 제공함에 있어, 토류벽(160)측에 위치되어 삽입 나사결합되는 선단부측으로는 스크류형상의 스크류나사부(110)가 형성되어 있고, 스크류나사부(110) 후단측으로 일정길이를 갖는 연결봉(120)이 일체로 연설되고 연결봉(120) 후단측으로 사다리꼴나사가 형성되어 너트(131)등이 체결되도록 하기 위한 너트체결부(130)가 일체 형성되고, 또한 너트체결부(130) 후단측으로는 공구등에 의해 타이볼트(100)의 회전이 가능하도록 하기 위한 공구연결부(140)가 일체로 형성된다.As shown in the accompanying drawings, the present invention, the construction of the retaining wall when the construction of the ground, such as when the construction of the retaining wall in the smooth construction of the retaining wall and the form 150 and the earth wall 160 through the fastening and fastening In providing the tie bolt 100 for firmly fixing and maintaining the formwork 150 from the earth wall 160 at an appropriate interval, the screw-shaped screw is located on the end side of the earth wall 160 to be inserted and screwed in. The thread 110 is formed, and the connecting rod 120 having a predetermined length toward the rear end side of the screw thread unit 110 is integrally addressed and a trapezoidal screw is formed at the rear end of the connecting rod 120 so that the nut 131 may be fastened. The nut fastening part 130 is integrally formed, and a tool connection part 140 is integrally formed at the rear end of the nut fastening part 130 to enable the rotation of the tie bolt 100 by a tool or the like.

여기서 상기 스크류나사부(110)는 상기한 공구연결부(140)와 연결되는 공구의 사용에 의해 타이볼트(100)를 회전시켜 상기 스크류나사부(110)가 목재의 토류벽(160)내에 나사결합될 수 있도록 형성하는바, 일반적 스크류나사와 동일한 형상 및 구조를 갖는다.Here, the screw thread unit 110 rotates the tie bolt 100 by using a tool connected to the tool connection unit 140 so that the screw thread unit 110 may be screwed into the earth wall of wood 160. To form, it has the same shape and structure as a general screw screw.

한편 상기 너트체결부(130)는 거푸집(150) 외측면으로 돌출되는 것으로, 거푸집(150)과 토류벽(160)간을 고정 연결한 후, 너트(131) 등으로 체결한 다음 거푸집(150)과 토류벽(160) 사이에 형성되는 공간부측으로 콘크리트를 타설, 양생한 후 상기 거푸집(150)을 탈거하기 전에 거푸집(150) 외면으로 돌출된 부분을 절단 분리할 수 있도록 하는 것으로, 도면에서 보듯이 절단과정에서 그 절단이 용이할 수 있도록 하기 위해 너트체결부(130)의 나사형태를 사다리꼴나사형으로 형성하는 것이 바람직하다.Meanwhile, the nut fastening part 130 protrudes to the outer side of the formwork 150, and after the formwork 150 and the earth wall 160 are fixedly connected, the nut fastening portion 130 is fastened with a nut 131, and then the formwork 150 and the like. After placing and curing concrete toward the space portion formed between the earth walls 160 to cut and separate the parts protruding to the outer surface of the formwork 150 before removing the formwork 150, cutting as shown in the drawing In order to facilitate the cutting in the process, it is preferable to form the screw shape of the nut coupling portion 130 in a trapezoidal screw shape.

아울러, 상기 공구연결부(140)는 상술한 바와 같이 타이볼트(100)를 재질이 목재로 되는 토류벽(160)내에 상기 스크류나사부(110)를 용이하게 삽입, 나사 결합될 수 있도록 하기 위한 것으로, 공구연결부(140)의 형상은 사각 또는 육각등의 다각면체로 형성함으로써 다각면으로 되는 요홈을 갖고 있는 일반적 렌찌(미도시)등의 공구를 이용하여 상기 공구연결부(140)가 렌찌의 요홈부측으로 삽입 된 후 작업자가 가해지는 힘에 의해 타이볼트(100)가 전체적으로 회동되어져, 타이볼트(100) 최선단의 스크류나사부(110)가 거푸집(150)과 토류벽(160)을 관통하여 토류벽(160)내 나사결합되며 삽입 가능하도록 함으로써 상기 거푸집(150)과 토류벽(160)을 일정간격 유지시키며 고정될 수 있도록 하는 것이다.In addition, the tool connecting portion 140 is to allow the screw bolt 110 to be easily inserted and screwed into the earth wall 160 of which the material is made of wood. The connecting portion 140 is formed in a polygonal shape such as a square or a hexagon, so that the tool connecting portion 140 is inserted into the recess portion of the wrench by using a tool such as a general wrench (not shown) having a groove having a polygonal shape. After the operation, the tie bolt 100 is rotated as a whole by the force applied by the worker, so that the screw thread part 110 at the uppermost end of the tie bolt 100 penetrates the form 150 and the earth wall 160 to form the earth wall 160. By screwing and inserting, the formwork 150 and the earth wall 160 may be fixed while maintaining a predetermined interval.

상기한 구성에 의한 본 고안의 타이볼트를 이용하여 거푸집을 고정시킨 후, 옹벽을 형성하는 과정을 설명한다.After fixing the formwork using the tie bolt of the present invention according to the above configuration, the process of forming the retaining wall will be described.

먼저, 지상건축물등을 축조하기 위해서 지하를 굴착한 후 그 굴착면(W)이 붕괴되는 것을 방지하기 위해 옹벽을 설치 시공하게 되는데, 도 1에서 보는 것처럼 H 빔(170)을 일정간격으로 설치한 후 H 빔(170)과 H 빔(170) 사이에 각목재를 수평방향으로 적층하여 토류벽(160)을 형성한다.First, after the basement is excavated in order to build the ground building, the retaining wall is installed to prevent the drilling surface W from collapsing. As shown in FIG. 1, the H beam 170 is installed at a predetermined interval. After that, the timber is laminated in the horizontal direction between the H beam 170 and the H beam 170 to form the earth wall 160.

이와같이 형성된 토류벽(160)으로부터 설치하고자 하는 옹벽의 두께를 감안하여 그 두께만큼 이격되는 거푸집(150)을 설치 시공한 후 상기 거푸집(150)을 관통하며 토류벽(160)내에 삽입 고정될 수 있도록 하기 위한 본 고안의 타이볼트 (100)를 관통 체결하게 되는데, 거푸집(150)을 관통 체결하는 타이볼트(100)를 고정하기 위해 해당 설정위치의 거푸집(150)에 구멍을 먼저 천공하고 타이볼트(100)를 삽입한 후 그 끝단인 스크류나사부(110)를 상기 토류벽(160)에 수평하게 위치시킨 후 체결위치를 선정한다.Considering the thickness of the retaining wall to be installed from the earth wall formed in this way, after installing the formwork 150 spaced apart by the thickness to penetrate the formwork 150 to be inserted into the earth wall 160 to be fixed The tie bolt 100 of the present invention is to be fastened through, in order to fix the tie bolt 100 to fasten the formwork 150 through a hole in the formwork 150 of the corresponding setting position and tie bolt 100 Insert the end of the screw screw 110 is positioned horizontally to the earth wall 160, and then select the fastening position.

그런다음, 별도의 렌찌등의 공구를 이용하여 타이볼트(100) 타단의 공구연결부(140)와 연결하여 돌리게 되면, 스크류나사부(110)가 목재의 토류벽(160)을 뚫고 고정 체결된다.Then, by using a tool such as a separate wrench and turned to connect with the tool connection portion 140 of the other end of the tie bolt 100, the screw thread 110 is fixed and fastened through the earth wall 160 of the wood.

이와같이 고정된 타이볼트(100)의 타측 너트체결부(130)에 너트(131)를 체결하게 되면, 거푸집(150)과 토류벽(160)간을 견고하게 고정, 유지할 수 있게 되며 토류벽(160)과 거푸집(150)간 형성되는 공간부측으로 콘크리트를 타설하여 양생, 경화시켜 옹벽을 시공할 수 있게 된다.When the nut 131 is fastened to the other nut coupling part 130 of the tie bolt 100 fixed as described above, the mold 150 and the earth wall 160 can be firmly fixed and maintained, and the earth wall 160 and It is possible to construct a retaining wall by pouring concrete into the space part formed between the molds 150 and curing and curing.

상기와 같이 콘크리트의 타설 및 양생과정이 완료되면, 거푸집(150)을 탈거한 후 옹벽으로부터 돌출된 타이볼트(100)의 너트체결부(130)를 절단하여 완성된 옹벽을 얻을 수 있게 되는 것이다.When the casting and curing process of the concrete is completed as described above, after removing the formwork 150 will be able to obtain the completed retaining wall by cutting the nut fastening portion 130 of the tie bolt 100 protruding from the retaining wall.

상기 너트체결부(130)는 상술한 바와 같이 나사산 및 나사골의 형상을 사다리꼴로 갖는 사다리꼴나사 형상으로 형성되어 비교적 절단이 용이하도록 하고 있다.As described above, the nut fastening portion 130 is formed in a trapezoidal screw shape having a trapezoidal shape of a screw thread and a screw valley, so that the cutting is relatively easy.

한편, 시공작업에 따라 거푸집(150) 외표면으로 파이프(180)등을 맞대어 거푸집(150)을 견고하게 지지, 고정할 수 있는데 이때에는 도 7에서 보는바와 같이 양방향으로 만곡요홈부(191)를 이루며 형성되는 파이프고정구(190)의 중앙으로 타이볼트(100)의 너트체결부(130)가 삽입 돌출되도록 함과 동시에 상기 양방의 만곡요홈부(191) 내측으로 파이프(180)가 내합되도록 한 후, 상기 파이프고정구(190) 중앙으로 돌출된 너트체결부(130)에 너트(131)를 체결 고정하여 콘크리트가 양생되는 동안 거푸집(150)을 견고하게 고정, 지지할 수 있다.On the other hand, according to the construction work can be firmly supported and fixed to the formwork 150 to face the pipe 180 to the formwork 150, the outer surface at this time, as shown in Figure 7 the curved groove 191 in both directions After the nut fastening portion 130 of the tie bolt 100 is inserted into and protruded into the center of the pipe fixing tool 190 formed, and the pipe 180 is integrated into the curved groove portions 191 of both sides. By fastening and fixing the nut 131 to the nut fastening portion 130 protruding toward the center of the pipe fixture 190, the formwork 150 may be firmly fixed and supported while the concrete is cured.

따라서 본 고안에 의하면, 거푸집과 토류벽간을 횡단하는 타이볼트를 고정하기 위해 종래와 같이 토류벽에 별도로 타이볼트를 고정하기 위한 고정구를 먼저 고정시킨 후 거푸집을 형성하고 거푸집을 관통하여 상기 고정구와 결합하는 일련의 과정을 삭제할 수 있고, 별도의 고정구와 같은 부품을 요하지 않은 상태에서 용이하게 거푸집과 토류벽간을 고정 할 수 있으므로 작업공기의 단축 및 이에 따른 전체적 시공가를 현저하게 절감할 수 있다.Therefore, according to the present invention, in order to fix the tie bolts crossing the formwork and the earth wall, the fixtures for fixing the tie bolts separately to the earth wall are fixed first, and then form the formwork and penetrate the formwork to combine with the fixture. A series of processes can be eliminated, and the formwork and the earth wall can be easily fixed without requiring parts such as a separate fixture, thereby reducing the work air and consequently reducing the overall construction cost.

Claims (1)

거푸집(150)과 이격되는 토류벽(160)간을 횡단 관통하여 연결 고정한 후 그 사이의 공간부에 콘크리트를 타설, 양생하여 지하옹벽을 형성할 수 있도록 하기 위한 지하 옹벽 구축용 거푸집 타이볼트에 있어서,In the formwork tie bolt for the construction of underground retaining wall to form a basement retaining wall to form and cure concrete through the connection between the formwork 150 and spaced apart between the earth wall 160 spaced apart and then placed in the space therebetween, 선단부측으로 스크류나사부(110)가 형성되고 그 후단으로 길게 일체로 연장되는 연결봉(120)과, 상기 연결봉(120) 후단측으로 사다리꼴나사 형상으로 되는 너트체결부(130)가 형성되고, 상기 너트체결부(130) 후단측으로 다각형상의 공구연결부(140)가 일체로 연결 형성되는 것을 구성상 특징으로 하는 지하 옹벽 구축용 거푸집 타이볼트.A screw rod 110 is formed at the tip end side, and a connecting rod 120 integrally extended to the rear end thereof and a nut coupling portion 130 formed in a trapezoidal screw shape at the rear end of the connecting rod 120 are formed. (130) Formwork tie bolt for underground building retaining wall, characterized in that the polygonal tool connecting portion 140 is formed integrally connected to the rear end.
KR2020020019718U 2002-06-29 2002-06-29 Construction form tie bolt for underground breast wall KR200289055Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020019718U KR200289055Y1 (en) 2002-06-29 2002-06-29 Construction form tie bolt for underground breast wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020019718U KR200289055Y1 (en) 2002-06-29 2002-06-29 Construction form tie bolt for underground breast wall

Publications (1)

Publication Number Publication Date
KR200289055Y1 true KR200289055Y1 (en) 2002-09-11

Family

ID=73077086

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020019718U KR200289055Y1 (en) 2002-06-29 2002-06-29 Construction form tie bolt for underground breast wall

Country Status (1)

Country Link
KR (1) KR200289055Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100465935B1 (en) * 2002-09-25 2005-01-14 (주)태경감리공단건축사사무소 Construction form tie bolt for underground breast wall
KR102161988B1 (en) * 2019-09-17 2020-10-06 주식회사 가우리안 Press-in nut-bolt assembly and construction method of steel material-concrete complex structure using it
WO2021054744A1 (en) * 2019-09-17 2021-03-25 주식회사 가우리안 Press-fit nut for assembly, press-fit nut-bolt assembly, and method of constructing steel-concrete composite structure using same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100465935B1 (en) * 2002-09-25 2005-01-14 (주)태경감리공단건축사사무소 Construction form tie bolt for underground breast wall
KR102161988B1 (en) * 2019-09-17 2020-10-06 주식회사 가우리안 Press-in nut-bolt assembly and construction method of steel material-concrete complex structure using it
WO2021054744A1 (en) * 2019-09-17 2021-03-25 주식회사 가우리안 Press-fit nut for assembly, press-fit nut-bolt assembly, and method of constructing steel-concrete composite structure using same
CN114555958A (en) * 2019-09-17 2022-05-27 高立安 Press-fit nut for assembly, press-fit nut-bolt assembly, and method of constructing steel-concrete composite structure using the same
US11852183B2 (en) 2019-09-17 2023-12-26 Gaurian Co., Ltd. Press-fit nut for assembly, press-fit nut-bolt assembly, and method of constructing steel-concrete composite structure using same

Similar Documents

Publication Publication Date Title
KR101216391B1 (en) Segment structure of shield tunnel making use of a prestressed steel wire and segment lining method fixing the segment therewith
US3982363A (en) Frangible insert
KR200289055Y1 (en) Construction form tie bolt for underground breast wall
KR20070027432A (en) A fastener for fixing a reinforcing bar assembly, a mold panel, and a ceiling panel by fixing pin
KR200291542Y1 (en) Construction form tie bolt assembly for underground breast wall
KR100465935B1 (en) Construction form tie bolt for underground breast wall
KR200307614Y1 (en) Underground revetment molding tie-bolt
KR100469031B1 (en) Connecting salt attached washer for installing flash board
KR200326562Y1 (en) Molding fixture for underground revetment construction
KR100730914B1 (en) Truss framework system for combined slurry wall
KR100322486B1 (en) Molding bar for formwork and installation method using formwork
KR200263625Y1 (en) Structure of concrete driving depth-adjustabled cover for head of steel pile
JP3159269U (en) Prefab stairs
KR100522746B1 (en) A Dismounting Structure Form And Manufacturing Method Thereof
KR200368875Y1 (en) A soil nailing for exclusion
KR102621973B1 (en) Apparatus for connecting retaining wall panel, panel-type retaining wall and construction method of panel-type retaining wall
JP3182288U (en) Panel form form and its connector
JP3159269U7 (en)
JPH0610500A (en) Building panel body
KR100797777B1 (en) Fencee
KR200355535Y1 (en) Nut jointing tool for electric drive tool
JP5131557B2 (en) Segment joint structure
KR200410226Y1 (en) A tool fastening and unfastening nut to volt
KR200238555Y1 (en) sepa-tie in construction
JPH11141033A (en) Structural panel body and connecting method thereof