KR20020081530A - Well form for the base operation of pier and it's operation method - Google Patents

Well form for the base operation of pier and it's operation method Download PDF

Info

Publication number
KR20020081530A
KR20020081530A KR1020010020887A KR20010020887A KR20020081530A KR 20020081530 A KR20020081530 A KR 20020081530A KR 1020010020887 A KR1020010020887 A KR 1020010020887A KR 20010020887 A KR20010020887 A KR 20010020887A KR 20020081530 A KR20020081530 A KR 20020081530A
Authority
KR
South Korea
Prior art keywords
well
base plate
water
construction
wells
Prior art date
Application number
KR1020010020887A
Other languages
Korean (ko)
Other versions
KR100418268B1 (en
Inventor
손영일
김유진
오재범
Original Assignee
동부엔지니어링 주식회사
동부건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 동부엔지니어링 주식회사, 동부건설 주식회사 filed Critical 동부엔지니어링 주식회사
Priority to KR10-2001-0020887A priority Critical patent/KR100418268B1/en
Publication of KR20020081530A publication Critical patent/KR20020081530A/en
Application granted granted Critical
Publication of KR100418268B1 publication Critical patent/KR100418268B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/18Foundations formed by making use of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0069Welding
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0032Steel; Iron in sheet form, i.e. bent or deformed plate-material

Abstract

PURPOSE: Provided is caisson for foundation construction of pier for quicker and more convenient installation in deep and thick ultra-frail grounded sea and good constructability. CONSTITUTION: The caisson for foundation construction of pier is comprised of the following as: the steel caisson foundation plate(10) which size is one of the divisions of whole height of caisson into equal several parts; many caisson units(10a), which are welded each other. In case of the caisson plate, inner and outer walls(11,12) are open on upper part and close on lower part in an empty double structure, in case of each unit(10a), all of inner and outer walls(11a,12a) are open in an empty double structure.

Description

교각의 기초 시공용 우물통과 그 시공방법{Well form for the base operation of pier and it's operation method}Well form for the base operation of pier and it's operation method

본 발명은 교각의 기초 시공용으로 사용되는 우물통과 그 시공방법에 관한 것으로서, 더욱 상세히는 수심이 깊은 해상에서 초연약 점성토층이 두껍게 분포하는 지반조건에 수평 및 연직 하중의 규모가 매우 큰 기초가 요구되는 조건에서 교각의 기초 시공용 우물통을 보다 손쉽고 신속 간편하게 설치할 수 있도록 하여 시공성 양호에 의한 공기단축과 공사의 안정성 및 신뢰성을 확보할 수 있는 교각의 기초 시공용 우물통과 그 시공방법을 제공하기 위한 것이다.The present invention relates to a well bucket used for the foundation construction of bridge piers and a construction method thereof, and more particularly, to a ground condition in which super soft viscous soils are thickly distributed in a deep sea, Providing the foundation well of the piers and the construction method of the piers, which can secure the air shortage and the stability and the reliability of the construction by making it easier and faster to install the foundation wells for the piers under the required conditions. It is for.

일반적으로 해상에서 교각 기초를 시공하기 위해 사용하는 방법으로는 말뚝 기초공법과 우물통 기초공법 및 가물막이 공법이 있으며, 수심이 깊은 해상에서 초연약 점성토층(N값 1내외)(이하 "초연약층"이라 함)이 두껍게 분포하는 지반은 수평 및 연직하중의 규모가 매우 큰 기초가 요구되므로 이러한 조건의 경우에는 말뚝 기초공법이나 우물통 기초공법을 적용할 수 없어 그 대체공법인 가물막이 공법을 주로 적용하여 왔다. 그러나, 가물막이 공법은 아래에서와 같이 많은 문제점을 갖고 있어서 효율적이지 못한 문제점이 있다.In general, the methods used to construct the piling foundations at sea include the pile foundation method, the well foundation method, and the temporary barrier method, and the super soft viscous soil layer (N value of around 1) in deep waters (hereinafter referred to as "ultra soft layer"). Since the foundations with thick distributions require very large horizontal and vertical loads, the pile foundation method or the well foundation method cannot be applied in these conditions, so the temporary barrier method, which is an alternative method, is mainly applied. Has come. However, the temporary clogging method has a number of problems as described below, which is not efficient.

즉, 기존의 말뚝 기초공법은 수평 및 연직 하중이 크고 초연약층이 두껍게 분포할 경우 초연약층을 관통하여 양호한 암반층에 말뚝기초를 설치하면 연직 지지력은 확보할 수 있으나, 수평지지력을 확보하기 어렵고 지지층을 직접 확인할 수가 없으므로 수심이 깊고 초연약층이 두껍게 분포하는 지반에서는 적용할 수 없었다.In other words, the existing pile foundation method has a large horizontal and vertical load, and if the super soft layer is thickly distributed, it is possible to secure vertical support by penetrating the super soft layer and installing a pile foundation in a good rock layer. Because it could not be directly identified, it could not be applied in the ground where the water depth was deep and the super soft layer was thickly distributed.

그리고, 우물통 기초의 시공방법은 기초가 설치될 위치에 수면 위로 상단부가 노출될 수 있을 정도의 높이를 갖도록 콘크리트로 제작된 우물통을 견인기로 들어서 우물통 설치위치에 놓으면 콘크리트 우물통이 자중에 의해 물속으로 가라앉으면서 침하되어 초연약층 및 토사층을 거쳐 암반층에 닿은 다음 우물통 내부의 흙을 크램쉘 등의 굴착장비를 이용하여 굴착해 내려가면서 소정의 암반 지지층 깊이까지 우물통 자중에 의하여 침하시키는 공법을 사용하였다.In addition, the construction method of the well basin foundation is to lift the wells made of concrete so that the upper portion is exposed to the water surface at the position where the foundation is to be installed as a retractor and put the concrete well in the well installation position It sinks while sinking into the water, touches the rock layer through the super soft layer and the soil layer, and then excavates the soil inside the well using excavation equipment such as cram shells, and sinks it by the well's own weight to a predetermined rock support layer depth. The method was used.

또한, 그 후 우물통내 물과 연약층을 펌핑하여 퍼내고 우물통 바닥을 정리하는 공정을 행한 다음 우물통내에 물담기와 수중콘크리트,채움재,콘크리트 타설공정을 행하는 과정을 거쳐 완료되는 공법으로서, 상기 종래의 우물통 공법은 그동안 우물통을 쉽게 침하시키는 방향으로만 개선되어 왔다.In addition, after the process of pumping out and pumping the water and the soft layer in the well and cleaning the bottom of the well, the process is completed through the process of dipping and submerged concrete in the well and underwater concrete, filling material, concrete pouring process, The conventional well-hole method has been improved only in the direction of easily sinking the well.

이러한 우물통 기초 시공방법은 연직 지지력뿐만 아니라 수평지지력이 매우 크므로 안정성 측면이 유리하고 지지층의 육안 확인이 가능하지만 콘크리트 구조물의 우물통은 중량이 상당히 많아나가 꽤 무겁기 때문에 견인하여 들어 옮기려면 용량이 상당히 큰 기중기선이 필요하며, 또한 그 높이를 높게 만드는데 한계가 있어서 수심이 깊은 곳에서는 적용할 수가 없었다.This well construction method is not only vertical support but also very large horizontal support, which is advantageous in terms of stability and visual confirmation of the support layer.However, the wells of concrete structures are quite heavy and are quite heavy. A fairly large crane was needed, and there was a limit to raising the height so that it could not be applied in deep waters.

즉, 초연약층 위에 거치시키게 되면 콘크리트 구조물의 우물통이 자중에 의하여 초연약성 점성토층 속으로 상당부분이 가라앉게 되므로 초연약층이 두꺼운 곳에서 사용하려면 우물통을 아주 높게 만들어야 하는데 이는 제작하기도 힘들지만 제작후 견인선으로 견인 운반하기도 힘들고 들어 올리기도 힘들어서 수심이 깊고 초연약층이 두껍게 분포하는 지반에서는 적용할 수가 없다.In other words, if it is mounted on the super soft layer, the well of the concrete structure will sink to the super soft viscous soil layer by its own weight. It is difficult to transport and lift by tow line, so it is not applicable to the ground which is deep and super soft layer is distributed.

따라서, 수심이 깊고 초연약층이 두껍게 분포하는 지반에서는 상기와 같은 우물통 기초공법의 한계성으로 가물막이 공법이 대체공법으로 사용되고 있으나, 이중 조립틀을 이용하는 일반 가물막이 공법은 조립틀의 제작(SHEET PILE조립) 운반 및 거치에 따라 가물막이할 범위가 넓어 항로확보 등 제약이 많으며, 시공수가 많고 시공성이 복잡하여 공기가 길어짐에 따라 공사비 증가 및 해양오염이 심해 이에 대한 대책이 요구되는 등의 문제점이 있다.Therefore, in the ground where the depth of water and the super soft layer are thickly distributed, the temporary barrier method is used as an alternative method due to the limitations of the above-mentioned basic method of the well tank, but the general temporary barrier method using the double assembly frame is the production of the assembly frame (SHEET PILE). Assembly) There are many limitations such as securing the route due to wide range of barriers due to transportation and mounting, and there are problems such as increase of construction cost and marine pollution due to the long air due to the large number of constructions and the complexity of construction. .

그리고, 벽강관 우물통을 이용하는 가물막이 공법은 "공사용 가교설치→가이드파일 및 강관파일 설치→굴토 및 강지보공 설치→물담기 및 수중콘크리트 타설→물푸기 및 기초콘크리트 타설"의 공정의 거쳐 시공을 완료하게 되는데, 이 역시 시공성이 복잡하고 공기가 오래 걸려 공사비가 증가하게 되고 안전사고 등의 위험성이 큰 문제점이 있다.In addition, the façade construction method using wall steel pipe wells is carried out through the process of "cross-linking installation for construction → guide pile and steel pipe pile installation → excavation and cultivation of earthen ground construction → water dipping and underwater concrete placement → watering and foundation concrete casting". This is completed, too, the construction is complicated and the air takes a long time to increase the construction cost, there is a big risk of safety accidents.

본 발명은 상기와 같은 종래의 문제점을 감안하여 개발된 것으로서, 본 발명의 목적은 수심이 깊고 초연약층이 두껍게 분포하는 지반조건에서 교각용 우물통을 신속 간편하면서도 안정성있게 시공할 수 있도록 하여 공기단축과 공사의 안정성 및 신뢰성을 확보할 수 있는 교각의 기초 시공용 우물통과 그 시공방법을 제공하는데 있다.The present invention was developed in view of the above-described conventional problems, and an object of the present invention is to shorten the air by allowing the construction of a well well for pier quickly and stably under ground conditions in which a deep depth and a super soft layer are thickly distributed. The present invention is to provide a well for the foundation construction of the piers that can ensure the stability and reliability of construction work and its construction method.

상기한 본 발명의 목적은 우물통을 철판의 강재 재질로 형성하되 전체 우물통 높이를 몇등분한 크기로 우물통 기초판과 수개의 우물통 유니트로 분할하여 교각의 기초 시공용 우물통을 형성한 다음 시공하고자 하는 위치에 상기 분할된 우물통 기초판을 먼저 부력을 이용하여 부양시켜 놓은 상태에서 그 내/외 벽체에 콘크리트나 담수를 속채움하여 소정 깊이까지 침하시킨 다음 그 위로 다른 우물통 유니트를 연속 용접하면서 침하시키는 과정을 반복하는 공정으로 교각의 기초 시공용 우물통 시공방법을 구성함으로써 상기 목적을 달성할 수가 있다.The object of the present invention described above is to form a well tub for steel construction of the steel plate, but divided into a well base plate and several well tub units to the size of the whole well height by dividing the height of the entire well barrel to form a well for the foundation construction of piers Next, the divided well basin base plate is buoyed by buoyancy first at the location to be constructed, and the inner / outer wall is filled with concrete or fresh water to settle down to a predetermined depth, and then the other well unit is placed thereon. The above object can be attained by constructing a well construction method for a foundation construction of a pier by a step of repeating the process of sinking while continuous welding.

이와 같은 본 발명은 우물통 유니트를 부양식으로 띄운 상태에서 상측에 새로운 우물통 유니트를 연속 용접하면서 침하시켜 시공하는 것으로서, 초연약층과 토사층을 통과해서 그 하부의 암반층에 지지되는 것을 확인하기가 양호하고, 기초에 작용하는 수평 및 연직하중의 규모가 매우 커 대규모의 수평지지력 및 연직 지지력이 요구되는 장대교량의 시공에 적합하며, 초연약층이 두껍게 분포하고 수심이 깊은 해상에서의 우물통 시공이 신속 간편한 등 시공성이 좋아 공기단축의 효과가 상당하므로 상기 목적이 효과적으로 달성되는 것이다.Such a present invention is to be settled while submerged welding the new well unit unit in the upper state in the state of floating the well unit in the form of floating, it is good to confirm that it is supported by the rock layer below the ultra soft layer and the soil layer. The large horizontal and vertical load acting on the foundation is suitable for the construction of long bridges requiring large horizontal and vertical loads, and the rapid construction of wells in deep seas with thick distribution of super soft layers. Since the workability is easy and the effect of air shortening is considerable, the said objective is effectively achieved.

도 1a 은 본 발명의 우물통을 우물통 기초판과 다수의 우물통 유니트로 분할 제작한 상태를 예시한 분해사시도Figure 1a is an exploded perspective view illustrating a state in which the wells of the present invention divided into a well base plate and a plurality of wells unit

도 1b 는 도 1a의 분할된 우물통중 하부의 기초판에 각 우물통 유니트가 연속 용접되는 상태를 보인 요부 횡단면도Figure 1b is a cross-sectional view showing the main portion showing the state in which each well casing unit is continuously welded to the base plate of the lower part of the divided well barrel of Figure 1a

도 2a 는 해상에서 본발명의 가이드파일을 시공하는 상태도Figure 2a is a state diagram constructing the guide file of the present invention at sea

도 2b 는 본 발명의 우물통 기초판을 가이드파일내에 부양시키는 상태도Figure 2b is a state diagram for supporting the well base plate of the present invention in the guide file

도 2c 는 본 발명에서 부양된 우물통 기초판의 내/외 벽체속에 콘크리트를 타설하여 침하시키는 상태도Figure 2c is a state diagram for laying down concrete in the interior / exterior walls of the well basin plate supported by the present invention

도 2d 는 본 발명의 우물통 기초판 위에 유니트를 용접하여 연결하는 상태도Figure 2d is a state diagram connecting the unit by welding on the well base plate of the present invention

도 2e 는 본 발명에서 용접 연결된 우물통 유니트의 내/외 벽체속에 콘크리트를 타설하여 침하시키는 상태도Figure 2e is a state in which the concrete is placed in the inner / outer walls of the well connected welded well unit in the present invention to sink

도 2f 는 본 발명의 우물통 유니트를 연속 연결하는 상태도Figure 2f is a state diagram for continuously connecting the well unit of the present invention

도 3 은 본 발명의 연결된 우물통이 자중으로 완전히 침하된 상태도Figure 3 is a state in which the connected well bucket of the present invention completely submerged in its own weight

도 4 는 본 발명에서 완전 침하된 우물통 속의 물,초연약층,토사를 차례로퍼내는 상태도Figure 4 is a state in which the water, the ultra soft layer, the soil in the well settled well bucket in the present invention in sequence

도 5 는 본 발명에서 굴착작업에 의해 우물통을 암반층에 안착시키는 상태도Figure 5 is a state diagram seated in the well layer rock bed by excavation work in the present invention

도 6 은 본 발명에서 암반층에 안착된 우물통속에 담수를 채우는 상태도Figure 6 is a state filled with fresh water in the well bucket seated on the rock bed in the present invention

도 7 은 본 발명의 우물통 내부 바닥에 수중콘크리트를 타설하는 상태도Figure 7 is a state diagram for pouring underwater concrete in the bottom of the well bucket of the present invention

도 8 은 본 발명의 우물통 속에 채움재와 배근 및 콘크리트를 타설한 상태도8 is a state in which the filling material and reinforcement and concrete in the well bucket of the present invention

도 9 는 본 발명의 우물통에 의해 교각 기초의 시공이 완성된 상태도Figure 9 is a state diagram completed the construction of the piers foundation by the well of the present invention

도 10 은 본 발명의 우물통 기초판 내/외 벽체속에 담수를 채워 침하시키는 다른 실시예의 상태도10 is a state diagram of another embodiment for filling and sinking fresh water in the inner / outer wall of the well base plate of the present invention

도 11 은 본 발명의 우물통 내/외 벽체속에 담수를 먼저 채워 침하시킨 다음 수중콘크리트를 타설하여 늘어난 자중으로 우물통이 더 침하되게 한 상태도FIG. 11 is a state in which the wells of the present invention are filled with fresh water in the inner / outer wall of the present invention, and then submerged, and then the submerged concrete is submerged to increase the weight of the wells.

도면의 주요 부분에 대한 부호의 설명Explanation of symbols for the main parts of the drawings

10 : 우물통 기초판 10a : 우물통 유니트10: well base plate 10a: well unit

11,11a: 내 벽체 12,12a: 외 벽체11,11a: inner wall 12,12a: outer wall

20 : 가이드파일 30 : 초연약층20: guide file 30: ultra soft layer

40 : 토사층 50 : 암반층40: soil layer 50: rock layer

60 : 크레인 70 : 수중콘크리트60: crane 70: underwater concrete

100 : 교각용 기초100: foundation for piers

이하, 본 발명의 목적을 효과적으로 달성할 수 있는 바람직한 교량의 교각 시공용 우물통과 그 시공방법을 실시예별로 첨부한 도면에 의해 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the well for the construction of the well bridge and the construction method of the preferred bridge that can effectively achieve the object of the present invention will be described.

<실시예1> 콘크리트 채움 침하방법Example 1 Concrete Filling Settlement Method

제1공정(우물통 분리 제작과 가이드파일 시공공정)1st process (Separation of the water tank and construction of guide pile)

제작장에서는 도 1a 및 도 1b 와 같이 철판의 강재 재질로 설치할 우물통의 전체 높이를 몇등분한 상태로 우물통 기초판(10)과 수개의 우물통 유니트(10a)를 제작하되 우물통 기초판(10)은 내/외 벽체(11)(12)를 내부가 비어있는 2중구조로제작하되 각 벽체(11)(12)의 상단부는 개구되고 하단부는 막혀있는 상태로 제작하고, 각 우물통 유니트(10a) 역시 내부가 비어있는 2중구조로 내/외 벽체(11a)(12a)를 형성하되 그 상/하단부를 모두 개구된 상태로 제작한다.1A and 1B, while manufacturing the well base plate 10 and several well unit units 10a while dividing the overall height of the wells to be installed with steel materials of steel plate as shown in FIGS. 1A and 1B, the well base plate 10, the inner and outer walls 11 and 12 are manufactured in a double structure with an empty interior, and the upper end of each of the walls 11 and 12 is opened and the lower end is closed, and each well box unit is manufactured. (10a) also forms an inner / outer wall (11a) (12a) in a double structure with an empty inside, while manufacturing both the upper and lower ends are open.

그리고, 교각을 시공하고자 하는 해상 위치 주변에서는 도 2a 와 같이 부양된 우물통의 이동방지용 가이드파일(20)을 초연약층(30)과 토사층(40)을 거쳐 암반층(50)에 꽂힐 때까지 박아서 시공한다.Then, around the sea position to be constructed pier to drive the guide pile 20 for preventing movement of the wells supported as shown in Figure 2a until the super soft layer 30 and the soil layer 40 through the rock layer 50 is inserted Construct

제2공정(우물통위치에 기초판 거치공정)2nd process (base plate mounting process at wells location)

제작된 우물통 기초판(10)을 기중기선의 크레인(60) 등으로 들어서 도 2b 와 같이 가이드파일(20)내에 거치시켜 놓으면 우물통 기초판(10)은 비어있는 내/외 벽체(11)(12)의 부력에 의해 부양된 상태를 유지하게 되며, 이와같이 부양된 우물통 기초판(10)은 사방을 가이드파일(20)이 막아주고 있으므로 부력에 의해 부양된 위치가 그대로 유지된다.If the well box base plate 10 is lifted by a crane 60 of a crane, etc., and mounted in the guide pile 20 as shown in FIG. 2B, the well base plate 10 is an empty inner / outer wall 11 ( The buoyancy of 12) is maintained in a buoyant state, and thus, the well bucket base plate 10 supported in this way is supported by the guide pile 20 so that the buoyancy is maintained by the buoyant position.

제3공정(콘크리트 속채움공정)3rd process (concrete filling)

도 2c 와 같이 부양된 우물통 기초판(10)의 내/외 벽체(11)(12) 내부에 콘크리트를 타설하여 속채움한다. 그러면 우물통 기초판(10)은 벽체(11)(12)속에 채워지는 콘크리트의 무게에 의하여 점차 가라앉게 된다.As shown in FIG. 2c, concrete is poured into and filled inside / outer walls 11 and 12 of the well base plate 10 supported. Then the well base plate 10 is gradually submerged by the weight of concrete filled in the walls (11, 12).

그런데, 이때 타설되는 콘크리트에 의해 증가되는 우물통 기초판(10)의 자중과 부력을 검토하여 우물통 기초판(10)은 한쪽이 기울지 않도록 균형되게 콘크리트를 타설하여야 하고, 우물통 기초판(10)의 상단이 수면 위로 약간 노출된 상태를 유지할 때까지 서서히 침하되게 함이 바람직하다.However, at this time, by examining the self-weight and buoyancy of the well base plate 10 increased by the concrete to be poured, the well base plate 10 should be concretely placed so that one side does not tilt, and the well base plate 10 It is desirable to allow the top of the 서서히 to settle slowly until it remains slightly exposed above the surface of the water.

제4공정(우물통 유니트 연속 연결 공정)4th process (continuously connecting the well unit)

상기 제3공정 후 다시 기중기선의 크레인(60) 등으로 우물통 유니트(10a)를 들어서 도 2d 와 같이 수면위로 약간 노출되어 있는 우물통 기초판(10) 위에 올려놓고 용접하여 우물통 기초판(10)과 우물통 유니트(10a)를 연결한 다음 도 2e 와 같이 그 연결된 우물통 유니트(10a)의 비어있는 내/외 벽체(11)(12)속에 콘크리트를 타설하는 속채움으로 우물통의 자중을 늘려 다시 침하를 시킨다.After the third step, the well tank unit 10a is lifted again by the crane 60 of the crane, etc., placed on the well base plate 10 which is slightly exposed above the water surface as shown in FIG. 2D, and welded to the well base plate 10. ) And the wells unit (10a) is connected and then the weight of the wells by filling the concrete into the empty inner / outer walls (11) (12) of the connected wells unit (10a) as shown in Figure 2e Increase to sink again.

이때 역시 침하되는 우물통 유니트(10a)의 상단이 수면 위로 약간 노출될 때가지 침하시키는 것이며, 도 2f 와 같이 그 위로 다른 우물통 유니트(10a)를 용접 연결하는 과정과 속채움으로 타설되는 콘크리트에 의한 자중 증가로 침하시키는 공정을 반복하여 도 3 과 같이 최하단의 우물통 기초판(10)이 초연약층(30)과 토사층 (40)을 차례로 지나 자중만으로는 더 이상 침하되지 않을 때까지(대부분 암반층에 닿을 때까지) 계속한다.At this time, it is to sink until the top of the sink well unit (10a) is slightly exposed over the water surface, as shown in FIG. 2f to the concrete to be poured by the process of welding the other well unit (10a) and filling Repeat the step of sinking due to the increase in self-weight caused by the bottom of the bottom well 10 through the super soft layer 30 and the soil layer 40 in turn as shown in Figure 3 until it no longer sinks only by its own weight (mostly in the rock layer) Continue until you reach it).

제5공정(우물통내 물과 연약층 펌핑 및 우물통 기초정리 공정)5th process (Pumping of water and soft layers in wells and basic cleaning process of wells)

상기 제4공정 후 도 4 와 같이 우물통 내에 채워진 물과 초연약층(30) 및 토사층(40)을 펌프로 펌핑하여 퍼내는 작업을 행한다. 그리고, 우물통 내부의 물과 초연약층(30) 및 토사층(40)을 퍼내는 작업이 완료되어 우물통 바닥에 암반층(50)이 나타나면 도 5 와 같이 크램쉘 등의 굴착장비를 이용하여 암반을 굴착해 내려가면서 도 6 과 같이 소정의 암반층(50) 깊이까지 용접된 우물통이 침하되어 지지될 때까지 우물통을 인위적으로 침하시키는 공정과 우물통 바닥을 깨끗하게 정리하는 공정을 행한다.After the fourth step, as shown in FIG. 4, the water filled in the well, the ultra soft layer 30, and the earth and sand layer 40 are pumped out. Then, when the work of discharging the water and the ultra soft layer 30 and the soil layer 40 in the well is completed and the rock layer 50 appears on the bottom of the well, the rock is formed by using an excavation equipment such as a cram shell as shown in FIG. 5. While drilling down, as shown in FIG. 6, the step of artificially sinking the well until the welded well down to the predetermined rock layer 50 depth is supported and the step of cleaning the bottom of the well is performed.

제6공정(물담기와 수중콘크리트,채움재,콘크리트 타설공정)6th process (water dipping and underwater concrete, filling material, concrete pouring process)

상기 제5공정에 의해 암반층(50)에 안정적으로 안착되면 우물통 내부에 물을 소정 높이까지 담은 다음 도 7 과 같이 수중콘크리트(70)를 부력 저항위치까지 타설하는 공정과 우물통 내부의 물을 완전히 퍼내는 공정을 거쳐 도 8 과 같이 채움재(71)를 채우는 공정과 채움재(71) 위로 배근공사 및 콘크리트(72) 타설공사를 하여 양생시키는 공정을 차례로 행한 다음 최종 정리를 하면 도 9 와 같이 상단이 수면위로 노출되는 교각용 기초(100)의 시공이 완료되는 것이다.When it is stably seated on the rock layer 50 by the fifth process, the water is contained in the well to a predetermined height, and then the water concrete 70 is poured into the buoyancy resistance position as shown in FIG. After the process of completely draining, the process of filling the filling material 71 as shown in Figure 8 and the process of curing by placing the reinforcement work and concrete 72 pouring over the filling material 71 in turn, and then the final arrangement, as shown in Figure 9 Construction of the piers foundation 100 exposed on the water surface is completed.

<실시예2> 담수 채움 침하방법Example 2 Freshwater Filling Settling Method

제1공정(우물통 분리 제작과 가이드파일 시공공정) 및 제2공정(우물통위치에 기초판 거치공정)1st process (Separation process and construction of guide pile) and 2nd process (base plate mounting process at well position)

제작창에서 강재 재질의 우물통을 상기의 우물통 기초판(10)과 여러개의 우물통 유니트(10a)로 분리 제작하고, 가이드파일(20)을 시공하는 제1공정과 우물통 설치 위치에 우물통 기초판(10)을 기중기선이 크레인(60)으로 들어서 거치하는 제2공정은 상기 <실시예1>의 제1공정 및 제2공정과 같다.In the production window, the steel well is separated into the well base plate 10 and several well unit units 10a, and the guide file 20 is constructed at the first step and the well installation position. The second step of mounting the bucket base plate 10 by the crane 60 by the crane 60 is the same as the first step and the second step of <Example 1>.

제3공정(담수 속채움 공정)Third Process (Freshwater Filling Process)

상기 2공정 후 도 10 과 같이 부양된 우물통 기초판(10)의 내/외 벽체(11) (12) 내부에 담수를 펌프로 펌핑하여 속채움한다. 그러면 우물통 기초판(10)은 채워지는 담수의 무게에 의하여 점차 가라앉게 되는데, 이때 채워지는 담수는 벽체 내부에 고르게 퍼져 저절로 평형성을 맞추기 때문에 기초판(10)의 자중과 부력만을검토하면 될 뿐 수평을 맞추지 않아도 됨에 따라 작업성이 좋으며, 우물통 기초판(10)의 상단이 수면 위로 약간 노출된 상태를 유지할 때까지 서서히 침하되게 함이 바람직하다.After the second step, the fresh water is pumped into the inner / outer walls 11 and 12 of the well basin base plate 10 supported as shown in FIG. Then, the well base plate 10 is gradually sinked by the weight of the fresh water being filled in. At this time, the filled fresh water is spread evenly in the wall to balance itself by itself, so only the weight and buoyancy of the base plate 10 need to be examined. Workability is good as it does not have to be level, and it is preferable to allow the top of the well base plate 10 to settle slowly until it maintains a slightly exposed state above the water surface.

제4공정(우물통 유니트 연속 연결과 담수 채움 공정)4th process (continuous connection of well unit and filling of fresh water)

상기 제3공정 후 다시 기중기선의 크레인(60) 등으로 우물통 유니트(10a)를 들어서 수면위로 약간 노출되어 있는 우물통 기초판(10) 위에 올려놓고 용접하여 우물통 기초판(10)과 우물통 유니트(10a)를 연결한 다음 그 용접된 우물통 유니트 (10a)의 비어있는 내/외 벽체(11)(12)속에 다시 담수를 채우는 속채움으로 우물통의 자중을 늘려 침하를 시킨다.After the third process, the well tank unit 10a is lifted again by the crane 60 of the crane, etc., placed on the well base plate 10 which is slightly exposed on the water surface, and welded to the well base plate 10 and the well box. The unit 10a is connected and then submerged by increasing the weight of the wells by filling the fresh water into the empty inner / outer walls 11 and 12 of the welded wells unit 10a.

이때 역시 침하되는 우물통 유니트(10a)의 상단이 수면 위로 약간 노출될 때가지 침하시킨 다음 그 위로 다른 우물통 유니트(10a)를 용접 연결하는 공정과 속채움으로 채워지는 담수에 의한 자중 증가로 침하시키는 공정을 반복하여 우물통이 채워진 담수와 강재 자중만으로 침하될 때까지 행한다.At this time, the submerged well tank unit 10a is submerged until the top of the water surface is slightly exposed, and then the other well tank unit 10a is welded and submerged by an increase in the weight of fresh water filled with filling. The process is repeated until the wells are submerged only with filled fresh water and steel weight.

그런 다음 도 11 과 같이 우물통의 내/외 벽체(11)(12)속에 수중콘크리트를 타설하여 우물통의 하중을 증가시키면 우물통은 2차 침하를 하게 되며, 수중콘크리트를 다 채워서 최하단의 우물통 기초판(10)이 초연약층(30)과 토사층(40)을 차례로 지나 자중만으로는 더 이상 침하되지 않을 때까지(대부분 암반층에 닿을 때까지) 침하되게 한다.Then, as shown in FIG. 11, when the water concrete is placed in the inner / outer walls 11 and 12 of the well to increase the load of the well, the well is subjected to the second settlement, and the bottom of the bottom is filled by filling the underwater concrete. The bucket base plate 10 is passed through the super soft layer 30 and the soil layer 40 in turn until it no longer sinks by its own weight (mostly until it reaches the rock layer).

제5공정(우물통내 물과 연약층 펌핑 및 우물통 기초정리 공정)5th process (Pumping of water and soft layers in wells and basic cleaning process of wells)

상기 제4공정이 완료되면 도 4 와 같이 우물통 내에 채워진 물과 초연약층(30)을 퍼내는 작업, 우물통 바닥의 암반층(50)을 굴착해 우물통이 암반층(50) 소정의 깊이까지 침하되게 하는 것으로 이는 상기 <실시예1>의 제5공정과 같다.When the fourth step is completed as shown in FIG. 4, the water filled in the well and the super soft layer 30 are excavated, the rock layer 50 at the bottom of the well is excavated, and the well is settled down to a predetermined depth of the rock layer 50. This is the same as the fifth step of <Example 1>.

제6공정(물담기와 수중콘크리트,채움재,콘크리트 타설공정)6th process (water dipping and underwater concrete, filling material, concrete pouring process)

상기 암반층(50)에 안정적으로 안착된 우물통 내부에 물을 소정 높이까지 담고 수중콘크리트(70)를 부력 저항위치까지 타설하는 공정, 그 후 우물통 내부의 물을 완전히 퍼내고 채움재(71)와 배근공사 및 콘크리트(72)를 차례로 채워넣고 양생시키는 공정은 상기 <실시예1>의 제6공정과 같은 것으로서, 최종 정리를 하면 상단이 수면위로 노출되는 교각용 기초의 시공이 완료된다.The process of placing water in the well bucket secured to the rock bed layer 50 to a predetermined height and placing the underwater concrete 70 to the buoyancy resistance position, and then completely drain the water inside the well bucket and filling material 71 and The process of filling and curing the reinforcement work and concrete 72 in sequence is the same as the sixth step of <Example 1>, and when the final arrangement is completed, the construction of the foundation for the piers where the upper end is exposed on the water surface is completed.

이상에서와 같이 본 발명은 교각의 기초시공용 우물통을 우물통 기초판과 여러개의 우물통 유니트로 분리 제작한 다음 이들을 부양식으로 띄운 상태에서 연속 용접하면서 침하시켜 시공하는 것이기 때문에 수심이 깊고 초연약층이 두껍게 분포하는 지반조건의 해상에서 기존 우물통 공법보다 신속 간편하게 설치할 수 있고, 암반층에 지지되는 것을 확인하기가 쉬워 시공성이 양호한 효과가 있다.As described above, the present invention separates and manufactures the wells for the foundation construction of the piers into wells base plate and several wells units, and then sinks them while continuously welding them in a floating state, so that they are deep and deep. In the sea of the ground condition where the soft layer is thickly installed, it can be easily and quickly installed than the existing well-hole method, and it is easy to confirm that it is supported on the rock layer, and thus the workability is good.

또한, 기초에 작용하는 수평 및 연직하중의 규모가 커 대규모의 수평지지력 및 연직 지지력이 요구되는 장대교량의 시공에 적합한 효과가 있는 것으로, 교각의 기초시공용 우물통을 설치할 때 공기단축에 의한 공사비 절감효과가 높고, 공사의 안정성 및 신뢰성을 확보가 용이하여 매우 획기적인 발명이라고 할 수 있다.In addition, the large horizontal and vertical loads acting on the foundation have the effect of being suitable for the construction of long bridges requiring large horizontal and vertical loads. It is a very innovative invention because it has high saving effect and easy to secure stability and reliability of construction.

Claims (3)

교각의 기초 시공용 우물통을 구성함에 있어서,In constructing the wells for the foundation construction of the piers, 철판의 강재 재질로 전체 우물통 높이를 몇등분한 크기의 우물통 기초판(10)과 수개의 우물통 유니트(10a)를 분할 형성하되 상기 우물통 기초판(10)은 내/외 벽체(11)(12)를 내부가 비어있는 2중구조 상태에서 상단은 개구되고 하단은 막혀있는 상태로 제작하고, 각 우물통 유니트(10a)는 내부가 비어있는 2중구조의 내벽(11a)과 외벽(12a)의 상/하단을 모두 개구된 상태로 제작하여 서로 용접되게 한 것을 특징으로 하는 교각의 기초 시공용 우물통.The well base plate 10 and several well unit units 10a are formed by dividing the entire well height by the steel material of the steel plate, and the well base plate 10 is an inner / outer wall 11 (12) is manufactured in a state in which the double structure is empty inside and the top is opened and the bottom is blocked, and each well barrel unit 10a has an inner wall 11a and an outer wall 12a of the double structure empty inside. The wells for foundation construction of piers, characterized in that both the upper and lower ends of the) are manufactured to be welded to each other. 교각의 기초 시공용 우물통을 시공함에 있어서,In constructing the wells for the foundation construction of the piers, 우물통을 내/외 벽체(11)(12),(11a)(12a)의 내부가 비어있는 2중구조 상태에서 그 상단은 개구되고 하단은 막혀있는 우물통 기초판(10)과 상/하단이 모두 개구된 다수의 우물통 유니트(10a)를 소정 높이로 분할하여 제작하고, 교각을 시공하고자 하는 해상 위치 주변에 우물통 이동방지용 가이드파일(20)을 초연약층(30)과 토사층(40)을 거쳐 암반층(50)에 꽂힐 때까지 박아 시공하는 제1공정과;In the double structure with the inside of the inner and outer walls 11, 12 and 11a and 12a being empty, the upper and lower ends of the well and the lower / closed base plate 10 are closed. All of the wells are opened by dividing a plurality of wells unit 10a to a predetermined height, and the super-soft layer 30 and the soil layer 40 to guide the movement of the wells 20 around the sea position where the pier is to be constructed A first step of driving the construction until it is inserted into the rock layer 50 through; 상기 우물통 기초판(10)을 들어서 가이드파일(20)내의 우물통 위치에 거치시켜서 자체 부력으로 부양시키는 제2공정과;A second step of lifting the well barrel base plate 10 and placing it in the well bucket position in the guide pile 20 to support it with its own buoyancy; 부양된 우물통 기초판(10)의 내/외 벽체(11)(12) 내부에 균형있게 콘크리트를 타설하는 속채움하여 우물통 기초판(10)의 상단이 수면 위로 약간 노출된 상태를 유지할 때까지 침하시키는 제3공정과;When the top of the well base plate 10 is slightly exposed above the water surface by filling the inside of the inside / outer walls 11 and 12 of the raised well base plate 10 in a balanced manner A third step of sinking until; 상기 수면위로 상단이 노출된 우물통 기초판(10) 위에 우물통 유니트(10a)를 올려놓고 연결 용접한 다음 우물통 유니트(10a)의 비어있는 내/외 벽체(11)(12)속에 콘크리트를 타설하는 속채움으로 우물통 유니트(10a)의 상단이 수면 위로 약간 노출될 때가지 2차 침하시키고, 그 후 다른 우물통 유니트(10a)를 계속 용접하는 과정과 콘크리트 속채움하는 공정을 반복하여 최하단의 우물통 기초판(10)이 초연약층(30)과 토사층(40)을 거쳐 자중만으로 더 이상 침하되지 않을 때까지 계속 침하시키는 제4공정과;Put the well box unit 10a on the well base plate 10 with the upper end exposed to the surface of the water, and connect and weld the well into the empty inner / outer walls 11 and 12 of the well box unit 10a. With the filling stuffing, the secondary sinking is performed until the top of the well unit 10a is slightly exposed to the surface of water, and then the process of continuously welding the other well unit 10a and the process of filling the concrete are repeated at the bottom. The fourth step of continuing to sink until the well plate base plate 10 of the well through the super soft layer 30 and the soil layer 40 is no longer submerged only by its own weight; 상기 제4공정 후 우물통 내에 채워진 물과 초연약층(30)을 퍼내어 우물통 바닥에 암반층(50)이 나타나면 이를 굴착해 내려가면서 소정의 암반층(50) 깊이까지 용접된 우물통을 침하시켜 안정적으로 지지되게 하는 제5공정과;After the fourth process, the water filled in the well and the super soft layer 30 are scooped out, and when the rock layer 50 appears on the bottom of the well, it is excavated and lowered into the well to be welded to a predetermined rock layer 50 depth. A fifth step of being supported by; 상기 제5공정 후 우물통 내부에 물을 소정 높이까지 담고 수중콘크리트(70)를 부력 저항위치까지 타설한 다음 우물통 내부의 물을 완전히 퍼내고 채움재(71)와 배근공사 및 콘크리트(72) 타설공사를 차례로 하여 양생시키면 상단이 수면위로 노출되는 교각용 기초(100)의 시공이 완료되게 하는 제6공정;After the fifth process, the water is contained in the well to the predetermined height, and the underwater concrete 70 is poured to the buoyancy resistance position, and then the water in the well is completely drained and the filling material 71 and the reinforcement work and concrete 72 are placed. A sixth step of completing the construction of the piers foundation 100 where the top is exposed to the surface when curing is performed in sequence; 으로 이루어진 것을 특징으로 하는 교각의 기초 시공용 우물통의 시공방법.Construction method of the well construction for the foundation construction of piers, characterized in that consisting of. 제2항에 있어서, 제3공정에서는 가이드파일(20)내에서 부양된 우물통 기초판(10)의 내/외 벽체(11)(12) 속에 담수를 채워 침하시키고,The method of claim 2, wherein in the third step, the fresh water is filled and settled in the inner and outer walls (11) and (12) of the well base plate (10) supported in the guide pile (20), 제4공정에서는 우물통 기초판(10)위로 연속 용접되는 우물통 유니트(10a)의 비어있는 내/외 벽체(11a)(12a)속에 담수를 채워 자중만으로 먼저 침하시킨 다음 상기 내/외 벽체(11)(12),(11a)(12a)속에 수중콘크리트를 채워서 우물통의 자중을 높힘으로서 최하단의 우물통 기초판(10)이 초연약층(30)과 토사층(40)을 거쳐 최대한 침하되게 한 다음 상기 제5공정과 제6공정을 차례로 행하도록 한 것을 특징으로 하는 교각의 기초 시공용 우물통의 시공방법.In the fourth process, fresh water is filled into the empty inner / outer walls 11a and 12a of the well unit 10a which is continuously welded onto the well base plate 10, and then submerged first with only its own weight. 11) (12), (11a) (12a) by filling the water concrete in the well to increase the weight of the well, so that the lowermost basin base plate 10 is submerged as much as possible through the super soft layer 30 and the soil layer (40) And the fifth and sixth steps are performed in sequence.
KR10-2001-0020887A 2001-04-18 2001-04-18 Well form bucket of division style for the base operation of pier and it's operation method KR100418268B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0020887A KR100418268B1 (en) 2001-04-18 2001-04-18 Well form bucket of division style for the base operation of pier and it's operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0020887A KR100418268B1 (en) 2001-04-18 2001-04-18 Well form bucket of division style for the base operation of pier and it's operation method

Publications (2)

Publication Number Publication Date
KR20020081530A true KR20020081530A (en) 2002-10-28
KR100418268B1 KR100418268B1 (en) 2004-02-11

Family

ID=27701621

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0020887A KR100418268B1 (en) 2001-04-18 2001-04-18 Well form bucket of division style for the base operation of pier and it's operation method

Country Status (1)

Country Link
KR (1) KR100418268B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100440726B1 (en) * 2002-03-15 2004-07-19 삼성중공업 주식회사 Apparatus for confirming well barrel's foundation on rock floor in the bridge base
KR100567738B1 (en) * 2005-05-20 2006-04-04 재현토건(주) Open caisson construction method for the structures constructed over the water
KR101134025B1 (en) * 2009-12-22 2012-04-05 한신공영 주식회사 Method for constructing a foundation using a open caisson
CN108239988A (en) * 2018-02-23 2018-07-03 中交第三航务工程勘察设计院有限公司 A kind of assembled steel barrel base structure and its construction method
CN114541458A (en) * 2022-02-24 2022-05-27 杭州建工集团有限责任公司 Self-sinking precast concrete open caisson bed-mould structure for silt geological conditions and construction method
CN115162395A (en) * 2022-07-04 2022-10-11 中铁大桥勘测设计院集团有限公司 Shell-core separation type composite open caisson foundation and construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102245582B1 (en) 2020-03-02 2021-04-28 현대스틸산업주식회사 Method for footing Jack up Barge using Mudmat

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5673725A (en) * 1979-11-20 1981-06-18 Kawasaki Steel Corp Construction of foundation under water
JPS59111823U (en) * 1983-11-24 1984-07-28 住友建設株式会社 Large diameter pile
KR0129092B1 (en) * 1993-08-17 1998-04-10 양원희 Cellular block laying method
JP2590044B2 (en) * 1993-09-29 1997-03-12 大豊建設株式会社 Underwater structure construction equipment
JPH1181353A (en) * 1997-09-04 1999-03-26 Ohbayashi Corp Construction underwater multi-layer structure
KR100383409B1 (en) * 2000-04-19 2003-05-14 (주)평화엔지니어링 Construction Method of Direct Foundation for using Caisson

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100440726B1 (en) * 2002-03-15 2004-07-19 삼성중공업 주식회사 Apparatus for confirming well barrel's foundation on rock floor in the bridge base
KR100567738B1 (en) * 2005-05-20 2006-04-04 재현토건(주) Open caisson construction method for the structures constructed over the water
KR101134025B1 (en) * 2009-12-22 2012-04-05 한신공영 주식회사 Method for constructing a foundation using a open caisson
CN108239988A (en) * 2018-02-23 2018-07-03 中交第三航务工程勘察设计院有限公司 A kind of assembled steel barrel base structure and its construction method
CN114541458A (en) * 2022-02-24 2022-05-27 杭州建工集团有限责任公司 Self-sinking precast concrete open caisson bed-mould structure for silt geological conditions and construction method
CN115162395A (en) * 2022-07-04 2022-10-11 中铁大桥勘测设计院集团有限公司 Shell-core separation type composite open caisson foundation and construction method

Also Published As

Publication number Publication date
KR100418268B1 (en) 2004-02-11

Similar Documents

Publication Publication Date Title
US9567720B2 (en) Offshore platform for a marine environment
EP3118374A1 (en) Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same
KR100819624B1 (en) Waterproof open caisson assembly and concrete foundation construction method using the same
KR101211811B1 (en) Cast in concrete pile With precast type Caisson
KR100714179B1 (en) Concrete Well Construction Method Using Weight Reducing Method and Concrete Well Thereof
KR100937740B1 (en) A method of constructing precast concrete house under water using caisson
US3624702A (en) Offshore platform support
KR100383409B1 (en) Construction Method of Direct Foundation for using Caisson
KR101256274B1 (en) Reverse Drill Method With precast type Caisson and Jacket
CN111851543A (en) Long and narrow deep foundation pit construction cofferdam structure and use method thereof
KR20110107888A (en) Construction method of the pier without the temporary dam in the sea or the river
KR100418268B1 (en) Well form bucket of division style for the base operation of pier and it&#39;s operation method
CN101392521A (en) Rock-socketed steel dock structure and construction method thereof
WO2016109962A1 (en) Construction method for fixing offshore marine platform to a seabed having layers of a soil/clay nature
CN101319501B (en) Construction method of deep foundation ditch
KR100403641B1 (en) Operation method of well form bucket of one style for the base operation of pier
US3091937A (en) Underwater foundation structure and method therefor
KR100768552B1 (en) steel well foundation construction and equipment
AU2012313196B2 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
KR200404677Y1 (en) Concrete Well Construction Method Using Weight Reducing Method and Concrete Well Thereof
US2935854A (en) Offshore drilling platform
CN109629587B (en) Steel caisson pile body structure for bank abrupt slope and construction method
US3965688A (en) Underwater structures, in particular for underwater drilling operations
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method
KR101134025B1 (en) Method for constructing a foundation using a open caisson

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130118

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20140117

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20150119

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20160127

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20180124

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20190123

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20191220

Year of fee payment: 17