KR20010035784A - A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site - Google Patents

A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site Download PDF

Info

Publication number
KR20010035784A
KR20010035784A KR1019990042515A KR19990042515A KR20010035784A KR 20010035784 A KR20010035784 A KR 20010035784A KR 1019990042515 A KR1019990042515 A KR 1019990042515A KR 19990042515 A KR19990042515 A KR 19990042515A KR 20010035784 A KR20010035784 A KR 20010035784A
Authority
KR
South Korea
Prior art keywords
water
fixing frame
synthetic resin
sides
vertical
Prior art date
Application number
KR1019990042515A
Other languages
Korean (ko)
Other versions
KR100371647B1 (en
Inventor
변무원
Original Assignee
변무원
주식회사 오주레진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=19613782&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR20010035784(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 변무원, 주식회사 오주레진 filed Critical 변무원
Priority to KR10-1999-0042515A priority Critical patent/KR100371647B1/en
Publication of KR20010035784A publication Critical patent/KR20010035784A/en
Application granted granted Critical
Publication of KR100371647B1 publication Critical patent/KR100371647B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
  • Sewage (AREA)

Abstract

PURPOSE: A partition wall structure of waterworks and sewage is provided, which can shorten construction time and cost by using prefabricating method of providing a flow frame of grid type and inserting a hollow panel with many passages into the frame, so that the maintenance and operation can be made easily and the life is prolonged to prevent effluent of toxic material. CONSTITUTION: The system comprises the followings: (i) a rectangular flow channel made by a base plane (1) and side walls (2); (ii) rectangular fixing frames (11) to be fixed in the flow channel, which is made by two side members (11c) , a bottom member (11a) and a middle member (11b); and (iii) vertical hollow panels (12) with hollow part (A) made by a flat plate (12b) and an uneven plate (12a), which has many water passing holes (13) and is fixed in the rectangular fixing frame (11).

Description

상,하수처리장의 간벽설치구조 및 그의 시공방법{A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site}A partition wall structure and a process for partitioning walls in a water treatment site

본발명은 상,하수처리장의 내부 중간에 유입수의 흐름방향에 대하여 직각으로 설치되어 유입수의 흐름이 일정하도록 통수시켜 주는 상,하수처리장의 간벽설치구조 및 그의 시공방법에 관한 것이다.The present invention relates to the construction structure of the wall of the water and sewage treatment plant installed at right angles to the flow direction of the inflow water in the middle of the water, sewage treatment plant to pass the flow of the influent to be constant and its construction method.

통상적으로 상,하수처리장은 유입수를 설정된 경로로 이동시키면서 침전 및 화학작용을 일으켜서 적정수준의 수질을 유지하도록 처리하여 주는 시설물로 알려져 있는 바, 이러한 상,하수처리장에는 유입수의 흐름이 일정하도록 통수시켜서 처리효율을 향상시켜 주도록 간벽을 설치하여 왔다.In general, water and sewage treatment plants are known as facilities that treat sedimentation and chemical reactions while maintaining the proper level of water by moving the influent to a predetermined path. Walls have been installed to improve the treatment efficiency.

종래의 상,하수처리장의 간벽(100)은 도1에 도시되는 바와 같이, 유입수의 경로를 이루도록 콘크리트로서 시공되는 바닥(1)과 양측벽(2)의 해당 구획위치에 통수공(110a)들이 형성된 콘크리트벽체(110)를 현장타설하여서 설치 시공하여 왔다.As shown in FIG. 1, the conventional wall 100 of the water and sewage treatment plant has water holes 110a at corresponding partition positions of the floor 1 and the side walls 2, which are constructed as concrete to form a path of inflow water. It has been installed by installing the concrete wall 110 formed on-site.

이 상,하수처리장의 간벽(100)은 타설 경화된 후에 물리적인 충격이나 하중에 대하여 구조적강도가 우수한 특성을 가지는 콘크리트를 소재로하여서 시공되기 때문에, 유입수에 의하여 커다란 흐름저항을 지속적으로 작용받더라도 비교적 견고하게 유지되는 장점을 가지는 것이 사실이다.Since the partition wall 100 of the water and sewage treatment plant is constructed of concrete which has excellent structural strength against physical impact or load after being hardened, even if a large flow resistance is continuously applied by the inflow water, It is true that it has the advantage of being robust.

그러나, 이와 같은 상,하수처리장의 간벽(100)을 시공할 때에 거푸집을 조립한 후에 콘크리트벽체(110)를 현장타설하여서 설치하고, 콘크리트벽체(110)가 성형된 후에는 다시 거푸집을 해체하여야 하는 번거롭고도 까다로운 작업공정을 수행하게 되므로, 공사기간 및 공사비용이 과도하게 소요되는 문제점이 있었다.However, when constructing the formwork wall 100 of the water and sewage treatment plant, after assembling the formwork to install the concrete wall 110 on-site, after the concrete wall 110 is formed, the formwork must be dismantled again. Since it is cumbersome and difficult to perform the work process, there was a problem that the construction period and the construction cost is excessively required.

또한, 상,하수처리장 내에 설치된 기존 간벽(100)이 노후화된 경우에, 콘크리트벽체(110)를 해체하고 다시 새로운 콘크리트벽체를 현장타설하여서 설치하는 데에 지나치게 많은 공사기간 및 공사비용이 소요되는 관계로 보수 및 유지관리가 용이하지 못한 문제점이 있었다.In addition, in the case where the old interior wall 100 installed in the water and sewage treatment plant is deteriorated, it takes too much construction period and construction cost to dismantle the concrete wall 110 and install by installing the new concrete wall again. There was a problem that is not easy to maintain and maintain.

더욱이, 상,하수처리장의 경우 유입수를 화학적으로 처리하는 과정이 필수적으로 수반되는 점을 감안하여 볼 때, 간벽(100)을 이루는 콘크리트벽체(110)가 화학반응을 일으켜서 쉽게 부스러지거나 손상될 뿐만 아니라, 콘크리트벽체(110)로부터 독성물질이 유출되어서 처리된 유입수를 오히려 오염시키는 심각한 문제점이 있었다.In addition, in the case of water and sewage treatment plants, the process of chemically treating the influent water is essential, so that the concrete wall 110 constituting the trunk wall 100 is not only brittle or damaged due to chemical reaction. Toxic substances are leaked from the concrete wall 110, so there is a serious problem of polluting the treated influent.

본발명은 고정틀내에 합성수지 중공판넬들을 설치하여서 된 조립식구조로서 상,하수처리장의 간벽을 이루어서, 시공시 설치작업을 능률적으로 수행할 수 있도록 작업여건을 개선하여서 시공성을 향상시켜 주며, 내화학성이 우수한 합성수지 중공판넬을 소재로 사용하여서 내구성 및 안정성을 획기적으로 향상시켜 주는 상,하수처리장의 간벽설치구조 및 그의 시공방법을 제공하는 데 그 목적이 있다.The present invention is a prefabricated structure made by installing synthetic resin hollow panels in a fixed frame, which forms the walls of water and sewage treatment plants, and improves workability by improving work conditions so that installation work can be efficiently performed during construction. It is an object of the present invention to provide an interlayer structure of the water and sewage treatment plant and a construction method thereof using the synthetic resin hollow panel as a material to dramatically improve durability and stability.

도1은 종래 상,하수처리장의 간벽을 나타낸 사시도1 is a perspective view showing the walls of the conventional water and sewage treatment plant

도2는 본발명 상,하수처리장의 간벽을 나타낸 분리사시도Figure 2 is an exploded perspective view showing the walls of the waste water treatment plant of the present invention

도3 및 도4는 변형예에 따른 상,하수처리장의 간벽을 나타낸 것임3 and 4 shows the walls of the water and sewage treatment plant according to the modification

도5a, 도5b, 도5c는 본발명 상,하수처리장의 간벽을 시공하는 작업공정을 단계별Figures 5a, 5b, 5c is a step-by-step work process for constructing the walls of the water and sewage treatment plant of the present invention

로 예시한 것임Illustrated as

〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

10: 간벽 11: 고정틀 11a: 하부 수평부재10: partition wall 11: fixing frame 11a: lower horizontal member

11b: 중간 수평부재 11c: 양측의 수직부재 11d: 중간 수직부재11b: intermediate horizontal member 11c: vertical member on both sides 11d: intermediate vertical member

B: 앵커볼트 12: 합성수지 중공판넬 12a: 굴곡판부B: Anchor Bolt 12: Synthetic Resin Hollow Panel 12a: Bend Plate Part

12b: 평판부 A: 중공부 13: 통수관12b: plate portion A: hollow portion 13: water pipe

14: 청소구 15: 통수구14: cleaning hole 15: water outlet

본발명의 상,하수처리장의 간벽설치구조는 도2에 도시되는 바와 같이, 유입수가 이동하는 경로를 이루도록 콘크리트로서 시공된 바닥(1)과 양측벽(2)의 해당 구획위치마다 그 내주면 둘레를 따라 찬넬형상의 하부 및 중간 수평부재(11a)(11b)와 양측의 수직부재(11c)들을 종횡으로 연결하여서 격자형으로 조립되는 고정틀(11)을 설치하고, 상기 고정틀(11)내의 조립공간에 복수의 중공부(A)들을 가지는 합성수지 중공판넬(12)들을 통수가능하도록 설치하여서 됨을 기술구성상의 기본적인 특징으로 한다.As shown in FIG. 2, the partition wall installation structure of the water and sewage treatment plant of the present invention has a circumference of the inner circumferential surface of the bottom 1 and the side walls 2, which are constructed as concrete to form a path through which the influent flows. Accordingly, by connecting the lower and middle horizontal members 11a and 11b of the channel shape and the vertical members 11c on both sides in the vertical and horizontal direction, a fixing frame 11 is assembled in a lattice shape and installed in the assembly space in the fixing frame 11. The synthetic resin hollow panel 12 having a plurality of hollows (A) is to be installed so as to be able to pass through as a basic feature in the technical configuration.

다시말해서, 본발명의 상,하수처리장의 간벽(10)은 종횡으로 연결되는 하부 및 중간 수평부재(11a)(11b)와 양측의 수직부재(11c)들로서 격자형으로 조립된 고정틀(11)내에 중공부(A)를 가지는 합성수지 중공판넬(12)들을 설치하여서 된 조립식구조로 이루어짐으로써, 첫째 시공시에 불필요한 작업공정을 억제하면서도 작업능률은 향상시켜서 공사기간 및 공사비용을 대폭적으로 감축시켜 주며, 둘째 자유로이 설치 및 해체할 수 있도록 배려하여서 보수 및 유지관리가 용이하며, 셋째 화학적특성이 안정된 합성수지 중공판넬을 소재로 사용하는 만큼 수명을 연장시켜 주면서도 독성물질이 유출됨을 방지하여 주는 등의 장점을 가지게 되는 것이다.In other words, the partition wall 10 of the upper and the sewage treatment plants of the present invention is formed in the fixed frame 11 assembled in a lattice form as the lower and middle horizontal members 11a and 11b connected vertically and horizontally and the vertical members 11c on both sides. By constructing the prefabricated structure by installing the synthetic resin hollow panels 12 having the hollow portion (A), firstly, while reducing the unnecessary work process at the time of construction, it improves the work efficiency, significantly reducing the construction period and construction cost, Second, it is easy to repair and maintain by considering installation and disassembly freely. Third, as it uses synthetic resin hollow panel with stable chemical properties as material, it has the advantage of preventing the leakage of toxic substances while extending the service life. Will be.

이하, 첨부도면에 도시되는 구체적인 실시예를 통하여 본발명의 기술내용을 상세히 설명하면 다음과 같다.Hereinafter, the technical details of the present invention through the specific embodiments shown in the accompanying drawings in detail as follows.

본발명의 실시예에서 상,하수처리장의 간벽(10)은 상기 고정틀(11)이 그 하부 및 중간 수평부재(11a)(11b)와 양측의 수직부재(11c)들을 연결하여서 상하방향으로 조립공간이 확보되도록 설치하고, 상기 고정틀(11)내의 조립공간에 상하방향의 일렬로서 합성수지 중공판넬(12)들을 배열 설치하여서 된 것으로 예시하고 있다.In the embodiment of the present invention, the partition wall 10 of the water and sewage treatment plant has an assembly space in the vertical direction by connecting the lower and middle horizontal members 11a and 11b and the vertical members 11c on both sides thereof. It is installed so as to secure, and the hollow resin panels 12 are arranged in an up and down direction in the assembly space in the fixing frame 11 is illustrated as having been arranged.

상기 고정틀(11)은 바닥(1)에 고정되는 하부 수평부재(11a)의 양끝단에서 수직으로 연이어져서 서로 마주하도록 양측의 수직부재(11c)들을 양측벽(2)에 각각 배치 고정하고, 양측의 수직부재(11c)들 사이에 중간 수평부재(11b)들을 수평하게 설치하여 상기 합성수지 중공판넬(12)들이 설치되는 조립공간이 확보되도록 격자형으로 조립 설치하여서 된다.The fixing frame 11 is vertically connected at both ends of the lower horizontal member 11a fixed to the bottom 1 so that the vertical members 11c on both sides are disposed and fixed to both side walls 2 so as to face each other. Intermediate horizontal members 11b are horizontally installed between the vertical members 11c of the vertical members 11c so as to secure the assembly space in which the synthetic resin hollow panels 12 are installed.

그리고, 상기 고정틀(11)을 이루는 하부 수평부재(11a)와 양측의 수직부재(11c)들은 각각 내식성이 양호한 스테인레스재질의 C형강으로 만들어지도록 하고, 그 고정틀(11)의 중간 수평부재(11b)는 내식성이 양호한 스테인레스재질의 H형강으로 만들어지도록 한다.The lower horizontal member 11a and the vertical members 11c on both sides of the fixing frame 11 are made of stainless steel C-type steel having good corrosion resistance, respectively, and the middle horizontal member 11b of the fixing frame 11. Is made of H type steel of good corrosion resistance.

여기에서, 상기 고정틀(11)은 하부 및 중간 수평부재(11a)(11b)와 양측의 수직부재(11c)들을 임의의 길이로 설정하여서, 상기 합성수지 중공판넬(12)의 크기에 맞추어 조립공간이 확보되도록 조립 설치되도록 함이 바람직하다.Herein, the fixing frame 11 sets the lower and middle horizontal members 11a and 11b and the vertical members 11c on both sides to have an arbitrary length, so that the assembly space is adjusted to the size of the synthetic resin hollow panel 12. It is desirable to be assembled and secured.

상기 합성수지 중공판넬(12)들은 격자형으로 조립되는 고정틀(11) 내에 확보된 조립공간에 통수가능하도록 설치하여서 된다.The synthetic resin hollow panels 12 are to be installed so as to be able to pass through the assembly space secured in the fixed frame 11 is assembled in a grid.

그리고, 상기 합성수지 중공판넬(12)들은 각각 굴곡되는 파형이 폭방향으로 반복되는 굴곡판부(12a)의 양측면에 일체로서 평활하게 접합되는 양측의 평판부(12b)로 이루어져서, 그 굴곡판부(12a)와 양측의 평판부(12b) 내에 일정간격마다 형성되는 중공부(A)들을 가지도록 형성하여서 된다.In addition, the synthetic resin hollow panels 12 are formed of flat plate portions 12b on both sides which are integrally and smoothly joined to both side surfaces of the curved plate portion 12a in which the curved waveform is repeated in the width direction, respectively, the curved plate portion 12a. And the hollow portions A formed at regular intervals in the flat plate portions 12b on both sides thereof.

또, 상기 합성수지 중공판넬(12)들은 그 중공부(A)들을 수평하게 관통하여서 통수시켜 주도록 접합되는 다수의 통수관(13)들을 가지도록 하고, 상기 고정틀(11)내의 조립공간에 필요한 위치마다 선택적으로 설치되도록 하여서, 유입수를 통수시키면서 일정한 흐름을 유지하도록 설치하여서 된다.In addition, the synthetic resin hollow panel 12 has a plurality of water pipes 13 are joined to pass through the hollow portion (A) horizontally to pass through, and each position necessary for the assembly space in the fixing frame 11 It is to be installed selectively so as to maintain a constant flow while passing through the influent.

여기에서, 상기 합성수지 중공판넬(12)들 중 어느 하나의 합성수지 중공판넬은 일정크기로 뚫어지는 청소구(14)를 형성하고 상기 고정틀(11)내의 최하부 조립공간에 설치되도록 하여서, 상,하수처리장 내부의 청소작업을 용이하게 수행할 수 있도록 함이 바람직하다.Here, the synthetic resin hollow panel of any one of the synthetic resin hollow panel 12 forms a cleaning hole 14 to be drilled to a certain size and to be installed in the lower assembly space in the fixing frame 11, water, sewage treatment plant It is desirable to facilitate the cleaning of the interior.

도3은 본발명의 변형예를 나타낸 것으로, 상기 고정틀(11)은 하부 수평부재(11a)와 양측의 수직부재(11c)들 사이에 중간 수평부재(11b) 및 중간 수직부재(11d)들을 직각으로 교차되도록 연결 조립하여서 상하좌우로 조립공간이 확보되도록 설치하고, 상기 고정틀(11)내의 조립공간에 상하좌우방향으로 합성수지 중공판넬(12)들을 배열 설치하여서 된 것이다. 이때, 상기 고정틀(11)내의 조립공간에 필요한 위치마다 복수의 통수관(13)들을 뚫어지는 합성수지 중공판넬(12)을 선택적으로 설치하여서 통수가능하도록 한다.3 shows a variation of the present invention, wherein the fixing frame 11 is perpendicular to the intermediate horizontal member 11b and the intermediate vertical member 11d between the lower horizontal member 11a and the vertical members 11c on both sides. The assembly is installed so that the assembly space is secured in the up, down, left and right by cross-linking, and the synthetic resin hollow panels 12 are arranged in the vertical space in the assembly space in the fixing frame (11). At this time, the synthetic resin hollow panel 12 through which the plurality of water pipes 13 are drilled at every position necessary for the assembly space in the fixing frame 11 so as to allow water flow.

여기에서, 도4의 도시와 같이 상기 고정틀(11) 내에 확보된 조립공간중 일개소의 조립공간을 비워서 유입수가 통수되는 통수구(15)를 이루도록 합성수지 중공판넬(12)들을 배열 설치하여서, 유입수를 통수시키면서 일정한 흐름을 유지하도록 설치할 수도 있음을 밝혀 둔다.Here, as shown in Figure 4 by emptying the assembly space of one of the assembly space secured in the fixing frame 11 by arranging the synthetic resin hollow panels 12 to form a water inlet 15 through which the inflow water, the inflow water Note that it can be installed to maintain a constant flow while passing through.

이와 같은 본발명의 상,하수처리장의 간벽시공방법을 설명하면 다음과 같다.Such a method for constructing the wall of the water and sewage treatment plant of the present invention is as follows.

도5a, 도5b, 도5c의 도시와 같이, 유입수가 이동하는 경로를 이루도록 콘크리트로서 시공된 바닥(1)과 양측벽(2)에 각각 하부 수평부재(11a)와 양측의 수직부재(11c)들을 앵커볼트(B)로서 고정시킨 후에 합성수지 중공판넬(12)을 끼워서 설치하고, 합성수지 중공판넬(12)의 상단에 끼워져서 양측의 수직부재(11c)들과 연결되도록 중간 수평부재(11b)를 설치한 다음, 기 설치된 양측의 수직부재(11c)들과 연이어지도록 양측벽(2)에 양측의 수직부재(11c)들을 앵커볼트(B)로서 고정시킨 후에 합성수지 중공판넬(12)을 끼워서 적층되도록 설치하고, 합성수지 중공판넬(12)의 상단에 끼워져서 양측의 수직부재(11c)들과 연결되도록 중간 수평부재(11b)를 설치하는 작업을 반복적으로 수행하여서, 격자형으로 고정틀(11)을 조립하면서 그 고정틀내에 합성수지 중공판넬(12)이 배열 설치되도록 시공하여서 된다.5A, 5B, and 5C, the lower horizontal member 11a and the vertical members 11c on both sides are respectively formed on the floor 1 and the side walls 2, which are constructed as concrete to form a path through which the inflow water moves. After fixing them as anchor bolts B, the synthetic hollow panel 12 is inserted and installed, and the intermediate horizontal member 11b is fitted to the upper ends of the synthetic resin hollow panel 12 to be connected to the vertical members 11c on both sides. After installation, the two vertical members 11c are fixed to both side walls 2 as anchor bolts B so as to be connected to the vertical members 11c on both sides, and then the synthetic resin hollow panel 12 is sandwiched. After installing, the operation of installing the intermediate horizontal member (11b) to be fitted to the upper end of the synthetic resin hollow panel 12 and connected to the vertical members (11c) on both sides, to assemble the fixing frame (11) in a grid While the hollow plastic panel 12 is arranged in the fixing frame Hayeoseo is constructed so that value.

이와 같이 상,하수처리장의 간벽(10)을 시공할 때에는 고정틀(11)내의 조립공간에 필요한 위치마다 통수관(13)들 또는 청소구(14)를 가지는 합성수지 중공판넬(12)을 선택적으로 설치하여서 된다.In this way, when constructing the interior wall 10 of the water and sewage treatment plant, a synthetic resin hollow panel 12 having water pipes 13 or cleaning holes 14 is selectively installed at each position necessary for the assembly space in the fixing frame 11. It is done.

그리고, 상기 고정틀(11)의 하부 및 중간 수평부재(11a)(11b)와 양측의 수직부재(11c)들은 상호 용접하여서 조립할 수도 있으며, 필요에 따라서는 연결철물(미도시)들로서 연결 조립할 수도 있음을 밝혀 둔다.In addition, the lower and middle horizontal members 11a and 11b of the fixing frame 11 and the vertical members 11c on both sides may be assembled by welding each other, and may be connected and assembled as connecting hardware (not shown) as necessary. Leave it on.

이와 같은 작업공정을 통하여 수행되는 상,하수처리장의 간벽시공방법은 작업자가 단순조립하여서 능률적으로 시공할 수 있기 때문에, 불필요한 작업량 및 작업시간을 감축시켜 주는 이점을 기대할 수 있게 되는 것이다.The wall construction method of the water and sewage treatment plant performed through such a work process can be efficiently constructed by the operator simply assembling, thereby reducing the amount of unnecessary work and working time.

이상에서 살펴 본 바와 같이 본발명은 격자형으로 조립되는 고정틀 내에 합성수지 중공판넬들을 설치하는 조립식구조로 구성하여서, 공사기간 및 공사비용을 대폭적으로 감축될 뿐만 아니라 보수 및 유지관리가 용이하고, 수명이 연장되며 독성물질이 유출됨을 방지하여 주는 효과를 가지게 되는 것이다.As described above, the present invention is composed of a prefabricated structure in which synthetic resin hollow panels are installed in a fixed frame assembled in a lattice shape, which not only greatly reduces the construction period and construction cost but also facilitates maintenance and maintenance, and has a long service life. It is prolonged and has the effect of preventing the release of toxic substances.

Claims (6)

유입수가 이동하는 경로를 이루도록 콘크리트로서 시공된 바닥(1)과 양측벽(2)의 해당 구획위치마다 그 내주면 둘레를 따라 찬넬형상의 하부 및 중간 수평부재(11a)(11b)와 양측의 수직부재(11c)들을 종횡으로 연결하여서 격자형으로 조립되는 고정틀(11)을 설치하고, 상기 고정틀(11)내의 조립공간에 복수의 중공부(A)들을 가지는 합성수지 중공판넬(12)들을 통수가능하도록 설치하여서 됨을 특징으로 하는 상,하수처리장의 간벽설치구조.The lower and middle horizontal members 11a and 11b of the channel shape along the periphery of the inner circumferential surface of each of the corresponding partition positions of the floor 1 and the side walls 2 constructed as concrete to form a path for the inflow of water, and the vertical members on both sides. (11c) is installed to connect the longitudinally and horizontally fixed frame 11 assembled in a lattice shape, and installed so that the synthetic resin hollow panel 12 having a plurality of hollows (A) in the assembly space in the fixing frame 11 can pass through The wall installation structure of the water and sewage treatment plant, characterized in that. 제1항에 있어서, 상기 고정틀(11)은 그 하부 및 중간 수평부재(11a)(11b)와 양측의 수직부재(11c)들을 연결하여서 상하방향으로 조립공간이 확보되도록 설치하고, 상기 고정틀(11)내의 조립공간에 상하방향의 일렬로서 합성수지 중공판넬(12)들을 배열 설치하여서 됨을 특징으로 하는 상,하수처리장의 간벽설치구조.According to claim 1, The fixing frame 11 is installed so as to secure the assembly space in the vertical direction by connecting the lower and middle horizontal members (11a) (11b) and the vertical member (11c) of both sides, the fixing frame (11) The hollow wall installation structure of the water and sewage treatment plant, characterized in that the hollow plastic panels 12 are arranged in a row in the vertical space in the assembly space. 제1항에 있어서, 상기 합성수지 중공판넬(12)들은 그 중공부(A)들을 수평하게 관통하여서 통수시켜 주도록 접합되는 다수의 통수관(13)들을 가지도록 하고, 상기 고정틀(11)내의 조립공간에 필요한 위치마다 선택적으로 설치되도록 함을 특징으로 하는 상,하수처리장의 간벽설치구조.The method of claim 1, wherein the synthetic resin hollow panel 12 has a plurality of water pipes (13) are joined to pass through the hollow portion (A) horizontally through the assembly space in the fixing frame 11 The partition wall installation structure of the water and sewage treatment plant, characterized in that it is selectively installed for each required position. 제1항 또는 제2항에 있어서, 상기 고정틀(11)은 하부 수평부재(11a)와 양측의 수직부재(11c)들 사이에 중간 수평부재(11b) 및 중간 수직부재(11d)들을 직각으로 교차되도록 연결 조립하여서 상하좌우로 조립공간이 확보되도록 설치하고, 상기 고정틀(11)내의 조립공간에 상하좌우방향으로 합성수지 중공판넬(12)들을 배열 설치하여서 됨을 특징으로 하는 상,하수처리장의 간벽설치구조.The fixing frame 11 crosses the middle horizontal member 11b and the middle vertical member 11d at right angles between the lower horizontal member 11a and the vertical members 11c on both sides. The assembly structure is installed so that the assembly space is secured in up, down, left and right by assembling, and the synthetic resin hollow panels 12 are arranged in the up and down, left and right directions in the assembly space in the fixing frame 11. . 제1항 또는 제2항에 있어서, 상기 고정틀(11) 내에 확보된 조립공간중 일개소의 조립공간을 비워서 유입수가 통수되는 통수구(15)를 이루도록 합성수지 중공판넬(12)들을 배열 설치하여서 됨을 특징으로 하는 상,하수처리장의 간벽설치구조.According to claim 1 or 2, wherein the synthetic resin hollow panels 12 are arranged so as to form a water inlet 15 through which the inlet water flows by emptying one of the assembly space secured in the fixing frame (11). Characteristic wall installation structure of water and sewage treatment plant. 유입수가 이동하는 경로를 이루도록 콘크리트로서 시공된 바닥(1)과 양측벽(2)에 각각 하부 수평부재(11a)와 양측의 수직부재(11c)들을 앵커볼트(B)로서 고정시킨 후에 합성수지 중공판넬(12)을 끼워서 설치하고, 합성수지 중공판넬(12)의 상단에 끼워져서 양측의 수직부재(11c)들과 연결되도록 중간 수평부재(11b)를 설치한 다음, 기 설치된 양측의 수직부재(11c)들과 연이어지도록 양측벽(2)에 양측의 수직부재(11c)들을 앵커볼트(B)로서 고정시킨 후에 합성수지 중공판넬(12)을 끼워서 적층되도록 설치하고, 합성수지 중공판넬(12)의 상단에 끼워져서 양측의 수직부재(11c)들과 연결되도록 중간 수평부재(11b)를 설치하는 작업을 반복적으로 수행하여서, 격자형으로 고정틀(11)을 조립하면서 그 고정틀내에 합성수지 중공판넬(12)이 배열 설치되도록 시공하여서 됨을 특징으로 하는 상,하수처리장의 간벽시공방법.The hollow resin panel after fixing the lower horizontal member 11a and the vertical member 11c on both sides to the bottom 1 and the side walls 2 which are constructed as concrete to form a path for inflowing water, respectively, as anchor bolts B. (12) is inserted and installed, the intermediate horizontal member (11b) is installed so as to be fitted to the upper end of the synthetic resin hollow panel 12 and connected to the vertical members (11c) on both sides, and then the vertical members (11c) on both sides of the existing installation After fixing the vertical member (11c) of both sides to the side wall (2) as anchor bolts (B) to be connected to the field, it is installed to sandwich the synthetic resin hollow panel (12), and inserted into the upper end of the synthetic resin hollow panel (12) By repeatedly performing the operation of installing the intermediate horizontal member 11b so as to be connected to the vertical members 11c on both sides, the hollow plastic panels 12 are arranged in the fixing frame while assembling the fixing frame 11 in a lattice shape. Special construction Wall construction method of water and sewage treatment plant
KR10-1999-0042515A 1999-10-02 1999-10-02 A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site KR100371647B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-1999-0042515A KR100371647B1 (en) 1999-10-02 1999-10-02 A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-1999-0042515A KR100371647B1 (en) 1999-10-02 1999-10-02 A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site

Publications (2)

Publication Number Publication Date
KR20010035784A true KR20010035784A (en) 2001-05-07
KR100371647B1 KR100371647B1 (en) 2003-02-11

Family

ID=19613782

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-1999-0042515A KR100371647B1 (en) 1999-10-02 1999-10-02 A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site

Country Status (1)

Country Link
KR (1) KR100371647B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100481646B1 (en) * 2002-08-22 2005-04-13 주식회사 젠트로 Partition wall for purifying water in water reservoir
KR100719883B1 (en) * 2006-11-17 2007-05-18 주식회사 진우엔지니어링 Drainage of tunnels

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020089035A (en) * 2001-05-22 2002-11-29 변무원 Partition Wall for Water Treatment Tank
KR100910738B1 (en) * 2007-09-13 2009-08-05 조창균 Partition wall structure of a water treatment site
KR101789247B1 (en) 2017-08-01 2017-10-26 (주)아쿠아 Dear water prevented system of polyethylene double frame panel baffle

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100406084B1 (en) * 1999-04-13 2003-11-17 변무원 Enclosure wall body of water source and sewage disposal plant and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100481646B1 (en) * 2002-08-22 2005-04-13 주식회사 젠트로 Partition wall for purifying water in water reservoir
KR100719883B1 (en) * 2006-11-17 2007-05-18 주식회사 진우엔지니어링 Drainage of tunnels

Also Published As

Publication number Publication date
KR100371647B1 (en) 2003-02-11

Similar Documents

Publication Publication Date Title
KR101286255B1 (en) Water treatment plant of the guide wall assembly structure and construction method thereof
KR100406084B1 (en) Enclosure wall body of water source and sewage disposal plant and construction method thereof
KR20010035784A (en) A Partition Wall Structure and a Process for Partitioning Walls in a Water Treatment Site
KR100910738B1 (en) Partition wall structure of a water treatment site
KR102264592B1 (en) Assembly type stream guidance wall for filtration plant
KR20080050110A (en) Precasted concrete retaining wall with tension
KR100690628B1 (en) Structure of partition wall for water disposal plant and construction method thereof
KR200437433Y1 (en) bottom structure for assembly plate a water tank
CN214738198U (en) Prefabricated basis of modularization
KR100914169B1 (en) Prefabricated wall
KR100362822B1 (en) Partition Wall for Water Treatment Tank
JP2018501958A (en) Joiner for block for septic tank and water treatment facility, and assembly type block using the same
KR100427772B1 (en) Partition Wall for Water Treatment Tank
KR100399013B1 (en) Construct for Prevent water leaking to innerpart of two arched tunnel
CN102276063A (en) Integrated sewage treatment tank structure and manufacturing process thereof
KR200268519Y1 (en) Partition Wall for Water Treatment Tank
KR102455364B1 (en) Panel-type guiding wall installation means using a band
KR200269537Y1 (en) Partition Wall for Water Treatment Tank
KR20020089035A (en) Partition Wall for Water Treatment Tank
CN217978788U (en) Novel silencer for axial flow burner
KR101304440B1 (en) Guide wall and baffle wall junctions absence of unnecessary
KR200431700Y1 (en) The base frame of pre-engineered water tank
CN216839932U (en) Steel pipe concrete column and steel pipe concrete beam support connection structure and node
KR102520663B1 (en) Anchor-less and assembly type stream guidance wall
KR102610318B1 (en) Prefabricated antibacterial baffle wall using PE material

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130103

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140122

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20150102

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160104

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20170102

Year of fee payment: 15

J206 Request for trial to confirm the scope of a patent right
J204 Request for invalidation trial [patent]
J206 Request for trial to confirm the scope of a patent right
J301 Trial decision

Free format text: TRIAL NUMBER: 2017100000813; TRIAL DECISION FOR INVALIDATION REQUESTED 20170316

Effective date: 20170719

Free format text: TRIAL NUMBER: 2017100000177; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20170119

Effective date: 20170719