KR102865757B1 - Supporting structure using decorative stone and method for construction of that - Google Patents
Supporting structure using decorative stone and method for construction of thatInfo
- Publication number
- KR102865757B1 KR102865757B1 KR1020250088895A KR20250088895A KR102865757B1 KR 102865757 B1 KR102865757 B1 KR 102865757B1 KR 1020250088895 A KR1020250088895 A KR 1020250088895A KR 20250088895 A KR20250088895 A KR 20250088895A KR 102865757 B1 KR102865757 B1 KR 102865757B1
- Authority
- KR
- South Korea
- Prior art keywords
- soil
- decorative
- decorative stones
- mixture
- rear support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0283—Retaining or protecting walls characterised by constructional features of mixed type
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0266—Retaining or protecting walls characterised by constructional features made up of preformed elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0275—Retaining or protecting walls characterised by constructional features cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0075—Textiles
- E02D2300/0076—Textiles non-woven
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/40—Miscellaneous comprising stabilising elements
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
본 발명은 유공후방지지물을 강결하여 배면토압에 저항하도록 하고, 유공후방지지물을 통하여 배수가 용이하도록 하여 우기시에도 안정성을 확보할 수 있는 장식석을 이용한 지지구조물 및 그 시공방법에 관한 발명이다.
본 발명은 경사토사면의 하단부와 접하도록 타설되는 기초콘크리트; 상기 기초콘크리트의 일측에 세워지며 연결구에 의해 서로 밀착되도록 연결되는 개별 장식석; 상기 장식석에서 소정의 간격으로 이격되어 상측으로 다단으로 구축되되, 상측으로 갈수록 장식석에서 점차 거리가 멀어지도록 구축되는 고화제혼합토; 상기 고화제혼합토 후단에 수평으로 설치되어 지지되며 토사에서 배출되는 우수가 모아지는 후방지지배수부; 상기 장식석과 고화제혼합토의 사이에 다단으로 포설되는 제1되메움토사층; 상기 고화제혼합토의 후단과 경사토사면과의 사이에 다단으로 포설되는 제2되메움토사층; 및 상기 후방지지배수부와 장식석 사이에 연결되어 지지되는 간격유지대;를 포함하는 것을 특징으로 한다.
본 발명은 장식석에 의해 경관성이 향상되고 기존 콘크리트 옹벽에서 발생하는 열섬현상을 저감시키는 효과가 있다.The present invention relates to a support structure using decorative stones that can ensure stability even during rainy seasons by strengthening a perforated rear support to resist back soil pressure and facilitating drainage through the perforated rear support, and a construction method thereof.
The present invention is characterized by including: foundation concrete poured to be in contact with the lower part of a sloped soil surface; individual decorative stones erected on one side of the foundation concrete and connected to each other by means of a connecting member; solidifying agent mixed soil constructed in multiple stages upwardly spaced apart from the decorative stones at a predetermined interval, but constructed so that the distance from the decorative stones gradually increases as it goes upward; a rear support drainage section installed horizontally and supported at the rear end of the solidifying agent mixed soil and collecting rainwater discharged from the soil; a first backfill soil layer laid in multiple stages between the decorative stones and the solidifying agent mixed soil; a second backfill soil layer laid in multiple stages between the rear end of the solidifying agent mixed soil and the sloped soil surface; and a gap maintenance member connected and supported between the rear support drainage section and the decorative stones.
The present invention has the effect of improving the landscape by using decorative stones and reducing the heat island phenomenon that occurs in existing concrete retaining walls.
Description
본 발명은 장식석을 이용한 지지구조물 및 그 시공방법에 관한 것으로, 보다 상세하게는 유공후방지지물을 강결하여 배면토압에 저항하도록 하고, 유공후방지지물을 통하여 배수가 용이하도록 하여 우기시에도 안정성을 확보할 수 있는 장식석을 이용한 지지구조물 및 그 시공방법에 관한 발명이다.The present invention relates to a support structure using decorative stones and a construction method thereof, and more specifically, to a support structure using decorative stones and a construction method thereof, which can ensure stability even during rainy seasons by strengthening a perforated rear support to resist back soil pressure and facilitating drainage through the perforated rear support.
일반적으로, 하천의 제방, 도로, 아파트 단지, 기타 비탈면의 사면파괴가 발생하지 않게 하기 위한 대책공법으로 안전율 유지법과 안전율 증가법의 두가지로 구분할 수 있다. 즉 강우, 융설 등과 같은 물의 영향에 의하여 사면의 안전율이 감소하는 것을 방지시켜 사면파괴를 발생시키는 직접적 요인으로부터 사면을 보호하는 소극적 대책방법과, 불안전하게 판단된 사면의 안전율을 옹벽 등의 저항력을 이용하여 증가시켜 사면파괴의 잠재적 취약성을 개선시키려는 적극적 대책방법이 있다.Generally, countermeasure methods to prevent slope failures of river embankments, roads, apartment complexes, and other slopes can be divided into two types: safety factor maintenance methods and safety factor increase methods. Specifically, passive countermeasure methods protect slopes from direct factors that can cause slope failure by preventing the reduction in the slope safety factor due to water influences such as rainfall and snowmelt. Active countermeasure methods, on the other hand, attempt to improve the potential vulnerability of slopes deemed unsafe by increasing the safety factor of slopes using the resistance of retaining walls and other means.
그 중 안전율 증가법의 하나인 옹벽은 토압 또는 우수 등에 의해 붕괴되는 것을 방지할 수 있도록 형성되는 벽체로, 벽돌 또는 콘크리트 등으로 구축되며, 이는 통상적으로 공장에서 콘크리트에 의해 제작된 블록을 사면에 축조하여 사면을 안정화하게 된다.Among them, a retaining wall, which is one of the safety factor increasing methods, is a wall that is formed to prevent collapse due to earth pressure or rain, etc., and is constructed with bricks or concrete, and is usually constructed by building blocks manufactured with concrete at a factory on the slope to stabilize the slope.
그러나, 이러한 콘크리트 블록으로 구축된 옹벽은 인공적인 시설물이라는 점에서 자연경관을 저해하고 이질감을 불러일으키는 것은 물론, 보는 이로 하여금 위압감을 느끼게 할 뿐만 아니라 주변 환경과 어울리지 못하는 상반된 환경을 조성하는 문제점을 가지고 있다.However, these retaining walls constructed with concrete blocks have the problem of obstructing the natural landscape and creating a sense of alienation because they are artificial structures, and they not only make the viewer feel oppressed, but also create a conflicting environment that does not fit in with the surrounding environment.
또한, 그 특성상 설치대상 경사지 및 암반 등의 형태에 대응한 유연성 및 가변성이 부족하게 되어 지지기반의 확보를 위해 설치대상 경사지 또는 암반으로부터 비교적 멀리 떨어지도록 형성된다.In addition, due to its nature, it lacks flexibility and variability in response to the shape of the slope or rock to be installed, so it is formed relatively far away from the slope or rock to be installed in order to secure a support base.
따라서, 작업공간이 많이 필요하게 되고 상대적으로 공사 후 뒷채움 작업이 많아지게 되어 공사기간이 연장되며 공사비용이 상승되는 문제점이 있을 뿐만 아니라, 추후 옹벽에 부분적인 파손이 발생될 경우 부분적인 보수가 곤란한 문제점이 있다.Therefore, there is a problem that a lot of work space is required, and the backfilling work after construction is relatively more, which extends the construction period and increases the construction cost. In addition, there is a problem that partial repairs are difficult in the event of partial damage to the retaining wall in the future.
그리고, 최근에 발생하는 옹벽 붕괴사고의 주원인은 주로 우기시 우수로 인한 수압증가로 인하여 발생하는데 최근 국지성호우가 증가하는 추세이므로 이에 대한 대응이 필요한 실정이다.In addition, the main cause of recent retaining wall collapse accidents is the increase in water pressure caused by rainwater during the rainy season. As the number of localized heavy rains has been increasing recently, it is necessary to respond to this.
이에 대해 본 출원인이 선등록한 특허 10-0933660호에서는 장식석의 후단에 콘크리트보 형태로 구축되는 수평 정착물과, 콘크리트 기둥 형태로 구축되는 수직 정착물을 설치한 후 인장재에 의해 장식석과 수평 정착물을 연결하는 기술이 개시되고 있다.In this regard, the patent 10-0933660 previously registered by the applicant discloses a technology for installing a horizontal fixture constructed in the form of a concrete beam at the rear end of a decorative stone and a vertical fixture constructed in the form of a concrete pillar, and then connecting the decorative stone and the horizontal fixture by a tension member.
이는 지중으로 유입된 빗물을 집수 및 배수하여 수압으로 인한 지반의 붕괴를 방지하고자 제안되었으나, 수평 정착물과 수직 정착물 사이가 무방비 상태로 노출됨에 따라 후단의 토사가 붕괴하는 경우 이를 확실하게 차단하지 못하여 장식석의 붕괴 염려가 발생하게 되는 문제점이 있다.This was proposed to collect and drain rainwater that flows into the ground and prevent the collapse of the ground due to water pressure, but there is a problem in that the gap between the horizontal and vertical fixtures is exposed without protection, so if the soil at the rear collapses, it cannot be reliably blocked, and there is a concern that the decorative stones may collapse.
본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 기존 콘크리트 옹벽에서 발생하는 열섬현상을 저감시키고, 장식석이 후방토압에 의해 붕괴되지 않도록 견고하게 지지하는 것은 물론, 우기 시 빗물이 원활하게 배수되도록 하여 수압으로 인한 지반의 붕괴를 방지하도록 하는데 그 해결하고자 하는 과제가 있다.The present invention has been devised to solve the above problems, and has the task of reducing the heat island phenomenon occurring in existing concrete retaining walls, firmly supporting decorative stones so that they do not collapse due to rear earth pressure, and preventing ground collapse due to water pressure by allowing rainwater to drain smoothly during the rainy season.
본 발명은 상기와 같은 과제를 해결하기 위해 경사토사면의 하단부와 접하도록 타설되는 기초콘크리트; 상기 기초콘크리트의 일측에 세워지며 연결구에 의해 서로 밀착되도록 연결되는 장식석; 상기 장식석에서 소정의 간격으로 이격되어 상측으로 다단으로 구축되되, 상측으로 갈수록 장식석에서 점차 거리가 멀어지도록 구축되는 고화제혼합토; 상기 고화제혼합토 후단에 수평으로 설치되어 지지되며 토사에서 배출되는 우수가 모아지는 후방지지배수부; 상기 장식석과 고화제혼합토의 사이에 다단으로 포설되는 제1되메움토사층; 상기 고화제혼합토의 후단과 경사토사면과의 사이에 다단으로 포설되는 제2되메움토사층; 및 상기 후방지지배수부와 장식석 사이에 연결되어 지지되는 간격유지대;를 포함하는 것을 특징으로 한다.The present invention is characterized in that it comprises: foundation concrete poured to be in contact with the lower part of a sloped soil slope; decorative stones erected on one side of the foundation concrete and closely connected to each other by a connecting member; solidifying agent mixture soil built in multiple stages upwardly spaced apart from the decorative stones at a predetermined interval, but built so that the distance from the decorative stones gradually increases as it goes upward; a rear support drainage part installed horizontally and supported at the rear end of the solidifying agent mixture soil and collecting rainwater discharged from the soil; a first backfill soil layer laid in multiple stages between the decorative stones and the solidifying agent mixture soil; a second backfill soil layer laid in multiple stages between the rear end of the solidifying agent mixture soil and the sloped soil slope; and a gap maintenance member connected and supported between the rear support drainage part and the decorative stones.
본 발명의 일 실시예에 따르면, 상기 상하단 제1되메움토사층의 사이 및 상하단 제2되메움토사층의 사이에는 각각 부직포가 더 설치되고, 최하단의 제1되메움토사층의 하부와 기초콘크리트의 사이에는 쇄석이 채워지고, 상기 쇄석의 사이에는 유공관이 설치되는 것을 특징으로 한다.According to one embodiment of the present invention, non-woven fabric is further installed between the upper and lower first backfill soil layers and between the upper and lower second backfill soil layers, crushed stone is filled between the lower part of the lowermost first backfill soil layer and the foundation concrete, and a perforated pipe is installed between the crushed stone.
본 발명의 일 실시예에 따르면, 상기 기초콘크리트의 상측에 구축되는 고화제혼합토는 기초콘크리트의 후면과 경사토사면과의 사이까지 연장되는 하부지지혼합토가 더 형성되는 것을 특징으로 한다.According to one embodiment of the present invention, the hardening agent mixture constructed on the upper side of the foundation concrete is characterized in that a lower support mixture is further formed that extends between the rear surface of the foundation concrete and the inclined soil slope.
본 발명의 일 실시예에 따르면, 고화제혼합토의 상부에는 오목한 걸림홈이 더 형성되고, 고화제혼합토 하부에는 상기 걸림홈에 끼움 결합되는 끼움돌기가 돌출 형성되며, 상기 걸림홈과 끼움돌기는 하측으로 갈수록 폭이 점차 넓어지도록 형성되어 결속력이 향상되는 것을 특징으로 한다.According to one embodiment of the present invention, a concave engaging groove is further formed on the upper portion of the solidifying agent mixture, and a fitting projection that is fitted into the engaging groove is protruded and formed on the lower portion of the solidifying agent mixture, and the engaging groove and the fitting projection are formed to have a width that gradually increases as they go downward, thereby improving the bonding force.
본 발명의 일 실시예에 따르면, 상기 기초콘크리트는, 1단 콘크리트와, 상기 1단 콘크리트의 상부에 타설되어 장석식의 일부가 매립되도록 타설되는 2단 콘크리트를 포함하며, 상기 1단 콘크리트 내부에는 기초철근이 배근되고, 상기 기초철근의 일측 끝단에서 수직방향으로 절곡되어 2단 콘크리트를 관통하도록 기초보강철근이 더 구비되며, 상기 기초보강철근과 장식석에 구비되는 세트앙카의 사이에는 서포트연결대가 연결되는 것을 특징으로 한다.According to one embodiment of the present invention, the foundation concrete includes a first stage concrete and a second stage concrete that is poured on top of the first stage concrete so that a portion of the feldspar is buried, foundation reinforcement is arranged inside the first stage concrete, and foundation reinforcement is further provided so as to be bent vertically at one end of the foundation reinforcement and penetrate the second stage concrete, and a support connecting member is connected between the foundation reinforcement and a set anchor provided on the decorative stone.
본 발명의 일 실시예에 따르면, 상기 후방지지배수부의 내부에는 길이방향으로 우수유도관이 구비되고, 상기 후방지지배수부의 상면에는 우수유도관과 연통되도록 우수인입관이 인출되고, 상기 후방지지배수부의 측면에는 우수유도관과 연통되도록 우수배출관이 연결되며, 상기 우수배출관의 타측 끝단은 장식석의 측면까지 인출되어, 상기 우수인입관을 통해 유입된 우수가 장식석의 측면으로 배출되는 것을 특징으로 한다.According to one embodiment of the present invention, a rainwater drainage pipe is provided in the longitudinal direction inside the rear support drainage part, a rainwater inlet pipe is drawn out on the upper surface of the rear support drainage part so as to be connected to the rainwater drainage pipe, a rainwater discharge pipe is connected to the side of the rear support drainage part so as to be connected to the rainwater drainage pipe, and the other end of the rainwater discharge pipe is drawn out to the side of the decorative stone, so that rainwater introduced through the rainwater inlet pipe is discharged to the side of the decorative stone.
본 발명의 일 실시예에 따르면, 상기 후방지지배수부의 상면에는 부직포가 덮혀지고, 상기 부직포의 상면에는 골재가 적층되며, 상기 골재의 상면에도 부직포가 올려져 덮혀져, 상기 우수인입관을 통해 우수가 쉽게 유입되면서도 토사의 유입은 차단하는 것을 특징으로 한다.According to one embodiment of the present invention, the upper surface of the rear support drainage part is covered with a nonwoven fabric, aggregate is laminated on the upper surface of the nonwoven fabric, and a nonwoven fabric is also placed and covered on the upper surface of the aggregate, so that rainwater can easily flow in through the rainwater inlet pipe while blocking the inflow of soil.
본 발명의 일 실시예에 따르면, 상기 기초콘크리트의 상면에는 수직바연결홈이 형성된 수직바연결소켓이 설치되고, 상기 후방지지배수부의 선단부에 위치하도록 수직바가 세워지되, 상기 수직바의 하단은 수직바연결소켓에 결합되는 것을 특징으로 한다.According to one embodiment of the present invention, a vertical bar connection socket having a vertical bar connection groove formed on the upper surface of the foundation concrete is installed, and a vertical bar is erected so as to be positioned at the front end of the rear support drainage unit, and the lower end of the vertical bar is connected to the vertical bar connection socket.
본 발명의 일 실시예에 따른 시공방법은, 경사토사면의 하단과 접하도록 터파기를 하는 단계; 상기 터파기된 공간에 기초콘크리트를 타설하는 단계; 상기 기초콘크리트의 상면에 장식석을 구축하는 단계; 상기 장식석의 후면에 소정의 간격으로 이격되도록 고화제혼합토를 포설하는 단계; 상기 고화제혼합토의 후면에 후방지지배수부를 수평으로 설치하는 단계; 상기 후방지지배수부와 장식석을 간격유지대에 의해 연결하는 단계; 및 상기 장식석과 고화제혼합토의 사이에 제1되메움토사층을 채워 다지고, 고화제혼합토의 후면과 경사토사면의 사이에는 제2되메움토사층을 채워 다지는 단계;를 포함하는 것을 특징으로 한다.A construction method according to one embodiment of the present invention is characterized by including the steps of: excavating a site so as to be in contact with the lower part of a sloped soil surface; pouring foundation concrete into the excavated space; constructing decorative stones on the upper surface of the foundation concrete; spreading a solidifying agent mixture on the rear surface of the decorative stones at a predetermined interval; horizontally installing a rear support drainage unit on the rear surface of the solidifying agent mixture; connecting the rear support drainage unit and the decorative stones by a gap retainer; and filling and compacting a first backfill soil layer between the decorative stones and the solidifying agent mixture, and filling and compacting a second backfill soil layer between the rear surface of the solidifying agent mixture and the sloped soil surface.
본 발명의 일 실시예에 따르면, 상기 상하단 제1되메움토사층 사이 및 상하단 제2되메움토사층의 사이에는 각각 부직포를 더 설치하며, 최하단의 제1되메움토사층의 하부와 기초콘크리트의 사이에는 쇄석을 채우고, 상기 쇄석의 사이에는 유공관을 설치하는 것을 특징으로 한다.According to one embodiment of the present invention, a non-woven fabric is further installed between the upper and lower first backfill soil layers and between the upper and lower second backfill soil layers, crushed stone is filled between the lower part of the lowermost first backfill soil layer and the foundation concrete, and a perforated pipe is installed between the crushed stone.
본 발명의 일 실시예에 따르면, 상기 기초콘크리트 타설 단계는, 내부에 수평의 기초철근과, 기초철근의 일측 끝단에 수직으로 기초보강철근이 배근된 1단 콘크리트를 타설하고, 상기 1단 콘크리트의 상부에 장석식의 일부가 매립되도록 2단 콘크리트를 타설하는 것을 포함하며, 상기 기초콘크리트와 장식석의 사이에 서포트연결대를 연결하는 것을 특징으로 한다.According to one embodiment of the present invention, the step of pouring the foundation concrete includes pouring a first-stage concrete having horizontal foundation reinforcement bars inside and vertical foundation reinforcing bars arranged at one end of the foundation reinforcement bars, pouring a second-stage concrete so that a portion of the feldspar is embedded on top of the first-stage concrete, and connecting a support connecting member between the foundation concrete and the decorative stone.
본 발명의 일 실시예에 따르면, 상기 후방지지배수부는, 내부에 길이방향으로 우수유도관을 설치하고, 상기 후방지지배수부의 상면에는 우수유도관과 연통되도록 우수인입관을 인출하여 설치하고, 상기 후방지지배수부의 측면에는 우수유도관과 연통되도록 우수배출관을 연결하며, 상기 우수배출관의 타측 끝단은 장식석의 측면까지 인출되어, 상기 우수인입관을 통해 유입된 우수가 장식석의 측면으로 배출되도록 하는 것을 특징으로 한다.According to one embodiment of the present invention, the rear support drainage unit is characterized in that a rainwater drainage pipe is installed longitudinally therein, a rainwater inlet pipe is drawn out and installed on the upper surface of the rear support drainage unit so as to be connected to the rainwater drainage pipe, a rainwater discharge pipe is connected to a side of the rear support drainage unit so as to be connected to the rainwater drainage pipe, and the other end of the rainwater discharge pipe is drawn out to the side of the decorative stone so that rainwater introduced through the rainwater inlet pipe is discharged to the side of the decorative stone.
본 발명의 일 실시예에 따르면, 상기 후방지지배수부의 상면에는 부직포가 덮혀지고, 상기 부직포의 상면에는 골재를 적층한 후 골재의 상면에 부직포를 덮어, 상기 우수인입관을 통해 우수가 쉽게 유입되면서도 토사의 유입은 차단하는 것을 특징으로 한다.According to one embodiment of the present invention, the upper surface of the rear support drainage part is covered with a nonwoven fabric, aggregate is laminated on the upper surface of the nonwoven fabric, and then the upper surface of the aggregate is covered with the nonwoven fabric, so that rainwater can easily flow in through the rainwater inlet pipe while blocking the inflow of soil.
본 발명의 일 실시예에 따르면, 상기 기초콘크리트의 상면에 수직바연결홈이 형성된 수직바연결소켓을 설치하고, 상기 후방지지배수부의 선단부에 위치하도록 수직바를 설치하되, 상기 수직바연결소켓에 수직바의 하단이 끼워지도록 결합하는 것을 특징으로 한다.According to one embodiment of the present invention, a vertical bar connection socket having a vertical bar connection groove formed on the upper surface of the foundation concrete is installed, and a vertical bar is installed so as to be positioned at the front end of the rear support drainage part, and the lower end of the vertical bar is fitted into the vertical bar connection socket and is coupled.
본 발명은 장식석에 의해 경관성이 향상되고 기존 콘크리트 옹벽에서 발생하는 열섬현상을 저감시키는 효과가 있다.The present invention has the effect of improving the landscape by using decorative stones and reducing the heat island phenomenon that occurs in existing concrete retaining walls.
또한, 본 발명은 장식석이 후방토압에 의해 붕괴되지 않도록 견고하게 지지하는 것은 물론, 우기 시 빗물이 원활하게 배수되도록 하여 수압으로 인한 지반의 붕괴를 방지하는 효과가 있다.In addition, the present invention has the effect of not only firmly supporting decorative stones so that they do not collapse due to back pressure, but also preventing collapse of the ground due to water pressure by allowing rainwater to drain smoothly during the rainy season.
도 1은 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 간략 측단면 개념도
도 2는 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 간략 평단면 예시도
도 3은 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 시공을 위해 터파기 후 1단 콘크리트를 타설한 상태를 도시한 간략 측단면 예시도
도 4는 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 시공을 위해 장식석을 세우고 서포트연결대로 연결한 상태를 도시한 간략 측단면 예시도
도 5는 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 시공을 위해 2단 콘크리트를 타설한 상태를 도시한 간략 측단면 예시도
도 6은 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 시공을 위해 고화제혼합토와 제1되메움토사층을 채워 다지는 상태를 도시한 간략 측단면 예시도
도 7은 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 시공을 위해 후방지지배수부와 간격유지대와 우수배출관을 연결하는 상태를 도시한 간략 측단면 예시도
도 8 내지 10은 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 시공을 위해 고화제혼합토와 후방지지배수부 및 제1,2되메움토사층을 다단으로 구축하는 상태를 도시한 간략 측단면 예시도
도 11 및 도 12는 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 시공을 위해 장식석을 2단 내지 다단으로 축조하는 상태를 도시한 간략 측단면 예시도
도 13은 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 시공을 위해 수평바를 설치한 상태를 도시한 간략 측단면 예시도
도 14는 본 발명의 일 실시예에 따른 장식석을 이용한 지지구조물의 시공방법을 도시한 순서도Figure 1 is a simplified cross-sectional conceptual diagram of a support structure using decorative stones according to one embodiment of the present invention.
Figure 2 is a simplified cross-sectional view of a support structure using decorative stones according to one embodiment of the present invention.
Figure 3 is a simplified cross-sectional view showing a state in which a first layer of concrete is poured after excavation for the construction of a support structure using decorative stones according to one embodiment of the present invention.
Figure 4 is a simplified cross-sectional view illustrating a state in which decorative stones are erected and connected to a support connecting member for the construction of a support structure using decorative stones according to one embodiment of the present invention.
Figure 5 is a simplified cross-sectional view showing a state in which two-stage concrete is poured for the construction of a support structure using decorative stones according to one embodiment of the present invention.
Figure 6 is a simplified cross-sectional view illustrating a state in which a solidified mixed soil and a first backfill soil layer are filled and compacted for the construction of a support structure using decorative stones according to one embodiment of the present invention.
Figure 7 is a simplified side cross-sectional example showing a state in which a rear support drainage part, a gap maintenance member, and a rainwater drainage pipe are connected for the construction of a support structure using decorative stones according to one embodiment of the present invention.
Figures 8 to 10 are simplified cross-sectional views illustrating a state in which a solidified mixed soil, a rear support drainage part, and first and second backfill soil layers are constructed in multiple stages for the construction of a support structure using decorative stones according to one embodiment of the present invention.
Figures 11 and 12 are simplified cross-sectional views illustrating a state in which decorative stones are constructed in two or more stages for the construction of a support structure using decorative stones according to one embodiment of the present invention.
Figure 13 is a simplified cross-sectional view showing a state in which a horizontal bar is installed for the construction of a support structure using decorative stones according to one embodiment of the present invention.
Figure 14 is a flowchart illustrating a method for constructing a support structure using decorative stones according to one embodiment of the present invention.
본 명세서 또는 출원에 개시되어 있는 본 발명의 실시 예들에 대해서 특정한 구조적 내지 기능적 설명들은 단지 본 발명에 따른 실시 예를 설명하기 위한 목적으로 예시된 것으로, 본 발명에 따른 실시 예들은 다양한 형태로 실시될 수 있으며 본 명세서 또는 출원에 설명된 실시예 들에 한정되는 것으로 해석되어서는 아니 된다.Specific structural and functional descriptions of the embodiments of the present invention disclosed in this specification or application are merely illustrative for the purpose of explaining the embodiments according to the present invention, and the embodiments according to the present invention may be implemented in various forms and should not be construed as limited to the embodiments described in this specification or application.
본 발명에 따른 실시예는 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있으므로 특정실시 예들을 도면에 예시하고 본 명세서 또는 출원에 상세하게 설명하고자 한다. 그러나, 이는 본 발명의 개념에 따른 실시 예를 특정한 개시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.Since embodiments of the present invention can be modified in various ways and take various forms, specific embodiments are illustrated in the drawings and described in detail in this specification or application. However, this is not intended to limit embodiments of the present invention to specific disclosed forms, but rather to encompass all modifications, equivalents, and alternatives falling within the spirit and technical scope of the present invention.
제 1 및 제 2 등의 용어는 다양한 구성 요소들을 설명하는데 사용될 수 있지만, 상기 구성 요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성 요소를 다른 구성 요소로부터 구별하는 목적으로만, 예컨대 본 발명의 개념에 따른 권리 범위로부터 이탈되지 않은 채, 제 1 구성요소는 제 2 구성요소로 명명될 수 있고, 유사하게 제 2 구성요소는 제 1 구성요소로도 명명될 수 있다.While terms such as "first" and "second" may be used to describe various components, these components should not be limited by these terms. These terms are only intended to distinguish one component from another; for example, without departing from the scope of the invention, a first component may be referred to as a second component, and similarly, a second component may also be referred to as a first component.
어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 구성요소들 간의 관계를 설명하는 다른 표현들, 즉 "~사이에"와 "바로 ~사이에" 또는 "~에 이웃하는"과 "~에 직접 이웃하는" 등도 마찬가지로 해석되어야 한다.When a component is referred to as being "connected" or "connected" to another component, it should be understood that it may be directly connected or connected to that other component, but that there may be other components in between. Conversely, when a component is referred to as being "directly connected" or "directly connected" to another component, it should be understood that there are no other components in between. Other expressions that describe the relationship between components, such as "between" and "directly between" or "adjacent to" and "directly adjacent to", should be interpreted similarly.
본 명세서에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 명세서에서, "포함하다" 또는 "가지다" 등의 용어는 설시된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terminology used herein is for the purpose of describing specific embodiments only and is not intended to limit the present invention. The singular expressions include plural expressions unless the context clearly indicates otherwise. In this specification, it should be understood that the terms "comprises" or "has" indicate the presence of a described feature, number, step, operation, component, part, or combination thereof, but do not preclude the presence or addition of one or more other features, numbers, steps, operations, components, parts, or combinations thereof.
다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 의미를 가지는 것으로 해석되어야 하며, 본 명세서에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. Terms defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant technology, and will not be interpreted in an idealized or overly formal sense unless explicitly defined herein.
본 발명의 지지구조물은 장식석을 이용하는 것으로서, 기초콘크리트(100)와 개별 장식석(200)과 고화제혼합토(300), 그리고 후방지지배수부(400)와 제1되메움토사층(500)과 제2되메움토사층(600) 및 세로연결결속대(700)와 간격유지대(800)를 포함하여 구성될 수 있다.The support structure of the present invention utilizes decorative stones and can be configured to include foundation concrete (100), individual decorative stones (200), a hardening agent mixture (300), a rear support drainage section (400), a first backfill soil layer (500), a second backfill soil layer (600), a vertical connecting tie (700), and a spacing member (800).
기초콘크리트(100)는 장식석(200)을 견고하게 세워 구축하기 위한 것으로서, 1단 콘크리트(110)와 1단 콘크리트(110)의 상면에 타설되어 장식석(200)의 하부를 지지하는 2단 콘크리트(120)로 구분될 수 있다.The base concrete (100) is used to firmly erect and construct the decorative stone (200), and can be divided into a first-stage concrete (110) and a second-stage concrete (120) that is poured on the upper surface of the first-stage concrete (110) and supports the lower part of the decorative stone (200).
1단 콘크리트(110)는 내부에 기초철근(111)이 배근되고, 기초철근(111)의 일측 끝단에서 기초보강철근(112)이 상측으로 절곡 형성되며, 기초보강철근(112)의 일부는 2단 콘크리트(120)을 관통하여 상측으로 노출된다. In the first stage concrete (110), foundation reinforcement (111) is placed inside, and foundation reinforcement (112) is formed by bending upward at one end of the foundation reinforcement (111), and a part of the foundation reinforcement (112) penetrates the second stage concrete (120) and is exposed upward.
서로 접하는 장식석(200)과 장식석(200)은 연결구(220)에 의해 서로 밀착되도록 결합되고, 장식석(200)에 구비되는 세트앙카(210)와 기초보강철근(112)의 사이에는 서포트연결대(240)가 견고하게 연결 지지된다. 또한, 장식석(200)과 장식석(200) 사이에 형성되는 틈새는 부직포(230)로 차단하여 토사가 유출되지 않도록 한다.Decorative stones (200) and decorative stones (200) that are in contact with each other are joined to each other in close contact by means of a connecting member (220), and a support connecting member (240) is firmly connected and supported between a set anchor (210) provided on the decorative stones (200) and a foundation reinforcing bar (112). In addition, the gap formed between the decorative stones (200) and the decorative stones (200) is blocked with a non-woven fabric (230) to prevent soil from flowing out.
고화제혼합토(300)는 고화제와 원지반의 토사가 혼합되어 경화되어 지지력을 향상시키는 것으로서, 장식석(200)의 후면과 소정의 간격으로 이격되도록 기초콘크리트(100)의 상면 일측에 소정의 폭과 높이로 포설되어 다짐기로 다짐된다. 고화제혼합토(300)는 상측으로 다단으로 구비되는데, 상측으로 갈수록 장식석(200)에서 점차 멀어지도록 포설되는 것이 바람직하다.The solidifying agent mixture (300) is a mixture of a solidifying agent and the soil of the original ground that is hardened to improve bearing capacity. It is laid on one side of the upper surface of the foundation concrete (100) with a predetermined width and height so as to be spaced apart from the back of the decorative stone (200) by a predetermined distance, and is then compacted with a tamping machine. The solidifying agent mixture (300) is provided in multiple stages toward the upper side, and it is preferable that it be laid so as to gradually move away from the decorative stone (200) as it goes toward the upper side.
여기서 기초콘크리트(100)의 상면에 구축되는 최초의 고화제혼합토(300)는 기초콘크리트(100)의 후면과 경사토사면(130)과의 사이까지 연장되는 하부지지혼합토(301)가 형성된다.Here, the first hardening agent mixture (300) built on the upper surface of the foundation concrete (100) forms a lower support mixture (301) that extends to the space between the rear surface of the foundation concrete (100) and the inclined soil slope (130).
그리고, 고화제혼합토(300)의 상부에는 오목한 형태의 걸림홈(310)이 형성되고, 고화제혼합토(300)의 하부에는 걸림홈(310)에 끼움 결합되는 형태의 끼움돌기(320)가 돌출 형성된다. In addition, a concave-shaped hooking groove (310) is formed on the upper part of the solidifying agent mixture (300), and a fitting projection (320) that is fitted into the hooking groove (310) is formed protruding on the lower part of the solidifying agent mixture (300).
걸림홈(310)과 걸림돌기(320)는 하측으로 갈수록 폭이 점차 넓어지는 형태로 이루어져 서로 견고하게 끼움 결합되도록 하는 것이 바람직하다. It is desirable that the catch groove (310) and the catch projection (320) be formed in a shape in which the width gradually increases toward the bottom so that they are firmly fitted together.
후방지지배수부(400)는 고화제혼합토(300)의 후단과 접하도록 수평 상태로 구비된다. 후방지지배수부(400)는 내부에 길이방향으로 우수유도관(410)이 구비되고, 후방지지배수부(400)의 상면에는 우수유도관(410)과 연통되도록 우수인입관(420)이 인출 형성되며, 후방지지배수부(400)의 측면에는 우수유도관(410)과 연통되는 우수배출관(430)이 연결되며, 우수배출관(430)은 장식석(200)에 접하는 길이로 형성될 수 있다.The rear support drainage unit (400) is provided in a horizontal state so as to be in contact with the rear end of the solidification agent mixture (300). The rear support drainage unit (400) is provided with a rainwater drainage pipe (410) in the longitudinal direction therein, and a rainwater inlet pipe (420) is formed to be drawn out on the upper surface of the rear support drainage unit (400) so as to be in communication with the rainwater drainage pipe (410), and a rainwater discharge pipe (430) that is in communication with the rainwater drainage pipe (410) is connected to the side of the rear support drainage unit (400), and the rainwater discharge pipe (430) can be formed to a length that is in contact with the decorative stone (200).
그리고, 후방지지배수부(400)의 상측에는 부직포(230)가 덮혀지고, 부직포(230)의 위에는 골재(450)가 적층되며, 골재(450)의 상측에도 부직포(230)가 덮혀져 경사토사면(130)에서 배출되는 우수가 후방지지배수부(400)의 우수인입관(420)으로 유입되도록 하면서도 토사의 유입은 차단하는 역할을 한다.In addition, a non-woven fabric (230) is covered on the upper side of the rear support drainage unit (400), aggregate (450) is laminated on top of the non-woven fabric (230), and the upper side of the aggregate (450) is also covered with a non-woven fabric (230), so that rainwater discharged from the inclined soil slope (130) flows into the rainwater inlet pipe (420) of the rear support drainage unit (400), while blocking the inflow of soil.
제1되메움토사층(500)은 장식석(200)과 고화제혼합토(300) 사이에 채워지고, 고화제혼합토(300)와 경사토사면(130) 사이에는 제2되메움토사층(600)이 채워진다. 그리고, 상하단의 제1되메움토사층(500) 사이 및 상하단의 제2되메움토사층(600)의 사이에는 각각 부직포(230)를 더 설치한다.The first backfill soil layer (500) is filled between the decorative stone (200) and the solidifying agent mixture (300), and the second backfill soil layer (600) is filled between the solidifying agent mixture (300) and the slope soil surface (130). In addition, non-woven fabrics (230) are additionally installed between the first backfill soil layers (500) at the upper and lower ends and between the second backfill soil layers (600) at the upper and lower ends, respectively.
이때, 최하단의 제1되메움토사층(500)의 하부와 기초콘크리트(100)의 상면 사이에 쇄석(510)을 채우고, 쇄석(510)의 사이에는 길이방향으로 유공관(520)을 설치하여 평상시에는 토사에 산소를 공급하여 주고 비가 오는 경우 일측으로 구배가 형성된 유공관(520)을 통해 우수를 배출할 수 있도록 한다. 쇄석(510)과 제1되메움토사층(500) 사이에도 부직포(230)를 덮어 차단하는 것이 바람직하다.At this time, crushed stone (510) is filled between the lower part of the first backfill soil layer (500) at the lowest level and the upper surface of the foundation concrete (100), and a perforated pipe (520) is installed longitudinally between the crushed stone (510) so that oxygen is supplied to the soil in normal times and rainwater can be discharged through the perforated pipe (520) formed with a slope to one side when it rains. It is also preferable to block the space between the crushed stone (510) and the first backfill soil layer (500) by covering it with a nonwoven fabric (230).
다수단으로 적층 형성된 최하단의 고화제혼합토(300)부터 최상단의 고화제혼합토(300)의 내부를 관통하여 세로연결결속대(700)가 더 설치되어 일체로 경화될 수 있다. 세로연결결속대(700)는 경사토사면(130)에서 가해지는 압력을 상하측 전체의 고화제혼합토(300)에서 동시에 저항할 수 있도록 하기 위함이다.A vertical connecting tie (700) is further installed through the interior of the uppermost solidifying agent mixture (300) formed by multi-layering, starting from the lowest solidifying agent mixture (300), so that the solidifying agent mixture can be hardened as a whole. The vertical connecting tie (700) is intended to enable the pressure applied from the inclined soil slope (130) to be resisted simultaneously by the entire upper and lower solidifying agent mixture (300).
간격유지대(800)는 장식석(200)과 후방지지배수부(400)의 사이에 연결되어 장식석(200)이 후방으로 넘어지거나 밀리는 것을 방지하는 역할을 한다. 이를 위해 후방지지배수부(400)의 내부에 철근(460)을 배근하고 철근(460)의 일부가 후방지지배수부(400)의 외측으로 노출되도록 하고, 철근(460)과 장식석(200)에 설치된 세트앙카(210)와의 사이에 간격유지대(800)가 연결된다.The spacing member (800) is connected between the decorative stone (200) and the rear support drainage unit (400) to prevent the decorative stone (200) from falling over or being pushed backward. To this end, a reinforcing bar (460) is arranged inside the rear support drainage unit (400), and a portion of the reinforcing bar (460) is exposed to the outside of the rear support drainage unit (400), and the spacing member (800) is connected between the reinforcing bar (460) and the set anchor (210) installed on the decorative stone (200).
한편, 기초콘크리트(100)의 상면에서 최상단의 후방지지배수부(400)의 선단까지 접하도록 수직바(900)가 세워져 설치될 수 있으며, 수직바(900)는 소정의 간격마다 설치될 수 있다. 이를 위해 기초콘크리트(100)의 상면에 수직바연결소켓(910)이 설치되고, 수직바연결소켓(910)에 형성된 수직바연결홈(911)에 수직바(900)가 끼워져 세워진다. 이때 후방지지배수부(400)가 상단으로 갈수록 장식석(200)에서 점차 멀어지며 구축됨에 따라, 수직바(900)도 경사토사면(130)과 나란하게 경사지도록 설치되는 것이 바람직하다.Meanwhile, a vertical bar (900) may be installed so as to be in contact with the upper surface of the foundation concrete (100) to the tip of the uppermost rear support drainage unit (400), and the vertical bars (900) may be installed at predetermined intervals. To this end, a vertical bar connection socket (910) is installed on the upper surface of the foundation concrete (100), and the vertical bar (900) is installed by being fitted into a vertical bar connection groove (911) formed in the vertical bar connection socket (910). At this time, as the rear support drainage unit (400) is constructed to gradually move away from the decorative stone (200) toward the upper surface, it is preferable that the vertical bar (900) is also installed so as to be inclined parallel to the sloped soil surface (130).
본 발명의 지지구조물은 경사토사면(130)의 높이가 장식석(200)의 높이보다 현저히 높은 경우에는 장식석(200)을 2단으로 구축할 수도 있으며, 이를 위해 1단의 장식석(200) 상단부측에는 다시 기초콘크리트(100)를 구축하고, 그 위에 2단의 장식석(200)을 세우고 고화제혼합토(300)와 후방지지배수부(400), 제1되메움토사층(500)과 제2되메움토사층(600) 및 세로연결결속대(700)와 간격유지대(800)를 구축할 수 있다.In the case where the height of the inclined soil slope (130) of the support structure of the present invention is significantly higher than the height of the decorative stone (200), the decorative stone (200) may be constructed in two stages. To this end, a foundation concrete (100) is constructed again on the upper side of the decorative stone (200) of the first stage, and a second stage of decorative stone (200) is erected thereon, and a solidified soil mixture (300), a rear support drainage part (400), a first backfill soil layer (500), a second backfill soil layer (600), a vertical connection tie band (700), and a gap maintenance band (800) may be constructed.
이하, 상기와 같이 구성되는 본 발명의 지지구조물을 시공하는 방법을 설명한다.Hereinafter, a method for constructing a support structure of the present invention configured as described above will be described.
본 발명의 지지구조물을 시공하기 위해 경사토사면(130)의 하부와 접하도록 하여 소정 폭과 깊이로 터파기를 한다(S100).In order to construct the support structure of the present invention, a excavation is made to a predetermined width and depth so as to be in contact with the lower part of the inclined soil slope (130) (S100).
그리고 터파기된 공간에 기초콘크리트(100)를 타설하는데(S110), 기초콘크리트(100)는 1단 콘크리트(110)와 2단 콘크리트(120)로 구분되어 타설하는 것이 바람직하다. 이를 위해 먼저 터파기된 공간에 기초철근(111)을 배근하고, 기초철근(111)의 일측 끝단에 기초보강철근(112)을 수직으로 세워 결합한 후, 거푸집을 설치하고 콘크리트를 타설하여 1단 콘크리트(110)를 형성한다. 기초보강철근(112)은 1단 콘크리트(110)의 상면으로 일부가 노출되어 타설된다.And when pouring foundation concrete (100) into the excavated space (S110), it is preferable to pour the foundation concrete (100) divided into first-stage concrete (110) and second-stage concrete (120). To this end, first, foundation reinforcing bars (111) are arranged in the excavated space, and foundation reinforcing bars (112) are vertically erected and joined to one end of the foundation reinforcing bars (111), and then a formwork is installed and concrete is poured to form the first-stage concrete (110). The foundation reinforcing bars (112) are poured with a portion exposed on the upper surface of the first-stage concrete (110).
경화된 1단 콘크리트(110)의 상면에 다시 거푸집을 설치 후 소정의 높이로 2단 콘크리트(120)를 타설하여 경화시킨다. 이때, 2단 콘크리트(120)를 타설하기 전에 1단 콘크리트(110)의 상면 끝단에 장식석(200)을 세워 설치하고 2단 콘크리트(120)를 소정의 높이로 타설함으로써, 장식석(200)의 하측 일부가 2단 콘크리트(120) 속에 매설된 상태로 구축된다(S120).After installing a formwork again on the upper surface of the hardened first-stage concrete (110), the second-stage concrete (120) is poured to a predetermined height and allowed to harden. At this time, before pouring the second-stage concrete (120), a decorative stone (200) is erected and installed on the upper end of the first-stage concrete (110) and the second-stage concrete (120) is poured to a predetermined height, thereby constructing the structure with a portion of the lower part of the decorative stone (200) embedded in the second-stage concrete (120) (S120).
장식석(200)에는 세트앙카(210)가 매설되고, 세트앙카(210)와 기초보강철근(112) 사이에는 서포트연결대(220)를 연결하여 장식석(200))을 지지한다. 그리고, 세트앙카(210)와 서포트연결대(220)의 표면에는 에폭도장을 하여 부식을 방지한다. 장식석(200)과 서로 접하는 장식석(200)은 연결구(220)에 의해 서로 견고히 연결한다.A set anchor (210) is embedded in a decorative stone (200), and a support connecting member (220) is connected between the set anchor (210) and the foundation reinforcing bar (112) to support the decorative stone (200). In addition, the surfaces of the set anchor (210) and the support connecting member (220) are epoxy coated to prevent corrosion. The decorative stones (200) and the decorative stones (200) that come into contact with each other are firmly connected to each other by the connecting member (220).
따라서, 기초콘크리트(100)의 하부는 2단 콘크리트(120)의 속에 일부가 매설되고 후면은 기초보강철극(112)과 서포트연결대(220)에 의해 연결 지지되므로, 기초콘크리트(100) 위에 세워진 장식석(200)이 시공 중 전도될 염려가 없게 된다.Accordingly, the lower part of the foundation concrete (100) is partially buried in the two-stage concrete (120) and the rear part is connected and supported by the foundation reinforcing steel pole (112) and the support connecting member (220), so there is no concern that the decorative stone (200) erected on the foundation concrete (100) will fall over during construction.
기초콘크리트(100)의 상면에는 소정의 간격으로 수직바(900)가 더 설치될 수 있으며, 이를 위해 기초콘크리트(100)의 상면에 수직바연결소켓(910)을 견고히 설치하고, 수직바연결소켓(910)의 수직바연결홈(911)에 수직바를 끼워 세운다. 수직바연결홈(911)은 수직바(900)가 완전히 수직으로 세워지지 않고 경사토사면(130)과 유사하게 경사지게 세워질 수 있도록 경사지게 형성되는 것이 바람직하다. On the upper surface of the foundation concrete (100), vertical bars (900) can be further installed at predetermined intervals. To this end, a vertical bar connection socket (910) is firmly installed on the upper surface of the foundation concrete (100), and a vertical bar is inserted into a vertical bar connection groove (911) of the vertical bar connection socket (910) and erected. It is preferable that the vertical bar connection groove (911) be formed to be inclined so that the vertical bar (900) can be erected at an angle similar to the inclined soil slope (130) rather than being erected completely vertically.
장식석(200)의 후면과 소정의 간격으로 이격되도록 고화제와 토사를 혼합한 고화제혼합토(300)를 소정의 폭과 높이로 포설한다(S130). A solidifying agent mixture (300) made by mixing a solidifying agent and soil is laid at a predetermined width and height so as to be spaced apart from the back of the decorative stone (200) at a predetermined interval (S130).
기초콘크리트(100)의 상면에 구축하는 고화제혼합토(300)는 기초콘크리트(100)의 후면과 경사토사면(130)과의 사이까지 연장하여 하부지지혼합토(301)를 형성한다.The hardening agent mixture (300) built on the upper surface of the foundation concrete (100) extends to the space between the rear surface of the foundation concrete (100) and the inclined soil slope (130) to form a lower support mixture (301).
하단의 고화제혼합토(300)가 견고하게 경화되면, 고화제혼합토(300)의 후면에는 수평 상태로 후방지지배수부(400)를 설치한다(S140). 후장지지배수부(400)는 견고하게 고화된 고화제혼합토(300)에 지지되어 장식석(200)을 지지하는 것은 물론, 경사토사면(130)에 침투한 우수를 배출하는 역할을 한다.When the solidified mixture soil (300) at the bottom is firmly hardened, a rear support drainage unit (400) is installed horizontally on the rear side of the solidified mixture soil (300) (S140). The rear support drainage unit (400) is supported by the solidified solidified mixture soil (300) and not only supports the decorative stone (200), but also serves to drain rainwater that has infiltrated the inclined soil slope (130).
이를 위해 장식석(130)과 후방지지배수부(400)는 간격유지대(800)로 연결하여 간격이 유지되도록 지지하며, 간격유지대(800)는 다수개를 연결할 수 있다(S150).To this end, the decorative stone (130) and the rear support drain (400) are connected to a gap maintainer (800) to maintain the gap, and multiple gap maintainers (800) can be connected (S150).
그리고 후방지지배수부(400)의 우수유도관(410)에 우수배출관(430)을 연결하여 장식석(200)까지 인출되도록 하며, 후방지지배수부(400)의 상측에 부직포(230)를 덮고, 부직포(230)의 위에 골재(450)를 적층시킨 후 다시 부직포(230)를 덮는다.And, a rainwater discharge pipe (430) is connected to a rainwater induction pipe (410) of a rear support drainage unit (400) so that it is drawn out to the decorative stone (200), a non-woven fabric (230) is covered on the upper side of the rear support drainage unit (400), aggregate (450) is laminated on top of the non-woven fabric (230), and then the non-woven fabric (230) is covered again.
여기서 후방지지배수부(400)는 별도의 공간에서 대량으로 제작한 후 이송하여 설치하는 것이 바람직하다.Here, it is desirable to manufacture the rear support drainage unit (400) in large quantities in a separate space and then transport and install it.
이후 장식석(200)과 고화제혼합토(300)의 사이에 토사를 메워 다짐으로써 제1되메움토사층(500)을 형성하고, 고화제혼합토(300)와 경사토사면(130)의 사이에도 토사를 메워 다져 제2되메움토사층(600)을 형성한다(S160).Afterwards, the first backfill soil layer (500) is formed by filling and compacting soil between the decorative stone (200) and the solidified mixed soil (300), and the second backfill soil layer (600) is formed by filling and compacting soil between the solidified mixed soil (300) and the inclined soil slope (130) (S160).
여기서 고화제혼합토(300)와 제1되메움토사층(500)과 제2되메움토사층(600)은 최하단부터 소정의 높이로 경화와 다짐을 통해 견고하게 형성한 후, 그 상단에 구축하는 것을 반복함으로써 다단으로 적층하여 구축하는 것이 바람직하다. 특히 고화제혼합토(300)는 상측단으로 갈수록 경사토사면(130)의 경사와 같이 장식석(200)과의 사이 거리가 점차 멀어지도록 형성하는 것이 바람직하다. 마찬가지로 장식석(200)과 고화제혼합토(300)의 사이에 포설되는 제1되메움토사층(600)도 상측으로 갈수록 점차 폭이 넓어지게 된다. Here, it is preferable to construct the solidified mixed soil (300) and the first backfill soil layer (500) and the second backfill soil layer (600) by repeatedly forming them solidly through hardening and compaction from the bottom to a predetermined height, and then constructing them on top of that, thereby stacking them in multiple stages. In particular, it is preferable to form the solidified mixed soil (300) so that the distance between it and the decorative stone (200) gradually increases toward the upper end, like the slope of the inclined soil slope (130). Similarly, the first backfill soil layer (600) laid between the decorative stone (200) and the solidified mixed soil (300) also gradually increases in width toward the upper end.
한편, 최하단의 고화제혼합토(300)의 상면에는 오목한 형태의 걸림홈(310)이 형성되도록 하여 구축하여 경화시키고, 그 상단에 구축되는 고화제혼합토(300)는 일부가 걸림홈(310)에 삽입되도록 하여 소정의 높이로 구축함으로써, 하부에 걸림돌기(320)가 연결되어 형성되도록 한다. 그리고 상부에는 오목한 형태의 걸림홈(310)을 형성한다. 이렇게 각각의 고화제혼합토(300)의 상부에는 걸림홈(310)을 형성하고 하부에는 걸림돌기(320)를 형성하여 서로 끼움 결합되도록 한다.Meanwhile, a concave-shaped catch groove (310) is formed on the upper surface of the solidification mixture (300) at the lowest level and hardened, and the solidification mixture (300) built on the upper side is partially inserted into the catch groove (310) to build it to a predetermined height, so that a catch protrusion (320) is connected and formed at the lower side. In addition, a concave-shaped catch groove (310) is formed at the upper side. In this way, a catch groove (310) is formed at the upper side of each solidification mixture (300) and a catch protrusion (320) is formed at the lower side so that they are fitted together.
이렇게 상하 다단으로 구축된 고화제혼합토(300)는 상하단이 견고하게 끼움결합되어 구축됨에 따라 경사토사면(130)의 토압이 가해지는 경우에도 고화제혼합토(300)가 밀릴 염려가 줄어들고 장식석(200)이 전도될 염려가 줄어들게 된다. As the solidified mixed soil (300) constructed in this way in multiple upper and lower stages is constructed with the upper and lower stages firmly fitted together, there is less concern about the solidified mixed soil (300) being pushed when the earth pressure of the inclined soil slope (130) is applied, and there is less concern about the decorative stone (200) being toppled.
그리고, 최하단의 고화제혼합토(300) 내부에서부터 최상단의 고화제혼합토(300) 내부까지 연결되는 세로연결결속대(700)를 매립하여 설치할 수 있다.In addition, a vertical connecting tie (700) that connects from the inside of the solidified soil mixture (300) at the lowest level to the inside of the solidified soil mixture (300) at the highest level can be installed by burying it.
한편, 최하단의 제1되메움토사층(500)은 토사만으로 되메우지 않고 일부를 쇄석(410)으로 채우고 유공관(520)을 설치한 후 그 외측을 부직포(230)로 감싸고, 그 외측에 토사를 되메워 다짐으로써 제1되메움토사층(500)을 형성할 수 있다. Meanwhile, the first backfill soil layer (500) at the bottom is not backfilled with soil alone, but is partially filled with crushed stone (410), a perforated pipe (520) is installed, and the outside is wrapped with non-woven fabric (230), and then soil is backfilled and compacted on the outside to form the first backfill soil layer (500).
따라서, 장식석을 이용한 본 발명이 지지구조물은 선출원과 달리 다단으로 적층된 고화제혼합토(300)가 경사토사면(120)과 장식석(200) 사이 전체에 걸쳐서 차단하는 구조를 가지게 된다. 따라서 고화제혼합토(300)가 완충벽 역할을 하여 경사토사면(130)의 토압을 저항하여 완충시키고 토사가 유실되는 것을 방지한다. 또한 고화제혼합토(300)와 제1되메운토사층(500)에 의해 경사토사면(130)으로 부터 가해지는 압력이 장식석(130)에 가해지지 않도록 완충 역할을 하게 된다.Accordingly, the support structure of the present invention using decorative stones has a structure in which, unlike the previous application, the solidified mixed soil (300) laminated in multiple stages blocks the entire area between the inclined soil slope (120) and the decorative stones (200). Accordingly, the solidified mixed soil (300) acts as a buffer wall to resist and buffer the earth pressure of the inclined soil slope (130) and prevent the soil from being lost. In addition, the solidified mixed soil (300) and the first backfilled soil layer (500) serve as a buffer so that the pressure applied from the inclined soil slope (130) is not applied to the decorative stones (130).
본 발명은 많은 비가 오는 경우 경사토사면(130)에 침투한 우수가 배출되어 후방지지배수부(400)의 상측 부직포(230)를 거쳐 골재(450) 속으로 유입되고, 이는 다시 우수인입관(42)을 통해 후방지지배수부(400) 내부의 우수유도관(410)으로 모아진다.In the present invention, when there is a lot of rain, rainwater that has penetrated into the slope (130) is discharged and flows into the aggregate (450) through the upper non-woven fabric (230) of the rear support drainage unit (400), and this is again collected into the rainwater guide pipe (410) inside the rear support drainage unit (400) through the rainwater inlet pipe (42).
그리고 다시 측면의 우수배출관(430)을 통해 장식석(200) 후면까지 배출되며, 최하부의 제1되메움토사층(500) 측에 구비된 유공관(520)을 통해 배출되어 토사의 붕괴를 방지하는 효과를 가진다.And again, it is discharged to the back of the decorative stone (200) through the excellent discharge pipe (430) on the side, and is discharged through the perforated pipe (520) provided on the side of the first backfill soil layer (500) at the lowest part, thereby having the effect of preventing the collapse of the soil.
100 : 기초콘크리트 200 : 장식석
110 : 1단 콘크리트 111 : 기초철근
112 : 기초보강철근 120 : 2단 콘크리트
130 : 경사토사면 210 : 세트앙카
220 : 서포트연결대 230 : 부직포
300 : 고화제혼합토 310 : 걸림홈
320 : 끼움돌기 400 : 후방지지배수부
410 : 우수유도관 420 : 우수인입관
430 : 우수배출관 440 : 골재
500 : 제1되메움토사층 510 : 쇄석
520 : 유공관 600 : 제2되메움토사층
700 : 세로연결결속대 800 : 간격유지대100: Base concrete 200: Decorative stone
110: 1st layer concrete 111: Foundation steel
112: Foundation reinforcement steel 120: 2-stage concrete
130: Slope 210: Set anchor
220: Support connecting rod 230: Non-woven fabric
300: Hardening agent mixture 310: Hook groove
320: Insertion lug 400: Rear support drain
410: Superior induction pipe 420: Superior inlet pipe
430: Rainwater drainage pipe 440: Aggregate
500: 1st backfill soil layer 510: Crushed stone
520: Yugong Hall 600: 2nd backfill soil layer
700: Vertical connection tie bar 800: Spacing tie bar
Claims (14)
상기 기초콘크리트의 일측에 세워지며 연결구에 의해 서로 밀착되도록 연결되는 장식석;
상기 장식석에서 소정의 간격으로 이격되어 상측으로 다단으로 구축되되, 상측으로 갈수록 장식석에서 점차 거리가 멀어지도록 구축되는 고화제혼합토;
상기 고화제혼합토 후단에 수평으로 설치되어 지지되며 토사에서 배출되는 우수가 모아지는 후방지지배수부;
상기 장식석과 고화제혼합토의 사이에 다단으로 포설되는 제1되메움토사층;
상기 고화제혼합토의 후단과 경사토사면 사이에 다단으로 포설되는 제2되메움토사층; 및
상기 후방지지배수부와 장식석 사이에 연결되어 지지되는 간격유지대를 포함하고,
상기 기초콘크리트의 상측에 구축되는 고화제혼합토는 기초콘크리트의 후면과 경사토사면과의 사이까지 연장되는 하부지지혼합토가 더 형성되는 것을 특징으로 하는 장식석을 이용한 지지구조물.
Foundation concrete poured to make contact with the bottom of a slope;
Decorative stones erected on one side of the above foundation concrete and connected to each other by means of a connecting member;
A solidified mixed soil that is built in multiple stages upwards at a predetermined interval from the above decorative stones, but is built so that the distance from the decorative stones gradually increases as it goes upwards;
A rear support drainage unit that is installed horizontally and supported at the rear end of the above-mentioned solidified soil mixture and collects rainwater discharged from the soil;
The first backfill soil layer is laid in multiple stages between the above decorative stone and the hardening agent mixture;
A second backfill soil layer laid in multiple stages between the rear end of the above-mentioned solidified soil mixture and the slope of the soil; and
It includes a spacer that is connected and supported between the above rear support drainage unit and the decorative stone,
A support structure using decorative stones, characterized in that the solidified soil mixture built on the upper side of the above foundation concrete is further formed as a lower support mixture that extends between the rear surface of the foundation concrete and the inclined soil slope.
상기 기초콘크리트의 일측에 세워지며 연결구에 의해 서로 밀착되도록 연결되는 장식석;
상기 장식석에서 소정의 간격으로 이격되어 상측으로 다단으로 구축되되, 상측으로 갈수록 장식석에서 점차 거리가 멀어지도록 구축되는 고화제혼합토;
상기 고화제혼합토 후단에 수평으로 설치되어 지지되며 토사에서 배출되는 우수가 모아지는 후방지지배수부;
상기 장식석과 고화제혼합토의 사이에 다단으로 포설되는 제1되메움토사층;
상기 고화제혼합토의 후단과 경사토사면 사이에 다단으로 포설되는 제2되메움토사층; 및
상기 후방지지배수부와 장식석 사이에 연결되어 지지되는 간격유지대를 포함하고,
고화제혼합토의 상부에는 오목한 걸림홈이 더 형성되고, 고화제혼합토 하부에는 상기 걸림홈에 끼움 결합되는 끼움돌기가 돌출 형성되는 것을 특징으로 하는 장식석을 이용한 지지구조물.
Foundation concrete poured to make contact with the bottom of a slope;
Decorative stones erected on one side of the above foundation concrete and connected to each other by means of a connecting member;
A solidified mixed soil that is built in multiple stages upwards at a predetermined interval from the above decorative stones, but is built so that the distance from the decorative stones gradually increases as it goes upwards;
A rear support drainage unit that is installed horizontally and supported at the rear end of the above-mentioned solidified soil mixture and collects rainwater discharged from the soil;
The first backfill soil layer is laid in multiple stages between the above decorative stone and the hardening agent mixture;
A second backfill soil layer laid in multiple stages between the rear end of the above-mentioned solidified soil mixture and the slope of the soil; and
It includes a spacer that is connected and supported between the above rear support drainage unit and the decorative stone,
A support structure using decorative stones, characterized in that a concave groove is formed on the upper part of the solidified mixture soil, and a fitting projection that fits into the groove is formed protruding on the lower part of the solidified mixture soil.
상기 걸림홈과 끼움돌기는 하측으로 갈수록 폭이 점차 넓어지도록 형성되어 결속력이 향상되는 것을 특징으로 하는 장식석을 이용한 지지구조물.
In the second paragraph,
A support structure using decorative stones, characterized in that the above-mentioned catch grooves and inserts are formed so that their widths gradually increase toward the bottom, thereby improving the bonding strength.
상기 기초콘크리트의 일측에 세워지며 연결구에 의해 서로 밀착되도록 연결되는 장식석;
상기 장식석에서 소정의 간격으로 이격되어 상측으로 다단으로 구축되되, 상측으로 갈수록 장식석에서 점차 거리가 멀어지도록 구축되는 고화제혼합토;
상기 고화제혼합토 후단에 수평으로 설치되어 지지되며 토사에서 배출되는 우수가 모아지는 후방지지배수부;
상기 장식석과 고화제혼합토의 사이에 다단으로 포설되는 제1되메움토사층;
상기 고화제혼합토의 후단과 경사토사면 사이에 다단으로 포설되는 제2되메움토사층; 및
상기 후방지지배수부와 장식석 사이에 연결되어 지지되는 간격유지대를 포함하고,
상기 기초콘크리트의 상면에는 수직바연결홈이 형성된 수직바연결소켓이 설치되고, 상기 후방지지배수부의 선단부에 위치하도록 수직바가 세워지되, 상기 수직바의 하단은 수직바연결소켓에 결합되는 것을 특징으로 하는 장식석을 이용한 지지구조물.
Foundation concrete poured to make contact with the bottom of a slope;
Decorative stones erected on one side of the above foundation concrete and connected to each other by means of a connecting member;
A solidified mixed soil that is built in multiple stages upwards at a predetermined interval from the above decorative stones, but is built so that the distance from the decorative stones gradually increases as it goes upwards;
A rear support drainage unit that is installed horizontally and supported at the rear end of the above-mentioned solidified soil mixture and collects rainwater discharged from the soil;
The first backfill soil layer is laid in multiple stages between the above decorative stone and the hardening agent mixture;
A second backfill soil layer laid in multiple stages between the rear end of the above-mentioned solidified soil mixture and the slope of the soil; and
It includes a spacer that is connected and supported between the above rear support drainage unit and the decorative stone,
A support structure using decorative stones, characterized in that a vertical bar connection socket having a vertical bar connection groove formed on the upper surface of the above-mentioned foundation concrete is installed, and a vertical bar is erected to be positioned at the front end of the above-mentioned rear support drainage section, and the lower end of the vertical bar is connected to the vertical bar connection socket.
상기 터파기된 공간에 기초콘크리트를 타설하는 단계;
상기 기초콘크리트의 상면에 장식석을 구축하는 단계;
상기 장식석의 후면에 소정의 간격으로 이격되도록 고화제혼합토를 포설하는 단계;
상기 고화제혼합토의 후면에 후방지지배수부를 수평으로 설치하는 단계;
상기 후방지지배수부와 장식석을 간격유지대에 의해 연결하는 단계; 및
상기 장식석과 고화제혼합토의 사이에 제1되메움토사층을 채워 다지고, 고화제혼합토의 후면과 경사토사면의 사이에는 제2되메움토사층을 채워 다지는 단계를 포함하고,
상기 기초콘크리트의 상면에 수직바연결홈이 형성된 수직바연결소켓을 설치하고, 상기 후방지지배수부의 선단부에 위치하도록 수직바를 설치하는 것을 특징으로 하는 장식석을 이용한 지지구조물 시공방법.A step of excavating so that it touches the bottom of the slope;
A step of pouring foundation concrete into the above-mentioned excavated space;
A step of constructing decorative stones on the upper surface of the above foundation concrete;
A step of laying a hardening agent mixture at a predetermined interval on the back of the above decorative stone;
A step of horizontally installing a rear support drainage unit on the rear of the above-mentioned solidified soil mixture;
A step of connecting the above rear support drainage unit and decorative stone using a spacer; and
It includes a step of filling and compacting a first backfill soil layer between the above decorative stone and the solidified soil mixture, and filling and compacting a second backfill soil layer between the back of the solidified soil mixture and the slope of the soil.
A method for constructing a support structure using decorative stones, characterized in that a vertical bar connection socket having a vertical bar connection groove formed on the upper surface of the above-mentioned foundation concrete is installed, and a vertical bar is installed so as to be positioned at the front end of the above-mentioned rear support drainage section.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020250088895A KR102865757B1 (en) | 2025-07-02 | 2025-07-02 | Supporting structure using decorative stone and method for construction of that |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020250088895A KR102865757B1 (en) | 2025-07-02 | 2025-07-02 | Supporting structure using decorative stone and method for construction of that |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR102865757B1 true KR102865757B1 (en) | 2025-09-26 |
Family
ID=97199916
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020250088895A Active KR102865757B1 (en) | 2025-07-02 | 2025-07-02 | Supporting structure using decorative stone and method for construction of that |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR102865757B1 (en) |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20010097310A (en) * | 2000-04-21 | 2001-11-08 | 정기종 | Revetment structure using natural stones |
| KR20040037909A (en) * | 2002-10-30 | 2004-05-08 | 유근무 | A Constructing Method for Preventing the Sinking of the Back Filling in the Civil Structure for using Solidify Treatment |
| KR20090028964A (en) * | 2007-09-17 | 2009-03-20 | 주식회사 에코밸리 | Retaining wall structure with drainage system and construction method |
| KR100933660B1 (en) | 2009-08-04 | 2009-12-23 | 동양이앤씨 주식회사 | Masonry support structure and construction method |
| KR20100076650A (en) * | 2008-12-26 | 2010-07-06 | 대림산업 주식회사 | Design and construction method for dead block type sone retaining wall |
| KR20110106643A (en) * | 2010-03-23 | 2011-09-29 | 주식회사 제이티이엔지 | Retaining Wall Structure Using Natural Stone |
| KR101070644B1 (en) * | 2011-03-29 | 2011-10-07 | 엔지니어스 주식회사 | Steep Reinforcement using Solidified Agitated Soil and Construction Method |
| KR20130142465A (en) * | 2012-06-19 | 2013-12-30 | 김미곤 | Retaining wall having natural rock and construction method thereof |
| KR101841506B1 (en) * | 2017-06-07 | 2018-03-23 | 장윤석 | Stone wall infrastructure of using natural stone |
| KR101971015B1 (en) | 2018-08-09 | 2019-04-22 | 주식회사 지오환경 | Civil engineering structures using natural stone and its construction method |
-
2025
- 2025-07-02 KR KR1020250088895A patent/KR102865757B1/en active Active
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20010097310A (en) * | 2000-04-21 | 2001-11-08 | 정기종 | Revetment structure using natural stones |
| KR20040037909A (en) * | 2002-10-30 | 2004-05-08 | 유근무 | A Constructing Method for Preventing the Sinking of the Back Filling in the Civil Structure for using Solidify Treatment |
| KR20090028964A (en) * | 2007-09-17 | 2009-03-20 | 주식회사 에코밸리 | Retaining wall structure with drainage system and construction method |
| KR20100076650A (en) * | 2008-12-26 | 2010-07-06 | 대림산업 주식회사 | Design and construction method for dead block type sone retaining wall |
| KR100933660B1 (en) | 2009-08-04 | 2009-12-23 | 동양이앤씨 주식회사 | Masonry support structure and construction method |
| KR20110106643A (en) * | 2010-03-23 | 2011-09-29 | 주식회사 제이티이엔지 | Retaining Wall Structure Using Natural Stone |
| KR101070644B1 (en) * | 2011-03-29 | 2011-10-07 | 엔지니어스 주식회사 | Steep Reinforcement using Solidified Agitated Soil and Construction Method |
| KR20130142465A (en) * | 2012-06-19 | 2013-12-30 | 김미곤 | Retaining wall having natural rock and construction method thereof |
| KR101841506B1 (en) * | 2017-06-07 | 2018-03-23 | 장윤석 | Stone wall infrastructure of using natural stone |
| KR101971015B1 (en) | 2018-08-09 | 2019-04-22 | 주식회사 지오환경 | Civil engineering structures using natural stone and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101023660B1 (en) | Retaining wall using anchor and concrete panel and construction method using same | |
| CN110042716B (en) | Widening construction method for high-fill roadbed with foamed light soil | |
| KR101105092B1 (en) | Construction method of this precast retaining wall panel using precast retaining wall panel and semi-dry backfill | |
| KR101973565B1 (en) | Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate | |
| KR100933660B1 (en) | Masonry support structure and construction method | |
| CN113308953A (en) | Construction method for widening embankment by utilizing foam concrete of existing retaining wall | |
| CA2561785A1 (en) | A reinforced soil retaining wall system and method of construction | |
| KR100939311B1 (en) | Pavement with prestressing in PC block and steel pipe and construction method | |
| KR102259659B1 (en) | Ornamental stone retaining wall structure and construction method using L type anker and strip bar | |
| KR102865757B1 (en) | Supporting structure using decorative stone and method for construction of that | |
| CN212294705U (en) | Inflation dirt road moat slope reinforced structure | |
| KR101235826B1 (en) | The method of constructing block for wall | |
| CN218175758U (en) | Rectangular channel constructed by reverse construction method | |
| KR100884391B1 (en) | Reinforced soil retaining wall reinforced with drainage function at the top of retaining wall and its construction method | |
| KR20090073330A (en) | Landscape Retaining Wall Structures | |
| CN215594068U (en) | Insert and bury ground stake formula side slope supporting construction | |
| CN211312041U (en) | Flood-immersed embankment side slope protection structure | |
| KR101328027B1 (en) | Cutting the ground area breast wall and slant safe-guard structure | |
| KR100976277B1 (en) | Eco-friendly ecological retaining wall construction method using pipe anchor and PC block | |
| KR200223114Y1 (en) | A structure reinforcing for retaining wall for inclined plane which to cut off a rock wall | |
| CN113863334A (en) | Highway slope protection structure | |
| KR100748607B1 (en) | Groundwater Drainage Construction Method and System for Reducing Upstream Pressure of Building | |
| JP7472385B1 (en) | Retaining walls and construction methods | |
| JP2547946B2 (en) | Reinforced soil structure | |
| KR102869607B1 (en) | Landscape retaining wall structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| P11 | Amendment of application requested |
Free format text: ST27 STATUS EVENT CODE: A-2-2-P10-P11-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13 | Application amended |
Free format text: ST27 STATUS EVENT CODE: A-2-2-P10-P13-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| D16 | Fast track examination requested |
Free format text: ST27 STATUS EVENT CODE: A-1-2-D10-D16-EXM-PA0302 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| D17 | Fast track examination accepted |
Free format text: ST27 STATUS EVENT CODE: A-1-2-D10-D17-EXM-PA0302 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| PA0302 | Request for accelerated examination |
St.27 status event code: A-1-2-D10-D17-exm-PA0302 St.27 status event code: A-1-2-D10-D16-exm-PA0302 |
|
| D21 | Rejection of application intended |
Free format text: ST27 STATUS EVENT CODE: A-1-2-D10-D21-EXM-PE0902 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| E13 | Pre-grant limitation requested |
Free format text: ST27 STATUS EVENT CODE: A-2-3-E10-E13-LIM-X000 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
| P11 | Amendment of application requested |
Free format text: ST27 STATUS EVENT CODE: A-2-2-P10-P11-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13 | Application amended |
Free format text: ST27 STATUS EVENT CODE: A-2-2-P10-P13-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| D22 | Grant of ip right intended |
Free format text: ST27 STATUS EVENT CODE: A-1-2-D10-D22-EXM-PE0701 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| F11 | Ip right granted following substantive examination |
Free format text: ST27 STATUS EVENT CODE: A-2-4-F10-F11-EXM-PR0701 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-2-2-U10-U11-OTH-PR1002 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| Q13 | Ip right document published |
Free format text: ST27 STATUS EVENT CODE: A-4-4-Q10-Q13-NAP-PG1601 (AS PROVIDED BY THE NATIONAL OFFICE) |