KR102806532B1 - Roof waterproofing system and its construction method - Google Patents

Roof waterproofing system and its construction method Download PDF

Info

Publication number
KR102806532B1
KR102806532B1 KR1020240125737A KR20240125737A KR102806532B1 KR 102806532 B1 KR102806532 B1 KR 102806532B1 KR 1020240125737 A KR1020240125737 A KR 1020240125737A KR 20240125737 A KR20240125737 A KR 20240125737A KR 102806532 B1 KR102806532 B1 KR 102806532B1
Authority
KR
South Korea
Prior art keywords
waterproofing
roof
layer
coating layer
adhesive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
KR1020240125737A
Other languages
Korean (ko)
Inventor
홍덕기
Original Assignee
홍덕기
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍덕기 filed Critical 홍덕기
Priority to KR1020240125737A priority Critical patent/KR102806532B1/en
Application granted granted Critical
Publication of KR102806532B1 publication Critical patent/KR102806532B1/en
Assigned to 주식회사 굿네이버건설 reassignment 주식회사 굿네이버건설 권리의 전부이전등록 Assignors: 홍덕기
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • E04B1/644Damp-proof courses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0281Repairing or restoring roofing or roof covering

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

개시된 지붕 방수 구조물 시공방법은, 경사진 지붕 기초면을 청소하고 균열 또는 들뜸 부분을 보수하는 지붕 기초면 정리 단계; 상기 지붕 기초면 정리 단계가 수행된 지붕 기초면에 프라이머를 도포한 후 건조하여 프라이머 도막층을 형성하는 단계; 상기 프라이머 도막층 상에 방수도료를 도포하여 기초 방수 도막층을 형성하는 단계; 상기 기초 방수 도막층 상에 복수의 지붕 마감재들을 포개어 부착하는 단계; 및 상기 지붕 마감재들을 덮도록 수용성 아크릴 에멀젼과 방청 안료를 포함하는 주제와 경화제를 혼합하여 만든 2액형 방수도료를 도포하여 지붕 마감재 방수 도막층을 형성하는 단계를 포함한다.The disclosed roof waterproofing structure construction method comprises: a roof base surface preparation step of cleaning a sloping roof base surface and repairing cracks or raised portions; a step of applying a primer to the roof base surface on which the roof base surface preparation step has been performed and then drying it to form a primer coating layer; a step of applying a waterproofing paint on the primer coating layer to form a base waterproofing coating layer; a step of overlapping and attaching a plurality of roof finishing materials on the base waterproofing coating layer; and a step of applying a two-component waterproofing paint made by mixing a subject matter including a water-soluble acrylic emulsion and a rust-preventive pigment and a hardener to cover the roof finishing materials, thereby forming a roof finishing material waterproofing coating layer.

Description

지붕 방수 구조물 및 그 시공 방법{Roof waterproofing system and its construction method}Roof waterproofing structure and its construction method {Roof waterproofing system and its construction method}

본 발명은 지붕 방수 구조물에 관한 것으로서, 더 상세하게는, 건축물의 지붕에 적용되어 비나 바람 등과 같은 외부 환경으로부터 건축물 내부를 보호하는 지붕 방수 구조물에 관한 것이다. The present invention relates to a roof waterproofing structure, and more specifically, to a roof waterproofing structure applied to the roof of a building to protect the interior of the building from external environments such as rain or wind.

통상적으로, 건축물의 지붕은, 외벽이 외부로 그대로 노출되는 경우, 계절별 시간별 온도 변화에 따라 수축과 팽창을 반복하므로, 균열 등의 발생 가능성이 커지며, 이러한 균열을 누수 발생을 초래할 수 있다.Normally, the roof of a building, when the exterior wall is exposed to the outside, repeatedly contracts and expands according to seasonal and hourly temperature changes, which increases the possibility of cracks occurring, and these cracks can cause water leaks.

이에 대하여, 최근에는 지붕 기초면에 판재 형태의 지붕 마감재들을 부착하여, 외부 환경으로부터 지붕 기초면을 보호하는 시공법이 적용되고 되고 있다. 이때, 지붕 마감재들은 기와 형태로 덧대어지는 구조가 반복되어 지붕 기초면 전체를 덮는다.In this regard, a construction method has been recently applied that protects the roof base surface from the external environment by attaching roof finishing materials in the form of boards to the roof base surface. At this time, the roof finishing materials are repeatedly added in the form of tiles to cover the entire roof base surface.

그런데 지붕 마감재들이 접착층에 의해 지붕 기초면에 고정되지만 서로 덧대어지거나 포개져 있는 지붕 마감재들 사이가 취약하므로, 센 바람 등에 의해 지붕 마감재들이 떨어져 나갈 수가 있었다.However, although the roof finishing materials are fixed to the roof base surface by an adhesive layer, the gap between the roof finishing materials that are overlapped or covered with each other is weak, so the roof finishing materials can fall off due to strong winds, etc.

또한, 지붕 마감재들 사이가 들뜨거나 하여 분리될 수 있으며 또한 시간 경과에 따라 지붕 마감재들 사이의 틈이 확장되어 누수가 발생될 수 우려가 있다.Additionally, there is a risk that the roof finishes may become loose or separate, and the gaps between the roof finishes may expand over time, causing leakage.

특허등록 10-1041557 (2011년 6월 8일)Patent registration 10-1041557 (June 8, 2011)

본 발명은, 종래기술의 문제점을 해결하기 위한 것으로서, 건축물의 지붕에 적용되어 비나 바람 등과 같은 외부 환경으로부터 건축물 내부를 보호할 수 있으며, 지붕 마감재의 분리 및 누수 등의 문제 발생시 보수가 쉽고 간편한 지붕 방수 구조물에 제공하는 것을 목적으로 한다.The present invention is intended to solve the problems of the prior art, and aims to provide a roof waterproofing structure that can be applied to the roof of a building to protect the interior of the building from external environments such as rain or wind, and that is easy and simple to repair when problems such as separation of roof finishing materials and leakage occur.

본 발명의 일측면에 따른 지붕 방수 구조물 시공방법은, 경사진 지붕 기초면을 청소하고 균열 또는 들뜸 부분을 보수하는 지붕 기초면 정리 단계; 상기 지붕 기초면 정리 단계가 수행된 지붕 기초면에 프라이머를 도포한 후 건조하여 프라이머 도막층을 형성하는 단계; 상기 프라이머 도막층 상에 방수도료를 도포하여 기초 방수 도막층을 형성하는 단계; 상기 기초 방수 도막층 상에 복수의 지붕 마감재들을 포개어 부착하는 단계; 및 상기 지붕 마감재들을 덮도록 수용성 아크릴 에멀젼과 방청 안료를 포함하는 주제와 경화제를 혼합하여 만든 2액형 방수도료를 도포하여 지붕 마감재 방수 도막층을 형성하는 단계를 포함한다.A method for constructing a roof waterproofing structure according to one aspect of the present invention comprises: a roof base surface preparation step of cleaning a sloping roof base surface and repairing cracks or raised portions; a step of applying a primer to the roof base surface on which the roof base surface preparation step has been performed and then drying it to form a primer coating layer; a step of applying a waterproofing paint on the primer coating layer to form a base waterproofing coating layer; a step of overlapping and attaching a plurality of roof finishing materials on the base waterproofing coating layer; and a step of applying a two-component waterproofing paint made by mixing a subject matter including a water-soluble acrylic emulsion and a rust-preventive pigment and a hardener to cover the roof finishing materials to form a roof finishing material waterproofing coating layer.

본 발명의 다른 측면에 따른 지붕 방수 구조물 시공방법은, 경사진 지붕 기초면을 청소하고 균열 또는 들뜸 부분을 보수하는 지붕 기초면 정리 단계; 상기 지붕 기초면 정리 단계가 수행된 지붕 기초면에 프라이머를 도포한 후 건조하여 프라이머 도막층을 형성하는 단계; 상기 프라이머 도막층 상에 방수도료를 도포하여 기초 방수 도막층을 형성하는 단계; 상기 기초 방수 도막층 상에 아스팔트와 접착성 강화물질을 혼합한 접착력 강화성 도막 방수재를 도포하여 접착력 강화성 도막 방수재 층을 형성하는 단계; 상기 접착력 강화성 도막 방수재 층이 굳기 전에 상기 접착력 강화성 도막 방수재 층 상으로 적층된 화이버글라스 쉬트 및 화이버글라스 쉬트에 스며든 플라스틱 수지에 의해 형성된 보강 방수층을 형성하는 단계; 상기 보강 방수층 상에 지붕 마감재들을 포개어 부착하는 단계; 및 상기 지붕 마감재들을 덮도록 수용성 아크릴 에멀젼과 방청 안료를 포함하는 주제와 경화제를 혼합하여 만든 방수도료를 도포하여 지붕 마감재 방수 도막층을 형성하는 단계를 포함한다.According to another aspect of the present invention, a method for constructing a roof waterproofing structure comprises: a roof base surface preparation step of cleaning a sloping roof base surface and repairing cracks or raised portions; a step of applying a primer to the roof base surface on which the roof base surface preparation step has been performed, and then drying the primer to form a primer coating layer; a step of applying a waterproofing paint on the primer coating layer to form a foundation waterproofing coating layer; a step of applying an adhesive-reinforcing coating waterproofing agent mixed with asphalt and an adhesive-reinforcing agent on the foundation waterproofing coating layer to form an adhesive-reinforcing coating waterproofing agent layer; a step of forming a reinforcing waterproofing layer formed by a fiberglass sheet laminated on the adhesive-reinforcing coating waterproofing agent layer and a plastic resin permeated into the fiberglass sheet before the adhesive-reinforcing coating waterproofing agent layer hardens; a step of overlapping and attaching roof finishing materials on the reinforcing waterproofing layer; and a step of applying a waterproofing paint made by mixing a subject matter including a water-soluble acrylic emulsion and a rust-preventive pigment and a hardener to cover the roof finishing materials, thereby forming a roof finishing material waterproofing coating layer.

본 발명의 일측면에 따른 지붕 방수 구조물은, 지붕 기초면에 형성된 프라이머 도막층; 상기 프라이머 도막층 상에 형성된 기초 방수 도막층; 상기 기초 방수 도막층 상에 접착력 강화성 도막 방수재를 도포하여 형성된 접착력 강화성 도막 방수재 층; 상기 접착력 강화성 도막 방수재 층이 굳기 전에 상기 접착력 강화성 도막 방수재 층 상으로 적층된 화이버글라스 쉬트 및 화이버글라스 쉬트에 스며든 플라스틱 수지에 의해 형성된 보강 방수층; 상기 보강 방수층 상에 접착물질에 의해 포개어 부착되되, 각각이 상부 부착 판부 및 하부 부착 판부와 상기 상부 부착 판부와 상기 하부 부착 판부 사이를 경사지게 연결하는 연결판부를 포함하며, 상기 보강 방수층과 상기 상부 부착 판부 사이에 접착물질이 개재되어 부착되고, 상기 하부 부착 판부와 다른 지붕 마감재의 상부 부착 판부 사이에 접착물질이 개재되어 부착되는 금속 재질로 형성된 복수의 지붕 마감재들; 지붕 마감재 각각의 상부 부착 판부와 연결판부 사이의 절곡 부분이 걸려 유지되도록 해주는 걸림 띠; 및 상기 복수의 지붕 마감재들의 상부를 전체적으로 덮도록 형성된 지붕 마감재 방수 도막층을 포함한다.According to one aspect of the present invention, a roof waterproofing structure comprises: a primer coating layer formed on a roof base surface; a base waterproofing coating layer formed on the primer coating layer; an adhesive-reinforced coating waterproofing layer formed by applying an adhesive-reinforced coating waterproofing material on the base waterproofing coating layer; a reinforcing waterproofing layer formed by a fiberglass sheet laminated on the adhesive-reinforced coating waterproofing layer before the adhesive-reinforced coating waterproofing layer hardens and a plastic resin permeated into the fiberglass sheet; a plurality of roof finishing materials formed of a metal material, which are overlapped and attached by an adhesive material on the reinforcing waterproofing layer, each of which includes an upper attachment plate portion and a lower attachment plate portion and a connecting plate portion that obliquely connects the upper attachment plate portion and the lower attachment plate portion, and an adhesive material is interposed between the reinforcing waterproofing layer and the upper attachment plate portion, and an adhesive material is interposed between the lower attachment plate portion and the upper attachment plate portion of another roof finishing material, and is attached; a catch band that allows a folded portion between the upper attachment plate portion and the connecting plate portion of each roof finishing material to be caught and maintained; And it includes a roof finishing material waterproofing coating layer formed to entirely cover the upper portion of the plurality of roof finishing materials.

본 발명에 따르면, 건축물의 지붕에 적용되어 비나 바람 등과 같은 외부 환경으로부터 건축물 내부를 보호할 수 있으며, 지붕 마감재의 분리 및 누수 등의 문제 발생시 보수가 쉽고 간편하다는 장점을 갖는다.According to the present invention, it can be applied to the roof of a building to protect the interior of the building from external environments such as rain or wind, and has the advantage of being easy and simple to repair when problems such as separation of roof finishing materials and leakage occur.

도 1은 본 발명의 일 실시예에 따른 지붕 방수 구조물 시공방법을 설명하기 위한 순서도이고,
도 2는 본 발명의 일 실시예에 따른 지붕 방수 구조물을 설명하기 위한 단면도이고,
도 3은 본 발명의 다른 실시예에 따른 지붕 방수 구조물 시공방법을 설명하기 위한 순서도이고,
도 4는 본 발명의 다른 실시예에 따른 지붕 방수 구조물을 설명하기 위한 단면도이다.
Figure 1 is a flow chart for explaining a method for constructing a roof waterproofing structure according to one embodiment of the present invention.
FIG. 2 is a cross-sectional view illustrating a roof waterproofing structure according to one embodiment of the present invention.
Figure 3 is a flow chart for explaining a method for constructing a roof waterproofing structure according to another embodiment of the present invention.
FIG. 4 is a cross-sectional view illustrating a roof waterproofing structure according to another embodiment of the present invention.

이하, 첨부한 도면을 참고로 하여 본 발명의 실시예들에 대하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예들에 한정되지 않는다.Hereinafter, embodiments of the present invention will be described in detail with reference to the attached drawings so that those skilled in the art can easily implement the present invention. The present invention may be implemented in various different forms and is not limited to the embodiments described herein.

본 발명을 설명함에 있어서, 도면에 도시된 구성요소의 크기나 형상 등은 설명의 명료성과 편의를 위해 과장되거나 단순화되어 나타날 수 있다. In describing the present invention, the size or shape of components illustrated in the drawings may be exaggerated or simplified for clarity and convenience of explanation.

또한, 본 발명의 구성 및 작용을 고려하여 특별히 정의된 용어들은 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다. 이러한 용어들은 본 명세서 전반에 걸친 내용을 토대로 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야 한다.In addition, terms specifically defined in consideration of the configuration and operation of the present invention may vary depending on the intention or custom of the user or operator. These terms should be interpreted as meanings and concepts that are consistent with the technical idea of the present invention based on the contents throughout this specification.

본 발명을 명확하게 설명하기 위하여 본 발명의 기술적 사상과 관계없는 부분의 설명은 생략하였으며, 명세서 전체를 통하여 동일 또는 유사한 구성요소에 대해서는 동일한 참조 부호를 붙이도록 한다.In order to clearly explain the present invention, the description of parts unrelated to the technical idea of the present invention is omitted, and the same reference numerals are given to the same or similar components throughout the specification.

또한, 여러 실시예들에 있어서, 동일한 구성을 가지는 구성요소에 대해서는 동일한 부호를 사용하여 대표적인 실시예에서만 설명하고, 그 외의 다른 실시예에서는 대표적인 실시예와 다른 구성에 대해서만 설명하기로 한다.In addition, in various embodiments, components having the same configuration are described only in representative embodiments using the same reference numerals, and in other embodiments, only configurations different from the representative embodiments are described.

도 1은 본 발명의 일 실시예에 따른 지붕 방수 구조물의 시공방법을 설명하기 위한 순서도이다.FIG. 1 is a flowchart for explaining a method for constructing a roof waterproofing structure according to one embodiment of the present invention.

도 1에 도시된 바와 같이, 본 발명의 일 실시예에 따른 지붕 방수 구조물의 시공방법은, 경사진 지붕 기초면(2)을 청소하고 균열 또는 들뜸 부분을 보수하는 지붕 기초면 정리 단계(S1)와, 상기 지붕 기초면 정리 단계(S1)가 수행된 지붕 기초면에 프라이머를 도포한 후 건조하여 프라이머 도막층(10)을 형성하는 단계(S2)와, 상기 프라이머 도막층(10) 상에 방수도료를 도포하여 기초 방수 도막층(30)을 형성하는 단계(S3)와, 상기 기초 방수 도막층(30) 상에 지붕 마감재(50)들을 포개어 부착하는 단계(S4)와, 상기 지붕 마감재(50)들을 덮도록 수용성 아크릴 에멀젼 30 ~ 35 중량%, 실리카 에어로겔 3 ~ 5 중량%, 티타늄 디옥사이드 5 ~ 10 중량%, 탄산칼슘 15 ~ 25 중량%, 에폭시 수지 5 ~ 10 중량%, 실란 커플링제 0.5 ~ 1.5 중량%, 아연 인산염 또는 스트론튬 크로메이트와 알루미늄 플레이크를 포함하는 방청 안료 방청 안료 2 ~ 5 중량%, 미세 구형 실리카 1 ~ 3 중량%, 분산제 0.5 ~ 1.0 중량%, 증점제 0.2 ~ 0.5 중량%, 탈수제 0.2 ~ 0.5 중량%, 나머지 물을 포함하는 주제와, 저분자량 폴리아민 30 ~ 50 중량%, 지방족 폴리아민 20 ~ 30 중량 %, 알코올 10 ~ 20 중량%, 가교제 5 ~ 10 중량 %를 포함하는 경화제를 10 : 3 ~ 10 : 10의 중량비로 혼합하여 만든 방수도료를 도포하여 지붕 마감재 방수 도막층(70)을 형성하는 단계(S5)를 포함한다. 추가로 상기 지붕 마감재 방수 도막층(70) 상에 추가로 보호층을 더 형성할 수 있다. 프라이머 도막층을 형성하는 프라이머와 기초 방수 도막층을 형성하는 방수도료는 공지의 것을 사용하는 것도 가능하다.As illustrated in FIG. 1, a method for constructing a roof waterproofing structure according to an embodiment of the present invention comprises: a roof base surface preparation step (S1) of cleaning a sloping roof base surface (2) and repairing cracks or raised portions; a step (S2) of applying a primer to the roof base surface on which the roof base surface preparation step (S1) has been performed and drying it to form a primer coating layer (10); a step (S3) of applying a waterproofing paint on the primer coating layer (10) to form a base waterproofing coating layer (30); a step (S4) of covering and attaching roof finishing materials (50) on the base waterproofing coating layer (30); and a water-soluble acrylic emulsion of 30 to 35 wt%, silica aerogel of 3 to 5 wt%, titanium dioxide of 5 to 10 wt%, calcium carbonate of 15 to 25 wt%, epoxy resin of 5 to 10 wt%, and silane coupling agent of 0.5 to 1 wt% to cover the roof finishing materials (50). A step (S5) of forming a roof finishing material waterproofing film layer (70) by applying a waterproofing paint made by mixing a subject matter including 1.5 wt% of a rust-preventive pigment containing zinc phosphate or strontium chromate and aluminum flakes, 2 to 5 wt% of a rust-preventive pigment, 1 to 3 wt% of fine spherical silica, 0.5 to 1.0 wt% of a dispersant, 0.2 to 0.5 wt% of a thickener, 0.2 to 0.5 wt% of a dehydrating agent, and the remainder water, and a hardener including 30 to 50 wt% of a low molecular weight polyamine, 20 to 30 wt% of an aliphatic polyamine, 10 to 20 wt% of an alcohol, and 5 to 10 wt% of a crosslinking agent in a weight ratio of 10:3 to 10:10. In addition, a protective layer can be further formed on the roof finishing material waterproofing film layer (70). It is also possible to use known primers that form the primer coating layer and waterproofing paints that form the base waterproofing coating layer.

상기 지붕 기초면 정리 단계(S1)는 방수, 차열 및 단열 작업의 기본이 되는 중요한 단계이며, 고압의 물을 강하게 분사하여 먼지, 이물질, 기존 도막 등을 제거하는 것과, 망치, 끌, 그라인더 등을 이용하여 들뜬 부분이나 균열 부위를 제거하고, 표면을 거칠게 만들어 접착력을 높이는 것을 포함하며, 필요에 따라, 도막 제거용 화학 약품을 사용하여 기존 도막을 효과적으로 제거할 수 있다. The above roof base surface preparation step (S1) is an important step that forms the basis of waterproofing, heat insulation, and insulation work, and includes removing dust, foreign substances, existing paint films, etc. by strongly spraying high-pressure water, removing raised areas or cracked areas using a hammer, chisel, grinder, etc., and roughening the surface to increase adhesion. If necessary, the existing paint film can be effectively removed by using a paint film removal chemical.

본 발명은 지붕 방수 구조물의 신규 시공은 보수 시공에 다 적용될 수 있는데, 보수 시공의 경우에는, 바람이나 외력 또는 노후화에 의해 파손된 지붕 마감재 방수 도막층 및/또는 그 아래에 있는 파손된 지붕 마감재를 제거한 후, 제거된 영역의 지붕 기초면을 깨끗하게 정리하고 청소하는 것이 상기 지붕 기초면 정리 단계에 포함될 수 있다.The present invention can be applied to both new construction and repair construction of roof waterproofing structures. In the case of repair construction, the roof foundation surface preparation step may include removing a roof finishing material waterproofing coating layer damaged by wind, external force, or aging and/or damaged roof finishing material underneath, and then cleaning and organizing the roof foundation surface of the removed area.

프라이머 도막층을 형성하는 단계(S2)는 상기 지붕 기초면 정리 단계(S1)가 수행된 지붕 기초면에 프라이머를 도포한 후 건조하여 프라이머 도막층(10)을 형성하는 것을 포함한다. 프라이머로는 콘크리트, 시멘트 몰탈 등의 미네랄 기반 재료에 강한 접착력을 갖는 것이 선택될 수 있다. 기초 방수 도막층(30)을 형성하는 단계(S3)는 아크릴, 우레탄, 실리콘 등을 포함하는 다양한 종래의 액체 방수도료를 프라이머 도막층 상에 도포한 후 건조시켜 형성될 수 있으며, 이때, 그 위치에 시공되는 금속 재질의 지붕 마감재의 부식 방지를 위해 방수도료에는 방청 성분의 재료가 첨가될 수 있다.The step (S2) of forming a primer coating layer includes applying a primer to the roof base surface on which the roof base surface preparation step (S1) has been performed, and then drying to form a primer coating layer (10). As the primer, a material having strong adhesiveness to mineral-based materials such as concrete and cement mortar may be selected. The step (S3) of forming a base waterproof coating layer (30) may be formed by applying various conventional liquid waterproofing paints including acrylic, urethane, silicone, etc., on the primer coating layer, and then drying. At this time, a material having a rust-preventive component may be added to the waterproof coating to prevent corrosion of a metal roof finishing material constructed at that location.

기초 방수 도막층(30) 상에 여러개의 지붕 마감재(50)들을 포개어 부착하는 단계(S4)는 상부 부착 판부(52) 및 하부 부착 판부(54)와, 상부 부착 판부(52)와 하부 부착 판부(54) 사이를 경사지게 연결하는 연결판부(53)를 포함하는 금속 재질의 지붕 마감재(50)들을 준비하고, 상부 부착 판부(52)의 하부면과 기초 방수 도막층(30)이 형성된 지붕 기초면 사이에 제1 접착물질(5A)을 개재하여 지붕 마감재(50)들을 기초 방수 도막층(30)이 형성된 지붕 기초면에 부착하는 것과, 하나의 지붕 마감재(50)의 하부 부착 판부(54)와 하부면과 다른 지붕 마감재(50)의 상부 부착 판부(52)의 상부면에 제2 접착물질(5B)을 개재하여 지붕 마감재(50)들을 포개어 부착하는 것을 포함한다. The step (S4) of overlapping and attaching multiple roof finishing materials (50) on the base waterproofing coating layer (30) includes preparing roof finishing materials (50) made of metal, including an upper attachment plate (52), a lower attachment plate (54), and a connecting plate (53) that obliquely connects the upper attachment plate (52) and the lower attachment plate (54), interposing a first adhesive material (5A) between the lower surface of the upper attachment plate (52) and the roof base surface on which the base waterproofing coating layer (30) is formed, to attach the roof finishing materials (50) to the roof base surface on which the base waterproofing coating layer (30) is formed, and interposing a second adhesive material (5B) between the lower surface and the upper attachment plate (52) of one roof finishing material (50) and the upper surface of the upper attachment plate (52) of another roof finishing material (50), to overlapping and attach the roof finishing materials (50).

지붕 마감재(50)들을 접착물질(5A, 5B)을 이용하여 지붕 기초면 상의 기초 방수 도막층(30) 상에 부착하는 경우에도, 지붕 기초면이 경사져 있으므로 지붕 마감재(50)들의 하중이 접착물질의 접착력을 이기고 아래로 밀려 내려가는 경우가 발생한다. 이를 방지하기 위해, 기초 방수 도막층(30) 상에 지붕 마감재(50)들을 포개어 부착하는 단계(S4) 전에 기초 방수 도막층(30)의 상면을 따라 일정 간격 이동시킬 수 있는 강성 직선자 또는 강성 직선막대를 이용하여 기초 방수 도막층(30) 상에 일정 간격의 직선형 걸림 띠(5C)를 실리콘 또는 에폭시 등을 포함하는 씰링 재료로 형성할 수 있다. 또한, 기초 방수 도막층(30) 상에 지붕 마감재(50)들을 포개어 부착하는 단계(S4)에서는 상기 지붕 마감재(50)의 상부 부착 판부(52)와 연결판부(53) 사이의 절곡 부분이 걸림 띠에 걸려 유지되며, 이것은 공정 진행 중 지붕 마감재(50)가 접착물질의 접착력을 이기고 아래로 밀려 내려가는 것을 막을 수 있다. 걸림 띠(5C)는 지붕 방수 구조물의 신규 시공에도 유리할 뿐 아니라 보수 시공시에는 파손된 지붕 마감재 대신에 새로운 지붕 마감재(50)를 걸어 유지시켜 쉽게 보수 작업을 할 수 있도록 돕는다.Even when roof finishing materials (50) are attached to the base waterproofing coating layer (30) on the roof base surface using adhesives (5A, 5B), since the roof base surface is inclined, there are cases where the load of the roof finishing materials (50) overcomes the adhesive force of the adhesive and is pushed down. To prevent this, before the step (S4) of overlapping and attaching the roof finishing materials (50) on the base waterproofing coating layer (30), a rigid straight edge or rigid straight bar that can be moved along the upper surface of the base waterproofing coating layer (30) at a predetermined interval can be used to form a linear catch band (5C) at a predetermined interval on the base waterproofing coating layer (30) using a sealing material including silicone or epoxy. In addition, in the step (S4) of covering and attaching roof finishing materials (50) on the base waterproofing coating layer (30), the folded portion between the upper attachment plate (52) and the connecting plate (53) of the roof finishing material (50) is held by the catch band, which can prevent the roof finishing material (50) from being pushed down by overcoming the adhesive force of the adhesive material during the process. The catch band (5C) is not only advantageous for new construction of the roof waterproofing structure, but also helps to make repair work easier by holding a new roof finishing material (50) instead of a damaged roof finishing material during repair work.

지붕 마감재 방수 도막층(70)을 형성하는 단계는 아래의 [표 1]과 같은 성분의 주제와 아래의 [표 2]와 같은 경화제를 혼합한 2액형 방수도료를 지붕 마감재들을 덮도록 1 ~ 3회 도포 및 건조를 반복하는 것을 포함한다.The step of forming a roof finishing waterproofing coating layer (70) includes applying and drying a two-component waterproofing paint mixed with a subject matter of the same composition as in [Table 1] below and a hardener as in [Table 2] below 1 to 3 times to cover the roof finishing materials.

성분ingredient 함량 (중량 %)Content (weight %) 비고note 수용성 아크릴 에멀젼Water-soluble acrylic emulsion 30 - 3530 - 35 결합제, 유연성 부여binder, flexibility 실리카 에어로겔Silica Aerogel 3 - 53 - 5 방수성, 내마모성Waterproof, wear resistant 티타늄 디옥사이드Titanium Dioxide 5 - 105 - 10 자외선 차단, 내후성UV protection, weather resistance 탄산칼슘Calcium carbonate 15 - 2515 - 25 충전제, 도막 강도 향상Filler, improving coating strength 에폭시 수지Epoxy resin 5 - 105 - 10 접착력 향상, 내화학성Improved adhesion, chemical resistance 실란 커플링제Silane coupling agent 0.5 - 1.50.5 - 1.5 접착력 향상, 습기 방지Improved adhesion, moisture resistance 아연 인산염 또는 스트론튬 크로메이트와 알루미늄 플레이크를 포함하는 방청 안료Anti-rust pigment containing zinc phosphate or strontium chromate and aluminum flakes 2 - 52 - 5 부식 방지Corrosion protection 미세 구형 실리카Micro spherical silica 1 - 31 - 3 균열 치유, 방수성 향상Crack healing, improved waterproofing 분산제Dispersant 0.5 - 10.5 - 1 분산 안정성Distributed stability 증점제Thickener 0.2 - 0.50.2 - 0.5 점도 조절Viscosity control 탈수제Dehydrator 0.2 - 0.50.2 - 0.5 수분 제거moisture removal 물(용매)Water (solvent) 나머지remain 용매menstruum

성분ingredient 함량 (중량 %)Content (weight %) 저분자량 폴리아민low molecular weight polyamine 30 - 5030 - 50 지방족 폴리아민aliphatic polyamine 20 - 3020 - 30 알코올alcohol 10 - 2010 - 20 가교제Crosslinking agent 5 - 105 - 10 촉매 및 기타 첨가물Catalysts and other additives 소량handful

방수도료는 주제와 경화제를 10: 3~ 10: 10의 중량비로 혼합하여 만들어 사용할 수 있다. 기타 첨가물로 난연제 또는 UV 흡수제 등이 첨가될 수 있다. Waterproofing paint can be made and used by mixing the main agent and hardener in a weight ratio of 10:3 to 10:10. Other additives such as flame retardants or UV absorbers can be added.

지붕 방수 구조물의 신규 시공시에는 지붕 마감재(50)들을 전체적으로 덮도록 2액형 방수도료를 도포하여 지붕 마감재 방수 도막층(70)을 형성하고, 지붕 방수 구조물의 보수 시공시에는 파손된 지붕 마감재(50)를 제거하고, 그 제거된 영역의 지붕 기초면 정리 및 프라이머 도막층, 기초 방수 도막층 형성 후, 그 파손된 지붕 마감재 대신에 다른 지붕 마감재를 접착제를 이용하여 부착한 후, 교체된 지붕 마감재를 포함하는 영역을 덮도록 방수도료를 도포하여 지붕 마감재 방수 도막층(70)을 형성할 수 있다.When constructing a new roof waterproofing structure, a two-component waterproofing paint is applied to cover the entire roof finishing materials (50) to form a roof finishing material waterproofing film layer (70), and when constructing a repair work on a roof waterproofing structure, damaged roof finishing materials (50) are removed, the roof base surface of the removed area is prepared, and a primer coating layer and a base waterproofing coating layer are formed. Then, instead of the damaged roof finishing material, another roof finishing material is attached using an adhesive, and then waterproofing paint is applied to cover the area including the replaced roof finishing material to form a roof finishing material waterproofing film layer (70).

본 발명의 일 실시예에 따라 지붕 기초면에 시공된 지붕 방수 구조물은, 도 2에 도시된 바와 같이, 지붕 기초면(2)에 형성된 프라이머 도막층(10)과, 프라이머 도막층(10) 상에 형성된 기초 방수 도막층(30)과, 기초 방수 도막층(30) 상에 접착물질에 의해 포개어 부착되되, 각각이 상부 부착 판부(52) 및 하부 부착 판부(54)와 상기 상부 부착 판부(52)와 상기 하부 부착 판부(54) 사이를 경사지게 연결하는 연결판부(53)를 포함하며, 기초 방수 도막층(30)과 상부 부착 판부(52) 사이에 제1 접착물질(5A)이 개재되어 부착되고, 하부 부착 판부(54)와 다른 지붕 마감재(50)의 상부 부착 판부(52) 사이에 제2 접착물질(5B)이 개재되어 부착되는 금속 재질로 형성된 복수의 지붕 마감재(50)와, 상기 지붕 마감재(50)의 상부 부착 판부(52)와 연결판부(53) 사이의 절곡 부분이 걸려 유지되도록 해주는 걸림 띠(5C)와, 수용성 아크릴 에멀젼 30 ~ 35 중량%, 실리카 에어로겔 3 ~ 5 중량%, 티타늄 디옥사이드 5 ~ 10 중량%, 탄산칼슘 15 ~ 25 중량%, 에폭시 수지 5 ~ 10 중량%, 실란 커플링제 0.5 ~ 1.5 중량%, 아연 인산염 또는 스트론튬 크로메이트와 알루미늄 플레이크를 포함하는 방청 안료 방청 안료 2 ~ 5 중량%, 미세 구형 실리카 1 ~ 3 중량%, 분산제 0.5 ~ 1.0 중량%, 증점제 0.2 ~ 0.5 중량%, 탈수제 0.2 ~ 0.5 중량%, 나머지 물을 포함하는 주제와, 저분자량 폴리아민 30 ~ 50 중량%, 지방족 폴리아민 20 ~ 30 중량 %, 알코올 10 ~ 20 중량%, 가교제 5 ~ 10 중량 %를 포함하는 경화제를 10: 3~ 10: 10의 중량비로 혼합하여 만든 방수도료를 상기 복수의 지붕 마감재(50)의 표면을 전체적으로 덮도록 도포하여 형성되는 지붕 마감재 방수 도막층(70)을 포함한다.According to one embodiment of the present invention, a roof waterproofing structure constructed on a roof foundation surface comprises, as illustrated in FIG. 2, a primer coating layer (10) formed on a roof foundation surface (2), a foundation waterproofing coating layer (30) formed on the primer coating layer (10), and a connecting plate (53) that is attached by covering the foundation waterproofing coating layer (30) with an adhesive material, each of which comprises an upper attachment plate (52) and a lower attachment plate (54), and an upper attachment plate (52) and a lower attachment plate (54) that are inclinedly connected between the upper attachment plate (52) and the lower attachment plate (54), a first adhesive material (5A) is interposed and attached between the foundation waterproofing coating layer (30) and the upper attachment plate (52), and a second adhesive material (5B) is interposed and attached between the lower attachment plate (54) and the upper attachment plate (52) of another roof finishing material (50), and a plurality of roof finishing materials (50) formed of a metal material, and an upper attachment of the roof finishing material (50). A subject matter comprising a catch band (5C) for allowing a folded portion between a plate (52) and a connecting plate (53) to be caught and maintained, 30 to 35 wt% of a water-soluble acrylic emulsion, 3 to 5 wt% of a silica aerogel, 5 to 10 wt% of titanium dioxide, 15 to 25 wt% of calcium carbonate, 5 to 10 wt% of an epoxy resin, 0.5 to 1.5 wt% of a silane coupling agent, 2 to 5 wt% of a rust-preventive pigment including zinc phosphate or strontium chromate and aluminum flakes, 1 to 3 wt% of fine spherical silica, 0.5 to 1.0 wt% of a dispersant, 0.2 to 0.5 wt% of a thickener, 0.2 to 0.5 wt% of a dehydrating agent, and the remainder water, 30 to 50 wt% of a low molecular weight polyamine, 20 to 30 wt% of an aliphatic polyamine, and 10 to 20 wt% of an alcohol. A waterproof coating layer (70) for a roof finishing material is formed by applying a waterproof paint made by mixing a hardener containing 5 to 10 wt % of a crosslinking agent in a weight ratio of 10:3 to 10:10 so as to cover the entire surface of the plurality of roof finishing materials (50).

도 3은 본 발명의 다른 실시예에 따른 지붕 방수 구조물 및 그 시공방법을 설명하기 위한 순서도이다.FIG. 3 is a flowchart for explaining a roof waterproofing structure and its construction method according to another embodiment of the present invention.

도 3을 참조하면, 본 실시예에 따른 지붕 방수 구조물 시공방법은 경사진 지붕 기초면(2)을 청소하고 균열 또는 들뜸 부분을 보수하는 지붕 기초면 정리 단계(s1)와, 상기 지붕 기초면 정리 단계(s1)가 수행된 지붕 기초면(2)에 프라이머를 도포한 후 건조하여 프라이머 도막층(10)을 형성하는 단계(s2)와, 상기 프라이머 도막층(10) 상에 방수도료를 도포하여 기초 방수 도막층(30)을 형성하는 단계(s3)와, 상기 기초 방수 도막층(30) 상에 아스팔트와, 아크릴 및 에폭시로부터 선택된 접착성 강화물질과 실리콘 및 첨가물을 혼합한 액상 또는 겔상의 접착력 강화성 도막 방수재를 도포하여 접착력 강화성 도막 방수재 층(42)을 형성하는 단계(s4)와, 상기 접착력 강화성 도막 방수재 층(42)이 굳기 전에 상기 접착력 강화성 도막 방수재 층(42) 상으로 적층된 화이버글라스 쉬트 및 화이버글라스 쉬트에 스며든 플라스틱 수지에 의해 형성된 보강 방수층(44)을 형성하는 단계(s5)와, 상기 보강 방수층(44) 상에 지붕 마감재(50)들을 포개어 부착하는 단계(s6)와, 지붕 마감재(50)들을 덮도록 수용성 아크릴 에멀젼 30 ~ 35 중량%, 실리카 에어로겔 3 ~ 5 중량%, 티타늄 디옥사이드 5 ~ 10 중량%, 탄산칼슘: 15 ~ 25 중량%, 에폭시 수지 5 ~ 10 중량%, 실란 커플링제 0.5 ~ 1.5 중량%, 아연 인산염 또는 스트론튬 크로메이트와 알루미늄 플레이크를 포함하는 방청 안료 방청 안료 2 ~ 5 중량%, 미세 구형 실리카 1 ~ 3 중량%, 분산제 0.5 ~ 1.0 중량%, 증점제: 0.2 ~ 0.5 중량%, 탈수제 0.2 ~ 0.5 중량%, 물 나머지를 포함하는 주제와, 저분자량 폴리아민: 30~50 중량%, 지방족 폴리아민 20~30 중량 %, 알코올 10~20 중량%, 가교제 5~10 중량 %를 포함하는 경화제를 10: 3~ 10: 10의 중량비로 혼합하여 만든 방수도료를 도포하여 지붕 마감재 방수 도막층(70)을 형성하는 단계(s7)를 포함한다. Referring to FIG. 3, the roof waterproofing structure construction method according to the present embodiment comprises a roof base surface preparation step (s1) of cleaning a sloping roof base surface (2) and repairing cracks or raised areas, a step (s2) of applying a primer to the roof base surface (2) on which the roof base surface preparation step (s1) has been performed and drying it to form a primer coating layer (10), a step (s3) of applying a waterproofing paint on the primer coating layer (10) to form a base waterproofing coating layer (30), a step (s4) of applying a liquid or gel-type adhesive-reinforcing coating waterproofing agent mixed with asphalt, an adhesive-reinforcing material selected from acrylic and epoxy, and silicone and an additive on the base waterproofing coating layer (30) to form an adhesive-reinforcing coating waterproofing agent layer (42), and a fiberglass sheet and a fiberglass sheet laminated on the adhesive-reinforcing coating waterproofing agent layer (42) before the adhesive-reinforcing coating waterproofing agent layer (42) hardens. A step (s5) of forming a reinforcing waterproof layer (44) formed by a permeated plastic resin, a step (s6) of covering and attaching roof finishing materials (50) on the reinforcing waterproof layer (44), and a subject matter including 30 to 35 wt% of a water-soluble acrylic emulsion, 3 to 5 wt% of silica aerogel, 5 to 10 wt% of titanium dioxide, 15 to 25 wt% of calcium carbonate, 5 to 10 wt% of an epoxy resin, 0.5 to 1.5 wt% of a silane coupling agent, 2 to 5 wt% of a rust-preventive pigment including zinc phosphate or strontium chromate and aluminum flakes, 1 to 3 wt% of fine spherical silica, 0.5 to 1.0 wt% of a dispersant, 0.2 to 0.5 wt% of a thickener, 0.2 to 0.5 wt% of a dehydrating agent, and the remainder of water, and a low molecular weight A step (s7) of forming a waterproof coating layer (70) for a roof finishing material is included, by applying a waterproof paint prepared by mixing a hardener containing 30 to 50 wt% of polyamine, 20 to 30 wt% of aliphatic polyamine, 10 to 20 wt% of alcohol, and 5 to 10 wt% of a crosslinking agent in a weight ratio of 10:3 to 10:10.

지붕 마감재들(50)을 포개어 부착하는 단계(S4)는 상부 부착 판부(52) 및 하부 부착 판부(54)와, 상부 부착 판부(52)와 하부 부착 판부(54) 사이를 경사지게 연결하는 연결판부(53)를 포함하는 금속 재질의 지붕 마감재(50)들을 준비하고, 상부 부착 판부(52)의 하부면과 기초 방수 도막층(30)이 형성된 지붕 기초면 사이에 접착물질(5A)을 개재하여 지붕 마감재(50)들을 보강 방수층(30) 상에 부착하는 것과, 하나의 지붕 마감재(50)의 하부 부착 판부(54)와 하부면과 다른 지붕 마감재(50)의 상부 부착 판부(52)의 상부면에 접착물질을 개재하여 지붕 마감재(50)들을 포개어 부착하는 것을 포함한다. The step (S4) of covering and attaching roof finishing materials (50) includes preparing metal roof finishing materials (50) including an upper attachment plate (52), a lower attachment plate (54), and a connecting plate (53) that connects the upper attachment plate (52) and the lower attachment plate (54) at an angle, interposing an adhesive material (5A) between the lower surface of the upper attachment plate (52) and the roof base surface on which the base waterproofing coating layer (30) is formed, and attaching the roof finishing materials (50) on the reinforcing waterproofing layer (30), and interposing an adhesive material between the lower surface and the lower attachment plate (54) of one roof finishing material (50) and the upper surface of the upper attachment plate (52) of another roof finishing material (50), and covering and attaching the roof finishing materials (50).

지붕 마감재(50)들을 접착물질(5A, 5B)을 이용하여 보강 방수층(30)에 부착하는 경우에도, 지붕 기초면(2)의 경사진 형태에 의해 보강 방수층(30)도 경사져 있으므로 지붕 마감재(50)들의 하중이 접착물질의 접착력을 이기고 아래로 밀려 내려가는 경우가 발생한다. 이를 방지하기 위해, 보강 방수층(30) 상에 지붕 마감재(50)들을 포개어 부착하는 단계 전에 보강 방수층(30)을 따라 일정 간격 이동시킬 수 있는 강성 자 또는 강성 막대를 이용하여 보상 방수층 상에 일정 간격의 걸림 띠를 실리콘 또는 에폭시 등 접착물질로 형성할 수 있다. Even when roof finishing materials (50) are attached to the reinforcing waterproofing layer (30) using adhesives (5A, 5B), since the reinforcing waterproofing layer (30) is also inclined due to the inclined shape of the roof base surface (2), there are cases where the load of the roof finishing materials (50) overcomes the adhesive force of the adhesive and is pushed down. To prevent this, before the step of overlapping and attaching the roof finishing materials (50) on the reinforcing waterproofing layer (30), a rigid bar or rigid rod capable of moving along the reinforcing waterproofing layer (30) at a certain interval can be used to form a catch band at a certain interval on the compensation waterproofing layer using an adhesive material such as silicone or epoxy.

접착력 강화성 도막 방수재 층 형성 단계(s3)는, 방수층을 형성하면서도 강력한 접착력을 제공하여, 상부층과의 결합력을 높이고, 초기 균열 발생을 방지하기 위한 것이며 예시로 보인 표 3과 같이 다양한 조성비로 조성되어 이용될 수 있다.The step (s3) of forming a waterproofing layer with enhanced adhesive strength is to provide strong adhesive strength while forming a waterproofing layer, thereby increasing the bonding strength with the upper layer and preventing the occurrence of initial cracks, and can be used by being composed in various composition ratios as shown in Table 3 as an example.

실시예 Example 조성비Composition ratio 용도use 특징characteristic 실시예1Example 1 아스팔트 59.5%, 아크릴 19.5%, 실리콘 19.5%, 접착력 향상제 1%, 유동성 조절제 0.5%Asphalt 59.5%, Acrylic 19.5%, Silicone 19.5%, Adhesion Improver 1%, Fluidity Regulator 0.5% 일반 지붕 기초면General roof foundation 균형 잡힌 성능, 내구성 및 유연성Balanced performance, durability and flexibility 실시예2Example 2 아스팔트 49%, 에폭시 29%, 실리콘 14.5%, 경화 촉진제 1.9%, 내마모성 향상제 0.6%Asphalt 49%, Epoxy 29%, Silicone 14.5%, Cure Accelerator 1.9%, Wear Resistance Improver 0.6% 혹독한 환경의 지붕 기초면Roof foundation for harsh environments 에폭시의 강도를 활용하여 혹독한 조건에서의 강도 보장Utilizes the strength of epoxy to ensure strength under harsh conditions 실시예3Example 3 아스팔트 39%, 아크릴 29%, 실리콘 24.5%, 유연성 향상제 1.9%, 균열 방지제 0.6%Asphalt 39%, Acrylic 29%, Silicone 24.5%, Flexibility Improver 1.9%, Anti-Cracking Agent 0.6% 유연성 필요한 지붕 기초면Roof foundations requiring flexibility 유연성 우수Excellent flexibility 실시예4Example 4 아스팔트 59%, 아크릴 19%, 실리콘 19%, 저온 유동성 향상제 1.5%Asphalt 59%, Acrylic 19%, Silicone 19%, Low Temperature Fluidity Improver 1.5% 추운 지역 지붕 기초면Cold Region Roof Basement 저온 유연성 유지, 균열 방지Maintains low temperature flexibility and prevents cracking

접착력 향상제로는 실란 커플링제가 이용될 수 있으며, 유동성 조절제로는 레올로지 개량제와, 아세톤 또는 톨루엔 등 용제와, 계면활제가 이용될 수 있고, 경화 촉진제로는 에폭시 수지의 경화를 촉진시키는 아민류, 실리콘의 경화를 촉진시키는 산 촉매 등이 이용될 수 있고, 내마모성 향상제로는 실리카, 탄산칼슘, 아라미드 섬유 등이 이용될 수 있고, 유연성 향상제로는 플라스틱 사이저 또는 액체 고무 등이 이용될 수 있고, 균열방지제로는 마이크로 크랙 방지제 또는 탄성중합체가 이용될 수 있고, 저온 유동성 향상제로는 저온 경화제, 용제 등이 이용될 수 있다.As an adhesion improver, a silane coupling agent can be used; as a fluidity regulator, a rheology improver, a solvent such as acetone or toluene, and a surfactant can be used; as a curing accelerator, amines that promote the curing of epoxy resins, and an acid catalyst that promotes the curing of silicone can be used; as a wear resistance improver, silica, calcium carbonate, aramid fibers, etc. can be used; as a flexibility improver, a plastic sizer or liquid rubber can be used; as a crack prevention agent, a micro crack prevention agent or an elastomer can be used; and as a low-temperature fluidity improver, a low-temperature curing agent, a solvent, etc. can be used.

전술한 것과 같이 아크릴, 에폭시 등의 접착력 강화물질과 실리콘 및 첨가물을 혼합하여 만든 액상 또는 겔상의 접착력 강화성 도막 방수재를 균일하게 도포한다.As described above, a liquid or gel-type adhesive-enhancing waterproofing coating material is uniformly applied by mixing an adhesive-enhancing material such as acrylic or epoxy with silicone and additives.

보강 방수층 형성 단계(s4)는, 방수층의 강도를 높이고, 외부 충격이나 변형에 대한 저항성을 향상시키기 위한 단계로서, 접착력 강화성 도막 방수재 층 위에 화이버글라스 쉬트를 겹쳐 붙이고, 화이버 글라스 쉬트 전체에 액상 플라스틱 수지가 스며들게 하여 보강 방수층을 형성한다. 액상 플라스틱 수지로는 에폭시 수지, 비닐에스터 수지, 페놀 수지, 폴리우레탄 수지로부터 선택된 것이 유리하게 이용될 수 있다. 특히, 에폭시 수지는 높은 강도, 내열성, 내화학성을 가지며, 접착력이 우수하다는 장점을 가지며, 게다가, 아래에 위치한 접착력 강화 도막 방수재 층이 에폭시를 다량 함유한 경우, 하부층에 대하여 보다 더 강한 결합력을 나타낼 수 있다.The step of forming a reinforced waterproof layer (s4) is a step for increasing the strength of the waterproof layer and improving resistance to external impact or deformation, in which a fiberglass sheet is overlapped and attached on an adhesive-reinforced waterproofing film layer, and a liquid plastic resin is allowed to permeate the entire fiberglass sheet to form a reinforced waterproofing layer. As the liquid plastic resin, one selected from epoxy resin, vinyl ester resin, phenol resin, and polyurethane resin can be advantageously used. In particular, epoxy resin has the advantages of high strength, heat resistance, chemical resistance, and excellent adhesive strength, and further, when the adhesive-reinforced waterproofing film layer located underneath contains a large amount of epoxy, it can exhibit a stronger bonding force to the lower layer.

본 발명의 바람직한 실시예에 따라, 접착력 강화성 도막 방수재 도포 단계와, 그에 뒤 이은 화이버글라스 쉬트의 붙임(적층) 및 플라스틱 함침을 포함한 보강 방수층 형성 단계는, 2회 이상 반복되며, 따라서, 접착력 강화성 방수재 층과 보강 방수층이 2회 이상 교대로 적층된 중간 방수층이 형성된다.According to a preferred embodiment of the present invention, the step of applying an adhesive-reinforcing waterproofing film, followed by the step of forming a reinforcing waterproofing layer including bonding (laminating) a fiberglass sheet and impregnating it with plastic, is repeated two or more times, so that an intermediate waterproofing layer is formed in which an adhesive-reinforcing waterproofing film layer and a reinforcing waterproofing layer are alternately laminated two or more times.

이와 같은 반복 적층과 그로 인한 복층 구조의 방수층은 얇은 화이버 글라스의 사용을 가능하게 하여, 화이버 글라스를 보강하는 플라스틱 수지가 전체적으로 충분히 스며들게 할 수 있고, 액상 플라스틱 수지가 접착력 강화성 방수재 층이 서로 결합력을 발생시켜 보다 더 단단한 결합 구조의 형성을 가능하게 한다.This kind of repeated lamination and the resulting multi-layer waterproofing layer enable the use of thin fiberglass, allowing the plastic resin reinforcing the fiberglass to fully permeate the entire structure, and the liquid plastic resin creates a bond between the adhesive-reinforcing waterproofing material layers, enabling the formation of a more solid bonding structure.

도 4는 전술한 시공방법에 의해 시공된 지붕 방수 구조물을 나타낸 도면이다.Figure 4 is a drawing showing a roof waterproofing structure constructed using the construction method described above.

도 4를 참조하면, 지붕 방수 구조물은 지붕 기초면에 형성된 프라이머 도막층(10)과, 프라이머 도막층(10) 상에 형성된 기초 방수 도막층(30)과, 기초 방수 도막층(30) 상에 아스팔트와, 아크릴 및 에폭시로부터 선택된 접착성 강화물질과 실리콘 및 첨가물을 혼합한 액상 또는 겔상의 접착력 강화성 도막 방수재를 도포하여 접착력 강화성 도막 방수재 층(42)과, 상기 접착력 강화성 도막 방수재 층(42)이 굳기 전에 상기 접착력 강화성 도막 방수재 층(42) 상으로 적층된 화이버글라스 쉬트 및 화이버글라스 쉬트에 스며든 플라스틱 수지에 의해 형성된 보강 방수층(44)과, 상기 보강 방수층(44) 상에 접착물질(5A, 5B)에 의해 포개어 부착되되, 각각이 상부 부착 판부(52) 및 하부 부착 판부(54)와 상기 상부 부착 판부(52)와 상기 하부 부착 판부(54) 사이를 경사지게 연결하는 연결판부(53)를 포함하며, 상기 보강 방수층(44)과 상부 부착 판부(52) 사이에 접착물질(5A)이 개재되어 부착되고, 하부 부착 판부(54)와 다른 지붕 마감재(50)의 상부 부착 판부(52) 사이에 접착물질(5B)이 개재되어 부착되는 금속 재질로 형성된 복수의 지붕 마감재(50)와, 상기 지붕 마감재(50)의 상부 부착 판부(52)와 연결판부(53) 사이의 절곡 부분이 걸려 유지되도록 상기 보강 방수층(44)에 형성된 걸림 띠(5C)와, 수용성 아크릴 에멀젼 30 ~ 35 중량%, 실리카 에어로겔 3 ~ 5 중량%, 티타늄 디옥사이드 5 ~ 10 중량%, 탄산칼슘 15 ~ 25 중량%, 에폭시 수지 5 ~ 10 중량%, 실란 커플링제 0.5 ~ 1.5 중량%, 아연 인산염 또는 스트론튬 크로메이트와 알루미늄 플레이크를 포함하는 방청 안료 방청 안료 2 ~ 5 중량%, 미세 구형 실리카 1 ~ 3 중량%, 분산제 0.5 ~ 1.0 중량%, 증점제 0.2 ~ 0.5 중량%, 탈수제 0.2 ~ 0.5 중량%, 물 나머지를 포함하는 주제와, 저분자량 폴리아민 30~50 중량%, 지방족 폴리아민 20~30 중량 %, 알코올 10~20 중량%, 가교제 5~10 중량 %를 포함하는 경화제를 10: 3~ 10: 10의 중량비로 혼합하여 만든 방수도료를 상기 복수의 지붕 마감재(50)의 상부를 전체적으로 덮도록 도포하여 형성되는 지붕 마감재 방수 도막층(70)을 포함한다.Referring to FIG. 4, the roof waterproofing structure comprises a primer coating layer (10) formed on a roof base surface, a base waterproofing coating layer (30) formed on the primer coating layer (10), a liquid or gel-type adhesive-reinforcing coating waterproofing material mixed with asphalt, an adhesive reinforcing material selected from acrylic and epoxy, and silicone and an additive, applied on the base waterproofing coating layer (30), an adhesive-reinforcing coating waterproofing material layer (42), a fiberglass sheet laminated on the adhesive-reinforcing coating waterproofing material layer (42) before the adhesive-reinforcing coating waterproofing material layer (42) hardens, and a reinforcing waterproofing layer (44) formed by a plastic resin impregnated into the fiberglass sheet, and an adhesive material (5A, 5B) that is overlapped and attached on the reinforcing waterproofing layer (44), each of which comprises an upper attachment plate (52) and a lower attachment plate (54) and between the upper attachment plate (52) and the lower attachment plate (54). A plurality of roof finishing materials (50) formed of a metal material, which include a connecting plate (53) that is connected in an inclined manner, and an adhesive material (5A) is interposed and attached between the reinforcing waterproofing layer (44) and the upper attachment plate (52), and an adhesive material (5B) is interposed and attached between the lower attachment plate (54) and the upper attachment plate (52) of another roof finishing material (50), and a hook band (5C) formed on the reinforcing waterproofing layer (44) so that the folded portion between the upper attachment plate (52) of the roof finishing material (50) and the connecting plate (53) is hooked and maintained, and a water-soluble acrylic emulsion of 30 to 35 wt%, silica aerogel of 3 to 5 wt%, titanium dioxide of 5 to 10 wt%, calcium carbonate of 15 to 25 wt%, epoxy resin of 5 to 10 wt%, silane coupling agent of 0.5 to 1.5 wt%, zinc phosphate or strontium chromate and aluminum A waterproofing paint comprising a subject matter including 2 to 5 wt% of a rust-preventive pigment including flakes, 1 to 3 wt% of fine spherical silica, 0.5 to 1.0 wt% of a dispersant, 0.2 to 0.5 wt% of a thickener, 0.2 to 0.5 wt% of a dehydrating agent, and the remainder of water, and a hardener including 30 to 50 wt% of a low molecular weight polyamine, 20 to 30 wt% of an aliphatic polyamine, 10 to 20 wt% of an alcohol, and 5 to 10 wt% of a crosslinking agent, is mixed in a weight ratio of 10:3 to 10:10, and applied so as to entirely cover the upper portions of the plurality of roof finishing materials (50), thereby forming a waterproofing coating layer (70) for a roof finishing material.

본 발명은 전술한 실시예에 의해 제한되지 않고 다양하게 변형되어 실시될 수 있다.The present invention is not limited to the above-described embodiments and can be implemented with various modifications.

2: 지붕 기초면 10: 프라이머 도막층
30: 기초 방수 도막층 50: 지붕 마감재
70: 지붕 마감재 방수 도막층
2: Roof base 10: Primer coating layer
30: Base waterproofing coating layer 50: Roof finishing material
70: Roof finish waterproofing coating layer

Claims (3)

경사진 지붕 기초면을 청소하고 균열 또는 들뜸 부분을 보수하는 지붕 기초면 정리 단계;
상기 지붕 기초면 정리 단계가 수행된 지붕 기초면에 프라이머를 도포한 후 건조하여 프라이머 도막층을 형성하는 단계;
상기 프라이머 도막층 상에 방수도료를 도포하여 기초 방수 도막층을 형성하는 단계;
상기 기초 방수 도막층 상에 아스팔트와, 아크릴 및 에폭시로부터 선택된 접착성 강화물질과, 실리콘 및 첨가물을 혼합한 액상 또는 겔상의 접착력 강화성 도막 방수재를 도포하여 접착력 강화성 도막 방수재 층을 형성하는 단계와
상기 접착력 강화성 도막 방수재 층이 굳기 전에 상기 접착력 강화성 도막 방수재 층 상으로 화이버글라스 쉬트를 적층하고, 상기 화이버글라스 쉬트에 액상 플라스틱 수지를 스며들게 도포하여,화이버글라스 쉬트가 플라스틱 수지에 의해 보강된 보강 방수층을 형성하는 단계와,
상기 보강 방수층 상에 지붕 마감재들을 포개어 부착하는 단계와,
상기 지붕 마감재들을 덮도록, 수용성 아크릴 에멀젼 30 ~ 35 중량%, 실리카 에어로겔 3 ~ 5 중량%, 티타늄 디옥사이드 5 ~ 10 중량%, 탄산칼슘: 15 ~ 25 중량%, 에폭시 수지 5 ~ 10 중량%, 실란 커플링제 0.5 ~ 1.5 중량%, 아연 인산염 또는 스트론튬 크로메이트와 알루미늄 플레이크를 포함하는 방청 안료 방청 안료 2 ~ 5 중량%, 미세 구형 실리카 1 ~ 3 중량%, 분산제 0.5 ~ 1.0 중량%, 증점제: 0.2 ~ 0.5 중량%, 탈수제 0.2 ~ 0.5 중량%, 물 나머지를 포함하는 주제와, 저분자량 폴리아민, 지방족 폴리아민, 알코올 및 가교제를 포함하는 경화제를 10: 3~ 10: 10의 중량비로 혼합하여 만든 방수도료를 도포하여 지붕 마감재 방수 도막층을 형성하는 단계를 포함하며,
상기 보강 방수층 상에 지붕 마감재들을 포개어 부착하는 단계는, 상부 부착 판부(52) 및 하부 부착 판부(54)와, 상기 상부 부착 판부(52)와 상기 하부 부착 판부(54) 사이를 경사지게 연결하는 연결판부(53)를 포함하는 지붕 마감재들을 준비하는 것과, 상기 지붕 마감재의 상부 부착 판부(52)와 연결판부(53) 사이의 절곡 부분이 걸려 유지되도록 상기 보강 방수층에 걸림 띠(5C)를 미리 형성하는 것과, 상기 보강 방수층과 상기 상부 부착 판부 사이에 접착물질(5A)이 개재되어 부착되게 하는 것과, 상기 하부 부착 판부(54)와 다른 지붕 마감재(50)의 상부 부착 판부(52) 사이에 접착물질(5B)이 개재되어 부착되게 하는 것을 포함하는 것을 특징으로 하는 지붕 방수 구조물 시공방법.
Roof foundation preparation stage, which cleans the sloping roof foundation and repairs any cracks or lifting areas;
A step of applying a primer to a roof base surface on which the above roof base surface preparation step has been performed and then drying it to form a primer coating layer;
A step of forming a base waterproof coating layer by applying a waterproof paint on the primer coating layer;
A step of forming an adhesive-reinforcing coating waterproofing material layer by applying a liquid or gel-type adhesive-reinforcing coating waterproofing material mixed with asphalt, an adhesive-reinforcing material selected from acrylic and epoxy, and silicone and additives on the above-mentioned basic waterproofing coating layer;
A step of laminating a fiberglass sheet on the adhesive-reinforced waterproofing film layer before the adhesive-reinforced waterproofing film layer hardens, and applying a liquid plastic resin to permeate the fiberglass sheet, thereby forming a reinforced waterproofing layer in which the fiberglass sheet is reinforced by the plastic resin;
A step of attaching roof finishing materials by covering them on the above-mentioned reinforcing waterproofing layer,
A step of forming a waterproofing film layer of a roof finishing material by applying a waterproofing paint made by mixing a subject matter including 30 to 35 wt% of a water-soluble acrylic emulsion, 3 to 5 wt% of a silica aerogel, 5 to 10 wt% of titanium dioxide, 15 to 25 wt% of calcium carbonate, 5 to 10 wt% of an epoxy resin, 0.5 to 1.5 wt% of a silane coupling agent, 2 to 5 wt% of a rust-preventive pigment including zinc phosphate or strontium chromate and aluminum flakes, 1 to 3 wt% of fine spherical silica, 0.5 to 1.0 wt% of a dispersant, 0.2 to 0.5 wt% of a thickener, 0.2 to 0.5 wt% of a dehydrating agent, and the remainder of water, and a hardener including a low molecular weight polyamine, an aliphatic polyamine, an alcohol, and a crosslinking agent in a weight ratio of 10:3 to 10:10 to cover the roof finishing materials. Including,
A method for constructing a roof waterproofing structure, characterized in that the step of covering and attaching roof finishing materials on the above-mentioned reinforced waterproofing layer comprises: preparing roof finishing materials including an upper attachment plate (52), a lower attachment plate (54), and a connecting plate (53) that obliquely connects the upper attachment plate (52) and the lower attachment plate (54); forming a catch band (5C) in advance on the above-mentioned reinforced waterproofing layer so that a folded portion between the upper attachment plate (52) and the connecting plate (53) of the above-mentioned roof finishing material is caught and maintained; interposing an adhesive material (5A) between the above-mentioned reinforced waterproofing layer and the upper attachment plate so that it is attached; and interposing an adhesive material (5B) between the lower attachment plate (54) and the upper attachment plate (52) of another roof finishing material (50) so that it is attached.
삭제delete 삭제delete
KR1020240125737A 2024-09-13 2024-09-13 Roof waterproofing system and its construction method Active KR102806532B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020240125737A KR102806532B1 (en) 2024-09-13 2024-09-13 Roof waterproofing system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020240125737A KR102806532B1 (en) 2024-09-13 2024-09-13 Roof waterproofing system and its construction method

Publications (1)

Publication Number Publication Date
KR102806532B1 true KR102806532B1 (en) 2025-05-12

Family

ID=95711343

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020240125737A Active KR102806532B1 (en) 2024-09-13 2024-09-13 Roof waterproofing system and its construction method

Country Status (1)

Country Link
KR (1) KR102806532B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04350240A (en) * 1991-02-05 1992-12-04 Gantan Beauty Kogyo Kk tiled roof structure
KR20020003161A (en) * 2001-11-20 2002-01-10 유재관 2 .omitted
JP2003238897A (en) * 2002-02-14 2003-08-27 Nippon Tokushu Toryo Co Ltd Heat and sound insulating paint and process
KR101041557B1 (en) 2010-10-20 2011-06-15 박승규 Repair of roof shingles and anti-fogging method and roof shingles

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04350240A (en) * 1991-02-05 1992-12-04 Gantan Beauty Kogyo Kk tiled roof structure
KR20020003161A (en) * 2001-11-20 2002-01-10 유재관 2 .omitted
JP2003238897A (en) * 2002-02-14 2003-08-27 Nippon Tokushu Toryo Co Ltd Heat and sound insulating paint and process
KR101041557B1 (en) 2010-10-20 2011-06-15 박승규 Repair of roof shingles and anti-fogging method and roof shingles

Similar Documents

Publication Publication Date Title
KR102443457B1 (en) Heat-resistant polyurea waterproofing method for enhancing building durability
US4021981A (en) Insulated water impermeable roofing system
KR100908457B1 (en) Construction method of composite waterproof layer using resistive insulating material and reflective protective coating
EP2871053B1 (en) Reinforced water-resistant board
KR101573298B1 (en) Polyurea surface preparation compounds and polyurea waterproofing method using polyurea surface preparation compounds
KR102532708B1 (en) Heat-shielding urethane waterproofing film and manufacturing method thereof
KR100533231B1 (en) Stretchy rubberized asphalt felt for waterproofing and waterproofing material of duplex rubberized asphalt membrane plus felt
KR100935712B1 (en) Polyurethane waterproof membrane structure using thermoplastic polyurethane film, and construction method thereof
US6395845B1 (en) Waterproofing membrane from epoxy resin and amine-terminated polyamide
KR101241940B1 (en) Aliphatic epoxy modified tarurethane waterproofing material and manufacturing method thereof, construction method and structure for complex waterproofing using aliphatic epoxy modified tarurethane waterproofing material and complex sheet with hole
KR101361910B1 (en) Structure for complex waterproof sheet having polymerized composite sheet and rubber asphalt sheet with heat insulator and method using the same
KR20160087131A (en) Crack repair construction method for concrete structure
KR102806532B1 (en) Roof waterproofing system and its construction method
KR101923918B1 (en) Structural reinforcement method using high tensile fast curing type polyurea composition and structural reinforcement means
KR100426899B1 (en) Method for carrying out water-proof on the housetop
CN108868187B (en) A construction method for a leaky water repair system in an elevator shaft
KR102485889B1 (en) Building crack repair method
KR101332646B1 (en) Structure for double complex waterproof sheet with heat insulator and method using the same
KR20170088555A (en) Hybrid water proofing material comprising acrylic copolymer and inorganic powder
KR101607811B1 (en) Triplication Composite waterproofing method
KR101088315B1 (en) Composite waterproof coating method
KR102696617B1 (en) Method of Integrated-complex type waterproof using urethane asphalt
JP2010101128A (en) Structure and method for reinforcing slate roof
KR102755104B1 (en) External insulation composite waterproofing system and its construction method
KR102620581B1 (en) Structure of composite multi waterproofing layer and its construction method

Legal Events

Date Code Title Description
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

PA0302 Request for accelerated examination

St.27 status event code: A-1-2-D10-D17-exm-PA0302

St.27 status event code: A-1-2-D10-D16-exm-PA0302

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16 Ip right document amended

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P16-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16 A copy of ip right certificate issued

Free format text: ST27 STATUS EVENT CODE: A-4-4-Q10-Q16-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

R11 Change to the name of applicant or owner or transfer of ownership requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R11-ASN-PN2301 (AS PROVIDED BY THE NATIONAL OFFICE)

P16 Ip right document amended

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P16-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

R14 Transfer of ownership recorded

Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R14-ASN-PN2301 (AS PROVIDED BY THE NATIONAL OFFICE)