KR102554701B1 - Installation method of lightning protection equipment for transformers and extra-high voltage distribution lines - Google Patents
Installation method of lightning protection equipment for transformers and extra-high voltage distribution lines Download PDFInfo
- Publication number
- KR102554701B1 KR102554701B1 KR1020230013035A KR20230013035A KR102554701B1 KR 102554701 B1 KR102554701 B1 KR 102554701B1 KR 1020230013035 A KR1020230013035 A KR 1020230013035A KR 20230013035 A KR20230013035 A KR 20230013035A KR 102554701 B1 KR102554701 B1 KR 102554701B1
- Authority
- KR
- South Korea
- Prior art keywords
- wall panel
- driving unit
- flexible wall
- area
- contact part
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000009434 installation Methods 0.000 title claims description 15
- 230000005856 abnormality Effects 0.000 claims abstract description 4
- 238000001514 detection method Methods 0.000 claims abstract description 4
- 238000003825 pressing Methods 0.000 claims description 17
- 239000012212 insulator Substances 0.000 claims description 12
- 238000010276 construction Methods 0.000 claims description 3
- 230000008878 coupling Effects 0.000 description 30
- 238000010168 coupling process Methods 0.000 description 30
- 238000005859 coupling reaction Methods 0.000 description 30
- 230000008569 process Effects 0.000 description 15
- 238000001816 cooling Methods 0.000 description 13
- 238000010438 heat treatment Methods 0.000 description 13
- 230000002265 prevention Effects 0.000 description 10
- 238000003780 insertion Methods 0.000 description 7
- 230000037431 insertion Effects 0.000 description 7
- 230000008901 benefit Effects 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 239000012530 fluid Substances 0.000 description 4
- 230000001965 increasing effect Effects 0.000 description 4
- 238000002347 injection Methods 0.000 description 4
- 239000007924 injection Substances 0.000 description 4
- 230000005389 magnetism Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 230000007613 environmental effect Effects 0.000 description 3
- 230000000149 penetrating effect Effects 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 239000004020 conductor Substances 0.000 description 2
- 230000008602 contraction Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 2
- 239000010931 gold Substances 0.000 description 2
- 229910052737 gold Inorganic materials 0.000 description 2
- 239000011810 insulating material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000005489 elastic deformation Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G13/00—Installations of lightning conductors; Fastening thereof to supporting structure
- H02G13/80—Discharge by conduction or dissipation, e.g. rods, arresters, spark gaps
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B17/00—Insulators or insulating bodies characterised by their form
- H01B17/14—Supporting insulators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G13/00—Installations of lightning conductors; Fastening thereof to supporting structure
- H02G13/40—Connection to earth
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/02—Devices for adjusting or maintaining mechanical tension, e.g. take-up device
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
Description
본 발명은 배전 기술 분야 중 변압기와 특고압 배전선로의 낙뢰 방지 설비 설치방법에 관한 것으로 더욱 상세하게는 변압기가 설치된 전신주의 접지라인과 피뢰라인이 바람등에 의하여 유동하지 않으면서 미관을 고려하여 고정시켜 낙뢰 피해를 방지하고, 해당 작업자의 작업환경을 쾌적하게 조성하면서 작업에 필요한 각종 기자재를 안전하게 보관하면서 보안성을 확보하는 변압기와 특고압 배전선로의 낙뢰 방지 설비 설치방법에 관한 것이다. The present invention relates to a method for installing lightning protection equipment for transformers and extra-high voltage distribution lines in the field of power distribution technology. It relates to a method for installing lightning protection equipment for transformers and extra-high voltage distribution lines that prevents lightning damage, creates a pleasant working environment for workers, safely stores various equipment necessary for work, and secures security.
변압기가 설치된 전신주 또는 전주에 연결하고자 하는 배전선로를 전신주(전주) 상단 양측에 횡으로 설치되는 완금의 양측에서 애자를 통해 결합하고, 애자 사이를 점퍼선으로 연결하되, 연결되는 점퍼선은 완금의 상단에 설치되는 애자를 통해 지지될 수 있도록 시공하여 사용하였다. 이때 변압기는 완금에 설치하는 것이 일반적이다. Combine the distribution line to be connected to the telephone pole where the transformer is installed or to the telephone pole through insulators on both sides of the wank installed horizontally on both sides of the telephone pole (electric pole), and connect the insulators with jumper wires. It was constructed and used so that it could be supported through the insulator installed on the top. At this time, it is common to install the transformer in wangeum.
한편, 종래에는 변압기가 설치된 전주로 낙뢰가 내리 칠 시 낙뢰로부터 전주에 설치된 배전선로와 변압기가 포함되는 각종 시설 또는 구성을 안전하게 보호하기 위하여 통상 피뢰기를 설치하며, 피뢰기에는 전주로부터 인출된 접지라인과 전기적으로 연결되는 피뢰라인을 구비한다. On the other hand, conventionally, lightning arresters are installed to safely protect various facilities or configurations including distribution lines and transformers installed on poles from lightning when lightning strikes a pole on which a transformer is installed. It is provided with a lightning protection line that is electrically connected.
그런데 종래에는 접지라인과 피뢰라인을 외부에서 상호 연결함에 따라 바람이 불 경우 이에 의해 접지라인과 피뢰라인이 유동하게 되면서 미관상 보기 좋지 않았다. However, conventionally, as the ground line and the lightning protection line are interconnected from the outside, when wind blows, the ground line and the lightning protection line move, which is not aesthetically pleasing.
아울러 이러한 부분을 해결하는 고정용 기기(장치, 시설)를 시공 구축(설치)하는 일련의 과정에서 작업자의 작업환경과, 각종 기자재와 물품의 보관 및 보안성 등을 확보할 수 있는 부분이 고려되지 못하고 있다. In addition, in the process of constructing (installing) fixed devices (devices, facilities) that solves these problems, the work environment of workers and the storage and security of various equipment and supplies are not considered. can't
본 발명이 해결하고자 하는 과제는 라인고정어셈블리를 매개로 피뢰라인과 접지라인을 쉽고 간편하게 연결해 줄 수 있어 작업이 보다 용이하도록 하는 변압기와 특고압 배전선로의 낙뢰 방지 설비 설치방법을 제공하는 것이 추구하는 목적 중에 하나이다.The problem to be solved by the present invention is to provide a lightning protection facility installation method for transformers and extra-high voltage distribution lines that can easily and simply connect a lightning protection line and a grounding line through a line fixing assembly to make work easier. one of the purposes.
또한, 본 발명은 변압기와 특고압 배전선로의 낙뢰 방지 설비를 설치하는 과정에서 해당 작업자들이 환경적 요인에 대해서 자유롭게 안전하게 휴식을 취할수 있는 구조물이 설치 작업 과정에 제공되어 이용되도록 하는 것이 추구하는 목적 중에 하나 이다. In addition, in the process of installing lightning protection equipment for transformers and extra-high voltage distribution lines, the object of the present invention is to provide and use a structure in which workers can freely and safely rest against environmental factors in the course of installation work. It is one.
또한, 본 발명은 변압기와 특고압 배전선로의 낙뢰 방지 설비를 설치하는 과정에서 관련 기자재와 작업도구 등을 쉽게 보관하고 간편하게 이용할 수 있도록 하는 구조물이 해당 설비 구축(설치) 과정에 제공되어 이용되도록 하는 것이 추구하는 목적 중에 하나 이다. In addition, the present invention provides a structure that allows easy storage and convenient use of related equipment and work tools in the process of installing lightning protection equipment for transformers and extra-high voltage distribution lines, which is provided and used in the process of building (installing) the corresponding equipment It is one of the goals pursued.
또한, 본 발명은 변압기와 특고압 배전선로의 낙뢰 방지 설비를 설치하는 작업자가 작업에 적합하지 아니한 고온의 환경이면 냉방을 위한 환경을 제공하고, 저온의 환경이면 난방을 위한 환경을 제공하여 작업자의 작업효율을 높이는 것이 추구하는 목적 중에 하나 이다. In addition, the present invention provides an environment for cooling if the high temperature environment is not suitable for the worker who installs the lightning protection equipment of the transformer and the extra-high voltage distribution line, and provides an environment for heating if the low temperature environment is not suitable for the worker. Improving work efficiency is one of the goals pursued.
또한, 본 발명은 외부의 침입자로부터 변압기와 특고압 배전선로의 낙뢰 방지 설비를 설치하는데 사용되는 각종 기자재 및 시설 등이 포함되는 관련 대상물이 부당하게 도난당하는 것을 방지하도록 하는 구조물이 해당 설비 구축(설치) 과정에 제공되어 이용되도록 하는 것이 추구하는 목적 중에 하나 이다. In addition, the present invention is a structure that prevents the unauthorized theft of related objects, including various equipment and facilities used to install lightning protection facilities for transformers and extra-high voltage distribution lines from external intruders. ) is one of the purposes pursued to be provided and used in the process.
또한, 본 발명은 이러한 구조물이 형성하는 면적의 확장과 축소가 가능하여, 내부에 수용되는 대상물의 수량과 작업자의 인원에 대응하는 최적화된 공간을 조성하는 것이 추구하는 목적 중에 하나 이다. In addition, one of the objects of the present invention is to create an optimized space corresponding to the number of objects and the number of workers accommodated therein by expanding and reducing the area formed by these structures.
또한, 본 발명은 상기 구조물의 내부 면적을 축소시켜 난방 환경 또는 냉방 환경이 신속하게 이루어지고, 냉방 및 난방의 효율성을 높이는 구조물이 해당 설비 구축(설치) 과정에 제공되어 이용되도록 하는 것이 추구하는 목적 중에 하나 이다. In addition, the object of the present invention is to reduce the internal area of the structure so that a heating environment or a cooling environment is quickly established and a structure that enhances the efficiency of cooling and heating is provided and used in the process of constructing (installing) the corresponding facility. is one of
또한, 본 발명은 상기 구조물의 가벽패널이 수동식 혹은 전동식으로 유동되며, 비상상황 발생시 유동이 제한되는 것을 방지하는 강제적 유동 수단이 수반되어 작업자의 구축환경이 안전하게 조성되도록 하는 것이 추구하는 목적 중에 하나 이다. In addition, the present invention is one of the purposes pursued to ensure that the temporary wall panel of the structure is moved manually or electrically, and that the construction environment for the operator is safely created by accompanying a forced flow means to prevent the flow from being restricted in the event of an emergency. .
본 발명은 변압기와 특고압 배전선로의 낙뢰 방지 설비 설치방법에 있어서, 배전선로의 낙뢰 방지 설비의 가공배전선 고정기기가 준비되는 단계; 상기 가공배전선 고정기기의 구축을 위한 현장 작업자, 작업도구, 설치장비 및 부품요소가 위치되는 가구조물이 설치되는 단계; 상기 부품요소가 설치되어, 상기 배전선로 이상검출 시스템이 구축되는 단계를 포함하고, 상기 부품요소는, 접지라인(GL)을 갖춘 전주(P)의 상단부에 설치되는 완금(100); 완금(100)의 양단부에 각각 설치되어 가공배전선(L)과 완금(100) 사이를 절연하는 LP애자(200)로 구성된 가공배전선 고정기기로서, 상기 전주(P) 상단에 설치되며 외부로 노출되는 피뢰라인(PL)을 구비하는 꼬깔모양의 피뢰기(300);를 포함하고, 상기 가구조물이 설치되는 단계는, 제1구동유닛(10')과, 제2구동유닛(20'), 제3구동유닛(30') 및 제4구동유닛(40')이 구비되는 단계; 상기 제1구동유닛(10')과 상기 제2구동유닛(20') 사이에 제1가벽패널(51')이 구비되는 단계; 상기 제3구동유닛(30')과 상기 제4구동유닛(40') 사이에 제2가벽패널(52')이 구비되는 단계; 상기 제1구동유닛(10')과 상기 제3구동유닛(30') 사이에 제3가벽패널(53')이 구비되는 단계; 및 상기 제2구동유닛(20')과 상기 제4구동유닛(40') 사이에 제4가벽패널(54')이 구비되는 단계를 포함하되, 상기 제1가벽패널(51') 내지 상기 제4가벽패널(54')은 내부공간을 형성하도록 둘레부로 배치되며, 상기 내부공간(S')은 상기 현장 작업자가, 상기 작업도구, 상기 설치장비가 위치된다.The present invention relates to a method for installing a lightning protection facility for a transformer and an extra-high voltage distribution line, comprising the steps of preparing an overhead distribution line fixing device for a lightning protection facility for a distribution line; Installing a furniture structure in which field workers, work tools, installation equipment, and component elements for constructing the overhead distribution line fixing device are located; The part element is installed, and the distribution line abnormality detection system is constructed, and the part element includes: a
본 발명에 따르면 다음과 같은 효과가 하나 혹은 그 이상이 있다. According to the present invention, there is one or more of the following effects.
본 발명은 라인고정어셈블리를 매개로 전주에 설치된 변압기와 배전선로 등을 보호하기 위한 피뢰라인과 접지라인을 쉽고 간편하게 연결해 줄 수 있어 작업이 보다 용이해지는 장점이 있다. The present invention has the advantage of making the work easier by easily and conveniently connecting the lightning protection line and the ground line for protecting the transformer and the distribution line installed on the pole through the line fixing assembly.
또한, 본 발명은 변압기와 특고압 배전선로의 낙뢰 방지 설비를 설치하는 과정에서 해당 작업자들이 환경적 요인에 대해서 자유롭게 안전하게 휴식을 취할 수 있는 구조물이 해당 설비 구축(설치) 과정에 제공되어 이용되도록 하는 효과가 있다. In addition, the present invention provides a structure in which workers can freely and safely take a break from environmental factors in the process of installing lightning protection equipment for transformers and extra-high voltage distribution lines is provided and used in the process of building (installing) the equipment It works.
또한, 본 발명은 변압기와 특고압 배전선로의 낙뢰 방지 설비를 설치하는 과정에서 관련 자재와 작업도구 등을 보관하고 이용할 수 있도록 하는 구조물이 해당 설비 구축(설치) 과정에 제공되어 이용되도록 하는 효과가 있다. In addition, the present invention has the effect of providing and using a structure for storing and using related materials and work tools in the process of installing lightning protection equipment for transformers and extra-high voltage distribution lines in the process of constructing (installing) the corresponding equipment there is.
또한, 본 발명은 변압기와 특고압 배전선로의 낙뢰 방지 설비를 설치하는 해당 작업자가 작업하기 어려운 고온 환경에서는 작업하기 적합한 냉방 환경을 제공하고, 저온 환경에서는 작업하기 적합한 난방 환경을 제공하여 작업자의 작업효율을 높이는 장점이 있다. In addition, the present invention provides a cooling environment suitable for working in a high-temperature environment where it is difficult for a corresponding worker who installs a lightning protection facility for a transformer and an extra-high voltage distribution line to work, and provides a heating environment suitable for working in a low-temperature environment, so that the worker's work It has the advantage of increasing efficiency.
또한, 본 발명은 변압기와 특고압 배전선로의 낙뢰 방지 설비를 설치하는데 소요되는 각종 기자재 및 설비 등이 포함되는 대상물을 외부의 부당한 침입자로부터 보호하여 도난당하는 것을 방지하도록 하는 구조물이 해당 설비 구축(설치) 과정에 제공되어 이용되도록 하는 효과가 있다. In addition, the present invention is a structure that prevents theft by protecting objects, including various equipment and facilities required to install lightning protection facilities for transformers and extra-high voltage distribution lines, from outside intruders. ) has the effect of being provided to the process and being used.
또한, 본 발명은 상기 구조물이 형성하는 면적의 확장과 축소가 가능하여, 내부에 수용되는 대상물의 수량과 작업자의 인원에 대응하는 최적화된 공간 조성이 가능하게 하는 장점이 있다. In addition, the present invention has the advantage of enabling an optimized space composition corresponding to the number of objects accommodated inside and the number of workers by enabling expansion and contraction of the area formed by the structure.
또한, 본 발명은 상기 작업자가 작업하는 구조물의 내부 면적 또는 용적을 축소시켜 난방 또는 냉방이 신속하게 이루어지고, 냉방 또는 난방의 효율성도 높이는 구조물이 해당 설비 구축(설치) 과정에 제공되어 이용되도록 하는 효과가 있다. In addition, the present invention reduces the internal area or volume of the structure in which the operator works so that heating or cooling is performed quickly and the efficiency of cooling or heating is increased. It works.
또한, 본 발명은 상기 구조물의 가벽패널이 수동식 혹은 전동식으로 유동되며, 비상상황 발생시에는 이러한 유동이 제한되는 것을 방지하는 강제적 유동 수단이 수반되어, 해당 작업자의 작업환경이 안전하게 조성되도록 하는 장점이 있다. In addition, the present invention has the advantage that the temporary wall panel of the structure is moved manually or electrically, and in the event of an emergency, it is accompanied by a forced flow means to prevent such flow from being restricted, so that the worker's working environment can be safely created. .
도 1은 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기의 사시도.
도 2는 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기에서 라인고정어셈블리를 따로 발췌하여 보인 부분단면 사시도.
도 3은 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기에서 라인고정어셈블리의 분해사시도.
도 4는 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기에서 라인고정어셈블리의 요부를 따로 발췌하여 보인 분해사시도.
도 5는 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기에서 커넥터를 따로 발췌하여 보인 분해사시도.
도 6a 내지 도 6e는 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기에서 라인고정어셈블리의 작용효과를 설명하기 위한 도면.
도 7 내지 도 10은 도 1에 따른 주요 구성을 개략적으로 도시한 도면들이다.1 is a perspective view of a lightning protection type overhead distribution line fixing device according to the present invention.
Figure 2 is a partial cross-sectional perspective view showing a line fixing assembly separately extracted from the lightning damage prevention overhead distribution line fixing device according to the present invention.
Figure 3 is an exploded perspective view of a line fixing assembly in a lightning protection type overhead distribution line fixing device according to the present invention.
Figure 4 is an exploded perspective view showing separately extracted main parts of the line fixing assembly in the lightning damage prevention overhead distribution line fixing device according to the present invention.
Figure 5 is an exploded perspective view showing a connector separately extracted from the lightning damage prevention type overhead distribution line fixing device according to the present invention.
6a to 6e are views for explaining the effect of the line fixing assembly in the lightning damage prevention type overhead distribution line fixing device according to the present invention.
7 to 10 are diagrams schematically illustrating the main components of FIG. 1 .
이하, 첨부된 도면에 의거하여 상세하게 설명한다.Hereinafter, it will be described in detail based on the accompanying drawings.
도 1은 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기의 사시도이고, 도 2는 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기에서 라인고정어셈블리를 따로 발췌하여 보인 부분 단면 사시도이며, 도 3은 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기에서 라인고정어셈블리의 분해사시도이며, 도 4는 본 발명에 따른낙뢰피해방지형 가공배전선 고정기기에서 라인고정어셈블리의 요부를 따로 발췌하여 보인 분해사시도이며, 도 5는 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기에서 커넥터를 따로 발췌하여 보인 분해사시도이다.1 is a perspective view of a lightning damage prevention type overhead power distribution line fixing device according to the present invention, Figure 2 is a partial cross-sectional perspective view showing a line fixing assembly separately extracted from the lightning damage prevention type overhead power distribution line fixing device according to the present invention, FIG. is an exploded perspective view of the line fixing assembly in the lightning damage prevention type overhead distribution line fixing device according to the present invention, and FIG. 5 is an exploded perspective view showing a connector separately extracted from the lightning damage prevention overhead distribution line fixing device according to the present invention.
도 1 내지 도 5를 참조하면, 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기는 완금(100)과 LP애자(200),피뢰기(300) 및 라인고정어셈블리(400)로 구성된 것으로서, 이에 의하면 가공배전선(L)을 안정적으로 고정할 수있음은 물론 피뢰라인(PL)과 접지라인(GL)을 쉽고 간편하게 연결해 줄 수 있는 기술적인 특징이 있다.1 to 5, the lightning damage prevention overhead distribution line fixing device according to the present invention is composed of a
상기 완금(100)은 전주(P)와 직교를 이루는 방향으로 전주(P)의 상단부에 설치된다. 이러한 완금(200)의 양단부상면에는 LP애자(200)가 설치되어 가공배전선(L)을 떠받친다. 여기서 LP애자(200)는 가공배전선(L)과 완금(100)사이를 절연하는 역할을 한다.The
한편, 상기 전주(P)의 상단에는 낙뢰로부터 주변 자재들을 보호해 주기 위한 피뢰기(300)가 착탈가능하게 설치되며, 피뢰기(300)는 낙뢰가 내리쳤을 때 이를 유도하기 위한 피뢰라인(PL)을 구비한다. 이러한 피뢰라인(PL)은외부로 노출되어 전주(P)로부터 인출된 접지라인(GL)과 라인고정어셈블리(400)를 매개로 전기적으로 연결된다. On the other hand, a
상기 라인고정어셈블리(400)는 거치대(410)와 쇄클(420), T볼트(430), 가압너트(440), 제1픽스유닛(450), 제2픽스유닛(460) 및 커넥터(470)로 구성된 것으로서, 본 실시 예의 경우 전주(P)에 착탈가능하게 설치되어 피뢰라인(PL)과 접지라인(GL)을 전기적으로 상호 연결해주는 역할을 한다. 또한, 필요에 따라 착탈가능하게 설치되는 애자를 매개로 분기선 등을 절연하는 용도로 사용할 수 있다.The
상기 거치대(410)는 베이스(411)와 커버(412)로 구성되며 절연재질로 제작된다. 상기 베이스(411)는 사각형상의 관으로, 밴드(B)를 매개로 전주(P)에 착탈가능하게 설치된다. 이러한 베이스(411)의 상면에는 코터핀(CP)이 관통되게 끼워질 수 있도록 상하로 관통된 핀결합부(411a)가 일체로 형성되고, 전주(P)와 마주보는 면에는 접지라인투입구(411b)가 일체로 형성된다. 참고로 전주(P)로부터 인출된 접지라인(GL)은 접지라인투입구(411b)를 통해 인출되어 베이(411)에 수용된다. 그리고 베이스(411)의 양단은 착탈가능하게 설치되는 커버(412)에 의해 폐구된다.The
상기 커버(412)는 사각형상의 플레이트로, 일면에는 베이스(411)의 내측으로 착탈가능하게 끼워지는 장착테(412a)가 일체로 형성되고, 커버(412)의 중앙에는 커넥터결합부(412b)가 일체로 형성된다. 참고로 커넥터결합부(412b)에는 커넥터(470)가 압입고정된다. 그리고 필요에 따라 커넥터결합부(412b)의 내주면과 커넥터(470)에는 나사산이 형성될 수 있으며, 이 나사산을 매개로 나합될 수도 있다.The
상기 쇄클(420)은 쇄클바디(421)와 제1핀결합부(422), 보강리브(423) 및 걸림턱(424)으로 구성된 절연재질로 제작된 부재로서, 본 실시 예의 경우 코터핀(CP)과 분할핀(SP)을 매개로 베이스(411)에 회동가능하게 설치된다.The
상기 쇄클바디(421)는, 정면에서 보았을 때,‘⊂’형상을 이루는 부재로, 꼭지점에는 결합공(421a)이 일체로 형성된다. 여기서 쇄클바디(421)의 각 말단부에는 베이스(411)의 핀결합부(411a)와 상호 연통되는 구멍이 일체로 형성되며, 핀결합부(411a)와 이 구멍을 관통하는 코터핀(CP)을 매개로 쇄클바디(421)는 베이스(411)에 회전가능 하게 설치된다. 그리고 코터핀(CP)에는 분할핀(SP)이 착탈가능하게 끼워져 코터핀(CP)의 이탈을 제한한다. 이와같이 설치된 쇄클바디(421)는 코터핀(CP)을 중심으로 회전된다.The
상기 제1핀결합부(422)는 결합공(411a)을 기준으로 상호 대향되게 쇄클바디(421)의 직선구간에 형성된다. 여기서 제1핀결합부(422)는 핀볼트(PB)가 관통되게 끼워지는 구멍이며, 이후에 설명되는 제2핀결합부(452)와 상호연통된 상태에서 관통되게 끼워지는 핀볼트(PB)를 매개로 상호 연결된다.The first
상기 보강리브(423)는 쇄클바디(421)의 구조적인 강성을 강화시켜 주기 위하여 쇄클바디(421)의 일부를 함몰시켜 형성한 것으로, 결합공(411a)과 제1핀결합부(422) 사이(만곡구간)에 형성되며 결합공(411a)을 기준으로 상호대향되게 배치된다. 이러한 보강리브(423)의 함몰된 홈에는 이후에 설명되는 판스프링(462)의 말단부가 삽입된다.The reinforcing
상기 걸림턱(424)은 제1핀결합부(422)와 보강리브(423) 사이에 형성되며 결합공(411a)을 기준으로 상호 대향되게 배치된다. 그리고 걸림턱(424)은 쇄클바디(421)로부터 돌출되어 이후에 설명되는 판스프링(462)의 탄성변형시 판스프링(462)이 보강리브(423)로부터 이탈되지 않게 제한하는 역할을 한다.The locking
상기 T볼트(430)는‘T’자 모양의 부재로서, 본 실시 예의 경우 쇄클(420)의 결합공(421a)에 상하 회동가능하게 끼워진다. 이러한 T볼트(430)의 내부에는 길이방향으로 관통된 피뢰라인투입구(431)가 일체로 형성되며, 피뢰라인(PL)은 피뢰라인투입구(431)에 관통되게 삽입된다.The T-
상기 가압너트(440)는 쇄클(420)의 결합공(421a)에 관통되게 끼워진 T볼트(430)에 이동가능하게 체결된다. 상기 제1픽스유닛(450)은 밀착판(451)과 제2핀결합부(452)로 구성된 것으로서, 본 실시 예의 경우 베이스(411)에 맞대어져 쇄클(420)의 회동을 제한하는 역할을 한다.The
상기 밀착판(451)은 소정의 폭과 두께를 갖는 직사각형상의 플레이트이다. 이러한 밀착판(451)의 상단과 하단에는 나란하게 수평으로 연장된 제2핀결합부(452)가 일체로 형성되며, 제1픽스유닛(450)은 핀볼트(PB)와 너트(N)를 매개로 쇄클(420)에 고정된다.The
일 예로, 상기 제1픽스유닛(450)을 베이스(411)와 맞닿지 않게 쇄클(420)의 내부에 배치한 상태에서 핀볼트(PB)을 매개로 고정하게 되면 쇄클(420)은 코터핀(CP)을 중심으로 회전할 수 있지만, 제1픽스유닛(450)을 베이스(411)에 맞대어지게 쇄클(420)의 내부에 배치한 상태에서 핀볼트(PB)을 매개로 고정하게 되면 쇄클(420)은 제1픽스유닛(450)에 의해 회전이 제한된다.For example, when the
이와 같이 제1픽스유닛(450)의 배치에 따라 쇄클(420)의 작동(회전) 여부를 현장에서 적절하게 선택할 수 있기 때문에 작업의 편의성을 크게 강화할 수 있게 된다. 상기 제2픽스유닛(460)은 부시(461)와 한 쌍의 판스프링(462)으로 구성된 것으로서, 본 실시 예의 경우 T볼트(430)에 이동가능하게 끼워져 T볼트(430)의 움직임(회동)을 견고하게 고정 및 지지하는 역할을 한다.In this way, since it is possible to properly select whether or not to operate (rotate) the
상기 부시(461)와 한 쌍의 판스프링(462)은 일체로 제작된다. 상기 부시(461)는 내부가 관통된 관으로, T볼트(430)에 이동가능하게 끼워진다. 이렇게 끼워진 부시(461)는 판스프링(462)에 의해 가압너트(440)에 맞대어진다.The
상기 한 쌍의 판스프링(462)은 부시(461)를 사이에 두고 쇄클(420)을 향해 연장된다. 이렇게 연장된 판스프링(462)의 말단은 보강리브(423)와 걸림턱(424) 사이로 삽입된다. 여기서 판스프링(462)은 부시(461)의 이동에 의해 탄성변형되어 T볼트(430)가 움직이지 않게 고정 및 지지하는 역할을 한다.The pair of
일 예로, 상기 가압너트(440)를 쇄클(420)를 향해 조여주게 되면, 가압너트(440)에 의해 부시(461)가 쇄클(420)을 향해 이동하게 되고, 이 과정에 판스프링(462)은 자연스럽게 탄성변형된다. 상기와 같이 판스프링(462)이 탄성변형됨에 따라 판스프링(462)에 작용하는 복원력에 의해 쇄클(420)과 T볼트(430)는 서로 반대방향으로 밀리게 되므로 쇄클(420)과 T볼트(430) 간에는 움직임 억제된 상태 즉, 고정된 상태를 유지하게 된다.For example, when the
이와 같이 제2픽스유닛(460)을 매개로 쇄클(420)과 T볼트(430) 간의 유동여부를 현장에서 적절하게 선택할 수 있기 때문에 작업의 편의성을 크게 강화할 수 있게 된다.In this way, since it is possible to properly select whether or not to flow between the
이처럼 본 발명은 제1픽스유닛(450)과 제2픽스유닛(460)의 작용에 따라 쇄클(420)의 회동만 제어하거나, 쇄클(420)과 T볼트(430) 간의 유동만 제어하거나, 마지막으로 쇄클(420)의 회동과 쇄클(420)과 T볼트(430) 간의 유동 모두를 현장(주변) 여건(상황)에 따라 적절하게 선택하여 실시할 수 있다는 점에서 작업의 편의성을 크게 강화할 수 있는 이점이 있다.As such, the present invention controls only the rotation of the
상기 커넥터(470)는 관체(471)와 도전체(472)로 구성된 것으로서, 본 실시 예의 경우 커버(412)의 커넥터결합부(412b)에 삽탈가능하게 끼워져 피뢰라인(PL)과 접지라인(GL)을 전기적으로 상호 연결해주는 역할을 한다. 상기 관체(471)는 제1바디부(471a)와 제2바디부(471b)로 각각 분할형성되어 상호 결합에 의해 관 형태를 이루며, 내측으로 인입된 피뢰라인(PL)과 접지라인(GL)을 감싸 고정한다.The
상기 제1바디부(471a)와 제2바디부(471b)가 서로 맞대어지는 면에는 결합돌기(471a-1)와 결합홈(471b-1)이 일체로 형성되며, 제1바디부(471a)와 제2바디부(471b)는 이들 결합돌기(471a-1)와 결합홈(471b-1)을 매개로 착탈가능하게 결합된다.The
상기 제1바디부(471a)와 제2바디부(471b)의 양단부 내면에는 내주면을 따라 돌출된 다수의 가압돌기(471a2,471b-2)가 일체로 형성되는데, 여기서 가압돌기(471a-2,471b-2)는 제1바디부(471a)와 제2바디부(471b) 상호 결합시 내측에 배치된 피뢰라인(PL)과 접지라인(GL)의 피복을 가압하여 피뢰라인(PL)과 접지라인(GL)이 관체(471)로부터 이탈되는 것을 제한하는 역할을 한다.A plurality of pressing protrusions 471a2 and 471b-2 protruding along inner circumferential surfaces are integrally formed on inner surfaces of both ends of the
상기 도전체(472)는 관체(471)에 내설되어 피뢰라인(PL)과 접지라인(GL)의 금속선을 전기적으로 연결해주는 역할을 한다. 본 실시 예에 의하면, 상기와 같이 피뢰라인(PL)과 접지라인(GL)의 연결작업을 쉽고 간편하게 실시할 수 있어작업시간을 획기적으로 단축할 수 있는 이점이 있다. The
상기와 같은 구성으로 이루어진 본 발명의 사용상태에서 대해 설명하면 다음과 같다.먼저, 전주(P)에 완금(100)과, 피뢰라인(PL)을 갖춘 피뢰기(300) 및 라인고정어셈블리(400)를 설치해 준다. 그리고 완금(100)의 양단부 상면에 LP애자(200)를 설치하고, 이렇게 설치된 완금(100)에 가공배전선(L)을 배치한 상태에서 결속선을 이용해 고정한다. 상기와 같이 설치한 이후에는 라인고정어셈블리(400)를 이용해 전주(P)로부터 인출된 접지라인(GL)과 피뢰라인(PL)을 전기적으로 상호 연결해 준다. 도 6a 내지 도 6e는 본 발명에 따른 낙뢰피해방지형 가공배전선 고정기기에서 라인고정어셈블리의 작용효과를 설명하기 위한 도면으로서, 이를 참조하여 설명하면 다음과 같다.The use state of the present invention composed of the above configuration is described as follows. First, the
도 6a 및 도 6b를 참조하면, 제1픽스유닛(450)을 쇄클(420)로부터 인출할 수 있게 핀볼트(BP)를 쇄클(420)로부터 분리시켜준다. 상기와 같이 제1픽스유닛(450)이 인출되면, 제1픽스유닛(450)의 제2핀결합부(452)가 T볼트(430)의 길이방향을 향하도록 뒤집어준 다음, 제1픽스유닛(450)을 쇄클(420)의 내측으로 삽입하며, 이때 제1픽스유닛(450)의 밀착판(451)이 베이스(411)에 밀착되도록 배치한다.Referring to FIGS. 6A and 6B , the pin bolt BP is separated from the
상기와 같이 제1픽스유닛(450)이 배치되면 분리했던 핀볼트(BP)를 매개로 쇄클(420)과 제1픽스유닛(450)을 고정해준다. 상기와 같이 제1픽스유닛(450)이 완금(100)에 밀착된 상태(도 6b 및 도 6c 참조)에서 쇄클(420)과 상호 결합됨에 따라 쇄클(420)은 제1픽스유닛(450)으로 인해 코터핀(CP)을 중심으로 회전되는 것이 실질적으로 불가능해지며, 이를 통해 쇄클(420)의 유동을 제한할 수 있게 된다.When the
한편, 상기 쇄클(420)의 유동을 제한한 것과는 별개로 쇄클(420)과 T볼트(430) 간의 유동도 제한해 줄 수 있는데, 이에 대해 좀 더 구체적으로 설명해 보면 다음과 같다.On the other hand, apart from restricting the flow of the
도 6c에 도시된 바와 같이, 가압너트(440)를 쇄클(420)을 향해 조여주게 되면, 가압너트(440)의 조임에 의해 부시(251)가 T볼트(430)를 따라 이동되고, 이 과정에 판스프링(462)은 자연스럽게 탄성변형된다. 상기와 같이 판스프링(462)이 탄성변형됨에 따라 판스프링(462)에 작용하는 복원력에 의해 쇄클(420)과 T볼트(430)는 서로 반대방향으로 밀리게 되므로 쇄클(420)과 T볼트(430) 간에는 움직임 억제된 상태 즉, 고정된 상태를 유지하게 된다.As shown in Figure 6c, when the
이와 같이 제2픽스유닛(460)을 매개로 쇄클(420)과 T볼트(430) 간의 유동여부를 현장에서 적절하게 선택할 수 있기 때문에 작업의 편의성을 크게 강화할 수 있게 된다.In this way, since it is possible to properly select whether or not to flow between the
이처럼 본 발명은 제1픽스유닛(450)과 제2픽스유닛(460)의 작용에 따라 쇄클(420)의 회동만 제어하거나, 쇄클(420)과 T볼트(430) 간의 유동만 제어하거나, 마지막으로 쇄클(420)의 회동과 쇄클(420)과 T볼트(430) 간의 유동 모두를 현장(주변) 여건(상황)에 따라 적절하게 선택하여 실시할 수 있다는 점에서 작업의 편의성을 크게 강화할 수 있는 이점이 있다.As such, the present invention controls only the rotation of the
상기와 같이 쇄클(420)과 T볼트(430)의 고정작업이 완료되면, 도 6d에 도시된 바와 같이, 피뢰라인(PL)을 T볼트(430)의 피뢰라인투입구(431)에 관통되게 끼워준다. 그리고 커버(412)의 커넥터결합부(412b)로부터 커넥터(470)를 인출한 다음 커넥터(470)의 내측으로 피뢰라인(PL)과 접지라인(GL)을 각각 삽입하여 전기적으로 연결되도록 한 다음, 커넥터(470)를 커넥터결합부(412b)에 압입고정하며, 이를 도 6e와 같이 도시하였다.When the fixing work of the
도 7 내지 도 9를 참조하면,변압기와 특고압 배전선로의 낙뢰 방지 설비 설치방법에 있어서, 배전선로의 낙뢰 방지 설비의 가공배전선 고정기기가 준비되는 단계; 상기 가공배전선 고정기기의 구축을 위한 현장 작업자, 작업도구, 설치장비 및 부품요소가 위치되는 가구조물이 설치되는 단계; 상기 부품요소가 설치되어, 상기 배전선로 이상검출 시스템이 구축되는 단계를 포함한다.Referring to Figures 7 to 9, in the lightning protection installation method of the transformer and extra-high voltage distribution line, the step of preparing the overhead distribution line fixing device of the lightning protection facility of the distribution line; Installing a furniture structure in which field workers, work tools, installation equipment, and component elements for constructing the overhead distribution line fixing device are located; and constructing the distribution line abnormality detection system by installing the components.
여기서 상기 부품요소는, 접지라인(GL)을 갖춘 전주(P)의 상단부에 설치되는 완금(100); 완금(100)의 양단부에 각각 설치되어 가공배전선(L)과 완금(100) 사이를 절연하는 LP애자(200)로 구성된 가공배전선 고정기기로서, 상기 전주(P) 상단에 설치되며 외부로 노출되는 피뢰라인(PL)을 구비하는 꼬깔모양의 피뢰기(300);를 포함한다.Here, the component elements include: wangeum 100 installed at the upper end of the electric pole (P) with the ground line (GL); An overhead distribution line fixing device composed of
상기 가구조물이 설치되는 단계는, 제1구동유닛(10')과, 제2구동유닛(20'), 제3구동유닛(30') 및 제4구동유닛(40')이 구비되는 단계; 상기 제1구동유닛(10')과 상기 제2구동유닛(20') 사이에 제1가벽패널(51')이 구비되는 단계; 상기 제3구동유닛(30')과 상기 제4구동유닛(40') 사이에 제2가벽패널(52')이 구비되는 단계; 상기 제1구동유닛(10')과 상기 제3구동유닛(30') 사이에 제3가벽패널(53')이 구비되는 단계; 및 상기 제2구동유닛(20')과 상기 제4구동유닛(40') 사이에 제4가벽패널(54')이 구비되는 단계를 포함한다. (도 8(a)참조)The step of installing the furniture structure includes a step in which a first driving unit 10', a second driving unit 20', a third driving unit 30', and a fourth driving unit 40' are provided; providing a first flexible wall panel 51' between the first driving unit 10' and the second driving unit 20'; providing a second flexible wall panel (52') between the third driving unit (30') and the fourth driving unit (40'); providing a third flexible wall panel (53') between the first driving unit (10') and the third driving unit (30'); and providing a fourth flexible wall panel 54' between the second driving unit 20' and the fourth driving unit 40'. (See Fig. 8(a))
아울러 상기 제1가벽패널(51') 내지 상기 제4가벽패널(54')은 내부공간을 형성하도록 둘레부로 배치되며, 상기 내부공간(S')은 상기 현장 작업자가, 상기 작업도구, 상기 설치장비가 위치된다. (도 8(a)참조)In addition, the first flexible wall panel 51' to the fourth flexible wall panel 54' are arranged around the circumference to form an inner space, and the inner space S' is the site worker, the work tool, the installation equipment is located. (See Fig. 8(a))
한편 상기 가구조물이 설치되는 단계는, 상기 제1가벽패널(51')이 상기 제1구동유닛(10')과 상기 제2구동유닛(20') 사이에서, 상기 내부공간(S')의 외부측을 향하여, 슬라이딩 방식으로 이동하여, 상기 내부공간(S')이 1차확장되도록 하는 제1확장단계가 수행된다. (도 8(b)참조)Meanwhile, in the step of installing the furniture structure, the first flexible wall panel 51' is placed between the first driving unit 10' and the second driving unit 20', and A first expansion step is performed to move toward the outside in a sliding manner so that the inner space (S') is first expanded. (See Fig. 8(b))
이어서 상기 제2가벽패널(52')이 상기 제3구동유닛(30')과 상기 제4구동유닛(40') 사이에서, 상기 내부공간(S')의 외부측으로 슬라이딩 방식으로 이동하여, 상기 내부공간(S')이 2차확장되도록 하는 제2확장단계가 수행된다. (도 8(c)참조)Subsequently, the second removable wall panel 52' moves between the third driving unit 30' and the fourth driving unit 40' in a sliding manner to the outside of the inner space S', A second expansion step is performed so that the inner space S' is secondarily expanded. (See Fig. 8(c))
이어서 상기 제3가벽패널(53')이 상기 제1구동유닛(10')과 상기 제3구동유닛(30') 사이에서, 상기 내부공간(S')의 외부측으로 슬라이딩 방식으로 이동하여, 상기 내부공간(S')이 3차확장되도록 하는 제3확장단계가 수행된다. (도 8(d)참조)Then, the third removable wall panel 53' moves between the first driving unit 10' and the third driving unit 30' in a sliding manner to the outside of the inner space S', A third expansion step is performed so that the inner space S' is expanded three times. (See Fig. 8(d))
이어서 상기 제4가벽패널(54')이 상기 제2구동유닛(20')과 상기 제4구동유닛(40') 사이에서, 상기 내부공간(S')의 외부측으로 슬라이딩 방식으로 이동하여, 상기 내부공간(S')이 4차확장되도록 하는 제4확장단계가 수행된다. (도 8(e)참조)Subsequently, the fourth flexible wall panel 54' moves between the second driving unit 20' and the fourth driving unit 40' in a sliding manner to the outside of the inner space S', A fourth expansion step is performed so that the inner space S' is expanded in a fourth order. (See Fig. 8(e))
아울러 상기 내부공간(S')의 중앙부에 위치된 지탱체구동유닛(60')이, 봉형상의 제1지탱체(61')를 상기 제1가벽패널(51')을 항햐여 전진시켜 상기 제1가벽패널(51')을 지탱시키는 제1지탱단계가 수행된다. (도 8(f)참조)In addition, the support body drive unit 60' located in the central part of the inner space S' moves the rod-shaped first support body 61' along the first flexible wall panel 51' to move the first support body 61' forward. A first supporting step of supporting the first temporary wall panel 51' is performed. (See Fig. 8(f))
상기 지탱체구동유닛(60')이, 봉형상의 제2지탱체(62')를 상기 제2가벽패널(52')을 항햐여 전진시켜 상기 제2가벽패널(52')을 지탱시키는 제2지탱단계와, 상기 지탱체구동유닛(60')이, 봉형상의 제3지탱체(63')를 상기 제3가벽패널(53')을 항햐여 전진시켜 상기 제3가벽패널(53')을 지탱시키는 제3지탱단계가 수행된다. (도 8(a)참조)The support body drive unit 60' moves the rod-shaped second support body 62' along the second flexible wall panel 52' to support the second flexible wall panel 52'. In the supporting step, the support body driving unit 60' advances the rod-shaped third support member 63' along the third flexible wall panel 53' to move the third flexible wall panel 53' forward. A third holding step of holding is performed. (See Fig. 8(a))
이어서 상기 지탱체구동유닛(60')이, 봉형상의 제4지탱체(64')를 상기 제4가벽패널(54')을 항햐여 전진시켜 상기 제4가벽패널(54')을 지탱시키는 제4지탱단계가 수행된다. (도 8(a)참조)Subsequently, the support body drive unit 60' moves the rod-shaped fourth support body 64' forward along the fourth flexible wall panel 54' to support the fourth
상기 제1가벽패널(51') 내지 상기 제4가벽패널(54')은 상기 제1지탱체(61') 내지 상기 제4지탱체(64')를 통해 외부로부터 상기 내부공간(S')측을 향하여 가해지는 충격을 방어하도록 구비된다.(도 8(f)참조)The first flexible wall panel 51' to the fourth flexible wall panel 54' extend through the first support body 61' to the fourth support body 64' from the outside to the inner space S'. It is provided to protect the impact applied toward the side. (See FIG. 8(f))
상기 내부공간(S')은, 상기 제1지탱체(61')와 상기 제3지탱체(63')에 의하여 구획되는 제1공간(S1')과, 상기 제1지탱체(61')와 상기 제4지탱체(64')에 의하여 구획되는 제2공간(S2')과, 상기 제2지탱체(62')와 상기 제3지탱체(63')에 의하여 구획되는 제3공간(S3')과, 상기 제2지탱체(62')와 상기 제4지탱체(64')에 의하여 구획되는 제4공간을 포함한다.The inner space (S') includes a first space (S1') partitioned by the first support member (61') and the third support member (63'), and the first support member (61'). and a second space S2' partitioned by the fourth support body 64', and a third space partitioned by the second support body 62' and the third support body 63' ( S3'), and a fourth space partitioned by the second support member 62' and the fourth support member 64'.
아울러 상기 제1공간(S1') 내지 상기 제4공간에는 상기 현장 작업자, 작업도구, 설치장비, 공사장비가 복합적으로 혹은 구분되어 위치된다. 상기 제1구동유닛(10')은 제1방향(A')에, 상호 이격된 제1-1접촉부(11')와 제1-2접촉부(12')가 구비되며, 상기 제1-1접촉부(11')로 상기 제1가벽패널(51')의 일측의 전면영역인 제1영역을 누르고, 상기 제1-2접촉부(12')로 상기 제1가벽패널(51')의 일측의 후면영역인 제2영역을 누르는 제1-1파지동작을 수행한다.In addition, in the first space (S1 ') to the fourth space, the field workers, work tools, installation equipment, and construction equipment are located in combination or separately. The first driving unit 10' is provided with a 1-1 contact part 11' and a 1-2 contact part 12' spaced apart from each other in a first direction A', and the 1-1 The contact portion 11' presses the first area, which is the front area of one side of the first flexible wall panel 51', and the first-second contact portion 12' presses the first area on one side of the first flexible wall panel 51'. The 1-1 gripping operation of pressing the second area, which is the rear area, is performed.
상기 제2구동유닛(20')은 제2방향(B')에, 상호 이격된 제2-1접촉부(21')와 제2-2접촉부(22')가 구비되며, 상기 제2-1접촉부(21')로 상기 제1가벽패널(51')의 타측의 전면영역인 제3영역을 누르고, 상기 제2-2접촉부(22')로 상기 제1가벽패널(51')의 타측의 후면영역인 제4영역을 누르는 제2-1파지동작을 수행한다.The second driving unit 20' is provided with a 2-1 contact part 21' and a 2-2 contact part 22' spaced apart from each other in the second direction (B'), and the 2-1 The contact part 21' presses the third area, which is the front area of the other side of the first flexible wall panel 51', and the 2-2 contact part 22' presses the other side of the first flexible wall panel 51'. The 2-1 gripping operation of pressing the fourth area, which is the rear area, is performed.
여기서 상기 제3구동유닛(30')은 제1방향(A')에, 상호 이격된 제3-1접촉부(31')와 제3-2접촉부(32')가 구비되며, 상기 제3-1접촉부(31')로 상기 제2가벽패널(52')의 타측의 전면영역인 제5영역을 누르고, 상기 제3-2접촉부(32')로 상기 제2가벽패널(52')의 타측의 후면영역인 제6영역을 눌러 파지하는 제3-1파지동작을 수행한다.Here, the third driving unit 30' is provided with a 3-1 contact part 31' and a 3-2 contact part 32' spaced apart from each other in the first direction A', and the 3-1 contact part 32' is provided. The fifth area, which is the front area of the other side of the second flexible wall panel 52', is pressed with the first contact portion 31', and the other side of the second flexible wall panel 52' is pressed with the 3-2 contact portion 32'. The 3-1 gripping operation is performed by pressing and gripping the sixth area, which is the rear area of the .
상기 제4구동유닛(40')은 제2방향(B')에, 상호 이격된 제4-1접촉부(41')와 제4-2접촉부(42')가 구비되며, 상기 제4-1접촉부(41')로 상기 제2가벽패널(52')의 타측의 전면영역인 제7영역을 누르고, 상기 제4-2접촉부(42')로 상기 제2가벽패널(52')의 타측의 후면영역인 제8영역을 눌러 파지하는 제4-1파지동작을 수행한다.The fourth driving unit 40' is provided with a 4-1 contact part 41' and a 4-2 contact part 42' spaced apart from each other in the second direction (B'), and the 4-1 The seventh area, which is the front area of the other side of the second flexible wall panel 52', is pressed with the contact portion 41', and the 4-2 contact portion 42' is used to press the other side of the second flexible wall panel 52'. The 4-1 gripping operation is performed by pressing and gripping the eighth area, which is the rear area.
한편 상기 제1구동유닛(10')은 제3방향(C')에, 상호 이격된 제1-3접촉부(13')와 제1-4접촉부(14')가 구비되며, 상기 제1-3접촉부(13')로 상기 제3가벽패널(53')의 타측의 전면영역인 제9영역을 누르고, 상기 제1-4접촉부(14')로 상기 제3가벽패널(53')의 타측의 후면영역인 제10영역을 눌러 파지하는 제1-2파지동작을 수행한다.Meanwhile, the first driving unit 10' is provided with a 1-3
아울러 상기 제3구동유닛(30')은 제4방향(D')에, 상호 이격된 제4-3접촉부(43')와 제4-4접촉부(44')가 구비되며, 상기 제4-3접촉부(43')로 상기 제3가벽패널(53')의 타측의 전면영역인 제11영역을 누르고, 상기 제4-4접촉부(44')로 상기 제3가벽패널(53')의 타측의 후면영역인 제12영역을 눌러 파지하는 제3-2파지동작을 수행한다.In addition, the third driving unit 30' is provided with a 4-3 contact part 43' and a 4-4 contact part 44' spaced apart from each other in the fourth direction D', and the 4-3 contact part 44' is provided. The 11th area, which is the front area of the other side of the third flexible wall panel 53', is pressed with the 3 contact portion 43', and the other side of the third flexible wall panel 53' is pressed with the 4-4 contact portion 44'. The 3-2 gripping operation of pressing and gripping the twelfth area, which is the rear area of the , is performed.
상기 제2구동유닛(20')은 제3방향(C')에, 상호 이격된 제2-3접촉부(23')와 제2-4접촉부(24')가 구비되며, 상기 제2-3접촉부(23')로 상기 제4가벽패널(54')의 타측의 전면영역인 제13영역을 누르고, 상기 제2-4접촉부(24')로 상기 제4가벽패널(54')의 타측의 후면영역인 제14영역을 눌러 파지하는 제2-2파지동작을 수행한다.The second driving unit 20' is provided with a 2-3 contact part 23' and a 2-4 contact part 24' spaced apart from each other in a third direction (C'), and the 2-3 contact part 24' is provided. The contact portion 23' presses the 13th area, which is the front area of the other side of the fourth flexible wall panel 54', and the 2-4 contact portion 24' presses the other side of the fourth flexible wall panel 54'. A 2-2 gripping operation of pressing and gripping the 14th area, which is the rear area, is performed.
이러한 상기 제4구동유닛(40')은 제4방향(D')에, 상호 이격된 제4-3접촉부(43')와 제4-4접촉부(44')가 구비되며, 상기 제4-3접촉부(43')로 상기 제4가벽패널(54')의 타측의 전면영역인 제15영역을 누르고, 상기 제4-4접촉부(44')로 상기 제4가벽패널(54')의 타측의 후면영역인 제16영역을 눌러 파지하는 제4-2파지동작을 수행한다.The fourth driving unit 40' is provided with a 4-3 contact part 43' and a 4-4 contact part 44' spaced apart from each other in the fourth direction D', and the 4-3 contact part 44' is provided. The 15th area, which is the front area of the other side of the fourth flexible wall panel 54', is pressed with the third contact portion 43', and the other side of the fourth flexible wall panel 54' is pressed with the 4-4 contact portion 44'. The 4-2 gripping operation of pressing and gripping the 16th area, which is the rear area of the , is performed.
도 8, 9 및 도 10을 참조하면, 상기 제1가벽패널(51')은, 상기 제1영역에 제1자력돌기(T11')와, 상기 제1자력돌기(T11')와 이웃하는 제2자력돌기(T12')와, 상기 제2자력돌기(T12')와 이웃하는 제3자력돌기(T13')가 출몰식으로 구비된다.8, 9 and 10, the first removable wall panel 51' has a first magnetic protrusion T11' in the first area and a second adjacent to the first magnetic protrusion T11'. Two magnetic protrusions T12' and a third magnetic protrusion T13' adjacent to the second magnetic protrusion T12' are provided in a protruding and retracting manner.
상기 제2영역에 제4자력돌기(T14')와, 상기 제4자력돌기(T14')와 이웃하는 제5자력돌기(T15')와, 상기 제4자력돌기(T14')와 이웃하는 제6자력돌기(T16')가 출몰식으로 구비된다.The fourth magnetic protrusion T14' in the second area, the fifth magnetic protrusion T15' adjacent to the fourth magnetic protrusion T14', and the fourth magnetic protrusion T14' adjacent to the fourth magnetic protrusion T14'. Six magnetic projections (T16') are provided in a retractable manner.
상기 제1-1접촉부(11')는 내부에 상기 제1자력돌기(T11') 내지 상기 제3자력돌기(T13')에 대응하는 제1-1자성체(11a')가 구비되며, 상기 제1자력돌기(T11') 내지 상기 제3자력돌기(T13')는 상기 제1-1접촉부(11') 내부로 삽입된다.The 1-1 contact portion 11' is provided with 1-1
상기 제1-2접촉부(12')는 내부에 상기 제4자력돌기(T14') 내지 상기 제5자력돌기(T15')와 대응하는 제1-2자성체(12a')가 구비되고, 상기 제4자력돌기(T14') 내지 상기 제6자력돌기(T16')는 상기 제1-2접촉부(12') 내부로 삽입된다.The first-second contact portion 12' is provided with first-second
상기 제1-1자성체(11a')는, 상기 제1-1파지동작이 수행되는 경우, 상기 제1-1파지동작에 대응하여 상기 제1자력돌기(T11') 내지 상기 제3자력돌기(T13')와 인력이 발생되도록 자성이 설정되어 상기 제1-1파지동작의 결속력을 보강되도록 한다.When the 1-1 gripping operation is performed, the 1-1
상기 제1-2자성체(12a')는, 상기 제1-1파지동작이 수행되는 경우, 상기 제1-1파지동작에 대응하여 상기 제4자력돌기(T14') 내지 상기 제6자력돌기(T16')와 상호간에 인력이 발생되도록 자성이 설정되어 상기 제1-1파지동작의 결속력이 보강되도록 한다.When the 1-1 gripping operation is performed, the 1-2
여기서 상기 제1-1자성체(11a')는, 상기 제1-1파지동작과 반대되는 제1-1파지해제동작이 수행되는 경우, 상기 제1-1파지해제동작에 대응하여 상기 제1자력돌기(T11') 내지 상기 제3자력돌기(T13')와 척력이 발생되도록 자성이 설정되어, 상기 제1-1파지해제동작이 신속하게 수행되도록 한다.Here, the 1-1
아울러 상기 제1-2자성체(12a')는, 상기 제1-1파지동작과 반대되는 제1-1파지해제동작이 수행되는 경우, 상기 제1-1파지해제동작에 대응하여 상기 제4자력돌기(T14') 내지 상기 제6자력돌기(T16')와 척력이 발생되도록 자성이 설정되어, 상기 제1-1파지해제동작의 신속하게 수행되도록 한다.In addition, when the 1-1 gripping releasing operation opposite to the 1-1 gripping operation is performed, the 1-2
아울러 상기 제1지탱체(61')는, 상기 제1구동유닛(10')에 설치되는 제1지지구(61a')와, 상기 제1지지구(61a')의 단부에 구비되는 제1회동력제공부(61b')와, 상기 제1회동력제공부(61b')에 설치되고, 상기 제1가벽패널(51')에 삽입되는 제1삽입회전구(61c')가 구비된다.In addition, the first support member 61' includes a
상기 제2지탱체(62')는, 상기 제2구동유닛(20')에 설치되는 제2지지구(62a')와, 상기 제2지지구(62a')의 단부에 구비되는 제2회동력제공부(62b')와, 상기 제2회동력제공부(62b')에 설치되고, 상기 제2가벽패널(52')에 삽입되는 제2삽입회전구(62c')가 구비된다.The second support member 62' includes a
상기 제3지탱체(63')는, 상기 제3구동유닛(30')에 설치되는 제3지지구(63a')와, 상기 제3지지구(63a')의 단부에 구비되는 제3회동력제공부(63b')와, 상기 제3회동력제공부(63b')에 설치되고, 상기 제3가벽패널(53')에 삽입되는 제3삽입회전구(63c')가 구비된다. 상기 제4지탱체(64')는, 상기 제4구동유닛(40')에 설치되는 제4지지구(64a')와, 상기 제4지지구(64a')의 단부에 구비되는 제4회동력제공부(64b')와, 상기 제4회동력제공부(64b')에 설치되고, 상기 제4가벽패널(54')에 삽입되는 제4삽입회전구(64c')가 구비된다.The third support member 63' includes a
여기서 상기 제1삽입회전구(61c') 내지 상기 제4삽입회전구(64c')는 각각 상기 제1가벽패널(51') 내지 상기 제4가벽패널(54')에 삽입된 상태에서 회전구동됨으로써, 상기 지탱체구동유닛(60')을 상기 제1가벽패널(51') 내지 상기 제4가벽패널(54')과 연동고정시킨다.Here, the first inserting
아울러 상기 지탱체구동유닛(60')은, 이상상황 발생시, 상기 제1삽입회전구(61c') 내지 상기 제4삽입회전구(64c')를 매개로, 상기 제1가벽패널(51') 내지 상기 제4가벽패널(54')을 강제로 밀어내거나, 강제로 잡아당겨서, 상기 제1공간(S1') 내지 상기 제4공간의 범위를 확장 혹은 축소되도록 한다.In addition, when an abnormal situation occurs, the support body driving unit 60', via the first
상기 지탱체구동유닛(60')은, 내부와 외부 간에 출몰하며, 상기 제1공간(S1')에 대하여 히팅 혹은 냉각을 위한 유체를 분사하는 제1기체분사부(71')와, 내부와 외부 간에 출몰하며, 상기 제2공간(S2')에 대하여 히팅 혹은 냉각을 위한 유체를 분사하는 제2기체분사부(72')와, 내부와 외부 간에 출몰하며, 상기 제3공간(S3')에 대하여 히팅 혹은 냉각을 위한 유체를 분사하는 제3기체분사부(73')와, 내부와 외부 간에 출몰하며, 상기 제4공간에 대하여 히팅 혹은 냉각을 위한 유체를 분사하는 제4기체분사부(74')를 포함한다. 아울러 상기 가구조물은 상부 전체 혹은 일부를 덮는 덮개패널이 장착될 수 있다. 이를 통해 내부의 온도조건을 보다 용이하게 조성되도록 한다. The support body drive unit 60', which protrudes between the inside and outside, and the first gas injection unit 71' for injecting a fluid for heating or cooling to the first space S1', The second gas injection unit 72', which appears between the outside and injects a fluid for heating or cooling with respect to the second space S2', and the third space S3', which appears between the inside and the outside. A third
그러므로 본 발명은 변압기와 특고압 배전선로의 낙뢰 방지 설비를 설치하는 과정에서 해당 작업자들이 환경적 요인에 대해서 자유롭게 안전하게 휴식을 취할 수 있는 구조물이 해당 설비 구축(설치) 과정에 제공되어 이용되도록 하고, 또한, 관련 자재와 작업도구 등을 보관하고 이용할 수 있도록 하는 구조물을 제공하며, 또한, 해당 작업자에게 작업하기 적합한 냉방 환경과 작업하기 적합한 난방 환경을 제공하여 작업자의 작업효율을 높이고 또한, 상기 설비를 설치하는데 소요되는 각종 기자재 및 설비 등이 포함되는 대상물을 외부의 부당한 침입자로부터 보호하여 도난당하는 것을 방지하도록 하고 또한, 상기 구조물이 형성하는 면적의 확장과 축소가 가능하여, 내부에 수용되는 대상물의 수량과 작업자의 인원에 대응하는 최적화된 공간 조성이 가능하게 하고 또한, 작업자가 작업하는 구조물의 내부 면적 또는 용적 또는 공간을 축소시켜 난방 또는 냉방이 신속하게 이루어지고, 냉방 또는 난방의 효율성도 높이며 또한, 구조물의 가벽패널이 수동식 혹은 전동식으로 유동되고, 비상상황 발생시에는 이러한 유동이 제한되는 것을 방지하는 강제적 유동 수단이 수반되어, 해당 작업자의 작업환경이 안전하게 조성되도록 하는 등의 장점이 있다.Therefore, in the present invention, in the process of installing lightning protection equipment for transformers and extra-high voltage distribution lines, a structure in which workers can freely and safely rest against environmental factors is provided and used in the process of constructing (installing) the equipment, In addition, it provides a structure for storing and using related materials and work tools, and also provides a cooling environment suitable for working and a heating environment suitable for working to the worker, thereby increasing the work efficiency of the worker, and It protects objects, including various equipment and facilities required for installation, from outside intruders to prevent them from being stolen, and also allows the expansion and contraction of the area formed by the structure, so the number of objects accommodated inside It enables the creation of an optimized space corresponding to the number of workers and workers, and also reduces the internal area or volume or space of the structure where the worker works, so that heating or cooling is performed quickly, and the efficiency of cooling or heating is also increased. The temporary wall panel of the structure is moved manually or electrically, and in the event of an emergency, it is accompanied by a forced flow means to prevent such flow from being restricted, so that the working environment of the worker can be safely created.
도 10을 참조하면 상기 제1가벽패널(51') 내지 상기 제4가벽패널(54')의 타입은 패널 자체에 평면형과 타공형 등으로 다양하게 구비되는 것이 가능하다. Referring to FIG. 10, the first flexible wall panel 51' to the fourth flexible wall panel 54' may be provided in various types such as a flat type and a perforated type on the panel itself.
이상에서 전술한 물리적 구성들의 구동방식은 모터, 엑츄에이터 등을 기반으로 전후유동, 회전이동이 이루어지며 각 구성부의 형상과 크기는 설치 현장과 구현하고자하는 자재들에 따라 다양하게 선택되어 구비될 수 있다. 본 발명은 도면에 도시된 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의하여 정해져야 할 것이다The driving method of the physical components described above is forward-backward movement and rotational movement based on motors, actuators, etc., and the shape and size of each component can be selected and provided in various ways depending on the installation site and the materials to be implemented. . Although the present invention has been described with reference to the embodiments shown in the drawings, this is only exemplary, and those skilled in the art will understand that various modifications and equivalent other embodiments are possible therefrom. Therefore, the true technical protection scope of the present invention should be determined by the technical spirit of the appended claims.
본 발명은 도면에 도시된 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의하여 정해져야 할 것이다. Although the present invention has been described with reference to the embodiments shown in the drawings, this is only exemplary, and those skilled in the art will understand that various modifications and equivalent other embodiments are possible therefrom. Therefore, the true technical scope of protection of the present invention should be determined by the technical spirit of the appended claims.
100: 완금 200: LP애자
300: 피뢰기 100: complete 200: LP insulator
300: arrester
Claims (2)
배전선로의 낙뢰 방지 설비의 가공배전선 고정기기가 준비되는 단계; 상기 가공배전선 고정기기의 구축을 위한 현장 작업자, 작업도구, 설치장비 및 부품요소가 위치되는 가구조물이 설치되는 단계;
상기 부품요소가 설치되어, 상기 배전선로 이상검출 시스템이 구축되는 단계를 포함하고,
상기 부품요소는,
접지라인(GL)을 갖춘 전주(P)의 상단부에 설치되는 완금(100); 완금(100)의 양단부에 각각 설치되어 가공배전선(L)과 완금(100) 사이를 절연하는 LP애자(200)로 구성된 가공배전선 고정기기로서, 상기 전주(P) 상단에 설치되며 외부로 노출되는 피뢰라인(PL)을 구비하는 꼬깔모양의 피뢰기(300);를 포함하고,
상기 가구조물이 설치되는 단계는,
제1구동유닛(10')과, 제2구동유닛(20'), 제3구동유닛(30') 및 제4구동유닛(40')이 구비되는 단계; 상기 제1구동유닛(10')과 상기 제2구동유닛(20') 사이에 제1가벽패널(51')이 구비되는 단계; 상기 제3구동유닛(30')과 상기 제4구동유닛(40') 사이에 제2가벽패널(52')이 구비되는 단계; 상기 제1구동유닛(10')과 상기 제3구동유닛(30') 사이에 제3가벽패널(53')이 구비되는 단계; 및 상기 제2구동유닛(20')과 상기 제4구동유닛(40') 사이에 제4가벽패널(54')이 구비되는 단계를 포함하되,
상기 제1가벽패널(51') 내지 상기 제4가벽패널(54')은 내부공간(S')을 형성하도록 둘레부로 배치되며, 상기 내부공간(S')은 상기 현장 작업자가, 상기 작업도구, 상기 설치장비가 위치되고,
상기 가구조물이 설치되는 단계는,
상기 제1가벽패널(51')이 상기 제1구동유닛(10')과 상기 제2구동유닛(20') 사이에서, 상기 내부공간(S')의 외부측을 향하여, 슬라이딩 방식으로 이동하여, 상기 내부공간(S')이 1차확장되도록 하는 제1확장단계와,
상기 제2가벽패널(52')이 상기 제3구동유닛(30')과 상기 제4구동유닛(40') 사이에서, 상기 내부공간(S')의 외부측으로 슬라이딩 방식으로 이동하여, 상기 내부공간(S')이 2차확장되도록 하는 제2확장단계와,
상기 제3가벽패널(53')이 상기 제1구동유닛(10')과 상기 제3구동유닛(30') 사이에서, 상기 내부공간(S')의 외부측으로 슬라이딩 방식으로 이동하여, 상기 내부공간(S')이 3차확장되도록 하는 제3확장단계와,
상기 제4가벽패널(54')이 상기 제2구동유닛(20')과 상기 제4구동유닛(40') 사이에서, 상기 내부공간(S')의 외부측으로 슬라이딩 방식으로 이동하여, 상기 내부공간(S')이 4차확장되도록 하는 제4확장단계를 포함하되,
상기 내부공간(S')에의 중앙부에 위치된 지탱체구동유닛(60')이, 봉형상의 제1지탱체(61')를 상기 제1가벽패널(51')을 항햐여 전진시켜 상기 제1가벽패널(51')을 지탱시키는 제1지탱단계와,
상기 지탱체구동유닛(60')이, 봉형상의 제2지탱체(62')를 상기 제2가벽패널(52')을 항햐여 전진시켜 상기 제2가벽패널(52')을 지탱시키는 제2지탱단계와,
상기 지탱체구동유닛(60')이, 봉형상의 제3지탱체(63')를 상기 제3가벽패널(53')을 항햐여 전진시켜 상기 제3가벽패널(53')을 지탱시키는 제3지탱단계와,
상기 지탱체구동유닛(60')이, 봉형상의 제4지탱체(64')를 상기 제4가벽패널(54')을 항햐여 전진시켜 상기 제4가벽패널(54')을 지탱시키는 제4지탱단계를 더 포함하되,
상기 제1가벽패널(51') 내지 상기 제4가벽패널(54')은 상기 제1지탱체(61') 내지 상기 제4지탱체(64')를 통해 외부로부터 상기 내부공간(S')측을 향하여 가해지는 충격을 방어하도록 구비되며,
상기 내부공간(S')은,
상기 제1지탱체(61')와 상기 제3지탱체(63')에 의하여 구획되는 제1공간(S1')과, 상기 제1지탱체(61')와 상기 제4지탱체(64')에 의하여 구획되는 제2공간(S2')과, 상기 제2지탱체(62')와 상기 제3지탱체(63')에 의하여 구획되는 제3공간(S3')과, 상기 제2지탱체(62')와 상기 제4지탱체(64')에 의하여 구획되는 제4공간(S4')을 포함하며,
상기 제1공간(S1') 내지 상기 제4공간(S4')에는 상기 현장 작업자, 작업도구, 설치장비, 공사장비가 복합적으로 혹은 구분되어 위치되되,
상기 제1구동유닛(10')은 제1방향(A')에, 상호 이격된 제1-1접촉부(11')와 제1-2접촉부(12')가 구비되며, 상기 제1-1접촉부(11')로 상기 제1가벽패널(51')의 일측의 전면영역인 제1영역을 누르고, 상기 제1-2접촉부(12')로 상기 제1가벽패널(51')의 일측의 후면영역인 제2영역을 누르는 제1-1파지동작을 수행하고,
상기 제2구동유닛(20')은 제2방향(B')에, 상호 이격된 제2-1접촉부(21')와 제2-2접촉부(22')가 구비되며, 상기 제2-1접촉부(21')로 상기 제1가벽패널(51')의 타측의 전면영역인 제3영역을 누르고, 상기 제2-2접촉부(22')로 상기 제1가벽패널(51')의 타측의 후면영역인 제4영역을 누르는 제2-1파지동작을 수행하며,
상기 제3구동유닛(30')은 제1방향(A')에, 상호 이격된 제3-1접촉부(31')와 제3-2접촉부(32')가 구비되며, 상기 제3-1접촉부(31')로 상기 제2가벽패널(52')의 타측의 전면영역인 제5영역을 누르고, 상기 제3-2접촉부(32')로 상기 제2가벽패널(52')의 타측의 후면영역인 제6영역을 눌러 파지하는 제3-1파지동작을 수행하고,
상기 제4구동유닛(40')은 제2방향(B')에, 상호 이격된 제4-1접촉부(41')와 제4-2접촉부(42')가 구비되며, 상기 제4-1접촉부(41')로 상기 제2가벽패널(52')의 타측의 전면영역인 제7영역을 누르고, 상기 제4-2접촉부(42')로 상기 제2가벽패널(52')의 타측의 후면영역인 제8영역을 눌러 파지하는 제4-1파지동작을 수행하며,
상기 제1구동유닛(10')은 제3방향(C')에, 상호 이격된 제1-3접촉부(13')와 제1-4접촉부(14')가 구비되며, 상기 제1-3접촉부(13')로 상기 제3가벽패널(53')의 타측의 전면영역인 제9영역을 누르고, 상기 제1-4접촉부(14')로 상기 제3가벽패널(53')의 타측의 후면영역인 제10영역을 눌러 파지하는 제1-2파지동작을 수행하고,
상기 제3구동유닛(30')은 제4방향(D')에, 상호 이격된 제4-3접촉부(43')와 제4-4접촉부(44')가 구비되며, 상기 제4-3접촉부(43')로 상기 제3가벽패널(53')의 타측의 전면영역인 제11영역을 누르고, 상기 제4-4접촉부(44')로 상기 제3가벽패널(53')의 타측의 후면영역인 제12영역을 눌러 파지하는 제3-2파지동작을 수행하며,
상기 제2구동유닛(20')은 제3방향(C')에, 상호 이격된 제2-3접촉부(23')와 제2-4접촉부(24')가 구비되며, 상기 제2-3접촉부(23')로 상기 제4가벽패널(54')의 타측의 전면영역인 제13영역을 누르고, 상기 제2-4접촉부(24')로 상기 제4가벽패널(54')의 타측의 후면영역인 제14영역을 눌러 파지하는 제2-2파지동작을 수행하고,
상기 제4구동유닛(40')은 제4방향(D')에, 상호 이격된 제4-3접촉부(43')와 제4-4접촉부(44')가 구비되며, 상기 제4-3접촉부(43')로 상기 제4가벽패널(54')의 타측의 전면영역인 제15영역을 누르고, 상기 제4-4접촉부(44')로 상기 제4가벽패널(54')의 타측의 후면영역인 제16영역을 눌러 파지하는 제4-2파지동작을 수행하는, 변압기와 특고압 배전선로의 낙뢰 방지 설비 설치방법. In the method of installing lightning protection equipment for transformers and extra-high voltage distribution lines,
preparing an overhead distribution line fixing device of a lightning protection facility of a distribution line; Installing a furniture structure in which field workers, work tools, installation equipment, and component elements for constructing the overhead distribution line fixing device are located;
Including the step of installing the component element and constructing the distribution line abnormality detection system,
The component elements,
Wangeum 100 installed on the upper end of the electric pole (P) with the ground line (GL); An overhead distribution line fixing device composed of LP insulators 200 installed at both ends of the wangeum 100 to insulate between the overhead distribution line L and the wangeum 100, installed at the top of the pole P and exposed to the outside A cone-shaped lightning arrester 300 having a lightning protection line (PL); includes,
The step of installing the furniture structure,
providing a first driving unit 10', a second driving unit 20', a third driving unit 30', and a fourth driving unit 40'; providing a first flexible wall panel 51' between the first driving unit 10' and the second driving unit 20'; providing a second flexible wall panel (52') between the third driving unit (30') and the fourth driving unit (40'); providing a third flexible wall panel (53') between the first driving unit (10') and the third driving unit (30'); and providing a fourth temporary wall panel 54' between the second driving unit 20' and the fourth driving unit 40',
The first flexible wall panel 51' to the fourth flexible wall panel 54' are arranged around the periphery to form an inner space S', and the inner space S' is the work tool used by the field worker. , the installation equipment is located,
The step of installing the furniture structure,
The first removable wall panel 51' moves between the first driving unit 10' and the second driving unit 20' toward the outside of the inner space S' in a sliding manner, , A first expansion step of allowing the inner space (S') to be first expanded,
The second removable wall panel 52' moves between the third driving unit 30' and the fourth driving unit 40' in a sliding manner to the outside of the inner space S', A second expansion step in which the space S' is secondarily expanded;
The third removable wall panel 53' moves between the first driving unit 10' and the third driving unit 30' in a sliding manner to the outside of the inner space S', A third expansion step in which the space (S') is expanded in a third order;
The fourth temporary wall panel 54' moves between the second driving unit 20' and the fourth driving unit 40' in a sliding manner to the outside of the inner space S', Including a fourth expansion step so that the space (S ') is expanded fourth,
The support body drive unit 60' located in the central portion of the inner space S' advances the rod-shaped first support body 61' along the first flexible wall panel 51' to move the first support body 61' forward. A first supporting step of supporting the temporary wall panel 51';
The support body drive unit 60' moves the rod-shaped second support body 62' along the second flexible wall panel 52' to support the second flexible wall panel 52'. sustain stage,
The support body drive unit 60' moves the rod-shaped third support body 63' along the third flexible wall panel 53' to support the third flexible wall panel 53'. sustain stage,
The support body driving unit 60' moves the rod-shaped fourth support body 64' along the fourth flexible wall panel 54' to support the fourth flexible wall panel 54'. It further includes a support step,
The first flexible wall panel 51' to the fourth flexible wall panel 54' extend through the first support body 61' to the fourth support body 64' from the outside to the inner space S'. It is provided to protect the impact applied toward the side,
The inner space (S ') is,
The first space S1' partitioned by the first support member 61' and the third support member 63', and the first support member 61' and the fourth support member 64' ), a second space (S2') partitioned by, a third space (S3') partitioned by the second support body (62') and the third support body (63'), and the second support body (63'). It includes a fourth space (S4') partitioned by the body (62') and the fourth support body (64'),
In the first space (S1 ') to the fourth space (S4'), the field workers, work tools, installation equipment, and construction equipment are located in a complex or separate manner,
The first driving unit 10' is provided with a 1-1 contact part 11' and a 1-2 contact part 12' spaced apart from each other in a first direction A', and the 1-1 The contact portion 11' presses the first area, which is the front area of one side of the first flexible wall panel 51', and the first-second contact portion 12' presses the first area on one side of the first flexible wall panel 51'. The 1-1 gripping operation of pressing the second area, which is the rear area, is performed,
The second driving unit 20' is provided with a 2-1 contact part 21' and a 2-2 contact part 22' spaced apart from each other in the second direction (B'), and the 2-1 The contact part 21' presses the third area, which is the front area of the other side of the first flexible wall panel 51', and the 2-2 contact part 22' presses the other side of the first flexible wall panel 51'. The 2-1 gripping operation of pressing the fourth area, which is the rear area, is performed,
The third driving unit 30' is provided with a 3-1 contact part 31' and a 3-2 contact part 32' spaced apart from each other in the first direction A', and the 3-1 contact part 32' is provided. The fifth region, which is the front region of the other side of the second flexible wall panel 52', is pressed with the contact portion 31', and the 3-2 contact portion 32' presses the other side of the second flexible wall panel 52'. The 3-1 gripping operation of pressing and gripping the 6th area, which is the rear area, is performed,
The fourth driving unit 40' is provided with a 4-1 contact part 41' and a 4-2 contact part 42' spaced apart from each other in the second direction (B'), and the 4-1 The seventh area, which is the front area of the other side of the second flexible wall panel 52', is pressed with the contact portion 41', and the 4-2 contact portion 42' is used to press the other side of the second flexible wall panel 52'. The 4-1 gripping operation of pressing and gripping the eighth area, which is the rear area, is performed,
The first driving unit 10' is provided with a 1-3 contact part 13' and a 1-4 contact part 14' spaced apart from each other in a third direction C', and the 1-3 contact part 14' is provided. The contact portion 13' presses the ninth area, which is the front area of the other side of the third flexible wall panel 53', and the 1-4 contact portion 14' presses the other side of the third flexible wall panel 53'. 1-2 gripping operations of pressing and gripping the tenth area, which is the rear area, are performed;
The third driving unit 30' is provided with a 4-3 contact part 43' and a 4-4 contact part 44' spaced apart from each other in the fourth direction D', and the 4-3 contact part 44' is provided. The contact part 43' presses the 11th area, which is the front area of the other side of the third flexible wall panel 53', and the 4-4 contact part 44' presses the other side of the third flexible wall panel 53'. The 3-2 gripping operation of pressing and gripping the twelfth area, which is the rear area, is performed,
The second driving unit 20' is provided with a 2-3 contact part 23' and a 2-4 contact part 24' spaced apart from each other in a third direction (C'), and the 2-3 contact part 24' is provided. The contact part 23' presses the 13th area, which is the front area of the other side of the fourth flexible wall panel 54', and the 2-4 contact part 24' presses the other side of the fourth flexible wall panel 54'. A 2-2 gripping operation of pressing and gripping the 14th area, which is the rear area, is performed;
The fourth driving unit 40' is provided with a 4-3 contact part 43' and a 4-4 contact part 44' spaced apart from each other in the fourth direction D', and the 4-3 contact part 44' is provided. The contact portion 43' presses the 15th area, which is the front area of the other side of the fourth flexible wall panel 54', and the 4-4 contact portion 44' presses the other side of the fourth flexible wall panel 54'. A method of installing lightning protection equipment for transformers and extra-high voltage distribution lines, performing the 4-2 gripping operation of pressing and holding the 16th area, which is the rear area.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020230013035A KR102554701B1 (en) | 2023-01-31 | 2023-01-31 | Installation method of lightning protection equipment for transformers and extra-high voltage distribution lines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020230013035A KR102554701B1 (en) | 2023-01-31 | 2023-01-31 | Installation method of lightning protection equipment for transformers and extra-high voltage distribution lines |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102554701B1 true KR102554701B1 (en) | 2023-07-12 |
Family
ID=87163768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020230013035A KR102554701B1 (en) | 2023-01-31 | 2023-01-31 | Installation method of lightning protection equipment for transformers and extra-high voltage distribution lines |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102554701B1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030065195A (en) * | 2002-01-31 | 2003-08-06 | 동일계기주식회사 | A Earth Leakage Detector and Alarm |
KR101394093B1 (en) * | 2013-02-13 | 2014-05-30 | 한국에너지기술연구원 | Extensible temporary construction building |
KR102238683B1 (en) * | 2020-11-23 | 2021-04-08 | 장경섭 | Internal space expansion device for camping car |
KR102246336B1 (en) * | 2020-09-18 | 2021-04-29 | 주식회사 라이컨기술단 | Overhead distribution line support facility equipped with overhead distribution line connection clamps |
KR102398546B1 (en) * | 2021-11-16 | 2022-05-17 | 주식회사 백두 | Lightning damage prevention type overhead distribution line fixing device |
-
2023
- 2023-01-31 KR KR1020230013035A patent/KR102554701B1/en active IP Right Grant
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030065195A (en) * | 2002-01-31 | 2003-08-06 | 동일계기주식회사 | A Earth Leakage Detector and Alarm |
KR101394093B1 (en) * | 2013-02-13 | 2014-05-30 | 한국에너지기술연구원 | Extensible temporary construction building |
KR102246336B1 (en) * | 2020-09-18 | 2021-04-29 | 주식회사 라이컨기술단 | Overhead distribution line support facility equipped with overhead distribution line connection clamps |
KR102238683B1 (en) * | 2020-11-23 | 2021-04-08 | 장경섭 | Internal space expansion device for camping car |
KR102398546B1 (en) * | 2021-11-16 | 2022-05-17 | 주식회사 백두 | Lightning damage prevention type overhead distribution line fixing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102398546B1 (en) | Lightning damage prevention type overhead distribution line fixing device | |
EP1970915A2 (en) | Electric power cable fixing apparatus for an insulator | |
KR100835679B1 (en) | Cable coaming device | |
KR101621744B1 (en) | Protecting pipe of ground electric power distribution line | |
EP3668746A1 (en) | Charging station and method for installing a charging station | |
CN105826883A (en) | Line fixing mechanism | |
CN105790191A (en) | Terminal wire fastening device assembly | |
KR102554701B1 (en) | Installation method of lightning protection equipment for transformers and extra-high voltage distribution lines | |
KR102377571B1 (en) | Insulation connecting equipment of underground power line | |
KR102536227B1 (en) | Cable fixing system of underground transmission line and its construction management method | |
KR102391556B1 (en) | Providing method of a replacement system for distribution lines | |
KR20240113730A (en) | Portable supporting device for lifting termination box | |
KR102560520B1 (en) | Installation method of distribution line protection system for overhead power cable in mountainous area | |
CN105811342A (en) | Rolling contact wire fixing device | |
KR102546494B1 (en) | Installation method of earth leakage monitoring system of distribution line where transformer is installed | |
CN106207518A (en) | A kind of articulating device of high-voltage resin busbar joint | |
CN205610162U (en) | Terminal thread fixing device subassembly | |
KR102640868B1 (en) | providing method for earth leakage blocking system for distribution lines | |
KR20190139074A (en) | Holding apparatus of protective cover | |
KR102634013B1 (en) | providing method for earth leakage blocking system for distribution lines | |
KR102173375B1 (en) | Uninterruptible power method and lndirect live lifting device for Electronic polefor power line | |
KR102093601B1 (en) | Apparatus for connecting protective cover | |
CN210779582U (en) | High fire control electrical control cabinet of security | |
CN211829225U (en) | Self-adaptive temporary grounding wire | |
KR100977317B1 (en) | Connecting apparatus for distributing board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |