KR102449915B1 - Earth plate leveling device for rock crushing protection facility and construction method of rock crushing protection facility using the same - Google Patents

Earth plate leveling device for rock crushing protection facility and construction method of rock crushing protection facility using the same Download PDF

Info

Publication number
KR102449915B1
KR102449915B1 KR1020220036365A KR20220036365A KR102449915B1 KR 102449915 B1 KR102449915 B1 KR 102449915B1 KR 1020220036365 A KR1020220036365 A KR 1020220036365A KR 20220036365 A KR20220036365 A KR 20220036365A KR 102449915 B1 KR102449915 B1 KR 102449915B1
Authority
KR
South Korea
Prior art keywords
earth plate
beams
leveling device
length
protection facility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
KR1020220036365A
Other languages
Korean (ko)
Inventor
서동명
Original Assignee
라파이엔씨 주식회사
서동명
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 라파이엔씨 주식회사, 서동명 filed Critical 라파이엔씨 주식회사
Priority to KR1020220036365A priority Critical patent/KR102449915B1/en
Application granted granted Critical
Publication of KR102449915B1 publication Critical patent/KR102449915B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00—Excavations; Bordering of excavations; Making embankments
    • E02D17/02—Foundation pits
    • E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00—Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04—Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
    • E01F7/045—Devices specially adapted for protecting against falling rocks, e.g. galleries, nets, rock traps
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00—Excavations; Bordering of excavations; Making embankments
    • E02D17/06—Foundation trenches ditches or narrow shafts
    • E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00—Geometrical or physical properties
    • E02D2200/15—Geometrical or physical properties including at least a hinge
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00—Temporary installations or constructions
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00—Miscellaneous
    • E02D2600/20—Miscellaneous comprising details of connection between elements
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23—Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Shovels (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명은 토류판이 수평을 이루도록 쉽게 설치할 수 있고, 토류판과 바닥면 사이에 이격된 틈이 형성되지 않도록 하는 암파쇄 방호시설용 토류판 수평조절장치 및 이를 이용한 암파쇄 방호시설 시공방법에 관한 것이다.
상기의 과제를 해결하기 위한 본 발명에 따른 암파쇄 방호시설용 토류판 수평조절장치는, 소정 간격을 두고 설치되는 한 쌍의 H빔 사이의 바닥에 소정 길이를 가지는 빔부재로 이루어지고, 상기 빔부재의 일단 부분에는, 나사 조립에 의해 상단의 높이가 조절되는 높이조절볼트가 설치되며, 토류판이 상기 빔부재 위에 안착된 다음, 상기 높이조절볼트를 이용하여 상기 토류판 일단 저면의 높이를 조절하는 것으로 상기 토류판의 수평을 조절함과 동시에 상기 토류판과 바닥 사이의 틈이 상기 빔부재를 통해 커버되도록 구성되는 것을 특징으로 한다.
The present invention relates to an earth plate leveling device for a rock shredding protection facility that can be easily installed so that the earth plate is horizontal and prevents a spaced gap between the earth plate and the floor from being formed, and a method for constructing a dark shredding protection facility using the same.
To solve the above problems, the earth plate leveling device for a rock crushing protection facility according to the present invention consists of a beam member having a predetermined length on the floor between a pair of H-beams installed at a predetermined interval, and At one end, a height adjustment bolt for adjusting the height of the upper end by screw assembly is installed, and after the earth plate is seated on the beam member, the earth plate is adjusted to the height of one end of the earth plate by using the height adjustment bolt. It is characterized in that it is configured such that the gap between the earth plate and the floor is covered through the beam member while simultaneously adjusting the level of the .

Description

암파쇄 방호시설용 토류판 수평조절장치 및 이를 이용한 암파쇄 방호시설 시공방법{Earth Retaining Plate Leveling Device for Rock Crushing Protection Facility and Construction Method of Rock Crushing Protection Facility using the same}Earth Retaining Plate Leveling Device for Rock Crushing Protection Facility and Construction Method of Rock Crushing Protection Facility using the same}

본 발명은 암파쇄 방호시설용 토류판 수평조절장치 및 이를 이용한 암파쇄 방호시설 시공방법에 관한 것으로, 더욱 상세하게는 도로 변을 따라 설치되어 절토사면 보강 작업시 절토사면에서 흘러내리는 흙이나 암석 등이 도로를 통행하는 차량에 위험요소로 작용하는 것을 방지하기 위해 설치되는 암파쇄 방호시설에 있어서, 토류벽을 수평으로 설치하여 토압을 지지하는 힘을 충분히 발휘할 수 있도록 하는 암파쇄 방호시설용 토류판 수평조절장치 및 이를 이용한 암파쇄 방호시설 시공방법에 관한 것이다.The present invention relates to an earth plate leveling device for a rock crushing protection facility and a method for constructing a rock crushing protection facility using the same. In the rock shredding protection facility installed to prevent acting as a risk factor for vehicles passing through the It relates to the construction method of the rock crushing protection facility used.

일반적으로 절토사면의 안정화 시공시 도로변을 따라 암파쇄 방호시설이 설치되어 토사 및 낙석 등에 의해 도로를 주행하는 차량의 안전이 저해되지 않도록 하고 있다.In general, rock crushing protection facilities are installed along the roadside during the stabilization of the cut slope to prevent the safety of vehicles traveling on the road from being impaired by soil and falling rocks.

이러한 암파쇄 방호시설의 종래 기술로는 등록특허공보 제2244853호의 암파쇄 방호벽 및 그 시공방법(이하 '특허문헌'이라 한다)이 개시되어 있다.As a prior art of such a dark shattering protection facility, there is disclosed a dark shattering protection wall and its construction method (hereinafter referred to as 'patent document') of Korean Patent Publication No. 2244853.

상기 특허문헌에 개시된 암파쇄 방호벽은 도로를 따라 상호 일정간격 이격되도록 구비되며 양측에는 결합홈이 형성된 복수개의 지주와, 양단이 상기 결합홈에 결합되어 상기 지주 사이의 공간을 막도록 된 방호벽체를 포함하는 암파쇄 방호벽에 있어서, 상기 방호벽체는 측방향으로 연장되며 양단이 상기 지주의 결합홈에 삽입되는 복수개의 지지부재를 상호 상하방향으로 적층하여 구성되고, 상기 지지부재는 측방향으로 연장되며 양단이 상기 지주의 결합홈에 삽입되는 지지판과, 상기 지지판의 전면에 구비되며 양단이 상기 지지판에 측방향으로 유동되도록 고정 결합된 탄성판과, 상기 지지판의 전면 양측에 구비되어 상기 탄성판의 양단을 지지하는 댐퍼를 포함하고, 상기 지지부재의 양단 전후면에 밀착되어 상기 결합홈에 삽입된 지지부재의 양단이 전후방향으로 유동되지 않으면서 지지부재에 가해지는 충격을 흡수하도록 된 고무재질의 전후방 탄성부재를 포함하며, 상기 지지판의 양단 전면에는 전방으로 연장된 나사축이 구비되고, 상기 탄성판은 측방향으로 연장되며 중앙부는 전방으로 돌출되도록 라운드지게 구성되고 양단에는 측방향으로 연장된 연장부가 형성되며, 상기 연장부에는 상기 나사축이 관통하는 장공이 측방향으로 연장되도록 형성되어, 상기 나사축이 장공을 관통하도록 탄성판을 결합하고, 상기 나사축의 전단부에 너트를 결합하여 조임으로써, 상기 탄성판의 양단이 상기 지지판에 측방향으로 유동되도록 고정 결합되는 것으로 이루어진다.The dark fracture protection wall disclosed in the patent document is provided to be spaced apart from each other at a predetermined distance along the road, and a plurality of posts having coupling grooves formed on both sides thereof, and a protective wall having both ends coupled to the coupling grooves to block the space between the posts. In the arm fracture protection wall comprising, the protection wall is configured by stacking a plurality of support members extending in the lateral direction and having both ends inserted into the coupling grooves of the posts in an up-down direction with each other, the support members extending in the lateral direction, A support plate having both ends inserted into the coupling groove of the support plate, an elastic plate provided on the front surface of the support plate and fixedly coupled so that both ends flow in the lateral direction to the support plate, and both ends of the elastic plate provided on both sides of the front surface of the support plate It includes a damper for supporting the support member, and is closely attached to the front and rear surfaces of both ends of the support member so that both ends of the support member inserted into the coupling groove do not flow in the front and rear directions and absorb the impact applied to the support member. It includes an elastic member, the front side of both ends of the support plate is provided with screw shafts extending forward, the elastic plate is extended in the lateral direction, the central portion is configured to be rounded so as to protrude forward, and extended portions extending in the lateral direction at both ends The extension is formed so that a long hole through which the screw shaft passes is extended in the lateral direction, and an elastic plate is coupled so that the screw shaft passes through the long hole, and a nut is coupled to the front end of the screw shaft and tightened, Both ends of the elastic plate are fixedly coupled to the support plate to flow in the lateral direction.

이와 같이 종래의 암파쇄 방호시설은 토류판과 H빔의 결합을 통해 토사 및 낙석 등을 효과적으로 지지하도록 구성된다.As described above, the conventional rock crushing protection facility is configured to effectively support the soil and rocks through the combination of the earth plate and the H-beam.

그러나 일반적으로 절토사면이 형성된 도로의 경우 지형적으로 경사진 곳이 많고, 이 때문에 수직으로 설치되는 H빔 사이를 수평으로 연결하도록 토류판이 설치되게 되면, 자연스럽게 토류판의 하단과 바닥 사이에 틈이 형성되게 된다.However, in general, in the case of roads with cut slopes, there are many topographically inclined places, and for this reason, when earth plates are installed to horizontally connect between H-beams installed vertically, a gap is naturally formed between the bottom of the earth plate and the floor. do.

이러한 틈으로 토사 등이 도로로 유출되어 교통사고의 위험이 있고, 배면 쪽에 공극이 형성되게 되며, 따라서 토류판과 바닥 사이의 틈을 골재 등으로 메꾸는 작업이 요구되는 문제가 있다.There is a risk of a traffic accident by leaking soil and the like into the road through these gaps, and a void is formed on the back side.

또한, 토류판을 수평으로 설치하기 위해 크레인 등을 이용하여 토류판을 공중에 띄워 놓은 상태에서 작업자가 수평을 맞추어 H빔에 볼트 등으로 고정해야 하므로 작업시 안전사고 발생의 위험이 있고, 이와 동시에 작업 시간이 증가되는 문제가 있다.In addition, in order to install the earth plate horizontally, there is a risk of safety accidents during work because the operator has to level the earth plate in the air using a crane and fix it to the H-beam with bolts, etc. There is an increasing problem with this.

따라서 토류판을 수평으로 쉽게 설치할 수 있으면서 도로의 경사에 따른 토류판과 바닥면 사이에 틈이 형성되지 않도록 하는 토류판 수평조절장치 및 이를 이용한 암파쇄 방호시설 시공방법의 개발이 요구된다.Therefore, it is required to develop an earth plate leveling device that can easily install the earth plate horizontally and prevent a gap between the earth plate and the floor surface according to the slope of the road, and a method for constructing a rock crushing protection facility using the same.

KR 10-2244853 B1 (2021. 04. 21.)KR 10-2244853 B1 (2021. 04. 21.) KR 10-2243450 B1 (2021. 04. 16.)KR 10-2243450 B1 (2021. 04. 16.) KR 10-2240831 B1 (2021. 04. 09.)KR 10-2240831 B1 (2021. 04. 09.) KR 10-2136260 B1 (2020. 07. 15.)KR 10-2136260 B1 (2020. 07. 15.)

본 발명은 상기와 같은 종래의 암파쇄 방호시설 및 그 시공방법이 가지는 문제점을 해결하기 위해 안출된 것으로, 본 발명이 해결하고자 하는 과제는 토류판이 수평을 이루도록 쉽게 설치할 수 있고, 토류판과 바닥면 사이에 이격된 틈이 형성되지 않도록 하는 암파쇄 방호시설용 토류판 수평조절장치 및 이를 이용한 암파쇄 방호시설 시공방법을 제공하는 것이다.The present invention has been devised to solve the problems of the conventional rock shredding protection facility and its construction method as described above. It is to provide an earth plate leveling device for a rock shredding protection facility that prevents the formation of a spaced gap in the slab and a method for constructing a rock fracturing protection facility using the same.

상기의 과제를 해결하기 위한 본 발명에 따른 암파쇄 방호시설용 토류판 수평조절장치는, 소정 간격을 두고 설치되는 한 쌍의 H빔 사이의 바닥에 소정 길이를 가지는 빔부재로 이루어지고, 상기 빔부재의 일단 부분에는, 나사 조립에 의해 상단의 높이가 조절되는 높이조절볼트가 설치되며, 토류판이 상기 빔부재 위에 안착된 다음, 상기 높이조절볼트를 이용하여 상기 토류판 일단 저면의 높이를 조절하는 것으로 상기 토류판의 수평을 조절함과 동시에 상기 토류판과 바닥 사이의 틈이 상기 빔부재를 통해 커버되도록 구성되는 것을 특징으로 한다.To solve the above problems, the earth plate leveling device for a rock crushing protection facility according to the present invention consists of a beam member having a predetermined length on the floor between a pair of H-beams installed at a predetermined interval, and At one end, a height adjustment bolt for adjusting the height of the upper end by screw assembly is installed, and after the earth plate is seated on the beam member, the earth plate is adjusted to the height of one end of the earth plate by using the height adjustment bolt. It is characterized in that it is configured such that the gap between the earth plate and the floor is covered through the beam member while simultaneously adjusting the level of the .

그리고 본 발명은 상기 빔부재가 소정 길이를 가지는 제1 베이스빔과 제2 베이스빔으로 이루어지고, 상기 제1, 2 베이스빔 사이에는, 소정 크기의 길이조절부재가 설치되어 상기 한 쌍의 H빔 사이의 거리에 맞추어 상기 제1, 2 베이스빔 사이의 간격이 조절되도록 구성되는 것을 또 다른 특징으로 한다.And in the present invention, the beam member is composed of a first base beam and a second base beam having a predetermined length, and between the first and second base beams, a length adjusting member of a predetermined size is installed to provide the pair of H-beams. Another feature is that it is configured to adjust the distance between the first and second base beams according to the distance between them.

또한, 본 발명의 상기 제1, 2 베이스빔에는 상기 한 쌍의 H빔에 끼움 삽입되어 고정되도록 하는 소정 크기의 끼움홈이 형성되는 것을 또 다른 특징으로 한다.In addition, it is another feature that fitting grooves of a predetermined size are formed in the first and second base beams of the present invention to be fitted and fixed to the pair of H beams.

한편, 본 발명에 따른 토류판 수평조절장치를 이용한 암파쇄 방호시설 시공방법은, 소정 간격을 두고 복수 개의 H빔을 수직으로 설치하는 H빔 설치 단계; 상기 H빔 사이의 간격에 맞추어 바닥에 토류판 수평조절장치를 설치하는 토류판 수평조절장치 설치 단계; 상기 H빔 사이를 수평으로 연결하도록 토류판을 상기 H빔의 위에서 아래쪽 방향으로 삽입하여 설치하는 토류판 1차 설치 단계; 상기 토류판 수평조절장치의 높이조절볼트를 이용하여 상기 토류판이 수평이 되도록 일단 저면 높이를 조절하는 높이 조절 단계; 상기 토류판의 높이가 조절된 다음, 연속하여 상기 H빔 사이로 토류판을 삽입 설치하는 토류판 2차 설치 단계; 및 상기 토류판의 일측면을 따라 대각선으로 상기 토류판을 보강하는 보강대를 설치하는 보강대 설치 단계로 이루어지는 것을 특징으로 한다.On the other hand, according to the present invention, the method of constructing a rock crushing protection facility using the earth plate leveling device includes: an H-beam installation step of vertically installing a plurality of H-beams at a predetermined interval; an earth plate leveling device installation step of installing the earth plate leveling device on the floor according to the interval between the H-beams; a first earth plate installation step of inserting a earth plate from the top of the H-beam in a downward direction so as to horizontally connect the H-beams; a height adjustment step of adjusting the height of one end of the earth plate so that the earth plate becomes horizontal by using the height adjustment bolt of the earth plate leveling device; a second earth plate installation step of continuously inserting the earth plate between the H-beams after the height of the earth plate is adjusted; and installing a reinforcing bar for reinforcing the earth plate diagonally along one side of the earth plate.

그리고 본 발명은 상기 토류판 수평조절장치 설치 단계가 상기 H빔 사이의 간격에 맞추어 빔부재의 길이를 조절하는 길이 조절 단계; 및 상기 H빔에 상기 빔부재를 고정볼트로 고정하는 고정 단계를 더 포함하는 것을 또 다른 특징으로 한다.And the present invention is a length adjustment step of adjusting the length of the beam member according to the interval between the H-beam in the installation step of the earth plate leveling device; and a fixing step of fixing the beam member to the H-beam with a fixing bolt.

본 발명에 따르면, 도로에 경사가 있는 경우 토류판 수평조절장치가 바닥에 설치된 다음, 수직 설치되는 한 쌍의 H빔을 연결하도록 토류판 수평조절장치를 통해 토류판이 수평으로 설치되게 되고, 이를 통해 토류판이 토압을 충분히 지지할 수 있게 됨과 동시에 토류판 수평조절장치를 통해 토류판의 하단과 바닥이 들뜨는 것이 구조적으로 방지되는 장점이 있다.According to the present invention, when there is a slope on the road, the earth plate leveling device is installed on the floor, and then the earth plate is horizontally installed through the earth plate leveling device to connect a pair of vertically installed H-beams, and through this, the earth plate leveling device is installed. It has the advantage of being able to sufficiently support the earth pressure and structurally preventing the bottom and bottom of the earth plate from lifting up through the earth plate leveling device.

또한, 토류판 수평조절장치가 H빔 사이에 끼움 삽입된 다음 볼트 등으로 강건하게 고정되므로 토압 등의 외력이 작용하더라도 토류판 수평조절장치가 임의로 움직여 위치 이탈되는 것이 방지된다.In addition, since the earth plate leveling device is inserted between the H-beams and then firmly fixed with bolts, etc., the earth plate leveling device is prevented from moving arbitrarily and displaced even when an external force such as earth pressure is applied.

도 1 및 도 2는 본 발명에 따른 토류판 수평조절장치의 예를 보인 사시도.
도 3은 본 발명에 따른 빔부재의 예를 보인 사시도.
도 4는 본 발명에 따른 빔부재의 예를 보인 평면도.
도 5는 본 발명에 따른 길이조절부재의 예를 보이 사시도.
도 6은 도 5의 평면도.
도 7은 본 발명에 따른 토류판 수평조절장치가 한 쌍의 H빔 사이에 설치되는 예를 보인 도면.
도 8은 본 발명에 따른 길이조절부재를 통해 빔부재의 설치 각도가 조절되는 예를 보인 도면.
도 9는 본 발명에 따른 암파쇄 방호시설용 토류판 수평조절장치를 이용한 암파쇄 방호시설 시공방법의 예를 보인 공정 순서도.
도 10은 본 발명에 따른 토류판 수평조절장치를 이용하여 암파쇄 방호시설이 시공되는 예를 보인 도면.
도 11은 본 발명에 따른 토류판 수평조절장치가 H빔에 고정되는 예를 보인 도면.
도 12는 본 발명에 따른 암파쇄 방호시설 시공방법에 따라 토류판이 H빔에 지지 고정되는 예를 보인 도면.
도 13은 본 발명에 따른 길이조절부재의 다른 실시예를 보인 도면.
도 14 및 도 15는 도 13에 따른 길이조절부재가 사용되는 예를 보인 도면.
1 and 2 are perspective views showing an example of the earth plate leveling device according to the present invention.
3 is a perspective view showing an example of a beam member according to the present invention.
4 is a plan view showing an example of a beam member according to the present invention.
5 is a perspective view showing an example of a length adjusting member according to the present invention.
Fig. 6 is a plan view of Fig. 5;
7 is a view showing an example in which the earth plate leveling device according to the present invention is installed between a pair of H-beams.
8 is a view showing an example in which the installation angle of the beam member is adjusted through the length adjusting member according to the present invention.
9 is a process flow chart showing an example of a method of constructing a rock crushing protection facility using the earth plate leveling device for a dark crushing protection facility according to the present invention.
10 is a view showing an example in which the rock crushing protection facility is constructed using the earth plate leveling device according to the present invention.
11 is a view showing an example in which the earth plate leveling device according to the present invention is fixed to the H-beam.
12 is a view showing an example in which the earth plate is supported and fixed to the H-beam according to the method of constructing a rock fracturing protection facility according to the present invention.
13 is a view showing another embodiment of the length adjusting member according to the present invention.
14 and 15 are views showing an example in which the length adjusting member according to FIG. 13 is used.

이하에서는 본 발명의 바람직한 실시예를 도시한 첨부도면에 따라 상세하게 설명한다.Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 토류판이 수평을 이루도록 쉽게 설치할 수 있고, 토류판과 바닥면 사이에 이격된 틈이 형성되지 않도록 하는 암파쇄 방호시설용 토류판 수평조절장치 및 이를 이용한 암파쇄 방호시설 시공방법을 제공하고자 하는 것으로, 이를 위한 본 발명의 토류판 수평조절장치(2)는 소정 길이를 가지는 "L"자 단면 모양의 형강으로 이루어지고, 이러한 빔부재(10)는 도로변을 따라 수직으로 설치되는 복수 개의 H빔(1) 사이의 간격에 맞추어 바닥에 지지되도록 설치되며, 그 위로 토류판(3)이 안착되어 빔부재(10)를 통해 토류판(3)의 저면이 지지되게 된다.The present invention is to provide an earth plate leveling device for a rock crushing protection facility that can be easily installed so that the earth plate is horizontal, and a spaced gap is not formed between the earth plate and the floor, and a method for constructing a dark crushing protection facility using the same, For this purpose, the earth plate leveling device (2) of the present invention is made of a “L”-shaped cross-sectional shape having a predetermined length, and such a beam member 10 is a plurality of H-beams (1) installed vertically along the roadside. It is installed so as to be supported on the floor according to the interval between them, and the earth plate 3 is seated thereon so that the bottom surface of the earth plate 3 is supported through the beam member 10 .

이때 도로의 경사를 기준으로 낮은 쪽의 빔부재(10) 일단에는 토류판(3)의 저면을 지지하면서 높이를 조절하는 높이조절볼트(14)가 설치되는데, 이러한 높이조절볼트(14)는 나사 결합에 의해 높이조절볼트(14)의 상단이 승강되도록 구성된다.At this time, a height adjustment bolt 14 for adjusting the height while supporting the bottom surface of the earth plate 3 is installed at one end of the beam member 10 on the lower side based on the inclination of the road. These height adjustment bolts 14 are screwed together. The upper end of the height adjustment bolt 14 is configured to be lifted by the.

상기와 같은 구성을 통해 도로의 경사로 인해 높이가 상대적으로 낮은 토류판(3)의 일단 저면이 높이조절볼트(14)에 의해 높이가 보상되어 지지되게 되고, 그 결과 토류판(3)이 도로의 경사와 상관없이 한 쌍의 H빔(1) 사이를 수평으로 연결하도록 설치되게 된다.Through the above configuration, one end of the lower surface of the earth plate 3, which has a relatively low height due to the slope of the road, is compensated for and supported by the height adjustment bolt 14. As a result, the earth plate 3 is aligned with the slope of the road. Regardless, it is installed to horizontally connect between the pair of H-beams (1).

이하에서는 본 발명에 따른 토류판 수평조절장치(2)의 실시예에 따라 더욱 상세하게 설명한다.Hereinafter, an embodiment of the earth plate leveling device 2 according to the present invention will be described in more detail.

실시예에 따른 토류판 수평조절장치(2)는 도 1 및 도 2에 도시된 바와 같이 빔부재(10) 및 길이조절부재(20)로 이루어진다.The earth plate leveling device 2 according to the embodiment includes a beam member 10 and a length adjusting member 20 as shown in FIGS. 1 and 2 .

빔부재(10)는 도 1 및 도 2에 도시된 바와 같이 소정 길이를 가지면서 수평부(11)와 수직부(12)를 가지는 "L"자 단면 모양의 제1 베이스빔(10A)과 제2 베이스빔(10B)으로 구성되고, 이러한 제1, 2 베이스빔(10A, 10B)은 서로 대칭이 되도록 형성될 수 있다.As shown in FIGS. 1 and 2, the beam member 10 includes a first base beam 10A and a second base beam 10A of an “L” cross-section having a horizontal portion 11 and a vertical portion 12 while having a predetermined length. Consists of two base beams (10B), these first and second base beams (10A, 10B) may be formed to be symmetrical to each other.

그리고 H빔(1)과 마주하는 방향의 수직부(12) 일단 부분에는 도 3 및 도 4에 도시된 바와 같이 소정 크기를 가지는 지지판(13)이 용접 등에 의해 강건하게 설치되고, 이러한 지지판(13)의 가운데 부분에는 소정 지름을 가지는 나사결합공(도면부호 없음)이 형성되며, 상기 나사결합공에 소정 길이를 가지는 높이조절볼트(14)가 아래에서 위쪽 방향으로 관통하도록 나사 결합되게 된다.And at one end of the vertical portion 12 in the direction facing the H-beam 1, a support plate 13 having a predetermined size as shown in FIGS. 3 and 4 is strongly installed by welding, etc., and such a support plate 13 ) is formed in a central portion of a screwing hole (no reference numeral) having a predetermined diameter, and the height adjustment bolt 14 having a predetermined length is screwed through the screwing hole in an upward direction from the bottom.

또한, 제1, 2 베이스빔(10A, 10B)가 서로 마주하는 타단 부분에는 소정 길이를 가지는 복수 개의 결합볼트(15)가 수직으로 돌출되도록 구비되고, 이러한 복수 개의 결합볼트(15)를 통해 후술되는 길이조절부재(20)가 슬라이딩 가능하게 조립되게 된다.In addition, the first and second base beams (10A, 10B) are provided with a plurality of coupling bolts 15 having a predetermined length to protrude vertically to the other end portion facing each other, through the plurality of coupling bolts 15 will be described later The length adjusting member 20 to be slidably assembled.

이에 더해 지지판(13)이 설치되는 방향의 수평부(11)에는 H빔(1)의 단면 두께에 대응되는 소정 두께의 끼움홈(16)이 소정 길이를 가지도록 형성되고, 이러한 끼움홈(16)에 H빔(1)이 끼움 삽입되면서 빔부재(10)가 한 쌍의 H빔(1) 사이에 끼움 설치되는 것만으로 간단하게 위치가 고정되게 된다.In addition, in the horizontal portion 11 in the direction in which the support plate 13 is installed, a fitting groove 16 of a predetermined thickness corresponding to the cross-sectional thickness of the H-beam 1 is formed to have a predetermined length, and these fitting grooves 16 ) as the H-beam (1) is inserted, the position of the beam member (10) is simply fixed by being fitted between the pair of H-beams (1).

한편, 위에서는 제1, 2 베이스빔(10A, 10B)에 지지판(13)이 각각 설치된 다음, 상기 지지판(13)에 높이조절볼트(14)가 나사 결합되는 것으로만 설명되어 있으나, 제1, 2 베이스빔(10A, 10B) 중에서 선택된 어느 하나의 베이스빔에만 지지판(13)과 높이조절볼트(14)가 설치되는 것으로 변경되어 실시되어도 무방하다.On the other hand, in the above, the first and second base beams (10A, 10B) are respectively installed with the support plate 13, and then the height adjustment bolt 14 is screwed to the support plate 13. However, the first, The support plate 13 and the height adjustment bolt 14 are installed only on any one of the base beams selected from the two base beams 10A and 10B.

또한, 제1, 2 베이스빔(10A, 10B)에 지지판(13)과 높이조절볼트(14)가 각각 설치되더라도, 도로의 경사에 따라 상대적으로 낮은 쪽의 지지판(13)에만 높이조절볼트(14)가 조립되고, 높은 쪽의 지지판(13)에는 높이조절볼트(14)가 제거되어 토류판(3)의 양단이 지지판(13)과 높이조절볼트(14)에 의해 지지되도록 하여 사용될 수 있다.In addition, even if the support plate 13 and the height adjustment bolt 14 are respectively installed on the first and second base beams 10A and 10B, the height adjustment bolt 14 only on the relatively low support plate 13 according to the inclination of the road. ) is assembled, and the height adjustment bolt 14 is removed from the support plate 13 on the higher side, so that both ends of the earth plate 3 are supported by the support plate 13 and the height adjustment bolt 14 to be used.

이에 더해 위에서는 높이조절볼트(14)의 상단에 토류판(3)의 저면이 지지되는 것으로만 도시되고 설명되었으나, 이와 달리 높이조절볼트(14)의 상단에 소정 넓이를 가지는 받침판(도시하지 않음)이 조립된 다음, 상기 받침판에 토류판(3)의 저면이 지지되도록 변경되어 구성될 수 있다.In addition, in the above, only the bottom surface of the earth plate 3 is supported on the upper end of the height adjustment bolt 14, but unlike the above, a support plate having a predetermined width on the upper end of the height adjustment bolt 14 (not shown) After this assembly, it may be configured such that the bottom surface of the earth plate 3 is supported on the support plate.

길이조절부재(20)는 제1, 2 베이스빔(10A, 10B) 사이의 간격을 조절하여 빔부재(10)의 길이를 조절하고, 이를 통해 한 쌍의 H빔(1) 사이로 빔부재(10)가 쉽게 설치되도록 함과 동시에 설치된 상태가 강건하게 유지되도록 하는 구성이다.The length adjusting member 20 adjusts the length of the beam member 10 by adjusting the distance between the first and second base beams 10A and 10B, and through this, the beam member 10 is interposed between the pair of H beams 1 . ) is easy to install, and at the same time, it is configured to keep the installed state robustly.

이러한 길이조절부재(20)는 도 5 및 도 6에 도시된 바와 같이 소정 크기를 가지는 제1 연결판(21)과, 상기 제1 연결판(21)의 일단과 마주하도록 설치되는 소정 크기의 제2 연결판(22) 및 상기 제1, 2 연결판(21, 22)의 서로 마주보는 일단을 회전 가능하게 연결하는 소정 길이의 힌지결합핀(23)을 포함한다.As shown in FIGS. 5 and 6 , the length adjusting member 20 includes a first connecting plate 21 having a predetermined size, and a first connecting plate 21 having a predetermined size installed to face one end of the first connecting plate 21 . and a hinge coupling pin 23 of a predetermined length for rotatably connecting the two connecting plates 22 and the opposite ends of the first and second connecting plates 21 and 22 to each other.

그리고 제1, 2 연결판(21, 22)에는 제1, 2 베이스빔(10A, 10B)의 결합볼트(15)가 관통 삽입되면서 슬라이딩 가능하게 하는 소정 길이의 장공(21A, 22A)이 형성된다.And the first and second connecting plates (21, 22) are formed with long holes (21A, 22A) of a predetermined length to enable sliding while the coupling bolts 15 of the first and second base beams (10A, 10B) are inserted through them. .

상기와 같은 구성을 통해 제1, 2 베이스빔(10A, 10B)의 결합볼트(15)가 제1, 2 연결판(21, 22)의 장공(21A, 22A)을 관통하도록 설치된 다음, 도 7에 도시된 바와 같이 제1, 2 베이스빔(10A, 10B) 사이의 간격이 적절하게 조절되고, 이후 결합볼트(15)에 너트가 조립되는 것으로 제1, 2 베이스빔(10A, 10B)의 간격이 유지되게 된다.After the coupling bolts 15 of the first and second base beams 10A and 10B are installed to pass through the long holes 21A and 22A of the first and second connecting plates 21 and 22 through the above configuration, FIG. 7 As shown in, the spacing between the first and second base beams 10A and 10B is appropriately adjusted, and then the first and second base beams 10A and 10B are spaced by the nut being assembled to the coupling bolt 15. this will be maintained

이때 도로변의 경사가 일정하지 않는 경우 제1, 2 연결판(21, 22)이 도 8에 도시된 바와 같이 힌지결합핀(23)을 중심으로 자연스럽게 각도 조절되면서 제1, 2 베이스빔(10A, 10B)이 바닥면에 안정적으로 밀착된 상태로 설치되게 된다.At this time, when the slope of the roadside is not constant, the first and second connecting plates 21 and 22 are naturally angularly adjusted around the hinge coupling pin 23 as shown in FIG. 8, and the first and second base beams 10A, 10B) will be installed in a state in which it is stably adhered to the floor surface.

이하에서는 도 9에 따른 토류판 수평조절장치를 이용한 암파쇄 방호시설 시공방법에 대하여 설명한다.Hereinafter, a method of constructing a rock crushing protection facility using the earth plate leveling device according to FIG. 9 will be described.

절토사면의 안정화 시공 작업시 도로변을 따라 소정 간격을 두고 수직으로 복수 개의 H빔(1)이 설치된다(S10).During stabilization of the cut slope, a plurality of H-beams 1 are vertically installed at a predetermined interval along the roadside (S10).

그런 다음, 도 10에 도시된 바와 같이 토류판 수평조절장치(2)를 인접하는 한 쌍의 H빔(1) 사이에 설치된다(S20).Then, as shown in FIG. 10, the earth plate leveling device 2 is installed between a pair of adjacent H-beams 1 (S20).

이때 토류판 수평조절장치(2)는 H빔(1) 사이의 간격에 맞추어 길이가 조절되고(S21), 길이가 적절하게 조절되고 나면 너트로 길이가 임의로 변경되지 않도록 고정시킨다(S22).At this time, the earth plate leveling device 2 is adjusted in length according to the interval between the H-beams 1 (S21), and after the length is properly adjusted, the length is fixed with a nut so that the length is not arbitrarily changed (S22).

또한, 도 11에 도시된 바와 같이 제1, 2 베이스빔(10A, 10B)의 수직부(12)에는 복수 개의 고정볼트(B)가 설치되고, 이를 통해 끼움홈(16)에 H빔(1)이 끼움 삽입된 상태에서 H빔(1)의 외측면이 고정볼트(B)에 의해 가압되도록 구성될 수 있으며, 이를 통해 토류판 수평조절장치(2)가 H빔(1)에 더욱 강건하게 고정되도록 하여 설치될 수 있다.In addition, as shown in FIG. 11, a plurality of fixing bolts (B) are installed in the vertical portion 12 of the first and second base beams 10A and 10B, and the H beam 1 is installed in the fitting groove 16 through this. ) may be configured such that the outer surface of the H-beam 1 is pressed by the fixing bolt B in the inserted state, and through this, the earth plate leveling device 2 is more firmly fixed to the H-beam 1 . It can be installed as possible.

이렇게 토류판 수평조절장치(2)가 바닥에 설치되고 나면, 그 위로 토류판(3)을 설치하게 되는데, 이때 토류판(3)은 크레인 등을 이용하여 H빔(1)의 위에서 아래쪽으로 삽입되어 설치되게 된다(S30).After the earth plate leveling device 2 is installed on the floor, the earth plate 3 is installed thereon. At this time, the earth plate 3 is inserted and installed from the top of the H-beam 1 using a crane or the like. becomes (S30).

위와 같이 1차로 토류판(3)이 설치되고 나면, 토류판 수평조절장치(2)의 높이조절볼트(14)를 이용하여 높이가 낮은 쪽의 토류판(3) 일단의 높이를 상승시키고, 이를 통해 토류판(3)이 수평이 되도록 조절하게 된다(S40).After the earth plate 3 is first installed as above, the height of one end of the earth plate 3 on the lower side is raised using the height adjustment bolt 14 of the earth plate leveling device 2, and through this, the earth plate ( 3) is adjusted to be horizontal (S40).

토류판(3)의 높이가 수평으로 조절되고 나면, 그 위로 연속하여 H빔(1) 사이로 토류판(3)을 삽입 설치하게 된다(S50).After the height of the earth plate 3 is adjusted horizontally, the earth plate 3 is continuously inserted between the H beams 1 above it (S50).

이때 토류판(3)은 도 12에 도시된 바와 같이 H빔(1)에 설치되는 지지판(1A)에 의해 H빔(1) 사이에서 임의로 움직이지 않도록 지지되게 된다.At this time, the earth plate 3 is supported so as not to move arbitrarily between the H beams 1 by the support plate 1A installed on the H beam 1 as shown in FIG. 12 .

그리고 토류판(3)의 설치가 끝나면, 토류판(3)의 일측면을 따라 대각선으로 토류판(3)을 보강하는 보강대(4)를 설치하여 암파쇄 방호시설의 시공이 완료된다(S60).And when the installation of the earth plate 3 is finished, the reinforcing bar 4 for reinforcing the earth plate 3 is installed diagonally along one side of the earth plate 3 to complete the construction of the rock crushing protection facility (S60).

한편, 위에서는 길이조절부재(20)가 제1, 2 연결판(21, 22)으로 구성되고, 상기 제1, 2 연결판(21, 22)이 힌지결합핀(23)에 의해 결합되는 것으로만 도시되고 설명되었으나, 이와 달리 제1, 2 연결판(21, 22)을 연결하는 힌지결합핀(23)을 대신하여 공지된 다양한 종류의 경첩이 용접 또는 볼트와 나사 등의 체결부재를 통해 조립 고정되어 제1, 2 연결판(21, 22)이 각도 조절 가능하도록 변경될 수 있다.On the other hand, from above, the length adjusting member 20 is composed of first and second connecting plates 21 and 22 , and the first and second connecting plates 21 and 22 are coupled by a hinge coupling pin 23 . Although only shown and described, on the contrary, in place of the hinge coupling pins 23 connecting the first and second connecting plates 21 and 22, various types of known hinges are assembled through welding or fastening members such as bolts and screws. It is fixed so that the first and second connecting plates 21 and 22 can be changed so that the angle can be adjusted.

또 다르게는 도 13 및 도 14에 도시된 바와 같이 길이조절부재(20)가 제1, 2 연결판(21, 22)으로 구성되는 대신 소정 길이를 가지는 하나의 판으로 구성되고, 이러한 길이조절부재(20)의 양측에 소정 길이를 가지는 장공(H)이 형성되며, 빔부재(10)의 제1, 2 베이스빔(10A, 10B)에 구비되는 결합볼트(15)가 제1, 2 베이스빔(10A, 10B)의 측면 쪽에 구비되어 장공(H)을 관통하여 조립되고, 이에 의해 결합볼트(15)를 중심으로 길이조절부재(20)가 회전되도록 하여 제1, 2 베이스빔(10A, 10B)의 설치 각도가 조절됨과 동시에 길이조절이 가능하도록 변경되어 구성될 수 있다.Alternatively, as shown in FIGS. 13 and 14, the length adjusting member 20 is composed of one plate having a predetermined length instead of being composed of the first and second connecting plates 21 and 22, and this length adjusting member Long holes (H) having a predetermined length are formed on both sides of (20), and the coupling bolts (15) provided in the first and second base beams (10A, 10B) of the beam member (10) are the first and second base beams (20). It is provided on the side of the (10A, 10B) and assembled through the long hole (H), whereby the length adjusting member 20 is rotated around the coupling bolt 15 to rotate the first and second base beams 10A, 10B. ) can be configured to be changed so that the installation angle is adjusted and the length can be adjusted at the same time.

상기와 같은 구성을 통해 도 15에 도시된 바와 같이 인접한 한 쌍의 H빔(1) 사이에 제1, 2 베이스빔(10A, 10B)가 바닥에 닿도록 배치된 상태에서 길이조절부재(20)의 양측 장공(H)에 결합볼트(15)를 관통시킨 다음, 너트를 조립하여 강건하게 고정하는 것으로 빔부재(10)의 길이조절과 각도 조절이 동시에 완료되게 된다.As shown in FIG. 15 through the above configuration, the first and second base beams 10A and 10B between a pair of adjacent H-beams 1 are disposed so as to touch the floor length adjustment member 20 After passing the coupling bolts 15 through the long holes (H) on both sides of the nut, the length adjustment and angle adjustment of the beam member 10 are simultaneously completed by assembling a nut and firmly fixing it.

이상 설명한 바와 같이 본 발명은 도로에 경사가 있는 경우 토류판 수평조절장치가 바닥에 설치된 다음, 수직 설치되는 한 쌍의 H빔을 연결하도록 토류판 수평조절장치를 통해 토류판이 수평으로 설치되게 되고, 이를 통해 토류판이 토압을 충분히 지지할 수 있게 됨과 동시에 토류판 수평조절장치를 통해 토류판의 하단과 바닥이 들뜨는 것이 구조적으로 방지된다.As described above, according to the present invention, when the road is inclined, the earth plate leveling device is installed on the floor, and then the earth plate is horizontally installed through the earth plate leveling device to connect a pair of vertically installed H-beams, and through this The earth plate can sufficiently support the earth pressure, and at the same time, the lower part and the bottom of the earth plate are structurally prevented from being lifted by the earth plate leveling device.

또한, 토류판 수평조절장치가 H빔 사이에 끼움 삽입된 다음 볼트 등으로 강건하게 고정되므로 토압 등의 외력이 작용하더라도 토류판 수평조절장치가 임의로 움직여 위치 이탈되는 것이 방지된다.In addition, since the earth plate leveling device is inserted between the H-beams and then firmly fixed with bolts, etc., the earth plate leveling device is prevented from moving arbitrarily and displaced even when an external force such as earth pressure is applied.

위에서는 설명의 편의를 위해 바람직한 실시예를 도시한 도면과 도면에 나타난 구성에 도면부호와 명칭을 부여하여 설명하였으나, 이는 본 발명에 따른 하나의 실시예로서 도면상에 나타난 형상과 부여된 명칭에 국한되어 그 권리범위가 해석되어서는 안 될 것이며, 발명의 설명으로부터 예측 가능한 다양한 형상으로의 변경과 동일한 작용을 하는 구성으로의 단순 치환은 통상의 기술자가 용이하게 실시하기 위해 변경 가능한 범위 내에 있음은 지극히 자명하다고 볼 것이다.In the above description, for convenience of description, reference numerals and names were given to the drawings showing preferred embodiments and the components shown in the drawings, but this is an embodiment according to the present invention. It should not be construed as being limited, and simple substitution into a configuration having the same function as a change in various predictable shapes from the description of the invention is within the range that can be changed for easy implementation by those skilled in the art. It will be seen as extremely self-explanatory.

1: H빔 1A: 지지판
2: 토류판 수평조절장치 3: 토류판
4: 보강대 10: 빔부재
10A: 제1 베이스빔 10B: 제2 베이스빔
11: 수평부 12: 수직부
13: 지지판 14: 높이조절볼트
15: 결합볼트 16: 끼움홈
20: 길이조절부재 21: 제1 연결판
21A: 장공 22: 제2 연결판
22A: 장공 23: 힌지결합핀
B: 고정볼트 H: 장공
1: H-beam 1A: support plate
2: earth plate leveling device 3: earth plate
4: reinforcing bar 10: beam member
10A: first base beam 10B: second base beam
11: horizontal part 12: vertical part
13: support plate 14: height adjustment bolt
15: coupling bolt 16: fitting groove
20: length adjustment member 21: first connecting plate
21A: long hole 22: second connecting plate
22A: long hole 23: hinge coupling pin
B: Fixing bolt H: Long hole

Claims (5)

소정 간격을 두고 설치되는 한 쌍의 H빔(1) 사이의 바닥에 소정 길이를 가지는 빔부재(10)로 이루어지고,
상기 빔부재(10)의 일단 부분에는,
나사 조립에 의해 상단의 높이가 조절되는 높이조절볼트(14)가 설치되며,
토류판(3)이 상기 빔부재(10) 위에 안착된 다음, 상기 높이조절볼트(14)를 이용하여 상기 토류판(3) 일단 저면의 높이를 조절하는 것으로 상기 토류판(3)의 수평을 조절함과 동시에 상기 토류판(3)과 바닥 사이의 틈이 상기 빔부재(10)를 통해 커버되도록 구성되고,
상기 빔부재(10)는,
소정 길이를 가지면서 수평부(11)와 수직부(12)를 가지는 "L"자 단면 모양의 제1 베이스빔(10A)과 제2 베이스빔(10B)으로 이루어지고,
상기 제1, 2 베이스빔(10A, 10B) 사이에는,
소정 크기의 길이조절부재(20)가 설치되어 상기 한 쌍의 H빔(1) 사이의 거리에 맞추어 상기 제1, 2 베이스빔(10A, 10B) 사이의 간격이 조절되도록 구성되며,
상기 길이조절부재(20)는,
소정 길이를 가지는 하나의 판으로 이루어지고,
상기 길이조절부재(20)의 양측에 소정 길이의 장공(H)이 형성되며,
상기 제1, 2 베이스빔(10A, 10B)의 측면 쪽에 상기 장공(H)을 관통하여 조립되는 결합볼트(15)가 구비되어, 상기 길이조절부재(20)가 상기 결합볼트(15)를 중심으로 회전되도록 하여 설치 각도가 조절됨과 동시에 길이조절이 가능하도록 구성되고,
상기 제1, 2 베이스빔(10A, 10B)에는,
상기 한 쌍의 H빔(1)에 끼움 삽입되어 고정되도록 하는 소정 크기의 끼움홈(16)이 형성되며,
상기 제1, 2 베이스빔(10A, 10B)의 수직부(12)에는,
복수 개의 고정볼트(B)가 설치되고, 이를 통해 끼움홈(16)에 H빔(1)이 끼움 삽입된 상태에서 H빔(1)의 외측면이 고정볼트(B)에 의해 가압되어 고정되도록 구성되는 것을 특징으로 하는 암파쇄 방호시설용 토류판 수평조절장치.
Consists of a beam member 10 having a predetermined length on the floor between a pair of H-beams 1 installed at a predetermined interval,
At one end of the beam member 10,
A height adjustment bolt (14) whose height is adjusted at the top by screw assembly is installed,
After the earth plate (3) is seated on the beam member (10), the level of the earth plate (3) is adjusted by adjusting the height of one end of the bottom surface of the earth plate (3) using the height adjustment bolt (14) At the same time, the gap between the earth plate (3) and the floor is configured to be covered through the beam member (10),
The beam member 10,
Consists of a first base beam (10A) and a second base beam (10B) having an “L” cross-sectional shape having a horizontal portion 11 and a vertical portion 12 while having a predetermined length,
Between the first and second base beams (10A, 10B),
A length adjusting member 20 of a predetermined size is installed to adjust the distance between the first and second base beams 10A and 10B according to the distance between the pair of H-beams 1,
The length adjustment member 20,
Consists of one plate having a predetermined length,
Long holes (H) of a predetermined length are formed on both sides of the length adjusting member (20),
A coupling bolt 15 assembled through the long hole H is provided on the side of the first and second base beams 10A and 10B, and the length adjusting member 20 is positioned around the coupling bolt 15 . It is configured so that the installation angle is adjusted and the length can be adjusted at the same time by rotating it with
In the first and second base beams (10A, 10B),
A fitting groove 16 of a predetermined size is formed so as to be inserted and fixed in the pair of H-beams 1,
In the vertical portion 12 of the first and second base beams 10A, 10B,
A plurality of fixing bolts (B) are installed, so that the outer surface of the H beam (1) is pressed and fixed by the fixing bolt (B) in a state where the H beam (1) is inserted into the fitting groove (16) through this. Earth plate leveling device for rock crushing protection facilities, characterized in that it is configured.
삭제delete 삭제delete 청구항 1에 따른 토류판 수평조절장치(2)를 이용한 암파쇄 방호시설 시공방법에 있어서,
소정 간격을 두고 복수 개의 H빔(1)을 수직으로 설치하는 H빔 설치 단계(S10);
상기 H빔(1) 사이의 간격에 맞추어 바닥에 토류판 수평조절장치(2)를 설치하는 토류판 수평조절장치 설치 단계(S20);
상기 H빔(1) 사이를 수평으로 연결하도록 토류판(3)을 상기 H빔(1)의 위에서 아래쪽 방향으로 삽입하여 설치하는 토류판 1차 설치 단계(S30);
상기 토류판 수평조절장치(2)의 높이조절볼트(14)를 이용하여 상기 토류판(3)이 수평이 되도록 일단 저면 높이를 조절하는 높이 조절 단계(S40);
상기 토류판(3)의 높이가 조절된 다음, 연속하여 상기 H빔(1) 사이로 토류판을 삽입 설치하는 토류판 2차 설치 단계(S50); 및
상기 토류판(3)의 일측면을 따라 대각선으로 상기 토류판(3)을 보강하는 보강대(4)를 설치하는 보강대 설치 단계(S60);
로 이루어지고,
상기 토류판 수평조절장치 설치 단계(S20)는,
상기 H빔(1) 사이의 간격에 맞추어 빔부재(10)의 길이를 조절하는 길이 조절 단계(S21); 및
상기 H빔(1)에 상기 빔부재(10)를 고정볼트(B)로 고정하는 고정 단계(S22);
를 더 포함하는 것을 특징으로 하는 암파쇄 방호시설용 토류판 수평조절장치를 이용한 암파쇄 방호시설 시공방법.
In the method of constructing a rock crushing protection facility using the earth plate leveling device (2) according to claim 1,
H-beam installation step (S10) of vertically installing a plurality of H-beams (1) at predetermined intervals;
Earth plate leveling device installation step (S20) of installing the earth plate leveling device (2) on the floor according to the interval between the H-beams (1);
a first earth plate installation step (S30) of inserting and installing the earth plate (3) from the top of the H beam (1) downward to horizontally connect the H beams (1);
a height adjustment step (S40) of adjusting the height of one end of the earth plate (3) so that the earth plate (3) is horizontal by using the height adjustment bolt (14) of the earth plate leveling device (2);
a second earth plate installation step of continuously inserting the earth plate between the H beams 1 after the height of the earth plate 3 is adjusted (S50); and
a reinforcing bar installation step of installing a reinforcing bar 4 for reinforcing the earth plate 3 diagonally along one side of the earth plate 3 (S60);
is made of,
The earth plate leveling device installation step (S20),
a length adjustment step (S21) of adjusting the length of the beam member 10 according to the interval between the H-beams (1); and
A fixing step (S22) of fixing the beam member (10) to the H-beam (1) with a fixing bolt (B);
A method of constructing a rock crushing protection facility using a leveling device for an earth plate for a dark crushing protection facility, characterized in that it further comprises a.
삭제delete
KR1020220036365A 2022-03-24 2022-03-24 Earth plate leveling device for rock crushing protection facility and construction method of rock crushing protection facility using the same Active KR102449915B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220036365A KR102449915B1 (en) 2022-03-24 2022-03-24 Earth plate leveling device for rock crushing protection facility and construction method of rock crushing protection facility using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220036365A KR102449915B1 (en) 2022-03-24 2022-03-24 Earth plate leveling device for rock crushing protection facility and construction method of rock crushing protection facility using the same

Publications (1)

Publication Number Publication Date
KR102449915B1 true KR102449915B1 (en) 2022-09-30

Family

ID=83451560

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220036365A Active KR102449915B1 (en) 2022-03-24 2022-03-24 Earth plate leveling device for rock crushing protection facility and construction method of rock crushing protection facility using the same

Country Status (1)

Country Link
KR (1) KR102449915B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119736861A (en) * 2025-03-04 2025-04-01 四川省公路规划勘察设计研究院有限公司 An intelligent monitoring device for slope hazards on highway networks in mountainous areas during strong earthquakes

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200172604Y1 (en) * 1999-09-30 2000-03-15 주식회사삼우이엠씨 Horizontal balancing apparatus for light-weight partition pannel
KR100327066B1 (en) * 1999-07-15 2002-03-09 권재원, 김정원 A Retaining Wall Structure for using Pipes and It's Construction Method
KR20020065877A (en) * 2002-07-12 2002-08-14 이준 Steel Grating Panel to landslide
KR20170121403A (en) * 2016-04-25 2017-11-02 (주) 일성뉴텍 Adjustable Length Type Soil Retaining Panel
KR102136260B1 (en) 2020-01-23 2020-07-21 한태훈 Protective wall for rock crushing and building method thereof
KR102243450B1 (en) 2020-09-10 2021-04-22 지호이엔씨 주식회사 Fabrication Method of Protection Facility for Rock Breaking
KR102244853B1 (en) 2020-10-15 2021-04-27 한태웅 protection wall and the construction method thereof
KR102240831B1 (en) 2020-07-03 2021-05-12 주식회사 신웅 Rockfall protection facility with Double Beam and construction method it

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100327066B1 (en) * 1999-07-15 2002-03-09 권재원, 김정원 A Retaining Wall Structure for using Pipes and It's Construction Method
KR200172604Y1 (en) * 1999-09-30 2000-03-15 주식회사삼우이엠씨 Horizontal balancing apparatus for light-weight partition pannel
KR20020065877A (en) * 2002-07-12 2002-08-14 이준 Steel Grating Panel to landslide
KR20170121403A (en) * 2016-04-25 2017-11-02 (주) 일성뉴텍 Adjustable Length Type Soil Retaining Panel
KR102136260B1 (en) 2020-01-23 2020-07-21 한태훈 Protective wall for rock crushing and building method thereof
KR102240831B1 (en) 2020-07-03 2021-05-12 주식회사 신웅 Rockfall protection facility with Double Beam and construction method it
KR102243450B1 (en) 2020-09-10 2021-04-22 지호이엔씨 주식회사 Fabrication Method of Protection Facility for Rock Breaking
KR102244853B1 (en) 2020-10-15 2021-04-27 한태웅 protection wall and the construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119736861A (en) * 2025-03-04 2025-04-01 四川省公路规划勘察设计研究院有限公司 An intelligent monitoring device for slope hazards on highway networks in mountainous areas during strong earthquakes

Similar Documents

Publication Publication Date Title
US20110164921A1 (en) Shallow Mounted Fixed Vehicle Barrier Device
KR102553574B1 (en) Precast concrete member with connection box and construction method thereof
ES2960490T3 (en) Device, system and installation method for mounting a panel
KR101767845B1 (en) Bridge bearing replacement method for preventing drop of upper structure
KR102240831B1 (en) Rockfall protection facility with Double Beam and construction method it
KR100753011B1 (en) Road safety boundary stone base for easy height and inclination adjustment
KR101383314B1 (en) Blow mold footbridge
KR101931989B1 (en) An easy-orienting support cantilever and bridge structure using the same
CN115288518B (en) Safety support protection device for municipal foundation pit construction
KR102928133B1 (en) Horizontal adjustment bracket device for extended footbridge
KR102666091B1 (en) Manhole frame lifting device with previnting the lateral buckling and, manhole frame lifting repair method using the same
KR20230110120A (en) Furring strip mounting method for enhanced safety and structure of the same
KR101550396B1 (en) Method for installing road boundary stone
JP2017193857A (en) Attachment structure of transverse member and guard fence
KR20150010421A (en) Cap beam assembly
KR102236509B1 (en) Gradient and height adjuster of manhole cover
KR20020001480A (en) Steel form for slab concrete applicable to P.C. beam or Steel Box methods
KR102604871B1 (en) Method for forming retaining wall using impermeable wall and earth anchor
KR100954209B1 (en) Beam structure
KR102507885B1 (en) soundproof wall with foundation connecting type's bracing
KR102248682B1 (en) Reusable supporting bracket for furring strip
KR102157487B1 (en) A fixing device for a out side panel of building
KR101104124B1 (en) Prefab Rockfall Protection
KR101885472B1 (en) Bridge structure for ground settlement
KR102866664B1 (en) Anchor-type shear key with adjustable spacing by presetting templates

Legal Events

Date Code Title Description
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

PA0302 Request for accelerated examination

St.27 status event code: A-1-2-D10-D17-exm-PA0302

St.27 status event code: A-1-2-D10-D16-exm-PA0302

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-3-3-R10-R18-oth-X000

PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

PE0801 Dismissal of amendment

St.27 status event code: A-2-2-P10-P12-nap-PE0801

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

U11 Full renewal or maintenance fee paid

Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE)

Year of fee payment: 4

R18 Changes to party contact information recorded

Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R18-OTH-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18 Changes to party contact information recorded

Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R18-OTH-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000