KR102290220B1 - Precast counterfort retaining walls and the construction method thereof - Google Patents
Precast counterfort retaining walls and the construction method thereof Download PDFInfo
- Publication number
- KR102290220B1 KR102290220B1 KR1020200164542A KR20200164542A KR102290220B1 KR 102290220 B1 KR102290220 B1 KR 102290220B1 KR 1020200164542 A KR1020200164542 A KR 1020200164542A KR 20200164542 A KR20200164542 A KR 20200164542A KR 102290220 B1 KR102290220 B1 KR 102290220B1
- Authority
- KR
- South Korea
- Prior art keywords
- bottom plate
- anchor
- retaining wall
- buttress
- anchor hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/025—Retaining or protecting walls made up of similar modular elements stacked without mortar
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0266—Retaining or protecting walls characterised by constructional features made up of preformed elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/165—Shapes polygonal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/40—Miscellaneous comprising stabilising elements
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
본 발명에서는 조립식 설치를 위한 부벽형 프리캐스트 옹벽을 구성함에 있어서, 상면에 부벽이 구비된 전면 벽체가 안착되는 저판부 몸체에, 상기 전면 벽체 후면에 구비되는 부벽 말단 하부로부터 연장 형성되는 헤드 앵커가 삽입되는 앵커홀을 형성하되, 상기 앵커홀은 하부로 갈수록 단면적이 넓어지도록 테이퍼(taper)진 형상으로 상기 저판부 몸체를 관통하도록 형성하고, 상기 앵커홀 주변의 저판부 몸체에는 상기 앵커홀을 둘러싸는 형태로 코일 형태의 나선형 철근과 다수개의 폐합스터럽(closed stirrup)을 삽설하여, 전면 벽체에 가해지는 하중에 의해 유발되는 헤드앵커의 상방 인발력에 의해 야기되는 앵커홀 주변의 횡방향 인장력에 대한 저항력을 효과적으로 보강하여 저판부 몸체와 전면 벽체 간의 결합을 공고히 유지함으로써 프리캐스트 공법을 통해 옹벽구조물의 시공 편의성을 향상시키는 동시에, 설치된 옹벽구조물의 구조안전성 및 내구성을 높은 신뢰도로 증대시킬 수 있다.In the present invention, in constructing a buttress-type precast retaining wall for prefabricated installation, the head anchor formed extending from the lower end of the buttress provided on the rear surface of the front wall to the bottom plate body on which the front wall provided with the buttress on the upper surface is mounted. An anchor hole to be inserted is formed, but the anchor hole is formed to penetrate the bottom plate body in a tapered shape so that the cross-sectional area becomes wider toward the lower part, and the bottom plate part body around the anchor hole surrounds the anchor hole. The resistance to the lateral tensile force around the anchor hole caused by the upward pulling force of the head anchor caused by the load applied to the front wall by inserting a coil-shaped spiral reinforcing bar and a plurality of closed stirrups in the form of By effectively reinforcing the structure, it is possible to improve the construction convenience of the retaining wall structure through the precast method by firmly maintaining the bond between the bottom plate body and the front wall, and at the same time, it is possible to increase the structural safety and durability of the installed retaining wall structure with high reliability.
Description
본 발명은 부벽형 프리캐스트 옹벽 및 그 시공 방법에 관한 것으로서, 더욱 상세하게는 조립식 설치를 위한 부벽형 프리캐스트 옹벽을 구성함에 있어서, 상면에 부벽이 구비된 전면 벽체가 안착되는 저판부 몸체에, 상기 전면 벽체 후면에 구비되는 부벽 말단 하부로부터 연장 형성되는 헤드 앵커가 삽입되는 앵커홀을 형성하되, 상기 앵커홀은 하부로 갈수록 단면적이 넓어지도록 테이퍼(taper)진 형상으로 상기 저판부 몸체를 관통하도록 형성하고, 상기 앵커홀 주변의 저판부 몸체에는 상기 앵커홀을 둘러싸는 형태로 코일 형태의 나선형 철근과 다수개의 폐합스터럽(closed stirrup)을 삽설하여, 전면 벽체에 가해지는 하중에 의해 유발되는 헤드앵커의 상방 인발력에 의해 야기되는 앵커홀 주변의 횡방향 인장력에 대한 저항력을 효과적으로 보강하여 저판부 몸체와 전면 벽체 간의 결합을 공고히 유지함으로써 프리캐스트 공법을 통해 옹벽구조물의 시공 편의성을 향상시키는 동시에, 설치된 옹벽구조물의 구조안전성 및 내구성을 높은 신뢰도로 증대시킨 부벽형 프리캐스트 옹벽과 이렇게 제작된 부벽형 프리캐스트 옹벽의 시공 방법에 관한 것이다. The present invention relates to a buttress-type precast retaining wall and a construction method thereof, and more particularly, in constructing a buttress-type precast retaining wall for prefabricated installation, on a bottom plate body on which a front wall having a buttress on its upper surface is mounted, An anchor hole is formed into which a head anchor extending from the lower end of the buttress provided on the rear surface of the front wall is inserted, and the anchor hole is tapered to penetrate the bottom plate body in a tapered shape so that the cross-sectional area becomes wider toward the lower part. The head anchor caused by the load applied to the front wall by inserting a coil-shaped spiral reinforcing bar and a plurality of closed stirrups in the bottom plate body around the anchor hole to surround the anchor hole. By effectively reinforcing the resistance to the lateral tensile force around the anchor hole caused by the upward pulling force of The present invention relates to a buttress-type precast retaining wall that increases the structural safety and durability of a structure with high reliability, and a construction method of the buttress-type precast retaining wall manufactured in this way.
자연적으로 형성된 경사면을 갖는 지형에 도로공사, 철도공사, 택지개발 등과 같이 인위적 개발에 의해 형성되는 절토 및 성토부에는 부지 지지기반 확보를 위한 구조체로서 옹벽이 설치되고 있다.Retaining walls are being installed as structures to secure the support base of the site in cuts and fills formed by artificial development such as road construction, railroad construction, and housing site development in the terrain having a naturally formed slope.
종래의 옹벽 시공에 있어서는 지반굴착 및 옹벽 설치를 위한 콘크리트 타설 등과 같은 제반 시공 공정을 모두 현장에서 일괄적으로 직접 시행하는 현장 시공이 주를 이루어 왔으나, 이와 같은 현장 시공 방법은 현장에서 콘크리트 타설 및 양생 등이 직접 이루어지게 됨에 따라, 필연적으로 공사 기간이 길어지게 되고, 그에 따른 통행불편이나 분진, 소음 등으로 인한 민원발생은 물론 안전사고가 발생할 위험도 상대적으로 높아질 수 밖에 없다는 문제가 있다.In the conventional retaining wall construction, on-site construction in which all construction processes such as ground excavation and concrete pouring for retaining wall installation are collectively performed directly at the site has been mainly performed. As such is directly carried out, the construction period inevitably becomes longer, and there is a problem in that the risk of safety accidents as well as civil complaints due to traffic inconvenience, dust, and noise is relatively high.
최근에는 이와 같은 문제를 보완하기 위해, 옹벽 구조물을 프리캐스트 타입으로 사전 제작하여, 현장에서는 간단한 조립 설치 공정만을 진행하는 방식을 통해 옹벽의 시공 편의성 및 공사 기간 단축을 도모하는 시도가 이루어지고 있는데, 그 한 예가 한국등록특허 제10-1920622호에 개시되어 있다.Recently, in order to compensate for this problem, an attempt has been made to promote convenience in the construction of retaining walls and shorten the construction period by pre-fabricating the retaining wall structure in a precast type and performing only a simple assembly and installation process at the site. One example is disclosed in Korean Patent No. 10-1920622.
상기 제1920622호 특허에서는, 저판부, 보벽몸체가 구비된 벽체몸체 및 삽입고정몸체로 이루어지는 조립식 옹벽 구조를 통해, 이들 각각의 구조물들을 프리캐스트 방식으로 사전 제조하여, 먼저 저판부에 형성되는 고정체안치홈에 삽입고정몸체를 삽입하여 조립한 후, 현장에서 시공 위치의 바닥면에 삽입고정몸체가 조립된 저판부를 시공하고, 이어서 상기 저판부의 상면에 상기 보벽몸체가 구비된 벽체몸체를 안착시켜, 보벽몸체의 하부로 돌출된 고정돌출체를 삽입고정몸체에 형성된 고정통공에 삽입한 후, 콘크리트를 타설하여 고정하는 방식의 조립식 옹벽 및 그 시공방법을 설명하고 있다.In the patent No. 1920622, through the prefabricated retaining wall structure consisting of a bottom plate part, a wall body equipped with a retaining wall body, and an insertion fixed body, each of these structures is pre-fabricated by a precast method, and first the fixture formed on the bottom plate part After inserting and assembling the insertion fixing body into the seating groove, the bottom plate part with the insertion fixing body assembled on the bottom surface of the construction site is constructed at the site, and then the wall body equipped with the reinforcement wall body is mounted on the upper surface of the bottom plate part, A prefabricated retaining wall and its construction method are described in which the fixing protrusion protruding from the lower part of the beam body is inserted into the fixing hole formed in the insertion fixing body, and then concrete is poured and fixed.
그런데, 상기 제1920622호 특허에서와 같이, 단순히 저판부에 삽입, 조립되는 삽입고정몸체를 통해 벽체몸체를 고정, 지지하는 구조로 옹벽을 설치하는 시공 방식의 경우, 벽체몸체에 가해지는 하중이 증가함에 따라 삽입고정몸체가 저판부로부터 이탈되어 벽체몸체와 저판부가 분리되는 현상이 발생할 우려가 있으며, 동시에 보벽몸체와 연결된 고정돌출체의 상방 인발력에 의해 고정통공 주위의 삽입고정몸체에 횡방향의 인장력이 발생하게 되어, 이로 인해 삽입고정몸체에 균열 등이 발생하는 경우, 역시 벽체몸체와 저판부가 분리되는 현상이 발생하게 되어, 설치된 옹벽구조물의 구조안전성이 크게 훼손될 수 있다는 문제점이 있다.However, as in the patent No. 1920622, in the case of a construction method in which the retaining wall is installed in a structure that fixes and supports the wall body through the insertion fixing body that is simply inserted and assembled into the bottom plate, the load applied to the wall body increases. As a result, there is a risk that the insertion fixing body is separated from the bottom plate part and the wall body and the bottom plate part are separated. This occurs, and thus, when cracks occur in the insertion and fixed body, a phenomenon in which the wall body and the bottom plate are separated also occurs, and there is a problem that the structural safety of the installed retaining wall structure may be greatly damaged.
본 발명은 상술한 종래 기술에 따른 문제점을 해결하기 위한 것으로서, 본 발명에서는, 조립식 설치를 위한 부벽형 프리캐스트 옹벽을 구성함에 있어서, 상면에 부벽이 구비된 전면 벽체가 안착되는 저판부 몸체에, 상기 전면 벽체 후면에 구비되는 부벽 말단 하부로부터 연장 형성되는 헤드 앵커가 삽입되는 앵커홀을 형성하되, 상기 앵커홀은 하부로 갈수록 단면적이 넓어지도록 테이퍼(taper)진 형상으로 상기 저판부 몸체를 관통하도록 형성하고, 상기 앵커홀 주변의 저판부 몸체에는 상기 앵커홀을 둘러싸는 형태로 코일 형태의 나선형 철근과 다수개의 폐합스터럽(closed stirrup)을 삽설하여, 전면 벽체에 가해지는 하중에 의해 유발되는 헤드앵커의 상방 인발력에 의해 야기되는 앵커홀 주변의 횡방향 인장력에 대한 저항력을 효과적으로 보강하여 저판부 몸체와 전면 벽체 간의 결합을 공고히 유지함으로써 프리캐스트 공법을 통해 옹벽구조물의 시공 편의성을 향상시키는 동시에, 설치된 옹벽구조물의 구조안전성 및 내구성을 높은 신뢰도로 증대시킨 부벽형 프리캐스트 옹벽 및 그 시공 방법을 제공하는데 그 목적이 있다.The present invention is to solve the problems according to the prior art described above. In the present invention, in constructing a buttress-type precast retaining wall for prefabricated installation, the front wall provided with the buttress on the upper surface is mounted on the bottom plate body body, An anchor hole is formed into which a head anchor extending from the lower end of the buttress provided on the rear surface of the front wall is inserted, and the anchor hole is tapered to penetrate the bottom plate body in a tapered shape so that the cross-sectional area becomes wider toward the lower part. The head anchor caused by the load applied to the front wall by inserting a coil-shaped spiral reinforcing bar and a plurality of closed stirrups in the bottom plate body around the anchor hole to surround the anchor hole. By effectively reinforcing the resistance to the lateral tensile force around the anchor hole caused by the upward pulling force of An object of the present invention is to provide a buttress-type precast retaining wall that has increased structural safety and durability of a structure with high reliability and a construction method thereof.
상기의 목적을 달성하기 위해 본 발명에서는, 프리캐스트 타입으로 사전 제작되는 판형의 저판부와, 전면 벽체 및 상기 전면 벽체 후면에 일체로 형성되는 복수의 부벽으로 이루어지는 벽체부로 이루어지되, 저판부를 구성하는 저판부 몸체 상면에는 상기 전면 벽체가 안착되는 전단키홈이 형성되어, 옹벽 조립 시, 상기 벽체부를 구성하는 전면 벽체의 하단이 상기 전단키홈에 삽입되어 결합되며, 상기 복수의 부벽 내부에 구비되는 주철근 말단에는 부벽 하부로 돌출 형성되는 헤드앵커가 각각 일체로 연결되어 구비되고, 상기 저판부 몸체에는 상기 헤드앵커와 대응하는 위치에 저판부 몸체를 관통하여 상부에서 하부로 갈수록 단면적이 확대되도록 테이퍼진(tepered) 형태로 형성되는 앵커홀이 각각 형성되어, 시공 현장에서의 조립 과정에서, 상기 헤드앵커가 상기 앵커홀에 삽입되도록 조립한 후, 앵커홀 내부 공간에 모르타르를 충진하여 굳힘으로써 상기 저판부 및 벽체부가 상호 체결되는 부벽형 프리캐스트 옹벽 구조를 제시한다.In order to achieve the above object, in the present invention, a plate-shaped base plate pre-fabricated as a precast type, and a wall part consisting of a front wall and a plurality of buttresses integrally formed on the rear surface of the front wall, constituting the bottom plate part A shear key groove on which the front wall is seated is formed on the upper surface of the bottom plate body, and when assembling the retaining wall, the lower end of the front wall constituting the wall part is inserted into and coupled to the shear key groove, and ends of the main reinforcing bars provided inside the plurality of buttresses is provided with head anchors protruding to the lower part of the buttress and provided integrally connected to each other, and the bottom plate body is tapered so that the cross-sectional area increases from the top to the bottom by penetrating the bottom plate body at a position corresponding to the head anchor. ) shape is formed, and in the assembly process at the construction site, the head anchor is assembled to be inserted into the anchor hole, and then the bottom plate part and the wall are hardened by filling the inner space of the anchor hole with mortar. A buttress-type precast retaining wall structure in which parts are mutually fastened is presented.
본 발명에 따른 부벽형 프리캐스트 옹벽은 전면 벽체 후면에 구비되는 부벽 말단 하부로부터 연장 형성되는 헤드 앵커가 삽입되는 앵커홀 주변의 저판부 몸체에, 앵커홀을 둘러싸는 형태로 코일 형태의 나선형 철근과 다수개의 폐합스터럽을 삽설하여, 전면 벽체에 가해지는 하중에 의해 유발되는 앵커홀 주변의 횡방향 인장력에 대한 저항력을 효과적으로 보강하여 저판부 몸체와 전면 벽체 간의 결합을 공고히 유지함으로써 옹벽구조물의 구조안전성 및 내구성을 높은 신뢰도로 증대시킬 수 있는 효과가 있다.The buttress-type precast retaining wall according to the present invention comprises a coil-shaped spiral reinforcing bar in a shape surrounding the anchor hole in the body of the bottom plate part around the anchor hole into which the head anchor extended from the lower end of the buttress provided on the rear surface of the front wall is inserted. By inserting a plurality of closed stirrups to effectively reinforce the resistance to the lateral tensile force around the anchor hole caused by the load applied to the front wall, the structural safety of the retaining wall structure and the It has the effect of increasing durability with high reliability.
또한, 옹벽 구조물을 프리캐스트 타입으로 사전 제작하여, 현장에서는 간단한 조립 설치 공정만을 진행하는 시공 방식을 통해 옹벽의 시공 편의성 및 공사 기간 단축을 제공할 수 있으며, 저판부 몸체에 형성된 전단키홈에 안착되는 전면 벽체와 저판부 몸체의 연결 부위에 앵커 볼트를 이용한 전단 고정 구조를 도입하여 옹벽 시공 과정에서 하중에 의한 밀림 등에 의해 전면 벽체가 결합 위치에서 벗어나는 것을 원천적으로 방지하여 보다 신속하고 정밀한 옹벽 조립 설치가 가능한 시공 방법을 제공하는 효과가 있다.In addition, by pre-fabricating the retaining wall structure as a precast type, it is possible to provide convenience and shorten the construction period of the retaining wall through a construction method that proceeds only with a simple assembly and installation process at the site, and is seated in the shear key groove formed in the body of the base plate. By introducing a shear fixing structure using anchor bolts in the connection part of the front wall and the bottom plate body, it fundamentally prevents the front wall from moving out of the bonding position due to the push due to the load during the construction process of the retaining wall, allowing for faster and more precise retaining wall assembly and installation. It has the effect of providing a possible construction method.
도 1은 본 발명의 일실시예에 따른 부벽형 프리캐스트 옹벽이 시공된 상태를 보여주는 사시도이다.
도 2는 본 발명의 일실시예에 따른 부벽형 프리캐스트 옹벽의 시공 과정 및 결합 상태를 설명하기 위한 측단면도이다.
도 3은 도 2에 도시된 부벽형 프리캐스트 옹벽의 전단 고정 구조를 설명하기 위한 요부 상세 도면이다.
도 4는 도 2에 도시된 부벽형 프리캐스트 옹벽에서 전면 벽체 후면에 구비되는 부벽 말단 하부로부터 연장 형성되는 헤드 앵커가 삽입되는 앵커홀 주변의 저판부 몸체 내부에 삽설된 코일 형태의 나선형 철근과 다수개의 폐합스터럽의 구성을 설명하기 위한 요부 상세 도면이다.
도 5는 본 발명의 일실시예에 따른 부벽형 프리캐스트 옹벽의 시공 과정을 설명하기 위한 순서도이다.1 is a perspective view showing a state in which a buttress-type precast retaining wall according to an embodiment of the present invention is constructed.
2 is a side cross-sectional view for explaining a construction process and a coupling state of a buttress-type precast retaining wall according to an embodiment of the present invention.
FIG. 3 is a detailed view of essential parts for explaining the shear fixing structure of the buttress-type precast retaining wall shown in FIG. 2 .
4 is a coil-shaped spiral reinforcing bar inserted inside the bottom plate body around the anchor hole, into which a head anchor extending from the lower end of the buttress provided at the rear of the front wall in the buttress-type precast retaining wall shown in FIG. 2 is inserted, and a plurality of It is a detailed drawing for explaining the configuration of the dog closure stirrup.
5 is a flowchart illustrating a construction process of a buttress-type precast retaining wall according to an embodiment of the present invention.
본 발명은 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 본문에 상세하게 설명하고자 한다.Since the present invention can have various changes and can have various forms, specific embodiments are illustrated in the drawings and described in detail in the text.
그러나, 이는 본 발명을 특정한 개시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 제1, 제2 등의 용어는 다양한 구성 요소들을 설명하는데 사용될 수 있지만, 상기 구성 요소들은 상기 용어들에 의해 한정되어서는 안된다. 상기 용어들은 하나의 구성 요소를 다른 구성 요소로부터 구별하는 목적으로만 사용된다. 예를 들어, 본 발명의 권리 범위를 벗어나지 않으면서 제1 구성 요소는제2 구성 요소로 명명될 수 있고, 유사하게 제2 구성 요소도 제1 구성 요소로 명명될 수 있다.However, this is not intended to limit the present invention to the specific disclosed form, it should be understood to include all modifications, equivalents and substitutes included in the spirit and scope of the present invention. Terms such as first, second, etc. may be used to describe various elements, but the elements should not be limited by the terms. The above terms are used only for the purpose of distinguishing one component from another. For example, without departing from the scope of the present invention, a first component may be referred to as a second component, and similarly, the second component may also be referred to as a first component.
본 출원에서 사용한 용어는 단지 특정한 실시예들을 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, "포함하다" 또는 "가지다" 등의 용어는 명세서에 기재된 특징, 숫자, 단계, 동작, 구성 요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성 요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terminology used in the present application is only used to describe specific embodiments, and is not intended to limit the present invention. The singular expression includes the plural expression unless the context clearly dictates otherwise. In the present application, terms such as “comprise” or “have” are intended to designate that a feature, number, step, operation, component, part, or combination thereof described in the specification is present, and includes one or more other features or It should be understood that the existence or addition of numbers, steps, operations, components, parts, or combinations thereof does not preclude the possibility of addition.
이하, 본 발명의 바람직한 실시예를 첨부 도면에 의거하여 상세하게 설명하기로 한다.Hereinafter, a preferred embodiment of the present invention will be described in detail based on the accompanying drawings.
도 1은 본 발명의 일실시예에 따른 부벽형 프리캐스트 옹벽이 시공된 상태를 보여주는 사시도이고, 도 2는 본 발명의 일실시예에 따른 부벽형 프리캐스트 옹벽의 시공 과정 및 결합 상태를 설명하기 위한 측단면도이다.1 is a perspective view showing a state in which a buttress-type precast retaining wall according to an embodiment of the present invention is constructed, and FIG. 2 is a construction process and a coupling state of the buttress-type precast retaining wall according to an embodiment of the present invention. is a cross-sectional view for
또한, 도 3 및 도 4는 도 2에 도시된 부벽형 프리캐스트 옹벽의 전단 고정 구조와, 도 2에 도시된 부벽형 프리캐스트 옹벽에서 전면 벽체 후면에 구비되는 부벽 말단 하부로부터 연장 형성되는 헤드 앵커가 삽입되는 앵커홀 주변의 저판부 몸체 내부에 삽설된 코일 형태의 나선형 철근과 다수개의 폐합스터럽의 구성을 각각 설명하기 위한 요부 상세 도면으로, 이하에서는 상기 도 1 내지 도 4를 참조하여 본 발명의 구체적인 실시예를 설명하기로 한다.In addition, FIGS. 3 and 4 are the front end fixing structure of the buttress-type precast retaining wall shown in FIG. 2 and the head anchor extending from the lower end of the buttress provided on the rear side of the front wall in the buttress-type precast retaining wall illustrated in FIG. 2 . It is a detailed drawing of the main part for explaining the configuration of a coil-shaped spiral reinforcing bar and a plurality of closed stirrups inserted inside the bottom plate body around the anchor hole into which is inserted. Hereinafter, with reference to Figs. A specific example will be described.
도 1 및 도 2에 도시된 바와 같이, 본 발명에 따른 부벽형 프리캐스트 옹벽(100)은, 옹벽이 설치되는 바닥에 수평하게 설치되는 판형의 저판부(110)와, 전면 벽체(121) 및 상기 전면 벽체 후면에 일체로 형성되는 복수의 부벽(122)으로 구성되는 벽체부(120)로 이루어져, 프리캐스트 타입으로 사전 제작된 상기 저판부(110) 및 벽체부(120)를 현장에서 조립 및 체결하는 시공 과정을 통해 설치된다.1 and 2, the buttress-type
이때, 상기 전면 벽체 후면에 일체로 형성되는 복수의 부벽(122)은 전면 벽체의 너비나 옹벽의 설계사양 등에 따라 통상 2개 내지 4개의 범위에서 형성된다.At this time, the plurality of
저판부(110)를 구성하는 저판부 몸체(111) 상면에는 전면 벽체(121)가 안착되는 전단키홈(112)이 형성되어 있으며, 상기 전면 벽체 후면에 일체로 형성되는 복수의 부벽(122)과의 결합 부위에는, 상기 전단키홈에 인접하여 나사산이 상기 저판부 몸체(111) 상면으로 돌출 형성된 복수의 앵커볼트(113)가 각각 구비된다.A
도 3을 참조하면, 상기 복수의 부벽(122) 하부에는, 상기 앵커볼트(113)에 대응하는 위치에 관통홀(123)이 형성되고, 상기 관통홀(123) 상부에 체결홈(124)이 형성되어, 시공 현장에서 저판부(110) 및 벽체부(120)를 조립, 설치하는 과정에서 저판부 몸체(111)에 일체로 구비되는 앵커볼트(113)가 상기 관통홀(123)을 관통하여 앵커볼트(113)의 상단이 상기 체결홈(124) 내로 돌출되도록 조립한 후, 너트(128) 조임을 통해 상기 앵커볼트(113)를 상기 체결홈(124)에 고정함으로써, 이후의 옹벽 시공 과정에서 하중에 의한 밀림 등에 의해 전면 벽체가 결합 위치에서 이탈되는 것을 효과적으로 방지할 수 있다.Referring to FIG. 3 , a
여기서, 본 실시예에서는 프리캐스트 타입의 저판부 몸체(111)를 제작하는 과정에서, 저판부 몸체(111)에 복수의 앵커볼트(113)가 삽설되어 일체로 형성되는 사례에 대해 설명하고 있으나, 다른 실시예에서는 저판부 몸체(111)에서 상기 앵커볼트(113)가 삽입될 위치에 인서트 너트(미도시)를 삽설하여 프리캐스트 타입의 저판부 몸체(111)를 제작한 후, 현장 시공 시, 상기 인서트 너트에 전산(全山)볼트를 삽입, 체결하여 저판부 몸체(111)를 전면 벽체와 결합시킨 후, 전산볼트 상단을 너트(128) 조임을 통해 벽체부(120)의 체결홈(124)과 고정되도록 구성할 수도 있다.Here, in the present embodiment, in the process of manufacturing the precast type
너트(128) 조임을 통해 앵커볼트(113)를 체결홈(124)에 고정한 이후에는, 체결홈 내부 공간에 모르타르를 충진하여 굳힘으로써 결합상태를 공고하게 유지한다.After fixing the
또한, 전면 벽체(121) 후면에 일체로 형성되는 부벽(122) 내부에는 부벽의 구조 강건성 유지를 위한 다수개의 철근들이 부벽의 경사방향을 따라 내장되게 되는데, 이때 부벽 내부에서 최외곽에 배치되는 주철근(125) 말단에는, 부벽 하부로 돌출 형성되는 헤드앵커(126)가 연결되어 구비되고, 저판부 몸체(111)에는 상기 헤드앵커(126)와 대응하는 위치에 저판부 몸체(111)를 관통하여 형성되는 앵커홀(114)이 형성되어, 시공 현장에서 저판부(110) 및 벽체부(120)를 조립, 설치하는 과정에서 상기 헤드앵커(126)가 상기 앵커홀(114)에 삽입되도록 조립한 후, 상기 앵커홀(114) 내부 공간에 모르타르를 충진하여 굳힘으로써 옹벽의 체결 설치를 완료하게 된다.In addition, inside the
이때, 상기 헤드앵커(126)의 말단에는 헤드앵커(126)의 몸체 직경보다 큰 직경을 갖는 앵커헤드(127)가 구비되어, 모르타르가 충진되어 굳어진 앵커홀(114)로부터 헤드앵커(126)가 이탈하는 것을 보다 효과적으로 방지할 수 있도록 구성된다.At this time, an
또한, 상기 앵커홀(114)은 상부에서 하부로 갈수록 단면적이 확대되는 테이퍼진(tapered) 형태로 형성되어, 앵커홀(114)에 충진되어 굳어진 모르타르가 앵커홀(114)로부터 이탈되는 것을 방지하도록 구성된다.In addition, the
여기서, 상술한 실시예에서는 하나의 주철근(125) 말단에 하나의 헤드앵커(126)가 연결되어 구비되는 구조에 대하여 설명하였으나, 상기 헤드앵커(126)는 부벽 내부의 주철근 사양이나 옹벽 설계 사양 등에 따라, 하나의 주철근에 1개 또는 2개의 헤드앵커가 연결되거나 혹은 2열/2개의 4개의 헤드앵커가 연결되어 구성될 수도 있으며, 삽입되는 헤드앵커(126)의 개수에 따라 그에 대응하는 앵커홀(114)의 단면적이 조정될 수 있음은 물론이다.Here, in the above-described embodiment, the structure in which one
그런데, 이와 같은 구성을 통해 저판부(110)와 벽체부(120)가 연결되면, 옹벽 시공 후, 전면 벽체(121)에 가해지는 토압이 증가함에 따라, 전면 벽체 후면 부벽에 연결된 헤드앵커(126)에 상방 인발력이 작용하게 되고, 그에 따라 상기 헤드앵커(126)가 모르타르 결합을 통해 연결된 앵커홀(114) 주변의 저판부 몸체(111)에는, 앵커홀(114) 내부에 충진되어 굳어진 모르타르의 쐐기 작용에 의해 앵커홀(114) 주변에서 횡방향의 인장력이 발생하게 된다.However, when the
이때, 강한 압축 저항력을 보여주는 반면에 상대적으로 인장 저항력이 약한 콘크리트 구조물의 특성 상, 상기 앵커홀(114) 주변의 저판부 몸체(111)에서 상술한 횡방향 인장력에 의한 균열이 발생할 위험이 발생하고, 이와 같은 균열은 결국 저판부(110)와 벽체부(120)의 결합이 분리되는 현상으로 이어져 설치된 옹벽구조물의 구조안전성을 크게 위협하게 된다.At this time, there is a risk of cracking due to the above-described lateral tensile force in the
본 발명에서는 이와 같은 앵커홀(114) 주변의 저판부 몸체(111)에 가해지는 횡방향 인장력에 대응하여, 앵커홀 주변의 저판부 몸체에, 앵커홀을 둘러싸는 형태로 코일 형태의 나선형 철근과 다수개의 폐합스터럽을 삽설하여, 전면 벽체에 가해지는 하중에 의해 유발되는 앵커홀 주변의 횡방향 인장력에 대한 저항력을 효과적으로 보강하여 저판부 몸체와 전면 벽체 간의 결합을 공고히 유지함으로써 옹벽구조물의 구조건전성을 보다 강건하게 유지하고 있으며, 이하에서는 도 4를 참조하여 상술한 보강 구조를 보다 상세하게 설명하기로 한다.In the present invention, in response to the lateral tensile force applied to the
도 4에 나타난 바와 같이, 본 발명에서는 앵커홀(114) 주변의 저판부 몸체(111)에 앵커홀(114)의 둘레를 따라 다수개의 폐합스터럽(115)이 앵커홀(114)에 인접하여 방사형으로 배치되도록 삽설하고, 동시에 앵커홀(114) 외주면 둘레에 앵커홀(114)의 길이 방향을 따라 코일 형태의 나선형 철근(116)을 삽설하여 방사형으로 배치된 다수개의 폐합스터럽(115)의 결합위치를 보다 공고하게 고정한다.As shown in FIG. 4 , in the present invention, a plurality of
이와 같은 보강 구조를 통해 본 발명에서는, 앵커홀(114) 주변의 저판부 몸체(111)에 횡방향 인장력에 대한 저항력을 보강하는 보강 구조를 도입하여, 전면 벽체에 가해지는 하중에 의해 유발되는 앵커홀 주변의 횡방향 인장력에 대한 저항력을 효과적으로 보강하여 저판부 몸체(111)의 균열 발생을 억제함으로써, 저판부 몸체와 전면 벽체 간의 공고한 결합을 통해 옹벽구조물의 구조건전성을 더욱 향상시킬 수 있다.In the present invention through such a reinforcing structure, a reinforcing structure for reinforcing resistance to lateral tensile force is introduced into the
이상에서 살펴본 바와 같이, 본 발명에 따른 부벽형 프리캐스트 옹벽은, 옹벽 시공 과정에서 저판부 몸체에 형성된 전단키홈에 안착되는 전면 벽체와 저판부 몸체의 연결 부위에 앵커 볼트를 이용한 전단 고정 구조를 도입하여 시공 과정에서의 구조물 결합 위치를 보다 정확하게 유지할 수 있으며, 부벽 하부로부터 연장 형성되는 헤드 앵커가 삽입되는 앵커홀 주변의 저판부 몸체에, 앵커홀을 둘러싸는 형태로 코일 형태의 나선형 철근과 다수개의 폐합스터럽을 삽설하여, 옹벽 시공 후, 전면 벽체에 가해지는 하중에 의해 유발되는 앵커홀 주변의 횡방향 인장력에 대한 저항력을 효과적으로 보강하여, 프리캐스트 타입으로 사전 제작된 옹벽 구조물을 현장에서 간단히 조립, 설치하는 시공 방식을 통해 옹벽의 시공 편의성을 높이면서도, 설치된 옹벽 구조물의 구조안전성 및 내구성을 높은 신뢰도로 증대시킬 수 있다.As described above, the buttress-type precast retaining wall according to the present invention introduces a shear fixing structure using an anchor bolt at the connection portion between the front wall and the bottom plate body, which is seated in the shear key groove formed in the bottom plate body during the retaining wall construction process. Thus, it is possible to more accurately maintain the structure bonding position during the construction process, and the coil-shaped spiral reinforcing bar and multiple By inserting a closed stirrup to effectively reinforce the resistance to the lateral tensile force around the anchor hole caused by the load applied to the front wall after the retaining wall construction, the precast type retaining wall structure can be easily assembled on site. It is possible to increase the structural safety and durability of the installed retaining wall structure with high reliability while improving the construction convenience of the retaining wall through the installation method.
도 5는 상술한 바와 같은 구조로 이루어진 본 발명의 부벽형 프리캐스트 옹벽의 시공 과정을 설명하기 위한 순서도이다.5 is a flowchart for explaining the construction process of the buttress-type precast retaining wall of the present invention having the structure as described above.
이미 앞에서 설명한 바와 같이, 본 발명에 따른 부벽형 프리캐스트 옹벽을 시공함에 있어서는, 먼저 옹벽을 구성하는 저판부와 벽체부를 프리캐스트 타입으로 사전 제작한다(S100).As already described above, in constructing the buttress-type precast retaining wall according to the present invention, the bottom plate and the wall portion constituting the retaining wall are pre-fabricated in precast type (S100).
이 과정에서, 저판부를 구성하는 저판부 몸체에는 벽체부의 전면 벽체가 안착되는 전단키홈과 부벽 하부의 헤드앵커가 삽입되는 앵커홀이 형성되는데, 이때 이미 앞에서 설명한 바와 같이, 상기 전면 벽체 후면에 일체로 형성되는 복수의 부벽과 결합되는 저판부 몸체에는, 상기 전단키홈에 인접하여 나사산이 상기 저판부 몸체 상면으로 돌출 형성된 복수의 앵커볼트나 또는 전산볼트의 삽입을 위한 인서트 너트가 일체로 구비되어 제작되며, 상기 앵커홀 주변의 저판부 몸체에는 코일 형태의 나선형 철근과 다수개의 폐합스터럽이 삽설되어 제작된다.In this process, in the bottom plate body constituting the bottom plate part, a shear key groove in which the front wall of the wall part is seated and an anchor hole in which the head anchor below the buttress is inserted are formed. In the bottom plate body coupled to the formed plurality of buttresses, an insert nut for inserting a plurality of anchor bolts or computerized bolts having a screw thread protruding from the upper surface of the bottom plate body adjacent to the shear keyway is integrally provided and manufactured. , is manufactured by inserting a coil-shaped spiral reinforcing bar and a plurality of closed stirrups in the bottom plate body around the anchor hole.
또한, 벽체부를 구성하는 전면 벽체에 연결되어 구비되는 복수의 부벽 하부에는, 상기 앵커볼트 또는 인서트 너트에 대응하는 위치에 관통홀이 형성되고, 상기 관통홀 상부에 너트 체결을 위한 체결홈이 형성되어 제작되며, 각각의 부벽 말단 하부에는, 부벽 내부에 배치되는 주철근의 말단과 연결되어 부벽 하부로 돌출 형성되는 헤드앵커가 구비된다.In addition, a through hole is formed at a position corresponding to the anchor bolt or insert nut in the lower part of the plurality of buttresses connected to the front wall constituting the wall part, and a fastening groove for fastening the nut is formed in the upper part of the through hole. Manufactured, at the lower end of each of the buttresses, a head anchor is provided that is connected to the ends of the main reinforcing bars disposed inside the buttresses and protrudes into the lower portion of the buttresses.
이렇게 옹벽의 조립 설치를 위한 저판부 및 벽체부의 프리캐스트 구조물 제작이 완료되면, 옹벽 설치를 위한 지면의 바닥면 시공을 수행한다(S200).When the precast structure of the bottom plate part and the wall part for assembly and installation of the retaining wall is completed in this way, the construction of the bottom surface of the ground for the installation of the retaining wall is performed (S200).
이어서, 바닥면 시공을 통해 다져진 지면에 저판부를 안치(S300)하고, 저판부 상부에 형성된 전단키홈에 벽체부를 형성하는 전면 벽체를 안착시켜 저판부와 벽체부를 상호 결합(S400)시킴으로써 옹벽 구조물을 조립, 설치한다.Then, the bottom plate part is placed on the ground compacted through the floor construction (S300), and the front wall forming the wall part is seated in the shear key groove formed on the upper part of the bottom plate part, and the bottom plate part and the wall part are mutually coupled (S400) to assemble the retaining wall structure. , install
이 과정에서, 저판부 몸체 상면으로 돌출 형성된 복수의 앵커볼트(또는, 인서트 너트에 삽입되는 전산볼트)가 상기 벽체부에 형성된 관통홀을 관통하여 연결되도록 상기 저판부와 벽체부를 배치한 후, 상기 체결홈을 통해 너트 고정함으로써, 옹벽 시공 과정에서의 옹벽 구조물 간의 결합 위치를 보다 견고하게 유지할 수 있다.In this process, after disposing the bottom plate part and the wall part so that a plurality of anchor bolts (or computerized bolts inserted into the insert nut) protruded to the upper surface of the bottom plate part body are connected through the through hole formed in the wall part, the By fixing the nut through the fastening groove, the coupling position between the retaining wall structures in the retaining wall construction process can be more firmly maintained.
상기 저판부와 벽체부의 조립 과정에서, 부벽 하부로 돌출 형성된 헤드앵커는 저판부 몸체에 형성된 앵커홀에 삽입되며, 상기 체결홈을 통한 너트 결합으로 저판부와 벽체부를 조립한 후에는, 상기 헤드앵커가 삽입된 앵커홀과 상기 앵커볼트가 체결된 체결홈에 각각 모르타를 충진하여 굳힘으로써 조립, 설치된 옹벽 구조물을 단단히 고정(S500)하여 본 발명에 따른 부벽형 프리캐스트 옹벽의 설치를 완료하게 된다.In the process of assembling the bottom plate part and the wall part, the head anchor protruding to the bottom of the buttress is inserted into the anchor hole formed in the bottom plate part body, and after assembling the bottom plate part and the wall part by nut coupling through the fastening groove, the head anchor The installation of the buttress-type precast retaining wall according to the present invention is completed by firmly fixing the assembled and installed retaining wall structure (S500) by filling and hardening the anchor hole into which is inserted and the fastening groove to which the anchor bolt is fastened, respectively. .
이상에서 설명한 바와 같이, 본 발명에서는 옹벽 구조물을 프리캐스트 타입으로 사전 제작하여, 현장에서는 간단한 조립 설치 공정만을 진행하는 시공 방식을 통해 옹벽의 시공 편의성 및 공사 기간 단축을 제공할 수 있으며, 특히 저판부 몸체에 형성된 전단키홈에 안착되는 전면 벽체와 저판부 몸체의 연결 부위에 앵커 볼트를 이용한 전단 고정 구조를 도입하여 보다 신속하고 정밀한 옹벽 조립 설치가 가능함은 물론, 전면 벽체 후면에 구비되는 부벽 말단 하부로부터 연장 형성되는 헤드 앵커가 삽입되는 앵커홀 주변의 저판부 몸체에, 앵커홀을 둘러싸는 형태로 코일 형태의 나선형 철근과 다수개의 폐합스터럽을 삽설하여, 전면 벽체에 가해지는 하중에 의해 유발되는 앵커홀 주변의 횡방향 인장력에 대한 저항력을 효과적으로 보강하여 저판부 몸체와 전면 벽체 간의 결합을 공고히 유지함으로써 옹벽구조물의 구조안전성 및 내구성을 높은 신뢰도로 증대시킬 수 있다.As described above, in the present invention, by pre-fabricating the retaining wall structure in a precast type, it is possible to provide convenience in construction of the retaining wall and shorten the construction period through a construction method in which only a simple assembly and installation process is performed at the site. By introducing a shear fixing structure using an anchor bolt at the connection part between the front wall and the bottom plate body, which is seated in the shear keyway formed on the body, it is possible to assemble and install the retaining wall more quickly and precisely, as well as from the lower end of the buttress provided at the rear of the front wall. An anchor hole caused by a load applied to the front wall by inserting a coil-shaped spiral reinforcing bar and a plurality of closed stirrups in the bottom plate body around the anchor hole into which the extended head anchor is inserted. The structural safety and durability of the retaining wall structure can be increased with high reliability by effectively reinforcing the resistance to the surrounding lateral tensile force and firmly maintaining the bond between the bottom plate body and the front wall.
또한, 이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것은 아니며, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러가지 치환, 변형 및 변경이 가능하다는 것은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어 명백하다 할 것이다.In addition, the present invention described above is not limited by the above-described embodiments and the accompanying drawings, and it is understood that various substitutions, modifications and changes can be made without departing from the technical spirit of the present invention. It will be clear to those with ordinary knowledge in
100 : 옹벽 110 : 저판부
111 : 저판부 몸체 112 : 전단키홈
113 : 앵커볼트 114 : 앵커홀
115 : 폐합스터럽 116 : 나선형 철근
120 : 벽체부 121 : 전면 벽체
122 : 부벽 123 : 관통홀
124 : 체결홈 125 : 주철근
126 : 헤드앵커 127 : 앵커헤드
128 : 너트100: retaining wall 110: bottom plate part
111: bottom plate body 112: shear key groove
113: anchor bolt 114: anchor hole
115: closed stirrup 116: spiral reinforcing bar
120: wall portion 121: front wall
122: buttress 123: through hole
124: fastening groove 125: main reinforcing bar
126: head anchor 127: anchor head
128: Nut
Claims (10)
판형의 저판부;와 전면 벽체 및 상기 전면 벽체 후면에 일체로 형성되는 복수의 부벽으로 이루어지는 벽체부;를 포함하여 구성되되,
상기 저판부를 구성하는 저판부 몸체 상면에는 상기 전면 벽체가 안착되는 전단키홈이 형성되어, 옹벽 조립 시, 상기 벽체부를 구성하는 전면 벽체의 하단이 상기 전단키홈에 삽입되어 결합되며,
상기 복수의 부벽 내부에 구비되는 주철근의 말단에는 부벽 하부로 돌출 형성되는 헤드앵커가 각각 연결되어 구비되고, 상기 저판부 몸체에는 상기 헤드앵커와 대응하는 위치에 저판부 몸체를 관통하여 상부에서 하부로 갈수록 단면적이 확대되도록 테이퍼진(tepered) 형태로 형성되는 앵커홀이 각각 형성되어,
시공 현장에서의 조립 과정에서, 상기 헤드앵커가 상기 앵커홀에 삽입되도록 조립한 후, 앵커홀 내부 공간에 모르타르를 충진하여 굳힘으로써 상기 저판부 및 벽체부가 상호 체결되도록 구성되며,
상기 앵커홀 주변의 저판부 몸체에는,
앵커홀의 둘레를 따라 다수개의 폐합스터럽이 앵커홀에 인접하여 방사형으로 배치되도록 삽설되고, 앵커홀 외주면 둘레에 앵커홀의 길이 방향을 따라 코일 형태의 나선형 철근이 삽설되어, 전면 벽체에 가해지는 하중에 의해 유발되는 상방 인발력에 의한 앵커홀 주변의 횡방향 인장력에 대한 저항력을 보강하도록 구성되는 것을 특징으로 하는 부벽형 프리캐스트 옹벽.
In the buttress-type precast retaining wall installed prefabricated at the construction site,
A plate-shaped bottom plate portion; and a wall portion comprising a front wall and a plurality of buttresses integrally formed on the rear surface of the front wall;
A shear key groove in which the front wall is seated is formed on the upper surface of the bottom plate body constituting the bottom plate part, and when assembling the retaining wall, the lower end of the front wall constituting the wall part is inserted into and coupled to the shear key groove,
At the ends of the main reinforcing bars provided inside the plurality of buttresses, head anchors protruding from the bottom of the buttresses are respectively connected and provided, and the bottom plate body penetrates the bottom plate body at a position corresponding to the head anchor from the top to the bottom. Each anchor hole is formed in a tapered shape so that the cross-sectional area is gradually enlarged,
In the assembly process at the construction site, after assembling the head anchor to be inserted into the anchor hole, the bottom plate part and the wall part are mutually fastened by filling the inner space of the anchor hole with mortar and hardening,
In the bottom plate body around the anchor hole,
A plurality of closed stirrups are inserted along the perimeter of the anchor hole so as to be radially arranged adjacent to the anchor hole, and coil-shaped spiral reinforcing bars are inserted along the longitudinal direction of the anchor hole around the outer peripheral surface of the anchor hole. A buttress-type precast retaining wall, characterized in that it is configured to reinforce the resistance to the lateral tensile force around the anchor hole due to the induced upward pulling force.
상기 전면 벽체 후면에는,
2개 내지 4개의 부벽이 일체로 형성되는 것을 특징으로 하는 부벽형 프리캐스트 옹벽.
The method of claim 1,
At the rear of the front wall,
A buttress-type precast retaining wall, characterized in that two to four buttresses are integrally formed.
상기 헤드앵커의 말단에는,
상기 헤드앵커의 몸체 직경보다 큰 직경을 갖는 앵커헤드가 구비되는 것을 특징으로 하는 부벽형 프리캐스트 옹벽.
The method of claim 1,
At the end of the head anchor,
Buttress-type precast retaining wall, characterized in that provided with an anchor head having a larger diameter than the body diameter of the head anchor.
상기 복수의 부벽 내부에 구비되는 주철근 말단에는,
1개 내지 4개의 헤드앵커가 각각 연결되어 구비되는 것을 특징으로 하는 부벽형 프리캐스트 옹벽.
The method of claim 1,
At the ends of the main reinforcing bars provided inside the plurality of buttresses,
A buttress-type precast retaining wall, characterized in that 1 to 4 head anchors are connected to each other.
상기 저판부 몸체에는, 상기 전단키홈에 인접하여, 상기 전면 벽체 후면에 형성된 복수의 부벽과 결합되는 위치에, 저판부 몸체 상면으로 돌출 형성되는 복수의 앵커볼트가 각각 구비되고,
상기 복수의 부벽 하부에는, 상기 앵커볼트와 대응하는 위치에 관통홀이 형성되고, 상기 관통홀 상부에는 체결홈이 형성되어,
시공 현장에서의 조립 과정에서, 상기 앵커볼트가 상기 관통홀을 관통하여, 너트 조임을 통해 상기 체결홈에 고정되도록 조립되는 것을 특징으로 하는 부벽형 프리캐스트 옹벽.
The method of claim 1,
A plurality of anchor bolts protruding from the upper surface of the bottom plate body are provided on the bottom plate body, adjacent to the shear key groove, at positions coupled with a plurality of buttresses formed on the rear surface of the front wall, respectively,
A through hole is formed in a lower portion of the plurality of buttresses at a position corresponding to the anchor bolt, and a fastening groove is formed in an upper portion of the through hole,
In the assembly process at the construction site, the anchor bolt penetrates the through hole and is assembled to be fixed to the fastening groove by tightening a nut.
상기 저판부 몸체에는, 상기 전단키홈에 인접하여, 상기 전면 벽체 후면에 형성된 복수의 부벽과 결합되는 위치에, 복수의 인서트 너트가 각각 삽설되어 구비되고,
상기 복수의 부벽 하부에는, 상기 인서트 너트와 대응하는 위치에 관통홀이 형성되고, 상기 관통홀 상부에는 체결홈이 형성되어,
시공 현장에서의 조립 과정에서, 상기 인서트 너트에 전산볼트를 삽입, 체결하고, 상기 전산볼트가 상기 관통홀을 관통하여, 너트 조임을 통해 상기 체결홈에 고정되도록 조립되는 것을 특징으로 하는 부벽형 프리캐스트 옹벽.
The method of claim 1,
In the bottom plate body, adjacent to the shear key groove, a plurality of insert nuts are respectively inserted and provided at positions coupled with a plurality of buttresses formed on the rear surface of the front wall,
A through hole is formed in a lower portion of the plurality of buttresses at a position corresponding to the insert nut, and a fastening groove is formed in an upper portion of the through hole,
In the assembly process at the construction site, a computerized bolt is inserted and fastened to the insert nut, and the computerized bolt passes through the through hole and is assembled to be fixed to the fastening groove by tightening the nut. cast retaining wall.
상기 앵커볼트가 너트 조임을 통해 상기 체결홈에 고정된 이후에는,
상기 체결홈에 모르타르를 충진하여 굳힘으로써 조립 위치가 고정되는 것을 특징으로 하는 부벽형 프리캐스트 옹벽.
7. The method of claim 6,
After the anchor bolt is fixed to the fastening groove by tightening the nut,
A buttress-type precast retaining wall, characterized in that the assembly position is fixed by filling the fastening groove with mortar and hardening it.
부벽형 프리캐스트 옹벽을 구성하는 저판부 및 벽체부를 프리캐스트 타입으로 사전 제작하는 단계;
옹벽 설치를 위한 지면의 바닥면 시공을 수행하는 단계;
바닥면 시공을 통해 다져진 지면에 프리캐스트 타입으로 사전 제작된 저판부를 안치하는 단계;
상기 저판부 상부에 프리캐스트 타입으로 사전 제작된 벽체부를 설치하되, 상기 저판부 몸체 상면에 형성된 전단키홈에 상기 벽체부를 구성하는 전면 벽체의 하단을 삽입하여 상기 저판부와 벽체부를 상호 결합시키는 단계;
상기 부벽 하부로 돌출 형성된 헤드앵커를 저판부 몸체에 형성된 앵커홀에 삽입한 후, 앵커홀 내부 공간에 모르타르를 충진하여 굳히는 단계;
를 포함하여 구성되되,
상기 저판부를 프리캐스트 타입으로 사전 제작하는 단계에서는,
상기 앵커홀 주변의 저판부 몸체에, 앵커홀의 둘레를 따라 다수개의 폐합스터럽이 앵커홀에 인접하여 방사형으로 배치되도록 삽설하고,
앵커홀 외주면 둘레의 저판부 몸체에는, 앵커홀의 길이 방향을 따라 코일 형태의 나선형 철근을 삽설하여 제작하여,
옹벽 시공 후, 전면 벽체에 가해지는 하중에 의해 유발되는 상방 인발력에 의한 앵커홀 주변의 횡방향 인장력에 대한 저항력을 보강하는 것을 특징으로 하는 부벽형 프리캐스트 옹벽 시공방법.
In the on-site construction method of the buttress-type precast retaining wall according to claim 1,
pre-fabricating the bottom plate and wall parts constituting the buttress-type precast retaining wall in a precast type;
performing the bottom surface construction of the ground for the retaining wall installation;
Placing a pre-fabricated base plate in a precast type on the ground compacted through floor construction;
Installing a pre-fabricated wall part in a precast type on the bottom plate part, inserting the lower end of the front wall constituting the wall part into the shear key groove formed on the upper surface of the bottom plate part body to mutually couple the bottom plate part and the wall part;
After inserting the head anchor protruding from the bottom of the buttress into the anchor hole formed in the bottom plate body, filling the inner space of the anchor hole with mortar to harden;
Consists of including,
In the step of pre-fabricating the base plate in a precast type,
In the bottom plate body around the anchor hole, a plurality of closed stirrups are inserted along the circumference of the anchor hole so as to be radially disposed adjacent to the anchor hole,
In the bottom plate body around the outer peripheral surface of the anchor hole, coil-shaped spiral reinforcing bars are inserted along the length direction of the anchor hole and manufactured.
A buttress-type precast retaining wall construction method, characterized in that after retaining wall construction, the resistance to the lateral tensile force around the anchor hole due to the upward pulling force induced by the load applied to the front wall is reinforced.
상기 전산볼트가 너트 조임을 통해 상기 체결홈에 고정된 이후에는,
상기 체결홈에 모르타르를 충진하여 굳힘으로써 조립 위치가 고정되는 것을 특징으로 하는 부벽형 프리캐스트 옹벽.8. The method of claim 7,
After the computerized bolt is fixed to the fastening groove by tightening the nut,
A buttress-type precast retaining wall, characterized in that the assembly position is fixed by filling the fastening groove with mortar and hardening it.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020200164542A KR102290220B1 (en) | 2020-11-30 | 2020-11-30 | Precast counterfort retaining walls and the construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020200164542A KR102290220B1 (en) | 2020-11-30 | 2020-11-30 | Precast counterfort retaining walls and the construction method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR102290220B1 true KR102290220B1 (en) | 2021-08-20 |
Family
ID=77466578
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020200164542A Active KR102290220B1 (en) | 2020-11-30 | 2020-11-30 | Precast counterfort retaining walls and the construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR102290220B1 (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115217145A (en) * | 2022-07-12 | 2022-10-21 | 福州市规划设计研究院集团有限公司 | Assembly stop-log type supporting system with mortise and tenon joints and construction method thereof |
| KR102484234B1 (en) | 2022-08-29 | 2023-01-04 | 대영스틸산업주식회사 | Precast Self Retaining wall and its construction method |
| CN116837894A (en) * | 2023-07-21 | 2023-10-03 | 河北建筑工程学院 | Retaining wall structure for improving earthquake resistance of roadbed and construction method |
| KR102627588B1 (en) * | 2023-04-03 | 2024-01-24 | 주식회사 티에프이앤씨 | Retaining wall using anchorage construction method |
| KR102670860B1 (en) | 2023-10-12 | 2024-05-30 | 대영스틸산업주식회사 | Structure of Self-Stand Retaining Wall for Rigidity Reinforcement Type |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011043009A (en) * | 2009-08-24 | 2011-03-03 | Hazama Corp | Reinforcing member around opening in reinforcing concrete beam with opening, and reinforcing structure and method using the same |
| KR20180103219A (en) * | 2017-03-08 | 2018-09-19 | 주식회사 상아이앤씨 | Prefabricated Buttressed Retaining Wall |
| KR101920622B1 (en) | 2018-02-22 | 2019-02-13 | 박창진 | Combined Retaining Wall and Method for Constructing Thereof |
| CN111733867A (en) * | 2020-06-11 | 2020-10-02 | 上海市政工程设计研究总院(集团)有限公司 | Adopt prefabricated assembled cantilever retaining wall that combination mode is connected |
-
2020
- 2020-11-30 KR KR1020200164542A patent/KR102290220B1/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011043009A (en) * | 2009-08-24 | 2011-03-03 | Hazama Corp | Reinforcing member around opening in reinforcing concrete beam with opening, and reinforcing structure and method using the same |
| KR20180103219A (en) * | 2017-03-08 | 2018-09-19 | 주식회사 상아이앤씨 | Prefabricated Buttressed Retaining Wall |
| KR101920622B1 (en) | 2018-02-22 | 2019-02-13 | 박창진 | Combined Retaining Wall and Method for Constructing Thereof |
| CN111733867A (en) * | 2020-06-11 | 2020-10-02 | 上海市政工程设计研究总院(集团)有限公司 | Adopt prefabricated assembled cantilever retaining wall that combination mode is connected |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115217145A (en) * | 2022-07-12 | 2022-10-21 | 福州市规划设计研究院集团有限公司 | Assembly stop-log type supporting system with mortise and tenon joints and construction method thereof |
| KR102484234B1 (en) | 2022-08-29 | 2023-01-04 | 대영스틸산업주식회사 | Precast Self Retaining wall and its construction method |
| KR102627588B1 (en) * | 2023-04-03 | 2024-01-24 | 주식회사 티에프이앤씨 | Retaining wall using anchorage construction method |
| CN116837894A (en) * | 2023-07-21 | 2023-10-03 | 河北建筑工程学院 | Retaining wall structure for improving earthquake resistance of roadbed and construction method |
| KR102670860B1 (en) | 2023-10-12 | 2024-05-30 | 대영스틸산업주식회사 | Structure of Self-Stand Retaining Wall for Rigidity Reinforcement Type |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108547217B (en) | Prefabricated bridge precast concrete pier column and cover beam socket structure and construction method | |
| JP6691880B2 (en) | Precast wall balustrade mounting structure and mounting method | |
| KR100932468B1 (en) | Centrifugal hollow PC columns and their construction methods using cast-in-place concrete or steel columns | |
| CN101939492B (en) | Precast temporary facility structure and construction method for the same | |
| JP3900344B2 (en) | Column-to-pile connection structure of steel structure building and its construction method | |
| JP2007162448A (en) | Reinforcing method and reinforcing structure for columnar structure | |
| JP4433066B2 (en) | Wall structure with permanent anchor construction, wall construction method with permanent anchor construction, | |
| JP4750562B2 (en) | Connection structure between pile head and precast girder | |
| JP2006104747A (en) | Joint structure and joining method of pedestal | |
| JP2008231799A (en) | Seismic isolation structure | |
| KR101789567B1 (en) | Concrete anchor block for strengthening an anchor component force on the slope | |
| KR20060000492A (en) | Precast Concrete Beam-Column Connection Structure | |
| KR100870861B1 (en) | Concrete filling head reinforcement device of steel pipe pile | |
| KR102349866B1 (en) | Connecting hardware for dry method and a structure for joining a pc girder to a pc column using the connecting hardware and construction method of the joining structure | |
| KR200201561Y1 (en) | Head reinforcement structure of steel pipe pile | |
| JP3671344B2 (en) | Joint structure between foundation pile and column base and its construction method | |
| KR102657183B1 (en) | concrete pile having post tension and haed reinforced hollow portion and manufacturing method of it, and reinforced pile with it | |
| JP4420697B2 (en) | Standing structure of steel pipe columns | |
| KR102200400B1 (en) | Precast segment, pillar structure including the same and construction method of pillar structure usinging the same | |
| KR102521105B1 (en) | Connected Structure of Column and Precast Coping and its Construction Method | |
| KR100639786B1 (en) | Installation structure of precast impression slab for manhole and precast impression slab for manhole and construction method of precast impression slab for manhole | |
| JP7049980B2 (en) | Construction method of composite foundation structure | |
| JP3096660B2 (en) | Pile head structure of cast-in-place steel pipe concrete pile and its construction method | |
| KR102685846B1 (en) | Head reinforcement cap for PHC pile | |
| KR102899166B1 (en) | Bolt-couplable retaining wall panel and construction method of retaining wall using the same |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| PA0302 | Request for accelerated examination |
St.27 status event code: A-1-2-D10-D17-exm-PA0302 St.27 status event code: A-1-2-D10-D16-exm-PA0302 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-PN2301 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| P16-X000 | Ip right document amended |
St.27 status event code: A-5-5-P10-P16-nap-X000 |
|
| Q16-X000 | A copy of ip right certificate issued |
St.27 status event code: A-4-4-Q10-Q16-nap-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 5 |