KR102143057B1 - A bolck-assembly type eco pillar debris barrier and construction method thereof - Google Patents

A bolck-assembly type eco pillar debris barrier and construction method thereof Download PDF

Info

Publication number
KR102143057B1
KR102143057B1 KR1020180016923A KR20180016923A KR102143057B1 KR 102143057 B1 KR102143057 B1 KR 102143057B1 KR 1020180016923 A KR1020180016923 A KR 1020180016923A KR 20180016923 A KR20180016923 A KR 20180016923A KR 102143057 B1 KR102143057 B1 KR 102143057B1
Authority
KR
South Korea
Prior art keywords
block
pillar
stacked
hollow pillar
eco
Prior art date
Application number
KR1020180016923A
Other languages
Korean (ko)
Other versions
KR20190097459A (en
Inventor
김현기
Original Assignee
가톨릭관동대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 가톨릭관동대학교 산학협력단 filed Critical 가톨릭관동대학교 산학협력단
Priority to KR1020180016923A priority Critical patent/KR102143057B1/en
Publication of KR20190097459A publication Critical patent/KR20190097459A/en
Application granted granted Critical
Publication of KR102143057B1 publication Critical patent/KR102143057B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams

Abstract

본 발명은 블록 적층형 에코 필라 사방댐 및 그 시공방법을 개시한다. 본 발명에 의한 블록 적층형 에코 필라 사방댐은, 콘크리트 기초층에 일정한 배열 패턴의 기둥형 축조 구조물로 시공되는 다수의 중공 필라는 실린더형 몸체의 상단과 하단을 관통하는 다수의 관통홀이 환형상의 배열로 형성되도록 프리캐스트 콘크리트로 제작된 복수의 단위 중공 필라 블록이 순차적으로 적층되어 세그먼트를 형성하도록 이루어지며, 각 단위 중공 필라 블록의 관통홀에 프리스트레스 긴장재로 삽입되는 강봉 및 그 주위를 에워싸도록 충전되는 그라우팅재에 의해 형성되는 연결 보강부에 의해 일체적인 구조체를 이루도록 축조되는 구성을 가진다. 이와 같은 구성에 의하면, 시공효율성의 향상과 시공기간의 단축을 통하여 경제적인 블록 적층형 에코 필라 사방댐 및 그 시공방법을 제공할 수 있다.The present invention discloses a block-stacked eco-pillar four-way dam and a construction method thereof. The block-stacked eco-pillar four-sided dam according to the present invention is constructed in a concrete base layer as a columnar construction structure with a certain arrangement pattern, and a plurality of through holes penetrating the top and bottom of the cylindrical body are arranged in an annular shape. A plurality of unit hollow pillar blocks made of precast concrete to be formed are sequentially stacked to form a segment, and a steel rod inserted as a prestress tension member into the through hole of each unit hollow pillar block and filled to surround it. It has a configuration that is built to form an integral structure by the connection reinforcing portion formed by the grouting material. According to this configuration, it is possible to provide an economical block-laminated eco-pillar all-round dam and its construction method through improvement of construction efficiency and reduction of construction period.

Description

블록 적층형 에코 필라 사방댐 및 그 시공방법{A bolck-assembly type eco pillar debris barrier and construction method thereof}Block-laminated eco pillar debris barrier and construction method thereof {A bolck-assembly type eco pillar debris barrier and construction method thereof}

본 발명은 에코 필라 사방댐 및 그 시공방법에 관한 것으로서, 보다 상세하게는 프리캐스트(PC) 콘크리트로 제작된 단위 중공 필라 블록(Unit hollow pillar block)을 지반에 타설되는 콘크리트 기초층에 순차적으로 적층 시공하여 축조되는 블록 적층형 에코 필라 사방댐 및 그 시공방법에 관한 것이다.The present invention relates to an eco-pillar four-way dam and its construction method, and in more detail, a unit hollow pillar block made of precast (PC) concrete is sequentially laminated to a concrete base layer placed on the ground. It relates to a block-stacked eco-pillar four-way dam constructed by doing this and a construction method thereof.

근래에 들어 지구온난화에 따른 기후변화의 영향으로 인해 발생하는 돌발적인 국지성 집중호우의 빈도와 강도가 증가함에 따라 토석류 피해사례의 증가와 대형화가 초래되고 있어 방재대책에 대한 수요가 급증하고 있다.In recent years, as the frequency and intensity of sudden localized torrential rains arising from the effects of climate change caused by global warming have increased, the number of cases of damage caused by earth and stones has increased and the demand for disaster prevention measures is increasing rapidly.

특히, 우리나라는 국토의 약 65%를 차지하는 산지의 경사가 급하고 계곡이 협소한데다 인구밀도가 높아 토지이용 특성상 산지의 개발 행위가 진행됨에 따라 주택이나 공장 및 각종 사회기반시설이 산록(山麓; the foot of a mountain)에 위치하게 되어 잠재적인 토사 재해의 위험성이 높은 상황으로 알려져 있다.In particular, in Korea, due to the nature of land use due to the steep slope and narrow valleys and high population density in the mountainous regions that occupy about 65% of the country's land, houses, factories, and various social infrastructures are located on the hillside (山麓; the It is located in the foot of a mountain and is known to be a high risk of potential sediment disasters.

통상적인 토석류 재해는 시공간적인 불균일성을 갖고 돌발적으로 발생하기 때문에 정확한 예측에 한계를 지니게 되므로, 산사태와 같은 토석류 재해를 최소화하기 위해서는 잠재적인 토석류 재해 위험지역의 예방을 위한 사방사업의 시행이 매우 중요하다. 이와 같은 토석류 재해예방 사방사업 중에서 가장 큰 비중을 차지하는 사방댐은 토사와 토석 및 유목의 유출 억제를 주된 목적으로 시공되는 횡단 구조물로서, 요컨대 계곡 상류에서 발생한 산사태 등으로 나무와 흙이 한꺼번에 하류로 쏟아지는 것을 막아 하류지역의 민가와 농경지 및 도로 등의 피해를 저지하는 재해방지용 시설물로 기능하게 된다.Since conventional earth and stone disasters occur unexpectedly with spatio-temporal non-uniformity, it is very important to implement an all-round project to prevent potential earth and stone disasters in order to minimize earth and stone disasters such as landslides. . Sabang Dam, which accounts for the largest proportion of such earth and stone disaster prevention projects, is a cross-section structure constructed for the main purpose of suppressing the outflow of soil, soil, and driftwood.In short, it prevents the flooding of trees and soil into the downstream due to landslides occurring in the upper valley. It will function as a disaster prevention facility to prevent damage to private houses, agricultural land, and roads in the downstream area.

상기한 바와 같은 사방댐은 1986년 우리나라에 최초로 시공된 이후 재해 저감 효과가 알려지기 시작하면서 기상이변에 의한 집중호우로 산림피해가 대형화되고 빈번하게 발생하게 됨에 따라 피해를 최소화할 수 있는 해결책으로 하류지역의 보전을 위해 꼭 필요한 시설로 인식하여 1990년대부터 본격적인 시공시설을 통해 점차 확충되어 가는 추세이다.Since the Sabang Dam as described above was first constructed in Korea in 1986, the disaster reduction effect began to be known, and as the forest damage increased and frequently occurred due to torrential rains caused by extreme weather, it is a solution to minimize the damage. It is recognized as an essential facility for the preservation of the building and is gradually being expanded through full-fledged construction facilities from the 1990s.

그런데 기존의 통상적인 사방댐은 콘크리트 벽 구조체의 획일적인 형태로 축조되면서 주변 경관과 조화를 이루지 못한데다 하천 생태계도 고려하지 못해 새로운 공법의 사방댐 건설 필요성이 대두 됨에 따라 최근에는 예를 들어 대한민국 등록특허공보 제10-0965467호에 제시된 바와 같은 친환경적인 에코 필라(Eco-Pillar) 사방댐 개발이 활성화되고 있다.However, as the conventional Sabang Dam is constructed in a uniform form of a concrete wall structure, it is not in harmony with the surrounding landscape, and the necessity of constructing a Sabang Dam using a new construction method has emerged due to the inability to consider the river ecosystem. The development of eco-friendly Eco-Pillar all-round dam as suggested in No. 10-0965467 is being activated.

즉, 기존의 강재 틀이나 중력식 콘크리트 사방댐은 상류에 폐광지 등이 있어 토석이 지속적으로 내려올 경우 이를 퍼내 바닥을 깊게 하는 준설작업이 필요하다는 단점이 있으며, 바닥 준설시 하천 양쪽이 침식되면서 또 다른 산사태를 유발하는 원인으로 작용하는 문제점이 있다. 이에 따라 사방댐의 높이가 대형화되어 주변 경관을 크게 손상시키고 계류의 횡단을 방해하면서 생태단절 현상까지 초래하는 문제점 등이 드러나고 있는 상황으로 알려지고 있다.In other words, the existing steel frame or gravity-type concrete four-way dam has a disadvantage in that it is necessary to deepen the bottom by scooping out if the soil is continuously descending because there is an abandoned mine area upstream, and when the bottom is dredged, another landslide occurs as both sides of the river are eroded. There is a problem that acts as a cause to cause. As a result, it is known that the height of the Sabang dam is increased, which greatly damages the surrounding landscape, obstructs the crossing of the mountain stream, and causes ecological disconnection.

한편, 에코 필라(Eco-Pillar) 사방댐은 차단 위주의 기존 사방댐이 지니고 있는 단점과 문제점을 보완하고 시설규모를 소형화하여 주변 자연경관의 훼손을 최소화할 수 있도록 개발된 것으로서, 상하류 간의 소통이 원활하게 시공되어 어류와 양서류 및 동물의 이동이 자유롭고 시각적으로 친근감을 지니는 장점이 있다.On the other hand, the Eco-Pillar four-way dam was developed to compensate for the shortcomings and problems of the existing four-sided dams focusing on blocking, and to minimize damage to the surrounding natural landscape by miniaturizing the facility size. It is constructed so that fish, amphibians, and animals can move freely and has the advantage of visually friendly.

또한, 에코 필라 사방댐은 그 자체가 방수로의 역할과 기능을 수행할 수 있게 됨에 따라 방수로 안전율이 높고 댐의 높이가 낮아지면서 시공 효율성과 경제성이 크게 향상되는 등의 장점을 지니고 있다.In addition, the Eco Pillar Sabang Dam has advantages such as a high spillway safety factor and a low dam height, greatly improving construction efficiency and economics, as it can perform the role and function of a spillway.

그러나, 현재까지 시공되어 축조되는 에코 필라 사방댐은 거푸집을 조립하고 현장 타설 콘크리트를 양생하는 시공방법으로 축조함에 따라 거푸집 배치와 철근조립 등으로 인하여 시공상의 공정이 복잡하게 이루어져 있어서 인건비 등의 시공원가와 시공기간이 증가하는 단점을 지니고 있다.However, the Eco Pillar Sabang Dam, which has been constructed and constructed so far, is constructed by a construction method of assembling formwork and curing cast-in-place concrete, which complicates the construction process due to the formwork arrangement and rebar assembly. It has the disadvantage of increasing the construction period.

또한, 기존 에코 필라 사방댐은 콘크리트 양생까지의 오랜 소요시간으로 인하여 품질확보가 어려운 단점을 지니고 있으며, 콘크리트 타설 시간이 제한된 레미콘 차량이 시공현장까지 진입하지 못하는 경우도 많아 그 적용에 지리적 환경적 제약의 영향을 많이 받고 있는 실정이다.In addition, the existing Eco Pillar Sabang Dam has a disadvantage that it is difficult to secure quality due to the long time required to cure concrete, and there are many cases where ready-mixed concrete vehicles with limited concrete placement time cannot enter the construction site. The situation is being influenced a lot.

대한민국 등록특허공보 제10-1418998호Republic of Korea Patent Publication No. 10-1418998 대한민국 등록특허공보 제10-1313868호Korean Registered Patent Publication No. 10-1313868 대한민국 등록특허공보 제10-0995832호Korean Patent Publication No. 10-0995832 대한민국 등록특허공보 제10-0965467호Korean Patent Publication No. 10-0965467 대한민국 등록특허공보 제10-0908676호Republic of Korea Patent Publication No. 10-0908676 대한민국 등록실용신안공보 제20-0291969호Republic of Korea Utility Model Publication No. 20-0291969

본 발명은 상기한 바와 같은 기존의 사방댐이 지니고 있는 단점과 문제점을 감안하여 이를 개선하기 위해 창출된 것으로서, 본 발명의 목적은 가도와 가물막 등의 가시설물 설치를 최소화할 수 있는 동시에 철근의 현장조립과 거푸집 양생 등의 공정 생략 및 자재 핸들링의 용이성에 의해 효율적인 공기단축을 통한 경제적인 블록 적층형 에코 필라 사방댐 및 그 시공방법을 제공하기 위한 것이다.The present invention was created to improve this in consideration of the disadvantages and problems of the existing Sabang dam as described above, and an object of the present invention is to minimize the installation of temporary facilities such as roadways and temporary barriers, and at the same time It is to provide an economical block-laminated eco-pillar four-way dam and its construction method through efficient reduction of construction period by omitting processes such as assembly and formwork curing and ease of material handling.

본 발명의 다른 목적은 프리캐스트 콘크리트로 제작되어 적층 세그멘트로 사용되는 단위 중공 필라들의 연결부에 프리스트레스 긴장재로 설치되는 강봉과 그라우팅재의 충전을 통해 연결 보강부를 형성하여 구조적 안정성과 내구성을 용이하게 확보하여 부식우려가 높은 기존의 고비용 강재 사방댐을 유효하게 대체할 수 있는 새로운 형식의 블록 적층형 에코 필라 사방댐 및 그 시공방법을 제공하기 위한 것이다.Another object of the present invention is to form a connection reinforcement part through filling of a steel bar installed as a prestress tension material and a grouting material at the connection part of the unit hollow pillars used as a laminated segment made of precast concrete, thereby easily securing structural stability and durability to prevent corrosion. It is to provide a new type of block-stacked eco-pillar all-round dam and its construction method that can effectively replace the existing high-cost steel four-sided dam with high concern.

본 발명의 또 다른 목적은 경사 지반에 타설되는 콘크리트 기초층에 프리캐스트(PC) 콘크리트 단위 중공 필라 블록을 순차적으로 적층 시공하여 경량화와 소형화에 유리하도록 개량된 경제적인 블록 적층형 에코 필라 사방댐 및 그 시공방법을 제공하기 위한 것이다.Another object of the present invention is an economical block-laminated eco-pillar four-way dam and its construction improved to benefit weight reduction and miniaturization by sequentially stacking precast (PC) concrete unit hollow pillar blocks on a concrete foundation layer placed on a sloped ground. It is to provide a way.

본 발명의 또 다른 목적은 환경적 지리적 제약조건의 영향을 최소화할 수 있는 동시에 주변환경과의 조화를 최대한 확보할 수 있는 새로운 형식의 블록 적층형 에코 필라 사방댐 및 그 시공방법을 제공하기 위한 것이다.Another object of the present invention is to provide a new type of block-stacked eco-pillar all-round dam and its construction method, which can minimize the influence of environmental and geographic constraints and secure maximum harmony with the surrounding environment.

본 발명의 또 다른 목적은 상기한 목적들을 달성하기 위한 블록 적층형 에코 필라 사방댐 축조용 프리캐스트 콘크리트 중공 필라 블록 유닛을 제공하기 위한 것이다.Another object of the present invention is to provide a precast concrete hollow pillar block unit for constructing a block-stacked eco-pillar four-way dam for achieving the above objects.

상기한 목적을 달성하기 위하여 본 발명에 의한 블록 적층형 에코 필라 사방댐은, 지반에 타설되는 콘크리트 기초층과, 그 콘크리트 기초층에 일정한 간격 패턴으로 배열되는 직립 기둥형 축조 구조물로 시공되는 다수의 중공 필라를 포함하는 에코 필라 사방댐에 있어서, 상기 중공 필라는 실린더형 몸체의 상단과 하단을 관통하는 다수의 관통홀이 환형 배열로 형성되도록 프리캐스트 콘크리트로 제작된 복수의 단위 중공 필라 블록이 순차적으로 적층되어 세그먼트를 형성하도록 이루어지며, 상기 각 단위 중공 필라 블록은 상기 관통홀에 프리스트레스 긴장재로 삽입되는 강봉 및 그 강봉의 주위를 에워싸도록 충전되는 그라우팅재에 의해 형성되는 연결 보강부에 의해 일체적인 구조체를 이루도록 축조되는 것을 특징으로 한다.In order to achieve the above object, the block-stacked eco-pillar four-sided dam according to the present invention includes a concrete base layer poured on the ground, and a plurality of hollow pillars constructed with an upright columnar construction structure arranged in a regular interval pattern on the concrete base layer. In the eco-pillar four-way dam comprising a, the hollow pillar is a plurality of unit hollow pillar blocks made of precast concrete are sequentially stacked so that a plurality of through holes penetrating the upper and lower ends of the cylindrical body are formed in an annular arrangement. It is made to form a segment, and each unit of the hollow pillar block is an integral structure by a steel rod inserted into the through hole as a prestressed tension member and a connection reinforcing part formed by a grouting material filled to surround the steel rod. It characterized in that it is built to achieve.

상기한 목적을 달성하기 위하여 본 발명에 의한 다른 블록 적층형 에코 필라 사방댐은, 지반에 타설되는 콘크리트 기초층과, 그 콘크리트 기초층에 일정한 간격 패턴으로 배열되는 직립 기둥형 축조 구조물로 시공되는 다수의 중공 필라를 포함하는 에코 필라 사방댐에 있어서, 상기 중공 필라는 원통형 몸체의 상단과 하단을 관통하는 다수의 관통홀이 환형 배열로 형성되도록 프리캐스트 콘크리트로 제작된 복수의 단위 중공 필라 블록이 순차적으로 적층되어 세그먼트를 형성하도록 이루어지고, 상기 각 단위 중공 필라 블록은 상기 관통홀에 프리스트레스 긴장재로 삽입되는 강봉 및 그 강봉의 주위를 에워싸도록 충전되는 그라우팅재에 의해 형성되는 연결 보강부에 의해 일체적인 구조체를 이루도록 축조되며, 상기 콘크리트 기초층에 탑재되는 최하단의 단위 중공 필라 블록은 상기 콘크리트 기초층에 돌출되도록 매설되어 중공 내부에 삽입된 상태로 정렬되는 복수의 철근 및 그 철근의 매립을 위해 타설되는 몰탈층에 의해 형성되는 보강 접합부를 포함하는 것을 특징으로 한다.In order to achieve the above object, another block-laminated eco-pillar four-sided dam according to the present invention is constructed with a concrete base layer poured into the ground and an upright columnar construction structure arranged in a regular interval pattern on the concrete base layer. In the eco-pillar four-way dam including pillars, the hollow pillars are formed by sequentially stacking a plurality of unit hollow pillar blocks made of precast concrete so that a plurality of through holes penetrating the upper and lower ends of the cylindrical body are formed in an annular arrangement. It is made to form a segment, and each unit hollow pillar block is an integral structure formed by a steel bar inserted into the through hole as a prestressed tension material and a connecting reinforcement part formed by a grouting material filled to surround the steel bar. The lowermost unit hollow pillar block mounted on the concrete foundation layer is buried so as to protrude from the concrete foundation layer, and a plurality of reinforcing bars arranged to be inserted into the hollow interior and a mortar layer poured for the reinforcement It characterized in that it comprises a reinforcing joint formed by.

상기한 목적을 달성하기 위하여 본 발명에 의한 블록 적층형 에코 필라 사방댐 시공방법은, 지반에 타설되는 콘크리트 기초층에 다수의 중공 필라를 일정한 간격의 배열 패턴으로 축조하는 에코 필라 사방댐의 시공방법에 있어서, 프리스트레스 긴장재로 설치되는 강봉이 돌출된 상태로 매설되도록 지반에 콘크리트 기초층을 타설하여 양생하는 단계 및 상기 중공 필라를 형성하기 위해 적층되는 세그먼트를 이루도록 실린더형 몸체의 상단과 하단을 관통하는 다수의 관통홀이 구비된 단위 중공 필라 블록을 콘크리트 프리캐스트로 제작하는 단계를 각각 별도의 공정으로 수행하며, 상기 단위 중공 필라 블록을 현장으로 운반하여 상기 관통홀에 상기 강봉이 삽입되도록 상기 콘크리트 기초층에 순차적으로 적층하는 단계와; 상기 강봉에 프리스트레스를 가하기 위해 정착구를 설치하고, 상기 관통홀에 그라우팅재를 충전하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above object, the method of constructing a block-laminated eco-pillar four-way dam according to the present invention, in the construction method of an eco-pillar four-way dam, in which a plurality of hollow pillars are constructed in an arrangement pattern at regular intervals on a concrete foundation layer poured into the ground, A step of curing by pouring a concrete foundation layer in the ground so that a steel bar installed as a prestressed tension member is buried in a protruding state, and a plurality of penetrations penetrating the top and bottom of the cylindrical body to form a segment that is stacked to form the hollow pillar. Each of the steps of manufacturing a unit hollow pillar block equipped with a hole into a concrete precast is carried out as a separate process, and the unit hollow pillar block is transported to the site so that the steel rod is inserted into the through hole sequentially in the concrete base layer. Stacking with; And installing a fixing unit to apply prestress to the steel bar, and filling the through hole with a grouting material.

상기한 목적을 달성하기 위하여 본 발명에 의한 다른 블록 적층형 에코 필라 사방댐 시공방법은, 지반에 타설되는 콘크리트 기초층에 다수의 중공 필라를 일정한 간격 배열 패턴으로 축조하는 에코 필라 사방댐의 시공방법에 있어서, 프리스트레스 긴장재로 설치되는 강봉이 돌출된 상태로 매설되도록 지반에 콘크리트 기초층을 타설하여 양생하는 단계 및 상기 중공 필라를 형성하기 위해 적층되는 세그먼트를 이루도록 실린더형 몸체의 상단과 하단을 관통하는 다수의 관통홀이 구비된 단위 중공 필라 블록을 콘크리트 프리캐스트로 제작하는 단계를 각각 별도의 공정으로 수행하며, 상기 단위 중공 필라 블록을 현장으로 운반하여 상기 관통홀에 상기 강봉이 삽입되도록 상기 콘크리트 기초층에 순차적으로 적층하는 단계와; 상기 강봉에 프리스트레스를 가하기 위해 정착구를 설치하고, 상기 관통홀에 그라우팅재를 충전하는 단계;를 포함하는 것을 특징으로 한다.In order to achieve the above object, another block-laminated eco-pillar four-way dam construction method according to the present invention is a construction method of an eco-pillar four-way dam in which a plurality of hollow pillars are constructed in a regular spacing arrangement pattern on a concrete base layer poured on the ground, A step of curing by pouring a concrete foundation layer in the ground so that a steel bar installed as a prestressed tension member is buried in a protruding state, and a plurality of penetrations penetrating the top and bottom of the cylindrical body to form a segment that is stacked to form the hollow pillar. Each of the steps of manufacturing a unit hollow pillar block equipped with a hole into a concrete precast is carried out as a separate process, and the unit hollow pillar block is transported to the site so that the steel rod is inserted into the through hole sequentially in the concrete base layer. Stacking with; And installing a fixing unit to apply prestress to the steel bar, and filling the through hole with a grouting material.

상기한 바와 같은 구성을 가지는 발명에 의한 블록 적층형 에코 필라 사방댐 및 그 시공방법에 있어서, 상기 강봉은 상기 단위 중공 필라 블록의 관통홀과 대응하는 배열 상태로 상기 콘크리트 기초층에 매설되는 것이 바람직하다.In the block-stacked eco-pillar four-way dam and its construction method according to the invention having the configuration as described above, the steel rod is preferably buried in the concrete base layer in an arrangement corresponding to the through hole of the unit hollow pillar block.

본 발명의 다른 측면에 따르면, 상기 강봉은 적어도 하나 이상의 커플러에 의해 복수 단위가 연장되는 상태로 설치되는 구성을 가질 수 있다.According to another aspect of the present invention, the steel bar may have a configuration in which a plurality of units are extended by at least one coupler.

상기 단위 중공 필라 블록은 상단 트랙면과 하단 트랙면에 각각 상기 관통홀의 주위로 확공되도록 단차지게 형성되는 요홈부가 구비되며, 상기 요홈부는 상기 단위 중공 필라 블록의 적층시 정합되어 상보적인 공간으로 이루어진 용기 형태의 챔버를 형성하여 그라우팅재가 충전되는 것이 바람직하다.The unit hollow pillar block is provided with grooves formed stepwise to expand around the through-holes on the upper track surface and the lower track surface, respectively, and the grooves are matched when stacking the unit hollow pillar blocks to form a complementary space It is preferable to form a chamber in the form of a grouting material.

다른 한편으로, 상기 단위 중공 필라 블록은 상단 트랙면과 하단 트랙면에 상기 관통홀 주위로 확장되도록 단차지게 형성된 그루브가 연속적으로 구비되며, 상기 그루브는 상기 단위 중공 필라 블록의 적층시 정합되어 상보적인 공간으로 이루어진 도너츠 형태의 챔버를 형성하여 그라우팅재가 충전되는 구성을 가질 수 있다.On the other hand, the unit hollow pillar block is continuously provided with grooves formed stepwisely extending around the through hole on the upper track surface and the lower track surface, and the grooves are matched and complementary when the unit hollow pillar blocks are stacked. By forming a donut-shaped chamber made of space, it may have a configuration in which a grouting material is filled.

본 발명에 따르면, 상기 단위 중공 필라 블록은 트랙 단면이 타원형이나 물방울 및 말발굽 형상 중에서 선택된 어느 하나로 형성되는 것이 바람직하다.According to the present invention, it is preferable that the unit hollow pillar block is formed of an oval track cross section, or any one selected from water droplets and horseshoe shapes.

본 발명의 다른 측면에 따르면, 상기 단위 중공 필라 블록은 관통홀이 서로 다른 축상에 배열되도록 제작되어 서로 다른 축상에 엇갈린 상태로 설치되는 강봉에 의해 프리스트레스 긴장재가 중복된 구간에 도입되는 구성을 가질 수도 있다.According to another aspect of the present invention, the unit hollow pillar block may have a configuration in which the prestress tension member is introduced into the overlapping section by steel bars that are manufactured so that through holes are arranged on different shafts and installed in a staggered state on different shafts. have.

본 발명의 일측면에 따르면, 상기 중공 필라를 이루는 최상단의 단위 중공 필라 블록은 중공부를 폐쇄하도록 설치된 캡부재가 더 구비되는 것이 바람직하다.According to an aspect of the present invention, it is preferable that the uppermost unit hollow pillar block constituting the hollow pillar further includes a cap member installed to close the hollow portion.

상기 콘크리트 기초층에 탑재되는 최하단의 단위 중공 필라 블록은 상기 보강 접합부를 이루고 있는 중공 내벽에 보강용 요철부가 형성되는 구성을 가질 수 있다.The lowermost unit hollow pillar block mounted on the concrete base layer may have a configuration in which an uneven portion for reinforcement is formed on a hollow inner wall constituting the reinforcing joint.

상기한 목적을 달성하기 위하여 본 발명에 의한 다른 블록 적층형 에코 필라 사방댐의 필라 축조용 중공 필라 블록 유닛은, 지반에 타설되는 콘크리트 기초층에 일정한 간격 패턴으로 배열되는 중공 필라로 축조되어 사방댐을 이루도록 프리캐스트 콘크리트로 제작되어 상기 콘크리트 기초층에 순차적으로 적층되는 세그먼트를 이루는 것으로, 프리캐스트 콘크리트 제작에 의해 실린더형 몸체의 상단과 하단을 관통하여 프리스트레스 긴장재가 삽입되도록 형성된 다수의 관통홀과, 상기 실린더형 몸체의 상단 트랙면과 하단 트랙면에 각각 상기 관통홀의 주위로 확장되도록 단차지게 형성된 요홈부를 구비하며, 상기 콘크리트 기초층에 순차적인 적층시 상기 요홈부가 마주하도록 정합되어 상보적인 공간으로 이루어진 챔버를 형성하고, 그 챔버에 그라우팅재가 충전되어 보강 연결부의 형성이 가능하도록 이루어진 것을 특징으로 한다.In order to achieve the above object, the hollow pillar block unit for pillar construction of another block-laminated eco-pillar four-sided dam according to the present invention is constructed with hollow pillars arranged in a regular interval pattern on a concrete base layer poured into the ground to form a four-way dam. A plurality of through-holes made of cast concrete to form a segment sequentially stacked on the concrete base layer, and formed to insert a prestressed tension member through the upper and lower ends of the cylindrical body by precast concrete manufacturing, and the cylindrical The upper track surface and the lower track surface of the body are provided with grooves formed stepwise to extend around the through holes, respectively, and when sequentially stacked on the concrete base layer, the grooves are aligned to face each other to form a chamber consisting of a complementary space. And, the chamber is filled with a grouting material to form a reinforcing connection.

상기 요홈부는 상기 관통홀 주위로 확장되도록 단차지게 형성된 그루브가 연속적으로 구비되며, 상기 그루브는 상기 실린더형 몸체의 적층시 정합되어 상보적인 공간으로 이루어진 도너츠 형태의 챔버를 형성하여 그라우팅재가 충전되도록 이루어질 수 있다.The groove portion is continuously provided with grooves formed stepwise to expand around the through hole, and the grooves are matched when the cylindrical body is stacked to form a donut-shaped chamber made of a complementary space, so that the grouting material is filled. have.

본 발명에 의한 블록 적층형 에코 필라 사방댐 및 그 제조방법에 따르면 다음과 같은 효과를 얻을 수 있다.According to the block-stacked eco-pillar four-way dam and a method of manufacturing the same according to the present invention, the following effects can be obtained.

첫째, 콘크리트 기초층에 프리캐스 콘크리트로 제작된 단위 중공 필라 블록을 세그먼트로 적층 시공함에 따라 자재 핸들링의 용이성과 효율성 및 경량화와 소형화가 유리하여 경제적인 사방댐의 축조가 가능하다. 이에 따라 환경적 지리적 제약조건의 영향을 최소화할 수 있으므로, 주변환경과의 조화를 최대한 확보할 수 있는 새로운 형식의 에코 필라 사방댐 및 그 시공방법을 제공할 수 있다.First, as the unit hollow pillar blocks made of precast concrete are laminated in segments on the concrete base layer, it is possible to construct an economical four-way dam because it is advantageous in material handling, efficiency, weight reduction and miniaturization. Accordingly, since the influence of environmental and geographic constraints can be minimized, it is possible to provide a new type of eco-pillar all-round dam and its construction method that can secure maximum harmony with the surrounding environment.

둘째, 가물막이나 가도 등과 같은 가시설물의 설치를 최소화할 수 있는 동시에 철근의 현장조립이나 거푸집 양생 등과 같은 공정을 배제할 수 있으므로 효율적인 공기단축과 시공원가의 감축을 통하여 경제적인 사방댐의 축조가 가능하다.Second, it is possible to minimize the installation of temporary facilities such as temporary barriers and roads, and at the same time eliminate processes such as on-site assembly of reinforcing bars and curing of formwork, so it is possible to construct an economical four-sided dam through efficient construction and reduction of city park areas. .

셋째, 콘크리트 기초층과 프리캐스 콘크리트로 제작된 단위 중공 필라 블록의 연결부에 프리스트레스 긴장재를 도입하여 연결 보강부를 형성함으로써 구조적인 안정성과 내구성을 용이하게 확보할 수 있는 사방댐의 축조가 가능하다. 이에 따라 부식우려가 높은 기존의 고비용 강재 사방댐을 유효하게 대체할 수 있는 새로운 형식의 사방댐 및 그 시공방법을 제공할 수 있다.Third, it is possible to construct a four-way dam that can easily secure structural stability and durability by forming a connection reinforcement part by introducing a prestress tension material to the connection part between the concrete base layer and the unit hollow pillar block made of precast concrete. Accordingly, it is possible to provide a new type of four-sided dam and a construction method thereof that can effectively replace the existing four-sided dam of high-cost steel with high corrosion concerns.

도 1 은 본 발명에 의한 블록 적층형 에코 필라 사방댐을 개략적으로 도시해 보인 요부 절제 사시도.
도 2는 본 발명에 의한 블록 적층형 에코 필라 사방댐을 개략적으로 도시해 보인 평면도.
도 3은 도 1 및 도 2에 도시해 보인 본 발명에 의한 블록 적층형 에코 필라 사방댐의 요부를 발췌하여 일부를 확대 도시해 보인 개략적 수직 단면도,
도 4 및 도 5는 각각 본 발명에 의한 블록 적층형 에코 필라 사방댐의 시공요소부재로 이용되는 단위 중공 필라 블록을 발췌하여 도시해 보인 개략적 사시도 및 단면도,
도 6 및 도 7은 각각 본 발명에 의한 블록 적층형 에코 필라 사방댐의 시공요소부재로 이용되는 단위 중공 필라 블록의 요부가 변형된 실시예를 예시해 보인 개략적 평면도,
도 8 및 도 9는 각각 본 발명에 의한 블록 적층형 에코 필라 사방댐의 시공요소부재로 이용되는 단위 중공 필라 블록의 형상 구조가 변형된 실시예를 예시해 보인 개략적 평면도,
도 10은 본 발명에 따른 블록 적층형 에코 필라 사방댐의 시공방법을 설명하기 위해 주요 공정을 도시해 보인 개략적 단면도.
도 11은 본 발명의 다른 실시예에 의한 블록 적층형 에코 필라 사방댐의 시공방법을 설명하기 위해 주요 공정을 도시해 보인 개략적 단면도.
도 12는 본 발명의 다른 실시예에 의한 블록 적층형 에코 필라 사방댐을 개략적으로 도시해 보인 단면도.
도 13은 본 발명의 또 다른 실시예에 의한 블록 적층형 에코 필라 사방댐을 개략적으로 도시해 보인 단면도.
Figure 1 is a perspective view of the main part showing schematically a block-stacked eco-pillar four-bang dam according to the present invention.
2 is a plan view schematically showing a block-stacked eco-pillar four-way dam according to the present invention.
3 is a schematic vertical cross-sectional view showing an enlarged view of a part of the main part of the block-stacked eco-pillar four-way dam according to the present invention shown in FIGS. 1 and 2;
4 and 5 are a schematic perspective view and a cross-sectional view showing an excerpted unit hollow pillar block used as a construction element member of the block-stacked eco-pillar four-bang dam according to the present invention, respectively,
6 and 7 are schematic plan views exemplifying a modified embodiment of a main part of a unit hollow pillar block used as a construction element member of a block-stacked eco-pillar four-way dam according to the present invention, respectively;
8 and 9 are schematic plan views illustrating an embodiment in which the shape structure of a unit hollow pillar block used as a construction element member of a block-stacked eco-pillar four-way dam according to the present invention is modified;
10 is a schematic cross-sectional view showing a main process to explain the construction method of the block-stacked eco-pillar fourbang dam according to the present invention.
11 is a schematic cross-sectional view showing a main process for explaining the construction method of the block-stacked eco-pillar fourbang dam according to another embodiment of the present invention.
12 is a cross-sectional view schematically showing a block-stacked eco-pillar four-way dam according to another embodiment of the present invention.
13 is a cross-sectional view schematically showing a block-stacked eco-pillar four-way dam according to another embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명에 의한 블록 적층형 에코 필라 사방댐 및 그 시공방법을 상세하게 설명한다. 이하의 설명 내용과 첨부된 도면은 본 발명에 따른 기술 구성과 그 작용 상태를 이해하기 위한 바람직한 실시예에 불과한 것으로서, 청구범위에 기재된 본 발명을 한정하는 것은 아니며, 본 발명의 기술 분야에서 통상의 기술자가 용이하게 구현할 수 있는 부분은 생략될 수 있다.Hereinafter, with reference to the accompanying drawings will be described in detail a block-stacked eco-pillar four-way dam and a construction method thereof according to the present invention. The following description and the accompanying drawings are merely preferred embodiments for understanding the technical configuration and operating state of the present invention, and do not limit the present invention described in the claims, and are common in the technical field of the present invention. Parts that can be easily implemented by a technician may be omitted.

도 1 및 도 2는 각각 본 발명에 의한 블록 적층형 에코 필라 사방댐을 개략적으로 도시해 보인 요부 절제 사시도 및 평면도이고, 도 3은 도 1 및 도 2에 도시해 보인 본 발명에 의한 블록 적층형 에코 필라 사방댐의 요부를 발췌하여 일부를 확대 도시해 보인 개략적 수직 단면도이다,1 and 2 are a perspective view and a plan view schematically showing a block-stacked eco-pillar four-sided dam according to the present invention, respectively, and FIG. 3 is a block-laminated eco-pillar four-sided dam according to the present invention shown in FIGS. 1 and 2 It is a schematic vertical cross-sectional view showing an enlarged part of the main part of

도 1 내지 도 3을 참조하면, 본 발명에 의한 블록 적층형 에코 필라 사방댐(100)은, 지반에 타설되는 콘크리트 기초층(110)과, 그 콘크리트 기초층(110)에 일정한 간격 패턴으로 배열되는 기둥형태의 구조물로 축조(築造)되는 다수의 중공 필라(120)를 포함하며, 상기 중공 필라(120)는 프리캐스트 콘크리트로 제작된 복수의 단위 중공 필라 블록(121)이 세그먼트(segment)를 이루도록 순차적으로 적층된 상태에서 각 연결부에 프리스트레싱에 의한 보강 연결부가 형성되도록 축조된다.1 to 3, the block-laminated eco-pillar all-around dam 100 according to the present invention includes a concrete base layer 110 that is poured into the ground, and a column arranged in a regular spacing pattern on the concrete base layer 110 It includes a plurality of hollow pillars 120 constructed as a structure in the form of a structure, and the hollow pillars 120 are sequentially made so that a plurality of unit hollow pillar blocks 121 made of precast concrete form a segment. In the stacked state, it is constructed to form a reinforcing connection part by prestressing in each connection part.

상기 콘크리트 기초층(110)은 예컨대, 경사면 등의 지반에 타설되도록 시공되는 기초 구조물로서, 현장 타설시 상기 각 단위 중공 필라 블록(121)의 보강 연결부를 형성하기 위한 프리스트레스 긴장재로 매설되는 강봉(131)이 일정 길이 돌출되도록 직립된 상태로 구비된다.The concrete foundation layer 110 is, for example, a foundation structure constructed to be poured on the ground such as an inclined surface, and a steel rod 131 buried with a prestressed tension member for forming a reinforcing connection portion of the hollow pillar blocks 121 of each unit when placed on site. ) Is provided in an upright state to protrude a certain length.

본 발명의 일측면에 따르면, 상기 강봉(131)은 상기 콘크리트 기초층(110)의 상면으로부터 돌출되는 길이가 한정되는 것은 아니나, 예컨대 크레인 등으로 상기 단위 중공 필라 블록(121)을 들어올려서 적층하기 위한 시공작업의 용이성과 효율성을 확보하기 위해서 3m 이내의 높이로 설치되는 것이 바람직하며, 이와 같은 강봉(131)의 돌출 높이가 본 발명을 한정하는 것은 아니다.According to one aspect of the present invention, the length of the steel bar 131 protruding from the upper surface of the concrete base layer 110 is not limited, but the unit hollow pillar block 121 is lifted and stacked by, for example, a crane. In order to secure the ease and efficiency of the construction work for, it is preferable to be installed at a height of 3m or less, and the protruding height of the steel bar 131 does not limit the present invention.

본 발명의 다른 측면에 따르면, 상기 강봉(131)은 일정한 길이로 재단된 복수의 단위 갯수가 커플러(C)에 의해 연결되어 프리스트레스 긴장재로 사용될 수 있다.According to another aspect of the present invention, the steel bar 131 may be used as a prestress tension member by connecting a plurality of units cut to a predetermined length by a coupler (C).

예컨대, 경사면 등의 지반에 콘크리트의 타설시 프리스트레 긴장재로 이용되는 강봉(131)이 직립된 상태로 일정 길이 돌출된 상태로 매설되도록 콘크리트를 타설하여 기초 구조물을 형성한다.For example, a foundation structure is formed by pouring concrete so that a steel bar 131 used as a prestress tension member is erected and protruded for a certain length when placing concrete on a ground such as a slope.

본 발명의 일측면에 따르면, 상기 강봉(131)은 상기 콘크리트 기초층(110)의 상면으로부터 돌출되는 길이가 한정되는 것은 아니나, 예컨대 크레인 등으로 상기 단위 중공 필라 블록(121)을 들어올려서 적층하기 위한 시공작업의 용이성과 효율성을 확보하기 위해서 3m 이내의 높이로 설치되는 것이 바람직하며, 이와 같은 강봉(131)의 돌출 높이가 본 발명을 한정하는 것은 아니다.According to one aspect of the present invention, the length of the steel bar 131 protruding from the upper surface of the concrete base layer 110 is not limited, but the unit hollow pillar block 121 is lifted and stacked by, for example, a crane. In order to secure the ease and efficiency of the construction work for, it is preferable to be installed at a height of 3m or less, and the protruding height of the steel bar 131 does not limit the present invention.

본 발명의 다른 측면에 따르면, 상기 강봉(131)은 후술하는 바와 같이 상기 단위 중공 필라 블록(121)의 적층 과정에서 일정한 길이로 재단된 복수의 단위 갯수가 커플러(C)에 의해 연결되어서 프리스트레스 긴장재로 사용될 수 있으며, 이에 대한 구체적인 구성은 후술하는 도 10에 예시하는 시공방법에서 상세하게 설명하기로 한다.According to another aspect of the present invention, the steel bar 131 is a prestressed tension member by connecting a plurality of units cut to a predetermined length in a stacking process of the unit hollow pillar block 121 by a coupler (C), as described later. It can be used as, a specific configuration for this will be described in detail in the construction method illustrated in FIG. 10 to be described later.

다른 한편으로, 상기 콘크리트 기초층(110)은 현장 타설시 예를 들어 가장자리를 따라 배치되도록 보강용 철근(미도시)이 심재(心材)로 매설될 수 있다.On the other hand, the concrete base layer 110 may be buried with a reinforcing reinforcing bar (not shown) as a core material so as to be disposed along the edge, for example, when casting on site.

도 4 및 도 5는 각각 본 발명에 의한 블록 적층형 에코 필라 사방댐의 시공요소부재로 이용되는 단위 중공 필라 블록을 발췌하여 도시해 보인 개략적 사시도 및 단면도이다.4 and 5 are schematic perspective and cross-sectional views showing excerpts of unit hollow pillar blocks used as construction element members of the block-stacked eco-pillar four-bang dam according to the present invention, respectively.

도 4 및 도 5를 참조하면, 상기 단위 중공 필라 블록(121)은 실린더형 벽체로 이루어진 몸체(121a)의 상단과 하단을 관통하도록 형성되어 환형상으로 배열된 관통홀(121h)이 구비된다.Referring to FIGS. 4 and 5, the unit hollow pillar block 121 is provided with through-holes 121h arranged in an annular shape by being formed to penetrate the upper and lower ends of the body 121a made of a cylindrical wall.

상기 단위 중공 필라 블록(121)의 관통홀(121h)은 상기 강봉(131)이 관통하도록 삽입이 허용되는 동시에 그 주위를 에워싸도록 주입되는 그라우팅재(G)가 수용되어 충전되도록 일정한 규격의 구경(口徑)을 가지도록 형성된다.The through hole 121h of the unit hollow pillar block 121 has a diameter of a certain size so that the steel rod 131 is inserted through it and the grouting material G injected to surround the steel bar 131 is accommodated and filled. It is formed to have (口徑).

따라서, 상기 단위 중공 필라 블록(121)의 관통홀(121h)에는 보다 작은 직경의 강봉(131)이 프리스트레스 긴장재로 삽입된다. 이에 따라 상기 관통홀(121h)의 내벽과 강봉(131)의 외주면 사이에 일정한 규격의 틈새 공간이 형성되며, 그 틈새 공간에 그라우팅재(G)가 주입되어 충전된다. 이로써, 상기 콘크리트 기초층(110)에 순차적으로 적층된 복수의 단위 중공 필라 블록(121)은 각각의 경계부에 견고한 보강 연결부가 형성되어 일체적인 보강 구조체를 이루게 되므로 전단력에 대해 유효한 대항력을 보유할 수 있는 중공 기둥형 구조물로 축조된다.Accordingly, a steel rod 131 having a smaller diameter is inserted into the through hole 121h of the unit hollow pillar block 121 as a prestressed tension member. Accordingly, a gap space of a certain standard is formed between the inner wall of the through hole 121h and the outer circumferential surface of the steel bar 131, and the grouting material G is injected and filled in the gap space. Accordingly, the plurality of unit hollow pillar blocks 121 sequentially stacked on the concrete base layer 110 form an integral reinforcement structure by forming a solid reinforcing connection at each boundary, so that it can hold an effective counter force against shear force. It is constructed as a hollow columnar structure.

본 발명의 일측면에 따르면, 상기 단위 중공 필라 블록(121)의 상단 및 하단 트랙면에는 상기 관통홀(121h)의 주위로 확공되어 단차지게 형성된 원형의 요홈부(121w)가 구비된다.According to an aspect of the present invention, a circular groove 121w is provided on the upper and lower track surfaces of the unit hollow pillar block 121 to be expanded around the through-hole 121h and formed stepwise.

상기 요홈부(121w)는 도 2의 원형 내부에 발췌하여 확대 도시해 보인 요부 단면도에 나타내 보인 바와 같이, 상기 단위 중공 필라 블록(121)의 적층시 하부와 상부의 각 단위 중공 필라 블록(121)의 상단 트랙면과 하단 트랙면이 서로 맞닿으면서 상보적인 공간으로 이루어진 용기 형태의 챔버를 형성하게 된다. 이에 따라 상기 단위 중공 필라 블록(121)의 관통홀(121h)로 주입되는 그라우팅재(G)가 상기 요홈부(121w)에 의해 형성되는 챔버에 수용되어 충전된다.The concave groove 121w is, as shown in the cross-sectional view of the main part, which is extracted and enlarged in the circular interior of FIG. 2, when the unit hollow pillar block 121 is stacked, each unit of hollow pillar blocks 121 at the lower and upper portions The upper track surface and the lower track surface of are in contact with each other to form a container-shaped chamber consisting of a complementary space. Accordingly, the grouting material G injected into the through hole 121h of the unit hollow pillar block 121 is accommodated and filled in the chamber formed by the concave portion 121w.

도 6은 상기 요홈부(121w)가 변형된 다른 실시예를 예시해 보인 것으로서, 상기 관통홀(121h)의 주위에 사각형태로 확장되어 단차지게 형성된 것이다. 이와 같은 요홈부(121w)의 변형된 실시예는 상기 단위 중공 필라 블록(121)의 적층시 상기 요홈부(121w)의 내부에 충전되는 그라우팅재(G)의 수용량을 다양한 형태로 제어하기 위해 실시할 수 있다. 6 illustrates another embodiment in which the concave groove 121w is deformed, and is formed to be stepped by expanding in a rectangular shape around the through hole 121h. This modified embodiment of the groove portion (121w) is implemented to control the capacity of the grouting material (G) filled in the groove portion (121w) when stacking the unit hollow pillar block 121 in various forms. can do.

도 7은 또 다른 변형 실시예를 예시해 보인 것으로서, 상기 단위 중공 필라 블록(121)은 관통홀(121h)의 주위에 확장되어 단차지게 형성된 그루브(121g)가 연속적으로 구비된 구성을 가질 수 있다. 이에 따라 상기 그루브(121g)는 상기 단위 중공 필라 블록(121)의 적층시 하부와 상부의 각 단위 중공 필라 블록(121)의 상단 트랙면과 하단 트랙면이 서로 맞닿으면서 상보적인 공간으로 이루어진 도너츠 형태의 챔버를 형성하게 되며, 그 도너츠 형태의 챔버에 상기 관통홀(121h)로 주입되는 그라우팅재(G)가 수용되어 충전된다.7 illustrates another modified embodiment, and the unit hollow pillar block 121 may have a configuration in which grooves 121g that are extended and stepped around the through hole 121h are continuously provided. . Accordingly, the groove 121g is a donut made of a complementary space when the upper and lower track surfaces of the lower and upper unit hollow pillar blocks 121 contact each other when the unit hollow pillar block 121 is stacked. A type of chamber is formed, and the grouting material G injected into the through hole 121h is accommodated and filled in the donut type chamber.

한편, 도 7의 미설명 참조 부호 121d는 상기 그루브(121g)의 연속성을 차단하기 위해 형성된 단턱부로서, 이는 상기 단위 중공 필라 블록(121)의 적층시 상기 그루브(121g)의 내부에 충전되는 그라우팅재(G)의 수용량을 적절하게 제어하기 위한 수단으로 다양하게 변형된 실시예의 적용이 가능하다. Meanwhile, the unexplained reference numeral 121d in FIG. 7 is a stepped portion formed to block continuity of the groove 121g, which is a grouting filled in the groove 121g when the unit hollow pillar block 121 is stacked. Various modified embodiments can be applied as a means for appropriately controlling the capacity of the ash (G).

한편, 도 8 및 도 9는 각각 상기 단위 중공 필라 블록(121)의 형상 구조가 변형된 실시예를 예시해 보인 개략적 평면도이다.Meanwhile, FIGS. 8 and 9 are schematic plan views illustrating an exemplary embodiment in which the shape structure of the unit hollow pillar block 121 is modified, respectively.

즉, 본 발명에 의한 블록 적층형 에코 필라 사방댐(100)의 축조에 이용되는 단위 중공 필라 블록(121)은 상술한 바와 같은 타원 형태의 형상 구조에 한정되는 것은 아니며, 본 발명에 의한 블록 적층형 에코 필라 사방댐(100)의 시공현장의 환경과 특성에 따라서 도 8에 예시해 보인 바와 같이 예를 들어 전방이 축소되고 후방이 확장된 타원형 트랙 형태로 변형된 물방울 형상의 평면 형상 구조를 가질 수 있으며, 다른 한편으로는 도 9에 예시해 보인 바와 같이 말발굽 형태의 평면 형상 구조를 가질 수도 있다.That is, the unit hollow pillar block 121 used for the construction of the block-stacked eco-pillar fourbang dam 100 according to the present invention is not limited to the elliptical shape structure as described above, and the block-stacked eco-pillar according to the present invention Depending on the environment and characteristics of the construction site of the Sabang Dam 100, as illustrated in FIG. 8, for example, it may have a water droplet-shaped planar structure transformed into an elliptical track shape with a reduced front and an expanded rear. On the one hand, as illustrated in FIG. 9, it may have a planar structure in the form of a horseshoe.

이하에서는 상술한 바와 같은 구성을 가지는 본 발명에 따른 블록 적층형 에코 필라 사방댐의 시공방법에 대하여 도면을 참조하면서 상세하게 설명하기로 한다.Hereinafter, a method of constructing a block-stacked eco-pillar fourbang dam according to the present invention having the above-described configuration will be described in detail with reference to the drawings.

도 10은 본 발명에 따른 블록 적층형 에코 필라 사방댐의 시공방법을 설명하기 위해 주요 공정을 도시해 보인 개략적 단면도이다.10 is a schematic cross-sectional view showing a main process for explaining the construction method of the block-stacked eco-pillar fourbang dam according to the present invention.

도 10을 참조하면, 본 발명에 따른 블록 적층형 에코 필라 사방댐의 시공방법은, 경사면 등의 지반에 콘크리트 기초층(110)을 타설하여 양생하는 단계(a)와, 공장에서 상기 단위 중공 필라 블록(121)을 프리캐스트 제작하는 단계(미도시)를 각각 별도의 공정에 의해 수행하며, 상기 단위 중공 필라 블록(121)을 현장으로 운반하여 상기 콘크리트 기초층(110)에 순차적으로 적층하는 단계(b)~(d) 및 상기 단위 중공 필라 블록(121)의 관통홀(121h)에 그라우팅재(G)를 주입하는 단계(d)를 포함하여 구성된다.Referring to FIG. 10, the construction method of the block-stacked eco-pillar four-way dam according to the present invention includes the step (a) of pouring and curing a concrete base layer 110 on a ground such as an inclined surface, and the unit hollow pillar block ( A step (not shown) of producing a precast 121) is performed by a separate process, and the step of sequentially stacking the concrete base layer 110 by transporting the unit hollow pillar block 121 to the site (b ) to (d) and the step (d) of injecting a grouting material (G) into the through hole (121h) of the unit hollow pillar block (121).

본 발명에 따르면, 상기 콘크리트 기초층(110)을 타설하는 단계(a)에서는 예컨대, 경사면 등의 지반에 콘크리트의 타설시 프리스트레 긴장재로 이용되는 강봉(131)이 직립된 상태로 일정 길이 돌출된 상태로 매설되도록 콘크리트를 타설하여 기초 구조물을 형성한다.According to the present invention, in the step (a) of pouring the concrete base layer 110, a steel rod 131 used as a prestress tension member when placing concrete on a ground such as a slope is erected and protruded for a certain length. The foundation structure is formed by pouring concrete to be buried in the state.

본 발명의 일측면에 따르면, 상기 강봉(131)은 상기 콘크리트 기초층(110)의 상면으로부터 돌출되는 길이가 한정되는 것은 아니나, 예컨대 크레인 등으로 상기 단위 중공 필라 블록(121)을 들어올려서 적층하기 위한 시공작업의 용이성과 효율성을 확보하기 위해서 3m 이내의 높이로 설치되는 것이 바람직하며, 이와 같은 강봉(131)의 돌출 높이가 본 발명을 한정하는 것은 아니다.According to one aspect of the present invention, the length of the steel bar 131 protruding from the upper surface of the concrete base layer 110 is not limited, but the unit hollow pillar block 121 is lifted and stacked by, for example, a crane. In order to secure the ease and efficiency of the construction work for, it is preferable to be installed at a height of 3m or less, and the protruding height of the steel bar 131 does not limit the present invention.

본 발명의 다른 측면에 따르면, 상기 강봉(131)은 후술하는 바와 같이 상기 단위 중공 필라 블록(121)의 적층 과정에서 일정한 길이로 재단된 복수의 단위 갯수가 커플러(C)에 의해 연결되어서 프리스트레스 긴장재로 사용될 수 있으며, 이에 대한 구체적인 구성은 후술하는 도 11에 예시하는 시공방법에서 상세하게 설명하기로 한다.According to another aspect of the present invention, the steel bar 131 is a prestressed tension member by connecting a plurality of units cut to a predetermined length in a stacking process of the unit hollow pillar block 121 by a coupler (C), as described later. It can be used as, and a specific configuration for this will be described in detail in the construction method illustrated in FIG. 11 to be described later.

한편, 본 발명에 있어서 상기 강봉(131)은 후술하는 상기 단위 중공 필라 블록(121)의 관통홀(121h)에 삽입되어 프리스트레스 긴장재로 기능하게 되는데, 이에 따라 상기 단위 중공 필라 블록(121)의 관통홀(121h)과 상보적인 결합이 가능한 배열 간격으로 설계되어 설치된다.On the other hand, in the present invention, the steel rod 131 is inserted into the through hole 121h of the unit hollow pillar block 121 to be described later to function as a prestress tension member, thereby penetrating the unit hollow pillar block 121 It is designed and installed at an arrangement interval capable of complementary coupling with the hole 121h.

본 발명의 다른 측면에 따르면, 상기 강봉(131)은 후술하는 바와 같이 상기 단위 중공 필라 블록(121)의 적층 과정에서 일정한 길이로 재단된 복수의 단위 갯수가 커플러(C)에 의해 연결되어서 프리스트레스 긴장재로 사용될 수 있다.According to another aspect of the present invention, the steel bar 131 is a prestressed tension member by connecting a plurality of units cut to a predetermined length in a stacking process of the unit hollow pillar block 121 by a coupler (C), as described later. Can be used as

다른 한편으로는, 상기 콘크리트 기초층(110)의 타설시 예를 들어 가장자리 등을 따라 보강용 철근(미도시)이 심재(心材)로 매설되될 수 있다.On the other hand, when the concrete base layer 110 is poured, reinforcing reinforcing bars (not shown) may be buried with a core material along an edge, for example.

한편, 상기 단위 중공 필라 블록(121)은 비록 도면에 의해 예시하지는 않았으나, 통상적인 콘크리트 프리캐스트 제조공정을 통하여 제작되는 것으로서, 도 1 내지 도 7에 의해 설명된 바와 같이 실린더형 몸체의 상단과 하단을 관통하는 다수의 관통홀(121h)과, 그 관통홀(121h)의 주위로 단차지게 확장된 요홈부(121w)(121g)가 형성되도록 제작된다. 이와 같이 콘크리트 프리캐스트로 제작된 단위 중공 필라 블록(121)은 상기 콘크리트 기초층(110)이 형성되는 현장으로 운반되어 중공 필라(120)를 형성하도록 적층되는 세그먼트로 사용된다.Meanwhile, the unit hollow pillar block 121 is manufactured through a conventional concrete precast manufacturing process, although not illustrated by the drawings, and the upper and lower ends of the cylindrical body as described by FIGS. 1 to 7 A plurality of through-holes (121h) penetrating the through hole (121h), and the grooves (121w) (121g) which are steppedly extended around the through-holes (121h) are formed. In this way, the unit hollow pillar block 121 made of concrete precast is transported to the site where the concrete base layer 110 is formed, and is used as a segment stacked to form the hollow pillar 120.

본 발명에 따르면, 상기 단위 중공 필라 블록(121)의 관통홀(121h)은 상기 강봉(131)이 관통하도록 삽입이 허용되는 동시에 그 주위를 에워싸도록 주입되는 그라우팅재(G)가 수용되어 충전되도록 일정한 규격의 구경(口徑)을 가지도록 형성된다. 이에 따라, 상기 콘크리트 기초층(110)의 강봉(131)은 상기 단위 중공 필라 블록(121)의 관통홀(121h)의 직경 보다 작은 직경의 것이 설치된다. 이와 같은 구성으로 인하여 후술하는 상기 단위 중공 필라 블록(121)을 적층하는 단계(a)~(d)에서 상기 단위 중공 필라 블록(121)의 관통홀(121h)에 상기 강봉(131)이 프리스트레스 긴장재로 삽입되면 상기 관통홀(121h)의 내벽과 강봉(131)의 외주면 사이에 일정한 규격의 틈새 공간이 형성되어 그 틈새 공간에 그라우팅재(G)가 주입되어 충전될 수 있다.According to the present invention, the through hole 121h of the unit hollow pillar block 121 is allowed to be inserted so that the steel rod 131 penetrates, and at the same time, the grouting material G injected to surround the steel bar 131 is accommodated and filled. It is formed to have a diameter of a certain standard as possible. Accordingly, the steel rod 131 of the concrete base layer 110 is installed having a diameter smaller than the diameter of the through hole 121h of the unit hollow pillar block 121. Due to this configuration, in the steps (a) to (d) of stacking the unit hollow pillar block 121 to be described later, the steel bar 131 is a prestressed tension member in the through hole 121h of the unit hollow pillar block 121 When inserted into the groove, a gap space of a certain standard is formed between the inner wall of the through hole 121h and the outer circumferential surface of the steel bar 131, so that the grouting material G may be injected and filled in the gap space.

한편, 상기 단위 중공 필라 블록(121)의 요홈부(121w)(121g)는 도 3에 의해 설명한 바와 같이 상기 단위 중공 필라 블록(121)의 적층시 하부와 상부의 각 단위 중공 필라 블록(121)의 상단 트랙면과 하단 트랙면이 서로 맞닿으면서 상보적인 공간으로 이루어진 챔버를 형성하게 되는 것으로서, 도 1 및 도 4에 예시한 바와 같은 원형이나 도 6에 예시한 바와 같은 사각형 또는 도 7에 예시한 바와 같은 트랙형 그루브(121g)로 변형된 실시예가 적용될 수 있으며, 이에 대한 상세한 설명은 도 6 및 도 7을 통해 설명하였으므로 생략하기로 한다.On the other hand, the recessed portions 121w (121g) of the unit hollow pillar block 121 are each unit hollow pillar block 121 at the lower and upper portions when the unit hollow pillar block 121 is stacked, as described with reference to FIG. 3. The upper track surface and the lower track surface of are in contact with each other to form a chamber consisting of a complementary space, and are circular as illustrated in FIGS. 1 and 4 or a square as illustrated in FIG. 6 or illustrated in FIG. 7. An embodiment modified with the track-type groove 121g as described above may be applied, and a detailed description thereof has been described with reference to FIGS. 6 and 7 and thus will be omitted.

다음 시공 단계로서, 상기 단위 중공 필라 블록(121)을 상기 콘크리트 기초층(110)에 적층하는 단계(b)~(d)에서는 예컨대 크레인 등으로 상기 단위 중공 필라 블록(121)을 들어올려서 상기 콘크리트 기초층(110)의 강봉(131)이 상기 관통홀(121h)에 삽입되도록 적재한다. 이와 같은 적재 과정에서는 상기 단위 중공 필라 블록(121)의 관통홀(121h)이 상기 콘크리트 기초층(110)의 강봉(131)과 동축상으로 나란하게 정렬된 상태에서 축공과 축의 결합을 통해 상기 강봉(131)에 상기 단위 중공 필라 블록(121)이 끼워져 구속되는 상태로 설치된다.As the next construction step, in the steps (b) to (d) of stacking the unit hollow pillar block 121 on the concrete base layer 110, the unit hollow pillar block 121 is lifted with a crane, etc. The steel rod 131 of the base layer 110 is loaded to be inserted into the through hole 121h. In such a loading process, the through hole 121h of the unit hollow pillar block 121 is aligned coaxially with the steel rod 131 of the concrete base layer 110, and the steel rod is combined with the shaft hole and the shaft. The unit hollow pillar block 121 is inserted into 131 and installed in a constrained state.

따라서, 상기한 바와 같은 단위 중공 필라 블록(121)의 적재 작업을 반복 수행하면서 상기 콘크리트 기초층(110)에 복수의 단위 중공 필라 블록(121)을 일정 높이 적층시켜 기둥형태의 중공 필라(120)를 구조물로 축조한다.Therefore, while repeatedly performing the loading operation of the unit hollow pillar block 121 as described above, a plurality of unit hollow pillar blocks 121 are stacked at a predetermined height on the concrete base layer 110 to form a columnar hollow pillar 120 Is constructed as a structure.

본 발명에 있어서, 상기 단위 중공 필라 블록(121)의 적층 높이는 사방댐의 시공 장소나 환경 및 특성 등에 따라 설계되는 규격에 맞도록 다양하게 조절된 상태로 시공될 수 있다.In the present invention, the stacking height of the unit hollow pillar block 121 may be variously adjusted to meet the specifications designed according to the construction location, environment, and characteristics of the four-way dam.

다음 시공 단계로서, 상기 관통홀(121h)에 그라우팅재를 충전하는 단계(d)에서는 상기 중공 필라(120)의 최상단에 위치하도록 적층된 단위 중공 필라 블록(121)의 관통홀(121h)에 그라우팅재(G)를 주입한다. 이에 따라 상기 단위 중공 필라 블록(121)의 관통홀(121h)의 내벽과 상기 강봉(131)의 외주면 사이에 형성된 틈새 공간에 그라우팅재(G)가 주입되어 충전된다. 이때, 도 2에 의해 설명한 바와 같이 상기 단위 중공 필라 블록(121)의 요홈부(121w)(121g)가 상보적인 공간으로 형성하는 챔버에 그라우팅재(G)가 충분히 수용되어 충전될 때까지 주입한다.As the next construction step, in the step (d) of filling the through hole 121h with a grouting material, grouting is performed in the through hole 121h of the unit hollow pillar block 121 stacked to be located at the top of the hollow pillar 120 Inject ash (G). Accordingly, a grouting material G is injected and filled into a gap formed between the inner wall of the through hole 121h of the unit hollow pillar block 121 and the outer peripheral surface of the steel bar 131. In this case, as described with reference to FIG. 2, the grooves 121w and 121g of the unit hollow pillar block 121 are injected into the chamber formed as a complementary space until the grouting material G is sufficiently accommodated and filled. .

이어서, 최상단의 단위 중공 필라 블록(121)의 상부 관통홀(121h)에서 상기 강봉(131)의 상단에 고정 정착구(132)를 설치하여 프리스트레스를 인가한다. 이로써, 상기 콘크리트 기초층(110)에 순차적으로 적층된 복수의 단위 중공 필라 블록(121)은 각각의 경계부에 견고한 보강 연결부가 형성되어 일체적인 보강 구조체를 이루게 되므로 전단력에 대해 유효한 대항력을 보유할 수 있는 중공 기둥형 구조물로 축조된다.Subsequently, a fixing fixture 132 is installed on the upper end of the steel bar 131 in the upper through hole 121h of the unit hollow pillar block 121 at the top to apply prestress. Accordingly, the plurality of unit hollow pillar blocks 121 sequentially stacked on the concrete base layer 110 form an integral reinforcement structure by forming a solid reinforcing connection at each boundary, so that it can hold an effective counter force against shear force. It is constructed as a hollow columnar structure.

본 발명에 따르면, 상술한 바와 같은 단계를 거쳐서 상기 콘크리트 기초층(110)에 복수의 단위 중공 필라 블록(121)은 순차적으로 적층하여 기둥형태의 구조물로 축조한 중공 필라(120)의 상단에 도 1에 예시한 바와 같이 캡부재(141)를 설치하여 단일의 중공 필라(120)에 대한 시공작업을 마감한다.According to the present invention, through the steps as described above, a plurality of unit hollow pillar blocks 121 are sequentially stacked on the concrete base layer 110 to be shown on the top of the hollow pillar 120 constructed as a columnar structure. As illustrated in 1, the cap member 141 is installed to finish the construction work for the single hollow pillar 120.

따라서, 본 발명에 의한 블록 적층형 에코 필라 사방댐의 시공방법에 따르면, 상술한 바와 같은 단계를 거쳐서 상기 콘크리트 기초층(110)에 일정한 간격 패턴으로 다수의 중공 필라(120)가 배열된 블록 적층형 에코 필라 사방댐의 시공을 완료할 수 있다.Therefore, according to the construction method of the block-stacked eco-pillar four-sided dam according to the present invention, a block-stacked eco-pillar in which a plurality of hollow pillars 120 are arranged in a regular spacing pattern on the concrete base layer 110 through the steps described above. The construction of the four-way dam can be completed.

한편, 도 11은 본 발명의 다른 실시예에 의한 블록 적층형 에코 필라 사방댐의 시공방법을 설명하기 위해 주요 공정을 도시해 보인 개략적 단면도이다.On the other hand, Figure 11 is a schematic cross-sectional view showing a main process to explain the construction method of the block-stacked eco-pillar fourbang dam according to another embodiment of the present invention.

도 11을 참조하면, 본 발명의 다른 실시예에 의한 블록 적층형 에코 필라 사방댐의 시공방법에 따르면, 경사면 등의 지반에 콘크리트 기초층(110)을 타설하여 양생하는 단계(a)와, 공장에서 상기 단위 중공 필라 블록(121)을 프리캐스트 제작하는 단계(미도시)를 각각 별도의 공정에 의해 수행하며, 상기 단위 중공 필라 블록(121)을 현장으로 운반하여 상기 콘크리트 기초층(110)에 순차적으로 적층하는 단계(b)~(d) 및 상기 단위 중공 필라 블록(121)의 관통홀(121h)에 그라우팅재(G)를 주입하는 단계(d)를 포함하여 구성된다.Referring to FIG. 11, according to the construction method of the block-laminated eco-pillar all-around dam according to another embodiment of the present invention, the step (a) of pouring and curing a concrete base layer 110 on the ground such as an inclined surface, and the above Each of the steps (not shown) of precast manufacturing the unit hollow pillar block 121 is performed by a separate process, and the unit hollow pillar block 121 is transported to the site and sequentially transferred to the concrete base layer 110 It includes the steps (b) to (d) of stacking and the step (d) of injecting a grouting material (G) into the through hole (121h) of the unit hollow pillar block (121).

요컨대, 본 발명의 다른 실시예에 의한 블록 적층형 에코 필라 사방댐의 시공방법은 도 10에 의해 설명된 본 발명의 시공방법과 전체적인 공정 단계의 흐름이 실질적으로 동일하나, 상기 단위 중공 필라 블록(121)의 적층 과정에서 일정한 길이로 재단된 복수의 강봉(131)이 커플러(C)에 의해 조여져 인장되도록 연결되면서 프리스트레스 긴장재로 사용되는 구성적 차이점을 가진다.In short, the construction method of the block-laminated eco-pillar fourbang dam according to another embodiment of the present invention is substantially the same as the construction method of the present invention described by FIG. 10 and the overall flow of process steps, but the unit hollow pillar block 121 A plurality of steel bars 131 cut to a certain length in the stacking process of are connected to be tensioned by being tightened by a coupler (C), thereby having a structural difference used as a prestressed tension member.

즉, 본 발명의 다른 실시예에 의한 블록 적층형 에코 필라 사방댐의 시공방법에 따르면, 상기 콘크리트 기초층(110)을 타설하여 양생하는 단계(a)에서 예컨대, 경사면 등의 지반에 콘크리트의 타설시 프리스트레 긴장재로 이용되는 강봉(131)의 끝단부에 커플러(C)가 설치될 수 있는 상태로 노출되어 매설되도록 콘크리트를 타설하여 기초 구조물을 형성한다.That is, according to the construction method of the block-laminated eco-pillar four-sided dam according to another embodiment of the present invention, in the step (a) of pouring the concrete foundation layer 110 to cure, for example, when placing concrete on a ground such as a slope The foundation structure is formed by pouring concrete so that the coupler (C) is exposed and buried at the end of the steel bar 131 used as a tension material.

상기 단위 중공 필라 블록(121)은 비록 도면에 의해 예시하지는 않았으나, 도 9에 의해 설명된 시공방법과 동일하게 통상적인 콘크리트 프리캐스트 제조공정을 통하여 제작되는 것으로서, 그 구체적인 구성에 대한 상세한 설명은 생략한다.The unit hollow pillar block 121, although not illustrated by the drawings, is manufactured through a conventional concrete precast manufacturing process in the same manner as the construction method described by FIG. 9, and a detailed description of its specific configuration is omitted. do.

다음 시공 단계로서, 상기 단위 중공 필라 블록(121)을 상기 콘크리트 기초층(110)에 적층하는 단계(b)~(d)에서는 상기 콘크리트 기초층(110)에 매설된 강봉(131)의 끝단부에 커플러(C)를 결합하여 일정한 길이로 재단된 다른 단위 강봉(131)의 연결에 의해 프리스트레스 긴장재로 도입하고, 예컨대 크레인 등으로 상기 단위 중공 필라 블록(121)을 들어올려서 관통홀(121h)이 상기 강봉(131)에 끼워져 구속되는 상태로 적재한다.As the next construction step, in the steps (b) to (d) of stacking the unit hollow pillar blocks 121 on the concrete base layer 110, the end portions of the steel bars 131 buried in the concrete base layer 110 The coupler (C) is coupled to the prestressed tension member by connection of another unit steel bar 131 cut to a certain length, and the through hole 121h is formed by lifting the unit hollow pillar block 121 with, for example, a crane. It is inserted into the steel bar 131 and loaded in a constrained state.

따라서, 상기한 바와 같은 단위 중공 필라 블록(121)의 적재 작업을 반복 수행하면서 상기 콘크리트 기초층(110)에 복수의 단위 중공 필라 블록(121)을 일정 높이 적층시켜 기둥형태의 중공 필라(120)를 구조물로 축조한다. 여기서, 상기 단위 중공 필라 블록(121)의 적층 높이는 사방댐의 시공 장소나 환경 및 특성 등에 따라 설계되는 규격에 맞도록 다양하게 조절된 상태로 시공될 수 있다.Therefore, while repeatedly performing the loading operation of the unit hollow pillar block 121 as described above, a plurality of unit hollow pillar blocks 121 are stacked at a predetermined height on the concrete base layer 110 to form a columnar hollow pillar 120 Is constructed as a structure. Here, the stacking height of the unit hollow pillar block 121 may be variously adjusted to meet the specifications designed according to the construction location, environment, and characteristics of the four-way dam.

다음 시공 단계로서, 상기 관통홀(121h)에 그라우팅재를 충전하는 단계(d)에서는 상기 중공 필라(120)의 최상단에 위치하도록 적층된 단위 중공 필라 블록(121)의 관통홀(121h)에 그라우팅재(G)를 주입한다. 이에 따라 상기 단위 중공 필라 블록(121)의 관통홀(121h)의 내벽과 상기 강봉(131)의 외주면 사이에 형성된 틈새 공간에 그라우팅재(G)가 주입되어 충전된다. 이때, 도 2에 의해 설명한 바와 같이 상기 단위 중공 필라 블록(121)의 요홈부(121w)(121g)가 상보적인 공간으로 형성하는 챔버에 그라우팅재(G)가 충분히 수용되어 충전될 때까지 주입한다.As the next construction step, in the step (d) of filling the through hole 121h with a grouting material, grouting is performed in the through hole 121h of the unit hollow pillar block 121 stacked to be located at the top of the hollow pillar 120 Inject ash (G). Accordingly, a grouting material G is injected and filled into a gap formed between the inner wall of the through hole 121h of the unit hollow pillar block 121 and the outer circumferential surface of the steel bar 131. At this time, as described with reference to FIG. 2, the grooves 121w and 121g of the unit hollow pillar block 121 are injected into the chamber formed as a complementary space until the grouting material G is sufficiently accommodated and filled. .

이어서, 최상단의 단위 중공 필라 블록(121)의 상부 관통홀(121h)에서 상기 강봉(131)의 상단에 고정 정착구(132)를 설치하여 프리스트레스를 인가한다. 이로써, 상기 콘크리트 기초층(110)에 순차적으로 적층된 복수의 단위 중공 필라 블록(121)은 각각의 경계부에 견고한 보강 연결부가 형성되어 일체적인 보강 구조체를 이루게 되므로 전단력에 대해 유효한 대항력을 보유할 수 있는 중공 기둥형 구조물로 축조된다.Subsequently, a fixing fixture 132 is installed on the upper end of the steel bar 131 in the upper through hole 121h of the unit hollow pillar block 121 at the top to apply prestress. Accordingly, the plurality of unit hollow pillar blocks 121 sequentially stacked on the concrete base layer 110 form an integral reinforcement structure by forming a solid reinforcing connection at each boundary, so that it can hold an effective counter force against shear force. It is constructed as a hollow columnar structure.

본 발명에 따르면, 상술한 바와 같은 단계를 거쳐서 상기 콘크리트 기초층(110)에 복수의 단위 중공 필라 블록(121)은 순차적으로 적층하여 기둥형태의 구조물로 축조한 중공 필라(120)의 상단에 도 1에 예시한 바와 같이 캡부재(141)를 설치하여 단일의 중공 필라(120)에 대한 시공작업을 마감한다.According to the present invention, through the steps as described above, a plurality of unit hollow pillar blocks 121 are sequentially stacked on the concrete base layer 110 to be shown on the top of the hollow pillar 120 constructed as a columnar structure. As illustrated in 1, the cap member 141 is installed to finish the construction work for the single hollow pillar 120.

따라서, 본 발명의 다른 실시예에 의한 블록 적층형 에코 필라 사방댐의 시공방법에 따르면, 상술한 바와 같은 단계를 거쳐서 상기 콘크리트 기초층(110)에 일정한 간격 패턴으로 다수의 중공 필라(120)가 배열되는 블록 적층형 에코 필라 사방댐의 시공을 완료할 수 있다.Accordingly, according to the construction method of the block-laminated eco-pillar four-way dam according to another embodiment of the present invention, a plurality of hollow pillars 120 are arranged in a regular interval pattern on the concrete base layer 110 through the steps as described above. The construction of the block-stacked eco-pillar all-around dam can be completed.

도 12는 본 발명의 또 다른 실시예에 의한 블록 적층형 에코 필라 사방댐의 요부를 발췌하여 개략적으로 도시해 보인 단면도이다.12 is a cross-sectional view schematically showing a main part of a block-stacked eco-pillar four-bang dam according to another embodiment of the present invention.

도 12를 참조하면, 본 발명의 또 다른 실시예에 의한 블록 적층형 에코 필라 사방댐은, 지반에 타설되는 콘크리트 기초층(110)에 일정한 간격 패턴으로 배열되는 기둥형태의 구조물로 축조(築造)되는 다수의 중공 필라(120)가 프리캐스트 콘크리트로 제작된 복수의 단위 중공 필라 블록(121)이 세그먼트(segment)를 이루도록 순차적으로 적층되어 각 연결부에 프리스트레싱에 의한 보강 연결부가 형성되며, 상기 콘크리트 기초층(110)과 최하단의 단위 중공 필라 블록(121)의 연결부에 보강 접합부(111, 112)가 형성되도록 축조된다. 여기서, 앞서 도시된 도면의 참조부호와 동일한 도면 참조부호는 동일한 구성요소에 해당하는 것으로서, 그 구성요소들에 대한 상세한 설명은 생략한다.Referring to FIG. 12, the block-stacked eco-pillar four-way dam according to another embodiment of the present invention is constructed as a column-shaped structure arranged in a regular interval pattern on the concrete base layer 110 that is poured on the ground. A plurality of unit hollow pillar blocks 121 made of precast concrete are sequentially stacked to form a segment, thereby forming a reinforcing connection part by prestressing at each connection part, and the concrete base layer ( 110) and the lowermost unit hollow pillar block 121 is constructed so that reinforcing joints 111 and 112 are formed at the connection portion. Here, the same reference numerals as those of the drawings shown above correspond to the same elements, and detailed descriptions of the elements will be omitted.

즉, 본 발명의 다른 실시예에 의한 블록 적층형 에코 필라 사방댐에 따르면,상기 콘크리트 기초층(110)에 탑재되는 최하단의 단위 중공 필라 블록(121)은 상기 콘크리트 기초층(110)에 돌출되도록 매설되어 중공 내부에 삽입된 상태로 정렬되는 복수의 철근(111) 및 그 철근(111)이 매립되도록 상기 최하단의 단위 중공 필라 블록(121)의 중공부에 타설되는 몰탈층(112)에 의해 보강 접합부(111, 112)가 형성되도록 축조된다.That is, according to the block-stacked eco-pillar four-way dam according to another embodiment of the present invention, the lowermost unit hollow pillar block 121 mounted on the concrete base layer 110 is buried to protrude from the concrete base layer 110 A reinforcing joint by a mortar layer 112 poured into the hollow portion of the unit hollow pillar block 121 at the lowermost end so that a plurality of reinforcing bars 111 arranged in a state inserted into the hollow and the reinforcing bars 111 are buried ( 111, 112) is built to form.

그리고, 상기 콘크리트 기초층(110)에 탑재되는 최하단의 단위 중공 필라 블록(121)은 상기 보강 접합부를 이루고 있는 중공 내벽에 보강용 요철부(도면부호 없음)가 형성되어 있는 것이 바람직하다.In addition, it is preferable that the lowermost unit hollow pillar block 121 mounted on the concrete base layer 110 has an uneven portion for reinforcement (no drawing symbol) formed on the hollow inner wall constituting the reinforcing joint.

또한, 상기 콘크리트 기초층(110)에 순차적으로 적층되는 복수의 단위 중공 필라 블록(121)은 관통홀(121h)에 프리스트레스 긴장재로 설치되는 강봉(131)이 삽입되어 고정 정착구(132)에 의해 양측단이 고정되고, 상기 관통홀(121h)의 내벽과 상기 강봉(131)의 외주면 사이에 형성된 틈새 공간에 그라우팅재(G)가 주입되어 충전됨으로써, 상기 단위 중공 필라 블록(121)의 경계부에 견고한 보강 연결부가 형성되어 일체적인 구조체를 이루게 되므로 전단력에 대해 유효한 대항력을 보유할 수 있는 중공 기둥형 구조물로 축조된다.In addition, in the plurality of unit hollow pillar blocks 121 sequentially stacked on the concrete base layer 110, steel bars 131 installed as prestressed tension members are inserted into the through-holes 121h, and both sides by the fixing fixture 132 The end is fixed, and a grouting material (G) is injected into the gap space formed between the inner wall of the through hole 121h and the outer circumferential surface of the steel bar 131 to be filled, thereby making the unit solid pillar block 121 Since the reinforcing connection is formed to form an integral structure, it is constructed as a hollow columnar structure capable of retaining an effective counter force against shear force.

도 13은 본 발명의 또 다른 실시예에 의한 블록 적층형 에코 필라 사방댐을 개략적으로 도시해 보인 단면도이다. 여기서, 앞서 도시된 도면의 참조부호와 동일한 도면의 참조부호는 동일한 구성요소에 해당하는 것으로서, 그 구성요소들에 대한 상세한 설명은 생략한다.13 is a cross-sectional view schematically showing a block-stacked eco-pillar four-way dam according to another embodiment of the present invention. Here, reference numerals in the drawings that are the same as those in the drawings shown above correspond to the same elements, and detailed descriptions of the elements are omitted.

도 13을 참조하면, 본 발명의 또 다른 실시예에 의한 블록 적층형 에코 필라 사방댐은, 상기 단위 중공 필라 블록(121)의 관통홀(121h)이 서로 다른 축상에 배열되도록 제작할 수 있다. 이에 따라 상기 강봉(131)은 복수의 커플러(C)에 의해 서로 다른 축상에 엇갈린 상태로 배열되도록 복수의 단위 갯수가 프리스트레스 긴장재로 설치될 수 있다.Referring to FIG. 13, the block-stacked eco-pillar four-way dam according to another embodiment of the present invention may be manufactured such that the through holes 121h of the unit hollow pillar block 121 are arranged on different axes. Accordingly, the number of units of the steel rods 131 may be installed as prestressed tension members so that they are arranged in a staggered state on different axes by a plurality of couplers C.

따라서, 상기 단위 중공 필라 블록(121)은 서로 다른 축상에 엇갈린 상태로 설치되는 강봉(131)에 의해 프리스트레스 긴장재가 중복된 구간으로 도입되는 구성을 가질 수 있다.Accordingly, the unit hollow pillar block 121 may have a configuration in which the prestressed tension member is introduced into an overlapping section by the steel bars 131 installed in a staggered state on different axes.

이상에서 설명한 바와 같은 본 발명은 상술한 특정의 바람직한 실시예에 의해 한정되지 않으며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진자라면 누구든지 다양한 변형 실시예가 가능한 것은 물론이고, 그와 같은 변경은 기재된 청구범위 내에 있게 된다.The present invention as described above is not limited by the specific preferred embodiment described above, and anyone with ordinary knowledge in the technical field to which the present invention belongs without departing from the gist of the present invention claimed in the claims Various modifications are possible, of course, and such modifications are intended to be within the scope of the described claims.

110 : 콘크리트 기초층
111 : 철근
120 : 중공 필라
121 : 단위 중공 필라 블록
121h : 관통공
121w : 요홈부
121g : 그루브 요홈부
131 : 강봉
132 : 정착구
141 : 캡부재
C: 커플러
G : 그라우팅재
110: concrete base layer
111: rebar
120: hollow pillar
121: unit hollow pillar block
121h: through hole
121w: groove
121g: groove
131: steel rod
132: settlement
141: cap member
C: coupler
G: grouting material

Claims (18)

지반에 타설되는 콘크리트 기초층(110)과, 그 콘크리트 기초층(110)에 일정한 간격 패턴으로 배열되는 직립 기둥형 축조 구조물로 시공되는 다수의 중공 필라(120)를 포함하는 에코 필라 사방댐에 있어서,
상기 중공 필라(120)는 실린더형 몸체(121a)의 상단과 하단을 관통하는 다수의 관통홀(121h)이 환형 배열로 형성되도록 프리캐스트 콘크리트로 제작된 복수의 단위 중공 필라 블록(121)이 순차적으로 적층되어 세그먼트를 형성하도록 이루어지며,
상기 각 단위 중공 필라 블록(121)은 상기 관통홀(121h)에 프리스트레스 긴장재로 삽입되는 강봉(131) 및 그 강봉(131)의 주위를 에워싸도록 충전되는 그라우팅재에 의해 형성되는 연결 보강부에 의해 일체적인 구조체를 이루도록 축조되고,
상기 단위 중공 필라 블록(121)은 상단 트랙면과 하단 트랙면에 각각 상기 관통홀(121h)의 주위로 확공되도록 단차지게 형성되는 요홈부가 구비되며, 그 요홈부는 상기 단위 중공 필라 블록(121)의 적층시 정합되어 상보적인 공간으로 이루어진 용기 형태의 챔버를 형성하고, 그 챔버의 형태에 따라 그라우팅재가 충전되는 수용량을 제어할 수 있도록 이루어지는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐.
In the eco-pillar four-way dam comprising a concrete base layer 110 poured on the ground, and a plurality of hollow pillars 120 constructed as an upright columnar construction structure arranged in a regular interval pattern on the concrete base layer 110,
The hollow pillar 120 includes a plurality of unit hollow pillar blocks 121 made of precast concrete so that a plurality of through holes 121h penetrating the upper and lower ends of the cylindrical body 121a are formed in an annular arrangement. Is stacked to form a segment,
Each unit of the hollow pillar block 121 is a connection reinforcing portion formed by a steel rod 131 inserted as a prestress tension member into the through hole 121h and a grouting material filled to surround the steel rod 131 It is built to form an integral structure by
The unit hollow pillar block 121 is provided with a groove portion steppedly formed so as to expand around the through hole (121h), respectively, on the upper track surface and the lower track surface, the groove portion of the unit hollow pillar block 121 A block-stacked eco-pillar four-sided dam, characterized in that it is matched during lamination to form a container-shaped chamber consisting of a complementary space, and to control a capacity to be filled with a grouting material according to the shape of the chamber.
제 1 항에 있어서,
상기 콘크리트 기초층(110)에 탑재되는 최하단의 단위 중공 필라 블록(121)은 상기 콘크리트 기초층(110)에 돌출되도록 매설되어 중공 내부에 삽입된 상태로 정렬되는 복수의 철근(111) 및 그 철근(111)의 매립을 위해 타설되는 몰탈층(112)에 의해 형성되는 보강 접합부를 포함하는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐.
The method of claim 1,
The lowermost unit hollow pillar block 121 mounted on the concrete foundation layer 110 is buried so as to protrude from the concrete foundation layer 110, and a plurality of reinforcing bars 111 arranged in a state inserted into the hollow interior and reinforcing bars thereof Block-stacked eco-pillar four-sided dam, characterized in that it comprises a reinforcing joint formed by the mortar layer 112 is poured for the burial of (111).
제 1 항 또는 제 2 항에 있어서,
상기 강봉(131)은 상기 단위 중공 필라 블록(121)의 관통홀(121h)과 대응하는 배열 상태로 상기 콘크리트 기초층(110)에 상방 돌출되도록 매설되는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐.
The method of claim 1 or 2,
The steel rod 131 is a block-stacked eco-pillar four-sided dam, characterized in that it is buried so as to protrude upward in the concrete base layer 110 in an arrangement corresponding to the through hole 121h of the unit hollow pillar block 121.
제 1 항 또는 제 2 항에 있어서,
상기 강봉(131)은 적어도 하나 이상의 커플러(C)에 의해 복수 단위가 연장되는 상태로 설치되는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐.
The method of claim 1 or 2,
The steel bar 131 is a block-stacked eco-pillar four-way dam, characterized in that installed in a state in which a plurality of units are extended by at least one coupler (C).
삭제delete 제 1 항 또는 제 2 항에 있어서,
상기 단위 중공 필라 블록(121)은 상단 트랙면과 하단 트랙면에 상기 관통홀(121h) 주위로 확장되도록 단차지게 형성된 그루브(121g)가 연속적으로 구비되며,
상기 그루브(121g)는 상기 단위 중공 필라 블록(121)의 적층시 정합되어 상보적인 공간으로 이루어진 도너츠 형태의 챔버를 형성하여 그라우팅재(G)가 충전되는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐.
The method of claim 1 or 2,
The unit hollow pillar block 121 is continuously provided with grooves 121g steppedly formed so as to extend around the through hole 121h on the upper track surface and the lower track surface,
The groove (121g) is matched when the unit hollow pillar block (121) is stacked to form a donut-shaped chamber consisting of a complementary space, characterized in that the grouting material (G) is filled, characterized in that the block-stacked eco-pillar square dam.
제 1 항 또는 제 2 항에 있어서,
상기 단위 중공 필라 블록(121)은 트랙 단면이 타원형이나 물방울 및 말발굽 형상 중에서 선택된 어느 하나로 형성되는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐.
The method of claim 1 or 2,
The unit hollow pillar block 121 is a block-stacked eco-pillar four-sided dam, characterized in that the track cross-section is formed in any one selected from an oval shape, water droplets and horseshoe shape.
제 1 항 또는 제 2 항에 있어서,
상기 단위 중공 필라 블록(121)은 관통홀(121h)이 서로 다른 축상에 배열되도록 제작되어 서로 다른 축상에 엇갈린 상태로 설치되는 강봉(131)에 의해 프리스트레스 긴장재가 중복된 구간에 도입되는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐.
The method of claim 1 or 2,
The unit hollow pillar block 121 is characterized in that the prestressed tension member is introduced into the overlapping section by the steel bars 131 that are manufactured so that the through holes 121h are arranged on different axes and installed in a staggered state on the different axes. Block stacked eco-pillar all-round dam.
제 1 항 또는 제 2 항에 있어서,
상기 중공 필라(120)를 이루는 최상단의 단위 중공 필라 블록(121)은 중공부를 폐쇄하도록 설치된 캡부재(141)가 더 구비되는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐.
The method of claim 1 or 2,
The top unit hollow pillar block 121 constituting the hollow pillar 120 is a block-stacked eco-pillar four-way dam, characterized in that a cap member 141 installed to close the hollow portion is further provided.
제 2 항에 있어서,
상기 콘크리트 기초층(110)에 탑재되는 최하단의 단위 중공 필라 블록(121)은 상기 보강 접합부를 이루고 있는 중공 내벽에 보강용 요철부가 형성되어 있는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐.
According to claim 2,
The bottom unit hollow pillar block 121 mounted on the concrete base layer 110 is a block-stacked eco-pillar four-sided dam, characterized in that a reinforcing convex portion is formed on a hollow inner wall constituting the reinforcing joint.
지반에 타설되는 콘크리트 기초층(110)에 다수의 중공 필라(120)를 일정한 간격의 배열 패턴으로 축조하는 에코 필라 사방댐의 시공방법에 있어서,
프리스트레스 긴장재로 설치되는 강봉(131)이 돌출된 상태로 매설되도록 지반에 콘크리트 기초층(110)을 타설하여 양생하는 단계 및 상기 중공 필라(120)를 형성하기 위해 적층되는 세그먼트를 이루도록 실린더형 몸체의 상단과 하단을 관통하는 다수의 관통홀(121h)이 구비된 단위 중공 필라 블록(121)을 콘크리트 프리캐스트로 제작하는 단계를 각각 별도의 공정으로 수행하며,
상기 단위 중공 필라 블록(121)을 현장으로 운반하여 상기 관통홀(121h)에 상기 강봉(131)이 삽입되도록 상기 콘크리트 기초층(110)에 순차적으로 적층하는 단계와;
상기 강봉(131)에 프리스트레스를 가하기 위해 정착구를 설치하고, 상기 관통홀(121h)에 그라우팅재를 충전하는 단계;를 포함하며,
상기 단위 중공 필라 블록(121)은 상단 트랙면과 하단 트랙면에 각각 상기 관통홀(121h)의 주위로 확공되도록 단차지게 형성되는 요홈부(121w)가 구비되고, 그 상기 요홈부(121w)는 상기 단위 중공 필라 블록(121)의 적층시 정합되어 상보적인 공간으로 이루어진 용기 형태의 챔버를 형성하며, 그 챔버의 형태에 따라 그라우팅재가 충전되는 수용량을 제어할 수 있도록 이루어지는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐의 시공방법.
In the construction method of the eco-pillar all-round dam in which a plurality of hollow pillars 120 are constructed in an arrangement pattern at regular intervals on the concrete base layer 110 poured in the ground,
The step of curing by pouring a concrete base layer 110 in the ground so that the steel rod 131 installed as a prestressed tension member is buried in a protruding state, and the cylindrical body to form a segment that is stacked to form the hollow pillar 120 Each of the steps of manufacturing the unit hollow pillar block 121 provided with a plurality of through-holes 121h penetrating the top and bottom of the concrete precast is performed as a separate process,
Transporting the unit hollow pillar block 121 to the site and sequentially stacking the steel bar 131 on the concrete base layer 110 so that the steel bar 131 is inserted into the through hole 121h;
Including; installing a fixing unit to apply prestress to the steel bar 131, and filling the through hole 121h with a grouting material; and
The unit hollow pillar block 121 is provided with a groove portion (121w) stepwisely formed to expand around the through hole (121h), respectively, on the upper track surface and the lower track surface, the groove (121w) When the unit hollow pillar blocks 121 are stacked, they are matched to form a container-shaped chamber consisting of a complementary space, and a capacity to be filled with a grouting material can be controlled according to the shape of the chamber. Construction method of the pillar dam.
삭제delete 삭제delete 제 11 항에 있어서,
상기 단위 중공 필라 블록(121)은 상단 트랙면과 하단 트랙면에는 상기 관통홀(121h) 주위로 확장되도록 단차지게 형성된 그루브(121g)가 연속적으로 구비되며,
상기 그루브(121g)는 상기 단위 중공 필라 블록(121)의 적층시 정합되어 상보적인 공간으로 이루어진 도너츠 형태의 챔버를 형성하여 그라우팅재가 충전되는는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐의 시공방법.
The method of claim 11,
The unit hollow pillar block 121 is continuously provided with grooves 121g steppedly formed so as to extend around the through hole 121h on the upper track surface and the lower track surface,
The groove (121g) is matched when the unit hollow pillar block (121) is stacked to form a donut-shaped chamber consisting of a complementary space, wherein the grouting material is filled.
제 11 항에 있어서,
상기 단위 중공 필라 블록(121)은 트랙 단면이 타원형이나 물방울 및 말발굽 형상 중에서 선택된 어느 하나로 형성되는 것을 특징으로 하는 블록 적층형 에코 필라 사방댐의 시공방법.
The method of claim 11,
The unit hollow pillar block 121 is a construction method of a block-stacked eco-pillar four-sided dam, characterized in that the track cross-section is formed in any one selected from oval shape, water droplets and horseshoe shape.
지반에 타설되는 콘크리트 기초층에 일정한 간격 패턴으로 배열되는 중공 필라로 축조되어 사방댐을 이루도록 프리캐스트 콘크리트로 제작되어 상기 콘크리트 기초층에 순차적으로 적층되는 세그먼트를 이루는 것으로,
프리캐스트 콘크리트 제작에 의해 실린더형 몸체의 상단과 하단을 관통하여 프리스트레스 긴장재가 삽입되도록 형성된 다수의 관통홀(121h)과, 상기 실린더형 몸체의 상단 트랙면과 하단 트랙면에 각각 상기 관통홀(121h)의 주위로 확장되도록 단차지게 형성된 요홈부를 구비하며,
상기 콘크리트 기초층(110)에 순차적인 적층시 상기 요홈부가 마주하도록 정합되어 상보적인 공간으로 이루어진 챔버를 형성하고, 그 챔버의 형태에 따라 그라우팅재가 충전되는 수용량을 제어할 수 있는 보강 연결부의 형성이 가능하도록 이루어진 것을 특징으로 하는 블록 적층형 사방댐의 필라 축조용 중공 필라 블록 유닛.
Constructed with hollow pillars arranged in a pattern at regular intervals on the concrete foundation layer poured on the ground and made of precast concrete to form a four-way dam, forming a segment sequentially stacked on the concrete foundation layer,
A plurality of through holes 121h formed to penetrate the upper and lower ends of the cylindrical body by precast concrete so that the prestressed tension member is inserted, and the through holes 121h in the upper and lower track surfaces of the cylindrical body, respectively. ) And has a groove formed stepwise to expand around,
When sequentially stacked on the concrete base layer 110, the grooves are matched to face to form a chamber consisting of a complementary space, and the formation of a reinforcing connection capable of controlling the capacity to be filled with the grouting material according to the shape of the chamber A hollow pillar block unit for building a pillar of a block-stacked four-way dam, characterized in that it is made possible.
제 16 항에 있어서,
상기 요홈부는 상기 실린더형 몸체의 상단 트랙면과 하단 트랙면에 각각 상기 관통홀(121h)의 주위로 확장되도록 단차지게 형성된 그루브(121g)로 형성되어 상기 콘크리트 기초층(110)에 순차적인 적층시 정합되어 상보적인 공간으로 이루어진 도너츠 형태의 챔버를 형성하는 것을 특징으로 하는 블록 적층형 사방댐의 필라 축조용 중공 필라 블록 유닛.
The method of claim 16,
The groove portion is formed of grooves (121g) stepwise formed so as to extend around the through hole (121h) on the upper track surface and the lower track surface of the cylindrical body, respectively, when sequentially stacked on the concrete base layer (110) A hollow pillar block unit for building a pillar of a block stacked four-way dam, characterized in that the matched to form a donut-shaped chamber consisting of a complementary space.
제 16 항 또는 제 17 항에 있어서,
상기 실린더형 몸체의 트랙 단면이 타원형이나 물방울 및 말발굽 형상 중에서 선택된 어느 하나로 형성되는 것을 특징으로 하는 블록 적층형 사방댐의 필라 축조용 중공 필라 블록 유닛.
The method of claim 16 or 17,
A hollow pillar block unit for building a pillar of a block-stacked four-way dam, wherein the track cross section of the cylindrical body is formed in one selected from an oval shape, a water droplet, and a horseshoe shape.
KR1020180016923A 2018-02-12 2018-02-12 A bolck-assembly type eco pillar debris barrier and construction method thereof KR102143057B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180016923A KR102143057B1 (en) 2018-02-12 2018-02-12 A bolck-assembly type eco pillar debris barrier and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180016923A KR102143057B1 (en) 2018-02-12 2018-02-12 A bolck-assembly type eco pillar debris barrier and construction method thereof

Publications (2)

Publication Number Publication Date
KR20190097459A KR20190097459A (en) 2019-08-21
KR102143057B1 true KR102143057B1 (en) 2020-08-10

Family

ID=67808177

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180016923A KR102143057B1 (en) 2018-02-12 2018-02-12 A bolck-assembly type eco pillar debris barrier and construction method thereof

Country Status (1)

Country Link
KR (1) KR102143057B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102313398B1 (en) * 2020-11-03 2021-10-15 주식회사 이산 Erosion Control Facilities Having Prefabricated Erosion Control Structure Using Mountain Land, River or Valley
KR102353981B1 (en) * 2021-05-27 2022-01-21 주식회사 이산 Erosion Control Facilities Having Eco-Friendly Environment Structure Installed Mountain, River Stream, Valley Area

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004060388A (en) * 2002-07-31 2004-02-26 Jfe Metal Products & Engineering Inc Permeable sand control dam

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200291969Y1 (en) 2002-07-23 2002-10-11 안승주 An concrete block pile up for retaining wall
KR100908676B1 (en) 2008-12-24 2009-07-22 대한민국 Assembly block devris barrier
KR101143310B1 (en) * 2009-07-21 2012-05-09 한국건설기술연구원 Precast concrete segments for constructing bridge piers with elongated round holes surrounding reinforcing bars and the method using the same
KR100965467B1 (en) 2009-12-17 2010-06-24 대한민국 Eco-pillar debris barrier
KR100995832B1 (en) 2010-07-28 2010-11-22 (주)대흥이엔지 A slit debris barrier
KR101418998B1 (en) 2012-05-24 2014-07-15 (주)우경케이피이 Column structure for debris flow prevention, Safety fences and Construction Method thereof
KR101313868B1 (en) 2012-11-26 2013-10-01 강릉원주대학교산학협력단 A debris barrier with plural empty structure
KR101478131B1 (en) * 2013-03-06 2014-12-31 주식회사 케이씨이엔지니어링 Construction Method of Precast Pier

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004060388A (en) * 2002-07-31 2004-02-26 Jfe Metal Products & Engineering Inc Permeable sand control dam

Also Published As

Publication number Publication date
KR20190097459A (en) 2019-08-21

Similar Documents

Publication Publication Date Title
KR102143057B1 (en) A bolck-assembly type eco pillar debris barrier and construction method thereof
JP6854479B2 (en) Liquefaction countermeasure structure for underground structures
KR100483350B1 (en) In place assembling top blocks and their reinforced complex foundation method
KR101324231B1 (en) Soil cement wall structure and method for constructing thereof
KR20090091608A (en) Method making the spot watercourse block a model arrangement continuity
RU2321701C2 (en) Weir construction method
KR101960500B1 (en) A assembly type eco pillar debris barrier and construction method thereof
CN109811607B (en) Light high embankment structure in mountain steep slope road section beneficial to disaster prevention and construction method
JP2017082441A (en) Dam structure
KR20130009348A (en) Composite pile
JP2005155229A (en) Rainwater underground permeation structure and its execution method
KR101920789B1 (en) Bridges of scour prevention structure
KR101339948B1 (en) Construction technique of steel box girder and this
JP3930954B2 (en) Construction method of structure
CN216640631U (en) Assembled friction pile
KR102426192B1 (en) File fof retaining wall and construction method using file
CN214737838U (en) A block structure for mud-rock flow disaster is administered
KR102197091B1 (en) Underground structure wall and underground structure and method construturing the same
KR102234513B1 (en) Block type reinforcement retaining wall structure and constructing method for the same
KR200450476Y1 (en) Water Keeping Block and Rain Water Keeping Station Using the Block
JP4457396B2 (en) Retaining wall foundation block
JP2811436B2 (en) Construction method of earth retaining or fence and concrete block used in the method
KR100478987B1 (en) prestressed walltype pile and manufacturing method thereof and construction method of pile wall structure using the same pile
EP0922810B1 (en) Method of securing slopes
KR200339984Y1 (en) In place assembling top base blocks

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant