KR102073887B1 - Installation equipment for thr road drainage construction - Google Patents

Installation equipment for thr road drainage construction Download PDF

Info

Publication number
KR102073887B1
KR102073887B1 KR1020190040632A KR20190040632A KR102073887B1 KR 102073887 B1 KR102073887 B1 KR 102073887B1 KR 1020190040632 A KR1020190040632 A KR 1020190040632A KR 20190040632 A KR20190040632 A KR 20190040632A KR 102073887 B1 KR102073887 B1 KR 102073887B1
Authority
KR
South Korea
Prior art keywords
main body
drainage
drain pipe
pouring
road
Prior art date
Application number
KR1020190040632A
Other languages
Korean (ko)
Inventor
장무순
노경호
Original Assignee
장무순
노경호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to KR1020190027765 priority Critical
Priority to KR20190027765 priority
Application filed by 장무순, 노경호 filed Critical 장무순
Application granted granted Critical
Publication of KR102073887B1 publication Critical patent/KR102073887B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • F16L1/038Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being made in situ

Abstract

The present invention relates to a placing apparatus, which is used for placing construction of a continuous road drainage facility forming a plurality of collecting wells spaced apart from a side gutter of a road and a drainage part formed by connecting the collecting wells through a drain pipe. The placing apparatus includes: a main body formed with an internal space, the bottom open, and an opening bored on one side of the top; a hopper formed with an inlet, through which mortar cement is introduced, at the top and formed on an upper surface of the opening; and a pipe protecting part formed in the main body to protect an outer surface of the drain pipe.

Description

도로연속배수시설의 타설장치{INSTALLATION EQUIPMENT FOR THR ROAD DRAINAGE CONSTRUCTION}INSTALLATION EQUIPMENT FOR THR ROAD DRAINAGE CONSTRUCTION}

본 명세서에 개시된 내용은 토목 기술분야에 관한 것으로서, 더욱 상세하게는 도로의 연속배수 방식의 배수시설시공에 사용되는 타설장치에 관한 것이다.The disclosure disclosed herein relates to the field of civil engineering, and more particularly, to a pouring apparatus used for constructing a drainage system of a continuous drainage method of a road.

본 명세서에서 달리 표시되지 않는 한, 이 섹션에 설명되는 내용들은 이 출원의 청구항들에 대한 종래 기술이 아니며, 이 섹션에 포함된다고 하여 종래 기술이라고 인정되는 것은 아니다.Unless otherwise indicated herein, the contents described in this section are not prior art to the claims of this application, and inclusion in this section is not admitted to be prior art.

일반적으로 도로의 배수시설이란 비 또는 눈에 의해 발생된 도로면의 우수를 배수하기 위하여 도로 양쪽 또는 한쪽에 평행하게 만든 배수로 등을 의미한다.In general, a road drainage system means a drainage path made parallel to both or one side of a road to drain rainwater on the road surface generated by rain or snow.

이와 같이 도로에 배수시설을 설치함으로써 자동차의 주행상의 안정성과 주차 등의 편리를 고려한 것이다.By installing a drainage facility on the road as described above, the safety of the car and convenience of parking are considered.

종래의 도로의 배수시설은 점배수 방식의 배수시설로서, 도로상의 우수(노면수)가 배수시설 내부로 유입될 수 있는 집수정을 도로의 측구에 일정 간격 설치하고, 각 집수정을 연결하는 배수관을 형성한다. Conventional road drainage system is a drainage system of a point drainage system, in which drainage pipes in which water drainage on the road flows into the drainage system are installed at regular intervals on the side of the road, and each drainage pipe is connected to each other. To form.

따라서, 도로상의 우수가 유입될 수 있는 입구는 집수정밖에 존재하지 않는다.Therefore, the entrance to which rainwater on the road can flow is present only in the sump.

이러한 종래의 점배수 방식의 배수시설은 집중 호우시 배수가 원활히 수행되지 않음에 따라 도로의 물고임 현상 등으로 인하여 빗길 교통사고가 빈번하게 발생 되는 문제점이 있어왔다.Such a conventional drainage system of the point drainage method has been a problem that frequent traffic accidents due to rain on the road due to the phenomenon of water trapping due to poor drainage during heavy rainfall.

또한, 배수시설의 시공의 측면에 있어서도 집수정과 배수관을 형성하는 콘크리트 본체의 현장 타설을 위해 배근 및 거푸집 설치 작업이 요구되어 다소 비효율적인 문제점이 있어 왔다.In addition, in terms of the construction of the drainage facility, the installation of the reinforcement and formwork is required for the site of the concrete body forming the water collecting well and the drain pipe, there has been a somewhat inefficient problem.

도로는 매우 중요한 기반시설이지만, 도로 배수시설의 용량부족으로 인한 도로 침수 또는 유실로 인해 심각한 사회경제적, 인적 피해를 유발시키고 있는 실정이다.The road is a very important infrastructure, but it is causing serious socioeconomic and human damage due to road inundation or loss due to insufficient capacity of the road drainage system.

도로 배수는 통상 원활한 배수를 위해 도로의 중앙선 쪽이 높고, 갓길 쪽으로 낮아지도록 하는 구배로 시공한다. Road drainage is usually constructed with a gradient such that the centerline side of the road is higher and lower toward the shoulder for smooth drainage.

이에 따라, 도로 중앙선 높은 쪽에서 갓길 쪽으로 우수가 몰리고, 우수가 지속적으로 배출되거나 호우가 내리면 사면이 깍이거나 붕괴되기 쉽기 때문에, 이를 방지하기 위해 가드레일 지주가 설치된 갓길 어깨 위치에 다이크를 설치하여, 집수된 우수를 일정 구간 배치된 사면 배수로나 측구를 이용하여 점 배수방식으로 우수를 폐쇄형으로 집수처리 한다.As a result, rainwater gathers from the high side of the road to the shoulder, and if the rainwater is continuously discharged or the heavy rain falls, the slope is easily cut or collapsed. The rainwater is collected in a closed manner by a point drainage method using a slope drainage or a side opening arranged in a certain section.

그런데 기존 도로 배수시설로는, 하절기 잦은 호우로 배수가 원활하게 이루어지지 않아 수막현상이 발생하기 쉽고, 집중 호우시는 집수된 우수에 의해 도로의 갓 길에 인접하는 차선이 물에 잠겨빗길 교통사고의 주된 원인이 되고 있다.However, with existing road drainage facilities, water drainage is apt to occur due to frequent drainage due to frequent heavy rains in summer, and lanes adjacent to the side of the road are flooded with water due to the collected rainwater. It is the main cause.

뿐만 아니라, 동절기 제설작업시 제설리무버가 작업할 퇴설 공간이 부족하여 눈이 갓길에 쌓여 장기간 도로 결빙 및 갓길 미사용의 문제점이 따르고, 폭설시 제설능력이 상실되는 실정이다.In addition, there is a lack of retreat space for snow removal removers to work on during winter snow removal, so snow is piled on the road, which leads to problems of long-term freezing of roads and unused roads, and snow removal ability is lost during heavy snowfall.

상기 문제점들을 해결하기 위해 한국특허등록 제10-1429147호는 연속배수시설이 구비된 도로에서, 도로의 측구에 일정하게 이격 형성되며, 연속배수시설에 퇴적되는 협잡물의 청소를 위한 복수의 집수정 및 상기 복수의 집수정 사이를 연결하는 배수부를 포함하여, 상기 배수부 내부로 우수유입구가 도로를 따라 연속 형성되어 우수를 연속 배출하는 기술이 개시하고 있으며, 이에 사용되는 시공방법을 살펴 보면, 연속배수시설에 퇴적되는 협잡물의 청소를 위한 복수의 집수정을 도로의 측구에 일정 간격 이격하여 형성시키는 단계 및 복수의 집수부사이를 연결하는 배수부를 형성시키는 단계를 포함하되, 배수부 내부로 우수가 유입되는 우수유입구를 도로를 따라 연속하여 형성시키는 것을 특징으로 하며 도로와 인도를 구분하는 도로 경계석을 형성시키는 단계 및 집수정 내부 및 배수부 내부로의 우수의 유입을 원활하게 함과 아울러, 인도 측으로 우수가 월류되지 않도록 상기 도로 경계석을 따라 형성되는 월류방지턱을 형성시키는 단계를 포함할 수 있다.In order to solve the above problems, Korean Patent Registration No. 10-1429147 is formed on a road with a continuous drainage system, which is formed at regular intervals on the side of the road, and a plurality of water collecting wells for cleaning the debris deposited on the continuous drainage system and Disclosed is a technology for continuously draining rainwater by continuously forming rainwater inlets along the road into the drainage portion, including a drainage portion connecting the plurality of collection wells. Forming a plurality of catchment wells for cleaning the debris deposited in the facility at regular intervals on the side of the road and forming a drain connecting the plurality of catches, rainwater flows into the drain Characterized in that to form a continuous rainwater inlet along the road to form a road boundary stone that separates the road and sidewalk The key may include a step and a step of smoothing the inflow of the rainwater into the sump and the drainage portion, and forming a overflow barrier formed along the road boundary stone so that the rainwater does not overflow to the side of the delivery side.

여기서 배수부를 형성시키는 단계는, 상부에 우수유입구가 형성된 배수부 본체를 형성하는 콘크리트 하부에 위치하는 하부철근을 배근하는 단계, 하부철근을 구속하는 기초콘크리트를 타설하는 단계,Wherein the step of forming the drain, the step of reinforcing the lower reinforcing bar located in the lower part of the concrete forming the drainage main body formed with rainwater inlet in the upper step, placing the foundation concrete to restrain the lower reinforcement,

우수유입구를 통해 유입된 우수가 이동하는 배수관부 형성을 위한 배수관부 형성용 관을 설치 및 고정하는 단계, 배수부 본체를 형성하는 콘크리트 상부에 위치하는 상부철근을 배근하는 단계 및 콘크리트를 타설하여 상기 배수부 본체를 형성시키는 단계를 포함하며,Installing and fixing the drain pipe forming pipe for forming the drain pipe portion to move the rainwater flowing through the rainwater inlet, the step of reinforcing the upper reinforcing bar located in the upper portion of the concrete forming the drain body and placing the concrete Forming a drain body;

하부철근을 먼저 배근하고, 배근된 하부철근을 구속하는 기초콘크리트를 타설한 후 배수관부 형성용 관을 설치 및 고정하는 것이 시공의 측면에서 효율적이며 이후 상부철근을 배근하고, 콘크리트를 타설하여 배수구 본체를 형성시킨다.Reinforce the lower reinforcement first, install the foundation concrete to restrain the reinforced lower reinforcement, and install and fix the pipe for forming the drainage pipe part.It is efficient in terms of construction.Afterwards, the upper reinforcement is added and concrete is poured to drain the main body. To form.

하부철근과 상부철근은 겹이음 방식으로 배근 되는 것이 시공의 용이성 측면에서 타당하다.Lower bar and upper bar are reinforcement in the form of lap joint, so it is reasonable in terms of ease of construction.

또한, 콘크리트의 양생이 완료되기 전까지 배구관부 형성용 관이 적정 위치에서 이탈되는 것을 방지하기 위해 관 고정부재가 추가적으로 포함될 수 있다.In addition, the tube fixing member may be additionally included to prevent the volleyball tube forming tube from being released from the proper position until curing of the concrete is completed.

배수부를 형성시키는 단계 이후에, 우수유입구 상에 노출된 배수관부 형성용 관의 노출면을 절단하는 단계를 더 포함할 수 있다라고 기술하고 있다.After the step of forming the drain, it is described that it may further comprise the step of cutting the exposed surface of the drain pipe forming tube exposed on the rain inlet.

다만, 이러한 시공방법은 타설단계에서 몰탈시멘트가 배수관부 형성용 관(배수관)의 외면에 접촉되어 몰탈시멘트의 하중으로 관이 찌그러지거나, 파손될 수 있는 문제점이 있다.However, this construction method has a problem that the mortar cement in contact with the outer surface of the drainage pipe forming pipe (drainage pipe) during the pouring step, the tube may be crushed or damaged by the load of the mortar cement.

대한민국 등록특허 제10-1429147호Republic of Korea Patent No. 10-1429147

개시된 내용은 도로연속배수시설의 시공에 사용되는 타설장치로서, 타설시공시 몰탈시멘트의 하중 또는 충격으로부터 배수관을 보호하면서 타설시공을 할 수 있는 타설장치를 제공하고자 한다.Disclosed is a pouring apparatus used for the construction of continuous road drainage, and to provide a pouring apparatus that can be poured while protecting the drain pipe from the load or impact of mortar cement during the pouring construction.

또한, 상술한 바와 같은 기술적 과제들로 한정되지 않으며, 이하의 설명으로부터 또 다른 기술적 과제가 도출될 수도 있음은 자명하다.In addition, the present invention is not limited to the above-described technical problems, and it is apparent that other technical problems may be derived from the following description.

본 명세서에 개시된 내용은 도로의 측구에 이격 되어 형성되는 복수의 집수정 및 상기 집수정 사이를 배수관으로 연결 시켜 배수부를 형성시키는 도로연속배수시설의 타설시공에 사용되는 타설장치 있어서,According to the present disclosure, in the pouring apparatus, which is used to construct a continuous drainage system for forming a drainage by connecting a plurality of water collecting wells formed at a side of a road and the water collecting wells by a drain pipe,

상기 타설장치는 내부에 공간이 형성되고, 하부가 개방되며 상부일측에 개구공이 관통되어 형성되는 본체와 상부에 몰탈시멘트가 투입되는 투입구가 형성되고, 상기 개구공의 상면에 형성되는 호퍼와 상기 본체의 내부에 형성되어 상기 배수관의 외면을 보호하는 관보호부를 포함하는 타설장치에 대해 기술하고 있다.The pouring device has a space formed therein, a lower part is opened, a main body formed by opening an opening hole at an upper side thereof, and an injection hole into which a mortar cement is injected is formed at an upper part thereof, and a hopper formed on an upper surface of the opening hole and the main body. Described is a pouring apparatus formed in the interior of the pipe including a protective portion for protecting the outer surface of the drain pipe.

개시된 내용의 바람직한 특징에 따르면, 상기 본체는 직사각형의 형태로 형성되며, 상기 본체의 양측면이 상기 배수관의 양측에 배근된 철근에 결합되는 것을 특징으로 하는 타설장치.According to a preferred feature of the disclosed contents, the main body is formed in the form of a rectangular, the pouring device, characterized in that both sides of the main body is coupled to the reinforcing bars on both sides of the drain pipe.

개시된 내용의 바람직한 특징에 따르면, 상기 관보호부의 내경은 상기 배수관의 내경보다 큰 값을 갖게 형성되는 것을 특징으로 하는 타설장치.According to a preferred feature of the disclosure, the inner diameter of the tube protection portion is placed, characterized in that having a larger value than the inner diameter of the drain pipe.

개시된 내용의 바람직한 특징에 따르면, 상기 본체의 상부일측에 그레이팅이 안착 되는 요입부이 상기 본체의 길이방향으로 연장형성 되는 것을 특징으로 한다.According to a preferred feature of the disclosed contents, the inlet portion to be grating is seated on the upper one side of the main body is characterized in that it is formed extending in the longitudinal direction of the main body.

개시된 내용의 바람직한 특징에 따르면, 상기 본체를 사용하여 일 구간의 배수관 타설 시공 후, 상기 일 구간의 콘트리트가 양성되기 전에 상기 본체를 다음 시공구간으로 이동하여 다른 구간의 배수관 타설시공을 하는 것을 특징으로 한다.According to a preferred feature of the disclosed content, after the construction of the drain pipe in one section using the main body, before the concrete is positive in one section, the main body is moved to the next construction section, characterized in that the drain pipe installation in another section do.

개시된 내용의 바람직한 특징에 따르면, 상기 관보호부는 내부가 관통된 원통형으로 형성되고 하부가 개구되어 형성되는 것을 특징으로 한다.According to a preferred feature of the disclosure, the tube protection portion is characterized in that the inner cylindrical shape is formed through and the lower portion is formed to be opened.

개시된 내용의 바람직한 특징에 따르면,상기 호퍼는 하부로 갈수록 내경이 좁아지게 형성되는 것을 특징으로 한다.According to a preferred feature of the disclosure, the hopper is characterized in that the inner diameter is formed narrower toward the bottom.

개시된 내용의 바람직한 특징에 따르면,상기 관보호부는 강철로 이루어지는 것을 특징으로 한다.According to a preferred feature of the disclosure, the tube protection portion is characterized in that made of steel.

개시된 내용은 타설장치의 본체 내부에 관보호부가 형성되어 배수관의 외면을 보호함으로써, 타설시공시 배수관의 파손을 방지할 수 있는 타설장치를 제공하고자 한다.The present disclosure is to provide a pouring apparatus that can be formed inside the main body of the pouring apparatus to protect the outer surface of the drain pipe, thereby preventing damage of the drain pipe during pouring.

본 발명의 효과들은 이상에서 언급한 효과들로 제한되지 않으며, 언급되지 않은 또 다른 효과들은 청구범위의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다.The effects of the present invention are not limited to the above-mentioned effects, and other effects not mentioned will be clearly understood by those skilled in the art from the description of the claims.

도 1은 개시된 내용의 일 실시예에 따른 도로의 측구에 형성되는 집수정과 배수부가 연결된 도로연속배수시설을 나태내는 개략도.
도 2는 개시된 내용의 일 실시예에 따른 콘크리트가 양성된 배수부의 구조를 나타내는 단면도.
도 3는 개시된 내용의 일 실시예에 따른 타설장치의 구조를 나타내는 사시도.
도 4은 개시된 내용의 일 실시예에 따른 타설장치의 구조를 나타내는 정면도.
도 5는 개시된 내용의 일 실시예에 따른 타설장치의 구조를 나타내는 평면도.
도 6은 개시된 내용의 일 실시예에 따른 타설장치를 슬립폼페이버 장비에 장착하여 시공 준비 상태를 나타낸 도면,
도 7은 개시된 내용의 일 실시예에 따른 타설장치에 의해 콘크리트 구조물이 시공되는 예를 나타낸 도면,
도 8은 개시된 내용의 일 실시예에 따른 타설장치를 사용한 타설시공을 나타내는 사용상태도,
도 9는 개시된 내용의 다른 실시예에 따른 타설장치의 구조를 나타내는 사시도.
도 10은 개시된 내용의 다른 실시예에 따른 타설장치의 구조를 나타내는 정면도.
도 11는 개시된 내용의 다른 실시예에 따른 타설장치에 의해 타설된 배수부에 대한 사시도,
도 12은 또다른 실시예에 따른 타설장치를 나타낸 것으로, 본체 내부의 공간의 상면 양측에 높이 차이를 둔 형상을 보여주는 정면도,
도 13은 또다른 실시예에 따른 타설장치를 나타낸 것으로, 일측면에 개구부가 형성된 형태를 나타낸 사시도.
1 is a schematic diagram showing a road continuous drainage system connected to a water collecting well and a drain formed on the side of a road according to an embodiment of the present disclosure.
Figure 2 is a cross-sectional view showing the structure of the concrete positive drain in accordance with an embodiment of the disclosure.
Figure 3 is a perspective view showing the structure of the pouring apparatus according to an embodiment of the disclosed contents.
4 is a front view showing the structure of the pouring apparatus according to one embodiment of the disclosed contents.
5 is a plan view showing the structure of the pouring apparatus according to one embodiment of the disclosed contents.
6 is a view showing a construction preparation state by mounting a pouring apparatus according to an embodiment of the disclosed contents to slip foam fabric equipment,
7 is a view showing an example in which a concrete structure is constructed by a pouring apparatus according to an embodiment of the disclosed contents;
8 is a use state diagram showing the pouring construction using a pouring apparatus according to an embodiment of the present disclosure;
9 is a perspective view showing the structure of the pouring apparatus according to another embodiment of the disclosed contents.
10 is a front view showing the structure of the pouring apparatus according to another embodiment of the disclosed contents.
11 is a perspective view of a drain portion poured by a pouring apparatus according to another embodiment of the disclosed contents;
12 is a front view showing a shape of placing the height difference on both sides of the upper surface of the space inside the main body, according to another embodiment,
FIG. 13 is a perspective view illustrating a pouring apparatus according to another embodiment, in which an opening is formed in one side; FIG.

본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술 되어 있는 실시 예들을 참조하면 명확해질 것이다. 그러나 본 발명은 이하에서 개시되는 실시 예들에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 본 실시 예들은 본 발명의 개시가 완전하도록 하고, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. 명세서 전체에 걸쳐 동일 도면부호는 동일 구성 요소를 지칭한다.Advantages and features of the present invention, and methods for achieving them will be apparent with reference to the embodiments described below in detail with reference to the accompanying drawings. However, the present invention is not limited to the embodiments disclosed below, but may be implemented in various different forms, only the embodiments are to make the disclosure of the present invention complete, and the general knowledge in the technical field to which the present invention belongs. It is provided to fully convey the scope of the invention to those skilled in the art, and the present invention is defined only by the scope of the claims. Like reference numerals refer to like elements throughout.

본 발명의 실시 예들을 설명함에 있어서 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략할 것이다. 그리고 후술되는 용어들은 본 발명의 실시 예에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.In describing the embodiments of the present disclosure, when it is determined that a detailed description of a known function or configuration may unnecessarily obscure the subject matter of the present disclosure, the detailed description thereof will be omitted. Terms to be described below are terms defined in consideration of functions in the embodiments of the present invention, and may vary according to intentions or customs of users or operators. Therefore, the definition should be made based on the contents throughout the specification.

개시된 내용은 도 1에 도시된 바와 같이, 도로(1)의 측구에 이격 되어 형성되는 복수의 집수정(100) 및 상기 집수정(100) 사이를 연결하는 배수부(B)를 형성시키는 도로연속배수시설의 타설시공에 사용되는 타설장치에 관한 것이다.As disclosed in FIG. 1, a plurality of water collecting wells 100 formed at a side opening of a road 1 and a road continuous line forming a drain portion B connecting between the water collecting wells 100 are disclosed. It relates to a pouring device used for pouring construction of drainage facilities.

도 2는 이러한 도로연속배수시설의 타설시공이 끝난 후 양성된 배수부(B)의 구조를 나타내는 단면도이다.Figure 2 is a cross-sectional view showing the structure of the drainage portion (B) nurtured after the construction of the road continuous drainage.

도 2에 도시된 바와 같이, 배수관(205)의 양측에 철근(10)을 배근하고 몰탈시멘트를 타설함으로써 배수관(205)은 배수부(B)의 내면에 고정된다.As shown in FIG. 2, the drain pipe 205 is fixed to the inner surface of the drain portion B by placing the reinforcing bars 10 on both sides of the drain pipe 205 and placing mortar cement.

또한, 요입부(307)와 배수관(205)의 상부를 커팅기를 사용하여 절단함으로써 도로(1) 위의 우수 등은 요입부(307)를 통해 배수관(205)으로 유입되게 된다.In addition, by cutting the upper portion of the concave portion 307 and the drain pipe 205 using a cutting machine, rainwater on the road 1 is introduced into the drain pipe 205 through the concave portion 307.

본 명세서에 개시된 내용은 이러한 배수부(B)를 양성하기 위해 타설시공에 사용되는 타설장치에 관한 것으로 이하 상세한 설명을 한다. The contents disclosed herein relate to a pouring apparatus used for pouring to cultivate such a drain portion (B), which will be described in detail below.

도 3 및 도 4에 도시된 바와 같이, 본체(300)는 지면으로부터 직립 되는 수직벽(301)이 양측으로 대칭으로 형성되며, 각 수직벽(301)의 상단을 연결하여 윗면이 형성된다.As shown in FIGS. 3 and 4, the main body 300 has a vertical wall 301 upright from the ground symmetrically formed at both sides, and an upper surface thereof is formed by connecting the upper ends of each vertical wall 301.

본체(300)의 형상은 정사각형, 직사각형 등 다양하게 형성될 수 있지만, 도 3에 도시된 바와 같이, 배수관(205)의 측면에 배근되는 철근(10)의 구조가 직사각형임을 고려할 때,The shape of the main body 300 may be formed in various ways such as square, rectangular, etc., but as shown in FIG. 3, considering that the structure of the reinforcing bar 10 arranged on the side of the drain pipe 205 is rectangular,

본체(300)도 이에 대응하여 직사각형으로 형성되는 것이 바람직하다. The main body 300 is also preferably formed in a rectangular correspondingly.

도 3에 도시된 바와 같이, 본체(300) 내부에는 공간이 형성된다.As shown in FIG. 3, a space is formed inside the main body 300.

이러한 본체(300) 내부의 공간(303)은 몰탈시멘트를 사용하는 타설시공단계에서, 몰탈시멘트가 유입되기 위한 것이다.The space 303 inside the main body 300 is for pouring mortar cement in the pouring process using mortar cement.

본체(300) 내부의 공간(303)의 형상은 본체(300)의 형상에 따라 달라질 수 있지만, 시공되는 배수부(B)가 직사각형으로 형성되고 본체(300)의 형상도 이에 대응하여 직사각형으로 형성되는바, 본체내부의 형상도 직사각형으로 형성되는 것이 바람직하다.The shape of the space 303 inside the main body 300 may vary depending on the shape of the main body 300, but the drainage portion B to be constructed is formed into a rectangle, and the shape of the main body 300 is also formed into a rectangle corresponding thereto. It is preferable that the shape inside the main body is also formed into a rectangle.

또한, 도 3 및 도 4에 도시된 바와 같이, 본체(300)의 하부는 개방되어 형성된다.3 and 4, the lower portion of the main body 300 is formed to be open.

이는 타설시공에 있어서, 배수관(205)의 양측에 배근되는 철근(10)과의 결합을 용이하게 하기 위한 것으로, 일 예로, 본체(300)를 배근되는 철근(10)의 상부에서 하부로 끼워지게 결합할 수 있다.This is to facilitate the coupling with the reinforcing bars 10 are arranged on both sides of the drain pipe 205 in the pouring construction, for example, the main body 300 to be fitted from the upper part of the reinforcing bar 10 to be lowered Can be combined.

이러한 본체(300)의 각 수직벽간의 간격은 다양하게 형성될 수 있지만, 전술한 바와 같이, 수직벽(301)의 내면이 배근되는 철근(10)의 외면과 접하면서 고정되어야 함으로 수직벽(301)간의 간격은 배수관(205)의 양측에 배근되는 철근(10)사이의 간격에 상응하거나, 큰 값을 갖게 형성되는 것이 바람직하다.The spacing between each vertical wall of the main body 300 may be variously formed, but as described above, the inner surface of the vertical wall 301 should be fixed while being in contact with the outer surface of the reinforcing bar 10 to be reinforced, the vertical wall 301. Spacing between the () is preferably formed to correspond to the spacing between the reinforcing bars 10 are arranged on both sides of the drain pipe 205, or to have a large value.

도 3에 도시된 바와 같이, 본체(300)의 상부일측에는 개구공(305)이 관통되어 형성된다.As shown in FIG. 3, an opening hole 305 penetrates through an upper side of the main body 300.

이러한 개구공(305)은 후술할 호퍼(400)로 투입된 몰탈시멘트가 본체(300)내부로 유입되기 위한 것으로 형상은 직사각형, 정사각형 등 다양하게 형성될 수 있다.The opening hole 305 is to be introduced into the main body 300 mortar cement introduced into the hopper 400 to be described later may be formed in a variety of shapes, such as rectangular, square.

다만, 전술한 바와 같이, 본체(300)의 형상이 직사각형이고, 호퍼(400)로 유입된 몰탈시멘트가 손실 없이 본체(300)내부로 흘러들어가기 위해서 걸림면이 가장 작게 형성되는 직사각형 이나 원형으로 형성되는 것이 바람직하다.However, as described above, the main body 300 has a rectangular shape, and the mortar cement introduced into the hopper 400 is formed into a rectangle or a circle having the smallest locking surface in order to flow into the main body 300 without loss. It is desirable to be.

본체(300)의 재질은 강철, 플라스틱 등으로 다양하게 형성될 수 있지만, 몰탈시멘트의 하중 또는 충격에 대한 내구성을 고려할 때, 강철로 형성되는 것이 바람직하다.The material of the main body 300 may be variously formed of steel, plastic, or the like, but considering the durability against load or impact of the mortar cement, it is preferable to be formed of steel.

도 3에 도시된 바와 같이, 본체(300)의 상부에는 호퍼(400)가 형성된다.As shown in FIG. 3, a hopper 400 is formed on an upper portion of the main body 300.

이러한 호퍼(400)의 형상은 원통형, 직사각형 등 다양하게 형성될 수 있지만, 본체(300)의 형상이 직사각형이고, 호퍼(400)는 본체(300)의 상부에 형성되는 개구공(305)에서 연장형성되는 것인바, 개구공(305)의 형상에 대응하여 직사각형으로 형성되는 것이 바람직하다.The shape of the hopper 400 may be formed in a variety of cylindrical, rectangular, etc., the shape of the main body 300 is a rectangular shape, the hopper 400 extends from the opening hole 305 formed on the upper portion of the main body 300 The bar is preferably formed in a rectangular shape corresponding to the shape of the opening hole 305.

도 3에 도시된 바와 같이, 호퍼(400)의 상부에는 투입구(401)가 형성된다.As shown in FIG. 3, an inlet 401 is formed at an upper portion of the hopper 400.

이러한 투입구(401)에는 몰탈시멘트가 투입되는 것으로, 형상은 원형, 직사각형, 정사각형등 다양하게 형성될 수 있으며, 투입구(401)의 내경도 다양하게 형성될 수 있다.Mortar cement is injected into the inlet 401, and the shape may be variously formed in a circle, a rectangle, a square, and the like, and an inner diameter of the inlet 401 may be variously formed.

다만, 현장타설이나 슬립폼페이버(slip-form paver) 장비를 이용한 기계방식으로 몰탈시멘트를 투입시키기 위해선 투입구(401)의 내경이 개구공(305)의 내경보다 크게 형성되는 것이 바람직하다.However, in order to inject mortar cement in a mechanical method using on-site casting or slip-form paver equipment, the inner diameter of the inlet 401 may be larger than the inner diameter of the opening hole 305.

더 나아가, 호퍼(400)의 형상은 투입구(401)에서 하부로 갈수록 내경이 좁아지는 형태로 형성되는 것이 바람직하다.Furthermore, the shape of the hopper 400 is preferably formed in a shape in which the inner diameter is narrowed toward the lower portion from the inlet 401.

즉, 호퍼(400)의 벽면은 유선형으로 형성되게 되며, 이에 따라 투입구(401)로 투입된 몰탈시멘트는 호퍼(400)의 벽면을 따라 본체(300)로 자연스럽게 흘러들어 가게 된다.That is, the wall surface of the hopper 400 is formed to be streamlined, and thus the mortar cement introduced into the inlet 401 flows naturally into the main body 300 along the wall surface of the hopper 400.

도 3 및 도 4에 도시된 바와 같이, 관보호부(500)는 본체(300)의 내부에 형성된다.As shown in FIG. 3 and FIG. 4, the tube protection part 500 is formed inside the main body 300.

이러한 관보호부(500)는 본체(300)의 상단내부면에 결합 되거나, 상단내부면에서 본체(300)의 하부를 향해 연장형성될 수 있다.The tube protection part 500 may be coupled to the upper inner surface of the main body 300 or may extend from the upper inner surface toward the lower portion of the main body 300.

다만, 관보호부(500)가 따로 제작되어 본체(300)에 결합 되는 경우는 제조비용이 증가하고, 결합부의 마모에 의한 내구성의 문제가 있는바, 본체(300)와 일체로써 본체(300) 상단내부면에서 연장형성되는 것이 바람직하다. However, when the tube protection part 500 is manufactured separately and coupled to the main body 300, the manufacturing cost increases, and there is a problem of durability due to the wear of the coupling part. The upper part of the main body 300 is integrally formed with the main body 300. It is preferably extended from the inner surface.

관보호부(500)의 형상은 다양하게 형성될 수 있다.The tube protection part 500 may have various shapes.

다만, 관보호부(500)는 배수관(205)의 외면을 커버 하여 몰탈시멘트의 접촉으로부터 배수관(205)의 파손 등을 방지하는 것인바, 내측은 관통되어 관보호부내부공간(503)을 형성되어야 한다.However, the tube protection part 500 covers the outer surface of the drain pipe 205 to prevent breakage of the drain pipe 205 from the contact of the mortar cement, and the inside thereof should be penetrated to form the tube protection part inner space 503. .

이에 의해, 지면에 나열된 배수관(205)이 관보호부내부공간(503)에 삽입될 수 있다.Thereby, the drain pipe 205 listed on the ground can be inserted into the tube protecting part internal space 503.

이러한 관보호부내부공간(503)의 형상은 관보호부(500)의 형상에 따라 다르게 형성될 수 있다.The shape of the tube protecting part inner space 503 may be formed differently according to the shape of the tube protecting part 500.

예를 들어, 관보호부(500)의 단면이 직사각형을 갖는 직육면체로 형성되는 경우, 관보호부내부공간(503)도 직육면체로 형성될 것이다.For example, when the cross section of the tube protection part 500 is formed as a rectangular parallelepiped, the tube protection part inner space 503 may also be formed as a rectangular parallelepiped.

이렇듯 관보호부(500)의 형상과 관보호부내부공간(503)의 형상은 다양하게 형성될 수 있지만, 일반적인 배수관(205)의 형상은 원통형(주름관)이고, 배수관(205)의 외면과 접하게 되는 접촉면적과, 배수관(205) 양측에 배근되는 철근(10)과의 이격 거리를 고려할 때, 배수관(205)의 형상에 대응되는 원통형으로 형성되는 것이 바람직하다.As described above, the shape of the tube protection part 500 and the shape of the tube protection part inner space 503 may be variously formed, but the shape of the general drainage pipe 205 is cylindrical (wrinkle pipe) and is in contact with the outer surface of the drainage pipe 205. In consideration of the area and the separation distance between the reinforcing bars 10 arranged on both sides of the drain pipe 205, it is preferably formed in a cylindrical shape corresponding to the shape of the drain pipe 205.

만약, 관보호부(500)가 직육면체로 형성된다면, 배수관(205)과 관보호부(500) 사이에 공간이 형성되고, 결국 배수부(B) 내부에 형성되는 배수관(205)과 배수부벽체(202) 사이에도 공간이 형성되어 배수관(205)이 외부 충격으로부터 보호되지 못해 내구성의 문제가 발생할 수 있다.If the pipe protection part 500 is formed as a rectangular parallelepiped, a space is formed between the drain pipe 205 and the pipe protection part 500, and eventually, the drain pipe 205 and the drain wall 202 formed inside the drain part B. The space is formed between the) so that the drain pipe 205 is not protected from the external impact may cause durability problems.

또한, 전술한 바와 같이 관보호부(500)의 내부에 배수관(205)이 삽입되어야 함으로 관보호부(500)의 내경은 배수관(205)의 내경 보다 큰 값을 갖도록 형성되어야 한다.In addition, as described above, since the drain pipe 205 is inserted into the tube protection part 500, the inner diameter of the pipe protection part 500 should be formed to have a larger value than the inner diameter of the drain pipe 205.

이를 더 구체적으로 설명하자면, 배수관(205)의 내경이 일반적으로 450(mm) ~ 500(mm)의 값을 갖는바, 관보호부(500)의 내경은 배수부(B)시공에 사용되는 배수관(205)의 내경 보다 큰 값을 갖게 형성되어야 한다.More specifically, the inner diameter of the drain pipe 205 generally has a value of 450 (mm) to 500 (mm), and the inner diameter of the tube protection part 500 is a drain pipe used for the drainage part (B) construction. It should be formed to have a value larger than the inner diameter of 205).

만약, 관보호부(500)의 내경이 배수관(205)의 내경보다 작은 값을 갖게 형성된다면, 배수관(205)이 관보호부내부공간(503)에 삽입될 수 없어 배수관(205)을 보호하지 못하기 때문이다.If the inner diameter of the tube protection part 500 is formed to have a value smaller than that of the drain pipe 205, the drain pipe 205 may not be inserted into the tube protection part inner space 503 and thus may not protect the drain pipe 205. Because.

도 3 및 도 4에 도시된 바와 같이, 관보호부(500)의 하부는 개구되어 형성된다.As shown in Figure 3 and 4, the lower portion of the tube protection portion 500 is formed by opening.

이는 전술한 바와 같이, 본체(300)를 배수관(205)의 상향에서 하향으로 결합하는 경우 배수관(205)이 삽입될 수 있게 하기 위함이다.This is to allow the drain pipe 205 to be inserted when the main body 300 is coupled downward from the top of the drain pipe 205.

이러한 관보호부(500)의 재질은 강철, 목재, 플라스틱 등 다양하게 형성될 수 있는데, 본체(300)와 일체로 제작하여 제조원가를 절감하고, 몰탈시멘트의 하중에 대한 내구성을 고려할 때 본체(300)와 같은 강철로 형성되는 것이 바람직하다.The material of the tube protection part 500 may be formed in various ways, such as steel, wood, plastic, the body 300 is produced integrally with the body to reduce the manufacturing cost, when considering the durability of the mortar cement load body 300 It is preferably formed of steel, such as

도 3, 도 7에 도시된 바와 같이, 요입부(307)은 본체(300)의 상부일측에 길이방향으로 연장형성 된다. As shown in Figure 3, 7, the concave portion 307 is formed extending in the longitudinal direction on the upper side of the main body 300.

따라서 양성되는 배수관(205)의 상부에는 요입부(307)로 인해 배수로(B-1)가 형성될 수 있고, 배수로(B-1)의 일부위에는 집수정 및 그레이팅(미도시)이 설치된다.Therefore, a drainage path B-1 may be formed on the upper portion of the drainage pipe 205 to be nurtured by the concave inlet 307, and a water collecting well and a grating (not shown) are installed on a part of the drainage path B-1.

일반적으로 배수부(B)의 상면은 도로 위의 우수가 배수부(B)로 흘러들어가기 용이하게 하기 위해서, 도 2에 도시된 바와 같이, 양측에서 중앙으로 하향 경사지게 형성된다.In general, the upper surface of the drain portion (B) is formed to be inclined downward from both sides to the center, as shown in Figure 2, in order to facilitate the rain on the road to flow into the drain (B).

따라서, 우수와 함께 유입되는 오염물을 방지하기 위한 그레이팅(미도시)의 기능을 고려할 때, 배수부(B)의 상면의 형상에 대응하여, 요입부(307)은 본체(300)의 상부 중앙측에 형성되는 것이 바람직하다.Therefore, when considering the function of the grating (not shown) for preventing the contaminants introduced with rainwater, corresponding to the shape of the upper surface of the drain portion (B), the concave portion 307 is the upper center side of the main body 300 It is preferably formed in.

한편 도 12에 도시된 바와 같이, 요입부(307)의 양측에 형성되는 본체(300)의 내부 공간(303)은 높이가 상이하도록 형성되어 단차를 갖도록 형성될 수 있다. On the other hand, as shown in Figure 12, the inner space 303 of the main body 300 formed on both sides of the concave portion 307 may be formed so as to have a different height is formed.

요입부(307)의 좌측에 제1단차부(L1)가 형성되고, 우측에 제2단차부(L2)가 형성된다. The first stepped portion L1 is formed on the left side of the concave portion 307, and the second stepped portion L2 is formed on the right side.

양측 제1단차부(L1)와 제2단차부(L2)는 높이가 상이하게 형성된다. Both sides of the first stepped part L1 and the second stepped part L2 are formed to have different heights.

도 12에 도시된 바와 같이, 제1단차부(L1)가 제2단차부(L2) 보다 높게 형성되거나 또는 이와 반대로 형성될 수 있다. As shown in FIG. 12, the first stepped portion L1 may be formed higher than the second stepped portion L2 or vice versa.

이렇게 양측 제1,2단차부(L1)(L2)의 높이차를 둠으로써 현장에서 지면 높이의 조건 또는 도로 중앙이나 측단에 설치되는 위치에 따라 선택적으로 적용될 수 있어 보다 넓은 많은 조건을 충족시킬 수 있다. By placing the height difference between the first and second stepped portions L1 and L2 on both sides, it can be selectively applied according to the condition of the ground level or the position installed at the center or side of the road in the field, so that it can satisfy a wider range of conditions. have.

또한 바람직하게는 제1단차부(L1)와 제2단차부(L2)는 요입부(307)를 향해 경사지게 형성됨으로써 빗물이나 하수가 요입부(307)로 수렴하도록 구배(勾配; gradient를 형성한다. Also preferably, the first stepped portion L1 and the second stepped portion L2 are formed to be inclined toward the concave portion 307 to form a gradient such that rainwater or sewage converges to the concave portion 307. .

아울러 제1단차부(L1) 또는 제2단차부(L2) 각각은 끝부분에 경사각이 크게 하여 2차 경사단차부(L3)를 더 형성할 수 있다. In addition, each of the first stepped portion L1 or the second stepped portion L2 may further form a second inclined stepped portion L3 by increasing the inclination angle at the end thereof.

이러한 2차 경사단차부(L3)는 유체의 흐름을 촉진시킬 수 있는 기능을 하게 된다. The secondary inclination step (L3) is to function to promote the flow of the fluid.

한편 도 13에 도시된 바와 같이, 본체(300)는 양측에 형성되는 수직벽(301)을 절개하여 하방으로 개구된 개구부(3012)가 더 형성될 수 있다.Meanwhile, as shown in FIG. 13, the main body 300 may further include an opening 3012 open downward by cutting the vertical walls 301 formed at both sides.

개구부(3012)가 형성된 수직벽(301)은 보도블럭(미도시)이 시공된 쪽을 향하도록 배치된다.The vertical wall 301 having the opening 3012 is disposed to face the side where the sidewalk block (not shown) is constructed.

따라서 보도블럭이 설치된 장소에서 실시예에 따른 타설장치를 이용하여 도로연속배수시설의 타설시공을 하는 경우 수직벽(301)에 형성된 개구부(3012)에 보도블럭이 삽입될 수 있으므로 보도블럭과의 간섭이 없게 되어 시공작업이 원활하게 실시될 수 있다. Therefore, when the construction of the road continuous drainage facility using the pour device according to the embodiment in the place where the sidewalk block is installed, the sidewalk block can be inserted into the opening 3012 formed in the vertical wall 301, so interference with the sidewalk block There can be no construction work can be carried out smoothly.

이와 같이 구성된 실시예의 작용을 설명하면 다음과 같다.Referring to the operation of the embodiment configured as described above is as follows.

도 6은 개시된 내용의 일 실시예에 따른 타설장치를 슬립폼페이버 장비에 장착하여 시공 준비 상태를 나타낸 도면, 도 7은 개시된 내용의 일 실시예에 따른 타설장치에 의해 콘크리트 구조물이 시공되는 예를 나타낸 도면, 도 8은 개시된 내용의 일 실시예에 따른 타설장치를 사용한 타설시공을 나타내는 사용상태도이다.FIG. 6 is a view illustrating a construction preparation state by mounting a pouring apparatus according to an embodiment of the disclosed contents to a slip foam fabric device, and FIG. 7 illustrates an example in which a concrete structure is constructed by a pouring apparatus according to an embodiment of the disclosed contents. 8 is a state diagram showing the construction of placing using a pouring apparatus according to an embodiment of the disclosed contents.

본체(300)의 중간 상면에 개구공(305)이 형성되고 이러한 개구공(305)의 상부에 호퍼(400)가 결합 된다.The opening hole 305 is formed on the middle upper surface of the main body 300 and the hopper 400 is coupled to the upper portion of the opening hole 305.

또한, 관보호부(500)는 본체(300) 내부의 개방된 공간에 본체(300) 상부면에서 하향으로 연장형성되고, 관보호부(500)의 형상은 배수관(205)의 형상에 대응하여 원통형으로 형성되되 내부가 관통되어 형성된다.In addition, the tube protection part 500 is extended downward from the upper surface of the main body 300 in the open space inside the main body 300, the shape of the tube protection part 500 is cylindrical in correspondence with the shape of the drain pipe 205. It is formed but penetrated inside.

본체(300)의 상부면 중앙에는 길이방향을 따라 요입부(307)이 연장 형성된다.In the center of the upper surface of the main body 300, the concave portion 307 is formed extending along the longitudinal direction.

이러한 본체(300)를 자력 구동이 가능한 슬립폼페이버 장비(800)에 장착한다. The main body 300 is mounted on the slip foam fabric apparatus 800 capable of magnetic driving.

호퍼(400)의 일측에 슬립폼페이버 장비(800)에 장착하기 위한 브라켓(370)이 형성되고, 브라켓(370)에는 높이 설정이 가능하도록 다수의 통공(374)이 형성된다. A bracket 370 is mounted on one side of the hopper 400 for mounting on the slip foam fabric device 800, and a plurality of through holes 374 are formed in the bracket 370 to set the height.

지면에 배수관(205)이 설치되고, 배수관(205)의 일측말단에서 타측으로 관보호부(500)에 끼워지도록 하거나 배수관(205)의 상부에서 하부방향으로 덮어 결합함으로써 배수관(205)은 관보호부(500)의 내부공간(503)으로 삽입되게 된다(도 4 참조).A drain pipe 205 is installed on the ground, and the drain pipe 205 is fitted by being fitted to the pipe protection part 500 from one end of the drain pipe 205 to the other side or covered in a downward direction from the top of the drain pipe 205. It is inserted into the inner space 503 of 500 (see Fig. 4).

시공하고자 하는 일 구간의 배수관(205)의 외면이 관보호부(500)의 외주면에 의해 보호되도록 배수관(205)의 외측에 철근(10)을 가설하여 뼈대를 형성한 후, 현장타설 또는 슬립폼페이버 장비(800)를 이용하여 호퍼(400)의 투입구(401)에 몰탈시멘트를 투입함으로써 타설시공이 이루어지게 된다.After installing the reinforcing bars 10 on the outside of the drain pipe 205 so that the outer surface of the drain pipe 205 in one section to be protected by the outer circumferential surface of the pipe protection part 500 to form a skeleton, cast in place or slip foam By pouring mortar cement into the inlet 401 of the hopper 400 by using the equipment 800 is poured construction.

타설시공방법에 있어서는, 슬립폼페이버(slip-form paver) 장비(800)를 이용한 기계콘크리트 타설 방식인 것이 바람직하다.In the placing method, it is preferable that the machine concrete placing method using the slip-form paver equipment (800).

슬립폼페이버(slip-form paver) 장비란, 콘크리트 슬래브의 포설기계의 일종으로서, 펴고 다짐 기능, 표면 마무리 등의 콘크리트 타설에 필요한 기능을 겸비하고 있어 거푸집을 설치하지 않고 슬립폼페이버(slip-form paver) 장비만으로 콘크리트 슬래브(C)를 연속적으로 포설할 수 있다.Slip-form paver equipment is a type of concrete slab laying machine that combines the functions necessary for concrete placement such as flattening and compacting and surface finishing. The concrete slab (C) can be laid continuously with only paver equipment.

거푸집이 필요없이 콘크리트를 타설할 수 있어 시공의 경제성 및 시공성을 확보할 수 있는 효과가 있다.Since concrete can be poured without the need for formwork, it is possible to secure the economics and constructability of construction.

또한, 연속배수시설의 배수부(B)는 거푸집을 이용한 현장타설 또는 프리캐스트가설 방식으로 시공될 수 있다. In addition, the drain portion (B) of the continuous drainage system can be constructed in a cast-in-place or precast construction method using the formwork.

구체적으로는 배수부(B)의 형성 길이가 짧은 경우, 슬립폼페이버(slip-form paver) 장비를 사용하는 것보다 거푸집을 이용한 현장타설이나 프리캐스트 가설 방식을 통해 배수부(B)(slip-form paver)를 시공하는 것이 시공성 및 시공비용 측면에서 바람직하다.Specifically, when the formation length of the drain portion B is short, the drain portion B (slip-) is formed by using the formwork or precast construction method using formwork rather than using slip-form paver equipment. Form paver is preferable in view of workability and cost.

본론으로 돌아와, 일 구간의 배수부(B)의 타설시공이 끝난 후에는 그 일 구간의 콘크리트가 양성되기 전에 본체(300)를 다음 구간의 배수관(205)으로 이동하여 배수부(B)의 타설시공을 하게 되며, 이러한 방법으로 도로의 연속배수시설의 타설시공을 연속적으로 할 수 있다.Returning to the main point, after finishing the construction of the drain section B in one section, the main body 300 is moved to the drain pipe 205 in the next section before the concrete is trained in the section, and the drain section B is poured. In this way, it is possible to continuously build the road drainage system.

또한, 도 3 및 도 9에 도시된 바와 같이, 호퍼(400)가 형성되는 본체(300)의 중앙을 기준으로 본체 전방(308)과 본체 후방(310)으로 연장되어 형성되고, 이러한 본체(300)의 상면 중앙에는 요입부(307)가 형성된다.In addition, as shown in FIGS. 3 and 9, the main body 300 is formed extending from the front body 308 and the rear body 310 based on the center of the main body 300 in which the hopper 400 is formed. In the center of the upper surface of the recess 307 is formed.

이에 따라, 배수부(B)의 콘크리트 양성 후에는 배수부(B)의 상면에는 배수로(B-1)가 형성된다. Accordingly, after the concrete of the drain portion B is formed, the drain path B-1 is formed on the upper surface of the drain portion B.

본체 후방(310)에 형성된 요입부(307)는 다음 구간의 시공을 위해 본체(300)이동시 이미 형성된 이전 구간의 요입부(307)에 의해 형성된 배수로(B-1)의 형상을 유지시켜 준다.The concave inlet 307 formed at the rear of the main body 310 maintains the shape of the drainage path B-1 formed by the concave inlet 307 of the previous section that is already formed when the main body 300 moves for the construction of the next section.

도로연속배수시설의 타설시공은 시공하고자 하는 구역에 배수관(205)을 일 열로 지면에 안착시킨 후 타설시공을 연속적으로 하는 것인바, 본 발명의 타설장치를 사용하여 일방향으로 타설시공을 연속적으로 할수 있어 작업시간 단축에 의해 작업 효율성이 증대되며, 기존 타설시공방법을 사용하는 경우 배수부(B)의 내부에 안착 되는 배수관(205)을 보호하지 못하는 문제점을 해결하여 사용자에게 파손되지 아니한 배수관(205)을 제공할 수 있는 장점을 제공한다. The pouring construction of the road continuous drainage system is to place the drain pipe 205 on the ground in one row in the area to be constructed, and then perform the pouring construction continuously. The pouring construction can be continuously performed in one direction using the pouring apparatus of the present invention. Work efficiency is increased by shortening the work time, and when using the existing pouring method solves the problem of not protecting the drain pipe 205 seated inside the drain (B) drain pipe not damaged to the user (205) It provides the advantage that can provide).

한편 도 9는 개시된 내용의 다른 실시예에 따른 타설장치의 구조를 나타내는 사시도, 도 10은 개시된 내용의 다른 실시예에 따른 타설장치의 구조를 나타내는 정면도, 도 11은 개시된 내용의 다른 실시예에 따른 타설장치에 의해 타설된 배수부에 대한 사시도이다.9 is a perspective view showing the structure of a pouring apparatus according to another embodiment of the disclosed contents, FIG. 10 is a front view showing the structure of a pouring apparatus according to another embodiment of the disclosed contents, and FIG. 11 is a different embodiment of the disclosed contents. A perspective view of the drainage portion poured by the pouring device according to the invention.

다른 실시예에 따른 타설장치는, 내부에 공간이 형성되고, 하부가 개방되며 상부 일측에 개구공이 관통되어 형성되는 본체(300); 상부에 몰탈시멘트가 투입되는 투입구가 형성되고, 상기 개구공의 상면에 형성되는 호퍼(400); 본체(300)의 내부에 형성되어 배수관(205)의 외면을 보호하는 관보호부(500);를 포함하되, 본체(300)의 전방에 전면판(600)이 수직하게 형성되고, 전면판(600)의 하부에는 관보호부(500)와 통하며 요입부(307)보다 상부로 오목하게 인입되어 확장공간부(640)가 형성되어 이루어진다. The pouring device according to another embodiment includes a body 300 having a space formed therein, a lower portion of which is opened, and an opening hole penetrating through an upper portion thereof; An inlet through which a mortar cement is introduced, and a hopper 400 formed on an upper surface of the opening hole; It is formed inside the main body 300 to protect the outer surface of the drain pipe 205, the tube protection portion 500; including, the front plate 600 is formed in front of the main body 300 vertically, the front plate 600 The lower portion of the) is communicated with the tube protection portion 500 and is recessed into the upper portion than the concave inlet portion 307 is formed by the expansion space portion 640 is formed.

호퍼(400)는 외측에는 다단으로 격벽(372)이 형성되고, 각 격벽(372)을 연결하는 브라켓(370)이 형성되며, 상기 브라켓(370)에 다수의 통공(374)이 형성된다. The hopper 400 has a partition 372 formed in multiple stages on the outside, and a bracket 370 connecting each partition 372 is formed, and a plurality of through holes 374 are formed in the bracket 370.

브라켓(370)의 통공(374)에 크레인(미도시)의 후크를 걸어 승강시켜서 이동할 수 있고, 시공 장소에 본체(300)를 운반할 수 있는 것이다. A hook of a crane (not shown) can be lifted and moved to the through hole 374 of the bracket 370, and the main body 300 can be transported to a construction site.

아울러 다수개의 격벽(372)이 다단으로 형성되어 브라켓(370)의 강도를 보강해줄 수 있고 작업자가 밟을 수 있는 발판의 역할을 할 수도 있다. In addition, a plurality of partitions 372 may be formed in multiple stages to reinforce the strength of the bracket 370 and may serve as a foothold on which an operator can step.

관보호부(500)는 배수관(205)의 외면에 결합되도록 하부가 개방된 호형으로 형성되며, 내측은 관통되어 관보호부내부공간(503)이 형성된다. The tube protection part 500 is formed in an arc shape of which the lower part is opened to be coupled to the outer surface of the drain pipe 205, and the inner side of the pipe protection part 500 is formed through the tube protection part inner space 503.

본체(300)는 내부의 공간(303)에 몰탈시멘트를 사용하는 타설시공단계에서, 몰탈시멘트가 유입되기 위한 것으로, 전면판(600)도 하부가 개방되어 개구부가 형성되며 관보호부(500)와 연결되는 요입부(307)가 전면판(600)의 상부에 형성된다. The main body 300 is a mortar cement is introduced in the pouring process using mortar cement in the space 303 therein, the front plate 600 also has a lower opening to form an opening, and the tube protection part 500 and A concave inlet 307 is formed on the front plate 600.

본체(300)는 개구부의 일측이 상부로 오목하게 인입되어 확장공간부(640)가 형성된다. The main body 300 has one side of the opening recessed in the upper portion to form an expansion space 640.

확장공간부(640)대략 사다리꼴 단면을 갖는다. The expansion space 640 has a substantially trapezoidal cross section.

따라서 몰탈시멘트가 본체(300)의 내부 공간에 타설되면 관보호부(500)의 외면과 전면판(600)의 개구부에 몰탈시멘트가 채워져서 관보호부(500)에 해당하는 공간을 갖는 배수부(B)이 형성된다. Therefore, when the mortar cement is poured into the inner space of the main body 300, the mortar cement is filled in the outer surface of the tube protection part 500 and the opening of the front plate 600, and the drain part B having a space corresponding to the tube protection part 500. ) Is formed.

또한 배수부(B)는 상부에는 요입부(307)로 인해 배수로(B-1)가 형성되며, 배수로(B-1)의 일측에는 확장공간부(640)에 의해 돌출된 단턱(B-2)이 형성된다. In addition, the drain portion B has a drainage path B-1 formed at the top due to the concave inlet 307, and a stepped protrusion B-2 protruded by the expansion space 640 on one side of the drainage path B-1. ) Is formed.

단턱(B-2)은 물이나 토사 등의 넘침을 방지하는 역할을 하게 된다. Step (B-2) is to prevent the overflow of water or earth and sand.

개시된 내용은 예시에 불과하며, 특허청구범위에서 청구하는 청구의 요지를 벗어나지 않고 당해 기술분야에서 통상의 지식을 가진 자에 의하여 다양하게 변경 실시될 수 있으므로, 개시된 내용의 보호범위는 상술한 특정의 실시예에 한정되지 않는다.The disclosed contents are only examples, and various modifications may be made by those skilled in the art without departing from the scope of the claims claimed in the claims, and thus the protection scope of the disclosed contents may be It is not limited to an Example.

1 : 도로
10 : 배근되는 철근
100 : 집수정
200 : 배수부
202 : 배수부벽체
205 : 배수관
300 : 본체
301 : 수직벽
303 : 본체내부의 공간
305 : 개구공
307 : 요입부
308 : 본체전방
310 : 본체후방
400 : 호퍼
401 : 투입구
500 : 관보호부
503 : 관보호부 내부공간
1: road
10: reinforcing bar
100: sump
200: drain
202: drain wall
205: drain pipe
300 body
301: vertical wall
303: space inside the body
305: opening hole
307: recessed part
308: front of the main body
310: rear body
400: Hopper
401 slot
500: tube protection
503: inner space of the tube protection unit

Claims (14)

도로의 측구에 이격 되어 형성되는 복수의 집수정 및 상기 집수정 사이를 배수관으로 연결 시켜 배수부를 형성시키는 도로연속배수시설의 타설시공에 사용되는 타설장치 있어서,
상기 타설장치는 내부에 공간이 형성되고, 하부가 개방되며 상부일측에 개구공이 관통되어 형성되는 본체;
상부에 몰탈시멘트가 투입되는 투입구가 형성되고, 상기 개구공의 상면에 형성되는 호퍼;
상기 본체의 내부에 형성되어 상기 배수관의 외면을 보호하는 관보호부를 포함하며,
상기 호퍼는 외측에 다단으로 격벽이 형성되고, 각 격벽을 연결하는 브라켓이 형성되며, 상기 브라켓에 다수의 통공이 형성되는 것을 특징으로 하는 타설장치.
In the pouring device used in the construction of the continuous road drainage system to form a drainage by connecting a plurality of water collecting wells formed to be spaced apart from the side of the road and the water collecting pipe by a drain pipe,
The pouring device includes a body having a space formed therein, a lower portion of which is opened, and an opening hole penetrated through an upper portion thereof;
A hopper into which an injection hole into which mortar cement is injected is formed, and formed on an upper surface of the opening hole;
It is formed inside the main body includes a tube protection unit for protecting the outer surface of the drain pipe,
The hopper has a multi-stage partition wall is formed on the outside, the bracket is formed to connect each partition wall, the pouring device characterized in that a plurality of through-holes are formed in the bracket.
제 1항에 있어서,
상기 본체는 지면으로부터 직립 되는 수직벽이 대칭으로 형성되며, 각 수직벽의 상단을 연결하여 윗면이 형성되고,
상기 본체의 양측면이 상기 배수관의 양측에 배근된 철근에 결합되는 것을 특징으로 하는 타설장치.
The method of claim 1,
The main body has a vertical wall symmetrically formed from the ground, the upper surface is formed by connecting the top of each vertical wall,
Both sides of the main body is poured in the reinforcement device, characterized in that coupled to the reinforcement bars on both sides of the drain pipe.
제 1항에 있어서,
상기 관보호부의 내경은 상기 배수관의 내경보다 큰 값을 갖게 형성되는 것을 특징으로 하는 타설장치.
The method of claim 1,
The inner diameter of the pipe protector is placed having a larger value than the inner diameter of the drain pipe.
제 1 항에 있어서,
상기 본체의 상부일측에 요입부가 상기 본체의 길이방향으로 연장형성 되는 것을 특징으로 하는 타설장치.
The method of claim 1,
A pouring device, characterized in that the concave inlet portion extending in the longitudinal direction of the main body on one side of the upper body.
제 1항에 있어서,
상기 본체를 사용하여 일 구간의 배수관 타설 시공 후, 상기 일 구간의 콘트리트가 양성되기 전에 상기 본체를 다음 시공구간으로 이동하여 다른 구간의 배수관 타설시공을 하는 것을 특징으로 하는 타설장치.
The method of claim 1,
After placing the drainage pipe in one section using the main body, before the concrete is positive in one section, the main body is moved to the next construction section, the pouring apparatus for placing the drainage pipe in another section.
제 1항에 있어서,
상기 관보호부는 내부가 관통된 원통형으로 형성되고 하부가 개구되어 형성되는 것을 특징으로 하는 타설장치.
The method of claim 1,
The tube protecting part is formed in a cylindrical shape penetrating the inside, the pouring device, characterized in that formed by opening.
제 1항에 있어서,
상기 호퍼는 하부로 갈수록 내경이 좁아지게 형성되는 것을 특징으로 하는 타설장치.
The method of claim 1,
The hopper is a pour device, characterized in that the inner diameter is formed narrower toward the bottom.
제 1항에 있어서,
상기 관보호부는 강철로 이루어지는 것을 특징으로 하는 타설장치.
The method of claim 1,
The tube protector is pouring device, characterized in that made of steel.
제 4항에 있어서,
상기 본체는
관보호부와 통하며 요입부보다 상부로 오목하게 인입되어 형성되는 확장공간부;를 포함하는 것으로,
몰탈시멘트가 본체의 내부 공간에 타설되면 관보호부의 외면에 콘크리트 구조물이 형성되며,
상기 콘크리트 구조물은 상부에는 요입부에 의해 배수로가 형성되며,
상기 배수로의 일측에는 상기 확장공간부에 의해 단턱이 형성되어 이루어지는 것을 특징으로 하는 타설장치.
The method of claim 4, wherein
The main body
It includes; expansion space formed through the tube protection portion concave inlet upwardly than the concave portion;
When mortar cement is poured into the inner space of the main body, a concrete structure is formed on the outer surface of the tube protection part,
The concrete structure has a drainage path formed by a recess in the upper portion,
A pouring apparatus, characterized in that the step is formed on one side of the drainage by the expansion space.
삭제delete 제 4항에 있어서,
상기 요입부의 양측에 높이가 상이하도록 형성되어 단차를 갖는 것을 특징으로 하는 것을 특징으로 하는 타설장치.
The method of claim 4, wherein
A pouring apparatus, characterized in that the height is formed on both sides of the concave portion has a step.
제 11항에 있어서,
상기 요입부의 일측에 제1단차부가 형성되고, 타측에 제2단차부가 형성되며,
상기 제1단차부와 제2단차부는 높이가 상이하게 형성되는 것을 특징으로 하는 타설장치.
The method of claim 11,
A first step portion is formed on one side of the concave portion, a second step portion is formed on the other side,
The pouring device, characterized in that the first step portion and the second step portion is formed in a different height.
제 12항에 있어서,
상기 제1단차부와 제2단차부는 요입부를 향해 경사지게 형성되는 것을 특징으로 하는 타설장치.
The method of claim 12,
And the first step portion and the second step portion are inclined toward the concave portion.
제 2항에 있어서,
상기 수직벽에 개구부가 형성된 것을 특징으로 하는 타설장치.
The method of claim 2,
A pouring device, characterized in that the opening is formed in the vertical wall.
KR1020190040632A 2019-03-11 2019-04-08 Installation equipment for thr road drainage construction KR102073887B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020190027765 2019-03-11
KR20190027765 2019-03-11

Publications (1)

Publication Number Publication Date
KR102073887B1 true KR102073887B1 (en) 2020-02-05

Family

ID=69514748

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190040632A KR102073887B1 (en) 2019-03-11 2019-04-08 Installation equipment for thr road drainage construction

Country Status (1)

Country Link
KR (1) KR102073887B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0729014U (en) * 1993-11-02 1995-06-02 功 尾形 Soft ground egg type drainage block
KR20060089383A (en) * 2005-02-04 2006-08-09 태갑성 Drainage way construction method at tunnel site and it's device
KR100731957B1 (en) * 2006-01-11 2007-07-03 하용수 A case for prevention damage of a drain pipe
KR101429147B1 (en) 2013-06-27 2014-08-11 한국도로공사 The road equipped with indiscreted draining facility and construction method using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0729014U (en) * 1993-11-02 1995-06-02 功 尾形 Soft ground egg type drainage block
KR20060089383A (en) * 2005-02-04 2006-08-09 태갑성 Drainage way construction method at tunnel site and it's device
KR100731957B1 (en) * 2006-01-11 2007-07-03 하용수 A case for prevention damage of a drain pipe
KR101429147B1 (en) 2013-06-27 2014-08-11 한국도로공사 The road equipped with indiscreted draining facility and construction method using the same

Similar Documents

Publication Publication Date Title
KR101090400B1 (en) Construction method of road for extending breadth of road on slope face
KR101344063B1 (en) The construction method of steel-concrete underpass
KR20140139217A (en) Concrete protection wall with linear drainage functions and construction method thereof
KR101187369B1 (en) Cip use of underground motorways construction work method
KR101563713B1 (en) U Method for constructing Utype roadside drain and sliding form
KR102073887B1 (en) Installation equipment for thr road drainage construction
KR101429147B1 (en) The road equipped with indiscreted draining facility and construction method using the same
KR20090105254A (en) Integrated type infiltration sump
CN209456840U (en) A kind of pavement with compound drainage function
KR101770268B1 (en) Detention unit block and reservoir water tank structure for infiltration and detention of rainwater, and construction method for the same
KR200423906Y1 (en) The precast drainage structure of clothoid egg-shaped curve with shoulder and gutter
JP2518390Y2 (en) Overhang walkway block and overhang walkway structure using it
JP6153187B1 (en) Road bridge cover widening unit
KR100884391B1 (en) Abreast wall having enhanced supply function on the top of retaining wall and construction method thereof
CN212247917U (en) Combined box culvert for drainage of building site
JP6340044B2 (en) Overhang trail construction body and construction method of overhang trail using these
CN210140780U (en) Anti-clogging ecological permeable box culvert
KR102116480B1 (en) Drainage system by the Acorn-shaped pipe which have the optimum hydraulic characteristic according to rainfall and easy manufacture, Construction method by its
KR102146635B1 (en) Apparatus for protecting road gutter and installation method of road gutter using the same
CN214363961U (en) Tunnel portal hidden road surface intercepting ditch
CN210216254U (en) Concrete guardrail structure
KR100400676B1 (en) Method constructing gutler and struc ture thereof
CN210529482U (en) Bridge expansion joint drainage structures
CN212103654U (en) Bridge expansion joint drainage device
KR100457132B1 (en) Route structures for inspecting the sloping surface of the cut ground using gutter in ridge line

Legal Events

Date Code Title Description
GRNT Written decision to grant