KR101965801B1 - Assembly manhole apparatus for connecting hume pipe and constructing method thereof - Google Patents

Assembly manhole apparatus for connecting hume pipe and constructing method thereof Download PDF

Info

Publication number
KR101965801B1
KR101965801B1 KR1020180013482A KR20180013482A KR101965801B1 KR 101965801 B1 KR101965801 B1 KR 101965801B1 KR 1020180013482 A KR1020180013482 A KR 1020180013482A KR 20180013482 A KR20180013482 A KR 20180013482A KR 101965801 B1 KR101965801 B1 KR 101965801B1
Authority
KR
South Korea
Prior art keywords
lower body
upper body
body part
plate
cover
Prior art date
Application number
KR1020180013482A
Other languages
Korean (ko)
Other versions
KR20180026413A (en
Inventor
김상헌
Original Assignee
정철원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정철원 filed Critical 정철원
Priority to KR1020180013482A priority Critical patent/KR101965801B1/en
Publication of KR20180026413A publication Critical patent/KR20180026413A/en
Application granted granted Critical
Publication of KR101965801B1 publication Critical patent/KR101965801B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

본 발명은 흄관 연결용 조립식 맨홀장치 및 그의 시공방법에 관한 것으로서, 흄관이 연결되는 하체부와, 이 하체부의 상부에 연결되며 하체부의 단면적 보다 작게 형성된 상체부와, 이 상체부의 상부에 개폐하도록 설치된 커버부를 포함하고, 하체부의 측벽과, 상체부의 측벽과, 커버부의 커버홀 내벽은, 일부지점에서 상하 길이방향으로 서로 연접하도록 배치되어 있는 것을 특징으로 한다. 따라서 본 발명은 상체부의 사이즈를 작게하고 하체부 상체부 및 커버부의 내벽을 일부에서 상하로 연접하도록 설치함으로써, 상체부의 제작비용 및 시공비용을 절감하는 동시에 내부 벽면을 일부에서 연접시켜 작업자의 출입을 용이하게 할 수 있는 효과를 제공한다.The present invention relates to a prefabricated manhole apparatus for connecting a humidifier pipe and a construction method thereof, and more particularly, to a prefabricated manhole apparatus for connecting a humdrum pipe and a method of manufacturing the same, comprising a lower body portion to which a humdrum pipe is connected, an upper body portion connected to an upper portion of the lower body portion, Wherein the side wall of the lower body part, the side wall of the upper body part, and the inner wall of the cover hole of the cover part are arranged so as to be connected to each other in the vertical direction at some point. Accordingly, the present invention provides a structure in which the size of the upper body is reduced and the inner wall of the lower body part and the cover part are connected to each other vertically so as to reduce the manufacturing cost and construction cost of the upper body part, Thereby providing an effect that can be facilitated.

Figure 112018012097978-pat00001
Figure 112018012097978-pat00001

Description

흄관 연결용 조립식 맨홀장치 및 그의 시공방법{ASSEMBLY MANHOLE APPARATUS FOR CONNECTING HUME PIPE AND CONSTRUCTING METHOD THEREOF}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a prefabricated manhole apparatus for connecting a humidifier pipe,

본 발명은 흄관 연결용 조립식 맨홀장치 및 그의 시공방법에 관한 것으로서, 보다 상세하게는 지중에 우수, 오수 또는 하수를 배수하기 위해 지중에 매설되는 흄관 연결용 조립식 맨홀장치 및 그의 시공방법에 관한 것이다.The present invention relates to a prefabricated manhole apparatus for connecting a humidifier pipe and a method of constructing the same, and more particularly, to a prefabricated manhole apparatus for connecting a humidifier pipe buried in the ground to drain excellent water, sewage or sewage into the ground, and a method of construction thereof.

각종 토목 및 건축공사, 도로공사 등에는 오수, 폐수 등을 처리하기 위한 하수관거 공사가 필수적이다. 또한 상기 하수관거의 사이사이에는 관거 내의 검사, 청소, 통풍, 환기, 접합 및 분기 등의 목적으로 맨홀을 일정한 간격으로 설치하게 된다.Sewer pipe works to treat sewage, wastewater, etc. are essential for various civil engineering and construction work, road construction and others. The manholes are installed at regular intervals between the sewer pipes for inspection, cleaning, ventilation, ventilation, joining and branching.

현재, 일반적으로 맨홀 축조 공법 중 현장타설 콘크리트 맨홀 축조 공법이 가장 많이 활용되고 있다. 하지만, 현장타설 콘크리트 맨홀은 공사 기간의 장기화, 공사비의 증가, 교통체증의 유발, 시공품질의 저하, 기능공 확보의 어려움, 민원의 증가, 완전한 누수 차단의 어려움 및 높이 조절의 어려움 등의 단점으로 인하여 최근에는 그 사용을 점차 기피하고 있는 실정이다.Currently, most of the manhole construction method is using the construction method of the manhole in place. However, due to the disadvantages such as prolonged construction period, increase of construction cost, induction of traffic congestion, deterioration of construction quality, difficulty in securing skilled workers, increase of complaints, difficulty in completely blocking leakage and difficulty in height adjustment Recently, it has been avoiding its use gradually.

이에 따라 최근에는 조립식 맨홀이 사용되어, 공사기간의 단축, 제품의 표준화 등 공사의 편리함이 향상되었다. 하지만, 현장에서는 맨홀 설치 높이가 다양하며, 운반성의 문제로 조립식 맨홀을 완성품 형태로 공급하는 것이 어렵다는 문제가 있다. 따라서 시공 현장에서는 여러 개의 콘크리트블록을 개별로 나누어 공급하고, 현장에서 직접 조립하는 방법이 사용되고 있다.Accordingly, recently, a prefabricated manhole is used, and the convenience of construction such as shortening the construction period and standardizing the product has been improved. However, there is a problem in that it is difficult to supply a prefabricated manhole in the form of a finished product because of a variety of manhole installation heights in the field and the problem of transportability. Therefore, in the construction site, several concrete blocks are separately supplied and assembled directly in the field.

일반적으로 지중에 설치되는 맨홀은 외측에 1 이상의 관통구가 형성되어 있으며, 이들 관통구에는 각각 유입관 또는 유출관으로 사용되는 흄관(Hume Pipe)이 연결되어 고정된다. 이에 의해 유입관을 통해 맨홀 내부로 유입된 우수, 하수 또는 오수가 다른 유출관을 통해 배출된다.Generally, a manhole installed in the ground is formed with at least one through hole on the outer side, and a hume pipe used as an inlet pipe or an outlet pipe is connected and fixed to each through hole. Whereby the stormwater, sewage or sewage introduced into the manhole through the inlet pipe is discharged through the other outlet pipe.

맨홀은 지중에 매설되어 사용되는데, 맨홀 본체의 하부 양측에 연결관이 일체로 형성되고 본체 상하부에는 플랜지가 형성되며, 본체 상부 중앙에는 뚜껑이 설치된다. 이러한 맨홀은 주로 콘크리트 일체형으로 이루어지며, 콘크리트를 현장 타설하거나 또는 일정 형태로 제작된 콘크리트 기성제품을 사용하여 시공한다. The manhole is embedded in the ground. The manhole body is integrally formed with the lower part of the lower part of the manhole body, a flange is formed at the upper and lower parts of the main body, and a lid is installed at the center of the upper part of the main body. These manholes are mainly composed of concrete, and they are constructed by placing the concrete on site or using a concrete-based product manufactured in a certain form.

콘크리트를 현장 타설하는 경우에는 일정형태의 거푸집을 설치하고, 설치된 거푸집 내에 철근을 삽입한 후 콘크리트를 타설해 주어야 하므로 시공이 불편할 뿐만 아니라, 콘크리트를 양생시키는데 오랜 시간이 소요되어 공사기간이 길어지는 문제가 있다.In case of pouring the concrete into the field, it is necessary to install a certain formwork and insert the reinforced concrete into the installed formwork, so that the construction is inconvenient, and it takes a long time to cure the concrete, .

또한, 맨홀을 콘크리트 일체형으로 제작하여 설치하게 되면 자체적인 탄성이 미흡하여 지반의 진동 등에 따른 내구성이 미흡할 뿐만 아니라 콘크리트의 내부로 물이 침투하여 맨홀이 부식되는 등의 문제가 발생된다. 즉, 맨홀의 수명이 단축되는 것이다.In addition, when the manhole is integrally formed with a concrete, it is insufficient in its own elasticity, resulting in insufficient durability due to vibration of the ground, etc., as well as causing water to penetrate into the concrete and corroding the manhole. That is, the life of the manhole is shortened.

그리고, 일체형 시멘트 콘크리트 맨홀의 경우 연결홈에 시멘트 페이스트를 주입하여 부착하는 방식으로 시멘트 페이스트의 부착강도가 약하고 내부에 있는 공기를 배제시키기 어렵기 때문에 수밀성이 떨어지는 문제점도 있다.In the case of the integral cement concrete manhole, the adhesion strength of the cement paste is weak and it is difficult to eliminate the air in the inside by injecting the cement paste into the connection groove.

또한, 관체를 설치하기 위한 기초부를 콘크리트를 타설하여 형성시킨 후 그 위에 관체를 설치하여야 하므로, 관체와 기초 콘크리트 사이로 물의 누수가 발생될 뿐만 아니라, 현장에서 기초 콘크리트를 양생시켜야 하므로, 시공기간이 많이 걸리는 문제점도 내포되어 있다.In addition, since the foundation for installing the tube is formed by pouring the concrete and then the tube is installed thereon, not only water leakage occurs between the tube and the foundation concrete, but also the foundation concrete is cured on the site. There is also a problem to be caught.

또한, 종래 맨홀은 압축강도가 작기 때문에 이를 보상하기 위하여 맨홀의 부피를 크게 함과 아울러 중량을 무겁게 하고 있으며, 이에 따라, 운반 차량에 탑재할 수 있는 수량이 적을 수밖에 없으므로 운반비가 많이 소요되고 운반을 위해 대형 장비를 사용하는 문제점도 있다.In addition, since the conventional manhole has a small compressive strength, the manhole is bulky and heavy in weight in order to compensate for it, and accordingly, the amount of the manhole that can be mounted on the vehicle is small, There is also the problem of using large equipment.

또한, 지중에 터파기를 하고 거푸집을 성형한 뒤 콘크리트를 타설하여 맨홀을 제작하는 방법은 거푸집을 지중에 성형하기 때문에 터파기 면적이 넓어져 시공비가 많이 들고, 콘크리트의 양생기간 동안 작업을 진행할 수 없어 공사기간이 늘어나 시공원가가 늘어나는 단점이 있다.In addition, the method of making the manhole by forming the trench and forming the mold in the ground and then casting the concrete, because the formwork is formed in the ground, the area of the trencher is widened and the cost of the construction is increased, and the work can not be performed during the curing period of the concrete There is a disadvantage that construction cost increases because construction period is increased.

대한민국 등록특허 제10-0967427호 (2010년07월01일)Korean Patent No. 10-0967427 (Jul. 01, 2010) 대한민국 등록실용 제20-0337105호 (2003년12월31일)Korean Registration Practice No. 20-0337105 (December 31, 2003) 대한민국 등록실용 제20-0342335호 (2004년02월18일)Korean Registration Practice No. 20-0342335 (February 18, 2004)

본 발명은 상기와 같은 종래의 문제점을 해소하기 위해 안출한 것으로서, 상체부의 제작비용 및 시공비용을 절감하는 동시에 내부 벽면을 일부에서 연접시켜 작업자의 출입을 용이하게 할 수 있는 흄관 연결용 조립식 맨홀장치 및 그의 시공방법을 제공하는 것을 그 목적으로 한다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the above problems of the prior art, and it is an object of the present invention to provide a prefabricated manhole apparatus for connecting a hume pipe, which can reduce manufacturing cost and construction cost of the upper body part, And a method of constructing the same.

또한, 본 발명은 하부몸체의 설치 및 제작을 용이하게 하는 동시에 지지강도를 향상시킬 수 있는 흄관 연결용 조립식 맨홀장치 및 그의 시공방법을 제공하는 것을 또 다른 목적으로 한다.It is still another object of the present invention to provide a prefabricated manhole apparatus for connecting a humidifier pipe and a method of constructing the same that can facilitate installation and manufacture of a lower body and improve strength of a support.

또한, 본 발명은 하부판, 하부몸체 및 상부판 사이의 결합을 용이하게 하는 동시에 기밀성능을 향상시킬 수 있는 흄관 연결용 조립식 맨홀장치 및 그의 시공방법을 제공하는 것을 또 다른 목적으로 한다.It is another object of the present invention to provide a prefabricated manhole apparatus for connecting a humidifier pipe and a method of constructing the same that can facilitate the coupling between the bottom plate, the lower body, and the upper plate and improve the airtightness.

또한, 본 발명은 흄관의 매립깊이에 따라 다단의 상부몸체를 결합하여 상체부의 설치 및 결합을 용이하게 할 수 있는 흄관 연결용 조립식 맨홀장치 및 그의 시공방법을 제공하는 것을 또 다른 목적으로 한다.It is another object of the present invention to provide a prefabricated manhole apparatus for connecting a humdrum pipe and a method of constructing the same, which can facilitate installation and connection of an upper body by joining upper ends of multiple stages in accordance with the depth of embedding of a humdrum tube.

또한, 본 발명은 상부몸체 사이의 결합을 용이하게 하는 동시에 기밀성능을 향상시킬 수 있는 할 수 있는 흄관 연결용 조립식 맨홀장치 및 그의 시공방법을 제공하는 것을 또 다른 목적으로 한다.It is another object of the present invention to provide a prefabricated manhole apparatus for connecting a humidifier pipe and a method of constructing the same which can improve the airtight performance while facilitating the connection between the upper bodies.

상기와 같은 목적을 달성하기 위한 본 발명은, 흄관이 연결되는 하체부(10); 상기 하체부(10)의 상부에 연결되며, 상기 하체부(10)의 단면적 보다 작게 형성된 상체부(20); 및 상기 상체부(20)의 상부에 개폐하도록 설치된 커버부(30);를 포함하고, 상기 하체부(10)의 측벽과, 상기 상체부(20)의 측벽과, 상기 커버부(30)의 커버홀 내벽은, 일부지점에서 상하 길이방향으로 서로 연접하도록 배치되어 있는 것을 특징으로 한다.According to an aspect of the present invention, there is provided a vacuum cleaner comprising: a lower body part to which a humdrum tube is connected; An upper body portion 20 connected to an upper portion of the lower body portion 10 and formed to be smaller than a cross sectional area of the lower body portion 10; And a cover 30 installed to open and close on the upper part of the upper body part 20. The side wall of the lower body part 10 and the side wall of the upper body part 20, And the inner wall of the cover hole is arranged so as to be connected to each other in the vertical direction at some point.

본 발명의 상기 하체부(10)는, 바닥에 설치되는 하부판; 상기 하부판의 상부에 입설되며 흄관이 연결되는 하부몸체; 및 상기 하부몸체의 상부를 개폐하도록 설치된 상부판;을 포함하는 것을 특징으로 한다.The lower body part (10) of the present invention comprises: a lower plate installed on the floor; A lower body installed on an upper portion of the lower plate and connected to a humdrum tube; And an upper plate installed to open and close the upper portion of the lower body.

본 발명의 상기 하부판과 상기 하부몸체 사이 및 상기 하부몸체와 상기 상부판 사이에는, 끼움홈과 끼움돌기가 서로 대응해서 결합되도록 형성되어 있는 것을 특징으로 한다. 본 발명의 상기 하부판과 상기 하부몸체 사이 및 상기 하부몸체와 상기 상부판 사이에는, 실링부재가 삽입되어 있는 것을 특징으로 한다.The present invention is characterized in that a fitting groove and a fitting projection are formed between the lower plate and the lower body and between the lower body and the upper plate so as to be coupled to each other. A sealing member is inserted between the lower plate and the lower body of the present invention and between the lower body and the upper plate.

본 발명의 상기 상체부(20)는, 상기 하체부(10)의 상부면 가장자리의 일방에 다단으로 적층되며 단면이 원형으로 형성된 복수의 상부몸체로 이루어져 있는 것을 특징으로 한다.The upper body 20 of the present invention is composed of a plurality of upper bodies which are stacked at one end of the upper surface edge of the lower body 10 and have a circular section.

본 발명의 상기 상부몸체 사이에는, 끼움홈과 끼움돌기가 서로 대응해서 결합되도록 형성되어 있는 것을 특징으로 한다. 본 발명의 상기 상부몸체 사이에는, 실링부재가 삽입되어 있는 것을 특징으로 한다.The present invention is characterized in that, between the upper bodies, the fitting grooves and the fitting protrusions are formed so as to be coupled to each other. A sealing member is inserted between the upper body of the present invention.

또한, 본 발명은 흄관 연결용 조립식 맨홀장치의 시공방법으로서, 터파기 단계; 하체부를 설치하는 단계; 상기 설치된 하체부에 흄관을 연결하는 단계; 상기 흄관이 연결된 하체부의 상부에 상체부를 연결해서 설치하는 단계; 상기 연결된 상체부에 커버부를 설치하는 단계; 및 상기 하체부와 상기 상체부를 지하에 매립하는 단계;를 포함하는 것을 특징으로 한다.In addition, the present invention provides a method of constructing a prefabricated manhole apparatus for connecting a humidifier pipe, comprising: Installing a lower body part; Connecting a humdrum tube to the installed lower body part; Connecting an upper body to an upper portion of a lower body portion to which the humdrum tube is connected; Installing a cover part on the connected upper body part; And burying the lower body part and the upper body part in the ground.

본 발명의 상기 하체부와 상기 상체부의 연결단계는, 상기 상체부가 상기 하체부의 상부면 가장자리의 일방에 다단으로 입설되는 것을 특징으로 한다. 본 발명의 상기 하체부(10)의 측벽과, 상기 상체부(20)의 측벽과, 상기 커버부(30)의 커버홀 내벽은, 일부지점에서 상하 길이방향으로 서로 연접하도록 설치되어 있는 것을 특징으로 한다.The connecting step between the lower body part and the upper body part of the present invention is characterized in that the upper body part is formed in multiple stages in one side of the upper surface edge of the lower body part. The sidewall of the lower body 10 of the present invention, the sidewall of the upper body 20 and the inner wall of the cover hole of the cover 30 are provided so as to be connected to each other in the vertical direction at some points .

이상에서 살펴본 바와 같이, 본 발명은 상체부의 사이즈를 작게하고 하체부 상체부 및 커버부의 내벽을 일부에서 상하로 연접하도록 설치함으로써, 상체부의 제작비용 및 시공비용을 절감하는 동시에 내부 벽면을 일부에서 연접시켜 작업자의 출입을 용이하게 할 수 있는 효과를 제공한다.As described above, according to the present invention, since the size of the upper body is reduced and the inner wall of the lower body part and the cover part are connected to each other in the upper part and the lower part, the manufacturing cost and construction cost of the upper part are reduced, So that it is possible to facilitate entry and exit of the operator.

또한, 하체부로서 하부판, 하부몸체 및 상부판을 조립식으로 구비함으로써, 하부몸체의 설치 및 제작을 용이하게 하는 동시에 지지강도를 향상시킬 수 있는 효과를 제공한다.Further, since the lower body, the lower body, and the upper body are provided as a lower body, the lower body can be easily installed and manufactured, and at the same time, the support strength can be improved.

또한, 하체부가 끼움홈과 끼움돌기가 서로 대응해서 결합되고 실링부재가 설치됨으로써, 하부판, 하부몸체 및 상부판 사이의 결합을 용이하게 하는 동시에 기밀성능을 향상시킬 수 있는 효과를 제공한다.In addition, the lower body portion and the fitting protrusions are coupled to each other in correspondence with each other and the sealing member is provided, thereby facilitating the engagement between the lower plate, the lower body and the upper plate, and improving airtightness.

또한, 상체부가 원형 단면으로 형성된 다단의 상부몸체로 이루어짐으로써, 흄관의 매립깊이에 따라 다단의 상부몸체를 결합하여 상체부의 설치 및 결합을 용이하게 할 수 있는 효과를 제공한다.Also, since the upper body is composed of a multi-stage upper body formed in a circular cross-section, the upper body can be coupled according to the depth of embedding of the humdrum tube, thereby facilitating installation and connection of the upper body.

또한, 상체부가 끼움홈과 끼움돌기가 서로 대응해서 결합되고 실링부재가 설치됨으로써, 상부몸체 사이의 결합을 용이하게 하는 동시에 기밀성능을 향상시킬 수 있는 할 수 있는 효과를 제공한다.Further, the upper body is fitted to the fitting grooves and the fitting protrusions in correspondence with each other and the sealing member is provided, thereby facilitating the coupling between the upper bodies and improving the airtightness.

도 1은 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치를 나타내는 구성도.
도 2는 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치를 나타내는 단면도.
도 3은 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치를 나타내는 분해도.
도 4는 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치를 나타내는 평면도.
도 5는 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치의 시공방법을 나타내는 흐름도.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing a prefabricated manhole apparatus for connecting a humidifier pipe according to an embodiment of the present invention; FIG.
2 is a cross-sectional view illustrating a prefabricated manhole apparatus for connecting a humidifier pipe according to an embodiment of the present invention;
3 is an exploded view showing a prefabricated manhole apparatus for connecting a humidifier pipe according to an embodiment of the present invention.
4 is a plan view showing a prefabricated manhole apparatus for connecting a humidifier pipe according to an embodiment of the present invention.
5 is a flowchart illustrating a method of constructing a prefabricated manhole apparatus for connecting a humidifier pipe according to an embodiment of the present invention.

이하, 첨부도면을 참조하여 본 발명의 바람직한 일 실시예를 더욱 상세히 설명한다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치를 나타내는 구성도이고, 도 2는 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치를 나타내는 단면도이고, 도 3은 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치를 나타내는 분해도이고, 도 4는 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치를 나타내는 평면도이고, 도 5는 본 발명의 일 실시예에 의한 흄관 연결용 조립식 맨홀장치의 시공방법을 나타내는 흐름도이다.2 is a cross-sectional view illustrating a prefabricated manhole apparatus for connecting a humidifier pipe according to an embodiment of the present invention. FIG. 3 is a cross- FIG. 4 is a plan view showing a prefabricated manhole apparatus for connecting a humidifier pipe according to an embodiment of the present invention, and FIG. 5 is a cross-sectional view of a prefabricated manhole apparatus for connecting a humdrum pipe according to an embodiment of the present invention. Fig. 7 is a flowchart showing a construction method of a prefabricated manhole apparatus for connecting a humidifier pipe. Fig.

도 1 내지 도 3에 나타낸 바와 같이, 본 실시예에 의한 흄관 연결용 조립식 맨홀장치는, 하체부(10), 상체부(20) 및 커버부(30)를 포함하여 이루어져, 지중에 매설되며 오수, 하수 또는 우수 등을 배출하기 위해 흄관을 연결하는 흄관 연결용 조립식 맨홀장치이다. 또한, 본 실시예의 조립식 맨홀장치는 시공 전에 제작공장에서 미리 콘크리트로 제작되어 시공현장에 제공되는 것이 바람직하다. 1 to 3, the prefabricated manhole apparatus for connecting a humidifier pipe according to the present embodiment includes a lower body 10, an upper body 20, and a cover 30, Is a prefabricated manhole device for connecting a humidifier pipe to connect a humidifier pipe to discharge sewage or stormwater. It is preferable that the prefabricated manhole apparatus of the present embodiment is made of concrete in advance in a manufacturing factory before installation and is provided at a construction site.

하체부(10)는, 오수, 하수 또는 우수 등을 배출하기 위해 흄관을 서로 연결하는 연결부재로서, 하부판(11), 하부몸체(12), 상부판(13), 제1 연결홀(14) 및 제2 연결홀(15)로 이루어져 있다.The lower body 10 includes a lower plate 11, a lower body 12, an upper plate 13, a first connection hole 14, and a second connection hole 14, which connect the humdrum pipes to each other to discharge waste water, sewage, And a second connection hole (15).

하부판(11)은, 지면에서 터파기된 지하의 바닥에 설치되는 판부재로서, 대략 사각형상의 판부재로 이루어지며, 하부판(11)의 상부면의 가장자리에는 하부몸체(12)를 끼워맞춤하여 결합하도록 하판 끼움홈(11a)이 외곽둘레를 따라 형성되어 있다.The lower plate 11 is a plate member provided on the floor of the ground that has been torn from the ground and is formed of a plate member having a substantially rectangular shape and the lower body 12 is fitted to the edge of the upper surface of the lower plate 11 The lower plate fitting groove 11a is formed along the outer circumference.

하부몸체(12)는, 하부판(11)의 상부에 입설되며 흄관이 연결되는 몸체부재로서, 상단 및 하단이 개방된 대략 사각형상의 박스체로 형성되며, 하부몸체(12)의 하단 가장자리에는 하부판(11)의 하판 끼움홈(11a)에 끼워맞춤하도록 하단 끼움돌기(12a)가 외곽둘레를 따라 형성되어 있고, 하부몸체(12)의 상단 가장자리에는 상부판(13)을 끼워맞춤하여 결합하도록 상단 끼움홈(12b)이 외곽둘레를 따라 형성되어 있다.The lower body 12 is formed as a substantially square box body having an upper end and a lower end opened and connected to the upper end of the lower body 11. A lower end of the lower body 11 is connected to a lower end of the lower body 11 End fitting projections 12a are formed along the outer circumference so as to fit into the lower plate fitting grooves 11a of the lower body 12 and the upper plate 13 is fitted to the upper edge of the lower body 12, (12b) are formed along the outer circumference.

따라서, 하부판(11)과 하부몸체(12) 사이에는 하판 끼움홈(11a)과 하단 끼움돌기(12a)가 서로 대응해서 결합되도록 형성되어 있고, 하부판(11)과 하부몸체(12) 사이에는 실링부재가 삽입되어 있는 것도 가능함은 물론이다.The lower plate 11 and the lower body 12 are formed with a lower plate 11a and a lower plate 12b so that the lower plate 11 and the lower body 12 are coupled to each other. It goes without saying that a member may be inserted.

상부판(13)은, 하부몸체(12)의 상부에 결합하여 설치되는 판부재로서, 대략 사각형상의 판부재로 이루어지며, 상부판(13)의 하면의 가장자리에는 하부몸체(12)의 상단 끼움홈(12b)과 끼워맞춤 결합되도록 상판 끼움돌기(13a)가 외곽둘레를 따라 형성되어 있다.The upper plate 13 is a plate member which is attached to an upper portion of the lower body 12 and is formed of a plate member having a substantially rectangular shape and the upper end of the lower body 12 And an upper plate fit-in protrusion 13a is formed along the outer circumference to be engaged with the groove 12b.

상부판(13)의 상면의 일방 가장자리에는 상체부(20)를 결합하기 위한 상판 끼움홈(13b)이 외곽둘레를 따라 형성되어 있고, 이러한 상판 끼움홈(13b)의 내부 둘레에는 하체부(10)의 하부몸체(12)와 상체부(20)가 서로 연통되도록 연통홀(13c)이 관통형성되어 있다.An upper plate fitting groove 13b for engaging the upper body portion 20 is formed on one edge of the upper surface of the upper plate 13 along the outer circumference and an inner circumference of the lower body fitting portion 13b The communication hole 13c is formed so as to communicate with the lower body 12 and the upper body 20 of the main body 20 through the communication hole 13c.

따라서, 하부몸체(12)와 상부판(13) 사이에는 상단 끼움홈(12b)과 상판 끼움돌기(13a)가 서로 대응해서 결합되도록 형성되어 있고, 하부몸체(12)와 상부판(13) 사이에는 실링부재가 삽입되어 있는 것도 가능함은 물론이다.An upper fitting groove 12b and an upper plate fitting protrusion 13a are formed between the lower body 12 and the upper plate 13 so as to correspond to each other and are formed between the lower body 12 and the upper plate 13 It is of course possible to insert a sealing member.

제1 연결홀(14)은, 하부몸체(12)의 양쪽 측면에 형성된 연결홀로서, 하부몸체(12)의 측벽에 매립되거나 돌출된 제1 연결홀(14)의 내주부위에 단차가 형성되며 여기에 흄관이 끼워맞춤되면서 흄관의 단부가 밀착되어 결합지지력이 향상된다.The first connection hole 14 is formed as a connection hole formed on both sides of the lower body 12 and a step is formed in the inner circumferential portion of the first connection hole 14 buried or protruded in the side wall of the lower body 12 Here, the hume pipe is fitted and the end of the hume pipe is closely contacted to improve the engagement force.

제2 연결홀(15)은, 하부몸체(12)의 전면 또는 후면에 형성된 연결홀로서, 하부몸체(12)의 측벽에 매립되거나 돌출된 제2 연결홀(15)의 내주부위에 단차가 형성되어 여기에 흄관이 끼워맞춤되면서 흄관의 단부가 밀착되어 결합지지력이 향상된다.The second connection hole 15 is formed as a connection hole formed on the front or rear surface of the lower body 12 and a step is formed in the inner circumferential portion of the second connection hole 15 embedded or protruded in the side wall of the lower body 12 And the end of the hume pipe is closely contacted with the hume pipe, thereby improving the engagement force.

상체부(20)는, 하체부(10)의 상부에 연결되며 하체부(10)의 단면적 보다 작게 형성된 연결부재로서, 흄관의 매립깊이에 따라 적어도 하나 이상의 상부몸체로 이루어져 있는 것이 바람직하다.The upper body part 20 is connected to the upper part of the lower body part 10 and is formed to be smaller than the cross sectional area of the lower body part 10 and is preferably composed of at least one or more upper bodies depending on the depth of embedding of the humdrum tube.

이러한 상부몸체는, 하체부(10)의 상부면 가장자리의 일방에 다단으로 적층되며 단면이 원형으로 형성된 복수의 상부몸체로 이루어져 있는 것이 바람직하다. 구체적으로 이러한 복수의 상부몸체는, 제1 상부몸체(21), 제2 상부몸체(22) 및 제3 상부몸체(23)와 같이 상부몸체가 3단으로 적층되어 있는 것도 가능함은 물론이다.It is preferable that the upper body is composed of a plurality of upper bodies which are stacked at one end of the upper surface edge of the lower body 10 and have a circular section. It should be understood that the plurality of upper bodies may be stacked in three stages such as the first upper body 21, the second upper body 22, and the third upper body 23.

제1 상부몸체(21)는, 하체부(10)의 상부판(13)의 상면에 결합되도록 대략 원통형상으로 형성된 연통부재로서, 제1 상부몸체(21)의 하면의 가장자리에는 상부판(13)의 상판 끼움홈(13b)과 끼워맞춤 결합되도록 제1 끼움돌기(21a)가 외곽둘레를 따라 형성되어 있고, 제1 상부몸체(21)의 상면의 가장자리에는 제2 상부몸체(22)와 끼워맞춤 결합되도록 제1 끼움홈(21b)이 외곽둘레를 따라 형성되어 있다.The first upper body 21 is a communicating member formed in a substantially cylindrical shape to be coupled to the upper surface of the upper plate 13 of the lower body part 10. The upper body 13 is provided at the edge of the lower surface of the first upper body 21 A first fitting protrusion 21a is formed along the outer circumference so as to be fitted to the upper plate fitting groove 13b of the first upper body 21 and the second upper body 22 is fitted to an edge of the upper surface of the first upper body 21 And a first fitting groove 21b is formed along the outer circumference so as to be fitted and fixed.

제2 상부몸체(22)는, 제1 상부몸체(21)의 상면에 결합되도록 대략 원통형상으로 형성된 연통부재로서, 제2 상부몸체(22)의 하면의 가장자리에는 제1 상부몸체(21)의 제1 끼움홈(21b)과 끼워맞춤 결합되도록 제2 끼움돌기(22a)가 외곽둘레를 따라 형성되어 있고, 제2 상부몸체(22)의 상면의 가장자리에는 제3 상부몸체(23)와 끼워맞춤 결합되도록 제2 끼움홈(22b)이 외곽둘레를 따라 형성되어 있다.The second upper body 22 is a communicating member formed in a substantially cylindrical shape to be coupled to the upper surface of the first upper body 21. The second upper body 22 is connected to the upper surface of the first upper body 21, A second fitting protrusion 22a is formed along the outer circumference to be engaged with the first fitting groove 21b and a third upper body 23 is fitted to the edge of the upper surface of the second upper body 22 A second fitting groove 22b is formed along the outer circumference.

제3 상부몸체(23)는, 제2 상부몸체(22)의 상면에 결합되도록 대략 원통형상으로 형성된 연통부재로서, 제3 상부몸체(23)의 하면의 가장자리에는 제2 상부몸체(22)의 제2 끼움홈(22b)과 끼워맞춤 결합되도록 제3 끼움돌기(23a)가 외곽둘레를 따라 형성되어 있고, 제3 상부몸체(23)의 상면의 가장자리에는 커버부(30)와 끼워맞춤 결합되도록 제3 끼움홈(23b)이 외곽둘레를 따라 형성되어 있다.The third upper body 23 is a communicating member formed in a substantially cylindrical shape to be coupled to the upper surface of the second upper body 22. The third upper body 23 is connected to the lower surface of the second upper body 22, A third fitting protrusion 23a is formed along the outer circumference so as to be engaged with the second fitting groove 22b and is fitted to the edge of the upper surface of the third upper body 23 to be fitted to the cover portion 30. [ And a third fitting groove 23b is formed along the outer circumference.

따라서, 제1 상부몸체(21)와 제2 상부몸체(22) 사이에는 제1 끼움홈(21b)과 제2 끼움돌기(22a)가 서로 대응해서 결합되도록 형성되어 있고, 제1 상부몸체(21)와 제2 상부몸체(22) 사이에는 실링부재가 삽입되어 있는 것도 가능함은 물론이다.A first fitting groove 21b and a second fitting projection 22a are formed so as to correspond to each other between the first upper body 21 and the second upper body 22. The first upper body 21 It is also possible to insert a sealing member between the first upper body 22 and the second upper body 22.

또한, 제2 상부몸체(22)와 제3 상부몸체(23) 사이에는 제2 끼움홈(22b)과 제3 끼움돌기(23a)가 서로 대응해서 결합되도록 형성되어 있고, 제2 상부몸체(22)와 제3 상부몸체(23) 사이에는 실링부재가 삽입되어 있는 것도 가능함은 물론이다.A second fitting groove 22b and a third fitting protrusion 23a are formed between the second upper body 22 and the third upper body 23 so as to correspond to each other and the second upper body 22 It is also possible to insert a sealing member between the second upper body 23 and the third upper body 23.

특히, 하체부(10)의 하부몸체(12)의 측벽과, 상체부(20)의 상부몸체의 측벽은, 일부지점에서 상하 길이방향으로 서로 연접하도록 배치되어, 맨홀장치의 내부로 작업자가 출입이 용이하게 일자형상의 길이방향의 통로를 형성하는 동시에 여기에 맨홀의 고정식 사다리를 용이하게 설치할 수 있게 된다.Particularly, the side walls of the lower body 12 of the lower body 10 and the side walls of the upper body of the upper body 20 are arranged to be connected to each other in the vertical direction at some points, The longitudinal lanes of the straight shape can be easily formed and the fixed ladder of the manhole can be easily installed there.

또한, 도 4에 나타낸 바와 같이 상체부(20)의 상부몸체의 측벽의 단면이, 하체부(10)의 하부몸체(12)의 측벽의 단면과 중첩되도록 입설되어, 상체부(20)의 매립깊이가 긴 경우에 상체부(20)의 하중 일부를 하체부(10)의 측벽에서 지지하게 되므로, 하체부(10)의 지지강성를 향상시킬 수 있게 된다.4, the cross section of the side wall of the upper body of the upper body 20 overlaps the end face of the lower wall of the lower body 12 of the lower body 10, A part of the load of the upper body part 20 is supported by the side wall of the lower body part 10 when the depth is long, so that the supporting rigidity of the lower body part 10 can be improved.

커버부(30)는, 상체부(20)의 상부에 형성된 개방부위를 폐쇄하도록 상체부(20)의 상부에 끼워맞춤 결합에 의해 설치된 커버부재로서, 커버(31) 및 커버홀(32)로 이루어져 있다.The cover portion 30 is a cover member which is fitted to the upper portion of the upper body portion 20 so as to close the open portion formed on the upper portion of the upper body portion 20, consist of.

커버(31)는, 상체부(20)의 상부에 형성된 개방부위를 폐쇄하도록 상체부(20)의 상부에 끼워맞춤되는 덮개부재로서, 이러한 커버(31)는 상체부(20)의 상부에 끼워맞춤되도록 상체부(20)의 상부몸체와 동등한 원형상으로 형성되어 있다.The cover 31 is a lid member fitted to the upper portion of the upper body 20 to close an open portion formed on the upper portion of the upper body 20. The cover 31 is fitted to the upper portion of the upper body 20 And is formed in a circular shape equal to the upper body of the upper body 20 so as to be fit.

또한, 커버(31)의 하면의 가장자리에는 상체부(20)의 제3 상부몸체(23)의 제3 끼움홈(23b)과 끼워맞춤 결합되도록 커버 끼움돌기(31a)가 외곽둘레를 따라 형성되어 있다.A cover fitting projection 31a is formed along an outer circumference at an edge of a lower surface of the cover 31 so as to be engaged with the third fitting groove 23b of the third upper body 23 of the upper body 20 have.

커버홀(32)은, 커버(31)의 상면 측방에 관통형성된 홀부재로서, 여기에 맨홀뚜껑이 개폐하도록 설치되며 맨홀 내부에서 유지보수작업이나 청소작업을 위해 작업자가 출입할 수 있는 출입통로를 형성하게 된다.The cover hole 32 is a hole member formed through the upper side of the cover 31 so as to open and close the manhole cover and is provided with an access passage through which the operator can enter and exit for maintenance work or cleaning work Respectively.

따라서, 커버부(30)의 커버홀(32)의 내벽은, 하체부(10)의 측벽 및 상체부(20)의 측벽과 일부지점에서 상하 길이방향으로 서로 연접하도록 배치되어, 맨홀장치의 내부로 작업자가 출입이 용이하게 일자형상의 길이방향의 통로를 형성하는 동시에 여기에 맨홀의 고정식 사다리를 용이하게 설치할 수 있게 된다.The inner wall of the cover hole 32 of the cover portion 30 is disposed so as to be connected to each other in the vertical direction at the side wall of the lower body portion 10 and at a part of the side wall of the upper body portion 20, So that the worker can easily access the ladder of the manhole in the longitudinal direction while forming a straight passage in the form of a straight line.

도 3 및 도 5에 나타낸 바와 같이, 본 실시예의 흄관 연결용 조립식 맨홀장치를 지중에 설치하는 흄관 연결용 조립식 맨홀장치의 시공방법은, 터파기 단계(S10), 하체부 설치단계(S20), 흄관 연결단계(S30), 상체부 설치단계(S40), 커버부 설치단계(S50) 및 매립단계(S60)를 포함하여 이루어져, 오수, 하수 또는 우수 등을 배출하기 위해 흄관을 연결하는 흄관 연결용 조립식 맨홀장치를 지하에 매설하는 흄관 연결용 조립식 맨홀장치의 시공방법이다.As shown in FIGS. 3 and 5, the method for constructing the prefabricated manhole apparatus for connecting the humdrum pipe for installing the humdrum pipe connecting humdrum device of the present embodiment in the ground includes a trenching step S10, a lower body installing step S20, The connection of the humidifier pipe for connecting the humidifier pipe for discharging the sewage, the sewage or the storm is made by connecting the humidifier pipe connection step S30, the upper body installation step S40, the cover part installing step S50 and the filling step S60, This is a method of constructing a prefabricated manhole device for connecting a humvee pipe to a prefabricated manhole device buried underground.

터파기 단계(S10)는, 맨홀장치를 지중에 매립하기 위해 지상에서 굴착설비를 이용하여 소정깊이의 지중으로 굴착하는 단계로서, 오수, 하수 또는 우수 등을 배출하기 위해 흄관을 연결하도록 흄관의 매립깊이까지 굴착하게 된다.The trenching step S10 is a step of excavating the manhole apparatus to the ground at a predetermined depth by using an excavation facility on the ground to bury the manhole apparatus in the ground. The trenching step S10 is a step of excavating the humdrum pipe to connect the humdrum pipe to discharge the sewage, It is excavated to depth.

하체부 설치단계(S20)는, 터파기 단계(S10)에서 지중에 굴착된 굴착공간에 하체부(10)를 설치하는 단계로서, 크레인이나 기중기를 이용하여 하체부(10)를 이동하여 지하의 바닥에 안착시켜 고정 설치하게 된다.The lower body installation step S20 is a step of installing the lower body 10 in the excavation space excavated in the ground at the trenching step S10 and moving the lower body 10 using a crane or a crane, It is fixed on the floor and fixedly installed.

흄관 연결단계(S30)는, 하체부 설치단계(S20)에서 설치된 하체부(10)에 흄관을 연결하는 단계로서, 하체부(10)의 제1 연결홀(14) 및 제2 연결홀(15)에 흄관을 삽입하여 연결하게 된다.The connecting step S30 of connecting the humdrum tube to the lower body 10 in the lower body mounting step S20 includes the first connecting hole 14 and the second connecting hole 15 of the lower body 10, ) To be connected.

상체부 설치단계(S40)는, 흄관 연결단계(S30)에서 흄관이 연결된 하체부(10)의 상부에 상체부(20)를 끼워맞춤 결합해서 연결 설치하는 단계로서, 상체부(20)가 하체부(10)의 상부면 가장자리의 일방에 상부몸체가 다단으로 입설되는 것도 가능함은 물론이다.The upper body mounting step S40 is a step of fitting and connecting the upper body 20 to the upper portion of the lower body 10 to which the humdrum pipe is connected in the humdrum pipe connecting step S30, It is also possible that the upper body is installed at one end of the upper surface edge of the portion 10 in multiple stages.

이때, 하체부(10)의 측벽과 상체부(20)의 측벽은, 일부지점에서 상하 길이방향으로 서로 연접하도록 설치되어, 맨홀장치의 내부로 작업자가 출입이 용이하게 일자형상의 길이방향의 통로를 형성하는 동시에 여기에 맨홀의 고정식 사다리를 용이하게 설치할 수 있게 된다.At this time, the side wall of the lower body 10 and the side wall of the upper body 20 are provided so as to be connected to each other in the vertical direction at some point, and the worker can easily enter and exit the inside of the manhole, And the fixed ladder of the manhole can be easily installed thereon.

커버부 설치단계(S50)는, 상체부 설치단계(S40)에서 하체부(10)의 상부에 연결된 상체부(20)에 커버부(30)를 설치하는 단계로서, 상체부(20)의 상부에 커버부(30)를 끼워맞춤하여 설치하게 된다.The cover portion mounting step S50 is a step of installing the cover portion 30 on the upper body portion 20 connected to the upper portion of the lower body portion 10 in the upper body mounting step S40, And the cover portion 30 is fitted to the cover portion 30.

이때, 커버부(30)의 커버홀(32)의 내벽은, 하체부(10)의 측벽 및 상체부(20)의 측벽과 일부지점에서 상하 길이방향으로 서로 연접하도록 배치되어, 맨홀장치의 내부로 작업자가 출입이 용이하게 일자형상의 길이방향의 통로를 형성하는 동시에 여기에 맨홀의 고정식 사다리를 용이하게 설치할 수 있게 된다.At this time, the inner wall of the cover hole 32 of the cover portion 30 is arranged so as to be connected to each other in the vertical direction at the side wall of the lower body portion 10 and a part of the side wall of the upper body portion 20, So that the worker can easily access the ladder of the manhole in the longitudinal direction while forming a straight passage in the form of a straight line.

매립단계(S60)는, 커버부 설치단계(S50)에서 커버부(30)가 설치된 하체부(10)와 상체부(20)를 지하에 매립하는 단계로서, 터파기 단계(S10)에서 굴착된 토사를 지중에 되메우기를 하여 맨홀의 시공을 완료하게 된다.The embedding step S60 is a step of embedding the lower body 10 and the upper body 20 provided with the cover 30 in the cover step installation step S50 in the ground, The soil is backed up in the ground and the construction of the manhole is completed.

이상 설명한 바와 같이, 본 발명에 따르면 상체부의 사이즈를 작게하고 하체부 상체부 및 커버부의 내벽을 일부에서 상하로 연접하도록 설치함으로써, 상체부의 제작비용 및 시공비용을 절감하는 동시에 내부 벽면을 일부에서 연접시켜 작업자의 출입을 용이하게 할 수 있는 효과를 제공한다.As described above, according to the present invention, since the size of the upper body is made smaller and the inner wall of the lower body part and the cover part are connected to each other in the upper part and lower part, the manufacturing cost and the construction cost of the upper part are reduced, So that it is possible to facilitate entry and exit of the operator.

또한, 하체부로서 하부판, 하부몸체 및 상부판을 조립식으로 구비함으로써, 하부몸체의 설치 및 제작을 용이하게 하는 동시에 지지강도를 향상시킬 수 있는 효과를 제공한다.Further, since the lower body, the lower body, and the upper body are provided as a lower body, the lower body can be easily installed and manufactured, and at the same time, the support strength can be improved.

또한, 하체부가 끼움홈과 끼움돌기가 서로 대응해서 결합되고 실링부재가 설치됨으로써, 하부판, 하부몸체 및 상부판 사이의 결합을 용이하게 하는 동시에 기밀성능을 향상시킬 수 있는 효과를 제공한다.In addition, the lower body portion and the fitting protrusions are coupled to each other in correspondence with each other and the sealing member is provided, thereby facilitating the engagement between the lower plate, the lower body and the upper plate, and improving airtightness.

또한, 상체부가 원형 단면으로 형성된 다단의 상부몸체로 이루어짐으로써, 흄관의 매립깊이에 따라 다단의 상부몸체를 결합하여 상체부의 설치 및 결합을 용이하게 할 수 있는 효과를 제공한다.Also, since the upper body is composed of a multi-stage upper body formed in a circular cross-section, the upper body can be coupled according to the depth of embedding of the humdrum tube, thereby facilitating installation and connection of the upper body.

또한, 상체부가 끼움홈과 끼움돌기가 서로 대응해서 결합되고 실링부재가 설치됨으로써, 상부몸체 사이의 결합을 용이하게 하는 동시에 기밀성능을 향상시킬 수 있는 할 수 있는 효과를 제공한다.Further, the upper body is fitted to the fitting grooves and the fitting protrusions in correspondence with each other and the sealing member is provided, thereby facilitating the coupling between the upper bodies and improving the airtightness.

이상 설명한 본 발명은 그 기술적 사상 또는 주요한 특징으로부터 벗어남이 없이 다른 여러 가지 형태로 실시될 수 있다. 따라서 상기 실시예는 모든 점에서 단순한 예시에 지나지 않으며 한정적으로 해석되어서는 안 된다. The present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. Therefore, the above embodiments are merely illustrative in all respects and should not be construed as limiting.

10: 하체부
20: 상체부
30: 커버부
10: Lower body part
20: upper body part
30: Cover part

Claims (6)

흄관이 연결되는 하체부(10);
상기 하체부(10)의 상부에 연결되며, 상기 하체부(10)의 단면적 보다 작게 형성된 상체부(20); 및
상기 상체부(20)의 상부에 개폐하도록 설치된 커버부(30);를 포함하고,
상기 하체부(10)의 측벽과, 상기 상체부(20)의 측벽과, 상기 커버부(30)의 커버홀 내벽은, 일부지점에서 상하 길이방향으로 서로 연접하도록 배치되어 있고,
상기 하체부(10)는, 바닥에 설치되는 하부판; 상기 하부판의 상부에 입설되어 흄관이 연결되며 단면이 사각형으로 형성된 하부몸체; 상기 하부몸체의 상부를 개폐하도록 설치되며, 상기 하체부(10)와 상기 상체부(20) 사이에 단차를 형성하도록 평판형상으로 형성된 상부판; 상기 하부몸체의 양쪽 측면에 형성되며, 내주부위에 단차가 형성된 제1 연결홀; 및 상기 하부몸체의 전면 또는 후면에 형성되며, 내주부위에 단차가 형성된 제2 연결홀;을 포함하고,
상기 상체부(20)는, 상기 하체부(10)의 상부면 가장자리의 일방에 다단으로 적층되며 단면이 원형으로 형성되고, 측벽 전체가 지면에 수직한 복수의 상부몸체로 이루어져 있고, 상기 상부몸체 사이에는, 끼움홈과 끼움돌기가 서로 대응해서 결합되도록 형성되어 있고, 상기 상부몸체 사이에는, 실링부재가 삽입되어 있고,
상기 상체부(20)는, 원형으로 형성된 상기 상부몸체의 측벽의 단면이, 상기 하체부(10)의 사각형으로 형성된 상기 하부몸체의 인접하는 2개의 측벽의 단면과 중첩되도록 입설되어, 상기 하부몸체에 상기 상부몸체가 2개의 단면에서 지지되어 있고,
상기 하부판과 상기 하부몸체 사이 및 상기 하부몸체와 상기 상부판 사이에는, 끼움홈과 끼움돌기가 서로 대응해서 결합되도록 형성되어 있고,
상기 하부판과 상기 하부몸체 사이 및 상기 하부몸체와 상기 상부판 사이에는, 실링부재가 삽입되어 있는 것을 특징으로 하는 흄관 연결용 조립식 맨홀장치.
A lower body 10 to which a humdrum tube is connected;
An upper body portion 20 connected to an upper portion of the lower body portion 10 and formed to be smaller than a cross sectional area of the lower body portion 10; And
And a cover part (30) installed to open and close on the upper part of the body part (20)
The side wall of the lower body 10, the side wall of the upper body 20, and the inner wall of the cover hole of the cover 30 are arranged so as to be connected to each other in the vertical direction at some point,
The lower body part (10) comprises: a bottom plate installed on the floor; A lower body installed at an upper portion of the lower plate and connected to a humdrum tube and having a rectangular cross section; An upper plate installed to open and close an upper portion of the lower body and formed in a flat plate shape to form a step between the lower body 10 and the upper body 20; A first connection hole formed on both side surfaces of the lower body and having a step at an inner circumferential portion thereof; And a second connection hole formed on a front surface or a rear surface of the lower body and having a step on an inner circumferential portion thereof,
The upper body 20 has a plurality of upper bodies which are stacked at one end of the upper face edge of the lower body 10 and are formed in a circular shape and whose entire side walls are perpendicular to the ground, A sealing member is inserted between the upper and lower bodies, and a sealing member is inserted between the upper and lower bodies,
The upper body 20 is formed so that a section of a side wall of the upper body formed in a circular shape overlaps an end face of two adjacent side walls of the lower body formed by a square of the lower body 10, The upper body is supported at two end faces,
Between the lower plate and the lower body and between the lower body and the upper plate, the fitting grooves and the fitting protrusions are formed so as to correspond to each other,
Wherein a sealing member is inserted between the lower plate and the lower body and between the lower body and the upper plate.
삭제delete 삭제delete 제 1 항에 기재된 흄관 연결용 조립식 맨홀장치의 시공방법으로서,
터파기 단계;
하체부를 설치하는 단계;
상기 설치된 하체부에 흄관을 연결하는 단계;
상기 흄관이 연결된 하체부의 상부에 상체부를 연결해서 설치하는 단계;
상기 연결된 상체부에 커버부를 설치하는 단계; 및
상기 하체부와 상기 상체부를 지하에 매립하는 단계;를 포함하는 것을 특징으로 하는 흄관 연결용 조립식 맨홀장치의 시공방법.
A method of constructing a prefabricated manhole apparatus for connecting a humidifier pipe as set forth in claim 1,
A tearing step;
Installing a lower body part;
Connecting a humdrum tube to the installed lower body part;
Connecting an upper body to an upper portion of a lower body portion to which the humdrum tube is connected;
Installing a cover part on the connected upper body part; And
And burying the lower body part and the upper body part in the ground.
제 4 항에 있어서,
상기 하체부와 상기 상체부의 연결단계는, 상기 상체부가 상기 하체부의 상부면 가장자리의 일방에 다단으로 입설되는 것을 특징으로 하는 흄관 연결용 조립식 맨홀장치의 시공방법.
5. The method of claim 4,
Wherein the connecting step between the lower body part and the upper body part is formed such that the upper body part is formed at one end of the upper surface edge of the lower body part in a multi-stage manner.
제 5 항에 있어서,
상기 하체부(10)의 측벽과, 상기 상체부(20)의 측벽과, 상기 커버부(30)의 커버홀 내벽은, 일부지점에서 상하 길이방향으로 서로 연접하도록 설치되어 있는 것을 특징으로 하는 흄관 연결용 조립식 맨홀장치의 시공방법.
6. The method of claim 5,
Wherein the side wall of the lower body part (10), the side wall of the upper body part (20), and the cover hole inner wall of the cover part (30) Construction method of prefabricated manhole device for connection.
KR1020180013482A 2018-02-02 2018-02-02 Assembly manhole apparatus for connecting hume pipe and constructing method thereof KR101965801B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180013482A KR101965801B1 (en) 2018-02-02 2018-02-02 Assembly manhole apparatus for connecting hume pipe and constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180013482A KR101965801B1 (en) 2018-02-02 2018-02-02 Assembly manhole apparatus for connecting hume pipe and constructing method thereof

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020160113343 Division 2016-09-02

Publications (2)

Publication Number Publication Date
KR20180026413A KR20180026413A (en) 2018-03-12
KR101965801B1 true KR101965801B1 (en) 2019-04-05

Family

ID=61729059

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180013482A KR101965801B1 (en) 2018-02-02 2018-02-02 Assembly manhole apparatus for connecting hume pipe and constructing method thereof

Country Status (1)

Country Link
KR (1) KR101965801B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102059194B1 (en) 2019-07-26 2019-12-24 동양특수콘크리트 (주) Watertight apparatus haved a between manhole and pipe
KR102224124B1 (en) * 2021-01-06 2021-03-05 부산대학교 산학협력단 direction indicating device for installing simple seismometer installed true north direction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200385995Y1 (en) * 2005-03-08 2005-06-07 이영재 Manhole structure for protecting a leak
JP2007169927A (en) * 2005-12-20 2007-07-05 Nikko Kensetsu Kk Earthquake resisting manhole structure and its manufacturing method
WO2014109905A1 (en) * 2012-12-28 2014-07-17 Geneva Polymer Products, Llc System and method for making polymer concrete

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200337105Y1 (en) 2003-09-30 2003-12-31 주식회사 씨앤앤건설 The concrete manhole where transportation and Union construction are easy
KR200342335Y1 (en) 2003-11-15 2004-02-18 주식회사 토암산업 Fabricated Precast Concrete Sewerage Manhole
KR101128269B1 (en) * 2009-06-08 2012-03-27 주식회사 미래산업 A manhole be prefabrication laminated solidarity construction
KR100967427B1 (en) 2010-03-25 2010-07-01 성원콘크리트(주) Prefabricated manhole having fastening structure by coupler

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200385995Y1 (en) * 2005-03-08 2005-06-07 이영재 Manhole structure for protecting a leak
JP2007169927A (en) * 2005-12-20 2007-07-05 Nikko Kensetsu Kk Earthquake resisting manhole structure and its manufacturing method
WO2014109905A1 (en) * 2012-12-28 2014-07-17 Geneva Polymer Products, Llc System and method for making polymer concrete

Also Published As

Publication number Publication date
KR20180026413A (en) 2018-03-12

Similar Documents

Publication Publication Date Title
KR101965801B1 (en) Assembly manhole apparatus for connecting hume pipe and constructing method thereof
KR20080061580A (en) Precast concrete file and method for constructing thereof
KR100982819B1 (en) A prefabricated drain-road
CN216131506U (en) Hydraulic engineering prefabricated inspection shaft and drain pipe connection structure
KR200428388Y1 (en) Power transmission manhole
KR101157643B1 (en) Manhole height adjustment implement and manhole construction method
KR101526461B1 (en) Functional precast concrete culvert
KR100740052B1 (en) Power transmission manhole
KR20070076560A (en) Sectional manhole
KR100456610B1 (en) Structure method for drainageway of weak stratum and the conduct pipe thereof
KR101826619B1 (en) Non-buoyant sump haning function of preventing leak
KR200275363Y1 (en) The mold establishment necessit do not exist assembly road water pipe
KR20130004811A (en) Supporting means for hume pipe and forming means for waterway and the construction method
KR100805555B1 (en) Sectional manhole using multi-divided segments
KR100999410B1 (en) Assembled wale beam and construction method of underground structure using the same
KR20190081605A (en) Installation structure and method of precast concrete culvert
CN111335445A (en) Construction method of concrete catch basin by using steel pipe as inner mold
KR102018992B1 (en) Assembly manhole structure using using waste plastic
KR20160140122A (en) Conduit trench for draining water of the underground building structure
KR101304987B1 (en) Assembly type precast manhole
KR101496635B1 (en) Manufacturing method of Assembly type precast manhole
KR102642702B1 (en) Manhole for distribution with anti-submergence means
KR102305260B1 (en) PC structure with residual settlement prevention function and construction method of PC structure using the same
KR101262856B1 (en) Concrete manhole mold
KR20010016306A (en) Method for constructing of assembly type manhole

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant