KR101965634B1 - Drainage induction structure of hume pipe - Google Patents

Drainage induction structure of hume pipe Download PDF

Info

Publication number
KR101965634B1
KR101965634B1 KR1020170047329A KR20170047329A KR101965634B1 KR 101965634 B1 KR101965634 B1 KR 101965634B1 KR 1020170047329 A KR1020170047329 A KR 1020170047329A KR 20170047329 A KR20170047329 A KR 20170047329A KR 101965634 B1 KR101965634 B1 KR 101965634B1
Authority
KR
South Korea
Prior art keywords
wing
fastening
guide panel
fixing hole
drainage
Prior art date
Application number
KR1020170047329A
Other languages
Korean (ko)
Other versions
KR20180115102A (en
Inventor
박문수
Original Assignee
(주)덕산지에스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)덕산지에스 filed Critical (주)덕산지에스
Priority to KR1020170047329A priority Critical patent/KR101965634B1/en
Publication of KR20180115102A publication Critical patent/KR20180115102A/en
Application granted granted Critical
Publication of KR101965634B1 publication Critical patent/KR101965634B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F7/00Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/001Methods, systems, or installations for draining-off sewage or storm water into a body of water

Abstract

본 발명은 하수로와 하천이 연결되는 배수위치에 설치되어 배수를 원활하게 유도하면서 주변 지반의 침하나 붕괴를 방지하는 배수 유도 구조물에 관한 것으로, 더욱 상세하게는 현장에서 조립 가능하게 다수의 패널 형태로 제작되어 현장에서 조립 시공 가능한 흄관의 배수 유도 구조물에 관한 것이다.
이를 위해 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물은, 구조물의 바닥면을 이루는 가이드 판넬과, 가이드 판넬의 상부에 설치되고 중앙에는 배수홀이 형성되어 흄관과 연통 설치되는 면벽 및 가이드 판넬의 상부에 끼워지고, 면벽에 조립 설치되어 하수가 배수되는 양 측을 지지하는 날개벽이 각각 별도로 제작되어 현장에서 조립 시공되는 것을 특징으로 한다.
The present invention relates to a drainage inducing structure installed at a drainage position where a sewer and a river are connected to each other to prevent drainage and collapse of a surrounding ground while smoothly guiding drainage. More particularly, The present invention relates to a drainage inducing structure of a humidifier pipe which can be assembled and assembled in the field.
For this, a drainage inducing structure for a humidifier pipe according to an embodiment of the present invention includes a guide panel that forms a bottom surface of a structure, a face wall that is installed on an upper portion of the guide panel and has a drain hole formed at the center thereof, And a wing wall for supporting both sides where the sewage is drained is separately manufactured and assembled in the field.

Description

흄관의 배수 유도 구조물{Drainage induction structure of hume pipe}{Drainage induction structure of hume pipe}
본 발명은 하수로와 하천이 연결되는 배수위치에 설치되어 배수를 원활하게 유도하면서 주변 지반의 침하나 붕괴를 방지하는 배수 유도 구조물에 관한 것으로, 더욱 상세하게는 현장에서 조립 가능하게 다수의 패널 형태로 제작되어 현장에서 조립 시공 가능한 흄관의 배수 유도 구조물에 관한 것이다. The present invention relates to a drainage inducing structure installed at a drainage position where a sewer and a river are connected to each other to prevent drainage and collapse of a surrounding ground while smoothly guiding drainage. More particularly, The present invention relates to a drainage inducing structure of a humidifier pipe which can be assembled and assembled in the field.
일반적으로 하수를 처리함에 있어서 하수를 유도하여 하천 등으로 배수하는 흄관을 이용한다. Generally, in the treatment of sewage, a humidifier pipe is used for inducing sewage and discharging it to a river or the like.
흄관을 통해 유도된 하수는 하천으로 배수됨에 있어서 연약지반으로 배수가 이루어질 경우 연속적인 배수에 의해 지반이 침하되거나, 시간이 흐름에 따라 침하 정도가 심해지면서 주변의 지반이 붕괴되는 등의 문제가 발생한다.In the case of draining to the river, drainage derived from the hume pipe is drained into the river, and when the drainage is made to the soft ground, the ground subsidence is caused by continuous drainage, or the ground is collapsed do.
상기한 문제점을 해결하기 위해 배수구 주변에 지반을 보강할 수 있는 구조물을 설치하여 지반이 침하되는 것을 방지한다.In order to solve the above problem, a structure for reinforcing the ground around the drain hole is provided to prevent the ground from sinking.
이러한 구조물은 주로 콘크리트를 이용해 설치하게 되는데 종래에는 배수구 주변 지반을 배수구보다 넓은 크기로 터파기 한 후 터파기한 바닥과 벽면에 콘크리트를 타설하여 지반을 보강하면서 배수에 의한 침하를 방지하게 된다. These structures are mainly installed with concrete. In the past, after the ground around the drain hole has been widened to a larger size than the drain hole, the concrete is laid on the floor and wall of the tidal floor to prevent settlement by drainage while reinforcing the ground.
일반적으로 콘크리트를 이용해 구조물을 시공할 경우 터파기한 바닥면과 벽면에 거푸집을 설치하고 거푸집에 철근 및 콘크리트를 타설하여 이를 양생함에 따라 시공 완료하게 된다.Generally, when constructing a structure using concrete, it is necessary to install a mold on the bottom and wall of the foundation, and to install the reinforced concrete and concrete on the formwork.
하지만 상기와 같이 현장에서 거푸집을 이용해 콘크리트를 타설하여 양생될 때 까지 시공 기간이 길어지고, 노출된 외부공간에서 양생함에 따라 양생 중 기상이나 기타 외부요인에 의해 구조물에 변형이 생기는 등의 문제가 발생한다. However, as mentioned above, the construction period is prolonged until curing by pouring the concrete using the formwork in the field, and when the curing takes place in the exposed external space, there arises a problem such as deformation of the structure due to weather or other external factors during curing do.
또한, 구조물을 완제품 형태로 제작하여 현장에서 바로 시공할 수도 있으나 하천 주변에 설치되는 구조물의 특성상 대형의 구조물을 이송하기에 무리가 따르고, 지반의 형태에 따라 대응되는 형태로 제작해야 하는 문제가 발생하게 된다.In addition, it is possible to construct the structure in the form of a finished product and immediately construct it in the field. However, due to the nature of the structure installed around the river, it is difficult to transport the large structure, .
본 발명은 상술한 문제점을 해결하기 위해 안출된 것으로서, 구조물을 다수의 판 형태로 분할 제작하여 시공하고자 하는 현장까지 용이하게 이송할 수 있고, 현장에서 간편하게 시공할 수 있게 됨과 아울러 지반 여건에 맞게 날개벽의 각도를 조절할 수 있는 흄관의 배수 유도 구조물을 제공하는 것을 목적으로 한다. SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to provide a method of manufacturing a multi- Which can control the angle of the hump tube.
상기한 목적을 달성하기 위한 본 발명에 따른 흄관의 배수 유도 구조물은, 구조물의 바닥면을 이루는 가이드 판넬(100);, 상기 가이드 판넬(100)의 상부에 설치되고 중앙에는 배수홀(230)이 형성되어 흄관(P)과 연통 설치되는 면벽(200); 및 상기 가이드 판넬(100)의 상부에 끼워지고, 면벽(200)에 조립 설치되어 하수가 배수되는 양 측을 지지하는 날개벽(300);이 각각 별도로 제작되어 현장에서 조립 시공되는 것을 특징으로 한다.In order to accomplish the above object, a drainage inducing structure according to the present invention comprises a guide panel 100 constituting a bottom surface of a structure, a drain hole 230 installed at the center of the guide panel 100, A face wall 200 formed in communication with the humdrum pipe P; And a wing wall 300 which is fitted on the upper portion of the guide panel 100 and supports both sides of the wall 200 to drain the sewage, are separately manufactured and assembled in the field.
여기서, 상기 가이드 판넬(100)은 흄관(P) 측 상부에 상기 면벽(200)이 끼워지며 결합되는 면벽 고정홀(110)이 형성되고, 상기 면벽(200)과 날개벽(300)이 끼워지며 결합되는 축을 중심으로 원형을 이루며 다수 배열된 날개벽 고정홀(120)이 형성되며, 상기 면벽 고정홀(110)과 날개벽 고정홀(120)에 끼워지며 결합되어 상기 가이드 판넬(100)에 면벽(200)과 날개벽(300)이 결합되는 것을 안내 및 지지하는 인서트 강봉(130)을 포함하는 것을 특징으로 한다.Here, the guide panel 100 has a surface wall fixing hole 110 in which the surface wall 200 is fitted and coupled to an upper portion of the humdrum pipe P, and the surface wall 200 and the wing wall 300 are fitted, The guide wall 100 is formed with a plurality of circular blade fixing holes 120. The guide wall 100 is provided with a side wall fixing hole 120. The side wall fixing hole 120 is engaged with the blade fixing hole 120, And an insert rod (130) for guiding and supporting the coupling of the wing wall (300).
그리고 상기 면벽(200)은 상기 면벽(200)의 하부에 형성되어 상기 가이드 판넬(100)의 면벽 고정홀(110)에 설치되는 인서트 강봉(130)의 상부로 끼워지며 결합되는 면벽 바닥 고정홀(210)과, 상기 면벽(200)의 양측에 구비되어 상기 날개벽(300)과 끼워지며 결합되는 날개벽 체결부(220) 및 상기 면벽(200)의 중앙에 상기 흄관(P)의 배수구와 연통되게 관통 형성되는 배수홀(230)을 포함하는 것을 특징으로 한다.The face wall 200 is formed at a lower portion of the face wall 200 and is inserted into an upper portion of an insert steel bar 130 installed in a face wall fixing hole 110 of the guide panel 100, A wing fastening part 220 provided on both sides of the face wall 200 to be engaged with and coupled to the wing wall 300 and a wing fastening part 220 formed at the center of the face wall 200 to communicate with a drain port of the humdrum pipe P, And a drain hole (230) formed therein.
또한, 상기 날개벽(300)은 상기 날개벽(300)의 하부에 구비되어 상기 가이드 판넬(100)의 날개벽 고정홀(120)에 설치되는 인서트 강봉(130)의 상부로 끼워지며 결합되는 날개벽 바닥 고정홀(310)과, 상기 면벽(200)의 양측에 구비된 날개벽 체결부(220)에 끼워지며 결합되는 면벽 체결부(320) 및 상기 날개벽의 면벽 체결부(320) 및 상기 날개벽(300)의 내측이나 외측, 또는 양측에 다수로 결합되어 날개벽(300)의 지지력을 보강하는 보강 인서트(330)를 포함하는 것을 특징으로 한다.The wing wall 300 is provided at a lower portion of the wing wall 300 and is inserted into the upper portion of the insert steel bar 130 installed in the wing wall fixing hole 120 of the guide panel 100, A side wall coupling part 320 fitted to and coupled to a side wall coupling part 220 provided at both sides of the side wall 200 and a side wall coupling part 320 connected to the inside of the side wall coupling part 320, And a plurality of reinforcing inserts (330) coupled to the outer side or both sides to reinforce the supporting force of the wing wall (300).
한편, 상기 면벽(200)에 구비된 날개벽 체결부(220)와, 상기 날개벽(300)에 구비된 면벽 체결부(320)는 중앙에 형성된 면벽 강봉 체결홀(221)과 날개벽 강봉 체결홀(321)에 체결 강봉(400)이 관통되게 끼워지며 결합되어 상기 면벽(200)과 날개벽(300)을 고정 지지하는 것을 특징으로 한다.The wing fastening part 220 provided on the face wall 200 and the face wall fastening part 320 provided on the wing wall 300 are provided with a face wall reinforcing fastening hole 221 and a wing wall fastening fastening hole 321 The fastening bar 400 is inserted into the fastening bar 400 through the fastening bar 400 and fixedly supports the side wall 200 and the wing wall 300.
상기한 목적을 달성하기 위한 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물은 다음과 같은 효과가 있다.In order to accomplish the above object, a drainage inducing structure of a humidifier pipe according to an embodiment of the present invention has the following effects.
첫째, 분할된 형태로 제작되어 적재 및 이송이 용이한 효과가 있다.First, it is produced in divided form, and it is easy to load and transport.
둘째, 시공하고자 하는 현장에서 조립에 의해 간편하게 시공할 수 있는 효과가 있다. Second, there is an effect that the construction can be easily performed by assembling at the site to be constructed.
셋째, 현장에서 조립하여 바로 시공 가능하여 시공 기간을 단축시킬 수 있는 효과가 있다.Third, the construction time can be shortened because it can be constructed immediately after assembling in the field.
넷째, 각도를 조절하며 설치할 수 있어서 다양한 여건에 대응할 수 있는 효과가 있다.Fourth, since the angle can be adjusted and installed, it is possible to cope with various conditions.
도 1은 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 전체 사시도
도 2는 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 분해 사시도
도 3은 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 각도를 조절하는 상태를 나타낸 평면도
도 4a는 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 가이드 판넬을 시공한 상태를 나타낸 시공 상태도
도 4b는 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 가이트 판넬에 면벽을 설치한 상태를 나타낸 시공 상태도
도 4c는 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 가이드 판넬과 면벽에 날개벽을 설치하는 상태를 나타낸 시공 상태도
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a drainage induction structure of a humidifier according to an embodiment of the present invention;
2 is an exploded perspective view of a drainage induction structure of a humidifier pipe according to an embodiment of the present invention.
3 is a plan view showing a state of adjusting the angle of a drainage induction structure of a humdrum tube according to an embodiment of the present invention.
FIG. 4A is a view showing a construction state of a guide panel of a drainage induction structure of a humdrum pipe according to an embodiment of the present invention. FIG.
FIG. 4B is a view showing a construction state showing a state in which a face wall is installed on a gutter panel of a drainage induction structure of a hume pipe according to an embodiment of the present invention. FIG.
FIG. 4c is a view showing a state in which a wing wall is installed on a guide panel and a face wall of a drainage induction structure of a hume pipe according to an embodiment of the present invention. FIG.
본 발명은 하수를 배수하는 흄관의 배수구 측에 결합되어 지반의 침하 및 붕괴를 방지하는 배수 유도 구조물에 관한 것으로, 판형태로 이루어진 다수의 구조물을 조립 가능하게 제작하여 현장에서 간편하게 조립 시공할 수 있게 됨과 아울러 설치 지반에 따라 측판의 각도를 조절하며 시공할 수 있어서 시공기간을 단축하고, 다양한 지반에 대응하며 시공할 수 있는 흄관의 배수 유도 구조물에 관한 것을 특징으로 한다.The present invention relates to a drainage inducing structure coupled to a drain port side of a hearth pipe for draining sewage to prevent settlement and collapse of a ground, and is capable of easily assembling a plurality of structures in a plate- The present invention relates to a drainage induction structure of a humidifier pipe which can be installed by adjusting the angle of the side plate according to the installation ground, thereby shortening the construction period and coping with various grounds.
이하, 이러한 특징을 갖는 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물을 첨부된 도면을 참조하여 상세히 설명하기로 한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a drainage inducing structure according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 전체 사시도이고, 도 2는 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 분해 사시도이다.FIG. 1 is an overall perspective view of a drainage induction structure of a humdrum tube according to an embodiment of the present invention, and FIG. 2 is an exploded perspective view of a drainage induction structure of a humdrum tube according to an embodiment of the present invention.
도 1 내지 도 2를 참조하면, 본 발명은 크게 가이드 판넬(100), 면벽(200) 및 날개벽(300)을 포함하여 구성된다. Referring to FIGS. 1 and 2, the present invention mainly includes a guide panel 100, a face wall 200, and a wing wall 300.
상기 가이드 판넬(100)은 사각 판 형태로 이루어지고, 상부 뒤쪽(배수홀 측)에는 상기 면벽(200)이 결합되는 면벽 고정홀(110)이 양측에 서로 대칭되게 구비되고, 상기 면벽(200)과 날개벽(300)이 결합되는 양쪽 축을 중심으로 방사형을 이루며 다수의 날개벽 고정홀(120)이 구비된다.The guide panel 100 is formed in a rectangular plate shape. A face wall fixing hole 110 to which the face wall 200 is coupled is symmetrically disposed on both sides of the upper face (drain hole side) And a plurality of blade wall fixing holes 120 are formed in a radial shape about both axes to which the blade walls 300 are coupled.
상기 면벽 고정홀(110)과 날개벽 고정홀(120)에는 면벽(200)과 날개벽(300)을 고정 설치하기 위한 인서트 강봉(130)이 각각 끼워지며 결합된다.An insert bar 130 is fixed to the wall fixing hole 110 and the blade fixing hole 120 to fix the face wall 200 and the blade 300 to each other.
상기 인서트 강봉(130)은 금속 재질의 봉 형태로 이루어져 면벽(200)과 날개벽(300)을 견고하게 고정 지지하는 것으로, 상기 면벽 고정홀(110)과 날개벽 고정홀(120)에 나사체결 방식으로 끼워지거나 억지 끼움으로 끼워지며 고정될 수 있다.The insert rod 130 is made of a metal rod and fixedly supports the face wall 200 and the wing wall 300. The insert wall fixing hole 110 and the wing wall fixing hole 120 are screw- It can be fitted or fixed with interference.
상기 면벽(200)은 상기 가이드 판넬(100)과 결합되는 하부에 구비되어 상기 가이드 판넬(100)의 면벽 고정홀(110)에 결합된 인서트 강봉(130)의 상부로 끼워지며 결합되는 면벽 바닥 고정홀(210)과, 면벽(200)의 양측에 돌출되게 형성되어, 상기 날개벽(300)이 끼워지며 결합되는 날개벽 체결부(220) 및 상기 흄관(P)의 하수가 배수되는 끝부분에 연통되게 관통 형성된 배수홀(230)을 포함하여 구성된다. The face wall 200 is provided at a lower portion coupled to the guide panel 100 and is fitted to an upper portion of the insert steel bar 130 coupled to the face wall fixing hole 110 of the guide panel 100, Holes 210 and a wing coupling 220 formed to protrude from both sides of the side wall 200 and to which the wing wall 300 is fitted and coupled and an end portion where the wastewater of the humdrum pipe P is drained And a drain hole (230) formed therethrough.
이때, 상기 면벽 바닥 고정홀(210)은 하부에서 상부로 관통되게 형성되어 가이드 판넬(100)과의 결합이 완료된 후 상부에 무수축 몰탈(M)을 주입함에 따라 보다 견고하게 면벽(200)과 가이드 판넬(100)의 결합 상태를 유지할 수 있게 된다.In this case, the bottom wall fixing hole 210 is formed so as to penetrate from the bottom to the top, and after the connection with the guide panel 100 is completed, the non-shrinkage mortar M is injected to the top, The guide panel 100 can be maintained in the engaged state.
또한, 상기 날개벽 체결부(220)에는 상부에서 하부로 관통되는 면벽 강봉 체결홀(221)이 형성되어 후술하는 체결 강봉(400)이 끼워지면서 면벽(200)과 날개벽(300)을 고정 지지할 수 있게 된다.The wing wall fastening part 220 is provided with a surface wall fastening hole 221 penetrating from the upper part to the lower part so that the fastening rod 400 to be described later is inserted to fix and support the face wall 200 and the wing wall 300 .
상기 날개벽(300)은 상기 가이드 판넬(100)과 결합되는 바닥면에 구비되어 상기 날개벽 고정홀(120)에 결합된 인서트 강봉(130)의 상부로 끼워지며 결합되는 날개벽 바닥 고정홀(310)과, 상기 날개벽(300)의 면벽(200)과 결합되는 끝부분에 상기 면벽(200)의 날개벽 체결부(220)와 대응되는 위치에 구비되어, 상기 날개벽 체결부(220)와 서로 끼워지며 결합되는 면벽 체결부(320) 및 상기 날개벽(300)의 가이드 판넬(100)과 결합되는 하부에 상기 가이드 판넬(100)의 상면과 날개벽(300)의 측면을 지지하는 'L'자 형태의 보강 인서트(330)를 포함하여 구성된다.The wing wall 300 includes a wing wall floor fixing hole 310 formed on a bottom surface of the guide panel 100 and coupled to the upper portion of the insert steel bar 130 coupled to the wing wall fixing hole 120, And is coupled with the wing fastening part 220 of the face wall 200 at an end part of the wing wall 300 which is coupled with the face wall 200 and is engaged with the wing fastening part 220 An L-shaped reinforcing insert (not shown) for supporting the upper surface of the guide panel 100 and the side surface of the wing wall 300 is formed at a lower portion of the lower surface of the guide panel 100, which is coupled to the face wall coupling part 320 and the guide panel 100 of the wing wall 300 330).
이때, 날개벽 바닥 고정홀(310)은 하부에서 상부로 관통되게 형성되어 상기 가이드 판넬(100)과 날개벽(300)의 조립이 완료된 후 상부로 무수축 몰탈(M)을 주입함에 따라 보다 견고하게 조립상태를 유지할 수 있게 된다. In this case, the wing-wall bottom fixing hole 310 is formed to penetrate from the lower part to the upper part so that the shroud mortar M is injected into the upper part after the assembly of the guide panel 100 and the wing wall 300 is completed, State can be maintained.
또한, 상기 면벽 체결부(320)에는 상기 면벽의 날개벽 체결부(220)에 구비된 면벽 강봉 체결홀(221)과 대응되는 위치에 상하 수직방향으로 관통 형성되어 후술하는 체결 강봉(400)에 의해 면벽(200)과 결합되는 날개벽 강봉 체결홀(321)이 더 구비된다.The face wall fastening part 320 is formed with a fastening steel bar 400 which is vertically and vertically formed at a position corresponding to the face wall fastening fastening hole 221 provided in the wing fastening part 220 of the face wall And a wing wall reinforcing bar fastening hole 321 coupled to the face wall 200.
이로 인해 상기 가이드 판넬(100)과 면벽(200) 및 날개벽(300)은 시공하고자 하는 위치에 각각 별도로 조립함에 따라 간편하게 시공 완료할 수 있게 된다.Accordingly, the guide panel 100, the face wall 200, and the wing wall 300 can be easily assembled by separately assembling them at positions to be installed.
도 3은 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 각도를 조절하는 상태를 나타낸 평면도이다.3 is a plan view showing a state of adjusting the angle of a drainage induction structure of a humdrum tube according to an embodiment of the present invention.
도 3을 참조하면 본 발명은, 흄관의 배수 유도 구조물을 설치함에 있어서 공사현장 설계 반영을 위함이나, 시공 현장에 따른 특정 각도를 지향해야 할 경우 그리고 지반 형태 등에 의해 현장 맞춤이 필요한 경우등에 그에 맞는 각도로 조절하며 시공할 수 있게 된다.Referring to FIG. 3, in order to reflect a construction site design in installing a drainage induction structure of a humidifier pipe, when a specific angle is required according to a construction site, It is possible to adjust it by angle.
이때 상기 가이드 판넬(100)에 방사 형태로 다수 구비된 날개벽 고정홀(120)을 이용하여 시공하고자 하는 각도에 맞게 인서트 강봉(130)을 결합한 후 면벽(200)의 날개벽 체결부(220)와 상기 인서트 강봉(130)을 이용하여 날개벽(300)을 끼워서 원하는 각도로 시공할 수 있게 된다.At this time, the insert rod 130 is coupled to the guiding panel 100 in accordance with an angle to be used by using a plurality of radial fixing wings 120, and then the wing coupling part 220 of the side wall 200 It is possible to insert the wing wall 300 by using the insert steel bar 130 and to construct it at a desired angle.
이로 인해 별도로 제작된 판 형태의 가이드 판넬(100)과 면벽(200) 및 날개벽(300)을 시공하고자 하는 현장으로 이송하여 간편하게 시공할 수 있게 된다.Accordingly, it is possible to easily transfer the guide panel 100, the surface plate 200, and the wing wall 300, which are separately manufactured, to the site to be installed.
도 4a는 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 가이드 판넬을 시공한 상태를 나타낸 시공 상태도이다.FIG. 4A is a view showing a state in which a guide panel of a drainage induction structure of a humidifier pipe is installed according to an embodiment of the present invention. FIG.
도 4a를 참조하면, 본 발명은 터파기 된 자리에 먼저 가이드 판넬(100)을 수평 방향으로 지면과 밀착되게 시공한다.Referring to FIG. 4A, the guide panel 100 is installed horizontally in close contact with the ground on the ground.
이때, 상기 가이드 판넬(100)은 면벽 고정홀(110)이 흄관(P) 측으로 접하게 시공하고 면벽 고정홀(110)과 날개벽 고정홀(120)이 상부를 향하도록 시공한다.At this time, the guide panel 100 is installed such that the face wall fixing hole 110 is in contact with the hume pipe P side, and the face wall fixing hole 110 and the blade fixing hole 120 are directed upward.
이후 상기 면벽 고정홀(110)에 인서트 강봉(130)을 설치하고, 상기 날개벽 고정홀(120)은 시공하고자 하는 위치에 맞춰 인서트 강봉(130)을 설치한다.Thereafter, an insert steel bar 130 is installed in the face wall fixing hole 110, and the insert steel bar 130 is installed at the position where the blade fixing hole 120 is to be installed.
도 4b는 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 가이드 판넬에 면벽을 설치한 상태를 나타낸 시공 상태도이다.FIG. 4B is a construction diagram showing a state in which a face wall is installed on a guide panel of a drainage induction structure of a humidifier pipe according to an embodiment of the present invention.
도 4b를 참조하면, 가이드 판넬(100)에 설치된 인서트 강봉(130) 상부로 면벽(200)의 면벽 바닥 고정홀(210)을 끼우며 면벽(200)과 가이드 판넬(100)을 일체로 조립한다.4B, the face wall 200 and the guide panel 100 are integrally assembled by inserting the face wall bottom fixing hole 210 of the face wall 200 onto the insert steel bar 130 installed on the guide panel 100 .
이때, 상기 면벽(200)의 뒤쪽에 배수홀(230) 위치와 일치되도록 흄관(P)을 시공한다. At this time, a hump pipe (P) is installed on the rear side of the side wall (200) so as to coincide with the position of the drain hole (230).
도 4c는 본 발명의 일실시예에 따른 흄관의 배수 유도 구조물의 가이드 판넬과 면벽에 날개벽을 설치하는 상태를 나타낸 시공 상태도이다.FIG. 4c is a construction diagram showing a state in which a wing wall is installed on a guide panel and a face wall of a drainage induction structure of a hume pipe according to an embodiment of the present invention.
도 4c를 참조하면, 가이드 판넬(100) 상부에 면벽(200)이 설치된 후 상기 가이드 판넬(100)의 날개벽 고정홀(120)에 설치된 인서트 강봉(130) 상부로 날개벽(300) 하부에 구비된 날개벽 바닥 고정홀(310)을 끼우면서 면벽(200)의 날개벽 체결부(220)와 날개벽(300)의 면벽 체결부(320)를 서로 일치시켜 결합한다.Referring to FIG. 4C, after a face wall 200 is installed on a guide panel 100, the upper part of the insert rod 130 installed on the blade fixing hole 120 of the guide panel 100, When the wing wall bottom fixing hole 310 is inserted, the wing fastening part 220 of the face wall 200 and the face wall fastening part 320 of the wing wall 300 are coupled to each other.
이후 상기 날개벽 체결부(220)에 형성된 면벽 강봉 체결홀(221)과 상기 면벽 체결부(320)에 형성된 날개벽 강봉 체결홀(321)에 체결 강봉(400)을 끼워 최종 조립 완료한다. Then, the fastening steel bar 400 is inserted into the fastening bolt fastening hole 221 formed in the blade fastening part 220 and the fastening bolt fastening hole 321 formed in the face wall fastening part 320 to complete final assembly.
이때, 상기 날개벽(300)의 외측이나 내측, 또는 양측에는 별도의 보강 인서트(330)를 체결하여 날개벽(300)이 보다 견고하게 고정 유지될 수 있게 된다.At this time, a separate reinforcing insert 330 is fastened to the outer side, the inner side, or both sides of the wing wall 300, so that the wing wall 300 can be more firmly fixed.
상기와 같이 조립 완료된 배수 유도 구조물은 면벽(200)에 구비된 면벽 바닥 고정홀(210)과 날개벽(300)에 구비된 날개벽 바닥 고정홀(310)의 관통된 상부에 무수축 몰탈(M)을 충진하고, 날개벽 체결부(220) 및 면벽 체결부(320)와 지반 사이의 공간에도 무수축 몰탈(M)을 충진함에 따라 시공이 완료된다.The drainage inducing structure completed as described above is constructed such that an unshrunk mortar M is formed on the through-wall bottom fixing hole 210 provided in the face wall 200 and the penetrating upper part of the wing floor bottom fixing hole 310 provided in the wing wall 300 And the non-shrinkage mortar M is filled in the space between the wing-wall fastening part 220 and the face wall fastening part 320 and the ground. Thus, the construction is completed.
이로 인해 배수 유도 구조물을 현장에서 간편하게 설치할 수 있게 됨과 아울러 결합상태를 견고하게 유지할 수 있게 된다.As a result, the drainage inducing structure can be easily installed on the site, and the jointed state can be firmly maintained.
상기와 같이 이루어진 본 발명은, 배수 유도 구조물을 흄관의 배수구에 설치함에 있어서 분할된 형태로 이송하여 현장에서 간편하게 조립할 수 있게 됨과 아울러 공사 현장 설계 반영을 위함이나 시공 현장에 따른 특정 각도를 지향해야 할 경우, 그리고 지반 형태 등에 의해 현장 맞춤이 필요할 경우 날개벽의 각도를 조절하며 시공할 수 있어서 다양한 여건에 대응하며 시공할 수 있게 된다. In the present invention as described above, when the drainage inducing structure is installed in the drainage port of the humidifier pipe, it is transported in a divided form so that it can be easily assembled in the field. In addition, it is required to reflect a design angle of the construction site, When the site alignment is required by the ground type and the like, the angle of the wing wall can be adjusted and the construction can be carried out in accordance with various conditions.
100 : 가이드 판넬 110 : 면벽 고정홀
120 : 날개벽 고정홀 130 : 인서트 강봉
200 : 면벽 210 : 면벽 바닥 고정홀
220 : 날개벽 체결부 221 : 면벽 강봉 체결홀
230 : 배수홀 300 : 날개벽
310 : 측벽 바닥 고정홀 320 : 면벽 체결부
321 : 측벽 강봉 체결홀 330 : 보강 인서트
400 : 체결 강봉 M : 무수축 몰탈
P : 흄관
100: guide panel 110: face wall fixing hole
120: blade fixing hole 130: insert steel bar
200: face wall 210: face wall floor fixing hole
220: wing wall fastening part 221: surface wall fastening hole
230: drain hole 300: wing wall
310: side wall bottom fixing hole 320: face wall fastening portion
321: side wall steel rod fastening hole 330: reinforcement insert
400: fastening steel rod M: non-shrinkable mortar
P: Hume pipe

Claims (5)

  1. 구조물의 바닥면을 이루는 가이드 판넬(100);
    상기 가이드 판넬(100)의 상부에 설치되고 중앙에는 배수홀(230)이 형성되어 흄관(P)과 연통 설치되는 면벽(200); 및
    상기 가이드 판넬(100)의 상부에 끼워지고, 면벽(200)에 조립 설치되어 하수가 배수되는 양 측을 지지하는 날개벽(300);이 각각 별도로 제작되어 현장에서 조립 시공됨에 있어서,
    상기 가이드 판넬(100)은 흄관(P) 측 상부에 상기 면벽(200)이 끼워지며 결합되는 면벽 고정홀(110)이 형성되고, 상기 면벽(200)과 날개벽(300)이 끼워지며 결합되는 축을 중심으로 원형을 이루며 다수 배열된 날개벽 고정홀(120)이 형성되며, 상기 면벽 고정홀(110)과 날개벽 고정홀(120)에 끼워지며 결합되어 상기 가이드 판넬(100)에 면벽(200)과 날개벽(300)이 결합되는 것을 안내 및 지지하는 인서트 강봉(130)을 포함하는 것을 특징으로 하는 흄관의 배수 유도 구조물.
    A guide panel (100) forming a bottom surface of the structure;
    A face wall 200 installed at an upper portion of the guide panel 100 and having a drain hole 230 formed at the center thereof and communicating with the hood pipe P; And
    A wing wall 300 which is fitted to the upper portion of the guide panel 100 and supports both sides of the wall 200 to drain the sewage,
    The guide panel 100 is formed with a face wall fixing hole 110 in which the face wall 200 is fitted and coupled to the upper side of the hood pipe P, and a shaft, to which the face wall 200 and the wing wall 300 are fitted, And a wing wall fixing hole 120 is formed in the center of the guide wall 100. The wing wall fixing hole 110 and the wing wall fixing hole 120 are fitted and coupled to the guide panel 100, And an insert rod (130) for guiding and supporting the coupling part (300).
  2. 삭제delete
  3. 청구항 1에 있어서,
    상기 면벽(200)은 상기 면벽(200)의 하부에 형성되어 상기 가이드 판넬(100)의 면벽 고정홀(110)에 설치되는 인서트 강봉(130)의 상부로 끼워지며 결합되는 면벽 바닥 고정홀(210)과, 상기 면벽(200)의 양측에 구비되어 상기 날개벽(300)과 끼워지며 결합되는 날개벽 체결부(220) 및 상기 면벽(200)의 중앙에 상기 흄관(P)의 배수구와 연통되게 관통 형성되는 배수홀(230)을 포함하는 것을 특징으로 하는 흄관의 배수 유도 구조물.
    The method according to claim 1,
    The face wall 200 is formed at a lower portion of the face wall 200 and is inserted into an upper portion of an insert steel bar 130 installed in a face wall fixing hole 110 of the guide panel 100, A wing fastening part 220 provided at both sides of the face wall 200 to be engaged with and coupled to the wing wall 300 and a wing fastening part 220 formed at the center of the face wall 200 to communicate with a drain port of the humdrum pipe P And a drain hole (230) formed in the drain hole (230).
  4. 청구항 3에 있어서,
    상기 날개벽(300)은 상기 날개벽(300)의 하부에 구비되어 상기 가이드 판넬(100)의 날개벽 고정홀(120)에 설치되는 인서트 강봉(130)의 상부로 끼워지며 결합되는 날개벽 바닥 고정홀(310)과, 상기 면벽(200)의 양측에 구비된 날개벽 체결부(220)에 끼워지며 결합되는 면벽 체결부(320) 및 상기 날개벽의 면벽 체결부(320) 및 상기 날개벽(300)의 내측이나 외측, 또는 양측에 다수로 결합되어 날개벽(300)의 지지력을 보강하는 보강 인서트(330)를 포함하는 것을 특징으로 하는 흄관의 배수 유도 구조물.
    The method of claim 3,
    The wing wall 300 is provided at a lower portion of the wing wall 300 and has a wing wall bottom fixing hole 310 which is fitted to and joined to an upper portion of the insert steel bar 130 installed in the wing wall fixing hole 120 of the guide panel 100 And a side wall fastening part 320 which is fitted to and bonded to a wing fastening part 220 provided on both sides of the face wall 200. The side wall fastening part 320 and the face wall fastening part 320 of the wing wall and the inside or outside of the wing wall 300 , Or a plurality of reinforcing inserts (330) coupled to both sides to reinforce the supporting force of the wing wall (300).
  5. 청구항 4에 있어서,
    상기 면벽(200)에 구비된 날개벽 체결부(220)와, 상기 날개벽(300)에 구비된 면벽 체결부(320)는 중앙에 형성된 면벽 강봉 체결홀(221)과 날개벽 강봉 체결홀(321)에 체결 강봉(400)이 관통되게 끼워지며 결합되어 상기 면벽(200)과 날개벽(300)을 고정 지지하는 것을 특징으로 하는 흄관의 배수 유도 구조물.
    The method of claim 4,
    The wing fastening part 220 provided on the face wall 200 and the face wall fastening part 320 provided on the wing wall 300 are provided with a face wall reinforcing fastening hole 221 and a wing wall fastening fastening hole 321 Wherein the fastening steel bar (400) is pierced and coupled so as to fixedly support the side wall (200) and the wing wall (300).
KR1020170047329A 2017-04-12 2017-04-12 Drainage induction structure of hume pipe KR101965634B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170047329A KR101965634B1 (en) 2017-04-12 2017-04-12 Drainage induction structure of hume pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170047329A KR101965634B1 (en) 2017-04-12 2017-04-12 Drainage induction structure of hume pipe

Publications (2)

Publication Number Publication Date
KR20180115102A KR20180115102A (en) 2018-10-22
KR101965634B1 true KR101965634B1 (en) 2019-04-03

Family

ID=64102578

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170047329A KR101965634B1 (en) 2017-04-12 2017-04-12 Drainage induction structure of hume pipe

Country Status (1)

Country Link
KR (1) KR101965634B1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200355875Y1 (en) * 2004-04-14 2004-07-09 (주)삼영엔지니어링 Mounting structure of drain pipe for road

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980068733U (en) * 1998-09-08 1998-12-05 윤수열 Face wall for water pipe installation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200355875Y1 (en) * 2004-04-14 2004-07-09 (주)삼영엔지니어링 Mounting structure of drain pipe for road

Also Published As

Publication number Publication date
KR20180115102A (en) 2018-10-22

Similar Documents

Publication Publication Date Title
KR101506782B1 (en) In-Site Molding Apparatus for manufacturing In-site Concrete Culverts with assembled Partial Precast Concrete
KR100588445B1 (en) Method for installation of environment friendly electric utility pole
KR100710920B1 (en) Apparatus for draining subsurface water
KR101648704B1 (en) Underground wall structure
CN106703077B (en) Integral underground comprehensive pipe gallery structure of prefabricated assembly
KR20170032826A (en) Precast concrete dual wall structure and construction method thereof
CN207405730U (en) A kind of discharge structure of basement
KR101675441B1 (en) Integrated wall structure, form and manufacturing method for integrated wall structure
KR101965634B1 (en) Drainage induction structure of hume pipe
KR101965801B1 (en) Assembly manhole apparatus for connecting hume pipe and constructing method thereof
KR100487838B1 (en) Prefabricated retaining wall and it's construction method
KR200387408Y1 (en) Knockdown basic-block
KR200428388Y1 (en) Power transmission manhole
KR101808833B1 (en) Floor structure of underground floor with reduced floor height using shear reinforcement and the construction method thereof
KR100982819B1 (en) A prefabricated drain-road
KR101908943B1 (en) RC WALL STRUCTURE FOR TOP-DOWN AND METHOD FOR CONSTRUCTING THE STRUCTUREa
KR100740052B1 (en) Power transmission manhole
KR20150073562A (en) Sump supported by a concrete foundation
KR100665210B1 (en) Concrete mold for manhole manufacture
JP4475116B2 (en) Vertical shaft structure and its construction method
KR100462236B1 (en) panel for external underground wall of building, structure and construction method using the same
KR20070095695A (en) Half assembly-typed construction system and method of common duct
JP6422084B2 (en) Underground space construction method
KR101753744B1 (en) Structure and Constructing Method of Integrated Pier-Base
KR100669198B1 (en) Wall structure unified the finish material

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right