Pedestrian bridge and construction method thereof Download PDF

Info

Publication number
KR101948649B1
KR101948649B1 KR1020180062312A KR20180062312A KR101948649B1 KR 101948649 B1 KR101948649 B1 KR 101948649B1 KR 1020180062312 A KR1020180062312 A KR 1020180062312A KR 20180062312 A KR20180062312 A KR 20180062312A KR 101948649 B1 KR101948649 B1 KR 101948649B1
Authority
KR
South Korea
Prior art keywords
cable
deck
coupled
fixing
coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
KR1020180062312A
Other languages
Korean (ko)
Inventor
나복용
Original Assignee
선풍종합건설 주식회사
나복용
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 선풍종합건설 주식회사, 나복용 filed Critical 선풍종합건설 주식회사
Priority to KR1020180062312A priority Critical patent/KR101948649B1/en
Application granted granted Critical
Publication of KR101948649B1 publication Critical patent/KR101948649B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

전후방향을 따라 복수의 데크(110)가 열지어 형성된 데크부(100); 데크부(100)에 결합되어 데크부(100)의 자중 및 보도하중(P)을 지지하는 제1케이블(C1); 제1케이블(C1)의 양 단부를 지지하기 위해 한 쌍으로 설치되는 케이블 고정부(200);를 포함하되, 데크(110)의 모서리에는 상측으로 돌출 형성된 전방일측 기둥부(120a), 전방타측 기둥부(120b), 후방일측 기둥부(120c), 후방타측 기둥부(120d)를 포함하는 기둥부(120)가 형성되고, 제1케이블(C1)은 전방일측 기둥부(120a), 전방타측 기둥부(120b), 후방일측 기둥부(120c), 후방타측 기둥부(120d)의 외측으로 각각 돌출 형성된 제1케이블 결합부(130)에 전후방향을 따라 결합되며, 복수의 데크(110)는 보도하중(P)에 의해 상호 벌어지는 것이 방지되도록 유격제한 장치(300)에 의해 상호 결합된다.
본 발명은 도 4와 같이 복수의 데크(110)가 전후 방향을 따라 제1케이블(C1)에 의해 열지어 결합되는 현수 구조의 보도교 이다.
현수 보도교의 특성에 의해 이웃하는 한 쌍의 데크(110)는 풍하중 및 보도하중(P)에 의해 상호 사이 간격이 벌이지게 되는데, 이를 방지하기 위하여 유격제한 장치(300)가 설치된다.
A deck part (100) in which a plurality of decks (110) are formed by being opened along the forward and backward directions; A first cable C1 coupled to the deck part 100 to support the self weight and the sidewise load P of the deck part 100; And a cable fixing part 200 which is installed in a pair to support both ends of the first cable C1. The corner of the deck 110 is provided with a front one side pole part 120a protruded upward, A column 120 including a column 120b, a rear one-side column 120c and a rear second column 120d is formed and the first cable C1 is connected to the front one-side post 120a, The plurality of decks 110 are coupled to the first cable coupling part 130 protruding from the outer side of the pillar part 120b, the rear side pillar part 120c and the rear side second pillar part 120d, Are coupled to each other by the clearance restricting device (300) so as to be prevented from spreading by the press load (P).
As shown in Fig. 4, the present invention is a pedestrian bridge having a suspended structure in which a plurality of decks 110 are coupled by being opened and closed by a first cable C1 along the longitudinal direction.
The pair of decks 110 adjacent to each other due to the characteristics of the suspension bridges are spaced apart from each other by the wind load and the sidewalk load P, and a clearance limiting device 300 is installed to prevent this.

Description

현수 보도교 및 그 시공방법{PEDESTRIAN BRIDGE AND CONSTRUCTION METHOD THEREOF}{PEDESTRIAN BRIDGE AND CONSTRUCTION METHOD THEREOF}

본 발명은 건설분야에 관한 것으로서, 상세하게는 현수 보도교 및 그 시공방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction field, and more particularly, to a suspension bridge and a construction method thereof.

자연훼손을 최소화하고, 공사기간을 단축하여 친환경적인 공사를 추구하고자 하는 노력이 활발히 이루어지고 있다. 건설기술에서의 친환경성은 상술한 바와 같이, 자연훼손을 최소화 하고, 시공기간을 단축하여 빠른 시간내에 훼손된 자연을 복구하는 것을 말한다.Efforts are being actively pursued to minimize environmental damage and shorten the construction period to pursue eco-friendly construction. As mentioned above, the eco-friendliness in construction technology means restoration of damaged nature in a short time by minimizing natural damage and shortening construction period.

특히, 산림지역이나 국립공원 내에 설치되는 공공시설물은 최소한의 환경훼손과 신속한 급속공사를 필요로 한다.In particular, public facilities installed in forests or national parks require minimal environmental degradation and rapid rapid construction.

교량(인도교)의 시공에 있어서 친환경적인 기술이라 함은 교각의 개수를 줄이고, 부대시설(부대시설이란 구조물의 시공을 위해 설치되는 동바리, 작업로, 밴트 등의 임시 구조물을 말한다.)을 최소화 하여 자연훼손을 줄이는 것이다.Environment-friendly technology in the construction of bridges (footbridge) means to reduce the number of bridge piers and to minimize the number of bridge facilities (auxiliary facilities means temporary structures such as bridge, work road, It is to reduce natural damage.

아울러, 공기단축을 통하여 훼손된 자연을 신속하게 복구하는 것이 중요하다.In addition, it is important to quickly recover the damaged nature through shortening of the air.

대한민국특허 제10-2013-0064256호 '현수보도교 및 그 시공방법'은 기초부와, 기초부에 세워 설치되며 메인케이블을 정착시키며 메인케이블에 장력을 부여하는 메인케이블 정착부와 상기 백스테이 케이블의 일끝단이 체결되는 백스테이 케이블 정착플레이트를 갖는 주탑과, 상기 주탑 사이에 설치되며 상기 주탑의 상부에 정착 고정되는 메인케이블과, 일끝단은 상기 주탑의 상부에 체결되고 타끝단은 상기 백스테이 고정용 기초부에 체결되는 백스테이 케이블과, 상기 주탑사이에 설치되는 바닥케이블과 상기 바탁케이블에 체결되는 바닥판을 포함하는 발판부를 구비하며, 상기 메인케이블 정착부와 상기 백스테이 케이블 정착플레이트는 서로 다른 축을 구비하여 상기 메인케이블과 상기 백스테이 케이블은 상기 주탑의 상부에서 서로 다른 지점에서 상기 주탑에 정착되고, 메인케이블은 동일한 크기의 모노케이블이 하나 이상 설치되어 구성되어, 각각의 케이블에 상응하는 와이어를 별도로 제작할 필요없이 하나의 모노케이블을 현장에 반입하여 필요에 따라 적절한 길이로 절단하여 사용할 수 있으므로, 제조 및 시공이 용이하고, 크기와 무게가 작은 하나의 모노케이블로써 설치가 가능하기 때문에 시공에 필요한 장비도 또한 소형화할 수 있으므로 시공이 간편하고 시공비용을 절감할 수 있다.Korean Patent No. 10-2013-0064256 entitled " Suspension bridge bridge and method of construction thereof " is a suspension bridging bridge comprising: a base part; a main cable fixing part erected on a base part and fixing the main cable and applying tension to the main cable; A main cable installed between the main tower and fixed to the upper part of the main tower; one end of the main cable is fastened to the upper part of the main tower and the other end is fixed to the back stay fixing The main cable fixing unit and the backstay cable fixing plate are connected to each other by a cable connecting the main cable fixing unit and the backstay cable fixing plate to each other. Wherein the main cable and the backstay cable are provided at different points on the top of the main tower, And the main cable is constituted by one or more mono cables of the same size, so that one mono cable is brought into the field without cutting the wire corresponding to each cable separately and cut to an appropriate length as necessary Because it can be used, it is easy to manufacture and install, and it can be installed with a single mono cable of small size and weight. Therefore, equipment required for construction can be also miniaturized, so that construction can be simplified and construction cost can be reduced.

대한민국특허 제10-2017-0055010호 '세그먼트형 현수바닥판 구조 및 이를 이용한 현수보도교의 시공방법'은 현장에서 콘크리트를 타설하지 않고 공장에서 미리 제작된 다수 개의 세그먼트형 현수바닥판의 구조에관한 것으로서, 상기 현수바닥판 구조는 교량의 바닥판을 구성하는 바닥세그먼트와, 상기 바닥세그먼트를 지지하면서 상기 메인케이블에 의해 현수되는 현수거치빔으로 이루어지는 것으로서, 상기 바닥세그먼트는, 양측에 위치한 각 지지빔, 상기 지지빔의 각 상부플랜지 사이에 설치되는 상판, 상기 지지빔의 각 웨브 사이 또는 각 하부플랜지 사이에 설치되는 쉘플레이트 및, 상기 쉘플레이트의 상부에서 쉘플레이트와 각 지지빔 및 상판을 일체화시키는 쉘지지대로 이루어지고, 상기 현수거치빔은, 양측단에 위치하면서 메인케이블에 연결된 행어케이블의 단부가 고정되는 행잉부와, 중앙에 위치하면서 상기 바닥세그먼트가 거치될 수 있도록 하부로 오목한 거치홈이 형성되도록 양측의 단턱플레이트와 거치플레이트가 구비되는 거치부로 이루어지는 것을 특징으로 한다.Korean Patent No. 10-2017-0055010 " Segment type hanging bottom plate structure and method for constructing a hanging bridge using the same " relates to a structure of a plurality of segment hanging bottom plates manufactured in the factory without placing concrete in the field Wherein the suspended bottom plate structure comprises a bottom segment constituting a bottom plate of the bridge and a suspended suspension beam suspended by the main cable while supporting the bottom segment, A shell plate disposed between each of the webs of the support beams or between each of the lower flanges and a shell for integrating the shell plate with the support beams and the top plate at the top of the shell plate, Wherein the suspension beam is located at both ends and is connected to the main cable And the hanging portion is a fixed end of the control cable, characterized in that formed parts are provided with a stepped mounting plate and the mounting plate at both sides and at the center so that the concave mounting groove is formed in the bottom so that the bottom segments can be mounted.

대한민국특허 제10-2009-0077983호 '현수 보도교 및 그 시공방법'은 보행자의 통행을 위해 2개의 이격된 위치를 잇는 길이로 형성된 보강형과; 상기 보강형의 일단부 근처에 세워진 제1주탑과; 상기 보강형의 타단부 근처에 세워진 제2주탑과 ; 상기 보강형의 길이 방향을 따라 상기 보강형의 양측 외측에 각각 배열되도록 상기 제1주탑과 상기 제2주탑의 사이를 연결하는 한 쌍의 주 케이블과; 상기 보강형의 길이 방향을 따라 서로 간격을 두고 상기 보강형과 상기 주 케이블을 연직 방향에 대하여 경사지게 연결하는 다수의 행어 케이블을; 포함하여 구성되어, 주 케이블이 상기 보강형의 양측의 외측(外側)에 위치하고, 행어 케이블이 지면에 연직 방향과 경사지게 배열됨으로써, 행어 케이블의 긴장력의 수평 분력에 의한 구속력이 보강형의 교축 횡방향의 바깥쪽으로 잡아당기도록 작용하여, 경간이 짧고 가벼운 보도용 보강형의 횡방향으로의 흔들림 변위를 억제하여 통행자들이 안정감있게 통행할 수 있으면서 심미감있는 외관을 갖는 현수 보도교 및 그 시공 방법을 제공한다.Korean Patent No. 10-2009-0077983 'Suspension bridge and its construction method' is composed of a reinforcing type having a length connecting two spaced positions for pedestrian's passage; A first main tower erected near one end of the reinforcing die; A second main tower installed near the other end of the reinforcing type; A pair of main cables connecting the first main tower and the second main tower so as to be respectively arranged on both sides of the reinforcing type along the longitudinal direction of the reinforcing type; A plurality of hanger cables connecting the reinforcing die and the main cable at an interval from each other along the longitudinal direction of the reinforcing die in an inclined relation with respect to the vertical direction; Wherein the main cable is located on the outside (outside) of both sides of the reinforcing type, and the hanger cables are arranged on the ground in an inclined manner with respect to the vertical direction so that the restraining force due to the horizontal component of the tensional force of the hanger cables, To provide a hanging pedestrian bridge which has a short span and has a light span and can suppress a lateral displacement of a sideways stiffening type so that passengers can pass through in a stable manner while having aesthetically pleasing appearance and a construction method thereof do.

대한민국특허 제10-2013-0064256호Korean Patent No. 10-2013-0064256 대한민국특허 제10-2017-0055010호Korean Patent No. 10-2017-0055010 대한민국특허 제10-2009-0077983호Korean Patent No. 10-2009-0077983

본 발명은 교각을 설치하지 않아 자연훼손을 최소화하고, 공사기간을 단축할 수 있는 현수 보도교 및 그 시공방법을 제시한다.The present invention proposes a suspension bridge capable of minimizing natural damages and shortening a construction period without installing a bridge pier and a construction method thereof.

상기 과제의 해결을 위하여, 전후방향을 따라 복수의 데크(110)가 열지어 형성된 데크부(100); 상기 데크부(100)에 결합되어 상기 데크부(100)의 자중 및 보도하중(P)을 지지하는 제1케이블(C1); 상기 제1케이블(C1)의 양 단부를 지지하기 위해 한 쌍으로 설치되는 케이블 고정부(200);를 포함하되, 상기 데크(110)의 모서리에는 상측으로 돌출 형성된 전방일측 기둥부(120a), 전방타측 기둥부(120b), 후방일측 기둥부(120c), 후방타측 기둥부(120d)를 포함하는 기둥부(120)가 형성되고, 상기 제1케이블(C1)은 상기 전방일측 기둥부(120a), 전방타측 기둥부(120b), 후방일측 기둥부(120c), 후방타측 기둥부(120d)의 외측으로 각각 돌출 형성된 제1케이블 결합부(130)에 전후방향을 따라 결합되며, 상기 복수의 데크(110)는 상기 보도하중(P)에 의해 상호 벌어지는 것이 방지되도록 유격제한 장치(300)에 의해 상호 결합된다.In order to solve the above-described problems, a deck part (100) having a plurality of decks (110) A first cable (C1) coupled to the deck part (100) and supporting a self weight and a sidewise load (P) of the deck part (100); And a pair of cable fixing parts 200 installed to support both ends of the first cable C1. The deck 110 has a front one-side pole part 120a protruded upward, The first cable C1 is formed with the front one-side post 120a, the rear one-side post 120b, the rear one-side post 120c, and the rear second post 120d, Rear direction and connected to the first cable coupling part 130 protruding outward from the front second column part 120b, the rear one-side column part 120c and the rear second column part 120d, The decks 110 are coupled to each other by the clearance restricting device 300 so as to be prevented from spreading by the sidewall load P.

상기 유격제한 장치(300)는 상기 데크(110)의 전방으로 돌출 결합된 고정부(310); 상기 데크(110)의 후방으로 돌출 결합된 유격제한부(320); 측방향을 따라 상기 고정부(310)와 상기 유격제한부(320)에 공통으로 삽입되는 고정핀(330);을 포함하고, 상기 데크(110)의 측방향을 따라, 상기 고정부(310)와 상기 유격제한부(320)는 각각 상호 간격을 두고 복수가 결합되되, 이웃하여 결합되는 복수의 데크(110) 중 전방 데크(110a)에 결합된 상기 유격제한부(320)는 후방 데크(110b)에 결합된 상기 고정부(310)의 사이 공간(S)에 끼워지는 구조로 상호 결합되는 것이 바람직하다.The clearance limiting device 300 includes a fixing part 310 protruded and coupled to the front of the deck 110; A clearance restricting portion 320 protrudingly coupled to the rear of the deck 110; And a fixing pin 330 commonly inserted into the fixing part 310 and the clearance restricting part 320 along the lateral direction of the fixing part 310, The clearance restricting portion 320 coupled to the front deck 110a of the plurality of decks 110 adjacent to each other with a gap therebetween may be disposed in the rear deck 110b (S) of the fixing part (310) coupled to the fixing part (310).

상기 유격제한부(320)에는 상기 고정핀(330)이 관통되어 전후방향을 따라 유격되도록, 전후방향을 따라 장공으로 형성된 공간부(321)가 형성되고, 상기 고정핀(330)은 상기 고정부(310)에 고정되는 것이 바람직하다.The clearance restricting portion 320 is formed with a space portion 321 formed as a long hole along the forward and backward direction so that the fixing pin 330 penetrates and is spaced along the forward and backward directions, (Not shown).

상기 고정부(310)의 전면과 상기 유격제한부(320)의 후면에는 고무패드(400)가 설치된 것이 바람직하다.A rubber pad 400 may be provided on the front surface of the fixing portion 310 and the rear surface of the clearance limiting portion 320.

상기 제1케이블 결합부(130)는 상기 기둥부(120)의 외측으로 돌출 형성된 돌부(131); 상기 돌부(131)의 외측 가장자리에서 하측으로 돌출 형성된 기립부(132); 상기 기둥부(120), 상기 돌부(131), 상기 기립부(132)에 의해 형성된 케이블 설치 공간부(133); 상기 케이블 설치 공간부(133)의 하측 개구부를 폐쇄하도록 결합되는 덮개부(134);를 포함하는 것이 바람직하다.The first cable coupling part 130 includes: a protrusion 131 protruding outward from the pillar 120; An upstanding portion 132 protruded downward from an outer edge of the protrusion 131; A cable installation space 133 formed by the pillar 120, the protrusion 131, and the rising portion 132; And a lid part 134 coupled to close the lower opening of the cable installation space part 133.

케이블 설치 공간부(133)에는 상기 제1케이블(C1)이 관통되는 관통홀(h)이 형성된 케이블 정착장치(135)가 설치되되, 상기 케이블 정착장치(135)는 상기 제1케이블(C1)의 상면을 덮도록 설치되는 상부 정착장치(135a); 상기 제1케이블(C1)의 하면을 덮도록 설치되는 하부 정착장치(135b);를 포함하는 것이 바람직하다.The cable fixing unit 135 is provided with a through hole h through which the first cable C1 passes, and the cable fixing unit 135 is connected to the first cable C1, An upper fixing unit 135a installed to cover the upper surface of the fixing unit 135a; And a lower fixing unit 135b installed to cover the lower surface of the first cable C1.

상기 케이블 고정부(200)에는 제2케이블(C2)이 결합되되, 상기 제2케이블(C2)은 상하방향을 기준으로, 상기 기둥부(120)의 측방 하측 영역에서 외측으로 돌출된 제2케이블 결합부(140)에 결합되고, 상기 제1케이블(C1)과 상기 제2케이블(C2)이 측방향을 따라 서로 다른 위치에 설치되도록, 상기 제2케이블 결합부(140)와 상기 제1케이블 결합부(130)는 측방으로 돌출된 정도가 서로 상이한 것이 바람직하다.The second cable C2 is connected to the cable fixing part 200 and the second cable C2 is connected to the second cable C2 protruding outward from the lower side area of the column part 120, The first cable coupling part 140 and the second cable coupling part 140 are coupled to the coupling part 140 such that the first cable C1 and the second cable C2 are installed at different positions along the lateral direction, It is preferable that the joint portions 130 have different degrees of projecting laterally.

상기 데크부(100)의 전도를 방지하기 위해, 양 단부는 상기 케이블 고정부(200)의 측방으로 이격된 측방고정부(210)에 고정되고, 중앙부(C3-a)는 상기 데크부(100)에 결합되는 제3케이블(C3)을 더 포함하는 것이 바람직하다.Both ends of the cable fixing part 200 are fixed to the lateral fixing part 210 which is spaced laterally of the cable fixing part 200 and the central part C3-a is fixed to the deck part 100 And a third cable (C3) coupled to the second cable (C3).

상기 제3케이블(C3)의 상기 중앙부(C3-a)는 상기 데크부(100)의 중앙부에 결합된 상기 복수의 데크(110) 상기 제1케이블 결합부(130)에 결합되는 것이 바람직하다.The central portion C3-a of the third cable C3 is coupled to the first cable coupling portion 130 of the plurality of decks 110 coupled to the central portion of the deck portion 100. [

상기 제3케이블(C3)의 상기 중앙부(C3-a)는 상기 제1케이블 결합부(130)에 결합된 제1케이블(C1)의 외측 영역에 결합되도록, 상기 케이블 정착장치(135)에는 복수의 상기 관통홀(h)이 형성되고, 상기 하부 정착장치(135b)는 상기 복수의 관통홀(h)을 각각 형성하도록 내측 하부정착장치(135b-1) 및 외측 하부정착장치(135b-2)를 포함하며, 상기 덮개부(134)는 상기 내측 하부정착장치(135b-1) 및 상기 외측 하부정착장치(135b-2)에 대응하는 내측덮개부(134-1) 및 외측덮개부(134-2)를 구비한 것이 바람직하다.The central portion C3-a of the third cable C3 is coupled to the outer region of the first cable C1 coupled to the first cable coupling portion 130, The lower fixing device 135b is provided with an inner lower fixing device 135b-1 and an outer lower fixing device 135b-2 so as to form the plurality of through holes h, And the lid part 134 includes an inner lid part 134-1 and an outer lid part 134-1 corresponding to the inner lower fixing device 135b-1 and the outer lower fixing device 135b- 2).

상기 제3케이블(C3)의 상기 중앙부(C3-a)에는 일단은 상기 제1케이블 결합부(130)의 측방에 결합되고, 타단은 상기 제3케이블(C3)에 결합되는 제4케이블(C4)이 설치된 것이 바람직하다.One end of the third cable C3 is coupled to a side of the first cable coupling part 130 and the other end of the fourth cable C4 is coupled to the third cable C3. Is preferably installed.

상기 제3케이블(C3)의 상기 중앙부(C3-a)에는 일단은 상기 제2케이블 결합부(140)의 측방에 결합되고, 타단은 상기 제3케이블(C3)에 결합되는 제4케이블(C4)이 설치된 것이 바람직하다.One end of the third cable C3 is coupled to the center of the third cable C3 and the other end of the fourth cable C4 is coupled to the third cable C3. Is preferably installed.

상기 제3케이블(C3)은 상기 데크부(100)의 측방 상측 영역에 위치되도록 설치되되, 상기 중앙부(C3-a)는 상기 데크부(100)를 향하여 볼록한 만곡구조로 설치된 것이 바람직하다.It is preferable that the third cable C3 is installed at a side upper side region of the deck part 100 and the center part C3-a is formed in a curved convex shape toward the deck part 100. [

상기 제2케이블 결합부(140)는 상기 제2케이블(C2)의 상면을 덮도록 하면에서 상향으로 상향 홈(141h)이 형성된 결합부 상부(141); 상기 제2케이블(C2)의 하면을 덮도록 상면에서 하향으로 하향 홈(142h)이 형성된 결합부 하부(142);를 구비하고, 상기 상향 홈(141h)과 상기 하향 홈(142h)으로 형성된 홈에 결합되는 상기 제2케이블(C2)의 외면에는 케이블커버(160)가 설치되는 것이 바람직하다.The second cable coupling portion 140 includes an upper portion 141 of the coupling portion 141 having an upward groove 141h formed upwardly in the lower surface thereof so as to cover the upper surface of the second cable C2. And a coupling portion lower portion 142 formed with a downward groove 142h downward from the upper surface so as to cover the lower surface of the second cable C2. The coupling portion lower portion 142 includes a groove formed by the upward groove 141h and the downward groove 142h And a cable cover 160 is installed on the outer surface of the second cable C2.

상기 케이블커버(160)는 상기 제2케이블 결합부(140)를 통해 상기 제2케이블(C2)에 전달되는 하중을 분산시키기 위해 전후방향을 기준으로, 상기 제2케이블 결합부(140)의 전방과 후방으로 각각 돌출되도록 형성된 것이 바람직하다.The cable cover 160 is disposed at a front side of the second cable coupling part 140 with respect to the front and rear direction to disperse a load transmitted to the second cable C2 through the second cable coupling part 140. [ And to be protruded rearward.

본 발명의 일 실시 예에 따른 현수 보도교 시공방법은 상기 케이블 고정부(200)를 설치하는 케이블 고정부 설치단계; 상기 케이블 고정부(200)에 상기 제1 케이블(C1), 상기 제2 케이블(C2)을 설치하고, 상기 측방고정부(210)에 제3 케이블(C3)을 설치하는 케이블 설치단계; 상기 한 쌍의 케이블 고정부(200) 중 전방에 설치된 상기 케이블 고정부(200)에서, 상기 제1 케이블(C1), 상기 제2케이블(C2)이 결합되도록 상기 테크(110)를 설치하는 테크결합단계; 상기 데크결합단계를 반복수행하되, 먼저 설치된 상기 데크(110)를 후방으로 밀어내면서 다음 상기 데크(110)를 설치하는 데크부 형성단계; 상기 제3케이블(C3)을 상기 데크(110)에 결합시키는 제3케이블 고정단계;를 포함하는 것이 바람직하다.A method of constructing a suspension bridge structure according to an embodiment of the present invention includes: a cable fixing part mounting step of installing the cable fixing part 200; A cable installation step of installing the first cable (C1) and the second cable (C2) in the cable fixing part (200) and installing the third cable (C3) in the side fixing part (210); The cable 110 is installed in the cable fixing part 200 installed in front of the pair of cable fixing parts 200 so that the first cable C1 and the second cable C2 are coupled to each other. Bonding step; A deck forming step of repeating the deck attaching step, wherein the deck 110 is installed while pushing the installed deck 110 backward; And a third cable fixing step of coupling the third cable (C3) to the deck (110).

상기 데크결합단계는 이웃하여 결합되는 상기 복수의 데크(110) 중 상기 전방 데크(110a)에 결합된 상기 유격제한부(320)와 상기 후방 데크(110b)에 결합된 상기 고정부(310)에 상기 고정핀(330)을 설치하는 유격제한장치결합단계;를 더 포함하는 것이 바람직하다.The deck joining step includes joining the clearance restricting part 320 coupled to the front deck 110a among the plurality of decks 110 adjacent to each other and the fixing part 310 coupled to the rear deck 110b And a step of engaging the restraint pin 330 to attach the restraint pin 330.

본 발명은 케이블을 이용한 현수 타입의 보도교로서, 교각을 설치하지 않기 때문에 자연훼손을 최소화하고, 공사기간을 단축할 수 있다.The present invention is a suspension bridge of a suspension type using a cable. Since a pier is not installed, natural damage can be minimized and the construction period can be shortened.

도 1은 대한민국특허 제10-2013-0064256호의 현수보도교를 나타내는 도면.
도 2는 대한민국특허 제10-2017-0055010호의 현수바닥판 구조를 나타내는 도면.
도 3은 대한민국특허 제10-2009-0077983호의 현수 보도교의 구성을 도시한 사시도.
도 4는 본 발명의 일 실시 예에 따른 현수보도교 사시도.
도 5는 본 발명의 일 실시 예에 따른 제1케이블과 제2케이블이 결합된 데크 단면도.
도 6은 본 발명의 일 실시 예에 따른 기둥부와 유격제한장치가 결합된 데크 사시도.
도 7은 본 발명의 일 실시 예에 따른 기둥부와 유격제한장치가 결합된 데크평면도.
도 8은 본 발명의 일 실시 예에 따른 고정부와 유격제한부를 나타내는 도면.
도 9는 본 발명의 일 실시 예에 따른 전방 데크에 결합된 유격제한부와 후방 데크에 결합된 고정부가 결합된 것을 나타내는 도면.
도 10은 본 발명의 또 다른 실시 예에 따른 제1케이블 결합부 단면도.
도 11은 본 발명의 일 실시 예에 따른 내측 하부정착장치와 외측 하부정착장치를 나타내는 사시도.
도 12는 본 발명의 일 실시 예에 따른 내측 하부정착장치와 외측 하부정착장치가 결합된 제1케이블 결합부를 나타내는 도면.
도 13은 본 발명의 일 실시 예에 따른 제1케이블 결합부에 제3케이블이 결합된 것을 나타내는 도면.
도 14는 본 발명의 일 실시 예에 따른 제4케이블이 제3케이블과 제1케이블결합부에 결합된 것을 나타내는 도면.
도 15는 본 발명의 일 실시 예에 따른 제4케이블이 제3케이블과 제2케이블 결합부에 결합된 것을 나타내는 사시도.
도 16은 본 발명의 일 실시 예에 따른 제4케이블이 제3케이블과 제1케이블결합부에 결합된 것을 나타내는 평면도.
도 17은 본 발명의 일 실시 예에 따른 제3케이블이 제1케이블결합부에 결합된 것을 나타내는 단면도.
도 18은 본 발명의 일 실시 예에 따른 제3케이블이 제1케이블결합부에 결합된 것을 나타내는 평면도.
도 19는 본 발명의 일 다른 실시 예에 따른 제2케이블결합부 단면도.
도 20은 본 발명의 또 다른 실시 예에 따른 케이블커버가 결합된 제2케이블이 제2케이블 결합부에 결합된 것을 나타내는 도면.
도 21은 본 발명의 일 실시 예에 따른 제2케이블에 케이블커버가 결합된 것을 나타내는 사시도.
1 is a view showing a suspension bridge of Korean Patent No. 10-2013-0064256.
2 is a view showing a suspension bottom plate structure of Korean Patent No. 10-2017-0055010.
3 is a perspective view showing the configuration of a suspension bridge of Korean Patent No. 10-2009-0077983.
4 is a perspective view of a suspension bridge according to an embodiment of the present invention;
5 is a cross-sectional view of a deck in which a first cable and a second cable are coupled according to an embodiment of the present invention;
FIG. 6 is a deck perspective view of a pole unit and a clearance limiting device according to an embodiment of the present invention. FIG.
FIG. 7 is a deck plan view of a pillar combined with a clearance limiting device according to an embodiment of the present invention; FIG.
8 is a view showing a fixed portion and a clearance limiting portion according to an embodiment of the present invention.
Figure 9 is a view showing a combination of a clearance restricting portion coupled to the front deck and a securing portion coupled to the rear deck according to an embodiment of the present invention.
10 is a cross-sectional view of a first cable coupling according to another embodiment of the present invention.
11 is a perspective view showing an inner lower fixing device and an outer lower fixing device according to an embodiment of the present invention.
12 is a view showing a first cable coupling portion in which an inner lower fixing device and an outer lower fixing device are combined according to an embodiment of the present invention.
13 is a view showing a third cable coupled to a first cable coupling according to an embodiment of the present invention;
14 is a view showing that a fourth cable according to an embodiment of the present invention is coupled to the third cable and the first cable coupling portion;
15 is a perspective view illustrating a fourth cable according to an embodiment of the present invention coupled to a third cable and a second cable coupling;
16 is a plan view showing that a fourth cable according to an embodiment of the present invention is coupled to the third cable and the first cable coupling portion;
17 is a cross-sectional view showing that a third cable according to an embodiment of the present invention is coupled to the first cable coupling portion;
18 is a plan view showing that a third cable according to an embodiment of the present invention is coupled to the first cable coupling portion.
19 is a cross-sectional view of a second cable coupling according to another embodiment of the present invention.
20 is a view showing that a second cable coupled with a cable cover according to another embodiment of the present invention is coupled to the second cable coupling portion.
21 is a perspective view showing a cable cover coupled to a second cable according to an embodiment of the present invention;

본 발명에 따른 현수 보도교 및 그 시공방법의 일 실시 예를 첨부도면을 참조하여 상세히 설명하기로 하며, 첨부 도면을 참조하여 설명함에 있어, 동일하거나 대응하는 구성 요소는 동일한 도면 번호를 부여하고 이에 대해 중복되는 설명은 생략하기로 한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Reference will now be made in detail to the preferred embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the like elements throughout. A duplicate description will be omitted.

또한, 이하 사용되는 제1, 제2 등과 같은 용어는 동일 또는 상응하는 구성 요소들을 구별하기 위한 식별 기호에 불과하며, 동일 또는 상응하는 구성 요소들이 제1, 제2 등의 용어에 의하여 한정되는 것은 아니다.It is also to be understood that the terms first, second, etc. used hereinafter are merely reference numerals for distinguishing between identical or corresponding components, and the same or corresponding components are defined by terms such as first, second, no.

또한, 결합이라 함은, 각 구성 요소 간의 접촉 관계에 있어, 각 구성 요소 간에 물리적으로 직접 접촉되는 경우만을 뜻하는 것이 아니라, 다른 구성이 각 구성 요소 사이에 개재되어, 그 다른 구성에 구성 요소가 각각 접촉되어 있는 경우까지 포괄하는 개념으로 사용하도록 한다.In addition, the term " coupled " is used not only in the case of direct physical contact between the respective constituent elements in the contact relation between the constituent elements, but also means that other constituent elements are interposed between the constituent elements, Use them as a concept to cover each contact.

이하, 첨부도면을 참조하여 현수 보도교 및 그 시공방법에 관하여 상세히 설명한다.Hereinafter, the suspension bridge and its construction method will be described in detail with reference to the accompanying drawings.

전후방향을 따라 복수의 데크(110)가 열지어 형성된 데크부(100); 데크부(100)에 결합되어 데크부(100)의 자중 및 보도하중(P)을 지지하는 제1케이블(C1); 제1케이블(C1)의 양 단부를 지지하기 위해 한 쌍으로 설치되는 케이블 고정부(200);를 포함하되, 데크(110)의 모서리에는 상측으로 돌출 형성된 전방일측 기둥부(120a), 전방타측 기둥부(120b), 후방일측 기둥부(120c), 후방타측 기둥부(120d)를 포함하는 기둥부(120)가 형성되고, 제1케이블(C1)은 전방일측 기둥부(120a), 전방타측 기둥부(120b), 후방일측 기둥부(120c), 후방타측 기둥부(120d)의 외측으로 각각 돌출 형성된 제1케이블 결합부(130)에 전후방향을 따라 결합되며, 복수의 데크(110)는 보도하중(P)에 의해 상호 벌어지는 것이 방지되도록 유격제한 장치(300)에 의해 상호 결합된다.A deck part (100) in which a plurality of decks (110) are formed by being opened along the forward and backward directions; A first cable C1 coupled to the deck part 100 to support the self weight and the sidewise load P of the deck part 100; And a cable fixing part 200 which is installed in a pair to support both ends of the first cable C1. The corner of the deck 110 is provided with a front one side pole part 120a protruded upward, A column 120 including a column 120b, a rear one-side column 120c and a rear second column 120d is formed and the first cable C1 is connected to the front one-side post 120a, The plurality of decks 110 are coupled to the first cable coupling part 130 protruding from the outer side of the pillar part 120b, the rear side pillar part 120c and the rear side second pillar part 120d, Are coupled to each other by the clearance restricting device (300) so as to be prevented from spreading by the press load (P).

본 발명은 도 4와 같이 복수의 데크(110)가 전후 방향을 따라 제1케이블(C1)에 의해 열지어 결합되는 현수 구조의 보도교 이다.As shown in Fig. 4, the present invention is a pedestrian bridge having a suspended structure in which a plurality of decks 110 are coupled by being opened and closed by a first cable C1 along the longitudinal direction.

현수 보도교의 특성에 의해 이웃하는 한 쌍의 데크(110)는 풍하중 및 보도하중(P)에 의해 상호 사이 간격이 벌이지게 되는데, 이를 방지하기 위하여 유격제한 장치(300)가 설치된다.The pair of decks 110 adjacent to each other due to the characteristics of the suspension bridges are spaced apart from each other by the wind load and the sidewalk load P, and a clearance limiting device 300 is installed to prevent this.

유격제한 장치(300)는 데크(110)의 전방으로 돌출 결합된 고정부(310); 데크(110)의 후방으로 돌출 결합된 유격제한부(320); 측방향을 따라 고정부(310)와 유격제한부(320)에 공통으로 삽입되는 고정핀(330);을 포함하고, 데크(110)의 측방향을 따라, 고정부(310)와 유격제한부(320)는 각각 상호 간격을 두고 복수가 결합되되, 이웃하여 결합되는 복수의 데크(110) 중 전방 데크(110a)에 결합된 유격제한부(320)는 후방 데크(110b)에 결합된 고정부(310)의 사이 공간(S)에 끼워지는 구조로 상호 결합되는 것이 바람직하다.The clearance limiting device 300 includes a fixing portion 310 protruded and coupled to the front of the deck 110; A clearance restricting portion 320 protruded and coupled to the rear of the deck 110; And a fixing pin 330 commonly inserted into the fixing part 310 and the clearance restricting part 320 along the lateral direction of the deck 110. The fixing part 330 is provided along the lateral direction of the deck 110, The plurality of decks 110 coupled to the front deck 110a of the plurality of decks 110 adjacent to each other with the spacing therebetween are coupled to the rear deck 110b, (S) of the base member (310).

도 8과 같이, 유격제한 장치(300)는 이웃하여 설치되는 한 쌍의 데크(110) 중 전방 데크(110a)에 결합된 유격제한부(320)와 후방 데크(110b)에 결합된 고정부(310)가 상호 결합되는 구조이다.8, the clearance limiting device 300 includes a clearance restricting portion 320 coupled to the front deck 110a of the pair of adjacent decks 110 and a fixed portion 320 coupled to the rear deck 110b 310 are mutually coupled.

유격제한부(320)에는 고정핀(330)이 관통되어 전후방향을 따라 유격되도록, 전후방향을 따라 장공으로 형성된 공간부(321)가 형성되고, 고정핀(330)은 고정부(310)에 고정되는 것이 바람직하다.The clearance restricting portion 320 is formed with a space portion 321 formed as a long hole along the forward and backward direction so that the fixing pin 330 penetrates and is spaced along the forward and backward directions. It is preferable to fix it.

이 경우, 이웃하여 설치되는 한 쌍의 데크(110) 중 전방 데크(110a)에 결합된 유격제한부(320)와 후방 데크(110b)에 결합된 고정부(310)는 고정핀(330)에 의해 도 9와 같이 결합된다.In this case, the clearance restricting portion 320 coupled to the front deck 110a of the pair of decks 110 adjacent to each other and the fixing portion 310 coupled to the rear deck 110b are fixed to the fixing pin 330 As shown in Fig.

이 때 고정핀(330)은 유격제한부(320)의 공간부(321)를 관통하여 고정부(310)에 결합되기 때문에 유격제한부(320)가 전후방향을 따라 공간부(321)의 길이만큼 움직이게 된다.Since the fixing pin 330 is coupled to the fixing portion 310 through the space portion 321 of the clearance restricting portion 320, the clearance limiting portion 320 is formed to have the length of the space portion 321 .

아울러, 고정부(310)의 전면과 유격제한부(320)의 후면에는 고무패드(400)가 도 9와 같이 설치되어, 이웃하여 설치되는 한 쌍의 데크(110)가 부딪치는 것을 방지한다.A rubber pad 400 is installed on the front surface of the fixing part 310 and the rear surface of the clearance limiting part 320 as shown in FIG. 9 to prevent a pair of adjacent decks 110 from colliding with each other.

제1케이블 결합부(130)는 기둥부(120)의 외측으로 돌출 형성된 돌부(131); 돌부(131)의 외측 가장자리에서 하측으로 돌출 형성된 기립부(132); 기둥부(120), 돌부(131), 기립부(132)에 의해 형성된 케이블 설치 공간부(133); 케이블 설치 공간부(133)의 하측 개구부를 폐쇄하도록 결합되는 덮개부(134);를 포함하는 것이 바람직하다.The first cable coupling portion 130 includes a protrusion 131 protruding outward from the pillar 120; An upstanding portion 132 protruding downward from an outer edge of the protrusion 131; A cable installation space portion 133 formed by the column portion 120, the projection portion 131, and the rising portion 132; And a lid part 134 coupled to close the lower opening of the cable installation space part 133. [

이 경우, 제1케이블(C1)은 현수 보도교의 하중을 지지하는 메인 케이블로서, 상기 설치공간부(133)에 복수가 설치될 수 있다.In this case, the first cable C1 is a main cable for supporting the load of the suspension bridge, and a plurality of cables may be installed in the installation space portion 133. [

케이블 설치 공간부(133)에는 제1케이블(C1)이 관통되는 관통홀(h)이 형성된 케이블 정착장치(135)가 설치되되, 케이블 정착장치(135)는 제1케이블(C1)의 상면을 덮도록 설치되는 상부 정착장치(135a); 제1케이블(C1)의 하면을 덮도록 설치되는 하부 정착장치(135b);를 포함하는 것이 바람직하다.The cable fixing space 135 is provided with a through hole h through which the first cable C1 passes, and the cable fixing unit 135 is disposed on the upper surface of the first cable C1 An upper fixing device 135a installed so as to cover it; And a lower fixing device 135b installed to cover the lower surface of the first cable C1.

이 경우, 설치 공간부(133)에는 상기 제1케이블(C1)을 고정하기 위해 도 11과 같은 정착장치(135)가 설치된다.In this case, the fixing space 135 is provided with a fixing device 135 as shown in FIG. 11 for fixing the first cable C1.

이때, 정착장치(135)는 제1케이블(C1)의 상면을 덮도록 설치되는 상부 정착장치(135a)와 제1케이블(C1)의 하면을 덮도록 설치되는 하부 정착장치(135b)가 결합되는데, 상부 정착장치(135a)는 돌부(131)의 하면에 미리 결합되고, 하부 정착장치(135b)는 덮개부(134)의 상면에 미리 결합되어 덮개부(134)의 설치시 정착장치(135)가 결합되는 구조를 취할 수 있다.The fixing device 135 includes an upper fixing device 135a disposed to cover the upper surface of the first cable C1 and a lower fixing device 135b disposed to cover the lower surface of the first cable C1 The upper fixing unit 135a is previously coupled to the lower surface of the protrusion 131 and the lower fixing unit 135b is coupled to the upper surface of the lid unit 134 in advance so as to fix the fixing unit 135 when the lid unit 134 is installed. Can be combined with each other.

케이블 고정부(200)에는 제2케이블(C2)이 결합되되, 제2케이블(C2)은 상하방향을 기준으로, 기둥부(120)의 측방 하측 영역에서 외측으로 돌출된 제2케이블 결합부(140)에 결합되고, 제1케이블(C1)과 제2케이블(C2)이 측방향을 따라 서로 다른 위치에 설치되도록, 제2케이블 결합부(140)와 제1케이블 결합부(130)는 측방으로 돌출된 정도가 서로 상이한 것이 바람직하다.The second cable C2 is coupled to the cable fixing part 200 and the second cable C2 is connected to the second cable coupling part (not shown) protruding outward from the lower side area of the pillar 120, And the first cable coupling part 140 and the first cable coupling part 130 are coupled to the first cable coupling part 140 so that the first cable C1 and the second cable C2 are installed at different positions along the lateral direction, Are different from each other.

데크부(100)의 전도를 방지하기 위해, 양 단부는 케이블 고정부(200)의 측방으로 이격된 측방고정부(210)에 고정되고, 중앙부(C3-a)는 데크부(100)에 결합되는 제3케이블(C3)을 더 포함하는 것이 바람직하다.The both ends are fixed to the lateral fixing parts 210 spaced laterally of the cable fixing part 200 and the central part C3-a is fixed to the deck part 100 to prevent the deck part 100 from conducting. And a third cable (C3).

제3케이블(C3)의 중앙부(C3-a)는 데크부(100)의 중앙부에 결합된 복수의 데크(110) 제1케이블 결합부(130)에 결합되는 것이 바람직하다.The center portion C3-a of the third cable C3 is coupled to the first cable coupling portion 130 of the plurality of decks 110 coupled to the center portion of the deck portion 100. [

이 경우, 도 18과 같이 제3케이블(C3)의 중앙부(C3-a)가 제1케이블 결합부(130)에 결합되어 현수 보도교의 전도를 방지한다.In this case, as shown in Fig. 18, the central portion C3-a of the third cable C3 is coupled to the first cable coupling portion 130 to prevent conduction of the suspension bridge.

제3케이블(C3)의 중앙부(C3-a)는 제1케이블 결합부(130)에 결합된 제1케이블(C1)의 외측 영역에 결합되도록, 케이블 정착장치(135)에는 복수의 관통홀(h)이 형성되고, 하부 정착장치(135b)는 복수의 관통홀(h)을 각각 형성하도록 내측 하부정착장치(135b-1) 및 외측 하부정착장치(135b-2)를 포함하며, 덮개부(134)는 내측 하부정착장치(135b-1) 및 외측 하부정착장치(135b-2)에 대응하는 내측덮개부(134-1) 및 외측덮개부(134-2)를 구비한 것이 바람직하다.The central portion C3-a of the third cable C3 is coupled to the outer region of the first cable C1 coupled to the first cable coupling portion 130 so that the cable fixing device 135 is provided with a plurality of through holes and the lower fixing device 135b includes an inner lower fixing device 135b-1 and an outer lower fixing device 135b-2 so as to form a plurality of through holes h, 134 preferably include an inner lid portion 134-1 and an outer lid portion 134-2 corresponding to the inner lower fixing device 135b-1 and the outer lower fixing device 135b-2.

이 경우, 제3케이블(C3)의 중앙부(C3-a)는 하부 정착장치(135b)의 외측 하부정착장치(135b-2)에 결합된다.In this case, the central portion C3-a of the third cable C3 is coupled to the outer lower fixing device 135b-2 of the lower fixing device 135b.

하부 정착장치(135b)를 내측 하부정착장치(135b-1) 및 외측 하부정착장치(135b-2)로 구분하여 설치한 것은 제1케이블(C1)설치와 제3케이블(C3)의 설치를 별도공정으로 진행하기 위함이다.The lower fixing device 135b is divided into an inner lower fixing device 135b-1 and an outer lower fixing device 135b-2 separately from the first cable C1 and the third cable C3 To proceed to the process.

즉, 내측과 외측 하부정착장치의해 제1케이블(C1)이 내측 하부정착장치(135b-1)에 의해 완전 결합되고, 이후 결합되는 제3케이블(C3)이 외측 하부정착장치(135b-2)에 의해 완전 결합될 수 있다.That is, the first cable C1 is fully engaged by the inner lower fixing device 135b-1 by the inner and outer lower fixing devices, and the third cable C3, which is then coupled to the outer lower fixing device 135b- Lt; / RTI >

제3케이블(C3)의 중앙부(C3-a)에는 일단은 제1케이블 결합부(130)의 측방에 결합되고, 타단은 제3케이블(C3)에 결합되는 제4케이블(C4)이 설치된 것이 바람직하다.A fourth cable C4 is coupled to the center portion C3-a of the third cable C3 and has one end coupled to the side of the first cable coupling portion 130 and the other end coupled to the third cable C3 desirable.

이 경우, 제3케이블(C3)에는 도14와 같이 일단은 제1케이블 결합부(130)의 측방에 결합되고, 타단은 제3케이블(C3)에 결합되는 제4케이블(C4)이 설치되어 현수 보도교의 전도를 방지할 수 있다.In this case, the third cable C3 is provided with a fourth cable C4, one end of which is coupled to the side of the first cable coupling part 130 and the other end thereof is coupled to the third cable C3 as shown in FIG. 14 It is possible to prevent the evangelism of Hyunsudo Bridge.

제3케이블(C3)의 중앙부(C3-a)에는 일단은 제2케이블 결합부(140)의 측방에 결합되고, 타단은 제3케이블(C3)에 결합되는 제4케이블(C4)이 설치된 것이 바람직하다.A fourth cable C4 is coupled to the center portion C3-a of the third cable C3 and has one end coupled to the side of the second cable coupling portion 140 and the other end coupled to the third cable C3 desirable.

이 경우, 제3케이블(C3)에는 도15와 같이 일단은 제2케이블 결합부(140)의 측방에 결합되고, 타단은 제3케이블(C3)에 결합되는 제4케이블(C4)이 설치되어 현수 보도교의 전도를 방지할 수 있다.In this case, the third cable (C3) is provided with a fourth cable (C4), one end of which is coupled to the side of the second cable coupling part (140) and the other end is coupled to the third cable (C3) It is possible to prevent the evangelism of Hyunsudo Bridge.

제3케이블(C3)은 데크부(100)의 측방 상측 영역에 위치되도록 설치되되, 중앙부(C3-a)는 데크부(100)를 향하여 볼록한 만곡구조로 설치된 것이 바람직하다.It is preferable that the third cable C3 is disposed at a side upper side region of the deck unit 100 and the center portion C3-a is provided at a convex curved structure toward the deck unit 100. [

이 경우, 제3케이블(C3)은 데크부(100)의 측방 상측 영역에 위치되도록 설치되어 현수 보도교의 측방을 상측에서 지지하도록 설치된다.In this case, the third cable C3 is installed so as to be positioned in the upper side area of the deck section 100 and supports the side of the suspension bridge at the upper side.

제2케이블 결합부(140)는 제2케이블(C2)의 상면을 덮도록 하면에서 상향으로 상향 홈(141h)이 형성된 결합부 상부(141); 제2케이블(C2)의 하면을 덮도록 상면에서 하향으로 하향 홈(142h)이 형성된 결합부 하부(142);를 구비하고, 상향 홈(141h)과 하향 홈(142h)으로 형성된 홈에 결합되는 제2케이블(C2)의 외면에는 케이블커버(160)가 설치되는 것이 바람직하다.The second cable coupling portion 140 includes a coupling portion upper portion 141 having an upward groove 141h formed upwardly in a lower surface thereof so as to cover the upper surface of the second cable C2; And a coupling lower portion 142 having a downward groove 142h formed downward from the upper surface so as to cover the lower surface of the second cable C2 and coupled to the groove formed by the upward groove 141h and the downward groove 142h The cable cover 160 is preferably installed on the outer surface of the second cable C2.

케이블커버(160)는 제2케이블 결합부(140)를 통해 제2케이블(C2)에 전달되는 하중을 분산시키기 위해 전후방향을 기준으로, 제2케이블 결합부(140)의 전방과 후방으로 각각 돌출되도록 형성된 것이 바람직하다.The cable cover 160 is disposed in front of and behind the second cable coupling portion 140 in the forward and backward directions to disperse the load transmitted to the second cable C2 through the second cable coupling portion 140 It is preferable that it is formed to protrude.

이 경우 도 20, 21과 같이 제2케이블 결합부(140)에 결합되는 제2케이블(C2)의 외면에는 제2케이블결합부(140)를 통해 전달되는 하중을 분산시켜, 제2케이블(C2)에 하중이 집중되는 것을 방지하도록 케이블커버(160)가 결합된다.In this case, as shown in FIGS. 20 and 21, the load transmitted through the second cable coupling part 140 is dispersed on the outer surface of the second cable C2 coupled to the second cable coupling part 140, and the second cable C2 The cable cover 160 is engaged to prevent the load from being concentrated on the cable cover 160. [

본 발명의 일 실시 예에 따른 현수 보도교 시공방법은 케이블 고정부(200)를 설치하는 케이블 고정부 설치단계; 케이블 고정부(200)에 제1 케이블(C1), 제2 케이블(C2)을 설치하고, 측방고정부(210)에 제3 케이블(C3)을 설치하는 케이블 설치단계; 한 쌍의 케이블 고정부(200) 중 전방에 설치된 케이블 고정부(200)에서, 제1 케이블(C1), 제2케이블(C2)이 결합되도록 테크(110)를 설치하는 테크결합단계; 데크결합단계를 반복수행하되, 먼저 설치된 데크(110)를 후방으로 밀어내면서 다음 데크(110)를 설치하는 데크부 형성단계; 제3케이블(C3)을 데크(110)에 결합시키는 제3케이블 고정단계;를 포함하는 것이 바람직하다.A method of constructing a hanging bridge structure according to an embodiment of the present invention includes a cable fixing section 200 for installing a cable fixing section 200; A cable installing step of installing a first cable (C1) and a second cable (C2) in the cable fixing part (200) and installing a third cable (C3) in the side fixing part (210); A tethering step of installing the tether 110 so that the first cable C1 and the second cable C2 are coupled to each other at the cable fixing part 200 provided at the front of the pair of cable fixing parts 200; A deck forming step of repeating the deck joining step, wherein the deck 110 is installed while pushing the installed deck 110 backward; And a third cable fixing step of coupling the third cable (C3) to the deck (110).

데크결합단계는 이웃하여 결합되는 복수의 데크(110) 중 전방 데크(110a)에 결합된 유격제한부(320)와 후방 데크(110b)에 결합된 고정부(310)에 고정핀(330)을 설치하는 유격제한장치결합단계;를 더 포함하는 것이 바람직하다.The deck joining step includes a clearance restricting part 320 coupled to the front deck 110a of the plurality of decks 110 adjacent to each other and a fixing pin 330 to the fixing part 310 coupled to the rear deck 110b And a restraining device coupling step of installing the restraint device.

이 경우, 케이블 설치단계가 완료되면 한 쌍의 케이블 고정부(200) 중 상하방향을 기준으로 하측에 형성된 케이블 고정부(200)에서 기 설치된 제1케이블(C1), 제2케이블(C2)에 데크(110)를 설치한다.In this case, when the cable installation step is completed, the first cable (C1) and the second cable (C2) installed in the cable fixing part (200) formed on the lower side with respect to the vertical direction of the pair of cable fixing parts The deck 110 is installed.

설치된 데크(110)는 제1케이블(C1), 제2케이블(C2)에 완전결합되지 않은 상태로, 제1케이블(C1)과 제2케이블(C2)을 따라 슬라이딩 되어 이동된다.The installed deck 110 is slid along the first cable C1 and the second cable C2 without being fully engaged with the first cable C1 and the second cable C2.

즉, 한 쌍의 케이블 고정부(200)가 설치된 곳 중 어느 한 곳에서 반대편에 설치되는 데크(110)부터 순차적으로 설치하고, 이를 슬라이딩시켜 밀어내기식으로 데크(110)를 시공하게 된다. 따라서 데크(110) 설치를 위한 별도의 벤트가 필요하지 않는다.That is, the deck 110 installed on one side of the pair of cable fixing parts 200 is sequentially installed from the opposite side, and the deck 110 is slidably installed. Therefore, a separate vent for installing the deck 110 is not required.

이후, 설치된 제3케이블(C3)을 데크(110)에 결합하여 현수 보도교의 전도를 방지한다.Then, the third cable C3 installed is coupled to the deck 110 to prevent the suspension bridge from being conducted.

아우러, 본 발명의 현수보도교 케이블(C1, C2, C3)에는 케이블의 장력을 확인할 수 있는 계측 장비가 설치되어, 케이블의 장력을 확인할 수 있다.In addition, the suspension bridge cable bridges C1, C2 and C3 of the present invention are provided with a measuring device for checking the tension of the cable, so that the tension of the cable can be confirmed.

C1 : 제1케이블 C2 : 제2케이블
C3 : 제3케이블 C3-a : 중양부
C4 : 제4케이블 S : 사이 공간
h : 관통홀 100 : 데크부
110 : 데크 120 : 기둥부
120a : 전방일측 기둥부 120b : 전방타측 기둥부
120c : 후방일측 기둥부 120d : 후방타측 기둥부
130 : 제1케이블 결합부 131 : 돌부
132 : 기립부 133 : 케이블 설치 공간부
134 : 덮개부 135 : 케이블정착장치
135a : 상부 정착장치 135b : 하부 정착장치
140 : 제2케이블 결합부 141 : 상부
142 : 하부 160 : 케이블커버
200 : 케이블고정부 210 : 측방고정부
300 : 유격제한장치 310 : 고정부
320 : 유격제한부 321 : 공간부
330 : 고정핀 400 : 고무패드
C1: first cable C2: second cable
C3: Third cable C3-a:
C4: fourth cable S: space between
h: through hole 100: deck part
110: Deck 120:
120a: front one side post 120b: front one side post 120b:
120c: rear one-side pillar portion 120d: rear-side other pillar portion
130: first cable coupling part 131:
132: standing portion 133: cable installation space portion
134: lid part 135: cable fixing device
135a: upper fixing unit 135b: lower fixing unit
140: second cable coupling portion 141: upper portion
142: Lower part 160: Cable cover
200: Cable fixing part 210: Side fixing part
300: play restriction device 310:
320: restricting portion 321:
330: Fixing pin 400: Rubber pad

Claims (17)

전후방향을 따라 복수의 데크(110)가 열지어 형성된 데크부(100);
상기 데크부(100)에 결합되어 상기 데크부(100)의 자중 및 보도하중(P)을 지지하는 제1케이블(C1);
상기 제1케이블(C1)의 양 단부를 지지하기 위해 한 쌍으로 설치되는 케이블 고정부(200);를 포함하되,
상기 데크(110)의 모서리에는 상측으로 돌출 형성된 전방일측 기둥부(120a), 전방타측 기둥부(120b), 후방일측 기둥부(120c), 후방타측 기둥부(120d)를 포함하는 기둥부(120)가 형성되고,
상기 제1케이블(C1)은 상기 전방일측 기둥부(120a), 전방타측 기둥부(120b), 후방일측 기둥부(120c), 후방타측 기둥부(120d)의 외측으로 각각 돌출 형성된 제1케이블 결합부(130)에 전후방향을 따라 결합되며,
상기 복수의 데크(110)는 상기 보도하중(P)에 의해 상호 벌어지는 것이 방지되도록 유격제한 장치(300)에 의해 상호 결합되고,
상기 제1케이블 결합부(130)는
상기 기둥부(120)의 외측으로 돌출 형성된 돌부(131);
상기 돌부(131)의 외측 가장자리에서 하측으로 돌출 형성된 기립부(132);
상기 기둥부(120), 상기 돌부(131), 상기 기립부(132)에 의해 형성된 케이블 설치 공간부(133);
상기 케이블 설치 공간부(133)의 하측 개구부를 폐쇄하도록 결합되는 덮개부(134);를 포함하는 것을 특징으로 하는 현수 보도교.
A deck part (100) in which a plurality of decks (110) are formed by being opened along the forward and backward directions;
A first cable (C1) coupled to the deck part (100) and supporting a self weight and a sidewise load (P) of the deck part (100);
And a cable fixing part (200) installed in pairs to support both ends of the first cable (C1)
The deck 110 has a column portion 120 including a front side column portion 120a, a front side column portion 120b, a rear side column portion 120c, and a rear side other column portion 120d, Is formed,
The first cable C1 is connected to the first cable C1 by being protruded to the outside of the front side first pillar 120a, the front second side pillar 120b, the rear one side pillar 120c and the rear second side pillar 120d, And is coupled to the portion 130 along the longitudinal direction,
The plurality of decks 110 are coupled to each other by the clearance limiting device 300 so as to be prevented from spreading by the sidewise load P,
The first cable coupling part (130)
A protrusion 131 protruding outward from the pillar 120;
An upstanding portion 132 protruded downward from an outer edge of the protrusion 131;
A cable installation space 133 formed by the pillar 120, the protrusion 131, and the rising portion 132;
And a lid part (134) coupled to close the lower opening of the cable installation space part (133).
제1항에 있어서,
상기 유격제한 장치(300)는
상기 데크(110)의 전방으로 돌출 결합된 고정부(310);
상기 데크(110)의 후방으로 돌출 결합된 유격제한부(320);
측방향을 따라 상기 고정부(310)와 상기 유격제한부(320)에 공통으로 삽입되는 고정핀(330);을 포함하고,
상기 데크(110)의 측방향을 따라, 상기 고정부(310)와 상기 유격제한부(320)는 각각 상호 간격을 두고 복수가 결합되되,
이웃하여 결합되는 복수의 데크(110) 중 전방 데크(110a)에 결합된 상기 유격제한부(320)는 후방 데크(110b)에 결합된 상기 고정부(310)의 사이 공간(S)에 끼워지는 구조로 상호 결합되는 것을 특징으로 하는 현수 보도교.
The method according to claim 1,
The clearance limiting device (300)
A fixing part 310 protruded and coupled to the front of the deck 110;
A clearance restricting portion 320 protrudingly coupled to the rear of the deck 110;
And a fixing pin (330) commonly inserted into the fixing portion (310) and the clearance restricting portion (320) along the lateral direction,
The plurality of fastening portions 310 and the fastening restricting portions 320 are coupled to each other along the lateral direction of the deck 110,
The clearance restricting portion 320 coupled to the front deck 110a of the plurality of decks 110 adjacent to each other is inserted into the space S between the fixing portions 310 coupled to the rear deck 110b The structure of the suspension bridge is characterized by being mutually coupled to the structure.
제2항에 있어서,
상기 유격제한부(320)에는
상기 고정핀(330)이 관통되어 전후방향을 따라 유격되도록, 전후방향을 따라 장공으로 형성된 공간부(321)가 형성되고,
상기 고정핀(330)은 상기 고정부(310)에 고정되는 것을 특징으로 하는 현수 보도교.
3. The method of claim 2,
In the clearance limiting unit 320,
A space portion 321 formed as a long hole along the front-rear direction is formed so that the fixing pin 330 penetrates and is spaced along the front-rear direction,
Wherein the fixing pin (330) is fixed to the fixing portion (310).
제3항에 있어서,
상기 고정부(310)의 전면과 상기 유격제한부(320)의 후면에는 고무패드(400)가 설치된 것을 특징으로 하는 현수 보도교.
The method of claim 3,
And a rubber pad (400) is installed on the front surface of the fixing part (310) and the rear surface of the clearance restricting part (320).
삭제delete 제2항에 있어서,
케이블 설치 공간부(133)에는
상기 제1케이블(C1)이 관통되는 관통홀(h)이 형성된 케이블 정착장치(135)가 설치되되,
상기 케이블 정착장치(135)는
상기 제1케이블(C1)의 상면을 덮도록 설치되는 상부 정착장치(135a);
상기 제1케이블(C1)의 하면을 덮도록 설치되는 하부 정착장치(135b);를 포함하는 것을 특징으로 하는 현수 보도교.
3. The method of claim 2,
In the cable installation space portion 133,
And a cable fixing device 135 having a through hole h through which the first cable C1 passes,
The cable fixing device 135
An upper fixing device 135a installed to cover the upper surface of the first cable C1;
And a lower fixing device (135b) installed to cover the lower surface of the first cable (C1).
제6항에 있어서,
상기 케이블 고정부(200)에는 제2케이블(C2)이 결합되되,
상기 제2케이블(C2)은 상하방향을 기준으로,
상기 기둥부(120)의 측방 하측 영역에서 외측으로 돌출된 제2케이블 결합부(140)에 결합되고,
상기 제1케이블(C1)과 상기 제2케이블(C2)이 측방향을 따라 서로 다른 위치에 설치되도록, 상기 제2케이블 결합부(140)와 상기 제1케이블 결합부(130)는 측방으로 돌출된 정도가 서로 상이한 것을 특징으로 하는 현수 보도교.
The method according to claim 6,
The second cable C2 is coupled to the cable fixing part 200,
The second cable (C2) is connected to the first cable
And is coupled to a second cable coupling portion 140 protruding outward in a lateral lower side region of the column portion 120,
The second cable coupling part 140 and the first cable coupling part 130 are protruded sideways such that the first cable C1 and the second cable C2 are installed at different positions along the lateral direction, Which are different from each other.
제7항에 있어서,
상기 데크부(100)의 전도를 방지하기 위해,
양 단부는 상기 케이블 고정부(200)의 측방으로 이격된 측방고정부(210)에 고정되고,
중앙부(C3-a)는 상기 데크부(100)에 결합되는 제3케이블(C3)을 더 포함하는 것을 특징으로 하는 현수 보도교.
8. The method of claim 7,
To prevent conduction of the deck part 100,
Both ends are fixed to the lateral fixing part 210 which is laterally spaced apart from the cable fixing part 200,
Wherein the central portion (C3-a) further comprises a third cable (C3) coupled to the deck portion (100).
제8항에 있어서,
상기 제3케이블(C3)의 상기 중앙부(C3-a)는
상기 데크부(100)의 중앙부에 결합된 상기 복수의 데크(110) 상기 제1케이블 결합부(130)에 결합되는 것을 특징으로 하는 현수 보도교.
9. The method of claim 8,
The central portion (C3-a) of the third cable (C3)
And the plurality of decks (110) coupled to a central portion of the deck unit (100) are coupled to the first cable coupling unit (130).
제9항에 있어서,
상기 제3케이블(C3)의 상기 중앙부(C3-a)는
상기 제1케이블 결합부(130)에 결합된 제1케이블(C1)의 외측 영역에 결합되도록,
상기 케이블 정착장치(135)에는 복수의 상기 관통홀(h)이 형성되고,
상기 하부 정착장치(135b)는
상기 복수의 관통홀(h)을 각각 형성하도록 내측 하부정착장치(135b-1) 및 외측 하부정착장치(135b-2)를 포함하며,
상기 덮개부(134)는 상기 내측 하부정착장치(135b-1) 및 상기 외측 하부정착장치(135b-2)에 대응하는 내측덮개부(134-1) 및 외측덮개부(134-2)를 구비한 것을 특징으로 하는 현수 보도교.
10. The method of claim 9,
The central portion (C3-a) of the third cable (C3)
The first cable coupling part 130 is coupled to the first cable C1,
The cable fixing device 135 is provided with a plurality of through-holes h,
The lower fixing device 135b
An inner lower fixing device 135b-1 and an outer lower fixing device 135b-2 for respectively forming the plurality of through holes h,
The lid portion 134 includes an inner lid portion 134-1 and an outer lid portion 134-2 corresponding to the inner lower fixing device 135b-1 and the outer lower fixing device 135b-2. Suspension pedestrian bridge featuring one.
제8항에 있어서,
상기 제3케이블(C3)의 상기 중앙부(C3-a)에는
일단은 상기 제1케이블 결합부(130)의 측방에 결합되고, 타단은 상기 제3케이블(C3)에 결합되는 제4케이블(C4)이 설치된 것을 특징으로 하는 현수 보도교.
9. The method of claim 8,
The central portion (C3-a) of the third cable (C3)
And a fourth cable (C4) coupled at one end to the side of the first cable coupling part (130) and at the other end to the third cable (C3).
제8항에 있어서,
상기 제3케이블(C3)의 상기 중앙부(C3-a)에는
일단은 상기 제2케이블 결합부(140)의 측방에 결합되고, 타단은 상기 제3케이블(C3)에 결합되는 제4케이블(C4)이 설치된 것을 특징으로 하는 현수 보도교.
9. The method of claim 8,
The central portion (C3-a) of the third cable (C3)
Wherein a fourth cable (C4) is coupled at one end to the side of the second cable coupling part (140) and at the other end to the third cable (C3).
제8항에 있어서,
상기 제3케이블(C3)은
상기 데크부(100)의 측방 상측 영역에 위치되도록 설치되되,
상기 중앙부(C3-a)는 상기 데크부(100)를 향하여 볼록한 만곡구조로 설치된 것을 특징으로 하는 현수 보도교.
9. The method of claim 8,
The third cable (C3)
The deck unit 100 is installed to be positioned in a lateral upper area of the deck unit 100,
Wherein the center portion (C3-a) is provided with a convex curved structure toward the deck portion (100).
제8항에 있어서,
상기 제2케이블 결합부(140)는
상기 제2케이블(C2)의 상면을 덮도록 하면에서 상향으로 상향 홈(141h)이 형성된 결합부 상부(141);
상기 제2케이블(C2)의 하면을 덮도록 상면에서 하향으로 하향 홈(142h)이 형성된 결합부 하부(142);를 구비하고,
상기 상향 홈(141h)과 상기 하향 홈(142h)으로 형성된 홈에 결합되는 상기 제2케이블(C2)의 외면에는 케이블커버(160)가 설치되는 것을 특징으로 하는 현수 보도교.
9. The method of claim 8,
The second cable coupling part 140
An upper portion 141 of the coupling portion 141 having an upward groove 141h formed upwardly in a lower surface thereof so as to cover the upper surface of the second cable C2;
And a coupling portion lower portion (142) formed with a downward groove (142h) downward from the upper surface so as to cover the lower surface of the second cable (C2)
And a cable cover (160) is installed on the outer surface of the second cable (C2) coupled to the groove formed by the upward groove (141h) and the downward groove (142h).
제14항에 있어서,
상기 케이블커버(160)는
상기 제2케이블 결합부(140)를 통해 상기 제2케이블(C2)에 전달되는 하중을 분산시키기 위해 전후방향을 기준으로,
상기 제2케이블 결합부(140)의 전방과 후방으로 각각 돌출되도록 형성된 것을 특징으로 하는 현수 보도교.
15. The method of claim 14,
The cable cover 160
In order to distribute the load transmitted to the second cable C2 through the second cable coupling part 140,
And the second cable coupling part (140) is formed to protrude forward and rearward of the second cable coupling part (140).
제8항 내지 제15항 중 어느 한 항의 현수 보도교 시공방법으로서
상기 케이블 고정부(200)를 설치하는 케이블 고정부 설치단계;
상기 케이블 고정부(200)에 상기 제1 케이블(C1), 상기 제2 케이블(C2)을 설치하고, 상기 측방고정부(210)에 제3 케이블(C3)을 설치하는 케이블 설치단계;
상기 한 쌍의 케이블 고정부(200) 중 전방에 설치된 상기 케이블 고정부(200)에서, 상기 제1 케이블(C1), 상기 제2케이블(C2)이 결합되도록 상기 데크(110)를 설치하는 테크결합단계;
상기 데크결합단계를 반복수행하되, 먼저 설치된 상기 데크(110)를 후방으로 밀어내면서 다음 상기 데크(110)를 설치하는 데크부 형성단계;
상기 제3케이블(C3)을 상기 데크(110)에 결합시키는 제3케이블 고정단계;를 포함하는 것을 특징으로 하는 현수 보도교 시공방법.
15. A method of constructing a suspension bridge of any one of claims 8 to 15
Installing a cable fixing part (200);
A cable installation step of installing the first cable (C1) and the second cable (C2) in the cable fixing part (200) and installing the third cable (C3) in the side fixing part (210);
The deck 110 is installed on the cable fixing part 200 installed in front of the pair of cable fixing parts 200 so that the first cable C1 and the second cable C2 are coupled to each other. Bonding step;
A deck forming step of repeating the deck attaching step, wherein the deck 110 is installed while pushing the installed deck 110 backward;
And a third cable fixing step of coupling the third cable (C3) to the deck (110).
제16항에 있어서,
상기 데크결합단계는
이웃하여 결합되는 상기 복수의 데크(110) 중 상기 전방 데크(110a)에 결합된 상기 유격제한부(320)와 상기 후방 데크(110b)에 결합된 상기 고정부(310)에 상기 고정핀(330)을 설치하는 유격제한장치결합단계;를 더 포함하는 것을 특징으로 하는 현수 보도교 시공방법.
17. The method of claim 16,
The deck joining step
The fastening part 320 coupled to the front deck 110a of the plural decks 110 adjacent to each other and the fixing part 330 attached to the fixing part 310 coupled to the rear deck 110b And a jointing step of installing a foot restraint device for installing the foot restraint device.
KR1020180062312A 2018-05-31 2018-05-31 Pedestrian bridge and construction method thereof Active KR101948649B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180062312A KR101948649B1 (en) 2018-05-31 2018-05-31 Pedestrian bridge and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180062312A KR101948649B1 (en) 2018-05-31 2018-05-31 Pedestrian bridge and construction method thereof

Publications (1)

Publication Number Publication Date
KR101948649B1 true KR101948649B1 (en) 2019-05-02

Family

ID=66581510

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180062312A Active KR101948649B1 (en) 2018-05-31 2018-05-31 Pedestrian bridge and construction method thereof

Country Status (1)

Country Link
KR (1) KR101948649B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102113878B1 (en) * 2019-10-21 2020-05-21 (주)신흥이앤지 Structure for pedestrian suspension bridge supported by several cables
KR102123296B1 (en) * 2019-12-13 2020-06-16 (주)신흥이앤지 Girder bridge supported metal pipe
KR102269930B1 (en) * 2020-12-02 2021-06-28 (주)신흥이앤지 A Suspension Bridge and Its Construction Method with Excellent Wind Resistance Characteristics

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100422298B1 (en) * 2001-04-18 2004-03-10 이종호 building construction method using lattice typed cable structure in the plane
KR20090077983A (en) 2001-10-16 2009-07-16 소니 가부시끼 가이샤 Information processing apparatus, recording medium and data structure, reproduction apparatus and method and program
KR20130064256A (en) 2011-12-08 2013-06-18 현대중공업 주식회사 Automatic language display device by gps
KR101643983B1 (en) * 2014-07-04 2016-07-29 주식회사 케이블브릿지 Method of constructing segment palte for cable bridge
KR20170055010A (en) 2017-03-06 2017-05-18 주식회사유한양행 Bristle mixed with baking soda and toothbrush including the same bristle

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100422298B1 (en) * 2001-04-18 2004-03-10 이종호 building construction method using lattice typed cable structure in the plane
KR20090077983A (en) 2001-10-16 2009-07-16 소니 가부시끼 가이샤 Information processing apparatus, recording medium and data structure, reproduction apparatus and method and program
KR20130064256A (en) 2011-12-08 2013-06-18 현대중공업 주식회사 Automatic language display device by gps
KR101643983B1 (en) * 2014-07-04 2016-07-29 주식회사 케이블브릿지 Method of constructing segment palte for cable bridge
KR20170055010A (en) 2017-03-06 2017-05-18 주식회사유한양행 Bristle mixed with baking soda and toothbrush including the same bristle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102113878B1 (en) * 2019-10-21 2020-05-21 (주)신흥이앤지 Structure for pedestrian suspension bridge supported by several cables
KR102123296B1 (en) * 2019-12-13 2020-06-16 (주)신흥이앤지 Girder bridge supported metal pipe
KR102269930B1 (en) * 2020-12-02 2021-06-28 (주)신흥이앤지 A Suspension Bridge and Its Construction Method with Excellent Wind Resistance Characteristics

Similar Documents

Publication Publication Date Title
KR101948649B1 (en) Pedestrian bridge and construction method thereof
KR102374283B1 (en) deckrod system with elastic coupling clip type deckrod and expandable handrail with reinforced cohesion and H Beam Structure
KR101881104B1 (en) Suspension bridge for pedestrian and construction method thereof
KR102279697B1 (en) Deck road system
KR100987061B1 (en) Bridge upper part structure extended structure and method
KR101618787B1 (en) Hybrid cable structure system using radial hangers and earth-anchored cables and construction method thereof
KR101804986B1 (en) Pedestrian suspension bridge supported by double cables
KR101924924B1 (en) Pedestrian bridge and construction method thereof
KR20140090041A (en) Extended walk passageway structure and construction method of the same
KR101920039B1 (en) Pedestrian bridge and construction method thereof
US20050097686A1 (en) Bridge structure
KR101920038B1 (en) Pedestrian bridge and construction method thereof
KR102168881B1 (en) reinforcement structure of bridge inspection facility
KR101088869B1 (en) Variable fence
KR102113878B1 (en) Structure for pedestrian suspension bridge supported by several cables
KR101793842B1 (en) Connector for non-welding type square shaped frame
KR101703110B1 (en) Structure and method of constructing pier for pedestrian bridge without welding
JP2787422B2 (en) Protective fences for avalanches
JP2008195475A (en) Passenger conveyor equipment for building earthquake resistance
KR101457633B1 (en) Guardrail having tilt ability cope with slope way and height adjusting
KR100889021B1 (en) Buckling Prevention Structure of Structural Beam for Bridge Construction
KR20170079922A (en) Length variable girder structure of the temporary bridge, and bridge construction method using the same
KR101893418B1 (en) Combination structure of beam and pillar
US20070028551A1 (en) Beam attachment system
JP2001090240A (en) Deck plate and concrete floor

Legal Events

Date Code Title Description
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20180531

PA0201 Request for examination
PA0302 Request for accelerated examination

Patent event date: 20180601

Patent event code: PA03022R01D

Comment text: Request for Accelerated Examination

Patent event date: 20180531

Patent event code: PA03021R01I

Comment text: Patent Application

PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20180920

Patent event code: PE09021S01D

PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20190124

PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 20190211

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 20190211

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
PR1001 Payment of annual fee

Payment date: 20220210

Start annual number: 4

End annual number: 4