KR101947038B1 - Vertical wall type soundproof wall foundation construction - Google Patents

Vertical wall type soundproof wall foundation construction Download PDF

Info

Publication number
KR101947038B1
KR101947038B1 KR1020180065100A KR20180065100A KR101947038B1 KR 101947038 B1 KR101947038 B1 KR 101947038B1 KR 1020180065100 A KR1020180065100 A KR 1020180065100A KR 20180065100 A KR20180065100 A KR 20180065100A KR 101947038 B1 KR101947038 B1 KR 101947038B1
Authority
KR
South Korea
Prior art keywords
base
guide
wall
construction
base part
Prior art date
Application number
KR1020180065100A
Other languages
Korean (ko)
Inventor
박용선
Original Assignee
한국콘크리트산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to KR20170127866 priority Critical
Priority to KR1020170127866 priority
Application filed by 한국콘크리트산업 주식회사 filed Critical 한국콘크리트산업 주식회사
Application granted granted Critical
Publication of KR101947038B1 publication Critical patent/KR101947038B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • E01F8/0023Details, e.g. foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

According to the present invention, in a vertical wall type soundproof wall foundation construction, in a construction site to construct a soundproof wall, a PC H-beam that is pre-manufactured in advance is vertically deposited, and the PC H-beam and a PC foundation construction are coupled to improve unification between members. Moreover, right side-opened square-shaped steel is formed on both side surfaces of the PC foundation construction to simplify a coupling structure of a PC wall continuously installed, and at the same time, an inner coupling is increased to improve constructability and shorten the number of construction processes.

Description

직벽형 방음벽 기초 시공구조물{VERTICAL WALL TYPE SOUNDPROOF WALL FOUNDATION CONSTRUCTION}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a vertical wall type soundproof wall construction,

본 발명은 직벽형 방음벽 기초 시공구조물에 관한 것으로서, 더욱 상세하게는 H형상의 PC구조물과 방음벽 기초를 결합하여 지면으로부터 견고하게 수직하도록 시공하는 것이 가능하며, 복수개의 방음벽 사이의 결합구조를 간편하게 형성하여 시공성이 향상되는 새로운 구조의 직벽형 방음벽 기초 시공구조물에 관한 것이다.The present invention relates to a wall-type soundproof wall foundation construction structure, and more particularly, it relates to a wall-type soundproof wall foundation construction structure, and more particularly, Thereby improving the workability of the wall structure.

일반적으로 도로나 철도와 같은 교통시설물의 주변으로는 교통시설물 내에서 발생되는 소음이 외부로 퍼져나가는 것을 방지하거나 저감시키기 위한 방음벽을 설치한다.In general, soundproof walls are installed around traffic facilities such as roads and railroads to prevent or reduce the noise generated in traffic facilities.

이러한 방음벽은 차량이 사고로 인해 외부로 튕겨나가는 것을 방지하기 위하여 안전난간의 역할을 함께 수행하게 되는 것이 일반적이며, 이를 위해서는 방음벽을 지지하기 위한 PC 기초구조물을 지면에 견고히 고정하게 된다.Such a sound barrier generally acts as a safety guardrail in order to prevent the vehicle from being thrown out to the outside due to an accident. To this end, the PC foundation structure for supporting the sound barrier wall is firmly fixed to the ground.

이를 위한 시공방법으로는 지면을 소정의 깊이만큼 터파기를 진행한 후, 터파기한 자리에 H형강 또는 I형상으로 형성된 수직철강을 수직타설하며, 수직타설된 수직철강과 PC 기초구조물을 서로 결합하여 시공하게 된다.As a construction method for this purpose, a vertical depth of the vertical steel formed by the H-shaped steel or I-shaped steel is vertically laid in the place of the terraces after the ground is tilted by a predetermined depth, .

이때 방음벽의 PC 기초구조물과 수직철강을 일체로 결합시키기 위해서는, PC 기초구조물의 하측단부에 오목한 홈을 형성하여 수직철강을 내입시킨 후, 현장에서 현장타설 콘크리트를 타설하여 일체화하고 있으나, 수직철강과 현장타설 콘크리트와의 일체성이 저하되어 PC 기초구조물의 지지력이 저하되는 문제점이 존재하고 있다.At this time, in order to integrally join the PC foundation structure of the soundproof wall and the vertical steel, concave grooves are formed at the lower end of the PC foundation structure to penetrate the vertical steel, and then the cast concrete is laid on the site to integrate it. There is a problem that the integrity of the PC concrete structure is lowered and the bearing capacity of the PC foundation structure is lowered.

이러한 일체성을 해결하기 위하여 수직철강의 주변으로 복수개의 철근을 격자형상으로 배근한 후, 현장타설 콘크리트를 타설하여 일체성을 향상시키는 시공방법을 사용하고 있으나, 현장에서 철근을 추가로 배근하여야 하기 때문에 공기가 길어지며, 철근의 추가사용으로 인해하여 시공비용이 증가하게 되는 문제점이 여전히 존재하고 있다.In order to solve this unity, a plurality of reinforcing bars are arranged in a lattice shape around a vertical steel, and then a casting method in which a cast concrete is placed to improve the integrity is used. However, Therefore, there is still a problem that the air is lengthened and the construction cost is increased due to the additional use of the rebar.

또한 현장에서 직접 철근을 배근하여야 하기 때문에, 작업자의 숙련도나 주변 환경에 따라 시공성이 저하되는 문제점 또한 존재하고 있다.In addition, since the rebar must be directly installed on the site, there is a problem that the workability is deteriorated depending on the skill of the operator and the surrounding environment.

한편, 횡방향으로 서로 연속되어 설치되는 방음벽 PC 기초구조물은 서로 접합되어지는 접합면을 일체로 결합시키기 위해서, PC 기초구조물이 접합되어지는 부분에 철근을 추가로 타설하고 방수작업을 실시한 후, 몰탈 또는 접착몰탈을 충진하여 시공하는 방법이 종종 사용되고 있다.On the other hand, in order to integrally join the bonding surfaces to be bonded to each other, a soundproofing wall PC foundation structure continuously installed in mutually transverse direction is additionally installed with a reinforcing bar at a portion where the PC foundation structure is to be joined, Or a method of filling the adhesive mortar by filling it is often used.

그러나 이러한 시공방법은 철근을 추가적으로 배근하기 때문에 공기가 길어지게 되는 문제점이 존재하고 있으며, 또한 접착몰탈을 충진할 경우에는 PC 기초구조물간의 결합강도가 다소 떨어지기 때문에 외부충격에 의해 PC 기초구조물이 쉽게 손상됨에 따라 수명이 저하되는 문제점이 여전히 존재하고 있다.However, this construction method has a problem that the air is elongated because reinforcing bars are additionally installed. Also, when the adhesive mortar is filled, the bonding strength between the PC foundation structures is somewhat lowered, There is still a problem that the service life is deteriorated due to damage.

또한 현장에서 방수작업을 추가적으로 실시함에 따라, 작업자의 숙련도나 작업환경에 따라 방수작업의 처리 속도 및 완성도가 저하되어, PC 기초구조물의 방수성능의 저하 및 시공성이 저하되는 문제점이 여전히 존재하고 있다.Further, waterproofing work is additionally carried out in the field, so that the processing speed and completeness of the waterproofing work are lowered depending on the skill of the operator and the work environment, and the waterproof performance of the PC foundation structure is lowered and the workability is lowered.

따라서 지면에 수직으로 타설되는 방음벽 PC 기초구조물의 하단부를 지면과 견고하게 고정하는 것이 가능하면서도, 각각의 PC 기초구조물을 견고하게 결합하는 것이 가능함과 동시에 공기의 단축 및 시공성이 향상된 새로운 구조의 직벽형 방음벽 기초 시공구조물의 필요성이 존재하고 있다.Therefore, it is possible to firmly fix the lower end portion of the soundproofing wall PC base structure vertically installed on the ground to the ground, but also to strengthen the shortening of air and the workability of each PC foundation structure, There is a need for a soundproof wall foundation construction.

한국등록특허 제 10-1287487 호(2013.07.12.)Korean Registered Patent No. 10-1287487 (July 13, 2013)

본 발명은 상기와 같은 종래기술의 문제점을 해결하기 위하여 창안된 것으로서, 더욱 상세하게는 단면이 H형상으로 형성된 PC 수직빔을 터파기 자리에 타설한 후, 상기 PC 수직빔과 방음벽의 PC 기초구조물을 결합시키고 현장에서 몰탈을 충진함으로써 일체성을 향상시키며, 각각의 PC 기초구조물의 양측단부에 ㄷ자 형강을 서로 어긋나게 배치하여 PC 기초구조물간의 결합이 간편하여 시공성이 향상된 직벽형 방음벽 기초 시공구조물을 제공하는 것을 목적으로 한다.SUMMARY OF THE INVENTION Accordingly, the present invention has been made keeping in mind the above problems occurring in the prior art, and more particularly, to a method of manufacturing a PC vertical structure, Walled type soundproof wall foundation construction structure in which the U-shaped beams are arranged at mutually opposite ends of each PC foundation structure so as to be easy to connect between the PC foundation structures, thereby improving the workability .

본 발명은 상기와 같은 문제점을 해결하기 위하여 창안된 것으로서, 더욱 상세하게는 소정의 위치에는 복수개의 헤드앵커(h)가 구성되어 시공시 양중되어지며, 폭방향으로 서로 연속적으로 설치되어지는 기초부(100)와, 상기 기초부(100)의 상측단부에 구성되어 소정의 길이만큼 상측방향으로 돌출되어지며, 기초부(100)의 설치방향에 대응하여 서로 연속되어 구성되는 방음벽(200)과, 상기 기초부(100)의 하측단부에 구성되어 기초부(100)와 일체형으로 결합되어지며, 지면(1)의 터파기 자리(2)에 수직으로 삽입되어지는 H형상의 PC 수직빔(300)을 포함하는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and more particularly, it is an object of the present invention to provide a head anchor h which is formed at a predetermined position, A soundproof wall 200 formed on the upper end of the base part 100 and protruding upward by a predetermined length and formed continuously with respect to the installation direction of the base part 100, An H-shaped PC vertical beam 300 formed at the lower end of the base portion 100 and integrally coupled to the base portion 100 and vertically inserted into the ter- minal base 2 of the ground 1, The present invention is also directed to a base wall construction of a wall-type sound barrier wall.

본 발명의 다른 실시예에 따르면, 상기 기초부(100)는 전후면을 서로 관통하는 복수개의 배수구(111)가 형성된 몸체부(110)와, 상기 몸체부(110)의 양측단부 중 일측단부는 내측으로 오목한 오목홈이 형성된 제1 단부(120)와, 상기 제1 단부(120)의 타측단부는 평평한 면으로 형성된 제2 단부(130)와, 상기 기초부(100)의 하측단부에는 소정의 길이만큼 상측방향으로 오목한 오목홈이 형성되어 PC 수직빔(300)의 상측단부가 내입되어지며, 현장에서 콘크리트가 타설되어지는 결합홈(140)을 포함하는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.According to another embodiment of the present invention, the base portion 100 includes a body portion 110 having a plurality of drain holes 111 passing through the front and rear surfaces thereof, and one end portion of both ends of the body portion 110 A second end portion 130 formed on the flat surface at the other end portion of the first end portion 120 and a second end portion 130 formed at a lower end portion of the base portion 100, And an upper end of the PC vertical beam (300) is inserted into the concave groove, the concave groove being concave in the upper direction by a length of the concave groove, and the concave groove (140) .

본 발명의 다른 실시예에 따르면, 상기 제1,2 단부(120, 130)는 일측단부는 제1,2 단부(120, 130)의 내부에 삽입되고 타측단부는 외부로 돌출되어지며, 평단면이 ㄷ자 형상으로 형성되어 각각 한쌍으로 구성되고, 오목한 부분이 내측방향을 향하는 한쌍의 제1 결합부재(121)와, 오목한 부분이 외측방향을 향하는 한쌍의 제2 결합부재(131)가 서로 교차되어 결합되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.According to another embodiment of the present invention, the first and second ends 120 and 130 are inserted into the first and second ends 120 and 130, respectively, and the other end is protruded outward. A pair of first engaging members 121 each having a concave portion facing inward and a pair of second engaging members 131 having a concave portion facing outward intersect with each other Wherein the first and second sound insulation walls are combined with each other.

본 발명의 또 다른 실시예에 따르면, 상기 한쌍의 제2 결합부재(131) 사이에는 기초부(100)의 높이에 대응되는 길이로 구성되며 일측단부는 제2단부(130)의 내부에 삽입되고 타측단부는 외부로 돌출되어지는 지수판(132)을 더 포함하는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.According to another embodiment of the present invention, a length corresponding to the height of the base 100 is inserted between the pair of second engaging members 131, and one end is inserted into the second end 130 And the other end further includes a waterproof plate (132) protruding outwardly.

본 발명의 또 다른 실시예에 따르면, 상기 한쌍의 제2 결합부재(131)의 일측단부는 기초부(100)의 내부에 삽입되고 타측단부는 외부로 돌출되어 T자 형상으로 형성되어, 상기 제1 결합부재(121)의 홈에 결합되어지며, 상기 제2 결합부재(131)의 돌출부분의 외측면에는 지수재(134)가 도포되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.According to another embodiment of the present invention, one end of the pair of second engaging members 131 is inserted into the base 100 and the other end of the second engaging member 131 is protruded outward to form a T- Characterized in that an exponent material (134) is applied to the outer surface of the protruding portion of the second joint member (131), and the exponent material (134) is applied do.

본 발명의 다른 실시예에 따르면, 상기 방음벽(200)은 상기 기초부(100)의 상측단부에 구성되어 소정의 두께를 가지는 지지판(210)과, 상기 지지판(210)의 상측단부에는 소정의 길이만큼 상측방향으로 돌출되어지며 평단면이 H형상으로 구성된 방음벽 지지대(220)와, 상기 일측에 구성된 지지대(220)와 타측에 구성된 지지대(220)의 사이에 결합되어 구성되는 방음판(230)을 포함하는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.According to another embodiment of the present invention, the sound barrier 200 includes a support plate 210 having a predetermined thickness and formed at an upper end of the base member 100, And a soundproof plate 230 coupled between the support 220 and the support 220 on the other side of the sound insulation board 220. The sound insulation board 230 includes a sound insulation board 220 protruded upward by a predetermined distance, Walled type sound insulation wall base construction structure.

본 발명의 다른 실시예에 따르면, 상기 지지판(210)은 일측단부는 상기 지지판(210)의 타공에 삽입되어 결합부재로 결합되어지고, 타측단부는 내측방향으로 절곡되어 L자 형상으로 형성되는 복수개의 고정부재(211)에 의해 고정되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.According to another embodiment of the present invention, the support plate 210 is inserted into the bore of the support plate 210 at one end thereof and coupled to the engagement member, and the other end is bent inward to form a plurality of L- Is fixed by a pair of fixing members (211).

본 발명의 다른 실시예에 따르면, 상기 터파기 자리(2)의 양측 지면(1)에 전후방향으로 연장된 레일(R)을 설치하며, 상기 레일(R)을 따라 이동되어 기초부(100)의 삽입 위치를 안내하는 시공가이드 장치(400)를 구성하며, 상기 기초부(100)의 헤드앵커(h)를 통해 양중장비가 기초부(100)를 들어 올린 후 상기 시공가이드 장치(400)에 의해 삽입 위치로 삽입되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.According to another embodiment of the present invention, a rail R extending in forward and backward directions is provided on both side surfaces 1 of the ter- mator seat 2, and the rail R is moved along the rail R, And the upper and lower heavy equipment lifts the base part 100 through the head anchor h of the base part 100 and is guided to the installation guide device 400 And the sound insulation wall is inserted into the insertion position by the sound insulation wall.

본 발명의 다른 실시예에 따르면, 상기 시공가이드 장치(400)는 상기 레일(R)과 결합되어 이동되어지는 휠 부재(411)를 구비하며, 중앙부분에는 상기 기초부(100)와 대응되는 삽입부(412)가 상하로 관통되어지도록 구성된 가이드 몸체부(410)와, 상하방향으로 구성된 바(bar) 형상으로 형성되어, 상기 가이드 몸체부(410)의 둘레가 승강가능하게 결합되며 승강장치(421)에 의해 승강되어 하강될 시, 하단부가 지면(1)에 삽입고정되는 고정핀(420)과, 상측방향으로 돌출된 패널형상으로 구성되며, 복수개의 가이드 롤러(431)가 밀착되어 기초부(100)가 삽입부(412)로부터 이탈되어지지 않고 수직삽입 가능하게 구성된 가이드 패널(430)과, 상기 가이드 패널(430)의 후면에 구성되어 가이드 패널(430)이 전후진되어지도록 구성되는 전후진 장치(440)을 포함하는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.According to another embodiment of the present invention, the construction guide device 400 includes a wheel member 411 which is moved in association with the rail R, A guide body 410 formed to vertically penetrate the guide body 410 and a bar body 412 formed vertically so that the guide body 410 can be lifted and lowered around the guide body 410, A fixing pin 420 whose lower end portion is inserted and fixed to the paper surface 1 when the paper sheet is lifted and lowered by the guide roller 421 and descended by the paper guide 421, The guide panel 430 is formed on the rear surface of the guide panel 430 so that the guide panel 430 can be vertically inserted without being detached from the insertion portion 412, Characterized in that it comprises a device (440) It characterized by a vertical wall-shaped soundproof wall construction based structure.

본 발명의 다른 실시예에 따르면, 상기 가이드 몸체부(410)는 시공가이드 장치(400)가 이동되어지는 이동방향의 반대방향이 개방되어 평면형상이 ㄷ자 형상으로 구성되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물을 특징으로 한다.According to another embodiment of the present invention, the guide body 410 is formed in a U-shape in plan view by being opened in a direction opposite to the moving direction in which the operation guide device 400 is moved. It is characterized by a soundproof wall foundation construction.

한편 본 명세서에 개시된 기술에 관한 설명은 단지 구조적 내지 기능적 설명을 위한 실시예에 불과하므로, 개시된 기술의 권리범위는 본문에 설명된 실시예에 의하여 제한되는 것으로 해석되어서는 아니 된다. 즉, 실시예는 다양한 변경이 가능하고 여러 가지 형태를 가질 수 있으므로 개시된 기술의 권리범위는 기술적 사상을 실현할 수 있는 균등물들을 포함하는 것으로 이해되어야 한다. 또한, 개시된 기술에서 제시된 목적 또는 효과는 특정 실시예가 이를 전부 포함하여야 한다거나 그러한 효과만을 포함하여야 한다는 의미는 아니므로, 개시된 기술의 권리범위는 이에 의하여 제한되는 것으로 이해되어서는 아니 될 것이다.On the other hand, the description of the technology disclosed herein is merely an example for structural or functional explanation, and the scope of the right of the disclosed technology should not be construed as being limited by the embodiments described in the text. That is, the embodiments are to be construed as being variously embodied and having various forms, so that the scope of the disclosed technology should be understood to include equivalents capable of realizing technical ideas. Also, the purpose or effect of the disclosed technology should not be construed as being limited thereby, as it does not mean that a particular embodiment must include all such effects or merely include such effects.

또한 본 발명에서 서술되는 용어의 의미는 다음과 같이 이해되어야 할 것이다. “제1”, “제2” 등의 용어는 하나의 구성요소를 다른 구성요소로부터 구별하기 위한 것으로, 이들 용어들에 의해 권리범위가 한정되어서는 아니 된다. 예를 들어, 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2 구성요소로 제1 구성요소로 명명될 수 있다.Also, the meaning of the terms described in the present invention should be understood as follows. The terms " first ", " second ", and the like are intended to distinguish one element from another, and the scope of the right should not be limited by these terms. For example, the first component may be referred to as a second component, and similarly, the second component may be referred to as a first component.

나아가 어떤 구성요소가 다른 구성요소에 “연결되어”있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결될 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 “직접 연결되어”있다고 언급된 때에는 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 한편, 구성요소들 간의 관계를 설명하는 다른 표현들, 즉 “~사이에”와 “~사이에” 또는 “~에 이웃하는”과 “~에 직접 이웃하는” 등도 마찬가지로 해석되어야 한다.Further, when an element is referred to as being "connected" to another element, it should be understood that other elements may also be present in the middle, although it may be directly connected to the other element. On the other hand, when an element is referred to as being "directly connected" to another element, it should be understood that there are no other elements in between. On the other hand, other expressions describing the relationship between components, such as "between", "between" or "neighboring to" and "directly adjacent to" should be interpreted as well.

단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한 복수의 표현을 포함하는 것으로 이해되어야 하고, “포함하다”또는 “가지다” 등의 용어는 설시된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이며, 하나 또는 그 이상의 다른 특징이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.It should be understood that the singular " include " or " have " are to be construed as including a stated feature, number, step, operation, component, It is to be understood that the combination is intended to specify that it does not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or combinations thereof.

본 발명에 따른 직벽형 방음벽 기초 시공구조물은, 방음벽 시공이 이루어지는 시공현장에서 사전에 미리 제작된 PC H빔을 수직으로 타설하고, 상기 PC H빔과 PC 기초구조물을 결합시켜 각 부재간의 일체성을 향상시키며, PC 기초구조물의 양측면에 ㄷ자 형강을 구성함으로써, 서로 연속되어 설치되는 PC벽체의 결합구조를 간편화함과 동시에 내부결합을 증대시킴으로써, 시공성이 향상되고 공기를 단축시킬 수 있는 효과가 있다.The wall-type soundproof wall basic construction structure according to the present invention is constructed such that a pre-manufactured PC H beam is vertically installed at the construction site where the soundproof wall construction is performed, and the PC H beam and the PC foundation structure are combined, And by forming the U-shaped beams on both sides of the PC foundation structure, the joining structure of the PC wall continuously connected to each other is simplified and the inner joint is increased, thereby improving the workability and shortening the air.

도 1은 본 발명에 따른 직벽형 방음벽 기초 시공구조물의 전체모습을 도시한 도면,
도 2는 본 발명에 따른 직벽형 방음벽 기초 시공구조물의 결합상태를 도시한 도면,
도 3은 본 발명에 따른 직벽형 방음벽 치고 식공구조물의 정단면을 도시한 도면,
도 4는 본 발명에 따른 직벽형 방음벽 기초 시공구조물의 측단면을 도시한 도면,
도 5는 본 발명에 따른 직벽형 방음벽 기초 시공구조물의 결합상태를 도시한 도면,
도 6은 본 발명의 다른 실시예에 따른 직벽형 방음벽 기초 시공구조물의 결합상태를 도시한 도면,
도 7은 본 발명의 또 다른 실시예에 따른 직벽형 방음벽 기초 시공구조물의 결합상태를 도시한 도면,
도 8 내지 도 13은 본 발명에 따른 직벽형 방음벽 기초 시공구조물의 시공모습을 도시한 도면
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing the entire construction of a wall-type soundproof wall foundation construction according to the present invention;
FIG. 2 is a view showing a combined state of a wall-type sound barrier wall foundation construction according to the present invention,
FIG. 3 is a front view of a wall structure of a wall-type soundproof wall according to the present invention,
FIG. 4 is a side cross-sectional view of a wall-type sound barrier wall foundation construction according to the present invention,
FIG. 5 is a view showing a combined state of the wall-type sound barrier wall foundation construction according to the present invention,
FIG. 6 is a view showing a combined state of a wall-mounted soundproof wall foundation construction according to another embodiment of the present invention, and FIG.
FIG. 7 is a view showing a combined state of a wall-mounted soundproof wall foundation construction according to another embodiment of the present invention, and FIG.
8 to 13 are views showing a construction view of a base wall construction of a wall type sound barrier wall according to the present invention

이하, 본 발명이 속하는 선호적인 실시예를 참고로 하여 더욱 상세하게 설명한다.Hereinafter, the present invention will be described in more detail with reference to the preferred embodiments to which the present invention belongs.

먼저 도 1은 본 발명에 따른 직벽형 방음벽 기초 시공구조물의 전체모습을 도시한 도면으로, 기초부(100), 방음벽(200) 및 PC 수직빔(300)이 일체로 결합되어 도로시설물의 지면에 삽입되며, 도 2에 도시된 바와 같이 기초부(100)의 폭방향으로 서로 연속적으로 설치되어짐으로써 직벽형 방음벽을 구성하게 된다.1 is a view showing an entire structure of a wall-type sound barrier wall construction according to the present invention. The base wall 100, the sound barrier wall 200, and the PC vertical beam 300 are integrally connected to the ground of the road facility As shown in FIG. 2, they are continuously installed in the width direction of the base 100, thereby forming a wall-like soundproof wall.

이를 상세히 설명하면 상기 기초부(100)는 소정의 위치에 복수개의 헤드앵커(h)가 구성되어 시공 시, 양중장비를 이용하여 양중이 가능하게 구성되어진다.In more detail, the base part 100 includes a plurality of head anchors h at a predetermined position, and is constructed so as to be able to bend using both heavy equipment at the time of construction.

이때 상기 헤드앵커(h)의 도 3에 도시된 바와 같이 일측단부는 외부로 돌출되어지고, 타측단부는 기초부(100)의 내부에 삽입된 상태로 구성되어 기초부(100)와 함께 생산되어지게 된다.3, one end of the head anchor h is protruded outward and the other end of the head anchor h is inserted into the base part 100 and is produced together with the base part 100 .

상기 기초부(100)는 전후면을 서로 관통하는 복수개의 배수구(111)가 형성된 몸체부(110)가 구성되어진다. 상기 배수구(111)는 기초부(100)의 하측단부가 지면(1)에 삽입되어질 시에, 지하수 또는/ 및 지면에 흡수된 우수가 원활히 이동되어지도록 하게 된다.The base portion 100 includes a body portion 110 having a plurality of drain holes 111 passing through the front and rear surfaces thereof. When the lower end of the base part 100 is inserted into the ground 1, the drain hole 111 smoothly moves the water absorbed in the groundwater and / or the ground.

상기 몸체부(110)의 양측단부는 일측단부에 구성된 제1 단부(120)와, 타측단부에 구성된 제2 단부(130)로 구성되어진다.  Both ends of the body part 110 are constituted by a first end part 120 formed at one end and a second end part 130 formed at the other end part.

상기 제1,2 단부(120, 130)는 도 5에 도시된 바와 같이, 상기 제1 단부(120)는 내측으로 오목하여 사다리꼴 형상의 오목홈이 형성되며, 제2 단부는 평평한 면으로 형성되어진다.As shown in FIG. 5, the first and second end portions 120 and 130 are recessed inwardly to form a trapezoidal concave groove, and the second end portion is formed as a flat surface Loses.

상기 제1,2 단부(120, 130)에는 평단면이 ㄷ자 형상으로 형성되어, 일측단부는 상기 제1,2 단부(120, 130)의 내부에 구성되고, 타측단부는 외부로 돌출되며 각각 한쌍으로 구성된 제1, 2 결합부재(121, 131)가 구성되어진다. The first and second end portions 120 and 130 are formed in a C-shape having a flat cross section. One end portion is formed inside the first and second end portions 120 and 130, and the other end portion protrudes outward. The first and second coupling members 121 and 131 are formed.

상기 제1, 2 결합부재(121, 131)는 금속재질로 구성되어지는 것이 선호되지만, 동일한 목적과 기능을 달성할 수 있는 범위 대에서 다른 재질로 사용되어지는 것을 배제하는 것은 아니다.Although it is preferred that the first and second coupling members 121 and 131 are made of a metal material, it is not excluded that the first and second coupling members 121 and 131 are used in different materials in the range where the same purpose and function can be achieved.

상기 제1 결합부재(121)는 제1 단부(120)에 구성되며 오목한 부분이 내측방향을 향하도록 구성되며, 제2 결합부재(131)는 제2 단부(130)에 구성되며 오목한 부분이 외측방향을 향하도록 구성된다.The first engaging member 121 is formed at the first end 120 and the concave portion is configured to be directed toward the inside direction while the second engaging member 131 is configured at the second end 130, Direction.

상기 제1,2 결합부재(121, 131)는 상기 기초부(100)의 높이에 대응되는 길이로 구성되어 기초부(100)가 폭방향으로 서로 연속되어 설치되어질 시, 서로 교차되어 결합되어짐으로써 기초부(100) 간의 결합이 용이하며, 견고하게 고정되어지는 장점이 있다.The first and second coupling members 121 and 131 are formed to have a length corresponding to the height of the base 100. When the base 100 is continuously installed in the width direction, The base part 100 can be easily coupled and firmly fixed.

상기 제1,2 결합부재(121, 131)가 결합되어지면, 제1,2 단부(120, 130)에는 소정의 공간이 형성되어지는데, 상기 소정의 공간에는 현장에서 몰탈(M)을 충진하게 된다.When the first and second coupling members 121 and 131 are coupled to each other, a predetermined space is formed in the first and second ends 120 and 130. The predetermined space is filled with mortar M do.

또한 제1,2 단부(120, 130)가 접합되어지는 접합부분에는 추가적으로 코깅작업을 실시하여 기초부(100)의 내부 방수효과를 향상시키게 된다.Further, the joining portion where the first and second end portions 120 and 130 are joined is further subjected to a cogging operation to improve the internal waterproof effect of the base portion 100.

한편, 도 6은 본 발명의 다른 실시예를 도시한 도면으로, 상기 한쌍의 제2 결합부재(131) 사이에는 상기 기초부(100)의 높이에 대응되는 길이로 구성된 지수판(132)이 구성되어진다.6 is a view illustrating another embodiment of the present invention. A power plate 132 having a length corresponding to the height of the base 100 is formed between the pair of second coupling members 131 Loses.

상기 지수판(132)은 일측단부가 제2 단부(130)의 내부에 구성되고, 타측단부는 외부로 돌출되어지도록 구성되어짐으로써, 상기 기초부(100)의 내부 방수를 2중으로 구성하여 수밀성이 더욱 향상되어지는 장점이 있다.Since the one end portion of the water level plate 132 is formed inside the second end portion 130 and the other end portion is protruded to the outside, the waterproofness of the base portion 100 is doubled, There is an advantage to be improved.

상기 기초부(100)의 하측단부에는 소정의 길이만큼 상측방향으로 오목한 결합홈(140)이 형성되어진다. 상기 결합홈(140)은 추후에 상세히 설명하도록 한다.At the lower end of the base portion 100, an engaging groove 140 is formed in a concave shape upward by a predetermined length. The engaging groove 140 will be described later in detail.

도 7은 본 발명의 또 다른 실시예를 도시한 도면으로, 상기 한쌍의 제2 결합부재(131)의 일측단부는 기초부(100)의 내부에 구성되고, 타측단부는 외부로 돌출되어지되, 평단면의 형상이

Figure 112018055537783-pat00001
자 형상으로 형성되어진다.7 is a view illustrating another embodiment of the present invention, wherein one end of the pair of second engaging members 131 is formed inside the base 100 and the other end is protruded outward, The shape of the flat section
Figure 112018055537783-pat00001
Shape.

이때 상기 제2 결합부재(131)의 돌출된 타측단부는 상기 제1 결합부재(121)가 형성하는 내측형상에 대응되도록 구성되어 결합되어진다. 또한 상기 제2 결합부재(131)의 타측단부 외측면에는 지수재(134)가 도포되어짐으로써, 제1,2 결합부재(121, 131)간의 결합력이 향상되어지며, 추가적으로 수밀성이 더욱 향상되어지는 장점이 있다.At this time, the other protruded end of the second engaging member 131 is configured to correspond to the inner shape formed by the first engaging member 121. In addition, since the exposing member 134 is coated on the outer surface of the other end of the second engaging member 131, the engaging force between the first and second engaging members 121 and 131 is improved and the water tightness is further improved There are advantages.

한편, 상기 제2 결합부재(131)는 탄성재질로 구성된 지수판으로 대체되어 사용되어지는 것을 추가로 구성한다.The second coupling member 131 may be replaced with a waterproof plate made of an elastic material.

상기 제2 결합부재(131)의 평단면 형상은

Figure 112018055537783-pat00002
자로 형성되어짐에 따라 내부 공간에 몰탈을 충진하게 되면, 소정의 크기만큼 부풀어 오르게 되고, 상기 제2 결합부재(131)의 외측면이 제1 결합부재(121)의 내측면에 맞닿게 되어 밀착되어지게 된다.The flat cross-sectional shape of the second engaging member 131 is
Figure 112018055537783-pat00002
The outer surface of the second engaging member 131 is brought into close contact with the inner surface of the first engaging member 121 so that the outer surface of the second engaging member 131 is in close contact with the inner surface of the first engaging member 121. As a result, .

상기와 같이 제2 결합부재(131)를 탄성재질의 지수판으로 구성함으로써, 추가적인 방수작업 및 지수판을 추가하지 않는 것이 가능하여 방수효과의 향상과 함께 시공비용이 절감되어지는 장점이 있다.As described above, since the second coupling member 131 is made of a water-resistant plate made of an elastic material, it is possible not to add additional water-proofing work and a water-proof plate, thereby improving the waterproof effect and reducing the construction cost.

한편, 상기에서는 제1 단부(120)에 제1 결합부재(121)가 구성되고, 제2 단부(130)에 제2 결합부재(131)가 구성되어지는 것을 설명하고 있으나, 동일한 목적과 기능을 달성할 수 있는 범위 내에서, 제1 단부(120)에 제2 결합부재(131)가 구성되고, 제2 단부(130)에 제1 결합부재(121)가 서로 교차되어 사용되어질 수 있다.Although the first engaging member 121 is formed at the first end 120 and the second engaging member 131 is formed at the second end 130 in the above description, The first engaging member 131 may be formed at the first end 120 and the first engaging member 121 may be used at the second end 130 to cross each other within a range that can be achieved.

다음으로 상기 방음벽(200)은 상기 기초부(100)의 상측단부에 구성되어 도로시설물에서 발생되는 소음이 외부로 퍼져나가는 것을 저감시키거나 차단시키는 역할을 한다.Next, the soundproof wall 200 is formed at the upper end of the base part 100 to reduce or prevent noise emitted from the road facilities from spreading to the outside.

상기 방음벽(200)은 상기 기초부(100)의 상측단부에 구성되며 소정의 두께를 가지는 지지판(210)이 구성되어진다. The sound barrier 200 is formed on the upper end of the base 100 and has a predetermined thickness.

상기 지지판(210)의 소정의 위치에는 복수개의 타공이 구성되어지는데, 상기 타공에 대응되는 크기로 구성된 고정부재(211)에 의해 기초부(100)에 고정되어진다.A plurality of pores are formed at a predetermined position of the support plate 210, and are fixed to the base 100 by a fixing member 211 having a size corresponding to the pore.

상기 고정부재(2110)의 일측단부는 상기 지지판(210)의 타공에 삽입되어 볼트와 같은 결합부재로 인해 결합되어지고, 타측단부는 내측방향으로 절곡되어 L자 형상으로 형성되어짐으로써, 상기 지지판(210)이 기초부(100)의 상측단부에 견고하게 고정되어질 수 있다.One end of the fixing member 2110 is inserted into the hole of the support plate 210 and is coupled by a coupling member such as a bolt and the other end of the fixing member 2110 is bent inward to form an L shape, 210 can be firmly fixed to the upper end of the base portion 100.

한편, 상기 고정부재(211)는 최초에 기초부(100)를 생산할 시에, 미리 매립하여 함께 생산되어진다.On the other hand, when the base member 100 is produced for the first time, the fixing member 211 is buried in advance and produced together.

상기 지지판(210)의 상측단부에는 소정의 길이만큼 상측방향으로 돌출되며, 평단면이 H형상으로 구성된 방음벽 지지대(220)가 구성되어진다. 이때 상기 지지판(210)은 방음벽 지지대(220)에서 발생되는 충격을 완충시키기 위하여 탄성재질로 구성되어지는 것이 선호되지만, 동일한 목적과 기능을 달성할 수 있는 범위 내에서 다른 재질로 구성되어지는 것을 배제하는 것은 아니다.A soundproof wall support 220 protruding upward by a predetermined length and having a flat H-shape is formed at the upper end of the support plate 210. At this time, it is preferable that the support plate 210 is made of an elastic material in order to buffer the impact generated in the sound barrier support 220. However, it is preferable to exclude that the support plate 210 is made of other materials within the range that can achieve the same purpose and function It does not.

상기 방음벽 지지대(220)는 일측에 구성된 지지대(220)와 타측에 구성된 지지대(220)가 한쌍으로 구성되며, 상기 한쌍의 지지대(220) 사이에 방음판(230)이 결합되어 방음벽을 구성하게 된다.The soundproof wall support 220 includes a pair of support rods 220 on one side and a support rods 220 on the other side and a soundproof plate 230 is coupled between the pair of support rods 220 to form a soundproof wall.

상기 방음판(230)은 지지대(220)의 오목한 홈에 결합되어지며, 주변환경 및 사용목적에 따라 흡음판, 반사판, 방풍판 등 다양한 구성으로 적용하게 사용되어질 수 있다.The sound insulation plate 230 is coupled to the concave groove of the support table 220 and can be used in various configurations such as a sound absorption plate, a reflection plate, and a windshield depending on the surrounding environment and purpose of use.

상기 기초부(100)의 하측단부에는 콘크리트 재질로 구성되어 미리 생산딘 PC 수직빔(300)이 결합되어진다.At the lower end of the base part 100, a pre-produced PC vertical beam 300 is formed of a concrete material.

이때 상기 PC 수직빔(300)의 상측단부는 도 4에 도시된 바와 같이, 상기 기초부(100)의 하측단부에 구성된 결합홈(140)에 삽입되어지며, 현장에서 콘크리트가 타설되어지게 된다.At this time, the upper end of the PC vertical beam 300 is inserted into the coupling groove 140 formed at the lower end of the base part 100 as shown in FIG. 4, and the concrete is installed in the field.

상기 기초부(100)와 PC 수직빔(300)은 각각 콘크리트 재질로 구성되며, 미리 제작된 PC구조물로 구성되어진다. The base part 100 and the PC vertical beam 300 are each made of a concrete material and are made of a pre-fabricated PC structure.

따라서 현장에서 타설되어지는 콘크리트로 인해 기초부(100)와 PC 수직빔(300)의 일체성이 향상되어 구조가 견고하도록 구성되어지며, 기초부(100)와 PC 수직빔(300)을 결합하기 위하여 철근을 추가적으로 시공해야하는 시공단계를 생략하는 것이 가능하여 공기 및 시공비용이 절감되는 장점이 있다.Therefore, it is possible to improve the integrity of the base portion 100 and the PC vertical beam 300 due to the concrete placed on the site, It is possible to omit the construction step in which reinforcing bars are additionally required to be installed, thereby reducing air and construction costs.

다음으로 도 8 내지 도 13은 본 발명에 따른 직벽형 방음벽 기초 시공구조물의 시공모습을 도시한 도면이다.Next, FIGS. 8 to 13 are views showing a construction of a base wall construction of a wall-type sound barrier wall according to the present invention.

먼저 터파기 자리(2)의 양측 지면(10)에는 전후방향으로 연장된 레일(R)을 설치하며, 상기 레일(R)을 따라 이동되어 기초부(100)의 삽입 위치를 안내해서 터파기 자리(2)에 삽입하는 시공가이드 장치(400)를 구성한다.A rail R extending in the forward and backward directions is provided on both sides of the ground surface 10 of the terra cotta seat 2 and is guided along the rail R to guide the insertion position of the base portion 100, Thereby forming a construction guide device 400 to be inserted into the installation guide 2.

상기 시공가이드 장치(400)를 레일(R)에 설치한 후, 상기 기초부(100)에 구성된 헤드앵커(h)를 이용하여 양중장비가 기초부(100)를 들어 올리고, 상기 시공가이드 장치(400)에 안착시켜, 터파기 자리(2)에 기초부(100)를 삽입하게 된다.After the installation guide device 400 is installed on the rail R, both heavy equipment lifts the foundation 100 using the head anchor h formed on the foundation 100, 400, so that the base 100 is inserted into the ter- minal spacer 2.

이때 삽입되는 기초부(100)는 방음벽(200)과 PC 수직빔(300)을 일체형으로 결합시킨 후, 터파기 자리(2)에 삽입되어진다.At this time, the inserted base part 100 is integrally joined with the soundproof wall 200 and the PC vertical beam 300, and then inserted into the ter- minal base 2.

상기 시공가이드 장치(400)는 휠 부재(411)를 구비하며, 상기 휠 부재(411)는 레일(R)과 결합되어 전후진 이동되어진다. The construction guide device 400 includes a wheel member 411. The wheel member 411 is coupled with the rail R and is moved forward and backward.

상기 휠 부재(411)는 가이드 몸체부(410)의 하측단부에 구비되어지며, 상기 가이드 몸체부(410)의 중앙부분에는 상기 기초부(100)와 대응되는 삽입부(412)가 상하로 관통되어지도록 구성되어진다.The wheel member 411 is provided at the lower end of the guide body 410 and the insertion portion 412 corresponding to the base portion 100 is vertically inserted into the center portion of the guide body portion 410 .

이때 상기 삽입부(412)는 시공가이드 장치(400)가 이동되어지는 이동방향의 반대방향이 개방된 형상으로 형성되어, 상기 가이드 몸체부(410)의 평면형상이 ㄷ자 형상으로 형성되어진다.At this time, the inserting portion 412 is formed in an open shape opposite to the moving direction in which the construction guide device 400 is moved, and the guide body portion 410 is formed in a planar shape in a C shape.

상기 가이드 몸체부(410)는 일측방향이 개방된 ㄷ자 형상으로 형성되어짐으로써, 기초부(100)의 하측단부가 터파기 자리(2)에 삽입되어도 시공가이드 장치(400)가 레일(R)을 따라 이동되어질 시 간섭이 발생되지 않는다.The guiding body unit 410 is formed in a U-shape with one side opened so that even if the lower end of the base part 100 is inserted into the tearing seat 2, No interference occurs when moving along.

상기 가이드 몸체부(410)의 상면에는 상측방향으로 돌출된 패널형상으로 구성된 가이드 패널(430)이 구성되어진다.A guide panel 430 having a panel shape protruding upward is formed on the upper surface of the guide body 410.

상기 가이드 패널(430)은 기초부(100)에 밀착되어지도록 패널 가이드(413)가 가이드 패널(430)의 외측면에 구성되어 슬라이드 이동되어진다. 이때, 패널 가이드(413)는 상기 가이드 패널(430)의 개수에 대응되도록 구성되어진다.The panel guide 413 is slidably moved on the outer surface of the guide panel 430 so that the guide panel 430 is in close contact with the base 100. At this time, the panel guide 413 is configured to correspond to the number of the guide panels 430.

한편, 상기 패널 가이드(413)는 사이드 몸체부(410)의 개방된 부분을 제외하고, 삽입부(412)의 각 면에 구성되어진다.The panel guide 413 is formed on each side of the insertion portion 412 except for the open portion of the side body portion 410.

상기 가이드 패널(430)의 내측면에는 상기 기초부(100)의 둘레면에 밀착되어 상하방향으로 이동되어지도록 하기 위한 가이드 롤러(431)가 구비되어진다.The inner surface of the guide panel 430 is provided with a guide roller 431 which is in close contact with the circumferential surface of the base part 100 and is moved in the vertical direction.

상기 가이드 롤러(431)는 기초부(100)가 지정된 위치에서 이탈되어지지 않도록 수직으로 삽입되어지는 것을 유도함과 동시에, 가이드 패널(430)과 기초부(100)간의 마찰력을 최소화하여 기초부(100)가 손상되어지는 것을 방지하는 효과가 있다.The guide roller 431 may guide the base portion 100 to be vertically inserted so that the base portion 100 is not separated from the designated position and minimize the frictional force between the guide panel 430 and the base portion 100, Is prevented from being damaged.

다음으로 상기 가이드 몸체부(410)에는 기초부(100)가 터파기 자리(2)에 삽입되어질 시에 시공가이드 장치(400)가 자리에서 이탈되지 않고 정확하게 위치에 시공되어지도록 하기 위한 고정핀(420)이 구성되어진다.Next, the guide body 410 is provided with a fixing pin (not shown) for precisely positioning the guide guide 400 when the base 100 is inserted into the tether 2, 420).

상기 고정핀(420)은 상하방향으로 구성된 바(bar) 형상으로 형성되되 하단이 뾰족하도록 구성되며, 가이드 몸체부(410)의 둘레에 구성된 승강장치(421)에 의해 승하강 되어지도록 구성된다.The fixing pin 420 is configured to be vertically formed in a bar shape and has a lower end sharpened and configured to be raised and lowered by an elevating device 421 formed around the guide body 410.

상기 승강장치(421)는 유압실린더로 구성되며, 상기 고정핀(420)을 하강시키면, 고정핀(420)은 지면(1)으로 파고들어가 시공가이드 장치(400)가 움직이지 않도록 고정하게 되어, 터파기 자리(2)에 기초부(100)가 정확하게 삽입되어지도록 한다.The elevating device 421 is constituted by a hydraulic cylinder and when the fixing pin 420 is lowered, the fixing pin 420 digs into the ground 1 and is fixed so that the construction guide device 400 does not move, So that the base portion 100 is correctly inserted into the ter- treator seat 2.

상기 가이드 패널(430)의 후면에는 가이드 패널(430)이 전후진 이동되어지도록 하기 위하여 유압실린더로 구성된 전후진 장치(440)가 구성된다.In the rear surface of the guide panel 430, a forward / backward device 440 composed of a hydraulic cylinder is configured to move the guide panel 430 forward and backward.

상기 전후진 장치(440)가 작동되어지면, 상기 패널 가이드(413)를 따라 가이드 패널(430)이 이동되어 기초부(100)와 밀착되어지도록 조절하게 된다.The guide panel 430 is moved along the panel guide 413 so as to be brought into close contact with the base part 100. [

상기와 같이 구성된 시공가이드 장치(400)를 이용하여 직벽형 방음벽 기초 시공구조물을 시공하는 방법에 대해 상세히 설명한다.A method of constructing the base wall construction of the wall-type sound barrier wall using the construction guide device 400 constructed as above will be described in detail.

먼저, 시공가이드 장치(400)를 기초부(100)가 설치될 위치로 이동시킨 후, 승강장치(421)를 이용하여 고정핀(420)을 지면(1)에 고정시켜 시공가이드 장치(400)가 움직이지 않게 고정시킨다.The installation guide device 400 is moved to a position where the foundation 100 is to be installed and then the fixing pin 420 is fixed to the paper surface 1 by using the elevating device 421, .

상기와 같기 가이드 장치(400)가 고정되면 전후진 장치(440)를 통하여 가이드 패널(430)을 외측방향으로 슬라이드 이동시킨 후, 양중장비를 이용하여 기초부(100)에 구성된 헤드앵커(h)를 와이어로 결합한 다음, 삽입부(411)의 위치까지 기초부(100)를 이동시킨다.When the guide device 400 is fixed as described above, the guide panel 430 is slid outward through the forward / reverse device 440, and then the head anchor h formed on the base 100 using both heavy equipment, And then moves the base portion 100 to the position of the insertion portion 411. [

상기와 같이 삽입부(411)에 기초부(100)가 위치되어지면, 전후진 장치(440)를 이용하여 가이드 패널(430)을 내측방향으로 슬라이드 이동시켜, 사이드 롤러(431)가 기초부(100)의 둘레면이 밀착되어지도록 하며, 기초부(100)를 삽입하여야 할 터파기 자리(2)에 위치되도록 조정하게 된다.When the base part 100 is positioned on the inserting part 411 as described above, the guide panel 430 is slid in the inward direction using the forward / backward device 440 so that the side roller 431 is moved to the base part 100 are brought into close contact with each other, and the base 100 is adjusted to be positioned at the ter- minal 2 to be inserted.

기초부(100)의 삽입위치에 대한 조정이 완료되면, 양중장치를 이용하여 기초부(100)를 하상시키게 되면, 가이드 패널(430)의 가이드 롤러(431)에 의해 수직으로 안내되어 터파기 자리(2)에 정확히 삽입되어진다.When the adjustment of the insertion position of the base part 100 is completed, when the base part 100 is raised by using the double-sided tape machine, the base part 100 is vertically guided by the guide roller 431 of the guide panel 430, (2).

상기와 같이 기초부(100)가 삽입되어지면, 시공가이드 장치(400)의 승강장치(421)를 승강시켜 고정핀(420)을 승강시킴으로써, 지면(1)에 삽입되어 고정된 고정핀(420)을 제거하게 된다.When the base part 100 is inserted as described above, the lifting and lowering device 421 of the installation guide device 400 is moved up and down to move the fixing pin 420 up and down, ).

상기 고정핀(420)이 제거된 시공가이드 장치(400)는 레일(R)을 따라 기초부(100)의 폭 길이만큼 이동되어진 후, 상기 전술한 과정을 반복하여 기초부(100)를 서로 연속되어지도록 설치하게 된다.The installation guide device 400 from which the fixing pin 420 has been removed is moved along the rail R by the width of the base 100 and then the above process is repeated to connect the base 100 to each other As shown in FIG.

이때, 상기 기초부(100)의 제1,2 단부(120, 130)에 구성된 제1,2 결합부재(121, 131)를 서로 교차되어 결합되어지도록 한 후, 상기 제1, 2단부(120, 130)에 형성된 공간부에 몰탈(M)을 충진함으로써 시공이 이루어지게 된다.The first and second coupling members 121 and 131 formed at the first and second ends 120 and 130 of the base 100 are coupled to each other so as to intersect with each other. And 130 are filled with mortar M, so that construction is performed.

한편, 상기 시공방법을 진행하기에 앞서, 기초부(100), 방음벽(200) 및 PC 수직빔(300)이 미리 결합되어 시공이 이루어지는 것이 선호되지면, 작업 환경 및 시공방법에 따라 기초부(100)와 PC 수직빔(300) 만이 미리 결합되어 지면(1)에 삽입되어진 후, 추후에 방음벽(200)이 추가 시공되어질 수 있다.If it is preferred that the foundation 100, the soundproof wall 200 and the PC vertical beam 300 are pre-assembled before proceeding with the construction method, 100 and the PC vertical beam 300 are previously combined and inserted into the ground 1, and the soundproof wall 200 can be additionally installed at a later time.

상기와 같이 직벽형 방음벽 기초 시공구조물을 시공함으로써, 정확한 위치에 기초부(100)를 지면(1)에 삽입하는 것이 가능하여 시공오차를 최소화할 수 있으며, 이에 따른 공기가 단축되어지는 장점이 있다.As described above, by installing the base wall construction of a wall-type sound barrier wall, it is possible to insert the base part 100 into the ground surface 1 at an accurate position, thereby minimizing a construction error and shortening the air accordingly .

또한 기초부(100)의 양측단부에 구성된 제1,2 결합부재(121, 131)를 이용하여 서로 연속되어지는 기초부(100)를 서로 결합시키는 것이 가능하여,추가적인 결합부재의 사용 및 추가시공을 생략하는 것이 가능한 장점이 있다.It is also possible to join the base portions 100 which are connected to each other by using the first and second coupling members 121 and 131 formed at both side ends of the base portion 100, There is an advantage in that it can be omitted.

또한 본 발명의 다른 실시예에 따르면, 좌우 한쌍으로 구성된 제2 결합부재(131)의 사이에는 기초부(100)의 높이에 대응되는 길이로 구성된 지수판(132)를 추가적으로 구성하여 기초부(100)의 수밀성을 향상시킬 수 있는 장점이 있다.According to another embodiment of the present invention, a power plate 132 having a length corresponding to the height of the base 100 is additionally provided between the pair of left and right second coupling members 131, It is possible to improve the watertightness.

또한 본 발명의 또 다른 실시예에 따르면, 상기 제2 결합부재(131)의 평단면 형상을

Figure 112018055537783-pat00003
자 형상으로 구성하여, 제1 결합부재(121)와의 결합성을 향상시킴과 동시에, 제2 결합부재(131)의 외측면에 지수재(134)를 추가적으로 도포함으로써, 기초부(100)의 수밀성을 더욱 향상시킬 수 있는 장점이 있다.According to another embodiment of the present invention, the flat cross-sectional shape of the second engaging member 131 is
Figure 112018055537783-pat00003
And the index member 134 is additionally applied to the outer surface of the second engaging member 131 so that the water tightness of the base member 100 can be improved by improving the coupling property with the first engaging member 121, Can be further improved.

상기에서는 본 발명의 바람직한 실시예를 참조하여 설명하였지만, 해당 기술 분야의 숙련된 당업자는 하기의 특허 청구의 범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이행할 수 있을 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the present invention as defined by the following claims It will be possible to do so.

100 : 기초부 200 : 방음벽
300 : PC 수직빔 400 : 시공가이드 장치
100: base portion 200: soundproof wall
300: PC vertical beam 400: Installation guide device

Claims (8)

소정의 위치에는 복수개의 헤드앵커(h)가 구성되어 시공시 양중되어지며, 폭방향으로 서로 연속적으로 설치되어지는 기초부(100)와,
상기 기초부(100)의 상측단부에 구성되어 소정의 길이만큼 상측방향으로 돌출되어지며, 기초부(100)의 설치방향에 대응하여 서로 연속되어 구성되는 방음벽(200)과,
상기 기초부(100)의 하측단부에 구성되어 기초부(100)와 일체형으로 결합되어지며, 지면(1)의 터파기 자리(2)에 수직으로 삽입되어지는 H형상의 PC 수직빔(300)을 포함하고,
상기 기초부(100)는 전후면을 서로 관통하는 복수개의 배수구(111)가 형성된 몸체부(110)와,
상기 몸체부(110)의 양측단부 중 일측단부는 내측으로 오목한 오목홈이 형성된 제1 단부(120)와,
상기 제1 단부(120)의 타측단부는 평평한 면으로 형성된 제2 단부(130)와,
상기 기초부(100)의 하측단부에는 소정의 길이만큼 상측방향으로 오목한 오목홈이 형성되어 PC 수직빔(300)의 상측단부가 내입되어지며, 현장에서 콘크리트가 타설되어지는 결합홈(140)을 포함하고,
일측단부는 제1,2 단부(120, 130)의 내부에 삽입되고 타측단부는 외부로 돌출되어지며, 평단면이 ㄷ자 형상으로 형성되어 각각 한쌍으로 구성되고, 오목한 부분이 내측방향을 향하는 한쌍의 제1 결합부재(121)와, 오목한 부분이 외측방향을향하는 한쌍의 제2 결합부재(131)가 서로 교차되어 결합되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물.
A base part 100 which is formed at a predetermined position so as to be constituted by a plurality of head anchors h and which is installed continuously in the width direction,
A sound barrier 200 formed at an upper end of the base part 100 and protruding upward by a predetermined length, and configured to be continuous with the installation direction of the base part 100;
An H-shaped PC vertical beam 300 formed at the lower end of the base portion 100 and integrally coupled to the base portion 100 and vertically inserted into the ter- minal base 2 of the ground 1, / RTI >
The base portion 100 includes a body portion 110 having a plurality of drain holes 111 passing through the front and rear surfaces,
One end portion of each side end portion of the body portion 110 includes a first end portion 120 having an inwardly concave recessed portion,
The other end of the first end 120 has a second end 130 formed as a flat surface,
The upper end of the PC vertical beam 300 is inserted into the lower end of the base portion 100 by a predetermined length so as to be recessed in the upward direction. Including,
One end portion is inserted into the first and second end portions 120 and 130, and the other end portion is protruded outward. The flat end surface is formed in a U-shape and each of the pair of end portions is formed of a pair of concave portions facing inward Wherein the first joining member (121) and the pair of second joining members (131) having a concave portion facing outward are joined to each other so as to intersect with each other.
제 1 항에 있어서,
상기 한쌍의 제2 결합부재(131) 사이에는 기초부(100)의 높이에 따라 대응되도록 구성되며 일측단부는 제2단부(130)의 내부에 삽입되고 타측단부는 외부로 돌출되어지는 지수판(132)을 더 포함하는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물.
The method according to claim 1,
And a pair of second coupling members 131 are formed to correspond to the height of the base part 100. One end of the first coupling part 131 is inserted into the second end part 130 and the other end of the second coupling part 131 is connected to a water- Further comprising: a base structure for supporting the base structure.
제 1 항에 있어서,
상기 한쌍의 제2 결합부재(131)의 일측단부는 기초부(100)의 내부에 삽입되고 타측단부는 외부로 돌출되어 T자 형상으로 형성되어, 상기 제1 결합부재(121)의 홈에 결합되어지며,
상기 제2 결합부재(131)의 돌출부분의 외측면에는 지수재(134)가 도포되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물.
The method according to claim 1,
One end of the pair of second engaging members 131 is inserted into the base 100 and the other end of the second engaging member 131 protrudes outward to form a T- Lt; / RTI >
And an exponent material (134) is applied to an outer surface of a protruded portion of the second joint member (131).
제 1 항에 있어서,
상기 방음벽(200)은 상기 기초부(100)의 상측단부에 구성되어 소정의 두께를 가지는 지지판(210)과,
상기 지지판(210)의 상측단부에는 소정의 길이만큼 상측방향으로 돌출되어지며 평단면이 H형상으로 구성된 방음벽 지지대(220)와,
상기 일측에 구성된 지지대(220)와 타측에 구성된 지지대(220)의 사이에 결합되어 구성되는 방음판(230)을 포함하는 것을 특징으로 하는 직벽형 방음벽 기초시공구조물.
The method according to claim 1,
The soundproof wall 200 includes a support plate 210 having a predetermined thickness at the upper end of the base 100,
A soundproof wall support 220 protruding upward by a predetermined length from the upper end of the support plate 210 and having a flat section H,
And a sound absorbing plate (230) coupled between the support rods (220) on one side and the support rods (220) on the other side.
제 4 항에 있어서,
일측단부는 상기 지지판(210)의 타공에 삽입되어 결합부재로 결합되어지고,
타측단부는 내측방향으로 절곡되어 L자 형상으로 형성되는 복수개의 고정부재(211) 에 의해 고정되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물.
5. The method of claim 4,
One end of which is inserted into the hole of the support plate 210 and is coupled to the coupling member,
And the other end is fixed by a plurality of fixing members (211) bent in an inward direction and formed in an L shape.
제 1 항에 있어서,
상기 터파기 자리(2)의 양측 지면(1)에 전후방향으로 연장된 레일(R)을 설치하며,
상기 레일(R)을 따라 이동되어 기초부(100)의 삽입 위치를 안내하는 시공가이드 장치(400)를 구성하며,
상기 기초부(100)의 헤드앵커(h)를 통해 양중장비가 기초부(100)를 들어 올린 후 상기 시공가이드 장치(400)에 의해 삽입 위치로 삽입되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물.
The method according to claim 1,
A rail (R) extending in the front-rear direction is provided on both side surfaces (1) of the ter- treator seat (2)
A guide guide device 400 which moves along the rail R to guide the insertion position of the base part 100,
Wherein both the heavy equipment lifts the base part (100) through the head anchor (h) of the base part (100) and is inserted into the insertion position by the installation guide device (400) structure.
제 6 항에 있어서,
상기 시공가이드 장치(400)는 상기 레일(R)과 결합되어 이동되어지는 휠 부재(411)를 구비하며,
중앙부분에는 상기 기초부(100)와 대응되는 삽입부(412)가 상하로 관통되어지도록 구성된 가이드 몸체부(410)와, 상하방향으로 구성된 바(bar) 형상으로 형성되어,
상기 가이드 몸체부(410)의 둘레가 승강가능하게 결합되며 승강장치(421)에 의해 승강되어 하강될시, 하단부가 지면(1)에 삽입고정되는 고정핀(420)과, 상측방향으로 돌출된 패널형상으로 구성되며,
복수개의 가이드 롤러(431)가 밀착되어 기초부(100)가 삽입부(412)로부터 이탈되어지지 않고 수직삽입 가능하게 구성된 가이드 패널(430)과,
상기 가이드 패널(430)의 후면에 구성되어 가이드 패널(430)이 전후진되어지도록 구성되는 전후진 장치(440)을 포함하는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물.
The method according to claim 6,
The construction guide device 400 includes a wheel member 411 that is moved in conjunction with the rail R,
A guide body 410 configured to vertically penetrate an insertion portion 412 corresponding to the base portion 100 at a central portion thereof and a guide body portion 410 formed in a bar shape configured in a vertical direction,
A fixing pin 420 whose lower end is inserted and fixed to the paper surface 1 when the guide body 410 is lifted and lowered by the lifting device 421, Panel shape,
A guide panel 430 having a plurality of guide rollers 431 tightly adhered so that the base portion 100 can be inserted vertically without being separated from the insertion portion 412,
And a forward / backward device (440) formed on a rear surface of the guide panel (430) and configured to move the guide panel (430) back and forth.
제 7 항에 있어서,
상기 가이드 몸체부(410)는 시공가이드 장치(400)가 이동되어지는 이동방향의 반대방향이 개방되어 평면형상이 ㄷ자 형상으로 구성되어지는 것을 특징으로 하는 직벽형 방음벽 기초 시공구조물.
8. The method of claim 7,
Wherein the guide body portion (410) is formed in a U-shaped planar shape in a direction opposite to the moving direction in which the construction guide device (400) is moved.
KR1020180065100A 2017-09-29 2018-06-05 Vertical wall type soundproof wall foundation construction KR101947038B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR20170127866 2017-09-29
KR1020170127866 2017-09-29

Publications (1)

Publication Number Publication Date
KR101947038B1 true KR101947038B1 (en) 2019-02-12

Family

ID=65369179

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180065100A KR101947038B1 (en) 2017-09-29 2018-06-05 Vertical wall type soundproof wall foundation construction

Country Status (1)

Country Link
KR (1) KR101947038B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102186472B1 (en) * 2019-06-24 2020-12-03 주식회사 케이씨산업 Base structure for soundproof wall of roadway

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101287487B1 (en) 2011-08-24 2013-07-19 매크로드 주식회사 Soundproof wall basic structure installation method using the precast concrete segment
KR101346020B1 (en) * 2012-12-10 2014-01-15 안창일 Wall type footing using precast member

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101287487B1 (en) 2011-08-24 2013-07-19 매크로드 주식회사 Soundproof wall basic structure installation method using the precast concrete segment
KR101346020B1 (en) * 2012-12-10 2014-01-15 안창일 Wall type footing using precast member

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102186472B1 (en) * 2019-06-24 2020-12-03 주식회사 케이씨산업 Base structure for soundproof wall of roadway

Similar Documents

Publication Publication Date Title
KR101200927B1 (en) Cnnecting structure of precast body and pile and constructing method of the same
KR101761734B1 (en) Cutoff wall structure of continuous wall type with hot rolled steel plate, and construction method of cutoff wall of temporary facility using the same
CN210031842U (en) Combined supporting system for adjacent deep foundation pit based on row piles, connecting beams and counter-pulling anchor cables
JP5182251B2 (en) Steel sheet pile joint structure and steel sheet pile wall structure
KR101947038B1 (en) Vertical wall type soundproof wall foundation construction
KR100977206B1 (en) A retaining wall structure for using slide rail and installation method
JP4320322B2 (en) Noise barrier for tunnel
KR20110088326A (en) Construction method for underground structure using pressed pipe
KR101169785B1 (en) Roof structures and method for constructing thereof
KR101863627B1 (en) Top-down Construction method using Drainage H-type prestressed concrete wall and drainage JRS slab system
KR20190038244A (en) Underground road way construction method
CN110565667A (en) Steel sheet pile cofferdam with slip casting platform
KR101851279B1 (en) Construction method of low-depth cutoff wall using steel plates connected in sequence
KR20160110699A (en) Structure for connecting earth retaining wall
JPH09100541A (en) Underground structure and asymmetric u-shaped steel sheet-pile
JP4036178B2 (en) Method and apparatus for installing concrete block
KR20120134677A (en) The precast concrete closed conduit that is reinforced by the shear connector and constructing method of it
KR101386275B1 (en) Reformed sheet plate and the method of installation of the same
KR100794810B1 (en) Excavation method of road and railroad lower part using deck unit jacking
JP3117786U (en) Flume raising block
CN217150380U (en) Subway upper cover building damping system
CN213625683U (en) Rail transit station concrete assembled fish-belly sill structure
CN113550349B (en) Assembly type subway station and construction method thereof
CN212200441U (en) Foundation pit support frame
KR102293522B1 (en) Construction method of cutoff wall of continuous wall type with hot rolled steel plate

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant