KR101890269B1 - Construction method of sewage treatment equipment and sewage treatment equipment by this method - Google Patents
Construction method of sewage treatment equipment and sewage treatment equipment by this method Download PDFInfo
- Publication number
- KR101890269B1 KR101890269B1 KR1020170002359A KR20170002359A KR101890269B1 KR 101890269 B1 KR101890269 B1 KR 101890269B1 KR 1020170002359 A KR1020170002359 A KR 1020170002359A KR 20170002359 A KR20170002359 A KR 20170002359A KR 101890269 B1 KR101890269 B1 KR 101890269B1
- Authority
- KR
- South Korea
- Prior art keywords
- pipe
- sewage treatment
- sewage
- concrete manhole
- treatment facility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
- E03F5/102—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins using already existing parts of the sewer system for runoff-regulation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D24/00—Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof
- B01D24/02—Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof with the filter bed stationary during the filtration
- B01D24/20—Filters comprising loose filtering material, i.e. filtering material without any binder between the individual particles or fibres thereof with the filter bed stationary during the filtration the filtering material being provided in an open container
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/001—Processes for the treatment of water whereby the filtration technique is of importance
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/02—Manhole shafts or other inspection chambers; Snow-filling openings; accessories
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/14—Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Water Supply & Treatment (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Environmental & Geological Engineering (AREA)
- Organic Chemistry (AREA)
- Sewage (AREA)
Abstract
본 문건은 시중에 판매되는 기성 콘크리트 맨홀과 기성 하수관을 이용한 하수처리시설 시공방법을 개시한다.
전술한 하수처리시설 시공방법의 실시예는, 바닥과 벽을 구비한 기성 콘크리트 맨홀과, 상기 콘크리트 맨홀의 내부에 수직으로 설치될 기성 하수관이 준비되는, 자재준비 단계; 상기 하수관이 상기 콘크리트 맨홀의 내벽 높이에 대응되는 길이로 절단되는, 하수관절단 단계; 상기 콘크리트 맨홀의 벽면 소정 높이에 오수가 유입되는 유입홀과, 오수가 유출되는 유출홀이 뚫려지고, 상기 하수관의 하부에 제1 유로홀이, 상부에 제2 유로홀이 뚫려지는, 자재천공 단계; 상기 콘크리트 맨홀의 내부에 상기 하수관이 설치되는, 하수관설치 단계; 및, 상기 배출홀과 상기 제2 유로홀이 연결관으로 연결되는, 연결관설치 단계;를 포함한다.
실시예에 따른 하수처리시설 시공방법은, 시중에 판매되는 기성 콘크리트 맨홀과 기성 하수관을 이용하여, 콘크리트 하수처리시설을 저렴한 비용으로 빠르게 시공할 수 있다.This document discloses a method of constructing a sewage treatment facility using a commercially available concrete manhole and an existing sewer pipe.
An embodiment of the above-described sewage treatment facility construction method includes: a prefabricated concrete manhole having a floor and a wall, and a ready-made sewage pipe to be vertically installed in the concrete manhole; Wherein the sewage pipe is cut to a length corresponding to the height of the inner wall of the concrete manhole; A material hole piercing step of piercing an inflow hole into which wastewater flows into a predetermined height of a wall surface of the concrete manhole and an outflow hole through which wastewater flows out and a first flow hole is formed in a lower portion of the sewer pipe, ; A sewer pipe installation step in which the sewer pipe is installed inside the concrete manhole; And a connection pipe installation step in which the discharge hole and the second flow hole are connected to each other through a connection pipe.
According to the embodiment of the present invention, the concrete sewage treatment facility can be constructed at low cost by using the ready-made concrete manhole and the ready-made sewage pipe sold on the market.
Description
본 문건이 개시하는 기술은, 하수처리시설과 관련된다.The technology disclosed by this document relates to a sewage treatment facility.
대부분의 국가에서는, 오·폐수를 발생시키는 건물(주택, 빌딩, 축사 등)은, 하수처리시설(정화조, 분뇨처리시설, 공공하수처리시설 등)을 설치하도록 법(하수도법 등)으로 규정하고 있다.In most countries, buildings (houses, buildings, housing, etc.) that generate wastewater are provided with sewage treatment facilities (sewage treatment facilities, etc.) to install sewage treatment facilities (septic tanks, manure treatment facilities and public sewage treatment facilities) .
한편, 단독정화조 등과 같이 크기가 작은 개인하수처리시설은, 주로 PE(폴리에틸렌) 또는 FRP(유리섬유강화플라스틱) 재질로 제작된다. 그러나 PE, FRP 재질로 제작된 하수처리시설은 강도와 내구성이 약한 문제점이 있다.On the other hand, a private sewage treatment plant having a small size such as a single septic tank is mainly made of PE (polyethylene) or FRP (glass fiber reinforced plastic). However, sewage treatment facilities made of PE and FRP have weak strength and durability.
특히, 최근에는 지하수 고갈 등의 이유로, 땅꺼짐(싱크홀) 현상이 빈번하게 발생함에 따라, PE, FRP 재질로 제작된 하수처리시설보다는 강도가 강한 콘크리트로 제작(시공)된 하수처리시설이 선호되고 있다.Especially, recently, as the ground off (sinkhole) phenomenon frequently occurs due to the depletion of ground water, the sewage treatment facility constructed (constructed) with stronger strength than the sewage treatment facility made of PE or FRP material is preferred .
한국 등록실용신안공보 제20-0419099호('콘크리트 오수처리시설')에는, 콘크리트로 제작된 하수처리시설의 일례가 개시되어 있다.Korean Utility Model Registration Utility Model No. 20-0419099 ('Concrete wastewater treatment facility') discloses an example of a sewage treatment facility made of concrete.
그러나 전술한 문헌에 개시된 콘크리트 하수처리시설을 제작하기 위해서는, 콘크리트 본체를 ① 공장에서 일괄 제작하거나, ② 현장에 거푸집을 설치한 뒤, 콘크리트를 타설·양생하여 제작해야 하는데, ①번 사항은, 콘크리트 본체를 제작하기 위한 별도의 시설을 마련해야 하기 때문에, 초기 시설 비용이 많이 소요되는 문제점이 있고, ②번 사항은, 대량 생산 방식을 적용할 수 없기 때문에, 제작기간이 오래 걸리고, 제작비용이 높은 문제점이 있다.However, in order to manufacture the concrete sewage treatment facility described in the above-mentioned document, the concrete body should be manufactured in a batch at the factory, or ② the concrete should be placed and cured after the mold is installed at the site. There is a problem that an initial facility cost is increased because a separate facility for manufacturing the main body needs to be provided, and since the mass production method can not be applied to the item (2), it takes a long period of time to manufacture, .
또한, 전술한 문헌에 개시된 콘크리트 하수처리시설은 평판형 격벽을 이용하여, 실[부패조(실), 여과조(실) 등]을 구분하는데, 소형 콘크리트 본체에 평판형 격벽이 구비될 경우, 오수의 이동거리가 충분히 확보되지 않는 문제점이 있다. * 예컨대, 미국은 단독정화조의 오수 유입구와 오수 유출구 사이를 '길이:폭 = 3:1'로 규정하고 있다.The concrete sewage treatment facility disclosed in the above-mentioned documents uses flat plate type bulkheads to separate seals (corruption chambers, filtration chambers, etc.). When a small-sized concrete body is provided with flat plate type bulkheads, There is a problem in that a sufficient moving distance of the motor can not be ensured. * For example, the United States defines 'length: width = 3: 1' between the sewage inlet and the sewage outlet of a single septic tank.
단기간 내에 낮은 비용으로 콘크리트 하수처리시설을 제작(시공)하는 방법을 제공하는 것이다.(Construction) of a concrete sewage treatment facility at a low cost within a short period of time.
시중에 판매되는 기성 콘크리트 맨홀과 기성 하수관을 이용한 하수처리시설 시공방법이 제시된다.A method of constructing a sewage treatment facility using a ready-made concrete manhole and an existing sewer pipe sold on the market is presented.
전술한 하수처리시설 시공방법의 실시예는, 바닥과 벽을 구비한 기성 콘크리트 맨홀과, 상기 콘크리트 맨홀의 내부에 수직으로 설치될 기성 하수관이 준비되는, 자재준비 단계; 상기 하수관이 상기 콘크리트 맨홀의 내벽 높이에 대응되는 길이로 절단되는, 하수관절단 단계; 상기 콘크리트 맨홀의 벽면 소정 높이에 오수가 유입되는 유입홀과, 오수가 유출되는 유출홀이 뚫려지고, 상기 하수관의 하부에 제1 유로홀이, 상부에 제2 유로홀이 뚫려지는, 자재천공 단계; 상기 콘크리트 맨홀의 내부에 상기 하수관이 설치되는, 하수관설치 단계; 및, 상기 배출홀과 상기 제2 유로홀이 연결관으로 연결되는, 연결관설치 단계;를 포함한다.An embodiment of the above-described sewage treatment facility construction method includes: a prefabricated concrete manhole having a floor and a wall, and a ready-made sewage pipe to be vertically installed in the concrete manhole; Wherein the sewage pipe is cut to a length corresponding to the height of the inner wall of the concrete manhole; A material hole piercing step of piercing an inflow hole into which wastewater flows into a predetermined height of a wall surface of the concrete manhole and an outflow hole through which wastewater flows out and a first flow hole is formed in a lower portion of the sewer pipe, ; A sewer pipe installation step in which the sewer pipe is installed inside the concrete manhole; And a connection pipe installation step in which the discharge hole and the second flow hole are connected to each other through a connection pipe.
* 전술한 실시예는, 본 문건이 개시하는 기술의 일부 양태(Aspect)에 불과하며, 다른 양태나 특징들은 '발명을 실시하기 위한 구체적인 내용'에서 설명된다.The above-described embodiments are only some aspects of the technology disclosed in this document, and other aspects and features are described in the Detailed Description of the Invention.
실시예에 따른 하수처리시설 시공방법은, 시중에 판매되는 기성 콘크리트 맨홀과 기성 하수관을 이용하여, 콘크리트 하수처리시설을 저렴한 비용으로 빠르게 시공할 수 있다.According to the embodiment of the present invention, the concrete sewage treatment facility can be constructed at low cost by using the ready-made concrete manhole and the ready-made sewage pipe sold on the market.
또한, 실시예에 따른 하수처리시설 시공방법으로 시공된 하수처리시설은, 콘크리트로 이루어져 강도와 내구성이 우수하며, 동일한 크기의 종래 하수처리시설에 비하여, 오수의 이동거리(침강시간)을 길게 확보할 수 있다.In addition, the sewage treatment facility constructed by the sewage treatment facility construction method according to the embodiment is excellent in strength and durability because it is made of concrete and has a longer moving distance (sedimentation time) than the conventional sewage treatment facility of the same size can do.
도 1은 실시예에 따른 하수처리시설 시공방법(S100)을 개략적으로 나타내는 도면이다.
도 2는 실시예에 따른 하수처리시설 시공방법(S100)으로 시공된 하수처리시설(100)의 사시도와 평면도이다.
도 3은 3실형 하수처리시설(100')의 시공 예이다.1 is a view schematically showing a sewage treatment facility construction method (S100) according to an embodiment.
2 is a perspective view and a plan view of a
3 is an example of the construction of a three-chamber type sewage treatment facility 100 '.
이하, 도면을 참조하여, 실시예에 따른 하수처리시설 시공방법 및, 이에 의해 시공된 하수처리시설을 구체적으로 설명한다.Hereinafter, a sewage treatment facility construction method and a sewage treatment facility constructed according to the embodiments will be described in detail with reference to the drawings.
도 1은 실시예에 따른 하수처리시설 시공방법(S100)을 개략적으로 나타내는 도면이다.1 is a view schematically showing a sewage treatment facility construction method (S100) according to an embodiment.
자재준비 단계(S110)In the material preparation step (S110)
도 1 (a)를 참조하면, 자재준비 단계(S110)는 시중에 판매되고 있는 기성 콘크리트 맨홀(110)과, 기성 하수관(150)이 준비되는 단계이다.Referring to FIG. 1 (a), the material preparation step (S110) is a stage in which a ready-made
콘크리트 맨홀(110)은 상부가 개방된 육면체 또는 원기둥 형상일 수 있으며, 다각기둥 형상이어도 무방하다.The
하수관(150)은 콘크리트 맨홀(110)의 내부에 수직으로 설치(안치)될 수 있는 적정한 지름을 갖는다. 즉, 하수관(150)의 단면적은 콘크리트 맨홀(110)의 내부 단면적에 비하여 작아야 한다. 하수관(150)은 합성수지 재질일 수도 있고, 콘크리트 흄관과 같이 콘크리트 재질일 수도 있다.The
하수관절단 단계(S120)Sewage pipe cutting step (S120)
도 1 (b)를 참조하면, 하수관절단 단계(S120)는 전 단계에서 준비된 하수관(150)이 콘크리트 맨홀(110)의 내벽 높이에 대응되는 길이로 절단되는 단계이다.Referring to FIG. 1 (b), the sewer pipe cutting step S120 is a step of cutting the
하수관(150)의 길이가 콘크리트 맨홀(110)의 내벽 높이에 비해 조금 짧아도 무방하며, 자재준비 단계(S110)에서 콘크리트 맨홀(110)의 내벽 높이에 비해 길이가 짧은 하수관(150)을 준비함으로써, 하수관절단 단계(S120)를 생략할 수도 있다.The length of the
자재천공 단계(S130)In the material piercing step (S130)
도 1 (c)를 참조하면, 자재천공 단계(S130)는 콘크리트 맨홀(110)의 벽면 소정 높이에 오수가 유입되는 유입홀(112)과, 오수가 유출되는 유출홀(114)이 뚫려지고, 수직으로 세워진 하수관(150)의 하부에 제1 유로홀(152)이, 상부에 제2 유로홀(154)이 뚫려지는 단계이다.1C, in the material piercing step S130, an
한편, 유입홀(112)과 유출홀(114)은, 콘크리트 맨홀(110)이 다각기둥 형상일 경우, 서로 다른 벽면에 각기 따로 구비되는 것이 바람직하며, 콘크리트 맨홀(110)이 원기둥 형상일 경우, 서로 마주하게 구비되는 것이 바람직하다.In the case where the
제1 유로홀(152)은 하수관(150)의 내부로 오수가 유입되는 통로 기능을 하며, 제2 유로홀(154)은 하수관(150)의 외부로 오수가 유출되는 통로 기능을 한다. 제1 유로홀(152)과 제2 유로홀(154)의 크기는 사용자에 따라 다양하게 정의될 수 있으며, 특히 제1 유로홀(152)은 하나 이상이어도 무방하다.The
하수관설치 단계(S140)The sewage pipe installation step (S140)
도 1 (d)를 참조하면, 하수관설치 단계(S140)는 콘크리트 맨홀(110)의 내부에 하수관(150)이 수직으로 설치되는 단계이다.Referring to FIG. 1 (d), the sewer pipe installation step S140 is a step in which the
콘크리트 맨홀(110)의 내부에 안치된 하수관(150)은 시멘트나 콘크리트를 이용하여, 콘크리트 맨홀(110)의 바닥에 단단히 고정하는 것이 바람직하다. 하수관(150)이 무게가 무거운 콘크리트 흄관 등일 경우, 고정을 하지 않아도 무방하다.It is preferable that the
한편, 자재천공 단계(S130)와 하수관설치 단계(S140)는 순서가 바뀌어도 무방하나, 좁은 콘크리트 맨홀(110) 내부에서의 작업성을 고려할 때, 콘크리트 맨홀(110)과 하수관(150)에 구멍을 먼저 뚫는 것이 효과적이다.However, considering the workability in the
연결관설치 단계(S150)In the connection pipe installation step (S150)
도 1 (e)를 참조하면, 연결관설치 단계(S150)는 콘크리트 맨홀(110)에 형성된 유출홀(114)과, 하수관(150)에 형성된 제2 유로홀(154)이 연결관(CP)으로 연결되는 단계이다.1E, the connection pipe installation step S150 includes an
한편, 하수관절단 단계(S120) 이후에는, 여재설치 단계(S160)가 더 이루어질 수 있다. 여재설치 단계(S160)는 하수관(150)의 내부에 여재(FM)가 설치되는 단계이다. 하수관(150)의 내부에 여재(FM)가 설치되면, 제1 유로홀(152)로 유입된 오수가 여재(F)를 통과하여 정화된 후, 제2 유로홀(154)로 유출된다.On the other hand, after the sewage pipe cutting step S120, the reinstalling step S160 may be further performed. The reinstallation step S160 is a step in which the filter medium FM is installed inside the
또한, 자재천공 단계(S130) 이후에는, 유입관설치 단계(S170)가 더 이루어질 수 있다. 유입관설치 단계(S170)는 유입홀(112)에 'T'자형 유입관(TP)이 설치되는 단계이다.Further, after the material piercing step (S130), the inflow pipe installing step (S170) may be further performed. The inflow tube installation step S170 is a step in which a 'T' type inflow pipe TP is installed in the
또한, 하수관절단 단계(S120) 이후에는, 유효용량설정 단계(S180)가 더 이루어질 수 있다. 유효용량설정 단계(S190)는, 콘크리트 맨홀(110)과 하수관(150) 사이의 공간, 하수관(150)의 내부 공간 중 어느 하나 또는 두 공간 모두에 콘크리트를 타설·양생함으로써, 오수 유효용량이 설정되는 단계이다. Further, after the sewage pipe cutting step (S120), the effective capacity setting step (S180) may be further performed. The effective capacity setting step S190 is a step in which concrete is placed and cured in any one or both of the space between the
예컨대, 대한민국 하수도법 시행규칙은 2실형 정화조(하수처리시설)의 경우, 제1실의 유효용량이 총유효용량의 3분의 2가 되도록 규정하고 있다. 즉, 사용자는 콘크리트 맨홀(110)과 하수관(150) 사이의 공간과, 하수관(150)에 콘크리트를 타설·양생함으로써, 수심을 조절하여 오수 유효용량을 손쉽게 설정할 수 있다.For example, the Enforcement Rule of the Korean Sewage Law stipulates that the effective capacity of the first room shall be two-thirds of the total effective capacity in the case of a two-chamber type purification tank (sewage treatment facility). That is, the user can easily set the effluent storage capacity by adjusting the depth of water by pouring and curing concrete in the space between the
실시예에 따른 하수처리시설 시공방법(S100)을 이용하면, 시중에 판매되는 기성 콘크리트 맨홀(110)과 기성 하수관(150)을 이용하여, 콘크리트 하수처리시설(100)을 저렴한 비용으로 빠르게 시공할 수 있으며, 실시예에 따른 하수처리시설 시공방법(S100)으로 시공된 하수처리시설(100)은 2실형 정화조가 된다. 예컨대, 콘크리트 맨홀(110)과 하수관(150) 사이의 공간은 부패조가 되고, 하수관(150)의 내부공간은 여과조가 될 수 있다.Using the sewage treatment facility construction method (S100) according to the embodiment, the concrete
한편, 도 3을 참조하면, 자재준비 단계(S110)에 2개 이상의 하수관(150)을 준비하여, 콘크리트 맨홀(110)의 내부에 함께 설치한 뒤, 2개 이상의 하수관(150)을 연결관(CP) 등으로 순차적으로 연결하면, 3실형 이상의 하수처리시설이 된다.3, two or
도 2는 실시예에 따른 하수처리시설 시공방법(S100)으로 시공된 하수처리시설(100)의 사시도와 평면도이다.2 is a perspective view and a plan view of a
이를 참조하면, 실시예에 따른 하수처리시설 시공방법(S100)으로 시공된 하수처리시설(100)은, 유입홀(112)의 정면에 제1 유로홀(152)이 위치할 필요가 없으므로[하수관(150)의 벽면에 제1 유로홀(152)이 형성되므로], 동일한 크기의 종래 하수처리시설에 비하여, 오수의 이동거리(침강시간)을 길게 확보할 수 있다.The
이상, 실시예에 따른 하수처리시설 시공방법(S100) 및, 이에 의해 시공된 하수처리시설(100)을 설명하였다.The sewage treatment facility construction method (S100) and the sewage treatment facility (100) constructed according to the embodiment have been described above.
그러나 앞에서 설명한 실시예는 예시에 불과하며, 이는 당해 기술분야에서 통상의 지식을 가진 자에 의하여, 발명의 기술적 사상을 벗어나지 않는 범위 내에서 다양하게 변형될 수 있다.However, the above-described embodiment is merely an example, and various modifications may be made by those skilled in the art without departing from the technical idea of the present invention.
따라서, 본 문건이 개시하는 기술의 권리범위는 특정 실시예를 표현하는 문구나 도면에 의해 축소 해석되어선 안 되며, 기술적 사상을 바탕으로 폭넓게 고려(해석)되어야 한다.Accordingly, the scope of rights of the technology disclosed herein is not to be construed as narrowly construed as a representation of a specific embodiment, nor as a limitation on the scope of the invention, and should be broadly interpreted on the basis of technical considerations.
S100 : 하수처리시설 시공방법
S110 : 자재준비 단계
S120 : 하수관절단 단계
S130 : 자재천공 단계
S140 : 하수관설치 단계
S150 : 연결관설치 단계
--
100 : 하수처리시설
110 : 콘크리트 맨홀
112 : 유입홀
114 : 유출홀
150 : 하수관
152 : 제1 유로홀
154 : 제2 유로홀
CP : 연결관
TP : 유입관
FM : 여재S100: Sewage treatment facility construction method
S110: Material preparation step
S120: Sewage pipe cutting step
S130: Material drilling step
S140: Stage of sewer installation
S150: Connector mounting step
-
100: Sewage treatment facility
110: Concrete manhole
112: inlet hole
114: outlet hole
150: Sewer
152: first flow hole
154: second flow hole
CP: Connector
TP: inlet pipe
FM: filter media
Claims (5)
바닥과 벽을 구비한 기성 콘크리트 맨홀과, 상기 콘크리트 맨홀의 내부에 수직으로 설치될 기성 하수관이 준비되는, 자재준비 단계;
상기 하수관이 상기 콘크리트 맨홀의 내벽 높이에 대응되는 길이로 절단되는, 하수관절단 단계;
상기 콘크리트 맨홀의 벽면 소정 높이에 오수가 유입되는 유입홀과, 오수가 유출되는 유출홀이 뚫려지고, 상기 하수관의 하부에 제1 유로홀이, 상부에 제2 유로홀이 뚫려지는, 자재천공 단계;
상기 콘크리트 맨홀의 내부에 상기 하수관이 설치되는, 하수관설치 단계;
상기 유출홀과 상기 제2 유로홀이 연결관으로 연결되는, 연결관설치 단계; 및,
상기 하수관의 내부에 여재가 설치되는, 여재설치 단계;를 포함하는 하수처리시설 시공방법.
A sewage treatment facility construction method for purifying contaminated water,
A prefabricated concrete manhole having a floor and a wall, and a ready-made sewer pipe to be vertically installed in the concrete manhole;
Wherein the sewage pipe is cut to a length corresponding to the height of the inner wall of the concrete manhole;
A material hole piercing step of piercing an inflow hole into which wastewater flows into a predetermined height of a wall surface of the concrete manhole and an outflow hole through which wastewater flows out and a first flow hole is formed in a lower portion of the sewer pipe, ;
A sewer pipe installation step in which the sewer pipe is installed inside the concrete manhole;
Wherein the outlet hole and the second flow hole are connected to each other through a connection pipe; And
And installing a filter material inside the sewage pipe.
상기 콘크리트 맨홀과 상기 하수관 사이의 공간, 상기 하수관의 내부 공간 중 어느 하나 또는 두 공간 모두에 콘크리트를 타설·양생함으로써, 오수 유효용량이 설정되는, 유효용량설정 단계;를 더 포함하는 하수처리시설 시공방법.
The method according to claim 1,
Setting a sewage effluent capacity by placing concrete in at least one of a space between the concrete manhole and the sewer pipe and an inner space of the sewer pipe; Way.
상기 유입홀에 'T'자형 유입관이 설치되는, 유입관설치 단계;를 더 포함하는 하수처리시설 시공방법.
The method according to claim 1,
And a 'T' shaped inflow pipe is installed in the inflow hole.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020170002359A KR101890269B1 (en) | 2017-01-06 | 2017-01-06 | Construction method of sewage treatment equipment and sewage treatment equipment by this method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020170002359A KR101890269B1 (en) | 2017-01-06 | 2017-01-06 | Construction method of sewage treatment equipment and sewage treatment equipment by this method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20180081300A KR20180081300A (en) | 2018-07-16 |
| KR101890269B1 true KR101890269B1 (en) | 2018-09-28 |
Family
ID=63048216
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020170002359A Active KR101890269B1 (en) | 2017-01-06 | 2017-01-06 | Construction method of sewage treatment equipment and sewage treatment equipment by this method |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR101890269B1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200499269Y1 (en) | 2024-12-12 | 2025-06-19 | 목민토건 주식회사 | Sludge leakage prevention filter assembly for rainage piping cleaning and dredge |
| KR200499592Y1 (en) | 2024-12-11 | 2025-09-17 | 동부환경이엔지(주) | Sludge leakage prevention structure for cleaning horizontal pipings |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002194804A (en) * | 2000-12-26 | 2002-07-10 | Inax Corp | Vacuum sewer manhole |
| JP2005264585A (en) * | 2004-03-19 | 2005-09-29 | Kubota Corp | Manhole equipment |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100922624B1 (en) * | 2007-10-16 | 2009-10-21 | 서원애 | Precaster for concrete septic tank and construction method of concrete septic tank using same |
-
2017
- 2017-01-06 KR KR1020170002359A patent/KR101890269B1/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002194804A (en) * | 2000-12-26 | 2002-07-10 | Inax Corp | Vacuum sewer manhole |
| JP2005264585A (en) * | 2004-03-19 | 2005-09-29 | Kubota Corp | Manhole equipment |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200499592Y1 (en) | 2024-12-11 | 2025-09-17 | 동부환경이엔지(주) | Sludge leakage prevention structure for cleaning horizontal pipings |
| KR200499269Y1 (en) | 2024-12-12 | 2025-06-19 | 목민토건 주식회사 | Sludge leakage prevention filter assembly for rainage piping cleaning and dredge |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20180081300A (en) | 2018-07-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7887256B2 (en) | Smooth interior water collection and storage assembly | |
| US7022222B2 (en) | In-pipe wastewater treatment system | |
| US7163635B2 (en) | Integrated below-ground vault with a filtered catch basin | |
| KR101838799B1 (en) | Leading a manhole with separation of functions | |
| KR20180081300A (en) | Construction method of sewage treatment equipment and sewage treatment equipment by this method | |
| US20070215212A1 (en) | Floor drain with incorporated flood prevention | |
| DK2295655T3 (en) | Shaft, in particular, control and purification shaft for wastewater with a flow channel and a plate for the flow channel | |
| US20060076300A1 (en) | System and method for reducing runoff of grease and similar effluents from restaurants and like facilites | |
| KR101826619B1 (en) | Non-buoyant sump haning function of preventing leak | |
| KR100810425B1 (en) | Glass Fiber Reinforced Plastic Manhole with Side Sealing Watertight Rubber Ring | |
| KR102046816B1 (en) | Multi-direction blocks for water purification | |
| WO2007016721A1 (en) | Storage of water, rainwater or grey water or other liquids beneath a concrete floor slab | |
| KR100922624B1 (en) | Precaster for concrete septic tank and construction method of concrete septic tank using same | |
| US20250163693A1 (en) | Vortex flow control device | |
| KR200424087Y1 (en) | Concrete septic tank | |
| CN220723648U (en) | Multifunctional sand setting grid well | |
| KR100739365B1 (en) | Drain trap | |
| KR101726275B1 (en) | manhole | |
| KR100931929B1 (en) | Manipulator for variable inverter type with FRP reinforcement and manhole using the same | |
| KR101796825B1 (en) | A wall plate assembly using concrete block | |
| KR100537414B1 (en) | The Sewage Disposal | |
| KR200388865Y1 (en) | manhole | |
| KR20130070173A (en) | Valve room | |
| GB2608876A (en) | Device | |
| GB2615506A (en) | Device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| S14-X000 | Exclusive voluntary license recorded |
St.27 status event code: A-4-4-S10-S14-lic-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| S16-X000 | Recordation of exclusive voluntary license cancelled |
St.27 status event code: A-4-4-S10-S16-lic-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 8 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 9 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 9 |