KR101724122B1 - Prestressed concrete girder having reinforcing member and the construction method thereof - Google Patents

Prestressed concrete girder having reinforcing member and the construction method thereof Download PDF

Info

Publication number
KR101724122B1
KR101724122B1 KR1020160091596A KR20160091596A KR101724122B1 KR 101724122 B1 KR101724122 B1 KR 101724122B1 KR 1020160091596 A KR1020160091596 A KR 1020160091596A KR 20160091596 A KR20160091596 A KR 20160091596A KR 101724122 B1 KR101724122 B1 KR 101724122B1
Authority
KR
South Korea
Prior art keywords
reinforcing
concrete
bottom plate
reinforcing bar
girder
Prior art date
Application number
KR1020160091596A
Other languages
Korean (ko)
Inventor
정영수
조규대
Original Assignee
주식회사 효성엘비데크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 효성엘비데크 filed Critical 주식회사 효성엘비데크
Priority to KR1020160091596A priority Critical patent/KR101724122B1/en
Application granted granted Critical
Publication of KR101724122B1 publication Critical patent/KR101724122B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Abstract

The present invention relates to a steel composite prestressed girder and a construction method using the same. According to the present invention, the steel composite prestressed girder includes: a main body concrete (110) comprising an upper flange (111) a web (112), and a lower flange (113); a reinforcing bar (120) installed in the main body concrete (110); and a T-shaped reinforcing member (130) connected to the upper part of the upper flange (111) and installed in the front and rear directions of the main body concrete (110). The reinforcing bar (120) includes: multiple main reinforcing bars (121) installed in the front and rear directions; and multiple shearing bars (122) installed along a transverse section of the main body concrete (110) by crossing the main reinforcing bar (121) and installed at intervals in the longitudinal direction. The reinforcing member (130) includes a vertical reinforcing member (131) and a horizontal reinforcing member (132), and the vertical reinforcing member (131) includes: an upper protrusion unit (131a) protruding to the upper side of the upper flange (111); and a lower embedment unit (131b) embedded in the upper flange (111). A shearing bar connection hole (133) which the shearing bar (122) passes through is formed in the embedment unit (131b) in the front and rear directions at intervals. The T-shaped reinforcing member (130) is embedded into the main body concrete (110) by being connected to the shearing bar (122), so a connection force of the reinforcing member and the main body concrete (110) is excellent. Also, the lower embedment unit (131b) embedded in the main body concrete (110) is a structure in which the vertical reinforcing member is embedded as shown in figure 5. So, the concrete is completely filled in a mold when the concrete of the main body concrete is placed in the mold.

Description

강합성 프리스트레스트 거더 및 그 시공방법{PRESTRESSED CONCRETE GIRDER HAVING REINFORCING MEMBER AND THE CONSTRUCTION METHOD THEREOF}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a composite steel prestressed girder and a method of constructing the steel composite prestressed girder.

본 발명은 건설분야에 관한 것으로, 상세하게는 보강재가 형성된 프리스트레스트 거더 및 프리스트레스트 거더 시공방법에 관한 것이다.The present invention relates to a construction field, and more particularly, to a prestressed girder and a prestressed girder construction method in which a reinforcing member is formed.

프리스트레스트 콘크리트 거더는 긴장재에 인장력을 도입하여 거더에 상향력을 도입하는 기술로서, 거더의 형고를 기존 콘크리트보다 낮게 설계할 수 있는 기술이다.A prestressed concrete girder is a technology that introduces upward force to a girder by introducing a tensile force to the girder. It is a technology that can design a girder lower than existing concrete.

그러나 상향력 도입시 거더의 전 단면에 압축력이 발생하고, 상향력 도입 이후 바닥판 콘크리트의 자중과 사용하중이 거더에 작용하면서 거더의 상부플랜지에 과도한 압축력이 발생하는 문제가 있다.However, when the upward force is applied, the compressive force is generated on the entire cross section of the girder, and after the upward force is applied, the self weight of the bottom plate concrete and the working load act on the girder, causing excessive compressive force to be generated in the upper flange of the girder.

이를 해결하기 위해 기존에는 콘크리트보다 강성이 우수한 판구조의 강재(보강재)를 상부플랜지의 상부에 결합하여 상부플랜지에 작용하는 압축력에 저항하는 방법을 사용해 왔다.In order to solve this problem, a method has been used in which a steel plate (stiffener) having a stiffness higher than that of concrete is bonded to the upper portion of the upper flange to resist the compressive force acting on the upper flange.

그러나 도1, 2, 3과 같이 상부플랜지에 매립되는 판구조의 보강재 구조는 거더 본체를 형성하는 콘크리트 타설과정에서 보강재 하부에 콘크리트 충전이 완전하게 이루어지지 않고, 이로 인해 거더와 보강재의 결합력이 약해지는 문제가 있다.However, as shown in FIGS. 1, 2 and 3, the reinforcing member structure of the plate structure embedded in the upper flange is not fully filled with concrete in the lower portion of the reinforcing member in the process of placing the concrete forming the girder main body, There is a problem to be solved.

한국특허 10-2003-0085869호 '교량용 합성거더'는 보강재와 콘크리트의 부착력을 증가시켜 합성거더의 내구성을 향상시키고, 압축압력과 인장응력을 집중적으로 받는 부분만을 보강하도록 하여 제작비용을 줄인 거더기술로서, 압축부와 인장부를 보강재로 보강하여서 된 공지의 교량용 합성거더는 보강재에 복수개의 스터드가 형성되고, 스터드의 단부에 확장부가 형성됨을 특징으로 한다. 아울러 보강재가 패널형태로 되고, 보강재는 압축부의 상측 단면과 인장부의 하측 단면에 각각 설치됨을 특징으로 한다.Korean Patent No. 10-2003-0085869 'Composite girder for bridges' improves the durability of composite girders by increasing the adhesion between reinforcing material and concrete, and reduces the manufacturing cost by reinforcing only the portion where compression pressure and tensile stress are intensively received As a technology, a known composite girder for a bridge, in which a compression portion and a tension portion are reinforced by a reinforcing material, is characterized in that a plurality of studs are formed on the reinforcing material, and an enlarged portion is formed at an end portion of the stud. The reinforcing member is formed in a panel shape, and the reinforcing member is provided on the upper end surface of the compression portion and the lower end surface of the tensile portion, respectively.

한국특허 10-2008-0092049호 '프리스트레스가 도입된 강재를 이용한 강합성 프리스트레스트 콘크리트 빔 및 그 제조방법'은 나중에 제거 가능한 압축 프리스트레스가 도입된 강재가 합성된 강합성 프리스트레스트 콘크리트 빔 및 그 제조방법에 관한 것으로서, 프리스트레스트 콘크리트 빔에 있어서, 빔의 중립축 위에 압축 프리스트레스가 도입된 강재가 콘크리트와 합성되며, 강재에 도입된 압축 프리스트레스는 바닥판 설치 후 제거되는 것을 특징으로 한다.Korean Patent No. 10-2008-0092049 'Steel composite prestressed concrete beam using prestressed steel material and method of manufacturing the same' is a steel composite prestressed concrete beam synthesized with a steel material with a removable compressive prestress, In a prestressed concrete beam, a steel material into which a compressive prestress is introduced is synthesized with concrete on a neutral axis of the beam, and a compressive prestress introduced into the steel material is removed after the bottom plate is installed.

한국특허 10-2013-0018240호 '강합성 프리스트레스트 콘크리트 빔 및 그 제작방법'은 PS강판의 신장력을 이용하여 추가적인 프리스트레스를 도입할 수 있는 강합성 프리스트레스트 콘크리트 빔 및 그 제작방법에 대한 것으로서, 강합성 프리스트레스트 콘크리트 빔은, 콘크리트 빔과, 콘크리트 빔의 내부에 인장된 상태로 배치된 PS강재와, 콘크리트 빔의 길이방향 중간부 상면에 콘크리트 빔의 길이방향으로 간격을 두고 설치된 한 쌍의 받침턱과, 한 쌍의 받침턱 사이의 간격보다 긴 길이로 제작되어 수축된 상태로 한 쌍의 받침턱 사이에 설치되며, 그 양단이 한 쌍의 받침턱 각각에 접촉 지지되고, 콘크리트 빔의 상면에 밀착 결합된 PS강판을 포함한다.Korean Patent No. 10-2013-0018240 " Steel composite prestressed concrete beam and method of manufacturing the same " relates to a steel composite prestressed concrete beam capable of introducing an additional prestress using the stretching force of a PS steel sheet, The composite prestressed concrete beam comprises a concrete beam, a PS steel disposed in a tensioned state in the interior of the concrete beam, and a pair of base beams arranged at intervals in the longitudinal direction of the concrete beam in the longitudinal middle portion of the concrete beam, And a pair of supporting jaws, each of the pair of supporting jaws having a length longer than an interval between the pair of supporting jaws and contracted, Bonded PS steel sheet.

한국특허 10-2003-0085869호Korean Patent No. 10-2003-0085869 한국특허 10-2008-0092049호Korean Patent No. 10-2008-0092049 한국특허 10-2013-0018240호Korean Patent No. 10-2013-0018240

본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 프리스트레스트 거더와 결합력이 우수하고, 거더 제작시 타설되는 콘크리트의 충전이 용이한 'T'형 구조의 보강재가 결합된 강합성 프리스트레스트 거더 및 그 시공방법을 제시한다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems, and it is an object of the present invention to provide a steel composite prestress girder which has excellent bonding force with a prestressed girder and has a reinforcing member of 'T' And its construction method.

상기 과제의 해결을 위하여, 본 발명의 강합성 프리스트레스트 거더는 상부플랜지(111), 복부(112), 하부플랜지로(113)로 형성되는 본체 콘크리트(110); 상기 본체 콘크리트(110)의 내부에 설치되는 철근(120); 상기 상부플랜지(111)의 상부에 결합되어 상기 본체 콘크리트(110)의 전후방향을 따라 설치되는 T형 구조의 보강재(130);를 포함하되, 상기 철근(120)은, 전후방향을 따라 설치되는 복수의 주철근(121); 상기 주철근(121)과 교차되어 상기 본체 콘크리트(110)의 횡단면을 따라 설치됨과 아울러, 길이방향을 따라 상호 이격되어 복수로 설치되는 전단철근(122);을 포함하고, 상기 보강재(130)는 세로보강재(131)와 가로보강재(132)를 포함하되, 상기 세로보강재(131)는, 상기 상부플랜지(111)의 상측으로 돌출되는 상측 돌출부(131a); 상기 상부플랜지(111)에 매립되는 하부 매립부(131b);를 포함하고, 상기 매립부(131b)에는 전후방향을 따라 상호 간격을 두고 상기 전단철근(122)이 관통되어 설치되는 전단철근결합홀(133)이 형성된다.In order to solve the above-described problems, the steel composite prestress girder of the present invention comprises a main body concrete 110 formed of an upper flange 111, a belly portion 112, and a lower flange portion 113; A reinforcing bar 120 installed inside the main body concrete 110; And a reinforcing member 130 of a T-shaped structure which is coupled to an upper portion of the upper flange 111 and installed along the front-rear direction of the main body concrete 110. The reinforcing member 120 is installed along the longitudinal direction A plurality of cast iron rods 121; And a plurality of shear reinforcing bars 122 installed along the transverse section of the main body concrete 110 so as to intersect with the main reinforcing bars 121 and spaced apart from each other along the longitudinal direction, Wherein the longitudinal stiffener (131) includes an upper protrusion (131a) protruding upward from the upper flange (111); And a lower end portion of the upper end portion of the upper end portion of the upper end portion of the upper end portion of the upper end portion (133) is formed.

상기 돌출부(131a)에는 바닥판 콘크리트(200) 형성시 격자형으로 설치되는 바닥판 철근(210) 중 좌우방향으로 설치되는 횡철근(211)이 관통 결합되도록 바닥판철근 결합홀(134)이 형성된 것이 바람직하다.A bottom plate reinforcing bar coupling hole 134 is formed in the protruding portion 131a so that a transverse reinforcing bar 211 installed in a lateral direction of the bottom plate reinforcing bar 210 installed in a lattice form when the bottom plate concrete 200 is formed .

상기 바닥판철근 결합홀(134)은 전후 방향을 기준을 상호 간격을 두고 설치되는 복수의 상기 횡철근(211)의 설치 간격과 동일한 간격으로 형성된 것이 바람직하다.It is preferable that the bottom plate reinforcing bars 134 are formed at the same interval as the installation intervals of the plurality of transverse reinforcing bars 211 spaced from each other with reference to the longitudinal direction.

상기 바닥판철근 결합홀(134)은 전후방향을 따라 장공으로 형성된 것이 바람직하다.The bottom plate reinforcing bar 134 may be formed as a long hole along the longitudinal direction.

상기 전단철근결합홀(133)은 전후방향을 따라 설치되는 복수의 상기 전단철근(122)의 설치 간격과 동일한 간격으로 형성된 것이 바람직하다.It is preferable that the shear reinforcing bars 133 are formed at the same interval as the installation intervals of the plurality of the shear reinforcing bars 122 installed along the forward and backward directions.

상기 전단철근 결합홀(133)은 전후방향을 따라 장공으로 형성된 것이 바람직하다.The shear reinforcing bars 133 are preferably formed as long holes along the longitudinal direction.

상기 전단철근(122)은 복수의 철근이 결합되어 형성되되, 상기 전단철근결합홀(133)에는 상기 전단철근(122) 중 '

Figure 112016070091491-pat00001
' 구조의 최상단 전단철근이 결합되는 것이 바람직하다.The front shear reinforcing bar 122 is formed by combining a plurality of reinforcing bars,
Figure 112016070091491-pat00001
It is preferable that the uppermost shear reinforcement of the " structure "

상기 가로보강재(132)는 전후방향을 기준으로 가장자리의 폭보다 중앙부의 폭이 더 넓은 것이 바람직하다.It is preferable that the width of the transverse stiffener 132 is wider than the width of the edge with respect to the longitudinal direction.

상기 바닥판 콘크리트(200)와 상기 보강재(130)의 결합력을 향상시키기 위해, 상기 가로보강재(132)의 상부에 전단연결재(135)가 결합된 것이 바람직하다.It is preferable that a shear connection member 135 is coupled to the upper portion of the transverse reinforcement member 132 in order to improve a coupling force between the bottom plate concrete 200 and the reinforcement member 130.

상기 세로보강재(131)는 상기 전단철근결합홀(133)의 사이 구간이 아치형상으로 절개된 것이 바람직하다.Preferably, the longitudinal stiffener 131 is cut in an arcuate section between the front-end reinforcing bars 133.

본 발명의 일 실시 예에 따른 강합성 프리스트레스트 거더 제작방법은 상기 철근(120)을 설치하되, 상기 전단철근(122)이 상기 전단철근 결합홀(133)을 관통하도록 상기 보강재(130)를 설치하는 철근-보강재설치단계; 상기 철근(120)의 측면에 거푸집(400)을 설치하는 거푸집 설치단계; 상기 매립부(131b)가 매립되도록 콘크리트를 타설하는 콘크리트 타설단계; 콘크리트 양생 후 긴장재(300)에 인장력을 도입하여 상기 거더(100)에 상향력을 도입하는 프리스트레스도입단계;를 포함한다.A method of manufacturing a composite composite prestressed girder according to an embodiment of the present invention includes installing the reinforcing bar 120 such that the shear reinforcing bar 122 passes through the front end reinforcing bar 133, A reinforcing steel-reinforcing material installation step; A mold setting step of setting a mold 400 on a side surface of the reinforcing bar 120; A concrete pouring step of pouring concrete so that the buried part 131b is embedded; And a prestress introduction step of introducing an upward force to the girder 100 by introducing a tensile force to the prestressing material 300 after concrete curing.

상기 철근-보강재설치단계에서 상기 보강재(130)는 보강재 지지부재(500)에 의해 고정설치되는 것이 바람직하다.In the reinforcing steel-reinforcing material mounting step, the reinforcing material 130 is preferably fixed by the reinforcing material supporting member 500.

본 발명의 일 실시 예에 따른 강합성 프리스트레스트 거더를 이용한 교량 시공방법은 상기 철근(120)을 설치하되, 상기 전단철근(122)이 상기 전단철근 결합홀(133)을 관통하도록 상기 보강재(130)를 설치하는 철근-보강재설치단계; 상기 철근(120)의 측면에 거푸집(400)을 설치하는 거푸집 설치단계; 상기 매립부(131b)가 매립되도록 콘크리트를 타설하는 콘크리트 타설단계; 콘크리트 양생 후 긴장재(300)에 인장력을 도입하여 상기 거더(100)에 상향력을 도입하는 프리스트레스도입단계; 프리스트레스가 도입된 상기 거더(100)를 교대 또는 교각에 거치시키는 거더설치단계; 상기 횡철근(211)이 상기 바닥판철근 결합홀(134)을 관통하여 설치되도록, 상기 바닥판 철근(210)을 설치하는 바닥판철근설치단계; 상기 바닥판 콘크리트(200)를 타설하는 바닥판 콘크리트타설단계;를 포함한다.A method of constructing a bridge using a steel composite prestressed girder according to an embodiment of the present invention includes installing the reinforcing bars 120 such that the shear reinforcing bars 122 penetrate the shear reinforcing bars 133 A reinforcing bar-stiffener mounting step for installing the reinforcing bars; A mold setting step of setting a mold 400 on a side surface of the reinforcing bar 120; A concrete pouring step of pouring concrete so that the buried part 131b is embedded; A prestress introduction step of introducing an upward force into the girder (100) by introducing a tensile force to the prestressing material (300) after concrete curing; A girder installing step of placing the girder (100) having a prestress introduced thereto alternately or at a pier; Installing a bottom plate reinforcing bar (210) so that the transverse reinforcing bars (211) are installed through the bottom plate reinforcing bars (134); And a bottom plate concrete casting step of casting the bottom plate concrete 200.

상기 철근-보강재설치단계에서 상기 보강재(130)는 보강재 지지부재(500)에 의해 고정설치되는 것이 바람직하다.In the reinforcing steel-reinforcing material mounting step, the reinforcing material 130 is preferably fixed by the reinforcing material supporting member 500.

본 발명의 강합성 프리스트레스트 거더는 거더의 전단철근이 T형 구조의 보강재를 관통하여 결합되기 때문에 보강재와 거더의 결합력이 우수하다.The steel composite prestress girder of the present invention is excellent in the bonding force between the reinforcing member and the girder since the shear reinforcing member of the girder is inserted through the reinforcing member of the T-shaped structure.

또한, 바닥판 형성을 위해 설치되는 바닥판 철근이 T형 구조의 보강재를 관통하여 설치되기 때문에 거더와 바닥판의 결합력을 향상시킨다.Further, since the bottom plate reinforcing bars provided for the formation of the bottom plate are installed through the reinforcing members of the T-shaped structure, the bonding force between the girder and the bottom plate is improved.

본 발명은 거더의 상부플렌지에 T형 구조의 보강재 중 세로보강재가 매립되는 구조로 결합하기 때문에 거더의 콘크리트 타설이 완전하게 이루어질 수 있다.Since the present invention is combined with a structure in which the longitudinal stiffener of the T-shaped stiffener is embedded in the upper flange of the girder, concrete pouring of the girder can be completed.

도 1은 한국특허 10-2003-0085869호의 교량용 합성거더 사시도.
도 2는 한국특허 10-2008-0092049호의 강합성 프리스트레스트 콘크리트 빔 단면도.
도 3은 한국특허 10-2013-0018240호의 강합성 프리스트레스트 콘크리트 빔
도 4는 본 발명의 일 실시 예에 따른 강합성 프리스트레스트 거더 단면도
도 5는 본 발명의 일 실시 예에 따른 보강재 사시도.
도 6은 본 발명의 또 다른 실시 예에 따른 보강재 사시도.
도 7은 본 발명의 또 다른 실시 예에 따른 보강재 사시도.
도 8은 본 발명의 일 실시 예에 따른 전단철근 조립도.
도 9는 본 발명의 일 실시 예에 따른 거더, 바닥판 철근, 바닥판 콘크리트가 결합된 교량 단면도.
도 10은 본 발명의 일 실시 예에 따른 교량 단면도.
도 11은 본 발명의 일 실시 예에 따른 철근-보강재설치단계 공정도.
도 12는 본 발명의 일 실시 예에 따른 거푸집 설치단계 공정도.
도 13은 본 발명의 일 실시 예에 따른 콘크리트 타설단계 공정도.
도 14는 본 발명의 일 실시 예에 따른 강합성 프리스트레스트 거더 사시도.
도 15는 본 발명의 일 실시 예에 따른 바닥판철근설치단계 공정도.
1 is a perspective view of a synthetic girder for a bridge of Korean Patent No. 10-2003-0085869.
2 is a sectional view of a steel composite prestressed concrete beam of Korean Patent No. 10-2008-0092049.
3 is a cross-sectional view of a steel composite prestressed concrete beam of Korean Patent No. 10-2013-0018240
4 is a cross-sectional view of a steel composite prestressed girder according to an embodiment of the present invention.
5 is a perspective view of a stiffener according to an embodiment of the present invention;
6 is a perspective view of a stiffener according to another embodiment of the present invention.
7 is a perspective view of a stiffener according to another embodiment of the present invention.
FIG. 8 is a view showing a shear reinforcement assembly according to an embodiment of the present invention. FIG.
9 is a cross-sectional view of a bridge including a girder, a bottom plate reinforced concrete, and a bottom plate concrete according to an embodiment of the present invention.
10 is a cross-sectional view of a bridge according to an embodiment of the present invention;
11 is a process diagram of a reinforcing steel-reinforcing material installation step according to an embodiment of the present invention.
FIG. 12 is a process diagram of a molding step according to an embodiment of the present invention; FIG.
13 is a process diagram of a concrete pouring step according to an embodiment of the present invention.
14 is a perspective view of a steel composite prestress girder according to one embodiment of the present invention.
15 is a process diagram of a step of installing a bottom plate reinforcing bar according to an embodiment of the present invention;

본 발명인 강합성 프리스트레스트 거더 및 그 시공방법의 실시 예를 첨부도면을 참조하여 상세히 설명하기로 하며, 첨부 도면을 참조하여 설명함에 있어, 동일하거나 대응하는 구성 요소는 동일한 도면 번호를 부여하고 이에 대한 중복되는 설명은 생략하기로 한다.BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a composite steel prestress girder according to the present invention; FIG. A duplicate description will be omitted.

또한, 이하 사용되는 제1, 제2 등과 같은 용어는 동일 또는 상응하는 구성 요소들을 구별하기 위한 식별 기호에 불과하며, 동일 또는 상응하는 구성 요소들이 제1, 제2 등의 용어에 의하여 한정되는 것은 아니다.It is also to be understood that the terms first, second, etc. used hereinafter are merely reference numerals for distinguishing between identical or corresponding components, and the same or corresponding components are defined by terms such as first, second, no.

또한, 결합이라 함은, 각 구성 요소 간의 접촉 관계에 있어, 각 구성 요소 간에 물리적으로 직접 접촉되는 경우만을 뜻하는 것이 아니라, 다른 구성이 각 구성 요소 사이에 개재되어, 그 다른 구성에 구성 요소가 각각 접촉되어 있는 경우까지 포괄하는 개념으로 사용하도록 한다.In addition, the term " coupled " is used not only in the case of direct physical contact between the respective constituent elements in the contact relation between the constituent elements, but also means that other constituent elements are interposed between the constituent elements, Use them as a concept to cover each contact.

이하, 첨부 표 및 도면을 참조하여 본 발명의 일 실시 예에 따른 강합성 프리스트레스트 거더 및 그 시공방법에 관하여 상세히 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a steel composite prestress girder and a construction method thereof according to an embodiment of the present invention will be described in detail with reference to the accompanying tables and drawings.

이하에서 도5에 나타난 방향을 기준으로 전후좌우의 방향을 정의한다.Hereinafter, the directions of the front, rear, left, and right are defined with reference to the direction shown in FIG.

본 발명에 의한 강합성 프리스트레스트 거더는 상부플랜지(111), 복부(112), 하부플랜지로(113)로 형성되는 본체 콘크리트(110); 본체 콘크리트(110)의 내부에 설치되는 철근(120); 상부플랜지(111)의 상부에 결합되어 본체 콘크리트(110)의 전후방향을 따라 설치되는 T형 구조의 보강재(130);를 포함하되, 철근(120)은 전후방향을 따라 설치되는 복수의 주철근(121); 주철근(121)과 교차 되어 본체 콘크리트(110)의 횡단면을 따라 설치됨과 아울러, 길이방향을 따라 상호 이격되어 복수로 설치되는 전단철근(122);을 포함하고, 보강재(130)는 세로보강재(131)와 가로보강재(132)를 포함하되, 세로보강재(131)는 상부플랜지(111)의 상측으로 돌출되는 상측 돌출부(131a); 상부플랜지(111)에 매립되는 하부 매립부(131b);를 포함하고 매립부(131b)에는 전후방향을 따라 상호 간격을 두고 전단철근(122)이 관통되어 설치되는 전단철근결합홀(133)이 형성된다.The steel composite prestressed girder according to the present invention comprises a main body concrete 110 formed of an upper flange 111, a belly portion 112, and a lower flange portion 113; A reinforcing bar 120 installed inside the main body concrete 110; And a reinforcing member 130 of a T-shaped structure which is coupled to an upper portion of the upper flange 111 and installed along the front-rear direction of the main body concrete 110. The reinforcing bar 120 includes a plurality of main- 121); And a plurality of shear reinforcing bars 122 installed along the transverse section of the main concrete 110 intersecting with the main reinforcing bars 121 and spaced apart from each other along the longitudinal direction of the main reinforcing bars 130. The reinforcing bar 130 includes a longitudinal stiffener 131 And a transverse stiffener 132. The longitudinal stiffener 131 includes an upper protrusion 131a protruding upward from the upper flange 111; And a bottom reinforced portion 131b embedded in the upper flange 111. A front end reinforcing bar 133 is formed in the buried portion 131b with a front reinforcing bar 122 passing through the front reinforcing bars 122 in the front- .

이 경우, T형 구조의 보강재(130)는 전단철근(122)과 결합되어 본체 콘크리트(110)에 매립되기 때문에 보강재와 본체 콘크리트(110)의 결합력이 우수하다.In this case, since the T-shaped stiffener 130 is combined with the front-end reinforcing bar 122 and embedded in the main body concrete 110, the coupling strength between the stiffener and the main body concrete 110 is excellent.

또한, 본체 콘크리트(110)에 매립되는 하부 매립부(131b)는 도5와 같이 세로 보강재가 매립되는 구조이기 때문에 본체 콘크리트의 콘크리트 타설시 거푸집 내부에 콘크리트 충진이 완벽하게 이루어진다.Since the lower embedded portion 131b embedded in the main body concrete 110 has a structure in which a longitudinal stiffener is embedded as shown in FIG. 5, the concrete is completely filled in the formwork when the concrete of the main body concrete is poured.

앞서 설명한 바와 같이 도1, 2, 3과 같이 판 구조의 보강재가 상부플랜지의 상면에 결합될 경우 보강재의 하부에 콘크리트의 충전이 밀실하게 이루어지지 않는 문제가 발생할 수 있지만 본원 발명은 거더 제작을 위한 콘크리트를 밀실하게 충전할 수 있다.As described above, when the stiffener having a plate structure is coupled to the upper surface of the upper flange as shown in Figs. 1, 2 and 3, there may arise a problem that the concrete is not filled tightly in the lower portion of the stiffener. However, Concrete can be filled tightly.

돌출부(131a)에는 바닥판 콘크리트(200) 형성시 격자형으로 설치되는 바닥판 철근(210) 중 좌우방향으로 설치되는 횡철근(211)이 관통 결합되도록 바닥판철근 결합홀(134)이 형성된 것이 바람직하다.A bottom plate reinforcing bar 134 is formed in the protruding portion 131a so that the transverse reinforcing bar 211 installed in the left and right direction of the bottom plate reinforcing bars 210 installed in a lattice form when the bottom plate concrete 200 is formed desirable.

이 경우, 횡철근(211)이 바닥판철근 결합홀(134)을 관통하여 설치되기 때문에 보강재와 바닥판과의 결합력이 우수하고, 바닥판 철근의 설치와 배근이 용이하다. In this case, since the transverse reinforcing bars 211 are provided through the bottom plate reinforcing bars 134, the connecting force between the reinforcing members and the bottom plate is excellent, and the installation and positioning of the bottom plate reinforcing bars is easy.

선행기술 중 보강재가 거더의 상부플랜지 상부에 노출된 경우, 보강재에 바닥판 철근이 관통될 수 있는 관통홀이 형성되어 있지 않기 때문에 보강재에 철근을 용접하는 결합방식으로 바닥판 철근을 설치한다. 따라서 용접에 대한 공사비가 증가함은 물론 공기가 길어지는 문제가 있어 왔다. In the prior art, when the stiffener is exposed on the upper flange of the girder, since the stiffener does not have a through hole that can penetrate the bottom plate reinforcing bar, the bottom plate reinforcing bar is installed by a method of welding the reinforcing bar to the stiffener. Therefore, there has been a problem that the cost of welding is increased and the air is lengthened.

그러나 본원발명은 바닥판철근 결합홀에 바닥판 철근을 관통하여 철근을 설치하기 때문에 시공이 용이함은 물론 공사기간을 단축할 수 있다.However, since the reinforcing bars are installed through the bottom plate reinforcing bars in the bottom plate reinforcing bars, the construction of the present invention is easy and the construction period can be shortened.

바닥판철근 결합홀(134)은 전후 방향을 기준으로 상호 간격을 두고 설치되는 복수의 횡철근(211)의 설치 간격과 동일한 간격으로 형성된 것이 바람직하다.It is preferable that the bottom plate reinforcing bars 134 are formed at the same interval as the installation intervals of the plurality of transverse reinforcing bars 211 provided at mutually spaced intervals with respect to the forward and backward directions.

이 경우, 바닥판철근 결합홀(134)이 횡철근(211)의 설치 간격과 동일한 간격으로 형성되고 상호 관통결합되기 때문에 바닥판과 보강재의 결합력을 향상시킨다.In this case, since the bottom plate reinforcing bars 134 are formed at the same intervals as the spacing of the lateral reinforcing bars 211 and are mutually penetratingly coupled, the coupling strength between the bottom plate and the reinforcing member is improved.

바닥판철근 결합홀(134)은 전후방향을 따라 장공으로 형성된 것이 바람직하다.It is preferable that the bottom plate reinforcing bar 134 is formed as a long hole along the front-rear direction.

이 경우, 철근배근이 용이하고, 보강재의 제작오차 및 철근의 조립 오차가 발생하여도 상호 관통 결합이 가능하다.In this case, mutual penetration can be achieved even if the reinforcement is easy to assemble, a manufacturing error of the reinforcing material, and an assembly error of the reinforcing bars occur.

전단철근결합홀(133)은 전후방향을 따라 설치되는 복수의 전단철근(122)의 설치 간격과 동일한 간격으로 형성된 것이 바람직하다.It is preferable that the shear reinforcing bars 133 are formed at the same intervals as the installation intervals of the plurality of shear reinforcing bars 122 provided along the front-rear direction.

이 경우, 전단철근결합홀(133)은 전단철근(122)의 설치 간격과 동일한 간격으로 형성되고 상호 관통 결합되기 때문에 보강재와 거더의 결합력을 향상시킨다.In this case, since the shear reinforcing bars 133 are formed at the same intervals as the installation spacing of the front-end reinforcing bars 122 and are mutually penetratingly coupled, the bonding strength between the reinforcing member and the girder is improved.

전단철근 결합홀(133)은 전후방향을 따라 장공으로 형성된 것이 바람직하다.The shear reinforcing bars 133 are preferably formed as long holes along the longitudinal direction.

이 경우, 철근배근이 용이하고, 보강재의 제작오차 및 철근의 조립 오차가 발생하여도 상호 관통결합이 가능하다.In this case, mutual penetration can be achieved even if the reinforcement is easy to assemble, a manufacturing error of the reinforcing material, and an assembly error of the reinforcing bars occur.

전단철근(122)은 복수의 철근이 결합되어 형성되되, 전단철근결합홀(133)에는 전단철근(122) 중 '

Figure 112016070091491-pat00002
' 구조의 최상단 전단철근이 결합되는 것이 바람직하다.The shear reinforcing bars 122 are formed by combining a plurality of reinforcing bars. The shear reinforcing bars 122 are formed by joining a plurality of reinforcing bars,
Figure 112016070091491-pat00002
It is preferable that the uppermost shear reinforcement of the " structure "

거더의 전단철근은 조립과 제작의 편의를 위해 복수의 철근을 상호 결합하여 조립하는 것이 일반적이다. 본 발명에서는 전단철근 결합홀(133)과 전단철근의 결합을 용이하게 하기 위해 전단철근(122) 중 '

Figure 112016070091491-pat00003
' 구조의 최상단 전단철근을 전단철근결합홀(133)에 관통시켜 전단철근을 조립한다.The shear reinforcement of the girder is generally assembled by assembling a plurality of reinforcing bars for the convenience of assembly and fabrication. In the present invention, in order to facilitate the coupling of the shear reinforcing bars 133 and the shear reinforcing bars,
Figure 112016070091491-pat00003
The uppermost shear reinforcement is passed through the shear reinforcing hole 133 to assemble the shear reinforcement.

가로보강재(132)는 전후방향을 기준으로 가장자리의 폭보다 중앙부의 폭이 더 넓은 것이 바람직하다.It is preferable that the width of the transverse stiffener 132 is wider than the width of the edge with respect to the longitudinal direction.

거더 실치 이후, 바닥판콘크리트 자중 및 사용하중이 작용되면 거더의 중앙부에 최대 모멘트가 발생하게 된다.After the girder has been installed, the maximum moment is generated in the center of the girder when the weight of the bottom plate concrete and the working load are applied.

특히 단순교의 경우, 거더 단부 에서 중앙부로 갈수록 모멘트의 크기가 점차 커지기 때문에 효율적인 보강재의 설치를 위하여 중앙부의 보강재 폭을 크게 하여 효율적인 보강재를 형성하였다.In particular, in the case of simple bridge, since the moment increases gradually from the end of the girder toward the center, an effective stiffener is formed by increasing the width of the stiffener at the central portion in order to install the stiffener efficiently.

바닥판 콘크리트(200)와 보강재(130)의 결합력을 향상시키기 위해, 가로보강재(132)의 상부에 전단연결재(135)가 결합된 것이 바람직하다.It is preferable that a shear connection member 135 is coupled to an upper portion of the transverse stiffener 132 to improve a coupling force between the bottom plate concrete 200 and the stiffener 130.

이 경우, 가로보강재(132)의 상부에 전단연결재(135)가 형성되어 있기 때문에 바닥판 콘크리트(200)와 보강재(130)의 결합력을 향상시킬 수 있다.In this case, since the shear connection member 135 is formed on the upper portion of the transverse reinforcement member 132, the coupling strength between the bottom plate concrete 200 and the reinforcement member 130 can be improved.

세로보강재(131)는 전단철근결합홀(133)의 사이 구간이 아치형상으로 절개된 것이 바람직하다.The longitudinal stiffener 131 is preferably formed such that the interval between the front-end reinforcing bars 133 is cut in an arch shape.

이 경우, 보강재의 강재량을 절감하여 보강재의 제작비용을 절감시킬 수 있고, 보강재의 자중이 감소되어, 효율적인 보강재 구조를 형성할 수 있다.In this case, the amount of steel material of the reinforcing material can be reduced to reduce the manufacturing cost of the reinforcing material, the weight of the reinforcing material can be reduced, and an efficient reinforcing material structure can be formed.

본 발명의 일 실시 예에 따른 강합성 프리스트레스트 거더 제작방법은 철근(120)을 설치함과 아울러, 전단철근(122)이 전단철근 결합홀(133)을 관통하도록 보강재(130)를 설치하는 철근-보강재설치단계; 철근(120)의 측면에 거푸집(400)을 설치하는 거푸집 설치단계; 매립부(131b)가 매립되도록 콘크리트를 타설하는 콘크리트 타설단계; 콘크리트 양생 후 긴장재(300)에 인장력을 도입하여 거더(100)에 상향력을 도입하는 프리스트레스도입단계;를 포함한다.A method of manufacturing a steel composite prestressed girder according to an embodiment of the present invention includes the steps of providing a reinforcing bar 120 and a reinforcing bar 130 for installing a reinforcing member 130 such that the shearing reinforcing bar 122 passes through the front- - Stiffener installation phase; A mold setting step of setting a mold 400 on a side surface of the reinforcing bar 120; A concrete casting step of casting concrete so that the buried portion 131b is embedded; And a prestress introduction step of introducing an upward force to the girder 100 by introducing a tensile force to the prestressing material 300 after the concrete curing.

이 경우, 전단철근이 보강재에 관통결합되기 때문에 거더에 결합된 보강재가 복합적인 하중에 의해 인발되는 것을 근본적으로 방지할 수 있다.In this case, since the shear reinforcement is penetrated through the reinforcing member, it is possible to fundamentally prevent the reinforcing member coupled to the girder from being pulled out by a complex load.

또한, 본원발명은 세로보강재(131)가 상부플랜지에 매립되는 구조로 결합되기 때문에 콘크리트 타설단계에서 보강재 하단에 콘크리트 충전이 불량해 지는 것을 방지할 수 있다. In addition, since the longitudinal stiffener 131 is embedded in the upper flange, the present invention can prevent the filling of the concrete at the lower end of the stiffener in the concrete pouring step.

철근-보강재설치단계에서 보강재(130)는 보강재 지지부재(500)에 의해 고정설치되는 것이 바람직하다.It is preferable that the reinforcing material 130 is fixedly installed by the reinforcing material supporting member 500 in the step of installing the reinforcing steel-reinforcing material.

이 경우, 지지부재(500)를 이용하여 철근조립과정에서 보강재의 위치를 고정하기 때문에 콘크리트 타설 및 거더 제작중에 발생할 수 있는 보강재의 제작오차를 최소화 할 수 있다.In this case, since the position of the reinforcing member is fixed in the process of assembling the reinforcing bar using the supporting member 500, it is possible to minimize the manufacturing error of the reinforcing member that may occur during the concrete pouring and the girder manufacturing.

본 발명의 일 실시 예에 따른 강합성 프리스트레스트 거더를 이용한 교량 시공방법은 철근(120)을 설치함과 아울러, 전단철근(122)이 전단철근 결합홀(133)을 관통하도록 보강재(130)를 설치하는 철근-보강재설치단계; 철근(120)의 측면에 거푸집(400)을 설치하는 거푸집 설치단계; 매립부(131b)가 매립되도록 콘크리트를 타설하는 콘크리트 타설단계; 콘크리트 양생 후 긴장재(300)에 인장력을 도입하여 거더(100)에 상향력을 도입하는 프리스트레스도입단계; 프리스트레스가 도입된 거더(100)를 교대 또는 교각에 거치시키는 거더설치단계; 횡철근(211)이 바닥판철근 결합홀(134)을 관통하여 설치되도록, 바닥판 철근(210)을 설치하는 바닥판철근설치단계; 바닥판 콘크리트(200)를 타설하는 바닥판 콘크리트타설단계;를 포함한다.A method of constructing a bridge using a steel composite prestressed girder according to an embodiment of the present invention includes installing a reinforcing bar 120 and installing a reinforcing member 130 so that the shear reinforcing bar 122 passes through the front- Installing rebar-stiffener steps; A mold setting step of setting a mold 400 on a side surface of the reinforcing bar 120; A concrete casting step of casting concrete so that the buried portion 131b is embedded; A prestress introduction step of introducing an upward force into the girder 100 by introducing a tensile force to the prestressing material 300 after the concrete curing; A girder installing step of placing the girders 100 into which the prestress is introduced alternately or at a pier; Installing a bottom plate reinforcing bar (210) so that the transverse reinforcing bars (211) are installed through the bottom plate reinforcing bars (134); And a bottom plate concrete casting step of casting the bottom plate concrete 200.

이 경우, 전단철근이 보강재에 관통결합되기 때문에 거더에 결합된 보강재가 복합적인 하중에 의해 인발 되는 것을 근본적으로 방지할 수 있다.In this case, since the shear reinforcement is penetrated through the reinforcing member, it is possible to fundamentally prevent the reinforcing member coupled to the girder from being pulled out by a complex load.

본원발명은 세로보강재(131)가 상부플랜지에 매립되는 구조로 결합되기 때문에 콘크리트 타설단계에서 보강재 하단에 콘크리트 충전이 불량해 지는 것을 방지할 수 있다. Since the longitudinal stiffener 131 is embedded in the upper flange of the present invention, it is possible to prevent the concrete from being poorly charged at the bottom of the stiffener in the concrete pouring step.

또한, 바닥판 형성시 보강재와 바닥판 철근이 관통결합되기 때문에 교량 구조물의 일체성을 향상시킬 수 있다.Further, when the bottom plate is formed, the reinforcing member and the bottom plate reinforcing bar are coupled with each other through the through hole, so that the integral structure of the bridge structure can be improved.

철근-보강재설치단계에서 보강재(130)는 보강재 지지부재(500)에 의해 고정설치되는 것이 바람직하다.It is preferable that the reinforcing material 130 is fixedly installed by the reinforcing material supporting member 500 in the step of installing the reinforcing steel-reinforcing material.

이 경우, 지지부재(500)를 이용하여 철근조립과정에서 보강재의 위치를 고정하기 때문에 콘크리트 타설 및 거더 제작중에 발생할 수 있는 보강재의 제작오차를 최소화 할 수 있다.In this case, since the position of the reinforcing member is fixed in the process of assembling the reinforcing bar using the supporting member 500, it is possible to minimize the manufacturing error of the reinforcing member that may occur during the concrete pouring and the girder manufacturing.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시 예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined in the appended claims. It is to be understood that both the technical idea and the technical spirit of the invention are included in the scope of the present invention.

100 : 강합성 프리스트레스트 거더 110 : 본체 콘크리트
111 : 상부플랜지 112 : 복부
113 : 하부플랜지 120 : 철근
121 : 주철근 122 : 전단철근
130 : 보강재 131 : 세로보강재
131a : 상측돌출부 131b : 하부매립부
132 : 가로보강재 133 : 전단철근결합홀
134 : 바닥판철근 결합홀 135 : 전단연결재
200 : 바닥판콘크리트 210 : 바닥판 철근
211 : 횡철근 300 : 긴장재
400 : 거푸집 500 : 지지부재
100: steel composite prestressed girder 110: main body concrete
111: upper flange 112: abdomen
113: lower flange 120: reinforcing bar
121: Cast iron root 122: Shear reinforcement
130: stiffener 131: longitudinal stiffener
131a: Upper projecting portion 131b: Lower-
132: transverse stiffener 133: shear reinforcing joint hole
134: bottom plate reinforcing joint hole 135: shear connection member
200: bottom plate concrete 210: bottom plate reinforcement
211: transverse reinforcement 300: tensile material
400: Formwork 500: Support member

Claims (14)

상부플랜지(111), 복부(112), 하부플랜지로(113)로 형성되는 본체 콘크리트(110);
상기 본체 콘크리트(110)의 내부에 설치되는 철근(120);
상기 상부플랜지(111)의 상부에 결합되어 상기 본체 콘크리트(110)의 전후방향을 따라 설치되는 T형 구조의 보강재(130);를 포함하되,
상기 철근(120)은, 전후방향을 따라 설치되는 복수의 주철근(121);
상기 주철근(121)과 교차되어 상기 본체 콘크리트(110)의 횡단면을 따라 설치됨과 아울러, 길이방향을 따라 상호 이격되어 복수로 설치되는 전단철근(122);을 포함하고,
상기 보강재(130)는 세로보강재(131)와 가로보강재(132)를 포함하되,
상기 세로보강재(131)는, 상기 상부플랜지(111)의 상측으로 돌출되는 상측 돌출부(131a);
상기 상부플랜지(111)에 매립되는 하부 매립부(131b);를 포함하고
상기 매립부(131b)에는 전후방향을 따라 상호 간격을 두고 상기 전단철근(122)이 관통되어 설치되는 전단철근결합홀(133)이 형성되고,
상기 전단철근결합홀(133)은 전후방향을 따라 장공으로 형성됨과 아울러, 전후방향을 따라 설치되는 복수의 상기 전단철근(122)의 설치 간격과 동일한 간격으로 설치되고,
상기 전단철근(122)은 복수의 철근이 결합되어 형성되되, 상기 전단철근결합홀(133)에는 상기 전단철근(122) 중 '
Figure 112016103854237-pat00020
' 구조의 최상단 전단철근이 결합되며,
상기 세로보강재(131)는 상기 전단철근결합홀(133)의 사이 구간이 아치형상으로 절개된 것을 특징으로 하는 강합성 프리스트레스트 거더.
The main body concrete 110 formed by the upper flange 111, the abdomen portion 112, and the lower flange path 113;
A reinforcing bar 120 installed inside the main body concrete 110;
And a stiffener 130 of a T-shaped structure, which is coupled to an upper portion of the upper flange 111 and installed along the front-rear direction of the main body concrete 110,
The reinforcing bars 120 include a plurality of cast iron rods 121 installed along the front-rear direction;
And a plurality of shear reinforcing bars (122) installed along the transverse section of the main body concrete (110) intersecting with the main reinforcement rods (121) and spaced apart from each other along the longitudinal direction,
The stiffener 130 includes a longitudinal stiffener 131 and a transverse stiffener 132,
The longitudinal stiffener 131 includes an upper protrusion 131a protruding upward from the upper flange 111;
And a lower buried portion 131b embedded in the upper flange 111
The front end reinforcing bars 133 are formed in the buried portions 131b so as to penetrate the front reinforcing bars 122 with an interval therebetween along the forward and backward directions.
The front-end reinforcing bars 133 are formed as long holes along the front-rear direction and are provided at the same intervals as the installation intervals of the plurality of the front-end reinforcing bars 122 installed along the front-
The front shear reinforcing bar 122 is formed by combining a plurality of reinforcing bars,
Figure 112016103854237-pat00020
The uppermost shear reinforcement of the structure is combined,
Wherein the longitudinal stiffener (131) is cut in an arcuate section between the front-end reinforcing bars (133).
제1항에 있어서,
상기 돌출부(131a)에는 바닥판 콘크리트(200) 형성시 격자형으로 설치되는 바닥판 철근(210) 중 좌우방향으로 설치되는 횡철근(211)이 관통 결합되도록 바닥판철근 결합홀(134)이 형성된 것을 특징으로 하는 강합성 프리스트레스트 거더.
The method according to claim 1,
A bottom plate reinforcing bar coupling hole 134 is formed in the protruding portion 131a so that a transverse reinforcing bar 211 installed in a lateral direction of the bottom plate reinforcing bar 210 installed in a lattice form when the bottom plate concrete 200 is formed Wherein the steel composite prestressing girder is made of steel.
제2항에 있어서,
상기 바닥판철근 결합홀(134)은 전후 방향을 기준으로 상호 간격을 두고 설치되는 복수의 상기 횡철근(211)의 설치 간격과 동일한 간격으로 형성된 것을 특징으로 강합성 프리스트레스트 거더.
3. The method of claim 2,
Wherein the bottom plate reinforcing bars (134) are spaced apart from each other by a distance equal to a spacing of a plurality of the transverse reinforcing bars (211) provided at mutually spaced intervals with respect to the longitudinal direction.
제3항에 있어서,
상기 바닥판철근 결합홀(134)은 전후방향을 따라 장공으로 형성된 것을 특징으로 하는 강합성 프리스트레스트 거더
The method of claim 3,
And the bottom plate reinforcing bar coupling hole (134) is formed as a long hole along the forward and backward direction.
삭제delete 삭제delete 삭제delete 제2항에 있어서,
상기 가로보강재(132)는 전후방향을 기준으로 가장자리의 폭보다 중앙부의 폭이 더 넓은 것을 특징으로 하는 강합성 프리스트레스트 거더.
3. The method of claim 2,
Wherein the width of the transverse stiffener (132) is wider than the width of the edge with respect to the longitudinal direction.
제8항에 있어서,
상기 바닥판 콘크리트(200)와 상기 보강재(130)의 결합력을 향상시키기 위해, 상기 가로보강재(132)의 상부에 전단연결재(135)가 결합된 것을 특징으로 하는 강합성 프리스트레스트 거더.
9. The method of claim 8,
Wherein a shear connection member (135) is coupled to an upper portion of the transverse reinforcement (132) to improve a coupling force between the bottom plate concrete (200) and the reinforcement member (130).
삭제delete 제1항 내지 제4항, 제8항, 제9항 중 어느 한 항의 강합성 프리스트레스트 거더 제작방법으로서,
상기 철근(120)을 설치함과 아울러, 상기 전단철근(122)이 상기 전단철근 결합홀(133)을 관통하도록 상기 보강재(130)를 설치하는 철근-보강재설치단계;
상기 철근(120)의 측면에 거푸집(400)을 설치하는 거푸집 설치단계;
상기 매립부(131b)가 매립되도록 콘크리트를 타설하는 콘크리트 타설단계;
콘크리트 양생 후 긴장재(300)에 인장력을 도입하여 상기 거더(100)에 상향력을 도입하는 프리스트레스도입단계;를 포함하는 것을 특징으로 하는 프리스트레스트 거더 제작방법.
A method of manufacturing a composite composite prestressed girder according to any one of claims 1 to 4, 8, 9,
Installing a reinforcing bar (120) and installing the reinforcing material (130) so that the shear reinforcing bar (122) penetrates the shear reinforcing bar (133);
A mold setting step of setting a mold 400 on a side surface of the reinforcing bar 120;
A concrete pouring step of pouring concrete so that the buried part 131b is embedded;
And a prestressing step of introducing an upward force to the girder (100) by introducing a tensile force to the prestressing material (300) after the concrete curing.
제11항에 있어서,
상기 철근-보강재설치단계에서
상기 보강재(130)는 보강재 지지부재(500)에 의해 고정설치되는 것을 특징으로 하는 프리스트레스트 거더 제작방법.
12. The method of claim 11,
In the reinforcing steel-reinforcing material installation step
Wherein the stiffener (130) is fixedly installed by a stiffener support member (500).
제2항 내지 제4항, 제8항, 제9항 중 어느 한 항의 강합성 프리스트레스트 거더를 이용한 교량 시공방법으로서,
상기 철근(120)을 설치함과 아울러, 상기 전단철근(122)이 상기 전단철근 결합홀(133)을 관통하도록 상기 보강재(130)를 설치하는 철근-보강재설치단계;
상기 철근(120)의 측면에 거푸집(400)을 설치하는 거푸집 설치단계;
상기 매립부(131b)가 매립되도록 콘크리트를 타설하는 콘크리트 타설단계;
콘크리트 양생 후 긴장재(300)에 인장력을 도입하여 상기 거더(100)에 상향력을 도입하는 프리스트레스도입단계;
프리스트레스가 도입된 상기 거더(100)를 교대 또는 교각에 거치시키는 거더설치단계;
상기 횡철근(211)이 상기 바닥판철근 결합홀(134)을 관통하여 설치되도록, 상기 바닥판 철근(210)을 설하는 바닥판철근설치단계;
상기 바닥판 콘크리트(200)를 타설하는 바닥판 콘크리트타설단계;를 포함하는 것을 특징으로 하는 교량시공방법.
A method of constructing a bridge using the steel composite prestress girder according to any one of claims 2 to 4, 8, 9,
Installing a reinforcing bar (120) and installing the reinforcing material (130) so that the shear reinforcing bar (122) penetrates the shear reinforcing bar (133);
A mold setting step of setting a mold 400 on a side surface of the reinforcing bar 120;
A concrete pouring step of pouring concrete so that the buried part 131b is embedded;
A prestress introduction step of introducing an upward force into the girder (100) by introducing a tensile force to the prestressing material (300) after concrete curing;
A girder installing step of placing the girder (100) having a prestress introduced thereto alternately or at a pier;
A bottom plate reinforcing bar mounting step of setting the bottom plate reinforcing bars 210 so that the transverse reinforcing bars 211 are installed through the bottom plate reinforcing bars 134;
And a bottom plate concrete casting step of casting the bottom plate concrete (200).
제13항에 있어서,
상기 철근-보강재설치단계에서
상기 보강재(130)는 보강재 지지부재(500)에 의해 고정설치되는 것을 특징으로 하는 교량시공방법.
14. The method of claim 13,
In the reinforcing steel-reinforcing material installation step
Wherein the reinforcing member (130) is fixedly installed by a reinforcing member supporting member (500).
KR1020160091596A 2016-07-19 2016-07-19 Prestressed concrete girder having reinforcing member and the construction method thereof KR101724122B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160091596A KR101724122B1 (en) 2016-07-19 2016-07-19 Prestressed concrete girder having reinforcing member and the construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160091596A KR101724122B1 (en) 2016-07-19 2016-07-19 Prestressed concrete girder having reinforcing member and the construction method thereof

Publications (1)

Publication Number Publication Date
KR101724122B1 true KR101724122B1 (en) 2017-04-06

Family

ID=58583881

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160091596A KR101724122B1 (en) 2016-07-19 2016-07-19 Prestressed concrete girder having reinforcing member and the construction method thereof

Country Status (1)

Country Link
KR (1) KR101724122B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112575694A (en) * 2020-12-10 2021-03-30 江苏捷达交通工程集团有限公司 Mounting construction method for long-span T beam
RU223028U1 (en) * 2023-10-27 2024-01-29 Александр Анатольевич Кулешов CONSTRUCTION PURLING BEAM

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030085869A (en) 2002-05-02 2003-11-07 엘지산전 주식회사 An Unit for Capacitor Switching
KR20050000295A (en) * 2003-06-23 2005-01-03 도피겐세츠고교 가부시기가이샤 A structure of connection portion between pre-cast concrete beam and concrete bottom plate in composite bridge
KR20080092049A (en) 2007-04-11 2008-10-15 엘지디스플레이 주식회사 Apparatus and method of cleaing cassette
KR20090068536A (en) * 2007-12-24 2009-06-29 (주)엠씨에스공법 Concrete-composite crossbeam and construction methods of slab structure using the same
KR100982668B1 (en) * 2007-12-21 2010-09-17 재단법인 포항산업과학연구원 Method for manufacturing prestressed concrete girder
KR20130018240A (en) 2010-03-25 2013-02-20 닛신 오일리오그룹 가부시키가이샤 Vaseline-like composition, and cosmetic preparation
KR101505039B1 (en) * 2014-11-03 2015-03-24 주식회사 오케이건설 Composite Girder with Heating-Reinforcing Steel Beam and Concrete Beam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030085869A (en) 2002-05-02 2003-11-07 엘지산전 주식회사 An Unit for Capacitor Switching
KR20050000295A (en) * 2003-06-23 2005-01-03 도피겐세츠고교 가부시기가이샤 A structure of connection portion between pre-cast concrete beam and concrete bottom plate in composite bridge
KR20080092049A (en) 2007-04-11 2008-10-15 엘지디스플레이 주식회사 Apparatus and method of cleaing cassette
KR100982668B1 (en) * 2007-12-21 2010-09-17 재단법인 포항산업과학연구원 Method for manufacturing prestressed concrete girder
KR20090068536A (en) * 2007-12-24 2009-06-29 (주)엠씨에스공법 Concrete-composite crossbeam and construction methods of slab structure using the same
KR20130018240A (en) 2010-03-25 2013-02-20 닛신 오일리오그룹 가부시키가이샤 Vaseline-like composition, and cosmetic preparation
KR101505039B1 (en) * 2014-11-03 2015-03-24 주식회사 오케이건설 Composite Girder with Heating-Reinforcing Steel Beam and Concrete Beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112575694A (en) * 2020-12-10 2021-03-30 江苏捷达交通工程集团有限公司 Mounting construction method for long-span T beam
RU223028U1 (en) * 2023-10-27 2024-01-29 Александр Анатольевич Кулешов CONSTRUCTION PURLING BEAM

Similar Documents

Publication Publication Date Title
KR101384609B1 (en) An assembly type beam mold reinforced a stiffness of a side plate
KR101499343B1 (en) Closed Built-up Beam, Hybrid Composite Beam and Strucutures using the same
KR101011070B1 (en) Connection method between steel plate concrete structure and different structure
KR101934405B1 (en) Prestressed concrete box girder and manufacturing method thereof
KR101915960B1 (en) Steel and concretre bridge construction method using precast half-deck
KR101991930B1 (en) Rahman bridge and construction method thereof
KR101547629B1 (en) Steel girder with end diaphragm and semi-integral abutment bridge construction method therewith
KR101683196B1 (en) End Continuing Structure for Truss Decks
KR101678999B1 (en) Method of manufacturing composite girder and of constructing birdge upper structure using same
KR101834006B1 (en) Roll forming steel plates built-up beam and steel frame using the same
KR101165207B1 (en) Closed steel composite girder and how the connection between a closed steel composite girder
KR101677668B1 (en) Formed steel beam having bolt connection with lattice reinforcement and composite beam using the same
KR200455723Y1 (en) Hybrid steel ball
KR101705002B1 (en) Prefabricated double composite plate girder bridge and its construction method
KR20100043731A (en) Precast concrete column using steel material and precast reinforced concrete construction using the same
KR101742046B1 (en) Composite girder and method of manufacturing composite girder and of constructing birdge upper structure using same
KR101347939B1 (en) Composite structure of corrugated steel plate web-PSC composite beam structure which combined corrugated steel plate and concrete plate with L shape steel
KR101577327B1 (en) Hybrid composite girder
KR101940876B1 (en) Composite girder and construction method thereof
KR101724122B1 (en) Prestressed concrete girder having reinforcing member and the construction method thereof
KR101396440B1 (en) Hybrid beam with reinforced end portions
KR101612623B1 (en) Fabricated beam with steel plates and angles and composite beam using the same
KR101447723B1 (en) Assembly temporary bridge using all-in-one floor plate and girder
KR101878762B1 (en) Coupling structure of double type for girder and column capable of reducing girder height
KR101698807B1 (en) Manufacturing method of the psc girder using the corrugated steel plate and the psc girder manufactured thereby

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20200312

Year of fee payment: 4