KR101704971B1 - Support device for leveling-adjustment and displacement recipience and overturning prevention of upper girder and Rahmen bridge using of the same - Google Patents

Support device for leveling-adjustment and displacement recipience and overturning prevention of upper girder and Rahmen bridge using of the same Download PDF

Info

Publication number
KR101704971B1
KR101704971B1 KR1020160065924A KR20160065924A KR101704971B1 KR 101704971 B1 KR101704971 B1 KR 101704971B1 KR 1020160065924 A KR1020160065924 A KR 1020160065924A KR 20160065924 A KR20160065924 A KR 20160065924A KR 101704971 B1 KR101704971 B1 KR 101704971B1
Authority
KR
South Korea
Prior art keywords
girder
plate
displacement
support
height
Prior art date
Application number
KR1020160065924A
Other languages
Korean (ko)
Inventor
천진욱
서동영
Original Assignee
천진욱
서동영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
Application filed by 천진욱, 서동영 filed Critical 천진욱
Priority to KR1020160065924A priority Critical patent/KR101704971B1/en
Application granted granted Critical
Publication of KR101704971B1 publication Critical patent/KR101704971B1/en
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=58121379&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR101704971(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Abstract

The present invention relates to a support device capable of installation height control, displacement accommodation, and overturn prevention of an upper girder, and a Rahmen bridge using the same. More specifically, the support device according to an embodiment of the present invention controls the height of the upper girder of a bridge and accommodates the horizontal transfer displacement, and the rotation behavior of the upper girder of the bridge. The support device comprises: a plurality of steel screw rods with a length of which the lower end is formed on a wall body side of a lower structure of the bridge and of which the upper end penetrates a lower flange of the upper girder; a pair of support nuts fastened to an upper part of the screw steel rods by a screw to decide the height of the upper girder; a displacement accommodation support plate inserted into the steel screw rods, and supported on the support nuts to allow the height to be controlled in accordance with control of position of the support nuts and to support the upper girder; a fixing nut fastened to the steel screw rods to fix the displacement accommodation support plate; an overturn prevention nut and an upper washer assembled on an upper of the steel screw rods to fasten the steel screw rods and the upper girder; an elastic plate installed between the upper washer and the lower flange of the upper girder to accommodate the rotation displacement generated when the upper girder is rotated; and a sliding upper plate and a sliding lower plate inserted into the steel screw rods, and installed between the elastic plate and the lower flange of the upper girder to accommodate the horizontal transfer displacement.

Description

시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치 및 이를 이용한 라멘교{Support device for leveling-adjustment and displacement recipience and overturning prevention of upper girder and Rahmen bridge using of the same}[0001] The present invention relates to a support device for supporting height adjustment of an upper girder during installation and for accommodating displacement and preventing falling, and a ramen bridge using the support device for leveling-adjustment and displacement recipient and overturning prevention.
본 발명은 거더를 상부구조로 사용하는 라멘교(Rahmen Bridge, Rigid-frame Bridge)에서 상부거더를 벽체에 지지시키고 연결시키기 위한 받침장치 및 이를 이용한 라멘교에 관한 것으로서, 더욱 상세하게는 시공 단계에서 상부거더의 설치높이 조절이 가능하여 교량의 계획높이 변경이 쉽고, 벽체 높이관련 시공 오차 및 오류의 수용범위를 확대시켜 시공성을 향상시키며, 수직하중과 온도변화에 대한 회전변위 및 수평변위를 수용하여 받침장치의 안전 및 안정성을 향상시킬 수 있고, 상부거더를 벽체와 연결하여 전도를 방지할 수 있으며, 완공 후에는 벽체 상단의 휨강성을 증대시킬 수 있는 받침장치 및 이를 이용한 라멘교에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a support device for supporting and connecting an upper girder to a wall in a Rahmen Bridge (Rigid-frame Bridge) using a girder as an upper structure, It is easy to change the planned height of the bridge by adjusting the installation height of the upper girder. It improves workability by enlarging the acceptance range of construction errors and errors related to wall height, and accommodates the rotational displacement and horizontal displacement with respect to vertical load and temperature change The present invention relates to a supporting apparatus capable of improving safety and stability of a supporting apparatus, connecting the upper girder to a wall to prevent conduction, and increasing the bending stiffness of the upper end of the wall after completion, and a raymen bridge using the supporting apparatus.
교량의 계획높이는 설계단계에서 관련 시방규정 및 현지 여건을 감안하여 결정되나 공사 중 접속도로의 선형변경, 홍수위에 대한 여유고 강화, 민가 등 건축물이 교량의 계획높이 보다 낮아져 저지대가 됨에 따라 발생되는 민원 등으로 교량의 계획높이는 시공 중 빈번히 변경된다. 상기 교량이 설치될 주변여건에 따른 계획높이 변경요인을 도 1에 도시하였다. 이러한 교량의 계획높이 변경은 하부구조인 벽체가 시공되기 전에 가능하며, 시공이 완료된 이후에는 철거한 후 다시 시공할 수밖에 없어 공사비 및 공기증대가 불가피하다.The planned height of the bridge is determined considering the relevant specification and the local conditions at the design stage. However, the linearity of the connection road, the increase in the flood level, and the civil building are lower than the planned height of the bridge, The height of the bridge is frequently changed during construction. FIG. 1 shows factors for changing the planned height according to the circumstance where the bridge will be installed. It is possible to change the planned elevation of such bridges before the wall of the lower structure is constructed. After the completion of the construction, it is inevitable that the construction cost and the air should be increased because the construction can not be done again after demolition.
거더를 상부구조로 사용하는 라멘교(이하 '거더-라멘교'라 함)에서, 교량의 계획높이에 관여하는 부분은 도 2a 내지 도 2b에 도시된 벽체(101)와 받침강형 또는 연결강형(이하 '연결부재(500)'라 함)이다. 연결부재(500)는 벽체(101) 위에 상부거더(200)를 연결 또는 거치시키기 위해 필요하며, 공사 초기에 발주되어 상부거더와 더불어 벽체보다 먼저 제작된다. 이러한 연결부재는 H형태 또는 I형태 단면의 강재로 자동 용접 및 절단기를 가진 공장에서 절단되어 조립되어 지며, 특히 구조용 목적으로 강재를 현장에서 절단하는 것은 허용되지 않는다. 따라서 상기 종래 거더-라멘교에서 계획높이가 시공 중 변경될 경우, 벽체 뿐만 아니라 연결부재의 재시공도 요구된다.In a ramen bridge (hereinafter referred to as " girder-ramen bridges ") using a girder as an upper structure, a portion involved in a planned height of a bridge is formed by a wall 101 shown in Figs. 2A and 2B, Hereinafter referred to as " connecting member 500 "). The connecting member 500 is required to connect or mount the upper girder 200 on the wall 101. The connecting member 500 is ordered at the beginning of the construction and is manufactured before the wall together with the upper girder. These connecting members are cut and assembled in factories with automatic welding and cutting machines with H-shaped or I-shaped cross-section steel, and it is not permissible to cut the steel in situ, especially for structural purposes. Therefore, in the above-mentioned conventional girder-bridging bridges, when the planned height is changed during construction, it is also required to re-work the connecting member as well as the wall.
또한 종래 거더-라멘교에서 벽체와 연결부재는 시공오차에 민감하여 재시공되는 사례가 빈번하며, 이를 해결하기 위한 경제적 손실 또한 종종 발생된다.Also, in the conventional girder-bridges bridge, the walls and the connecting members are often susceptible to construction errors and are frequently reworked, which often leads to economic losses.
통상적인 차당 레미콘의 용량은 6㎥으로 규격화되어 있어 도 2a 내지 2c에 도시된 벽체의 1차타설높이에 맞는 용량을 정확히 발주하기 어려우므로 대부분 초과 발주를 시행하며, 이로 인해 불필요한 비용 및 건설 폐기물이 증가된다. 만일 1차타설높이를 시공 오차 및 오류 등으로 맞추지 못할 경우 연결부재의 수정이 불가피하며 앞서 설명한 바와 같이 공사비 및 공기증대가 불가피하다. 이러한 1차타설높이는 교량의 횡구배 및 이로 인한 단차로 횡단면상 변화되므로 시공 오차 및 오류를 빈번히 유발시킨다.Since the conventional capacity of the concrete mixer is standardized to 6 m3, it is difficult to order the capacity corresponding to the height of the primary casting of the wall shown in Figs. 2a to 2c. Therefore, . If the height of the primary installation can not be adjusted due to construction errors and errors, it is inevitable to modify the connecting members. As described above, it is inevitable to increase the construction cost and the air. The height of the primary pile is varied transversely by the transverse direction of the bridge and the step due to it, which causes construction errors and errors frequently.
앞서 설명한 종래 거더-라멘교의 문제점 중 현장에서 변경사항에 맞게 수정할 수 없는 H형태 또는 I형태의 연결부재 대신, 단면이 작아 현장에서 절단이 가능한 강봉 또는 각강 등의 선부재를 연결부재로 사용할 경우 좌굴에 관련된 안정 및 안전성에 문제가 있어 구조부재로서 사용하기 어렵다.Among the problems of the conventional gutter-ramen bridge described above, when a wire member such as a steel bar or a steel bar, which can be cut at the site due to its small cross section, is used as a connecting member instead of H- or I- It is difficult to use it as a structural member.
좌굴(buckling)은 길고 곧은 부재에 압축력이 가해지면 하중의 크기가 작은 경우 압축력을 받는 봉과 같이 수축하게 되나, 하중의 크기가 어느 한도 값을 초과하면 가로 방향으로 큰 휨이 발생되어 불안정하게 되는 것을 의미하며, 이러한 휨 현상이 발생하는 순간의 하중을 임계하중 또는 Euler 좌굴하중이라 한다. 이러한 좌굴하중은 부재의 휨강성, 길이, 양단의 경계조건, 초기 처짐(변위), 하중의 편심 등에 따라 달라지며, 부재의 휨강성이 작을수록, 길이가 길수록, 경계조건의 구속정도가 약할수록(유효길이계수가 클수록), 초기 처짐(변위)이 클수록, 하중의 편심이 클수록 좌굴하중이 작아진다. 좌굴하중이 작아지면 실제 부재가 보유하고 있는 강도에 못 미치는 압축력에 의해 좌굴이 발생되므로 효율이 떨어져 비경제적이다. 또한 이러한 좌굴을 설계단계에 고려하지 않을 경우 갑작스런 붕괴가 발생하며, 최근 발생되는 슬래브 붕괴사고 역시 슬래브를 떠받치는 동바리의 수평방향 변위를 억제하는 수평재 및 경사재의 부족이 큰 원인으로 작용한 결과이다.If buckling is applied to a long and straight member, if the load is small, it contracts like a rod that receives a compressive force. However, if the load exceeds a certain value, large buckling occurs in the lateral direction and becomes unstable And the instantaneous load at which such a bending phenomenon occurs is called a critical load or an Euler buckling load. The buckling load depends on the bending stiffness of the member, the length, the boundary conditions at both ends, the initial deflection (displacement), the eccentricity of the load, and the longer the bending stiffness, the longer the length, The larger the length coefficient), the larger the initial deflection (displacement), the larger the eccentricity of the load, the smaller the buckling load. If the buckling load is small, buckling occurs due to the compressive force which is less than the strength of the actual member, which results in low efficiency and is uneconomical. In addition, sudden collapse occurs when the buckling is not considered in the design stage, and recent slab collapse is also a result of the lack of slabs and slabs that suppress horizontal displacements of the slab.
연결부재는 상단이 구속정도가 없는 자유단인 상태에서 상부거더를 지지하므로 유효길이계수가 클 수밖에 없고, 이러한 상태에서 휨강성이 I형 또는 H형 단면에 비해 상당히 작은 선부재를 사용할 경우 좌굴이 발생될 우려가 크다. 또한 연결부재는 상부거더에 작용하는 수직하중과 온도변화에 의한 회전변위 및 수평변위를 연결부재가 감당함에 따라 연결부재는 단순히 압축부재가 아니며, 초기 수평변위를 가진 휨-압축부재가 됨에 따라 좌굴발생은 불가피하다.Since the connecting member supports the upper girder in the state where the upper end is not free of restraint, the effective length coefficient must be large. In this state, if the bending stiffness is considerably smaller than the I- or H- There is a great deal of concern. The connecting member is not simply a compression member as the connecting member is subjected to the vertical load acting on the upper girder and the rotational displacement and the horizontal displacement due to the temperature change. The connecting member is a bending-compression member having an initial horizontal displacement, The occurrence is inevitable.
일반적으로 양단이 단순지지된 기둥에서 일직선이 아닌 초기 수평변위(δH)를 가질 경우 기둥 중앙부의 전체 탄성 처짐(δT)은 다음과 같다.In general, the total elastic deflection (δ T ) at the center of the column when the initial horizontal displacement (δ H ) is not straight but straight at both supported columns is as follows.
δT=δH+δ=
Figure 112016051431117-pat00001
T =H + 隆 =
Figure 112016051431117-pat00001
여기서, P는 압축력이며, PE는 단순지지된 기둥의 Euler 좌굴하중을 의미한다. 상기 식에서 초기 수평변위(δH)의 값의 변화에 따른 하중-변위 관계를 도 3에 도시하였다. 도 3으로부터 압축력의 크기가 Euler 좌굴하중에 접근할수록 초기 수평변위(δH)의 크기에 상관없이 과도한 횡변위(수평변위)가 발생한다. 즉, 초기 수평변위(δH)를 갖는 기둥의 좌굴하중은 항상 Euler 좌굴하중보다 작다. 또한 일정한 크기의 압축력이 작용하였을 때, 초기 수평변위(δH)의 크기가 큰 기둥일수록 발생되는 횡변위의 크기가 크다. 따라서 초기 수평변위(δH)의 크기가 큰 기둥일수록 Euler 좌굴하중과 비교하여 작은 압축력에 의하여 파괴됨을 알 수 있다.Where P is the compressive force and P E is the Euler buckling load of the simply supported column. FIG. 3 shows the load-displacement relationship according to the change of the initial horizontal displacement? H in the above equation. From FIG. 3, as the magnitude of the compressive force approaches the Euler buckling load, an excessive lateral displacement (horizontal displacement) occurs irrespective of the initial horizontal displacement (δ H ). That is, the buckling load of the column with the initial horizontal displacement (δ H ) is always smaller than the Euler buckling load. Also, when a certain amount of compressive force is applied, the amount of lateral displacement generated when the initial horizontal displacement (δ H ) is larger is larger. Therefore, it can be seen that the larger the initial horizontal displacement (δ H ) is, the smaller the compressive force is compared with the Euler buckling load.
즉, 종래 받침강형 또는 연결강형의 연결부재 대신 단면이 작아 현장에서 절단이 가능한 강봉 또는 각강 등의 선부재를 사용할 경우 상부거더에 작용하는 온도변화에 의한 초기 수평변위(δH)로 인해 작은 압축력에 의해서도 파괴되기 쉽고, 선부재의 상단이 구속정도가 없는 상태에서 상부거더를 지지하므로 유효길이계수가 클 수밖에 없어 파괴에 대한 저항성능을 더욱 감소시키며, 상부거더의 수직하중에 의한 상부거더 단부의 회전변위로 인해 선부재의 휨변형을 더욱 증대시므로 구조안전성을 확보하기 어렵다.In other words, when a wire member such as a steel bar or a steel bar which can be cut in the field is used instead of a connecting member having a conventional bearing steel or a connecting steel member, an initial horizontal displacement (δ H ) And the upper end of the wire member is supported by the upper girder without the degree of restraint, so that the effective length coefficient is inevitably large so that the resistance against fracture is further reduced, and the upper girder end portion due to the vertical load of the upper girder It is difficult to ensure structural safety because the flexural deformation of the wire member is further increased due to the rotational displacement.
따라서 종래 거더-라멘교의 경우 공사 중 접속도로의 선형변경, 홍수위에 대한 여유고 강화, 민가 등 건축물이 교량의 계획높이 보다 낮아져 저지대가 됨에 따라 발생되는 민원 등으로 교량의 계획높이가 설계상 변경될 경우, 시공 오차 및 오류 등으로 벽체 높이가 잘못 시공된 경우 벽체 및 연결부재의 재시공이 요구되므로 공사비 및 공기 증대가 불가피하다. 또한 상부거더에 작용하는 수직하중과 온도변화에 의한 회전변위 및 수평변위를 연결부재가 감당함에 따라 연결부재는 단순히 압축부재가 아닌 수평변위를 가진 휨-압축부재가 됨에 좌굴이 발생되는 문제점을 가지고 있다.Therefore, in the case of the conventional girder-ramen bridge, the height of the bridge is changed in design due to the linear change of the connecting road during the construction, the increase of the margin for the flood level, and the civil complaints caused by the building being lower than the planned height of the bridge. If the wall height is erroneously constructed due to construction errors and errors, it is inevitable to increase the construction cost and air because it is required to re-work the wall and the connecting member. In addition, as the connecting member is subjected to the vertical displacement and the horizontal displacement due to the vertical load acting on the upper girder and the temperature change, the connecting member is a bending-compression member having a horizontal displacement rather than a compression member, have.
본 발명의 배경이 되는 기술로는 한국 등록특허 등록번호 제10-1431640호로서, '거더의 형식에 관계없이 적용할 수 있는 거더 고정장치 및 이를 이용한 라멘교의 시공방법'이 제안되어 있다. 여기서 거더 고정장치는, 교대의 상면에 설치되는 기저부와, 상기 기저부의 상부에 위치하여 거더의 단부가 정착되고 거더의 폭방향으로 형성되는 힌지핀에 의해 기저부와 힌지결합하는 거더 정착부, 및 하단부가 교대 내에 정착되고 거더의 단부를 감싸면서 하방으로 눌러주는 긴장부를 포함하여 이루어지되; 상기 긴장부는, 하단부가 교대 내에 정착되고 거더 폭방향의 양측면에 인접하여 설치되는 것으로서 상기 힌지핀보다 거더의 말단에 더 가깝게 위치하는 한 쌍의 수직 긴장재와, 거더 상면에 위치하고 상기 수직 긴장재가 관통하는 제1누름판, 및 상기 제1누름판을 관통한 수직 긴장재 상부에 체결됨으로써 수직 긴장재를 긴장해주는 긴장너트를 포함하여 이루어지는 것을 특징으로 하여, 긴장재에 의해 보강된 거더를 안정적으로 지지해주는 역할을 한다.As a background of the present invention, Korean Registered Patent Registration No. 10-1431640, a girder fixing device which can be applied regardless of the type of girder and a construction method of a ramen bridge using the same is proposed. The girder fixing device includes a base portion provided on an alternate upper surface, a girder fixing portion positioned on the upper portion of the base portion and hinged to the base portion by a hinge pin formed in the width direction of the girder, And a tensioning portion which is fixed in an alternating manner and which presses the end portion of the girder downward; Wherein the tensioning portion comprises a pair of vertical tensions that are alternately positioned within the lower portion and are disposed adjacent to opposite sides of the girder width direction and are located closer to the ends of the girders than to the hinge pins; And a tension nut which is fastened to the upper portion of the vertical tension member passing through the first press plate to tightly tilt the vertical tension member, thereby stably supporting the girder reinforced by the tension member.
그러나 상기 배경기술은 시공 중에 교량의 계획높이가 설계상 변경될 경우 이에 대한 대처가 어렵고, 또한 상부거더에 작용하는 수직하중과 온도변화에 의한 회전변위 및 수평변위를 수용할 수 없는 구조를 가지고 있다.However, the background art has a problem in that when the planned height of the bridge is changed in design during construction, it is difficult to cope with it, and the vertical load applied to the upper girder and the rotational displacement due to the temperature change and the horizontal displacement can not be accommodated .
한국 등록특허 등록번호 제10-1431640호Korean Patent Registration No. 10-1431640
본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 연결부재로서 현장에서 높이 조절이 어려운 H형태 또는 I형태 단면 대신 받침높이 이상의 노출길이를 가진 나사강봉과 너트를 사용하여 연결부재의 직접적인 절단 및 용접 없이 상부거더의 설치높이 조절이 가능하도록 하고, 시공 중 상부거더의 하중을 벽체에 전달하기 위해 나사강봉이 벽체에 고정되는 지지길이 외에 추가 매입길이 만큼 더 확보하고 상기 추가 매입길이 위에 하강 수용높이 만큼 나사강봉을 노출시켜 벽체 1차타설높이의 높낮이 변화에 따른 시공 오차를 현장에서 쉽게 수용할 수 있어 시공성이 향상되며, 4개로 구성된 나사강봉을 변위수용 받침판과 너트 및 와셔로 구속하여 이에 따른 유효길이계수의 증대로 좌굴하중이 증대되어 나사강봉의 안정성이 향상되고, 상부거더 하면과 변위수용 받침판의 접촉면적을 최소화시키기 위한 수직 반달판과, 상부거더를 나사강봉에 체결하기 위해 사용되는 너트 및 와셔와의 마찰을 최소화시키기 위한 미끄럼 상판 및 미끄럼 하판과, 나사강봉과 상부거더의 직접적인 간섭을 피하기 위해 상부거더 단부 하면에 형성된 트랙형 홀을 통해 상부거더의 온도변화에 따른 수평변위를 나사강봉에 전달하지 않고 수용함으로써 강봉의 좌굴하중이 감소되지 않으며, 상부거더를 나사강봉에 체결하기 위해 사용되는 너트 및 와셔와 상부거더 사이에 탄성판을 설치하여 상부거더의 수직하중에 대한 상부거더 단부의 회전변위를 수용함으로써 나사강봉의 휨변형을 방지하여 구조적 안전성이 향상되고, 나사강봉의 하측이 벽체에 고정되고 상측은 상부거더의 하면을 관통하여 너트로 체결됨에 따라 시공 중 상부거더의 전도가 방지되며, 나사강봉은 벽체에 지지길이 외에 추가 매입길이를 더 확보하고 있음에 따라 공용 중 벽체 상단의 휨강성을 향상시킬 수 있는 받침장치 및 이를 이용한 라멘교를 제공하는데 그 목적이 있다.DISCLOSURE OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to provide a method for directly cutting and welding a connecting member by using a screw rod and a nut having an exposure length of not less than a height of a base instead of an H- So that the height of the upper girder can be adjusted, and in order to transmit the load of the upper girder to the wall during installation, it is further secured by the additional embedding length in addition to the supporting length in which the screw rod is fixed to the wall, By exposing the threaded steel rod, it is possible to easily accommodate the construction error due to the change of the height of the primary wall of the wall and to improve the workability. By restraining the four steel rods with the displacement receiving plate, the nut and the washer, As the coefficient increases, the buckling load increases and the stability of the screw thread is improved. A sliding upper plate and a sliding plate for minimizing the friction between the nut and the washer used to fasten the upper girder to the screw rod, the screw rod and the upper girder, The buckling load of the steel bar is not reduced by receiving the horizontal displacement according to the temperature change of the upper girder through the track hole formed in the lower side of the upper end of the upper girder without transmitting it to the screw bar, The elastic plate is provided between the washer and the upper girder used for fastening, and by accommodating the rotational displacement of the upper girder end with respect to the vertical load of the upper girder, flexural deformation of the screw rod is prevented, The upper side is fixed to the wall and the upper side is passed through the lower surface of the upper girder and is fastened with a nut Since the threaded steel bar has additional supporting length in addition to the supporting length in the wall, it is possible to improve the bending stiffness of the upper part of the common wall and to provide a ramen bridge using the same. There is a purpose.
본 발명의 적절한 실시 형태에 따른 받침장치는,According to a preferred embodiment of the present invention,
교량의 상부 거더의 높낮이 조절과 수평이동 변위 및 회전거동을 모두 수용하기 위한 받침장치에 있어서,A supporting device for accommodating both height adjustment and horizontal displacement displacement and rotational behavior of an upper girder of a bridge,
하단은 교량 하부 구조물의 벽체측에 위치되고 상단은 상부거더의 하부플랜지를 관통하여 위치되는 길이를 갖는 복수개 이상의 나사강봉과;A plurality of screw rods having a lower end located on the wall side of the bridge substructure and an upper end positioned to penetrate through the lower flange of the upper girder;
상기 상부거더의 높낮이 위치를 결정하기 위해 상기 나사강봉의 상부에 나사체결되어 있는 한 쌍의 받침너트와;A pair of support nuts screwed on an upper portion of the screw rod to determine a height of the upper girder;
상기 나사강봉에 삽입되고 한 쌍의 받침너트 위에 지지되어, 한 쌍의 받침너트의 위치 조정에 따라 높낮이 조절되면서 상기 상부거더를 받쳐주는 변위수용 받침판과;A displacement accepting support plate inserted in the screw rod and supported on the pair of support nuts to support the upper girder while being adjusted in height according to the position adjustment of the pair of support nuts;
상기 변위수용 받침판을 고정시키기 위해 상기 나사강봉에 체결된 고정너트와;A fixing nut fastened to the screw rod for fixing the displacement receiving plate;
상기 나사강봉과 상기 상부거더를 체결하기 위해 나사강봉의 상부에 조립된 전도방지너트 및 상부와셔와;An anti-nose nut and an upper washer assembled to an upper portion of the screw rod to fasten the screw rod and the upper girder;
상기 상부와셔와 상기 상부거더의 하부플랜지 사이에 설치되어 상부거더의 회전 거동시 발생되는 회전 변위를 수용하는 탄성판과;An elastic plate installed between the upper washer and the lower flange of the upper girder to receive a rotational displacement generated during rotational movement of the upper girder;
상기 나사강봉에 삽입되어 상기 탄성판과 상기 상부거더의 하부플랜지 사이에 설치되어 수평 이동변위를 수용하는 미끄럼 상판 및 미끄럼 하판을 포함하는 것을 특징으로 한다.And a sliding upper plate and a sliding plate inserted between the elastic plate and the lower flange of the upper girder to receive a horizontal displacement displacement.
또한, 상기 나사강봉은 상부거더 하중을 벽체에 전달하기 위해 벽체에 고정되는 지지길이 외에 추가 매입길이가 확보되고, 받침높이 이상의 상승 수용높이 및 하강 수용높이가 포함된 노출길이를 가지는 것을 특징으로 한다.In addition, the threaded steel rod is characterized by having an additional embedding length in addition to a supporting length fixed to the wall for transmitting the upper girder load to the wall, and an exposure length including an elevating receiving height higher than the receiving height and a lower receiving height .
또한, 상기 나사강봉은 상부거더의 지점부에서 4개로 구성된 것을 특징으로 한다.Further, the threaded steel bar is composed of four in the fulcrum portion of the upper girder.
또한, 상기 변위수용 받침판은 상기 나사강봉이 통과될 수 있는 관통 홀이 형성된 수평 밑판과, 상면이 곡면을 이루도록 반달형상이며 하면이 상기 수평 밑판의 상면에 접합되어 있는 수직 반달판으로 구성되는 것을 특징으로 한다.The displacement accommodating plate may include a horizontal base plate having a through hole through which the threaded steel rod can pass, and a vertical vandal plate having a semi-circular shape with an upper surface curved and a lower surface bonded to the upper surface of the horizontal base plate. .
또한, 수직 반달판은 2개 이상으로 이루어져 상호 나란하게 배치되어 있는 것을 특징으로 한다.Further, the vertical vandal plates are characterized by having two or more vertical vandal plates disposed side by side.
또한, 수직 반달판의 높이는 콘크리트의 원활한 채움을 위해 40mm 이상으로 구성된 것을 특징으로 한다.Further, the height of the vertical vane plate is more than 40 mm for smooth filling of the concrete.
또한, 수직 반달판은 콘크리트의 원활한 채움을 위해 측면에 반원형 홀이 더 형성되는 것을 특징으로 한다.Further, the vertical vane plate is characterized in that a semicircular hole is further formed on the side surface for smooth filling of the concrete.
또한, 변위수용 받침판의 응력집중 방지를 위해 한 쌍의 받침너트와 변위수용 받침판 사이에 받침와셔가 더 설치되어 있는 것을 특징으로 한다.In order to prevent stress concentration on the displacement receiving plate, a receiving washer is further provided between the pair of receiving nuts and the displacement receiving plate.
또한, 탄성판은 상부거더의 강성보다 작은 강성을 가지며, 합성고무패드, 폴리우레탄, FRP 중 어느 하나의 소재로 구성된 것을 특징으로 한다.Further, the elastic plate has a rigidity smaller than the rigidity of the upper girder, and is characterized by being made of any one of synthetic rubber pads, polyurethane, and FRP.
또한, 탄성판은 중앙에 상기 나사강봉이 통과될 수 있는 관통 홀을 갖는 것을 특징으로 한다.The resilient plate may have a through hole through which the screw thread can pass.
또한, 미끄럼 상판과 미끄럼 하판은 상부거더의 마찰계수보다 작은 마찰계수를 가지며, 불소수지판, 스테인레스판, 비닐시트 중 어느 하나의 소재로 제작된 것을 특징으로 한다.Further, the sliding upper plate and the sliding lower plate have a coefficient of friction smaller than that of the upper girder, and are made of any one of a fluororesin plate, a stainless plate, and a vinyl sheet.
또한, 미끄럼 상판은 상기 탄성판에 형성된 관통 홀과 동등한 크기의 관통 홀을 포함하며, 동시에 상기 탄성판과 동등한 크기의 폭과 길이를 갖는 것을 특징으로 한다.The sliding upper plate may include a through hole having a size equivalent to that of the through hole formed in the elastic plate, and has a width and a length equal to those of the elastic plate.
또한, 미끄럼 하판은 상기 미끄럼 상판의 하방에 설치되며, 상기 미끄럼 상판에 형성된 관통 홀 보다 상부거더의 길이방향으로 더 긴 트랙형 홀을 갖고, 상기 트랙형 홀의 길이만큼 미끄럼 하판은 미끄럼 상판보다 더 길게 구성된 것을 특징으로 한다.The slidable lower plate is provided below the slidable upper plate and has a longer track-shaped hole in the longitudinal direction of the upper girder than the through hole formed in the slidable upper plate. The slidable lower plate is longer than the slidable upper plate by the length of the track- .
또한, 상부거더는 상기 나사강봉과 상기 상부거더의 길이방향으로 직접적으로 맞닿지 않도록 상기 상부거더의 하부플랜지에 트랙형 홀이 구비되어 있는 것을 특징으로 한다.Further, the upper girder is provided with a track-shaped hole in the lower flange of the upper girder so as not to directly contact with the screw rod in the longitudinal direction of the upper girder.
또한, 관통 홀의 직경은 상기 나사강봉의 직경에 3mm 이상의 여유분을 더한 치수를 갖는 것을 특징으로 한다.Further, the diameter of the through-hole is characterized by having a dimension obtained by adding a clearance of 3 mm or more to the diameter of the screw thread.
한편, 본 발명에 따른 라멘교는 상부거더가 어느 하나의 받침장치를 매개로 교량 하부구조물의 벽체에 지지되어 시공된 것을 특징으로 한다.The racetrack bridge according to the present invention is characterized in that the upper girder is supported on the wall of the bridge lower structure via any supporting device.
또한, 상부거더의 하부플랜지에 형성된 트랙형 홀의 길이는 상기 받침장치에 포함된 나사강봉의 직경에 30mm 이상의 여유분을 더한 치수를 갖고 시공된 것을 특징으로 한다.The length of the track-shaped hole formed in the lower flange of the upper girder is formed to have a dimension obtained by adding a margin of 30 mm or more to the diameter of the screw thread included in the supporting apparatus.
또한, 벽체의 벽체철근에 고정철선으로 연결된 복수개의 받침철근과, 받침철근에 고정철선으로 연결되어 받침장치가 지지되는 묶음철근이 더 설치되어 시공된 것을 특징으로 한다.Further, the present invention is characterized in that a plurality of supporting bars connected to the wall reinforcing bar by a fixed iron wire and a bundle reinforcing bar connected to the supporting bar by a fixed iron wire and supporting the supporting device are further installed.
또한, 받침장치와 벽체의 상단 사이에 받침기둥이 더 연결되어 시공된 것을 특징으로 한다.Further, it is characterized in that a supporting column is further connected between the supporting device and the upper end of the wall.
본 발명에 따르면, 받침높이와 지지길이로 구성되는 연결부재의 종래 높이에 더하여 받침높이에 해당하는 하강 수용높이 외에 상승 수용높이 및 추가 매입길이를 포함하는 길이를 가진 나사강봉과, 상기 나사강봉에 받침너트의 체결 높이를 변경함으로써 연결부재의 직접적인 절단이나 용접 없이 시공 중 상부거더의 설치높이를 조절할 수 있는 효과가 있다.According to the present invention, in addition to the conventional height of the connecting member composed of the support height and the support length, a screwed steel bar having a height including a rising height corresponding to the height of the support and a length including an additional fill length, It is possible to adjust the installation height of the upper girder during installation without directly cutting or welding the connecting member by changing the fastening height of the support nut.
이러한 상부거더의 설치높이 조절효과는 시공 중 교량의 계획높이 변경에 대응할 뿐만 아니라, 설계도에 결정된 벽체의 1차타설높이를 하강 수용높이만큼 증대시키거나 추가 매입길이만큼 감소시킬 수 있어 1차타설높이에 대한 시공 오차 및 오류를 쉽게 흡수할 수 있고, 교량의 횡구배로 인한 단차를 고정너트의 체결 높이로 수용함에 따라 1차타설높이 내 단차를 제거시킬 수 있어 시공성을 증대시키는 효과가 있다.The effect of adjusting the installation height of the upper girder not only corresponds to the change of the planned height of the bridge during construction but also the height of the primary casting of the wall determined by the design can be increased by the lowering receiving height or reduced by the additional casting length, And it is possible to remove steps in the first casting height by accommodating the stepped portion of the bridge by the fastening height of the fixing nut, thereby improving the workability.
또한, 상부거더를 지지하는 변위수용 받침판의 상면에 상부거더와의 접촉면적을 최소화시키는 수직 반달판이 구비되고, 상부거더를 나사강봉에 체결하기 위해 사용되는 전도방지너트 및 상부와셔와의 마찰을 최소화시키기 위해 미끄럼 상판 및 미끄럼 하판이 설치되며, 나사강봉과 상부거더가 직접적인 간섭을 피하기 위해 상부거더 단부 하면에 트랙형 홀을 형성함으로써 상부거더의 온도변화에 따른 수평변위를 나사강봉에 전달하지 않고 변위수용 받침판이 전수 수용한다. 따라서 나사강봉은 수평변위의 영향을 받지 않아 종래 기둥부재와 달리 좌굴하중이 감소되지 않는 효과가 있다. Further, the upper surface of the displacement receiving plate for supporting the upper girder is provided with a vertical circular plate for minimizing a contact area with the upper girder, and the friction between the upper guard and the anti-nose nut used for fastening the upper girder to the screw rod is minimized A slid upper plate and a sliding lower plate are provided. In order to avoid direct interference between the screw rod and the upper girder, a track-shaped hole is formed on the lower end of the upper girder so that the horizontal displacement due to the temperature change of the upper girder is not transmitted to the screw rod, The receiving plate accommodates the transfer plate. Therefore, the screw rod is not affected by the horizontal displacement, so that the buckling load is not reduced unlike the conventional column member.
또한, 변위수용 받침판의 상면에 상부거더의 회전변위를 간섭하지 않는 수직 반달판이 구비되고, 상부거더를 나사강봉에 체결하기 위해 사용되는 전도방지너트 및 상부와셔와 상부거더 사이에 탄성판을 설치하여 상부거더의 수직하중에 대한 상부거더 단부의 회전변위를 수용함으로써 나사강봉의 휨변형을 방지하여 구조적 안정성이 향상되는 효과가 있다.The upper surface of the displacement receiving plate is provided with a vertical vandal plate which does not interfere with the rotational displacement of the upper girder, and an anti-nail nut used for fastening the upper girder to the screw rod and an elastic plate between the upper washer and the upper girder By accommodating the rotational displacement of the upper girder end relative to the vertical load of the upper girder, it is possible to prevent the warp deformation of the screw rod and to improve the structural stability.
또한, 상부거더가 변위수용 받침판에 설치되기 전에, 4개로 구성된 나사강봉을 변위수용 받침판과 받침너트 및 고정너트로 구속하여 이에 따른 유효길이계수가 증대됨으로써 나사강봉의 좌굴하중이 증대되어 상부거더의 가설에 따른 안정성이 증대되는 효과가 있다.In addition, before the upper girder is installed on the displacement receiving plate, the effective length coefficient is increased by restricting the four screw rods with the displacement receiving plate, the receiving nut and the fixing nut, thereby increasing the buckling load of the screw rod. The stability according to the hypothesis is increased.
또한, 나사강봉의 하측이 벽체에 고정되고 상측은 상부거더의 하면을 관통하여 전도방지너트로 체결됨에 따라 시공 중 상부거더의 전도가 방지되는 효과가 있다.Further, since the lower side of the screw rod is fixed to the wall, and the upper side passes through the lower surface of the upper girder and is fastened with the anti-rotation nut, the upper girder is prevented from being turned during installation.
또한, 나사강봉은 벽체에 지지길이 외에 추가 매입길이와 상승 수용높이를 더 확보하고 있음에 따라 벽체 상단의 휨강성을 향상시킬 수 있는 효과가 있다.In addition, since the threaded steel bar further secures the supporting body in addition to the support length, the reinforcing rigidity at the upper end of the wall can be improved.
본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1은 교량이 설치될 주변여건에 따른 계획높이 변경요인을 나타낸 도면이다.
도 2a는 종래 거더-라멘교에서 벽체의 1차타설높이 위에 설치되어 상부거더를 지지하는 받침강형을 나타낸 도면이다.
도 2b는 종래 거더-라멘교에서 벽체의 1차타설높이 위에 설치되어 상부거더를 지지하는 연결강형을 나타낸 도면이다.
도 2c는 횡구배에 의해 벽체의 1차타설높이에 단차가 형성된 것을 나타낸 횡단면도이다.
도 3은 초기 처짐을 갖는 기둥의 하중-변위 관계곡선을 나타낸 그림이다.
도 4a는 본 발명의 일 실시예인 받침장치를 포함한 받침부의 종단면상 상세도이다.
도 4b는 도 4a에 도시된 받침장치를 포함한 연결부의 횡단면상 상세도이다.
도 4c는 도 4a에 도시된 받침장치를 포함하는 받침부에 대해 횡단면상 1차타설높이를 나타낸 도면이다.
도 5a는 도 4a에 도시된 받침장치를 포함한 받침부의 조립상태를 나타낸 분리사시도이다.
도 5b는 도 5a에 도시된 분리사시도에서 변위수용 받침판의 상세를 나타낸 사시도이다.
도 6a는 도 4a에 도시된 받침장치를 포함한 받침부에서 상부거더의 수직하강이동을 나타낸 도면이다.
도 6b는 도 4a에 도시된 받침장치를 포함한 받침부에서 상부거더의 수직상승이동을 나타낸 도면이다.
도 7a는 도 4a에 도시된 받침장치를 포함한 받침부에서 상부거더의 회전거동을 나타낸 도면이다.
도 7b는 도 7a에 도시된 상부거더의 회전거동을 나타낸 도면에서 상세“A”를 확대한 상세도이다.
도 8a는 도 4a에 도시된 받침장치를 포함한 받침부에서 상부거더의 수평이동을 나타낸 도면이다.
도 8b는 도 8a에 도시된 상부거더의 수평이동을 나타낸 도면에서 상세“B”를 확대한 상세도이다.
도 9는 본 발명의 일 실시예인 받침장치가 다경간 교량의 중간지점부 벽체에 설치된 것을 나타낸 도면이다.
도 10a는 본 발명의 또 다른 실시예인 받침장치를 포함한 받침부의 종단면상 상세도이다.
도 10b는 도 10a에 도시된 받침장치를 포함한 연결부의 횡단면상 상세도이다.
도 11a는 도 10a 내지 도 10b에 도시된 변위수용 받침판의 상세를 타나낸 사시도이다.
도 11b는 도 10a 내지 도 10b에 도시된 상부거더와 확장지지대의 조립을 나타낸 분리사시도이다.
도 12a 및 도 12b는 본 발명의 받침장치에 추가된 받침기둥의 설치상태를 나타내는 종단면상 상세도 및 횡단면상 상세도이다.
BRIEF DESCRIPTION OF THE DRAWINGS The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate exemplary embodiments of the invention and, together with the description, serve to explain the principles of the invention, Shall not be construed as limiting.
FIG. 1 is a view showing a factor of changing the height of a planned height according to a surrounding condition in which a bridge is to be installed.
FIG. 2A is a view showing a supporting stiff type supporting the upper girder on the first casting height of a wall in a conventional girder-bridging bridge.
FIG. 2B is a view showing a connection rigid structure which is installed on a first casting height of a wall in a conventional girder-bridging bridge to support an upper girder.
Fig. 2C is a cross-sectional view showing that a step is formed at the height of the primary pouring of the wall by transverse gravity.
Fig. 3 is a graph showing load-displacement relationship curves of columns having initial deflections.
4A is a longitudinal sectional view of a receiving portion including a supporting device according to an embodiment of the present invention.
4B is a cross-sectional detail view of the connection including the support device shown in Fig. 4A.
Fig. 4c is a view showing the primary placement height on the transverse plane with respect to the receiving portion including the supporting device shown in Fig. 4a. Fig.
FIG. 5A is an exploded perspective view showing an assembled state of the pedestal including the pedestal shown in FIG. 4A. FIG.
FIG. 5B is a perspective view showing the displacement receiving plate in detail in the separated perspective view shown in FIG. 5A.
FIG. 6A is a view showing a vertical downward movement of the upper girder in the receiving portion including the supporting device shown in FIG. 4A.
FIG. 6B is a view showing a vertical upward movement of the upper girder in the receiving portion including the supporting device shown in FIG. 4A.
FIG. 7A is a view showing the rotational behavior of the upper girder in the receiving part including the supporting device shown in FIG. 4A.
FIG. 7B is a detail view showing an enlarged view of detail "A" in the drawing showing the rotational behavior of the upper girder shown in FIG. 7A.
Fig. 8A is a view showing the horizontal movement of the upper girder in the receiving part including the supporting device shown in Fig. 4A.
FIG. 8B is a detail view showing the horizontal movement of the upper girder shown in FIG.
Fig. 9 is a view showing that a supporting apparatus, which is an embodiment of the present invention, is installed on a mid-point secondary wall of a multi-span bridge.
FIG. 10A is a longitudinal sectional view of a receiving portion including a supporting device according to another embodiment of the present invention. FIG.
10B is a cross-sectional detail view of the connection including the support device shown in FIG. 10A.
Fig. 11A is a perspective view showing details of the displacement receiving plate shown in Figs. 10A to 10B.
11B is an exploded perspective view showing the assembly of the upper girder and the extension support shown in Figs. 10A to 10B.
Figs. 12A and 12B are a detailed view in cross section and a detailed view in longitudinal section showing a mounting state of a support column added to the supporting apparatus of the present invention. Fig.
아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the embodiments shown in the accompanying drawings, but the present invention is not limited thereto.
도 4a는 본 발명의 일 실시예인 받침장치를 포함한 받침부의 종단면상 상세도이고, 도 4b는 도 4a에 도시된 받침장치를 포함한 연결부의 횡단면상 상세도이며, 도 4c는 도 4a에 도시된 받침장치를 포함하는 받침부에 대해 횡단면상 1차타설높이를 나타낸 도면이다. 도 5a는 도 4a에 도시된 받침장치를 포함한 받침부의 조립상태를 나타낸 분리사시도이며, 도 5b는 도 5a에 도시된 분리사시도에서 변위수용 받침판의 상세를 나타낸 사시도이다. 본 일 실시예에서는, 상부거더(200)가 “강 거더(또는 빔)” 또는 “강합성 거더(또는 빔)”임을 전제로 한다.4A is a detailed view in longitudinal section of a receiving portion including a supporting device according to an embodiment of the present invention, FIG. 4B is a cross-sectional detail view of a connecting portion including the supporting device shown in FIG. 4A, Fig. 5 is a view showing the primary placement height on the transverse plane with respect to the receiving portion including the device. FIG. 5A is an exploded perspective view showing the assembled state of the bearing unit including the bearing unit shown in FIG. 4A, and FIG. 5B is a perspective view showing the displacement receiving plate in detail in an exploded perspective view shown in FIG. In the present embodiment, it is assumed that the upper girder 200 is a " steel girder (or beam) " or a " steel composite girder (or beam) ".
여기서, “벽체(101)”는 교량 상부구조물의 자중과 더불어 차량이나 사람 등의 상부하중을 지반이나 타 구조물에 전달하는 수직이나 수직에 가까운 하부구조를 통칭하는 의미로 사용된 것으로서, 교량에 사용될 경우 ‘교대’나 ‘교각’ 등을 포함하는 용어이며, 상기 “강 거더”는 강재만으로 거더를 이루는 아이빔(I-BEAM)과 플레이트 거더(Steel Plate Girder)를 포함하는 용어이며, “강합성 거더”는 강재와 콘크리트로 합성되고 소정의 선압축응력이 도입될 수 있는 프리플렉스 거더(Preflex Girder)와 프리스트레스트 강합성 거더(Prestressed Steel Composite Girder)를 총칭하는 용어이다.Here, the term " wall 101 " is used to refer to a vertical structure or a vertical structure close to a vertical structure that transfers the upper load of a vehicle or a person to a ground or other structure together with the self weight of the bridge structure. The term " steel girder " is a term including an I-BEAM and a steel plate girder forming a girder by only steel material, and the term " steel composite girder " Is a generic term for a preflex girder and a prestressed steel composite girder, which can be combined with steel and concrete to introduce a predetermined linear compressive stress.
도 4a 내지 도 5b를 참조하면, 본 발명의 바람직한 실시예에 따른 받침장치(10)는, 시공 중 부재의 물량 변경 및 작업량 증대 없이 상부거더(200)의 설치높이를 변경할 수 있고, 벽체의 1차타설높이 또한 유동적으로 조정할 수 있으며, 상부거더(200) 단부의 회전변위 및 수평변위를 수용하여 받침장치(10)의 안전 및 안정성을 증대시킬 수 있는 장치이다.4A to 5B, the supporting apparatus 10 according to the preferred embodiment of the present invention can change the installation height of the upper girder 200 without changing the volume of the member during construction and increasing the amount of work, The height of the car can also be adjusted in a fluid manner and it is a device that can increase the safety and stability of the support device 10 by accommodating the rotational displacement and the horizontal displacement of the end portion of the upper girder 200.
상부거더(200)는 도 5a와 같이 후술할 나사강봉(12)과 그의 길이방향으로 직접적으로 맞닿지 않도록 하부플랜지(201)에 트랙형 홀(201a)이 구비된다.5A, the upper girder 200 is provided with a track-shaped hole 201a in the lower flange 201 so as not to directly contact with the threaded steel rod 12 in a longitudinal direction thereof.
받침장치(10)는 교량이 단경간인 경우 상부거더(200)의 양쪽 단부에 각기 설치되고, 다경간인 경우 도 9와 같이 이웃한 상부거더(200과 200)를 연결하는 유사 단면을 갖는 상부 연결거더(210)의 중앙에 설치된다.The supporting device 10 is installed at both ends of the upper girder 200 when the bridges are short-span. When the bridges are multi-spans, the supporting device 10 has a similar cross section connecting the adjacent upper girders 200 and 200 And is installed at the center of the connecting girder 210.
도 4 내지 도 7과 같이 받침장치(10)는 전 길이에 걸쳐 나사산을 갖는 나사강봉(12)과, 나사강봉(12)의 상측에 설치된 후 상부거더(200)에 접하여 상부거더(200)의 하중을 지지함과 동시에 상부거더(200)의 수평이동 변위 및 회전 변위를 수용하는 변위수용 받침판(16)과, 나사강봉(12)에 조립되어 상부거더(200)의 수평이동 변위를 원활하게 하는 미끄럼 상판(26) 및 미끄럼 하판(28)과, 나사강봉(12)에 조립되어 상부거더(200)의 회전 변위를 탄성 압축변형을 통해 수용하는 탄성판(24)과, 나사강봉(12)에 체결되어 변위수용 받침판(16)의 설정 위치를 확보하는 받침너트(14)와, 나사강봉(12)에 지지되어 있는 변위수용 받침판(16)을 고정하기 위해 나사강봉(12)에 나사 체결되어 있는 고정너트(18)와, 나사강봉(12)의 상부에 체결되어 그 구속력으로 상부거더(200)의 이탈을 방지하는 전도방지너트(20)와, 부가적으로 받침와셔(15)와 상부와셔(22)를 포함하여 구성된다.4 to 7, the supporting apparatus 10 includes a threaded steel bar 12 having a thread over its entire length, and a threaded steel bar 12 disposed on the upper side of the threaded steel bar 12 and in contact with the upper girder 200, A displaceable receiving plate 16 for supporting a load and accommodating a horizontal movement displacement and a rotation displacement of the upper girder 200 and a displacement receiving plate 16 for supporting the upper girder 200, An elastic plate 24 which is assembled to the screw rod 12 and accommodates the rotational displacement of the upper girder 200 through elastic compression and deformation; (14) secured to the screw rod (12) for securing a displacement receiving plate (16) supported by the screw rod (12) The fixing nut 18 is fastened to the upper portion of the screw rod 12 to prevent the upper girder 200 from being separated by the restraining force And an upper washer 22, as shown in FIG.
탄성판(24)은 중앙에 상기 나사강봉(12)이 통과될 수 있는 관통 홀(241)을 갖는다.The elastic plate 24 has a through hole 241 through which the threaded steel rod 12 can pass.
미끄럼 상판(26)은 상기 탄성판(24)에 형성된 관통 홀(241)과 동등한 크기의 관통 홀(261)을 포함하며, 동시에 상기 탄성판(24)과 동등한 크기의 폭과 길이를 갖는다. 미끄럼 상판(26)과 미끄럼 하판(28)은 상부거더(200)의 마찰계수보다 작은 마찰계수를 가지며, 불소수지판, 스테인레스판, 비닐시트 중 어느 하나의 소재로 제작된다. The sliding upper plate 26 includes a through hole 261 having a size equivalent to that of the through hole 241 formed in the elastic plate 24 and has the same width and length as those of the elastic plate 24. The sliding upper plate 26 and the sliding lower plate 28 have a coefficient of friction smaller than that of the upper girder 200 and are made of any one of a fluorine resin plate, a stainless plate, and a vinyl sheet.
미끄럼 하판(28)은 상기 미끄럼 상판(26)의 하방에 설치되며, 상기 미끄럼 상판(26)에 형성된 관통 홀(261) 보다 상부거더(200)의 길이방향으로 더 긴 트랙형 홀(281)을 갖고, 상기 트랙형 홀(281)의 길이만큼 미끄럼 하판(28)은 미끄럼 상판(26)보다 더 길게 구성됨이 바람직하다.The slidable lower plate 28 is provided below the sliding upper plate 26 and has a longer track type hole 281 in the longitudinal direction of the upper girder 200 than a through hole 261 formed in the sliding upper plate 26 And the slidable plate 28 is longer than the slidable plate 26 by the length of the track-shaped hole 281.
받침와셔(15)는 변위수용 받침판(16)의 응력집중 방지를 위해 나사강봉(12)에 삽입되어 한 쌍의 받침너트(14)와 변위수용 받침판(16) 사이에 설치된다. 상부와셔(22)는 나사강봉(12)에 삽입되어 전도방지너트(20)의 하면에 설치된다.The support washer 15 is inserted between the pair of support nuts 14 and the displacement receiving plate 16 so as to be inserted into the screw rod 12 for preventing stress concentration on the displacement receiving plate 16. The upper washer 22 is inserted into the screw rod 12 and installed on the underside of the anti-nail 20.
우선 도 4a 내지 4c에서, 나사강봉(12)은 받침높이(DS)와 지지길이(DF)로 구성되는 종래 연결부재의 높이에 더하여 받침높이(DS)에 해당하는 하강 수용높이(DD) 외에 상승 수용높이(DU)를 포함한 노출길이(DE)를 가지도록 구성된다. 또한, 상기 나사강봉(12)은 상부거더(200)에 작용하는 시공 중 모든 하중을 벽체(101)에 안정적으로 전달하기 위한 지지길이(DF) 외에 상기 하중 전달의 목적이 아닌 추가 매입길이(DL)를 더 갖도록 구성된다.In Figures 4a to 4c First, the screw rod 12 is lowered acceptable height for the support height (D S) in addition to the height of the connecting member prior art consisting of a foot height (D S) and the supporting length (D F) (D D ) and an exposure length (D E ) including the elevation receiving height (D U ). In addition to the support length D F for stably transmitting all loads during the operation of the upper girder 200 to the wall 101, the threaded steel rod 12 may have an additional embedding length D L ).
따라서, 나사강봉(12)은 받침높이(DS)와 지지길이(DF)로 구성되는 종래 연결부재의 높이가 아닌, 상승 수용높이(DU)와 하강 수용높이(DD)를 포함하는 노출길이(DE)와 지지길이(DF) 및 추가 매입길이(DL)로 구성되며, 상기 나사강봉(12)은 벽체(101)에 지지길이(DF) 만큼 최소한 고정되며 추가 매입길이(DL)는 노출될 수도 있다.Therefore, the screw rod 12 does not include the height of the conventional connecting member composed of the support height D s and the support length D F , but includes the ascending accommodation height D U and the descending accommodation height D D exposure length (D E) and the supporting length (D F) and further embedded length is composed of (D L), the screw bar (12) is at least fixed by a supporting length (D F) to the wall (101) more pieces length (D L ) may be exposed.
이와 같은 나사강봉(12)의 하강 수용높이(DD)는 상부거더(200)의 하강에 대응하고, 상승 수용높이(DU)는 상부거더(200)의 상승에 대응하므로 시공 중 교량의 계획높이가 변경되더라도 나사강봉(12)의 절단 또는 용접이 불필요한 효과가 있다.Since the descending accommodation height D D of the screw rod 12 corresponds to the descent of the upper girder 200 and the ascending accommodation height D U corresponds to the ascending of the upper girder 200, There is an effect that cutting or welding of the screw rod 12 is unnecessary even if the height is changed.
또한, 상기 나사강봉(12)은 벽체(101)에 고정되는 지지길이(DF)에 더하여 추가 매입길이(DL)가 더 확보된다. 상기 지지길이(DF)는 시공 중 상부거더(200)에 작용하는 모든 하중을 벽체(101)에 안정적으로 전달하기 위해 요구되는 것으로서, 상기 하중의 크기에 따라 그 길이가 결정된다. 따라서 상기 추가 매입길이(DL)는 벽체(101)에 고정되지 않아도 된다. 이러한 추가 매입길이(DL)는 설계도서에 결정된 벽체의 1차타설높이를 상기 추가 매입길이(DL) 만큼 하강시킬 수 있고, 상기 하강 수용높이(DD) 만큼 상승시킬 수 있어 1차타설높이에 대한 시공 오차 및 오류를 쉽게 흡수할 수 있다. 또한 교량의 횡구배로 인한 단차를 한 쌍의 받침너트(14)의 체결 높이로 수용함에 따라 1차타설높이 내 단차를 제거시킬 수 있어 시공성을 증대시키는 효과가 있다.Further, the threaded steel bar 12 has an additional embedding length D L in addition to the supporting length D F fixed to the wall body 101. The supporting length D F is required to stably transfer all the loads acting on the upper girder 200 to the wall 101 during construction, and the length is determined according to the magnitude of the load. Therefore, the additional embedding length D L does not have to be fixed to the wall 101. The additional embedding length D L can be decreased by the additional embedding length D L and increased by the lowering receiving height D D determined by the design book, It is possible to easily absorb a construction error and an error with respect to height. In addition, since the step difference due to the transverse folding of the bridges is accommodated by the fastening height of the pair of support nuts 14, the step in the first pouring height can be removed, thereby improving the workability.
도 5a에서, 본 발명의 바람직한 실시예에 따른 받침장치(10)의 설치는, 상부거더(200)의 가설 전 작업과 가설 후 작업으로 나뉠 수 있다.In Fig. 5A, the installation of the supporting apparatus 10 according to the preferred embodiment of the present invention can be divided into pre-installation work of the upper girder 200 and post-installation work.
상기 상부거더(200)의 가설 전 받침장치(10)의 설치는, 벽체(101)에 설치된 나사강봉(12)에 한 쌍의 받침너트(14)가 체결되고, 상기 받침너트(14) 상에 받침와셔(15)가 설치되며, 나사강봉(12)의 설치 개수만큼 관통 홀(161a)이 형성된 상기 변위수용 받침판(16)이 상기 나사강봉(12)에 삽입되어 상기 받침와셔(15) 위에 가설된 다음 고정너트(18)로 체결하는 것으로 구성되어 있다.A pair of support nuts 14 are fastened to the screw rod 12 provided on the wall body 101 and the pair of support nuts 14 are fastened on the support nut 14, The displacement receiving plate 16 having the through holes 161a as much as the number of the screw rods 12 is inserted into the screw rod 12 and is fixed on the support washer 15. [ And then fastened with a fixing nut 18.
상기 변위수용 받침판(16)이 고정된 이후, 상부거더(200)의 하부플랜지(201)에 형성된 트랙형 홀(201a)에 나사강봉(12)이 관통되도록 하여 상기 상부거더(200)를 상기 변위수용 받침판(16) 위에 가설한 다음 받침장치(10)의 설치를 마무리한다.After the displacement receiving plate 16 is fixed, the screw rod 12 is passed through the track-shaped hole 201a formed in the lower flange 201 of the upper girder 200, And then the installation of the support device 10 is finished.
상기 상부거더(200)의 가설 후 받침장치(10)의 설치로는, 트랙형 홀(281)이 형성된 미끄럼 하판(28)과 관통 홀(261)이 형성된 미끄럼 상판(26)을 상기 상부거더(200)의 하부플랜지에 관통되어 노출된 상기 나사강봉(12)에 삽입하고, 상기 미끄럼 상판(26) 위에 노출된 상기 나사강봉(12)에 탄성판(24)과 상부와셔(22)를 순차적으로 삽입한 다음, 최종적으로 전도방지너트(20)로 체결하는 것으로 구성되어 있다.The slidable lower plate 28 having the track type holes 281 and the sliding upper plate 26 formed with the through holes 261 can be installed on the upper girder The elastic plate 24 and the upper washer 22 are sequentially inserted into the screwed steel bar 12 exposed on the sliding upper plate 26 and inserted into the exposed screwed rod 12 through the lower flange of the upper flange And then, finally, it is fastened with the anti-tip nuts 20.
도 5b에서, 본 발명의 바람직한 실시예에 따른 변위수용 받침판(16)은 수평으로 평평한 판에 나사강봉(12)의 설치 개수만큼 관통 홀(161a)이 구비된 수평 밑판(161)과, 상면이 일정한 곡률을 갖는 곡면을 이루도록 반달형상이며 하면이 상기 수평 밑판(161)에 용접되는 수직 반달판(162)으로 구성되어 있다. 따라서 수직 반달판(162)은 상부 곡면이 상부거더(200)와 선접촉을 통해 상부거더(200)를 지지한다. 또한 수직 반달판(162)은 상부거더(200)와 선접촉을 통해 상부거더(200)의 수평 변위에 따른 마찰력을 최소화시킬 수 있다.5B, the displacement accommodating plate 16 according to the preferred embodiment of the present invention includes a horizontal base plate 161 having a horizontal flat plate with a through hole 161a as many as the number of screw rods 12 installed, And a vertical vandal plate (162) having a semicircular shape and having a bottom surface welded to the horizontal bottom plate (161) to form a curved surface having a constant curvature. Thus, the vertical vandal plate 162 supports the upper girder 200 through an upper curved surface in line contact with the upper girder 200. In addition, the vertical vandal plate 162 can minimize the friction force due to the horizontal displacement of the upper girder 200 through line contact with the upper girder 200.
여기서, 수직 반달판(162)의 높이는 콘크리트의 원활한 채움을 위해 40mm 이상으로 구성됨이 바람직하다. 또한 수직 반달판(162)은 그의 측면에 후 시공되는 콘크리트가 조밀하게 타설될 수 있도록 반원형 홀(162a)이 더 구비될 수도 있다.Here, the height of the vertical vane plate 162 is preferably 40 mm or more for smooth filling of the concrete. Further, the vertical vane plate 162 may further include a semicircular hole 162a so that the concrete to be post-installed on the side of the vertical vane plate 162 may be densely installed.
따라서 도 6a와 같이 교량의 계획높이가 ΔV만큼 낮아질 경우 하강 수용높이(DD)를 활용하여 상부거더(200)의 설치높이를 낮출 수 있고, 도 6b와 같이 교량의 계획높이가 ΔV만큼 높아질 경우 상승 수용높이(DU)를 활용하여 상부거더(200)의 설치높이를 높게 할 수 있다.Accordingly, when the planned height of the bridge is lowered by? V as shown in FIG. 6A, the installation height of the upper girder 200 can be lowered by utilizing the lowered receiving height D D. If the planned height of the bridge is increased by? The installation height of the upper girder 200 can be increased by utilizing the elevation receiving height D U.
또한, 도 7a 및 도 7b와 같이 상부거더(200)의 회전변위(θ) 발생시 변위수용 받침판(16)에 형성된 수직 반달판(162)과 상부거더(200)의 하부플랜지(201)에 설치된 탄성판(24)이 회전변위를 수용할 수 있다. 이같이 탄성판(24)이 회전변위를 수용하므로 회전변위를 일으키는 모멘트는 받침장치(10)의 나사강봉(12)에 미치지 아니한다.7A and 7B, when the rotational displacement of the upper girder 200 occurs, the vertical vandal plate 162 formed on the displacement receiving plate 16 and the elasticity provided on the lower flange 201 of the upper girder 200 The plate 24 can receive the rotational displacement. Since the elastic plate 24 receives the rotational displacement in this way, the moment causing the rotational displacement does not extend beyond the screw rod 12 of the supporting apparatus 10. [
또한, 도 8a 및 도 8b와 같이 상부거더(200)의 수평변위(Δh) 발생시 변위수용 받침판(16)에 형성된 수직 반달판(162)과 상부거더(200)의 하부플랜지에 설치된 미끄럼 상판(26)과 미끄럼 하판(28)이 수평변위를 수용한다. 또한 상부거더(200)의 하부플랜지에 형성된 트랙형 홀(201a)로 인해 나사강봉(12)은 상부거더(200)의 수평변위(Δh)에 간섭받지 않으므로, 수평변위(Δh)가 받침장치(10)의 나사강봉(12)에 전달되지 않는다.8A and 8B, when the horizontal displacement? H of the upper girder 200 is generated, the vertical disc plate 162 formed on the displacement receiving plate 16 and the slidable upper plate 26 provided on the lower flange of the upper girder 200 And the sliding plate 28 receive the horizontal displacement. Since the screwed rod 12 is not interfered with the horizontal displacement? H of the upper girder 200 due to the track-shaped hole 201a formed in the lower flange of the upper girder 200, the horizontal displacement? 10 are not transmitted to the screw rods 12.
따라서 도 4a와 같이 벽체(101)의 상부에 받침장치(10)가 설치된 상태에서 받침너트(14)의 위치를 조정한 후, 상부거더(200)에 2차 콘크리트를 타설하고 바닥판을 시공하게 되면, 상부거더(200)의 높이가 조절된 라멘교를 시공할 수 있게 된다.4A, after the position of the support nut 14 is adjusted in a state where the support device 10 is installed on the upper part of the wall 101, the secondary concrete is laid on the upper girder 200 and the bottom plate is constructed It is possible to construct a ramen bridge with a height of the upper girder 200 adjusted.
도 9는 다경간 교량에서 중간지점부 벽체(101)에 설치된 받침장치(10)를 나타내는 것으로, 받침장치(10)에 상부 연결거더(210)의 하부 플랜지를 연결하여 설치한 다음, 길이방향으로 이웃한 상부거더(200와 200)를 각각 플레이트와 볼트 및 너트를 사용하여 연결거더(210)와 연결시키는 공정을 통해 다경간 교량의 가설이 이루어진다.9 shows a supporting device 10 installed on the intermediate-stage secondary wall 101 in a multi-span bridge. The supporting device 10 is installed by connecting the lower flange of the upper connecting girder 210 to the supporting device 10, The multi-span bridge is constructed through the process of connecting neighboring upper girders 200 and 200 to the connecting girder 210 by using plates, bolts and nuts, respectively.
도 10a, 10b 및 도 11b는 본 발명의 다른 실시예로서 상부거더(200)를 제작할 때 보강지지대(220)를 매입하여 일체로 제작하고, 추후 확장지지대(230)를 상기 보강지지대(220)에 포함된 결합너트(222)에 결합볼트(224)로 체결하여 고정시킨다. 이렇게 보강지지대(220)와 확장지지대(230)가 일체화된 상부거더(200)를 변형된 형태의 변위수용 받침판(16a)에 가설한다. 이때 나사강봉(12)은 도 11a의 변형된 변위수용 받침판(16a)의 관통홀(161a)에 삽통하여 위치된다.10A, 10B and 11B illustrate another embodiment of the present invention in which a reinforcing support 220 is embedded in the upper girder 200 to manufacture the upper girder 200 integrally with the reinforcing support 220, And fastened with the coupling bolt 224 to the included coupling nut 222. The upper girder 200, in which the reinforcing support 220 and the expansion support 230 are integrated, is installed on the deformed displacement receiving plate 16a in a deformed form. At this time, the screw rod 12 is inserted into the through hole 161a of the deformed displacement receiving plate 16a of Fig. 11A.
여기서, 상부거더(200)는 “콘크리트 거더(또는 빔)” 또는 “PSC 거더(또는 빔)” 임을 전제로 한다. 변형된 변위수용 받침판(16a)은 수직 반달판(162)이 4개 이상이 바람직하다. 또한 상기 변위수용 받침판(16a)은 콘크리트의 원활한 타설을 위해 블록아웃부(161b)를 갖을 수 있다.Here, the upper girder 200 is assumed to be a " concrete girder (or beam) " or " PSC girder (or beam) ". It is preferable that the deformed displacement receiving plate 16a has four or more vertical vane plates 162. Further, the displacement receiving plate 16a may have a block-out portion 161b for smooth pouring of the concrete.
한편, 국내 도로교설계기준((사)한국도로교통협회)에 강교 및 합성형교의 선팽창계수(α)는 1.2×10-5이며, 온도변화량(ΔT)은 강교의 경우 ±25℃이고, 일체식교대교량에서 강교의 최대 경간장(L)을 90m로 한정되어 있으므로 온도변화에 의한 강교의 수평변위량(δ)은 다음과 같다.On the other hand, the coefficient of linear expansion (α) of steel bridges and composite bridges is 1.2 × 10 -5 , the temperature change (ΔT) is ± 25 ° C. for steel bridges, Since the maximum span length (L) of a steel bridge is limited to 90 m in an alternating bridge, the horizontal displacement (δ) of the steel bridge due to the temperature change is as follows.
δ=α·ΔT·(L/2)=1.2×10-5·(2×25)·(90,000/2)=27mmδ = α · ΔT · (L / 2) = 1.2 × 10 -5 · (2 × 25) · (90,000 / 2) = 27mm
상기 수평변위량(δ)에 시공오차 3mm를 더한 총 30mm를 트랙형 홀(201)의 여유분으로 산정하였으며, 그 결과 트랙형 홀(201)의 길이는 나사강봉 직경+30(mm)가 된다.A total of 30 mm obtained by adding the installation error of 3 mm to the horizontal displacement amount δ is calculated as a margin of the track-shaped hole 201. As a result, the length of the track-shaped hole 201 becomes +30 mm.
또한, 트랙형 홀(201)의 폭과 관통 홀의 직경은 시공오차를 고려하여 나사강봉 직경+3(mm)가 된다.In addition, the width of the track-shaped hole 201 and the diameter of the through-hole are set to a diameter of the screw thread steel of +3 (mm) in consideration of the installation error.
한편, 도 4a 및 도 4b와 같이 라멘교의 시공시 받침장치(10)는 벽체(101)에 콘크리트를 타설하기 전, 즉 배근시 벽체철근(103)에 고정철선(104)으로 받침철근(105)을 연결한 후, 다수의 나사강봉(12)을 둘러싸는 묶음철근(107)을 받침철근(105)에 고정철선(106)으로 연결하여 나사강봉(12)을 우선적으로 설치한다. 이때 나사강봉(12)은 묶음철근(107)에 용접으로 접합되어 고정될 수도 있다.4a and 4b, the supporting device 10 is installed at the time of installation of the ramen bridge in a state in which the reinforcing bar 105 is fixed to the wall reinforcing bars 103 at the time of placing the reinforcing bars 104, The bundle reinforcing bar 107 surrounding the plurality of screw rods 12 is connected to the supporting bar 105 by the fixed wire 106 and the screw rod 12 is preferentially installed. At this time, the threaded steel rod 12 may be welded to the bundle reinforcing bars 107 and fixed thereto.
바람직하게 받침철근(105)과 묶음철근(107)은 나사강봉(12)의 하부측에 적어도 2개소에 설치되는 것이 좋다.It is preferable that the retaining reinforcing bar 105 and the bundle reinforcing bar 107 are provided at least at two places on the lower side of the screw rod 12. [
한편, 도 12a 및 도 12b와 같이 라멘교의 시공시 받침장치(10)는 콘크리트가 1차 타설된 벽체(101)의 상단에 앵커볼트(150)를 통해 고정되어 있는 받침기둥(50)에 설치될 수도 있다. 받침기둥(50)은 H형 단면 구조를 가지고 있으나 이러한 단면 구조에 한정되는 것은 아니다. 이때 받침장치(10)의 나사강봉(12)은 하단부가 받침기둥(50)의 상단에 일정 깊이만큼 삽입되어 너트로 고정되어 설치된다.12A and 12B, the supporting apparatus 10 is installed on a support column 50 fixed to an upper end of a wall 101 in which concrete is first installed through an anchor bolt 150 It is possible. The support column 50 has an H-shaped cross-sectional structure, but is not limited to this cross-sectional structure. At this time, the screw rod 12 of the support device 10 is inserted into the upper end of the support column 50 by a predetermined depth and fixed with a nut.
지금까지 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is evident that many alternatives, modifications and variations will be apparent to those skilled in the art in light of the above teachings. will be. The invention is not limited by these variations and modifications, but is limited only by the claims appended hereto.
12: 나사강봉
14; 받침너트
15: 받침와셔
16: 변위수용 받침판
161: 밑판
162: 수직반달판
18: 고정너트
20: 전도방지너트
22: 상부와셔
24: 탄성판
26: 미끄럼 상판
28: 미끄럼 하판
12: Screw thread
14; Support Nut
15: Washer washer
16: Displacement receiving plate
161: Base plate
162: vertical vane plate
18: Fixing nut
20: Antistatic nut
22: upper washer
24: elastic plate
26: Sliding top plate
28: Slip plate

Claims (19)

  1. 교량의 상부 거더(200)의 높낮이 조절과 수평이동 변위 및 회전거동을 모두 수용하기 위한 받침장치에 있어서,
    하단은 교량 하부 구조물(100)의 벽체(101)측에 위치되고 상단은 상부거더(200)의 하부플랜지(201)를 관통하여 위치되는 길이(DT)를 갖는 복수개 이상의 나사강봉(12)과;
    상기 상부거더(200)의 높낮이 위치를 결정하기 위해 상기 나사강봉(12)의 상부에 나사체결되어 있는 한 쌍의 받침너트(14)와;
    상기 나사강봉(12)에 삽입되고 한 쌍의 받침너트(14) 위에 지지되어, 한 쌍의 받침너트(14)의 위치 조정에 따라 높낮이 조절되면서 상기 상부거더(200)를 받쳐주는 변위수용 받침판(16)과;
    상기 변위수용 받침판(16)을 고정시키기 위해 상기 나사강봉(12)에 체결된 고정너트(18)와;
    상기 나사강봉(12)과 상기 상부거더(200)를 체결하기 위해 나사강봉(12)의 상부에 조립된 전도방지너트(20) 및 상부와셔(22)와;
    상기 상부와셔(22)와 상기 상부거더(200)의 하부플랜지(201) 사이에 설치되어 상부거더(200)의 회전 거동시 발생되는 회전 변위(Δθ)를 수용하는 탄성판(24)과;
    상기 나사강봉(12)에 삽입되어 상기 탄성판(24)과 상기 상부거더(200)의 하부플랜지(201) 사이에 설치되어 수평 이동변위(Δh)를 수용하는 미끄럼 상판(26) 및 미끄럼 하판(28)을 포함하며,
    상기 나사강봉(12)과 상기 상부거더(200)가 길이방향으로 직접적으로 맞닿지 않도록 상기 상부거더(200)의 하부플랜지(201)에 트랙형 홀(201a)이 구비되어 있는 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    A support device for accommodating both height adjustment and horizontal displacement displacement and rotational behavior of an upper girder (200) of a bridge,
    The lower end of which is located on the side of the wall 101 of the bridge substructure 100 and the upper end is a plurality of screw rods 12 having a length D T positioned through the lower flange 201 of the upper girder 200, ;
    A pair of support nuts (14) screwed on an upper portion of the screw rod (12) to determine a height of the upper girder (200);
    A displacement accepting support plate (not shown) which is inserted into the screw rod 12 and supported on the pair of support nuts 14 to support the upper girder 200 while adjusting the height of the pair of support nuts 14 16);
    A fixing nut (18) fastened to the screw rod (12) for fixing the displacement receiving plate (16);
    An antistatic nut 20 and an upper washer 22 assembled on the upper portion of the screw rod 12 to fasten the screw rod 12 and the upper girder 200;
    An elastic plate 24 installed between the upper washer 22 and the lower flange 201 of the upper girder 200 to receive a rotational displacement ?? generated in the rotational behavior of the upper girder 200;
    A sliding upper plate 26 inserted between the elastic plate 24 and the lower flange 201 of the upper girder 200 and receiving a horizontal movement displacement? 28,
    Characterized in that track-shaped holes (201a) are provided in a lower flange (201) of the upper girder (200) so that the screw rod (12) and the upper girder (200) It is possible to adjust the installation height of the middle girder, to accommodate displacement and to prevent falling.
  2. 제 1항에 있어서,
    상기 나사강봉(12)은,
    상부거더(200)의 하중을 벽체(101)에 전달하기 위해 벽체(101)에 고정되는 지지길이(DF) 외에 추가 매입길이(DL)가 확보되고, 받침높이(DS) 이상의 상승 수용높이(DU) 및 하강 수용높이(DD)가 포함된 노출길이(DE)를 가지는 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    The screw rod (12)
    Length support the load of the upper girder (200) fixed to the wall 101. Walls 101, for delivery to (D F) in addition to and to secure more embedded length (D L), support height (D S) or more acceptable rise And an exposure length (D E ) including a height (D U ) and a descending accommodation height (D D ), wherein the installation height of the upper girder is adjusted.
  3. 제 1항에 있어서,
    상기 나사강봉(12)은 상부거더(200)의 지점부에서 4개로 구성된 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    And the screw rod (12) is constituted of four pieces at the fulcrums of the upper girder (200). The supporting device is capable of adjusting the installation height of the upper girder and accommodating displacement and preventing the upper girder from falling.
  4. 제 1항에 있어서,
    상기 변위수용 받침판(16)은,
    상기 나사강봉(12)이 통과될 수 있는 관통 홀(161a)이 형성된 수평 밑판(161)과, 상면이 곡면을 이루도록 반달형상이며 하면이 상기 수평 밑판(161)의 상면에 접합되어 있는 수직 반달판(162)으로 구성되는 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    The displacement receiving plate (16)
    A vertical horizontal plate 161 having a through hole 161a through which the threaded steel rod 12 can pass and a vertical vandal plate 161 having a semicircular upper surface and a lower surface bonded to the upper surface of the horizontal bottom plate 161, (162). The supporting device is capable of adjusting the installation height of the upper girder, accommodating the displacement, and preventing the upper girder from falling.
  5. 제 4항에 있어서,
    수직 반달판(162)은 2개 이상으로 이루어져 상호 나란하게 배치되어 있는 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    5. The method of claim 4,
    Wherein the vertical vandal plates (162) are two or more and arranged in parallel to each other, wherein the installation height of the upper girder is adjusted, the displacement is accommodated, and the fall prevention is enabled.
  6. 제 4항에 있어서,
    수직 반달판(162)의 높이는 콘크리트의 원활한 채움을 위해 40mm 이상으로 구성된 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    5. The method of claim 4,
    And the height of the vertical vandal plate (162) is more than 40 mm for smooth filling of the concrete.
  7. 제 4항에 있어서,
    수직 반달판(162)은, 콘크리트의 원활한 채움을 위해 측면에 반원형 홀(162a)이 더 형성되는 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    5. The method of claim 4,
    The vertical vandal plate (162) is further provided with a semicircular hole (162a) on its side for smooth filling of the concrete. The vertical support plate (162) is capable of adjusting the installation height of the upper girder,
  8. 제 1항에 있어서,
    변위수용 받침판(16)의 응력집중 방지를 위해 한 쌍의 받침너트(14)와 변위수용 받침판(16) 사이에 받침와셔(15)가 더 설치되어 있는 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    Characterized in that a support washer (15) is further provided between a pair of support nuts (14) and a displacement receiving plate (16) to prevent stress concentration on the displacement receiving plate (16) A support device capable of accommodating and displacing displacement and preventing falling.
  9. 제 1항에 있어서,
    탄성판(24)은 상부거더(200)의 강성보다 작은 강성을 가지며, 합성고무패드, 폴리우레탄, FRP 중 어느 하나의 소재로 구성된 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    The elastic plate 24 has a rigidity smaller than the rigidity of the upper girder 200 and is made of any one of synthetic rubber pads, polyurethane, and FRP. A support device for preventing fall.
  10. 제 1항에 있어서,
    탄성판(24)은 중앙에 상기 나사강봉(12)이 통과될 수 있는 관통 홀(241)을 갖는 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    The elastic plate (24) has a through hole (241) through which the threaded steel rod (12) can pass. The elastic plate (24) .
  11. 제 1항에 있어서,
    미끄럼 상판(26)과 미끄럼 하판(28)은 상부거더(200)의 마찰계수보다 작은 마찰계수를 가지며, 불소수지판, 스테인레스판, 비닐시트 중 어느 하나의 소재로 제작된 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    The sliding upper plate 26 and the sliding lower plate 28 have a coefficient of friction smaller than that of the upper girder 200 and are made of any one of a fluorine resin plate, a stainless plate, and a vinyl sheet. It is possible to adjust the installation height of the upper girder, to accommodate displacement and to prevent falling.
  12. 제 1항에 있어서,
    미끄럼 상판(26)은 상기 탄성판(24)에 형성된 관통 홀(241)과 동등한 크기의 관통 홀(261)을 포함하며, 동시에 상기 탄성판(24)과 동등한 크기의 폭과 길이를 갖는 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    The sliding upper plate 26 includes a through hole 261 having the same size as the through hole 241 formed in the elastic plate 24 and has a width and a length equal to those of the elastic plate 24 Which is capable of adjusting the installation height of the upper girder and accommodating displacement and preventing falling during installation.
  13. 제 1항에 있어서,
    미끄럼 하판(28)은 상기 미끄럼 상판(26)의 하방에 설치되며, 상기 미끄럼 상판(26)에 형성된 관통 홀(261) 보다 상부거더(200)의 길이방향으로 더 긴 트랙형 홀(281)을 갖고, 상기 트랙형 홀(281)의 길이만큼 미끄럼 하판(28)은 미끄럼 상판(26)보다 더 길게 구성된 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    The slidable lower plate 28 is provided below the sliding upper plate 26 and has a longer track type hole 281 in the longitudinal direction of the upper girder 200 than a through hole 261 formed in the sliding upper plate 26 And the slidable plate (28) is longer than the slidable plate (26) by the length of the track-shaped hole (281). The slidable plate (28) Device.
  14. 삭제delete
  15. 제 1항에 있어서,
    관통 홀(281)의 직경은 상기 나사강봉(12)의 직경에 3mm 이상의 여유분을 더한 치수를 갖는 것을 특징으로 하는 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치.
    The method according to claim 1,
    And the diameter of the through hole (281) has a dimension obtained by adding a margin of 3 mm or more to the diameter of the threaded steel rod (12). The supporting device is capable of adjusting the installation height of the upper girder,
  16. 상부거더(200)가 청구항 제 1항의 받침장치(10)를 매개로 교량 하부구조물의 벽체(101)에 지지되어 시공된 것을 특징으로 하는 받침장치를 이용한 라멘교.Characterized in that the upper girder (200) is supported by the wall (101) of the bridge underground structure via the support device (10) of claim 1.
  17. 제 16항에 있어서,
    상부거더(200)의 하부플랜지(201)에 형성된 트랙형 홀(201a)의 길이는 상기 받침장치(10)에 포함된 나사강봉(12)의 직경에 30mm 이상의 여유분을 더한 치수를 갖고 시공된 것을 특징으로 하는 받침장치를 이용한 라멘교.
    17. The method of claim 16,
    The length of the track-shaped hole 201a formed in the lower flange 201 of the upper girder 200 is equal to or larger than the diameter of the threaded steel bar 12 included in the receiving apparatus 10 plus a margin of 30 mm or more Ramen bridge using the supporting device as a feature.
  18. 제 16항에 있어서,
    벽체(101)의 벽체철근(103)에 고정철선(104)으로 연결된 복수개의 받침철근(105)과, 받침철근(105)에 고정철선(106)으로 연결되어 받침장치(10)가 지지되는 묶음철근(107)이 더 설치되어 시공된 것을 특징으로 하는 받침장치를 이용한 라멘교.
    17. The method of claim 16,
    A plurality of supporting bars 105 connected to the wall reinforcing bar 103 of the wall 101 by a fixed iron wire 104 and a plurality of supporting bars 105 connected to the supporting bar 105 by a fixed iron wire 106 to support the supporting device 10 And a reinforcing bar (107) is further installed on the reinforcing bar.
  19. 제 16항에 있어서,
    받침장치(10)와 벽체(101)의 상단 사이에 받침기둥(50)이 더 연결되어 시공된 것을 특징으로 하는 받침장치를 이용한 라멘교.
    17. The method of claim 16,
    And a support column (50) is further connected between the support apparatus (10) and the upper end of the wall (101).
KR1020160065924A 2016-05-27 2016-05-27 Support device for leveling-adjustment and displacement recipience and overturning prevention of upper girder and Rahmen bridge using of the same KR101704971B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160065924A KR101704971B1 (en) 2016-05-27 2016-05-27 Support device for leveling-adjustment and displacement recipience and overturning prevention of upper girder and Rahmen bridge using of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160065924A KR101704971B1 (en) 2016-05-27 2016-05-27 Support device for leveling-adjustment and displacement recipience and overturning prevention of upper girder and Rahmen bridge using of the same

Publications (1)

Publication Number Publication Date
KR101704971B1 true KR101704971B1 (en) 2017-02-10

Family

ID=58121379

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160065924A KR101704971B1 (en) 2016-05-27 2016-05-27 Support device for leveling-adjustment and displacement recipience and overturning prevention of upper girder and Rahmen bridge using of the same

Country Status (1)

Country Link
KR (1) KR101704971B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101786758B1 (en) * 2017-04-28 2017-10-17 김성 Construction method of prstressed steel composite bridge using temporary hydraulic jack
KR101809166B1 (en) * 2017-03-31 2017-12-15 (주)리튼브릿지 Hinge support device for height and position adjustment, rahmen bridge therewith and rahmen bridge construction method therefor
KR102004277B1 (en) 2018-05-09 2019-07-26 정병목 Construction method for composite rigid-frame bridge with steel girder for reinforcing bridge support by t-shape steel and inducing pre-stress
KR102059631B1 (en) * 2019-03-25 2019-12-26 김준영 Support device for girder that can accommodate displacement for installation error and accommodate displacement when slab concrete is poured and constructing method rahmen bridge using the same
CN110656579A (en) * 2019-08-13 2020-01-07 苏清彬 Bridge construction support bracket
CN111560852A (en) * 2020-05-12 2020-08-21 陕西中立检测鉴定有限公司 Wind resisting device for large-span cable-stayed bridge in construction period and construction method
KR102179576B1 (en) * 2020-05-22 2020-11-17 (주)금호엘리베이터 Basic structure mounting structure of abutment inclined elevator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020023018A (en) * 2000-09-22 2002-03-28 이선구 Connection method between composite or precast deck and girders
KR100403158B1 (en) * 2000-10-12 2003-10-30 코벡주식회사 Method for Reinforcing the Performance of the bearing structure & its bearing apparatus for bridge & the bearing apparatus
KR101305522B1 (en) * 2013-04-08 2013-09-06 주식회사 길교이앤씨 Bridge with structure for joining beams and columns
KR101431640B1 (en) 2014-03-28 2014-08-20 박정환 Fixing girder apparatus able to apply to any type of girder, and construction method of rahmen bridge using this apparatus
JP2015086595A (en) * 2013-10-31 2015-05-07 大成建設株式会社 Junction structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020023018A (en) * 2000-09-22 2002-03-28 이선구 Connection method between composite or precast deck and girders
KR100403158B1 (en) * 2000-10-12 2003-10-30 코벡주식회사 Method for Reinforcing the Performance of the bearing structure & its bearing apparatus for bridge & the bearing apparatus
KR101305522B1 (en) * 2013-04-08 2013-09-06 주식회사 길교이앤씨 Bridge with structure for joining beams and columns
JP2015086595A (en) * 2013-10-31 2015-05-07 大成建設株式会社 Junction structure
KR101431640B1 (en) 2014-03-28 2014-08-20 박정환 Fixing girder apparatus able to apply to any type of girder, and construction method of rahmen bridge using this apparatus

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101809166B1 (en) * 2017-03-31 2017-12-15 (주)리튼브릿지 Hinge support device for height and position adjustment, rahmen bridge therewith and rahmen bridge construction method therefor
KR101786758B1 (en) * 2017-04-28 2017-10-17 김성 Construction method of prstressed steel composite bridge using temporary hydraulic jack
KR102004277B1 (en) 2018-05-09 2019-07-26 정병목 Construction method for composite rigid-frame bridge with steel girder for reinforcing bridge support by t-shape steel and inducing pre-stress
KR102059631B1 (en) * 2019-03-25 2019-12-26 김준영 Support device for girder that can accommodate displacement for installation error and accommodate displacement when slab concrete is poured and constructing method rahmen bridge using the same
CN110656579A (en) * 2019-08-13 2020-01-07 苏清彬 Bridge construction support bracket
CN111560852A (en) * 2020-05-12 2020-08-21 陕西中立检测鉴定有限公司 Wind resisting device for large-span cable-stayed bridge in construction period and construction method
KR102179576B1 (en) * 2020-05-22 2020-11-17 (주)금호엘리베이터 Basic structure mounting structure of abutment inclined elevator

Similar Documents

Publication Publication Date Title
KR101704971B1 (en) Support device for leveling-adjustment and displacement recipience and overturning prevention of upper girder and Rahmen bridge using of the same
KR101808825B1 (en) Support device for leveling-adjustment and displacement recipience and overturning prevention of upper girder and Rahmen bridge using of the same
KR100989586B1 (en) Girder for rahmen structure, the making method and bridge construction method using girder for rahmen structure
KR102059631B1 (en) Support device for girder that can accommodate displacement for installation error and accommodate displacement when slab concrete is poured and constructing method rahmen bridge using the same
US6751821B1 (en) Prestressed concrete girder of adjustable load bearing capacity for bridge and adjustment method for load bearing capacity of bridge
JP3898509B2 (en) Function change repair method for existing elastic bearings
KR102024209B1 (en) Bridges and retaining walls expanded footbridge
KR101791062B1 (en) Method of manufacturing steel girder and steel girder manufactured using same
JP3946527B2 (en) Function change repair method for existing elastic bearings
KR100632816B1 (en) Construction for preventing from upset of i-girder for bridge
JP2007276994A (en) Reinforcing structure of crane runway girder
KR101527782B1 (en) Management and reverse displacement of composite bridge composite inclined support installation method
CN105712168A (en) Truss supporting structure
KR100946716B1 (en) Long Span PSC Girder Type Rahmen Bridge and its Construction Method Using Moment Re-distribution
KR101664100B1 (en) Prefabricated temporary bridge
KR102132338B1 (en) Steel Composite PSC Girder Including Arched Reinforcement
EP1416101A1 (en) Composite beam
KR100549798B1 (en) Structure lifting device
KR200471594Y1 (en) Self-anchored Stress Ribbon Pedestrian Bridges
KR100648046B1 (en) Beam and Girder Reinforcing Apparatus using External Post-Tension and Reinforcing Method using the same
KR20030037258A (en) Continuous Prestress Expanding Girder Beam
KR200290739Y1 (en) Jacking system of bridge repair
JP3910029B2 (en) Terminal support structure of water pipe bridge
KR101786758B1 (en) Construction method of prstressed steel composite bridge using temporary hydraulic jack
KR200351452Y1 (en) Apparatus for decreasing negative moment and forming multiple supporting points with installed at the supporting point of Rahmen-type steel bridge

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20200203

Year of fee payment: 4