KR101678503B1 - Suspension type bridge comprised by metal pipes - Google Patents

Suspension type bridge comprised by metal pipes Download PDF

Info

Publication number
KR101678503B1
KR101678503B1 KR1020160121313A KR20160121313A KR101678503B1 KR 101678503 B1 KR101678503 B1 KR 101678503B1 KR 1020160121313 A KR1020160121313 A KR 1020160121313A KR 20160121313 A KR20160121313 A KR 20160121313A KR 101678503 B1 KR101678503 B1 KR 101678503B1
Authority
KR
South Korea
Prior art keywords
steel pipe
arch rib
fixedly coupled
rib
support
Prior art date
Application number
KR1020160121313A
Other languages
Korean (ko)
Inventor
표옥근
Original Assignee
(주)신흥이앤지
주식회사 지에스웹
주식회사 신흥
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)신흥이앤지, 주식회사 지에스웹, 주식회사 신흥 filed Critical (주)신흥이앤지
Priority to KR1020160121313A priority Critical patent/KR101678503B1/en
Application granted granted Critical
Publication of KR101678503B1 publication Critical patent/KR101678503B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Abstract

Provided is a bridge having a suspension structure of metal pipes, comprising: a first arch rib (65) which has a center portion having a certain curvature toward an upside, having both end portions fixated and joined to the upper side portions of first and second steel pipes (32, 36) located to be extended from a first pier (22) as a starting point to a certain distance in a left and a right direction; a second arch rib (66) which has a center portion having a certain curvature toward the upside, having both end portions fixated and joined to the upper side portions of the first and the second steel pipes (32, 36) located to be extended from a second pier (26) as a starting point to a certain distance in the left and right directions; a third arch rib (67) which has a center portion having a certain curvature toward a downside and fixated and joined to the lower side portions of the first and the second steel pipes (32, 36) between the first pier (22) and the second pier (26); a fourth arch rib (68) which has a center portion having a certain curvature toward the downside, and fixated and joined to the lower side portions of the first and second steel pipes (32, 36) between a first abutment (12) and the first pier (26); and a fifth arch rib (69) which has a center portion having a certain curvature toward the downside and fixated and joined to the lower side portions of the first and second steel pipes (32, 36) between the second pier (26) and a second abutment (16). The present invention is to provide a bridge having a suspension structure of metal pipes which has a simple structure and being able to stably distribute weight.

Description

금속관의 현수 구조로 이루어지는 교량{Suspension type bridge comprised by metal pipes}[0001] Suspension type bridge constructed by metal pipes [0002]

본 발명은 교량에 관한 것으로서, 더욱 구체적으로는 상하로 연속하는 복수 개의 아치리브를 금속관 및 철판을 이용하여 강관과 결합시켜 교량의 상판부를 지지하도록 구성함으로써, 대구경의 강관이나 복잡한 구조의 트러스 부재를 사용하지 않더라도 구조적으로 매우 안정하며 장경간으로 시공이 가능한 교량에 관한 것이다.The present invention relates to a bridge, and more particularly, to a structure in which a plurality of arch ribs successively arranged vertically are combined with a steel pipe using a metal pipe and an iron plate to support the upper plate portion of the bridge, The bridge is structurally very stable and can be installed in a long span.

교량은 하천이나 강, 또는 계곡 등과 같이 사람이나 차량의 자연스러운 보행이 불가능한 경우에 설치되는 구조물로서, 특히 강이나 해안가 등에 설치되는 교량들은 강의 수심이나 유속 등과 같은 이유로 교각과 교각 사이의 장견간이 굉장히 길어지는 경우가 종종 발생한다. A bridge is a structure that is installed when a person or a vehicle can not naturally walk, such as a river, a river, or a valley. Particularly, bridges installed on a river or a coastal area have a very long distance between the bridge and the bridge due to the depth of the river, Sometimes it happens.

거더교나 트러스교, 또는 아치교 등과 같은 강재 구조물 교량은 상판에 작용하는 하중을 교각 위에 설치되는 보의 휨강성으로 견디게 되는데, 장견간이 길어지게 되면 강 구조물 자체의 강성 감소와 증가되는 하중을 동시에 견뎌야 하기 때문에, 대개의 경우 거더 자체를 대구경의 강관으로 이루어지는 강재 구조물을 이용하거나 또는 복잡한 구조의 강재 트러스 구조물을 사용하는 방식으로 교량의 구조적인 안정을 꾀하고 있다. Steel structure bridges such as girder bridges, truss bridges, and arch bridges bear the load acting on the top plate by the bending stiffness of the beams installed on the bridge piers. When the length of the bridge is long, the steel structure itself must endure both the decrease in stiffness and the increased load , And the structural stability of the bridge is attempted by using a steel structure made of a steel pipe of a large diameter or a steel truss structure having a complicated structure in most cases.

하지만, 대구경의 강관을 이용한 강재 구조물이나 강재 트러스 구조물로서 거더를 구성하게 되면 장경간의 교량 시공이 가능한 장점은 있으나, 시공비용이 현저히 증가하게 됨은 물론 장시간의 시공기간이 소요되는 단점이 있다. 이를 위해 다양한 종류의 기술이 제안되고 있으나, 제안되고 있는 기술들 대부분은 장견간의 교량 시공을 위해 강관 내부에 보강콘크리트를 채워넣거나, 강관과 트러스 부재를 혼용하는 등과 같이 구조 자체를 매우 복잡하게 구성하는 것이 대부분이라는 점에서 이에 대한 개선방안이 필요하다.However, if a girder is constructed as a steel structure or a steel truss structure using a large-diameter steel pipe, it is possible to construct a bridge between the long-diameter bridges. However, the construction cost is considerably increased and a long construction period is required. Various techniques have been proposed for this purpose. However, most of the proposed technologies are very complicated structures such as filling reinforced concrete in the steel pipe for the installation of the bridge between the dogs, mixing the steel pipe and the truss member This is because most of them are needed.

대한민국 등록특허 제1029165호Korean Patent No. 1029165

본 발명은 종래 기술의 문제점을 해결하기 위해 제안된 것으로서, 본 발명의 목적은 단순한 구조를 가지면서도 상판부에 작용하는 하중을 매우 안정으로 흡수하여 분산시킬 수 있을 뿐 아니라 장견간으로 용이한 시공이 가능한 교량을 제공함에 있다.SUMMARY OF THE INVENTION The present invention has been proposed in order to solve the problems of the prior art, and it is an object of the present invention to provide an apparatus and a method which can achieve a stable structure, It is in providing bridges.

본 발명은 이러한 목적을 달성하기 위하여, 상부 일측 부위에 제1설치단(13)이 형성되며 하면 부위가 지면에 고정설치되는 제1교대(12), 상부 일측 부위에 제2설치단(17)이 형성되며 하면 부위가 지면에 고정설치되되 제1교대(12)와 일정 거리 떨어져 위치하는 제2교대(16); 각 하면 부위는 지면에 고정설치되되 상호 간에 일정 거리 떨어져 제1, 2교대(12, 16) 사이에 위치하는 제1, 2교각(22, 26); 일정 길이를 가지며 제1, 2교각(22, 26)에 의해 지지되되 일단 부위는 제1교대(12)의 제1설치단(13) 일측 부위에 고정결합되고 타단 부위는 제2교대(16)의 제2설치단(17) 일측 부위에 고정결합되는 제1강관(32), 일정 길이를 가지며 제1, 2교각(22, 26)에 의해 지지되어 제1강관(32)과 일정 간격 이격되어 대향하되 일단 부위는 제1교대(12)의 제1설치단(13) 타측 부위에 고정결합되고 타단 부위는 제2교대(16)의 제2설치단(17) 타측 부위에 고정결합되는 제2강관(36); 상호 간에 일정 간격 이격되어 위치하는 복수 개로 이루어지되, 각각의 양단 부위는 제1, 2강관(32, 36)의 내면 부위에 고정결합되는 연결관(40); 일단 부위는 제1강관(32)의 일단 상면 부위에 고정 결합되고 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장되는 제1지지봉(52), 일단 부위는 제2강관(36)의 일단 상면 부위에 고정 결합되고 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장되는 제2지지봉(54), 일단 부위는 제1강관(32)의 타단 상면 부위에 고정 결합되고 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장되는 제3지지봉(56), 일단 부위는 제2강관(36)의 타단 상면 부위에 고정 결합되고 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장되는 제4지지봉(58); 일단 부위는 제1지지봉(52)에 고정 결합되고 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제1교대(12)로부터 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합되는 제1지지리브(61), 일단 부위는 제2지지봉(54)에 고정 결합되고 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제1교대(12)로부터 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합되는 제2지지리브(62), 일단 부위는 제3지지봉(56)에 고정 결합되고 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제2교대(16)로부터 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합되는 제3지지리브(63), 일단 부위는 제4지지봉(56)에 고정 결합되고 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제2교대(16)로부터 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합되는 제4지지리브(64); 중앙 부위가 상방으로 일정 곡률을 이루되 각 양단 부위가 제1교각(22)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합되는 제1상부아치리브(652), 중앙 부위가 상방으로 일정 곡률을 이루되 각 양단 부위가 제1교각(22)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합되는 제2상부아치리브(654)로 이루어지는 제1아치리브(65); 중앙 부위가 상방으로 일정 곡률을 이루되 각 양단 부위가 제2교각(22)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합되는 제3상부아치리브(662), 중앙 부위가 상방으로 일정 곡률을 이루되 각 양단 부위가 제2교각(26)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합되는 제4상부아치리브(664)로 이루어지는 제2아치리브(66); 중앙 부위가 하방으로 일정 곡률을 이루며 제1교각(22)과 제2교각(26) 사이의 제1강관(32) 하부에 위치하되 각 양단 부위가 제1상부아치리브(652)의 일단 부위 및 제3상부아치리브(662)의 타단 부위와 가상의 연결선을 이루도록 제1강관(32)의 하면 부위에 고정 결합되는 제1하부아치리브(672), 중앙 부위가 하방으로 일정 곡률을 이루며 제1교각(22)과 제2교각(26) 사이의 제2강관(36) 하부에 위치하되 각 양단 부위가 제2상부아치리브(654)의 일단 부위 및 제4상부아치리브(664)의 타단 부위와 가상의 연결선을 이루도록 제2강관(36)의 하면 부위에 고정 결합되는 제2하부아치리브(674)로 이루어지는 제3아치리브(67); 중앙 부위가 하방으로 일정 곡률을 이루며 제1교대(12)와 제1교각(22) 사이의 제1강관(32) 하부에 위치하되 각 양단 부위가 제1지지리브(61)의 타단 부위 및 제1상부아치리브(652)의 타단 부위와 가상의 연결선을 이루도록 제1강관(32)의 하면 부위에 고정 결합되는 제3하부아치리브(682), 중앙 부위가 하방으로 일정 곡률을 이루며 제1교대(12)와 제1교각(22) 사이의 제2강관(36) 하부에 위치하되 각 양단 부위가 제2지지리브(62)의 타단 부위 및 제2상부아치리브(654)의 타단 부위와 가상의 연결선을 이루도록 제2강관(36)의 하면 부위에 고정 결합되는 제4하부아치리브(684)로 이루어지는 제4아치리브(68); 중앙 부위가 하방으로 일정 곡률을 이루며 제2교각(26)와 제2교대(16) 사이의 제1강관(32) 하부에 위치하되 각 양단 부위가 제3상부아치리브(662)의 일단 부위 및 제3지지리브(63)의 타단 부위와 가상의 연결선을 이루도록 제1강관(32)의 하면 부위에 고정 결합되는 제5하부아치리브(692), 중앙 부위가 하방으로 일정 곡률을 이루며 제2교각(26)와 제2교대(16) 사이의 제2강관(36) 하부에 위치하되 각 양단 부위가 제4상부아치리브(664)의 일단 부위 및 제4지지리브(64)의 타단 부위와 가상의 연결선을 이루도록 제2강관(32)의 하면 부위에 고정 결합되는 제6하부아치리브(694)로 이루어지는 제5아치리브(69); 제1지지리브(61)와 제1강관(32) 상호 간을 연결하는 복수 개의 제1행어관(71), 제2지지리브(62)와 제2강관(36) 상호 간을 연결하는 복수 개의 제2행어관(72), 제3지지리브(63)와 제1강관(32) 상호 간을 연결하는 복수 개의 제3행어관(73), 제4지지리브(64)와 제2강관(36) 상호 간을 연결하는 복수 개의 제4행어관(74), 제1상부아치리브(652)와 제1강관(32) 상호 간을 연결하는 복수 개의 제5행어관(75), 제2상부아치리브(664)와 제2강관(36) 상호 간을 연결하는 복수 개의 제6행어관(76), 제3상부아치리브(662)와 제1강관 상호 간을 연결하는 복수 개의 제7행어관(77), 제4상부아치리브(664)와 제2강관(36) 상호 간을 연결하는 복수 개의 제8행어관(78); 제1하부아치리브(672)와 제1강관(32) 사이 공간을 밀폐하면 결합되는 제1결합강판(81), 제2하부아치리브(674)와 제2강관(34) 사이 공간을 밀폐하면 결합되는 제2결합강판(82), 제3하부아치리브(682)와 제1강관(32) 사이 공간을 밀폐하면 결합되는 제3결합강판(83), 제4하부아치리브(684)와 제2강관(36) 사이 공간을 밀폐하면 결합되는 제4결합강판(84), 제5하부아치리브(692)와 제1강관(32) 사이 공간을 밀폐하면 결합되는 제5결합강판(85), 제6하부아치리브(694)와 제2강관(36) 사이 공간을 밀폐하면 결합되는 제6결합강판(86); 일단 부위는 제1교대(12) 상면 일측 부위에 고정 결합되고 타단 부위는 제1지지봉(52)에 고정 결합되는 제1지지케이블(92), 일단 부위는 제1교대(12) 상면 타측 부위에 고정 결합되고 타단 부위는 제2지지봉(54)에 고정 결합되는 제2지지케이블(94), 일단 부위는 제2교대(16) 상면 일측 부위에 고정 결합되고 타단 부위는 제3지지봉(52)에 고정 결합되는 제3지지케이블(96), 일단 부위는 제2교대(16) 상면 타측 부위에 고정 결합되고 타단 부위는 제4지지봉(52)에 고정 결합되는 제4지지케이블(98);을 포함하여 이루어지는 것을 그 기술적 특징으로 한다.In order to achieve the above object, according to the present invention, there are provided a first alternating section (12) having a first mounting end (13) formed on one side of an upper portion thereof and a lower surface portion fixedly mounted on the ground, A second shift 16 fixedly installed on the ground and having a predetermined distance from the first shift 12; First and second piers (22, 26) positioned between the first and second shifts (12, 16) and spaced from each other by a predetermined distance from each other; The first alternating section 12 is fixedly connected to one side of the first installation end 13 of the first alternation 12 and the other end of the second alternation 16 is supported by the first and second bridge columns 22, A first steel pipe 32 fixed to one side of the second installation end 17 of the first steel pipe 32 and having a predetermined length and spaced apart from the first steel pipe 32 by the first and second piers 22 and 26, And the other end is fixedly coupled to the other side of the first installation end 13 of the first alternation 12 and the other end is fixed to the other side of the second installation end 17 of the second alternation 16, A steel pipe 36; A connection pipe (40) fixedly coupled to the inner surface of the first and second pipes (32, 36) at both ends of the connection pipe (40); One end portion is fixed to one upper surface portion of the first steel pipe 32 and the other side portion is inclined at a predetermined angle to the rear side and extends upward. The other end of the second support rod 54 is fixedly connected to the upper end of the first steel pipe 32 and the other end of the second support rod 54 is inclined at a predetermined angle to the rear side. A fourth support rod 58 fixed to the upper end of the second steel pipe 36 at one end portion and fixed to the other end portion of the third support rod 56 and extending upward at a predetermined angle to the rear side; The other end portion of the first steel pipe 32 is fixedly coupled to the upper surface portion of the first steel pipe 32 extending from the first alternation 12 by a predetermined distance, The first support ribs 61 are fixedly coupled to the second support rods 54 at one end and the second steel pipes 36 extend at a predetermined distance from the first rotation 12, The other end of the second support rib 62 extends to a predetermined curvature downward and extends a predetermined distance from the second alternation 16. The second support rib 62 is fixed to the upper surface of the second support 16, And a third support rib 63 fixedly coupled to a top surface portion of the first steel pipe 32 positioned at the first end of the first steel pipe 32. One end portion of the third support rib 63 is fixedly coupled to the fourth support rod 56, And extends a predetermined distance from the shift 16 A fourth supporting ribs 64 which is fixed to the upper surface portion of the second steel pipe 36; The first upper arch ribs (32) are fixedly coupled to the upper surface of the first steel pipe (32), the center portion of which has a predetermined curvature and both ends are extended from the first pier (22) 652), and a second upper portion (362) fixedly coupled to an upper surface portion of the second steel pipe (36), the center portion of which has a predetermined curvature and both end portions extend from the first pier (22) A first arch rib 65 consisting of an arch rib 654; And a third upper arch rib (a second upper arch rib) fixedly coupled to an upper surface portion of the first steel pipe (32), the center portion of which has a predetermined curvature and both ends of which extend from the second pier (22) 662), and a fourth upper portion which is fixedly coupled to an upper surface portion of the second steel pipe (36) having a predetermined curvature upward at a central portion and extending a predetermined distance from the second pierce (26) A second arch rib 66 formed of an arch rib 664; The central portion of the first upper arch rib 652 is positioned below the first steel pipe 32 between the first pier 22 and the second pier 26, A first lower arch rib 672 fixedly coupled to a lower surface of the first steel pipe 32 so as to form a hypothetical connection line with the other end portion of the third upper arch rib 662, And both end portions are positioned at one end portion of the second upper arch rib 654 and at the other end portion of the fourth upper arch rib 664. The other end portion of the second upper arch rib 654 is located below the second steel pipe 36 between the bridge pier 22 and the second bridge 26, And a second lower arch rib (674) fixedly coupled to a lower surface of the second steel pipe (36) to form a hypothetical connecting line. The center portion of the first supporting rib 61 is positioned below the first steel pipe 32 between the first alternating ridge 12 and the first bridge pillar 22, A third lower arch rib 682 fixedly coupled to the lower surface of the first steel pipe 32 so as to form a hypothetical connection line with the other end portion of the upper arch rib 652, (36) between the first bridge pillar (12) and the first bridge pier (22), and both ends thereof are located at the other end of the second support rib (62) and the other end of the second upper arch rib A fourth arch rib 68 formed of a fourth lower arch rib 684 fixedly coupled to a lower surface of the second steel pipe 36 to form a connection line of the second steel pipe 36; The central portion of the first upper arch rib 662 has a predetermined curvature downward and is positioned below the first steel pipe 32 between the second pier 26 and the second alternation 16, A fifth lower arch rib 692 fixedly coupled to a lower surface of the first steel pipe 32 so as to form a hypothetical connecting line with the other end of the third supporting rib 63, Is positioned below the second steel pipe (36) between the first and second alternating ridges (26, 16), and both ends of each of the ends are connected to the one end of the fourth upper arch rib (664) A fifth arch rib 69 formed of a sixth lower arch rib 694 fixedly coupled to a lower surface of the second steel pipe 32 to form a connection line of the second steel pipe 32; A plurality of first hanger pipes 71 connecting the first support ribs 61 and the first steel pipe 32 and a plurality of second hanger pipes 71 connecting the second support ribs 62 and the second steel pipe 36, A plurality of third hanger pipes 73 connecting the third hanger pipe 72 and the third supporting rib 63 to the first steel pipe 32, a fourth supporting rib 64 and a second steel pipe 36 A plurality of fifth hanger pipes 75 connecting between the first upper arch ribs 652 and the first steel pipe 32, A plurality of sixth hanger pipes 76 connecting the ribs 664 and the second steel pipe 36 and a plurality of seventh hanger pipes 66 connecting the third steel pipe and the third upper arch rib 662 77, a plurality of eighth hanger pipes 78 connecting the fourth upper arch ribs 664 and the second steel pipe 36; When the space between the first lower arch rib 672 and the first steel pipe 32 is sealed to seal the space between the first joint steel plate 81 and the second lower arch rib 674 and the second steel pipe 34 A third coupling steel plate 83 and a fourth lower arch rib 684 which are coupled when the space between the third lower arch rib 682 and the first steel pipe 32 is sealed, A fourth joining steel plate 84 coupled when the space between the two steel pipes 36 is sealed, a fifth joining steel plate 85 joined by sealing the space between the fifth lower arch rib 692 and the first steel pipe 32, A sixth joining steel plate 86 joined when the space between the sixth lower arch rib 694 and the second steel pipe 36 is sealed; A first support cable 92 having one end fixedly coupled to one side of the upper surface of the first alternating 12 and the other end fixedly coupled to the first support bar 52, And a second support cable 94 fixedly coupled to the other end of the second support rod 54. The other end of the second support cable 94 is fixedly coupled to one side of the upper surface of the second shift 16, And a fourth support cable 98 fixedly coupled to the other side of the upper surface of the second shift 16 and one end of the third support cable 96 fixedly coupled to the fourth support bar 52 As a technical feature thereof.

상기 제1, 2, 3, 4지지케이블(92, 94, 96, 98) 각각에는 제1, 2, 3, 4장력조절수단(93, 95, 97, 99) 각각이 매개될 수 있다.The first, second, third and fourth tension adjusting means 93, 95, 97 and 99 may be respectively connected to the first, second, third and fourth support cables 92, 94, 96 and 98.

본 발명은 좌우 한 쌍의 각 강관에 상하 교대로 연속하는 아치리브를 결합함과 동시에 행어관 및 결합강판을 이용하여 강관과 아치리브 각각을 긴밀하게 연결하여 방식으로 교량의 상판부를 지지하도록 구성함으로써, 상대적으로 작은 직경의 강관을 사용하더라도 교량에 작용하는 휨모멘트를 용이하게 흡수 및 분산시킬 수 있다는 점에서 장시간 안정적인 구조를 유지할 수 있는 장경간의 교량을 용이하게 시공할 수 있도록 해준다.In the present invention, the upper and lower arch ribs are coupled to a pair of right and left steel pipes, and the steel pipe and the arch rib are tightly connected to each other using a hanger pipe and a joining steel plate, , It is possible to easily absorb and disperse the bending moment acting on the bridge even if a relatively small diameter steel pipe is used. Therefore, it is possible to easily construct a bridge having a long diameter capable of maintaining a stable structure for a long time.

도 1은 본 발명에 따른 교량의 개략적인 사시구성도.
도 2는 본 발명에 따른 교량의 개략적인 측면구성도.
도 3은 본 발명에 따른 교량의 개략적인 평면구성도.
1 is a schematic perspective view of a bridge according to the present invention;
2 is a schematic side view of a bridge according to the present invention;
3 is a schematic plan view of a bridge according to the present invention;

본 발명에 따른 바람직한 실시예를 첨부된 도면을 참조하여 상세하게 살펴보면 다음과 같은데, 본 발명의 실시예를 상술함에 있어 본 발명의 기술적 특징과 직접적인 관련성이 없거나, 또는 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 자명한 사항에 대해서는 그 상세한 설명을 생략하기로 한다. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings. However, the present invention is not limited to the technical features of the present invention, A detailed description thereof will be omitted.

도 1 내지 도 3 각각은 본 발명에 따른 교량의 개략적인 사시구성도, 측면구성도 그리고 평면구성도를 보여준다. 본 발명은 각 도면에 개시된 것과 같이, 제1, 2교대(12, 16), 제1, 2교각(22, 26), 제1, 2강관(32, 36), 연결관(40), 지지봉, 지지리브 및 아치리브, 행어관, 결합강판, 지지케이블을 포함하여 이루어지는 특징이 있다. 이들 각 구성을 구체적으로 살펴본다.Each of Figs. 1 to 3 shows a schematic perspective view, side view, and plan view of a bridge according to the present invention. As shown in the drawings, the present invention includes a first and second alternation 12, 16, first and second piers 22 and 26, first and second pipes 32 and 36, a connecting pipe 40, , A support rib and an arch rib, a hanger pipe, a joint steel plate, and a support cable. Each of these configurations will be described in detail.

제1, 2교대(12, 16) 각각은 서로 일정 거리 떨어져 위치하며, 각각의 하면 부위는 지면에 고정 설치되고, 제1, 2교대(12, 16) 각각의 상부 일측에는 제1, 2설치단(13, 17)이 형성된다. 제1, 2교대 각각은 철근-콘크리트 구조물로 이루어질 수 있다.Each of the first and second shifts 12 and 16 is spaced apart from each other by a predetermined distance and each of the lower portions is fixed to the ground. The ends 13 and 17 are formed. Each of the first and second alternations can be made of a reinforced concrete structure.

제1, 2교각(22, 26) 각각은 서로 일정 거리 떨어져 위치하되, 제1, 2교대(12, 16) 사이에 설치된다. 제1, 2교각(22, 26) 각각의 하면 부위는 지면에 고정설치된다. 제1, 2교대(12, 26)와 유사하게 제1, 2교각(22, 26) 역시 철근-콘크리트 구조물로 이루어질 수 있다.Each of the first and second bridge columns 22 and 26 is located at a certain distance from each other and is installed between the first and second alternation 12 and 16. The bottom portions of the first and second bridge columns 22 and 26 are fixed to the ground. Similar to the first and second alternations 12 and 26, the first and second bridge columns 22 and 26 may also be made of a reinforced concrete structure.

제1, 2강관(32, 36)은 일정 길이를 가지는 금속관으로 제1, 2교각(22, 26) 상부를 따라 설치되어 지지된다. 이때, 제1강관(32)의 일단 부위는 제1교대(12)의 제1설치단(13) 일측 부위에 고정결합되고, 그 타단 부위는 제2교대(16)의 제2설치단(17) 일측 부위에 고정결합된다. 또한, 제2강관(36)은 제1강관(32)과 일정 간격 이격되어 대향하되, 그 일단 부위는 제1교대(12)의 제1설치단(13) 타측 부위에 고정결합되고, 그 타단 부위는 제2교대(16)의 제2설치단(17) 타측 부위에 고정결합된다.The first and second steel pipes 32 and 36 are installed along the upper portions of the first and second bridge columns 22 and 26 with a metal pipe having a predetermined length. At this time, one end portion of the first steel pipe 32 is fixedly coupled to one side portion of the first installation end 13 of the first alternation 12, and the other end portion is fixed to the second installation end 17 ). The second steel pipe 36 is opposite to the first steel pipe 32 at a predetermined distance so that one end of the second steel pipe 36 is fixedly connected to the other side of the first installation end 13 of the first alternation 12, Is fixedly coupled to the other side of the second installation end (17) of the second shift (16).

연결관(40)은 제1, 2강관(32, 36) 상호 간을 결합하는 수단으로, 상호 간에 일정 간격 이격되어 위치하는 복수 개로 이루어지며, 각각의 양단 부위는 제1, 2강관(32, 36)의 내면 부위에 고정결합된다. 연결관은 일정 직경을 가지는 금속관으로 이루어질 수 있다.The connecting pipe 40 is a means for joining the first and second steel pipes 32 and 36 to each other. The connecting pipe 40 is composed of a plurality of first and second steel pipes 32 and 36, 36, respectively. The connection pipe may be made of a metal pipe having a constant diameter.

지지봉은 일정 직경 및 일정 길이을 가지는 금속관으로서, 제1, 2, 3, 4지지봉(52, 54, 56, 58)으로 이루어진다. 제1지지봉(52)은 그 일단 부위는 제1강관(32)의 일단 상면 부위에 고정 결합되고, 그 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장된다. 제2지지봉(54)은 그 일단 부위는 제2강관(36)의 일단 상면에 고정 결합되고, 그 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장된다.The support bar is a metal tube having a predetermined diameter and a predetermined length, and is composed of first, second, third and fourth support bars 52, 54, 56 and 58. One end portion of the first support bar 52 is fixedly coupled to the upper surface portion of one end of the first steel pipe 32, and the other end portion thereof is inclined rearward at a predetermined angle and extends upward. One end of the second support rod 54 is fixedly coupled to the upper surface of one end of the second steel pipe 36, and the other side thereof is inclined rearward at a predetermined angle and extends upward.

또한, 제3지지봉(56)은 그 일단 부위는 제1강관(32)의 타단 상면 부위에 고정 결합되고, 그 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장된다. 제4지지봉(58)은 그 일단 부위는 제2강관(36)의 타단 상면 부위에 고정 결합되고, 그 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장된다. The one end of the third support rod 56 is fixedly coupled to the upper end surface of the first steel pipe 32 and the other end thereof is inclined rearward at a predetermined angle and extends upward. One end of the fourth support rod 58 is fixedly coupled to the other end upper surface portion of the second steel pipe 36, and the other side thereof is inclined rearward at a predetermined angle and extends upward.

즉, 본 발명에 따른 제1, 2, 3, 4지지봉(52, 54, 56, 58) 각각은 수직 상방으로 일정 수직 높이를 가지며 설치되는 것이 아니라, 도 2와 같이 후방으로 일정 각도 경사지면서 설치되는 특징이 있다. 이는 지지리브를 보다 안정적으로 고정 결합하기 위한 것으로서 후술한다.That is, each of the first, second, third, and fourth support rods 52, 54, 56, and 58 according to the present invention is installed vertically upward at a predetermined vertical height, . This will be described later for fixing the supporting ribs more stably.

지지리브는 제1, 2교대(12, 16) 각각에 인접하여 설치되는 부분으로서, 제1, 2, 3, 4지지리브(61, 62, 63, 64)로 이루어진다. 제1지지리브(61)는 그 일단 부위가 제1지지봉(52)에 고정 결합되고, 그 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제1교대(12)로부터 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합된다. 제2지지리브(62)는 그 일단 부위가 제2지지봉(54)에 고정 결합되고, 그 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제1교대(12)로부터 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합된다. 즉, 제1, 2지지리브(61, 62) 각각은 중앙 부위가 상방으로 일정 곡률을 이루는 아치리브의 1/2을 이루는 구조로 이루어진다.The support ribs are provided adjacent to the first and second alternating portions 12 and 16 and are made of first, second, third and fourth support ribs 61, 62, 63 and 64. The first supporting rib 61 has one end portion fixedly coupled to the first supporting rod 52 and the other portion extending downward at a predetermined curvature and extending a predetermined distance from the first alternating portion 12, And is fixedly coupled to an upper surface portion of the steel pipe 32. The other end of the second support rib 62 is fixedly coupled to the second support rod 54 and the other end of the second support rib 62 extends in a downward direction with a predetermined curvature, And is fixedly coupled to an upper surface portion of the steel pipe 36. That is, each of the first and second support ribs 61 and 62 has a structure in which the center portion is half of the arch ribs having a certain curvature upward.

제3지지리브(63)는 그 일단 부위가 제3지지봉(56)에 고정 결합되고, 그 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제2교대(16)로부터 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합된다. 제4지지리브(64)는 그 일단 부위는 제4지지봉(56)에 고정 결합되고, 그 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제2교대(16)로부터 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합된다. 제1, 2지지리브(61, 62)와 유사하게, 제3, 4지지리브(63, 64) 각각은 중앙 부위가 상방으로 일정 곡률을 이루는 아치리브의 1/2을 이루는 구조로 이루어진다.The other end of the third support rib 63 is fixedly coupled to the third support rod 56 and the other end of the third support rib 63 extends downward with a predetermined curvature, And is fixedly coupled to an upper surface portion of the steel pipe 32. The other end of the fourth support rib 64 is fixedly coupled to the fourth support rod 56 at one end thereof and extends at a predetermined curvature downward to extend from the second support 16 to the second support 16, And is fixedly coupled to an upper surface portion of the steel pipe 36. Similarly to the first and second support ribs 61 and 62, each of the third and fourth support ribs 63 and 64 has a structure in which the center portion is half of the arch ribs having a predetermined curvature upward.

아치리브는 일정 직경의 금속관으로서 중앙 부위가 상방으로 일정 곡률을 이루며 제1, 2강관(32, 36)의 상부에 위치하는 제1, 2아치리브(65, 66)와, 일정 직경의 금속관으로서 중앙 부위가 하방으로 일정 곡률을 이루며 제1, 2강관(32, 36)의 하부에 위치하는 제3, 4, 5아치리브(67, 68, 69)로 분리 구성된다. The arch rib is a metal tube having a predetermined diameter, and the center portion of the arch rib has a predetermined curvature upward. The arch rib has first and second arch ribs 65 and 66 positioned at the upper portions of the first and second steel pipes 32 and 36, The central portion is divided into third, fourth and fifth arch ribs 67, 68 and 69 located below the first and second steel pipes 32 and 36 with a predetermined curvature downward.

중앙 부위가 상방으로 일정 곡률을 이루는 제1아치리브(65)는 제1교각(22)의 상부에 위치하며, 각 양단 부위가 제1교각(22)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제1강관(32)의 상면 일측 부위에 고정 결합되는 제1상부아치리브(652)와, 각 양단 부위가 제1교각(22)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제2강관(36)의 상면 일측 부위에 고정 결합되는 제2상부아치리브(654)로 이루어진다.The first arch ribs 65 having a predetermined curvature upward at the central portion are located at the upper portion of the first pier bridge 22 and are positioned such that both ends of the first arch ribs 65 extend to the left and right from the first pier bridge 22 A first upper arch rib 652 which is fixedly coupled to one side portion of the upper surface of the first steel pipe 32 and a second steel pipe 362 which is located at a predetermined distance from the first pierce 22, And a second upper arch rib 654 fixedly coupled to one side of the upper surface of the upper arch rib 654.

중앙 부위가 상방으로 일정 곡률을 이루는 제2아치리브(66)는 제2교각(26)의 상부에 위치하며, 각 양단 부위가 제2교각(22)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제1강관(32)의 상면 일측 부위에 고정 결합되는 제3상부아치리브(662)와, 각 양단 부위가 제2교각(26)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제2강관(36)의 상면 일측 부위에 고정 결합되는 제4상부아치리브(664)로 이루어진다.The second arch ribs 66 having a predetermined curvature upward at the central portion are located at the upper portion of the second pier 26 and are positioned such that both ends extend from the second pier bridge 22 to the left and right by a certain distance A third upper arch rib 662 fixedly coupled to one side portion of the upper surface of the first steel pipe 32 and a second steel pipe 36 positioned at a predetermined distance from the second pierce 26, And a fourth upper arch rib 664 fixedly coupled to one side of the upper surface of the upper arch rib 664.

중앙 부위가 하방으로 일정 곡률을 이루는 제3아치리브(67)는 제1교각(22)과 제2교각(26) 사이의 제1강관(32) 하부에 위치하며, 각 양단 부위가 제1상부아치리브(652)의 일단 부위 및 제3상부아치리브(662)의 타단 부위와 가상의 연결선을 이루도록 제1강관(32)의 하면 일측 부위에 고정 결합되는 제1하부아치리브(672)와, 각 양단 부위가 제2상부아치리브(654)의 일단 부위 및 제4상부아치리브(664)의 타단 부위와 가상의 연결선을 이루도록 제2강관(36)의 하면 일측 부위에 고정 결합되는 제2하부아치리브(674)로 이루어진다.The third arch ribs 67 having a predetermined curvature downward from the central portion are located below the first steel pipe 32 between the first bridge bridge 22 and the second bridge bridge 26, A first lower arch rib 672 fixedly coupled to one side of the lower surface of the first steel pipe 32 so as to form a hypothetical connection line with one end portion of the arch rib 652 and the other end portion of the third upper arch rib 662, The second lower arch ribs 654 and the fourth upper arch ribs 664 are connected to each other at one end of the second upper arch rib 654 and the other end of the fourth upper arch rib 664, And an arch rib 674.

중앙 부위가 하방으로 일정 곡률을 이루는 제4아치리브(68)는 제1교대(12)와 제1교각(22) 사이의 제1강관(32) 하부에 위치하며, 각 양단 부위가 제1지지리브(61)의 타단 부위 및 제1상부아치리브(652)의 타단 부위와 가상의 연결선을 이루도록 제1강관(32)의 하면 일측 부위에 고정 결합되는 제3하부아치리브(682)와, 각 양단 부위가 제2지지리브(62)의 타단 부위 및 제2상부아치리브(654)의 타단 부위와 가상의 연결선을 이루도록 제2강관(36)의 하면 일측 부위에 고정 결합되는 제4하부아치리브(684)로 이루어진다.The fourth arch ribs 68 having a predetermined curvature downward from the central portion are located below the first steel pipe 32 between the first alternating ridge 12 and the first piercing angle 22, A third lower arch rib 682 fixedly coupled to one side of the lower surface of the first steel pipe 32 so as to form a hypothetical connection line with the other end of the rib 61 and the other end of the first upper arch rib 652, And the other end of the second lower arch rib 654 is fixedly coupled to one side of the lower surface of the second steel pipe 36 so as to form a hypothetical connection line with the other end portion of the second support rib 62 and the other end portion of the second upper arch rib 654. [ (684).

또한, 중앙 부위가 하방으로 일정 곡률을 이루는 제5아치리브(69)는 제2교각(26)와 제2교대(16) 사이의 제1강관(32) 하부에 위치하며, 각 양단 부위가 제3상부아치리브(662)의 일단 부위 및 제3지지리브(63)의 타단 부위와 가상의 연결선을 이루도록 제1강관(32)의 하면 일측 부위에 고정 결합되는 제5하부아치리브(692)와, 각 양단 부위가 제4상부아치리브(664)의 일단 부위 및 제4지지리브(64)의 타단 부위와 가상의 연결선을 이루도록 제2강관(32)의 하면 일측 부위에 고정 결합되는 제6하부아치리브(694)로 이루어진다.The fifth arch ribs 69 having a predetermined curvature downward at the central portion are located below the first steel pipe 32 between the second bridge pier 26 and the second alternation 16, A fifth lower arch rib 692 fixedly coupled to one side of the lower surface of the first steel pipe 32 so as to form a hypothetical connection line with one end of the third upper arch rib 662 and the other end of the third support rib 63, A sixth lower portion (not shown) fixedly coupled to one side surface of the lower surface of the second steel pipe 32 so that both ends of the fourth upper arch rib 664 and the other end portion of the fourth support rib 64 form a virtual connecting line, And an arch rib 694.

이럴 경우, 제1, 2지지리브(61, 62)가 제4아치리브(68)와 가상의 연결선을 이루며 제1, 2강관(32, 36) 각각에 고정 결합되고, 제4아치리브(68)가 제1아치리브(65)와 가상의 연결선을 이루며 제1, 2강관(32, 36) 각각에 고정 결합되며, 제1아치리브(65)가 제3아치리브(67)와 가상의 연결선을 이루며 제1, 2강관(32, 36) 각각에 고정 결합되고, 제3아치리브(67)가 제2아치리브(66)와 가상의 연결선을 이루며 제1, 2강관(32, 36) 각각에 고정 결합되며, 제2아치리브(66)가 제5아치리브(69)와 가상의 연결선을 이루며 제1, 2강관(32, 36) 각각에 고정 결합되고, 제5아치리브(69)가 제3, 4지지리브(63, 64) 가상의 연결선을 이루며 제1, 2강관(32, 36) 각각에 고정 결합됨에 따라, 각 아치리브는 좌우에 위치하는 지지리브에 대하여 코사인 함수와 같은 궤적으로 이루게 된다.In this case, the first and second support ribs 61 and 62 are fixedly coupled to the first and second steel pipes 32 and 36 as virtual connection lines with the fourth arch rib 68, Are fixedly coupled to the first and second steel pipes 32 and 36 while forming a hypothetical connection line with the first arch ribs 65. The first arch ribs 65 are connected to the third arch ribs 67 and the imaginary connection ribs 65, The third arch ribs 67 are connected to the first and second steel pipes 32 and 36 and the third arch ribs 67 are connected to the second arch ribs 66 via the first and second steel pipes 32 and 36 And the second arch ribs 66 are fixedly coupled to the first and second steel pipes 32 and 36 while forming a hypothetical connection line with the fifth arch ribs 69 and the fifth arch ribs 69 And the third and fourth supporting ribs 63 and 64 are fixedly connected to the first and second steel pipes 32 and 36. The arched ribs have the same locus as the cosine function with respect to the right and left supporting ribs, .

즉, 제1, 2, 3, 4, 5아치리브(65, 66, 67, 68, 69) 각각은 제1, 2강관(32, 36)을 매개로 상하로 연속하는 아치를 이룸과 동시에 제1, 2강관(32, 36)에 긴밀하게 고정 결합되며, 제1교대(12)와 제1교각(22) 중간 부위 및 제1, 2교각(22, 26) 중간 부위, 그리고 제2교각(26)과 제2교대(16) 중간 부위에 위치하는 제1, 2강관(32, 36)의 하측에는 제3, 4, 5아치리브(67, 68, 69)가 마련된다.That is, each of the first, second, third, fourth and fifth arch ribs 65, 66, 67, 68 and 69 forms an arch which continues vertically through the first and second steel pipes 32 and 36, The first alternation 12 and the first bridge bridge 22 and the first and second bridge bridges 22 and 26 are tightly fixed to the first and second steel pipes 32 and 36, Third, fourth and fifth arch ribs 67, 68 and 69 are provided on the lower sides of the first and second steel pipes 32 and 36 located between the first and second steel pipes 26 and 26 and the second alternation 16, respectively.

일정 길이를 가지며 교대 및 교각에 의해 지지되는 제1, 2강관(32, 36)의 상하에 연속하는 아치리브들이 고정 결합되고, 교대 및 교각 중간 중간에 보강 부재로서의 아치리브들이 마련되는 경우, 교량은 장시간 구조적으로 매우 안정적인 상태를 유지할 수 있음은 물론 강관의 지지점으로 작용하는 교대와 교각, 그리고 교각 사이의 중앙 지점에 집중되는 휨모멘트를 보다 안정적으로 흡수하여 교대 또는 교각으로 전달하는 것이 가능하다.When arch ribs having a certain length and continuing to the top and bottom of first and second steel pipes 32 and 36 supported by alternating and piercing rings are fixedly coupled and arch ribs as reinforcing members are provided in the middle of the alternation and piercing angles, It is possible to maintain a very stable structure for a long period of time, and it is possible to more reliably absorb the bending moment concentrated at the midpoint between the alternation, pier, and bridge acting as support points of the steel pipe, and to transmit it alternately or at a pier.

또한, 제1교대(12)에 마련되는 제1, 2지지봉(52, 54) 및 제2교대(16)에 마련되는 제3, 4지지봉(56, 58) 각각을 수직 상방인 아닌 후방으로 일정 각도 경사지도록 설치하게 되면, 제1, 2강관(32, 36)에 대하여 가상의 연결선을 이루며 결합되는 각 아치리브를 더욱 안정적으로 지지하는 것이 가능하다.The first and second support rods 52 and 54 provided in the first alternation 12 and the third and fourth support rods 56 and 58 provided in the second alternation 16 are moved rearward It is possible to more stably support the respective arch ribs which are engaged with the first and second steel pipes 32 and 36 so as to form a virtual connection line.

행어관은 각 아치리브를 제1, 2강관(32, 36)과 연결하는 수단으로, 제1, 2, 3, 4, 5, 6, 7, 8행어관(71, 72, 73, 74, 75, 76, 77, 78)으로 이루어진다. 제1행어관(71)은 제1지지리브(61)와 제1강관(32) 상호 간을 연결하는 복수 개로 이루어지며, 제2행어관(72)은 제2지지리브(62)와 제2강관(36) 상호 간을 연결하는 복수 개로 이루어지고, 제3행어관(73)은 제3지지리브(63)와 제1강관(32) 상호 간을 연결하는 복수 개로 이루어진다.The hanger pipe is a means for connecting each arch rib to the first and second steel pipes 32 and 36. The first, second, third, fourth, fifth, sixth, seventh and eighth hanger pipes 71, 72, 75, 76, 77, 78). The first hanger pipe 71 is formed of a plurality of pieces connecting the first support ribs 61 and the first steel pipe 32 and the second hanger pipe 72 is formed of a plurality of second support ribs 62, And the third hanger pipe 73 is composed of a plurality of pipes connecting the third supporting ribs 63 and the first steel pipes 32. The third supporting ribs 63 and the first supporting pipes 63 are connected to each other.

또한, 제4행어관(74)는 제4지지리브(64)와 제2강관(36) 상호 간을 연결하는 복수 개로 이루어지고, 제5행어관(75)은 제1상부아치리브(652)와 제1강관(32) 상호 간을 연결하는 복수 개로 이루어지며, 제6행어관(76)은 제2상부아치리브(664)와 제2강관(36) 상호 간을 연결하는 복수 개로 이루어지고, 제7행어관(77)은 제3상부아치리브(662)와 제1강관 상호 간을 연결하는 복수 개로 이루어지며, 제8행어관(78)은 제4상부아치리브(664)와 제2강관(36) 상호 간을 연결하는 복수 개로 이루어진다.The fourth hanger pipe 74 is composed of a plurality of pieces connecting the fourth support ribs 64 and the second steel pipe 36 and the fifth hanger pipe 75 is connected to the first upper arch ribs 652, And the sixth hanger pipe 76 is composed of a plurality of pipes connecting the second upper arch ribs 664 and the second steel pipes 36, The seventh hanger pipe 77 is composed of a plurality of pieces connecting the third upper arch rib 662 and the first steel pipe and the eighth hanger pipe 78 is connected to the fourth upper arch rib 664, (36).

각 행어관에 의해 각 아치리브 및 지지리브 각각이 제1, 2강관 각각에 고정 결합되면, 아치리브 및 지지리브 각각과 제1, 2강관 상호 간은 트러스와 유사한 구성으로 결합됨에 따라 교량은 더욱 안정적인 구조를 가지게 된다. 각 행어관은 일정 직경의 금속관으로 이루어질 수 있으며, 도면에는 일정 각도를 이루며 결합되는 구성이 개시되어 있으나 이와 달리 행어관은 행어케이블과 유사하게 각 아치리브 및 지지리브를 제1, 2강관에 수직으로 연결될 수도 있을 것이다.When each of the arch ribs and the support ribs are fixedly coupled to the first and second steel pipes by the respective hanger pipes, the arch ribs and the support ribs and the first and second steel pipes are coupled in a similar structure to the trusses, And has a stable structure. Each of the hanger pipes may be formed of a metal pipe having a predetermined diameter, and the hanger pipe is connected to the first and second steel pipes Lt; / RTI >

결합강판은 아치리브 각각과 제1, 2강관 사이에 마련되며, 제1, 2, 3, 4, 5, 6결합강판(81, 82, 83, 84, 85, 86)으로 이루어진다. 제1결합강판(81)은 제1하부아치리브(672)와 제1강관(32) 사이 공간을 밀폐하면 결합되며, 제2결합강판(82)은 제2하부아치리브(674)와 제2강관(34) 사이 공간을 밀폐하면 결합되고, 제3결합강판(83)은 제3하부아치리브(682)와 제1강관(32) 사이 공간을 밀폐하면 결합된다.The bonded steel plate is provided between each of the arch ribs and the first and second steel pipes and is composed of first, second, third, fourth, fifth and sixth bonded steel plates 81, 82, 83, 84, 85 and 86. The first coupling steel plate 81 is coupled when the space between the first lower arch rib 672 and the first steel pipe 32 is sealed and the second coupling steel plate 82 is coupled with the second lower arch rib 674 and the second The third coupling steel plate 83 is coupled when the space between the third lower arch ribs 682 and the first steel pipe 32 is sealed.

또한, 제4결합강판(84)는 제4하부아치리브(684)와 제2강관(36) 사이 공간을 밀폐하면 결합되며, 제5결합강판(84)은 제5하부아치리브(692)와 제1강관(32) 사이 공간을 밀폐하면 결합되고, 제6결합강판(86)은 제6하부아치리브(694)와 제2강관(36) 사이 공간을 밀폐하면 결합된다. 각 결합강판은 일정 두께를 가지는 금속판으로 이루어질 수 있으며, 용접에 의해 제3, 4, 5아치리브와 제1, 2강관 사이에 결합될 수 있다.The fourth coupling steel plate 84 is coupled when the space between the fourth lower arch rib 684 and the second steel pipe 36 is sealed and the fifth coupling steel plate 84 is coupled with the fifth lower arch rib 692 The space between the sixth lower arch ribs 694 and the second steel pipe 36 is sealed when the space between the first steel pipes 32 is sealed. Each of the bonded steel plates may be formed of a metal plate having a predetermined thickness and may be joined between the third, fourth, and fifth arch ribs by welding and between the first and second steel pipes.

제1, 2강판에 대하여 제3, 4, 5아치리브 각각이 제1, 2아치리브 및 제1 내지 제3지지리브 각각과 가상의 연결선으로 곡률을 이루며 일체형 구조로 결합된 상태에서, 결합강판에 의해 제3, 4, 5아치리브와 제1, 2강관 상호 간이 연결되면, 제1, 2강관의 강성을 더욱 증진될 수 있음은 물론 제1, 2강관에 전달되는 휨모멘트를 더욱 적절하게 흡수하여 교대 또는 교각으로 전달하는 것이 가능하다.In the state that the third, fourth, and fifth arch ribs are curved with imaginary connecting lines with the first and second arch ribs and the first to third supporting ribs, respectively, with respect to the first and second steel plates, The stiffness of the first and second steel pipes can be further improved and the bending moment transmitted to the first and second steel pipes can be more appropriately adjusted It is possible to absorb and transfer it alternately or at a pier.

지지케이블은 지지봉을 안정적으로 지지하는 수단으로, 제1, 2, 3, 4지지케이블(92, 94, 96, 98)로 이루어진다. 제1지지케이블(92)은 그 일단 부위가 제1교대(12) 상면 일측 부위에 고정 결합되고, 그 타단 부위는 제1지지봉(52)에 고정 결합된다. 제2지지케이블(94)는 그 일단 부위가 제1교대(12) 상면 타측 부위에 고정 결합되고, 그 타단 부위는 제2지지봉(54)에 고정 결합된다.The support cable is a means for stably supporting the support rods and is made up of first, second, third, and fourth support cables 92, 94, 96, 98. One end of the first support cable 92 is fixedly coupled to one side of the upper surface of the first alternating 12 and the other end is fixedly coupled to the first support bar 52. One end of the second supporting cable 94 is fixedly coupled to the other side of the upper surface of the first alternating 12 and the other end is fixedly coupled to the second supporting rod 54.

또한, 제3지지케이블(96)은 그 일단 부위가 제2교대(16) 상면 일측 부위에 고정 결합되고, 그 타단 부위는 제3지지봉(52)에 고정 결합된다. 제4지지케이블(98)은 그 일단 부위가 제2교대(16) 상면 타측 부위에 고정 결합되고, 그 타단 부위는 제4지지봉(52)에 고정 결합된다. One end of the third support cable 96 is fixedly coupled to one side of the upper surface of the second alternation 16 and the other end is fixedly coupled to the third support bar 52. One end of the fourth support cable 98 is fixedly coupled to the other side of the upper surface of the second alternation 16 and the other end is fixedly coupled to the fourth support bar 52.

제1, 2, 3, 4지지케이블(92, 94, 96, 98) 각각은 와이어로프로 이루어질 수 있으며, 이들 각각에는 도면과 같이 제1, 2, 3, 4장력조절수단(93, 95, 97, 99) 각각이 매개될 수도 있다. 각 지지케이블에 별도의 장력조절수단이 마련되면 각 지지봉을 지지하는 지지케이블의 장력을 용이하게 조절할 수 있게 된다. 제1, 2, 3, 4장력조절수단 각각은 통상적인 턴바클로 이루어질 수 있다.Each of the first, second, third and fourth support cables 92, 94, 96 and 98 may be made of wire, each of which is provided with first, second, third and fourth tension adjusting means 93, 95, 97, and 99, respectively. When tensioning means is provided on each supporting cable, the tension of the supporting cable supporting each supporting rod can be easily adjusted. Each of the first, second, third and fourth tension adjusting means may be made of a conventional turnbuckle.

한편, 첨부된 도면에는 제1, 2교대(12, 16) 사이에 제1, 2교각(22, 26)이 설치되고, 각 아치리브는 제1교대(12)와 제1교각(22) 사이, 제1, 2교각(22, 26) 사이, 그리고 제2교각(26)과 제2교대(16) 사이에 상하로 배치되는 구성이 일례로 개시되어 있으나, 본 발명은 제1, 2교대 사이에 3개 이상의 교각이 설치되는 경우도 배제하지 않는다. In the accompanying drawings, first and second piers 22 and 26 are provided between the first and second alternations 12 and 16, and each arch rib is provided between the first pivot 12 and the first pier 22 The first and second bridge columns 22 and 26 and the second bridge bridge 26 and the second alternation 16 in the vertical direction, Or if three or more bridges are to be installed.

만일, 제1, 2교대 사이에 3개 이상의 교각이 설치되면, 각 교각의 상부에는 상방으로 일정 곡률을 이루는 아치리브가 위치하며, 교대와 교각 사이, 각 교각 사이, 그리고 교각과 교대 사이에는 하방으로 일정 곡률을 이루는 아치리브가 위치하고, 이들 각 아치리브의 양단부는 각 강관을 기점으로 가상의 연결선을 따라 강관의 상면 일측 부위 및 하면 일측 부위에 결합된다. 이때, 결합강판 역시 각 아치리브와 강관 사이에 마련되어야 함은 물론이다.If three or more bridges are installed between the first and second alternations, an arch rib having a predetermined curvature upward is located at the top of each bridge, and the bridge between the bridge and the bridge, between the bridges, and between the bridges and the bridge And both ends of each of the arch ribs are joined to one side of the upper surface of the steel pipe and one side of the lower surface along the imaginary connecting line starting from the respective steel pipes. At this time, it is needless to say that the joint steel plate is also provided between each of the arch ribs and the steel pipe.

상기에서는 본 발명의 바람직한 실시예들에 한정하여 설명하였으나 이는 단지 예시일 뿐이며, 본 발명은 이에 한정되지 않고 여러 다양한 방법으로 변경되어 실시될 수 있으며, 나아가 개시된 기술적 사상에 기초하여 별도의 기술적 특징이 부가되어 실시될 수 있음은 자명하다 할 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. It will be apparent that the present invention can be practiced with added features.

12, 16 : 제1, 2교대 22, 26 : 제1, 2교각
32, 36 : 제1, 2강관 40 : 연결관
52, 54, 56, 58 : 제1, 2, 3, 4지지봉
61, 62, 63, 64 : 제1, 2, 3, 4지지리브
65, 66, 67, 68, 69 : 제1, 2, 3, 4, 5아치리브
71, 72, 73, 74, 75, 76, 77, 78 : 제1, 2, 3, 4, 5, 6, 7, 8행어관
81, 82, 83, 84, 85, 86 : 제1, 2, 3, 4, 5, 6결합강판
92, 94, 96, 98 : 제1, 2, 3, 4지지케이블
93, 95, 97, 99 : 제1, 2, 3, 4장력조절수단
12, 16: first and second shifts 22, 26: first and second piers
32, 36: first and second steel pipes 40: connection pipe
52, 54, 56, 58: first, second, third, and fourth support rods
61, 62, 63, 64: first, second, third,
65, 66, 67, 68, 69: 1st, 2nd, 3rd, 4th, 5th arch ribs
71, 72, 73, 74, 75, 76, 77, 78: first, second, third, fourth, fifth, sixth, seventh,
81, 82, 83, 84, 85, 86: first, second, third, fourth, fifth,
92, 94, 96, 98: first, second, third, and fourth support cables
93, 95, 97, 99: 1st, 2nd, 3rd, 4th tension adjusting means

Claims (2)

상부 일측 부위에 제1설치단(13)이 형성되며 하면 부위가 지면에 고정설치되는 제1교대(12), 상부 일측 부위에 제2설치단(17)이 형성되며 하면 부위가 지면에 고정설치되되 제1교대(12)와 일정 거리 떨어져 위치하는 제2교대(16);
각 하면 부위는 지면에 고정설치되되 상호 간에 일정 거리 떨어져 제1, 2교대(12, 16) 사이에 위치하는 제1, 2교각(22, 26);
일정 길이를 가지며 제1, 2교각(22, 26)에 의해 지지되되 일단 부위는 제1교대(12)의 제1설치단(13) 일측 부위에 고정결합되고 타단 부위는 제2교대(16)의 제2설치단(17) 일측 부위에 고정결합되는 제1강관(32), 일정 길이를 가지며 제1, 2교각(22, 26)에 의해 지지되어 제1강관(32)과 일정 간격 이격되어 대향하되 일단 부위는 제1교대(12)의 제1설치단(13) 타측 부위에 고정결합되고 타단 부위는 제2교대(16)의 제2설치단(17) 타측 부위에 고정결합되는 제2강관(36);
상호 간에 일정 간격 이격되어 위치하는 복수 개로 이루어지되, 각각의 양단 부위는 제1, 2강관(32, 36)의 내면 부위에 고정결합되는 연결관(40);
일단 부위는 제1강관(32)의 일단 상면 부위에 고정 결합되고 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장되는 제1지지봉(52), 일단 부위는 제2강관(36)의 일단 상면 부위에 고정 결합되고 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장되는 제2지지봉(54), 일단 부위는 제1강관(32)의 타단 상면 부위에 고정 결합되고 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장되는 제3지지봉(56), 일단 부위는 제2강관(36)의 타단 상면 부위에 고정 결합되고 타측 부위는 후측으로 일정 각도 경사지며 상방으로 연장되는 제4지지봉(58);
일단 부위는 제1지지봉(52)에 고정 결합되고 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제1교대(12)로부터 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합되는 제1지지리브(61), 일단 부위는 제2지지봉(54)에 고정 결합되고 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제1교대(12)로부터 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합되는 제2지지리브(62), 일단 부위는 제3지지봉(56)에 고정 결합되고 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제2교대(16)로부터 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합되는 제3지지리브(63), 일단 부위는 제4지지봉(56)에 고정 결합되고 타측 부위는 하방으로 일정 곡률을 이루며 연장되어 제2교대(16)로부터 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합되는 제4지지리브(64);
중앙 부위가 상방으로 일정 곡률을 이루되 각 양단 부위가 제1교각(22)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합되는 제1상부아치리브(652), 중앙 부위가 상방으로 일정 곡률을 이루되 각 양단 부위가 제1교각(22)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합되는 제2상부아치리브(654)로 이루어지는 제1아치리브(65);
중앙 부위가 상방으로 일정 곡률을 이루되 각 양단 부위가 제2교각(22)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제1강관(32)의 상면 부위에 고정 결합되는 제3상부아치리브(662), 중앙 부위가 상방으로 일정 곡률을 이루되 각 양단 부위가 제2교각(26)을 기점으로 좌우로 일정 거리 연장되어 위치하는 제2강관(36)의 상면 부위에 고정 결합되는 제4상부아치리브(664)로 이루어지는 제2아치리브(66);
중앙 부위가 하방으로 일정 곡률을 이루며 제1교각(22)과 제2교각(26) 사이의 제1강관(32) 하부에 위치하되 각 양단 부위가 제1상부아치리브(652)의 일단 부위 및 제3상부아치리브(662)의 타단 부위와 가상의 연결선을 이루도록 제1강관(32)의 하면 부위에 고정 결합되는 제1하부아치리브(672), 중앙 부위가 하방으로 일정 곡률을 이루며 제1교각(22)과 제2교각(26) 사이의 제2강관(36) 하부에 위치하되 각 양단 부위가 제2상부아치리브(654)의 일단 부위 및 제4상부아치리브(664)의 타단 부위와 가상의 연결선을 이루도록 제2강관(36)의 하면 부위에 고정 결합되는 제2하부아치리브(674)로 이루어지는 제3아치리브(67);
중앙 부위가 하방으로 일정 곡률을 이루며 제1교대(12)와 제1교각(22) 사이의 제1강관(32) 하부에 위치하되 각 양단 부위가 제1지지리브(61)의 타단 부위 및 제1상부아치리브(652)의 타단 부위와 가상의 연결선을 이루도록 제1강관(32)의 하면 부위에 고정 결합되는 제3하부아치리브(682), 중앙 부위가 하방으로 일정 곡률을 이루며 제1교대(12)와 제1교각(22) 사이의 제2강관(36) 하부에 위치하되 각 양단 부위가 제2지지리브(62)의 타단 부위 및 제2상부아치리브(654)의 타단 부위와 가상의 연결선을 이루도록 제2강관(36)의 하면 부위에 고정 결합되는 제4하부아치리브(684)로 이루어지는 제4아치리브(68);
중앙 부위가 하방으로 일정 곡률을 이루며 제2교각(26)와 제2교대(16) 사이의 제1강관(32) 하부에 위치하되 각 양단 부위가 제3상부아치리브(662)의 일단 부위 및 제3지지리브(63)의 타단 부위와 가상의 연결선을 이루도록 제1강관(32)의 하면 부위에 고정 결합되는 제5하부아치리브(692), 중앙 부위가 하방으로 일정 곡률을 이루며 제2교각(26)와 제2교대(16) 사이의 제2강관(36) 하부에 위치하되 각 양단 부위가 제4상부아치리브(664)의 일단 부위 및 제4지지리브(64)의 타단 부위와 가상의 연결선을 이루도록 제2강관(32)의 하면 부위에 고정 결합되는 제6하부아치리브(694)로 이루어지는 제5아치리브(69);
제1지지리브(61)와 제1강관(32) 상호 간을 연결하는 복수 개의 제1행어관(71), 제2지지리브(62)와 제2강관(36) 상호 간을 연결하는 복수 개의 제2행어관(72), 제3지지리브(63)와 제1강관(32) 상호 간을 연결하는 복수 개의 제3행어관(73), 제4지지리브(64)와 제2강관(36) 상호 간을 연결하는 복수 개의 제4행어관(74), 제1상부아치리브(652)와 제1강관(32) 상호 간을 연결하는 복수 개의 제5행어관(75), 제2상부아치리브(664)와 제2강관(36) 상호 간을 연결하는 복수 개의 제6행어관(76), 제3상부아치리브(662)와 제1강관 상호 간을 연결하는 복수 개의 제7행어관(77), 제4상부아치리브(664)와 제2강관(36) 상호 간을 연결하는 복수 개의 제8행어관(78);
제1하부아치리브(672)와 제1강관(32) 사이 공간을 밀폐하면 결합되는 제1결합강판(81), 제2하부아치리브(674)와 제2강관(34) 사이 공간을 밀폐하면 결합되는 제2결합강판(82), 제3하부아치리브(682)와 제1강관(32) 사이 공간을 밀폐하면 결합되는 제3결합강판(83), 제4하부아치리브(684)와 제2강관(36) 사이 공간을 밀폐하면 결합되는 제4결합강판(84), 제5하부아치리브(692)와 제1강관(32) 사이 공간을 밀폐하면 결합되는 제5결합강판(85), 제6하부아치리브(694)와 제2강관(36) 사이 공간을 밀폐하면 결합되는 제6결합강판(86);
일단 부위는 제1교대(12) 상면 일측 부위에 고정 결합되고 타단 부위는 제1지지봉(52)에 고정 결합되는 제1지지케이블(92), 일단 부위는 제1교대(12) 상면 타측 부위에 고정 결합되고 타단 부위는 제2지지봉(54)에 고정 결합되는 제2지지케이블(94), 일단 부위는 제2교대(16) 상면 일측 부위에 고정 결합되고 타단 부위는 제3지지봉(52)에 고정 결합되는 제3지지케이블(96), 일단 부위는 제2교대(16) 상면 타측 부위에 고정 결합되고 타단 부위는 제4지지봉(52)에 고정 결합되는 제4지지케이블(98);
을 포함하는 금속관의 현수 구조로 이루어지는 교량.
A first installation step (13) is formed at one side of the upper part, a first alternation (12) where the lower part is fixed to the ground and a second installation step (17) A second shift 16 located a certain distance from the first shift 12;
First and second piers (22, 26) positioned between the first and second shifts (12, 16) and spaced from each other by a predetermined distance from each other;
The first alternating section 12 is fixedly connected to one side of the first installation end 13 of the first alternation 12 and the other end of the second alternation 16 is supported by the first and second bridge columns 22, A first steel pipe 32 fixed to one side of the second installation end 17 of the first steel pipe 32 and having a predetermined length and spaced apart from the first steel pipe 32 by the first and second piers 22 and 26, And the other end is fixedly coupled to the other side of the first installation end 13 of the first alternation 12 and the other end is fixed to the other side of the second installation end 17 of the second alternation 16, A steel pipe 36;
A connection pipe (40) fixedly coupled to the inner surface of the first and second pipes (32, 36) at both ends of the connection pipe (40);
One end portion is fixed to one upper surface portion of the first steel pipe 32 and the other side portion is inclined at a predetermined angle to the rear side and extends upward. The other end of the second support rod 54 is fixedly connected to the upper end of the first steel pipe 32 and the other end of the second support rod 54 is inclined at a predetermined angle to the rear side. A fourth support rod 58 fixed to the upper end of the second steel pipe 36 at one end portion and fixed to the other end portion of the third support rod 56 and extending upward at a predetermined angle to the rear side;
The other end portion of the first steel pipe 32 is fixedly coupled to the upper surface portion of the first steel pipe 32 extending from the first alternation 12 by a predetermined distance, The first support ribs 61 are fixedly coupled to the second support rods 54 at one end and the second steel pipes 36 extend at a predetermined distance from the first rotation 12, The other end of the second support rib 62 extends to a predetermined curvature downward and extends a predetermined distance from the second alternation 16. The second support rib 62 is fixed to the upper surface of the second support 16, And a third support rib 63 fixedly coupled to a top surface portion of the first steel pipe 32 positioned at the first end of the first steel pipe 32. One end portion of the third support rib 63 is fixedly coupled to the fourth support rod 56, And extends a predetermined distance from the shift 16 A fourth supporting ribs 64 which is fixed to the upper surface portion of the second steel pipe 36;
The first upper arch ribs (32) are fixedly coupled to the upper surface of the first steel pipe (32), the center portion of which has a predetermined curvature and both ends are extended from the first pier (22) 652), and a second upper portion (362) fixedly coupled to an upper surface portion of the second steel pipe (36), the center portion of which has a predetermined curvature and both end portions extend from the first pier (22) A first arch rib 65 consisting of an arch rib 654;
And a third upper arch rib (a second upper arch rib) fixedly coupled to an upper surface portion of the first steel pipe (32), the center portion of which has a predetermined curvature and both ends of which extend from the second pier (22) 662), and a fourth upper portion which is fixedly coupled to an upper surface portion of the second steel pipe (36) having a predetermined curvature upward at a central portion and extending a predetermined distance from the second pierce (26) A second arch rib 66 formed of an arch rib 664;
The central portion of the first upper arch rib 652 is positioned below the first steel pipe 32 between the first pier 22 and the second pier 26, A first lower arch rib 672 fixedly coupled to a lower surface of the first steel pipe 32 so as to form a hypothetical connection line with the other end portion of the third upper arch rib 662, And both end portions are positioned at one end portion of the second upper arch rib 654 and at the other end portion of the fourth upper arch rib 664 at the lower end portion of the second steel pipe 36 between the pier 22 and the second pier 26, And a second lower arch rib (674) fixedly coupled to a lower surface of the second steel pipe (36) to form a hypothetical connecting line.
The center portion of the first supporting rib 61 is positioned below the first steel pipe 32 between the first alternating ridge 12 and the first bridge pillar 22, A third lower arch rib 682 fixedly coupled to the lower surface of the first steel pipe 32 so as to form a hypothetical connection line with the other end portion of the upper arch rib 652, (36) between the first bridge pillar (12) and the first bridge pier (22), and both ends thereof are located at the other end of the second support rib (62) and the other end of the second upper arch rib A fourth arch rib 68 formed of a fourth lower arch rib 684 fixedly coupled to a lower surface of the second steel pipe 36 to form a connection line of the second steel pipe 36;
The central portion of the first upper arch rib 662 has a predetermined curvature downward and is positioned below the first steel pipe 32 between the second pier 26 and the second alternation 16, A fifth lower arch rib 692 fixedly coupled to a lower surface of the first steel pipe 32 so as to form a hypothetical connecting line with the other end of the third supporting rib 63, Is positioned below the second steel pipe (36) between the first and second alternating ridges (26, 16), and both ends of each of the ends are connected to the one end of the fourth upper arch rib (664) A fifth arch rib 69 formed of a sixth lower arch rib 694 fixedly coupled to a lower surface of the second steel pipe 32 to form a connection line of the second steel pipe 32;
A plurality of first hanger pipes 71 connecting the first support ribs 61 and the first steel pipe 32 and a plurality of second hanger pipes 71 connecting the second support ribs 62 and the second steel pipe 36, A plurality of third hanger pipes 73 connecting the third hanger pipe 72 and the third supporting rib 63 to the first steel pipe 32, a fourth supporting rib 64 and a second steel pipe 36 A plurality of fifth hanger pipes 75 connecting between the first upper arch ribs 652 and the first steel pipe 32, A plurality of sixth hanger pipes 76 connecting the ribs 664 and the second steel pipe 36 and a plurality of seventh hanger pipes 66 connecting the third steel pipe and the third upper arch rib 662 77, a plurality of eighth hanger pipes 78 connecting the fourth upper arch ribs 664 and the second steel pipe 36;
When the space between the first lower arch rib 672 and the first steel pipe 32 is sealed to seal the space between the first joint steel plate 81 and the second lower arch rib 674 and the second steel pipe 34 A third coupling steel plate 83 and a fourth lower arch rib 684 which are coupled when the space between the third lower arch rib 682 and the first steel pipe 32 is sealed, A fourth joining steel plate 84 coupled when the space between the two steel pipes 36 is sealed, a fifth joining steel plate 85 joined by sealing the space between the fifth lower arch rib 692 and the first steel pipe 32, A sixth joining steel plate 86 joined when the space between the sixth lower arch rib 694 and the second steel pipe 36 is sealed;
A first support cable 92 having one end fixedly coupled to one side of the upper surface of the first alternating 12 and the other end fixedly coupled to the first support bar 52, And a second support cable 94 fixedly coupled to the other end of the second support rod 54. The other end of the second support cable 94 is fixedly coupled to one side of the upper surface of the second shift 16, A fourth support cable 98 fixedly coupled to the other side of the upper surface of the second alternation 16 at one end portion and fixedly coupled to the fourth support bar 52 at the other end portion;
Wherein the bridge comprises a suspension structure of the metal pipe.
제1항에 있어서,
상기 제1, 2, 3, 4지지케이블(92, 94, 96, 98) 각각에는 제1, 2, 3, 4장력조절수단(93, 95, 97, 99) 각각이 매개되는 것을 특징으로 하는 금속관의 현수 구조로 이루어지는 교량.
The method according to claim 1,
The first, second, third and fourth tension adjusting means 93, 95, 97 and 99 are respectively connected to the first, second, third and fourth support cables 92, 94, 96 and 98 A bridge consisting of a suspended metal structure.
KR1020160121313A 2016-09-22 2016-09-22 Suspension type bridge comprised by metal pipes KR101678503B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160121313A KR101678503B1 (en) 2016-09-22 2016-09-22 Suspension type bridge comprised by metal pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160121313A KR101678503B1 (en) 2016-09-22 2016-09-22 Suspension type bridge comprised by metal pipes

Publications (1)

Publication Number Publication Date
KR101678503B1 true KR101678503B1 (en) 2016-12-06

Family

ID=57576406

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160121313A KR101678503B1 (en) 2016-09-22 2016-09-22 Suspension type bridge comprised by metal pipes

Country Status (1)

Country Link
KR (1) KR101678503B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102194380B1 (en) * 2019-09-27 2020-12-24 유영찬 Continuous arch bridge interacted with tension as major member force and continuous arch bridge construction method therefor

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0693603A (en) * 1992-09-11 1994-04-05 Kumagai Gumi Co Ltd Beam structure by use of inverted arched member and slantingly extended structure and arched member thereof
KR20100116317A (en) * 2009-04-22 2010-11-01 성원기술개발(주) Arch simple bridge

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0693603A (en) * 1992-09-11 1994-04-05 Kumagai Gumi Co Ltd Beam structure by use of inverted arched member and slantingly extended structure and arched member thereof
KR20100116317A (en) * 2009-04-22 2010-11-01 성원기술개발(주) Arch simple bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102194380B1 (en) * 2019-09-27 2020-12-24 유영찬 Continuous arch bridge interacted with tension as major member force and continuous arch bridge construction method therefor

Similar Documents

Publication Publication Date Title
KR100964067B1 (en) Steel girder for bridge and manufacturing method thereof
KR101186062B1 (en) Connection of concrete filled steel tube column and H-shaped steel beam and constructing method of the same
CN110747746B (en) Temporary supporting system for small box girder type hidden cover beam prefabricated on road and bridge and construction method thereof
CN104195959A (en) Construction technology for prefabricating a corrugated steel web PC I beam into combined box girder bridge
KR20140140730A (en) Curved Y shaped Pier with PC Steel Wire
KR101065633B1 (en) Prestressed steel tubular truss beam by external prestressing method
KR100776234B1 (en) A main girder of temporary bridge using circle pipe
KR101678503B1 (en) Suspension type bridge comprised by metal pipes
CN102733320A (en) Pier annular bracket type column embracing beam for jacking bridge
KR101691914B1 (en) Hybrid girder structure having truss and tension cable
CN211340439U (en) Temporary supporting system for small box girder type hidden cover beam prefabricated on road and bridge
KR101431974B1 (en) Vinyl house structuring system
CN103103925B (en) Combined H-shaped steel column bracket
KR101664283B1 (en) Composite girder having symmetric structure
CN205999766U (en) Laemodipodiform steel tubular type broken line arch bridge
JP4401429B1 (en) Protective fence
KR20160113917A (en) Continuous bridge for bicycle
KR102067254B1 (en) Negative moment reinforcement structure using girder and cross beam and method for constructing this same
JP6451383B2 (en) Horizontal structure
JP4256356B2 (en) Joint member of pier and main girder and bridge structure using this joint member
CN103835238A (en) High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process
KR101548215B1 (en) the deep composite precast beam, the connection structure between composite precast column and the deep composite precast beam
CN203716373U (en) U-shaped steel girder-rebar truss floor support plate building surface system
KR101392833B1 (en) truss-type bridge structure
CN214530201U (en) Self-anchored pipeline suspension bridge steel pipe truss girder and self-anchored pipeline suspension bridge

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20191104

Year of fee payment: 4