KR101518815B1 - Device and method forreinforcing the ground using a hollow wall adhere type anchor wedge - Google Patents

Device and method forreinforcing the ground using a hollow wall adhere type anchor wedge Download PDF

Info

Publication number
KR101518815B1
KR101518815B1 KR1020140055428A KR20140055428A KR101518815B1 KR 101518815 B1 KR101518815 B1 KR 101518815B1 KR 1020140055428 A KR1020140055428 A KR 1020140055428A KR 20140055428 A KR20140055428 A KR 20140055428A KR 101518815 B1 KR101518815 B1 KR 101518815B1
Authority
KR
South Korea
Prior art keywords
fixing
wedge
steel pipe
hinge
hole
Prior art date
Application number
KR1020140055428A
Other languages
Korean (ko)
Inventor
김수정
신규태
민경헌
최성문
민윤기
동용원
Original Assignee
동용원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 동용원 filed Critical 동용원
Priority to KR1020140055428A priority Critical patent/KR101518815B1/en
Application granted granted Critical
Publication of KR101518815B1 publication Critical patent/KR101518815B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/20Placing by pressure or pulling power
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/14Geometrical or physical properties resilient or elastic
    • E02D2200/146Springs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a ground reinforcing device using a hollow wall adhesive type-anchor wedge and a reinforcing method, and particularly relates to a new technology, which allows fixing agent to be smoothly inserted into a deep inside of a perforating hole and allows a plurality of anchor wedges to penetrate the hollow hole to be strongly anchored into the ground. According to the present invention, a plurality of anchor wedges, which are elastically installed, are retracted to be integrally bent by using bending wires to allow fixing agent to be smoothly inserted into a deep inside of the perforating hole, and, after the fixing agent is inserted to a predetermined depth of the perforating hole, a coupling pin restricting the bending wires is removed so that the anchor wedges are unfolded by an elastic force of a torsion spring to penetrate the hollow wall, thereby maintaining strong ground fixing force.

Description

공벽 밀착형 정착쐐기를 이용한 지반 보강장치 및 보강공법{Device and method forreinforcing the ground using a hollow wall adhere type anchor wedge}BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to a ground reinforcement device and a reinforcing method using a fixing wedge,

본 발명은 천공홀의 심도까지 정착체를 원활하게 투입 설치함은 물론 다수의 정착쐐기는 공벽을 파고들면서 지반에 강력한 힘으로 정착될 수 있도록 하는 신개념의 기술에 관한 것이다.The present invention relates to a novel concept that not only a fusing body can be smoothly inserted into the perforation hole, but also a plurality of fusing wedges can be fixed to the ground with a strong force while digging into a wall.

일반적으로, 터널 공사, 사면 보강 공사, 낙석 방지 공사, 사면 등의 녹화 공사, 터파기 시공 등에서는 흙이 무너져 내리는 것을 방지하기 위해 보강 공사나 흙막이 공사를 하며, 이러한 보강 공사나 흙막이 공사는 지반을 보강하면서, 암이나 흙이 무너져 내리는 것을 방지한다.Generally, reinforcement work or earth retaining works are performed to prevent soil from collapsing in tunnel construction, slope reinforcement work, anti-rocking work, greening work such as slope work, and earthworks work. While reinforcing, it prevents cancer and soil from collapsing.

그러한 대표적인 사면 보강 공사 방법 및 흙막이 시공 방법으로는 그라운드 앵커 방법과, 락볼트, 쏘일 네일링이 있으며, 이들 모두 천공할 곳에 천공을 하고, 철근 및 강관(철근 이외에도, 락볼트, 쏘일 네일링 방법이나 어스 앵커방법에 따라 개발된 별도의 네일이나 그라운드 앵커를 사용할 수 있다)을 삽입하고, 천공된 내부를 그라우팅 및 양생하는 구조이며, 그라운드 앵커는, 그라우팅의 양생 후에, 외부에서 박힌 보강재를 인장력을 가해 정착시키는 특징이 있다.Such typical slope reinforcement methods and retaining methods include ground anchors, rock bolts, and soilless nails. All of them are drilled to be drilled, and reinforced steel and steel pipes (other than reinforcing steel, rock bolts, A separate nail or ground anchor developed according to the earth anchor method can be used), and the perforated inside is grouted and cured. The ground anchor is a structure in which, after the curing of the grouting, There is a feature to settle.

그 중에서 쏘일 네일링 공법은 철근을 이용한 보강토공법의 일종으로 절토 사면의 전단력에 견디도록 강관 또는 봉모양의 보강재(네일)를 이용하여 현지의 흙을 보강하는 공법으로, 네일로 보강된 토괴는 일체화된 블록을 형성하여 중력 옹벽과 같은 기능을 함으로써 사면을 안정되게 유지한다.Among them, Soil Nailing method is a method of reinforcement soil method using reinforcing steel. It is a method of reinforcing local soil by using a steel pipe or rod-like reinforcing material (nail) to withstand the shear force of cut slope. Shaped block to function as a gravity retaining wall to keep the slope stable.

이러한 쏘일 네일링 공법 또는 이 쏘일 네일링에 관련한 선행기술로는 「특허등록 제1150125호, 명칭/ 확개된 앵커헤드부를 가지는 그라운드 앵커 및 그 그라운드 앵커를 이용한 앵거 시공방법」이 제안되고 있다.As a prior art related to such a soil nailing method or this soil nailing, there has been proposed " Patent Registration No. 1150125, name / ground anchor having a widened anchor head and an anchor construction method using the ground anchor ".

상기한 선등록 발명은 연속적인 시공이 가능하며, 이러한 앵커 시공은 사면 보강 공사, 흙막이 공사, 낙석 방지 공사, 녹화 공사는 물론, 상향천공이 필요한 터널 공사에도 적용하여, 시공성을 향상하고, 설치한 그라운드 앵커의 인장 직후부터 지반의 변위를 억제하는 효과를 제공한다.The above-mentioned line registration invention can be continuously applied, and such anchor construction can be applied not only to slope reinforcement work, earth retaining work, anti-rocking work, greening work, but also tunnel work requiring upward piercing to improve workability, And provides an effect of suppressing the displacement of the ground immediately after the tension of the ground anchor.

이와 같은 선등록 발명은 도 13과 같이 그라운드 앵커를 설치하는 과정에서 밀착부(220)보다 약간 작은 천공구멍에 앵커 헤드부(200)를 투입하는데 상기 밀착부(220)가 스프링의 탄성에 의해 오므려지면서 공벽면을 타고 들어간다.13, in the process of installing the ground anchor, the anchor head part 200 is inserted into the perforation hole slightly smaller than the tight contact part 220, and the tight contact part 220 comes up due to the elasticity of the spring. I get on the wall of the ball.

그러나 선등록 발명은 천공구멍의 중간이 붕괴되어 있거나 공벽면의 굴곡이 심한 경우에는 상기 밀착부(220)가 공벽면을 타고 들어감으로써 목적한 심도까지 투입 설치가 불가능함은 물론 천공구멍을 재천공해야만 하는 문제가 발생하여 이를 외부로 인출할 때에는 상기 밀착부(220)가 공벽면에 걸려 제거가 불가능한 폐단이 있다.However, when the middle of the perforation hole is collapsed or the curvature of the hole wall is severe, since the adhered portion 220 rides on the hole wall surface, it is not possible to insert the hole up to a desired depth, There is a problem that the tight contact part 220 is caught by the side wall and can not be removed.

또한, 상기 밀착부(220)는 벌어진 상태로 삽입되면서 밀착됨으로써 지반에 강한 힘으로 정착되지 못하고 단지 고정된 상태를 유지하는 것에 불과하여 천공구멍에 그라우팅을 하기 전에 인장을 하게되면 앵커 헤드부(200) 및 지지부(100)가 전체적으로 빠질 우려가 크고, 공벽에 돌출되어 있는 암편 등에 의해 밀착부(220)의 스파이크 및 걸림쐐기의 파손 및 마모로 인해 정착력이 약화될 수밖에 없는 실정이다.In addition, when the tight fitting part 220 is inserted while being in a flared state, it can not be fixed to the ground with a strong force but merely maintains a fixed state. Thus, if the anchor head part 200 And the supporting part 100 are likely to be totally lost, and the fixing force is inevitably weakened due to the breakage and wear of the spikes and the locking wedge of the tight fitting part 220 by an arm piece or the like protruding from the air wall.

또한, 실질적인 정착력을 발휘하는 앵커 헤드부(200)를 지지부(100)의 선단에 1개조만 설치하는 경우 1개조 이상의 인장력이 필요할 때에는 인장력의 확보가 불가하며, 이를 해소하기 위해 상기 지지부(100)에 다수의 앵커 헤드부(200)를 설치하게 되면 오히려 스프링의 탄성에 의한 밀착부(220)와 공벽의 마찰력으로 인해 앵커 헤드부(200)의 투입이 사실상 불가능한 문제점이 야기된다.In a case where the anchor head portion 200 exhibiting the substantial fixation force is provided only at one end of the support portion 100, it is impossible to secure the tensile force when a tensile force of one or more sets is required. To solve this problem, The anchor head 200 can not be inserted due to the frictional force between the close contact part 220 and the air wall due to the elasticity of the spring.

또한, 그라우팅 및 양생단계를 수행함에 있어 천공구멍에 별도의 호스를 투입 설치해야만 함으로써 공기가 지연됨은 물론 시공성이 저하되는 문제점이 야기된다.Further, in performing the grouting and curing steps, a separate hose must be installed in the perforation hole, thereby causing delay in air as well as deterioration in workability.

본 발명은 상기한 선등록 발명이 내포하고 있는 제반 문제점을 적극적으로 해소하기 위한 것으로, 탄력 설치된 다수의 정착쐐기를 오므린 후 밴딩 와이어를 이용하여 일체로 밴딩하여 천공홀의 심도까지 원활하게 정착체를 투입할 수 있도록 함을 발명의 해결과제로 한다.The present invention proposes a method for positively eliminating all the problems of the above-described prior art registration invention, in which a plurality of resilient fixation wedges are folded and then bent together using a banding wire to smoothly fix the fixation member So that it is possible to input the image data.

또한, 본 발명은 목적한 심도에 도달한 후 상기 밴딩 와이어를 결속하던 결속핀을 제거하여 상기 정착쐐기가 펼쳐지면서 공벽면을 파고들어 강력한 지반 정착력을 유지할 수 있도록 함을 발명의 해결과제로 한다.In addition, the present invention provides a method of removing a binding pin that binds a banding wire after reaching a desired depth, thereby piercing a hole wall of the fixing wedge so as to maintain a strong ground fixing force .

본 발명은 상기한 과제를 해결하기 위한 수단으로 보강 강관의 외측에 1개 이상의 정착체를 끼움 설치하되, 상기 정착체는 정착몸체의 후면에 방사상으로 다수의 정착쐐기를 토션스프링을 이용하여 오므림/펼침 가능하게 탄력 설치하며, 상기 정착쐐기를 오므린 상태에서 밴딩 와이어로 감싸면서 밴딩한 후 상기 밴딩 와이어의 선단에 연결된 암경첩과 수경첩을 상호 결속핀으로 결속하고, 상기 결속핀에는 견인줄을 연결하는 지반 보강장치의 기술을 강구한다.In order to solve the above-described problems, the present invention provides a fixing device for fixing a plurality of fixing wedges radially to the rear surface of a fixing body by using a torsion spring, And a bending wire is bent and bundled with the bending wire in a state where the fixation wedge is folded in an unfolded state, and the arm hinge and the hinge hinge connected to the tip of the bending wire are connected to each other with a mutual binding pin, Describe the technique of connecting ground reinforcement.

또한, 본 발명은 시공지에 다수의 천공홀을 형성하고, 상기 보강 강관의 외측에 다수의 앵커용 장착체를 끼움 설치하며, 상기 정착쐐기를 오므린 후 밴딩 와이어를 이용하여 정착쐐기를 감싼 상태에서 암경첩과 수경첩을 견인줄에 연결된 결속핀으로 관통하여 일체로 결속하고, 상기 보강 강관을 천공홀의 심도까지 투입 설치하되 견인줄을 외부로 노출되게 하며, 상기 견인줄을 잡아당겨 결속핀을 제거하여 상기 정착쐐기가 펼쳐지면서 공벽면을 파고들어 정착되도록 하는 한편, 상기 보강 강관의 외측에 지압판 및 웨지형 너트를 설치한 후 실린더를 이용하여 보강 강관을 인장하고, 상기 보강 강관에 그라우팅재를 주입하여 천공홀을 완전하게 메우는 지반 보강공법의 기술을 강구한다.In addition, the present invention is characterized in that a plurality of perforation holes are formed in an installation paper, a plurality of anchor mounting members are fitted to the outside of the reinforcing steel pipe, and after the fixing wedge is pinched, the fixing wedge is wrapped The arm hinge and the hinge hinge are integrally coupled through a binding pin connected to the pulling line, and the reinforcing steel pipe is inserted to the depth of the hole and the pulling string is exposed to the outside, and the pulling pin is pulled to remove the binding pin, The wedge is expanded and the ball wall is squeezed and fixed. On the other hand, a platen and a wedge-shaped nut are provided on the outer side of the reinforcing steel pipe, and then the reinforcing steel pipe is tensioned by using a cylinder. Grouting material is injected into the reinforcing steel pipe, The technique of the ground reinforcement method which completely fills it is found out.

본 발명에 따르면, 상기 정착체를 천공홀에 투입할 때 다수의 정착쐐기를 오므린 상태로 밴딩함으로써 공벽면과 정착쐐기 간에 어떠한 저항이나 마찰력이 발생하지 않아 상기 정착체를 천공홀의 목적하는 심도까지 원활하고 확실하게 투입할 수 있는 효과를 제공한다.According to the present invention, when the fixing body is inserted into the perforation hole, a plurality of fixing wedges are bent in a rounded state, so that no resistance or frictional force is generated between the cavity wall and the fixing wedge, Thereby providing an effect of being able to inject smoothly and reliably.

또한, 본 발명은 상기 정착체를 심도에 설치한 후 외부에서 밴딩 와이어의 결속을 해제함으로써 상기 정착쐐기가 순간적으로 펼쳐지면서 공벽면을 파고들어 지반에 강력한 정착력을 유지함은 물론 이로 인해 그라우팅 전에 인장을 하더라도 상기 정착체가 빠지는 현상을 해소하는 효과를 제공한다.Further, since the fixing wedge is instantaneously unfolded by releasing the binding of the banding wire from the outside after the fusing body is installed at the depth, the fusing wall is pierced to maintain a strong fixing force on the ground, It is possible to eliminate the phenomenon that the fixing member is removed.

또한, 상기 정착체를 다수 개 설치할 수 있어 현장여건에 따른 필요한 인장력을 충분하게 확보하면서도 투입과정에서 상기 정착쐐기가 밴딩됨으로써 공벽면의 마찰력으로 인한 간섭현상을 해소하여 원활한 투입이 이루어지는 효과를 제공한다.In addition, since a plurality of the fixing members can be installed, the fixation wedge is bent during the charging process while sufficiently securing the required tensile force according to the site conditions, thereby eliminating the interference phenomenon due to the frictional force of the cavity wall, .

아울러 본 발명은 그라우팅에 필요한 별도의 호스를 사용하지 않고 상기 정착체를 관통하여 결합된 보강 강관을 이용하여 그라우팅재를 주입하는 용도로 사용함으로써 시공이 간편함은 물론 공기의 단축 및 공사비를 대폭 절감하는 효과를 제공한다. In addition, since the present invention is used for injecting a grouting material by using a reinforced steel pipe penetrating through the fixing body without using a separate hose necessary for grouting, it is possible to simplify construction and significantly reduce air shortage and construction cost Effect.

도 1은 본 발명이 적용된 지반 보강장치의 정면도
도 2는 본 발명이 적용된 지반 보강장치의 측면도
도 3은 본 발명의 정착몸체 및 정착쐐기의 분리 사시도
도 4는 본 발명의 밴딩 와이어에 의한 정착쐐기의 밴딩 상태도
도 5는 본 발명의 결속핀이 분리되면서 정착쐐기의 밴딩이 해제되는 상태도
도 6은 본 발명의 암경첩 및 수경첩의 분리 사시도
도 7은 본 발명의 지반 보강공법에 따른 천공홀 천공상태 단면도
도 8은 본 발명의 천공홀에 보강 강관 및 정착체가 투입된 상태의 단면도
도 9는 본 발명의 결속핀이 분리되면서 정착쐐기가 공벽면에 정착된 상태의 단면도
도 10은 본 발명 보강 강관이 인장되는 상태의 단면도
도 11은 본 발명의 보강 강관을 통해 천공홀에 그라우팅재가 주입되는 상태의 단면도
도 12는 본 발명의 지반 보강공법을 순차적으로 나타낸 블럭도
도 13은 종래의 그라운드 앵커의 시공에 따른 시공상태 단면도
도 14는 본 발명의 보강 강관을 대신하여 앵커가 적용된 지반 보강장치의 측단면도
도 15는 본 발명의 보강 강관을 대신하여 쏘일네일이 적용된 지반 보강장치의 측단면도
도 16은 본 발명의 보강 강관을 대신하여 락볼트가 적용된 지반 보강장치의 측단면도
도 17은 본 발명의 보강 강관을 대신하여 케이블 볼트가 적용된 지반 보강장치의 측단면도
1 is a front view of a ground reinforcement apparatus to which the present invention is applied
2 is a side view of the ground reinforcement apparatus to which the present invention is applied
3 is an exploded perspective view of the fixing body and the fixing wedge of the present invention.
4 is a bending state diagram of a fixing wedge by the banding wire of the present invention
5 is a state in which the banding of the fixing wedge is released while the binding pin of the present invention is separated
6 is an exploded perspective view of the arm hinge and the hinge of the present invention.
7 is a cross-sectional view of the perforated hole according to the ground reinforcement method of the present invention
8 is a cross-sectional view of a state where the reinforcing steel pipe and the fixing member are inserted into the perforation hole of the present invention
9 is a cross-sectional view of the fixing pin according to the present invention in a state in which the fixing wedge is fixed on the cavity wall
10 is a cross-sectional view of a state in which the reinforcing steel pipe of the present invention is stretched
11 is a cross-sectional view of a state where the grouting material is injected into the perforation hole through the reinforced steel pipe of the present invention
12 is a block diagram sequentially showing the ground reinforcement method of the present invention
13 is a cross-sectional view of a conventional ground anchor according to construction
14 is a side sectional view of a ground reinforcement apparatus to which an anchor is applied in place of the reinforced steel pipe of the present invention
15 is a side cross-sectional view of a ground reinforcing apparatus to which a soil nail is applied in place of the reinforcing steel pipe of the present invention
16 is a side cross-sectional view of a ground reinforcing apparatus to which a rock bolt is applied in place of the reinforcing steel pipe of the present invention
17 is a side sectional view of a ground reinforcing apparatus to which a cable bolt is applied in place of the reinforcing steel pipe of the present invention

본 발명이 해결하고자 하는 과제의 해결수단을 보다 구체적으로 구현하기 위한 바람직한 실시 예에 대하여 설명하기로 한다.Preferred embodiments of the present invention will now be described in more detail with reference to the accompanying drawings.

본 발명의 바람직한 실시 예에 따른 지반 보강장치(R)의 전체적인 구성을 첨부된 도면에 의거 개략적으로 살펴보면, 보강 강관(10), 다수의 정착체(20), 밴딩 와이어(30), 결속핀(40)의 구성요소로 대분 됨을 확인할 수 있다.A reinforcing steel pipe 10, a plurality of fixing members 20, a bending wire 30, a binding pin (not shown) 40).

이하, 상기 개략적인 구성으로 이루어진 본 발명을 실시 용이하도록 좀더 상세하게 설명하기로 한다.Hereinafter, the present invention having the above-described schematic configuration will be described in more detail for facilitating the implementation.

우선적으로 본 발명의 보강 강관(10)은 강봉, 철근, 나사철근, 강연선 등을 사용하더라도 무방하나, 본 발명에는 보강재의 기본적인 역할을 수행함은 물론 내부가 비어 있어 별도의 주입관이나 호스를 설치하지 않고 직접 그라우팅재(1)를 천공홀(2)에 주입할 수 있는 역할을 복합적으로 수행할 수 있도록 중공관을 사용한다.The reinforcement steel pipe 10 of the present invention may be a steel bar, a reinforcing bar, a screw reinforcement, a stranded wire, etc. However, the present invention plays a fundamental role of reinforcing steel, A hollow tube is used so that the grouting material 1 can be directly injected into the perforation hole 2. [

따라서, 본 발명의 보강 강관(10)은 도 11과 같이 천공홀(2)의 외부로 노출된 시단부(11)를 통해 그라우팅재(1)를 주입함은 물론 주입된 그라우팅재(1)는 상기 천공홀(2)에 삽입된 종단부(12)를 통해 천공홀(2)의 내부로 분출됨으로써 그라우팅을 간편하게 시행할 수 있는 효과를 제공한다.Therefore, the reinforced steel pipe 10 of the present invention injects the grouting material 1 through the starting end 11 exposed to the outside of the perforation hole 2 as shown in FIG. 11, And is injected into the perforation hole 2 through the end portion 12 inserted in the perforation hole 2, thereby providing an effect of facilitating grouting.

이때 상기 보강 강관(10)의 외주면에는 하나 이상의 보조 분출구(14)가 추가로 형성됨으로써 천공홀(2)의 전체영역으로 그라우팅재(1)를 골고루 분출할 수 있는 부수적인 효과를 추가로 제공한다.At this time, one or more auxiliary jet holes 14 are additionally formed on the outer circumferential surface of the reinforced steel pipe 10 to further provide a side effect that the grouting material 1 can be evenly jetted to the entire area of the perforation hole 2 .

상기 보강 강관(10)의 외측에 하나 이상으로 끼움 설치되는 다수의 정착체(20)는 정착몸체(21)의 중앙에 전후로 관통된 결합공(22)이 형성되고, 상기 결합공(22)을 관통하여 보강 강관(10)이 끼움 설치되며, 상기 정착몸체(21)의 외주면에서 결합공(22)으로 연결된 나사공(23)에 세트스크류(24)를 나사결합함으로써 상기 정착몸체(21)와 보강 강관(10)을 상호 일체화 하여 견고하게 고정할 수 있게 된다.A plurality of fixation bodies 20 fitted in at least one outer side of the reinforced steel pipe 10 are provided with engagement holes 22 penetrating forward and backward in the center of the fixation body 21, And the set screw 24 is screwed into the screw hole 23 connected to the fixing body 21 through the fixing hole 22 at the outer circumferential surface of the fixing body 21, The reinforced steel pipe 10 can be integrated with each other and firmly fixed.

이와 같은 정착체(20)는 원통형의 정착몸체(21)의 중앙에 전후로 관통하는 결합공(22)이 형성되고, 상기 결합공(22)을 중심으로 후면에는 방사상으로 다수의 지지브라켓(25)이 돌출 형성되며, 상기 지지브라켓(25)에 다수의 정착쐐기(26)가 토션스프링(27)을 이용하여 오므림/펼침 가능하게 탄력 설치됨으로써 상기 토션스프링(27)의 탄성력에 의해 정착쐐기(26)는 벌어진 상태를 유지함은 물론 이를 강제로 오므렸다가 놓으면 자동으로 펼쳐진다.The fixation member 20 is provided with a fixing hole 21 penetrating the fixing body 21 in the forward and rearward directions and a plurality of support brackets 25 radially formed on the rear surface of the fixation hole 22, And a plurality of fixing wedges 26 are elastically provided on the supporting bracket 25 so as to be able to be opened / closed by using a torsion spring 27, whereby the fixing wedge 26 26) will remain open, but will automatically unfold when released.

즉 상기 정착쐐기(26)는 도 1 내지 도 3과 같이 일측이 지지브라켓(25)과 함께 회동핀(28)으로 관통하여 결합됨으로써 회전 가능한 상태를 유지하고, 상기 회동핀(28)의 외측에 끼워지는 토션스프링(27)의 일측은 보강 강관(10)의 외주면에 밀착 지지되며, 상기 토션스프링(27)의 타측은 정착쐐기(26)의 후면에 밀착 지지됨으로써 상기 정착쐐기(26)는 평상시 펼쳐진 상태를 유지한다.1 to 3, one side of the fixing wedge 26 is coupled with the support bracket 25 through a rotation pin 28 to be rotatable, and the fixing wedge 26 is fixed to the outer side of the rotation pin 28 One side of the torsion spring 27 to be fitted is tightly supported on the outer circumferential surface of the reinforced steel pipe 10 and the other side of the torsion spring 27 is tightly supported on the rear surface of the fixing wedge 26, Maintain the unfolded state.

여기에서 상기 정착쐐기(26)의 선단에는 공벽(3)을 파고드는 다수의 산형 슬립방지돌기(26a)가 연속적으로 돌출 형성됨으로써 더욱 견고하고 강력한 정착력을 유지할 수 있게 된다.At this time, a plurality of acid type slip prevention protrusions 26a are formed on the front end of the fusing wedge 26 so as to protrude continuously. Thus, a firm and strong fixation force can be maintained.

한편, 본 발명의 정착쐐기(26)는 펼쳐진 상태를 유지하므로 직접 천공홀(2)에 투입이 곤란함으로써 일시적으로 정착쐐기(26)를 도 4와 같이 오므린 상태에서 밴딩 와이어(30)를 이용하여 일체로 밴딩처리하는 기술이 추가로 접목된다.Since the fixation wedge 26 of the present invention maintains the unfolded state, it is difficult to directly insert the fixation wedge 26 into the perforation hole 2, thereby temporarily fixing the fixation wedge 26 with the bending wire 30 And a banding process is integrally performed.

이를 위한 기술적인 구성으로 밴딩 와이어(30)가 구비되고, 상기 밴딩 와이어(30)의 양측 선단에는 각각 암경첩(31) 및 수경첩(32)이 일체로 연결되며, 상기 암경첩(31)과 수경첩(32)은 결속핀(40)을 매개로 일체화된 결속력을 유지한다.The hinge 31 and the hinge 32 are integrally connected to both ends of the bending wire 30 and the hinge 31 and the hinge 32 are integrally connected to each other, The hinge hinge 32 maintains the unified binding force via the binding pin 40. [

따라서, 상기 정착쐐기(26)가 오므려진 상태에서 밴딩 와이어(30)는 정착쐐기(26)의 둘레를 감싸면서 상기 암경첩(31) 및 수경첩(32)이 상호 일체로 결속된다.The bending wire 30 surrounds the fusing wedge 26 and the arm hinge 31 and the hinge hinge 32 are integrally joined to each other while the fusing wedge 26 is tightened.

이와 같은 밴딩 와이어(30)의 암경첩(31)은 도 6과 같이 일측 전후에 각각 제1 결속부(31a)가 형성되고, 상기 제1 결속부(31a)의 사이에 삽입요부(31b)가 형성되며, 상기 삽입요부(31b)에는 수경첩(32)의 일측에 형성된 제2 결속부(32a)가 삽입된다.The arm hinge 31 of the banding wire 30 has the first binding portion 31a formed on one side before and after the other and the insertion concave portion 31b formed between the first binding portions 31a And a second binding portion 32a formed on one side of the hinge hinge 32 is inserted into the insertion recess 31b.

그리고 상기 제1, 제2 결속부(31a)(32a)에 결속핀(40)이 동시에 끼워지면서 암경첩(31) 및 수경첩(32)은 상호 일체화된 결속력을 유지함으로써 상기 밴딩 와이어(30)는 오므려진 다수의 정착쐐기(26)를 밴딩처리할 수 있게 된다.The binding pin 40 is simultaneously fitted to the first and second binding portions 31a and 32a so that the arm hinge 31 and the hinge hinge 32 maintain the unified binding force, It is possible to bend a plurality of settling wedges 26 that have been clipped.

아울러 상기 정착쐐기(26)의 전면에는 와이어홈(26b)이 추가로 형성되고, 상기 와이어홈(26b)에 상기 밴딩 와이어(30)가 삽입지지됨으로써 밴딩 와이어(30)가 유동됨을 방지하여 더욱 견고한 밴딩상태를 유지하는 특별한 효과를 제공한다.A wire groove 26b is additionally formed on the front surface of the fixation wedge 26 and the bending wire 30 is inserted into the wire groove 26b to prevent the bending wire 30 from flowing, Providing a special effect of maintaining the bending state.

상기 암경첩(31) 및 수경첩(32)을 일체로 결속하는 역할을 수행하는 결속핀(40)은 일측에 견인줄(42)이 일체로 연결되고, 상기 견인줄(42)은 천공홀(2)의 외부로 노출됨으로써 상기 견인줄(42)을 잡아당기면 도 5와 같이 암경첩(31) 및 수경첩(32)의 결속력이 해제되어 상호 분리됨과 동시에 밴딩 와이어(30)가 풀리면서 강제로 오므려진 상태를 유지하던 정착쐐기(26)는 토션스프링(27)의 탄성력이 최대로 발휘함에 따라 공벽(3) 쪽으로 펼쳐지면서 공벽(3)을 파고들어 강력한 정착력을 유지한다.The pulling pin 40 integrally connecting the arm hinge 31 and the hinge hinge 32 integrally connects the pulling string 42 to one side and the pulling string 42 is inserted into the hole 2, The pulling force of the arm hinge 31 and the hinge hinge 32 is released and separated from each other as shown in FIG. 5 when the pulling string 42 is pulled out, and at the same time, the bending wire 30 is loosened, The fixing wedge 26 is extended toward the wall 3 as the elastic force of the torsion spring 27 is maximized and the wall 3 is pierced to maintain a strong fixing force.

또한, 상기 공벽(3)을 파고들면서 정착력을 유지하는 정착쐐기(26)는 그라우팅을 하기 이전에 후술하는 인장작업을 시행하더라도 빠지지 않고 뛰어난 정착력을 유지하는 특별한 효과를 제공한다.In addition, the fixing wedge 26 holding the fixing force while digging the air wall 3 provides a special effect of maintaining a good fixing force without falling out even if a tensile work described later is performed before grouting.

한편, 본 발명은 보강재로 사용하는 보강 강관(10)을 대신하여 도 14 내지 도 17과 같이 앵커(5), 쏘일네일(6), 락볼트(7), 케이블볼트(8)가 적용될 수 있는 것으로, 상기 보강재의 종류를 달리하는 것만으로는 결코 본 발명의 범주를 벗어날 수 없게 된다.
In the meantime, the present invention can be applied to an anchor 5, a soil nail 6, a lock bolt 7, and a cable bolt 8 as shown in Figs. 14 to 17 instead of the reinforced steel pipe 10 used as a reinforcing material And it is impossible to depart from the scope of the present invention only by changing the kind of the reinforcement material.

다음으로, 상기한 지반 보강장치(R)를 이용하여 지반을 보강하는 보강공법에 대해서 설명하기로 한다.Next, a reinforcement method for reinforcing the ground using the above-described ground reinforcement apparatus R will be described.

1) 천공단계(S100)1) drilling step (S100)

본 발명의 천공단계(S100)는 지반 보강장치(R)를 시공할 시공지에 도 7과 같이 적절한 깊이로 다수의 천공홀(2)을 천공하는 단계이며, 천공은 시공지 외면의 수직방향으로 천공하는 것이 바람직하다.The perforating step S100 of the present invention is a step of perforating a plurality of perforation holes 2 at an appropriate depth as shown in FIG. 7 on a work paper to be installed in the ground reinforcement device R, .

2) 정착체 설치단계(S200)2) Fixture mounting step (S200)

상기의 천공홀(2)에 삽입되는 보강 강관(10)의 외측에 하나 이상의 정착체(20)를 일체로 끼움 설치하는 단계이며, 상기 보강 강관(10)과 정착체(20)는 세트스크류(24)를 이용하여 상호 견고한 일체성을 유지하도록 설치한다.The reinforcing steel pipe 10 and the fixing body 20 are integrally fitted to the outer surface of the reinforcing steel pipe 10 inserted into the perforation hole 2 by the set screw 24) so as to maintain solid integrity with each other.

3) 정착쐐기 밴딩단계(S300)3) Fixing wedge bending step (S300)

본 단계는 상기 보강 강관(10)에 정착체(20)의 설치가 완료되면 상기 정착체(20)를 천공홀(2)에 투입할 때 원활성을 제고하도록 상기 정착쐐기(26)를 일시적으로 밴딩하는 단계이다.In this step, when the fixing body 20 is installed in the reinforced steel pipe 10, the fixing wedge 26 is temporarily fixed to improve the circularity when the fixing body 20 is inserted into the perforation hole 2 Banding step.

이를 위해 상기 정착체(20)에 설치된 펼침상태의 정착쐐기(26)를 도 4와 같이 오므린 후 밴딩 와이어(30)를 이용하여 정착쐐기(26)의 둘레를 감싼다. 그리고 상기 밴딩 와이어(30)의 양단에 연결된 암경첩(31)과 수경첩(32)을 결속핀(40)으로 관통하여 일체화 결속함으로써 상기 밴딩 와이어(30)는 정착쐐기(26)가 펼펴지지 않도록 밴딩할 수 있게 된다.For this, the fixation wedge 26 in the unfolded state provided on the fixing body 20 is folded as shown in FIG. 4 and then wrapped around the fixation wedge 26 by using a banding wire 30. The arm hinge 31 and the hinge hinge 32 connected to both ends of the bending wire 30 penetrate through the binding pin 40 and are integrated so that the bending wire 30 can be prevented from spreading the fixation wedge 26 So that it can be banded.

4) 보강 강관 투입단계(S400)4) Strengthening steel pipe charging step (S400)

상기 정착쐐기(26)의 밴딩이 완료되면, 상기 정착체(20)가 설치된 보강 강관(10)을 천공홀(2)의 목적하는 심도까지 투입 설치한다.When the bending of the fixing wedge 26 is completed, the reinforcing steel pipe 10 provided with the fixing body 20 is inserted into the perforation hole 2 to a desired depth.

여기에서 본 발명의 정착쐐기(26)는 오므린 상태로 밴딩함으로써 공벽(3)과 정착쐐기(26) 간에 어떠한 저항이나 마찰력이 발생하지 않아 상기 정착체(20)를 천공홀(2)의 목적하는 심도까지 힘들이지 않고 편리하고 확실하게 투입하는 특별한 효과를 제공한다.The fixing wedge 26 of the present invention is bent in a pinching state so that no resistance or frictional force is generated between the pneumatic wall 3 and the fixing wedge 26 so that the fixing member 20 is brought into contact with the end of the perforation hole 2 Provides a special effect of effortless and convenient input into depth.

또한, 상기 결속핀(40)에 연결된 견인줄(42)은 상기 결속핀(40)을 제거할 수 있도록 외부로 노출시켜야만 한다.In addition, the pulling line 42 connected to the binding pin 40 should be exposed to the outside so that the binding pin 40 can be removed.

5) 결속핀 제거 및 정착단계(S500)5) Step of removing and fixing the binding pin (S500)

상기 보강 강관(10)의 투입이 완료되며, 외부로 노출된 견인줄(42)을 잡아당기면 도 5와 같이 결속핀(40)이 암경첩(31) 및 수경첩(32)으로부터 분리되고, 이와 동시에 결속력이 해제되면서 밴딩 와이어(30)가 풀어진다.When the reinforcing steel pipe 10 is completely inserted and the pulling string 42 exposed to the outside is pulled, the binding pin 40 is separated from the arm hinge 31 and the hinge hinge 32 as shown in Fig. 5, The binding force is released and the bending wire 30 is released.

즉 결속핀(40)이 제거됨과 동시에 상기 밴딩 와이어(30)가 풀림과 동시에 정착쐐기(26)가 토션스프링(27)의 탄성력에 의해 펼쳐지면서 공벽(3)을 파고들어 더욱 강력한 정착력을 유지하게 된다.The fixing pin 40 is removed and the fixing wedge 26 is unfolded by the elastic force of the torsion spring 27 while the bending wire 30 is loosened to pierce the wall 3 to maintain a strong fixing force .

6) 보강 강관 인장단계(S600)6) Strengthening steel pipe tensioning step (S600)

본 단계는 웨지형 너트(50)를 통해 보강 강관(10)을 인장하는 단계로서, 외부로 노출된 보강 강관(10)의 외측에 지압판(60)을 끼움 설치하고, 상기 지압판(60)은 시공지의 벽면에 밀착되게 하며, 상기 보강 강관(10)의 외측에 설치된 웨지형 너트(50)를 실린더를 이용하여 보강 강관(10)을 인장한다.In this step, the reinforcing steel pipe 10 is pulled through the wedge-shaped nut 50, and a supporting plate 60 is fitted on the outside of the reinforcing steel pipe 10 exposed to the outside, And the reinforced steel pipe 10 is tensioned by means of a cylinder by means of a wedge-shaped nut 50 provided on the outside of the reinforced steel pipe 10.

7) 그라우팅재 주입단계(S700)7) Grouting re-injection step (S700)

본 발명의 그라우팅은 천공홀(2)에 별도의 주입관이나 호스를 투입하지 않고 상기 보강 강관(10)의 시단부(11)에 그라우팅재(1)를 주입하면 종단부(12) 및 보조 분출공(14)을 통해 그라우팅재(1)가 천공홀(2)의 내부로 분출됨으로써 상기 천공홀(2)을 완전하게 메울 수 있으며, 이러한 그라우팅재 주입단계를 수행함에 있어 상기 보강 강관(10)을 이용하여 그라우팅재를 주입하는 용도로 사용함으로써 시공이 간편함은 물론 공기를 단축하고, 공사비를 대폭 절감하는 특별한 효과를 제공한다.The grouting of the present invention is characterized in that grouting material (1) is injected into the starting end (11) of the reinforcing steel pipe (10) without injecting a separate injection pipe or hose into the perforation hole (2) The grouting material 1 may be injected into the perforation hole 2 through the hole 14 to completely fill the perforation hole 2. In performing the grouting material injection step, It is possible to shorten the construction time and to shorten the air volume, and to provide a special effect of significantly reducing the construction cost.

R: 지반 보강장치 1: 그라우팅재
2: 천공홀 3: 공벽
10: 보강 강관 11: 시단부
12: 종단부 14: 보조 분출공
20: 정착체 21: 정착몸체
22: 결합공 24: 세트스크류
25: 지지브라켓 26: 정착쐐기
26b: 와이어홈 27: 토션스프링
28: 회동핀 30: 밴딩 와이어
31: 암경첩 32: 수경첩
40: 결속핀 42: 견인줄
50: 웨지형 너트 60: 지압판
R: Ground reinforcement device 1: Grouting material
2: Perforation hole 3:
10: reinforced steel pipe 11:
12: terminal end 14: auxiliary ejection hole
20: Fixture 21: Fixing body
22: engaging hole 24: set screw
25: support bracket 26: settling wedge
26b: wire groove 27: torsion spring
28: Pivot pin 30: Banding wire
31: female hinge 32: male hinge
40: tying pin 42: pull string
50: wedge type nut 60:

Claims (7)

시공지의 천공홀(2)에 삽입되는 보강 강관(10)과;
상기 보강 강관(10)이 관통하여 결합되는 결합공(22)이 정착몸체(21)의 중앙에 형성되고, 상기 결합공(22)을 중심으로 후면에 방사상으로 돌출 형성된 지지브라켓(25)에 다수의 정착쐐기(26)가 토션스프링(27)에 의해 오므림/펼침 가능하게 탄력 설치된 정착체(20)와;
상기 정착쐐기(26)가 오므려진 상태에서 정착쐐기(26)의 둘레를 감싸면서 밴딩하고, 양단에 각각 암경첩(31)과 수경첩(32)이 일체로 연결된 밴딩 와이어(30)와;
상기 암경첩(31)과 수경첩(32)을 관통하여 일체화 결속하고, 일측에 견인줄(42)이 연결된 결속핀(40)으로 이루어지는 한편;
상기 보강 강관(10)은 천공홀(2)의 외부로 노출된 시단부(11)를 통해 그라우팅재(1)가 주입되고, 상기 천공홀(2)에 삽입된 종단부(12)를 통해 그라우팅재가 상기 천공홀(2)로 분출되며, 상기 보강 강관(10)의 외주면에는 하나 이상의 보조 분출구(14)가 형성되고;
상기 정착쐐기(26)는 일측이 지지브라켓(25)과 함께 회동핀(28)으로 관통하여 오므림/펼침 가능하게 결합되고, 상기 회동핀(28)의 외측에 끼워진 토션스프링(27)의 일측은 보강 강관(10)의 외주면에 밀착 지지되며, 상기 토션스프링(27)의 타측은 정착쐐기(26)의 후면에 밀착 지지되고;
상기 정착쐐기(26)의 전면에는 상기 밴딩 와이어(30)가 유동되지 않도록 삽입지지되는 와이어홈(26b)이 함몰 형성되며;
상기 암경첩(31)은 일측 전후에 각각 제1 결속부(31a)가 형성되고, 상기 제1 결속부(31a)의 사이에 삽입요부(31b)가 형성되며, 상기 삽입요부(31b)에는 수경첩(32)의 일측에 형성된 제2 결속부(32a)가 삽입되고, 상기 제1, 제2 결속부(31a)(32a)에 결속핀(40)이 끼워지면서 암경첩(31) 및 수경첩(32)은 상호 일체화된 결속력을 유지하는 한편;
상기 정착쐐기(26)의 선단에는 다수의 슬립방지돌기(26a)가 연속적으로 돌출 형성되고;
상기 정착체(20)는 상기 보강 강관(10)의 외측에 하나 이상으로 끼움 설치되되고, 상기 정착몸체(21)의 외주면에서 결합공(22)으로 연결된 나사공(23)에 세트스크류(24)가 나사결합되어 상기 정착몸체(21) 및 보강 강관(10)은 상호 견고한 일체성을 유지하는 것을 특징으로 하는 공벽 밀착형 정착쐐기를 이용한 지반 보강장치.
A reinforced steel pipe (10) inserted into the perforation hole (2) of the installation paper;
A fixing hole 21 is formed at the center of the fixing body 21 and a supporting bracket 25 protruding radially from the fixing hole 22 The fixation wedge (26) of the fixing member (20) being resiliently biased by the torsion spring (27);
A bending wire 30 which surrounds the fixing wedge 26 while bending the fixing wedge 26 and bending the fixing wedge 26 and has the arm hinge 31 and the hinge hinge 32 integrally connected to both ends thereof;
And a binding pin (40) which penetrates through the arm hinge (31) and the hinge hinge (32) and binds together and has a pulling string (42) connected to one side thereof;
The grouting material 1 is injected into the reinforced steel pipe 10 through the start end 11 exposed to the outside of the perforation hole 2 and the grouting material 1 is inserted through the end portion 12 inserted into the perforation hole 2, The raw material is sprayed into the perforation hole (2), and at least one auxiliary jet port (14) is formed on an outer peripheral surface of the reinforced steel pipe (10);
One end of the fixing wedge 26 is engaged with the support bracket 25 through a rotation pin 28 so that the fixing wedge 26 can be engaged with the supporting bracket 25 and the other end of the fixing wedge 26 is fixed to one side of the torsion spring 27 fitted to the outside of the rotation pin 28 The other side of the torsion spring 27 is held in close contact with the rear surface of the fixing wedge 26;
A wire groove (26b) is formed on the front surface of the fixing wedge (26) to be inserted and supported so that the bending wire (30) does not flow;
The arm hinge 31 is formed with a first binding portion 31a on one side and an insertion recessed portion 31b between the first binding portion 31a and the insertion recessed portion 31b The second fastening portion 32a formed at one side of the hinge 32 is inserted and the fastening pin 40 is fitted to the first and second fastening portions 31a and 32a, (32) maintains a bonding force that is mutually integrated;
A plurality of slip prevention protrusions 26a are continuously protruded from the tip of the fixing wedge 26;
The fixing body 20 is installed at one or more outside of the reinforcing steel pipe 10 and the set screw 24 is attached to the screw hole 23 connected to the fixing body 21 through the fitting hole 22 on the outer circumferential surface of the fixing body 21. [ Is fixedly coupled to the fixation body (21) and the reinforcing steel pipe (10) to maintain a firm integrity with each other.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 제 1항에 기재된 공벽 밀착형 정착쐐기를 이용한 지반 보강장치에 의한 지반 보강공법에 있어서,
시공지에 다수의 천공홀(2)을 형성하는 천공단계(S100)와;
상기 천공홀(2)에 삽입되는 보강 강관(10)의 외측에 다수의 정착체(20)를 일체로 끼움 설치하는 정착체 설치단계(S200)와;
상기 정착체(20)의 정착쐐기(26)를 오므린 후 밴딩 와이어(30)를 이용하여 정착쐐기(26)의 둘레를 감싼 상태로 상기 밴딩 와이어(30)의 양단에 연결된 암경첩(31)과 수경첩(32)을 결속핀(40)으로 관통하여 일체화 결속하는 정착쐐기 밴딩단계(S300)와;
상기 정착체(20)가 설치된 보강 강관(10)을 천공홀(2)의 심도까지 투입 설치하되 상기 결속핀(40)에 연결된 견인줄(42)을 천공홀(2)의 외부로 노출시키는 보강 강관 투입단계(S400)와;
상기 외부로 노출된 견인줄(42)을 잡아당겨 결속핀(40)을 제거하여 상기 밴딩 와이어(30)가 풀림과 동시에 정착쐐기(26)가 토션스프링(27)의 탄성력에 의해 펼쳐지면서 공벽(3)을 파고들어 정착되도록 하는 결속핀 제거 및 정착단계(S500)와;
상기 외부로 노출된 보강 강관(10)의 외측에 지압판(60) 및 웨지형 너트(50)를 설치한 후 실린더를 이용하여 보강 강관(10)을 인장시키는 보강 강관 인장단계(S600)와;
상기 보강 강관(10)의 시단부에 그라우팅재(1)를 주입하여 천공홀(2)을 완전하게 메우는 그라우팅재 주입단계(S700)를 포함하여 이루어진 것을 특징으로 하는 공벽 밀착형 정착쐐기를 이용한 지반 보강공법.
A ground reinforcement method using a ground reinforcement apparatus using a fused-wall fixing fixation wedge according to claim 1,
A perforation step (S100) of forming a plurality of perforation holes (2) in the installation paper;
A fixing member mounting step (S200) in which a plurality of fixing members (20) are integrally fitted to the outside of the reinforcing steel pipe (10) inserted into the perforation hole (2);
The fixation wedge 26 of the fixing body 20 is folded and then the arm hinge 31 connected to both ends of the bending wire 30 is wound around the fixation wedge 26 by using the bending wire 30, A fixing wedge bending step (S300) in which the hinge pin (32) and the hinge pin (32) penetrate through the binding pin (40) and bind together;
A reinforcing steel pipe 10 in which the fixing body 20 is installed is inserted up to a depth of the hole 2 and a pulling line 42 connected to the binding pin 40 is exposed to the outside of the hole 2, An input step (S400);
The binding pin 30 is pulled out to pull the pulling string 42 exposed to the outside and the fixing wedge 26 is unfolded by the elastic force of the torsion spring 27 at the same time as the bending wire 30 is released, (S500) of fixing and pinching the fixing pin to fix the fixing pin;
A reinforcing steel pipe tensioning step S600 of tensioning the reinforcing steel pipe 10 using a cylinder after installing a pressure plate 60 and a wedge type nut 50 on the outside of the reinforcing steel pipe 10 exposed to the outside;
And a grouting material injection step (S700) of injecting the grouting material (1) into the starting end of the reinforcing steel pipe (10) to completely fill the perforation hole (2) Reinforcement method.
KR1020140055428A 2014-05-09 2014-05-09 Device and method forreinforcing the ground using a hollow wall adhere type anchor wedge KR101518815B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140055428A KR101518815B1 (en) 2014-05-09 2014-05-09 Device and method forreinforcing the ground using a hollow wall adhere type anchor wedge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140055428A KR101518815B1 (en) 2014-05-09 2014-05-09 Device and method forreinforcing the ground using a hollow wall adhere type anchor wedge

Publications (1)

Publication Number Publication Date
KR101518815B1 true KR101518815B1 (en) 2015-05-12

Family

ID=53394256

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140055428A KR101518815B1 (en) 2014-05-09 2014-05-09 Device and method forreinforcing the ground using a hollow wall adhere type anchor wedge

Country Status (1)

Country Link
KR (1) KR101518815B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653220A (en) * 2019-01-28 2019-04-19 南睿函 A kind of building municipal works slope reinforcement device and its application method
KR102596545B1 (en) * 2022-06-29 2023-11-01 유태은 Pile press-in device equipped with a file cutter and construction method using the same
CN117403668A (en) * 2023-12-14 2024-01-16 青岛天华易境建筑设计有限公司 Foundation pit fixing structure for supporting pile body

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200400698Y1 (en) * 2005-08-27 2005-11-08 유진지오 주식회사 The expansion friction type spacer for soil nailing
KR100892322B1 (en) * 2008-06-11 2009-04-08 주식회사 비엠테크 A soil-nail structure using bamboo
KR20100046796A (en) * 2008-10-28 2010-05-07 (주)경동기술공사 A ground pressure-type anchor and constructing method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200400698Y1 (en) * 2005-08-27 2005-11-08 유진지오 주식회사 The expansion friction type spacer for soil nailing
KR100892322B1 (en) * 2008-06-11 2009-04-08 주식회사 비엠테크 A soil-nail structure using bamboo
KR20100046796A (en) * 2008-10-28 2010-05-07 (주)경동기술공사 A ground pressure-type anchor and constructing method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653220A (en) * 2019-01-28 2019-04-19 南睿函 A kind of building municipal works slope reinforcement device and its application method
CN109653220B (en) * 2019-01-28 2021-05-14 南睿函 Slope reinforcing device for building municipal engineering and application method thereof
KR102596545B1 (en) * 2022-06-29 2023-11-01 유태은 Pile press-in device equipped with a file cutter and construction method using the same
CN117403668A (en) * 2023-12-14 2024-01-16 青岛天华易境建筑设计有限公司 Foundation pit fixing structure for supporting pile body
CN117403668B (en) * 2023-12-14 2024-03-08 青岛天华易境建筑设计有限公司 Foundation pit fixing structure for supporting pile body

Similar Documents

Publication Publication Date Title
KR101518815B1 (en) Device and method forreinforcing the ground using a hollow wall adhere type anchor wedge
KR100963682B1 (en) Anchor assembly, method for reinforcing slope using anchor assembly
KR100861938B1 (en) The earth anchor and construction method for use of that
KR20090101045A (en) Pretension Soil Nail and Construction Method Using the Same
KR101510297B1 (en) A removable prestressing steel pipe soil nailing structure
KR101402267B1 (en) Close juxtaposition tunnel pillar reinforcement structure and its construction methods
KR20090123779A (en) Guid apparatus for soil nail of reinforcing a slope
KR100746879B1 (en) Anchor
KR101546142B1 (en) Earth anchor and installation method thereof
KR101043127B1 (en) Device and method for reinforcing the ground using pc twisted steel wire
KR101417434B1 (en) Removable tendon cable type anchor
KR100858736B1 (en) Wedge type's earth pressure anchor that a packer is unnecessary and construction method thereof
KR101407965B1 (en) Reinforced Upper Tunnel Using Pre-support Structure and its Construction Method
KR100472135B1 (en) Anchor System for length control
JP2002070006A (en) Method of executing wire anchor and its wire anchor
KR101588860B1 (en) dismantling method of tension member for anchor and apparatus thereof
KR101017412B1 (en) Permanent anchor of friction bearing pressure type and constructing method thereof
KR100823603B1 (en) Casket anchor
KR101501454B1 (en) Anchor structure and reinforcing-method using the same
KR100873738B1 (en) The earth anchor
KR101547320B1 (en) Structure of Permanent Anchor
KR101603507B1 (en) Compression type anchor with central tube
KR101423292B1 (en) Apparatus for fixing rock bolt with leaf springs
KR200421375Y1 (en) Casket anchor
KR101386557B1 (en) Method and apparatus for expansive ground pressure type anchor using a stopper system

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180423

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee