KR101486099B1 - system and method for assessing and modifying workshop capacity - Google Patents
system and method for assessing and modifying workshop capacity Download PDFInfo
- Publication number
- KR101486099B1 KR101486099B1 KR20100129123A KR20100129123A KR101486099B1 KR 101486099 B1 KR101486099 B1 KR 101486099B1 KR 20100129123 A KR20100129123 A KR 20100129123A KR 20100129123 A KR20100129123 A KR 20100129123A KR 101486099 B1 KR101486099 B1 KR 101486099B1
- Authority
- KR
- South Korea
- Prior art keywords
- work
- capability
- information
- load
- target department
- Prior art date
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Abstract
The workplace capability assessment and adjustment system standardizes and measures the capabilities of internal factories or workplaces, and evaluates them quantitatively. By adjusting the capacity of internal factories or workplaces to deal with the optimal quantity of water according to changes in production volume, The productivity can be minimized, and the production cost can be reduced.
Description
The present invention relates to a system and a method for evaluating and adjusting the capability of a worksite in shipbuilding ship construction, and more particularly, to a system and method for evaluating and adjusting the capability of a shipbuilding ship, And more particularly, to a system and method for adjusting its capabilities for a user.
In shipbuilding business, shipbuilding volume can change drastically in response to international and external changes. In order to actively respond to these changes, it is necessary to adjust the volume rationally according to the capacity of internal factories or workshops (per bay / have. However, in the shipbuilding business, evaluating and adjusting the capacity of each domestic factory or workplace is done by hand, and there is no system that can standardize and measure the capacity of the internal factory and quantitatively evaluate it. Therefore, it takes a lot of time to evaluate and adjust the competence of internal factories or workplaces, and there is a problem that the evaluation and adjustment are less credible.
BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a diagram showing a configuration for performing work capacity evaluation and adjustment in a workplace according to the prior art; Fig.
Referring to FIG. 1, when the workplace evaluation of the internal factory is performed, the production information is manually collected and analyzed. The production information includes information such as the base area of each factory (where the base stands for workbenches for assembling the ship block), departmental production records, personnel status, and actual loading volume. Such production information is vast and complex I can not help it. In addition, cost analysis work such as equipment operation cost, electric power cost, gas cost, labor cost, etc. due to change of workplace operation of internal factory is also required. .
Thus, the manual collection and analysis of information can delay the decision making of the workplace adjustment and the reliability of the decision can not be guaranteed. This ultimately hinders production efficiency and increases production costs in the production process.
The present invention can standardize and measure the capacity of an internal factory or workplace, quantitatively evaluate it, and adjust the capacity of internal factories or workplaces to handle the optimum amount of water according to changes in production volume.
According to an aspect of the present invention, there is provided a workplace capability assessment and adjustment system comprising: a work capability input module to which work capability information of a work target department is input; A system database for storing the work capability information; A work capability criterion module for calculating a work capability criterion for each work target department through the work capability information stored in the system database; A demand quantity input module for inputting a quantity of goods required to be processed by the work target department; A load analysis module for analyzing a load of the work target department through the work capability reference and the required amount; A work capacity adjustment analysis module that adjusts the work capacity of the work target department in accordance with the variation amount of the required amount and analyzes the load of the adjusted work target department; And an analysis result output module for outputting an analysis result from the work capability adjustment analysis module.
And a management list input module into which cost information generated when the job is performed by the job target department is input.
The system database may store the cost information.
The work capability information and the cost information stored in the system database can be inquired and corrected.
The work capability information includes the area information, the number-of-persons information, the performance work information, or the production capability information for each work target department.
The cost information includes electric power cost, gas cost, labor cost, equipment fee, facility maintenance cost, or transportation equipment maintenance cost for each work site.
The work capability standard includes a production amount per area, an arithmetic total, a production amount per capita, a weighted total production per capita, or a production amount per capita.
The load analysis module may calculate the work capability reference value for the requested amount to analyze the load.
The load analysis module can analyze the load by the work target department and period.
The work capacity adjustment analysis module can adjust the work capacity of the work target department so that the load of the work target department becomes 100% with respect to the variation amount of the required amount.
As a result of the analysis, the output module can output adjusted work capability information, personnel change information, load information, or cost information of the work target department.
When the inputted request quantity is stored in the system database, it can be inquired and corrected.
A workplace capability evaluation and adjustment method according to an embodiment of the present invention includes: inputting work capability information of a work target department; Calculating a work capability standard for each work target department through the work capability information; Inputting a quantity of water required to be processed by the work target department; Analyzing a load of the work target department through the work capability reference and the requested amount; And adjusting the work capacity of the work target department in accordance with the variation amount of the required amount and analyzing the load of the adjusted work target department.
And a step of inputting cost information generated when the job target department performs an operation.
The work capability information and the cost information are stored in a system database.
And outputting the analyzed result.
According to the workplace capability evaluation and adjustment system and the adjustment method according to the embodiment of the present invention, the ability of the internal factory or the workplace is standardized and measured and quantitatively evaluated. The capacity of the internal factory or the workplace Can be adjusted.
Therefore, it is possible to minimize the production loss during shipbuilding, thereby increasing the productivity and reducing the production cost.
BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a diagram showing a configuration for performing work capacity evaluation and adjustment in a workplace according to the prior art; Fig.
2 is a block diagram that schematically illustrates a workplace capability assessment and control system in accordance with an embodiment of the present invention.
Figure 3 is a diagram of the functions of the components of the workplace capability assessment and control system in accordance with an embodiment of the present invention.
4 is a flow chart illustrating a workplace capability assessment and adjustment method in accordance with an embodiment of the present invention.
BRIEF DESCRIPTION OF THE DRAWINGS The above and other objects, features and advantages of the present invention will be more apparent from the following detailed description taken in conjunction with the accompanying drawings, in which: FIG.
2 is a block diagram that schematically illustrates a workplace capability assessment and control system in accordance with an embodiment of the present invention.
2, a workplace capability assessment and
The
The
The
The work
The management
The demanded
The
The work capability
The load analysis module (203) analyzes the load of the work target department through the work capability standard and the required amount. Specifically, the
The job capability
Although the degree to which the work capability of the work target department is adjusted is not fixed, the work ability
The analysis
In the present invention, the
The functions of the components of the workplace capability assessment and
Figure 3 is a diagram of the functions of the components of the workplace capability assessment and control system in accordance with an embodiment of the present invention.
2 and 3, the work
The management
The demand
The work capability
The
The work capability
The analysis
4 is a flow chart illustrating a workplace capability assessment and adjustment method in accordance with an embodiment of the present invention.
First, a workplace capability evaluation and adjustment method according to an embodiment of the present invention receives information related to a work capability of a work target department (step 401).
Next, cost related information of the job target department is received (step 402), and information related to the request amount for the job target department is received (step 403).
Next, the production amount based on a certain standard is calculated using the information related to the work capability (step 404).
Thereafter, the production load rate per standard is analyzed using the information related to the demand amount and the production amount of a certain standard (step 405).
If there is a change in the amount of demand, the work capacity of the job target department is adjusted and the load of the adjusted job target department is analyzed (Step 406).
In addition, the analyzed result can be output, and information related to the work capability and information related to the cost can be stored in the system database.
It should be noted that the above-described embodiments have been described in order to explain the present invention in more detail and are not intended to limit the present invention to these embodiments. It will be apparent to those skilled in the art that various changes and modifications may be made therein without departing from the spirit and scope of the invention.
Claims (16)
A system database for storing the work capability information;
A work capability criterion module for calculating a work capability criterion for each work target department through the work capability information stored in the system database;
A demand quantity input module for inputting a quantity of goods required to be processed by the work target department;
A load analysis module for analyzing a load of the work target department through the work capability reference and the required amount;
A work capacity adjustment analysis module that adjusts the work capacity of the work target department in accordance with the variation amount of the required amount and analyzes the load of the adjusted work target department;
An analysis result output module for outputting an analysis result from the work capability adjustment analysis module; And
And a management list input module to which cost information generated when the job target department performs an operation is inputted,
The work capability criterion
A workplace capability assessment and adjustment system including a production amount per arithmetic total of the work target departments and a production amount per weighted total workforce per the work target departments.
And storing the cost information.
Workplace capability assessment and control system that can be viewed and modified.
A work site capability evaluation and adjustment system including the area information, the number-of-persons information, the performance work information, or the production capability information for each work target department.
A workplace capability assessment and adjustment system including the electric power cost, gas cost, labor cost, equipment usage fee, facility maintenance cost, or transportation equipment maintenance cost for each work target department.
And a workplace capability assessment and adjustment system including the production amount per area or the production amount per work area of the work target department.
And evaluating and adjusting the work capacity reference value for the requested amount to analyze the load.
And evaluating and adjusting the workplace capability to analyze the load by the job target department or period.
And adjusts the work capability of the work target unit so that the load of the work target unit becomes 100% with respect to the variation amount of the required amount.
And outputting adjusted job capability information, personnel change information, load information, or cost information of the job target department.
A workplace capability assessment and adjustment system that can be viewed and modified when stored in the system database.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20100129123A KR101486099B1 (en) | 2010-12-16 | 2010-12-16 | system and method for assessing and modifying workshop capacity |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20100129123A KR101486099B1 (en) | 2010-12-16 | 2010-12-16 | system and method for assessing and modifying workshop capacity |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20120075583A KR20120075583A (en) | 2012-07-09 |
KR101486099B1 true KR101486099B1 (en) | 2015-01-26 |
Family
ID=46709438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20100129123A KR101486099B1 (en) | 2010-12-16 | 2010-12-16 | system and method for assessing and modifying workshop capacity |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101486099B1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101951339B1 (en) * | 2016-12-06 | 2019-02-22 | 주식회사 에스.제이테크 | System for improving manufacturing process design and verification |
KR101951332B1 (en) * | 2016-12-06 | 2019-02-22 | 주식회사 에스.제이테크 | System for improving manufacturing process management |
CN110689288B (en) * | 2019-12-10 | 2020-04-21 | 南昌掘策数据服务有限公司 | Energy consumption data processing method and system and workshop energy saving method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050082893A (en) * | 2004-02-20 | 2005-08-24 | 대우조선해양 주식회사 | Establishment method of producting plan through load analysis when vessel is constructed |
JP2007213294A (en) * | 2006-02-09 | 2007-08-23 | Hitachi Ltd | Production plan drafting system |
KR20080004243A (en) * | 2006-07-05 | 2008-01-09 | Stx조선주식회사 | A method of management planning for running a shipyard |
-
2010
- 2010-12-16 KR KR20100129123A patent/KR101486099B1/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050082893A (en) * | 2004-02-20 | 2005-08-24 | 대우조선해양 주식회사 | Establishment method of producting plan through load analysis when vessel is constructed |
JP2007213294A (en) * | 2006-02-09 | 2007-08-23 | Hitachi Ltd | Production plan drafting system |
KR20080004243A (en) * | 2006-07-05 | 2008-01-09 | Stx조선주식회사 | A method of management planning for running a shipyard |
Also Published As
Publication number | Publication date |
---|---|
KR20120075583A (en) | 2012-07-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Souza et al. | Lean-integrated management system: A model for sustainability improvement | |
Li et al. | Business orientation policy and process analysis evaluation for establishing third party providers of reverse logistics services | |
Chardine-Baumann et al. | A framework for sustainable performance assessment of supply chain management practices | |
Kumar et al. | Implementing the Lean Sigma framework in an Indian SME: a case study | |
De Felice et al. | Improving operations performance with world class manufacturing technique: a case in automotive industry | |
Bhinge et al. | Sustainability optimization for global supply chain decision-making | |
Liberale et al. | Reducing the Time for IRB Reviews: A Case Study. | |
KR101358673B1 (en) | Facilities condition assessment method using smartphone and system thereof | |
TWI403964B (en) | Project management system | |
Sopadang et al. | Sustainable supply chain performance measurement a case study of the sugar industry | |
KR101486099B1 (en) | system and method for assessing and modifying workshop capacity | |
Kim et al. | Cost analysis of information technology‐assisted quality inspection using activity‐based costing | |
Kovács et al. | Jobs and competency requirements in supply chains | |
Eun et al. | Integration of life cycle assessment in the environmental information system | |
US20090210296A1 (en) | System and method for providing a normalized correlated real-time employee appraisal | |
Goh | Towards an integrated approach for assessing triple bottom line in the built environment | |
CN105868924A (en) | Digital manufacturing-based furniture enterprise production quality control system | |
Rizlan et al. | Performance maintenance analysis using qfd method: a case study in Fabrication Company in Indonesia | |
US8548835B2 (en) | Modeling tool for determining an organization's supply chain emissions footprint | |
Pham et al. | Other lean tools in fashion and textile manufacturing | |
KR101513187B1 (en) | Method of human resource management using multiple competences analysis | |
de Souza | Lean integrated management system for sustainability improvement: An integrated system of tools and metrics for sustainability management | |
JP6997489B1 (en) | Sales organization management support device, sales organization management support system, sales organization management support method, sales organization management support program | |
JP2006119917A (en) | Process management support system, process management support method, and process management support program | |
Kwon et al. | Design and application of two-stage performance measurement system considering dynamic capabilities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |