KR101427208B1 - Prefabricated frame with modular concrete form - Google Patents

Prefabricated frame with modular concrete form Download PDF

Info

Publication number
KR101427208B1
KR101427208B1 KR1020130090722A KR20130090722A KR101427208B1 KR 101427208 B1 KR101427208 B1 KR 101427208B1 KR 1020130090722 A KR1020130090722 A KR 1020130090722A KR 20130090722 A KR20130090722 A KR 20130090722A KR 101427208 B1 KR101427208 B1 KR 101427208B1
Authority
KR
South Korea
Prior art keywords
frame
modular
spacer
elongated hole
prefabricated
Prior art date
Application number
KR1020130090722A
Other languages
Korean (ko)
Inventor
이창남
Original Assignee
이창남
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이창남 filed Critical 이창남
Priority to KR1020130090722A priority Critical patent/KR101427208B1/en
Application granted granted Critical
Publication of KR101427208B1 publication Critical patent/KR101427208B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/18Spacers of metal or substantially of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a prefabricated frame with a modular mold which can remarkably simplify a mold process by directly attaching a modular mold to a prefabricated frame formed by reinforcing rods or reinforcing rods and section steels which are combined with horizontal reinforcing rods. The prefabricated frame with the modular mold according to the present invention comprises: a prefabricated frame for attaching a modular mold which includes a principal member arranged at the edge of a concrete member used as a column or a beam, a plurality of spacers which is connected to be spaced apart from each other at the outside of the principal member and each of which has an elongated hole formed in a plate, and a first form tie which is fixed to the spacer in order to attach the modular mold to the prefabricated frame and has elongated holes formed at both end parts, wherein the elongated hole on one side is connected with an elongated hole of the spacer and the elongated hole on the other side is connected with the frame of the modular mold by a wedge pin; and a modular mold which has a plate connected between the upper and lower parts or between the right and left first form ties and a frame connected to the rear side of the plate, wherein the frame has an elongated hole formed at the corresponding position of the elongated hole on the other side of the first form tie to be connected with the first form tie by a wedge pin.

Description

모듈러 거푸집이 구비된 선조립 골조{Prefabricated frame with modular concrete form} {Prefabricated frame with modular concrete form}

본 발명은 철근 또는 철근과 형강을 횡방향 철근으로 결합한 선조립 철근콘크리트(PRC) 또는 선조립 철골철근콘크리트(PSRC) 골조에 직접 모듈러 거푸집을 부착함으로써, 공사기간의 중요한 부분을 차지하는 거푸집 공정을 대폭 간소화할 수 있는 모듈러 거푸집이 구비된 선조립 골조에 관한 것이다.
The present invention is characterized in that a modular formwork is directly attached to a pre-assembled reinforced concrete (PRC) or pre-assembled steel reinforced concrete (PSRC) frame in which reinforcing bars or reinforcing bars and sections are joined by transverse reinforcing bars, The present invention relates to a prefabricated frame having a modular formwork which can be simplified.

철근콘크리트 구조는 건물의 주체구조부(主體溝造部)에 콘크리트를 사용한 구조로서, 공사 현장에서 철근을 조립한 후 주변을 거푸집으로 둘러싸고 거푸집 내부에 콘크리트를 타설하여 양생이 완료되면 거푸집을 뜯어내는 과정을 통하여 시공된다. Reinforced concrete structure is a structure that uses concrete in the main structure of the building. It assembles the rebar at the construction site, surrounds it with the formwork, pours the concrete inside the formwork, .

철근콘크리트 구조의 개략적인 공사비 구성은 철근: 콘크리트: 거푸집=1:1:1이나 공사기간과 공사 난이도 측면에서는 거푸집의 비중이 가장 크다고 할 수 있다. 즉, 거푸집 공정은 철근콘크리트 공사에서 시간이 가장 많이 걸리며 까다로운 공정이기도 하다. The construction cost of the reinforced concrete structure is roughly 1: 1: 1 for rebar: concrete: formwork = 1, but the shape of the form is the largest in terms of construction time and construction difficulty. In other words, the formwork process is the most time-consuming and difficult process in reinforced concrete construction.

거푸집을 잘못 짜면 구조물의 수직, 수평도는 물론 평면상 위치조차 어긋나는 일이 생길 수 있으며, 콘크리트 타설 과정에서 거푸집이 터지거나 무너지는 안전사고가 발생할 수도 있다. If the formwork is erroneously misaligned, the structure may be displaced vertically, horizontally as well as on the plane, and a safety accident may occur in the concrete casting process.

이와 같이 거푸집 목공은 철근콘크리트 공사의 기간과 품질을 결정적으로 좌우하는 중요한 공정이지만, 전형적인 3D 작업으로 인식되어 거푸집 전문 목공 기능자는 점점 그 수가 줄어들고 있다.In this way, woodworking is an important process that decisively determines the duration and quality of reinforced concrete work, but it is recognized as a typical 3D work, and the number of specialized woodworking specialists is gradually decreasing.

일반적으로 소규모 부재의 재래식 거푸집은 거푸집판이 제 위치를 벗어나지 않도록 가설보와 가설기둥으로 이들을 지지하며, 가새를 추가하여 기울기를 방지한다. In general, the conventional formwork of a small-sized member is supported by a temporary beam and a temporary column so that the form plate does not deviate from the position, and a brace is added to prevent inclination.

그리고 대규모 부재의 거푸집으로는 최근 시스템 거푸집이 많이 사용되고 있다. 기둥의 경우 상기 시스템 거푸집의 시공은 미리 공장에서 ㄱ자형으로 제작한 반쪽 거푸집 한 쌍을 현장에서 조립하여 ㅁ자형 단면의 거푸집을 형성하고, 거푸집 내부에 콘크리트 타설 및 양생 후 거푸집을 해체하는 순으로 진행된다.Recently, system formwork is widely used as a form of large scale member. In the case of the column, the construction of the system form is carried out by assembling a pair of half molds made in the factory in advance in the factory to form a mold of a cross-sectional shape, and then dismantling the concrete after placing the concrete in the mold do.

한편, 본 발명의 출원인은 철근콘크리트나 철골철근콘크리트 골조를 공장에서 자동화된 설비로 선조립하는 PRC(Prefabricated Reinforced Concrete) 및 PSRC(Prefabricated Steel Reinforced Concrete) 기둥과 보를 개발하여 성공적으로 실무에 적용하고 있다. Meanwhile, the applicant of the present invention has successfully developed PRC (Prefabricated Reinforced Concrete) and PSRC (Prefabricated Steel Reinforced Concrete) columns and beams that preliminarily assembles reinforced concrete or steel-frame reinforced concrete frames from factories to automated facilities .

상기 PRC와 PSRC 기둥과 보는 기존의 수작업 배근에는 사용하지 못하던 굵은 철근 또는 ㄱ형강을 띠철근이나 스터럽과 함께 철구 공장에서 용접 또는 볼트로 조립하여 선조립 골조를 완성한 다음, 이를 철골처럼 현장에 운반하여 시공할 수 있도록 한 것이다.In the PRC and PSRC columns, the prefabricated frame is assembled by welding or bolting in a steel mill together with a band steel or a stirrup, which is not used for conventional manual laying, and then it is transported like a steel frame So that it can be constructed.

상기 선조립 골조는 직진도가 양호하고 골조만으로 수직도와 수평도를 확보할 수 있을 뿐만 아니라 시공중 하중을 충분히 지탱할 수 있는 등의 장점이 있다. The prefabricated frame has good straightness and can secure vertical and horizontal level only by framing, and can also support the load during construction.

그러므로 PRC, PSRC 부재를 이용할 경우 일반 철근콘크리트 구조와는 달리 고품질 시공 및 공사기간 단축이 가능하다. 특히, 종래 거푸집 공정에서 수행하던 측량 작업과 수직도 및 수평도 확보 작업이 이미 골조 단계에서 완료되므로, 종래의 거푸집 공정들 중 까다로운 부분을 대부분 생략할 수 있다. Therefore, unlike ordinary reinforced concrete structures, high quality construction and construction period can be shortened by using PRC and PSRC members. In particular, since the surveying work and the vertical and horizontal work are already completed in the framing stage, it is possible to omit most of the difficult parts of the conventional molding processes.

따라서 상기와 같은 선조립 골조에 의존하여 거푸집을 부착하기만 하면 되는데, 실제로는 아직 이와 관련된 구체적인 방법이 개발되지 않아, 상기 PRC, PSRC 선조립 골조가 가지고 있는 잠재적 이점을 제대로 활용하지 못하고 중복된 작업을 수행하고 있는 실정이다.Therefore, it is only necessary to attach the form depending on the above-mentioned pre-assembled frame. Actually, no concrete method related thereto has been developed yet, so that the potential advantages of the PRC and PSRC pre- And the like.

또한, 최근에는 높이 10m 이상의 기둥이나 벽체에서 콘크리트를 중간에 쉬지 않고 한 번에 타설하는 경향이 있다. 이 경우, 기둥 또는 벽체 최하부에서 거푸집판이 지지하여야 하는 하중은 타설 속도에 따라 9~23tf/㎡에 달하게 되는 반면, 기둥 단면 크기에 따라 종래의 가설재만으로 콘크리트 측압을 지지하기 어려운 경우가 있다.
Also, recently, there is a tendency to pour concrete at one time without resting in a pillar or wall with a height of 10 m or more. In this case, the load to be supported by the form plate at the bottom of the column or the wall reaches 9 ~ 23tf / ㎡ according to the putting speed, but it may be difficult to support the side pressure of concrete by conventional construction alone depending on the column section size.

상기와 같은 과제를 해결하기 위하여 본 발명은 선조립 철근콘크리트(PRC) 부재 또는 선조립 철골철근콘크리트(PSRC) 부재가 철근 또는 철근과 형강을 횡방향철근으로 결합한 선조립 골조 자체만으로 자립은 물론 시공 하중을 충분히 지탱할 수 있는 강성을 보유하는 특성을 활용하여, 상기 선조립 골조 외면에서 피복두께만큼 이격하여 모듈러 거푸집을 고정하는 것만으로 거푸집 시공을 간단하게 마칠 수 있는 모듈러 거푸집이 구비된 선조립 골조를 제공하고자 한다. In order to solve the above-mentioned problems, the present invention provides a pre-assembled reinforced concrete (PRC) member or pre-assembled steel reinforced concrete (PSRC) A prefabricated frame having a modular formwork capable of simply completing the formwork construction by fixing the modular formwork at a distance of the coating thickness from the outer surface of the prefabricated structure by utilizing a characteristic of having rigidity enough to bear the load, .

아울러 본 발명은 콘크리트 타설시의 측압을 견딜 수 있도록 선조립 골조에 모듈러 거푸집을 고정할 수 있는 모듈러 거푸집이 구비된 선조립 골조를 제공하고자 한다.
It is another object of the present invention to provide a prefabricated frame having a modular formwork capable of fixing a modular formwork to a prefabricated structure so as to withstand lateral pressure at the time of pouring concrete.

상기와 같은 과제를 해결하기 위하여 바람직한 실시예에 따른 본 발명은 기둥 또는 보로 사용되는 콘크리트 부재의 선조립 골조에서 부재의 모서리에 배치되는 주재, 상기 주재 외측에 복수 개가 수직 방향으로 일정 간격 이격되도록 결합되는 것으로서 플레이트에 장공이 형성된 스페이서 및 모듈러 거푸집을 선조립 골조에 부착하기 위해 각 스페이서에 고정되는 것으로서 양 단부측에 장공이 형성되어 일측 장공은 웨지핀으로 상기 스페이서의 장공과 결합되고, 타측 장공은 웨지핀으로 모듈러 거푸집의 프레임과 결합되는 제1폼타이로 구성되는 모듈러 거푸집 부착용 선조립 골조; 및 상하부 또는 좌우 제1폼타이 사이에 결합되는 것으로 판재와 판재 후면에 결합된 프레임으로 구성되고, 상기 프레임에는 제1폼타이의 타측 장공과 대응되는 위치에 장공이 형성되어 웨지핀에 의해 제1폼타이와 결합되는 모듈러 거푸집; 으로 구성되는 것을 특징으로 하는 모듈러 거푸집이 구비된 선조립 골조를 제공한다.According to an aspect of the present invention, there is provided a reinforced concrete structure for reinforcing concrete members, the reinforced concrete structure having a plurality of reinforcing members, Wherein a spacer is formed on the plate and a modular die is fixed to each spacer to attach the modular die to the prefabricated frame, wherein a long hole is formed on both end sides so that one long hole is coupled to the long hole of the spacer by a wedge pin, A prefabricated framework for modular formwork attachment comprising a first form tie coupled to a frame of a modular form with a wedge pin; And a frame coupled to the upper and lower portions or between the first and second left and right first tie rods, wherein a frame is formed in the frame at a position corresponding to the other elongated hole of the first form tie, A modular form coupled with a form tie; The present invention provides a prefabricated frame having a modular formwork.

다른 바람직한 실시예에 따른 본 발명은 상기 주재는 철근이고, 상기 스페이서는 고정구에 의해 주재와 결합되되, 상기 고정구는 ㄱ형강으로 형성되어 ㄱ형강의 외측면이 부재의 외측면을 향하도록 ㄱ형강의 내측면이 주재의 외측에 용접되며, 상기 스페이서는 고정구 외측면에 용접 결합되는 것을 특징으로 하는 모듈러 거푸집이 구비된 선조립 골조를 제공한다.According to another preferred embodiment of the present invention, the present invention is characterized in that the main body is a reinforcing bar, the spacer is joined to the main body by a fixing member, the fixing member is formed of a-shaped steel and the outer side of the a- Wherein the inner side surface is welded to the outer side of the base member, and the spacer is welded to the outer side surface of the fixture.

다른 바람직한 실시예에 따른 본 발명은 상기 주재는 ㄱ형강이고, 상기 스페이서는 형강의 외측면에 용접 결합되는 것을 특징으로 하는 모듈러 거푸집이 구비된 선조립 골조를 제공한다.According to another preferred embodiment of the present invention, there is provided a prefabricated frame having a modular form, characterized in that the main body is a section steel and the spacer is welded to an outer surface of the section steel.

삭제delete

다른 바람직한 실시예에 따른 본 발명은 마주보는 모듈러 거푸집의 간격 유지를 위해 마주보는 모듈러 거푸집의 프레임을 적어도 하나 이상의 제2폼타이로 상호 연결하는 것을 특징으로 하는 모듈러 거푸집이 구비된 선조립 골조를 제공한다.
According to another preferred embodiment of the present invention, there is provided a prefabricated frame having a modular formwork, characterized in that the frame of the opposing modular formwork is interconnected with at least one second form tie to maintain the spacing of the opposing modular formwork do.

본 발명에 따르면 다음과 같은 효과가 있다.The present invention has the following effects.

첫째, PRC 또는 PSRC 선조립 골조는 철근 또는 철근과 형강을 횡방향철근으로 결합한 선조립 골조 자체만으로 자립은 물론 시공 하중을 충분히 지탱할 수 있는 강성을 보유하기 때문에, 수직도와 수평도가 확보된 선조립 골조에 의지하여 모듈러 거푸집을 고정하는 것만으로 거푸집 시공을 간단하게 마칠 수 있다. First, since PRC or PSRC prefabricated frame has rigidity that can support not only self-standing but also construction load by using reinforced concrete or prefabricated frame in which reinforcing bars and section steel are combined with transverse reinforcing bars, It is easy to finish the formwork simply by fixing the modular formwork depending on the frame.

둘째, 재래식 거푸집에서 사용하는 가설보, 가설기둥, 가새 및 세퍼레이터 시공과 측량 작업을 생략하면서 부재의 수직도와 수평도를 확보할 수 있으며, 스페이서에 의하여 일정 크기의 피복두께를 확보할 수 있다.Second, it is possible to secure the verticality and the horizontality of the member while omitting the construction of the hypothetical beam, the suspension column, the bracing and the separator used in the conventional formwork, and the thickness of the cover can be ensured by the spacer.

셋째, 철근콘크리트 구조에서 거푸집 공정에 대한 의존도를 대폭 줄여 공사비 절감, 공기 단축 및 고품질 시공이 가능하다.Third, the reliance on the formwork process in the reinforced concrete structure can be greatly reduced, resulting in cost reduction, shortening of construction time, and high quality construction.

넷째, 기존의 유로폼 또는 알루미늄폼이 일정한 표준 치수의 거푸집판을 상하좌우로 이어서 사용하는 것과 달리, 본 발명에서는 기둥의 전체 폭 또는 보 전체 높이와 정확히 일치하는 모듈러 거푸집을 사용하여 거푸집판 자체의 횡강성을 확보할 수 있다.Fourthly, unlike the existing Eurofoam or Aluminum foam, which uses a mold plate having a certain standard size in a vertical direction, a left and a right direction, the present invention uses a modular form exactly matching the entire width of the column or the height of the beam, Rigidity can be ensured.

다섯째, 콘크리트 타설 및 양생 후 모듈러 거푸집을 탈형하여 동일한 폭의 부재에 재활용할 수 있으므로 공사비 절감이 가능하다. Fifth, it is possible to demolish the modular formwork after concrete pouring and curing and to recycle it to the same width member, thus it is possible to reduce the construction cost.

여섯째, 제1, 2폼타이를 적절히 배치하여 콘크리트 타설시의 측압을 견딜 수 있도록 모듈러 거푸집을 선조립 골조에 고정할 수 있다.
Sixth, the modular formwork can be fixed to the prefabricated frame so that the first and second foam ties can be appropriately placed to withstand the side pressure at the time of concrete pouring.

도 1은 본 발명에 이용되는 모듈러 거푸집을 도시하는 사시도이다.
도 2 내지 도 7은 PRC 선조립 기둥 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조의 단계별 시공 공정을 도시하는 사시도이다.
도 8은 PRC 선조립 기둥 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조 일부를 도시하는 사시도이다.
도 9는 PSRC 선조립 기둥 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조를 도시하는 사시도이다.
도 10은 PSRC 선조립 기둥 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조 일부를 도시하는 사시도이다.
도 11은 PRC 선조립 보 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조를 도시하는 사시도이다.
도 12는 PSRC 선조립 보 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조를 도시하는 사시도이다.
1 is a perspective view showing a modular die used in the present invention.
FIGS. 2 to 7 are perspective views showing a step-by-step construction process of a prefabricated frame having a modular formwork of the present invention for a PRC prefabricated column framing.
8 is a perspective view showing a part of a prefabricated frame having a modular formwork of the present invention for a PRC prefabricated column framing.
9 is a perspective view showing a prefabricated frame having a modular formwork of the present invention for a PSRC ship building column frame.
10 is a perspective view showing a part of a prefabricated frame having a modular formwork of the present invention for a PSRC ship building column frame.
11 is a perspective view showing a prefabricated frame having a modular formwork of the present invention for a PRC pre-assembled beam frame.
12 is a perspective view showing a prefabricated frame having a modular formwork according to the present invention for a PSRC pre-assembled beam frame.

이하, 첨부한 도면 및 바람직한 실시예에 따라 본 발명을 상세히 설명한다.
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and preferred embodiments.

본 발명의 모듈러 거푸집이 구비된 선조립 골조는 기둥 또는 보로 사용되는 콘크리트 부재의 선조립 골조(10)에서 부재의 모서리에 배치되는 주재(11), 상기 주재(11) 외측에 복수 개가 수직 방향으로 일정 간격 이격되도록 결합되는 것으로서 플레이트에 장공(141)이 형성된 스페이서(14), 모듈러 거푸집(20)을 선조립 골조(10)에 부착하기 위해 각 스페이서(14)에 고정되는 것으로서 양 단부측에 장공(151, 152)이 형성되어 일측 장공(151)은 웨지핀(16)으로 상기 스페이서(14)의 장공(141)과 결합되고, 타측 장공(152)은 웨지핀(16)으로 모듈러 거푸집(20)의 프레임(22)과 결합되는 제1폼타이(15)로 구성되는 모듈러 거푸집 부착용 선조립 골조; 및 상하부 또는 좌우의 제1폼타이(15) 사이에 결합되는 것으로 판재(21)와 판재(21) 후면에 결합된 프레임(22)으로 구성되고, 상기 프레임(22)에는 제1폼타이(15)의 타측 장공(152)과 대응되는 위치에 장공(221)이 형성되어 웨지핀(16)에 의해 제1폼타이(15)와 결합되는 모듈러 거푸집(20); 으로 구성되는 것을 특징으로 한다.
The prefabricated frame provided with the modular formwork of the present invention is characterized in that the prefabricated framework comprises a prefabricated member (11) arranged at a corner of a member in a prefabricated framework (10) of a concrete member used as a column or a beam, A spacer 14 having a long hole 141 formed in the plate so as to be spaced apart from each other by a predetermined distance and a spacer 14 fixed to each spacer 14 for attaching the modular die 20 to the prefabricated framework 10, One of the elongated holes 151 and 152 is engaged with the elongated hole 141 of the spacer 14 by the wedge pin 16 and the other elongated hole 152 is engaged with the wedge pin 16 by the modular die 20 And a first foam tie (15) joined to the frame (22) of the frame (22); And a frame 22 coupled between the upper and lower portions or between the left and right first foam ties 15 and joined to the rear surface of the plate member 21 and the frame 22 is provided with a first foam tie 15 A modular die 20 having an elongated hole 221 formed at a position corresponding to the other elongated hole 152 of the first form tie 15 and coupled to the first form tie 15 by a wedge pin 16; .

삭제delete

본 발명에서 상기 선조립 골조(10)는 콘크리트 기둥 또는 보의 길이 방향 철근을 띠철근이나 스터럽으로 용접 또는 볼트 조립한 PRC(Prefabricated Reinforced Concrete) 선조립 골조를 뜻하거나, 상기 PRC 선조립 골조에서 일부 길이 방향 철근을 ㄱ형강으로 대체한 PSRC(Prefabricated Steel Reinforced Concrete) 선조립 골조를 뜻한다.In the present invention, the prefabricated frame 10 refers to a PRC (Prefabricated Reinforced Concrete) prefabricated frame in which longitudinal reinforcing bars of a concrete column or beam are welded or bolted together with a reinforcing bar or stirrup, Means a PSRC (Prefabricated Steel Reinforced Concrete) prefabricated frame in which the longitudinal steel is replaced by a steel.

도 7에서 볼 수 있는 바와 같이, 본 발명의 모듈러 거푸집이 구비된 선조립 골조는 기둥 또는 보의 길이 방향 주재(11) 외측에 스페이서(14)를 결합하고, 스페이서(14) 외측에 모듈러 거푸집(20)을 위치시킨 다음, 제1폼타이(15)의 양단을 각각 스페이서(14) 및 모듈러 거푸집(20)의 프레임(22) 상면에 결합하여 선조립 골조(10)에 모듈러 거푸집(20)을 부착한다. 7, the prefabricated frame with the modular formwork of the present invention has a structure in which the spacers 14 are joined to the outside of the longitudinal prongs 11 of the posts or beams and the modular formwork The modular dies 20 are attached to the pre-assembled frame 10 by joining both ends of the first foam tie 15 to the upper surfaces of the spacers 14 and the frame 22 of the modular dies 20, .

이때, 제1폼타이(15)와 스페이서(14), 제1폼타이(15)와 모듈러 거푸집(20)의 프레임(22)은 웨지핀(16)에 의하여 상호 결속되며, 이들 결합을 위하여 제1폼타이(15)의 일측과 스페이서(14), 제1폼타이(15)의 타측과 모듈러 거푸집(20)의 프레임(22)에는 상호 대응되는 위치에 웨지핀 결합을 위한 장공(151과 141, 152와 221)이 형성된다. At this time, the first foam tie 15, the spacer 14, the first foam tie 15 and the frame 22 of the modular mold 20 are bound together by the wedge pin 16, One end of one foam tie 15 and the other end of the spacer 14 and the first foam tie 15 and the frame 22 of the modular mold 20 are provided with long holes 151 and 141 , 152 and 221 are formed.

아래에서는 본 발명의 모듈러 거푸집이 구비된 선조립 골조의 단계별 시공 공정을 참고하여 본 발명에 대하여 상세히 설명한다.
Hereinafter, the present invention will be described in detail with reference to a step-by-step construction process of a prefabricated frame having a modular formwork of the present invention.

도 1은 본 발명에 이용되는 모듈러 거푸집(20)을 도시하는 사시도이다.1 is a perspective view showing a modular die 20 used in the present invention.

도 1에 도시된 바와 같이, 본 발명에 이용되는 모듈러 거푸집(20)은 판재(21)와 판재(21) 후면에 결합되는 프레임(22)으로 구성된다.1, a modular die 20 used in the present invention is composed of a plate member 21 and a frame 22 coupled to a rear surface of the plate member 21. As shown in FIG.

상기 프레임(22)은 판재(21) 둘레를 따라 판재(21) 후면에 수직으로 돌출 결합된다. The frame 22 is vertically protruded from the rear surface of the plate 21 along the periphery of the plate 21.

상기 프레임(22) 중 적어도 대면하는 한 쌍의 프레임(22)에는 후에 제2폼타이(18)의 체결을 위한 요홈이 일정 간격 이격되어 복수 개 형성될 수 있으며, 다른 한 쌍의 프레임(22)에는 수직으로 인접하는 모듈러 거푸집(20)과의 긴결을 위하여 복수의 장공이 형성될 수 있다.A plurality of recesses for securing the second foam tie 18 may be formed at a predetermined interval on the pair of frames 22 facing at least one of the frames 22, A plurality of slots may be formed for tightening with the vertically adjacent modular dies 20.

또한, 상기 프레임(22)에는 제1폼타이(15)의 타측 장공(152)과 대응되는 위치에 장공(221)이 일정 간격 이격되어 복수 개 형성되며, 이들 장공(152, 221)을 관통하도록 웨지핀(16)을 결합하여 모듈러 거푸집(20)을 선조립 골조(10)에 결합한다. 이때, 프레임(22)의 장공(221)은 제2폼타이(18)와 상하 또는 좌우 모듈러 거푸집(20)을 일체로 결합할 수 있도록, 상기 요홈에 형성 가능하다. A plurality of long holes 221 are formed in the frame 22 at positions corresponding to the other elongated holes 152 of the first form tie 15 so as to penetrate the elongated holes 152 and 221 The wedge pin (16) is engaged to couple the modular dies (20) to the prefabricated framework (10). At this time, the slot 221 of the frame 22 can be formed in the groove so that the second foam tie 18 and the upper and lower or left and right modular dies 20 can be integrally joined.

상기 모듈러 거푸집(20)의 크기를 기둥 전체 폭 또는 보 전체 높이와 일치하도록 제작하는 경우에는 여러 개의 거푸집판을 결합하는 경우에 비하여 거푸집판 자체의 횡강성을 확보할 수 있다. 그리고 동일한 기둥 폭 또는 보 높이에 재활용할 수 있으며, 이러한 모듈러 거푸집(20)을 상하 또는 좌우로 결합하는 공정만으로 거푸집 시공을 완료할 수 있기 때문에 공정이 간편하다. When the modular formwork 20 is made to have a size corresponding to the entire width of the column or the whole height of the beam, the transverse rigidity of the formwork itself can be secured as compared with the case where a plurality of formwork boards are combined. In addition, the process can be recycled to the same column width or beam height, and the process can be completed simply by joining the modular formwork 20 vertically or horizontally.

본 발명에서는 일실시예로 모듈러 거푸집은 높이 600㎜, 프레임 너비 65㎜로 할 수 있다. 물론, 판재(21) 둘레에 위치되는 프레임(22) 외에 내부에도 보조 프레임을 위치시킬 수 있다.
In an embodiment of the present invention, the modular formwork may have a height of 600 mm and a frame width of 65 mm. Of course, in addition to the frame 22 positioned around the plate 21, the subframe can also be positioned inside.

도 2 내지 도 7은 PRC 선조립 기둥 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조의 단계별 시공 공정을 도시하는 사시도이고, 도 8은 PRC 선조립 기둥 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조 일부를 도시하는 사시도이다. FIGS. 2 to 7 are perspective views showing a step-by-step construction process of a prefabricated frame having a modular formwork according to the present invention for a PRC prefabricated column framing, FIG. 8 is a cross- Fig. 3 is a perspective view showing a part of a prefabricated frame.

PRC 선조립 골조에서는 도 2 내지 도 7에서 볼 수 있는 바와 같이, 상기 주재(11)는 철근이고, 상기 스페이서(14)는 고정구(17)에 의해 주재(11)와 결합되되, 상기 고정구(17)는 ㄱ형강으로 형성되어 ㄱ형강의 외측면이 부재의 외측면을 향하도록 ㄱ형강의 내측면이 주재(11)의 외측에 용접되며, 상기 스페이서(14)는 고정구(17) 외측면에 용접 결합되는 것을 특징으로 한다.2 to 7, the spacer 11 is a reinforcing bar, and the spacer 14 is engaged with the spacer 11 by the fixture 17, and the spacer 17 Is welded to the outer side of the fixing member (17), and the inner side of the b-shaped steel is welded to the outer side of the main member (11) so that the outer side of the b- .

즉, 기둥 모서리에 배치되는 주재(11)인 철근에 직접 스페이서(14)를 결합하기 어려우므로, ㄱ형강인 고정구(17)를 주재(11) 외측에 용접 결합한 다음, 고정구(17) 외측면에 스페이서(14)를 용접 결합한다. 물론, 인접 주재(11) 사이에는 보조철근(12)이 위치될 수 있으며, 주재(11)는 횡방향철근(13)에 의하여 결합된다. That is, since it is difficult to directly connect the spacers 14 to the reinforcing bars 11 disposed at the corners of the columns, the fastening holes 17, which are a-shaped, are welded to the outside of the base 11, The spacer 14 is welded. Of course, the auxiliary reinforcing bars 12 can be positioned between the adjacent reinforcing bars 11, and the reinforcing bars 11 are joined by the transverse reinforcing bars 13.

우선, 모듈러 거푸집이 구비된 PRC 선조립 골조를 시공하기 위하여 기둥 부재를 예로 들면, 복수의 길이 방향 철근에 띠철근을 결합하여 PRC 선조립 골조를 완성한다.First, in order to construct a PRC prefabricated frame having a modular form, a PRC prefabricated frame is completed by joining a plurality of longitudinal reinforcing bars to a girder, for example, a column member.

그리고 도 2에 도시된 바와 같이, 철근 중 기둥 모서리에 배치되는 주재(11)의 길이 방향을 따라 일정 간격 이격되도록 주재(11) 외측에 복수의 고정구(17)를 용접 결합하고, 고정구(17)에 스페이서(14)를 용접한다. 이때, 상기 고정구(17)는 ㄱ형강으로 외측면이 기둥 외측면을 향하도록 ㄱ형강 내측면을 주재(11) 외측에 결합한다.As shown in FIG. 2, a plurality of fasteners 17 are welded to the outside of the main body 11 so as to be spaced apart from each other by a predetermined distance along the longitudinal direction of the main body 11 disposed at the corner of the column, The spacer 14 is welded. At this time, the fixture (17) is connected to the inside of the main section (11) by the inside of the section so that its outer side faces the outside of the column.

상기 스페이서(14)는 고정구(17)에 결합되는 강판으로 두께는 9㎜ 내외로 할 수 있으며, 폭은 고정구(17)인 ㄱ형강의 폭과 같거나 100㎜로 할 수 있다. 상기 스페이서(14)가 고정구(17) 외측으로 돌출된 길이는 콘크리트 피복두께 또는 띠철근 굵기에 콘크리트 피복두께를 더한 크기와 같도록 한다. 따라서 스페이서(14)에 의하여 부재의 피복두께를 확보할 수 있다.
The spacer 14 is a steel plate coupled to the fixture 17 and may have a thickness of about 9 mm and a width equal to or 100 mm of the width of the steel pipe 17. The length of the spacer 14 protruding outside the fixture 17 is made equal to the thickness of the concrete covering or the thickness of the reinforcing bar plus the thickness of the concrete covering. Therefore, the coating thickness of the member can be secured by the spacer 14. [

한편, 주재(11)에 스페이서(14)를 결합하는 과정과는 별도로 도 2에서와 같이, 기둥 최하단에는 모듈러 거푸집(20)을 직접 결합하기보다, 기둥 각 면에 ㄷ형강의 웨브가 위치되도록 ㄷ형강을 배치하고 이들 ㄷ형강의 단부를 상호 볼트 또는 용접 결합하여 평면에서 보아 ㅁ자형의 베이스부(1)를 형성할 수 있다. 도 2에서는 ㄷ형강의 단부에서 ㄷ형강의 상하 플랜지와 웨브에 3면이 접하도록 플레이트를 용접한 다음, ㄷ형강 내측에 결합된 플레이트와 인접 ㄷ형강을 볼트 결합하였다.2, the modular dies 20 are not directly coupled to the bottom end of the column, but the web of the d-shaped steel is positioned on each side of the column, as shown in FIG. 2, separately from the process of coupling the spacer 14 to the main body 11. The base portion 1 can be formed in a plan view by arranging the sections and welding the ends of the sections to each other by bolts or welding. In FIG. 2, the plate is welded to the upper and lower flanges of the U-shaped steel and the web so that the three surfaces are in contact with the web at the end of the U-shaped steel, and then the plate coupled to the inner side of the U-shaped steel is bolted to the adjacent steel.

이때, 베이스부(1)를 구성하는 ㄷ형강의 상부 플랜지는 스페이서(14)의 상면과 일치시키며, 복수의 요홈이 형성된 플레이트를 ㄷ형강의 상면에 결합하거나 ㄷ형강의 상면에 복수의 요홈이 형성된 경우에는 상기 요홈의 상면과 스페이서(14)의 상면을 일치시킬 수 있다.At this time, the upper flange of the d-shaped section constituting the base section 1 is aligned with the upper surface of the spacer 14, and a plate having a plurality of recesses is coupled to the upper surface of the d-shaped section, The upper surface of the groove and the upper surface of the spacer 14 can be made to coincide with each other.

베이스부(1) 상부에 위치되는 스페이서(14)는 모듈러 거푸집(20)의 높이와 일치하는 간격으로 주재(11)에 용접 결합한다.
The spacers 14 located above the base portion 1 are welded to the housing 11 at intervals corresponding to the height of the modular dies 20.

그리고 도 3에서 볼 수 있는 바와 같이, 상기 양단이 스페이서(14)와 베이스부(1)의 요홈 상부에 위치하도록 제1폼타이(15)를 위치시킨다.As shown in FIG. 3, the first foam tie 15 is positioned so that both ends thereof are located above the spacer 14 and the concave portion of the base portion 1.

이때, 제1폼타이(15)는 양단에 각각 장공(151, 152)이 형성되어 일측 장공(151)은 웨지핀(16)으로 스페이서(14)의 장공(141)과 결합하여, 제1폼타이(15)를 스페이서(14)에 고정한다.At this time, the first foam tie 15 is formed with long holes 151 and 152 at both ends thereof so that the one long hole 151 is engaged with the long hole 141 of the spacer 14 by the wedge pin 16, And the tie 15 is fixed to the spacer 14.

그리고 베이스부(1)를 구성하는 ㄷ형강 중 서로 대면하는 ㄷ형강 상부에 양단이 위치하도록 제2폼타이(18)를 복수 개 배열한다. 상기 제2폼타이(18)는 베이스부(1)의 요홈 상면에 위치시킬 수 있다.
A plurality of second foam ties 18 are arranged such that both ends of the two form tiers constituting the base portion 1 are positioned on the upper portion of each of the mutually facing grooves. The second foam tie 18 may be positioned on the upper surface of the groove of the base portion 1. [

다음으로, 도 4에서와 같이 베이스부(1) 상부에 모듈러 거푸집(20)을 1단 올려놓고, 기둥 모서리 측에서 베이스부(1)의 ㄷ형강 상부 플랜지에 형성된 장공(111), 제1폼타이(15)의 타측 장공(152), 모듈러 거푸집(20)의 프레임(22) 중 하부에 위치하는 프레임(22)의 장공(221)을 관통하도록 웨지핀(16)을 삽입한다. 4, the modular formwork 20 is placed on the upper part of the base part 1, and the elongated hole 111 formed in the upper flange of the upper part of the base part 1 at the column edge side, The wedge pin 16 is inserted so as to pass through the elongated hole 221 of the frame 22 located under the other of the frame 22 of the modular die 20 and the other elongated hole 152 of the tie 15.

또한, 기둥 모서리를 제외한 다른 부분에서는 베이스부(1)의 ㄷ형강 상부 플랜지에 형성된 장공(111), 제2폼타이(18)의 단부에 형성된 장공, 모듈러 거푸집(20)의 프레임(22) 중 하부에 위치하는 프레임(22)의 장공(221)을 관통하도록 웨지핀(16)을 삽입한다.In other parts except for the corner of the column, the elongated hole 111 formed in the upper flange of the upper section of the base portion 1, the slot formed at the end of the second foam tie 18, The wedge pin 16 is inserted so as to pass through the elongated hole 221 of the lower frame 22.

이로써, 모듈러 거푸집(20) 1단을 PRC 선조립 골조에 고정한다.
As a result, the first stage of the modular dies 20 is fixed to the PRC ship assembly frame.

기둥 4면에 모듈러 거푸집(20)을 고정하여 모듈러 거푸집(20) 1단을 시공한 다음에는 수직으로 인접하는 모듈러 거푸집(20)을 상호 고정하기 위하여, 도 5에서와 같이 인접 모듈러 거푸집(20)의 측면 프레임(22)에 양 다리부가 결합되도록 ㄱ형강으로 구성되는 보조구(19)를 위치시킨다. 그리고 보조구(19)에 형성된 장공과 모듈러 거푸집(20)의 측면 프레임(22)에 형성된 장공을 관통하도록 보조구(19) 일면에서 웨지핀(16)을 삽입하고, 보조구(19) 타측으로 돌출된 웨지핀(16)의 장공을 관통하도록 다른 웨지핀(16)을 또 삽입하여 보조구(19)를 고정한다. 5, the modular dies 20 are fixed to the four sides of the columns to form the modular dies 20, and then the adjacent modular dies 20, as shown in FIG. 5, And an auxiliary tool (19) made of a steel is positioned so that both legs are coupled to the side frame (22). The wedge pin 16 is inserted from one side of the auxiliary tool 19 so as to pass through the slot formed in the auxiliary tool 19 and the slot formed in the side frame 22 of the modular tool 20, Another wedge pin 16 is inserted again through the elongated hole of the projected wedge pin 16 to fix the auxiliary port 19.

도 8의 (a)에서 이와 관련된 선조립 골조 일부를 도시하는 사시도를 확인할 수 있다.
In FIG. 8 (a), a perspective view showing a part of the prefabricated frame related to this is shown.

이후, 도 6에서와 같이, 모듈러 거푸집(20) 1단의 프레임(22) 상단과 스페이서(14) 상단에 제1폼타이(15)를 위치시킨 다음, 제1폼타이(15)의 일측 장공(151)과 스페이서(14)의 장공(141)에 웨지핀(16)을 삽입하여 제1폼타이(15)를 고정한다. 6, the first foam tie 15 is placed on the upper end of the frame 22 of the first end of the modular mold 20 and the upper end of the spacer 14, The first foam tie 15 is fixed by inserting the wedge pin 16 into the elongated hole 141 of the spacer 151 and the spacer 14.

이때, 모듈러 거푸집(20)의 상부 프레임(22)은 스페이서(14)의 상면과 일치시키며, 모듈러 거푸집(20)의 상부 프레임(22) 상면에 복수의 요홈이 형성된 경우에는 요홈의 상면과 스페이서(14)의 상면을 일치시킬 수 있다.In this case, the upper frame 22 of the modular formwork 20 coincides with the upper face of the spacer 14, and when a plurality of recesses are formed on the upper frame 22 of the modular formwork 20, 14 can be made to coincide with each other.

그리고 마주보는 모듈러 거푸집(20)의 프레임(22)을 적어도 하나 이상의 제2폼타이(18)로 상호 연결한다. 상기 제2폼타이(18)는 마주보는 모듈러 거푸집(20)의 간격 유지를 위하여 설치되는 것으로, 띠철근 또는 스터럽 역할을 겸하나 구조계산 결과에 따라 별도로 띠철근 또는 스터럽을 추가할 수도 있다.
And interconnects the frame 22 of the opposing modular dice 20 with at least one second foam tie 18. The second foam tie 18 is installed to maintain the space of the opposing modular dies 20 and may also serve as a reinforcing bar or a stirrup, but may additionally include a reinforcing bar or stirrup depending on the result of the structure calculation.

다음으로, 도 7에서 볼 수 있는 바와 같이, 모듈러 거푸집(20) 1단 상부에 모듈러 거푸집(20) 2단을 위치시키고, 기둥 모서리 측에서 모듈러 거푸집(20) 1단 상부 프레임(22)에 형성된 장공(221), 제1폼타이(15)의 타측 장공(152), 모듈러 거푸집(20) 2단 하부 프레임(22)에 형성된 장공(221)을 관통하도록 웨지핀(16)을 삽입한다. 7, the two ends of the modular formwork 20 are placed on the top of the first stage of the modular formwork 20 and the two ends of the modular formwork 20 are formed on the first end of the modular formwork 20, The wedge pin 16 is inserted so as to pass through the slot 221 formed in the second lower frame 22 of the modular die 20 and the other elongated hole 152 of the first foam tie 15 and the modular die 20.

또한, 기둥 모서리를 제외한 다른 측에서는 모듈러 거푸집(20) 1단 상부 프레임(22)에 형성된 장공(221), 제2폼타이(18)의 단부에 형성된 장공, 모듈러 거푸집(20) 2단 하부 프레임(22)에 형성된 장공(221)을 관통하도록 웨지핀(16)을 삽입한다. On the other side except for the corner of the column, a slot 221 formed in the first upper frame 22 of the modular die 20, a slot formed in the end of the second foam tie 18, a modular die 20, The wedge pin 16 is inserted so as to pass through the long hole 221 formed in the base plate 22.

이로써, 모듈러 거푸집(20) 2단을 PRC 선조립 골조에 고정하고, 앞서 도 5에서 설명한 바와 같이, 인접 모듈러 거푸집(20) 2단의 측면 프레임(22)에 양 다리부가 결합되도록 ㄱ형강으로 구성되는 보조구(19)를 위치시켜, 수직으로 인접하는 모듈러 거푸집(20)을 상호 고정한다. As a result, as shown in FIG. 5, the two modular molds 20 are fixed to the PRC prefabricated frame, and as shown in FIG. 5, the side frames 22 of the adjacent modular molds 20 And the vertically adjoining modular dies 20 are secured to each other.

도 8의 (b)에서 이와 관련된 선조립 골조 일부를 도시하는 사시도를 확인할 수 있다.
In FIG. 8 (b), a perspective view showing a part of the prefabricated frame is shown.

이후, 상기 도 6 내지 도 7에서 설명한 공정을 반복 실시하다가, 기둥의 모듈러 거푸집(20) 상단이 보 하단 높이에 도달하면, 최상부 모듈러 거푸집(20)의 프레임(22) 상부에 제1폼타이(15)와 제2폼타이(18)를 조립하여 고정한다. 6 to 7 are repeated. When the upper end of the modular form 20 of the column reaches the lower end height, a first form tie (not shown) is formed on the upper part of the frame 22 of the uppermost modular form 20 15 and the second foam tie 18 are assembled and fixed.

그리고 종래의 거푸집 작업에서와 동일한 방법으로 패널존을 정리한다.
The panel zones are organized in the same manner as in the conventional formwork.

상기와 같은 공정을 통하여 모듈러 거푸집(20)의 부착 작업이 완료되면, 종래 재래식 거푸집에서 사용하는 가설보, 가설기둥, 가새 및 세퍼레이터 시공 작업과 측량 작업을 생략하면서 수직도와 수평도, 일정 크기의 피복두께를 확보할 수 있다. 또한, 콘크리트 타설 및 양생 후 웨지핀(16)을 제거하고 모듈러 거푸집(20)과 베이스부(1)를 탈형하여 동일한 폭의 기둥에 재활용할 수 있다.
When the work of attaching the modular formwork 20 is completed through the above-described process, the construction of the conventional formwork is omitted, and the vertical, horizontal, and uniform sized cloths, The thickness can be secured. Further, after the concrete pouring and curing, the wedge pin 16 can be removed and the modular formwork 20 and the base part 1 can be demoulded and recycled to the columns of the same width.

도 9는 PSRC 선조립 기둥 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조를 도시하는 사시도이고, 도 10은 PSRC 선조립 기둥 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조 일부를 도시하는 사시도이다.FIG. 9 is a perspective view showing a pre-assembled frame having the modular formwork of the present invention for a PSRC pre-assembled column framing, and FIG. 10 is a part of a pre-assembled frame having the modular formwork of the present invention for a PSRC pre- It is a perspective view.

PSRC 선조립 골조에서 상기 주재(11)는 ㄱ형강이고, 상기 스페이서(14)는 형강의 외측면에 용접 결합되는 것을 특징으로 한다.In the PSRC prefabricated frame, the prestressing member (11) is a section steel, and the spacer (14) is welded to the outer surface of the section steel.

기둥 주재(11)로 철근 대신 ㄱ형강을 사용하는 것을 제외하고는 각부 구성 및 결합 관계는 앞서 도 2 내지 도 8의 PRC 선조립 기둥 골조에 대하여 설명한 것과 동일하다. The angular configuration and coupling relationship are the same as those described above with respect to the PRC prefabricated column framings of FIGS. 2 to 8, except that a steel beam is used instead of the reinforcing bar as the column support member 11.

도 10의 (a)는 모듈러 거푸집(20)을 1단 시공하였을 경우에 대한 사시도이고, 도 10의 (b)는 모듈러 거푸집(20)을 2단 시공하였을 경우에 대한 사시도이다.
10 (a) is a perspective view of a case where the modular dies 20 are installed in one stage, and FIG. 10 (b) is a perspective view of a case where the modular dies 20 are installed in two stages.

도 11은 PRC 선조립 보 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조를 도시하는 사시도이고, 도 12는 PSRC 선조립 보 골조에 대한 본 발명 모듈러 거푸집이 구비된 선조립 골조를 도시하는 사시도이다.FIG. 11 is a perspective view showing a pre-assembled frame having the modular formwork of the present invention for a PRC pre-assembled beam, FIG. 12 is a perspective view showing a pre-assembled frame having the modular formwork of the present invention for a PSRC pre- to be.

앞서, 도 2 내지 도 10의 실시예에서는 본 발명을 기둥용 거푸집 시공과 관련하여 설명하였다. In the embodiments of FIGS. 2 to 10, the present invention has been described in connection with the molding of a column.

기둥은 기둥의 4면에 기둥용 모듈러 거푸집(20)을 시공하는 반면, 보는 도 11 내지 도 12에서와 같이 하부면과 좌우측면인 3면에 보용 모듈러 거푸집(20)을 시공한다는 점에서 차이가 있다. 11 to 12, the gauging module 20 is constructed on three surfaces of the lower surface and the left and right sides, have.

특히, 기둥에서는 수직 방향으로 일정 간격 이격되도록 복수 개의 스페이서(14)를 각각 수평 방향으로 설치하고 상하로 인접하도록 모듈러 거푸집(20)을 위치시켰으나, 보에서는 수평 방향으로 일정 간격 이격되도록 복수 개의 스페이서(14)를 각각 수직 방향으로 설치하고 좌우로 인접하도록 모듈러 거푸집(20)을 위치시킨다는 점에서 차이가 있다. Particularly, in the column, the plurality of spacers 14 are horizontally arranged so as to be spaced apart from each other by a predetermined distance in the vertical direction, and the modular dies 20 are positioned vertically adjacent to each other. However, 14 are provided in the vertical direction and the modular dies 20 are positioned so as to be horizontally adjacent to each other.

따라서 보 거푸집에서는 베이스부(1) 시공과 관련된 내용만 삭제하고 기둥 주재 대신 보 주재에 도 2 내지 도 7에서 설명한 과정을 동일하게 수행하여 본 발명 본 발명 모듈러 거푸집이 구비된 선조립 골조의 시공을 완료한다.
Therefore, in the beam form, only the contents relating to the construction of the base part (1) are deleted, and the steps described in FIG. 2 to FIG. 7 are performed in the same manner as the beam- Complete.

1: 베이스부 111: 장공
10: 선조립 골조 11: 주재
12: 보조철근 13: 횡방향철근
14: 스페이서 141: 장공
15: 제1폼타이 151, 152: 장공
16: 웨지핀 17: 고정구
18: 제2폼타이 19: 보조구
20: 모듈러 거푸집 21: 판재
22: 프레임 221: 장공
1: Base portion 111: Slot
10: Prefabricated frame 11: Presence
12: auxiliary reinforcing steel 13: transverse reinforcing steel
14: spacer 141: long hole
15: first form tie 151, 152: long side
16: wedge pin 17: fastener
18: second form tie 19:
20: Modular die 21: Plate
22: Frame 221: Slot

Claims (5)

기둥 또는 보로 사용되는 콘크리트 부재의 선조립 골조(10)에서 부재의 모서리에 배치되는 주재(11), 상기 주재(11) 외측에 복수 개가 수직 방향으로 일정 간격 이격되도록 결합되는 것으로서 플레이트에 장공(141)이 형성된 스페이서(14) 및 모듈러 거푸집(20)을 선조립 골조(10)에 부착하기 위해 각 스페이서(14)에 고정되는 것으로서 양 단부측에 장공(151, 152)이 형성되어 일측 장공(151)은 웨지핀(16)으로 상기 스페이서(14)의 장공(141)과 결합되고, 타측 장공(152)은 웨지핀(16)으로 모듈러 거푸집(20)의 프레임(22)과 결합되는 제1폼타이(15)로 구성되는 모듈러 거푸집 부착용 선조립 골조; 및
상하부 또는 좌우 제1폼타이(15) 사이에 결합되는 것으로 판재(21)와 판재(21) 후면에 결합된 프레임(22)으로 구성되고, 상기 프레임(22)에는 제1폼타이(15)의 타측 장공(152)과 대응되는 위치에 장공(221)이 형성되어 웨지핀(16)에 의해 제1폼타이(15)와 결합되는 모듈러 거푸집(20); 으로 구성되는 것을 특징으로 하는 모듈러 거푸집이 구비된 선조립 골조.
(11) disposed at the edge of a member in a pre-assembled frame (10) of a concrete member used as a column or a beam, and a plurality of holes are provided outside the base member (11) Are formed on both sides of the spacers 14 to fix the spacers 14 and the modular dies 20 to the prefabricated framework 10 so that one long side 151 Is joined to the elongated hole 141 of the spacer 14 by a wedge pin 16 and the other elongated hole 152 is engaged with the frame 22 of the modular mold 20 by a wedge pin 16. [ And a tie (15); And
And a frame 22 coupled between the upper and lower portions or between the left and right first foam ties 15 by a plate member 21 and a frame 22 coupled to the rear surface of the plate member 21, A modular die 20 having an elongated hole 221 formed at a position corresponding to the other elongated hole 152 and coupled with the first foam tie 15 by a wedge pin 16; Wherein the modular formwork comprises a plurality of modular dies.
제1항에 있어서,
상기 주재(11)는 철근이고, 상기 스페이서(14)는 고정구(17)에 의해 주재(11)와 결합되되, 상기 고정구(17)는 ㄱ형강으로 형성되어 ㄱ형강의 외측면이 부재의 외측면을 향하도록 ㄱ형강의 내측면이 주재(11)의 외측에 용접되며, 상기 스페이서(14)는 고정구(17) 외측면에 용접 결합되는 것을 특징으로 하는 모듈러 거푸집이 구비된 선조립 골조.
The method according to claim 1,
The spacer (11) is a reinforcing bar, and the spacer (14) is coupled to the spacer (11) by a fixture (17), and the fixture (17) Wherein the inner surface of the a section steel is welded to the outside of the main body (11) and the spacer (14) is welded to the outer surface of the fixture (17).
제1항에 있어서,
상기 주재(11)는 ㄱ형강이고, 상기 스페이서(14)는 형강의 외측면에 용접 결합되는 것을 특징으로 하는 모듈러 거푸집이 구비된 선조립 골조.
The method according to claim 1,
Wherein the spacer (11) is a section steel and the spacer (14) is welded to the outer surface of the section steel.
제1항에 있어서,
마주보는 모듈러 거푸집(20)의 간격 유지를 위해 마주보는 모듈러 거푸집(20)의 프레임(22)을 적어도 하나 이상의 제2폼타이(18)로 상호 연결하는 것을 특징으로 하는 모듈러 거푸집이 구비된 선조립 골조.
The method according to claim 1,
Characterized in that the frame (22) of the opposing modular dies (20) is interconnected with at least one second foam tie (18) to maintain the spacing of the opposing modular dies (20) Framing.
삭제delete
KR1020130090722A 2013-07-31 2013-07-31 Prefabricated frame with modular concrete form KR101427208B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130090722A KR101427208B1 (en) 2013-07-31 2013-07-31 Prefabricated frame with modular concrete form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130090722A KR101427208B1 (en) 2013-07-31 2013-07-31 Prefabricated frame with modular concrete form

Publications (1)

Publication Number Publication Date
KR101427208B1 true KR101427208B1 (en) 2014-08-07

Family

ID=51749729

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130090722A KR101427208B1 (en) 2013-07-31 2013-07-31 Prefabricated frame with modular concrete form

Country Status (1)

Country Link
KR (1) KR101427208B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101609778B1 (en) * 2015-04-30 2016-04-06 (주)센벡스 System for supporting Lightweight form of Composite column of steel and concrete
KR101818889B1 (en) * 2017-08-04 2018-01-16 박세현 Mold supporting device for pouring concrete
KR20220126001A (en) * 2021-03-08 2022-09-15 주식회사 한화건설 construction method and structure for TG beam form
KR102526359B1 (en) * 2022-09-19 2023-05-04 (주)피씨엠글로벌기술사건축사사무소 One-piece construction method for vertical windpipes among firefighting ventilation systems

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040068523A (en) * 2003-08-14 2004-07-31 양주남 device and apparatus of connecting pannels each others and method thereof
KR100695491B1 (en) * 2006-03-15 2007-03-16 양지수 A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
KR20110015916A (en) * 2009-08-10 2011-02-17 최만수 Form tie for fixing concrete form
KR20110076722A (en) * 2009-12-28 2011-07-06 김시용 Construction mold panel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040068523A (en) * 2003-08-14 2004-07-31 양주남 device and apparatus of connecting pannels each others and method thereof
KR100695491B1 (en) * 2006-03-15 2007-03-16 양지수 A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
KR20110015916A (en) * 2009-08-10 2011-02-17 최만수 Form tie for fixing concrete form
KR20110076722A (en) * 2009-12-28 2011-07-06 김시용 Construction mold panel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101609778B1 (en) * 2015-04-30 2016-04-06 (주)센벡스 System for supporting Lightweight form of Composite column of steel and concrete
KR101818889B1 (en) * 2017-08-04 2018-01-16 박세현 Mold supporting device for pouring concrete
KR20220126001A (en) * 2021-03-08 2022-09-15 주식회사 한화건설 construction method and structure for TG beam form
KR102570377B1 (en) * 2021-03-08 2023-08-23 주식회사 한화건설 construction method and structure for TG beam form
KR102526359B1 (en) * 2022-09-19 2023-05-04 (주)피씨엠글로벌기술사건축사사무소 One-piece construction method for vertical windpipes among firefighting ventilation systems

Similar Documents

Publication Publication Date Title
KR101030419B1 (en) Joint structure of vertical member and horizontal member
KR102236828B1 (en) Construction method of prefabricated wall using prefabricated wall module
KR101766807B1 (en) the rigid connection structure between precast concrete column and precast concrete girder and the rigid connection structure between precast concrete girder and precast concrete beam using the plate, the modular system using the same
US10494807B2 (en) Construction of the prefabricated column and beam type
KR20130012898A (en) Joint of steel column
KR101920417B1 (en) Seismic retrofit structure
US10837167B2 (en) Construction of the prefabricated column and beam type
KR101427208B1 (en) Prefabricated frame with modular concrete form
KR101587583B1 (en) Mega Column and Construction Method thereof
KR20140012827A (en) The pillar and girder connecting structure for a building
KR20150075437A (en) Joint structure of remodeling modular unit for seismic retrofitting and joint method of using it
KR101050167B1 (en) Precasted slab module and knock-down type modular construction of use it and method of the same
JP2000170285A (en) Connecting method for steel sheet concrete structural wall and junction structure
KR101735077B1 (en) Bridge deck using precast concrete panel
KR200383309Y1 (en) Form system for construction of underground slab
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
KR101954387B1 (en) Grid precast concrete structure and constructing method thereof
KR102296982B1 (en) Transfer Structure Construction Method Using U-shaped Steel Girder
JP5001897B2 (en) Building construction method
KR102266630B1 (en) Construction method of building with composite beam structure using module deck
JP3137448B2 (en) Construction method of concrete main tower
KR100626326B1 (en) concrete structure
KR20220126001A (en) construction method and structure for TG beam form
KR102289243B1 (en) Underground Parking Lot Construction Method Using Pre-assembled bar column, U-shaped beam, Corrugated deck

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant