KR101379949B1 - Corrugated pipes fixing structure and corrugated piping construction method thereby - Google Patents

Corrugated pipes fixing structure and corrugated piping construction method thereby Download PDF

Info

Publication number
KR101379949B1
KR101379949B1 KR1020120141652A KR20120141652A KR101379949B1 KR 101379949 B1 KR101379949 B1 KR 101379949B1 KR 1020120141652 A KR1020120141652 A KR 1020120141652A KR 20120141652 A KR20120141652 A KR 20120141652A KR 101379949 B1 KR101379949 B1 KR 101379949B1
Authority
KR
South Korea
Prior art keywords
fixing
corrugated pipe
floor
corrugated
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020120141652A
Other languages
Korean (ko)
Inventor
황혜자
이용춘
이근기
한창완
Original Assignee
(주)케이에스피아이피
황혜자
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)케이에스피아이피, 황혜자 filed Critical (주)케이에스피아이피
Priority to KR1020120141652A priority Critical patent/KR101379949B1/en
Application granted granted Critical
Publication of KR101379949B1 publication Critical patent/KR101379949B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/28Installations of cables, lines, or separate protective tubing therefor in conduits or ducts pre-established in walls, ceilings or floors
    • H02G3/283Installations of cables, lines, or separate protective tubing therefor in conduits or ducts pre-established in walls, ceilings or floors in floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/26Installations of cables, lines, or separate protective tubing therefor directly on or in walls, ceilings, or floors
    • H02G3/263Installation, e.g. suspension, of conduit channels or other supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 발명은 주름관 배관 고정구조와 이를 이용한 주름관 배관시공방법에 관한 것으로서, 보다 상세하게는 본 출원인의 선출원된 특허출원 제2012-87951호의 이용발명으로 바닥 콘크리트 타설 전,후 전기, 통신 및 설비 등에서 매립에 사용되는 다수의 주름관 배관들의 위치고정과 각종 단자함과 수전함 등의 벽체매립함과, 일대일 이중관배관 원형수전구 및 전기, 통신의 각종 프레임의 고정을 위한 매립볼트를 용이하고 정밀하게 설치가능하며 상하층간 누수가 방지되고 바닥콘크리트 두께 변동에 따른 조절이 용이하고 안정되고 규격화된 반복작업이 가능하여, 각 세대별로 동질의 시공을 제공하고 벽체매립함 및 프레임 고정을 용이하게 수행할 수 있어 인건비 및 작업시간 절감과 하자 발생률이 현저히 감소되어 작업능률이 매우 우수하고 효율 및 안전성이 높은 주름관 배관 고정구조와 이를 이용한 주름관 배관시공방법을 제공하는 것을 특징으로 한다.
상기 목적달성을 위한 본 발명은 바닥 거푸집에 고정대결합구를 1번 고정한 뒤 반복적으로 주름관배관고정대를 고정하기 위한 기준으로 사용하되 주름관배관고정대의 결합 및 직립이 용이하고 상,하부지지구 및 두께조절봉이 온전히 매립되어 상하층 누수가 방지되며 주름관배관고정대와 결합이 용이한 고정틀을 제공하되 분리결합이 가능하고 구조를 변경하여 전체 무게를 경감하여 운반 및 설치가 용이하고 다수의 주름관 배관을 동시에 수용하도록 구조를 개선하여 전기, 통신 및 설비에 널리 사용되는 주름관 배관을 용이하게 고정하고 각종 벽체매립함 또는 프레임을 함께 시공하기 매우 용이한 주름관 배관 고정구조 및 이를 이용한 배관시공방법에 관한 것을 그 기술적 요지로 한다.
The present invention relates to a corrugated pipe fixing structure and a corrugated pipe construction method using the same, and more specifically, in the invention of the present application of the prior application of the Patent Application No. 2012-87951 of the present applicant, embedded in electricity, communication and facilities before and after floor concrete placement It is possible to easily and precisely install the location of a large number of corrugated pipes used in the wall, and to fill the wall of various terminal boxes and faucet boxes, and the buried bolts for fixing one-to-one double pipe pipe circular faucet and various frames for electricity and communication. It is possible to prevent leakage between upper and lower floors, and to adjust easily according to the change of floor concrete thickness, and to perform stable and standardized repetitive work, and to provide homogeneous construction for each generation, and to easily perform wall reclamation and frame fixing. Reduction of work time and remarkable reduction of defect rate result in excellent work efficiency, efficiency and safety It characterized in that it provides a high corrugated piping fixing structure with corrugated pipe construction method using the same.
The present invention for achieving the above object is used as a criterion for repeatedly fixing the fixing rod coupling sphere to the bottom formwork and to repeatedly fix the corrugated pipe fittings, and easy to combine and erect the corrugated pipe fittings, upper and lower supports and thickness adjustment rods It is completely embedded to prevent leakage of upper and lower layers, and provides a fixed frame that can be easily combined with the corrugated pipe fitting, but can be separated and combined, and it is easy to carry and install by reducing the overall weight by changing the structure. The technical gist of the present invention relates to a corrugated pipe fixing structure and a pipe construction method using the same, which are very easy to fix corrugated pipes widely used in electricity, communication, and facilities, and to construct various wall filling boxes or frames together. .

Description

주름관 배관 고정구조와 이를 이용한 주름관 배관시공방법{Corrugated Pipes Fixing Structure and Corrugated Piping Construction Method Thereby}Corrugated Pipes Fixing Structure and Corrugated Piping Construction Method Thereby}

본 발명은 주름관 배관 고정구조와 이를 이용한 주름관 배관시공방법에 관한 것으로, 보다 상세하게는 본 출원인의 선출원된 특허출원 제2012-87951호의 이용발명으로 바닥 콘크리트 타설 전,후 전기, 통신 및 설비 등에서 매립에 사용되는 다수의 주름관 배관들의 위치고정과 각종 단자함과 수전함 등의 벽체매립함과 각종 프레임의 고정을 위한 매립볼트를 용이하고 정밀하게 설치가능하며 상하층간 누수가 방지되고 바닥콘크리트 두께 변동에 따른 조절이 용이하고 안정되고 규격화된 반복작업이 가능하여, 각 세대별로 동질의 시공을 제공하고 벽체매립함과, 일대일 이중관배관 원형수전구 및 전기, 통신의 각종 프레임 고정을 용이하게 수행할 수 있어 인건비 및 작업시간 절감과 하자 발생률이 현저히 감소되어 작업능률이 매우 우수하고 효율 및 안전성이 높은 주름관 배관 고정구조와 이를 이용한 주름관 배관시공방법에 관한 것이다.
The present invention relates to a corrugated pipe fixing structure and a corrugated pipe construction method using the same. More specifically, the present invention relates to the use of the patent application No. 2012-87951, which is applied before and after the floor concrete is embedded in electricity, communication and facilities. It is possible to easily and precisely install the burying bolts for fixing the position of a plurality of corrugated pipes used in the pipes, wall filling boxes such as various terminal boxes and faucets, and fixing various frames, preventing leakage between upper and lower layers, and changing the thickness of the floor concrete. It is easy to adjust, stable, and standardized repetitive work is possible, and it is possible to provide homogeneous construction for each generation, to bury the wall, and to easily carry out one-to-one double pipe piping circular light bulb and fixing various frames of electricity and communication. Reduction of work and work time and the reduction of defects rate significantly result in excellent work efficiency, efficiency and safety St. high corrugated piping fixing structure and relates to a corrugated pipe construction method using the same.

일반적으로 건축물 내 기본적으로 설치되는 전기선, 통신선, 난방수 공급 및 환수 메인배관, 냉온수배관, 환기배관, 에어컨배관 등은 대부분 바닥, 천장, 벽체를 통해 연결되며 이중 바닥과 벽체를 통해 연결될 때는 미리 매립된 주름관 배관을 통해 연결되고 있다. In general, electric lines, communication lines, heating water supply and return main piping, cold and hot water piping, ventilation piping, and air conditioning piping, which are basically installed in a building, are mostly connected through floors, ceilings, and walls. Connected through a corrugated pipe.

이러한 주름관 배관의 매립시공은 바닥슬랩(Slab) 거푸집 설치후 바닥철근이 배근된 상태에서, 매립될 주름관 배관을 바닥철근에 소정길이의 철근으로 세워 바닥 콘트리트를 타설하되 주름관의 단부가 콘크리트 바닥 상부로 돌출되도록 매립하며 바닥 콘크리트가 양생된 이후에 거푸집 해체작업을 하고 벽체에 주름관 설치작업시에 상기 바닥 상부로 돌출된 주름관 배관을 연결한 벽체매립함을 마감될 벽체에 설치하여 벽돌조적, 방수후 미장작업, 타일 또는 벽지작업과 마무리연결작업을 통해 시공되고 있다.In the construction of the corrugated pipe, the bottom slab is installed after the floor slab formwork is installed. After the floor concrete is cured, form dismantling work and wall corrugated pipe connecting the corrugated pipe projecting to the upper part of the floor is installed on the wall to be finished and plastered after waterproofing. It is constructed through work, tile or wallpaper work and finishing connection work.

그러나, 종래의 이러한 주름관 배관시공은 바닥 콘크리트 타설전 바닥상부로 돌출되는 주름관 배관들의 배관 위치를 하나씩 하나씩 설계위치를 찾아 해당위치에 고정되도록 최소 1번 이상 절곡된 소정길이의 'L'자 또는 지그재그 'L'자 형상으로 절곡된 철근을 이용하여 철사로 묶거나 용접하는 작업을 주름관 배관 설치 위치마다 다수 번 해야하는데 잘 세워지지 않아 작업시간이 많이 걸리며 위치도 부정확한 문제점과, 공동주택의 경우 각 세대마다 반복적으로 동일한 작업을 반복해야 하는데, 반복작업의 소요시간이 많이 걸려 작업효율이 낮으며 이로 인한 인건비 및 작업시간 증가와 각 세대마다 동질(同質)의 시공이 되지 못하는 문제점과, 콘크리트 옹벽 및 천장 거푸집 해체작업시 낙하하는 무거운 거푸집에 의해 바닥 슬랩 상부로 돌출된 주름관 배관들이 파손되고 형틀목공 작업자의 거푸집 해체 및 운반정리시 부주의로 인한 파손에 취약한 문제점과, 바닥 콘크리트 타설 후 돌출된 'L'자형 철근 다발을 절단하고 조적벽의 경우 바닥을 뚫고 철근을 박아 넣은 뒤 세워 벽체매립함 및 일대일 이중관배관 원형수전구를 철사로 묶어 고정하는데, 철근 다발을 절단하는 작업은 매우 위험하고 절단에 사용되는 산소절단기에 자칫 주름관 배관의 손상을 초래할 수 있어 매우 조심스러운 작업이며 철근을 세우기 위해 바닥을 뚫는 작업 역시 매립된 주름관 배관을 관통하거나 파손시키는 문제점과, 파손된 주름관 배관의 교체는 파손부위를 절단하고 새로운 배관으로 연결하거나 바닥을 일부 복개후 연결하고 부분 재포장하는 문제점을 해결하고자 도 1에서 보는 바와 같이 본 출원인의 선출원된 특허출원 제2012-87951호에서, 배관 고정틀과 이를 이용한 배관시공방법을 개시한 바 있다. However, the conventional corrugated pipe construction finds the design position of the corrugated pipes projecting one by one above the floor before placing the concrete one by one, and at least one 'L' letter or zigzag of a predetermined length bent at least one time to be fixed to the corresponding position. The work of tying or welding wires using reinforcing bars bent into 'L' shape should be done many times for each installation position of corrugated pipes. It is necessary to repeat the same work repeatedly for each generation, but it takes a lot of time for repetitive work, resulting in low work efficiency, resulting in increased labor cost and work time, and inability to build homogeneous construction for each generation, and concrete retaining walls and Corrugated pipe protruded to the top of floor slab by heavy formwork falling during ceiling formwork dismantling The pipes are damaged and fragile due to inadvertent damage during form dismantling and transportation arrangement of the moldworkers, and after the concrete is laid, the 'L' shaped reinforcement bundles are cut and in the case of masonry walls, they are drilled into the floor and embedded with rebar Wall embedding and one-to-one double pipe piping circular taps are fixed with wires. Cutting the bundles of rebars is very dangerous and can cause damage to corrugated pipes. Drilling the floor to build also solves the problem of penetrating or breaking the buried corrugated pipe, and replacing the broken corrugated pipe by cutting the damaged part and connecting it with a new pipe or connecting the floor after partially covering and repacking it. As shown in FIG. 1, the applicant filed an earlier filed patent application. In 2012-87951, a pipe fixing frame and a pipe construction method using the same have been disclosed.

또한, 도 2에서 보는 바와 같이, 종래기술 중 바닥에 주름관을 세워 고정하기 위해 바닥 거푸집(1)의 상면에 암나사(62)를 용접하고 전산봉(63)을 결합시킨 뒤, 그 외주면에 합성수지관(64)을 세워 바닥 콘크리트 타설시 암나사(62)와 전산봉(63)이 매립되지 않도록 하고 상기 전산봉(63)에 주름관 배관(3)이 지지되도록 철사로 고정하여 콘크리트(65) 타설시 매립하며, 양생 뒤 전산봉(63)을 돌려 뺀 뒤 거푸집(1)을 제거하는 시공방법이 사용되고 있으나, 전산봉(63)이 제거된 주름관 배관(3)은 홀로 세워져 있어 파손에 무방비로 노출되어 있으며 바닥 콘크리트를 통해 아래층과 관통 매립된 합성수지관(64)에 의해 구획된 내경에는 추가적으로 바닥을 막고 별도의 시멘트(66)를 타설하는 작업이 필요하고 합성수지관(64) 내에서 양생된 시멘트(66)는 특성상 합성수지와 온전히 밀착되지 않아 상층에서 누수 발생시 누수된 물이 합성수지관(64) 모르타르 틈새를 통해 하층으로 누수가 자주 발생되는 문제점이 있었다. In addition, as shown in Figure 2, after welding the female screw 62 to the upper surface of the bottom formwork 1 to form a corrugated pipe in the bottom of the prior art, combined with a computer rod 63, the synthetic resin pipe on the outer peripheral surface (64) to prevent the female screw (62) and the computer rod (63) from being buried when placing the floor concrete, and fixed with a wire so that the corrugated pipe (3) is supported on the computer rod (63) when the concrete is embedded And, after curing, the construction method is used to remove the formwork (1) after turning off the threaded rod (63), but the corrugated pipe (3) from which the rod (63) has been removed is erected and exposed to damage without damage. The inner diameter partitioned by the bottom layer and the synthetic resin pipe 64 embedded through the bottom concrete requires additional work to block the floor and pour a separate cement 66, and the cement 66 cured in the plastic pipe 64. Is synthetic resin and Still does not close the leak in the event of water leakage from the upper layer there is a problem in that leakage often occurs in the lower layer through the resin tube 64, the mortar gap.

그러나, 본 출원인은 지속적인 개발 및 연구를 계속하던 중 몇 가지 개선점을 발견하고 이를 개선하고자 본 발명을 안출하게 되었다.However, the Applicant has come up with the present invention to discover several improvements and to improve them while continuing development and research.

먼저, 다수의 철사로 고정되는 지지철근(51)을 직립으로 고정시키기가 매우 어려워 구조적 개선이 필요하다.First, it is very difficult to fix the support bars 51 fixed by a plurality of wires in an upright structure, and structural improvement is necessary.

둘째, 바닥에 매립된 다수의 지지철근(51)을 고정틀(50)의 외주연에 결합된 철근고정수단(52)에 관통되도록 동시에 삽입하는 작업이 용이하지 않아, 지지철근(51) 및 철근고정수단(52)의 결합구조를 보다 간단하고 결합이 용이한 구조로 개선이 필요하다.Secondly, it is not easy to simultaneously insert a plurality of support bars 51 embedded in the bottom to penetrate the reinforcing bar fixing means 52 coupled to the outer circumference of the fixing frame 50, so that the support bars 51 and the bars are fixed. There is a need to improve the coupling structure of the means 52 into a simpler and easier coupling structure.

셋째, 공동주택의 경우, 바닥 거푸집(1)과 바닥철근(2)이 배근된 상태에서 주름관 배관들(3)과 매립철근(53)이 설치될 위치를 각 층마다 최소 1번 측량하여 설정하여야 하는데, 매번 측정할 필요 없이 1회 측정으로 동질의 시공이 이뤄질 수 있는 구조로 개선이 필요하다.Third, in the case of a multi-unit house, the floor form (1) and the bottom reinforcing bar (2) in the reinforcement state with the corrugated pipes (3) and the buried reinforcement (53) is to be installed at least once for each floor location It is necessary to improve the structure that homogeneous construction can be achieved by one measurement without having to measure each time.

넷째, 고정틀(50)의 무게나 길이를 감소시켜 작업자의 운반 및 작업이 용이한 구조로 개선이 필요하다.Fourth, by reducing the weight or length of the fixing frame 50 is necessary to improve the structure of the worker's transport and work easy.

다섯째, 상하층 간 누수발생이 방지될 수 있는 구조로 개선이 필요하다.Fifth, there is a need to improve the structure to prevent the occurrence of leakage between the upper and lower layers.

여섯째, 급수급탕용 냉온수배관외 전기선, 통신선, 환기배관, 에어컨배관 등의 매립배관에도 사용될 수 있는 공용구조로 개선이 필요하다.Sixth, there is a need to improve the common structure that can be used for landfill piping such as electric wire, communication line, ventilation pipe, air conditioner pipe, etc.

일곱째, 이중관고정핀(54)이 약간의 충격에도 쉽게 이탈되어 분실되는 것을 방지하기 위한 구조로 개선이 필요하다.
Seventh, the double-tube fixing pin 54 needs to be improved to a structure to prevent it from being easily detached and lost even with a slight impact.

본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여 안출되는 것으로, 본 출원인의 선출원된 특허출원 제2012-87951호의 이용발명으로 바닥 콘크리트 타설 전,후 전기, 통신 및 설비 등에서 매립에 사용되는 다수의 주름관 배관들의 위치고정과 각종 단자함과 수전함 등의 벽체매립함과, 일대일 이중관배관 원형수전구 및 전기, 통신의 각종 프레임의 고정을 위한 매립볼트를 용이하고 정밀하게 설치가능하며 상하층간 누수가 방지되고 바닥콘크리트 두께 변동에 따른 조절이 용이하고 안정되고 규격화된 반복작업이 가능하여, 각 세대별로 동질의 시공을 제공하고 벽체매립함 및 프레임 고정을 용이하게 수행할 수 있어 인건비 및 작업시간 절감과 하자 발생률이 현저히 감소되어 작업능률이 매우 우수하고 효율 및 안전성이 높은 주름관 배관 고정구조와 이를 이용한 주름관 배관시공방법을 제공함에 그 목적이 있다.
The present invention has been made to solve the above-mentioned conventional problems, a number of used in the landfill in electricity, telecommunications and facilities before and after the floor concrete casting in accordance with the use of the present patent application No. 2012-87951 of the applicant Position fixing of corrugated pipes and wall filling boxes such as various terminal boxes and faucets, and buried bolts for fixing one-to-one double pipe piping circular outlets and various frames for electricity and communication can be easily and precisely installed, and prevent leakage between upper and lower layers. It is easy to adjust to the variation of the thickness of the floor concrete, and it is possible to perform stable and standardized repetitive work, and it can provide the same construction for each generation and easily perform wall embedding and frame fixing, thus reducing labor cost and work time. Significantly reduced occurrence rate of corrugated pipe fittings with excellent work efficiency and high efficiency and safety The purpose is to provide a tubing and corrugated pipe construction method using the same.

상기 목적을 달성하기 위한 본 발명은 소정높이를 가지며 바닥 거푸집(1)의 상부면에 제1 고정수단(111)에 의해 고정되는 고정대결합구(11)와; 상기 고정대결합구(11)의 상측에서 끼움결합되도록 고정대결합구(11)의 외주면과 동일한 형상의 내주면을 하부에 형성하고 그 상부에 수직방향으로 두께조절봉공(122)이 형성되고 이를 수평방향에서 관통하여 결합되는 제2 고정수단(121)을 갖는 하부지지구(12)와; 상기 하부지지구(12)의 두께조절봉공(122)에 하부가 삽입되어 제2 고정수단(121)에 의해 위치고정되는 소정길이의 두께조절봉(13)과; 상기 두께조절봉(13)의 상부가 삽입되도록 하부에 두께조절봉삽입공(142)이 형성되고 이를 수평방향에서 관통하여 두께조절봉(13)을 위치고정하는 제3 고정수단(141)을 가지며 그 상측에 수평방향으로 관통되는 절곡철근공(143)이 형성되고 이와 연통되도록 상면 중앙을 세로방향으로 관통하여 형성되되 내경에는 암나사부(144a)를 형성하는 전산볼트공(144)이 구비되는 상부지지구(14)와; 상기 전산볼트공(144)에 나사결합되고 소정길이를 가지며 외주면에 고정된 1개의 조임너트(151)와 회전되어 고정틀(20)을 고정하기 위한 2개의 고정너트(152)를 구비하는 전산볼트(15)와; 상기 상부지지구(14)에 나사결합된 전산볼트(15)의 외주면을 타고 전산볼트공(144)으로 들어오는 콘크리트의 유입을 방지하도록 상기 상부지지구(14)의 상부를 밀폐하도록 형성되되 중앙에 전산볼트통공(161)이 형성되는 전산볼트공 덮개(16);를 포함하여 이루어지는 주름관배관고정대를 구비하는 것을 특징으로 하는 주름관 배관 고정구조를 제공함에 그 목적이 달성된다.The present invention for achieving the above object has a predetermined height and a fixed bar coupling sphere 11 is fixed to the upper surface of the bottom formwork (1) by the first fixing means (111); An inner circumferential surface of the same shape as the outer circumferential surface of the fixing rod coupling sphere 11 is formed at the lower portion so as to be fitted from the upper side of the fixing rod coupling sphere 11, and a thickness adjusting rod hole 122 is formed at the upper portion thereof in the horizontal direction. A lower support 12 having a second fixing means 121 coupled therethrough; A thickness adjustment rod 13 having a predetermined length that is inserted into a lower portion of the lower support 12 by a thickness adjusting rod hole 122 and fixed by the second fixing means 121; The thickness adjusting rod insertion hole 142 is formed in the lower portion so that the upper portion of the thickness adjusting rod 13 is inserted, and has a third fixing means 141 for fixing the position of the thickness adjusting rod 13 by penetrating it in the horizontal direction. The upper side is formed with a reinforcing reinforcement hole 143 is formed in the horizontal direction through the upper surface in the vertical direction so as to communicate with the upper side is formed in the inner diameter of the inner bolt hole 144 to form a female threaded portion (144a) The earth 14; Computing bolt screwed to the threaded bolt hole 144 and having a predetermined length and rotated with one tightening nut 151 fixed to the outer circumferential surface and two fixing nuts 152 for fixing the fixing frame 20 ( 15); Is formed to seal the upper portion of the upper support 14 to prevent the inflow of concrete coming into the computer bolt ball 144 riding on the outer circumferential surface of the computer bolt 15 screwed to the upper support 14 Computational bolt hole cover (161) is formed, the computerized bolt hole cover 16; the purpose is provided to provide a corrugated pipe piping fixed structure comprising a corrugated pipe piping fixing comprising a.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 두께조절봉(13)은 소정길이의 철근이거나 외주면에 눈금표시가 된 사출물인 것이 바람직하다.In addition, in the corrugated pipe fixed structure, the thickness adjusting rod 13 is preferably a reinforcement of a predetermined length or an injection molded product marked on the outer peripheral surface.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 상부지지구(14)는 그 외주면에 2개이상의 플렌지형상으로 확경되어 형성되는 지수부(145)를 형성하는 것이 바람직하다.In addition, in the corrugated pipe piping fixed structure, the upper support 14 is preferably formed on the outer peripheral surface of the exponent portion 145 which is formed to be expanded in the shape of two or more flanges.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 상부지지구(14)의 절곡철근공(143)에 삽입되는 최소 1번 이상 절곡된 소정길이의 절곡철근(17)을 더 구비하여, 상기 상부지지구(14)의 전산볼트공(144)에 나사결합된 전산볼트(15)를 조여 절곡철근공(143)에 삽입된 절곡철근(17)을 압착하여 위치고정이 가능한 것이 바람직하다.In addition, the corrugated pipe fixed structure, the upper support (14) is provided with a bending reinforcing bar 17 of a predetermined length bent at least one or more times to be inserted into the bending reinforcing hole 143 of the upper support (14) It is preferable to tighten the computer bolts 15 screwed to the computer bolts 144 of 14) to fix the position of the bent rebars 17 inserted into the bent rebar holes 143.

또한, 상기 주름관 배관 고정구조에 있어서, 단면형상이 'ㄱ'형상으로 절곡된 소정길이의 금속제 바를 결합하여 상하가 관통된 직사각틀 모양으로 형성하되 금속제 바의 수평면에 '∪'형상으로 절개되어 상기 고정대(10)의 고정너트(152)가 나결되는 고정대결합홈(211)을 형성하는 틀본체(21)와; 소정 두께와 폭을 갖는 판형으로 주름관 배관(3)을 수용하는 수용홈(221)이 형성되며 상기 틀본체(21)의 하부에 결합되는 주름관하부고정수단(22)과; 상기 주름관하부고정수단(22)에 의해 하부가 고정된 주름관 배관(3)의 상부를 고정하여 상향된 자세로 유지되도록, 소정 두께와 폭을 가진 판형으로 주름관하부고정수단(22)과 동일한 형상으로 형성되어 상기 틀본체(21)의 상부에 결합되는 주름관상부고정수단(23);을 포함하여 이루어져, 바닥 콘크리트 타설 전에 상기 다수의 고정대(10)에 고정대결합홈(211)을 고정함으로써 설계된 위치 그대로 이격되어 배관들(3)의 위치를 고정하고, 바닥 콘크리트 타설 후에 남는 길이의 주름관 배관들(3)을 눕혀서 틀본체(21) 내에 보관하는 주름관 배관 고정틀을 구비하는 것이 바람직하다.In addition, in the corrugated pipe fixed structure, the cross-sectional shape is formed in the shape of a rectangular frame penetrating the top and bottom by combining a metal bar of a predetermined length bent into a 'b' shape is cut in the '∪' shape on the horizontal surface of the metal bar A frame body 21 for forming a fixing bar coupling groove 211 in which fixing nuts 152 of the fixing table 10 are screwed together; An accommodating groove 221 for accommodating the corrugated pipe 3 in a plate shape having a predetermined thickness and width is formed, and a corrugated pipe lower fixing means 22 coupled to the lower portion of the frame body 21; In the same shape as the corrugated pipe lower fixing means 22 in a plate shape having a predetermined thickness and width so as to fix the upper part of the corrugated pipe piping 3 having the lower portion fixed by the corrugated pipe lower fixing means 22 and maintained in an upward position. Formed to form a corrugated tubular portion fixing means 23 is coupled to the upper portion of the frame body 21; comprises a fixed base coupling groove 211 to the plurality of the fixed base 10 before the floor concrete is placed intact It is preferable to have a corrugated pipe fixing frame for fixing the positions of the pipes 3 spaced apart from each other and laying down the corrugated pipes 3 having a length remaining after the bottom concrete is placed in the frame body 21.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 주름관하부고정수단(22) 및 주름관상부고정수단(23) 중 하나 이상은 주름관 배관(3)의 측면 착탈이 용이하도록 수용홈(221,231)의 일측을 절개하여 형성하되 절개된 개구방향을 삽입되는 주름관 배관(3)이 상기 고정틀(20) 내에 수용을 위해 절곡될 방향측으로 향하도록 설치되고 상기 절개된 개구의 좌우에 다수의 핀공(222,232)이 형성되며; 상기 절개된 개구를 통하여 주름관 배관(3)을 안착시킨 후 절개된 개구측을 밀폐하도록 상기 핀공(222,232)에 삽입되는 '∩'형상의 고정핀(24);을 더 포함하는 것이 바람직하다.In the corrugated pipe fixing structure, at least one of the corrugated pipe lower fixing means 22 and the corrugated pipe fixing means 23 cuts one side of the accommodating grooves 221 and 231 to facilitate side detachment of the corrugated pipe 3. A corrugated pipe (3) which is formed to be inserted into the cut opening direction and is directed toward the direction to be bent for receiving in the fixing frame (20), and a plurality of pin holes (222,232) are formed on the left and right of the cut opening; It is preferable to further include a '∩'-shaped fixing pin 24 inserted into the pin holes 222 and 232 so as to seal the cut opening side after seating the corrugated pipe (3) through the cut opening.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 고정핀(24)은 일측은 짧고 타측은 길게 형성하되 내측으로 기울어지는 경사를 갖도록 절곡되어, 짧은 일측을 먼저 핀공(222,232)에 삽입한 뒤 긴 타측을 핀공(222,232)에 삽입하고 누름으로써 용이하게 삽입되고, 긴 타측의 하부에서 상측으로 밀어주면 경사를 따라 상승하면서 용이하게 분리되는 것이 바람직하다.In addition, in the corrugated pipe piping fixed structure, the fixing pin 24 is bent so that one side is short and the other side is formed long, but inclined inwardly, the short one side is first inserted into the pin holes (222,232) and then the other long side. It is preferred that the pin holes 222 and 232 are easily inserted by pressing and pushing the pin holes 222 and 232, and are easily separated while being pushed upward from the lower side of the other long side.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 고정틀(20)은 바닥 콘크리트 타설 후에 주름관상부고정수단(23)과 고정핀(24)을 제거하고 상향된 자세로 고정되었던 주름관 배관들(3)을 틀본체(21) 내에 눕혀서 보관함으로써 타 작업자의 부주의에 의한 주름관 배관들(3)의 파손을 방지하는 것이 바람직하다.In the corrugated pipe fixing structure, the fixing frame 20 removes the corrugated pipe fixing means 23 and the fixing pin 24 after the bottom concrete is cast, and forms the corrugated pipe piping 3 that was fixed in an upward position. It is preferable to prevent the breakage of the corrugated pipes 3 due to carelessness of another operator by lying down in the main body 21.

또한, 상기 주름관 배관 고정구조에 있어서, 소정 두께와 폭을 갖는 판형으로 상하방향으로 관통되는 수용공(251)이 형성되며 틀본체(21)의 하부에 결합되는 전산봉고정수단(25)을 더 포함하는 것이 바람직하다.In addition, in the corrugated pipe fixed structure, the receiving hole 251 is formed in the plate shape having a predetermined thickness and width to penetrate in the vertical direction and is further coupled to the computer rod fixing means 25 is coupled to the lower portion of the frame body (21) It is preferable to include.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 전산봉고정수단(25)의 수용공(251)에 삽입고정되어 바닥 콘크리트 타설 및 양생 이후 상측으로 돌출되어 고정된 전산봉들(252)의 상단에 나결되는 소정길이의 장너트(30)와; 상기 장너트(30)의 상부에 나결되어 직립되도록 하부에 숫나사산(311)이 형성된 소정길이의 철근 또는 전산봉으로 된 지지봉(31)을 더 포함하는 것이 바람직하다.In addition, in the corrugated pipe fixed structure, inserted into the receiving hole 251 of the computer rod fixing means 25 is fixed to the upper end of the computer rods 252 fixed to protrude upward after the bottom concrete placement and curing. Long nut 30 having a predetermined length; It is preferable to further include a support rod 31 made of reinforcing rods or computer rods of a predetermined length having a male thread 311 formed at the bottom so as to be threaded upright on the top of the long nut 30.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 틀본체(21)는 운반 및 조립이 용이하도록 길이방향을 1/2, 1/3 또는 1/4로 절단되어 상호 맞닿는 부분 일측에는 돌출된 돌출결합부(26a)를 형성하고 타측에는 삽입결합부(26b)를 형성하여 상기 돌출결합부(26a)가 삽입결합부(26b)에 삽입되고 관통되는 제4 고정수단(261)에 의해 고정되는 것이 바람직하다.In addition, in the corrugated pipe fixed structure, the frame body 21 is cut into 1/2, 1/3 or 1/4 in the longitudinal direction to facilitate transportation and assembly protruding protrusions protruding on one side of the contact portion (26a) and the other side is formed by the insertion coupling portion (26b) is preferably the protrusion coupling portion (26a) is fixed by the fourth fixing means (261) inserted and penetrated into the insertion coupling portion (26b). .

또한, 상기 주름관 배관 고정구조에 있어서, 상기 고정틀(20)은 주름관 배관들(3)을 눕혀서 틀본체(21) 내에 보관할 수 있도록, 소정두께와 폭을 갖는 판형상으로 상기 틀본체(21)의 하부를 가로지르도록 형성되어 주름관 배관들(3)의 하부를 지지하는 하나 이상의 처짐방지수단(27)과; 소정두께와 폭을 갖는 판형상으로 상기 틀본체(21)의 상부를 가로지르도록 형성되어 주름관 배관들(3)의 상부 돌출을 제한하되 최소 일측은 탈착가능하여 개방이 용이하도록 형성되는 하나 이상의 돌출방지수단(28);을 포함하는 것이 바람직하다.In addition, in the corrugated pipe piping fixed structure, the fixing frame 20 of the frame main body 21 in a plate shape having a predetermined thickness and width so that the corrugated pipe piping (3) can be laid down and stored in the frame main body 21. One or more sagging prevention means (27) formed to cross the lower portion to support the lower portion of the corrugated pipes (3); One or more protrusions formed to cross the upper portion of the frame body 21 in a plate shape having a predetermined thickness and width to limit the upper protrusion of the corrugated pipes 3, but at least one side thereof is detachable. Prevention means 28; preferably includes.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 틀본체(21)는 주름관상부고정수단(23)과 주름관하부고정수단(22)과 처짐방지수단(27)과 돌출방지수단(28)과의 결합부위에 형성되는 결합통공(29) 중 어느 하나 이상을 장공으로 형성하여 현장에 따른 유사시 변동에 대응가능한 것이 바람직하다.In addition, in the corrugated pipe piping fixed structure, the frame body 21 is a coupling portion between the corrugated pipe fixing means 23, the corrugated pipe lower fixing means 22, sag prevention means 27 and the protrusion preventing means 28. It is preferable that any one or more of the coupling through holes 29 formed in the long holes are formed to correspond to the variation in time according to the site.

또한, 상기 주름관 배관 고정구조에 있어서, 상기 틀본체(21)는 주름관상부고정수단(23)과 주름관하부고정수단(22)과 처짐방지수단(27)과 돌출방지수단(28)과의 결합부위에 형성되는 제2 결합통공(291)을 사각으로 형성하고 이에 결합되는 고정수단으로 사각볼트(292)를 사용하는 것이 바람직하다.In addition, in the corrugated pipe piping fixed structure, the frame body 21 is a coupling portion between the corrugated pipe fixing means 23, the corrugated pipe lower fixing means 22, sag prevention means 27 and the protrusion preventing means 28. It is preferable to use the square bolt 292 as a fixing means to form a second coupling through hole 291 formed in the square coupled thereto.

상기 목적을 달성하기 위한 본 발명은 바닥 콘크리트 타설전에 주름관 배관의 일단부가 바닥상부로 돌출되도록 배관하여 콘크리트 양생후 벽돌 쌓는 위치를 표시하기 위해 바닥에 먹놓기 작업후 주름관 배관 설치위치에 각종 벽체매립함을 설치하고 벽돌을 조적하거나 벽돌 조적후 각종 프레임을 설치하고 마무리연결하는 주름관 배관시공방법에 있어서, 본층 바닥거푸집을 설치(S100)하고 거푸집 위에 벽체가 설치될 위치에 먹놓기 작업(S110)을 하며 바닥철근(4)을 배근(S120)한 이후, 설치된 거푸집(1)의 상부면에 설계에 따른 주름관 배관(3)이 설치될 위치를 바닥 먹놓기 배관위치에 맞추어 현장에서 확인하고 고정대결합구(11)의 설치위치를 설정하여 제1 고정수단(111)에 의해 하나 이상의 고정대결합구(11)를 고정하는 본층 고정대결합구고정 단계(S130)와; 상기 고정된 고정대결합구(11)의 상측에서 끼움결합되고 상부에 수직방향으로 두께조절봉(13)이 삽입되는 하부지지구(12)와, 소정길이의 상기 두께조절봉(13)과, 상기 두께조절봉(13)의 상부에 결합되고 그 상측에 수평방향으로 삽입되는 절곡철근(17)을 고정하도록 세로방향으로 상측에서 삽입되는 전산볼트(15)가 나결되는 상부지지구(14)와, 상측에 고정된 1개의 조임너트(151)와 고정틀(20)을 고정하기 위한 2개의 고정너트(152)를 구비하는 전산볼트(15)를 포함하여 이루어지는 주름관배관고정대(10)를 조립하는 본층 고정대조립 단계(S140)와; 상기 조립된 고정대(10)를 바닥 거푸집(1)에 고정된 고정대결합구(11)에 고정대(10)를 끼움결합하되 콘크리트 두께에 따라 두께조절봉(13)을 선택하여 결합한 뒤 미리 배근된 바닥철근(2)에 고정하는 본층 고정대고정 단계(S150)와; 상기 본층 바닥거푸집(1)에 콘크리트를 타설하는 본층 바닥콘크리트 단계(S170)와; 상기 본층 바닥콘크리트가 단계(S170) 이후 본층 벽체철근 배근(S190)후 본층 벽체 및 상층 바닥거푸집을 설치(S200)하고 상층 바닥철근을 배근(S210)한 이후, 설치된 상층 바닥거푸집의 상부면에 설계에 따른 주름관 배관(3)이 설치될 위치를 바닥 먹놓기 배관위치에 맞추어 현장에서 확인하고 고정대결합구(11)의 설치위치를 설정하여 제1 고정수단(111)에 의해 하나 이상의 고정대결합구(11)를 고정(S220)하고 본층 고정대조립과 동일한 방법으로 주름관배관고정대(10)를 상층에 조립(S230)하고 고정(S240)하는 단계와; 상기 본층 벽체 및 상층 바닥에 설치된 거푸집에 콘크리트를 타설하는 상층 바닥콘크리트 단계(S260)와; 상기 상층 바닥콘크리트 단계(S260) 이후 본층 바닥 거푸집(1)을 해체하는 본층 바닥거푸집해체 단계(S270)와; 상기 상층 바닥콘크리트 단계(S260) 이후 상층 벽체철근 배근(S290)후 상층 벽체 및 상2층 바닥 거푸집을 설치(S300)하되 상기 본층 바닥거푸집해체 단계(S270)에서 해체된 거푸집(1)을 이용하여 그대로 설치하고 상2층 바닥철근을 배근(S310)하는 단계와; 설치된 상2층 바닥 거푸집(1)에는 본층 고정대결합구고정 단계(S130)에서 고정했던 고정대결합구(11)가 고정되어 있어, 설치위치를 설정할 필요없이 상층 고정대조립과 동일한 방법으로 주름관배관고정대(10)를 상2층에 조립(S320)하고 고정(S330)하는 단계와; 상기 상층 벽체 및 상2층 바닥에 설치된 거푸집에 콘크리트를 타설하는 상2층 바닥콘크리트 단계(S350)와; 상기 상2층 바닥콘크리트 단계(S350) 이후 상층 바닥 거푸집(1a)을 해체하는 상층 바닥거푸집해체 단계(S360);를 포함하는 것을 특징으로 하는 주름관 배관구조를 이용한 주름관 배관시공방법을 제공함에 그 목적이 달성된다.The present invention for achieving the above object is to bury the various walls in the corrugated pipe installation location after the work to eat on the floor to indicate the brick stacking position after the concrete curing by pipe so that one end of the corrugated pipe pipe projected to the upper floor before placing the floor concrete. In the corrugated pipe construction method for installing and finishing bricks or installing various frames after brick masonry installation, the bottom floor formwork is installed on the main floor (S100) and the work on the wall is installed on the formwork (S110) After reinforcing the bottom reinforcing bar (4) (S120), the position of the corrugated pipe (3) according to the design to be installed on the upper surface of the installed formwork (1) to confirm the site in accordance with the flooring piping position in place and the fixed bar coupling ( 11) a main floor fixing bar fastener fixing step (S130) for fixing the one or more fixing bar fasteners 11 by the first fixing means 111 by setting the installation position; The lower support 12, which is fitted in the upper side of the fixed fixture coupler 11 and the thickness adjusting rod 13 is inserted in the vertical direction, the thickness adjusting rod 13 of the predetermined length, and the thickness The upper support 14, which is coupled to the upper portion of the adjustment rod 13 and the threaded rod 15 inserted in the upper direction in the vertical direction to fix the bending reinforcement 17 inserted in the horizontal direction on the upper side, and the upper side Assembly of the main floor assembling the corrugated pipe piping stand 10 including a computer bolt 15 having one fastening nut 151 and two fastening nuts 152 for fixing the fastening frame 20 fixed thereto. Step S140; The assembled guide (10) is fitted to the fixture (10) to the fixture holder (11) fixed to the floor formwork (1), but combined by selecting the thickness adjusting rod (13) according to the concrete thickness before the bottom A main floor fixing stand fixing step (S150) fixed to the reinforcing bar (2); A main floor floor concrete step (S170) of pouring concrete into the main floor floor formwork (1); After the main floor floor concrete step (S170) after the main floor wall reinforcement (S190) and then installed the main floor wall and the upper floor formwork (S200) and after the upper floor reinforcement (S210), designed on the upper surface of the installed upper floor formwork Corrugated pipe according to the position where the pipe (3) is to be installed on the floor in accordance with the plumbing position to check the site and set the mounting position of the fastener coupler (11) by the first fastening means (111) one or more fasteners ( 11) fixing (S220) and assembling the corrugated pipe fitting (10) to the upper layer (S230) and fixing (S240) in the same manner as the assembly of the main floor holder; An upper floor concrete step (S260) of placing concrete on the formwork installed on the main floor wall and the upper floor; A main floor floor formwork disassembling step (S270) of dismantling the main floor floor formwork (1) after the upper floor concrete step (S260); After the upper floor concrete step (S260) after the upper wall reinforcement (S290) to install the upper wall and the second floor floor formwork (S300), but using the formwork (1) dismantled in the main floor floor formwork dismantling step (S270) As it is installed and the upper second floor reinforcement bar (S310); In the installed upper two-floor bottom formwork (1) is fixed to the fasteners fasteners (11) fixed in the main stage fastener fastener step (S130), without having to set the installation position corrugated pipe fittings in the same way as the assembly of the upper floor fasteners ( 10) assembling (S320) and fixing (S330) the upper second layer; An upper second floor concrete step (S350) of placing concrete on the formwork installed on the upper wall and the upper second floor; To provide a corrugated pipe construction method using a corrugated pipe piping structure, characterized in that it comprises ;; the upper floor formwork dismantling step (S360) of dismantling the upper floor formwork (1a) after the upper two-layer bottom concrete step (S350). This is achieved.

또한, 상기 주름관 배관구조를 이용한 주름관 배관시공방법에 있어서, 상기 본층 고정대 고정 단계(S130) 이후 본층 바닥콘크리트 단계(S170) 이전에, 바닥철근(2)을 통해 배관된 주름관 배관들(3)을 상기 고정된 고정대(10)에 직접 묶어서 고정하거나 절곡철근(17)으로 연결된 둘 이상의 고정대들(10)에 보강철근(18)을 덧대어 상기 보강철근(18)과 절곡철근(17)에 묶어서 고정하는 것이 바람직하다.In addition, in the corrugated pipe piping construction method using the corrugated pipe piping structure, after the main floor fixing step (S130) before the main floor floor concrete step (S170), the corrugated pipe pipes (3) piped through the bottom reinforcement (2) The reinforcing bar 18 is added to two or more fixing bars 10 connected directly to the fixed bar 10 or connected to the bending bar 17, and then tied to the reinforcing bar 18 and the bending bar 17 to be fixed. It is desirable to.

또한, 상기 주름관 배관구조를 이용한 주름관 배관시공방법에 있어서, 상기 본층 고정대 고정 단계(S130) 이후 본층 바닥콘크리트 단계(S170) 이전과, 상기 상층 고정대 고정 단계(S240) 이후 상층 바닥콘크리트 단계(S260) 이전과, 상기 상2층 고정대 고정 단계(S330) 이후 상2층 바닥콘크리트 단계(S350) 이전에, 단면이 'ㄱ'형상의 금속제 바를 절단하고 결합하여 상하가 관통된 직사각틀 모양으로 형성하되 수평면에 '∪'형상으로 절개되는 고정대결합홈(211)을 형성하는 틀본체(21)를 형성하고, 일측을 절개한 수용홈(221)이 형성되는 판형의 주름관하부고정수단(22)을 상기 틀본체(21)의 하부에 결합하고 상기 주름관하부고정수단(22)과 동일한 형상의 주름관상부고정수단(23)을 상기 틀본체(21)의 상부에 결합하며 상하방향으로 관통되는 수용공(251)이 형성되는 판형의 전산봉고정수단(25)을 상기 틀본체(21)의 하부의 배관 위치부에 결합한 주름관 배관 고정틀(20)을 준비하여 현장에서 각가의 세대 타입별 주름관 배관 위치에 맞게 조립하되 상기 주름관하부고정수단(22) 및 주름관상부고정수단(23)의 수용홈(231)의 절개된 개구는 주름관 배관(3)이 상기 고정틀(20) 내에 수용을 위해 절곡될 방향측으로 향하도록 설치되는 주름관배관고정틀조립 단계(S160,S250,S340)와; 상기 고정된 고정대(10)를 상기 고정틀(20)의 고정대결합홈(211)에 삽입시킨 뒤 높이를 조절하고 고정너트(152)를 조여 고정틀(20)의 위치를 고정하는 고정틀고정 단계(S162,S252,S342)와; 상기 고정된 고정틀(20)의 내측에 형성된 전산봉고정수단(25)에 소정길이의 전산봉(252)을 고정하되 바닥 콘크리트시 전산봉(252)의 하단이 매립될 수 있도록 위치고정하는 전산봉고정 단계(S164,S254,S344)와; 상기 고정된 고정틀(20)의 하부에 결합된 주름관하부고정수단(22)의 절개된 개구측내에 바닥철근(2)을 통해 배관된 주름관 배관들(3)을 안착후 개구의 좌우측에 형성된 핀공(222)에 '∩'형상의 고정핀(24)을 걸어 주름관 배관(3)의 하부를 고정하는 주름관하부고정 단계(S166,S256,S346)와; 상기 고정틀(20)의 상부에 결합된 주름관상부고정수단(23)의 절개된 개구측내에 상기 하부가 고정된 주름관 배관들(3)의 상부를 안착후 개구의 좌우측에 형성된 핀공(232)에 '∩'형상의 고정핀(24)을 걸어 주름관 배관(3)의 상부를 고정하는 주름관상부고정 단계(S168,S258,S348);를 포함하고, 상기 본층 바닥콘크리트 단계(S170) 이후 상층 바닥콘크리트 단계(S260) 이전과, 상기 상층 바닥콘크리트 단계(S260) 이후 상2층 바닥콘크리트 단계(S350) 이전에, 상기 고정틀(20)의 주름관상부고정수단(23)의 고정핀(24)을 빼는 고정틀고정핀제거 단계(S180,S280)와; 상기 고정핀(24)이 제거된 주름관 배관들(3)의 상측으로 신장된 부분을 상기 고정틀(20)의 내부에 눕히고 외부충격을 방지하고자 상기 고정틀(20)의 상부면을 가리는 덮개(293)를 덮어 결합수단(294)으로 고정하는 고정틀주름관수용 단계(S182,S282);를 포함하며, 상기 상층 바닥거푸집해체 단계(S360) 이후에, 상기 본층에 설치된 고정틀(20)의 덮개(293)를 제거하고 고정틀(20)을 해체하는 본층 고정틀해체 단계(S380);를 포함하는 것이 바람직하다.In addition, in the corrugated pipe piping construction method using the corrugated pipe piping structure, after the main floor fixing stage (S130) before the main floor bottom concrete step (S170) and after the upper floor fixing stage (S240), the upper floor concrete step (S260) Before and after the upper two-layer fastening step (S330), before the upper two-layer bottom concrete step (S350), the cross-section is formed by cutting the rectangular bar of the 'b' shape and combined to form a rectangular frame penetrating the top and bottom, but the horizontal plane The frame main body 21 is formed to form a fixing bar coupling groove 211 to be cut in the '∪' shape, and the plate-shaped corrugated pipe lower fixing means 22 is formed in which the receiving groove 221 is cut in one side of the frame Receiving hole 251 is coupled to the lower portion of the main body 21 and coupled to the upper portion of the corrugated tubular fixing means 23 of the same shape as the lower portion of the corrugated pipe fixing means 22 and penetrated in the upper and lower directions Of which plate is formed Prepare the corrugated pipe fixing frame 20 in which the computerized rod fixing means 25 is coupled to the pipe position portion of the lower portion of the frame body 21, and then assembled to match the position of the corrugated pipe for each household type in the field, but the corrugated pipe fixing means (22) and the cut opening of the receiving groove 231 of the corrugated tubular fixing means 23 is corrugated pipe fixing frame assembly step is installed so that the corrugated pipe 3 is directed toward the direction to be bent for accommodation in the fixing frame (20) (S160, S250, S340); Inserting the fixed stator 10 into the stator coupling groove 211 of the fixing frame 20 and then adjusting the height and tightening the fixing nut 152 fixing frame fixing step (S162, S252, S342); Computing rod 252 of a predetermined length to the computer rod fixing means 25 formed inside the fixed fixing frame 20, but the computer rod for fixing the position so that the bottom of the computer rod 252 is embedded in the bottom concrete A fixing step (S164, S254, S344); Pin holes formed on the left and right sides of the opening after seating the corrugated pipes 3 piped through the bottom reinforcing bar 2 in the cut opening side of the corrugated pipe lower fixing means 22 coupled to the lower portion of the fixed frame 20 ( A lower corrugated pipe fixing step (S166, S256, S346) for fixing the lower portion of the corrugated pipe (3) by fastening the '∩' shaped pin 24 to the 222; The upper part of the corrugated pipe pipes 3 having the lower part fixed in the cut opening side of the corrugated tubular fixing means 23 coupled to the upper part of the fixing frame 20 is formed on the pin hole 232 formed at the left and right sides of the opening. ∩′-shaped corrugated pipe fixing step (S168, S258, S348) to fix the upper portion of the corrugated pipe (3) by hanging the pin 24, comprising the bottom floor concrete step after the bottom floor concrete step (S170) (S260) before and after the upper floor concrete step (S260) and before the upper two floor concrete step (S350), the fixing frame fixing to remove the fixing pin 24 of the corrugated tubular fixing means 23 of the fixing frame 20 Pin removal steps S180 and S280; The cover 293 which covers the upper surface of the fixing frame 20 to lay down the portion extending to the upper side of the corrugated pipes 3 from which the fixing pin 24 has been removed to the inside of the fixing frame 20 and to prevent external impact. Covering the fixing frame wrinkles for receiving step (S182, S282) for fixing to the coupling means (294); including, after the upper floor formwork dismantling step (S360), the cover 293 of the fixing frame 20 installed on the main floor It is preferable to include; the main layer fixed frame disassembly step (S380) to remove and disassemble the fixed frame 20.

또한, 상기 주름관 배관구조를 이용한 주름관 배관시공방법에 있어서, 상기 본층 고정틀해체 단계(S380) 이후, 바닥에 돌출된 전산볼트들(15)의 상부에 프레임(5)을 직접 고정하는 본층 프레임고정 단계(S385)를 더 포함하는 것이 바람직하다.In addition, in the corrugated pipe piping construction method using the corrugated pipe piping structure, after the main layer fixing frame dismantling step (S380), the main floor frame fixing step of directly fixing the frame (5) on top of the computer bolts 15 protruding to the bottom It is preferable to further include (S385).

또한, 상기 주름관 배관구조를 이용한 주름관 배관시공방법에 있어서, 상기 본층 고정틀해체 단계(S380) 이후, 바닥에 돌출된 전산볼트들(15)과 전산봉들(252) 중 하나 이상의 상부에 장너트(30)를 결합한 뒤 하부에 숫나사산(311)이 형성된 소정길이의 철근 또는 전산봉으로 된 지지봉(31)을 결합하여 직립되도록 세우는 본층 지지봉고정 단계(S390)와; 상기 직립된 지지봉(31)에 벽체매립함(4) 또는 프레임(5)을 고정하는 본층 매립함고정 단계(S392);를 더 포함하는 것이 바람직하다.
In addition, in the corrugated pipe piping construction method using the corrugated pipe piping structure, after the main layer fixing frame disassembly step (S380), a long nut (top nut) on the top of one or more of the computer bolts 15 and the computer rods 252 protruding from the bottom 30) the main layer supporting rod fixing step (S390) to stand upright to combine the support rod 31 made of a reinforcing rod or computer rod of a predetermined length having a male thread 311 is formed in the lower portion; It is preferable to further include; a buried layer buried box fixing step (S392) for fixing the wall buried box (4) or the frame (5) to the upright support rod (31).

본 발명의 효과는 다음과 같다.The effects of the present invention are as follows.

본 출원인의 선출원된 특허출원 제2012-87951호의 이용발명으로 바닥 콘크리트 타설 전,후 전기, 통신 및 설비 등에서 매립에 사용되는 다수의 주름관 배관들의 위치고정과 각종 단자함과 수전함 등의 벽체매립함과, 일대일 이중관배관 원형수전구 및 전기, 통신의 각종 프레임의 고정을 위한 매립볼트를 용이하고 정밀하게 설치가능하며 상하층간 누수가 방지되고 바닥콘크리트 두께 변동에 따른 조절이 용이하고 안정되고 규격화된 반복작업이 가능하여, 각 세대별로 동질의 시공을 제공하고 벽체매립함 및 프레임 고정을 용이하게 수행할 수 있어 인건비 및 작업시간 절감과 하자 발생률이 현저히 감소되어 작업능률이 매우 우수하고 효율 및 안전성이 높은 주름관 배관 고정구조와 이를 이용한 주름관 배관시공방법을 제공할 수 있는 매우 유용한 발명인 것이다.
In accordance with the present invention, the patent application No. 2012-87951 filed by the present applicant, and fixing the position of a number of corrugated pipes used for landfill in electricity, communication and equipment before and after floor concrete placement, and wall-filled boxes such as various terminal boxes and faucets. , One-to-one double pipe piping circular light bulb and buried bolts for fixing various frames of electricity and communication can be installed easily and precisely, preventing leakage between upper and lower layers, and easy to adjust according to the change of thickness of floor concrete. It is possible to provide homogeneous construction for each generation and easily perform wall embedding and frame fixing, which significantly reduces labor cost and working time and defects rate, resulting in highly efficient and safe corrugated pipe. Very useful invention that can provide a pipe fixing structure and corrugated pipe construction method using the same Will.

도 1 은 본 출원인의 선출원된 특허출원 제2012-87951호를 보이는 개략도
도 2 는 종래의 주름관 배관을 고정하는 구조 및 시공방법을 보이는 개략도
도 3 은 본 발명을 적용한 주름관배관고정대를 보이는 분해사시도
도 4 는 본 발명을 적용한 주름관배관고정대의 사용상태도
도 5,6,7 은 본 발명을 적용한 주름관 배관 고정구조의 시공방법을 보이는 개략도
도 8 은 본 발명을 적용한 주름관 배관 고정틀을 보이는 개략도
도 9 는 본 발명을 적용한 다른 주름관 배관 고정틀을 보이는 설치 상태도
도 10,11 은 본 발명의 분리결합가능한 주름관 배관 고정틀의 분리된 시공방법을 보이는 개략도
도 12는 본 발명을 적용한 주름관 배관 고정구조를 이용한 시공방법을 보이는 공정도
1 is a schematic view showing the applicant's prior patent application No. 2012-87951
Figure 2 is a schematic view showing a structure and construction method for fixing a conventional corrugated pipe
Figure 3 is an exploded perspective view showing a corrugated pipe fittings applying the present invention
Figure 4 is a state of use of the corrugated pipe piping fixture applying the present invention
5, 6, 7 is a schematic view showing the construction method of the corrugated pipe piping fixed structure to which the present invention is applied
8 is a schematic view showing a corrugated pipe fitting frame to which the present invention is applied
Figure 9 is an installation state showing another corrugated pipe piping fixed frame to which the present invention is applied
10, 11 is a schematic view showing a separated construction method of the separable corrugated pipe piping fixed frame of the present invention
12 is a process chart showing a construction method using a corrugated pipe fixed structure to which the present invention is applied

이하, 바람직한 실시예를 통하여 본 발명을 상세히 설명하고자 한다. 그러나, 본 실시예들은 본 발명을 보다 잘 이해할 수 있도록 설명하는 것으로 이해되어야 하며, 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정 해석되어서는 아니되고, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 하며, 본 발명을 이에 한정하는 것으로 이해되어서는 안될 것이다.
Hereinafter, the present invention will be described in detail with reference to preferred embodiments. It is to be understood, however, that the embodiments are illustrative of the invention in order that the invention may be better understood, and that the terms or words used should not be construed in a conventional or dictionary sense, It should be understood that the present invention should not be construed as being limited to the meanings and concepts consistent with the technical idea of the present invention based on the principle that the concept of the term can be appropriately defined in order to explain it by a method.

(실시예1)(Example 1)

먼저, 본 발명의 주름관 고정구조에 사용되는 대표적인 구성은 도 3,4와 도 8,9에서 보는 바와 같이, 주름관배관고정대(10)와 고정틀(20)이다. First, the representative configuration used in the corrugated pipe fixing structure of the present invention, as shown in Figures 3, 4 and 8, 9, the corrugated pipe fixing stand 10 and the fixing frame 20.

먼저, 도 3,4에서 보는 바와 같이, 상기 고정대(10)는 고정대결합구(11)와 하부지지구(12)와 두께조절봉(13)과 상부지지구(14)와 전산볼트(15)와 전산볼트공덮개(293)를 포함하여 이루어진다.First, as shown in Figures 3 and 4, the fixing rod 10 is a fixing rod coupler 11 and the lower support 12, the thickness adjusting rod 13, the upper support 14 and the computer bolt 15 and Computational bolt ball cover 293 is made.

상기 고정대결합구(11)는 바닥 거푸집(1)의 상부면에 제1 고정수단(111)에 의해 고정되어 고정대(10)의 하부지지구(12)와 결합되는 것으로, 결합이 용이하도록 소정높이를 가지며 원호형상 또는 다각형상의 외주면을 갖도록 형성되어 설계에 따라 고정대(10)가 설치될 위치를 정확히 찾은 뒤 설치된다. The fixing bar coupling sphere 11 is fixed to the upper surface of the bottom formwork (1) by the first fixing means 111 is coupled to the lower support 12 of the fixing table 10, the predetermined height to facilitate the coupling It is formed to have an outer circumferential surface in the shape of an arc or polygon and is installed after finding exactly the position where the fixing table 10 will be installed according to the design.

상기 제1 고정수단(111)은 볼트, 리벳, 용접 등 종래 고정수단으로 사용되는 것 중에서 고정대결합구(11)의 재질과 현장 상황에 따라 적절한 것으로 선택될 수 있다.The first fixing means 111 may be selected to be suitable according to the material and the site of the fixing bar coupler 11 from the conventional fixing means such as bolts, rivets, welding.

또한, 상기 하부지지구(12)는 상기 고정대결합구(11)의 상측에서 끼움결합되도록 고정대결합구(11)의 외주면과 동일한 형상의 내주면을 하부에 형성하고 그 상부에 수직방향으로 두께조절봉(13)이 삽입결합되는 두께조절봉공(122)이 형성되고 이를 수평방향에서 관통하여 삽입된 두께조절봉(13)을 고정하도록 결합되는 제2 고정수단(121)이 형성된다. In addition, the lower support 12 forms an inner circumferential surface of the same shape as the outer circumferential surface of the fixed stand coupling sphere 11 so as to be fitted from the upper side of the fixed stand coupling sphere 11 and the thickness adjustment rod in the vertical direction (top) A thickness adjusting rod hole 122 into which the 13 is inserted is formed, and a second fixing means 121 is formed to be coupled to fix the thickness adjusting rod 13 inserted therethrough in the horizontal direction.

또한, 상기 하부지지구(12)의 두께조절봉공(122)에 하부가 삽입되어 제2 고정수단(121)에 의해 위치고정되는 것으로, 소정길이의 철근을 절단하여 사용하거나 외주면에 다수의 눈금이 표기된 사출물로 미리 제작하여 설계 및 현장상황에 따른 콘크리트 두께에 따라 적절하게 절단하거나 제1 또는 제2 고정수단(,)을 풀어 길이를 조절한 뒤 사용될 수 있다.In addition, the lower part is inserted into the thickness adjusting rod hole 122 of the lower support 12 is fixed by the second fixing means 121, and is used by cutting the reinforcement of a predetermined length or a plurality of scales are marked on the outer peripheral surface Pre-fabricated by injection molding can be used after appropriately cutting or adjusting the length by loosening the first or second fixing means (,) according to the design and the site thickness.

또한, 상기 상부지지구(14)는 상기 두께조절봉(13)의 상부가 삽입되도록 하부에 두께조절봉삽입공(142)이 형성되고 이를 수평방향에서 관통하여 두께조절봉(13)을 위치고정하는 제3 고정수단(141)을 가지며 그 상측에 수평방향으로 관통되는 절곡철근공(143)이 형성되고 이와 연통되도록 상면 중앙을 세로방향으로 관통하여 형성되되 내경에는 암나사부(144a)를 형성하는 전산볼트공(144)이 구비되며 외주면에 2개이상의 플렌지형상으로 확경되어 매립시 상부지지구(14)를 따라 수분이 하측으로 유입되는 것을 막도록 지수부(止水部,145)를 형성한다. In addition, the upper support 14 has a thickness adjustment rod insertion hole 142 is formed in the lower portion so that the upper portion of the thickness adjustment rod 13 is inserted and penetrates it in the horizontal direction to fix the position of the thickness adjustment rod 13. Comprising a third reinforcing means 141 is formed in the upper side of the bent reinforcing steel hole 143 is formed through the center of the upper surface so as to communicate with the computer is formed to form a female screw portion (144a) in the inner diameter A bolt hole 144 is provided and expanded to two or more flange shapes on the outer circumferential surface to form an exponent part 145 to prevent water from flowing downward along the upper support 14 when buried.

또한, 상기 전산볼트(15)는 상기 전산볼트공(144)에 나사결합되고 소정길이를 가지며 외주면에 고정되어 회전시키면 전산볼트(15) 전체가 회전되면서 상부지지구(14)의 전산볼트공(144)에 나사결합되는 1개의 조임너트(151)와, 회전되어 높이를 조절한 뒤 고정틀(20)을 고정하기 위한 2개의 고정너트(152)를 구비한다. In addition, the threaded bolt 15 is screwed to the threaded bolt ball 144, has a predetermined length and is fixed to the outer peripheral surface and rotated, the threaded bolt 15 of the upper support (14) while the entire threaded bolt 15 is rotated ( One tightening nut 151 screwed to 144, and two fixing nuts 152 for fixing the fixing frame 20 after the rotation is adjusted to the height.

또한, 상기 전산볼트공 덮개(16)는 상기 상부지지구(14)의 상부에 밀폐하도록 형성되되 중앙에 전산볼트통공(161)이 형성되어 상기 상부지지구(14)에 나사결합된 전산볼트(15)의 외주면을 타고 전산볼트공(144)으로 들어오는 콘크리트의 유입을 방지한다. In addition, the computer bolt hole cover 16 is formed to be sealed to the upper portion of the upper support 14, a computer bolt through hole 161 is formed in the center of the computer bolt (screwed to the upper support 14 ( Take the outer circumferential surface of 15) to prevent the inflow of concrete coming into the computer bolt ball (144).

이와 같이 구성으로 도 6의 좌측에서 보는 바와 같이, 고정대(10)는 단일 주름관 배관(3)을 철사로 묶어 고정하는데 사용될 수 있으며, 도 4에서 보는 바와 같이, 상기 상부지지구(14)의 절곡철근공(143)에 삽입되는 최소 1번 이상 절곡된 소정길이의 절곡철근(17)을 더 구비하여, 상기 상부지지구(14)의 전산볼트공(144)에 나사결합된 전산볼트(15)를 조여 절곡철근공(143)에 삽입된 절곡철근(17)을 압착하여 위치고정되도록 함으로써 2개 이상의 고정대(10)를 연결시켜 상호간의 간격을 유지하면서 바닥철근(2)과 철사로 고정되어 도 6에서 보는 바와 같이 보강철근(18)을 구비하여 다수의 주름관 배관(3)을 고정하거나 고정틀(20)을 고정하는데 사용될 수 있다.
In this configuration, as shown in the left side of FIG. 6, the fixture 10 may be used to bind and fix a single corrugated pipe 3 with a wire, as shown in FIG. 4, bending of the upper support 14. Further provided with a reinforcing bar 17 of a predetermined length bent at least one or more times to be inserted into the reinforcing hole 143, the computer bolt 15 screwed to the computer bolt hole 144 of the upper support 14 By tightening the bending reinforcement (17) inserted into the bending reinforcement hole 143 to fix the position by connecting two or more fasteners (10) while maintaining the distance between each other is fixed with the bottom reinforcement (2) and wire As shown, the reinforcing bar 18 may be provided to fix a plurality of corrugated pipes 3 or to fix the fixing frame 20.

다음, 도 8,9에서 보는 바와 같이, 상기 고정틀(20)은 틀본체(21)와 주름관하부고정수단(22)과 주름관상부고정수단(23)과 고정핀(24)을 포함하여 이루어진다.Next, as shown in Figures 8 and 9, the fixing frame 20 comprises a frame body 21, the corrugated lower part fixing means 22, the corrugated tubular fixing means 23 and the fixing pin 24.

상기 틀본체(21)는 단면형상이 'ㄱ'형상으로 절곡된 소정길이의 금속제 바를 결합하여 상하가 관통된 직사각틀 모양으로 형성하되 금속제 바의 수평면에 '∪'형상으로 절개되어 상기 고정대(10)의 고정너트(152)가 나결되는 고정대결합홈(211)을 형성한다. The frame body 21 is formed in the shape of a rectangular frame through which the upper and lower portions of the metal bar of the predetermined length bent in a 'b' cross-section cut into a '∪' shape on the horizontal surface of the metal bar is fixed to (10) The fixing nut 152 of the) to form a fixing bar coupling groove 211.

상기와 같이 제작하는 이유는 본 출원인의 선출원된 특허출원 제2012-87951호에서 개시된 ']' 또는 '□'형상의 틀본체 보다 매우 경감된 중량으로 운반 및 작업이 용이하고 주름관하부고정수단(22)으로 제작하기 위한 것으로, 단면형상이 ''ㄱ'자 형상인 금속제 바를 소정길이로 절단하여 사용할 수도 있으며, 또한 평판 철판을 먼저 레이져로 외곽, 관통공, 장공 등을 정밀하게 절단 가공하고 절곡기를 이용하여 'ㄱ'형상으로 절곡하여 금속제 바를 만든 후 결합하게 되면 보다 정밀하게 제작할 수 있다.The reason for the manufacture as described above is easy to carry and work with a much lighter weight than the ']' or '□' shaped body disclosed in the applicant's prior filed patent application No. 2012-87951, and the corrugation pipe fixing means 22 It can be used to cut a metal bar with a cross section of `` a '' shape to a predetermined length, and can also cut and cut the outside, through hole, long hole, etc. with a flat plate first with a laser. By using the 'b' shape to make a metal bar and then combine it can be manufactured more precisely.

또한, 상기 주름관상부고정수단(23)과 주름관하부고정수단(22)은 소정 두께와 폭을 갖는 판형으로 주름관 배관(3)의 측면 착탈이 용이하도록 주름관 배관(3)의 지름 정도로 일측이 절개된 수용홈(221,231)을 동일하게 형성하되 절개된 개구방향을 삽입되는 주름관 배관(3)이 바닥 콘크리트 후 상기 고정틀(20) 내에 수용을 위해 절곡될 방향측으로 향하도록 설치되며 상기 절개된 개구의 좌우에 다수의 핀공(222,232)이 형성되고, 각각 틀본체(21)의 상부 및 하부에 결합되어 주름관 배관(3)의 상,하부를 고정함으로써 주름관 배관(3)이 상향된 자세로 유지되도록 한다. In addition, the corrugated pipe upper fixing means 23 and the corrugated pipe lower fixing means 22 is a plate having a predetermined thickness and width, one side is cut to the diameter of the corrugated pipe (3) to facilitate the side detachment of the corrugated pipe (3). Corrugated pipe (3) forming the receiving grooves (221, 231) in the same manner but inserted into the cut opening direction is installed so as to be directed toward the direction to be bent for receiving in the fixing frame (20) after the bottom concrete, and to the left and right of the cut opening. A plurality of pin holes 222 and 232 are formed, and are respectively coupled to the upper and lower portions of the frame body 21 to fix the upper and lower portions of the corrugated pipe 3 so that the corrugated pipe 3 is maintained in an upward position.

또한, 상기 고정핀(24)은 '∩'형상으로 형성되어, 상기 주름관상부고정수단(23)과 주름관하부고정수단(22)의 수용홈(221,231)의 절개된 개구를 통하여 주름관 배관(3)을 안착시킨 후 절개된 개구측을 밀폐하도록 상기 핀공(222,232)에 삽입된다. In addition, the fixing pin 24 is formed in a '∩' shape, the corrugated pipe (3) through the cut opening of the receiving grooves (221, 231) of the corrugated tubular fixing means 23 and the corrugated pipe lower fixing means 22. It is inserted into the pin holes (222, 232) to seal the opening side after being seated.

도 10,11에서 보는 바와 같이, 상기 고정핀(24)은 일측은 짧고 타측은 길게 형성하되 내측으로 기울어지는 경사를 갖도록 절곡되어, 짧은 일측을 먼저 핀공(222,232)에 삽입한 뒤 긴 타측을 핀공(222,232)에 삽입하고 누름으로써 용이하게 삽입되고, 긴 타측의 하부에서 상측으로 밀어주면 경사를 따라 상승하면서 용이하게 분리되도록 형성된다.As shown in Figure 10, 11, the fixing pin 24 is bent so as to form one side is short and the other side is elongated inclined inward, the short one side is first inserted into the pin hole (222,232) and then the other long pin ball It is easily inserted by pressing and inserting into the (222,232), and is pushed upward from the lower side of the other long side is formed to be easily separated while rising along the slope.

도 9 ~ 11에서 보는 바와 같이, 상기 주름관상부고정수단(23)과 주름관하부고정수단(22)의 수용홈(221,231)의 길이는 수용할 주름관 배관(3)의 수량에 따라 길어질 수 있으며, 그에 따른 핀공(222,232)도 다수 형성될 수 있어, 하나의 수용홈(221,231)에 다수의 주름관 배관(3)을 수용할 수 있다. As shown in Figures 9 to 11, the length of the receiving grooves (221, 231) of the corrugated tubular fixing means 23 and the corrugated pipe lower fixing means 22 may be lengthened depending on the quantity of corrugated pipe (3) to accommodate, Since a plurality of pin holes 222 and 232 may be formed, a plurality of corrugated pipes 3 may be accommodated in one accommodation groove 221 and 231.

상기와 같이 구성된 고정틀(20)은 바닥 콘크리트 타설 전에 설치된 다수의 고정대(10)에 고정대결합홈(211)을 걸고 고정볼트(152)를 조여 고정함으로써 설계된 위치 그대로 이격되어 배관들(3)의 위치를 고정하고 바닥 콘크리트 타설후 벽체천장 거푸집 설치시공 전 남는 길이의 주름관 배관들(3)을 눕혀서 틀본체(21) 내에 보관함으로써 천장 콘크리트 타설후 거푸집 해체시 무거운 거푸집의 낙하와 형틀목공 및 철근작업자의 부주의에 의한 주름관 배관(3)의 파손을 방지하게 된다.The fixed frame 20 configured as described above is spaced apart from the designed position by fastening the fixing bolt 152 by fastening the fixing bolt 152 to the plurality of fixing tables 10 installed prior to the floor concrete pouring. After laying the floor concrete and installing the wall ceiling formwork, the corrugated pipes (3) of the remaining length are laid down and stored in the frame main body (21). Inadvertent damage to the corrugated pipe 3 is prevented.

또한, 냉온수 계량기함, 전기/통신 단자함과 같은 벽체매립함(4) 및 일대일 이중관방식의 원형수전구, 난방/냉온수 분배기, 에어콘 실외기 등을 다수 설치해야 하는 경우, 추가적으로 전산봉고정수단(25)을 더 포함할 수 있는데, 이는 소정 두께와 폭을 갖는 판형으로 상하방향으로 관통되는 수용공(251)이 형성되며 틀본체(21)의 하부에 결합되어, 벽체매립함(4)을 지지할 지지봉(31)이 설치될 설계에 따른 정확한 장소에 전산봉(252)을 매립할 수 있다. In addition, if a large number of wall-filled boxes (4) such as cold and hot water meter box, electrical / communication terminal box and one-to-one double pipe type round water bulb, heating / hot and cold water distributor, air conditioner outdoor unit, etc. must be installed, additionally computerized rod fixing means (25) It may further include, which is a plate having a predetermined thickness and width is formed in the receiving hole 251 penetrating in the vertical direction and is coupled to the lower portion of the frame body 21, the support rod to support the wall buried (4) The computer rod 252 may be embedded in the correct place according to the design in which the 31 is to be installed.

상기 매립된 전산봉(252)에 장너트(30)를 결합하여 지지봉(31)을 직립시키는 기술은 본 출원인의 선출원된 특허출원 제2012-87951호에서 개시된 내용과 동일하므로 상세한 설명은 생략하고 구성만 설명하면 다음과 같다. The technology for erecting the support rod 31 by combining the jangnut 30 to the embedded rod 252 is the same as the contents disclosed in the applicant's patent application No. 2012-87951, the detailed description thereof will be omitted Explain only the following.

상기 장너트(30)는 소정길이로 상기 전산봉고정수단(25)의 수용공(251)에 삽입고정되어 바닥 콘크리트 타설 및 양생 이후 상측으로 돌출되어 고정된 전산봉들(252)의 상단에 나결되고, 상기 지지봉(31)은 소정길이의 철근 또는 전산봉으로 형성되어 상기 장너트(30)의 상부에 나결되어 직립되도록 하부에 숫나사산(311)이 형성된다.The long nut 30 is inserted into the receiving hole 251 of the computer rod fixing means 25 to a predetermined length and protrudes upward after bottom concrete placement and curing. The support rod 31 is formed of a reinforcing rod or a computer rod having a predetermined length, and a male thread 311 is formed at a lower portion of the support rod 31 so as to be connected to the upper portion of the long nut 30.

또한, 상기 틀본체(21)는 도 8,10,11에서 보는 바와 같이 운반 및 조립이 용이하도록 길이방향을 1/2, 1/3 또는 1/4로 절단되어 상호 맞닿는 부분 일측에는 돌출된 돌출결합부(26a)를 형성하고 타측에는 삽입결합부(26b)를 형성하여 상기 돌출결합부(26a)가 삽입결합부(26b)에 삽입되고 관통되는 제4 고정수단(261)에 의해 고정되도록 형성할 수 있다. 상기 절단된 틀본체(21)들을 결합시켜 고정시키는 방법은 종래 사용되는 방법 중 취사선택될 수 있다.In addition, the frame body 21 is projected to protrude on one side of the contact portion is cut in half, 1/3 or 1/4 in the longitudinal direction to facilitate transport and assembly as shown in Figures 8, 10, 11 A coupling portion 26a is formed and an insertion coupling portion 26b is formed on the other side so that the protruding coupling portion 26a is fixed by the fourth fixing means 261 inserted into and inserted into the insertion coupling portion 26b. can do. The method of fixing the cut frame bodies 21 by fixing may be selected from conventional methods.

상기 틀본체(21)를 절단하는 경우, 도 8에서 보는 바와 같이, 제1 틀본체(21a)와 제2 틀본체(21b)를 운반 및 작업이 용이하도록 분리결합이 용이한 형태로 분리 제작하여 사용할 수 있으며, 또 다른 경우는 도 10에서 보는 바와 같이 먼저, 제1 틀본체(21c)는 바닥 콘크리트 단계(S210) 전에 설치하여 주름관 배관(3)을 직립되도록 매립시킨 뒤, 도 11에서 보는 바와 같이 바닥 콘크리트 단계(S210) 후에 제2 틀본체(21d)를 제1 틀본체(21c)에 결합시키고 주름관 배관(3)을 수용시켜 보호할 수 있다.When cutting the frame body 21, as shown in Figure 8, by separating the first frame body 21a and the second frame body 21b in a form that is easy to separate and coupled to facilitate transport and operation In another case, as shown in FIG. 10, first, the first frame body 21c is installed before the bottom concrete step S210, and the corrugated pipe 3 is buried upright, and as shown in FIG. 11. As described above, after the bottom concrete step S210, the second frame body 21d may be coupled to the first frame body 21c, and the corrugated pipe 3 may be accommodated and protected.

이렇게 바닥 콘크리트 단계(S210) 전,후로 나누어서 제1 틀본체(21c)와 제2 틀본체(21d)를 설치하는 이유는 바닥 콘크리트시 전,후 및 바닥 콘크리트시 작업자의 작업 및 통행에 지장을 주지 않도록 하기 위함이다.The reason for installing the first frame main body 21c and the second frame main body 21d by dividing the floor concrete step before and after the step S210 is that it does not interfere with the worker's work and traffic before and after the floor concrete and the floor concrete. This is to avoid.

또한, 상기 고정틀(20)은 처짐방지수단(27)과 돌출방지수단(28)을 더 포함할 수 있는데, 이는 상기 고정틀(20) 내에 주름관 배관들(3)을 눕혀서 틀본체(21) 내에 보관할 수 있도록 하기 위한 것으로, 상기 처짐방지수단(27)은 소정두께와 폭을 갖는 판형상으로 상기 틀본체(21)의 하부를 가로지르도록 형성되어 주름관 배관들(3)의 하부를 지지하는 것으로 하나 이상이 설치될 수 있다. In addition, the fixing frame 20 may further include a deflection preventing means 27 and a protrusion preventing means 28, which lays the corrugated pipes 3 in the fixing frame 20 to be stored in the frame body 21. The sag preventing means 27 is formed to cross the lower portion of the frame body 21 in a plate shape having a predetermined thickness and width to support the lower portions of the corrugated pipes 3. The above can be installed.

또한, 상기 돌출방지수단(28)은 소정두께와 폭을 갖는 판형상으로 상기 틀본체(21)의 상부를 가로지르도록 형성되어 주름관 배관들(3)의 상부 돌출을 제한하되 최소 일측은 탈착가능하여 개방이 용이하도록 형성되는 것으로 하나 이상이 설치될 수 있다. In addition, the protrusion preventing means 28 is formed to cross the upper portion of the frame body 21 in a plate shape having a predetermined thickness and width to limit the upper protrusion of the corrugated pipes 3, but at least one side is removable. One or more may be installed so as to be easy to open.

또한, 상기 틀본체(21)는 주름관상부고정수단(23)과 주름관하부고정수단(22)과 처짐방지수단(27)과 돌출방지수단(28)과의 결합부위에 형성되는 결합통공(29) 중 어느 하나 이상을 장공으로 형성하여 현장에 따른 유사시 변동에 대응가능하다.In addition, the frame body 21 is a coupling through-hole 29 formed in the coupling portion of the corrugated tubular fixing means 23 and the corrugated pipe lower fixing means 22 and the deflection prevention means 27 and the protrusion preventing means 28. By forming any one or more of the long holes it is possible to cope with the variation in case of site.

또한, 상기 틀본체(21)는 주름관상부고정수단(23)과 주름관하부고정수단(22)과 처짐방지수단(27)과 돌출방지수단(28)과의 결합부위에 형성되는 제2 결합통공(291)을 사각으로 형성하고 이에 결합되는 고정수단으로 사각볼트(292)를 사용하여 나사결합 또는 나사풀림시 볼트가 회전되지 않아 작업이 용이하다. In addition, the frame body 21 has a second coupling hole formed in the coupling portion of the corrugated tubular fixing means 23, the corrugated pipe lower fixing means 22, the sag prevention means 27 and the protrusion preventing means 28 ( 291) is formed in a square and using a square bolt 292 as a fixing means coupled to it is easy to work because the bolt is not rotated when screwed or unscrewed.

이와 같이 고정틀(20)은 최소 2세트가 준비되어야 하는데, 그 이유는 통상적으로 본층에 고정틀(20)을 설치하고 바닥 콘크리트 타설한 뒤 양생하는 시간이 소요되므로 상층에 고정틀(20)을 설치하고 바닥 콘크리트 타설한 이후에야 본층 바닥 거푸집을 해체하게 되므로, 동시에 본층과 상층에서 고정틀(20)이 설치되어야 하기 때문이다.
In this way, at least two sets of fixing frames 20 should be prepared, because the fixing frame 20 is usually installed on the main floor and the concrete takes time to cure after placing the floor. This is because the main form floor formwork is to be dismantled only after the concrete is poured, and at the same time the fixing frame 20 must be installed in the main layer and the upper layer.

상기와 같은 주름관 배관 고정구조를 이용하여 주름관 배관(3)을 시공하는 방법을 설명하면 다음과 같다. Referring to the construction method of the corrugated pipe 3 using the corrugated pipe fixing structure as described above are as follows.

먼저, 본층 바닥 거푸집이 설치되고(S100) 거푸집 위에 벽체가 설치될 위치에 먹놓기 작업을 하고(S110) 바닥철근(4)을 배근한다(S120).First, the bottom floor formwork is installed (S100) and the eating work in the position where the wall is installed on the formwork (S110) and reinforces the bottom reinforcement (4) (S120).

다음, 설치된 거푸집(1)의 상부면에 설계에 따른 주름관 배관(3)이 설치될 위치를 벽돌 및 건식 벽체가 형성될 위치의 바닥 거푸집 먹놓기 작업후 배관위치에 맞추어 현장에서 확인하고 고정대결합구(11)의 설치위치를 설정하여 제1 고정수단(111)에 의해 하나 이상의 고정대결합구(11)를 고정한다(본층 고정대결합구고정 단계(S130)).Next, check the position of the corrugated pipe (3) according to the design on the upper surface of the installed formwork (1) will be installed on the site after the floor formwork of the brick and dry wall will be formed in accordance with the pipe position and fixed fixture Set the installation position of (11) to fix the one or more fasteners fasteners 11 by the first fastening means 111 (main floor fastener fasteners fixing step (S130)).

다음, 상기 고정된 고정대결합구(11)의 상측에서 끼움결합되고 상부에 수직방향으로 두께조절봉(13)이 삽입되는 하부지지구(12)와, 소정길이의 상기 두께조절봉(13)과, 상기 두께조절봉(13)의 상부에 결합되고 그 상측에 수평방향으로 삽입되는 절곡철근(17)을 고정하도록 세로방향으로 상측에서 삽입되는 전산볼트(15)가 나결되는 상부지지구(14)와, 상측에 고정된 1개의 조임너트(151)와 고정틀(20)을 고정하기 위한 2개의 고정너트(152)를 구비하는 전산볼트(15)를 포함하여 이루어지는 주름관배관고정대(10)를 조립한다(본층 고정대조립 단계(S140)).Next, the lower support 12 which is fitted in the upper side of the fixed fastener coupler 11 and the thickness adjusting rod 13 is inserted in the vertical direction, and the thickness adjusting rod 13 of a predetermined length, The upper support 14 which is coupled to the upper portion of the thickness adjusting rod 13 and the computer bolt 15 is inserted in the upper side in the vertical direction to fix the bending reinforcing bar 17 inserted in the horizontal direction on the upper side and Assembling the corrugated pipe piping stand (10) comprising a computer bolt (15) having one fastening nut (151) fixed to the upper side and two fixing nuts (152) for fixing the fixing frame (20) ( Main assembly stage assembly step (S140).

다음, 상기 조립된 고정대(10)를 바닥 거푸집(1)에 고정된 고정대결합구(11)에 고정대(10)를 끼움결합하되 콘크리트 두께에 따라 두께조절봉(13)을 선택하여 결합한 뒤 미리 배근된 바닥철근(2)에 고정한다(본층 고정대고정 단계(S150)).Next, the fitting fixture 10 is fitted to the fixture 10 is fixed to the coupling fixture (11) fixed to the floor formwork (1), but selected by combining the thickness adjusting rod (13) according to the concrete thickness before advance Fixed to the bottom reinforcing bar (2) (main floor fixing stand fixing step (S150)).

이때, 도 6에서 보는 바와 같이, 단일 주름관 배관(3)의 경우 바닥철근(2)을 통해 배관된 주름관 배관(3)을 상기 고정된 고정대(10)에 직접 묶어서 상향된 자세로 고정할 수 있고, 다수의 주름관 배관들(3)의 경우에도 절곡철근(17)으로 연결된 둘 이상의 고정대들(10)에 보강철근(18)을 덧대어 상기 보강철근(18)과 절곡철근(17)에 상,하부를 묶어서 상향된 자세로 고정할 수 있다.(본층 고정대에 주름관 고정 단계(S155))At this time, as shown in Figure 6, in the case of a single corrugated pipe 3, the corrugated pipe 3 piped through the bottom reinforcement (2) can be directly tied to the fixed fixture 10 and fixed in an upward position. In addition, in the case of a plurality of corrugated pipes (3) by adding a reinforcing bar (18) to the two or more fixing bars (10) connected by the bending bar (17) on the reinforcing bar (18) and the bending bar (17), The lower part can be tied and fixed in an upward position. (Colour tube fixing step (S155))

다음, 레이져로 절단된 뒤 절곡기를 이용하여 단면형상이 'ㄱ'형상으로 절곡된 소정길이의 금속제 바를 결합하여 상하가 관통된 직사각틀 모양으로 형성하되 수평면에 '∪'형상으로 절개되는 고정대결합홈(211)을 형성하는 틀본체(21)를 형성하고, 일측을 절개한 수용홈(221)과 그 좌우측에 핀공(222)이 형성되는 판형의 주름관하부고정수단(22)을 상기 틀본체(21)의 하부에 결합하고 상기 주름관하부고정수단(22)과 동일한 형상의 수용홈(231)과 핀공(232)이 형성된 주름관상부고정수단(23)을 상기 틀본체(21)의 상부에 결합하며 상하방향으로 관통되는 수용공(251)이 형성되는 판형의 전산봉고정수단(25)을 상기 틀본체(21)의 하부의 배관 위치부에 결합한 주름관 배관 고정틀(20)을 준비하여 현장에서 각각의 세대 타입별 주름관 배관 위치에 맞게 조립하되 상기 주름관하부고정수단(22) 및 주름관상부고정수단(23)의 수용홈(221,231)의 절개된 개구는 주름관 배관(3)이 상기 고정틀(20) 내에 수용을 위해 절곡될 방향측으로 향하도록 설치된다(본층 주름관배관고정틀조립 단계(S160)).Next, using a bending machine after cutting with a laser, the cross-section is formed into a rectangular frame through which a predetermined length is bent into a 'b' shape, and the upper and lower penetrates into a '모양' shape on the horizontal plane, The frame body 21 is formed to form a frame body 21 to form a 211, and the receiving groove 221 cut one side and the plate-shaped corrugated pipe lower part fixing means 22 is formed in the left and right sides of the frame body 21 Coupling tubular fixing means 23 is coupled to the lower portion of the corrugated tube lower fixing means 22 and the receiving groove 231 and the pin hole 232 having the same shape as the upper portion of the frame body 21 and up and down Each generation in the field by preparing a corrugated pipe fitting frame 20 in which a plate-shaped computer rod fixing means 25 having a receiving hole 251 penetrating in the direction is coupled to a pipe position portion of the lower portion of the frame body 21. Assemble according to the type of corrugated pipe piping by type The cut openings of the lower tube fixing means 22 and the receiving grooves 221 and 231 of the corrugated tubular fixing means 23 are installed so that the corrugated pipe 3 faces in the direction in which the corrugated pipe 3 will be bent for receiving in the fixing frame 20 ( Main layer corrugated pipe assembly frame assembly step (S160)).

다음, 상기 고정된 고정대(10)를 상기 고정틀(20)의 고정대결합홈(211)에 삽입시킨 뒤 높이를 조절하고 고정너트(152)를 조여 고정틀(20)을 위치고정한다(본층 고정틀고정 단계(S162)).Next, after inserting the fixed holder 10 into the holder coupling groove 211 of the fixing frame 20 to adjust the height and tighten the fixing nut 152 to fix the position of the fixing frame 20 (main layer fixing frame fixing step) (S162)).

다음, 상기 고정된 고정틀(20)의 내측에 형성된 전산봉고정수단(25)에 소정길이의 전산봉(252)을 고정하되 바닥 콘크리트시 전산봉(252)의 하단이 매립될 수 있도록 위치고정한다(본층 전산봉고정 단계(S164)).Next, the computer rod 252 of a predetermined length is fixed to the computer rod fixing means 25 formed on the inside of the fixed frame 20, and the bottom of the computer rod 252 is fixed when the bottom concrete is buried. (Main floor computerized rod fixing step (S164)).

다음, 상기 고정된 고정틀(20)의 하부에 결합된 주름관하부고정수단(22)의 절개된 개구측내에 바닥철근(2)을 통해 배관된 주름관 배관들(3)을 안착후 수용홈(221)의 좌우측에 형성된 핀공(222)에 '∩'형상의 고정핀(24)을 걸어 주름관 배관(3)의 하부를 고정한다(본층 주름관하부고정 단계(S166)).Next, the receiving groove 221 after seating the corrugated pipes 3 piped through the bottom reinforcing bar (2) in the cut opening side of the corrugated pipe lower fixing means 22 coupled to the lower portion of the fixed fixing frame 20 The pin hole 222 formed on the left and right of the '∩'-shaped fixing pin 24 is fixed to the lower part of the corrugated pipe piping 3 (main layer corrugated pipe lower fixing step (S166)).

다음, 상기 고정틀(20)의 상부에 결합된 주름관상부고정수단(23)의 절개된 개구측내에 상기 하부가 고정된 주름관 배관들(3)의 상부를 안착후 개구의 좌우측에 형성된 핀공(232)에 '∩'형상의 고정핀(24)을 걸어 주름관 배관(3)의 상부를 고정하여 주름관이 상향된 채 유지되게 된다(본층 주름관상부고정 단계(S168)).Next, the pin hole 232 formed on the left and right sides of the opening after seating the upper portion of the corrugated pipe pipes 3 fixed to the lower portion in the cut opening side of the corrugated tubular fixing means 23 coupled to the upper portion of the fixing frame 20. By fixing the '∩' shaped pin 24 to the upper portion of the corrugated pipe (3) to maintain the corrugated pipe upward (main layer corrugated pipe fixing step (S168)).

다음, 설치된 본층 바닥 거푸집(1)에 콘크리트를 부어 바닥 콘크리트를 타설한다.(본층 바닥 콘크리트 단계(S170))Next, the concrete is poured into the installed main floor floor formwork (1) to pour the floor concrete. (Main floor floor concrete step (S170))

다음, 상기 바닥 콘크리트 단계(S210) 이후 고정틀(20)의 주름관상부고정수단(23)의 고정핀(24)을 뺀다(본층 고정틀고정핀제거 단계(S180)).Next, after the bottom concrete step (S210) subtract the fixing pin 24 of the corrugated tubular fixing means 23 of the fixing frame 20 (main layer fixing frame fixing pin removal step (S180)).

다음, 상기 고정핀(24)이 제거된 주름관 배관들(3)의 상측으로 신장된 부분을 상기 고정틀(20)의 내부에 눕히고 외부충격을 방지하고자 상기 고정틀(20)의 상부면을 가리는 덮개(293)를 덮어 결합수단(294)으로 고정한다(본층 고정틀주름관수용 단계(S182)).Next, the cover extending to the upper side of the corrugated pipes (3) from which the fixing pin 24 is removed lies inside the fixing frame 20 and covers the upper surface of the fixing frame 20 to prevent external impact. 293) is fixed to the coupling means 294 (main layer fixing frame wrinkle receiving step (S182)).

도 8에서 보는 바와 같이 상기 틀본체(21)는 무게와 부피를 줄여 운반 및 설치가 용이하도록 틀본체(21)를 제1 틀본체(21a)와 제2 틀본체(21b)로 절단될 수 있다. 작업자는 상기 제1 및 제2 틀본체(21a,21b)를 현장으로 운반된 뒤 결합하여 설치하거나 설치하면서 결합할 수 있다.As shown in FIG. 8, the frame main body 21 may be cut into the first frame main body 21a and the second frame main body 21b to reduce the weight and volume to facilitate transport and installation. . The worker may combine the first and second frame bodies 21a and 21b while being transported to the site and installed or installed by combining them.

또한, 도 10,11에서 보는 바와 같이 틀본체(21)를 제1 틀본체(21c)와 제2 틀본체(21d)로 절단하여 설치하는 경우에는 바닥 콘크리트 단계(S210) 전에 제1 틀본체(21c)를 설치하여 주름관 배관들(3)을 상향하도록 매립시켜 작업자의 작업 및 통행이 용이하도록 한 뒤, 바닥 콘크리트 단계(S210) 후에 제2 틀본체(21d)를 설치하여 주름관 배관들(3)을 내측에 수용하게 된다.10 and 11, when the frame body 21 is cut and installed into the first frame body 21 c and the second frame body 21 d, the first frame body (before the floor concrete step S210) is installed. 21c) is installed to bury the corrugated pipes 3 upward to facilitate work and passage of the operator, and then install the second frame body 21d after the bottom concrete step S210 to corrugate pipes 3. Will be accommodated inside.

도 11에서 보는 바와 같이 상기 주름관 배관들(3)을 고정틀(20) 내부에 눕힐 때, 상기 틀본체(21)에 하나 이상의 처짐방지수단(27)과 돌출방지수단(28)이 구비되어 있으면 용이하게 감아서 수용할 수 있다.As shown in FIG. 11, when the corrugated pipes 3 are laid in the fixing frame 20, one or more sagging prevention means 27 and protrusion preventing means 28 are easily provided in the frame body 21. Can be accommodated.

상기 바닥 콘크리트에 매립된 다수의 고정대들(10)이 견고한 구조의 고정틀(20)을 지지하게 됨으로써 무거운 거푸집의 낙하로 인한 충격에도 고정틀(20)을 지지하여 주름관 배관들(3)을 보호하게 된다. 물론 추가적으로 설치되는 다수의 돌출방지수단(28)도 주름관 배관들(3)을 보호하게 된다.The plurality of fixing rods 10 embedded in the bottom concrete support the fixing frame 20 of the rigid structure to protect the corrugated pipes 3 by supporting the fixing frame 20 even when the heavy formwork falls. . Of course, a plurality of additional protrusion preventing means 28 is installed to protect the corrugated pipes (3).

다음, 본층 벽체철근 배근(S190)후 본층 벽체 및 상층 바닥 거푸집(1a)을 설치(S200)하고 상층 바닥철근을 배근(S210)한다.Next, after the main floor reinforcement bar (S190) to install the main floor wall and the upper floor formwork (1a) (S200) and the upper floor reinforcement (S210).

다음, 설치된 상층 바닥 거푸집(1a)의 상부면에 설계에 따른 주름관 배관(3)이 설치될 위치를 바닥 먹놓기 배관위치에 맞추어 현장에서 확인하고 고정대결합구(11)의 설치위치를 설정하여 제1 고정수단(111)에 의해 하나 이상의 고정대결합구(11)를 고정(S220)하고 본층 고정대조립과 동일한 방법으로 주름관배관고정대(10)를 상층에 조립(S230)하고 고정(S240)한다. Next, confirm the position of the corrugated pipe 3 according to the design on the upper surface of the installed upper floor formwork 1a in accordance with the flooring piping position, and set the installation position of the fastener coupler 11 by 1 Fixing means (111) by fixing the one or more fasteners (11) and the corrugated pipe pipe fittings (10) to the upper layer in the same manner as the assembly of the base holder (S230) and is fixed (S240).

다음, 상기 본층에서 동일한 방법으로 고정틀(20)을 상층에서 조립(250)하고 고정(S252)한 뒤 전산봉(63)을 고정(S254)하고 주름관하부고정수단(22)을 이용하여 주름관 배관(3)의 하부를 고정(S256)하고 주름관상부고정수단(23)을 이용하여 주름관 배관(3)의 상부를 고정(S258)한다.Next, assembling 250 in the upper layer in the same way in the main layer (250) and fixed (S252) and then fixing the rod (63) (S254) and corrugated pipe piping using the corrugated pipe lower fixing means 22 ( The lower part of 3) is fixed (S256) and the upper part of the corrugated pipe 3 is fixed using the corrugated tubular fixing means 23 (S258).

다음, 상기 본층 벽체 및 상층 바닥 거푸집 설치 단계(S200)에서 설치된 거푸집(1a)에 콘크리트를 부어 타설한다(상층 바닥콘크리트 단계(S260)).Next, the concrete is poured into the formwork 1a installed in the main floor wall and the upper floor formwork installation step (S200) (upper floor concrete step (S260)).

다음, 상층 바닥 콘크리트 단계(S260) 이후 양생완료된 본층 벽체 및 상층 바닥 거푸집을 해체한다(본층 바닥 거푸집 해체 단계(S270)).Next, after the upper floor concrete step (S260) to dismantle the cured main floor wall and the upper floor formwork (main floor floor formwork dismantling step (S270)).

여기서 해체된 거푸집은 그대로 상층 벽체 및 상2층 바닥 거푸집 설치(S300)시에 사용되는데, 바닥 거푸집(1)에 제1 고정수단(111)으로 고정된 고정대결합구(11)는 하부지지구(12)로부터 용이하게 분리되므로 바닥 거푸집(1) 해체시 함께 분리되어 거푸집(1)에 그대로 고정되어 사용됨으로써 상층 벽체 및 상2층 바닥 거푸집 설치(S300)시 동일한 위치에 동일한 고정대결합구(11)가 위치되게 된다. Here, the dismantled formwork is used at the time of installing the upper wall and the second floor formwork (S300) as it is, and the fixing stand coupling member 11 fixed to the bottom formwork 1 by the first fixing means 111 is the lower support 12. Since it is easily separated from the bottom formwork (1) when dismantled together to be used as it is fixed to the formwork (1) as it is used to install the upper wall and the second floor floor formwork (S300) at the same position in the same stationary coupler (11) To be located.

따라서, 공동주택의 경우 본층과 상층에서 1번씩의 주름관 배관(3) 위치설정 및 고정대결합구(11) 고정작업만으로 상2층에서는 별도의 작업 없이도 고정대(10)의 정확한 위치를 설정하게 되어 동질의 규격화된 반복시공이 가능하게 된다.Therefore, in the case of a multi-family house, the corrugated pipe (3) positioning and fixation fasteners (11) fixed only once in the main floor and the upper floor to set the exact position of the fixture 10 without additional work on the upper floor. Standardized repetitive construction of is possible.

다음, 상기 본층 바닥 거푸집 해체(S270)후 상층 고정틀(20)의 주름관상부고정수단(23)의 고정핀(24)을 빼고(S280) 주름관 배관들(3)의 상측으로 신장된 부분을 상기 고정틀(20)의 내부에 눕히고 외부충격을 방지하고자 상기 고정틀(20)의 상부면을 가리는 덮개(293)를 덮어 결합수단(294)으로 고정한다(상층 주름관수용 단계(S282)).Next, after removing the main form bottom formwork (S270), the fixing pin 24 of the corrugated pipe fixing means 23 of the upper layer fixing frame 20 is removed (S280) and the portion extending to the upper side of the corrugated pipes 3 is fixed to the fixing frame. Lying in the interior of the 20 and to cover the cover 293 covering the upper surface of the fixing frame 20 to prevent external shocks and fixed by the coupling means 294 (upper corrugation step (S282)).

다음, 상층 벽체철근을 배근(S290)하고 상층 벽체 및 상2층 바닥 거푸집(1)을 설치(S300)하며 상2층 바닥철근을 배근(S310)한다.Next, the reinforcement of the upper wall reinforcement (S290) and the upper wall and the upper second floor formwork (1) is installed (S300) and the upper reinforcement of the second floor reinforcement (S310).

이 때, 상기 상2층 바닥 거푸집 설치(S300)시에 본층 바닥 거푸집 해체 단계(S270)에서 해체된 거푸집(1)을 그대로 사용하여 설치하게 되므로 본층에서 고정된 고정대결합구(11)가 그대로 제 위치에 설치되므로, 이미 고정된 고정대결합구(11)에 상층 고정대조립과 동일한 방법으로 주름관배관고정대(10)를 상2층에 조립(S320)하고 고정(S330)한다. At this time, since the installation of the formwork (1) dismantled in the main floor floor formwork dismantling step (S270) at the time of the installation of the upper second floor floor formwork (S270) as it is installed, the fixed stand coupler (11) fixed in the main floor as it is Since it is installed in the position, assembling the corrugated pipe fittings 10 on the upper second floor in the same manner as the upper assembly of the fixing bar fastener assembly (11) fixed (S320) and fixed (S330).

다음, 상기 본층 주름관배관고정틀 조립단계(S160) 내지 본층 주름관상부고정 단계(S168)와 동일한 방법으로 상2층에서 주름관배관고정틀을 조립(S340)하고 고정(S342)한 뒤, 전산봉을 고정(S344)하고 주름관 배관(3)을 주름관하부고정수단(22)을 이용하여 하부를 고정(S346))하고 주름관상부고정수단(23)을 이용하여 상부를 고정(S348)한다. Next, assembling the corrugated pipe fixing frame (S340) and fixing (S342) in the upper two layers in the same manner as the main layer corrugated pipe fixing frame assembly step (S160) to the main layer corrugated pipe fixing step (S168), and then fixed the computer rod ( S344) and the lower portion of the corrugated pipe (3) using the corrugated pipe lower fixing means 22 (S346)) and the upper portion of the corrugated pipe fixing means 23 is fixed (S348).

다음, 상기 상층 벽체 및 상2층 바닥 거푸집 설치 단계(S300)에서 설치된 거푸집에 콘크리트를 타설한다(상2층 바닥콘크리트 단계(S350)).Next, the concrete is poured into the formwork installed in the upper wall and the upper second floor formwork installation step (S300) (upper second floor concrete step (S350)).

다음, 상기 상2층 바닥콘크리트 단계(S350) 이후 양생완료된 상기 본층 벽체 및 상층 바닥 거푸집(1a)을 해체한다.(상층 바닥거푸집 해체 단계(S360)) Next, dismantle the cured main wall and upper floor formwork 1a after the upper two floor concrete step (S350). (Upper floor formwork dismantling step (S360))

다음, 상기 상층 바닥 거푸집 해체(S360)후 본층의 고정틀(20)의 덮개(293)를 제거하고 고정틀(20)을 해체한다(본층 고정틀해체 단계(S370)). 해체시 고정틀(20)을 운반 및 결합이 용이하도록 1/2.1/3 또는 1/4로 분리하여 운반하는 것이 용이하다.Next, after dismantling the upper floor formwork (S360) to remove the cover 293 of the fixing frame 20 of the main layer and dismantle the fixing frame 20 (main layer fixing frame dismantling step (S370)). When dismantling, it is easy to separate and transport the fixing frame 20 in 1 / 2.1 / 3 or 1/4 so as to facilitate transport and coupling.

다음, 상기 본층 고정틀해체 단계(S370) 이후, 바닥에 돌출된 고정대(10)의 전산볼트들(15)의 상부에 각종 프레임(5)을 직접 고정할 수 있다(본층 프레임고정 단계(S380)).Next, after the main layer fixing frame disassembly step (S370), various frames 5 may be directly fixed to the upper part of the computer bolts 15 of the fixing bracket 10 protruding from the bottom (main layer frame fixing step (S380)). .

또한, 상기 고정틀해체 단계(S370) 이후, 바닥에 돌출된 고정대(10)의 전산볼트들(15)과 전산봉들(252) 중 하나 이상의 상부에 장너트(30)를 결합한 뒤 하부에 숫나사산(311)이 형성된 소정길이의 철근 또는 전산봉으로 된 지지봉(31)을 결합하여 직립되도록 세우고(본층 지지봉고정 단계(S382)), 상기 직립된 지지봉(31)에 벽체매립함(4) 또는 프레임(5)을 고정(본층 매립함고정 단계(S384))할 수도 있다. In addition, after the fixing frame disassembly step (S370), after coupling the long nut 30 to one or more of the computerized bolts 15 and the rods 252 protruding from the bottom 10 of the male thread at the bottom 3311 is formed so as to stand upright by combining the support rod 31 of the predetermined length of the reinforcement or computer rod (main layer support rod fixing step (S382)), the wall buried in the upright support rod 31 (4) or frame (5) may be fixed (main floor filling box fixing step S384).

이후 상2층 고정틀고정핀 제거 단계, 상2층 고정틀주름관 수용 단계를 시작으로 상기 상층 고정틀고정핀 제거 단계(S280), 상층 고정틀주름관 수용 단계(S282)이후 과정을 계속 상층으로 올라가면서 반복하여 진행하게 되므로 생략한다.
After the upper two-layer fixing frame fixing pin removal step, the upper two-layer fixing frame wrinkle tube receiving step starting with the upper layer fixing frame fixing pin removal step (S280), the upper layer fixing frame wrinkle tube receiving step (S282) proceeds to continue the process repeatedly up to the upper layer Will be omitted.

따라서, 바닥 콘크리트 타설 전,후 전기, 통신 및 설비 등에서 매립에 사용되는 다수의 주름관 배관들의 위치고정과 각종 단자함과 수전함 등의 벽체매립함과 각종 프레임의 고정을 위한 매립볼트를 용이하고 정밀하게 설치가능하며 상하층간 누수가 방지되고 바닥콘크리트 두께 변동에 따른 조절이 용이하고 안정되고 규격화된 반복작업이 가능하여, 각 세대별로 동질의 시공을 제공하고 벽체매립함 및 프레임 고정을 용이하게 수행할 수 있어 인건비 및 작업시간 절감과 하자 발생률이 현저히 감소되어 작업능률이 매우 우수하고 효율 및 안전성이 높은 주름관 배관 고정구조와 이를 이용한 주름관 배관시공방법을 제공할 수 있게 된다.
Therefore, it is easy and precise to fix the location of a large number of corrugated pipes used for landfill in the electric, communication and facilities before and after the floor concrete placement, and the wall embedding boxes such as various terminal boxes and faucets, and the fixing bolts for fixing various frames. It can be installed, prevents leakage between upper and lower floors, and can be easily adjusted according to the change of floor concrete thickness, and it is possible to perform stable and standardized repetitive work, providing homogeneous construction for each generation, and easily performing wall embedding and frame fixing. As the labor cost, work time reduction and defect occurrence rate are significantly reduced, it is possible to provide a corrugated pipe fixing structure having excellent work efficiency, high efficiency and safety, and a corrugated pipe construction method using the same.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.

<도면의 주요부분에 대한 부호의 설명>
1,1a: 거푸집 2: 바닥철근 3: 주름관 배관
4: 벽체매립함 5: 프레임 10: 고정대
11: 고정대결합구 111: 제1 고정수단 12: 하부지지구
121: 제2 고정수단 122: 두게조절봉공 13: 두께조절봉
131: 눈금 14: 상부지지구 141: 제3 고정수단
142: 두께조절봉삽입공 143: 절곡철근공
144: 전산볼트공 144a: 암나사부 145: 지수부
15: 전산볼트 151: 조임너트 152: 고정너트
16: 전산볼트공 덮개 161: 전산볼트통공
17: 절곡철근 18: 보강철근 20: 고정틀
21: 틀본체 21a,21b,21c,21d: 제1 및 제2 틀본체
211: 고정대결합홈 22: 주름관하부고정수단 221,231: 수용홈
222, 232: 핀공 23: 주름관상부고정수단 24: 고정핀
25: 전산봉고정수단 251: 수용공 252: 전산봉
26a: 돌출결합부 26b: 삽입결합부 261: 제4 고정수단
27: 처짐방지수단 28: 돌출방지수단 29: 결합통공
291: 제2 결합통공 292: 사각볼트 293: 덮개
294: 결합수단 30: 장너트 31: 지지봉
311: 숫나사산
S100: 본층 바닥거푸집 설치 단계 S110: 먹놓기 단계
S120: 본층 바닥철근 배근 단계 S130: 본층 고정대결합구 고정 단계
S140: 본층 고정대 조립 단계 S150: 본층 고정대 고정 단계
S155: 본층 고정대에 주름관 고정 단계 S160: 본층 고정틀 조립 단계
S162: 본층 고정틀 고정 단계 S164: 본층 전산봉 고정 단계
S166: 본층 주름관하부 고정 단계 S168: 본층 주름관상부 고정 단계
S170: 본층 바닥콘크리트 단계 S180: 본층 고정틀고정핀 제거 단계
S182: 본층 고정틀주름관 수용 단계 S190: 본층 벽체철근 배근 단계
S200: 본층 벽체 및 상층 바닥 거푸집설치 단계
S210: 상층 바닥철근 배근 단계 S220: 상층 고정대결합구 고정 단계
S230: 상층 고정대 조립 단계 S240: 상층 고정대 고정 단계
S250: 상층 고정틀 조립 단계 S252: 상층 고정틀 고정 단계
S254: 상층 전산봉고정 단계 S256: 상층 주름관하부 고정 단계
S258: 상층 주름관상부 고정 단계 S260: 상층 바닥콘크리트 단계
S270: 본층 바닥거푸집해체 단계 S280: 상층 고정틀고정핀 제거 단계
S282: 상층 고정틀주름관 수용 단계 S290: 상층 벽체철근 배근 단계
S300: 상층 벽체 및 상2층 바닥 거푸집설치 단계
S310: 상2층 바닥철근 배근 단계 S320: 상2층 고정대 조립 단계
S330: 상2층 고정대 고정 단계 S340: 상2층 고정틀 조립 단계
S342: 상2층 고정틀 고정 단계 S344: 상2층 전산봉 고정 단계
S346: 상2층 주름관하부 고정 단계 S348: 상2층 주름관상부 고정 단계
S350: 상2층 바닥콘크리트 단계 S360: 상층 바닥거푸집해체 단계
S370: 본층 고정틀해체 단계 S380: 본층 프레임고정 단계
S382: 본층 지지봉고정 단계 S384: 본층 매립함고정 단계
Description of the Related Art
1,1a: formwork 2: bottom rebar 3: corrugated pipe tubing
4: wall filling box 5: frame 10: holder
DESCRIPTION OF SYMBOLS 11 Fixing fastener 111: First fixing means 12: Lower supporter
121: second fixing means 122: thickness adjustment rod 13: thickness adjustment rod
131: scale 14: upper support 141: third fixing means
142: thickness adjustment rod insertion hole 143: bending reinforcement
144: computer bolt 144a: female thread 145: exponent
15: Computer bolt 151: Tightening nut 152: Fixing nut
16: Computer bolt hole cover 161: Computer bolt hole
17: bending bar 18: reinforcing bar 20: fixing frame
21: frame body 21a, 21b, 21c, 21d: first and second frame body
211: fixing bar coupling groove 22: corrugated pipe fixing means 221,231: receiving groove
222, 232: pin hole 23: corrugated tube fixing means 24: fixing pin
25: computer rod fixing means 251: receiving hole 252: computer rod
26a: protrusion coupling portion 26b: insertion coupling portion 261: fourth fixing means
27: deflection prevention means 28: protrusion prevention means 29: engagement hole
291: second engagement hole 292: square bolt 293: cover
294: coupling means 30: long nut 31: support rod
311: male thread
S100: main floor floor formwork installation step S110: feeding step
S120: the bottom floor reinforcement step S130: the main floor anchorage fastener fixing step
S140: Main Floor Fixture Assembly Step S150: Main Floor Fixture Fixing Step
S155: fixing the corrugated pipe to the main floor holder S160: assembling the main floor fixing frame
S162: fixing the main floor frame S164: fixing the main floor computer rod
S166: fixing the bottom corrugated pipe bottom step S168: fixing the main floor corrugated pipe bottom
S170: main floor bottom concrete step S180: main floor fixing frame fixing step
S182: main floor fixing frame receiving step S190: main wall reinforcement step
S200: main wall and upper floor formwork installation step
S210: Reinforcement step of the upper floor Reinforcement step S220: Fixing step of the upper anchorage coupler
S230: Assembling the Upper Fixture Step S240: Fixing the Upper Fixture
S250: Upper fixing frame assembly step S252: Upper fixing frame fixing step
S254: fixing the upper computer rod step S256: fixing the upper corrugated tube lower part
S258: fixing the upper corrugated pipe upper step S260: upper concrete floor step
S270: dismantling the bottom formwork of the main floor S280: step of removing the upper fixing frame fixing pin
S282: accommodating the upper fixing frame corrugated pipe step S290: reinforcement step of the upper wall reinforcement
S300: upper wall and upper floor deck formwork installation step
S310: Upper 2nd floor reinforcement step S320: Upper 2nd floor fixing bar assembly step
S330: fixing the upper second floor holder S340: assembling the upper two floor fixing frame
S342: fixing the upper two floors fixed frame S344: fixing the upper two floors computer rod
S346: fixing the upper two-layer corrugated pipe lower step S348: fixing the upper two-layer corrugated pipe lower part
S350: the upper concrete floor step S360: the upper floor formwork dismantling step
S370: main floor fixing frame disassembly step S380: main floor frame fixing step
S382: fixing the main floor support bar S384: fixing the main floor buried box

Claims (19)

소정높이를 가지며 바닥 거푸집(1)의 상부면에 제1 고정수단(111)에 의해 고정되는 고정대결합구(11)와;
상기 고정대결합구(11)의 상측에서 끼움결합되도록 고정대결합구(11)의 외주면과 동일한 형상의 내주면을 하부에 형성하고 그 상부에 수직방향으로 두께조절봉공(122)이 형성되고 이를 수평방향에서 관통하여 결합되는 제2 고정수단(121)을 갖는 하부지지구(12)와;
상기 하부지지구(12)의 두께조절봉공(122)에 하부가 삽입되어 제2 고정수단(121)에 의해 위치고정되는 소정길이의 두께조절봉(13)과;
상기 두께조절봉(13)의 상부가 삽입되도록 하부에 두께조절봉삽입공(142)이 형성되고 이를 수평방향에서 관통하여 두께조절봉(13)을 위치고정하는 제3 고정수단(141)을 가지며 그 상측에 수평방향으로 관통되는 절곡철근공(143)이 형성되고 이와 연통되도록 상면 중앙을 세로방향으로 관통하여 형성되되 내경에는 암나사부(144a)를 형성하는 전산볼트공(144)이 구비되는 상부지지구(14)와;
상기 전산볼트공(144)에 나사결합되고 소정길이를 가지며 외주면에 고정된 1개의 조임너트(151)와 회전되어 고정틀(20)을 고정하기 위한 2개의 고정너트(152)를 구비하는 전산볼트(15)와;
상기 상부지지구(14)에 나사결합된 전산볼트(15)의 외주면을 타고 전산볼트공(144)으로 들어오는 콘크리트의 유입을 방지하도록 상기 상부지지구(14)의 상부를 밀폐하도록 형성되되 중앙에 전산볼트통공(161)이 형성되는 전산볼트공 덮개(16);를 포함하여 이루어지는 주름관배관고정대(10)를 구비하는 것을 특징으로 하는 주름관 배관 고정구조.
A fixed pair coupler 11 having a predetermined height and fixed to the upper surface of the bottom formwork 1 by the first fixing means 111;
An inner circumferential surface of the same shape as the outer circumferential surface of the fixing rod coupling sphere 11 is formed at the lower portion so as to be fitted from the upper side of the fixing rod coupling sphere 11, and a thickness adjusting rod hole 122 is formed at the upper portion thereof in the horizontal direction. A lower support 12 having a second fixing means 121 coupled therethrough;
A thickness adjustment rod 13 having a predetermined length that is inserted into a lower portion of the lower support 12 by a thickness adjusting rod hole 122 and fixed by the second fixing means 121;
The thickness adjusting rod insertion hole 142 is formed in the lower portion so that the upper portion of the thickness adjusting rod 13 is inserted, and has a third fixing means 141 for fixing the position of the thickness adjusting rod 13 by penetrating it in the horizontal direction. The upper side is formed with a reinforcing reinforcement hole 143 is formed in the horizontal direction through the upper surface in the vertical direction so as to communicate with the upper side is formed in the inner diameter of the inner bolt hole 144 to form a female threaded portion (144a) The earth 14;
Computing bolt screwed to the threaded bolt hole 144 and having a predetermined length and rotated with one tightening nut 151 fixed to the outer circumferential surface and two fixing nuts 152 for fixing the fixing frame 20 ( 15);
Is formed to seal the upper portion of the upper support 14 to prevent the inflow of concrete coming into the computer bolt ball 144 riding on the outer circumferential surface of the computer bolt 15 screwed to the upper support 14 Corrugated pipe piping fixing structure, characterized in that provided with a threaded bolt hole cover (161) is formed;
제 1 항에 있어서,
상기 두께조절봉(13)은 소정길이의 철근이거나 외주면에 눈금표시가 된 사출물인 것을 특징으로 하는 주름관 배관 고정구조.
The method according to claim 1,
The thickness adjusting rod 13 is a corrugated pipe piping fixed structure, characterized in that the reinforcement of the predetermined length or the injection molding is marked on the outer peripheral surface.
제 1 항에 있어서,
상기 상부지지구(14)는 그 외주면에 2개이상의 플렌지형상으로 확경되어 형성되는 지수부(145)를 형성하는 것을 특징으로 하는 주름관 배관 고정구조.
The method according to claim 1,
The upper support (14) is a corrugated pipe piping structure, characterized in that to form an exponent portion 145 is formed in the outer circumferential diameter is expanded to two or more flanges.
제 1 항에 있어서,
상기 상부지지구(14)의 절곡철근공(143)에 삽입되는 최소 1번 이상 절곡된 소정길이의 절곡철근(17)을 더 구비하여,
상기 상부지지구(14)의 전산볼트공(144)에 나사결합된 전산볼트(15)를 조여 절곡철근공(143)에 삽입된 절곡철근(17)을 압착하여 위치고정이 가능한 것을 특징으로 하는 주름관 배관 고정구조.
The method according to claim 1,
Further provided with a bent rebar 17 of a predetermined length bent at least one or more times to be inserted into the bent rebar hole 143 of the upper support 14,
Corrugated pipe, characterized in that the position fixing is possible by pressing the bending reinforcement (17) inserted into the bending reinforcing hole (143) by tightening the computer bolt (15) screwed to the computerized bolt hole (144) of the upper support (14) Pipe fixing structure.
제 1 항에 있어서,
단면형상이 'ㄱ'형상으로 절곡된 소정길이의 금속제 바를 결합하여 상하가 관통된 직사각틀 모양으로 형성하되 금속제 바의 수평면에 '∪'형상으로 절개되어 상기 주름관배관고정대(10)의 고정너트(152)가 나결되는 고정대결합홈(211)을 형성하는 틀본체(21)와;
소정 두께와 폭을 갖는 판형으로 주름관 배관(3)을 수용하는 수용홈(221)이 형성되며 상기 틀본체(21)의 하부에 결합되는 주름관하부고정수단(22)과;
상기 주름관하부고정수단(22)에 의해 하부가 고정된 주름관 배관(3)의 상부를 고정하여 상향된 자세로 유지되도록, 소정 두께와 폭을 가진 판형으로 주름관하부고정수단(22)과 동일한 형상으로 형성되어 상기 틀본체(21)의 상부에 결합되는 주름관상부고정수단(23);을 포함하여 이루어져,
바닥 콘크리트 타설 전에 상기 다수의 주름관배관고정대(10)에 고정대결합홈(211)을 고정함으로써 설계된 위치 그대로 이격되어 배관들(3)의 위치를 고정하고, 바닥 콘크리트 타설 후에 남는 길이의 주름관 배관들(3)을 눕혀서 틀본체(21) 내에 보관하는 주름관 배관 고정틀을 구비하는 것을 특징으로 하는 주름관 배관 고정구조.
The method according to claim 1,
The cross-section is formed into a rectangular frame through which the metal bar of a predetermined length bent in a 'b' shape, the upper and lower portions are penetrated, but cut into a '∪' shape on the horizontal surface of the metal bar to fix the corrugated pipe fixing stand 10 ( A frame body 21 for forming a fixing bar coupling groove 211 in which 152 is formed;
An accommodating groove 221 for accommodating the corrugated pipe 3 in a plate shape having a predetermined thickness and width is formed, and a corrugated pipe lower fixing means 22 coupled to the lower portion of the frame body 21;
In the same shape as the corrugated pipe lower fixing means 22 in a plate shape having a predetermined thickness and width so as to fix the upper part of the corrugated pipe piping 3 having the lower portion fixed by the corrugated pipe lower fixing means 22 and maintained in an upward position. It is formed, including; pleated tubular fixing means 23 is coupled to the upper portion of the frame body 21;
By fixing the coupling coupling grooves 211 to the plurality of corrugated pipe fittings 10 before the floor concrete is laid in place to fix the positions of the pipes 3, the corrugated pipes of the length remaining after the floor concrete pouring ( 3) the corrugated pipe fixing structure, characterized in that it is provided with a corrugated pipe fixing frame for laying in the frame body (21).
제 5 항에 있어서,
상기 주름관하부고정수단(22) 및 주름관상부고정수단(23) 중 하나 이상은 주름관 배관(3)의 측면 착탈이 용이하도록 수용홈(221,231)의 일측을 절개하여 형성하되 절개된 개구방향을 삽입되는 주름관 배관(3)이 상기 고정틀(20) 내에 수용을 위해 절곡될 방향측으로 향하도록 설치되고 상기 절개된 개구의 좌우에 다수의 핀공(222,232)이 형성되며;
상기 절개된 개구를 통하여 주름관 배관(3)을 안착시킨 후 절개된 개구측을 밀폐하도록 상기 핀공(222,232)에 삽입되는 '∩'형상의 고정핀(24);을 더 포함하는 것을 특징으로 하는 주름관 배관 고정구조.
6. The method of claim 5,
At least one of the corrugated pipe lower fixing means 22 and the corrugated pipe fixing means 23 is formed by cutting one side of the receiving grooves 221 and 231 so that the side detachment of the corrugated pipe 3 is easily inserted, and the cut opening direction is inserted. A corrugated pipe (3) is installed in the fixing frame (20) toward the direction to be bent for receiving, and a plurality of pin holes (222,232) are formed on the left and right of the cut opening;
A corrugated pipe further comprising a '∩'-shaped fixing pin 24 inserted into the pin holes 222 and 232 to seal the cut opening side after seating the corrugated pipe 3 through the cut opening. Pipe fixing structure.
제 6 항에 있어서,
상기 고정핀(24)은 일측은 짧고 타측은 길게 형성하되 내측으로 기울어지는 경사를 갖도록 절곡되어, 짧은 일측을 먼저 핀공(222,232)에 삽입한 뒤 긴 타측을 핀공(222,232)에 삽입하고 누름으로써 용이하게 삽입되고,
긴 타측의 하부에서 상측으로 밀어주면 경사를 따라 상승하면서 용이하게 분리되는 것을 특징으로 하는 주름관 배관 고정구조.
The method according to claim 6,
The fixing pin 24 is short to one side and the other side is formed to be bent to have an inclined inclined inward, easy to insert the short one side into the pin hole (222,232) first and then insert the other end into the pin hole (222,232) Inserted into the
The corrugated pipe fixing structure, characterized in that it is easily separated while rising along the slope when pushed upward from the bottom of the other long side.
제 6 항에 있어서,
상기 고정틀(20)은 바닥 콘크리트 타설 후에 주름관상부고정수단(23)과 고정핀(24)을 제거하고 상향된 자세로 고정되었던 주름관 배관들(3)을 틀본체(21) 내에 눕혀서 보관함으로써 타 작업자의 부주의에 의한 주름관 배관들(3)의 파손을 방지하는 것을 특징으로 하는 주름관 배관 고정구조.
The method according to claim 6,
The fixing frame 20 removes the corrugated tubular fixing means 23 and the fixing pin 24 after the bottom concrete is poured and stores the corrugated pipes 3 which were fixed in an upward position by lying down in the frame body 21 and stored therein. Corrugated pipe piping fixed structure, characterized in that to prevent damage of the corrugated pipe piping (3) by carelessness.
제 5 항에 있어서,
소정 두께와 폭을 갖는 판형으로 상하방향으로 관통되는 수용공(251)이 형성되며 틀본체(21)의 하부에 결합되는 전산봉고정수단(25)을 더 포함하는 것을 특징으로 하는 주름관 배관 고정구조.
6. The method of claim 5,
Retaining hole 251 is formed in the plate shape having a predetermined thickness and width penetrating in the vertical direction and corrugated pipe piping fixed structure further comprises a computer rod fixing means (25) coupled to the lower portion of the frame body (21) .
제 9 항에 있어서,
상기 전산봉고정수단(25)의 수용공(251)에 삽입고정되어 바닥 콘크리트 타설 및 양생 이후 상측으로 돌출되어 고정된 전산봉들(252)의 상단에 나결되는 소정길이의 장너트(30)와;
상기 장너트(30)의 상부에 나결되어 직립되도록 하부에 숫나사산(311)이 형성된 소정길이의 철근 또는 전산봉으로 된 지지봉(31)을 더 포함하는 것을 특징으로 하는 주름관 배관 고정구조.
The method of claim 9,
Inserted and fixed in the receiving hole 251 of the computer rod fixing means 25 and the long nut 30 of the predetermined length to be protruded to the top of the computer rods 252 fixed to the upper side after placing and curing bottom concrete and curing ;
Corrugated pipe fixing structure, characterized in that it further comprises a support rod (31) of a predetermined length of reinforcing rod or computer rod formed with a male thread (311) formed in the lower portion so as to stand upright on the top of the long nut (30).
제 5 항에 있어서,
상기 틀본체(21)는 운반 및 조립이 용이하도록 길이방향을 1/2, 1/3 또는 1/4로 절단되어 상호 맞닿는 부분 일측에는 돌출된 돌출결합부(26a)를 형성하고 타측에는 삽입결합부(26b)를 형성하여 상기 돌출결합부(26a)가 삽입결합부(26b)에 삽입되고 관통되는 제4 고정수단(261)에 의해 고정되는 것을 특징으로 하는 주름관 배관 고정구조.
6. The method of claim 5,
The frame body 21 is cut into 1/2, 1/3, or 1/4 in the longitudinal direction to facilitate transportation and assembly to form a protruding protrusion coupling portion 26a on one side of the abutting portion and an insertion coupling on the other side. Corrugated pipe fixing structure, characterized in that the protruding coupling portion (26a) is formed by the fourth fixing means (261) inserted and penetrated in the insertion coupling portion (26b) to form a portion (26b).
제 5 항에 있어서,
상기 고정틀(20)은 주름관 배관들(3)을 눕혀서 틀본체(21) 내에 보관할 수 있도록,
소정두께와 폭을 갖는 판형상으로 상기 틀본체(21)의 하부를 가로지르도록 형성되어 주름관 배관들(3)의 하부를 지지하는 하나 이상의 처짐방지수단(27)과;
소정두께와 폭을 갖는 판형상으로 상기 틀본체(21)의 상부를 가로지르도록 형성되어 주름관 배관들(3)의 상부 돌출을 제한하되 최소 일측은 탈착가능하여 개방이 용이하도록 형성되는 하나 이상의 돌출방지수단(28);을 포함하는 것을 특징으로 하는 주름관 배관 고정구조.
6. The method of claim 5,
The fixing frame 20 is to lay down the corrugated pipes (3) to be stored in the frame body 21,
One or more deflection preventing means (27) formed to cross the lower portion of the frame body (21) in a plate shape having a predetermined thickness and width to support the lower portions of the corrugated pipes (3);
One or more protrusions formed to cross the upper portion of the frame body 21 in a plate shape having a predetermined thickness and width to limit the upper protrusion of the corrugated pipes 3, but at least one side thereof is detachable. Preventing means (28); corrugated pipe fixed structure comprising a.
제 5 항 내지 제 12 항 중 어느 한 항에 있어서,
상기 틀본체(21)는 주름관상부고정수단(23)과 주름관하부고정수단(22)과 처짐방지수단(27)과 돌출방지수단(28)과의 결합부위에 형성되는 결합통공(29) 중 어느 하나 이상을 장공으로 형성하여 현장에 따른 유사시 변동에 대응가능한 것을 특징으로 하는 주름관 배관 고정구조.
13. The method according to any one of claims 5 to 12,
The frame body 21 is any one of the coupling through-holes 29 formed in the coupling portion of the corrugated tubular fixing means 23 and the corrugated lower fixing means 22 and the sagging prevention means 27 and the protrusion preventing means 28. Corrugated pipe fixing structure, characterized in that formed by one or more holes to respond to variations in case of emergency.
제 5 항 내지 제 12 항 중 어느 한 항에 있어서,
상기 틀본체(21)는 주름관상부고정수단(23)과 주름관하부고정수단(22)과 처짐방지수단(27)과 돌출방지수단(28)과의 결합부위에 형성되는 제2 결합통공(291)을 사각으로 형성하고 이에 결합되는 고정수단으로 사각볼트(292)를 사용하는 것을 특징으로 하는 주름관 배관 고정구조.
13. The method according to any one of claims 5 to 12,
The frame body 21 has a second coupling through hole 291 formed in the coupling portion between the corrugated tubular fixing means 23, the corrugated lower fixing means 22, the deflection preventing means 27 and the protrusion preventing means 28. Corrugated pipe fixing structure, characterized in that to form a square and use a square bolt 292 as a fixing means coupled thereto.
바닥 콘크리트 타설전에 주름관 배관의 일단부가 바닥상부로 돌출되도록 배관하여 콘크리트 양생후 벽돌 쌓는 위치를 표시하기 위해 바닥에 먹놓기 작업후 주름관 배관 설치위치에 각종 벽체매립함을 설치하고 벽돌을 조적하거나 벽돌 조적후 각종 프레임을 설치하고 마무리연결하는 주름관 배관시공방법에 있어서,
본층 바닥거푸집을 설치(S100)하고 거푸집 위에 벽체가 설치될 위치에 먹놓기 작업(S110)을 하며 바닥철근(4)을 배근(S120)한 이후,
설치된 거푸집(1)의 상부면에 설계에 따른 주름관 배관(3)이 설치될 위치를 바닥 먹놓기 배관위치에 맞추어 현장에서 확인하고 고정대결합구(11)의 설치위치를 설정하여 제1 고정수단(111)에 의해 하나 이상의 고정대결합구(11)를 고정하는 본층 고정대결합구고정 단계(S130)와;
상기 고정된 고정대결합구(11)의 상측에서 끼움결합되고 상부에 수직방향으로 두께조절봉(13)이 삽입되는 하부지지구(12)와, 소정길이의 상기 두께조절봉(13)과, 상기 두께조절봉(13)의 상부에 결합되고 그 상측에 수평방향으로 삽입되는 절곡철근(17)을 고정하도록 세로방향으로 상측에서 삽입되는 전산볼트(15)가 나결되는 상부지지구(14)와, 상측에 고정된 1개의 조임너트(151)와 고정틀(20)을 고정하기 위한 2개의 고정너트(152)를 구비하는 전산볼트(15)를 포함하여 이루어지는 주름관배관고정대(10)를 조립하는 본층 고정대조립 단계(S140)와;
상기 조립된 주름관배관고정대(10)를 바닥 거푸집(1)에 고정된 고정대결합구(11)에 주름관배관고정대(10)를 끼움결합하되 콘크리트 두께에 따라 두께조절봉(13)을 선택하여 결합한 뒤 미리 배근된 바닥철근(2)에 고정하는 본층 고정대고정 단계(S150)와;
상기 본층 바닥거푸집(1)에 콘크리트를 타설하는 본층 바닥콘크리트 단계(S170)와;
상기 본층 바닥콘크리트가 단계(S170) 이후 본층 벽체철근 배근(S190)후 본층 벽체 및 상층 바닥거푸집을 설치(S200)하고 상층 바닥철근을 배근(S210)한 이후,
설치된 상층 바닥거푸집의 상부면에 설계에 따른 주름관 배관(3)이 설치될 위치를 바닥 먹놓기 배관위치에 맞추어 현장에서 확인하고 고정대결합구(11)의 설치위치를 설정하여 제1 고정수단(111)에 의해 하나 이상의 고정대결합구(11)를 고정(S220)하고 본층 고정대조립과 동일한 방법으로 주름관배관고정대(10)를 상층에 조립(S230)하고 고정(S240)하는 단계와;
상기 본층 벽체 및 상층 바닥에 설치된 거푸집에 콘크리트를 타설하는 상층 바닥콘크리트 단계(S260)와;
상기 상층 바닥콘크리트 단계(S260) 이후 본층 바닥 거푸집(1)을 해체하는 본층 바닥거푸집해체 단계(S270)와;
상기 상층 바닥콘크리트 단계(S260) 이후 상층 벽체철근 배근(S290)후 상층 벽체 및 상2층 바닥 거푸집을 설치(S300)하되 상기 본층 바닥거푸집해체 단계(S270)에서 해체된 거푸집(1)을 이용하여 그대로 설치하고 상2층 바닥철근을 배근(S310)하는 단계와;
설치된 상2층 바닥 거푸집(1)에는 본층 고정대결합구고정 단계(S130)에서 고정했던 고정대결합구(11)가 고정되어 있어, 설치위치를 설정할 필요없이 상층 고정대조립과 동일한 방법으로 주름관배관고정대(10)를 상2층에 조립(S320)하고 고정(S330)하는 단계와;
상기 상층 벽체 및 상2층 바닥에 설치된 거푸집에 콘크리트를 타설하는 상2층 바닥콘크리트 단계(S350)와;
상기 상2층 바닥콘크리트 단계(S350) 이후 상층 바닥 거푸집(1a)을 해체하는 상층 바닥거푸집해체 단계(S360);를 포함하는 것을 특징으로 하는 주름관 배관구조를 이용한 주름관 배관시공방법.
After the concrete is laid, one end of the corrugated pipe is projected to the upper part of the floor, so that the brick stacking after concrete curing is put on the floor. In the corrugated pipe construction method of installing and finishing the connection of various frames,
After installing the main floor floor formwork (S100) and the wall to be installed on the formwork work (S110) and the bottom reinforcement (4) after reinforcement (S120),
Check the position of the corrugated pipe 3 according to the design to be installed on the upper surface of the installed formwork (1) in accordance with the flooring pipe position, and set the installation position of the fastener coupling sphere 11 to the first fixing means ( 111, by fixing the one or more fasteners fasteners 11, the base stationary fasteners fixing step (S130);
The lower support 12, which is fitted in the upper side of the fixed fixture coupler 11 and the thickness adjusting rod 13 is inserted in the vertical direction, the thickness adjusting rod 13 of the predetermined length, and the thickness The upper support 14, which is coupled to the upper portion of the adjustment rod 13 and the threaded rod 15 inserted in the upper direction in the vertical direction to fix the bending reinforcement 17 inserted in the horizontal direction on the upper side, and the upper side Assembly of the main floor assembling the corrugated pipe piping stand 10 including a computer bolt 15 having one fastening nut 151 and two fastening nuts 152 for fixing the fastening frame 20 fixed thereto. Step S140;
The assembled corrugated pipe pipe fittings 10 are fitted to the corrugated pipe pipe fittings 10 to the stationary coupling fasteners 11 fixed to the bottom formwork 1, and then selected by combining the thickness adjusting rods 13 according to the concrete thickness. A main floor fixing stand fixing step (S150) fixed to the bottom reinforcing bar 2 beforehand;
A main floor floor concrete step (S170) of pouring concrete into the main floor floor formwork (1);
After the main floor floor concrete step (S170) after the main floor wall reinforcement (S190), after installing the main floor wall and the upper floor formwork (S200) and the upper floor reinforcement (S210),
Check the position of the corrugated pipe 3 according to the design to be installed on the upper surface of the upper floor formwork installed in accordance with the flooring pipe position, and set the installation position of the fastener coupler 11 to the first fixing means (111) Fixing (S220) one or more fastener couplers (11) and assembling the corrugated pipe fixture (10) to the upper layer (S230) and fixing (S240) in the same manner as the assembly of the main layer fasteners;
An upper floor concrete step (S260) of placing concrete on the formwork installed on the main floor wall and the upper floor;
A main floor floor formwork disassembling step (S270) of dismantling the main floor floor formwork (1) after the upper floor concrete step (S260);
After the upper floor concrete step (S260) after the upper wall reinforcement (S290) to install the upper wall and the second floor floor formwork (S300), but using the formwork (1) dismantled in the main floor floor formwork dismantling step (S270) As it is installed and the upper second floor reinforcement bar (S310);
In the installed upper two-floor bottom formwork (1) is fixed to the fasteners fasteners (11) fixed in the main stage fastener fastener step (S130), without having to set the installation position corrugated pipe fittings in the same way as the assembly of the upper floor fasteners ( 10) assembling (S320) and fixing (S330) the upper second layer;
An upper second floor concrete step (S350) of placing concrete on the formwork installed on the upper wall and the upper second floor;
Corrugated pipe construction method using a corrugated pipe piping structure comprising a; the upper floor formwork dismantling step (S360) of dismantling the upper floor formwork (1a) after the upper two-layer bottom concrete step (S350).
제 15 항에 있어서,
상기 본층 고정대 고정 단계(S130) 이후 본층 바닥콘크리트 단계(S170) 이전에,
바닥철근(2)을 통해 배관된 주름관 배관들(3)을 상기 고정된 주름관배관고정대(10)에 직접 묶어서 고정하거나 절곡철근(17)으로 연결된 둘 이상의 주름관배관고정대들(10)에 보강철근(18)을 덧대어 상기 보강철근(18)과 절곡철근(17)에 묶어서 고정하는 것을 특징으로 하는 주름관 배관구조를 이용한 주름관 배관시공방법.
16. The method of claim 15,
After the main floor fixture fixing step (S130) before the main floor floor concrete step (S170),
The corrugated pipe pipes 3 piped through the bottom reinforcing bar (2) is directly tied to the fixed corrugated pipe pipe fixture (10) or fixed to two or more corrugated pipe pipe fixing rods (10) connected by bending bars (17). 18) to the corrugated pipe construction method using a corrugated pipe piping structure, characterized in that the bundling and fixing to the reinforcing bar (18) and the bent bar (17).
제 15 항에 있어서,
상기 본층 고정대 고정 단계(S130) 이후 본층 바닥콘크리트 단계(S170) 이전과, 상기 상층 고정대 고정 단계(S240) 이후 상층 바닥콘크리트 단계(S260) 이전과, 상기 상2층 고정대 고정 단계(S330) 이후 상2층 바닥콘크리트 단계(S350) 이전에,
단면이 'ㄱ'형상의 금속제 바를 절단하고 결합하여 상하가 관통된 직사각틀 모양으로 형성하되 수평면에 '∪'형상으로 절개되는 고정대결합홈(211)을 형성하는 틀본체(21)를 형성하고, 일측을 절개한 수용홈(221)이 형성되는 판형의 주름관하부고정수단(22)을 상기 틀본체(21)의 하부에 결합하고 상기 주름관하부고정수단(22)과 동일한 형상의 주름관상부고정수단(23)을 상기 틀본체(21)의 상부에 결합하며 상하방향으로 관통되는 수용공(251)이 형성되는 판형의 전산봉고정수단(25)을 상기 틀본체(21)의 하부의 배관 위치부에 결합한 주름관 배관 고정틀(20)을 준비하여 현장에서 각가의 세대 타입별 주름관 배관 위치에 맞게 조립하되 상기 주름관하부고정수단(22) 및 주름관상부고정수단(23)의 수용홈(231)의 절개된 개구는 주름관 배관(3)이 상기 고정틀(20) 내에 수용을 위해 절곡될 방향측으로 향하도록 설치되는 주름관배관고정틀조립 단계(S160,S250,S340)와;
상기 고정된 주름관배관고정대(10)를 상기 고정틀(20)의 고정대결합홈(211)에 삽입시킨 뒤 높이를 조절하고 고정너트(152)를 조여 고정틀(20)의 위치를 고정하는 고정틀고정 단계(S162,S252,S342)와;
상기 고정된 고정틀(20)의 내측에 형성된 전산봉고정수단(25)에 소정길이의 전산봉(252)을 고정하되 바닥 콘크리트시 전산봉(252)의 하단이 매립될 수 있도록 위치고정하는 전산봉고정 단계(S164,S254,S344)와;
상기 고정된 고정틀(20)의 하부에 결합된 주름관하부고정수단(22)의 절개된 개구측내에 바닥철근(2)을 통해 배관된 주름관 배관들(3)을 안착후 개구의 좌우측에 형성된 핀공(222)에 '∩'형상의 고정핀(24)을 걸어 주름관 배관(3)의 하부를 고정하는 주름관하부고정 단계(S166,S256,S346)와;
상기 고정틀(20)의 상부에 결합된 주름관상부고정수단(23)의 절개된 개구측내에 상기 하부가 고정된 주름관 배관들(3)의 상부를 안착후 개구의 좌우측에 형성된 핀공(232)에 '∩'형상의 고정핀(24)을 걸어 주름관 배관(3)의 상부를 고정하는 주름관상부고정 단계(S168,S258,S348);를 포함하고,
상기 본층 바닥콘크리트 단계(S170) 이후 상층 바닥콘크리트 단계(S260) 이전과, 상기 상층 바닥콘크리트 단계(S260) 이후 상2층 바닥콘크리트 단계(S350) 이전에,
상기 고정틀(20)의 주름관상부고정수단(23)의 고정핀(24)을 빼는 고정틀고정핀제거 단계(S180,S280)와;
상기 고정핀(24)이 제거된 주름관 배관들(3)의 상측으로 신장된 부분을 상기 고정틀(20)의 내부에 눕히고 외부충격을 방지하고자 상기 고정틀(20)의 상부면을 가리는 덮개(293)를 덮어 결합수단(294)으로 고정하는 고정틀주름관수용 단계(S182,S282);를 포함하며,
상기 상층 바닥거푸집해체 단계(S360) 이후에,
상기 본층에 설치된 고정틀(20)의 덮개(293)를 제거하고 고정틀(20)을 해체하는 본층 고정틀해체 단계(S380);를 포함하는 것을 특징으로 하는 주름관 배관구조를 이용한 주름관 배관시공방법.
16. The method of claim 15,
After the main floor fixing step (S130) and before the main floor floor concrete step (S170), and after the upper floor fixing step (S240) before the upper floor concrete step (S260) and after the upper second floor fixing step (S330) Before the second floor concrete step (S350),
Cut and combine the metal bar of the 'b' shape to form a rectangular frame penetrating the upper and lower sides, but forms a frame body 21 for forming a fixing bar coupling groove 211 is cut in the '∪' shape on the horizontal plane, The plate-shaped corrugated pipe lower fixing means 22 formed with the receiving groove 221 cut in one side is coupled to the lower portion of the frame body 21 and the corrugated pipe fixing means having the same shape as the corrugated pipe lower fixing means 22 ( 23 is coupled to the upper portion of the frame body 21 and the plate-shaped computer rod fixing means 25 is formed in the pipe position portion of the lower portion of the frame body 21 is formed in the receiving hole 251 that penetrates in the vertical direction The prepared corrugated pipe fitting frame 20 is assembled in accordance with each generation type of corrugated pipe position in the field, but the cut opening of the receiving groove 231 of the corrugated pipe lower fixing means 22 and the corrugated pipe fixing means 23 Corrugated pipe 3 can be in the fixing frame 20 It is installed so as to face toward the direction to be bent corrugated pipe flange assembly steps for (S160, S250, S340) and;
Inserting the fixed corrugated pipe pipe fittings 10 into the fixing bar coupling groove 211 of the fixing frame 20 and then adjusting the height and tightening the fixing nut 152 to fix the position of the fixing frame 20 S162, S252, S342;
Computing rod 252 of a predetermined length to the computer rod fixing means 25 formed inside the fixed fixing frame 20, but the computer rod for fixing the position so that the bottom of the computer rod 252 is embedded in the bottom concrete A fixing step (S164, S254, S344);
Pin holes formed on the left and right sides of the opening after seating the corrugated pipes 3 piped through the bottom reinforcing bar 2 in the cut opening side of the corrugated pipe lower fixing means 22 coupled to the lower portion of the fixed frame 20 ( A lower corrugated pipe fixing step (S166, S256, S346) for fixing the lower portion of the corrugated pipe (3) by fastening the '∩' shaped pin 24 to the 222;
The upper part of the corrugated pipe pipes 3 having the lower part fixed in the cut opening side of the corrugated tubular fixing means 23 coupled to the upper part of the fixing frame 20 is formed on the pin hole 232 formed at the left and right sides of the opening. And a corrugated tubular fixing step (S168, S258, S348) for fastening the upper portion of the corrugated pipe 3 by hanging the pin-shaped fixing pin 24.
After the bottom floor concrete step (S170) before the upper floor concrete step (S260), and after the upper floor concrete step (S260) before the second floor floor concrete step (S350),
A fixing frame fixing pin removing step of removing the fixing pin 24 of the corrugated tubular fixing means 23 of the fixing frame 20 (S180 and S280);
The cover 293 which covers the upper surface of the fixing frame 20 to lay down the portion extending to the upper side of the corrugated pipes 3 from which the fixing pin 24 has been removed to the inside of the fixing frame 20 and to prevent external impact. Cover the fixing frame for receiving the wrinkles to secure the coupling means (294) (S182, S282); including,
After the upper floor formwork dismantling step (S360),
Corrugated pipe construction method using a corrugated pipe piping structure comprising a; main layer fixing frame disassembly step (S380) of removing the cover 293 of the fixing frame 20 installed on the main layer and dismantling the fixing frame 20.
제 17 항에 있어서,
상기 본층 고정틀해체 단계(S380) 이후, 바닥에 돌출된 전산볼트들(15)의 상부에 프레임(5)을 직접 고정하는 본층 프레임고정 단계(S385)를 더 포함하는 것을 특징으로 하는 주름관 배관 고정구조를 이용한 주름관 배관시공방법.
The method of claim 17,
After the main layer fixing frame disassembly step (S380), corrugated pipe piping fixed structure further comprises a main layer frame fixing step (S385) for directly fixing the frame 5 on top of the computer bolts 15 protruding to the bottom. Corrugated pipe construction method using.
제 17 항에 있어서,
상기 본층 고정틀해체 단계(S380) 이후,
바닥에 돌출된 전산볼트들(15)과 전산봉들(252) 중 하나 이상의 상부에 장너트(30)를 결합한 뒤 하부에 숫나사산(311)이 형성된 소정길이의 철근 또는 전산봉으로 된 지지봉(31)을 결합하여 직립되도록 세우는 본층 지지봉고정 단계(S390)와;
상기 직립된 지지봉(31)에 벽체매립함(4) 또는 프레임(5)을 고정하는 본층 매립함고정 단계(S392);를 더 포함하는 것을 특징으로 하는 주름관 배관 고정구조를 이용한 주름관 배관시공방법.
The method of claim 17,
After the main layer fixing frame disassembly step (S380),
A support rod made of a reinforcing rod or a computer rod having a predetermined length in which a male thread 311 is formed at the bottom after coupling the long nut 30 to one or more of the computer bolts 15 and the rods 252 protruding from the bottom ( 31) combine the main floor support rod fixing step (S390) to stand upright;
Corrugated pipe construction method using a corrugated pipe piping fixed structure further comprising; main layer buried box fixing step (S392) for fixing the wall buried box (4) or the frame (5) to the upright support rod (31).
KR1020120141652A 2012-12-07 2012-12-07 Corrugated pipes fixing structure and corrugated piping construction method thereby Expired - Fee Related KR101379949B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120141652A KR101379949B1 (en) 2012-12-07 2012-12-07 Corrugated pipes fixing structure and corrugated piping construction method thereby

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120141652A KR101379949B1 (en) 2012-12-07 2012-12-07 Corrugated pipes fixing structure and corrugated piping construction method thereby

Publications (1)

Publication Number Publication Date
KR101379949B1 true KR101379949B1 (en) 2014-04-02

Family

ID=50656188

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120141652A Expired - Fee Related KR101379949B1 (en) 2012-12-07 2012-12-07 Corrugated pipes fixing structure and corrugated piping construction method thereby

Country Status (1)

Country Link
KR (1) KR101379949B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107860638A (en) * 2017-12-22 2018-03-30 福州大学 It is a kind of to carry out reinforcing bar and the positioner of metal bellows grouting connection in batches
CN110725475A (en) * 2019-11-20 2020-01-24 中国建筑标准设计研究院有限公司 Prefabricated column with built-in high-corrugated pipe, frame structure of prefabricated column and construction method of prefabricated column

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060025920A (en) * 2004-09-18 2006-03-22 주식회사 알루폼스코리아 Window frame fixing structure and construction method accordingly.

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060025920A (en) * 2004-09-18 2006-03-22 주식회사 알루폼스코리아 Window frame fixing structure and construction method accordingly.

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107860638A (en) * 2017-12-22 2018-03-30 福州大学 It is a kind of to carry out reinforcing bar and the positioner of metal bellows grouting connection in batches
CN107860638B (en) * 2017-12-22 2024-02-09 福州大学 Positioning device capable of carrying out grouting connection of steel bars and metal corrugated pipes in batches
CN110725475A (en) * 2019-11-20 2020-01-24 中国建筑标准设计研究院有限公司 Prefabricated column with built-in high-corrugated pipe, frame structure of prefabricated column and construction method of prefabricated column

Similar Documents

Publication Publication Date Title
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
CN102535738A (en) A prefabricated house wall panel and a fully prefabricated house using the wall panel and its installation method
US20110283643A1 (en) Deck assembly module for a steel framed building
CN104863290A (en) Combined wall formed by single prefabricated wall sections and construction method
CN106049537A (en) Comprehensive pipe gallery embedded part fixing device and fixing method thereof
JP5897902B2 (en) Refrigerant piping unit and refrigerant piping construction method
KR101379949B1 (en) Corrugated pipes fixing structure and corrugated piping construction method thereby
CN107558633A (en) Installation method provided with prefabricated wall panels with distribution boxes
KR101170103B1 (en) Assembly Trench And Trench Structure Using The Same
KR20130102446A (en) Connector for vertical type cable tray and cable tray constructing method thereof
KR101315679B1 (en) Wiring method for lying cable in concrete without piping work using soil-filled box
KR200486198Y1 (en) Cable Wiring Hose Support Bar
KR101217380B1 (en) fixed box buried in wall and pipe building method using the same
CN114215230B (en) Green integrated assembled building wallboard and installation method thereof
KR101856583B1 (en) Safety structures for installation of slab openings in buildings and construction method thereof
CN111779268B (en) Construction method for synchronously pre-embedding and molding finished electric box along with main body structure
EP2292862B1 (en) Method for making a wall element including a conduit, a vertical mold and a wall element
KR102126340B1 (en) Hollow slab structure that enables wiring of sleeve piping
KR101391718B1 (en) Cold and Hot water Double Pipes Fixing Frame and Piping Construction Method Thereby
KR101526200B1 (en) Cd pipe supporting apparatus and weight fixing method and wall installing method
KR20150000654U (en) conduit support holder
CN107471406A (en) Wallboard preparation method with distribution box
KR100762012B1 (en) Piping protection sleeve
KR102062451B1 (en) Frame of electric box for building
KR20170013506A (en) Sleeve for Cable-Tray

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-3-3-R10-R18-oth-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20170326

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE