KR101373098B1 - 복합 트러스 에프씨엠 교량시공장치 및 이를 이용한 복합 트러스 에프씨엠 교량시공방법 - Google Patents
복합 트러스 에프씨엠 교량시공장치 및 이를 이용한 복합 트러스 에프씨엠 교량시공방법 Download PDFInfo
- Publication number
- KR101373098B1 KR101373098B1 KR1020110076910A KR20110076910A KR101373098B1 KR 101373098 B1 KR101373098 B1 KR 101373098B1 KR 1020110076910 A KR1020110076910 A KR 1020110076910A KR 20110076910 A KR20110076910 A KR 20110076910A KR 101373098 B1 KR101373098 B1 KR 101373098B1
- Authority
- KR
- South Korea
- Prior art keywords
- truss
- cantilever
- truss steel
- carrier
- steel
- Prior art date
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 122
- 239000010959 steel Substances 0.000 claims abstract description 122
- 239000002131 composite material Substances 0.000 claims abstract description 21
- 238000000034 method Methods 0.000 claims abstract description 8
- 239000006260 foam Substances 0.000 claims description 16
- 238000009415 formwork Methods 0.000 claims description 8
- 239000003381 stabilizer Substances 0.000 claims description 3
- 239000000725 suspension Substances 0.000 description 3
- 230000002457 bidirectional effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
도 2는 캔틸레버 상에 부설되는 직선궤도와 이 직선궤도를 따라 이동하는 캐 리어의 정면도
도 3은 도 1의 "가" 방향에서 본 확대도
도 4는 폼 트래빌러측 측면도
도 5는 도 4의 "나"부 확대도
도 6은 교각 상에 설치된 인상수단으로 트러스 강재를 인상하여 주두부측 직
선궤도 상에 대기 중인 캐리어에 옮겨 싣는 경우의 정면도
도 7은 트러스 강재가 실린 캐리어를 폼 트래블러 쪽으로 이동시킨 경우의 예시도
도 8은 폼 트래블러가 트러스 강재를 건네받은 후의 예시도
도 9는 전위 및 후위 호이스트로 트러스 강재를 들어올린 때의 예시도
도 10은 트러스 강재의 연결위치 이동과 캐리어의 복귀 예시도
도 11은 트러스 강재의 자세변환예시도
도 12는 트러스 강재의 연결상태도
도 13은 트러스 강재측 플랜지 콘크리트가 타설된 경우의 예시도
B: 트러스 강재
C: (선시공된) 캔틸레버
F: (교각측에 설치되는 트러스 강재용) 인상수단
10: 직선궤도
20: 캐리어
21, 28: 주행륜
22, 29: 기어드 모터
23: 레일
24,27: 활차
26: 보조대차
30: 폼 트래블러
31: 천정 프레임
33: 횡레일
34: 종레일
36a,36b: 전위 호이스트
37a,37b: 후위 호이스트
Claims (11)
- 트러스 강재로 초기에 시공된 캔틸레버에서 주두부를 기준으로 폼 트래빌러가 차지하고 남은 캔틸레버의 상면에 부설한 직선궤도와;
상기 직선궤도 상에서 인상된 트러스 강재를 옮겨 싣고 폼 트래빌러로 이동하여 트러스 강재를 인계하는 캐리어;로 이뤄진 것을 특징으로 하는 복합 트러스 에프씨엠 교량시공장치. - 제1항에 있어서, 캐리어는 주행륜이 기어드 모터로 구동시켜 주행토록 한 자주식인 복합 트러스 에프씨엠 교량시공장치.
- 제1항 또는 제2항에 있어서, 캐리어는 상면에 폼 캔틸레버의 시공방향으로 레일이 부설되고, 이 레일에 트러스 강재의 하단 쪽이 실리는 보조대차가 설치된 복합 트러스 에프씨엠 교량시공장치.
- 제3항에 있어서, 보조대차는 주행륜이 기어드 모터로 구동하는 자주식인 복합 트러스 에프씨엠 교량시공장치.
- 선시공된 캔틸레버의 단부에 위치하여 그 후단에 연결할 트러스 강재를 보급하는 폼 트래블러를 포함하여 이루어지되,
상기 폼 트래블러는
천정 프레임의 저면에 캔틸레버의 시공방향으로 부설된 횡레일과, 이 횡레일 상에서 이동하는 종레일과, 종레일을 궤도삼아 전후진하면서 캐리어에 의해 실려 온 트러스 강재를 인수하여 캔틸레버의 선단쪽으로 이동한 후 캔틸레버의 설계치대로 비스듬히 세워서 캔틸레버의 선단쪽으로 내려주고 복귀하는 한 쌍의 전위 호이스트와, 전위 호이스트와의 협동 하에 상기 캐리어로부터 인수한 트러스 강재를 인수하여 캔틸레버의 선단쪽으로 이동한 후 캔틸레버의 설계치대로 비스듬히 세워서 캔틸레버의 선단쪽으로 내려주고 복귀하는 한 쌍의 후위 호이스트가 구비된 것을 특징으로 하는 복합 트러스 에프씨엠 교량시공장치.
- 제5항에 있어서, 전위 호이스트 중에서 일측 전위 호이스트는 트러스 강재의 상단쪽 인상 및 인하용이고, 타측 전위 호이스트는 트러스 강재의 하단쪽 인상 및 인하용인 복합 트러스 에프씨엠 교량시공장치.
- 제5항에 있어서, 후위 호이스트 중에서는 일측 후위 호이스트는 트러스 강재의 상단쪽 인상 및 인하용이고, 타측 후위 호이스트는 트러스 강재의 하단쪽 인상 및 인하용인 복합 트러스 에프씨엠 교량시공장치
- 주두부측에 설치된 인상수단으로 주두부 위까지 트러스 강재를 인상하는 단계와, 주두부 위로 인상된 트러스 강재를 캐리어에 옮겨싣는 단계와, 선시공된 캔틸레버의 상면에 부설된 직선궤도 상에서 캐리어를 이동시켜 하판 거푸집이 장전된 폼 트래블러까지 트러스 강재를 이송하는 단계와, 캐리어에 실려 온 트러스 강재를 폼 트래빌러의 전위 및 후위 호이스트에 인계한 후 복귀하는 단계와, 건네받은 트러스 강재를 끌어당겨서 들어올리는 단계와, 복귀한 캐리어에 반대편 캔틸레버에 연결되는 트러스 강재를 인상하여 옮겨싣고 상기와 같은 요령으로 그 쪽 캔틸레버에 인계하고 복귀하는 단계와, 트러스 강재를 캔틸레버의 설계치대로 비스듬히 세워서 내려주는 자세 전환단계와, 선시공된 캔틸레버의 선단에 트러스 강재의 후단을 맞춰서 연결하는 단계와, 전위 및 후위 호이스트를 후속 트러스 강재 인수위치로 복귀시키는 단계와, 하판 거푸집에 콘크리트를 타설 양생 한 후 탈형하는 단계의 순으로 진행하는 것을 특징으로 하는 복합 트러스 에프씨엠 교량시공방법.
- 제8항에 있어서, 캐리어는 주행륜이 기어드 모터로 구동시켜 주행토록 한 자주식인 복합 트러스 에프씨엠 교량시공방법.
- 제8항 또는 제9항에 있어서, 캐리어는 상면에 캔틸레버의 시공방향으로 레일이 부설되고, 이 레일에 트러스 강재의 하단 쪽이 실리는 보조대차가 설치된 복합 트러스 에프씨엠 교량시공방법.
- 제10항에 있어서, 보조대차는 주행륜이 기어드 모터로 구동하는 자주식인 복합 트러스 에프씨엠 교량시공방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110076910A KR101373098B1 (ko) | 2011-08-02 | 2011-08-02 | 복합 트러스 에프씨엠 교량시공장치 및 이를 이용한 복합 트러스 에프씨엠 교량시공방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110076910A KR101373098B1 (ko) | 2011-08-02 | 2011-08-02 | 복합 트러스 에프씨엠 교량시공장치 및 이를 이용한 복합 트러스 에프씨엠 교량시공방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20130015084A KR20130015084A (ko) | 2013-02-13 |
KR101373098B1 true KR101373098B1 (ko) | 2014-03-12 |
Family
ID=47894971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020110076910A KR101373098B1 (ko) | 2011-08-02 | 2011-08-02 | 복합 트러스 에프씨엠 교량시공장치 및 이를 이용한 복합 트러스 에프씨엠 교량시공방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101373098B1 (ko) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119070A (zh) * | 2019-12-24 | 2020-05-08 | 江苏中铁山桥重工有限公司 | 一种采用对称门吊悬拼架设w形钢桁梁的方法 |
CN111519538A (zh) * | 2020-04-17 | 2020-08-11 | 中铁大桥局集团有限公司 | 一种大跨度连续钢桁梁逐孔架设方法 |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101657994B1 (ko) * | 2014-05-22 | 2016-09-20 | 김남열 | 폼 트래블러 및 이를 이용한 교량의 시공방법 |
CN110042769B (zh) * | 2019-06-03 | 2021-04-16 | 四川公路桥梁建设集团有限公司 | 一种组合梁斜拉桥辅助跨全悬臂拼装施工方法 |
CN113529583B (zh) * | 2021-07-28 | 2024-12-10 | 中铁大桥局集团有限公司 | 一种安装钢桁梁电缆搭载通道的方法及装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07102531A (ja) * | 1993-10-06 | 1995-04-18 | Mitsubishi Heavy Ind Ltd | 橋梁張出し架設工法及びその装置 |
JP2003193430A (ja) | 2001-12-28 | 2003-07-09 | Kajima Corp | 複合トラス橋の施工方法 |
JP2010047905A (ja) | 2008-08-19 | 2010-03-04 | Ihi Corp | 橋梁張り出し架設装置と架設方法 |
JP4489872B2 (ja) * | 1999-07-05 | 2010-06-23 | 三菱重工鉄構エンジニアリング株式会社 | 橋梁の架設方法および装置 |
-
2011
- 2011-08-02 KR KR1020110076910A patent/KR101373098B1/ko active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07102531A (ja) * | 1993-10-06 | 1995-04-18 | Mitsubishi Heavy Ind Ltd | 橋梁張出し架設工法及びその装置 |
JP4489872B2 (ja) * | 1999-07-05 | 2010-06-23 | 三菱重工鉄構エンジニアリング株式会社 | 橋梁の架設方法および装置 |
JP2003193430A (ja) | 2001-12-28 | 2003-07-09 | Kajima Corp | 複合トラス橋の施工方法 |
JP2010047905A (ja) | 2008-08-19 | 2010-03-04 | Ihi Corp | 橋梁張り出し架設装置と架設方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119070A (zh) * | 2019-12-24 | 2020-05-08 | 江苏中铁山桥重工有限公司 | 一种采用对称门吊悬拼架设w形钢桁梁的方法 |
CN111119070B (zh) * | 2019-12-24 | 2022-02-11 | 江苏中铁山桥重工有限公司 | 一种采用对称门吊悬拼架设w形钢桁梁的方法 |
CN111519538A (zh) * | 2020-04-17 | 2020-08-11 | 中铁大桥局集团有限公司 | 一种大跨度连续钢桁梁逐孔架设方法 |
Also Published As
Publication number | Publication date |
---|---|
KR20130015084A (ko) | 2013-02-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109137759B (zh) | 一种预应力混凝土箱梁节段预制悬臂拼装方法及系统 | |
CN106320182B (zh) | 悬索桥岸坡梁段长吊索荡移安装装置和方法 | |
CN105421249A (zh) | 一种拖吊结合式新型挂篮结构及施工方法 | |
KR101373098B1 (ko) | 복합 트러스 에프씨엠 교량시공장치 및 이를 이용한 복합 트러스 에프씨엠 교량시공방법 | |
CN109653105A (zh) | 箱梁桥悬臂施工挂篮主桁系统及其使用方法 | |
CN205223872U (zh) | 一种拖吊结合式新型挂篮结构 | |
CN101559905A (zh) | 一种缆载吊机 | |
JPH10292317A (ja) | 橋桁部材の架設方法および架設装置 | |
CN107476195B (zh) | 一种悬索桥运送加劲梁的运梁滑车系统 | |
CN113120771A (zh) | 适用于复合截面节段梁桥后装挑臂的双侧同步吊装设备及施工方法 | |
CN205526359U (zh) | 一种预制件运输装置 | |
CN110697571A (zh) | 一种单导梁下行式喂梁装置及其喂梁方法 | |
KR100627102B1 (ko) | 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공방법 | |
CN104746432B (zh) | 可行于板-梁的桥道板运输安装车 | |
CN111115461B (zh) | 一种钢筋及模具运输和自动拼装设备 | |
CN209024979U (zh) | 一种预应力混凝土箱梁节段预制悬臂拼装系统 | |
CN112323657A (zh) | 一种一体化预制桥梁拆除机及预制桥梁拆除方法 | |
CN205418901U (zh) | 一种预制件运输装置 | |
CN204919341U (zh) | 一种拱桥敞口格构式钢梁上异形预制桥面板的安装系统 | |
CN209652772U (zh) | 箱梁桥悬臂施工挂篮主桁系统 | |
JP3884689B2 (ja) | 部材架設用移動台車及びこれを用いた橋梁部材架設方法 | |
KR200363059Y1 (ko) | 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공시스템 | |
CN110904861A (zh) | 一种斜拉桥架梁吊机及其施工方法 | |
CN113235460B (zh) | 用于桥梁悬臂拼装的预制节段荡移法 | |
CN213925880U (zh) | 一种钢箱叠合梁桥梁节段及桥面板架设装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20110802 |
|
PA0201 | Request for examination | ||
PG1501 | Laying open of application | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20130221 Patent event code: PE09021S01D |
|
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20130422 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20130723 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20140305 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20140305 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
FPAY | Annual fee payment |
Payment date: 20170302 Year of fee payment: 4 |
|
PR1001 | Payment of annual fee |
Payment date: 20170302 Start annual number: 4 End annual number: 4 |
|
FPAY | Annual fee payment |
Payment date: 20180103 Year of fee payment: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20180103 Start annual number: 5 End annual number: 5 |
|
FPAY | Annual fee payment |
Payment date: 20190227 Year of fee payment: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20190227 Start annual number: 6 End annual number: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20220405 Start annual number: 9 End annual number: 9 |
|
PR1001 | Payment of annual fee |
Payment date: 20240325 Start annual number: 11 End annual number: 11 |