KR101366818B1 - Assembly permanent anchor and fixing method thereof - Google Patents

Assembly permanent anchor and fixing method thereof Download PDF

Info

Publication number
KR101366818B1
KR101366818B1 KR1020130046084A KR20130046084A KR101366818B1 KR 101366818 B1 KR101366818 B1 KR 101366818B1 KR 1020130046084 A KR1020130046084 A KR 1020130046084A KR 20130046084 A KR20130046084 A KR 20130046084A KR 101366818 B1 KR101366818 B1 KR 101366818B1
Authority
KR
South Korea
Prior art keywords
fixing
manshon
permanent anchor
groove
coupling
Prior art date
Application number
KR1020130046084A
Other languages
Korean (ko)
Inventor
김동필
Original Assignee
주식회사 서하
에스원건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 서하, 에스원건설 주식회사 filed Critical 주식회사 서하
Priority to KR1020130046084A priority Critical patent/KR101366818B1/en
Application granted granted Critical
Publication of KR101366818B1 publication Critical patent/KR101366818B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1607Shapes round, e.g. circle
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/165Shapes polygonal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0009PE
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to an assembly permanent anchor and a fixing method for the assembly permanent anchor. The assembly permanent anchor and the fixing method thereof insert a mounting part to be located in the end of the underground by continuously and sequentially connecting a connection member and a tensile part to a mounting part, form a permanent anchor by connecting an upper fixture with the connection member located on the ground, bury the permanent anchor by injecting grout into the ground, and fasten a nut by extending the upper fixture of the permanent anchor, thereby supporting soil pressure applied between the structure and the soil. According to the present invention, the assembly permanent anchor and a fixing method thereof can freely control the length of a permanent anchor with a tensile part and a connection member to correspond to the length of the underground; increase the soil pressure by the end of the permanent anchor supporting the soil pressure while located to be adjacent to the end of the underground; can omit a separate work because a strand of the permanent anchor is not required to cut; reduce costs by preventing an unnecessary part of the permanent anchor from being lost; perform work only with manpower by making the upper fixture, the tensile part, a connection member, and a mounting body to be assembled; and minimize volume by being separated into each component and then easily transport products and reduce distribution costs.

Description

조립형 영구앵커 및 그 정착방법{Assembly permanent anchor and fixing method thereof}Assembly permanent anchor and fixing method

본 발명은 영구앵커에 관한 것으로서, 더욱 상세하게는 조립형 영구앵커 및 그 정착방법에 관한 것이다.The present invention relates to a permanent anchor, and more particularly to an assembled permanent anchor and a fixing method thereof.

일반적으로, 영구앵커는 지중에 매립 설치되어 절토지의 흙이 무너지지 않게 토압력에 저항하는 벽체 또는 구조물 등을 지탱하는 기구이다.In general, the permanent anchor is buried in the ground is a mechanism for supporting the wall or structure that resists earth pressure so that the soil of the cut land does not collapse.

이때, 상기 영구앵커는 지중에 삽입된 상태에서 그라우트에 의해 지중에 매설되고, 그 상태에서 인장기에 의해 당겨진 상태로, 너트로 조여져 구조물(예컨대 : 벽체, 옹벽 등)과 절토지의 흙 간에 토압력을 지탱한다.At this time, the permanent anchor is embedded in the ground by the grout in the state inserted into the ground, pulled by the tensioner in that state, tightened with a nut to earth pressure between the structure (for example: wall, retaining wall, etc.) and the soil of the cut Support it.

특허문헌 1에 게재된 어스앵커를 살펴보면, 지중의 말단까지 삽입되는 하부맨션이 형성되어 있고, 상기 하부맨션 상부에 정착체가 형성되어 있으며, 상기 정착체 상부에 상기 정착체 내부에서 상부로 연장되는 긴장재를 감싸는 피복재가 형성되어 있고, 상기 피복재 상단에 상부맨션이 형성된 어스앵커가 게시되어 있다.Looking at the earth anchor disclosed in Patent Document 1, the lower mansion is formed to be inserted to the end of the ground, the fixing unit is formed on the lower mansion, the tension member extending from the inside of the fixing unit to the upper part of the fixing unit A covering is formed around the cover, and an earth anchor formed with an upper mansion is posted on the top of the covering.

여기서, 상기 어스앵커의 하부맨션 및 정착체는 지중으로 주입되어 굳어진 그라우트에 의해 견고하게 고정되어, 어스앵커가 외부로 이탈되는 것을 방지한다.Here, the lower mansion and the fixing body of the earth anchor is firmly fixed by the grout hardened by being injected into the ground, to prevent the earth anchor is separated out.

그리고, 상기 긴장재는 인장기에 의해 당겨지면서 구조물과 흙 간에 토압력이 지탱되도록 한다.Then, the tension member is pulled by the tensioner to support the earth pressure between the structure and the soil.

그리고, 상기 상부맨션은 외부로 노출된 상태에서 인장기에 의해 당겨지고, 그 상태에서 너트의 조임에 의해 압력지지판에 밀착고정되어 상기 긴장재가 인장된 상태를 유지하도록 한다.And, the upper mansion is pulled by the tensioner in the state exposed to the outside, in that state by tightening the nut tightly fixed to the pressure support plate to maintain the tension member in the tensioned state.

하지만, 특허문헌 1의 어스앵커는 다음과 같은 문제점이 있다.However, the earth anchor of patent document 1 has the following problems.

첫째로, 정해진 길이를 갖는 어스앵커의 길이보다 지중의 깊이가 깊은 경우 어스앵커가 지중의 말단부분까지 도달하지 못해 벽체와 흙 간의 토압력이 부실해지고, 어스앵커 길이보다 지중의 깊이가 얕은 경우 외부로 노출된 어스앵커를 절단하는 별도의 작업이 필요한 문제점이 있다.First, when the depth of the ground is deeper than the length of the earth anchor with a fixed length, the earth anchor does not reach the end of the ground, so the earth pressure between the wall and the soil is poor, and when the depth of the ground is shallower than the ground anchor length, There is a problem that requires a separate operation for cutting the exposed earth anchor.

둘째로, 지중 깊이가 얕은 상기의 이유로 어스앵커의 긴장재를 절단하는 경우, 어스앵커의 불필요한 부분이 손실되어 비용이 증가되는 문제점이 있다.Secondly, when the tension material of the earth anchor is cut because of the above-mentioned shallow ground depth, there is a problem in that an unnecessary part of the earth anchor is lost and the cost is increased.

셋째로, 어스앵커 정착 작업시 어스앵커의 상부맨션, 긴장재, 정착체, 하부맨션이 일체화되어 있어, 별도의 중장비를 이용하여 지중에 어스앵커를 삽입하여 작업비용이 증가되는 문제점이 있다.Third, the upper mansion, the tension member, the fixing body, the lower mansion of the earth anchor when the anchor anchoring work is integrated, there is a problem that the operation cost is increased by inserting the earth anchor in the ground using a separate heavy equipment.

넷째로, 상부맨션, 긴장재, 정착체, 하부맨션의 일체화로 어스앵커 부피가 증대되고, 이로 인해 제품의 운반이 어려움과 동시에 물류비가 증가되는 문제점이 있다.Fourth, the volume of the earth anchor is increased by the integration of the upper mansion, the tension member, the fixing body, the lower mansion, which is difficult to transport the product and at the same time there is a problem that the logistics cost increases.

(특허문헌 1) KR10-0436662 B1 (Patent Document 1) KR10-0436662 B1

본 발명은 상술한 바와 같은 문제점을 해결하기 위한 것으로서, 본 발명의 목적은, 정착부에 연결부재 및 인장부를 순차적으로 연속되게 연결하여 정착부가 지중의 말단에 위치되게 삽입하고, 지중의 상단에 위치된 연결부재에 상부만숀을 연결하여 영구앵커를 형성하며, 지중에 그라우트를 주입하여 영구앵커를 매설하고, 이 영구앵커의 상부만숀을 인장한 상태로 너트를 체결하여 구조물과 흙 간의 토압력을 지탱하는 조립형 영구앵커 및 그 정착방법을 제공하는 것이다.The present invention is to solve the problems as described above, an object of the present invention, by connecting the connecting member and the tensioning unit in sequence successively inserted into the fixing unit is located at the end of the ground, located on the top of the ground Connect the upper manshon to the connecting member to form a permanent anchor. Inject grout into the ground to bury the permanent anchor, and tighten the nut while tightening the upper manshon of the permanent anchor. It is to provide an assembled permanent anchor and a fixing method for supporting the.

상기와 같은 본 발명의 목적을 달성하기 위하여, 본 발명에 따른 조립형 영구앵커는, 지중에 정착되는 정착몸체가 형성되어 있고, 상기 정착몸체 일단에 하부만숀이 형성되어 있으며, 타단에 제1연결홈이 형성되어 있고, 상기 정착몸체 외면을 따라 나선형상의 걸림돌부가 형성되어 있는 정착부와; 상기 정착부 상부에 배치되고, 외면에 나사산이 형성되어 있으며, 일단에 제2연결홈이 형성되어 있는 상부만숀; 중공형상으로 내부에 복수개의 강연선이 구비되어 있고, 양단에 제3연결홈이 형성되어 있으며, 상기 정착부와 상기 상부만숀 사이에 배치되어 인장되는 인장부; 및 상기 제1,제2,제3 연결홈에 연결되어 상기 정착부, 상부만숀 및 인장부를 연결하는 연결부재;로 구성되는 것을 특징으로 한다.In order to achieve the object of the present invention as described above, the assembled permanent anchor according to the present invention, the fixing body is fixed to the ground is formed, the lower manshon is formed on one end of the fixing body, the first end on the other end A fixing part having a connecting groove formed therein and having a spiral engaging protrusion formed along an outer surface of the fixing body; An upper manshon disposed above the fixing unit, having a screw thread formed on an outer surface thereof, and having a second connection groove formed at one end thereof; A plurality of strands provided therein in a hollow shape, and third connecting grooves are formed at both ends thereof, and a tension unit disposed between the fixing unit and the upper manshon and tensioned; And a connecting member connected to the first, second and third connecting grooves to connect the fixing unit, the upper manshon and the tensioning unit.

본 발명에 따른 조립형 영구앵커에 있어서, 상기 정착부는 상기 정착몸체 및 하부만숀 내부에 복수개의 강연선이 구비되어 있는 것을 특징으로 한다.In the assembled permanent anchor according to the present invention, the fixing unit is characterized in that the plurality of strands are provided in the fixing body and the lower manshon.

본 발명에 따른 조립형 영구앵커에 있어서, 상기 정착부는 상기 걸림돌부가 원형, 타원형, 반구형 또는 다각형상 중 어느 하나로 형성되는 것을 특징으로 한다.In the assembled permanent anchor according to the present invention, the fixing unit is characterized in that the engaging protrusion is formed in any one of a circular, elliptical, hemispherical or polygonal shape.

본 발명에 따른 조립형 영구앵커에 있어서, 상기 상부만숀은 상기 제2연결홈이 적어도 2개 이상 형성된 것을 특징으로 한다.In the assembled permanent anchor according to the present invention, the upper manshon is characterized in that at least two or more second connection grooves are formed.

본 발명에 따른 조립형 영구앵커에 있어서, 상기 인장부는 상기 강연선이 폴리에틸렌수지 피복재 또는 폴리에틸렌수지 슬라이드 파이프로 감싸지는 것을 특징으로 한다.In the assembled permanent anchor according to the present invention, the tension portion is characterized in that the strand is wrapped with a polyethylene resin coating material or a polyethylene resin slide pipe.

본 발명에 따른 조립형 영구앵커에 있어서, 상기 정착부, 상부만숀 및 인장부의 제1,제2,제3 연결홈 내면에는 결합돌부가 형성되어 있고, 상기 연결부재 양단 외면에는 상기 결합돌부가 결합되는 결합홈이 형성되어 있는 것을 특징으로 한다.In the assembled permanent anchor according to the present invention, coupling protrusions are formed on inner surfaces of the first, second and third connecting grooves of the fixing unit, the upper manshon and the tensioning unit, and the coupling protrusions are formed on the outer surfaces of both ends of the connecting member. It is characterized in that the coupling groove is formed to be coupled.

본 발명에 따른 조립형 영구앵커에 있어서, 상기 연결부재의 결합홈은, 상기 결합돌부가 삽입되는 삽입홈이 형성되어 있고, 상기 삽입홈 말단에 직교되게 연장형성되어 상기 결합돌부의 이동을 안내하는 안내홈이 형성되어 있으며, 상기 안내홈 말단에 직교되게 연장형성되어 상기 결합돌부를 정착시키는 정착홈으로 구성되는 것을 특징으로 한다.In the assembled permanent anchor according to the present invention, the coupling groove of the connection member is formed with an insertion groove into which the coupling protrusion is inserted, extending perpendicularly to the end of the insertion groove to guide the movement of the coupling protrusion. The guide groove is formed, it is characterized in that it consists of a fixing groove for extending perpendicular to the end of the guide groove to fix the coupling protrusion.

본 발명에 따른 조립형 영구앵커에 있어서, 상기 연결부재의 결합홈은, 상기 정착홈과 반대되는 방향의 상기 안내홈 말단에 상기 정착홈에 정착된 결합돌부가 상기 안내홈으로 이탈되는 것을 방지하는 이탈방지홈을 형성하고 있는 것을 특징으로 한다.In the assembled permanent anchor according to the present invention, the coupling groove of the connecting member, the coupling protrusion fixed to the fixing groove at the end of the guide groove in the direction opposite to the fixing groove to prevent the departure from the guide groove It is characterized in that to form a departure prevention groove.

본 발명에 따른 조립형 영구앵커 정착방법은, 정착부에 연결부재 및 인장부를 연결하면서 상기 정착부와 호스를 지중에 삽입하는 제1과정과; 지중에 삽입된 복수의 상기 연결부재중 상단에 위치된 연결부재에 상부만숀을 연결하는 제2과정; 상기 호스를 통해 그라우트를 주입하여 정착부, 인장부 및 연결부재를 지중에 매설하고, 호스를 제거하는 제3과정; 상기 제3과정에서 주입된 그라우트가 굳어지면, 상기 상부만숀의 나사산에 너트를 결합하고, 상부만숀을 인장기로 당겨 인장부에 인장력이 발생되도록 하는 제4과정; 및 상기 제4과정에 의해 지중의 외측 테두리에 설치된 구조물에서 정해진 거리 이격된 너트를 구조물에 설치된 앵커플레이트에 밀착되도록 조여, 상기 인장부에 발생된 인장력을 유지시키는 제5과정;으로 구성되는 것을 특징으로 한다.An assembled permanent anchor fixing method according to the present invention includes a first process of inserting the fixing unit and the hose into the ground while connecting the connecting member and the tension unit to the fixing unit; A second process of connecting an upper manshon to a connection member positioned at an upper end of the plurality of connection members inserted into the ground; Injecting grout through the hose to bury the fixing part, the tension part, and the connection member in the ground, and removing the hose; A fourth step of coupling the nut to the thread of the upper manshon and pulling the upper manshon with a tensioner when the grout injected in the third step is hardened to generate a tensile force in the tension part; And a fifth process of tightening the nut spaced apart from the predetermined distance from the structure installed on the outer edge of the ground by the fourth process so as to be in close contact with the anchor plate installed on the structure, to maintain the tensile force generated in the tension portion. It is done.

본 발명에 따른 조립형 영구앵커 정착방법에 있어서, 상기 제1과정에서는, 상기 정착부에 연결부재를 연결하고, 상기 연결부재에 인장부를 순차적으로 연속되게 연결하여 지중의 말단부분에 상기 정착부가 위치되도록 하는 것을 특징으로 한다.In the assembled permanent anchor fixing method according to the present invention, in the first step, the fixing member is connected to the fixing unit, and the fixing unit is continuously connected to the connecting member in sequence so that the fixing unit is positioned at the distal end of the ground. It is characterized by that.

본 발명에 따른 조립형 영구앵커 정착방법에 있어서, 상기 제1과정에서는, 상기 정착부의 제1연결홈 내면에 형성된 결합돌부를 상기 연결부재 외면에 형성된 결합홈에 삽입 체결하고, 상기 연결부재 타단에 형성된 결합홈에 상기 인장부의 결합돌부를 삽입 체결하며, 상단에 위치된 연결부재의 결합홈에 상기 상부만숀의 결합돌부를 삽입 체결하여, 상기 정착부, 인장부 및 상부만숀을 연결부재로 순차적으로 연결하는 것을 특징으로 한다.In the assembled permanent anchor fixing method according to the present invention, in the first process, the engaging protrusion formed on the inner surface of the first connecting groove of the fixing part is inserted into the coupling groove formed on the outer surface of the fixing member, the other end of the connecting member Insert and fasten the engaging protrusion of the tension portion into the coupling groove formed, and insert and fasten the coupling protrusion of the upper manshon into the coupling groove of the connection member located at the top, the fixing unit, the tension portion and the upper manshon as a connection member It is characterized by connecting sequentially.

본 발명에 따른 조립형 영구앵커 정착방법에 있어서, 상기 앵커플레이트에 상기 상부만숀 및 너트를 감싸는 캡을 고정설치하는 제6과정을 더 포함하는 것을 특징으로 한다.In the assembled permanent anchor fixing method according to the invention, characterized in that it further comprises a sixth process of fixing the cap surrounding the upper manshon and nut on the anchor plate.

본 발명에 따르면, 인장부 및 연결부재로 지중의 깊이에 대응되게 영구앵커 길이를 자유롭게 조절할 수 있고, 영구앵커 말단이 지중의 말단부분에 근접 위치된 상태로 토압력을 지탱하여 토압력이 상승되며, 영구앵커의 강연선을 절단할 필요가 없어 별도의 작업이 불필요하되, 영구앵커의 불필요한 부분의 손실이 방지되어 비용이 절감되고, 상부만숀, 인장부, 연결부재 및 정착체가 조립가능하여 인력만으로도 작업이 가능하며, 각각의 부품으로 나누어져 부피가 최소화 되고, 이로 인해 제품의 운반이 용이함과 동시에 물류비가 절감되는 장점이 있다.According to the present invention, the length of the permanent anchor can be freely adjusted to correspond to the depth of the ground by the tension portion and the connecting member, and the earth pressure is increased by supporting the earth pressure with the permanent anchor end positioned near the end of the ground. There is no need to cut the strands of permanent anchors, so no additional work is required.However, the loss of unnecessary parts of the permanent anchors is prevented, and the cost is reduced. The work is possible, and the volume is minimized by dividing into individual parts, thereby facilitating the transportation of products and reducing the logistics costs.

도 1은 본 발명에 따른 조립형 영구앵커를 나타낸 사시도.
도 2는 도 1의 분해 사시도.
도 3은 본 발명에 따른 조립형 영구앵커의 결합 단면도.
도 4는 본 발명에 따른 조립형 영구앵커의 결합돌부를 결합홈에 결합하는 개략도면.
도 5는 본 발명에 따른 조립형 영구앵커의 또 다른 실시예를 나타낸 사시도.
도 6은 도 5의 분해 사시도.
도 7a 내지 7d는 본 발명에 따른 조립형 영구앵커를 지중에 매설하는 상태를 나타낸 도면.
도 8은 본 발명에 따른 조립형 영구앵커를 정착시키는 상태를 나타낸 도면.
도 9는 본 발명에 따른 조립형 영구앵커를 정착시키는 방법을 나타낸 순서도.
1 is a perspective view showing an assembled permanent anchor according to the present invention.
Fig. 2 is an exploded perspective view of Fig. 1; Fig.
3 is a cross-sectional view of the assembled permanent anchor according to the present invention.
Figure 4 is a schematic diagram for coupling the engaging protrusion of the assembled permanent anchor according to the present invention in the coupling groove.
5 is a perspective view showing another embodiment of the assembled permanent anchor according to the present invention.
6 is an exploded perspective view of FIG. 5;
7a to 7d is a view showing a state of embedding the assembled permanent anchor in the ground according to the present invention.
8 is a view showing a state of fixing the assembled permanent anchor according to the present invention.
9 is a flow chart illustrating a method of fixing the assembled permanent anchor according to the present invention.

이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 더욱 상세하게 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 4를 참조하면, 정착부(100)는 지중에 정착되는 정착몸체(101)가 형성되어 있고, 상기 정착몸체(101) 일단에 하부만숀(102)이 형성되어 있으며, 타단에 제1연결홈(103)이 형성되어 있고, 상기 정착몸체(101) 외면을 따라 나선형상의 걸림돌부(104)가 형성되어 있는 정착부(100)와;1 to 4, the fixing unit 100 has a fixing body 101 which is fixed in the ground, and a lower manshon 102 is formed at one end of the fixing body 101, and at the other end. A fixing part 100 having a first connecting groove 103 formed therein and having a spiral engaging protrusion 104 formed along the outer surface of the fixing body 101;

상기 정착부(100)의 정착몸체(101) 및 하부만숀(102)은 지중의 말단부분까지 삽입된다.The fixing body 101 and the lower manshon 102 of the fixing unit 100 is inserted to the end portion of the ground.

상기 정착몸체(101)의 걸림돌부(104)는 지중에서 굳어진 그라우트에 박혀 고정된다.The locking protrusion 104 of the fixing body 101 is fixed to the grout hardened in the ground.

상기 걸림돌부(104)의 단면 형상은 원형, 타원형, 반구형 또는 다각형상 중 어느 하나로 형성되고, 사용자의 선택에 따라 그라우트에 견고히 박혀 고정될 수 있는 형상으로 제작되는 것이 바람직하다.The cross-sectional shape of the locking portion 104 is formed in any one of a circular, elliptical, hemispherical or polygonal shape, it is preferable to be manufactured in a shape that can be firmly embedded in the grout according to the user's selection.

상기 정착부(100)는 상기 정착몸체(101) 및 하부만숀(102) 내부에 복수개의 강연선(105)을 구비한다.The fixing unit 100 includes a plurality of strands 105 inside the fixing body 101 and the lower manshon 102.

상기 강연선(105)은 상기 정착몸체(101) 및 하부만숀(102)이 인장력을 지탱하는 것을 보조한다.The strand 105 assists the fixing body 101 and the lower manshon 102 to support the tensile force.

상기 정착부(100)의 제1 연결홈(103) 내면에는 결합돌부(102a)가 형성된다.Coupling protrusions 102a are formed on the inner surface of the first connection groove 103 of the fixing unit 100.

상기 결합돌부(103a)는 상기 연결부재(400)의 결합홈(401)에 삽입 결합된다.The coupling protrusion 103a is inserted into and coupled to the coupling groove 401 of the connection member 400.

상부만숀(200)은 상기 정착부(100) 상부에 배치되고, 외면에 나사산(201)이 형성되어 있으며, 일단에 제2연결홈(202)이 형성된다.The upper manshon 200 is disposed on the fixing unit 100, the thread 201 is formed on the outer surface, the second connecting groove 202 is formed at one end.

상기 상부만숀(200)은 상기 제2연결홈(202)이 지중의 상단 부분에 위치된 연결부재(400)에 연결된다.The upper manshon 200 is connected to the connection member 400, the second connection groove 202 is located in the upper portion of the underground.

상기 상부만숀(200)의 나사산(201)은 지중의 외부로 노출되는 것이 바람직하다.The thread 201 of the upper manshon 200 is preferably exposed to the outside of the ground.

상기 상부만숀(200)은 인장기(10)에 의해 당겨져 상기 정착부(100), 인장부(300) 및 연결부(400)에 인장력을 부가한다.The upper manshon 200 is pulled by the tensioner 10 to add a tensile force to the fixing unit 100, the tension unit 300 and the connecting portion 400.

상기 상부만숀(200)의 나사산(201)에는 너트(N)가 체결된다.The nut N is fastened to the thread 201 of the upper manshon 200.

상기 상부만숀(200)은 인장기(10)에 의해 당겨지고, 상기 앵커플레이트(20)에 밀착되는 상기 너트(N)에 의해 당겨진 상태로 고정된다.The upper manshon 200 is pulled by the tensioner 10, and is fixed in the pulled state by the nut (N) in close contact with the anchor plate 20.

도 5 내지 도 6을 참조하면, 상기 상부만숀(200)은 상기 제2연결홈(202)이 적어도 2개 이상 형성되고, 이 제2연결홈(202)에는 각각의 정착부(100), 연결부(400) 및 인장부(300)가 순차적으로 연결된다.5 to 6, the upper manshon 200 has at least two second connection grooves 202 formed therein, each fixing unit 100 in each of the second connection grooves 202. The connection part 400 and the tension part 300 are sequentially connected.

상기 상부만숀(200)의 제2 연결홈(202) 내면에는 결합돌부(202a)가 형성된다.A coupling protrusion 202a is formed on an inner surface of the second connection groove 202 of the upper manshon 200.

상기 결합돌부(202a)는 상기 연결부재(400)의 결합홈(401)에 삽입 체결된다.The coupling protrusion 202a is inserted into and coupled to the coupling groove 401 of the connection member 400.

인장부(300)는 중공형상으로 내부에 복수개의 강연선(301)이 구비되어 있고, 양단에 제3연결홈(302)이 형성되어 있으며, 상기 정착부(100)와 상기 상부만숀(200) 사이에 배치되어 인장된다.Tensile portion 300 is a hollow shape is provided with a plurality of strands 301 therein, the third connecting groove 302 is formed at both ends, the fixing unit 100 and the upper manshon 200 Disposed between and tensioned.

상기 인장부(300)는 상기 연결부재(400)에 의해 복수개로 연결되어 상기 정착부(100)와 상부만숀(200) 사이에 배치된다.The tension unit 300 is connected to the plurality by the connecting member 400 is disposed between the fixing unit 100 and the upper manshon 200.

상기 인장부(300)의 제3연결홈(302)은 상기 연결부재(400)에 연결된다.The third connection groove 302 of the tension part 300 is connected to the connection member 400.

상기 인장부(300)는 상기 강연선(301)으로 인장기의 인장력을 지탱한다.The tension unit 300 supports the tensile force of the tensioner with the strand wire 301.

상기 인장부(300)의 강연선(301)은 폴리에틸렌수지 피복재(303-1) 또는 폴리에틸렌수지 슬라이드 파이프(303-2)로 감싸진다.The strand 301 of the tension unit 300 is wrapped with a polyethylene resin coating material 303-1 or a polyethylene resin slide pipe 303-2.

상기 인장부(300)의 제3 연결홈(302) 내면에는 결합돌부(302a)가 형성된다.A coupling protrusion 302a is formed on an inner surface of the third connecting groove 302 of the tension part 300.

상기 결합돌부(302a)는 상기 연결부재(400)의 결합홈(401)에 삽입 결합된다.The coupling protrusion 302a is inserted into and coupled to the coupling groove 401 of the connection member 400.

연결부재(400)는 상기 제1,제2,제3 연결홈(103,202,302)에 연결되어 상기 정착부(100), 상부만숀 (200)및 인장부(300)를 연결한다.The connection member 400 is connected to the first, second and third connection grooves 103, 202 and 302 to connect the fixing unit 100, the upper manshon 200 and the tension unit 300.

상기 연결부재(400)는 상기 제1,제2,제3 연결홈(103a,202a,302a)에 삽입된 상태에서, 회전 결합된다.The connection member 400 is rotatably coupled in the state of being inserted into the first, second, and third connection grooves 103a, 202a, and 302a.

상기 연결부재(400)는 상기 정착부(100)와 상부만숀(200) 사이에 복수개 구비되고, 복수개의 상기 인장부(300)사이를 연결하며, 상기 인장부(300)와 상기 정착부(100) 및 상부만숀(200) 사이를 연결한다.The connecting member 400 is provided between the fixing unit 100 and the upper manshon 200, a plurality of connection between the plurality of tension unit 300, the tension unit 300 and the fixing unit ( 100) and the upper manshon 200 is connected.

상기 연결부재(400) 양단 외면에는 상기 결합돌부(103a,202a,302a)가 결합되는 결합홈(401)이 형성된다.Coupling grooves 401 to which the coupling protrusions 103a, 202a, and 302a are coupled are formed on outer surfaces of both ends of the connection member 400.

상기 연결부재(400)의 결합홈(401)은, 상기 결합돌부(103a,202a,302a)가 삽입되는 삽입홈(401a)과, 상기 삽입홈(401a) 말단에 직교되게 연장형성되어 상기 결합돌부(103a,202a,302a)의 이동을 안내하는 안내홈(401b) 및 상기 안내홈(401b) 말단에 직교되게 연장형성되어 상기 결합돌부(103a,202a,302a)를 정착시키는 정착홈(401c)으로 구성된다.The coupling groove 401 of the connection member 400 is inserted into the insertion groove 401a into which the coupling protrusions 103a, 202a, and 302a are inserted, and extends perpendicularly to an end of the insertion groove 401a. Guide grooves 401b for guiding movement of the 103a, 202a, 302a and the fixing grooves 401c extending perpendicularly to the ends of the guide grooves 401b to fix the coupling protrusions 103a, 202a, 302a. It is composed.

상기 연결부재(400)의 결합홈(401)은, 상기 정착홈(401c)과 반대되는 방향의 상기 안내홈(401b) 말단에 상기 정착홈(401c)에 정착된 결합돌부(103a,202a,302a)가 상기 안내홈(401b)으로 이탈되는 것을 방지하는 이탈방지홈(401d)을 형성한다.Coupling grooves 401 of the connecting member 400, the engaging protrusions 103a, 202a, 302a fixed to the fixing grooves 401c at the end of the guide groove 401b in the direction opposite to the fixing grooves 401c. ) Is formed to prevent the departure groove 401d to prevent the departure to the guide groove (401b).

상기와 같이 구성되는 본 발명에 따른 조립형 영구앵커는 다음과 같은 방법에 의해 정착된다.The assembled permanent anchor according to the present invention configured as described above is fixed by the following method.

여기서, 경사지를 절토하고, 이 경사지에 구조물(예컨대: 격자블럭, 사각블럭, 옹벽 등)을 설치하며, 구조물과 경사지 사이에 콘크리트를 타설하여 양생하고, 경사지를 천공하는 과정의 상세한 설명은 생략하도록 한다.Here, the slope is cut, a structure (for example, lattice block, square block, retaining wall, etc.) is installed on the slope, the concrete is poured between the structure and the slope, and the detailed description of the process of drilling the slope is omitted. do.

도 9는 본 발명에 따른 조립형 영구앵커를 정착하는 방법을 나타낸 순서도로, 이를 참조하여 조립형 영구앵커가 정착되는 것을 설명하도록 한다.9 is a flowchart illustrating a method of fixing the assembled permanent anchor according to the present invention, with reference to this will be described that the assembled permanent anchor is fixed.

먼저, 도 7a 내지 도 7b를 참조하면, 정착부(100)의 제1연결홈(103)에 연결부재(400) 일단을 연결하고, 이 연결부재(400) 타단에 인장부(300)의 제3연결홈(302)을 연결하여 상기 정착부(100)를 천공된 지중에 삽입한다(S100).First, referring to FIGS. 7A to 7B, one end of the connecting member 400 is connected to the first connecting groove 103 of the fixing unit 100, and the other end of the tension unit 300 is connected to the other end of the connecting member 400. 3 connecting groove 302 is inserted to insert the fixing unit 100 in the perforated ground (S100).

이때, 상기 인장부(300)의 또 다른 제3연결홈(302)에 또 다른 연결부재(400)를 연결하고, 이 연결부재(400)에 또 다른 인장부(300)의 제3연결홈(302)을 연속적으로 연결하여 상기 정착부(100)가 지중의 말단 부분까지 진입되도록 한다.At this time, another connection member 400 is connected to another third connection groove 302 of the tension part 300, and a third connection groove of another tension part 300 is connected to the connection member 400. 302 is continuously connected to allow the fixing unit 100 to enter the distal end of the ground.

여기서, 천공된 지중에는 상기 정착부(100)와 호스(P)가 동시에 삽입된다.Here, the fixing unit 100 and the hose (P) is inserted at the same time in the perforated ground.

그리고, 상기 정착부(100)가 지중의 말단부분에 도달하면, 지중의 상단 부분에 위치된 연결부재(400)에 상부만숀(200)의 제2연결홈(202)을 연결하여, 상기 상부만숀(200)의 나사산(201)이 지중 외부로 노출되도록 한다(S200).When the fixing unit 100 reaches the distal portion of the ground, the second connecting groove 202 of the upper manshon 200 is connected to the connecting member 400 located at the upper portion of the ground. The thread 201 of the manshon 200 is exposed to the ground outside (S200).

여기서, 상기 정착부(100), 상부만숀(200) 및 인장부(300)에는 결합돌부(103a,202a,302a)를 형성되고, 이 결합돌부(103a,202a,302a)를 상기 연결부재(400)의 삽입홈(401a), 안내홈(401b), 정착홈(401c) 및 이탈방지홈(41d)을 형성하는 결합홈(401)에 삽입 결합하여 상기 연결부재(400)에 정착부(100), 상부만숀(200) 및 인장부(300)가 연결된다.Here, the fixing protrusions 100, the upper manshon 200, and the tensioning portion 300 are formed with coupling protrusions 103a, 202a and 302a, and the coupling protrusions 103a, 202a and 302a are connected to the connection member ( Fixing part 100 to the connecting member 400 by inserting and coupling to the coupling groove 401 to form the insertion groove 401a, guide groove 401b, fixing groove 401c and departure prevention groove 41d of the 400 ), The upper manshon 200 and the tension unit 300 is connected.

즉, 상기 정착부(100)의 결합돌부(103a)에 상기 연결부재(400)의 삽입홈(401a)을 삽입하고, 그 상태에서 상기 연결부재(400)를 일 방향으로 회전하여 상기 결합돌부(103a)가 상기 안내홈(401b)을 따라 이동되도록 하며, 상기 안내홈(401b) 말단에 상기 결합돌부(103a)가 위치되면, 상기 연결부재(400)를 밀어 상기 연결부재(400)의 정착홈(41c)에 상기 결합돌부(103a)가 위치되도록 한다.That is, the insertion groove 401a of the connection member 400 is inserted into the coupling protrusion 103a of the fixing unit 100, and in this state, the connection member 400 is rotated in one direction to connect the coupling protrusion ( When 103a is moved along the guide groove 401b, and the coupling protrusion 103a is positioned at the end of the guide groove 401b, the connection member 400 is pushed to fix the groove of the connection member 400. The coupling protrusion 103a is positioned at 41c.

이어서, 상기 인장부(300)의 결합돌부(302a)를 상기 연결부재(400)의 삽입홈(401a)에 삽입하고, 상기 인장부(300)를 일 방향으로 회전시켜 상기 결합돌부(302a)가 상기 안내홈(401b)을 따라 이동되도록 하며, 그 상태에서 상기 인장부(300)를 밀어 상기 연결부재(400)의 정착홈(401c)에 상기 결합돌부(302a)가 위치되도록 한다.Subsequently, the coupling protrusion 302a of the tension unit 300 is inserted into the insertion groove 401a of the connection member 400, and the coupling protrusion 302a is rotated by rotating the tension unit 300 in one direction. The guide groove 401b is moved, and in this state, the tensioning part 300 is pushed so that the coupling protrusion 302a is positioned in the fixing groove 401c of the connection member 400.

상기 상부만숀(200)의 경우에는, 상기 인장부(300)와 동일한 방법에 의해 상기 연결부재(400)에 연결된다.In the case of the upper manshon 200, it is connected to the connection member 400 by the same method as the tension portion 300.

이후, 도7c 및 도 7d를 참조하면, 상기 호스(P)를 통해 그라우트를 지중에 주입하여 상기 연결부재(400)에 의해 연결된 상기 정착부(100), 인장부(300)를 매설하고, 상기 호스(P)를 제거한다(S300).7C and 7D, the grout is injected into the ground through the hose P to bury the fixing unit 100 and the tension unit 300 connected by the connecting member 400. Remove the hose (P) (S300).

여기서, 지중에 주입되는 그라우트는, 지중 외부로 넘쳐흐르도록 주입하는 것이 바람직하다.Here, the grout injected into the ground is preferably injected to overflow outside the ground.

그리고, 도 8을 참조하면, 정해진 시간이 초과 되어 그라우트가 굳어지면, 지중 외부로 노출된 상기 상부만숀(200)의 나사산(201)에 너트(N)를 결합하고, 그 상태에서 상기 상부만숀(200)을 인장기(10)로 당겨 인장부(300)에 인장력이 발생되도록 한다(S400).And, referring to Figure 8, when the grout is hardened by a predetermined time is exceeded, the nut (N) is coupled to the thread 201 of the upper manshon 200 exposed to the ground out, only the upper part in the state The tension 200 is generated in the tension unit 300 by pulling the Shawn 200 into the tensioner 10 (S400).

여기서, 상기 정착부(100)의 정착몸체(101) 및 하부만숀(102)은 굳어진 그라우트에 매설된 상태로 고정되어 상기 인장기(10)에 의해 상기 인장부(300) 및 연결부(400)가 외부로 이탈되는 것을 방지한다.Here, the fixing body 101 and the lower manshon 102 of the fixing unit 100 is fixed in a state buried in the solidified grout, the tension unit 300 and the connecting portion 400 by the tensioner 10 Is prevented from escaping to the outside.

특히, 상기 정착몸체(101)의 걸림돌부(104)는 굳어진 그라우트에 걸림 된 상태로 고정되어 상기 인장기(10)의 인장력을 견고히 지탱한다.In particular, the locking protrusion 104 of the fixing body 101 is fixed in a state locked to the solidified grout to firmly support the tensile force of the tensioner (10).

또한, 상기 인장기(10)로 당겨지는 상기 정착부(100), 상부만숀(200), 인장부(300)의 결합돌부(103a,202a,302a)는 상기 연결부재(400)의 이탈방지홈(401d)에 걸림 고정되어 상기 결합돌부(103a,202a,302a)가 상기 안내홈(401b)으로 이탈되는 것이 방지된다.In addition, the fixing unit 100, the upper manshon 200, the engaging protrusions 103a, 202a, 302a of the tension unit 300, which is pulled by the tensioner 10 is prevented from being separated from the connection member 400. It is locked to the groove 401d to prevent the coupling protrusions 103a, 202a, and 302a from being separated into the guide groove 401b.

그러면, 상기의 인장부(300)에 인장력이 발생됨과 동시에 상기 상부만숀(200)에 결합된 너트(N)가 구조물(W)에 설치된 앵커플레이트(20)에서 정해진 거리 이격된다.Then, the tensile force is generated in the tension portion 300 and at the same time the nut (N) coupled to the upper manshon 200 is spaced apart from the anchor plate 20 installed in the structure (W).

이때, 상기 너트(N)를 조여 상기 앵커플레이트(20)에 상기 너트(N)를 밀착(S500)시키면, 상기 인장부(300)가 상기 상부만숀(200)에 의해 인장된 상태로 유지되고, 상기 상부만숀(200)은 상기 너트(N)에 의해 인장기(10)로 당겨진 위치에서 고정된다.At this time, by tightening the nut (N) in close contact with the nut (N) to the anchor plate 20 (S500), the tension portion 300 is maintained in a tensioned state by the upper manshon 200 , The upper manshon 200 is fixed in the position pulled by the tensioner 10 by the nut (N).

이후, 상기 앵커플레이트(20)에 상기 상부만숀(200) 및 너트(N)를 감싸는 캡(500)을 고정설치(S600)하여, 상기 상부만숀(200) 및 너트(N)가 외부 요인에 의해 파손되거나 혹은 빗물 등에 의해 부식되는 것을 방지한다.Thereafter, the anchor plate 20 is fixed to the cap 500 surrounding the upper manshon 200 and the nut N (S600), the upper manshon 200 and the nut (N) is an external factor It is prevented from being broken by or corroded by rain water.

한편, 본 발명에서는 상기 상부만숀(200)의 제2연결홈(202)을 1개로 형성하고, 이 제2연결홈(202)에 정착부(100), 인장부(300)를 연결부재(400)로 순차적으로 연결하여 토압력을 지탱하는 조립형 영구앵커를 형성하고, 이 조립형 영구앵커를 지중에 정착하는 방법을 예로 들어 설명하였습니다.Meanwhile, in the present invention, the second connection groove 202 of the upper manshon 200 is formed as one, and the fixing part 100 and the tension part 300 are connected to the second connection groove 202. 400) to form an assembled permanent anchor to support the earth pressure and to install the assembled permanent anchor in the ground as an example.

하지만, 도 5내지 도 6에 나타난 바와 같이, 본 발명은 사용자의 의도에 따라 상기 상부만숀(200)의 제2연결홈(202)을 복수개로 형성하고, 각각의 상기 제2연결홈(202)에 상기 연결부재(400)에 의해 연결된 정착부(100) 및 인장부(300)를 연결함으로써, 구조물(W)과 흙 간의 토압력을 지탱하는 지탱력을 향상시키는 조립형 영구앵커를 형성할 수 있습니다.However, as shown in FIGS. 5 to 6, the present invention forms a plurality of second connection grooves 202 of the upper manshon 200 according to a user's intention, and each of the second connection grooves 202. By connecting the fixing unit 100 and the tension unit 300 connected by the connecting member 400 to), to form an assembled permanent anchor to improve the bearing force supporting the earth pressure between the structure (W) and the soil can.

상기에서는 경사진 절토지에 지중이 천공된 것을 예로 들어 설명하였지만, 본 발명은 다양한 장소의 지중에 정착될 수 있다.In the above, the ground is perforated on the inclined cut land, but the present invention can be settled in the ground of various places.

또한, 본 발명에서는 청구범위 내용을 명확하게 하고자, 상기 정착부(100), 상부만숀(200) 및 인장부(300)의 제1,제2,제3연결홈(103,202,302)에 결합돌부(103a,202a,302a)를 형성하고, 이 결합돌부(103a,202a,302a)를 상기 연결부재(400)의 결합홈(401)에 결합하는 것을 예시하였지만, In addition, in the present invention, in order to clarify the contents of the claims, coupling protrusions (first, second, third connecting grooves 103, 202, 302 of the fixing unit 100, the upper manshon 200 and the tension unit 300) Although 103a, 202a, and 302a are formed and the coupling protrusions 103a, 202a, and 302a are coupled to the coupling groove 401 of the connection member 400,

사용자의 의도에 따라, 상기 정착부(100), 상부만숀(200) 및 인장부(300)의 제1,제2,제3연결홈(103,202,302)과 상기 연결부재(400)의 양단에 나사산을 형성하여, 상기 연결부재(400)를 상기 제1,제2,제3연결홈(103,202,302)에 나선방식으로 결합할 수 있다.According to the user's intention, the first, second and third connection grooves 103, 202, 302 of the fixing unit 100, the upper manshon 200, and the tension unit 300 are threaded at both ends of the connection member 400. By forming the connection member 400 may be coupled to the first, second, third connection grooves (103, 202, 302) in a spiral manner.

상기와 같이 정착부, 상부만숀, 인장부를 연결부재로 연결하여 조립된 조립형 영구앵커를 정착하는 구조는, 인장부 및 연결부재로 지중의 깊이에 대응되게 영구앵커 길이를 자유롭게 조절할 수 있고, 영구앵커 말단이 지중의 말단부분에 근접 위치된 상태로 토압력을 지탱하여 토압력이 상승되며, 영구앵커의 강연선을 절단할 필요가 없어 별도의 작업이 불필요하되, 영구앵커의 불필요한 부분의 손실이 방지되어 비용이 절감되고, 상부만숀, 인장부, 연결부재 및 정착체가 조립가능하여 인력만으로도 작업이 가능하며, 각각의 부품으로 나누어져 부피가 최소화된다.As described above, the structure for fixing the assembled permanent anchor assembled by connecting the fixing unit, the upper manshon, and the tension unit with the connecting member can freely adjust the permanent anchor length to correspond to the depth of the ground with the tension unit and the connecting member. The toe pressure is increased by supporting the toe pressure with the end of the permanent anchor close to the end of the ground, and no additional work is required because there is no need to cut the strand of the permanent anchor. It is prevented and the cost is reduced, and the upper manshon, the tension part, the connecting member and the fixing body can be assembled so that the work can be done only by manpower.

이상에서 설명한 본 발명에 조립형 영구앵커 및 그 정착방법은 상기한 실시예에 한정되지 않고, 이하의 특허청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양하게 변경하여 실시할 수 있는 범위까지 그 기술적 정신이 있다.The assembled permanent anchor and the fixing method thereof according to the present invention described above are not limited to the above-described embodiments, and are commonly used in the field of the present invention without departing from the gist of the present invention as claimed in the following claims. Anyone who has it has the technical spirit to the extent that various changes can be made.

10 : 인장기 20 : 앵커플레이트
100 : 정착부 101 : 정착몸체
102 : 하부만숀 103 : 제1연결홈
103a,202a,302a : 결합돌부 104 : 걸림돌부
105,301 : 강연선 200 : 상부만숀
201 : 나사산 202 : 제2연결홈
300 : 인장부 302 : 제3연결홈
303-1 : 폴리에틸렌수지 피복재
303-2 : 폴레이텔렌수지 슬라이드 파이프 400 : 연결부재
401 : 결합홈 401a : 삽입홈
401b : 안내홈 401c : 정착홈
401d : 이탈방지홈 500 : 캡
N : 너트 P : 호스
W : 구조물
10: tensioner 20: anchor plate
100: fixing unit 101: fixing body
102: lower mansion 103: first connection groove
103a, 202a, 302a: engaging protrusion 104: locking protrusion
105,301: Strand 200: Upper Manshon
201: thread 202: second connection groove
300: tension portion 302: third connection groove
303-1: Polyethylene resin coating material
303-2: polystyrene resin slide pipe 400: connecting member
401: coupling groove 401a: insertion groove
401b: Guide groove 401c: Settlement groove
401d: Breakaway prevention groove 500: Cap
N: Nut P: Hose
W: Structure

Claims (12)

지중에 정착되는 정착몸체(101)가 형성되어 있고, 상기 정착몸체(101) 일단에 하부만숀(102)이 형성되어 있으며, 타단에 제1연결홈(103)이 형성되어 있고, 상기 정착몸체(101) 외면을 따라 나선형상의 걸림돌부(104)가 형성되어 있는 정착부(100)와;
상기 정착부(100) 상부에 배치되고, 외면에 나사산(201)이 형성되어 있으며, 일단에 제2연결홈(202)이 형성되어 있는 상부만숀(200);
중공형상으로 내부에 복수개의 강연선(301)이 구비되어 있고, 양단에 제3연결홈(302)이 형성되어 있으며, 상기 정착부(100)와 상기 상부만숀(200) 사이에 배치되어 인장되는 인장부(300);
상기 제1,제2,제3 연결홈(102,202,302)에 연결되어 상기 정착부(100), 상부만숀 (200)및 인장부(300)를 연결하는 연결부재(400);
를 포함하여 구성되는 조립형 영구앵커에 있어서,
상기 정착부(100), 상부만숀(200) 및 인장부(300)의 제1,제2,제3 연결홈(103,202,302) 내면에는 결합돌부(102a,202a,302a)가 형성되어 있고, 상기 연결부재(400) 양단 외면에 상기 결합돌부(103a,202a,302a)가 결합되는 결합홈(401)이 형성되어 있으며,
상기 결합홈(401)은
상기 결합돌부(103a,202a,302a)가 삽입되는 삽입홈(401a)과, 상기 삽입홈(401a) 말단에 직교되게 연장형성되어 상기 결합돌부(103a,202a,302a)의 이동을 안내하는 안내홈(401b) 및 상기 안내홈(401b) 말단에 직교되게 연장형성되어 상기 결합돌부(103a,202a,302a)를 정착시키는 정착홈(401c)으로 구성되는 것을 특징으로 하는 조립형 영구앵커.
A fixing body 101 to be fixed in the ground is formed, the lower manshon 102 is formed at one end of the fixing body 101, the first connecting groove 103 is formed at the other end, the fixing body (101) a fixing unit (100) having a spiral engaging protrusion (104) formed along an outer surface thereof;
An upper manseon 200 disposed on the fixing unit 100 and having a thread 201 formed on an outer surface thereof, and having a second connection groove 202 formed at one end thereof;
A plurality of strands 301 are provided inside the hollow shape, and third connection grooves 302 are formed at both ends, and are disposed between the fixing unit 100 and the upper manshon 200 to be tensioned. Tension unit 300;
A connection member 400 connected to the first, second, and third connection grooves 102, 202, 302 to connect the fixing unit 100, the upper manshon 200, and the tension unit 300;
In the assembled permanent anchor is configured to include,
Coupling protrusions 102a, 202a, and 302a are formed on inner surfaces of the first, second, and third connection grooves 103, 202, and 302 of the fixing unit 100, the upper manshon 200, and the tension unit 300. Coupling grooves 401 to which the coupling protrusions 103a, 202a, and 302a are coupled are formed at both ends of the connection member 400,
The coupling groove 401 is
Insertion grooves 401a into which the coupling protrusions 103a, 202a, and 302a are inserted, and guide grooves extending perpendicularly to the ends of the insertion grooves 401a to guide the movement of the coupling protrusions 103a, 202a, and 302a. 401b and the guide groove 401b is formed orthogonal to the end of the assembled permanent anchor, characterized in that consisting of a fixing groove (401c) for fixing the engaging protrusions (103a, 202a, 302a).
제 1항에 있어서,
상기 정착부(100)는
상기 정착몸체(101) 및 하부만숀(102) 내부에 복수개의 강연선(105)이 구비되어 있는 것을 특징으로 하는 조립형 영구앵커.
The method of claim 1,
The fixing unit 100 is
Assembled permanent anchor, characterized in that the plurality of strands 105 is provided in the fixing body 101 and the lower manshon 102.
제 1항에 있어서,
상기 정착부(100)는
상기 걸림돌부(104)의 단면 형상은 원형, 타원형, 반구형 또는 다각형상 중 어느 하나로 형성되는 것을 특징으로 하는 조립형 영구앵커.
The method of claim 1,
The fixing unit 100 is
Cross-sectional shape of the engaging protrusion 104 is assembled permanent anchor, characterized in that formed in any one of a circular, elliptical, hemispherical or polygonal shape.
제 1항에 있어서,
상기 상부만숀(200)은
상기 제2연결홈(202)이 적어도 2개 이상 형성된 것을 특징으로 하는 조립형 영구앵커.
The method of claim 1,
The upper manshon 200
Assembled permanent anchor, characterized in that at least two second connection groove 202 is formed.
제 1항에 있어서,
상기 인장부(300)는
상기 강연선(301)이 폴리에틸렌수지 피복재(303-1) 또는 폴리에틸렌수지 슬라이드 파이프(303-2)로 감싸지는 것을 특징으로 하는 조립형 영구앵커.
The method of claim 1,
The tension unit 300 is
Assembly line permanent anchor, characterized in that the strand is wrapped with a polyethylene resin coating material (303-1) or polyethylene resin slide pipe (303-2).
삭제delete 삭제delete 제 1항에 있어서,
상기 연결부재의 결합홈(401)은,
상기 정착홈(401c)과 반대되는 방향의 상기 안내홈(401b) 말단에 상기 정착홈(401c)에 정착된 결합돌부(103a,202a,302a)가 상기 안내홈(401b)으로 이탈되는 것을 방지하는 이탈방지홈(401d)을 형성하고 있는 것을 특징으로 하는 조립형 영구앵커.
The method of claim 1,
The coupling groove 401 of the connection member,
To prevent the coupling protrusions 103a, 202a, and 302a fixed to the fixing grooves 401c at the end of the guide grooves 401b in the opposite direction to the fixing grooves 401c. Assembly permanent anchor, characterized in that the formation of the departure prevention groove (401d).
정착부(100)에 연결부재(400) 및 인장부(300)를 연결하면서 상기 정착부(100)와 호스(P)를 지중에 삽입하는 제1과정(S100);
지중에 삽입된 복수의 상기 연결부재(400)중 상단에 위치된 연결부재(400)에 상부만숀(200)을 연결하는 제2과정(S200);
상기 호스(P)를 통해 그라우트를 주입하여 정착부(100), 인장부(300) 및 연결부재(400)를 지중에 매설하고, 호스(P)를 제거하는 제3과정(S300);
상기 제3과정(S300)에서 주입된 그라우트가 굳어지면, 상기 상부만숀(200)의 나사산(201)에 너트(N)를 결합하고, 상부만숀(200)을 인장기(10)로 당겨 인장부(300)에 인장력이 발생되도록 하는 제4과정(S400);
상기 제4과정(S400)에 의해 지중의 외측 테두리에 설치된 구조물(W)에서 정해진 거리 이격된 너트(N)를 구조물(W)에 설치된 앵커플레이트(20)에 밀착되도록 조여, 상기 인장부(300)에 발생된 인장력을 유지시키는 제5과정(S500);
을 포함하는 조립형 영구앵커 정착방법에 있어서,
상기 제1과정(S100)에서는,
상기 정착부(100)에 연결부재(400)를 연결하고, 상기 연결부재(400)에 인장부(300)를 순차적으로 연속되게 연결하여 지중의 말단부분에 상기 정착부(100)가 위치되도록 하고, 상기 정착부(100)의 제1연결홈(103) 내면에 형성된 결합돌부(103a)를 상기 연결부재(400) 외면에 형성된 결합홈(401)에 삽입 체결하며, 상기 연결부재(400) 타단에 형성된 결합홈(401)에 상기 인장부(300)의 결합돌부(302a)를 삽입 체결하고, 상단에 위치된 연결부재(400)의 결합홈(401)에 상기 상부만숀(200)의 결합돌부(202a)를 삽입 체결하며, 상기 정착부(100), 인장부(300) 및 상부만숀(200)을 연결부재(400)로 순차적으로 연결하는 것을 특징으로 하는 조립형 영구앵커 정착방법.
A first step (S100) of inserting the fixing unit 100 and the hose P into the ground while connecting the connecting member 400 and the tension unit 300 to the fixing unit 100;
A second process (S200) of connecting the upper manshon 200 to a connection member 400 positioned at an upper end of the plurality of connection members 400 inserted into the ground;
Injecting grout through the hose (P) to embed the fixing unit (100), the tension unit (300) and the connection member (400) in the ground, and removing the hose (P) (S300);
When the grout injected in the third step S300 is hardened, the nut N is coupled to the thread 201 of the upper manshon 200, and the upper manshon 200 is pulled by the tensioner 10. A fourth process (S400) for generating a tensile force in the tension unit 300;
By tightening the nut (N) spaced a predetermined distance from the structure (W) installed on the outer edge of the ground by the fourth process (S400) to be in close contact with the anchor plate 20 installed on the structure (W), the tension portion 300 A fifth step (S500) of maintaining the tensile force generated in the);
In the assembled permanent anchor fixing method comprising a,
In the first process (S100),
The connecting member 400 is connected to the fixing unit 100, and the tensioning unit 300 is sequentially connected to the connecting member 400 so that the fixing unit 100 is positioned at an end portion of the ground. And inserting and coupling the coupling protrusion 103a formed on the inner surface of the first connecting groove 103 of the fixing unit 100 to the coupling groove 401 formed on the outer surface of the connecting member 400, and the other end of the connecting member 400. Insert and fasten the coupling protrusion 302a of the tension portion 300 to the coupling groove 401 formed in the coupling of the upper manshon 200 to the coupling groove 401 of the connection member 400 located at the top Inserting and fastening the projection (202a), permanent anchor anchoring method, characterized in that to connect the fixing unit 100, the tension unit 300 and the upper manshon 200 in sequence with a connecting member (400).
삭제delete 삭제delete 제 9항에 있어서,
상기 앵커플레이트(20)에 상기 상부만숀(200) 및 너트(N)를 감싸는 캡(500)을 고정설치하는 제6과정(S600)을 더 포함하는 것을 특징으로 하는 조립형 영구앵커 정착방법.
The method of claim 9,
And a sixth step (S600) of fixing the cap 500 surrounding the upper manshon 200 and the nut N on the anchor plate 20.
KR1020130046084A 2013-04-25 2013-04-25 Assembly permanent anchor and fixing method thereof KR101366818B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130046084A KR101366818B1 (en) 2013-04-25 2013-04-25 Assembly permanent anchor and fixing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130046084A KR101366818B1 (en) 2013-04-25 2013-04-25 Assembly permanent anchor and fixing method thereof

Publications (1)

Publication Number Publication Date
KR101366818B1 true KR101366818B1 (en) 2014-02-26

Family

ID=50271853

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130046084A KR101366818B1 (en) 2013-04-25 2013-04-25 Assembly permanent anchor and fixing method thereof

Country Status (1)

Country Link
KR (1) KR101366818B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200095612A (en) * 2019-01-31 2020-08-11 주식회사 대한 Nailing device with grooving type stiffener injection device
KR102358953B1 (en) 2021-05-20 2022-02-08 주식회사 구마에스앤씨(S&C) nailing device and the method of installing nailing device
KR102702723B1 (en) * 2024-05-29 2024-09-05 주식회사 서하 Retaining wall structure capable of linear variation in horizontal and vertical directions

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000007547U (en) * 1998-10-01 2000-05-06 최영근 Compression Removal Anchors
KR100436662B1 (en) 1996-10-21 2004-08-25 (주) 코리아에스이 Earth anchor, having fixing strength improved by fixing body installed to front end part
KR20050074416A (en) * 2005-06-27 2005-07-18 최두영 An assembly soil nail mechanism and a soil nailing method
KR100919277B1 (en) * 2008-11-11 2009-09-30 박시우 Fixing means using the nail anchor and method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100436662B1 (en) 1996-10-21 2004-08-25 (주) 코리아에스이 Earth anchor, having fixing strength improved by fixing body installed to front end part
KR20000007547U (en) * 1998-10-01 2000-05-06 최영근 Compression Removal Anchors
KR20050074416A (en) * 2005-06-27 2005-07-18 최두영 An assembly soil nail mechanism and a soil nailing method
KR100919277B1 (en) * 2008-11-11 2009-09-30 박시우 Fixing means using the nail anchor and method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200095612A (en) * 2019-01-31 2020-08-11 주식회사 대한 Nailing device with grooving type stiffener injection device
KR102186679B1 (en) * 2019-01-31 2020-12-07 주식회사 대한 Nailing device with grooving type stiffener injection device
KR102358953B1 (en) 2021-05-20 2022-02-08 주식회사 구마에스앤씨(S&C) nailing device and the method of installing nailing device
KR102702723B1 (en) * 2024-05-29 2024-09-05 주식회사 서하 Retaining wall structure capable of linear variation in horizontal and vertical directions

Similar Documents

Publication Publication Date Title
KR101150125B1 (en) the ground anchor with spreading anchor-head part and the construct method of ground anchor therewith
CA2968026C (en) Pole reinforcement
RU2398083C2 (en) Fastening device for supports
KR101453303B1 (en) Retension for anchorage
KR101366818B1 (en) Assembly permanent anchor and fixing method thereof
KR100955469B1 (en) Guid Apparatus for Soil Nail of reinforcing a slope
KR100793743B1 (en) Method for fixing permanent anchor assembly and apparatus thereof
KR20030051002A (en) Ground anchor
KR20120050605A (en) Structure of reinforcing net of tunnel
KR101052728B1 (en) Assembly Structure of Removable Soil Nails Using Wedge Wedges and Method of Assembling and Removing Soil Nails
KR101348219B1 (en) Culvert laying earthquake-resistant pin
WO2018189499A1 (en) Securing arrangement
KR101903699B1 (en) Anchor assembly
KR100929203B1 (en) Ground reinforcement device with protrusion members for injecting grout
KR101243281B1 (en) Steel strand cable bolts and rock bolts for settlement body construction equipment
JP2015010354A (en) Water cutoff member for ground anchor
KR100776620B1 (en) Bar Type Anchor
KR100818623B1 (en) Pulling eye for extracting power line
KR20190052488A (en) Device for Fixing the Steel Lattice Girder using a Steel Wire
KR100617393B1 (en) Slope stabilization method using slope reinforced member with bulb consisting FRP or CRP
KR101715132B1 (en) Assembling Construction Method Using Divided Manhole For Water Supply And Drainage
KR101213588B1 (en) Tie Cable for Ground Embankment
KR101603507B1 (en) Compression type anchor with central tube
KR101277730B1 (en) Anchor settle for integral body construction equipment and construction methods
KR101368055B1 (en) Anchor head device

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161125

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20171222

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20200121

Year of fee payment: 7