KR101321530B1 - Device for facilities fixed installed in a dry building - Google Patents

Device for facilities fixed installed in a dry building Download PDF

Info

Publication number
KR101321530B1
KR101321530B1 KR1020120155854A KR20120155854A KR101321530B1 KR 101321530 B1 KR101321530 B1 KR 101321530B1 KR 1020120155854 A KR1020120155854 A KR 1020120155854A KR 20120155854 A KR20120155854 A KR 20120155854A KR 101321530 B1 KR101321530 B1 KR 101321530B1
Authority
KR
South Korea
Prior art keywords
fixing
hole
facility
fixing bolt
pin
Prior art date
Application number
KR1020120155854A
Other languages
Korean (ko)
Inventor
박은권
Original Assignee
박은권
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박은권 filed Critical 박은권
Priority to KR1020120155854A priority Critical patent/KR101321530B1/en
Application granted granted Critical
Publication of KR101321530B1 publication Critical patent/KR101321530B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0889Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2201/00Joining sheets or plates or panels
    • E04F2201/05Separate connectors or inserts, e.g. pegs, pins, keys or strips

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Connection Of Plates (AREA)

Abstract

PURPOSE: A facility fixing device installed in a dry building is provided to increase assemblability, productivity, and economic feasibility with a simple structure. CONSTITUTION: A facility fixing device installed in a dry building (100) comprises a fixing bolt (110), a latching member (120), a hinge fixing pin (130), an auxiliary fixing member (140), and a fixing nut (150). The hinge fixing pin is combined with both a pin hole (111') and a pin hole (122) of the fixing bolt and guides the rotation of the latching member. The auxiliary fixing member combines the outer periphery of an auxiliary fixing body (141) into the inner surface of a penetration hole on a facility to be surface contacted, and contacts a polygonal head part (143) to the external surface of the facility in order to prevent the flow of the fixing bolt. The fixing nut is combined with a washer (150') and screws and pressurizes it to fix the fixing bolt, which passes the penetration hole, to an object to be installed.

Description

건식 건축물에 설치되는 시설물 고정장치{Device for facilities fixed installed in a dry building}Device for facilities fixed installed in a dry building}

본 발명은, 건식 건축물에 설치되는 시설물을 고정하는 고정장치에 관한 것으로, 보다 상세하게는, 시설물의 관통공으로 결합되는 걸림부재가 관통공을 통과하면서 힌지고정핀을 중심으로 자중으로 회전하여 시설물 내면에 밀착되도록 한 후, 고정볼트에 보조고정부재를 체결하면서 관통공에 결합되도록 하여 고정볼트의 유동을 방지함으로써, 시설물에 설치대상물을 견고하게 설치할 수 있는 건식 건축물에 설치되는 시설물 고정장치에 관한 것이다.
The present invention relates to a fixing device for fixing a facility installed in a dry building, and more particularly, the engaging member coupled to the through-hole of the facility rotates around its hinge pins while passing through the through-hole to the inner surface of the facility It is related to the facility fixing device installed in a dry building that can be installed firmly to the installation object by preventing the flow of the fixing bolt by being coupled to the through-hole while tightening the auxiliary fixing member to the fixing bolt after being in close contact. .

일반적으로 건식 건축물의 측벽에 고정된 대리석과 같은 외장재에 간판이나 벽체용 판재 등과 같은 시설물을 고정시키기 위해서는 토글앵커(10)를 사용하는데, 상기 토글앵커(10)는, 도 1에 도시된 바와 같이, 볼트부(11)와 볼트부(11)의 일단에 스프링(미도시)이 장착되어 힌지(13)로 결합되는 한 쌍의 걸림부재(12)를 포함한다.In general, a toggle anchor 10 is used to fix a facility such as a signboard or a wall board, etc. to an exterior material such as marble fixed to the sidewall of a dry building, and the toggle anchor 10 is, as shown in FIG. In addition, a bolt (11) and a spring (not shown) is mounted on one end of the bolt portion 11 includes a pair of engaging members 12 coupled to the hinge (13).

상기 토글앵커(10)는, 건식 건축물에 앵커볼트(B)와 앵글(A) 및 앵커너트(B')로 대리석 및 판재와 같은 시설물(20)이 고정되고, 상기 시설물(20)에 설치대상물(40)을 밀착시킨 후, 상기 토글앵커(10)의 스프링(미도시)이 복원력이 발생하도록 힌지(13)를 중심으로 한 쌍의 걸림부재(12)를 접은 상태에서 설치대상물(40)의 관통공(41)과 시설물(20)의 관통공(21)으로 결합하여 돌출시킨다.The toggle anchor 10, the anchor bolt (B) and the angle (A) and anchor nut (B ') in a dry building is fixed to the facility 20, such as marble and plate, the installation object to the facility 20 After the close contact with the 40, the spring (not shown) of the toggle anchor 10 of the installation object 40 in the folded state of the pair of engaging members 12 around the hinge 13 to generate a restoring force Combination with the through-holes 41 and the through-holes 21 of the facility 20 to protrude.

이때, 상기 걸림부재(12)는 스프링(미도시)의 복원력으로 힌지(13)를 중심으로 펼쳐져 복원되면서 시설물(20)의 내면에 걸려 빠지지 않는 상태가 되고, 이후 볼트부(11)에 너트부재(11')를 체결하여 설치대상물(40)에 밀착되면서 고정된다.At this time, the locking member 12 is expanded to the center of the hinge 13 by the restoring force of the spring (not shown) and is not caught on the inner surface of the facility 20, and then the nut member in the bolt portion 11 thereafter. The 11 'is fastened while being in close contact with the installation object 40.

그러나 상기 토글앵커는, 구조가 복잡하여 조립성 및 생산성이 저하됨은 물론 걸림부재를 복원시키는 스프링의 구조가 취약하여 복원동작이 원활하지 못할 뿐만 아니라 비교적 가벼운 설치대상물을 고정시킬 경우에만 사용하므로 허용 하중이 제한적인 문제점이 있었다.However, the toggle anchor has a complicated structure, which lowers the assembly and productivity, as well as the weak structure of the spring for restoring the locking member. There was this limiting problem.

또한, 볼트부에 접혀진 걸림부재가 통과하도록 시설물에 관통되는 관통공의 직경이 커짐에 따라 고정력이 취약함은 물론 관통공 내부에서 볼트부의 유동을 방지할 수 없어 견고한 설치가 어려운 문제점이 있었다.
In addition, as the diameter of the through-hole penetrating the facility is increased so that the locking member folded into the bolt portion passes, there is a problem in that the fixing force is weak and the installation of the bolt cannot be prevented in the through-hole.

이에 상술한 바와 같은 종래의 제반 문제점을 감안하여 이루어진 것으로, 본 발명의 목적은, 시설물의 관통공으로 결합되는 걸림부재가 관통공을 통과하면서 힌지고정핀을 중심으로 자중으로 회전하여 시설물 내면에 밀착되는 구성으로 구조가 간단하여 조립성 및 생산성이 증대됨은 물론 경제성을 향상시킬 수 있는 건식 건축물에 설치되는 시설물 고정장치를 제공함에 있다.This is made in view of the conventional problems as described above, the object of the present invention, the engaging member coupled to the through-hole of the facility is rotated to its own weight around the hinge fixing pin while passing through the through-hole is in close contact with the inside of the facility It is to provide a facility fixing device to be installed in a dry building that can improve the assembly and productivity as well as the economical efficiency as a simple structure.

또한, 본 발명의 다른 목적은, 걸림부재가 통과하는 관통공 직경을 최소로 함은 물론 고정볼트에 체결되는 보조고정부재가 관통공을 폐쇄시켜 고정볼트의 유동을 방지하여 견고한 설치가 가능하도록 하는 건식 건축물에 설치되는 시설물 고정장치를 제공함에 있다.
In addition, another object of the present invention is to minimize the diameter of the through-hole through which the locking member passes, as well as the auxiliary fixing member fastened to the fixing bolt to close the through-hole to prevent the flow of the fixing bolt to enable a solid installation. The present invention provides a fixture for installation in a dry building.

본 발명 건식 건축물에 설치되는 시설물 고정장치는,Facility fixing device installed on the dry building of the present invention,

건식 건축물에 설치되는 시설물 고정장치로서,As a facility fixing device installed in a dry building,

외주면에 나사산이 형성된 일단에 양측이 절취되는 연결편이 구비되고, 상기 연결편 단부에 관통되어 힌지고정핀이 결합되도록 하는 핀공이 구비된 고정볼트와;A fixing bolt having a connecting hole for cutting both sides at one end formed with a screw thread on an outer circumferential surface thereof, and having a pin hole through which the hinge fixing pin is coupled;

내부가 관통되면서 일단이 타단보다 무겁게 형성되는 걸림몸체가 구비되고, 상기 걸림몸체의 중심에 관통되어 힌지고정핀이 결합되도록 하는 핀공이 구비되며, 상기 핀공과 직교되면서 핀공을 중심으로 일단으로 개구되어 고정볼트의 연결편을 수용하는 안내홈이 구비된 걸림부재와;
상기 걸림부재의 핀공과 고정볼트의 핀공으로 결합되어 걸림부재의 회전을 안내하는 힌지고정핀과;
As the inside penetrates, a locking body having one end is formed to be heavier than the other end is provided, and a pin hole is provided to penetrate through the center of the locking body so that the hinge fixing pins are coupled to each other. A catching member having a guide groove for receiving a connection piece of the fixing bolt;
A hinge fixing pin coupled to the pin hole of the locking member and the pin hole of the fixing bolt to guide rotation of the locking member;

상기 힌지고정핀으로 결합된 걸림부재와 고정볼트의 단부가 시설물의 관통공으로 결합되어 통과되면, 상기 걸림부재는 힌지고정핀을 중심으로 하향으로 회전하여 수직을 유지하게 되고, 이 상태에서 고정볼트를 잡아당겨 시설물 내면에 걸림부재가 밀착되도록 한 후, 상기 걸림부재의 외경보다 크고 시설물의 관통공 내경과 같거나 작은 외경으로 형성된 보조고정몸체의 체결공이 고정볼트의 나사산에 체결되도록 다각형의 머리부를 회전시킴과 동시에 보조고정몸체의 외주면이 시설물의 관통공 내면에 면접촉되게 결합되면서 다각형의 머리부가 시설물 외면에 밀착되어 고정볼트의 유동을 방지하는 보조고정부재와;When the end of the locking member and the fixing bolt coupled to the hinge fixing pin is coupled to pass through the through hole of the facility, the locking member is rotated downward about the hinge fixing pin to maintain the vertical, in this state fixed bolt After pulling out so that the locking member is brought into close contact with the inner surface of the facility, the head of the polygon is rotated so that the fastening hole of the auxiliary fixing body formed with an outer diameter larger than the outer diameter of the locking member and equal to or smaller than the inner diameter of the through hole of the facility is fastened to the thread of the fixing bolt. At the same time An auxiliary fixing member which is coupled to the outer circumferential surface of the auxiliary fixing body to be in surface contact with the inner surface of the through hole of the facility, while the head of the polygon is in close contact with the outside of the facility to prevent the flow of the fixing bolt;

상기 보조고정부재에 의해 시설물에 고정된 고정볼트로 설치대상물의 관통공을 결합하여 통과시킨 후, 상기 고정볼트에 와셔를 결합한 상태에서 상기 관통공으로 통과된 고정볼트에 설치대상물을 고정시키도록 체결하여 가압하는 고정너트를 포함하여 구성되는 것을 특징으로 하는 것이다.
After passing through the through-hole of the installation object by the fixing bolt fixed to the facility by the auxiliary fixing member, and fastened to fix the installation object to the fixing bolt passed through the through hole in the state in which the washer is coupled to the fixing bolt. It is characterized in that it comprises a fixing nut for pressing.

본 발명에 의하면, 시설물의 관통공으로 결합되는 걸림부재가 관통공을 통과하면서 힌지고정핀을 중심으로 자중으로 회전하여 시설물 내면에 밀착되는 구성으로 구조가 간단하여 조립성 및 생산성이 증대됨은 물론 경제성을 향상시킬 수 있는 이점을 가질 수 있는 것이다.According to the present invention, the locking member coupled to the through-hole of the facility is rotated to its own weight around the hinge fixing pin while passing through the through-hole to be in close contact with the inner surface of the facility, the structure is simple, the assembly and productivity is increased as well as economical It can have the advantage of improving.

또한, 본 발명에 의하면, 걸림부재가 통과하는 관통공 직경을 최소로 함은 물론 고정볼트에 체결되는 보조고정부재가 관통공을 폐쇄시켜 고정볼트의 유동을 방지하여 견고한 설치가 가능하도록 함으로써, 사용자로 하여금 제품에 대한 신뢰성을 향상시킬 수 있는 이점을 가질 수 있는 것이다.
Further, according to the present invention, as well as to minimize the diameter of the through-hole through which the locking member passes, the auxiliary fixing member fastened to the fixing bolt to close the through-hole to prevent the flow of the fixing bolt to enable a solid installation, It can have the advantage to improve the reliability of the product.

도 1은 일반적인 토글앵커의 설치상태 단면도
도 2는 본 발명의 사시도
도 3은 본 발명의 분리사시도
도 4 내지 도 9는 본 발명의 시공과정도
1 is a cross-sectional view of the installation state of a general toggle anchor
2 is a perspective view of the present invention
3 is an exploded perspective view of the present invention
4 to 9 is a construction process diagram of the present invention

이하, 첨부된 도면에 의거하여 본 발명을 상세히 설명한다. 도 2는 본 발명의 사시도이고, 도 3은 본 발명의 분리사시도이다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings. 2 is a perspective view of the present invention, Figure 3 is an exploded perspective view of the present invention.

본 발명 건식 건축물에 설치되는 시설물 고정장치(100)로서, 외주면에 나사산이 형성된 일단에 양측이 절취되는 연결편(111)이 구비되고, 상기 연결편(111) 단부에 관통되어 힌지고정핀(130)이 결합되도록 하는 핀공(111')이 구비된 고정볼트(110)가 구성되며, 내부가 관통되면서 일단이 타단보다 무겁게 형성되는 걸림몸체(121)가 구비되고, 상기 걸림몸체(121)의 중심에 관통되어 힌지고정핀(130)이 결합되도록 하는 핀공(122)이 구비되며, 상기 핀공(122)과 직교되면서 핀공(122)을 중심으로 일단으로 개구되어 고정볼트(110)의 연결편(111)을 수용하는 안내홈(123)이 구비된 걸림부재(120)가 구성되고, 상기 걸림부재(120)의 핀공(122)과 고정볼트(110)의 핀공(111')으로 결합되어 걸림부재(120)의 회전을 안내하는 힌지고정핀(130)이 구성되며, 상기 힌지고정핀(130)으로 결합된 걸림부재(120)와 고정볼트(110)의 단부가 시설물(30)의 관통공(31)으로 결합되어 통과되면, 상기 걸림부재(120)는 힌지고정핀(130)을 중심으로 하향으로 회전하여 수직을 유지하게 되고, 이 상태에서 고정볼트(110)를 잡아당겨 시설물(30) 내면에 걸림부재(120)가 밀착되도록 한 후, 상기 걸림부재(120)의 외경보다 크고 시설물(30)의 관통공(31) 내경과 같거나 작은 외경으로 형성된 보조고정몸체(141)의 체결공(142)이 고정볼트(110)의 나사산에 체결되도록 다각형의 머리부(143)를 회전시킴과 동시에 보조고정몸체(141)의 외주면이 시설물(30)의 관통공(31) 내면에 면접촉되게 결합되면서 다각형의 머리부(143)가 시설물(30) 외면에 밀착되어 고정볼트(110)의 유동을 방지하는 보조고정부재(140)가 구성되며, 상기 보조고정부재(140)에 의해 시설물(30)에 고정된 고정볼트(110)로 설치대상물(40)의 관통공(41)을 결합하여 통과시킨 후, 상기 고정볼트(110)에 와셔(150')를 결합한 상태에서 상기 관통공(41)으로 통과된 고정볼트에 설치대상물(40)을 고정시키도록 체결하여 가압하는 고정너트(150)를 포함하여 구성된다.
As the facility fixing device 100 installed in the dry building of the present invention, a connecting piece 111 is provided at both ends at one end of which a screw thread is formed on an outer circumferential surface thereof, and a hinge fixing pin 130 is penetrated through an end of the connecting piece 111. The fixing bolt 110 is provided with a pin hole (111 ') to be coupled, the locking body 121 is provided with one end is heavier than the other end as the inside penetrates, and penetrates through the center of the locking body 121 A pin hole 122 is provided to allow the hinge fixing pin 130 to be coupled thereto. The pin hole 122 is orthogonal to the pin hole 122 to open at one end about the pin hole 122 to accommodate the connection piece 111 of the fixing bolt 110. The locking member 120 having a guide groove 123 is configured to be coupled to the pin hole 122 of the locking member 120 and the pin hole 111 ′ of the fixing bolt 110. Hinge fixed pin 130 is configured to guide the rotation is coupled to the hinge fixed pin 130 When the end of the member 120 and the fixing bolt 110 is coupled and passed through the through-hole 31 of the facility 30, the locking member 120 is rotated downward about the hinge fixing pin 130 to vertical In this state, the fixing bolt 110 is pulled in this state so that the locking member 120 is brought into close contact with the inner surface of the facility 30, and the through hole of the facility 30 is larger than the outer diameter of the locking member 120. (31) Rotating the polygonal head 143 so that the fastening hole 142 of the auxiliary fixing body 141 formed with the outer diameter equal to or less than the inner diameter of the fixing bolt 110 and the auxiliary fixing body ( The outer circumferential surface of the 141 is coupled to the inner surface of the through-hole 31 of the facility 30 while the head 143 of the polygon is in close contact with the outer surface of the facility 30 to prevent the flow of the fixing bolt 110 The member 140 is configured, and the mounting table as a fixing bolt 110 fixed to the facility 30 by the auxiliary fixing member 140 After passing through the through-hole 41 of the upper body 40, the installation object 40 to the fixing bolt passed through the through-hole 41 in the state in which the washer 150 'is coupled to the fixing bolt 110. It is configured to include a fixing nut 150 is fastened to press to fix the.

삭제delete

삭제delete

다음은 상기와 같이 구성된 본 발명의 결합 및 시공과정을 설명한다.Hereinafter, the combination and construction process of the present invention will be described.

먼저, 일정길이로 형성된 고정볼트(110)의 일단에 양측이 절취되는 연결편(111)을 형성하는데, 이의 폭은 걸림부재(120)의 안내홈(123) 폭보다 작게 형성하고, 길이는 길게 형성하여 고정볼트(110)에서 걸림부재(120)가 회전할 수 있도록 한다.First, the connecting piece 111 is formed at both ends of one end of the fixing bolt 110 formed to a predetermined length, the width of which is formed smaller than the width of the guide groove 123 of the locking member 120, the length is formed long To allow the locking member 120 to rotate in the fixing bolt 110.

상기 연결편(111)을 걸림부재(120)의 안내홈(123)이 개구된 걸림몸체(121)의 타측단으로 결합하여 연결편(111)과 걸림몸체(121)에 형성된 핀공(111')(122)이 동일 선상에 위치하도록 한 후, 상기 핀공(122)(111')으로 힌지고정핀(130)을 결합하여 돌출시킨 상태에서 힌지고정핀(130)의 양단부를 타격하여 핀공(122)보다 넓게 형성되도록 하거나 억지끼움으로 결합하여 힌지고정핀(130)이 핀공(122)에서 이탈되는 않도록 한다.The pin piece 111 'and 122 formed on the connecting piece 111 and the locking body 121 by coupling the connecting piece 111 to the other end of the locking body 121 in which the guide groove 123 of the locking member 120 is opened. ) Is positioned on the same line, and then hit both ends of the hinge fixing pin 130 in a state where the hinge pins 130 are joined to the pin holes 122 and 111 ′, thereby making them wider than the pin holes 122. To be formed or combined by interference fit so that the hinge fixing pin 130 is separated from the pin hole 122.

또한, 상기 고정볼트(110)에 보조고정부재(140)의 체결공(142) 및 고정너트(150)를 체결하면서 본 발명 건식 건축물에 설치되는 시설물 고정장치(100)의 결합이 완료되며, 상기 고정장치(100)를 설치하기 위해서는 도 4에 도시된 바와 같이 건식 건축물에 대리석 및 판재와 같은 시설물(30)이 통상의 앵커볼트(B)와 앵글(A) 및 앵커너트(B')로 고정돼 있어야 한다.In addition, while fastening the fastening hole 142 and the fixing nut 150 of the auxiliary fixing member 140 to the fixing bolt 110, the coupling of the facility fixing device 100 installed in the dry building of the present invention is completed, the In order to install the fixing device 100, as shown in FIG. 4, the facility 30 such as marble and plate is fixed to the anchor bolt B, the angle A, and the anchor nut B 'in a dry building. It should be.

상기 시설물(30)에 고정장치(100)가 결합되는 관통공(31)을 드릴과 같은 공구로 형성하는데, 상기 관통공(31)은 걸림부재(120)의 직경과 최소한 같거나 넓어 걸림부재(120)가 결합될 수 있어야 되며, 상기 걸림부재(120)의 핀공(122)에 결합된 힌지고정핀(130)을 수용할 수 있는 직경이어야 한다.The through-hole 31 to which the fixing device 100 is coupled to the facility 30 is formed by a tool such as a drill, wherein the through-hole 31 is at least equal to or wider than the diameter of the catching member 120 so that the catching member ( 120 should be able to be coupled, it should be a diameter that can accommodate the hinge fixing pin 130 coupled to the pin hole 122 of the locking member 120.

상기의 과정으로 관통공(31)이 형성되면, 상기 관통공(31)으로 고정장치(100)를 결합하는데, 상기 고정장치(100)의 고정너트(150)와 보조고정부재(140)를 고정볼트(110)의 타단에 위치하도록 회전시켜 이동한 상태에서 힌지고정핀(130)을 중심으로 고정볼트(110) 및 걸림부재(120)를 회전시켜 고정볼트(110)와 걸림부재(120)가 수평선상이 되도록 한 후, 상기 걸림부재(120)와 고정볼트(110)를 관통공(31)으로 결합한다.When the through hole 31 is formed in the above process, the fixing device 100 is coupled to the through hole 31, and the fixing nut 150 and the auxiliary fixing member 140 of the fixing device 100 are fixed. The fixing bolt 110 and the locking member 120 are rotated by rotating the fixing bolt 110 and the locking member 120 around the hinge fixing pin 130 in a state where the bolt 110 is rotated so as to be positioned at the other end of the bolt 110. After the horizontal line, the engaging member 120 and the fixing bolt 110 is coupled to the through hole 31.

이때, 상기 걸림부재(120)의 안내홈(123)이 시설물(30) 하부를 향하도록 결합함이 바람직하고, 상기 걸림부재(120)가 관통공(31)을 통과하면, 도 5에 도시된 바와 같이, 일단이 무거운 걸림부재(120)는 핀공(122)에 결합된 힌지고정핀(130)을 중심으로 일단이 자중에 의해 하향으로 회전한다.At this time, the guide groove 123 of the locking member 120 is preferably coupled to face the lower portion of the facility 30, when the locking member 120 passes through the through hole 31, shown in FIG. As described above, one end of the heavy locking member 120 is rotated downward by its own weight with respect to the hinge fixing pin 130 coupled to the pin hole 122.

여기서 상기 걸림부재(120)는 일단이 타단보다 무겁게 형성되어야 하는데, 이는 일단의 두께를 타단보다 두껍게 형성하거나, 걸림몸체(121)의 중심에서 핀공(122)을 편심되게 형성하여 일단이 타단보다 무겁게 형성할 수도 있고, 걸림몸체(121)의 일단에 무게추를 고정시켜 일단이 타단보다 무겁게 형성할 수도 있으며, 또는 도 6에 도시된 바와 같이, 걸림부재(120)의 걸림몸체(121) 내경이 일단이 좁고 타단이 넓도록 경사지게 형성할 수도 있는 것이다.Here, the catching member 120 has one end that is formed to be heavier than the other end, which is formed to be thicker than the other end, or the pin hole 122 is formed eccentrically at the center of the catching body 121 so that one end is heavier than the other end. It may be formed, by fixing the weight on one end of the locking body 121, one end may be formed heavier than the other end, or as shown in Figure 6, the inner diameter of the locking body 121 of the locking member 120 One end is narrow and the other end may be formed to be inclined.

일단이 무거운 걸림부재(120)가 힌지고정핀(130)을 중심으로 하향으로 회전하여 고정볼트(110)와 직교되도록 위치하면, 도 7에 도시된 바와 같이, 상기 고정볼트(110)를 잡아당겨 걸림부재(120)의 걸림몸체(121)가 시설물(30) 내면에 밀착되도록 한 후, 상기 고정볼트(110)의 타단에 위치한 보조고정부재(140)의 다각형의 머리부(143)를 회전시키면서 체결공(142)이 고정볼트(110)의 나사산을 따라 고정볼트(110)의 일단으로 보조고정몸체(141)가 이동되도록 하며, 상기 보조고정몸체(141)는 걸림부재(120)의 외경보다 크고 시설물(30)의 관통공(31) 내경과 같거나 작은 외경으로 형성되므로 상기 보조고정몸체(141)의 외경이 시설물(30)의 관통공(31) 내경에 면접촉되어 결합되어 고정볼트(110)의 유동을 방지할 수 있는 것이다.Once the heavy locking member 120 is rotated downward about the hinge fixing pin 130 and orthogonal to the fixing bolt 110, as shown in FIG. 7, the fixing bolt 110 is pulled out. After the locking body 121 of the locking member 120 is in close contact with the inner surface of the facility 30, while rotating the polygonal head 143 of the auxiliary fixing member 140 located at the other end of the fixing bolt 110. The fastening hole 142 allows the auxiliary fixing body 141 to move to one end of the fixing bolt 110 along the thread of the fixing bolt 110, and the auxiliary fixing body 141 is smaller than the outer diameter of the locking member 120. Since the outer diameter of the auxiliary fixing body 141 is coupled to the inner diameter of the through hole 31 of the facility 30 by being coupled to the inner diameter of the through hole 31 of the facility 30 by being smaller than or equal to the inner diameter of the through hole 31. 110) to prevent the flow.

또한, 상기 고정볼트(110)에 체결공(142)이 체결되면서 시설물(30)의 관통공(31)으로 보조고정몸체(141)가 면접촉되어 결합됨과 동시에 상기 보조고정몸체(141)에 형성된 다각형의 머리부(143)는 시설물(30) 외면에 밀착되며, 이 상태에서 고정볼트(110)에 체결되는 보조고정부재(140)의 체결력에 따라 걸림부재(120)는 시설물(30) 내면을 가압하면서 견고하게 밀착고정되는 것이다.In addition, while the fastening hole 142 is fastened to the fixing bolt 110, the auxiliary fixing body 141 is coupled to the surface of the auxiliary fixing body 141 to the through-hole 31 of the facility 30 and formed on the auxiliary fixing body 141 at the same time. The head 143 of the polygon is in close contact with the outer surface of the facility 30, in this state according to the fastening force of the auxiliary fixing member 140 is fastened to the fixing bolt 110, the locking member 120 to the inner surface of the facility (30) It is tightly fixed while pressing.

상기의 과정으로 고정볼트(110)와 걸림부재(120)가 시설물(30)의 관통공(31)에 고정되면, 도 8 내지 도 9에 도시된 바와 같이, 상기 관통공(31)으로 돌출된 고정볼트(110)에 설치대상물(40)의 관통공(41)을 결합한 후, 관통공(41)으로 돌출되는 고정볼트(110)에 와셔(150')를 결합하고, 고정너트(150)를 체결하면서 설치대상물(40)을 고정시킬 수 있는 것이다.When the fixing bolt 110 and the locking member 120 is fixed to the through hole 31 of the facility 30 in the above process, as shown in Figure 8 to 9, protruding into the through hole 31 After coupling the through hole 41 of the installation object 40 to the fixing bolt 110, the washer 150 'is coupled to the fixing bolt 110 protruding into the through hole 41, and the fixing nut 150 is Will be able to fix the installation object 40 while tightening.

이상과 같이 본 발명은, 비록 한정된 실시예와 도면에 의해 설명되었으나, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정되어 해석되어서는 아니되며, 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. 따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 일실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 발명의 청구범위를 벗어나지 않는 한도 내에서 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.
While the present invention has been described with reference to the particular embodiments and drawings, it is to be understood that the phraseology and terminology employed herein are for the purpose of description and should not be regarded as limiting in any ordinary or prejudicial sense. It must be interpreted in terms of meaning and concept. Therefore, the embodiments described in the present specification and the configurations shown in the drawings are only examples of the present invention, and not all of the technical ideas of the present invention are described. Therefore, It is to be understood that equivalents and modifications are possible.

100: 고정장치 110: 고정볼트
111: 연결편 111': 핀공
120: 걸림부재 121: 걸림몸체
122: 핀공 123: 안내홈
130: 힌지고정핀 140: 보조고정부재
141: 보조고정몸체 142: 체결공
143: 다각형의 머리부 150: 고정너트
100: fixing device 110: fixing bolt
111: connecting piece 111 ': pin ball
120: locking member 121: locking body
122: pin ball 123: guide groove
130: hinge fixing pin 140: auxiliary fixing member
141: auxiliary fixing body 142: fastener
143: head of polygon 150: fixing nut

Claims (3)

건식 건축물에 설치되는 시설물 고정장치로서,
외주면에 나사산이 형성된 일단에 양측이 절취되는 연결편이 구비되고, 상기 연결편 단부에 관통되어 힌지고정핀이 결합되도록 하는 핀공이 구비된 고정볼트와;
내부가 관통되면서 일단이 타단보다 무겁게 형성되는 걸림몸체가 구비되고, 상기 걸림몸체의 중심에 관통되어 힌지고정핀이 결합되도록 하는 핀공이 구비되며, 상기 핀공과 직교되면서 핀공을 중심으로 일단으로 개구되어 고정볼트의 연결편을 수용하는 안내홈이 구비된 걸림부재와;
상기 걸림부재의 핀공과 고정볼트의 핀공으로 결합되어 걸림부재의 회전을 안내하는 힌지고정핀과;
상기 힌지고정핀으로 결합된 걸림부재와 고정볼트의 단부가 시설물의 관통공으로 결합되어 통과되면, 상기 걸림부재는 힌지고정핀을 중심으로 하향으로 회전하여 수직을 유지하게 되고, 이 상태에서 고정볼트를 잡아당겨 시설물 내면에 걸림부재가 밀착되도록 한 후, 상기 걸림부재의 외경보다 크고 시설물의 관통공 내경과 같거나 작은 외경으로 형성된 보조고정몸체의 체결공이 고정볼트의 나사산에 체결되도록 다각형의 머리부를 회전시킴과 동시에 보조고정몸체의 외주면이 시설물의 관통공 내면에 면접촉되게 결합되면서 다각형의 머리부가 시설물 외면에 밀착되어 고정볼트의 유동을 방지하는 보조고정부재와;
상기 보조고정부재에 의해 시설물에 고정된 고정볼트로 설치대상물의 관통공을 결합하여 통과시킨 후, 상기 고정볼트에 와셔를 결합한 상태에서 상기 관통공으로 통과된 고정볼트에 설치대상물을 고정시키도록 체결하여 가압하는 고정너트를 포함하여 구성되는 것을 특징으로 하는 건식 건축물에 설치되는 시설물 고정장치.
As a facility fixing device installed in a dry building,
A fixing bolt having a connecting hole for cutting both sides at one end formed with a screw thread on an outer circumferential surface thereof, and having a pin hole through which the hinge fixing pin is coupled;
As the inside penetrates, a locking body having one end is formed to be heavier than the other end is provided. A catching member having a guide groove for receiving a connection piece of the fixing bolt;
A hinge fixing pin coupled to the pin hole of the locking member and the pin hole of the fixing bolt to guide rotation of the locking member;
When the end of the locking member and the fixing bolt coupled to the hinge fixing pin is coupled to pass through the through hole of the facility, the locking member is rotated downward about the hinge fixing pin to maintain the vertical, in this state fixed bolt After pulling out so that the locking member is brought into close contact with the inner surface of the facility, the head of the polygon is rotated so that the fastening hole of the auxiliary fixing body formed with an outer diameter larger than the outer diameter of the locking member and equal to or smaller than the inner diameter of the through hole of the facility is fastened to the thread of the fixing bolt. At the same time the outer peripheral surface of the auxiliary fixing body coupled to the inner surface of the through-hole of the facility while the head of the polygon is in close contact with the outer surface of the facility and the auxiliary fixing member for preventing the flow of the fixing bolt;
After passing through the through-hole of the installation object by the fixing bolt fixed to the facility by the auxiliary fixing member, and fastened to fix the installation object to the fixing bolt passed through the through hole in the state in which the washer is coupled to the fixing bolt. Fixing device installed in the dry building, characterized in that comprising a fixing nut for pressing.
삭제delete 삭제delete
KR1020120155854A 2012-12-28 2012-12-28 Device for facilities fixed installed in a dry building KR101321530B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120155854A KR101321530B1 (en) 2012-12-28 2012-12-28 Device for facilities fixed installed in a dry building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120155854A KR101321530B1 (en) 2012-12-28 2012-12-28 Device for facilities fixed installed in a dry building

Publications (1)

Publication Number Publication Date
KR101321530B1 true KR101321530B1 (en) 2013-10-28

Family

ID=49639161

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120155854A KR101321530B1 (en) 2012-12-28 2012-12-28 Device for facilities fixed installed in a dry building

Country Status (1)

Country Link
KR (1) KR101321530B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615087A (en) * 2013-11-06 2014-03-05 苏州金螳螂建筑装饰股份有限公司 Fastening bolt for fixing pendant to hollow block wall

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296624A (en) * 1995-04-27 1996-11-12 Wakai Sangyo Kk Bolt for hollow part
KR100842414B1 (en) * 2007-04-03 2008-07-01 주식회사 일산금속 Fixation using anchor bolt

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296624A (en) * 1995-04-27 1996-11-12 Wakai Sangyo Kk Bolt for hollow part
KR100842414B1 (en) * 2007-04-03 2008-07-01 주식회사 일산금속 Fixation using anchor bolt

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615087A (en) * 2013-11-06 2014-03-05 苏州金螳螂建筑装饰股份有限公司 Fastening bolt for fixing pendant to hollow block wall

Similar Documents

Publication Publication Date Title
KR101871193B1 (en) Connecting Device And Display Screen Having Same
US20130125497A1 (en) Beam-column connection structure of continued beam connection portion
US8245993B2 (en) Recessed mount with stowed clamps
RU2552983C2 (en) Connection facility and device for installation of lock, provided with similar connection facility
KR101842090B1 (en) Electric Trace Tool with Joining Structure Tightening by Double Screw
US20170101998A1 (en) Ceiling fan
US20150114273A1 (en) Boat Cleat
KR101321530B1 (en) Device for facilities fixed installed in a dry building
JP2019078405A (en) Fastener including engagement indicator
KR101009277B1 (en) Sprinkler' head unit fixing apparatus
CN205446346U (en) Self -locking bolt
KR102217587B1 (en) Fixing bracket for sprinkler
KR20220138591A (en) Concentric plug and wall fixing apparatus
KR20150135982A (en) Countersink washer
JP2012107724A (en) Adjacent fixing metal fitting of panel material
KR20200009557A (en) Hinge device for door
KR20190116603A (en) Easy-to-use wiring equipment support
KR20140127129A (en) Rods bar stopper
CN106907383A (en) A kind of self-locking screw
KR200467227Y1 (en) Clip head bolt
KR101127466B1 (en) Support for conducting wire of a thunderbolt with lightening rod
JP6445280B2 (en) Drying support device
KR100762784B1 (en) Apparatus for fixing a doorframe
KR102338315B1 (en) Mounting structure for door pivot
JP3165678U (en) Anti-theft

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170418

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee