KR101293682B1 - Suspention method for buried structures - Google Patents

Suspention method for buried structures Download PDF

Info

Publication number
KR101293682B1
KR101293682B1 KR1020120046092A KR20120046092A KR101293682B1 KR 101293682 B1 KR101293682 B1 KR 101293682B1 KR 1020120046092 A KR1020120046092 A KR 1020120046092A KR 20120046092 A KR20120046092 A KR 20120046092A KR 101293682 B1 KR101293682 B1 KR 101293682B1
Authority
KR
South Korea
Prior art keywords
obstacle
support
vertical
hanging
width
Prior art date
Application number
KR1020120046092A
Other languages
Korean (ko)
Inventor
양성호
이송헌
안동렬
김재윤
Original Assignee
쌍용건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 쌍용건설 주식회사 filed Critical 쌍용건설 주식회사
Priority to KR1020120046092A priority Critical patent/KR101293682B1/en
Application granted granted Critical
Publication of KR101293682B1 publication Critical patent/KR101293682B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Abstract

PURPOSE: A suspension method for an obstruction is provided to improve workability and stability of a task and to prevent a damage caused by sagging of the obstruction. CONSTITUTION: A suspension method for an obstruction comprises as follows. An upper support unit (100) is installed on the upper part of an obstruction (1). The side part of the obstruction is excavated, and an edge region of both lower sides of the obstruction is preliminarily excavated. The lower part of the obstruction is bored in a width direction so that a connection member insertion hole is formed. A support unit (200) is individually mounted on the edge of both lower sides of the obstruction. The support unit and the upper support unit are connected by an upper and lower direction connection member (300). A pair of the support unit is connected by a width direction connection member. The lower part of the obstruction is excavated.

Description

지장물 매달기 공법{SUSPENTION METHOD FOR BURIED STRUCTURES}Hanging obstacle hanging method {SUSPENTION METHOD FOR BURIED STRUCTURES}

본 발명은 건설 분야에 관한 것으로서, 상세하게는 지장물의 매달기 공법에 관한 것이다.The present invention relates to the construction field, and more particularly, to a hanging method of obstacles.

하수관로, 전선관로 등의 지장물(1)이 매설된 구간의 하부에 개착식 공법에 의해 지하도로, 전철 등의 지중구조물(a)을 시공하여야 하는 경우, 공사구간에 노출되는 지장물(1)은 별도의 임시구조물에 의해 임시로 매달아 두는 것이 필요하다(도 1,2).Obstacles (1) exposed to the construction section when underground structures (a) such as underground roads and trains must be constructed by the submerged construction method in the lower part of the section where the obstacles (1) such as sewer pipes and wire conduits are buried. It is necessary to temporarily hang by a separate temporary structure (Fig. 1,2).

도 1,2는 종래의 지장물 매달기 공법을 설명하기 위한 도면이다.1 and 2 are views for explaining a conventional obstacle hanging method.

도시된 바와 같이, 먼저 말뚝(11)에 의해 지지되는 폭방향 빔(13)을 설치하고, 지장물(1)의 양측을 굴착한 후, 양단이 폭방향 빔(13)에 의해 지지되는 와이어(2)를 지장물(1)을 둘러 설치한다.As shown in the drawing, first, the widthwise beam 13 supported by the pile 11 is installed, and both sides of the obstacle 1 are excavated, and then both ends of the wire supported by the widthwise beam 13 ( Install 2) around obstacles (1).

지장물(1)이 사각형 단면의 구조인 경우, 와이어(2)가 직접 지장물(1)의 모서리에 접촉하면 꺾임에 의한 파손의 문제가 있으므로, 와이어(2)와 지장물(1) 사이에는 각목 등의 간격재(3)를 설치하여, 모서리 영역에서 와이어(2)가 완만한 각도로 절곡되도록 한다.In the case where the obstacle 1 has a rectangular cross-sectional structure, there is a problem of breakage due to bending when the wire 2 directly contacts the edge of the obstacle 1, so that the obstacle 2 between the wire 2 and the obstacle 1 Spacers 3, such as wood, are installed so that the wires 2 are bent at a gentle angle in the corner region.

이 상태에서 지장물(1)의 하부를 굴착하고, 메인말뚝(12)에 설치된 브라켓(21)에 서브 빔(22) 및 메인 빔(23)을 설치하여, 메인 빔(23)이 지장물(1)의 하단에 접촉함으로써, 지장물(1)이 상측으로 지지되도록 한다.In this state, the lower part of the obstacle 1 is excavated, and the sub beam 22 and the main beam 23 are installed in the bracket 21 provided on the main pile 12, so that the main beam 23 is the obstacle ( By contacting the lower end of 1), the obstacle 1 is supported upward.

메인 빔(23)과 지장물(1)의 하단의 안정적인 접촉을 위하여, 그 사이에 충전재(24)를 설치한다.In order to ensure stable contact between the main beam 23 and the lower end of the obstacle 1, a filler 24 is provided therebetween.

이후, 지장물(1)의 하부를 완전굴착하고 지중구조물(a)을 시공한다.Then, the bottom of the obstacle (1) is completely excavated and the underground structure (a) is constructed.

그런데, 이러한 종래의 공법은 다음과 같은 문제가 있었다.However, such a conventional method has the following problems.

첫째, 지장물(1)을 둘러 지지하기 위해 설치되는 와이어(2)는 가요성 재질로서 비교적 변형이 큰 재질이므로, 메인 빔(23) 없이 와이어(2)에 의해 지장물(1)이 지지되는 상태에서 지장물(1)의 처짐현상이 발생한다는 점이다.First, since the wire 2 installed to surround the obstacle 1 is a flexible material having a relatively large deformation, the obstacle 1 is supported by the wire 2 without the main beam 23. In this state, deflection of the obstacle 1 occurs.

지장물(1)이 콘크리트 관로인 경우, 일부지점에서 처짐의 발생은 지장물(1)의 균열로 연결된다는 점에서 그 문제가 심각하다.If the obstacle 1 is a concrete pipeline, the problem is serious in that the occurrence of deflection at some points is connected to the crack of the obstacle 1.

둘째, 와이어(2)에 의해 지장물(1)이 지지되는 상태는 위와 같이 와이어(2)의 변형으로 인하여 위험한 상태이므로, 지장물(1)의 하부 굴착 시 작업의 안정성이 문제된다.Second, since the obstacle 1 is supported by the wire 2 is a dangerous state due to the deformation of the wire 2 as described above, the stability of the work when the lower excavation of the obstacle 1 is problematic.

셋째, 지장물(1)의 양측을 굴착한 후 서브 빔(22)을 설치하고, 지장물(1)의 하부를 관통하여 굴착을 진행하여 메인 빔(23)을 설치하여야 하는데, 협소한 공간에서 이러한 자재의 운반 및 설치작업을 하여야 하므로 시공성이 좋지 못하다.Third, after digging both sides of the obstacle (1) to install the sub-beams 22, through the lower portion of the obstacle (1) to proceed with the excavation to install the main beam 23, in a narrow space The workability is poor because it is necessary to transport and install these materials.

넷째, 메인 빔(23)과 지장물(1)의 하단이 정확히 접촉하도록 메인 빔(23)을 시공하는 것이 대단히 어려우므로, 별도의 충전재(24)에 의한 충전이 필요한데, 이에 과도한 수고와 비용이 소요된다.Fourth, since it is very difficult to construct the main beam 23 so that the lower end of the main beam 23 and the obstacle (1) exactly contact, it is necessary to charge by a separate filler 24, which is excessive labor and cost It takes

본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 지장물의 손상 우려가 없고, 작업의 안정성 및 시공성이 우수한 지장물 매달기 공법을 제시하는 것을 그 목적으로 한다.The present invention has been made to solve the above problems, and there is no fear of damaging the obstacles, and an object of the present invention is to propose a obstacle hanging method excellent in work stability and workability.

상기 과제의 해결을 위하여, 본 발명은 지장물(1)의 하부에 지중구조물(a)을 시공하기 위하여, 상기 지장물(1)을 임시로 매달아 두는 매달기 공법에 있어서, 상기 지장물(1)의 상부에 상부 지지부(100)를 설치하는 상부 지지부(100) 설치단계; 상기 지장물(1)의 측부를 굴착하는 예비굴착 단계; 상기 지장물(1)의 하부 양측 가장자리 영역을 굴착하는 가장자리 굴착단계; 상기 지장물(1)의 하부를 폭방향으로 천공하여 연결부재 삽입공(10)을 형성하는 하부 천공단계; 상기 지장물(1)의 하부 양측 가장자리에 각각 받침부(200)를 장착하는 한 쌍의 받침부 장착단계; 상기 받침부(200)와 상기 상부 지지부(100)를 상하방향 연결부재(300)에 의해 연결하는 상부 지지부 연결단계; 상기 한 쌍의 받침부(200)를 폭방향 연결부재(400)에 의해 연결하는 한 쌍의 받침부 연결단계; 상기 지장물(1)의 하부를 본굴착하는 본굴착 단계;를 포함하는 지장물 매달기 공법을 제시한다.In order to solve the above problems, the present invention, in order to construct the underground structure (a) in the lower portion of the obstacle (1), in the hanging method of temporarily hanging the obstacle (1), the obstacle (1) An upper support part 100 installing step of installing the upper support part 100 on an upper part of the upper part; Pre-excavation step of excavating the side of the obstacle (1); Edge excavation step of excavating the lower both side edge regions of the obstacle (1); A lower drilling step of drilling the lower portion of the obstacle 1 in the width direction to form a connection member insertion hole 10; A pair of supporting unit mounting steps for mounting the supporting unit 200 on both lower edges of the obstacle 1; An upper support part connecting step of connecting the support part 200 and the upper support part 100 by a vertical connection member 300; A pair of supporting part connecting steps of connecting the pair of supporting parts 200 by the widthwise connecting member 400; Presenting the obstacle hanging method comprising a; main excavation step of the main excavation of the lower portion of the obstacle (1).

상기 상부 지지부(100)는 상기 지장물(1)의 좌우측에 각각 길이방향으로 설치된 한 쌍의 길이방향 빔(110); 상기 한 쌍의 길이방향 빔(110)에 의해 지지되도록, 폭방향으로 설치된 폭방향 빔(120);을 포함하고, 상기 상하방향 연결부재(300)는 상기 폭방향 빔(120)에 의해 상측으로 지지되도록 설치된 것이 바람직하다.The upper support part 100 includes a pair of longitudinal beams 110 installed in the longitudinal direction on the left and right sides of the obstacle 1, respectively; And a widthwise beam 120 installed in the width direction so as to be supported by the pair of longitudinal beams 110, wherein the vertically connecting member 300 is moved upward by the widthwise beam 120. It is preferably installed to be supported.

상기 상부 지지부(100)는 상기 한 쌍의 길이방향 빔(110)을 지지하도록 매설된 파일(111);을 포함하는 것이 바람직하다.The upper support part 100 preferably includes a pile 111 embedded to support the pair of longitudinal beams 110.

상기 상부 지지부(100)는 상기 폭방향 빔(120)에 의해 지지되도록, 길이방향으로 설치된 제2 길이방향 빔(130);을 포함하고, 상기 상하방향 연결부재(300)는 상기 제2 길이방향 빔(130)에 의해 상측으로 지지되도록 설치된 것이 바람직하다.The upper support part 100 includes a second longitudinal beam 130 installed in a longitudinal direction so as to be supported by the widthwise beam 120, wherein the vertical connecting member 300 is in the second longitudinal direction. It is preferable that the beam 130 is installed to be supported upward.

상기 받침부(200)는 상기 지장물(1)의 하부 양측 가장자리를 지지하는 지지부(210); 상기 상하방향 연결부재(300)의 하단이 정착하는 상하방향 연결부재 정착부(220); 상기 폭방향 연결부재(400)의 단부가 정착하는 폭방향 연결부재 정착부(230);를 포함하는 것이 바람직하다.The support portion 200 is a support portion 210 for supporting both lower edges of the obstacle (1); A vertical connecting member fixing unit 220 in which a lower end of the vertical connecting member 300 is fixed; It is preferable to include a; width direction connecting member fixing unit 230 is fixed to the end of the width direction connecting member 400.

상기 받침부(200)는 수평부재(201) 및 수직부재(202)의 조합에 의해 "+"자형 단면을 갖도록 형성된 것이 바람직하다.The support portion 200 is preferably formed to have a "+" shaped cross section by the combination of the horizontal member 201 and the vertical member 202.

상기 받침부(200)는 상기 수평부재(201)의 내측 단부와 상기 수직부재(202)의 하측 단부를 연결하는 내측 사재(203)를 포함하는 것이 바람직하다.The support part 200 preferably includes an inner yarn 203 connecting the inner end of the horizontal member 201 and the lower end of the vertical member 202.

상기 받침부(200)는 상기 수직부재(202)의 상측 단부와 상기 수평부재(201)의 외측 단부를 연결하는 외측 사재(204)를 포함하는 것이 바람직하다.The support portion 200 preferably includes an outer yarn 204 connecting the upper end of the vertical member 202 and the outer end of the horizontal member 201.

상기 상하방향 연결부재 정착부(220)는 상기 수평부재(201)의 외측 단부에 형성되고, 상기 폭방향 연결부재 정착부(230)는 상기 수직부재(202)의 하측 단부에 형성된 것이 바람직하다.The vertical connecting member fixing unit 220 is formed at the outer end of the horizontal member 201, the width connecting member fixing unit 230 is preferably formed at the lower end of the vertical member 202.

상기 상하방향 연결부재(300) 및 폭방향 연결부재(400)는 강봉 또는 강연선인 것이 바람직하다.The vertical connecting member 300 and the width connecting member 400 is preferably a steel bar or strand.

본 발명은 지장물의 손상 우려가 없고, 작업의 안정성 및 시공성이 우수한 지장물 매달기 공법을 제시한다.The present invention provides a obstacle hanging method excellent in the stability and workability of work without fear of damage to the obstacle.

도 1은 종래의 지장물 매달기 공법에 관한 횡단면도.
도 2는 종래의 지장물 매달기 공법에 관한 종단면도.
도 3 이하는 본 발명에 의한 공법의 실시예를 도시한 것으로서,
도 3 내지 5는 제1 실시예의 공정도.
도 6은 제2 실시예의 주요부 확대도.
도 7은 제2 실시예의 사시도.
도 8은 제3 실시예의 주요부 확대도.
도 9는 제4 실시예의 평면도.
도 10은 제4 실시예의 종단면도.
1 is a cross-sectional view of a conventional obstacle hanging method.
2 is a longitudinal sectional view of a conventional obstacle hanging method.
3 is a view showing an embodiment of the method according to the present invention,
3 to 5 are process diagrams of the first embodiment.
6 is an enlarged view of an essential part of the second embodiment;
7 is a perspective view of a second embodiment.
8 is an enlarged view of an essential part of a third embodiment;
9 is a plan view of a fourth embodiment.
10 is a longitudinal sectional view of the fourth embodiment.

이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 3 이하에 도시된 바와 같이, 본 발명은 기본적으로 지장물(1)의 하부에 지중구조물(a)을 시공하기 위하여, 지장물(1)을 임시로 매달아 두는 매달기 공법에 관한 것으로서, 다음과 같은 공정에 의해 이루어진다.As shown below in Figure 3, the present invention basically relates to a suspension method for temporarily hanging the obstacle (1) in order to construct the underground structure (a) in the lower portion of the obstacle (1), It is made by the same process.

지장물(1)의 상부에 길이방향 빔(110), 폭방향 빔(120) 등의 상부 지지부(100)를 설치한다(도 3).The upper support part 100, such as the longitudinal beam 110, the width | variety beam 120, is installed in the upper part of the obstacle 1 (FIG. 3).

지장물(1)의 측부를 굴착하고, 연이어 지장물(1)의 하부 양측 가장자리 영역을 굴착하는데, 지장물(1)의 하부를 모두 굴착하지 않고 중앙부는 남겨둠으로써, 그 부분에 의해 지장물(1)이 상측으로 지지된 상태에 있도록 한다(도 4).The sides of the obstacle 1 are excavated, and the bottom both edge regions of the obstacle 1 are subsequently excavated, but the center portion is left without digging all of the lower portion of the obstacle 1, thereby preventing the obstacle. Let (1) be in the state supported upward (FIG. 4).

지장물(1)의 하부를 폭방향으로 천공하여 연결부재 삽입공(10)을 형성한다(도 4).The lower portion of the obstacle 1 is drilled in the width direction to form the connection member insertion hole 10 (FIG. 4).

양측에 설치된 한 쌍의 받침부(200)에 의해 지장물(1)이 상측으로 지지될 수 있도록, 지장물(1)의 하부 양측 가장자리에 각각 받침부(200)를 장착하는데, 받침부(200)와 상부 지지부(100)를 상하방향 연결부재(300)에 의해 연결하고, 한 쌍의 받침부(200)를 폭방향 연결부재(400)에 의해 연결한다(도 5).In order to support the obstacles 1 upward by a pair of support parts 200 installed on both sides, the support parts 200 are mounted on both lower edges of the obstacles 1, respectively. ) And the upper support part 100 are connected by the up and down connecting member 300, and the pair of supporting parts 200 are connected by the width connecting member 400 (Fig. 5).

이로써 지장물(1)의 안정적인 매달기 구조가 완성되므로, 이후 지장물(1)의 하부를 본굴착하고 지중구조물(a)을 형성한다(도 9,10).This completes the stable hanging structure of the obstacle 1, and thus excavates the lower portion of the obstacle 1 and forms the underground structure (a) (FIGS. 9 and 10).

본 발명에 의한 공법은 다음과 같은 효과가 있다.The method according to the present invention has the following effects.

첫째, 지장물(1)의 처짐에 의한 파손의 우려가 없다.First, there is no fear of damage due to sagging of the obstacle 1.

종래의 공법에서는 하나의 부재에 의해 지장물(1)을 둘러 지지해야 하므로, 가요성 재질인 와이어를 사용할 수밖에 없음에 따라 지장물(1)의 처짐 문제가 있었다.In the conventional method, since the obstacle 1 must be surrounded by one member, there is a problem of sagging of the obstacle 1 due to the use of a flexible wire.

그러나 본 발명은 지장물의 하부 양측 가장자리에 별도의 받침부(200) 한 쌍을 설치하고, 그 한 쌍의 받침부(200)를 각각 상하방향 연결부재(300) 및 폭방향 연결부재(400)에 의해 연결하여 지장물(1)을 지지하는 구조를 취하므로, 변형이 적은 재질에 의해 상하방향 연결부재(300) 및 폭방향 연결부재(400)를 만들어 사용하면 되는바, 종래의 공법과 같은 문제를 해소할 수 있다.However, in the present invention, a pair of separate support parts 200 are installed at both lower edges of the obstacle, and the pair of support parts 200 are respectively connected to the vertical connecting member 300 and the width connecting member 400. Since it takes a structure to support the obstacles (1) by connecting by using, so that the upper and lower connecting member 300 and the width connecting member 400 is made of a material using less deformation, the same problem as the conventional method Can be solved.

둘째, 지장물(1)의 하부 굴착 시 작업의 안정성이 우수하다.Second, when the lower excavation of the obstacle (1) the work stability is excellent.

본 발명에 의한 공법은 종래와 같이 지장물(1)을 임시로 와이어(2)에 의해 지지한 상태에서 지장물(1)의 하부를 굴착하는 것이 아니라, 지장물(1)의 하부 중 중앙부를 굴착하지 않은 상태에서, 받침부(200) 등에 의한 지지구조를 완성하고, 이후 비로소 지장물(1)의 하부 본굴착 작업을 수행하므로, 안전한 작업이 가능하다.The method according to the present invention does not excavate the lower part of the obstacle 1 in a state where the obstacle 1 is temporarily supported by the wire 2 as in the prior art, and the center portion of the lower part of the obstacle 1 is not excavated. In the non-drilled state, the support structure by the supporting part 200 is completed, and afterwards, since the bottom main excavation work of the obstacle 1 is performed, safe work is possible.

셋째, 시공성이 우수하다.Third, the workability is excellent.

받침부(200), 상하방향 연결부재(300), 폭방향 연결부재(400)는 종래의 공법에 사용되는 서브 빔(22), 메인 빔(23)에 비해 그 규모가 작아도 관계가 없으므로, 협소한 공간이라 하더라도 우수한 시공성을 기대할 수 있다.Since the supporting part 200, the vertical connecting member 300, and the width connecting member 400 have a smaller size than the sub beam 22 and the main beam 23 used in the conventional construction method, they are narrow. Even in one space, excellent workability can be expected.

넷째, 수고와 비용을 줄일 수 있다.Fourth, labor and cost can be reduced.

지장물(1)의 하부 가장자리 굴착 후, 받침부(200)를 지장물(1)의 하부 가장자리에 정확히 설치할 수 있으므로, 종래의 공법과 같이 별도의 충전재(24) 설치작업이 불필요한바, 작업에 소요되는 수고와 비용을 크게 줄일 수 있다.After excavating the lower edge of the obstacle 1, since the supporting portion 200 can be accurately installed on the lower edge of the obstacle 1, a separate filler 24 installation work is unnecessary as in the conventional method. This can significantly reduce the effort and costs.

이하, 본 발명에 의한 공법의 구체적 내용에 관한 실시예에 대하여 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, the Example regarding the specific content of the construction method by this invention is described.

상부 지지부(100)는 지장물(1)의 상부에 설치되어, 상하방향 연결부재(300)를 상측으로 지지할 수 있는 구조이면 어느 것이나 관계없으나, 지장물(1)의 좌우측에 각각 길이방향으로 설치된 한 쌍의 길이방향 빔(110); 한 쌍의 길이방향 빔(110)에 의해 지지되도록, 폭방향으로 설치된 폭방향 빔(120);을 포함하고, 상하방향 연결부재(300)는 폭방향 빔(120)에 의해 상측으로 지지되도록 설치된 구조를 취하는 것이 구조적 안정성을 위하여 바람직하다(도 3,7).The upper support part 100 may be installed on the obstacle 1, and may have any structure that can support the vertical connecting member 300 upwards, but may be in the longitudinal direction on the left and right sides of the obstacle 1, respectively. A pair of longitudinal beams 110 installed; And a widthwise beam 120 installed in the width direction so as to be supported by the pair of longitudinal beams 110. The vertically connecting member 300 is installed to be supported upward by the widthwise beam 120. Taking the structure is preferred for structural stability (Figs. 3,7).

견고한 지반의 경우에는, 그 지반 위에 한 쌍의 길이방향 빔(110)을 설치하더라도 문제가 없을 것이나, 연약지반의 경우에는 별도의 파일(111)을 매설 시공하고, 이에 의해 한 쌍의 길이방향 빔(110)이 지지되도록 하는 것이 바람직하다.In the case of solid ground, there would be no problem even if a pair of longitudinal beams 110 were installed on the ground, but in the case of soft ground, a separate pile 111 was buried, whereby a pair of longitudinal beams were installed. It is desirable to allow 110 to be supported.

폭방향 빔(120)에 의해 지지되도록, 길이방향으로 제2 길이방향 빔(130);을 설치하고, 상하방향 연결부재(300)는 위 제2 길이방향 빔(130)에 의해 상측으로 지지되도록 설치하는 것이 구조적 안정성 및 시공성 측면에서 더욱 바람직하다.And a second longitudinal beam 130 in the longitudinal direction so as to be supported by the widthwise beam 120, and the vertical connecting member 300 is supported upward by the second longitudinal beam 130. It is more preferable to install in terms of structural stability and workability.

받침부(200)는 기본적으로, 지장물(1)의 하부 양측 가장자리를 지지하는 지지부(210); 상하방향 연결부재(300)의 하단이 정착하는 상하방향 연결부재 정착부(220); 폭방향 연결부재(400)의 단부가 정착하는 폭방향 연결부재 정착부(230);를 포함하여 구성된다.The supporting part 200 basically includes: a support part 210 supporting lower edges of both sides of the obstacle 1; A vertical connecting member fixing unit 220 in which a lower end of the vertical connecting member 300 is fixed; And a widthwise connection member fixing unit 230 in which an end of the widthwise connection member 400 is fixed.

이는 철골 프레임 구조를 취할 수도 있고(도 6,7), 콘크리트 블록에 의한 구조를 취할 수도 있다(도 8).It may take a steel frame structure (FIGS. 6, 7), or may take a structure by a concrete block (FIG. 8).

전자의 경우, 받침부(200)는 수평부재(201) 및 수직부재(202)의 조합에 의해 "+"자형 단면을 갖도록 형성되는 것이 구조적 안정성을 위하여 바람직하고, 수평부재(201)의 내측 단부와 수직부재(202)의 하측 단부를 연결하는 내측 사재(203)를 포함하거나, 수직부재(202)의 상측 단부와 수평부재(201)의 외측 단부를 연결하는 외측 사재(204)를 포함하는 경우, 더욱 안정적인 구조를 얻을 수 있다.In the former case, the supporting part 200 is preferably formed to have a “+” cross section by a combination of the horizontal member 201 and the vertical member 202 for structural stability, and the inner end of the horizontal member 201 is provided. And an inner yarn 203 connecting the lower end of the vertical member 202 or an outer yarn 204 connecting the upper end of the vertical member 202 and the outer end of the horizontal member 201. More stable structure can be obtained.

이때, 상하방향 연결부재 정착부(220)는 수평부재(201)의 외측 단부에 형성되고, 폭방향 연결부재 정착부(230)는 수직부재(202)의 하측 단부에 형성된다.In this case, the vertical connecting member fixing unit 220 is formed at the outer end of the horizontal member 201, the width connecting member fixing unit 230 is formed at the lower end of the vertical member 202.

상하방향 연결부재(300) 및 폭방향 연결부재(400)는 강연선 등의 연성 재질에 의해 형성할 수도 있고, 강봉 등의 경성 재질에 의해 형성할 수도 있는데, 전자의 경우에는 강연선을 긴장하여 받침부(200)에 정착하는 것이 바람직하다.The vertical connecting member 300 and the width connecting member 400 may be formed of a flexible material such as a stranded wire, or may be formed of a rigid material such as a steel bar. It is preferable to fix at 200.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined in the appended claims. It is to be understood that both the technical idea and the technical spirit of the invention are included in the scope of the present invention.

a : 지중구조물 1 : 지장물
10 : 연결부재 삽입공 100 : 상부 지지부
110 : 길이방향 빔 111 : 파일
120 : 폭방향 빔 130 : 제2 길이방향 빔
200 : 받침부 201 : 수평부재
202 : 수직부재 203 : 내측 사재
204 : 외측 사재 210 : 지지부
220 : 상하방향 연결부재 정착부 230 : 폭방향 연결부재 정착부
300 : 상하방향 연결부재 400 : 폭방향 연결부재
a: underground structure 1: obstacle
10: connection member insertion hole 100: upper support
110: longitudinal beam 111: file
120: widthwise beam 130: second longitudinal beam
200: support 201: horizontal member
202: vertical member 203: inner yarn
204: outer yarn 210: support
220: up and down connecting member fixing unit 230: width direction connecting member fixing unit
300: vertical connecting member 400: width connecting member

Claims (10)

지장물(1)의 하부에 지중구조물(a)을 시공하기 위하여, 상기 지장물(1)을 임시로 매달아 두는 매달기 공법에 있어서,
상기 지장물(1)의 상부에 상부 지지부(100)를 설치하는 상부 지지부(100) 설치단계;
상기 지장물(1)의 측부를 굴착하는 예비굴착 단계;
상기 지장물(1)의 하부 양측 가장자리 영역을 굴착하는 가장자리 굴착단계;
상기 지장물(1)의 하부를 폭방향으로 천공하여 연결부재 삽입공(10)을 형성하는 하부 천공단계;
상기 지장물(1)의 하부 양측 가장자리에 각각 받침부(200)를 장착하는 한 쌍의 받침부 장착단계;
상기 받침부(200)와 상기 상부 지지부(100)를 상하방향 연결부재(300)에 의해 연결하는 상부 지지부 연결단계;
상기 한 쌍의 받침부(200)를 폭방향 연결부재(400)에 의해 연결하는 한 쌍의 받침부 연결단계;
상기 지장물(1)의 하부를 본굴착하는 본굴착 단계;를
포함하는 지장물 매달기 공법.
In the hanging method of temporarily hanging the obstacle (1) in order to construct the underground structure (a) in the lower portion of the obstacle (1),
An upper support part 100 installation step of installing an upper support part 100 on an upper part of the obstacle 1;
Pre-excavation step of excavating the side of the obstacle (1);
Edge excavation step of excavating the lower both side edge regions of the obstacle (1);
A lower drilling step of drilling the lower portion of the obstacle 1 in the width direction to form a connection member insertion hole 10;
A pair of supporting unit mounting steps for mounting the supporting unit 200 on both lower edges of the obstacle 1;
An upper support part connecting step of connecting the support part 200 and the upper support part 100 by a vertical connection member 300;
A pair of supporting part connecting steps of connecting the pair of supporting parts 200 by the widthwise connecting member 400;
A main excavation step of digging the lower portion of the obstacle 1;
Interfere hanging method that includes.
제1항에 있어서,
상기 상부 지지부(100)는
상기 지장물(1)의 좌우측에 각각 길이방향으로 설치된 한 쌍의 길이방향 빔(110);
상기 한 쌍의 길이방향 빔(110)에 의해 지지되도록, 폭방향으로 설치된 폭방향 빔(120);을 포함하고,
상기 상하방향 연결부재(300)는
상기 폭방향 빔(120)에 의해 상측으로 지지되도록 설치된 것을 특징으로 하는 지장물 매달기 공법.
The method of claim 1,
The upper support part 100
A pair of longitudinal beams 110 installed in the longitudinal direction on the left and right sides of the obstacle 1, respectively;
And a width beam 120 installed in the width direction so as to be supported by the pair of longitudinal beams 110.
The vertical connecting member 300 is
Obstacle hanging method, characterized in that installed so as to be supported upward by the width beam (120).
제2항에 있어서,
상기 상부 지지부(100)는
상기 한 쌍의 길이방향 빔(110)을 지지하도록 매설된 파일(111);을
포함하는 것을 특징으로 하는 지장물 매달기 공법.
The method of claim 2,
The upper support part 100
A pile 111 embedded to support the pair of longitudinal beams 110;
Obstruction hanging method, characterized in that it comprises.
제2항에 있어서,
상기 상부 지지부(100)는
상기 폭방향 빔(120)에 의해 지지되도록, 길이방향으로 설치된 제2 길이방향 빔(130);을 포함하고,
상기 상하방향 연결부재(300)는
상기 제2 길이방향 빔(130)에 의해 상측으로 지지되도록 설치된 것을 특징으로 하는 지장물 매달기 공법.
The method of claim 2,
The upper support part 100
And a second longitudinal beam 130 installed in the longitudinal direction so as to be supported by the width beam 120.
The vertical connecting member 300 is
Obstacle hanging method, characterized in that installed so as to be supported upward by the second longitudinal beam (130).
제1항에 있어서,
상기 받침부(200)는
상기 지장물(1)의 하부 양측 가장자리를 지지하는 지지부(210);
상기 상하방향 연결부재(300)의 하단이 정착하는 상하방향 연결부재 정착부(220);
상기 폭방향 연결부재(400)의 단부가 정착하는 폭방향 연결부재 정착부(230);를
포함하는 것을 특징으로 하는 지장물 매달기 공법.
The method of claim 1,
The support part 200 is
A support part 210 supporting lower edges of both sides of the obstacle 1;
A vertical connecting member fixing unit 220 in which a lower end of the vertical connecting member 300 is fixed;
Width connecting member fixing unit 230 is fixed to the end of the width connecting member 400;
Obstruction hanging method, characterized in that it comprises.
제5항에 있어서,
상기 받침부(200)는
수평부재(201) 및 수직부재(202)의 조합에 의해 "+"자형 단면을 갖도록 형성된 것을 특징으로 하는 지장물 매달기 공법.
The method of claim 5,
The support part 200 is
The obstacle hanging method, characterized in that formed by the combination of the horizontal member 201 and the vertical member 202 to have a "+" shaped cross section.
제6항에 있어서,
상기 받침부(200)는
상기 수평부재(201)의 내측 단부와 상기 수직부재(202)의 하측 단부를 연결하는 내측 사재(203)를 포함하는 것을 특징으로 하는 지장물 매달기 공법.
The method according to claim 6,
The support part 200 is
The obstacle hanging method, characterized in that it comprises an inner yarn 203 connecting the inner end of the horizontal member 201 and the lower end of the vertical member (202).
제6항에 있어서,
상기 받침부(200)는
상기 수직부재(202)의 상측 단부와 상기 수평부재(201)의 외측 단부를 연결하는 외측 사재(204)를 포함하는 것을 특징으로 하는 지장물 매달기 공법.
The method according to claim 6,
The support part 200 is
The obstacle hanging method, characterized in that it comprises an outer yarn 204 for connecting the upper end of the vertical member (202) and the outer end of the horizontal member (201).
제8항에 있어서,
상기 상하방향 연결부재 정착부(220)는 상기 수평부재(201)의 외측 단부에 형성되고,
상기 폭방향 연결부재 정착부(230)는 상기 수직부재(202)의 하측 단부에 형성된 것을 특징으로 하는 지장물 매달기 공법.
9. The method of claim 8,
The vertical connecting member fixing unit 220 is formed at the outer end of the horizontal member 201,
The widthwise connecting member fixing unit 230 is the obstacle hanging method, characterized in that formed on the lower end of the vertical member (202).
제1항에 있어서,
상기 상하방향 연결부재(300) 및 폭방향 연결부재(400)는 강봉 또는 강연선인 것을 특징으로 하는 지장물 매달기 공법.
The method of claim 1,
The up and down connecting member 300 and the width connecting member 400 is hanging obstacle method, characterized in that the steel bar or strand.
KR1020120046092A 2012-05-02 2012-05-02 Suspention method for buried structures KR101293682B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120046092A KR101293682B1 (en) 2012-05-02 2012-05-02 Suspention method for buried structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120046092A KR101293682B1 (en) 2012-05-02 2012-05-02 Suspention method for buried structures

Publications (1)

Publication Number Publication Date
KR101293682B1 true KR101293682B1 (en) 2013-08-06

Family

ID=49219967

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120046092A KR101293682B1 (en) 2012-05-02 2012-05-02 Suspention method for buried structures

Country Status (1)

Country Link
KR (1) KR101293682B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762898A (en) * 1992-04-30 1995-03-07 Ishikawajima Constr Materials Co Ltd Reinforcing method for existing tank
KR200263526Y1 (en) 1999-06-24 2002-02-06 박정진 Hanging semi down up system
KR100619272B1 (en) 2006-01-23 2006-09-07 주식회사 도화종합기술공사 Height adjusting apparatus of water supply and drainage pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762898A (en) * 1992-04-30 1995-03-07 Ishikawajima Constr Materials Co Ltd Reinforcing method for existing tank
KR200263526Y1 (en) 1999-06-24 2002-02-06 박정진 Hanging semi down up system
KR100619272B1 (en) 2006-01-23 2006-09-07 주식회사 도화종합기술공사 Height adjusting apparatus of water supply and drainage pipe

Similar Documents

Publication Publication Date Title
KR101329440B1 (en) Steel pipe strut having an enclosure connector
KR101648704B1 (en) Underground wall structure
KR101506880B1 (en) Shoring apparatus
JP6192972B2 (en) Calvert
KR101521556B1 (en) Underground wall construction method using wall members
KR101293682B1 (en) Suspention method for buried structures
CN105570539A (en) Construction method of pipeline protection structure
KR101138024B1 (en) Retaining wall structure
KR101348339B1 (en) The pressing device of underground strucyure for non-excavation method and its construccting methods thereof
KR101293683B1 (en) Suspention method for buried structures using joint member
KR101035404B1 (en) Slurry wall and slab junction structure and its using top-down construction method
KR101249603B1 (en) Steel pipe installing structure for resistance in vertical stress of none-excavation underground structure and construction method at the same
KR102081574B1 (en) A Waling Assembly of Sheeting Timbering
KR101507991B1 (en) Bracket for earth anchor
JP2011246910A (en) Construction method of underground structure
JP6462505B2 (en) Earth retaining wall structure and its construction method
JP6397321B2 (en) Construction method of water stop plate mounting member, water stop plate, rebar mount and continuous underground wall
JP6026916B2 (en) Construction method of support construction
JP4815198B2 (en) Sheet pile support structure for excavation grooves
KR20130102751A (en) Apparatus for connecting lattice girders
KR20170005365A (en) The smart supporting structure for top down construction method
JP2011001784A (en) Method of constructing underground structure
KR20140005672A (en) Strut assembly
JP5322708B2 (en) Relocation method of utility pole
CN104032755A (en) External corner connector of foundation pit supporting system

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160726

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170726

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190730

Year of fee payment: 7