KR101267363B1 - Pipe for balcony balustrade - Google Patents

Pipe for balcony balustrade Download PDF

Info

Publication number
KR101267363B1
KR101267363B1 KR1020110130096A KR20110130096A KR101267363B1 KR 101267363 B1 KR101267363 B1 KR 101267363B1 KR 1020110130096 A KR1020110130096 A KR 1020110130096A KR 20110130096 A KR20110130096 A KR 20110130096A KR 101267363 B1 KR101267363 B1 KR 101267363B1
Authority
KR
South Korea
Prior art keywords
mold
pipe
cylinder
hole
fixing
Prior art date
Application number
KR1020110130096A
Other languages
Korean (ko)
Inventor
김재웅
Original Assignee
주식회사 승일실업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 승일실업 filed Critical 주식회사 승일실업
Priority to KR1020110130096A priority Critical patent/KR101267363B1/en
Application granted granted Critical
Publication of KR101267363B1 publication Critical patent/KR101267363B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D28/00Shaping by press-cutting; Perforating
    • B21D28/24Perforating, i.e. punching holes
    • B21D28/28Perforating, i.e. punching holes in tubes or other hollow bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • B23Q3/02Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
    • B23Q3/06Work-clamping means
    • B23Q3/062Work-clamping means adapted for holding workpieces having a special form or being made from a special material
    • B23Q3/064Work-clamping means adapted for holding workpieces having a special form or being made from a special material for holding elongated workpieces, e.g. pipes, bars or profiles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/02Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby of table type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26FPERFORATING; PUNCHING; CUTTING-OUT; STAMPING-OUT; SEVERING BY MEANS OTHER THAN CUTTING
    • B26F1/00Perforating; Punching; Cutting-out; Stamping-out; Apparatus therefor
    • B26F1/02Perforating by punching, e.g. with relatively-reciprocating punch and bed

Abstract

PURPOSE: A worktable for continuously perforating a pipe of a handrail pole is provided to continuously perforate multiple holes while maintaining a constant interval by mounting a pipe with a server motor into equipment for inputting and outputting. CONSTITUTION: A worktable for continuously perforating a pipe of a handrail pole comprises a lead screw(50), a cylinder table(10), a cylinder, a punching die, a lower mold(200) for supporting perforation, an upper mold(80), and a connection rod(70) for fixing the lower mold. The upper mold includes multiple punching holes while corresponding to a penetration hole of the lower mold. One side of the connection rod for fixing the lower mold is connected to a connection groove formed on one side end portion of the lower mold. The other side of the connection rod for fixing the lower mold is connected to a fixed bracket(72).

Description

Handrail pipe continuous work bench {pipe for balcony balustrade}
The present invention relates to a railing pipe continuous drilling work platform, the upper and lower molds for pipe drilling on the press, and the pipe equipped with the server motor can be installed in the draw-out equipment to perform a plurality of holes in a continuous operation. Handrail pipe continuous perforated workbench.
In general, balcony balconies are equipped with safety railings to prevent users from falling if they use the balcony. Conventional safety railings are installed between the balcony wall incisions, and the safety railings consist of a structure in which the vertical members and the horizontal members are fixed to the balcony walls. Often produced. In addition, each connection part is welded to combine the two metal materials, so the manufacturing cost increases and the welding part is weak, there is a problem that the corrosion occurs.
Conventional balustrade pipes have a problem in that they cannot maintain a constant gap on long pipes and cannot work on a plurality of holes continuously.
The present invention is to improve the conventional problems, the upper and lower molds for pipe drilling on the press and the server equipped with the motor motor to the installation for the draw-out equipment that can work to drill a plurality of holes continuously Its purpose is to provide a railing pipe continuous drilling platform.
The present invention is a handrail pipe continuous perforating work platform that can work to drill a plurality of holes continuously by mounting the upper mold and the lower mold for pipe drilling on the press and the pipe equipped with the server motor in the draw-out facility. The mold is formed of a plurality of pieces so that the inner surface of the perforated portion of the pipe can be supported at the moment when the outer surface of the perforated portion of the pipe is hit by the punching tool of the upper mold while being inserted into the inside of the pipe.
The present invention is a handrail pipe that can be installed in the press for the pipe punching mold and the server equipped with the motor motor to the draw-out equipment to maintain a constant distance to the long length pipe and to drill a plurality of holes continuously Continuous perforation work bench.
1 is a perspective view showing a pipe manufactured in the present invention.
Figure 2 is a cross-sectional view showing a pipe manufactured in the present invention.
3 is a cross-sectional view showing a handrail pipe continuous drilling work platform of the present invention.
Figure 4 is a cross-sectional view showing a handrail pipe continuous drilling work platform of the present invention.
5 is a cross-sectional view showing a handrail pipe continuous drilling work platform of the present invention.
Figure 6 is an exploded perspective view showing a lower mold in the handrail pipe perforating workbench of the present invention.
7 is a plan view showing a handrail pipe continuous perforating workbench of the present invention.
8 is a cross-sectional view showing a handrail pipe continuous drilling work platform of the present invention.
In the present invention, the thread 52 is formed on the surface, one end of the lead screw 50 is connected to the server motor 40 fixed to one side of the work table 300, and the lower end of the cylinder table 10 Lead screw 50 is rotated in accordance with the operation of the server motor 40 in a state in which the thread 52 is inserted into the thread through-hole 12 formed in the; The threaded through hole 12 is formed at the lower portion of the cylinder table 10, and the lead screw 50 is connected to the screwed through hole 12 with the thread 52 of the lead screw 50 inserted thereinto. The cylinder table 10 is connected to the upper portion, the cylinder table 10 is moved in the left and right directions by the rotation of the lead screw (50); It is connected to the upper part of the cylinder table 10 in a state of being inserted into the cylinder support 24, the cylinder upper plate 22 is connected to the upper portion of the cylinder 20, the cylinder below one edge of the cylinder upper plate 22 A cylinder 20 moving upward and downward in a state in which the fixing pin 30 protrudes; Worktable 300 so that the pipe 100 can be fixed to the upper surface of the punching die 60 with the cylinder fixing pin 30 inserted into the pin fixing through hole 102 formed at one end of the pipe 100. The punching die 60 is installed in a fixed state with a plurality of external guides 90 at the central portion of the through hole, and the perforation of the lower mold 200 so that the perforated pieces 120 of the pipe 100 can be discharged downward. A punching die 60 in which a plurality of through holes 62 are formed in a vertical direction in a state corresponding to the sphere 202; The inside of the perforated 110 part of the pipe 100 at the moment when the outer surface of the perforated 110 part of the pipe 100 is hit by the punching hole 82 of the upper mold 80 while being inserted into the inside of the pipe 100. It is installed on the upper side of the punching die 60 so that the surface can be supported, the lower hole for supporting perforations formed with a plurality of through-holes 202 in a vertical direction in a state corresponding to the punching holes 82 of the upper mold 80 Mold 200; An upper mold 80 installed at an upper portion of the lower mold 200 and having a plurality of punching holes 82 formed in a state corresponding to the through hole 202 of the lower mold 200; And one end of the connecting rod 70 is connected to the connecting groove 206 formed at one end of the lower mold 200, and the other end of the connecting rod 70 is connected to the fixing bracket 72. It relates to a handrail pipe continuous perforating workbench characterized by consisting of (70).
In the workbench of the present invention, the lower mold is inserted into the inside of the pipe 100, and the punching hole 82 of the upper mold 80 is hit by the outer surface of the perforated 110 portion of the pipe 100 at the time of the pipe ( It is formed of a plurality of pieces so that the inner surface of the perforated 110 portion of the 100 is supported, a connection groove 206 is formed at one end of the piece piece, pin fixing holes on both sides of the connection groove 206 208 is formed, connecting projections 204 are formed at the other end of the piece piece, pin fixing holes 208 are formed on both sides of the connecting projections 204, pin fixing holes 208 It characterized in that the plurality of pieces are connected to the fixing pin 209 is inserted into. In addition, in the workbench of the present invention, the lower mold is characterized in that 3 to 7 pieces.
The present invention is a handrail pipe continuous perforating workbench for manufacturing a pipe as shown in Figs. As shown in Figure 3 to 8 the present invention is a handrail pipe continuous perforating workbench for manufacturing a continuous perforated pipe by mounting a pipe perforation mold to the press and mounting the pipe with the motor motor 40 to the draw-out equipment.
In the present invention, the upper mold 80 is the same as a general known mold and the lower mold 200 is separated from the main body by a punching die 60 to be connected to the lower mold fixing connecting rod 70 to be fixed to the outside of the mold. . In the present invention, the punching die 60 is separated from the lower mold 200 so that the pipe 100 is located at the top.
3 to 5 in the present invention, the punching die 60 punches the pipe 100 with the cylinder fixing pin 30 inserted into the pin fixing through hole 102 formed at one end of the pipe 100. In order to be fixed to the upper surface of the die 60, the punching die 60 is installed in a fixed state with a plurality of external guides 90 at the central portion of the work table 300, and the perforated pieces of the pipe 100 ( A plurality of through holes 62 are formed in the vertical direction in a state corresponding to the through holes 202 of the lower mold 200 so that the 120 may be discharged downward.
3 to 5, in the present invention, the lower mold fixing connecting rod 70 is connected to a connecting groove 206 formed at one end of the lower mold 200 at one end of the connecting rod 70 and the connecting rod 70. The other end of is connected to the fixing bracket (72).
3 to 5, the present invention secures the long pipe 100 to the draw-out workbench and the lower mold 200 is inserted into the inside of the pipe 100 after the press is operated at a predetermined interval to the pipe 100 It is a handrail pipe continuous perforation workbench is a continuous perforation 110 is formed.
In the present invention, as shown in FIG. 8, the lead screw 50 has a thread 52 formed on the surface thereof, and one end of the lead screw 50 is connected to the server motor 40 fixed to one side of the worktable 300. It is rotated according to the operation of the server motor 40 in a state in which the thread 52 is inserted into the thread through hole 12 formed in the lower portion of the cylinder table 10.
In the present invention, as shown in Figure 8, the cylinder table 10 has a threaded through hole 12 formed at the lower portion of the cylinder table 10, the thread 52 of the lead screw 50 in the threaded through hole 12 The lead screw 50 is connected in the inserted state, the cylinder 20 is connected to the upper portion, and is moved in the left and right directions by the rotation of the lead screw 50.
In addition, the cylinder 20 in the present invention as shown in Figure 8 is connected to the upper portion of the cylinder table 10 in a state inserted into the cylinder support 24, the cylinder upper plate 22 is connected to the upper portion of the cylinder 20 The cylinder pin 10 is moved upward and downward in a state in which the cylinder fixing pin 30 protrudes below one edge of the cylinder upper plate 22.
3 to 5 in the present invention, the upper mold 80 is installed on the upper portion of the lower mold 200, a plurality of punching holes 82 in a state corresponding to the through-hole 202 of the lower mold 200 ) Is formed.
3 to 5 in the present invention, the lower mold 200 for perforating support is punched in the punching hole 82 of the upper mold 80 in the state inserted into the inside of the pipe 100 (110) The upper surface of the punching die 60 is installed so that the inner surface of the perforated 110 portion of the pipe 100 can be supported at the moment when the outer surface of the portion is hit, and corresponds to the punching hole 82 of the upper mold 80. In the above state, a plurality of through holes 202 are formed in the vertical direction.
In the present invention, as shown in Figure 6, the lower mold 200 for perforation support is outside the perforated 110 portion of the pipe 100 by the punching holes 82 of the upper mold 80 in the state inserted into the inside of the pipe 100. It is formed of a plurality of pieces (210, 220, 230, 240, 250) so that the inner surface of the perforated 110 portion of the pipe 100 at the moment when the surface is hit, the connection groove 206 at one end of the piece Is formed, pin fixing holes 208 are formed at both sides of the connecting groove 206, and connecting protrusions 204 are formed at the other end of the piece, and both side surfaces of the connecting protrusions 204 are formed. The pin fixing hole 208 is formed in the plurality of pieces (210, 220, 230, 240, 250) is connected to the fixing pin 209 is inserted into the pin fixing hole 208.
In the present invention, as shown in Figure 6, the lower mold for supporting perforations 200, piece pieces (210, 220, 230, 240, 250) is preferably three to seven, a plurality of perforations 110 by one perforation at the same time It is formed and the continuous perforation is made automatically by repeating the recovery according to the length of the pipe (100). The pipe 100 after the work is completed can be continuously drilled by the cylinder in the vertical direction to move away from the pipe and the repetitive work by the electric control device.
10: cylinder table 20: cylinder
30: cylinder fixing pin 40: server motor
60: punching die 61: fixed bolt
64: perforated scrap collecting part 66: outlet
300: work bench 310: support portion

Claims (3)

  1. A thread 52 is formed on the surface, and one end of the lead screw 50 is connected to the server motor 40 fixed to one side of the worktable 300, and the thread formed at the lower portion of the cylinder table 10. Lead screw 50 is rotated in accordance with the operation of the server motor 40 in a state in which the thread 52 is inserted into the through hole 12;
    The threaded through hole 12 is formed at the lower portion of the cylinder table 10, and the lead screw 50 is connected to the screwed through hole 12 with the thread 52 of the lead screw 50 inserted thereinto. The cylinder table 10 is connected to the upper portion, the cylinder table 10 is moved in the left and right directions by the rotation of the lead screw (50);
    It is connected to the upper part of the cylinder table 10 in a state of being inserted into the cylinder support 24, the cylinder upper plate 22 is connected to the upper portion of the cylinder 20, the cylinder below one edge of the cylinder upper plate 22 A cylinder 20 moving upward and downward in a state in which the fixing pin 30 protrudes;
    Worktable 300 so that the pipe 100 can be fixed to the upper surface of the punching die 60 with the cylinder fixing pin 30 inserted into the pin fixing through hole 102 formed at one end of the pipe 100. The punching die 60 is installed in a fixed state with a plurality of external guides 90 at the central portion of the through hole, and the perforation of the lower mold 200 so that the perforated pieces 120 of the pipe 100 can be discharged downward. A punching die 60 in which a plurality of through holes 62 are formed in a vertical direction in a state corresponding to the sphere 202;
    The inside of the perforated 110 part of the pipe 100 at the moment when the outer surface of the perforated 110 part of the pipe 100 is hit by the punching hole 82 of the upper mold 80 while being inserted into the inside of the pipe 100. It is installed on the upper side of the punching die 60 so that the surface can be supported, the lower hole for supporting perforations formed with a plurality of through-holes 202 in a vertical direction in a state corresponding to the punching holes 82 of the upper mold 80 Mold 200;
    An upper mold 80 installed at an upper portion of the lower mold 200 and having a plurality of punching holes 82 formed in a state corresponding to the through hole 202 of the lower mold 200; And
    One end of the connecting rod 70 is connected to the connecting groove 206 formed at one end of the lower mold 200, and the other end of the connecting rod 70 is connected to the fixing bracket 72 for the lower mold fixing connecting rod ( Handrail pipe continuous perforating work platform characterized in that consisting of 70).
  2. The pipe of claim 1, wherein the lower mold is inserted into the pipe 100 and the moment the outer surface of the perforated 110 portion of the pipe 100 is hit by the punching hole 82 of the upper mold 80. It is formed of a plurality of pieces so that the inner surface of the perforated 110 part of the 100 can be supported, the connection groove 206 is formed at one end of the piece piece, pin fixing on both sides of the connection groove 206 The hole 208 is formed, the connecting projection 204 is formed at the other end of the piece piece, the pin fixing hole 208 is formed on both sides of the connecting projection 204, the pin fixing hole 208 Handrail pipe continuous perforating workbench, characterized in that a plurality of pieces are connected to the fixing pin 209 is inserted into the).
  3. The handrail pipe continuous perforating platform according to claim 1, wherein the lower mold has three to seven pieces.













KR1020110130096A 2011-12-07 2011-12-07 Pipe for balcony balustrade KR101267363B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110130096A KR101267363B1 (en) 2011-12-07 2011-12-07 Pipe for balcony balustrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110130096A KR101267363B1 (en) 2011-12-07 2011-12-07 Pipe for balcony balustrade

Publications (1)

Publication Number Publication Date
KR101267363B1 true KR101267363B1 (en) 2013-05-24

Family

ID=48666836

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110130096A KR101267363B1 (en) 2011-12-07 2011-12-07 Pipe for balcony balustrade

Country Status (1)

Country Link
KR (1) KR101267363B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103978095A (en) * 2014-05-08 2014-08-13 曾冰 Punching equipment for hollow tube/pipe
CN104624779A (en) * 2015-01-16 2015-05-20 佛山市固高自动化技术有限公司 Pipe punching machine
KR20170018676A (en) 2015-08-10 2017-02-20 주식회사 산돌기업 Square pipe hole processing apparatus

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100886881B1 (en) 2008-02-05 2009-03-04 김재영 Manufacturing apparatus of pipe with branch joint, manufacturing method and pipe with branch joint using thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100886881B1 (en) 2008-02-05 2009-03-04 김재영 Manufacturing apparatus of pipe with branch joint, manufacturing method and pipe with branch joint using thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103978095A (en) * 2014-05-08 2014-08-13 曾冰 Punching equipment for hollow tube/pipe
CN104624779A (en) * 2015-01-16 2015-05-20 佛山市固高自动化技术有限公司 Pipe punching machine
KR20170018676A (en) 2015-08-10 2017-02-20 주식회사 산돌기업 Square pipe hole processing apparatus

Similar Documents

Publication Publication Date Title
KR101085015B1 (en) Apparatus for manufacturing a Bus-Bar
KR100983448B1 (en) Punching press die for pipe
CN207057386U (en) A kind of continuous punch forming device for heavy-gauge sheeting punching operation
CN207386635U (en) A kind of pin processing perforating device
CN102689037B (en) Conical arc plate drilling clamp tool
CA2447396A1 (en) Elevator hoist machine installation apparatus
CN201960384U (en) Clamp tool for drilling conical arc plate
US8827604B1 (en) Hole saw apparatus
JP3174215U (en) Drilling jig
CN107537922A (en) A kind of hardware perforating mechanism
CN201446188U (en) Distance adjustable punching device
CN203109297U (en) Electric drill auxiliary hole puncher
CN105298113B (en) Combined type adjustable formwork reinforces back cord device
CN105332352A (en) On-site protection guardrail for repairing outdoor electrical equipment
CN204277324U (en) PCB abnormity welding tooling
CN105414609A (en) Main shaft device for PCB double-bit drilling machine
CN205309382U (en) Many specifications of diplopore formula automatic switch -over door and window section bar drilling equipment
CN201880966U (en) Movable drilling jig device
US10480200B2 (en) Double floor member
KR101056469B1 (en) Bus Bar Processing Equipment
CN103862235A (en) Production method of cantilever beam track of self-elevating drilling platform
CN205382615U (en) Adjustable cable suspension device of roof installation usefulness is decorated to large -span
CN204584326U (en) A kind of automatic drilling machine
CN205551699U (en) Spark -erosion perforating machine with pierce through detection function
WO2016049667A1 (en) Drilling jig having integrated drilling-dust suctioning

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160120

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180410

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190410

Year of fee payment: 7