KR101194300B1 - Method for assembling offshore structure - Google Patents

Method for assembling offshore structure Download PDF

Info

Publication number
KR101194300B1
KR101194300B1 KR1020100105674A KR20100105674A KR101194300B1 KR 101194300 B1 KR101194300 B1 KR 101194300B1 KR 1020100105674 A KR1020100105674 A KR 1020100105674A KR 20100105674 A KR20100105674 A KR 20100105674A KR 101194300 B1 KR101194300 B1 KR 101194300B1
Authority
KR
South Korea
Prior art keywords
spar
barge
spa
top plate
support pillars
Prior art date
Application number
KR1020100105674A
Other languages
Korean (ko)
Other versions
KR20120044412A (en
Inventor
박찬후
김병우
유영목
Original Assignee
삼성중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성중공업 주식회사 filed Critical 삼성중공업 주식회사
Priority to KR1020100105674A priority Critical patent/KR101194300B1/en
Publication of KR20120044412A publication Critical patent/KR20120044412A/en
Application granted granted Critical
Publication of KR101194300B1 publication Critical patent/KR101194300B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/02Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs

Abstract

본 발명은 해양구조물 조립방법이 개시된다. 본 발명의 일 측면에 따른 해양구조물 조립방법은, 복수개의 지지기둥이 결합된 스파(SPAR) 바디부를 해양에 부유시키고 복수개의 지지기둥의 일부가 해수면(吃水線) 상측으로 돌출되도록 복수개의 지지기둥이 결합된 스파 바디부를 수직하게 해수면 아래로 침수시켜 해저에 고정된 복수개의 케이블에 고정시키는 제 1 단계와, 바지선에 시추시설물을 설치한 스파(SPAR) 상판을 적재하여 해양으로 이동시키고, 복수개의 지지기둥 사이로 시추시설물을 설치한 스파 상판을 적재한 바지선을 진입시키는 제 2 단계와, 스파 상판을 적재한 바지선을 침수시켜 시추시설물이 설치된 스파 상판을 복수개의 지지기둥에 안착시키는 제 3 단계와, 시추시설물이 설치된 스파 상판과 복수개의 지지기둥을 체결하는 제 4 단계를 포함한다.The present invention discloses a method for assembling offshore structures. According to an aspect of the present invention, there is provided a method for assembling an offshore structure, comprising: a plurality of support columns such that a spar body portion coupled with a plurality of support pillars is suspended in the ocean, and a portion of the plurality of support pillars protrudes above the sea surface. The first step is to immerse the combined spa body portion vertically below the sea surface to be fixed to a plurality of cables fixed to the seabed, and to move to the sea by loading a spar (SPAR) plate installed with a drilling facility on the barge A second step of entering a barge loaded with the spa tops installed with the drilling facilities between the support columns; and a third step of submerging the barge loaded with the spa tops to seat the spa tops with the drilling facilities installed on the plurality of support columns; And a fourth step of engaging the plurality of support columns with the spa top plate on which the drilling facilities are installed.

Description

해양구조물 조립방법{Method for assembling offshore structure}Method for assembling offshore structure

본 발명은 조립방법에 관한 것으로서, 보다 상세하게는 해양구조물 조립방법에 관한 것이다.The present invention relates to a method for assembling, and more particularly, to a method for assembling offshore structures.

일반적으로 해양구조물은 다양하게 형성될 수 있다. 이때, 해양구조물은 석유 또는 천연가스 등을 시추하는 다양한 구조물을 포함할 수 있다.In general, offshore structures may be formed in various ways. In this case, the marine structure may include various structures for drilling oil or natural gas.

특히 석유 또는 천연가스 등을 시추하는 해양구조물의 경우 조립과정에서 발생하는 조립시간 및 조립비용은 해양구조물의 생산성에 큰 영향을 미친다. 따라서 해양구조물을 얼마나 적은 비용으로 신속하게 조립하느냐가 중요하다. In particular, in the case of offshore structures drilling oil or natural gas, the assembly time and assembly cost incurred during assembly have a great influence on the productivity of offshore structures. It is therefore important to quickly assemble offshore structures at low cost.

한편, 해양구조물을 조립하는 과정에서 다양한 시설물이 활용된다. 특히 해양구조물의 상판을 조립하는 경우 해상크레인을 사용하는 것이 일반적이다. 이때, 해상크레인을 활용하는 경우, 상판을 선박 등으로 예인하거나 선박에 적재하여 운반한다. 운반된 상판은 해상크레인으로 들어올려 해양구조물을 조립한다. Meanwhile, various facilities are utilized in assembling offshore structures. In particular, it is common to use offshore cranes when assembling the tops of offshore structures. At this time, in the case of utilizing the marine crane, the top plate is towed by a ship or the like or loaded on the ship and transported. The transported tops are lifted by offshore cranes to assemble offshore structures.

그러나 상기와 같은 방법은 해상크레인을 활용하기 위하여 상판을 선박에 적재하므로 많은 시간과 비용이 소요되었다. 또한, 해상의 날씨 등에 의하여 상판을 운반하지 못하거나 해상크레인을 활용하지 못하는 경우 많은 시간과 비용이 소요된다. However, the above method loads the top plate in the ship in order to take advantage of the marine crane was a lot of time and cost. In addition, when the top board cannot be transported or the sea crane cannot be utilized due to the sea weather, it takes a lot of time and money.

본 발명의 실시예들은 해양구조물의 조립비용 및 조립시간을 절감할 수 있는 해양구조물 조립방법을 제공하고자 한다.Embodiments of the present invention are to provide a marine structure assembly method that can reduce the assembly cost and assembly time of offshore structures.

본 발명의 일 측면에 따르면, 복수개의 지지기둥이 결합된 스파(SPAR) 바디부를 해양에 부유시키고 상기 복수개의 지지기둥의 일부가 해수면(吃水線) 상측으로 돌출되도록 상기 복수개의 지지기둥이 결합된 상기 스파 바디부를 수직하게 해수면 아래로 침수시켜 해저에 고정된 복수개의 케이블에 고정시키는 제 1 단계와, 바지선에 시추시설물을 설치한 스파(SPAR) 상판을 적재하여 해양으로 이동시키고, 상기 복수개의 지지기둥 사이로 상기 시추시설물을 설치한 상기 스파 상판을 적재한 상기 바지선을 진입시키는 제 2 단계와, 상기 스파 상판을 적재한 상기 바지선을 침수시켜 상기 시추시설물이 설치된 상기 스파 상판을 상기 복수개의 지지기둥에 안착시키는 제 3 단계와, 상기 시추시설물이 설치된 상기 스파 상판 및 상기 복수개의 지지기둥을 체결하는 제 4 단계를 포함하는 해양구조물 조립방법을 제공할 수 있다.According to an aspect of the present invention, a plurality of support columns are coupled to a plurality of support columns are coupled to the floating (SPAR) body portion in the ocean and a portion of the plurality of support pillars protrude above the sea surface (吃水線) The first step of fixing the spa body vertically below the sea surface to be fixed to a plurality of cables fixed to the sea floor, and the SPAR (top plate) installed with the drilling facility on the barge is loaded to move to the sea, the plurality of support A second step of entering the barge carrying the spa top plate with the drilling facility installed between the pillars; and flooding the barge carrying the spa top plate with the spar top installed with the drilling facility to the plurality of support columns. A third step of seating and fastening the spar top plate and the plurality of support pillars on which the drilling facility is installed; May provide a method for assembling offshore structures comprising the fourth step.

또한, 상기 복수개의 지지기둥 사이의 폭은 상기 바지선의 폭보다 크게 형성될 수 있다.In addition, the width between the plurality of support pillars may be formed larger than the width of the barge.

또한, 해수면으로부터 상기 스파 바디부의 최상단까지의 깊이는 상기 해수면으로부터 상기 침수된 바지선의 최하단까지의 깊이보다 깊을 수 있다.In addition, the depth from the sea level to the top end of the spa body portion may be deeper than the depth from the sea level to the bottom end of the submerged barge.

또한, 상기 제 1 단계전에 육상 작업장에서, 상기 스파 바디부와 상기 복수개의 지지기둥을 결합하고, 상기 시추시설물을 상기 스파 상판에 설치하는 단계와, 상기 복수개의 지지둥이 결합된 상기 스파바디부와, 상기 시추시설물이 설치된 상기 스파 상판을 바지선에 적재하여 해양으로 이동시키는 단계를 더 포함할 수 있다.In addition, in the land workshop before the first step, the spa body portion and the plurality of support pillars are coupled, the drilling facility is installed on the spar top plate, and the plurality of support body coupled to the spa body portion and The method may further include loading the spa top plate provided with the drilling facility on a barge and moving it to the sea.

본 발명의 실시예들에 따른 해양구조물 조립방법은 해양구조물의 조립비용 및 조립시간을 절감할 수 있다. Offshore structure assembly method according to embodiments of the present invention can reduce the assembly cost and assembly time of the offshore structure.

또한, 본 발명의 실시예들에 따른 해양구조물 조립방법은 신속하게 해양구조물을 조립하므로 해양구조물의 생산성을 향상시킬 수 있다. In addition, the offshore structure assembly method according to the embodiments of the present invention can quickly assemble the offshore structure, thereby improving the productivity of the offshore structure.

도 1은 본 발명의 일 실시예에 따른 해양구조물 조립과정을 보여주는 조립순서도이다.
도 2는 도 1에 도시된 해양구조물 조립과정을 보여주는 순서도이다.
1 is an assembly flow diagram showing a process of assembling offshore structures according to an embodiment of the present invention.
FIG. 2 is a flowchart illustrating a process of assembling an offshore structure shown in FIG. 1.

도 1은 본 발명의 일 실시예에 따른 해양구조물 조립과정을 보여주는 조립순서도이다. 도 2는 도 1에 도시된 해양구조물 조립과정을 보여주는 순서도이다.1 is an assembly flow diagram showing a process of assembling offshore structures according to an embodiment of the present invention. FIG. 2 is a flowchart illustrating a process of assembling an offshore structure shown in FIG. 1.

도 1 및 도 2를 참고하면, 해양구조물(미도시)은 해양에 부유하여 원유 또는 천연가스 등을 시추한다. 이때, 상기 해양구조물은 다양한 형태로 형성될 수 있다. 1 and 2, offshore structures (not shown) are suspended in the sea to drill crude oil or natural gas. In this case, the marine structure may be formed in various forms.

예를 들면, 상기 해양구조물은 스파(SPAR, 100)를 포함할 수 있다. 또한, 상기 해양구조물은 티엘피(TLP, Tension Leg Platform)를 포함할 수 있다. For example, the marine structure may include a spa (SPAR) 100. In addition, the marine structure may include TLP (Tension Leg Platform).

이하에서는 설명의 편의를 위하여 상기 해양구조물이 스파(100)인 경우를 설명한다. Hereinafter, a case in which the marine structure is a spar 100 for convenience of description.

스파(100)는 해양에 부유하는 스파 바디부(130)를 포함한다. 스파 바디부(130)는 해수면(海水面)의 아래에 배치될 수 있다. 이때, 스파 바디부(130)의 내측에는 정공이 형성될 수 있다. The spar 100 includes a spa body 130 that floats in the ocean. The spa body 130 may be disposed below the sea surface. In this case, holes may be formed inside the spa body 130.

또한, 스파 바디부(130)는 내측에 형성되는 발라스트 시스템(Ballasting system)을 구비할 수 있다. 상기 발라스트 시스템은 스파(100)가 가동 중에 해수면의 높이에 따라 해수면으로부터 후술할 스파 상판(110)까지의 거리를 제어할 수 있다. In addition, the spa body 130 may include a ballasting system (Ballasting system) formed on the inside. The ballast system may control the distance from the sea surface to the spar top plate 110, which will be described later, according to the height of the sea surface while the spar 100 is operating.

한편, 스파(100)는 스파 바디부(130)의 일측에 체결되는 복수개의 케이블(140)을 포함할 수 있다. 복수개의 케이블(140)은 타측이 해저의 바닥에 체결될 수 있다. The spar 100 may include a plurality of cables 140 fastened to one side of the spar body 130. The plurality of cables 140 may have the other side fastened to the bottom of the seabed.

복수개의 케이블(140)은 서로 소정간격 이격되도록 배치될 수 있다. 이때, 복수개의 케이블(140)은 균일하게 이격되어 스파 바디부(130)를 고정시킨다. The plurality of cables 140 may be arranged to be spaced apart from each other by a predetermined interval. In this case, the plurality of cables 140 are uniformly spaced to fix the spa body portion 130.

스파(100)는 스파 바디부(130)에 형성되는 복수개의 지지기둥(120)을 포함한다. 복수개의 지지기둥(120)은 서로 소정간격 이격되도록 배치될 수 있다. The spar 100 includes a plurality of support pillars 120 formed in the spar body portion 130. The plurality of support pillars 120 may be disposed to be spaced apart from each other by a predetermined interval.

이때, 복수개의 지지기둥(120)은 각 지지기둥(120) 사이의 거리가 바지선(B)의 폭보다 크게 형성될 수 있다. 또한, 복수개의 지지기둥(120)은 네개로 형성될 수 있다. In this case, the plurality of support columns 120 may be formed to have a distance between the support columns 120 is larger than the width of the barge (B). In addition, the plurality of support pillars 120 may be formed of four.

한편, 스파(100)는 복수개의 지지기둥(120)의 상측에 배치되는 스파 상판(110)을 포함할 수 있다. 스파 상판(110)은 플레이트 형태로 형성될 수 있다. 스파 상판(110)에는 석유 등을 시추할 수 있는 시추시설물(미표기)이 설치될 수 있다. On the other hand, the spar 100 may include a spar top plate 110 disposed above the plurality of support pillars 120. The spar top plate 110 may be formed in a plate shape. Spa top plate 110 may be installed drilling facilities (not shown) that can be drilling oil.

스파 상판(110)은 복수개의 지지기둥(120)과 체결될 수 있다. 이때, 복수개의 지지기둥(120)이 네개로 형성되는 경우, 스파 상판(110)을 보다 효과적으로 지지할 수 있을 뿐 아니라, 해양조건에 따라 스파(100)가 운동하는 경우 스파 상판(110)의 안전성을 확보할 수 있다.The spar top plate 110 may be coupled to the plurality of support pillars 120. At this time, when the plurality of support pillars 120 are formed in four, not only can support the spar top plate 110 more effectively, but also the safety of the spar top plate 110 when the spar 100 moves according to the marine conditions. Can be secured.

한편, 스파 상판(110)은 다양한 방법으로 복수개의 지지기둥(120)과 체결될 수 있다. 예를 들면, 스파 상판(110)은 복수개의 지지기둥(120)과 용접을 통하여 체결될 수 있다. 또한, 스파 상판(110)은 복수개의 지지기둥(120)과 특수한 체결부재(미도시)로 체결될 수 있다. On the other hand, the spar top plate 110 may be fastened to the plurality of support pillars 120 in various ways. For example, the spar top plate 110 may be fastened by welding with a plurality of support columns 120. In addition, the spar top plate 110 may be fastened with a plurality of support pillars 120 and a special fastening member (not shown).

이하에서는 설명의 편의를 위하여 스파 상판(110)이 복수개의 지지기둥(120)과 용접을 통하여 체결되는 경우를 중심으로 설명한다. Hereinafter, for convenience of description, a description will be given of a case where the spar plate 110 is fastened by welding with a plurality of support columns 120.

한편, 스파(100)를 조립하는 과정을 살펴보면, 육상의 작업장에서 스파 바디부(130)와 복수개의 지지기둥(120)을 결합시킨다. 또한, 육상의 작업장에서 스파 상판(110)에 상기 시추시설물을 설치하여 작업을 준비할 수 있다. (S110단계)On the other hand, looking at the process of assembling the spa 100, the spa body portion 130 and a plurality of support pillars 120 in the workplace of the land is coupled. In addition, by installing the drilling facility on the spa top plate 110 in the workplace of the land can be prepared for work. (Step S110)

한편, 상기의 과정이 완료되면, 복수개의 지지기둥(120)이 결합된 스파 바디부(130)를 바지선(B) 등에 적재하여 해양으로 인도한다. 이때, 복수개의 지지기둥(120)이 결합된 스파 바디부(130)는 크레인(미도시) 등을 활용하여 바지선(B)에 안착시킬 수 있다. 또한, 스파 바디부(130) 및 복수개의 지지기둥(120)은 바지선(B)에 용접이나 별도의 체결부재(미도시)에 의하여 고정된 상태로 인도될 수 있다.(S120단계)On the other hand, when the above process is completed, the spa body portion 130 coupled to the plurality of support pillars 120 is loaded on the barge (B) and guided to the sea. At this time, the spar body portion 130 to which the plurality of support pillars 120 are coupled may be seated on the barge B by using a crane (not shown). In addition, the spa body 130 and the plurality of support pillars 120 may be guided in a fixed state by welding or a separate fastening member (not shown) to the barge (B).

바지선(B)에 적재되어 해양으로 인도된 스파 바디부(130) 및 복수개의 지지기둥(120)은 해양에 부유한 후 스파 바디부(130)의 내부에 해수를 유입시킬 수 있다. The spa body portion 130 and the plurality of support pillars 120 which are loaded on the barge B and guided to the sea may float in the sea and then introduce seawater into the spa body portion 130.

스파 바디부(130)에 해수가 공급되면, 복수개의 지지기둥(120)이 결합된 스파 바디부(130)는 해수면에 수직하도록 부유할 수 있다. 따라서 복수개의 지지기둥(120)이 결합된 스파 바디부(130)는 해수면의 아래로 침수될 수 있다. 이때, 스파 바디부(130)는 해수면의 아래로 완전히 침수되고, 복수개의 지지기둥(120)의 일부만이 해수면으로 노출될 수 있다. When seawater is supplied to the spa body 130, the spa body 130 to which the plurality of support pillars 120 are coupled may float to be perpendicular to the sea surface. Therefore, the spa body portion 130 to which the plurality of support pillars 120 are coupled may be submerged below the sea level. At this time, the spa body 130 is completely submerged below the sea surface, only a portion of the plurality of support pillars 120 may be exposed to the sea surface.

한편, 복수개의 지지기둥(120)이 결합된 스파 바디부(130)가 소정 깊이까지 침수하면, 복수개의 지지기둥(120)이 결합된 스파 바디부(130)는 균형을 유지하도록 해저에 고정되는 복수개의 케이블(140)에 결합된다. 이때, 복수개의 케이블(140)은 스파 바디부(130)가 해양으로 인도되기 전에 해저에 일단이 고정되도록 설치될 수 있다.(S130단계) On the other hand, when the spa body portion 130 coupled to the plurality of support pillars 120 submerged to a predetermined depth, the spa body portion 130 coupled to the plurality of support pillars 120 is fixed to the seabed to maintain balance It is coupled to the plurality of cables 140. At this time, the plurality of cables 140 may be installed so that one end is fixed to the seabed before the spa body 130 is guided to the sea.

한편, 상기의 과정이 완료되면, 바지선(B)으로 육지에서 상기 시추시설물이 설치된 스파 상판(110)을 운반한다. 이때, 상기 시추시설물이 설치된 스파 상판(110)도 상기 크레인 등을 활용하여 바지선(B)에 안착시킬 수 있다. On the other hand, when the above process is completed, the bar top (B) carries a spa top plate 110 is installed on the drilling facility on land. At this time, the spar top plate 110 in which the drilling facility is installed may also be seated on the barge B using the crane.

상기 시추시설물이 설치된 스파 상판(110)은 상기에서 설명한 바와 같이 바지선(B)에 용접이나 별도의 체결부재를 통하여 고정될 수 있다. 따라서 스파 상판(110)은 바지선(B)이 해양을 운항하는 동안, 바지선(B)에 견고하게 고정된 상태에서 이동될 수 있다.(S140단계) The spar top plate 110 in which the drilling facility is installed may be fixed to the barge B through welding or a separate fastening member, as described above. Therefore, the spar top 110 may be moved while the barge B is operating in the ocean, while being firmly fixed to the barge B (step S140).

한편, 상기 시추시설물이 설치된 스파 상판(110)을 적재한 바지선(B)을 복수개의 지지기둥(120) 사이로 진입시킨다. 바지선(B)을 진입시킨 후 상기 시추시설물이 설치된 스파 상판(110)을 복수개의 지지기둥(120)과 조립위치를 일치시키도록 바지선(B)을 조정한다.(S150단계) On the other hand, the barge (B) loaded with the spar top plate 110 is installed between the plurality of support pillars 120 is installed. After entering the barge (B) adjusts the barge (B) to match the assembly position of the spar top plate 110 is installed with the drilling facilities 120 and the plurality of support columns (step S150).

이때, 복수개의 지지기둥(120)은 해수면으로부터 노출되는 부분의 높이가 바지선(B)의 높이보다 작을 수 있다. 따라서 바지선(B)이 상기 시추시설물이 설치된 스파 상판(110)을 적재하고 복수개의 지지기둥(120) 사이로 진입하는 경우 상기 시추시설물이 설치된 스파 상판(110)은 복수개의 지지기둥(120)에 간섭되지 않을 수 있다.In this case, the plurality of support pillars 120 may have a height of a portion exposed from the sea surface smaller than the height of the barge (B). Therefore, when the barge B loads the spa top plate 110 in which the drilling facility is installed and enters between the plurality of support pillars 120, the spa top plate 110 in which the drilling facility is installed interferes with the plurality of support pillars 120. It may not be.

상기의 과정이 완료되면, 바지선(B)을 침수시켜 상기 시추시설물이 설치된 스파 상판(110)을 복수개의 지지기둥(120)에 안착시킨다.(S160단계) 이때, 해수면으로부터 스파 바디부(130)의 상단까지의 깊이는 바지선(B)이 침수될 때 바지선(B)의 최하단까지의 깊이보다 크게 깊게 배치될 수 있다. 따라서 바지선(B)이 침수되더라도 스파 바디부(130)의 상단에 바지선(B)의 최하단이 충돌하지 않으므로 작업시 안정성을 확보할 수 있다.When the above process is completed, the bar top (B) is immersed to seat the spar top plate 110 is installed with the drilling facility on a plurality of support pillars 120 (step S160), the spa body portion 130 from the sea surface The depth to the top of the bar may be disposed deeper than the depth to the bottom of the barge (B) when the barge (B) is submerged. Therefore, even when the barge B is submerged, the bottom end of the barge B does not collide with the top of the spa body 130, thereby ensuring stability during operation.

한편, 상기의 과정이 완료되면, 상기 시추시설물이 설치된 스파 상판(110)과 복수개의 지지기둥(120)을 용접을 통하여 접합시킨다.(S170단계)On the other hand, when the above process is completed, the spun upper plate 110 and the plurality of support pillars 120 are installed by the drilling facility is bonded through welding (step S170).

따라서 신속하게 스파(100)를 조립할 수 있다. 또한, 해양구조물 조립방법은 해상크레인(미도시)을 이용하지 않으므로 조립시간 및 조립비용을 절감할 수 있다. 또한, 신속하게 해양구조물을 조립하므로 해양구조물의 생산성을 향상시킬 수 있다. Therefore, the spar 100 can be quickly assembled. In addition, the offshore structure assembly method does not use a marine crane (not shown) can reduce the assembly time and assembly cost. In addition, it is possible to assemble the offshore structure quickly to improve the productivity of the offshore structure.

이상, 본 발명의 실시예에 대하여 설명하였으나, 해당 기술 분야에서 통상의 지식을 가진 자라면 특허청구범위에 기재된 본 발명의 사상으로부터 벗어나지 않는 범위 내에서, 구성 요소의 부가, 변경, 삭제 또는 추가 등에 의해 본 발명을 다양하게 수정 및 변경시킬 수 있을 것이며, 이 또한 본 발명의 권리범위 내에 포함된다고 할 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

100 : 스파
110 : 스파 상판
120 : 지지기둥
130 : 스파 바디부
140 : 케이블
100: spa
110: spa tops
120: support pillar
130: spa body part
140: cable

Claims (4)

복수개의 지지기둥이 결합된 스파(SPAR) 바디부를 해양에 부유시키고 상기 복수개의 지지기둥의 일부가 해수면(吃水線) 상측으로 돌출되도록 상기 복수개의 지지기둥이 결합된 상기 스파 바디부를 수직하게 해수면 아래로 침수시켜 해저에 고정된 복수개의 케이블에 고정시키는 제 1 단계;
바지선에 시추시설물을 설치한 스파(SPAR) 상판을 적재하여 해양으로 이동시키고, 상기 복수개의 지지기둥 사이로 상기 시추시설물을 설치한 상기 스파 상판을 적재한 상기 바지선을 진입시키는 제 2 단계;
상기 스파 상판을 적재한 상기 바지선을 침수시켜 상기 시추시설물이 설치된 상기 스파 상판을 상기 복수개의 지지기둥에 안착시키는 제 3 단계; 및
상기 시추시설물이 설치된 상기 스파 상판과 상기 복수개의 지지기둥을 체결하는 제 4 단계;를 포함하는 해양구조물 조립방법.
The spar body portion coupled with a plurality of support pillars is suspended in the ocean and the spar body portion coupled with the plurality of support pillars is vertically below sea level so that a portion of the plurality of support pillars protrudes above the sea surface. A first step of immersion in the furnace to fix the plurality of cables fixed to the seabed;
A second step of stacking a spar plate having a drilling facility installed on a barge and moving it to the sea, and entering the barge carrying the spar top plate having the drilling facility installed between the plurality of support pillars;
A third step of submerging the barge on which the spar top plate is loaded to seat the spar top plate on which the drilling facility is installed on the plurality of support columns; And
And a fourth step of fastening the spar top plate and the plurality of support pillars on which the drilling facility is installed.
청구항 1에 있어서,
상기 복수개의 지지기둥 사이의 폭은 상기 바지선의 폭보다 크게 형성되는 해양구조물 조립방법.
The method according to claim 1,
And a width between the plurality of support columns is greater than the width of the barge.
청구항 1에 있어서,
해수면으로부터 상기 스파 바디부의 최상단까지의 깊이는 상기 해수면으로부터 상기 침수된 바지선의 최하단까지의 깊이보다 깊은 것을 특징으로 하는 해양구조물 조립방법.
The method according to claim 1,
The depth from the sea level to the top end of the spa body portion is deeper than the depth from the sea level to the bottom end of the submerged barge.
청구항 1에 있어서,
상기 제 1 단계전에
육상 작업장에서, 상기 스파 바디부와 상기 복수개의 지지기둥을 결합하고, 상기 시추시설물을 상기 스파 상판에 설치하는 단계;
상기 복수개의 지지둥이 결합된 상기 스파바디부와, 상기 시추시설물이 설치된 상기 스파 상판을 바지선에 적재하여 해양으로 이동시키는 단계;를 더 포함하는 해양구조물 조립방법.
The method according to claim 1,
Before the first step
In a land workshop, coupling the spar body portion and the plurality of support pillars and installing the drilling facility on the spar top plate;
And loading the spar body portion coupled with the plurality of support columns and the spar top plate on which the drilling facility is installed, onto a barge to move to the ocean.
KR1020100105674A 2010-10-28 2010-10-28 Method for assembling offshore structure KR101194300B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100105674A KR101194300B1 (en) 2010-10-28 2010-10-28 Method for assembling offshore structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100105674A KR101194300B1 (en) 2010-10-28 2010-10-28 Method for assembling offshore structure

Publications (2)

Publication Number Publication Date
KR20120044412A KR20120044412A (en) 2012-05-08
KR101194300B1 true KR101194300B1 (en) 2012-10-24

Family

ID=46264187

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100105674A KR101194300B1 (en) 2010-10-28 2010-10-28 Method for assembling offshore structure

Country Status (1)

Country Link
KR (1) KR101194300B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109094746B (en) * 2018-07-25 2023-09-29 惠生(南通)重工有限公司 Buoyancy tower platform and installation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4217848A (en) 1976-09-11 1980-08-19 Marine Service Gmbh Floating gas liquefaction installation
US5722797A (en) 1996-02-21 1998-03-03 Deep Oil Technology, Inc. Floating caisson for offshore production and drilling
US20020154954A1 (en) 1999-04-30 2002-10-24 Huang Edward W. Floating stability device for offshore platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4217848A (en) 1976-09-11 1980-08-19 Marine Service Gmbh Floating gas liquefaction installation
US5722797A (en) 1996-02-21 1998-03-03 Deep Oil Technology, Inc. Floating caisson for offshore production and drilling
US20020154954A1 (en) 1999-04-30 2002-10-24 Huang Edward W. Floating stability device for offshore platform

Also Published As

Publication number Publication date
KR20120044412A (en) 2012-05-08

Similar Documents

Publication Publication Date Title
CN103052751B (en) The method of the lifter plate of offshore platform and reduction floating offshore platform
KR101713850B1 (en) Jackup rig with length adjustable leg
CN105121270A (en) Floating offshore platform with pontoon-coupled extension plates for reduced heave motion
KR101741523B1 (en) Offshore platform
CN106364633A (en) Semi-submersible type ocean platform and implementation method of optimized heaving effect of semi-submersible type ocean platform
KR20100090991A (en) Semi-submersible structures with a heave damper
KR101194300B1 (en) Method for assembling offshore structure
KR20170035521A (en) Offshore structure installation vessel
AU2011101650A4 (en) Self installing tension leg platform and subsea storage tank
KR100907680B1 (en) Dry and Dry Constructions
US20140072371A1 (en) Platform deck installation and removal method and apparatus
KR101948639B1 (en) Buoyancy apparatus
CN100515858C (en) A method of constructing a semi-submersible vessel using dry dock mating
KR20150137353A (en) An addition buoyancy tank seperate structure of a Semi-submersible
KR101683154B1 (en) Method for manufacturing jack-up platform
KR20150120731A (en) Semi-Submersible marine structure
KR20160007947A (en) Semi-submersible marine structure
KR20150008271A (en) Buoyancy apparatus
KR101973102B1 (en) Semi-submersible offshore platforms with deck box structure
KR20150062509A (en) Anchor supporting structure for Semi submersible Rig
KR101690744B1 (en) Fixed offshore-structure and installation method of the same
KR20160087490A (en) Semi submersible ocean structure
KR20110023857A (en) Mating
KR20170021143A (en) Fixed type offshore structure and install method for recycling semi-submersible fpu and offshore plant having the same
KR20140003860U (en) Lower deck of marine structures for leg mounting equipment

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20191001

Year of fee payment: 8