KR101101182B1 - Top-down method of underground structure - Google Patents

Top-down method of underground structure Download PDF

Info

Publication number
KR101101182B1
KR101101182B1 KR1020110087835A KR20110087835A KR101101182B1 KR 101101182 B1 KR101101182 B1 KR 101101182B1 KR 1020110087835 A KR1020110087835 A KR 1020110087835A KR 20110087835 A KR20110087835 A KR 20110087835A KR 101101182 B1 KR101101182 B1 KR 101101182B1
Authority
KR
South Korea
Prior art keywords
formwork
support
girder
bracket
rack
Prior art date
Application number
KR1020110087835A
Other languages
Korean (ko)
Inventor
정범채
Original Assignee
(주)동하이엔지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)동하이엔지 filed Critical (주)동하이엔지
Priority to KR1020110087835A priority Critical patent/KR101101182B1/en
Application granted granted Critical
Publication of KR101101182B1 publication Critical patent/KR101101182B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS, WEDGES, JOINTS OR JOINTING
    • F16B37/00Nuts or like thread-engaging members

Abstract

PURPOSE: A top-down construction method for an underground structure is provided to support a girder form using a suspension support that is supported by a preconstructed floor frame. CONSTITUTION: A top-down construction method for an underground structure is as follows. The earth under a floor frame(100) preconstructed is excavated. Brackets(120) are installed on exposed columns(110) in the excavated part(102). Girder forms(130) are installed on the brackets to be supported with brackets. A suspension support(140) is installed to support the girders form between the brackets. Decks are installed between the girder forms. Reinforcements are arranged and concrete is placed successively on the girder forms and the decks. The suspension support and the brackets are removed after the curing of the placed concrete.

Description

지하구조물의 역타공법{Top-down method of underground structure}Top-down method of underground structure
본 발명은 복수 층으로 이루어진 지하구조물을 시공하기 위한 지하구조물의 시공방법에 관한 것으로서, 보다 상세하게는 역타공법에 의해 지하구조물을 시공하기 위한 방법에 관한 것이다.The present invention relates to a method for constructing an underground structure for constructing a plurality of underground structures, and more particularly, to a method for constructing an underground structure by a reverse drilling method.
여러 층으로 이루어진 지하구조물을 시공하는 방법은 일반적으로 순타(順打)공법과 역타(逆打))공법으로 나누어진다.The method of constructing a multi-storey underground structure is generally divided into a smooth method and a reverse method.
순타공법은 지상으로부터 흙막이 구조물을 설치하면서 기초계획고까지 지반을 굴토한 후, 맨 아래 지하층에서부터 지하구조물을 축조해 올라가는 방법이다.The netting method is a method of constructing an underground structure from the bottom basement, after excavating the ground to the foundation plan while installing the structure from the ground.
역타공법은 지상으로부터 지하를 향해 1개 층씩 굴토과 동시에 지하구조물을 축조하는 방법이다. Reverse drilling method is a method of constructing underground structures at the same time by excavating one layer from the ground to the basement.
도 1은 종래기술에 따른 지하구조물의 역타공법의 공정도이다.1 is a process chart of the reverse drilling method of the underground structure according to the prior art.
먼저, 도 1의 (a)에 도시된 바와 같이 굴토 작업 후 기둥(10)마다 후 설치될 브라켓(20)을 고정하기 위한 브라켓 고정장치(25)가 설치되며, 도 1의 (b)에 도시된 바와 같이 기둥(10)에 설치된 브라켓 고정장치(25)에 의해 기둥에 브라켓(20)이 설치되며, 도 1의 (c)에 도시된 바와 같이 기둥(10)에 설치된 브라켓(20)과 브라켓(20) 위에 후 설치될 거더용 거푸집(40)을 지지하기 위한 거푸집 지지틀(30)이 설치된다. 거푸집 지지틀(30)은 후 설치될 거더용 거푸집(40)의 전 부분을 지지토록 후 설치될 거더용 거푸집(40)에 대응되는 길이, 폭을 갖도록 이루어진다. 도 1의 (d)에 도시된 바와 같이 설치된 거푸집 지지틀(30) 위에 거더용 거푸집(40)이 설치됨과 동시에 거더용 거푸집(40)들 사이에 데크(deck)(50)들이 설치되며, 다음으로 거더용 거푸집(40) 및 데크(50) 상에 콘크리트(60)가 타설된다.First, as shown in (a) of FIG. 1, a bracket fixing device 25 is installed to fix the bracket 20 to be installed after each pillar 10 after the excavation work, and is illustrated in FIG. As shown in FIG. 1, the bracket 20 is installed on the pillar by the bracket fixing device 25 installed on the pillar 10, and the bracket 20 and the bracket installed on the pillar 10 are illustrated in FIG. 1C. Formwork support frame 30 for supporting the formwork 40 for the girders to be installed later on (20) is installed. Formwork support frame 30 is made to have a length, width corresponding to the girder formwork 40 to be installed after supporting the entire portion of the formwork for girder 40 to be installed later. As shown in (d) of FIG. 1, decks 50 are installed between the girder formwork 40 while the girder formwork 40 is installed on the formwork support frame 30, and then, decks 50 are installed. Concrete 60 is poured onto the formwork 40 and deck 50 for the girder.
도 1의 (e)에 도시된 바와 같이 타설된 콘크리트(60)의 양생 후 기둥(10)에 설치된 브라켓 고정장치(25), 브라켓(20), 거푸집 지지틀(30)을 기둥(10)으로부터 설치 해제하거나 인하하면 도 1의 (f)에 도시된 바와 같이 지하구조물의 1개 층의 바닥 골조(2) 시공이 완료될 수 있다.As shown in (e) of FIG. 1, after the curing of the poured concrete 60, the bracket fixing device 25, the bracket 20, and the formwork support frame 30 installed on the pillars 10 are removed from the pillars 10. When installed or lowered, construction of the bottom frame 2 of one layer of the underground structure can be completed as shown in FIG.
이후, 계속해서 다음 지하층의 골조를 시공하는 경우, 도 1에 도시된 바와 같이 반복해서 작업을 하면 된다. Subsequently, when constructing a frame of the next basement layer continuously, the operation may be repeated as shown in FIG. 1.
그러나, 종래기술에 따른 지하구조물의 역타공법은 다음과 같은 문제점이 지적될 수 있다.However, the following problems can be pointed out in the reverse drilling method of the underground structure according to the prior art.
즉, 거푸집 지지틀(30)이 거더용 거푸집(40)에 대응하는 길이를 갖도록 이루어짐에 따라, 거푸집 지지틀(30)을 이루는 철강 등의 고가의 부자재가 다량 소요된다.That is, as the formwork supporting frame 30 is made to have a length corresponding to the formwork 40 for the girder, a large amount of expensive subsidiary materials such as steel constituting the formwork supporting frame 30 is required.
하여, 거푸집 지지틀(30)의 제작단가가 상당히 높은 편이며, 부피 및 중량이 커 설치 및 해체, 인하시 중장비가 요구되며 시간이 많이 소요되고, 거푸집 지지틀(30)을 받치는 브라켓(20), 브라켓 고정장치(25) 또한 대형, 대중량의 거푸집 지지틀)3-_을 안정적으로 지지하기 위해 동반하여 다량의 고가 부자재에 의해 크고 무겁게 제작될 수밖에 없다.Thus, the production cost of the formwork support frame 30 is quite high, the volume and weight is large, installation and dismantling, heavy equipment is required for installation and dismantling, time-consuming, bracket 20 to support the formwork support frame 30 , Bracket fixing device 25 is also accompanied by a large, heavy formwork support frame (3-) to stably support the large and heavy production by large quantities of subsidiary materials.
또한, 거푸집 지지틀(30) 및 거더용 거푸집(40), 타설 콘크리트(60) 등에 의한 하중이 전부 브라켓(20)을 통해 기둥(10)에 집중되기 때문에, 요구되는 기둥(10)의 스펙(spec) 또한 높아질 수밖에 없다.In addition, since the load by the formwork supporting frame 30, the formwork for the girder 40, the pouring concrete 60, etc. are all concentrated on the column 10 through the bracket 20, the specification of the required column 10 ( spec) is also high.
대한민국 공개특허 10-2010-0100193Republic of Korea Patent Publication 10-2010-0100193
본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서, 선 시공된 바닥 골조에 의해 지지되는 현수식 지지대에 의해 거더용 거푸집을 지지할 수 있도록 이루어진 지하구조물의 역타공법을 제공함을 그 목적으로 한다.The present invention has been made to solve the above problems, and an object of the present invention is to provide an inverted method of underground structure made to support the formwork for girder by a suspension support supported by a pre-installed floor frame. .
상기한 과제를 해결하기 위해 본 발명은 선 시공된 바닥 골조 아래를 굴토하는 굴토단계; 상기 굴토된 부분에 노출된 기둥들에 브라켓(bracket)을 설치하는 브라켓 설치단계; 상기 브라켓들에 의해 지지될 수 있도록 거더용 거푸집을 설치하는 거푸집 설치단계; 상기 선 시공된 바닥 골조에 의해 지지되어 상기 브라켓과 브라켓 사이에서 상기 거더용 거푸집을 받칠 수 있는 현수식(懸垂式) 지지대를 설치하는 현수식 지지대 설치단계; 상기 거더용 거푸집과 거더용 거푸집 사이에 데크(deck)들을 설치하는 데크 설치단계; 상기 거더용 거푸집 및 데크 상에 배근 및 콘크리트 타설에 의해 1개 층의 바닥 골조를 시공하는 콘크리트 작업단계; 상기 타설된 콘크리트 양생 후, 상기 현수식 지지대 및 브라켓을 해체하는 해체단계;를 포함하는 것을 특징으로 하는 지하구조물의 역타공법을 제시할 수 있다.In order to solve the above problems, the present invention is the gulto step to pit under the pre-built floor frame; Bracket installation step of installing a bracket (bracket) on the pillars exposed to the excavated portion; Formwork installation step of installing the formwork for girder to be supported by the brackets; A suspension support installation step of installing a suspension support supported by the pre-installed floor frame to support the formwork for the girder between the bracket and the bracket; A deck installation step of installing decks between the girder formwork and the girder formwork; Concrete working step of constructing the floor frame of one floor by placing the reinforcement and concrete on the girder formwork and deck; After curing the poured concrete, the dismantling step of dismantling the suspended support and the bracket; can present a reverse drilling method of the underground structure comprising a.
상기 현수식 지지대는 상기 거더용 거푸집의 하측에 설치되어 상기 거더용 거푸집을 받치는 랙(rack)이 상기 브라켓과 브라켓 사이에 상호 소정 간격을 유지하도록 복수 설치되거나, 상기 랙이 상호 간격없이 연접되도록 복수 설치될 수 있다.The suspension support is installed on the lower side of the girder formwork, a plurality of racks supporting the girder formwork are installed to maintain a predetermined distance between the bracket and the bracket, or the plurality of racks to be connected without mutual gaps Can be installed.
상기 현수식 지지대는 상기 거더용 거푸집 밑에 설치되어 상기 거더용 거푸집을 받치는 랙(rack) 및, 상기 선 시공된 바닥 골조에 매달릴 수 있도록 설치되어 상기 랙을 지지하는 행거(hanger)를 포함할 수 있다.The suspension support may include a rack installed under the girder formwork to support the girder formwork, and a hanger installed to support the rack to be suspended from the pre-built floor frame. .
상기 랙은 상기 거더용 거푸집의 외측에서 상기 거더용 거푸집의 측벽을 지지하는 거푸집 외측 서포트를 포함할 수 있다.The rack may include a formwork outer support for supporting a sidewall of the formwork for the girder at the outside of the formwork for the girder.
상기 랙의 거푸집 외측 서포트는 상기 거더용 거푸집의 측벽에 밀착될 수 있도록 이루어진 측벽부를 포함하며, 상기 거더용 거푸집 위에 걸쳐지는 데크를 받칠 수 있도록 상기 거더용 거푸집으로부터 상기 데크를 향해 상기 측벽부로부터 돌출 형성된 데크 지지부를 더 포함할 수 있다.The formwork outer support of the rack includes a sidewall portion configured to be in close contact with the sidewall of the girder formwork, and protrudes from the girder formwork toward the deck to support the deck over the girder formwork from the sidewall portion. It may further comprise a formed deck support.
상기 거더용 거푸집 안쪽에 상기 거더용 거푸집의 측벽부를 지지할 수 있도록 거푸집 내측 서포트를 설치할 수 있다.Formwork inner support can be installed inside the girder formwork so as to support the side wall of the girder formwork.
상기 현수식 지지대의 행거는 상기 선 시공된 바닥 골조 위에 안착되는 서포트(support) 및, 상기 랙과 상기 서포트를 연결하는 로드(road)를 포함할 수 있다.The hanger of the suspension support may include a support seated on the pre-built floor frame, and a rod connecting the rack and the support.
상기 로드는 상하 길이 조절 가능토록 이루어질 수 있다.The rod may be made to be adjustable up and down length.
상기 랙은 상기 로드가 상하방향으로 끼워질 수 있도록 로드 홀이 형성되며, 상기 로드는 상기 랙에 탈착 가능토록 결합될 수 있도록 상기 로드 홀에 끼워질 수 있도록 이루어지며 너트가 체결되는 나사산이 형성될 수 있다.The rack is formed with a rod hole so that the rod can be fitted in the vertical direction, the rod is made to be fitted to the rod hole so that the rod can be detachably coupled to the rack and a screw thread to which the nut is fastened to be formed Can be.
또한, 본 발명은 선 시공된 바닥 골조 아래를 굴토하는 굴토단계, 상기 굴토된 부분에 노출된 기둥들에 브라켓(bracket)을 설치하는 브라켓 설치단계, 상기 브라켓들에 의해 지지될 수 있도록 거더용 거푸집을 설치하는 거푸집 설치단계, 상기 브라켓과 브라켓 사이에서 상기 거더용 거푸집을 받칠 수 있도록 현수식(懸垂式) 지지대를 설치하며 선택적으로 상기 거더용 거푸집 안쪽에 상기 거더용 거푸집의 측벽부를 지지할 수 있도록 거푸집 내측 서포트를 설치하는 현수식 지지대 설치단계, 상기 거더용 거푸집과 거더용 거푸집 사이에 데크(deck)들을 설치하는 데크 설치단계, 상기 거더용 거푸집 및 데크 상에 배근 및 콘크리트 타설에 의해 1개 층의 바닥 골조를 시공하는 콘크리트 작업단계, 상기 타설된 콘크리트 양생 후, 상기 현수식 지지대 및 브라켓을 해체하는 해체단계를 포함하며; 상기 현수식 지지대는 상기 거더용 거푸집의 하측에 설치되어 상기 거더용 거푸집을 받치며 상기 브라켓과 브라켓 사이에 상호 소정 간격을 유지하도록 복수 설치되거나 상호 간격없이 연접되도록 복수 설치된 랙(rack) 및, 상기 선 시공된 바닥 골조에 매달릴 수 있도록 설치되어 상기 랙을 지지하는 행거(hanger)를 포함하며; 상기 랙은 상기 거더용 거푸집의 외측에서 상기 거더용 거푸집의 측벽에 밀착될 수 있도록 이루어진 측벽부 및, 상기 거더용 거푸집 위에 걸쳐지는 데크를 받칠 수 있도록 상기 거더용 거푸집으로부터 상기 데크를 향해 상기 측벽부로부터 돌출 형성된 데크 지지부를 포함하며; 상기 행거는 상기 선 시공된 바닥 골조 위에 안착되는 서포트(support) 및, 상기 랙에 형성된 로드 홀에 상하방향으로 끼워져서 상기 랙에 탈착 가능토록 결합될 수 있도록 너트가 체결되는 나사산이 형성되어 상기 랙과 상기 서포트를 연결하며 상하 길이 조절 가능토록 이루어진 로드(road)를 포함하는 것을 특징으로 하는 지하구조물의 역타공법을 함께 제시할 수 있다.In addition, the present invention is the excavation step to excavate under the pre-constructed floor frame, bracket installation step of installing a bracket (bracket) to the pillars exposed to the excavated portion, formwork for the girder to be supported by the brackets Forming step of installing the step, between the bracket and the bracket to install the suspension support to support the formwork for the girder and optionally to support the side wall of the formwork for the girder inside the girder formwork Suspended support installation step for installing the formwork inner support, deck installation step for installing decks between the girder formwork and the formwork for the girder, one layer by reinforcement and concrete placing on the formwork and deck for the girder Concrete working step of constructing the bottom frame of the, after the pour concrete curing, the suspension support and bracket Including the step of dissolution and dissolution; The suspension support is installed on the lower side of the girder formwork to support the formwork for the girder and a plurality of racks or a plurality of racks are installed so as to be connected to each other without a mutual spacing between the bracket and the bracket, and the A hanger, which is installed to be suspended to the pre-installed floor frame and supports the rack; The rack has a side wall portion configured to be in close contact with the side wall of the girder formwork from the outside of the girder formwork, and the side wall portion from the girder formwork to the deck to support the deck over the girder formwork. A deck support protruding therefrom; The hanger has a support (seat) seated on the pre-installed floor frame, and a screw thread is formed is fastened to the rod hole formed in the rack to be coupled to the rack so that the nut can be detachably coupled to the rack And it can be presented together with the reverse drilling method of the underground structure, characterized in that it comprises a road (rod) made to connect the support and adjust the vertical length.
본 발명에 따른 지하구조물의 역타공법은 복수의 현수식 지지대에 의해 거더용 거푸집을 지지하는 방식이기 때문에 다음과 같은 이점을 가질 수 있다.The reverse drilling method of the underground structure according to the present invention can have the following advantages because it is a method of supporting the formwork for girder by a plurality of suspension support.
즉, 각각의 현수식 지지대의 중량이 종래의 거푸집 지지틀보다는 부피가 작고 가벼워 설치 및 해체 작업이 보다 용이하게 신속하며 안정적으로 이루어질 수 있으며, 시공 절차가 간소하며, 공사비가 현격하게 줄어들 수 있다.That is, the weight of each suspension support is smaller and lighter than the conventional formwork support frame, so that the installation and dismantling work can be made more quickly and stably, the construction procedure is simple, and the construction cost can be significantly reduced.
또한, 현수식 지지대들이 브라켓과 브라켓 사이에 서로 소정 간격을 두고 설치됨에 따라, 종래의 거더용 거푸집의 전 길이에 대응하여 이루어진 거푸집 지지틀과 비교해볼 때 철강 등의 부자재가 소량 소요되므로 공사비가 줄어들 수 있다.In addition, as the suspension supports are installed between the brackets and the brackets at a predetermined interval from each other, the construction cost is reduced because a small amount of subsidiary materials such as steel compared to the formwork support frame made corresponding to the entire length of the conventional girder formwork. Can be.
또한, 종래에는 거푸집 지지틀이 브라켓 위에 설치됨에 따라 최소한 거푸집 지지틀의 높이만큼 굴토 작업을 더 실시해야하나, 본 발명은 거푸집 지지틀의 높이만큼 더 굴토작업을 실시하지 않아도 된다.In addition, in the related art, as the formwork supporting frame is installed on the bracket, at least the height of the formwork supporting frame should be further excavated, but the present invention does not need to perform the work further as the height of the formwork supporting frame.
또한, 현수식 지지대를 통해, 거더용 거푸집 및 데크, 배근 타설 콘크리트 등의 하중이 선 시공된 바닥 골조로 분산될 수 있기 때문에, 구조적 안정성이 증대대될 수 있으며, 이에 따라 요구되는 거더용 거푸집, 브라켓의 스펙 또한 줄어들 수 있어 공사비를 줄일 수 있다.In addition, through the suspension support, since the loads such as girder formwork and deck, reinforcement concrete can be distributed to the pre-installed floor frame, structural stability can be increased, according to the required formwork for girder, The specifications of the bracket can also be reduced, which can reduce construction costs.
도 1은 종래기술에 따른 지하구조물의 역타공법의 공정도이다.
도 2 내지 도 8은 본 발명에 따른 지하구조물의 역타공법에 따른 공정도로서,
도 2는 굴토 단계,
도 3은 브라켓 설치 단계,
도 4는 거푸집 설치단계,
도 5는 현수식 지지대 설치단계,
도 6은 데크 설치단계,
도 7은 콘크리트 작업단계,
도 8은 해체단계이다.
도 9는 본 발명에 따른 현수식 지지대 설치 단계 후 평면도.
도 10은 본 발명에 따른 현수식 지지대의 일 실시 예의 모식도.
도 11은 본 발명에 따른 거푸집 내측 서포트의 설치 예를 보여주는 단면도.
1 is a process chart of the reverse drilling method of the underground structure according to the prior art.
2 to 8 is a process chart according to the reverse punching method of the underground structure according to the present invention,
2 is the gulting step,
3 is a bracket installation step,
4 is a formwork installation step,
5 is a suspension support installation step,
6 is a deck installation step,
7 is a concrete working step,
8 is a dismantling step.
9 is a plan view after the installation step of the suspended support according to the invention.
10 is a schematic view of an embodiment of the suspension support according to the present invention.
11 is a sectional view showing an installation example of the formwork inner support according to the present invention.
이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
다만, 본 발명을 설명함에 있어서, 공지된 기능 혹은 구성에 대해 구체적인 설명이 본 발명의 요지를 흩트리지 않도록 하기 위하여 생략하기로 한다. In the following description of the present invention, a detailed description of known functions and configurations will be omitted so as not to obscure the gist of the present invention.
도 2 이하에 도시된 바와 같이, 본 발명에 의한 지하구조물 역타공법은 다음과 같이 이루어질 수 있다.As shown in Figure 2, the underground structure reverse drilling method according to the present invention can be made as follows.
먼저, 도 2에 도시된 바와 같이, 흙막이 구조물 설치 및 기둥(110)들의 설치가 이루어진 상태에서, 선 시공된 바닥 골조(100) 아래를 현 시공할 1개의 지하층의 깊이에 대응하여 굴토한다.First, as shown in FIG. 2, in the state in which the installation of the earthenware structure and the installation of the pillars 110 are made, the bottom of the pre-built bottom frame 100 is excavated corresponding to the depth of one basement layer to be currently constructed.
선 시공된 바닥 골조(100)는 현 시공 대상의 지하층이 지하 1층인 경우 지상 1층의 바닥 골조일 수 있으며, 현 시공 대상의 지하층이 지하 2층 이하인 경우 본 발명에 따른 지하구조물의 역타공법에 의해 선 시공된 지하층의 바닥 골조일 수 있다.The pre-installed floor frame 100 may be the floor frame of the ground floor if the basement floor of the current construction is the first basement, and if the basement floor of the current construction is less than the second floor, the reverse structure of the underground structure according to the present invention. It may be the bottom frame of the basement floor constructed by.
굴토 작업이 이루어지면 현 굴토 작업에 의해 굴토된 부분(102)에 기 설치된 기둥(110)의 일부가 노출될 수 있다.When the gulto work is made, a portion of the pillar 110 pre-installed in the part 102 pitted by the current gulto work may be exposed.
굴토 작업이 완료되면, 먼저 도 3에 도시된 바와 같이, 현 굴토된 부분(102)에 노출된 기둥(110)들에 브라켓(bracket)(120)을 설치한다. 브라켓(120)은 후술할 거더용 거푸집(130)을 받칠 수 있다면 어떠한 구조이든 무방하며, 재활용이 가능토록 브라켓 고정장치 등에 의해 기둥(110)에 해체 가능토록 설치될 수 있다.When the gulting operation is completed, first, as shown in FIG. 3, the bracket 120 is installed on the pillars 110 exposed to the current pitted portion 102. The bracket 120 may have any structure as long as it can support the formwork 130 for the girder to be described later, and may be installed to be disassembled to the pillar 110 by a bracket fixing device so as to be recyclable.
브라켓(120)의 설치 작업이 완료되고 나면, 도 4에 도시된 바와 같이 기둥(110)과 기둥(110)을 연결하는 거더(girder)를 형성하기 위한 거더용 거푸집(130)을 기둥(110)에 설치된 브라켓(120)에 의해 지지될 수 있도록 브라켓(120) 위에 안착시켜 설치한다. After the installation of the bracket 120 is completed, as shown in FIG. 4, the pillars 110 for forming the girder 130 to form a girder connecting the pillars 110 and 110. It is installed by mounting on the bracket 120 to be supported by the bracket 120 installed in.
거더용 거푸집(130)은 거더에 따라 다양하게 설계될 수 있으며, 특히 동출원인의 선 특허출원인 등록번호 10-0954447호를 제시할 수 있다.The girder formwork 130 may be designed in various ways according to the girder, in particular, it can present a patent application No. 10-0954447 of the same applicant.
이때, 거더용 거푸집(130)이 복수인 경우, 모든 브라켓(120)의 설치 작업이 완료된 후 거더용 거푸집(130)의 설치 작업이 실시될 수도 있고, 브라켓(120)의 설치작업과 병행되어 실시될 수도 있다.At this time, in the case where the girder formwork 130 is plural, the installation work of the girder formwork 130 may be performed after the installation work of all the brackets 120 is completed, or performed in parallel with the installation work of the bracket 120. May be
다음으로, 도 5 및 도 9, 도 10에 도시된 바와 같이 브라켓(120)과 브라켓(120) 사이에서 설치된 거더용 거푸집(130)을 받칠 수 있도록 현수식(懸垂式) 지지대(140)를 설치한다. 즉, 현수식 지지대(140)가 브라켓(120)에 의해 직접적으로 지지되지 못하는 브라켓(120)과 브라켓(120) 사이의 거더용 거푸집(130)을 받치도록 설치되어, 거더용 거푸집(130)을 전체에 걸쳐 고르게 브라켓(120)과 함께 지지할 수 있다.Next, as shown in FIGS. 5, 9, and 10, a suspension support 140 is installed to support the formwork 130 for the girder installed between the bracket 120 and the bracket 120. do. That is, the suspension support 140 is installed to support the girder formwork 130 between the bracket 120 and the bracket 120 that is not directly supported by the bracket 120, the girder formwork 130 It can be supported with the bracket 120 evenly throughout.
현수식 지지대(140)는 특히, 거더용 거푸집(130) 밑에 설치되어 거더용 거푸집(130)을 받치는 랙(rack)(200) 및, 선 시공된 바닥 골조(100)에 매달릴 수 있도록 설치되어 랙(200)을 지지하는 행거(210)(hanger)를 포함토록 이루어질 수 있으며, 이에 따라 거더용 거푸집(130) 및 후술할 데크(150), 배근, 타설 콘크리트(160) 등에 의한 하중이 기둥(110)에 집중되지 않고 현수식 지지대(140)를 통해 선 시공된 바닥 골조(100)로 분산될 수 있다.Suspended support 140 is, in particular, the rack is installed under the girder formwork 130 to support the girder formwork 130 (rack) 200, and is installed to be suspended to the pre-installed floor frame 100 rack It may be made to include a hanger (210) (hanger) for supporting the 200, accordingly, the load due to the formwork for the girder 130 and the deck (150), reinforcement, pour concrete 160, etc. to be described later It can be distributed to the floor frame 100 pre-constructed through the suspension support 140 without being concentrated on).
랙(200)은 기본적으로 거더용 거푸집(130) 밑에 배치되어 받치는 베이스(202)를 포함하며, 베이스(202)는 도시된 바와 같이 프레임 구조를 취할 수 있으며, 또는 평판이나 박스 구조 등으로 이루어질 수 있다.The rack 200 basically includes a base 202 disposed under and supported by the formwork 130 for the girder, and the base 202 may take a frame structure as shown, or may be formed of a flat plate or a box structure. have.
아울러, 랙(200)은 거더용 거푸집(130)의 외측에서 거더용 거푸집(130)의 측벽(132)을 지지하는 거푸집 외측 서포트(204)를 더 포함할 수 있다. 따라서, 랙(200)의 거푸집 외측 서포트(204)가 후술할 데크(150)가 올려지는 거더용 거푸집(130)의 측벽(132)을 지지하기 때문에 거더용 거푸집(130)의 파손이 방지될 수 있으며, 이에 따라 랙(200)의 거푸집 외측 서포트(204)에 의한 지지가 없는 경우와 비교해볼 때 거더용 거푸집(130)의 측벽(132)의 두께 등의 스펙(spec)을 줄이는 것이 가능하여 거더용 거푸집(130)의 제조 비용 및 중량 등을 줄일 수 있다.In addition, the rack 200 may further include a formwork outer support 204 for supporting the side wall 132 of the formwork for girders 130 on the outside of the formwork for girders 130. Therefore, since the formwork outer support 204 of the rack 200 supports the side wall 132 of the formwork girder 130 on which the deck 150 to be described later is mounted, breakage of the formwork girder 130 can be prevented. As a result, it is possible to reduce the spec such as the thickness of the side wall 132 of the formwork girder 130 as compared with the case without the support by the formwork outer support 204 of the rack 200. It is possible to reduce the manufacturing cost and weight of the die for 130.
랙(200)의 거푸집 외측 서포트(204)는 다양한 구조로 설계될 수 있으며, 바람직하게는 거더용 거푸집(130)의 측벽에 밀착될 수 있도록 이루어진 측벽부(204a)를 포함하며, 나아가 거더용 거푸집(130) 위에 걸쳐지는 데크(150)를 받칠 수 있도록 거더용 거푸집(130)으로부터 데크(150)를 향해 측벽부(204a)로부터 돌출 형성된 데크 지지부(204b)를 더 포함할 수 있다. 따라서, 랙(200)의 거푸집 외측 서포트(204)가 거더용 거푸집(130)과 함께 데크(150)를 지지할 수 있기 때문에, 데크(150)가 보다 안정적으로 지지될 수 있다. 또한, 데크(150)의 하중이 거더용 거푸집(130)에만 집중되지 않고 랙(200)의 거푸집 외측 서포트(204)를 통해 랙(200)으로 분산될 수 있다. 랙(200)의 거푸집 외측 서포트(204)는 특히 도 5에 도시된 바와 같이, 측벽부(204a)와 데크 지지부(204b)가 'ㄱ'자형 단면 구조를 갖도록 이루어질 수 있다. 랙(200)의 거푸집 외측 서포트(204)는 랙(200)의 베이스(202)와 용접 등에 의해 일체화될 수도 있고, 볼트 체결 등에 의해 탈착 가능토록 결합될 수 있다.The formwork outer support 204 of the rack 200 may be designed in various structures, and preferably includes a sidewall portion 204a configured to be in close contact with the sidewall of the formwork 130 for the girder, and further, the formwork for the girder. It may further include a deck support portion 204b protruding from the side wall portion 204a toward the deck 150 from the girder formwork 130 to support the deck 150 over the (130). Therefore, since the formwork outer support 204 of the rack 200 can support the deck 150 together with the formwork 130 for the girder, the deck 150 can be supported more stably. In addition, the load of the deck 150 may be distributed to the rack 200 through the formwork outer support 204 of the rack 200 without concentrating only on the formwork 130 for the girder. The formwork outer support 204 of the rack 200 may be made such that the side wall portion 204a and the deck support 204b have a '-' cross-sectional structure, in particular as shown in FIG. 5. The formwork outer support 204 of the rack 200 may be integrated with the base 202 of the rack 200 by welding or the like, and may be detachably coupled by bolting or the like.
행거(210)는 선 시공된 바닥 골조(100)에 매달릴 수 있도록 특히, 선 시공된 바닥 골조(100) 위에 안착되는 서포트(support)(212) 및, 랙(200)과 서포트(212)를 연결하는 로드(rod)(214)를 포함할 수 있다. 따라서, 행거(210)를 선 시공된 바닥 골조(100)에 해체 가능토록 결합하기 위해 선 시공된 바닥 골조(100)에 브라켓 등의 별도의 구조물을 추가하지 않아도 된다. Hanger 210 is connected to the support (212) and the rack 200 and the support 212, which is mounted on the pre-installed floor frame 100, in particular, so that it can be suspended on the pre-installed floor frame 100 May comprise a rod 214. Therefore, it is not necessary to add a separate structure such as a bracket to the pre-installed bottom frame 100 in order to be able to disassemble the hanger 210 to the pre-installed bottom frame 100.
행거(210)의 서포트(212)와 로드(214)는 용접 결합 등에 의해 일체화될 수도 있고, 서로 탈착 가능토록 결합될 수 있다. 행거(210)의 로드(214)는 하나의 서포트(212)에 하나씩 구성될 수도 있으나, 도시된 바와 같이 하나의 서포트(212)에 복수 구성되는 것이 보다 바람직할 수 있다.The support 212 and the rod 214 of the hanger 210 may be integrated by welding or the like, or may be coupled to be detachable from each other. The rods 214 of the hanger 210 may be configured in one support 212, but it may be more preferable that a plurality of rods 214 are configured in one support 212 as shown.
행거(210)의 서포트(212)는 도시된 바와 같이 평판으로 이루어질 수 있으며, 필요에 따라 프레임 구조 등 다양하게 실시될 수 있다.The support 212 of the hanger 210 may be formed of a flat plate as shown, and may be variously implemented, such as a frame structure, as necessary.
행거(210)의 로드(214)는 후술하는 바와 같이 콘크리트(160) 양생 후 현수식 지지대(140)의 해체시 시공 완료된 바닥 골조(104)로부터 상하방향으로 걸림없이 빠질 수 있도록 이루어지는 것이 바람직하다. 이를 위해 예컨대 도시된 바와 같이, 행거(210)의 로드(214)는 적어도 시공 완료된 바닥 골조(104)를 관통하는 부분이 소정 형상의 단면(즉, 원형 단면)으로 일정하게 형성될 수 있다.The rod 214 of the hanger 210 is preferably made so that it can be pulled out in the vertical direction from the bottom frame 104 completed when dismantling the suspension support 140 after curing the concrete 160, as described below. To this end, for example, as shown, the rod 214 of the hanger 210 may be formed at least in a predetermined cross-section (ie, circular cross-section) of the predetermined portion of the bottom frame 104 penetrated.
행거(210)의 로드(214)는 시공되는 지하층의 상하방향 높이 변화 등에 따라 길이 조절이 가능토록 이루어질 수 있다. 길이 조절을 위해 행거(210)의 로드(214)는 도시된 바와 같이, 상단이 행거(210)의 서포트에 결합되며 하단에 나사산(s1)이 형성된 제1로드부재(214a) 및, 하단이 랙(200)에 결합되며 상단에 나사산이 형성된 제2로드부재(214b), 제1로드부재(214a)의 하단과 제2로드부재(214b)의 상단이 각각 끼워지면 제1로드부재(214a) 및 제2로드부재(214b)와 나사 체결될 수 있도록 나사산이 형성된 로드 연결부재(214c)를 포함할 수 있다. 따라서, 행거(210)의 로드(214)는, 제1로드부재(214a)와 제2로드부재(214b)가 로드 연결부재(214c)와의 나사 체결에 의해 상호 상하방향으로 얼마만큼 간격이 조절됨에 따라, 로드(214)의 길이 조절이 이루어질 수 있다. 또한 도시하지 않았지만, 행거(210)의 로드(214)는 유압/공압식 실린더 방식에 의해 길이 조절이 이루어질 수 있으며, 또한 제1로드부재(214a)와 제2로드부재(214b)의 직접적인 나사 체결에 의해 길이 조절이 이루어질 수 있으며, 이외에도 다양하게 실시될 수 있다.The rod 214 of the hanger 210 may be made to adjust the length according to the vertical height change of the basement floor to be constructed. Rod 214 of the hanger 210 for adjusting the length, as shown, the first rod member 214a and the bottom is coupled to the support of the hanger 210 and the thread (s1) is formed at the bottom, the bottom rack The first rod member 214a and the second rod member 214b having a screw thread formed at an upper end thereof, the lower end of the first rod member 214a and the upper end of the second rod member 214b, respectively, are fitted thereto. It may include a rod connecting member 214c in which a thread is formed to be screwed to the second rod member 214b. Therefore, the rod 214 of the hanger 210, the first rod member 214a and the second rod member 214b is adjusted by the amount of space in the vertical direction mutually by screwing the rod connecting member 214c, Accordingly, the length adjustment of the rod 214 can be made. In addition, although not shown, the rod 214 of the hanger 210 may be adjusted in length by a hydraulic / pneumatic cylinder method, and also may be directly screwed into the first rod member 214a and the second rod member 214b. Length adjustment can be made by, and may be variously carried out in addition to.
행거(210)의 로드(214), 즉 제2로드부재(214b)의 하단은 용접 결합 등에 의해 랙(200)에 고정될 수도 있고, 도시된 바와 같이 현수식 지지대(140)의 해체가 용이하도록 랙(200)과 탈착 가능토록 결합될 수 있다. 즉, 랙(200), 보다 상세하게는 랙(200)의 베이스(202)에는 로드(214)가 상하방향으로 끼워질 수 있도록 로드 홀(202a)이 형성되며, 로드(214), 보다 상세하게는 제2로드부재(214b)의 하단에는 랙(200)의 로드 홀(202a)에 상하방향으로 끼워진 상태에서 서포트(212)에 일체로 결합되기 위해 너트(216)가 나사 체결될 수 있도록 나사산이 형성될 수 있다. 이때, 너트는 하나의 로드(214)마다 하나씩만 체결될 수도 있고 도시된 바와 같이 더블 너트 방식으로 하나의 로드(214)마다 한 쌍씩 체결될 수 있다.The rod 214 of the hanger 210, that is, the lower end of the second rod member 214b may be fixed to the rack 200 by welding or the like, and as illustrated, to facilitate disassembly of the suspension support 140. The rack 200 may be coupled to be detachable. That is, in the rack 200, more specifically, the base 202 of the rack 200, the rod hole 202a is formed so that the rod 214 can be fitted in the vertical direction, the rod 214, in more detail The lower end of the second rod member 214b is threaded so that the nut 216 can be screwed to be integrally coupled to the support 212 in a state of being fitted up and down in the rod hole 202a of the rack 200. Can be formed. At this time, only one nut may be fastened for each rod 214 or a pair may be fastened for each rod 214 in a double nut manner as shown.
이와 같은 현수식 지지대(140)는 상기한 랙(200)이 브라켓(120)과 브라켓(120) 사이에 상호 간격없이 연접되도록 복수 설치될 수 있으며, 다만 도시된 바와 같이 랙(200)이 브라켓(120)과 브라켓(120) 사이에 상호 소정 간격을 유지하도록 복수 설치되더라도 거더용 거푸집(130)이 구조적으로 충분히 안정적으로 지지될 수 있는바, 후자가 현수식 지지대(140)의 사용 개수를 줄일 수 있어 시공비용 및 설치,해체 시간을 줄일 수 있다는 점 등의 측면에서 보다 유리할 수 있다.Suspended support 140 as described above may be installed in a plurality such that the rack 200 is connected between the bracket 120 and the bracket 120 without a mutual gap, but as shown in the rack 200 is a bracket ( Even if a plurality is installed so as to maintain a predetermined distance between the 120 and the bracket 120, the girder formwork 130 can be supported sufficiently structurally stable, the latter can reduce the number of use of the suspension support 140 It can be more advantageous in terms of construction cost and installation, disassembly time can be reduced.
현수식 지지대(140)의 설치작업은 먼저 랙(200)이 거더용 거푸집(130) 밑에 위치되도록 받친 상태에서, 랙(200)과 행거(210)를 연결할 수 있다.Installation work of the suspended support 140 may be connected to the rack 200 and the hanger 210 in a state in which the rack 200 is supported to be positioned below the girder formwork 130.
이러한 현수식 지지대(140)의 설치작업은 거더용 거푸집(130)이 복수인 경우, 모든 거더용 거푸집(130)의 설치 작업이 완료된 후 실시될 수도 있고, 거더용 거푸집(130)의 설치작업과 병행되어 실시될 수도 있다. If the installation work of the suspension support 140 is a plurality of girders formwork 130, may be carried out after the installation work of all the girders formwork 130 is completed, the installation work of the girders formwork 130 and It may be performed in parallel.
여기서, 현수식 지지대(140)의 설치 작업은 도시된 바와 같이 거더용 거푸집(130)의 설치된 후 실시되는 것을 제시하였는데, 도시하지 않았지만 거더용 거푸집(130)의 설치 전에 현수식 지지대(140)가 먼저 설치되는 것도 가능하다. 다만, 거더용 거푸집(130)이 설치된 상태에서 현수식 지지대(140)를 상호 구조적 간섭없이 용이하게 설치할 수 있으나, 현수식 지지대(140)가 먼저 설치된 상태에서 거더용 거푸집(130)을 설치할 경우 거더용 거푸집(130)의 측벽과 현수식 지지대(140)의 랙(200)의 거푸집 외측 서포트(204)의 구조적 간섭이 발생되어 시공이 용이하지 않을 수 있다. 따라서, 도시된 바와 같이 현수식 지지대(140)의 설치 작업는 거더용 거푸집(130)의 설치 후 실시되는 것이 보다 유리할 수 있다. 한편, 현수식 지지대(140)는 상술한 바와 같이 행거(210)의 상하방향 길이 조절이 가능한 경우라면, 현수식 지지대(140)가 거더용 거푸집(130)보다 먼저 설치되되, 거더용 거푸집(130)의 설치 전에는 현수식 지지대(140)의 랙(200)이 거더용 거푸집(130) 아래에 이격되어 있다가, 거더용 거푸집(130)의 설치 완료 후 현수식 지지대(140)의 랙(200)이 거더용 거푸집(130)을 받치도록 현수식 지지대(140)의 행거(210)의 상하방향 길이를 조절하는 방법으로 실시될 수 있다.Here, the installation of the suspension support 140 is presented to be carried out after the installation of the girder formwork 130 as shown, although not shown, the suspension support 140 before the installation of the girder formwork 130 It can also be installed first. However, in the state in which the girder formwork 130 is installed, the suspension support 140 can be easily installed without mutual structural interference, but when the suspension support 140 is installed first, the girder formwork 130 is installed. Structural interference between the side wall of the mold formwork 130 and the formwork outer support 204 of the rack 200 of the hanging support 140 may not be easy to construct. Therefore, as shown, the installation work of the suspension support 140 may be more advantageous to be carried out after installation of the formwork girder 130. On the other hand, the suspension support 140, if the vertical length of the hanger 210 is adjustable as described above, the suspension support 140 is installed before the girder formwork 130, the girder formwork 130 Before the installation of the rack 200 of the suspension support 140 is spaced below the girder formwork 130, the rack 200 of the suspension support 140 after completion of the installation of the girder formwork 130 The girder formwork 130 may be implemented by adjusting the vertical length of the hanger 210 of the suspension support 140 to support.
한편, 도 11을 참조하는 바와 같이, 거더용 거푸집(130) 안쪽에는 현수식 지지대(140)의 랙(200)의 거푸집 외측 서포트(204)와 함께 거더용 거푸집(130)의 측벽(132)을 지지할 수 있도록 거푸집 내측 서포트(250)를 설치할 수 있다. 따라서, 거더용 거푸집(130)의 측벽(132)이 내,외 양쪽에서 지지될 수 있어, 구조적 안전성이 증대될 수 있다. 거푸집 내측 서포트(250)의 설치 작업은 거더용 거푸집(130)의 설치 후 현수식 지지대(140)의 설치 전에 실시될 수도 있고, 현수식 지지대(140)의 설치 작업과 동시에 실시될 수도 있고, 현수식 지지대(140)의 설치 완료 후 실시될 수도 있다. 거푸집 내측 서포트(250)는, 현수식 지지대(140)의 랙(200)이 브라켓(120)과 브라켓(120) 사이에 서로 간격을 띄고 설치되는 경우, 브라켓(120)과 브라켓(120) 사이 방향을 따라 현수식 지지대(140)와 겹치도록 설치될 수도 있고, 겹치지 않도록 교차로 설치될 수도 있다. 거푸집 내측 서포트(250)는 추후 거더용 거푸집(130)으로부터 해체될 수도 있고, 후술할 타설되는 콘크리트(160)에 매립될 수 있다.Meanwhile, as shown in FIG. 11, the sidewalls 132 of the girder formwork 130 are formed inside the girder formwork 130 together with the formwork outer support 204 of the rack 200 of the hanging support 140. Formwork inner support 250 can be installed to support. Therefore, the side wall 132 of the girder formwork 130 can be supported at both the inside and the outside, so that the structural safety can be increased. Installation work of the formwork inner support 250 may be carried out before the installation of the suspension support 140 after the installation of the formwork for girders 130, may be carried out simultaneously with the installation work of the suspension support 140, After the installation of the modification support 140 may be carried out. The formwork inner support 250, the rack 200 of the suspension support 140 is installed between the bracket 120 and the bracket 120 at a distance from each other, the direction between the bracket 120 and the bracket 120 Along the suspension support 140 may be installed to overlap, or may be installed in the intersection so as not to overlap. The formwork inner support 250 may be later dismantled from the formwork girder 130, or may be embedded in the concrete 160 to be poured later.
이와 같이 현수식 지지대(140)의 설치 작업이 완료되면, 도 6에 도시된 바와 같이 거더용 거푸집(130)과 거더용 거푸집(130) 사이에 데크(deck)(150)들을 설치한 후, 도 7에 도시된 바와 같이 거더용 거푸집(130) 및 데크(150) 상에 배근 및 콘크리트(160) 타설 작업을 순차적으로 실시한다. As such, when the installation work of the suspension support 140 is completed, as shown in Figure 6, after installing the deck (deck) 150 between the girder formwork 130 and the girder formwork 130, As shown in FIG. 7, the placement of the reinforcement and concrete 160 is sequentially performed on the formwork 130 and the deck 150 for the girder.
그리고, 타설된 콘크리트(160)의 양생 후, 도 8에 도시된 바와 같이 현수식 지지대(140)를 선 시공된 바닥 골조(100)로부터 해체하고 브라켓(120)을 기둥(110)으로부터 해체하면 선 시공된 바닥 골조(100) 밑에 또 다른 지하층인 1개 층의 바닥 골조(104)가 시공될 수 있다.Then, after curing of the poured concrete 160, as shown in FIG. 8, the suspension support 140 is dismantled from the installed base frame 100 and the bracket 120 is dismantled from the pillar 110, One basement floor frame 104, which is another basement floor below the constructed floor frame 100, may be constructed.
이러한 지하구조물의 1개 층의 바닥 골조 시공작업을 반복 실시하면, 복수 층의 지하구조물의 시공이 이루어질 수 있다.When the floor frame construction work of one floor of such underground structures is repeated, construction of a plurality of layers of underground structures can be achieved.
이상에서는 본 발명의 바람직한 실시예를 예시적으로 설명하였으나, 본 발명의 범위는 이와 같은 특정 실시예에만 한정되는 것은 아니며, 특허청구범위에 기재된 범주 내에서 적절하게 변경 가능한 것이다. Although the preferred embodiments of the present invention have been described above by way of example, the scope of the present invention is not limited to these specific embodiments, and may be appropriately changed within the scope described in the claims.
100: 선 시공된 바닥 골조 110: 기둥
120: 브라켓 130: 거더용 거푸집
140: 현수식 지지대 150: 데크
200: 랙 210: 행거
100: pre-built floor frame 110: pillar
120: bracket 130: formwork for girder
140: suspension support 150: deck
200: rack 210: hanger

Claims (10)

  1. 선 시공된 바닥 골조 아래를 굴토하는 굴토단계;
    상기 굴토된 부분에 노출된 기둥들에 브라켓(bracket)을 설치하는 브라켓 설치단계;
    상기 브라켓들에 의해 지지될 수 있도록 거더용 거푸집을 설치하는 거푸집 설치단계;
    상기 선 시공된 바닥 골조에 의해 지지되어 상기 브라켓과 브라켓 사이에서 상기 거더용 거푸집을 받칠 수 있는 현수식(懸垂式) 지지대를 설치하는 현수식 지지대 설치단계;
    상기 거더용 거푸집과 거더용 거푸집 사이에 데크(deck)들을 설치하는 데크 설치단계;
    상기 거더용 거푸집 및 데크 상에 배근 및 콘크리트 타설에 의해 1개 층의 바닥 골조를 시공하는 콘크리트 작업단계;
    상기 타설된 콘크리트 양생 후, 상기 현수식 지지대 및 브라켓을 해체하는 해체단계;
    를 포함하는 것을 특징으로 하는 지하구조물의 역타공법.
    Gulto step to pit under the pre-built floor frame;
    Bracket installation step of installing a bracket (bracket) on the pillars exposed to the excavated portion;
    Formwork installation step of installing the formwork for girder to be supported by the brackets;
    A suspension support installation step of installing a suspension support supported by the pre-installed floor frame to support the formwork for the girder between the bracket and the bracket;
    A deck installation step of installing decks between the girder formwork and the girder formwork;
    Concrete working step of constructing the floor frame of one floor by placing the reinforcement and concrete on the girder formwork and deck;
    A dismantling step of dismantling the suspended support and the bracket after curing the poured concrete;
    Reverse perforation method of an underground structure comprising a.
  2. 청구항 1에 있어서,
    상기 현수식 지지대는 상기 거더용 거푸집의 하측에 설치되어 상기 거더용 거푸집을 받치는 랙(rack)이 상기 브라켓과 브라켓 사이에 상호 소정 간격을 유지하도록 복수 설치되거나, 상기 랙이 상호 간격없이 연접되도록 복수 설치되는 것을 특징으로 하는 지하구조물의 역타공법.
    The method according to claim 1,
    The suspension support is installed on the lower side of the girder formwork, a plurality of racks supporting the girder formwork are installed to maintain a predetermined distance between the bracket and the bracket, or the plurality of racks to be connected without mutual gaps Reverse perforation method of underground structure, characterized in that it is installed.
  3. 청구항 1에 있어서,
    상기 현수식 지지대는 상기 거더용 거푸집 밑에 설치되어 상기 거더용 거푸집을 받치는 랙(rack) 및, 상기 선 시공된 바닥 골조에 매달릴 수 있도록 설치되어 상기 랙을 지지하는 행거(hanger)를 포함하는 것을 특징으로 하는 지하구조물의 역타공법.
    The method according to claim 1,
    The suspension support includes a rack installed under the girder formwork to support the girder formwork, and a hanger installed to support the rack to be suspended from the pre-installed floor frame. Reverse perforation of underground structures.
  4. 청구항 3에 있어서,
    상기 랙은 상기 거더용 거푸집의 외측에서 상기 거더용 거푸집의 측벽을 지지하는 거푸집 외측 서포트를 포함하는 것을 특징으로 하는 지하구조물의 역타공법.
    The method according to claim 3,
    The rack is reverse perforation method of the underground structure, characterized in that it comprises a formwork outer support for supporting the sidewall of the formwork for girder on the outside of the formwork for girder.
  5. 청구항 4에 있어서,
    상기 랙의 거푸집 외측 서포트는 상기 거더용 거푸집의 측벽에 밀착될 수 있도록 이루어진 측벽부를 포함하며,
    상기 거더용 거푸집 위에 걸쳐지는 데크를 받칠 수 있도록 상기 거더용 거푸집으로부터 상기 데크를 향해 상기 측벽부로부터 돌출 형성된 데크 지지부를 더 포함하는 것을 특징으로 하는 지하구조물의 역타공법.
    The method of claim 4,
    Formwork outer support of the rack includes a side wall portion made to be in close contact with the sidewall of the girder formwork,
    And a deck support portion protruding from the side wall portion toward the deck from the girder formwork so as to support the deck over the girder formwork.
  6. 청구항 5에 있어서,
    상기 거더용 거푸집 안쪽에 상기 거더용 거푸집의 측벽부를 지지할 수 있도록 거푸집 내측 서포트를 설치하는 것을 특징으로 하는 지하구조물의 역타공법.
    The method according to claim 5,
    Reverse formwork of the underground structure, characterized in that the formwork inner support is installed to support the side wall portion of the formwork for the girder inside the girder formwork.
  7. 청구항 3에 있어서,
    상기 현수식 지지대의 행거는 상기 선 시공된 바닥 골조 위에 안착되는 서포트(support) 및, 상기 랙과 상기 서포트를 연결하는 로드(road)를 포함하는 것을 특징으로 하는 지하구조물의 역타공법.
    The method according to claim 3,
    The hanging support hanger is a reverse support method for an underground structure, characterized in that it comprises a support (support) seated on the pre-installed floor frame, and a road (road) connecting the rack and the support.
  8. 청구항 7에 있어서,
    상기 로드는 상하 길이 조절 가능토록 이루어진 것을 특징으로 하는 지하구조물의 역타공법.
    The method according to claim 7,
    The rod is reverse punching method of the underground structure, characterized in that made up and down to adjust the length.
  9. 청구항 7에 있어서,
    상기 랙은 상기 로드가 상하방향으로 끼워질 수 있도록 로드 홀이 형성되며,
    상기 로드는 상기 랙에 탈착 가능토록 결합될 수 있도록 상기 로드 홀에 끼워질 수 있도록 이루어지며 너트가 체결되는 나사산이 형성된 것을 특징으로 하는 지하구조물의 역타공법.
    The method according to claim 7,
    The rack is formed with a rod hole so that the rod can be fitted in the vertical direction,
    The rod is a reverse punching method of the underground structure, characterized in that the thread is formed to be fitted to the rod hole so that it can be coupled to the rack detachably and the nut is fastened.
  10. 선 시공된 바닥 골조 아래를 굴토하는 굴토단계, 상기 굴토된 부분에 노출된 기둥들에 브라켓(bracket)을 설치하는 브라켓 설치단계, 상기 브라켓들에 의해 지지될 수 있도록 거더용 거푸집을 설치하는 거푸집 설치단계, 상기 브라켓과 브라켓 사이에서 상기 거더용 거푸집을 받칠 수 있도록 현수식(懸垂式) 지지대를 설치하며 선택적으로 상기 거더용 거푸집 안쪽에 상기 거더용 거푸집의 측벽부를 지지할 수 있도록 거푸집 내측 서포트를 설치하는 현수식 지지대 설치단계, 상기 거더용 거푸집과 거더용 거푸집 사이에 데크(deck)들을 설치하는 데크 설치단계, 상기 거더용 거푸집 및 데크 상에 배근 및 콘크리트 타설에 의해 1개 층의 바닥 골조를 시공하는 콘크리트 작업단계, 상기 타설된 콘크리트 양생 후, 상기 현수식 지지대 및 브라켓을 해체하는 해체단계를 포함하며;
    상기 현수식 지지대는, 상기 거더용 거푸집의 하측에 설치되어 상기 거더용 거푸집을 받치며 상기 브라켓과 브라켓 사이에 상호 소정 간격을 유지하도록 복수 설치되거나 상호 간격없이 연접되도록 복수 설치된 랙(rack) 및, 상기 선 시공된 바닥 골조에 매달릴 수 있도록 설치되어 상기 랙을 지지하는 행거(hanger)를 포함하며;
    상기 랙은, 상기 거더용 거푸집의 외측에서 상기 거더용 거푸집의 측벽에 밀착될 수 있도록 이루어진 측벽부 및, 상기 거더용 거푸집 위에 걸쳐지는 데크를 받칠 수 있도록 상기 거더용 거푸집으로부터 상기 데크를 향해 상기 측벽부로부터 돌출 형성된 데크 지지부를 포함하며;
    상기 행거는, 상기 선 시공된 바닥 골조 위에 안착되는 서포트(support) 및, 상기 랙에 형성된 로드 홀에 상하방향으로 끼워져서 상기 랙에 탈착 가능토록 결합될 수 있도록 너트가 체결되는 나사산이 형성되어 상기 랙과 상기 서포트를 연결하며 상하 길이 조절 가능토록 이루어진 로드(road)를 포함하는 것을 특징으로 하는 지하구조물의 역타공법.
    Golto step to dig below the pre-installed floor frame, bracket installation step to install a bracket (bracket) to the pillars exposed to the pitted part, formwork installation to install the formwork for girder to be supported by the brackets Step, install a suspension support to support the formwork for the girder between the bracket and the bracket and optionally install the form inner support to support the side wall of the formwork for the girder inside the girder formwork Suspended support installation step to the deck, deck installation step of installing the deck (deck) between the girder formwork and the girder formwork, the floor frame of one floor by the reinforcement and concrete casting on the girder formwork and deck Concrete work step to dismantle the dismantled suspension support and bracket after curing the poured concrete It includes a system and;
    The suspension support is installed on the lower side of the girder formwork to support the formwork for the girder and a plurality of racks are installed so as to maintain a predetermined distance between the bracket and the bracket or a plurality of mutually connected without a gap (rack), A hanger (hanger) which is installed to be suspended to the pre-installed floor frame and supports the rack;
    The rack has a side wall portion configured to be in close contact with the side wall of the girder formwork from the outside of the girder formwork, and the sidewall from the girder formwork to the deck to support the deck over the girder formwork. A deck support protruding from the portion;
    The hanger includes a support seated on the pre-installed bottom frame and a screw thread to which a nut is fastened so as to be inserted into a rod hole formed in the rack in a vertical direction to be detachably coupled to the rack. The reverse perforation method of the underground structure, characterized in that it comprises a rod (rod) to connect the rack and the support and to adjust the vertical length.
KR1020110087835A 2011-08-31 2011-08-31 Top-down method of underground structure KR101101182B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110087835A KR101101182B1 (en) 2011-08-31 2011-08-31 Top-down method of underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110087835A KR101101182B1 (en) 2011-08-31 2011-08-31 Top-down method of underground structure

Publications (1)

Publication Number Publication Date
KR101101182B1 true KR101101182B1 (en) 2012-01-03

Family

ID=45613528

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110087835A KR101101182B1 (en) 2011-08-31 2011-08-31 Top-down method of underground structure

Country Status (1)

Country Link
KR (1) KR101101182B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100620366B1 (en) * 2004-09-13 2006-09-19 홍원기 Construction method of underground structures comprising composite reinforced concrete girders and beams using FRP
KR20090094971A (en) * 2008-03-04 2009-09-09 깨뱉시스템주식회사 Under ground top-down method
KR20100100193A (en) * 2009-03-05 2010-09-15 (주)씨엠파트너스건축사사무소 Form system for constructing rc-girder in rc top down method and the rc top down method using the same
KR20100113957A (en) * 2009-04-14 2010-10-22 (주)씨엠파트너스건축사사무소 Joint structure and method for constructing slab of underground structures using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100620366B1 (en) * 2004-09-13 2006-09-19 홍원기 Construction method of underground structures comprising composite reinforced concrete girders and beams using FRP
KR20090094971A (en) * 2008-03-04 2009-09-09 깨뱉시스템주식회사 Under ground top-down method
KR20100100193A (en) * 2009-03-05 2010-09-15 (주)씨엠파트너스건축사사무소 Form system for constructing rc-girder in rc top down method and the rc top down method using the same
KR20100113957A (en) * 2009-04-14 2010-10-22 (주)씨엠파트너스건축사사무소 Joint structure and method for constructing slab of underground structures using the same

Similar Documents

Publication Publication Date Title
CA2883418C (en) A panel support bracket
US9371648B1 (en) Concrete building structure and method for modular construction of same
US8365485B2 (en) Method and apparatus for setting support columns within a foundation
KR20090002344A (en) Land-side protection wall that use ground structure
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
JP3184322U (en) Solar panel mount
CN104234385B (en) Construction method of installation after a kind of terrace heavy steel plate built-in fitting
EP3124843B1 (en) Method for installing a stationary support in a planned position
CN102493554B (en) Abutting joint device of steel lattice column, and construction method of same
CN202194244U (en) Positioning support for embedding of ultra-high steel-work pedestals
US9937643B2 (en) Concrete forming systems and methods
KR101657994B1 (en) Form traveler, and bridge construction method for using the same
CN102383628B (en) Construction device and construction method for post construction of depressing cone of silo structure
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
US20130298496A1 (en) Method for assembling shell segments for forming tower sections of a hybrid wind turbine tower
CN103669655B (en) Deformation joint both walls body concrete pouring construction process
CN102418385B (en) Novel reinforced concrete prefabricated whole-poured building structure system and construction method thereof
CN109577534B (en) Tool-based hanging die assembly type composite floor slab and construction method
CN104594628A (en) Structure template supporting system for cast-in-place concrete beam plate and construction method for structure template supporting system
KR101107567B1 (en) For top down methode of rc structure, the connecting devices between beam structure and vertical steel material, the supporting structures of exclusive use, and the construction method using these devices
KR100819833B1 (en) Apparatus and method for building slab of a concrete build
KR20170032826A (en) Precast concrete dual wall structure and construction method thereof
KR200417438Y1 (en) Bracket structure for girder and slab construction
KR20070092460A (en) System form and construction method using the same
CN105569242A (en) Assembling method for composite floor slabs

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141222

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20171211

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20181210

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20191220

Year of fee payment: 9