KR101094276B1 - Sheet pile construction method through auger drilling machine - Google Patents

Sheet pile construction method through auger drilling machine Download PDF

Info

Publication number
KR101094276B1
KR101094276B1 KR1020110090318A KR20110090318A KR101094276B1 KR 101094276 B1 KR101094276 B1 KR 101094276B1 KR 1020110090318 A KR1020110090318 A KR 1020110090318A KR 20110090318 A KR20110090318 A KR 20110090318A KR 101094276 B1 KR101094276 B1 KR 101094276B1
Authority
KR
South Korea
Prior art keywords
auger
guide
rollers
drilling machine
guider
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
KR1020110090318A
Other languages
Korean (ko)
Inventor
김만진
Original Assignee
김만진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김만진 filed Critical 김만진
Priority to KR1020110090318A priority Critical patent/KR101094276B1/en
Application granted granted Critical
Publication of KR101094276B1 publication Critical patent/KR101094276B1/en
Assigned to 무성토건 주식회사 reassignment 무성토건 주식회사 권리의 일부이전등록 Assignors: 김만진
Assigned to 김만진 reassignment 김만진 권리의 일부이전등록 Assignors: 무성토건 주식회사
Assigned to 고려개발 주식회사, 삼부토건 주식회사, 한신공영 주식회사 reassignment 고려개발 주식회사 권리의 일부이전등록 Assignors: 무성토건 주식회사
Assigned to 디엘건설 주식회사 reassignment 디엘건설 주식회사 권리지분의 전부이전등록 Assignors: 고려개발 주식회사
Assigned to (주)경동엔지니어링, 주식회사 혜인이엔씨, (주)동명기술공단종합건축사사무소 reassignment (주)경동엔지니어링 권리의 일부이전등록 Assignors: 디엘건설 주식회사, 무성토건 주식회사, 삼부토건 주식회사, 한신공영 주식회사
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00—Special methods or apparatus for drilling
    • E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00—Rotary drilling
    • E21B3/02—Surface drives for rotary drilling
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00—Special methods or apparatus for drilling
    • E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02—Sheet piles or sheet pile bulkheads
    • E02D5/16—Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명은 오거 드릴링 머신의 시트파일 시공방법을 개시한다.
본 발명은, 오거부의 케이싱 하부 일측으로 가이드 홈이 형성된 연장 가이드를 하부측으로 연장 형성하는 공정과; 연장 가이드의 가이드 홈 내측에 일정간격으로 복수의 롤러를 회전 가능하게 축 지지하는 공정과; 롤러들 사이에 사각 단면 형상의 가이더를 각각 설치하는 공정;으로 이루어지는 것을 특징으로 하는 것으로서, 시트파일 연결고리와 연장 가이드의 가이드 홈간의 마찰을 롤러를 통해 방지시킬 수 있으며, 롤러간의 틈새로 흙등이 유입되는 것을 가이더를 통해 차단하여 파손의 문제점을 미연에 방지할 수 있다.
이에 더하여 가이더가 롤러의 높이와 동일 높이로 설치됨으로써 압력 분산의 효과에 의한 파손 방지 그리고 오링에 의해 축 부위에 물등이 유입되는 것이 차단되어 역시 장시간 사용이 가능한 효과를 얻게된다.
The present invention discloses a sheet pile construction method of an auger drilling machine.
The present invention, the step of extending to form the extension guide formed with a guide groove on one side of the lower casing portion of the auger; Axially rotatably supporting the plurality of rollers at a predetermined interval inside the guide groove of the extension guide; Steps to install each of the rectangular cross-sectional guider between the rollers, characterized in that consisting of, to prevent the friction between the seat pile connecting ring and the guide groove of the extension guide through the roller, the dirt between rollers By blocking the inflow through the guider can prevent the problem of damage in advance.
In addition, since the guider is installed at the same height as the height of the roller, it is possible to prevent damage due to the effect of pressure dispersion and to prevent water from flowing into the shaft portion by the O-ring, thereby obtaining a long-term use effect.

Description

오거 드릴링 머신을 통한 시트파일 시공방법{Sheet pile setting method utilizing ouger drilling machine}Sheet pile setting method utilizing auger drilling machine

본 발명은 오거 드릴링 머신을 통한 시트파일 시공방법에 관한 것으로서, 보다 상세하게는 시트파일을 수직도가 높은체 삽입할 수 있을 뿐만 아니라 작업시간을 단축할 수 있으며, 작업과정에서 발생될 수 있는 부품의 파손의 우려를 최소화 시킬 수 있는 오거 드릴링 머신을 통한 시트파일 시공방법에 관한 것이다.The present invention relates to a sheet pile construction method through an auger drilling machine, and more particularly, the sheet pile can be inserted into a high vertical body, as well as shorten the working time, parts that can be generated in the working process It relates to a method of seat pile construction through auger drilling machine that can minimize the risk of breakage.

일반적으로 널리 사용되고 있는 오거 드릴링 머신을 이용하여 기초공사를 위해 항(빔)을 타설코자 할 시에는 먼저 크레인에 장착되어 수직으로 세워지며, 리더회동장치에 의해 90도 회동되도록 한 리더(leader)를 따라서 승강하는 오거에 의해 회전하는 스크류로 일정한 심도까지 구멍을 천공한 다음 빔을 타설하게 된다.In general, when placing a port (beam) for foundation work using auger drilling machine, which is widely used, a leader mounted on a crane is erected vertically and rotated 90 degrees by a leader turning device. Therefore, a hole is drilled to a certain depth with a screw rotating by an auger, and then the beam is cast.

이런, 종래의 오거 드릴링 머신은 오거 드릴로 뚫은 수직공에 오거드릴의 외측에 형성된 케이싱을 러더의 상단에 형성된 와이어에 매달음 결합하여 오거드릴이 내부에 형성된 케이싱을 압입한 후에 와이어로 인상시키는 가능하도록 구성하는 것으로, 오거 드릴로 천공한 수직갱의 선단이 연질지반이면 용이하게 지반의 천공작업을 수행할 수 있으나, 암반과 같은 단단한 지반에서는 오거드릴과 케이싱이 자력으로 압입하여 삽입되지 못하는 문제점이 있었다.Such a conventional auger drilling machine is capable of pulling the casing formed on the outside of the auger drill to the wire formed on the top of the rudder to press the casing formed inside the auger drill into the vertical hole drilled by the auger drill If the tip of the vertical shaft drilled by the auger drill is a soft ground, the ground drilling can be easily performed. However, in a hard ground such as a rock, the auger drill and the casing cannot be inserted by magnetic force. .

한편, 종래의 오거 드릴링 머신은 오거드릴의 날개 상면에 점토, 니토 등의 천공토사가 단단히 달라 붙는 경우가 있는데, 날개 상면에 달라 붙은 천공토사 등의 이물질은 시추시 후천공토사의 지상 반출을 방해하는 장애물이 되는 문제점이 있었다.In the conventional auger drilling machine, perforated soils such as clay and nito are firmly adhered to the upper surface of the auger drill, but foreign matters such as perforated soil stuck to the upper surface of the auger drill prevent the groundwork of the perforated soil from drilling. There was a problem of being an obstacle.

이러한 문제점을 해결하고자 본 출원인은 등록번호 20-444957호를 통해 개선된 오거 드릴링 머신을 제안한 바 있다.In order to solve this problem, the applicant has proposed an improved auger drilling machine through the registration number 20-444957.

즉, 도 1 내지 도 5에 나타내 보인 바와 같이 본 출원인이 선출원한 오거 드릴링 머신(100)은, 작업위치로 이동하면서 동력을 공급하는 크레인(111)의 상부에 회동장치로 회동되는 러더(112)를 형성하고, 러더(112)의 상부에 크레인(111)의 동력으로 작동하는 와이어(117)를 구비한 복수의 구동풀리(116)를 풀리브라켓(115)으로 고정 형성하며, 러더(112)의 천공측으로 러더가이드(114)를 형성한 러더부(110)와, 상기 러더부(110)의 와이어(117)가 안치된 이송풀리(122)를 이송브라켓(121)의 상부에 형성하고, 이송브라켓(121)의 일측으로 러더가이드(114)에 결합 가이드 되는 이송가이드(124)를 형성하며, 이송브라켓(121)의 하부에 이송결합후크(123)를 형성한 이송부(120)와, 상기 이송부(120)의 이송결합후크(123)에 결합되도록 고정결합후크(133)를 고정프레임(131)의 상부에 힌지고정구에 구비된 후크힌지(134)로 힌지고정하고, 고정프레임(131)의 일측으로 러더가이드(114)에 결합되어 상하 작동 시 가이드되는 고정가이드(132)를 형성하며, 고정결합후크(133)의 일측으로 실린더고정힌지(138)로 고정프레임(131)에 고정 결합된 작동실린더(137)의 실린더로드(139)를 후크작동 힌지(136)로 힌지 결합하여 작동실린더(137)의 작동으로 고정결합후크(133)가 후크힌지를 중심으로 회전하면서 이송부(120)의 이송결합후크(123)와 결합과 해체를 작동하도록 형성한 이송고정부(130)와, 상기 이송고정부(130)의 고정프레임(131)의 하부에 오거드릴(141)을 구동하면 상하로 작동하는 상하작동실린더(144)를 형성한 드릴구동부의 일측으로 러더가이드(114)에 결합 가이드되는 구동가이드(143)를 형성하고, 드릴구동부의 하부에 구동되는 외측에 케이싱(146)을 구비한 오거드릴(141)을 형성한 오거부(140)를 포함하는 오거 드릴링 머신에 있어서. 상기 오거부(140)는 케이싱(145)의 하부 일측으로 가이드홈(147)이 형성된 연장가이드(146)를 하부 측으로 연장형성하여 오거드릴(141)로 천공된 구멍에 타설되는 타설체(1)(시트파일)를 가이드하도록 구성하는 것을 특징으로 하고 있다.That is, as shown in FIGS. 1 to 5, the auger drilling machine 100 pre- filed by the applicant has a rudder 112 that is rotated by a rotating device on an upper portion of the crane 111 that supplies power while moving to a working position. And a plurality of driving pulleys 116 having wires 117 operating on the power of the crane 111 on the upper part of the rudder 112 with the pulley bracket 115, A rudder portion 110 having a rudder guide 114 formed on the perforation side, and a transfer pulley 122 having the wire 117 of the rudder portion 110 formed thereon are formed on an upper portion of the transfer bracket 121, and a transfer bracket A transfer guide 124 which is coupled to the rudder guide 114 to one side of the 121 and a transfer part 120 having a transfer coupling hook 123 formed at the bottom of the transfer bracket 121 and the transfer part ( The fixed coupling hook 133 is hingedly fixed to the upper portion of the fixed frame 131 to be coupled to the transfer coupling hook 123 of 120. Hinge fixed by the hook hinge 134 provided in the, and coupled to the rudder guide 114 to one side of the fixed frame 131 to form a fixed guide 132 guided during the vertical operation, the fixed coupling of the hook 133 The cylinder rod 139 of the operation cylinder 137 fixedly coupled to the fixed frame 131 by the cylinder fixing hinge 138 to one side is hinged by the hook operation hinge 136 to be fixed by the operation of the operation cylinder 137. A transfer fixing part 130 formed to operate the coupling and disassembly of the transfer coupling hook 123 of the transfer part 120 while the hook 133 rotates about the hook hinge, and a fixed frame of the transfer fixing part 130. When driving the auger drill 141 in the lower portion of the (131) to form a driving guide 143 is coupled to the rudder guide 114 to one side of the drill driving unit formed up and down operation cylinder 144 to operate up and down, Auger with casing 146 on the outer side driven under the drill drive In the auger boring machine comprising a five reject 140 to form a reel (141). The auger 140 is formed by extending the extension guide 146 formed with the guide groove 147 to the lower side of the casing 145 to the lower side to be poured into the hole drilled by the auger drill 141. (Sheet file) is configured to guide.

이러한 본출원인이 선출원한 오거 드릴링 머신은 도 8에 비교 도시된 바와 같이, 1공 천공하고 시트파일을 바로 근입하여 모래, 흙을 채우지 않아도되고, 경암천공후 이상 유무를 바로 확인할 수 있으며, 가이드 홈(147)이 있어 시트파일연결고리를 감싸고 천공을해 수직도가 좋고 시트파일연결고리를 함마밧트천공시 연결고리를 보호해 근입이 잘이루어지는 것은 물론이고 경비절감의 효과가 있는 것입니다.As shown in Fig. 8, the auger drilling machine pre- filed by the present applicant does not need to fill a sand or soil by directly drilling a one-hole and inserting a sheet pile, and can immediately check whether there is an abnormality after the hard rock drilling. There are (147) to wrap and perforate the seat pile link, so that the verticality is good, and the seat pile link protects the link at the time of hammering the hammer.

즉, 도 8의 상부에 도시된 종래에는 1,4,2,5,3의 순서로 천공이 이루어지고 흙, 모래를 채우는 것이지만, 본출원인이 선출원한 것은 하부에 도시된 바와 같이 1,2,3,4,5의 순서로 바로 1공천공하고 시트파일을 오거드릴링 머신 자체의 바이브레터나 크레인에 바이브레터를 장착하여 근입하는 것입니다.That is, in the prior art shown in the upper portion of Fig. 8, the perforations are made in the order of 1, 4, 2, 5, 3 and fills the soil and sand. In the order of 3, 4, and 5, it drills 1 hole and inserts the sheet pile into a vibrator or crane mounted on the auger drilling machine itself.

그러나 이러한 본출원인이 선출원한 오거드릴링 머신에 있어서, 시트파일 연결고리와 연장가이드의 가이드홈간의 마찰로 인하여 천공후 케이싱 인발에 시간이 많이 걸리는 문제점을 내재하고 있다.However, in the auger drilling machine of the present applicant, there is a problem that it takes a lot of time to draw the casing after drilling due to friction between the seat pile connecting ring and the guide groove of the extension guide.

본 발명은 상술한 본 출원인이 선출원한 오거 드릴링 머신의 문제점을 해결하고자 창출된 것으로서, 기존 가이드 홈이 갖고 있는 장점에 더하여 시트파일 연결고리와 연장 가이드의 가이드 홈간의 마찰을 방지시킬 수 있어, 즉 천공과 케이싱 인발이 잘이루어지도록 함으로써 작업시간 단축과 경비절감을 도모할 수 있는 오거 드릴링 머신의 시트파일 시공방법을 제공함에 그 목적이 있다.The present invention was created in order to solve the problems of the above-described applicant auger drilling machine, in addition to the advantages of the existing guide groove can prevent friction between the guide ring of the seat pile linkage and the extension guide, that is, It is an object of the present invention to provide a method of constructing a sheet pile of an auger drilling machine, which can reduce work time and reduce cost by ensuring perforation and casing drawing.

이와같은 목적을 달성하기 위하여 본 발명에 따른 오거 드릴링 머신의 시트파일 시공방법은, 오거부의 케이싱 하부 일측으로 가이드 홈이 형성된 연장 가이드를 하부측으로 연장 형성하는 공정과; 상기 연장 가이드의 가이드 홈 내측에 일정간격으로 복수의 롤러를 회전 가능하게 축 지지하는 공정과; 상기 롤러들 사이에 사각 단면 형상의 가이더를 각각 설치하는 공정;으로 이루어지는 것을 그 특징으로 한다.In order to achieve the above object, a method of constructing a sheet pile of an auger drilling machine according to the present invention includes a step of extending and forming an extension guide having a guide groove formed on one side of a lower casing of the auger; Axially rotatably supporting a plurality of rollers at predetermined intervals inside the guide groove of the extension guide; It characterized in that it comprises a; step of installing each of the guider of the rectangular cross-sectional shape between the rollers.

본 발명의 바람직한 한 특징은, 상기 롤러들 사이에 배치된 가이더는, 금속으로 성형되며, 롤러의 외측면과 동일 높이를 갖도록 설치되는 것에 있다.One preferred feature of the present invention is that the guider disposed between the rollers is formed of a metal and installed to have the same height as the outer surface of the roller.

본 발명의 바람직한 다른 한 특징은, 상기 가이더는, 롤러들 사이에 별도의 삽입홈을 갖는 케이싱을 마련하고, 이 케이싱상에 가이더가 롤러들과 동일 높이로 설치되는 것에 있다.Another preferred feature of the present invention is that the guider is provided with a casing having a separate insertion groove between the rollers, and the guider is installed at the same height as the rollers on the casing.

본 발명의 바람직한 또 다른 한 특징은, 상기 롤러와 연장 가이드간의 결합 축 부위에는 오링을 개재하여 된 것에 있다.Another preferable feature of the present invention is that the engagement shaft portion between the roller and the extension guide is interposed between the O-rings.

상술한 바와 같이 본 발명에 따른 오거 드릴링 머신의 시트파일 시공방법은, 시트파일 연결고리와 연장 가이드의 가이드 홈간의 마찰을 롤러를 통해 방지시킬 수 있으며, 롤러간의 틈새로 흙등이 유입되는 것을 가이더를 통해 차단하여 파손의 문제점을 미연에 방지할 수 있다.As described above, the method of constructing a sheet pile of the auger drilling machine according to the present invention can prevent the friction between the sheet pile connecting ring and the guide groove of the extension guide through the roller, and guides the dirt into the gap between the rollers. It can be prevented in advance by blocking the problem of breakage.

이에 더하여 가이더가 롤러의 높이와 동일 높이로 설치됨으로써 압력 분산의 효과에 의한 파손 방지 그리고 오링에 의해 축 부위에 물등이 유입되는 것이 차단되어 역시 장시간 사용이 가능한 효과를 얻게된다.In addition, since the guider is installed at the same height as the height of the roller, it is possible to prevent damage due to the effect of pressure dispersion and to prevent water from flowing into the shaft portion by the O-ring, thereby obtaining a long-term use effect.

도 1 내지 도 5는 본 출원인이 선출원한 오거 드릴링 머신의 구성도들.
도 6은 본 발명의 요부 사시도.
도 7은 요부 정면도.
도 8은 종래와 본 발명의 시트파일 근입순서를 나타낸 구성도.
도 9는 본 발명의 다른 실시예를 보인 사시도.
1 to 5 are schematic views of the auger drilling machine filed by the applicant.
6 is a perspective view of main parts of the present invention;
7 is a main portion front view.
Fig. 8 is a configuration diagram showing a procedure for entering a sheet file of the prior art and the present invention.
9 is a perspective view showing another embodiment of the present invention.

이하 본 발명에 따른 오거 드릴링 머신의 시트파일 시공방법의 바람직한 실시예를 설명하면 다음과 같다.Hereinafter, a preferred embodiment of the sheet pile construction method of the auger drilling machine according to the present invention will be described.

그리고 이하에서는 본출원인이 선출원한 도 1 내지 도 5를 참조하여 설명한다.Hereinafter, the present applicant will be described with reference to FIGS. 1 to 5.

먼저 도 1 내지 도 5를 참조하여 설명하면, 오거 드릴링 머신(100)은, 작업위치로 이동하면서 동력을 공급하는 크레인(111)의 상부에 회동장치로 회동되는 러더(112)를 형성하고, 러더(112)의 상부에 크레인(111)의 동력으로 작동하는 와이어(117)를 구비한 복수의 구동풀리(116)를 풀리브라켓(115)으로 고정 형성하며, 러더(112)의 천공측으로 러더가이드(114)를 형성한 러더부(110)와, First, referring to FIGS. 1 to 5, the auger drilling machine 100 forms a rudder 112 that is rotated by a pivoting device on an upper portion of a crane 111 that supplies power while moving to a work position, and a rudder. A plurality of drive pulleys 116 having wires 117 operated by the power of the crane 111 on the upper part of the 112 are fixedly formed by the pulley bracket 115, and the rudder guide (to the perforation side of the rudder 112) Rudder portion 110 formed with 114,

상기 러더부(110)의 와이어(117)가 안치된 이송풀리(122)를 이송브라켓(121)의 상부에 형성하고, 이송브라켓(121)의 일측으로 러더가이드(114)에 결합 가이드 되는 이송가이드(124)를 형성하며, 이송브라켓(121)의 하부에 이송결합후크(123)를 형성한 이송부(120)와, Transfer guide pulley 122, the wire 117 of the rudder unit 110 is placed on the transfer bracket 121, the transfer guide is coupled to the rudder guide 114 to one side of the transfer bracket 121 A transfer part 120 forming a transfer coupling hook 123 at a lower portion of the transfer bracket 121,

상기 이송부(120)의 이송결합후크(123)에 결합되도록 고정결합후크(133)를 고정프레임(131)의 상부에 힌지고정구에 구비된 후크힌지(134)로 힌지고정하고, 고정프레임(131)의 일측으로 러더가이드(114)에 결합되어 상하 작동 시 가이드되는 고정가이드(132)를 형성하며, 고정결합후크(133)의 일측으로 실린더고정힌지(138)로 고정프레임(131)에 고정 결합된 작동실린더(137)의 실린더로드(139)를 후크작동 힌지(136)로 힌지 결합하여 작동실린더(137)의 작동으로 고정결합후크(133)가 후크힌지를 중심으로 회전하면서 이송부(120)의 이송결합후크(123)와 결합과 해체를 작동하도록 형성한 이송고정부(130)와, The fixed coupling hook 133 is hinged to a hook hinge 134 provided on the hinged fixture on the upper portion of the fixed frame 131 so as to be coupled to the transfer coupling hook 123 of the transfer unit 120, and the fixed frame 131. It is coupled to the rudder guide 114 to one side of the to form a fixed guide 132 is guided when operating up and down, fixed to the fixed frame 131 by a cylinder fixing hinge 138 to one side of the fixed coupling hook 133 The cylinder rod 139 of the operation cylinder 137 is hinged by the hook operation hinge 136 to fix the hook 133 by the operation of the operation cylinder 137 while rotating the hook hinge about the transfer of the transfer part 120. Transfer hook 130 formed to engage and disengage the coupling hook 123,

상기 이송고정부(130)의 고정프레임(131)의 하부에 오거드릴(141)을 구동하면 상하로 작동하는 상하작동실린더(144)를 형성한 드릴구동부의 일측으로 러더가이드(114)에 결합 가이드되는 구동가이드(143)를 형성하고, 드릴구동부의 하부에 구동되는 외측에 케이싱(146)을 구비한 오거드릴(141)을 형성한 오거부(140)를 포함하여 구성된다. When the auger drill 141 is driven to the lower part of the fixing frame 131 of the transfer fixing unit 130, a coupling guide is connected to the rudder guide 114 toward one side of the drill driving unit which forms a vertical operation cylinder 144 that operates up and down. The auger 140 is formed by forming a driving guide 143 and forming an auger drill 141 having a casing 146 at an outer side driven under the drill driving unit.

이때 오거부(140)는 실질적으로 본 발명의 특징적인 요소를 갖고 있는 것으로서, 케이싱(145)의 하부 일측으로 가이드홈(11)이 형성된 연장가이드(10)를 하부 측으로 연장형성하여 오거드릴(141)로 천공된 구멍에 타설되는 타설체(1)(시트파일)를 가이드하도록 구성된다.At this time, the auger 140 is substantially as having a characteristic element of the present invention, the auger drill 141 by extending the extension guide 10 formed with a guide groove 11 formed on the lower side of the casing 145 to the lower side. It is configured to guide the pour body 1 (sheet pile) to be poured into the perforated hole.

한편, 연장가이드(10)를 연장 형성하여 가이드홈(11)을 통해 타설체(1)를 가이드함에 있어서는, 상호간의 마찰이 발생될 우려가 야기된다.On the other hand, when the extension guide 10 is formed to guide the pour body 1 through the guide groove 11, there is a fear that friction between each other occurs.

따라서 연장가이드(10)의 내측면에 일정간격으로 롤러(20)를 회전 가능하게 축 지지시키는 공정을 수행한다.Therefore, a process of supporting the roller 20 in a rotatable manner at a predetermined interval on the inner surface of the extension guide 10 is performed.

이와같이 연장가이드(10)상에 롤러(20)를 개재시키면 접촉면이 최소화되어 타설체(1)의 가이드시 마찰이 적게 발생된다. 즉, 천공후 케이스(146) 인발 시간을단축할 수 있게된다.When the roller 20 is interposed on the extension guide 10 as described above, the contact surface is minimized, so that less friction is generated when the pouring body 1 is guided. That is, the case 146 can be shortened after the drilling time.

이때 상술한 롤러(20)만을 개재할 경우, 롤러(20)들 사이로 흙이나 돌가루가 유입되고 이들이 롤러(20)이 회전동작을 방해할 뿐만 아니라 회전축 부위의 손상에 의해 동작이 이루어지지 못하고 또한 마모가 빨리 발생되는 문제점이 내재되어 있다.In this case, when only the above-described roller 20 is interposed, soil or stone is introduced between the rollers 20, and they do not interfere with the rotation of the roller 20, and the operation is not performed due to damage of the rotation shaft. The problem that wear occurs quickly is inherent.

이를 방지하기 위한 것으로서, 상술한 롤러(20)들 사이에 사각 단면 형상의 가이더(30)를 개재시키는 공정을 더 수행한다.In order to prevent this, a process of interposing the guider 30 having a rectangular cross-sectional shape between the rollers 20 described above is further performed.

이러한 가이더(30)는 금속으로 성형되며, 특히 롤러(20)의 표면과 동일 평면을 이루는 높이를 갖는다.This guider 30 is formed of metal, and in particular has a height coplanar with the surface of the roller 20.

이와같이 롤러(20) 사이로 가이더(30)를 개재하게 되면, 이 가이더(30)가 일종의 이물질이 유입되는 것을 차단하는 방지턱의 기능을 수행할 뿐만 아니라 타설체(1)의 가이드시 가해지는 압력을 분산하여 흡수하는 기능을 수행하게 된다.In this way, when the guider 30 is interposed between the rollers 20, the guider 30 not only functions as a jaw blocking the introduction of a kind of foreign matter, but also distributes the pressure applied during the guide of the pouring body 1. To perform the function of absorption.

따라서 롤러(20)의 마모방지 및 이물질 유입에 의한 손상을 방지하여 장시간 사용이 가능하고, 이에 더하여 천공과 케이싱 인발이 원활하게 이루어져 전체 작업시간을 줄일 수 있는 효과가 있다.Therefore, it is possible to use for a long time by preventing the wear of the roller 20 and the damage caused by the inflow of foreign matter, and in addition, the perforation and casing drawing is made smoothly, thereby reducing the overall working time.

한편, 좀더 효과적인 롤러(20)의 손상 방지를 위하여 롤러(20)와 연장 가이드(10)간의 결합 축 부위에는 오링(O)을 개재함이 바람직할 것이다.On the other hand, in order to more effectively prevent the damage of the roller 20, it will be preferable to interpose the O-ring (O) in the coupling shaft portion between the roller 20 and the extension guide 10.

이때 상술한 가이더(30)는, 도 9에 나타내 발체하여 나타낸 보인 바와 같이, 롤러(20)들 사이에 별도의 삽입홈을 갖는 케이싱(50)을 이 케이싱(50)상에 롤러(20)들과 동일 높이로 설치될 수 있다.
At this time, the guider 30 described above has a casing 50 having a separate insertion groove between the rollers 20, as shown in Fig. 9, and the rollers 20 on the casing 50. It can be installed at the same height as.

한편, 본 발명은, 상기한 구체적인 예에 대해서만 상세히 설명하였지만 본 발명의 기술사상 범위내에서 다양한 변형 및 수정이 가능함은 당업자에게 있어서 명백한 것이며, 이러한 변형 및 수정이 청구된 특허청구범위에 속하는 것은 당연한 것이다.Meanwhile, the present invention has been described in detail only with respect to the specific examples described above, but it is obvious to those skilled in the art that various modifications and changes are possible within the technical scope of the present invention, and it is natural that such modifications and modifications fall within the claims. will be.

*도면의 주요 부분에 대한 부호의 설명
10 : 연장가이드 11 : 가이드 홈
20 : 롤러 30 : 가이더
O : 오링 140 : 오거부
145 : 케이싱 1 : 타설체(시트파일)
DESCRIPTION OF THE REFERENCE NUMERALS
10: extension guide 11: guide groove
20: roller 30: guider
O: O-ring 140: Ogre
145 casing 1: cast body (sheet file)

Claims (4)

오거부의 케이싱 하부 일측으로 가이드 홈이 형성된 연장 가이드를 하부측으로 연장 형성하는 공정과;
상기 연장 가이드의 가이드 홈 내측에 일정간격으로 복수의 롤러를 회전 가능하게 축 지지하는 공정과;
상기 롤러들 사이에 사각 단면 형상의 가이더를 각각 설치하는 공정;으로 이루어지는 것을 특징으로 하는 오거 드릴링 머신을 통한 시트파일 시공방법.
A step of extending and forming an extension guide having a guide groove formed on one side of the casing lower portion of the auger;
Axially rotatably supporting a plurality of rollers at predetermined intervals inside the guide groove of the extension guide;
A step of constructing a sheet pile through an auger drilling machine, characterized in that it comprises a step of installing each of the guides of the rectangular cross-sectional shape between the rollers.
제 1 항에 있어서,
상기 롤러들 사이에 배치된 가이더는, 금속으로 성형되며, 롤러의 외측면과 동일 높이를 갖도록 설치되는 것을 특징으로 하는 오거 드릴링 머신을 통한 시트파일 시공방법.
The method of claim 1,
The guider disposed between the rollers is formed of a metal, the sheet pile construction method through an auger drilling machine, characterized in that installed to have the same height as the outer surface of the roller.
제 1 항에 있어서,
상기 가이더는, 롤러들 사이에 별도의 삽입홈을 갖는 케이싱을 마련하고, 이 케이싱상에 가이더가 롤러들과 동일 높이로 설치되는 것을 특징으로 하는 오거 드릴링 머신을 통한 시트파일 시공방법,
The method of claim 1,
The guider is provided with a casing having a separate insertion groove between the rollers, the sheet pile construction method through the auger drilling machine, characterized in that the guider is installed on the casing at the same height as the rollers,
제 1 항에 있어서,
상기 롤러와 연장 가이드간의 결합 축 부위에는 오링을 개재하여 된 것을 특징으로 하는 오거 드릴링 머신을 통한 시트파일 시공방법.
The method of claim 1,
A method of constructing a sheet pile through an auger drilling machine, characterized in that the coupling shaft portion between the roller and the extension guide is interposed through an O-ring.
KR1020110090318A 2011-09-06 2011-09-06 Sheet pile construction method through auger drilling machine Active KR101094276B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110090318A KR101094276B1 (en) 2011-09-06 2011-09-06 Sheet pile construction method through auger drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110090318A KR101094276B1 (en) 2011-09-06 2011-09-06 Sheet pile construction method through auger drilling machine

Publications (1)

Publication Number Publication Date
KR101094276B1 true KR101094276B1 (en) 2011-12-19

Family

ID=45506340

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110090318A Active KR101094276B1 (en) 2011-09-06 2011-09-06 Sheet pile construction method through auger drilling machine

Country Status (1)

Country Link
KR (1) KR101094276B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101465536B1 (en) * 2013-05-31 2014-11-26 김만진 Perforated sheet pile construction arm structure through the auger drilling machine

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61250229A (en) 1985-04-30 1986-11-07 Mitsuo Sugaya Method and apparatus for penetration of steel sheet pile
KR200444957Y1 (en) 2007-06-19 2009-06-18 김만진 Auger Drilling Machine

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61250229A (en) 1985-04-30 1986-11-07 Mitsuo Sugaya Method and apparatus for penetration of steel sheet pile
KR200444957Y1 (en) 2007-06-19 2009-06-18 김만진 Auger Drilling Machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101465536B1 (en) * 2013-05-31 2014-11-26 김만진 Perforated sheet pile construction arm structure through the auger drilling machine

Similar Documents

Publication Publication Date Title
US4202416A (en) Method and apparatus for sinking a cased borehole for producing cased pile foundations
KR200478234Y1 (en) Core drill apparatus mounted excavator
JP6085484B2 (en) Pile driver
JP6085485B2 (en) Pile driver
KR20070016292A (en) File construction device that can simultaneously drill and drive
KR102178354B1 (en) Pile pullout apparatus
JP4448481B2 (en) Soil work method and soil work machine
CN115748678A (en) Mud-free low-noise micro-disturbance rock-socketed pile construction method
JP3839819B2 (en) Reverse circulation drill
KR20130031624A (en) Concrete pile setting method by utilizing an auger drilling maachine
KR20120125727A (en) Boring equipment
KR200401983Y1 (en) Device for rock drilling
KR20110073862A (en) Auger Drilling Machine
JP2010031523A (en) Vertical shaft excavator
CN104631536A (en) Inclined hole excavating machine with adjustable angle
CN205778548U (en) A kind of new drill structure
KR200444957Y1 (en) Auger Drilling Machine
CN108894724A (en) A kind of rock core drilling equipment for being mounted in excavator
JP3856739B2 (en) Drilling bucket for earth drill
KR100927850B1 (en) Auger Auger
KR101465536B1 (en) Perforated sheet pile construction arm structure through the auger drilling machine
KR102818076B1 (en) All-in-one percussion rotary drill method
JP2000017658A (en) Ready-made pile construction method and its equipment
KR200398533Y1 (en) Pile for using construction
CN213087943U (en) Reverse hole device of getting in narrow and small space in concrete engineering field

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

A302 Request for accelerated examination
D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

PA0302 Request for accelerated examination

St.27 status event code: A-1-2-D10-D17-exm-PA0302

St.27 status event code: A-1-2-D10-D16-exm-PA0302

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20140917

Year of fee payment: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20151005

Year of fee payment: 5

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

S17-X000 Non-exclusive voluntary license recorded

St.27 status event code: A-4-4-S10-S17-lic-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

FPAY Annual fee payment

Payment date: 20161006

Year of fee payment: 6

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 6

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 7

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20180928

Year of fee payment: 8

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 8

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

FPAY Annual fee payment

Payment date: 20191007

Year of fee payment: 9

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 9

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 10

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 13

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

R18 Changes to party contact information recorded

Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R18-OTH-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000