KR101091600B1 - Sidewall PC formwork and construction method using the same - Google Patents

Sidewall PC formwork and construction method using the same Download PDF

Info

Publication number
KR101091600B1
KR101091600B1 KR1020090011810A KR20090011810A KR101091600B1 KR 101091600 B1 KR101091600 B1 KR 101091600B1 KR 1020090011810 A KR1020090011810 A KR 1020090011810A KR 20090011810 A KR20090011810 A KR 20090011810A KR 101091600 B1 KR101091600 B1 KR 101091600B1
Authority
KR
South Korea
Prior art keywords
formwork
support
road boundary
boundary stone
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020090011810A
Other languages
Korean (ko)
Other versions
KR20100092609A (en
Inventor
신상원
Original Assignee
신상원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 신상원 filed Critical 신상원
Priority to KR1020090011810A priority Critical patent/KR101091600B1/en
Publication of KR20100092609A publication Critical patent/KR20100092609A/en
Application granted granted Critical
Publication of KR101091600B1 publication Critical patent/KR101091600B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명은 측구용 PC 거푸집 및 이를 이용한 측구 시공방법에 관한 것으로, 그 목적은 측구와 도로경계석의 동시 시공이 가능하게 함으로써 측구 및 도로경계석을 보다 용이하고 빠르게 시공할 수 있도록 한 측구용 PC 거푸집 구조체 및 이를 이용한 측구 시공방법을 제공함에 있다. 이를 위한 본 발명은 좌우측면 방향으로 연장된 장방형의 구조를 갖는 4각 판재 형상의 몸체와, 상기 몸체의 강도 보강을 위하여 몸체의 내부에 구비된 와이어메쉬와, 상기 와이어메쉬와 일체형으로 형성되며 측구의 형성을 위한 콘크리트의 타설시 콘크리트에 매립되도록 몸체의 외부로 돌출되게 형성되어 몸체와 콘크리트와의 결속력을 강화하는 하나 이상의 매립편으로 이루어진 한쌍의 측구용 PC 거푸집; 상기 한쌍의 측구용 PC 거푸집이 상호 이격된 상태에서 측구의 폭에 대응하는 사이간격을 갖도록 두 측구용 PC 거푸집을 연결하는 다수개의 폼타이; 상기 두 측구용 PC 거푸집 중 어느 하나의 측구용 PC 거푸집에 조립되어 도로경계석을 하부에서 지지하는 받침수단으로 구성된 측구용 PC 거푸집 및 이를 이용한 측구 시공방법에 관한 것을 기술적 요지로 한다.The present invention relates to a side-wall PC formwork and a side-gate construction method using the same, the purpose of which is to enable the simultaneous construction of the side and road borders, the side-wall PC formwork structure for easier and faster construction of the side and road borders And to provide a construction method using the same. The present invention for this purpose is a quadrangular plate-shaped body having a rectangular structure extending in the left and right side direction, a wire mesh provided inside the body for reinforcing the strength of the body, and formed integrally with the wire mesh and the side opening A pair of side PC PC formed of one or more buried pieces formed to protrude to the outside of the body to be embedded in the concrete when the concrete for the formation of the reinforcing force between the body and the concrete; A plurality of form ties connecting the two side PC dies so as to have an interval corresponding to the width of the side holes in a state in which the pair of side PC dies are spaced apart from each other; The technical gist of the two-sided PC formwork for the side-wall PC formwork which is assembled to any one of the side-wall PC formwork is composed of the support means for supporting the road boundary stone from the bottom and the construction method using the same.

측구, 측구용 PC 거푸집, 거푸집 구조체, 받침수단, 도로경계석 Side mouth, side face PC formwork, formwork, supporting means, road boundary stone

Description

측구용 PC 거푸집 구조체 및 이를 이용한 측구 시공방법{Precast form structure for gutter and construction method using the same}Precast form structure for gutter and construction method using the same}

본 발명은 도로의 측구를 시공하기 위한 거푸집 구조체 및 상기 거푸집 구조체를 이용한 측구 시공방법에 관한 것으로, 특히 측구를 시공함에 있어 미리 제작된 PC 거푸집 구조체를 이용하여 콘크리트가 타설될 공간을 형성함과 더불어 도로경계석의 간편한 설치가 가능하도록 한 측구용 PC 거푸집 구조체 및 이를 이용한 측구 시공방법에 관한 것이다.The present invention relates to a formwork for the construction of the side of the road and a method for constructing the side using the formwork, in particular in the construction of the side by using a PC formwork made in advance to form a space to be poured concrete The present invention relates to a PC formwork structure for a side gate to allow easy installation of road boundary stones, and a side construction method using the same.

일반적으로 측구(側溝,gutter)라 함은 비나 눈에 의해 생긴 도로면의 물을 배수하기 위하여 도로 양쪽 또는 한쪽에 도로와 평행하게 만든 배수로로써, 하수구가 완비된 시가지에서는 차도의 양쪽을 낮게 포장한다거나 낮은 L자형의 측구가 주로 사용되고, 하수도가 없는 지구의 도로에서는 주로 단면이 U자형으로 되어 있는 측구가 사용되고 있다.In general, the gutter is a drainage channel made parallel to the road on both sides or one side of the road to drain water from the road surface caused by rain or snow. Low L-shaped side openings are mainly used, and sideways with U-shaped cross-sections are mainly used on roads of the earth without sewers.

도 1은 종래 L자형 측구의 시공절차를 나타낸 공정도를 도시하고 있다.1 is a process chart showing a construction procedure of a conventional L-shaped side opening.

통상적으로 상기 L자형 측구는 도로경계석과 함께 시공되며, 그 시공절차는 아래와 같다.Typically, the L-shaped side opening is constructed with a road boundary stone, the construction procedure is as follows.

측구가 형성될 지반을 다지고, 그 위에 기초콘크리트(1)를 타설한 후, 이 기초콘크리트(1)가 적당히 굳어져 어느 정도의 강도를 가지게 되면, 그 위에 제2 콘크리트(2)를 타설한다. 한편 제2 콘크리트(2)가 적당한 굳기를 가지게 되었을 때(적당한 유동도를 가지고 있는 상태) 도로경계석(10)을 제2 콘크리트(2)의 위에 올려놓은 뒤, 도로경계석(10)의 높이와 수평도 및 직진도를 이웃한 도로경계석과 정렬하기 위한 위치조정작업을 수행하게 된다.After laying the ground on which the side openings are to be formed and placing the foundation concrete 1 thereon, when the foundation concrete 1 is appropriately hardened and has a certain degree of strength, the second concrete 2 is poured thereon. On the other hand, when the second concrete (2) has a suitable hardness (with a moderate flow), the road boundary stone 10 is placed on the second concrete (2), and then the height and horizontality of the road boundary stone 10 Positioning is performed to align the road and straightness with the neighboring road boundary stone.

이후 양측에 측구 거푸집(11,12)을 설치하고 제3 콘크리트(3)와 제4 콘크리트(4)를 타설한 뒤, 타설된 콘크리트가 양생되면 거푸집(11,12)을 제거함으로써 측구의 시공을 완료하게 된다.After installing the side molds (11, 12) on both sides and placing the third concrete (3) and the fourth concrete (4), and when the poured concrete is cured, the construction of the side holes is removed by removing the molds (11, 12) You are done.

위에서 설명된 바와 같이 종래의 측구 시공방법은 절차가 매우 복잡하고, 제1,2,3,4 콘크리트(1,2,3,4)의 타설 후, 타설된 콘크리트가 양생될 때까지의 기간 동안은 작업이 불가능함에 따라 오랜 시공기간이 요구되는 문제점을 가지고 있다.As described above, the conventional side construction method is very complicated in the procedure, and after pouring the first, second, third, and fourth concretes (1,2,3,4), for a period of time until the poured concrete is cured. The problem is that a long construction period is required as the work is impossible.

더욱이 측구 거푸집(11,12)의 경우, 제3 콘크리트(3) 및 제4 콘크리트(4)가 양생된 후, 제거되어야만 하므로 작업공정이 추가되는 것은 물론이고 거푸집의 제거시 거푸집이 손상되어 재사용이 불가능해짐으로써 건축 폐기물을 발생시키는 문제점을 가지고 있다.Moreover, in the case of the side molds (11, 12), after the third concrete (4) and the fourth concrete (4) must be removed, the work process is added, as well as the form is damaged when the form is removed, so reuse is not possible. There is a problem of generating construction waste by becoming impossible.

본 발명은 상기와 같은 문제점을 고려하여 이루어진 것으로, 본 발명의 목적은 측구와 도로경계석의 동시 시공이 가능하게 함으로써 측구 및 도로경계석을 보다 용이하고 빠르게 시공할 수 있도록 한 측구용 PC 거푸집 구조체 및 이를 이용한 측구 시공방법을 제공함에 있다.The present invention has been made in consideration of the above problems, and an object of the present invention is to enable the simultaneous construction of the side mouth and road boundary stone, the PC formwork structure for the side door to allow easier and faster construction of the side mouth and road boundary stone and It is to provide a side-gate construction method used.

본 발명의 또 다른 목적은 측구의 시공 후, 거푸집의 제거가 요구되지 않아 시공의 편의성을 향상시킬 수 있으며, 건축폐기물의 발생을 감소시킬 수 있는 측구용 PC 거푸집 구조체 및 이를 이용한 측구 시공방법을 제공함에 있다.Still another object of the present invention is to improve the convenience of construction since the removal of formwork is not required after the construction of the side opening, and provides a side construction PC formwork structure and a side construction method using the same that can reduce the generation of construction waste. Is in.

본 발명의 또 다른 목적은 PC 거푸집 구조체를 이용하여 도로경계석이 설치될 공간을 마련하고, 또 도로경계석의 위치 정렬이 용이하도록 한 측구용 PC 거푸집 구조체 및 이를 이용한 측구 시공방법을 제공함에 있다.Still another object of the present invention is to provide a space for installing a road boundary stone using a PC formwork structure, and to provide a side construction PC formwork structure and a side construction method using the same to facilitate the alignment of the road boundary stone.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명의 측구용 PC 거푸집 구조체는 좌우측면 방향으로 연장된 장방형의 구조를 갖는 4각 판재 형상의 몸체와, 상기 몸체의 강도 보강을 위하여 몸체의 내부에 구비된 와이어메쉬와, 상기 와이어메쉬와 일체형으로 형성되며 측구의 형성을 위한 콘크리트의 타설시 콘크리트에 매립되도록 몸체의 외부로 돌출되게 형성되어 몸체와 콘크리트와의 결속력을 강화하는 하나 이상의 매립편으로 이루어진 한쌍의 측구용 PC 거푸집; 상기 한쌍의 측구용 PC 거푸집이 상호 이격된 상태에서 측구의 폭에 대응하는 사이간격을 갖도록 두 측구용 PC 거푸집을 연결하는 다수개의 폼타이; 상기 두 측구용 PC 거푸집 중 어느 하나의 측구용 PC 거푸집에 조립되어 도로경계석을 하부에서 지지하는 받침수단으로 구성된 것을 특징으로 한다.A side door PC formwork structure of the present invention to achieve the object as described above and to perform a problem for eliminating the conventional defects is a quadrangular plate-shaped body having a rectangular structure extending in the left and right side direction, and the The wire mesh provided inside the body for strength reinforcement, and formed integrally with the wire mesh and formed to protrude to the outside of the body to be embedded in the concrete during the pouring of concrete for the formation of side holes to bond the body and the concrete A pair of sidewall PC formwork consisting of at least one landfill piece to be reinforced; A plurality of form ties connecting the two side PC dies so as to have an interval corresponding to the width of the side holes in a state in which the pair of side PC dies are separated from each other; It is characterized in that it is composed of a support means for supporting the road boundary stone is assembled to any one of the side PC PC formwork of the two side PC formwork.

한편, 측면방향으로 이웃하게 배치되는 두 측구용 PC 거푸집의 하단부에 끼움결합되어 이웃하는 두 측구용 PC 거푸집을 결속하는 결속부재가 더 포함된다.On the other hand, it is further included a binding member that is coupled to the lower end of the two side sphere PC formwork neighboring disposed in the lateral direction to bind the neighboring two side PC formwork.

한편, 상기 받침수단은 측구용 PC 거푸집에 조립되며, 도로경계석의 일단을 하부에서 지지하는 한쌍의 지주를 구비하는 제1 받침수단 및; 상기 제1 받침수단과 이격되도록 측구용 PC 거푸집에 조립되며, 도로경계석의 타단을 하부에서 지지하는 하나의 지주를 구비하는 제2 받침수단으로 구성된다.On the other hand, the support means is assembled to the side PC PC formwork, the first support means having a pair of struts supporting one end of the road boundary stone from the bottom; It is assembled to the side PC PC formwork so as to be spaced apart from the first support means, it is composed of a second support means having one support for supporting the other end of the road boundary stone from the bottom.

이때, 상기 제1 받침수단은 상호 이격된 채로 수직하게 연장된 한쌍의 지주부재를 갖는 제1 받침몸체; 상기 제1 받침몸체에 일단이 결합되고, 타단이 측구용 PC 거푸집에 조립되어 제1 받침몸체와 측구용 PC 거푸집을 결속하되, 제1 받침몸체가 상하방향으로 회전할 수 있도록 제1 받침몸체에 끼움결합되는 제1 거치대; 상기 한쌍의 지주부재에 각각 나사결합되며, 사용자에 의해 회전하며 상승하거나 하강함으로써 도로경계석의 높낮이를 조절하는 한쌍의 제1 볼트기둥; 및 상기 제1 볼트기둥의 상단부에 조립되어 도로경계석의 저면에 접하는 제1 캡으로 구성된다.At this time, the first support means has a first support body having a pair of strut members extending vertically spaced apart from each other; One end is coupled to the first support body, the other end is assembled to the side door PC formwork to bind the first support body and the side door PC formwork, the first support body to the first support body to rotate in the vertical direction A first cradle fitted; A pair of first bolt pillars screwed to the pair of strut members, respectively, to adjust the height of the road boundary stone by rotating and rising or falling by the user; And a first cap assembled to an upper end of the first bolt column to be in contact with the bottom surface of the road boundary stone.

또한, 상기 제2 받침수단은 수직하게 연장된 지주부재를 갖는 제2 받침몸체; 상기 제2 받침몸체에 일단이 결합되고, 타단이 측구용 PC 거푸집에 조립되어 제2 받침몸체와 측구용 PC 거푸집을 결속하되, 제2 받침몸체가 상하방향으로 회전할 수 있도록 제2 받침몸체에 끼움결합되는 제2 거치대; 상기 지주부재에 나사결합되며, 사용자에 의해 회전하며 상승하거나 하강함으로써 도로경계석의 높낮이를 조절하는 제2 볼트기둥; 및 상기 제2 볼트기둥의 상단부에 조립되어 도로경계석의 저면에 접하는 제2 캡으로 구성된다.In addition, the second support means includes a second support body having a vertically extending support member; One end is coupled to the second support body, and the other end is assembled to the side door PC formwork to bind the second support body and the side door PC formwork, so that the second support body can rotate in the vertical direction to the second support body. A second cradle fitted; A second bolt column which is screwed to the support member and adjusts the height of the road boundary stone by being rotated and raised or lowered by the user; And a second cap assembled to an upper end of the second bolt column to be in contact with the bottom surface of the road boundary stone.

한편, 상기 제1 볼트기둥과 제2 볼트기둥에 조립되어 사용자가 제1 볼트기둥 및 제2 볼트기둥을 용이하게 회전시킬 수 있도록 하는 회전용 손잡이가 더 구비된다.On the other hand, it is further provided with a rotating handle which is assembled to the first bolt pillar and the second bolt pillar to allow the user to easily rotate the first bolt pillar and the second bolt pillar.

본 발명의 측구 시공방법은 좌우측면 방향으로 연장된 장방형의 구조를 갖는 4각 판재 형상으로, 측구의 형성을 위한 콘크리트의 타설시 콘트리트에 매립되어 콘크리트와의 결속력을 강화하는 하나 이상의 매립편을 갖는 측구용 PC 거푸집을 다수개 준비하고, 준비된 다수개의 측구용 PC 거푸집들 중 두개의 측구용 PC 거푸집이 측구의 폭에 대응하는 사이거리를 갖도록 폼타이를 이용하여 두 측구용 PC 거푸집을 결속하여 구조체들을 형성하는 단계(S1); 상기 S1 단계를 통해 형성된 구조체들을 측구가 시공될 장소에 직렬구조로 배치하는 단계(S2); 상기 S2 단계를 통해 거푸집 구조체들의 배치가 완료된 후, 제1 받침몸체와 제1 거치대 및 제1 볼트기둥 그리고 제1 캡으로 구성되어 한쌍의 지주를 갖는 제1 받침수단과, 제2 받침몸체와 제2 거치대 및 제2 볼트기둥 그리고 제2 캡으로 구성되어 하나의 지주를 갖는 제2 받침수단을 상호 이격되게 측구용 PC 거푸집에 조립하여 도로경계석의 설치를 위한 공간을 형성하는 단계(S3); 상기 S3 단계를 통해 제1 받침수단과 제2 받침수단의 조립이 완료된 후, 제1 받침수단과 제2 받침수단의 상부에 도로경계석을 놓는 단 계(S4); 및 상기 S4 단계를 통해 도로경계석의 배치가 완료된 후, 거푸집 구조체에 의해 형성된 공간에 콘크리트를 타설하는 단계(S5)로 이루어진다.Side construction method of the present invention is a quadrilateral plate shape having a rectangular structure extending in the left and right side direction, having at least one buried piece to be embedded in the concrete during the pouring of concrete for the formation of the side hole to strengthen the binding force with the concrete A number of side PC PC forms are prepared, and two side PC PC dies of the prepared multiple side PC dies are formed by binding two side PC dies using a form tie to have a distance corresponding to the width of the side holes. Forming them (S1); Disposing the structures formed through the step S1 in a series structure at a place where the side opening is to be constructed (S2); After the arrangement of the formwork structure is completed through the step S2, the first support means consisting of a first support body, the first cradle and the first bolt pillar and the first cap having a pair of struts, the second support body and the first Comprising a second support means having a single post and a second support post and a second bolt post and a second cap spaced apart from each other in the formwork PC formwork to form a space for installation of the road boundary stone (S3); After the assembly of the first supporting means and the second supporting means through the step S3 is completed, the step of placing the road boundary stone on the upper portion of the first supporting means and the second supporting means (S4); And after the arrangement of the road boundary stone through the step S4 is completed, the step of placing concrete in the space formed by the formwork structure (S5).

한편, 상기 S4 단계에서 제1 볼트기둥과 제2 볼트기둥을 회전시켜 도로경계석의 높이 및 수평도를 정렬하는 것이 바람직하다.On the other hand, it is preferable to align the height and horizontality of the road boundary stone by rotating the first bolt pillar and the second bolt pillar in the step S4.

한편, 상기 S2 단계에서 측면방향으로 이웃하는 배치되는 두 측구용 PC 거푸집들의 하단부를 결속부재로 결속하는 것이 바람직하다.On the other hand, in the step S2 it is preferable to bind the lower end of the two side-wall PC formwork neighboring disposed in the lateral direction with a binding member.

상기와 같은 특징을 갖는 본 발명에 의하면, 측구 및 도로경계석의 동시 시공이 가능하고, 거푸집의 설치가 용이하며, 더욱이 거푸집의 해체가 요구되지 않아 시공이 용이한 것과 함께 빠른 시공이 가능하게 되었다.According to the present invention having the characteristics as described above, the simultaneous construction of the side opening and the road boundary stone is possible, the formwork is easy to install, and furthermore, since the disassembly of the formwork is not required, the construction is easy and the fast construction is possible.

또한, 거푸집의 해체가 요구되지 않으므로 건축 폐기물의 발생을 감소시킬 수 있게 되었다.In addition, since the dismantling of formwork is not required, the generation of construction waste can be reduced.

또한, 측구와 함께 설치되는 도로경계석의 수평도 및 높이를 보다 용이하게 정렬할 수 있게 되었다.In addition, it is possible to more easily align the horizontality and height of the road boundary stone installed with the side mouth.

이하, 본 발명의 바람직한 실시 예를 첨부된 도면과 연계하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 따른 측구용 PC 거푸집 구조체의 사시도를 도시하고 있다.Figure 2 shows a perspective view of the side PC PC formwork structure according to the present invention.

본 발명의 측구용 PC 거푸집 구조체는 측구의 시공을 위한 거푸집의 기능을 제공하는 것과 함께 콘크리트와 일체화되어 측구를 형성함으로써 콘크리트의 양생 후 거푸집의 해체가 요구되지 않으며, 또 측구 상에 배치되는 도로경계석을 보다 쉽게 시공할 수 있도록 한 것으로, 본 발명의 바람직한 실시예에 따른 측구용 PC 거푸집 구조체(100)는 한쌍의 측구용 PC 거푸집(110,110`)과, 폼타이(120)와, 받침수단(130)으로 구성되어 있다.PC formwork structure for the side opening of the present invention is integrated with the concrete to provide the function of the formwork for the construction of the side opening to form the side by the disassembly of the formwork after curing of the concrete is not required, and road boundary stone disposed on the side opening To make it easier to construct, the side PC PC formwork structure 100 according to a preferred embodiment of the present invention is a pair of side PC formwork (110, 110 '), the form tie 120 and the support means 130 )

도 3은 본 발명에 따른 측구용 PC 거푸집의 사시도를, 도 4는 본 발명에 따른 측구용 PC 거푸집의 이면 사시도를 도시하고 있다.Figure 3 shows a perspective view of the side PC PC formwork according to the present invention, Figure 4 shows a rear perspective view of the side PC PC formwork according to the present invention.

상기 측구용 PC 거푸집(110)은 몸체(111)와, 와이어메쉬(112)와, 매립편(113)으로 구성되어 있다.The side wall PC formwork 110 is composed of a body 111, a wire mesh 112, and a buried piece 113.

상기 몸체(111)는 소정의 형상을 갖도록 제작된 성형틀의 내부에 콘크리트를 타설 및 양생시킴으로써 제작되는 것으로, 좌우측면 방향으로 길게 연장된 장방형의 구조를 갖는 4각 판재의 형태를 갖도록 구성되어 있다.The body 111 is manufactured by placing and curing concrete in a mold formed to have a predetermined shape, and is configured to have a quadrangular plate shape having a rectangular structure extending in the left and right side directions. .

상기 와이어메쉬(112)는 몸체(111)의 내부에 설치되어 몸체(111)의 강도를 보강하는 것이다. 이러한 와이어메쉬(112)는 성형틀에 콘크리트를 타설하기 전 성형틀의 내부에 미리 설치되며, 이러한 상태에서 콘크리트를 타설 및 양생시킴으로써 몸체(111)의 내부에 와이어메쉬(112)를 설치할 수 있게 된다.The wire mesh 112 is installed inside the body 111 to reinforce the strength of the body 111. The wire mesh 112 is pre-installed in the mold before pouring the concrete in the mold, by placing and curing the concrete in this state it is possible to install the wire mesh 112 in the interior of the body 111. .

상기 매립편(113)은 몸체(111)의 외부로 돌출되어 측구의 형성을 위한 콘크리트의 타설시 콘크리트에 매립되어 몸체(111) 즉 측구용 PC 거푸집(110)과 측구의 결속력을 높이는 것이다. 이러한 매립편(113)은 와이어메쉬(112)에 결속 또는 용접 되어 와이어메쉬(112)와 일체형의 구조를 형성한 채로 몸체(111)의 외부로 돌출되도록 형성되는 것이 바람직하다.The buried piece 113 is projected to the outside of the body 111 is embedded in the concrete during the pouring of the concrete for the formation of the side is to increase the binding force between the body 111, that is, the PC formwork 110 and the side opening. The buried piece 113 is preferably formed to protrude out of the body 111 while being bound or welded to the wire mesh 112 to form an integrated structure with the wire mesh 112.

한편, 본 발명의 측구용 PC 거푸집(110)은 1~2m의 길이를 갖도록 형성되므로, 내부에 구비된 와이어메쉬(112)만으로는 충분한 강성을 유지하기 어렵다. 따라서 몸체(111)의 내부에서 몸체(111)의 좌우측면을 가로지도록 설치되어 측구용 PC 거푸집(110)의 휨을 방지하는 보강파이프(114)가 더 구비되는 것이 바람직하다. 이러한 보강파이프(114)는 와이어메쉬(112)와 마찬가지로 성형틀의 내부에 미리 설치된 상태에서 콘크리트를 타설함으로써 몸체(111)의 내부에 설치될 수 있다.On the other hand, since the side wall PC formwork 110 of the present invention is formed to have a length of 1 ~ 2m, it is difficult to maintain sufficient rigidity only with the wire mesh 112 provided therein. Therefore, it is preferable that a reinforcement pipe 114 is installed to cross the left and right side surfaces of the body 111 inside the body 111 to prevent bending of the side PC dies 110. The reinforcement pipe 114 may be installed inside the body 111 by pouring concrete in a state of being pre-installed in the molding die, similar to the wire mesh 112.

이러한 측구용 PC 거푸집(110)은 한쌍이 제공되어 측구용 PC 거푸집 구조체를 형성하게 되며, 제공된 두 측구용 PC 거푸집(110,110`)은 측구의 폭에 대응하는 사이간격을 갖도록 배치된다.The side-wall PC formwork 110 is provided with a pair to form a side-wall PC formwork structure, the provided two side-wall PC formwork (110, 110`) is arranged to have an interval corresponding to the width of the sidewall.

다시 도 2를 참조하면, 상기 폼타이(120)는 두 측구용 PC 거푸집(110,110`)을 상호 연결하여 고정하되, 두 측구용 PC 거푸집(110,110`)이 측구의 폭에 대응하는 사이간격을 갖도록 고정하는 것이다. 이러한 폼타이(120)는 두 측구용 PC 거푸집(110,110`)을 관통하도록 설치되는 체결봉(121)과, 상기 체결봉(121)의 양끝단에 체결되어 체결봉(121)과 측구용 PC 거푸집(110)을 결속하는 너트(122)로 구성되어 있다.Referring back to FIG. 2, the form tie 120 is fixed by interconnecting two side PC dies 110 and 110 ′, so that the two side PC dies 110 and 110 ′ have an interval corresponding to the width of the side hole. It is fixed. The form ties 120 are fastening rods 121 installed to penetrate two side PC dies 110 and 110`, and fastened to both ends of the fastening rods 121 and fastening rods 121 and PC dies for side openings. It consists of the nut 122 which binds 110.

한편 측구용 PC 거푸집(110,110`)을 관통하도록 설치된 체결봉(121)의 끝단에 하나의 너트(122)만이 체결될 경우, 측구용 PC 거푸집(110,110`)을 완전히 고정할 수 없으므로, 측구용 PC 거푸집(110,110`)의 완전한 고정을 위하여 각 측구용 PC 거푸집(110,110`)의 양측면에 각각 하나의 너트(122,122`)가 체결될 수 있도록 두개의 너트(122,122`)를 이용하여 하나의 측구용 PC 거푸집을 고정하거나 또는 너트(122)를 대신하는 미도시된 걸림턱을 체결봉(121)에 형성하여 너트(122)와 걸림턱을 이용하여 측구용 PC 거푸집(110,110`)을 완전하게 고정할 수 있다. 이와 같은 폼타이(120)는 거푸집의 결속을 위하여 사용되고 있는 주지,관용된 폼타이(Form tie)와 동일하게 구성될 수 있는 바, 보다 구체적인 설명은 생략하도록 한다.On the other hand, when only one nut 122 is fastened to the end of the fastening rod 121 installed to penetrate the side PC dies 110 and 110`, the side door PC dies 110 and 110` cannot be completely fixed, so the side door PC One side PC by using two nuts 122 and 122` so that one nut 122 and 122` can be fastened to both sides of each side PC mold 110 and 110` for complete fixing of the dies 110 and 110`. Fixing the formwork or by forming a locking jaw (not shown) in place of the nut 122 to the fastening rod 121 to completely fix the side PC PC formwork (110,110`) using the nut 122 and the locking jaw. have. Such a form tie 120 may be configured in the same manner as the well-known and tolerated form tie (Form tie) that is used for the binding of the form, more detailed description will be omitted.

한편, 측구의 전방, 즉 도로측에 설치되는 측구용 PC 거푸집(110`)을 관통하는 체결봉(121) 및 이 체결봉(121)에 체결되는 너트(122)가 측구용 PC 거푸집(110`)을 통해 외부로 돌출될 경우, 도로시공시 사용되는 장비와 체결봉(121)이 충돌하여 장비 또는 측구가 파손될 수 있으므로, 이를 방지하기 위하여 도로측에 설치되는 측구용 PC 거푸집(110`)에는 너트(122)가 몸체(111)의 내부에 매몰된 상태에서 체결봉(121)과 체결이 이루어지도록 하는 홈(117)이 형성되는 것이 바람직하다. 이때 도로측에 설치된 측구용 PC 거푸집(110`)을 관통하는 체결봉(121)의 끝단은 측구용 PC 거푸집(110)으로부터 돌출되지 않도록 체결봉(121)의 길이를 조절하는 것이 바람직하다.On the other hand, the fastening rod 121 penetrating through the front side of the side, that is, the roadside PC formwork 110` installed on the road side, and the nut 122 fastened to the fastening rod 121 is a sidewall PC formwork 110`. When protruding to the outside through), since the equipment used in the road construction and the fastening rod 121 may collide with the equipment or side openings may be damaged, the nut on the side PC formwork 110` installed on the road side to prevent this In the state where the 122 is buried in the body 111, it is preferable that a groove 117 is formed to be fastened with the fastening rod 121. At this time, it is preferable that the end of the fastening rod 121 penetrating the side wall PC formwork 110` installed on the side of the fastening rod 121 does not protrude from the side wall PC formwork 110 '.

도 5는 본 발명에 따른 받침수단의 사시도를, 도 6은 본 발명에 따른 받침수단에 의하여 도로경계석이 지지된 상태를 나타낸 평면도를 도시하고 있다.5 is a perspective view of the supporting means according to the present invention, Figure 6 is a plan view showing a state in which the road boundary stone is supported by the supporting means according to the present invention.

상기 받침수단(130)은 거푸집 구조체를 구성하는 두 측구용 PC 거푸집(110,110`) 중 어느 하나의 거푸집(110)에 설치되어 도로경계석(10)을 지지하는 것으로, 측구용 PC 거푸집(110)에 조립되며, 도로경계석(10)의 일단을 하부에서 지 지하는 한쌍의 지주(131a,131b)를 구비하는 제1 받침수단(131)과, 상기 제1 받침수단(131)과 이격되도록 측구용 PC 거푸집(110)에 조립되며, 도로경계석(10)의 타단을 하부에서 지지하는 하나의 지주(132a)를 구비하는 제2 받침수단(132)으로 구성되어 있다.The support means 130 is installed on any one of the formwork (110, 110`) two formwork PC formwork (110, 110`) constituting the formwork structure to support the road boundary stone 10, the sidewall PC formwork (110) Assembled, the first support means 131 having a pair of struts (131a, 131b) supporting one end of the road boundary stone 10 from the lower side, and the side PC to be spaced apart from the first support means (131) It is assembled to the formwork 110, and is composed of a second support means 132 having one support 132a for supporting the other end of the road boundary stone 10 from the bottom.

도 7은 본 발명에 따른 제1 받침수단의 분해사시도를, 도 8은 본 발명의 받침몸체와 거치대의 결속상태를 나타낸 단면도를 도시하고 있다.Figure 7 is an exploded perspective view of the first supporting means according to the present invention, Figure 8 is a cross-sectional view showing a binding state of the support body and the cradle of the present invention.

상기 제1 받침수단(131)은 제1 받침몸체(131-1)와, 제1 거치대(131-2)와, 제1 볼트기둥(131-3)과, 제1 캡(131-4)으로 구성되어 있다.The first support means 131 includes a first support body 131-1, a first holder 131-2, a first bolt pillar 131-3, and a first cap 131-4. Consists of.

이때, 상기 제1 받침몸체(131-1)는 상호 이격된 채로 수직하게 연장되는 한쌍의 지주부재(131-1a,131-1b)를 구비하는 것으로 구성된다.At this time, the first support body 131-1 is configured to include a pair of strut members 131-1a and 131-1b extending vertically while being spaced apart from each other.

상기 제1 거치대(131-2)는 일단이 제1 받침몸체(131-1)에 결합되고, 타단이 측구용 PC 거푸집(110)에 조립되어 제1 받침몸체(131-1)와 측구용 PC 거푸집(110)을 결속하는 것이다. 이러한 제1 거치대(131-2)는 제1 받침몸체(131-1)와 일체형의 구조로써 이루어질 수도 있으나, 이러한 구조에서 제1 받침몸체(131-1)가 놓여지는 바닥면의 평탄하지 못할 경우, 제1 받침수단(131)에 놓인 도로경계석(10)의 하중이 제1 받침몸체(131-1)를 통하여 바닥으로 고르게 분산되지 못함으로써, 제1 받침몸체(131-1)와 제1 거치대(131-2)를 손상을 유발하게 된다. 따라서 상기 제1 거치대(131-2)와 제1 받침몸체(131-1)를 결합시 제1 받침몸체(131-1)가 상하방향으로 일정각도 회전할 수 있도록 제1 받침몸체(131-1)에 수직방향의 결속공(131-1c)을 형성하고, 상기 결속공(131-1c)에 제1 거치대(131-2)의 일단을 삽입하여 제1 받침 몸체(131-1)와 제1 거치대(131-2)를 결속하되, 결속공(131-1c)이 제1 거치대(131-2)의 직경에 비해 충분히 큰 직경을 갖도록 함으로써, 제1 받침몸체(131-1)가 바닥면의 경사에 따라 상방향 또는 하방향으로 회전하여 기울어진 상태로 바닥면에 밀착되게 놓여질 수 있게 된다.One end of the first cradle 131-2 is coupled to the first support body 131-1, and the other end is assembled to the side door PC formwork 110 so that the first support body 131-1 and the side door PC The die 110 is to bind. The first cradle 131-2 may be formed as a unitary structure with the first support body 131-1, but in such a structure, when the first support body 131-1 is not flat on the bottom surface on which the first support body 131-1 is placed. Since the load of the road boundary stone 10 placed on the first supporting means 131 is not evenly distributed to the floor through the first supporting body 131-1, the first supporting body 131-1 and the first cradle (131-2) will cause damage. Accordingly, when the first cradle 131-2 and the first support body 131-1 are coupled to each other, the first support body 131-1 may rotate the first support body 131-1 at an angle in the vertical direction. Binding holes (131-1c) in the vertical direction in the (), and the first support body (131-1) and the first by inserting one end of the first holder (131-2) in the binding holes (131-1c) Bind the cradle (131-2), the binding hole (131-1c) has a diameter sufficiently large compared to the diameter of the first cradle (131-2), the first support body (131-1) of the bottom surface It can be placed in close contact with the bottom surface in an inclined state by rotating in the upward or downward direction according to the inclination.

상기 제1 볼트기둥(131-3)은 제1 받침몸체(131-1)에 구비된 한쌍의 지주부재(131-1a,131-1b)에 각각 체결될 수 있도록 2개가 제공된다. 이러한 제1 볼트기둥(131-3)은 각각의 지주부재(131-1a,131-1b)에 체결되어 사용자에 의한 회전시 상승하거나 하강함으로써, 제1 받침수단(131)에 놓여진 도로경계석(10)의 높낮이를 조절하게 된다.Two first bolt columns 131-3 are provided to be fastened to the pair of support members 131-1a and 131-1b provided in the first support body 131-1, respectively. The first bolt column 131-3 is fastened to each of the support members 131-1a and 131-1b and ascends or descends upon rotation by the user, thereby placing the road boundary stone 10 placed on the first support means 131. Will be adjusted.

한편 상기 제1 볼트기둥(131-3)에는 사용자가 제1 볼트기둥(131-3)을 보다 용이하게 회전시킬 수 있도록 하기 위한 회전용 손잡이(131-5)가 더 구비되는 것이 바람직하다. 이러한 회전용 손잡이(131-5)는 제1 볼트기둥(131-3)의 상단부에 결합되어 제1 볼트기둥(131-3)과 함께 회전하도록 설치되며, 외면에는 미끄러짐을 방지하기 위한 돌기(131-5a)가 형성되어 있다.Meanwhile, the first bolt pillar 131-3 may further include a rotation knob 131-5 for allowing a user to more easily rotate the first bolt pillar 131-3. The rotary knob 131-5 is coupled to an upper end of the first bolt pillar 131-3 and installed to rotate together with the first bolt pillar 131-3, and a protrusion 131 on the outer surface to prevent slippage. -5a) is formed.

상기 제1 캡(131-4)은 제1 볼트기둥(131-3)의 상단부에 조립되어 도로경계석(10)을 하부에서 지지함과 더불어 제1 볼트기둥(131-3)에 조립된 회전용 손잡이(131-5)가 이탈하는 것을 방지하게 된다. 이러한 제1 캡(131-4)의 상면에는 제1 받침수단(131)에 놓인 도로경계석(10)이 미끄러지는 것을 방지하기 위한 요철(131-4)이 형성되어 있다.The first cap 131-4 is assembled to the upper end of the first bolt pillar 131-3 to support the road boundary stone 10 from the bottom, and is assembled to the first bolt pillar 131-3 for rotation. The handle 131-5 is prevented from being separated. On the upper surface of the first cap 131-4, unevenness 131-4 is formed to prevent the road boundary stone 10 placed on the first support means 131 from slipping.

도 9는 본 발명에 따른 제2 받침수단의 분해사시도를 도시하고 있다.Figure 9 shows an exploded perspective view of the second support means according to the present invention.

상기 제2 받침수단(132)은 제2 받침몸체(132-1)와, 제2 거치대(132-2)와, 제2 볼트기둥(132-3)과, 제2 캡(132-4)으로 구성되어 있다.The second support means 132 includes a second support body 132-1, a second holder 132-2, a second bolt pillar 132-3, and a second cap 132-4. Consists of.

상기 제2 받침몸체(132-1)는 수직하게 연장되는 지주부재(132-1a)를 구비하는 것으로 구성된다.The second support body 132-1 is configured to include a support member 132-1a extending vertically.

상기 제2 거치대(132-2)는 일단이 제2 받침몸체(132-1)에 결합되고, 타단이 측구용 PC 거푸집(110)에 조립되어 제2 받침몸체(132-1)와 측구용 PC 거푸집을 결속하되, 제2 받침몸체(132-1)가 상하방향으로 회전할 수 있도록 제2 받침몸체(132-1)에 끼움결합된다. 이러한 제2 거치대(132-2)는 제1 거치대(131-2)와 제1 받침몸체(131-1)의 결합구조와 동일한 구조로 결합되는 것으로, 제2 거치대(132-2)와 제2 받침몸체(132-1)의 결합구조에 대한 상세한 설명은 생략하도록 한다.One end of the second cradle 132-2 is coupled to the second support body 132-1, and the other end is assembled to the side PC body 110 for the second support body 132-1 and the PC for the side door. Bind the formwork, the second support body 132-1 is fitted to the second support body 132-1 to rotate in the vertical direction. The second cradle 132-2 is coupled in the same structure as the coupling structure of the first cradle 131-2 and the first support body 131-1, and the second cradle 132-2 and the second cradle Detailed description of the coupling structure of the support body 132-1 will be omitted.

상기 제2 볼트기둥(132-3)은 제2 받침몸체(132-1)에 구비된 지주부재(132-1a)에 체결되어 사용자에 의한 회전시 상승하거나 하강함으로써, 제2 받침수단(132)에 놓여진 도로경계석(10)의 높낮이를 조절하게 된다. 이러한 제2 볼트기둥(132-3)에는 제1 볼트기둥(131-3)과 동일하게 회전용 손잡이(132-5)가 설치될 수 있다.The second bolt column (132-3) is fastened to the holding member (132-1a) provided in the second supporting body (132-1) is raised or lowered during rotation by the user, the second supporting means (132) To adjust the height of the road boundary stone 10 placed on. The second bolt pillar 132-3 may be provided with a rotating knob 132-5 in the same manner as the first bolt pillar 131-3.

상기 제2 캡(132-4)은 제2 볼트기둥(132-3)의 상단부에 조립되어 도로경계석(10)을 하부에서 지지함과 더불어 제2 볼트기둥(132-3)에 조립된 회전용 손잡이(132-5)가 이탈하는 것을 방지하게 된다. 이러한 제2 캡(132-4)의 상면에는 제2 받침수단(132)에 놓인 도로경계석이 미끄러지는 것을 방지하기 위한 요철(132-4a)이 형성되어 있다.The second cap 132-4 is assembled to the upper end of the second bolt pillar 132-3 to support the road boundary stone 10 from the bottom, and is assembled to the second bolt pillar 132-3 for rotation. The handle 132-5 is prevented from being separated. On the upper surface of the second cap 132-4, unevenness 132-4a is formed to prevent the road boundary stone placed on the second support means 132 from slipping.

상기와 같이 구성된 받침수단(130)에 의하면, 도로경계석(10)은 제1 받침수단(131)에 구비되는 2개의 지주(131a,131b)와, 제2 받침수단(132)에 구비되는 1개의 지주(132a)에 의하여 3점이 지지되며, 이때 제1 받침수단(131)에 구비된 두 제1 볼트기둥(131-3)을 회전시켜 도로경계석(10)의 일단에 대한 높이 및 수평도를 조절하게 되고, 제2 받침수단(132)에 구비된 제2 볼트기둥(132-3)을 회전시켜 도로경계석(10)의 나머지 타단에 대한 높이 및 수평도를 조절하게 된다.According to the support means 130 configured as described above, the road boundary stone 10 has two support pillars 131a and 131b provided in the first support means 131 and one provided in the second support means 132. Three points are supported by the support (132a), and at this time, by rotating the two first bolt pillars (131-3) provided in the first support means 131 to adjust the height and horizontality of one end of the road boundary stone (10) And, by rotating the second bolt column (132-3) provided in the second support means 132 to adjust the height and the horizontal level for the other end of the road boundary stone (10).

상기와 같이 구성된 측구용 PC 거푸집 구조체를 이용하여 측구를 시공하고자 할 경우, 여러개의 거푸집 구조체들을 직렬구조로 배열하여 콘크리트가 타설될 공간을 형성하게 되며, 이때 측면방향으로 이웃하는 두 측구용 PC 거푸집(110)의 결속을 위하여 결속부재가 더 포함되는 것이 바람직하다.If you want to construct the side sphere using the side PC structure for the side structure configured as described above, by forming a plurality of form structures in a series structure to form a space in which the concrete is to be placed, in this case neighboring two side PC formwork in the lateral direction It is preferable that the binding member is further included for the binding of the 110.

도 10은 본 발명에 따른 결속부재의 사시도를 도시하고 있다.10 is a perspective view of a binding member according to the present invention.

상기 결속부재(140)는 저면부(141)와, 저면부(141)의 양측에서 상방향으로 연장되게 형성되어 측구용 PC 거푸집(110)이 사이에 끼워지는 공간을 형성하는 한쌍의 측면부(142,143)로 구성되어 있다. 이러한 결속부재(140)는 이웃하는 두 측구용 PC 거푸집(110,110``)과 동시에 끼움결합됨으로써 이웃하는 두 측구용 PC 거푸집(110,110``)을 결속하게 된다.The binding member 140 is formed to extend upward from both sides of the bottom portion 141 and the bottom portion 141 to form a pair of side portions 142 and 143 to form a space between the side PC dies 110. It consists of). The binding member 140 is coupled to the two neighboring side PC dies (110, 110 ``) at the same time to bind the two neighboring side PC dies (110, 110 ``).

도 11은 본 발명에 따른 거푸집 구조체를 이용하여 측구를 시공하는 공정순서를 나타낸 공정도를, 도 12는 본 발명에 따른 거푸집 구조체를 이용하여 시공된 측구의 단면도를 도시하고 있다.11 is a process diagram showing the process sequence for constructing the side opening using the formwork according to the present invention, Figure 12 shows a cross-sectional view of the side opening constructed using the formwork according to the present invention.

본 발명에 따른 측구 시공방법은 여러개의 측구용 PC 거푸집 구조체를 이용 하여 이루어지게 되며, 이하의 설명에서는 이웃하는 두 측구용 PC 거푸집 구조체의 도면부호를 100 및 100`으로 하여 설명하도록 한다.Side construction method according to the present invention is made using a plurality of side PC PC formwork structure, in the following description will be described with reference numerals 100 and 100` of two neighboring side PC formwork structure.

한편 본 발명의 측구 시공방법은 거푸집 구조체(100,100`)들을 형성하는 단계(S1)와, 거푸집 구조체(100)들을 배치하는 단계(S2)와, 받침수단(130)을 거푸집 구조체(100,100`)에 설치하여 도로경계석이 놓여질 공간을 형성하는 단계(S3)와, 도로경계석을 배치하는 단계(S4)와, 콘크리트를 타설하는 단계(S5)로 이루어져 있다.On the other hand, the side opening construction method of the present invention (S1) forming the formwork structures (100,100`), the step of placing the formwork structures (S2) and the support means 130 to the formwork structure (100,100`) It comprises a step (S3) of installing and forming a space to place the road boundary stone, the step of placing the road boundary stone (S4), and the step of placing concrete (S5).

상기 S1 단계는 두개의 측구용 PC 거푸집(110,110`)을 폼타이(120)를 이용하여 조립함으로써 거푸집 구조체(100)를 형성하는 단계이다. 물론 S1 단계에서는 요구되는 수만큼의 거푸집 구조체(100,100`)를 제작하게 된다.The step S1 is a step of forming the formwork structure 100 by assembling two side-wall PC formwork (110,110`) using the form tie 120. Of course, in the step S1 to produce the required number of form structures (100, 100`).

상기 S2 단계는 제작된 거푸집 구조체(100,100`)들을 측구가 시공될 장소에 배치하는 단계로써, 여러개의 거푸집 구조체(100,100`)들을 직렬구조로 연속되게 배치하여 콘크리트가 타설될 공간을 형성하는 것이다. 이처럼 거푸집 구조체(100,100`)들을 직렬구조로 배치함에 있어 결속부재(140)를 이용하여 이웃하게 배치되는 측구용 PC 거푸집(110)들을 상호 연결하게 된다.The step S2 is a step of arranging the formwork structure (100,100`) fabricated in the place to be constructed, the formwork space (100, 100`) are arranged in series in a continuous structure to form a space in which concrete is to be poured. As such, when arranging the formwork structures 100 and 100` in a series structure, the side PC PC formwork 110 which is arranged to be adjacent to each other using the binding member 140 is interconnected.

상기 S3 단계는 배치가 완료된 거푸집 구조체(100,100`)에 제1 받침수단(131) 및 제2 받침수단(132)을 조립하여 도로경계석을 배치하기 위한 공간을 형성하는 단계이다. 이러한 S3 단계는 제1 받침수단(131)에 구비된 제1 거치대(131-2)와 제2 받침수단(132)에 구비된 제2 거치대(132-2)를 측구용 PC 거푸집에 결속함으로써 이루어지게 되며, 이때 제1 받침수단(131)과 제2 받침수단(132)이 도로경계 석의 양끝단에 위치할 수 있도록 제1 받침수단(131)과 제2 받침수단(132)의 사이거리를 적절하게 유지시키게 된다.The step S3 is a step of forming a space for arranging the road boundary stones by assembling the first support means 131 and the second support means 132 in the formwork structure (100, 100 ') is completed. This step S3 is achieved by binding the first holder 131-2 provided on the first support means 131 and the second holder 132-2 provided on the second support means 132 to the PC die for side opening. In this case, the distance between the first supporting means 131 and the second supporting means 132 may be appropriately positioned so that the first supporting means 131 and the second supporting means 132 are located at both ends of the road boundary stone. Maintained.

상기 S4 단계는 제1 받침수단(131) 및 제2 받침수단(132)의 설치로 인해 마련된 공간에 도로경계석(10,10`)들을 배치하는 단계이다. 이때 도로경계석(10,10`)들은 제1 받침수단(131)에 구비된 두 지주(131a,131b)와 제2 받침수단(132)에 구비된 한 지주(132a)에 의해 지지되며, 작업자는 제1 볼트기둥(131-3) 및 제2 볼트기둥(132-3)에 구비된 회전용 손잡이(131-5,132-5)를 회전시켜 제1 볼트기둥(131-3) 및 제2 볼트기둥(132-3)을 위쪽 또는 아래쪽으로 이동시키며 도로경계석(10,10`)의 높낮이 및 수평도를 조절하게 된다.The step S4 is a step of placing the road boundary stones (10, 10`) in the space provided by the installation of the first support means 131 and the second support means 132. At this time, the road boundary stones (10, 10`) are supported by two support (131a, 131b) provided in the first support means 131 and one support (132a) provided in the second support means 132, the worker Rotating knobs (131-5, 132-5) provided in the first bolt pillar (131-3) and the second bolt pillar (132-3) by rotating the first bolt pillar (131-3) and the second bolt pillar ( 132-3) to move up or down to adjust the height and level of the road boundary stones (10, 10`).

상기 S5 단계는 거푸집 구조체(100,100`)에 의해 형성된 공간에 콘크리트를 타설하는 단계이다. 한편 종래의 측구 시공방법에 의하면, 총 4단계의 콘크리트 타설이 요구되었으나, 본 발명의 측구 시공방법에 의하면 한번의 콘크리트 타설로 작업을 완료할 수 있게 된다.The step S5 is a step of placing concrete in the space formed by the formwork (100, 100`). On the other hand, according to the conventional side construction method, a total of four stages of concrete pouring was required, but according to the side construction method of the present invention it is possible to complete the work in one concrete pouring.

더욱이 본 발명은 상기한 바와 같이 측구와 도로경계석의 시공이 동시에 이루어짐으로써 보다 빠른 시공이 가능하게 되며, 콘크리트가 양생되면서 거푸집 구조체(100,100`)와 콘크리트가 일체화되어 측구를 형성함으로써 거푸집(10,10`)의 해체가 요구되지 않는 이점이 있다.In addition, the present invention is faster construction is possible by the construction of the side opening and the road boundary stone as described above, the formwork (100, 100`) and the concrete is integrated with the concrete to form the side by forming the side opening (10, 10) There is an advantage that dismantling of `) is not required.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

도 1 은 종래 L자형 측구의 시공절차를 나타낸 공정도,1 is a process chart showing a construction procedure of a conventional L-shaped side opening,

도 2 는 본 발명에 따른 측구용 PC 거푸집 구조체의 사시도,Figure 2 is a perspective view of the side PC PC formwork structure according to the present invention,

도 3 은 본 발명에 따른 측구용 PC 거푸집의 사시도,3 is a perspective view of a side PC for formwork according to the invention,

도 4 는 본 발명에 따른 측구용 PC 거푸집의 이면 사시도,Figure 4 is a perspective view of the back side of the PC die for the side mouth according to the invention,

도 5 는 본 발명에 따른 받침수단의 사시도,5 is a perspective view of the support means according to the present invention,

도 6 은 본 발명에 따른 받침수단에 의하여 도로경계석이 지지된 상태를 나타낸 평면도,6 is a plan view showing a state that the road boundary stone is supported by the support means according to the present invention,

도 7 은 본 발명에 따른 제1 받침수단의 분해사시도,7 is an exploded perspective view of the first supporting means according to the present invention;

도 8 은 본 발명의 받침몸체와 거치대의 결속상태를 나타낸 단면도,8 is a cross-sectional view showing the binding state of the support body and the cradle of the present invention,

도 9 는 본 발명에 따른 제2 받침수단의 분해사시도,9 is an exploded perspective view of a second support means according to the present invention;

도 10 은 본 발명에 따른 결속부재의 사시도,10 is a perspective view of a binding member according to the present invention;

도 11 은 본 발명에 따른 거푸집 구조체를 이용하여 측구를 시공하는 공정순서를 나타낸 공정도,11 is a process chart showing a process sequence for constructing a side opening using a formwork structure according to the present invention;

도 12 는 본 발명에 따른 거푸집 구조체를 이용하여 시공된 측구의 단면도.12 is a cross-sectional view of the side port constructed using a formwork structure according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

(110),(110`) : 측구용 PC 거푸집 (111) : 몸체(110), (110`): Side-side PC formwork (111): Body

(112) : 와이어메쉬 (113) : 매립편(112): wire mesh (113): landfill

(120) : 폼타이 (130) : 받침수단120: form tie (130): support means

(131) : 제1 받침수단 (131a),(131b) : 지주(131): first support means (131a), (131b): prop

(131-1) : 제1 받침몸체 (131-1a),(131-1b) : 지주부재(131-1): first support body (131-1a), (131-1b): holding member

(131-2) : 제1 거치대 (131-3) : 제1 볼트기둥131-2: 1st holder (131-3): 1st bolt column

(131-4) : 제1 캡 (131-5) : 회전용 손잡이(131-4): first cap (131-5): handle for rotation

(132) : 제2 받침수단 (132a) : 지주(132): second support means (132a): prop

(132-1) : 제2 받침몸체 (132-1a) : 지주부재(132-1): second support body (132-1a): holding member

(132-2) : 제2 거치대 (132-3) : 제2 볼트기둥(132-2): Second cradle (132-3): Second bolt pillar

(132-4) : 제2 캡 (132-5) : 회전용 손잡이(132-4): Second Cap (132-5): Rotating Handle

(140) : 결속부재140: binding member

Claims (9)

좌우측면 방향으로 연장된 장방형의 구조를 갖는 4각 판재 형상의 몸체(111)와, 상기 몸체(111)의 강도 보강을 위하여 몸체(111)의 내부에 구비된 와이어메쉬(112)와, 상기 와이어메쉬(112)와 일체형으로 형성되며 측구의 형성을 위한 콘크리트의 타설시 콘크리트에 매립되도록 몸체(111)의 외부로 돌출되게 형성되어 몸체(111)와 콘크리트와의 결속력을 강화하는 하나 이상의 매립편(113)으로 이루어진 한쌍의 측구용 PC 거푸집(110,110`);A quadrangular plate-shaped body 111 having a rectangular structure extending in left and right side directions, a wire mesh 112 provided inside the body 111 to reinforce the strength of the body 111, and the wire. One or more buried pieces formed integrally with the mesh 112 and formed to protrude to the outside of the body 111 so as to be embedded in the concrete during the pouring of the concrete to strengthen the binding force between the body 111 and the concrete ( A pair of side PC PC dies (110,110`) consisting of 113); 상기 한쌍의 측구용 PC 거푸집(110,110`)이 상호 이격된 상태에서 측구의 폭에 대응하는 사이간격을 갖도록 두 측구용 PC 거푸집(110,110`)을 연결하는 다수개의 폼타이(120);A plurality of form ties 120 connecting the two side PC dies 110 and 110 ′ so that the pair of side PC dies 110 and 110 ′ have an interval corresponding to the width of the side holes in a spaced apart state; 상기 두 측구용 PC 거푸집(110,110`) 중 어느 하나의 측구용 PC 거푸집(110)에 조립되어 도로경계석을 하부에서 지지하는 받침수단(130)으로 구성된 것을 특징으로 하는 측구용 PC 거푸집 구조체.The side PC PC formwork structure, characterized in that composed of the supporting means 130 which is assembled to any one of the side PC PC form 110 of the two side PC formwork (110, 110`) to support the road boundary stone from the bottom. 제 1 항에 있어서,The method of claim 1, 측면방향으로 이웃하게 배치되는 두 측구용 PC 거푸집의 하단부에 끼움결합되어 이웃하는 두 측구용 PC 거푸집을 결속하는 결속부재(140)를 더 포함하는 것을 특징으로 하는 측구용 PC 거푸집 구조체.Side-side PC formwork structure further comprises a binding member 140 is fitted to the lower end of the two side-wall PC formwork neighboring disposed in the lateral direction to bind the neighboring two side-wall PC formwork. 제 1 항에 있어서, 상기 받침수단(130)은,The method of claim 1, wherein the support means 130, 측구용 PC 거푸집에 조립되며, 도로경계석의 일단을 하부에서 지지하는 한쌍의 지주(131a,131b)를 구비하는 제1 받침수단(131) 및;A first support means 131 assembled to the side PC formwork and having a pair of struts 131a and 131b supporting one end of the road boundary stone from the bottom; 상기 제1 받침수단(131)과 이격되도록 측구용 PC 거푸집에 조립되며, 도로경계석의 타단을 하부에서 지지하는 하나의 지주(132a)를 구비하는 제2 받침수단(132)으로 구성된 것을 특징으로 하는 측구용 PC 거푸집 구조체.The second support means 132 is assembled to the side wall PC formwork so as to be spaced apart from the first support means 131, and provided with one support 132a for supporting the other end of the road boundary stone from the bottom. Side face PC formwork. 제 3 항에 있어서, 상기 제1 받침수단(131)은,The method of claim 3, wherein the first support means 131, 상호 이격된 채로 수직하게 연장된 한쌍의 지주부재(131-1a,131-1b)를 갖는 제1 받침몸체(131-1);A first support body 131-1 having a pair of strut members 131-1a and 131-1b vertically spaced apart from each other; 상기 제1 받침몸체(131-1)에 일단이 결합되고, 타단이 측구용 PC 거푸집에 조립되어 제1 받침몸체(131-1)와 측구용 PC 거푸집을 결속하되, 제1 받침몸체(131-1)가 상하방향으로 회전할 수 있도록 제1 받침몸체(131-1)에 끼움결합되는 제1 거치대(131-2);One end is coupled to the first support body (131-1), the other end is assembled to the side door PC formwork to bind the first support body (131-1) and the side door PC formwork, the first support body (131-) A first cradle 131-2 fitted into the first support body 131-1 so that 1) may rotate in the vertical direction; 상기 한쌍의 지주부재(131-1a,131-1b)에 각각 나사결합되며, 사용자에 의해 회전하며 상승하거나 하강함으로써 도로경계석의 높낮이를 조절하는 한쌍의 제1 볼트기둥(131-3); 및A pair of first bolt pillars 131-3 screwed to the pair of strut members 131-1a and 131-1b, respectively, to adjust the height of the road boundary stone by being rotated and raised or lowered by the user; And 상기 제1 볼트기둥(131-3)의 상단부에 조립되어 도로경계석의 저면에 접하는 제1 캡(131-4)으로 구성된 것을 특징으로 하는 측구용 PC 거푸집 구조체.Sidework PC formwork structure, characterized in that composed of the first cap (131-4) is assembled to the upper end of the first bolt pillar (131-3) in contact with the bottom surface of the road boundary stone. 제 3 항에 있어서, 상기 제2 받침수단(132)은,The method of claim 3, wherein the second support means 132, 수직하게 연장된 지주부재(132-1a)를 갖는 제2 받침몸체(132-1);A second support body (132-1) having a vertically extending support member (132-1a); 상기 제2 받침몸체(132-1)에 일단이 결합되고, 타단이 측구용 PC 거푸집에 조립되어 제2 받침몸체(132-1)와 측구용 PC 거푸집을 결속하되, 제2 받침몸체(132-1)가 상하방향으로 회전할 수 있도록 제2 받침몸체(132-1)에 끼움결합되는 제2 거치대(132-2);One end is coupled to the second support body 132-1, and the other end is assembled to the side PC body to bind the second support body 132-1 and the side PC body, but the second support body 132- A second cradle 132-2 fitted into the second support body 132-1 so that 1) may rotate in the vertical direction; 상기 지주부재(132-1a)에 나사결합되며, 사용자에 의해 회전하며 상승하거나 하강함으로써 도로경계석의 높낮이를 조절하는 제2 볼트기둥(132-3); 및A second bolt column 132-3 which is screwed to the support member 132-1a and adjusts the height of the road boundary stone by being rotated and raised or lowered by the user; And 상기 제2 볼트기둥(132-3)의 상단부에 조립되어 도로경계석의 저면에 접하는 제2 캡(132-4)으로 구성된 것을 특징으로 하는 측구용 PC 거푸집 구조체.Sidework PC formwork structure, characterized in that composed of a second cap (132-4) is assembled to the upper end of the second bolt pillar (132-3) in contact with the bottom surface of the road boundary stone. 제 4 항 또는 제 5 항에 있어서,The method according to claim 4 or 5, 상기 제1 볼트기둥(131-3)과 제2 볼트기둥(132-3)에 조립되어 사용자가 제1 볼트기둥(131-3) 및 제2 볼트기둥(132-3)을 용이하게 회전시킬 수 있도록 하는 회전용 손잡이(131-5,132-5)를 더 구비하는 것을 특징으로 하는 측구용 PC 거푸집 구조체.It is assembled to the first bolt pillar 131-3 and the second bolt pillar 132-3 so that the user can easily rotate the first bolt pillar 131-3 and the second bolt pillar 132-3. Sidework PC formwork structure, characterized in that it further comprises a rotating handle (131-5, 132-5). 좌우측면 방향으로 연장된 장방형의 구조를 갖는 4각 판재 형상으로, 측구의 형성을 위한 콘크리트의 타설시 콘트리트에 매립되어 콘크리트와의 결속력을 강화하는 하나 이상의 매립편(113)을 갖는 측구용 PC 거푸집(110)을 다수개 준비하고, 준비된 다수개의 측구용 PC 거푸집(110)들 중 두개의 측구용 PC 거푸집(110)이 측구의 폭에 대응하는 사이거리를 갖도록 폼타이(120)를 이용하여 두 측구용 PC 거푸집을 결속하여 거푸집 구조체(100,100`)들을 형성하는 단계(S1);Four-sided plate shape having a rectangular structure extending in the left and right side direction, the side PC PC formwork having one or more buried pieces 113 to be embedded in the concrete when the concrete to form the side holes to strengthen the binding force with the concrete Prepare a plurality of (110), two of the prepared a plurality of side PC dies 110 for the side PC using the form tie 120 so as to have a distance between the corresponding to the width of the side hole. Binding the side PC dies to form the die structures (100, 100 ') (S1); 상기 S1 단계를 통해 형성된 구조체(100,100`)들을 측구가 시공될 장소에 직렬구조로 배치하는 단계(S2);Disposing the structures (100, 100`) formed through the step S1 in a series structure in a place where the side opening is to be constructed (S2); 상기 S2 단계를 통해 거푸집 구조체(100,100`)들의 배치가 완료된 후, 제1 받침몸체(131-1)와 제1 거치대(131-2) 및 제1 볼트기둥(131-3) 그리고 제1 캡(131-4)으로 구성되어 한쌍의 지주(131a,131b)를 갖는 제1 받침수단(131)과, 제2 받침몸체(132-1)와 제2 거치대(132-2) 및 제2 볼트기둥(132-3) 그리고 제2 캡(132-4)으로 구성되어 하나의 지주(132a)를 갖는 제2 받침수단(132)을 상호 이격되게 측구용 PC 거푸집에 조립하여 도로경계석의 설치를 위한 공간을 형성하는 단계(S3);After the arrangement of the formwork structures 100 and 100 'is completed through the step S2, the first support body 131-1, the first cradle 131-2, the first bolt pillar 131-3, and the first cap ( 131-4, the first support means 131 having a pair of struts 131a and 131b, a second support body 132-1, a second holder 132-2, and a second bolt pillar ( 132-3) and the second cap 132-4, which is composed of a second support means 132 having one support 132a, is spaced apart from each other in a PC-form for side door to install a space for installing a road boundary stone. Forming step (S3); 상기 S3 단계를 통해 제1 받침수단(131)과 제2 받침수단(132)의 조립이 완료된 후, 제1 받침수단(131)과 제2 받침수단(132)의 상부에 도로경계석을 놓는 단계(S4); 및After the assembly of the first support means 131 and the second support means 132 is completed through the step S3, the step of placing a road boundary stone on top of the first support means 131 and the second support means 132 ( S4); And 상기 S4 단계를 통해 도로경계석의 배치가 완료된 후, 거푸집 구조체(100)에 의해 형성된 공간에 콘크리트를 타설하는 단계(S5)로 이루어진 것을 특징으로 하는 측구 시공방법.After the placement of the road boundary stone through the step S4 is completed, the side construction method comprising the step (S5) of placing concrete in the space formed by the formwork structure (100). 제 7 항에 있어서,The method of claim 7, wherein 상기 S4 단계에서 제1 볼트기둥(131-3)과 제2 볼트기둥(132-3)을 회전시켜 도로경계석의 높이 및 수평도를 정렬하는 것을 특징으로 하는 측구 시공방법.The method of claim 1, wherein in step S4 by rotating the first bolt pillar (131-3) and the second bolt pillar (132-3) to align the height and horizontality of the road boundary stone. 제 7 항에 있어서,The method of claim 7, wherein 상기 S2 단계에서 측면방향으로 이웃하는 배치되는 두 측구용 PC 거푸집(110)들의 하단부를 결속부재(140)로 결속하는 것을 특징으로 하는 측구 시공방법.Side step construction method characterized in that the step of binding the lower end of the two side PC PC formwork (110) which is arranged adjacent to the side in the step S2 with the binding member (140).
KR1020090011810A 2009-02-13 2009-02-13 Sidewall PC formwork and construction method using the same Expired - Fee Related KR101091600B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090011810A KR101091600B1 (en) 2009-02-13 2009-02-13 Sidewall PC formwork and construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090011810A KR101091600B1 (en) 2009-02-13 2009-02-13 Sidewall PC formwork and construction method using the same

Publications (2)

Publication Number Publication Date
KR20100092609A KR20100092609A (en) 2010-08-23
KR101091600B1 true KR101091600B1 (en) 2011-12-13

Family

ID=42757358

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090011810A Expired - Fee Related KR101091600B1 (en) 2009-02-13 2009-02-13 Sidewall PC formwork and construction method using the same

Country Status (1)

Country Link
KR (1) KR101091600B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102754897B1 (en) 2023-08-01 2025-01-21 한길아이엔씨 주식회사 Construction Method of Boundary Stone

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101291694B1 (en) * 2011-03-09 2013-07-31 신성식 Construction apparatus for boundary stone
CN112127228B (en) * 2020-09-16 2022-04-08 衡阳市金铭环境科技有限公司 Slab-shaped member with pile, pouring construction method for concrete layer of highway and highway
CN115012658B (en) * 2022-05-12 2023-08-11 国网河北省电力有限公司建设公司 A kind of clear-water concrete mold, clear-water concrete mold component and using method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1162072A (en) 1997-08-19 1999-03-05 Takamura Sogyo Kk Permanent form
KR200357084Y1 (en) 2004-04-22 2004-07-21 신상종 Curb support
JP2007231686A (en) 2006-03-03 2007-09-13 Takamura Sogyo Kk Permanent form
KR100873037B1 (en) 2008-05-16 2008-12-09 (주)미래기술단 Road border

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1162072A (en) 1997-08-19 1999-03-05 Takamura Sogyo Kk Permanent form
KR200357084Y1 (en) 2004-04-22 2004-07-21 신상종 Curb support
JP2007231686A (en) 2006-03-03 2007-09-13 Takamura Sogyo Kk Permanent form
KR100873037B1 (en) 2008-05-16 2008-12-09 (주)미래기술단 Road border

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102754897B1 (en) 2023-08-01 2025-01-21 한길아이엔씨 주식회사 Construction Method of Boundary Stone

Also Published As

Publication number Publication date
KR20100092609A (en) 2010-08-23

Similar Documents

Publication Publication Date Title
KR100938821B1 (en) Prefabricated mold structure of waterway and construction method of drainage canal
KR101105092B1 (en) Construction method of this precast retaining wall panel using precast retaining wall panel and semi-dry backfill
JP2002256573A (en) Existing foundation reinforced steel tower foundation and its construction method
KR20170032826A (en) Precast concrete dual wall structure and construction method thereof
JP2001295298A (en) Foundation for columnar structure and its work execution method
KR101091600B1 (en) Sidewall PC formwork and construction method using the same
KR100824713B1 (en) Shelf retaining wall using PC wall board and its construction method
KR101707170B1 (en) Structure for connecting support
KR101230986B1 (en) Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow
KR20130047096A (en) A multipurpose molding assembly for a construction
KR101011969B1 (en) Construction method of precast box structure using sliding means
JP7126248B2 (en) Culvert manufacturing method
KR102186470B1 (en) Dowel Bar steel form
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR100818733B1 (en) Concrete construction
KR100654170B1 (en) Road boundary stone construction device
KR102157763B1 (en) Retaining wall with anchor panel and gabion-wall and construction method thereof
KR101106799B1 (en) Construction method of top down concrete slab
KR20100059051A (en) Construction method of support plate for grating
KR200244705Y1 (en) Mold for raceway operation at a road construction
JP2009161961A (en) Gutter and method of constructing gutter
JP7197879B2 (en) Falling rock protection fence
JP2013170420A (en) Foundation forming method of architectural structure and foundation of architectural structure
KR102149662B1 (en) Method for constructing transfer layer of building using precast concrete slab
KR20090022451A (en) Gangpom for underground wall and construction method of underground wall using the same

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

PG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-PG1501

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

FPAY Annual fee payment

Payment date: 20141125

Year of fee payment: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20151203

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20151203

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000