KR101080836B1 - Buit-in steel plate with shear key for rebar splice - Google Patents

Buit-in steel plate with shear key for rebar splice Download PDF

Info

Publication number
KR101080836B1
KR101080836B1 KR1020090031957A KR20090031957A KR101080836B1 KR 101080836 B1 KR101080836 B1 KR 101080836B1 KR 1020090031957 A KR1020090031957 A KR 1020090031957A KR 20090031957 A KR20090031957 A KR 20090031957A KR 101080836 B1 KR101080836 B1 KR 101080836B1
Authority
KR
South Korea
Prior art keywords
coupler
steel plate
shear key
protrusion
reinforcing bar
Prior art date
Application number
KR1020090031957A
Other languages
Korean (ko)
Other versions
KR20100113398A (en
Inventor
오보환
천성철
김상구
Original Assignee
(주)대우건설
주식회사부원비엠에스
천성철
주식회사 유신건축종합건축사사무소
(주) 종합건축사사무소 동일건축
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)대우건설, 주식회사부원비엠에스, 천성철, 주식회사 유신건축종합건축사사무소, (주) 종합건축사사무소 동일건축 filed Critical (주)대우건설
Priority to KR1020090031957A priority Critical patent/KR101080836B1/en
Publication of KR20100113398A publication Critical patent/KR20100113398A/en
Application granted granted Critical
Publication of KR101080836B1 publication Critical patent/KR101080836B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/40Separate connecting elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups

Abstract

본 발명은 전단키를 구비한 철근 이음용 매립 강판에 관한 것으로서, 특히 코어선행공법이나 슬러리월 공법과 같이 선 시공된 벽체에 슬래브나 보를 연결할 때 사용되는 매립형 연결박스에 있어서, 직사각형태의 판형상으로 형성되고, 길이 방향으로 전단키가 돌출 형성되는 스틸 플레이트와; 일단이 상기 스틸 플레이트의 전면에 고정되는 커플러와; 상기 커플러의 일단에 이의 일단이 결속되는 이음 철근; 및 상기 이음 철근의 타단에 결속되는 정착판으로 이루어지는 것을 특징으로 한다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a buried steel sheet for reinforcing bars having a shear key, and in particular, in a buried connection box used when connecting a slab or beam to a pre-installed wall such as a core lead method or a slurry wall method, in a rectangular plate shape. A steel plate formed with a shear key protruding in the longitudinal direction; A coupler, one end of which is fixed to the front of the steel plate; A joint reinforcing bar having one end thereof coupled to one end of the coupler; And a fixing plate which is bound to the other end of the joint reinforcing bar.
상기와 같은 본 발명에 따르면 이음 철근의 일단에 커플러를 설치함으로써 철근을 접고 펴는 과정을 생략하여 철근의 손상 방지할 수 있고, 높은 강도의 철근을 사용하여 철근 개수를 줄일 수 있으며, 이음 철근의 타단에 정착판을 설치함으로써 벽체 철근에 매립 강판을 고정시킬 때 벽체 횡보강근과 같은 기존 코어 철근과의 간섭을 방지하여 설치를 원활하게 할 수 있으며, 구부러진 연장부, 정착 갈고리, 그리고 연결박스 덮개가 생략되어 무게를 감소시키므로 매립 강판의 길이를 길게하여 시공의 효율성을 향상시킬 수 있고, 매립 강판의 전면에 덮개를 없애고 전단키를 적용함으로써 콘크리트 이어치기 시에 불연속성을 제거하고, 신구 콘크리트면의 전단 성능을 향상시킬 수 있다.According to the present invention as described above, by installing a coupler at one end of the reinforcing bar to avoid the process of folding and unfolding the rebar to prevent damage to the reinforcement, using a high-strength reinforcement can reduce the number of rebar, the other end of the reinforcing bars When fixing the buried steel plate to the wall reinforcement by installing the fixing plate, the installation can be smoothed by preventing interference with existing core reinforcing bars such as wall reinforcing bars, and bent extensions, fixing hooks, and connection box covers are omitted. As the weight is reduced, the length of the embedded steel sheet can be lengthened to improve the efficiency of construction. By removing the cover on the front of the steel sheet and applying the shear key, the discontinuity can be eliminated when the concrete is connected, and the shear performance of the new concrete surface is improved. Can be improved.
코어선행공법, 매립 강판, 철근, 간섭, 손상, 커플러, 정착판 Core leading method, embedded steel plate, rebar, interference, damage, coupler, fixing plate

Description

전단키를 구비한 철근 이음용 매립 강판{BUIT-IN STEEL PLATE WITH SHEAR KEY FOR REBAR SPLICE}BUIT-IN STEEL PLATE WITH SHEAR KEY FOR REBAR SPLICE}
본 발명은 전단키를 구비한 철근 이음용 매립 강판에 관한 것으로서, 상세하게는 이음 철근의 양단에 커플러와 원형 정착판을 각각 형성하여 철근 손상 및 간섭을 최소화시키고, 스틸 플레이트에 전단키를 형성하여 신구 콘크리트면의 전단 성능을 향상시키도록 하는 전단키를 구비한 철근 이음용 매립 강판에 관한 것이다.The present invention relates to a buried steel sheet for reinforcing bars having shear keys. Specifically, couplers and circular fixing plates are formed on both ends of a joint reinforcing bar to minimize reinforcement damage and interference, and a shear key is formed on a steel plate. It relates to a buried steel sheet for reinforcing bar joints provided with a shear key to improve the shear performance of the face.
일반적으로 코어선행공법은 코어 부분의 콘크리트가 먼저 시공되고, 그 뒤를 따라 보, 기둥으로 구성된 라멘조가 올라오는 공법으로 코어 벽체만 먼저 시공하고 나중에 슬래브와 보를 연결하여 벽체와 일체시키는 공법이다.In general, the core leading method is a method in which the concrete of the core part is constructed first, followed by a ramen jaw consisting of beams and pillars, and only the core wall is constructed first, and later, the slab and the beam are connected to integrate with the wall.
어떻게 슬래브 이음 철근을 배치하고 코어에 연결되는 보의 철근을 정착시킬 매립 철물을 설치하는가는 코어선행공법의 한 요소기술이라고 할 수 있다.How to install the slab joint reinforcement and the reclamation hardware to fix the reinforcing bar of the beam connected to the core is an element technology of the core leading method.
슬래브와의 이음 철근은 향후 슬래브와 연결될 때 높이가 일치하여야 하고 벽체 거푸집 설치 및 해체에 장애가 되지 않아야 하며, 꺽어 놓았다가 다시 펼 때 손상을 입지 않기 위해 낮은 설계강도의 철근을 사용해야한다. 또한 다시 펴는 과정에서 철근이 손상될 것에 대비하여 필요한 철근량보다 통상 20%정도 더 많이 배 근한다.The joint reinforcing bar with the slab should be of the same height when connected to the slab in the future, and should not interfere with the installation and dismantling of the wall formwork, and the low design strength bar should be used to avoid damage when bending and unfolding. In addition, the rebar is usually 20% more than the required rebar in case of rebar damage.
선행되는 코어 벽체에 향후 슬래브를 연결하는 방법으로는 벽체에 매립 박스를 두는 방법이 주로 사용되고 있다.As a method of connecting the slab to the core wall in the future, a method of placing a buried box on the wall is mainly used.
이러한 매립형 연결박스는 선행 벽체에 박스를 묻고 그곳에 이음 철근을 접어 두었다가 펼쳐서 슬래브 철근과 연결하는 방법이다.Such a buried connection box is a method of burying a box on a preceding wall, folding a joint reinforcing bar and expanding it to connect with the slab reinforcing bar.
도 1은 일반적인 매립형 연결박스의 구성을 나타낸 측단면도이고, 도 2는 일반적인 매립형 연결박스의 구성을 나타낸 사시도이다.1 is a side cross-sectional view showing the configuration of a general buried connection box, Figure 2 is a perspective view showing the configuration of a general buried connection box.
도 1 및 도 2에 도시된 바와 같이 매립형 연결박스(30)는 그 일단에 정착 갈고리(21)가 형성되도록 U자형 또는 90도 갈고리로 형성되고, 그 타단에 연장부(23)가 형성된 이음 철근(20)과, 이음 철근(20)이 등간격으로 설치되되, 이음 철근(20)의 연장부(23)가 내부에 수납되는 강판 박스(30)로 이루어진다. 그리고, 강판 박스(30)는 내부에 물과 콘크리트가 인입되는 것을 막도록 전면에 덮개(31)를 구비한다.1 and 2, the buried connection box 30 is formed with a U-shaped or 90-degree hook so that the fixing hook 21 is formed at one end thereof, and a joint reinforcing bar having an extension 23 formed at the other end thereof. 20 and the joint reinforcing bar 20 is installed at equal intervals, the extension portion 23 of the joint reinforcing bar 20 is made of a steel box 30 is accommodated therein. In addition, the steel plate box 30 is provided with a cover 31 on the front surface to prevent water and concrete from being introduced therein.
이러한, 매립형 연결박스의 설치 과정을 설명하면, 벽체 주철근(1)에 매립형 연결박스(30)를 결속선에 의해 고정시킨 다음, 벽체 주철근(1)의 전면에 벽체 거푸집(3)을 설치 후 벽체 거푸집(3) 내에 콘크리트를 타설하여 양생하여 코어 선 시공한다.When explaining the installation process of the buried connection box, after fixing the buried connection box 30 to the wall cast iron (1) by the binding line, and then install the wall formwork (3) in front of the wall cast steel (1) wall The concrete is poured into the formwork (3) and cured to construct the core line.
그런 다음 후속 슬래브 또는 보 공정에서 강판 박스(30)의 덮개(31)를 제거하고, 구부려진 연장부(23)를 펴서 슬래브 또는 보의 주근과 연결한다.Then, in the subsequent slab or beam process, the cover 31 of the steel plate box 30 is removed, and the bent extension 23 is extended to connect with the main root of the slab or beam.
그러나, 이러한 종래의 매립형 연결박스는 연장부가 강판 박스 내에서 접혀 져 있다가 후속 슬래브 공정의 주철근과 이음을 위해서 다시 펴는 과정에서 철근에 손상이 발생하는 문제점이 있다. 건설관련 각종 시방서에서는 철근을 구부렸다 펴는 행위를 원칙적으로 허용하지 않으며 콘크리트표준시방서 해설에서는 큰 반경으로 구부리고 다시 펼 때는 가열을 하여 철근의 품질 저하를 최소화시키도록 규정하고 있다. 철근의 손상을 최소화하기 위해 설계강도가 낮은 철근을 사용하여 철근 개수가 늘어나는 문제점이 있으며, 펴는 과정에서 손상이 발생될 것을 우려하여 통상 20%정도 더 많은 철근을 배치한다.However, such a conventional buried connection box has a problem that the extension is folded in the steel box, the damage to the reinforcing bar in the re-rolling process for the joint with the reinforcing bar of the subsequent slab process. Various construction-related specifications do not allow bending and unrolling of reinforcing bars in principle, and in the specification of concrete standard specifications, it is required to bend to a large radius and to heat them when unfolding to minimize the deterioration of rebar quality. In order to minimize the damage of reinforcing bars, there is a problem that the number of reinforcing bars is increased by using reinforcing bars having low design strength, and in general, 20% more rebars are placed because of fear of damage occurring during unfolding.
또한, 이러한 종래의 매립형 연결박스는 설치시 이음 철근의 정착을 위해 설치한 정착 갈고리가 벽체 횡보강근과 같은 기존 코어 철근과의 간섭이 발생하여 시공이 어려운 문제점이 있다.In addition, such a conventional buried connection box has a problem in that the fixing hook installed for fixing the reinforcing bars when the installation is difficult to interfere with the existing core reinforcing bars such as wall reinforcement.
또, 이러한 종래의 매립형 연결박스는 구부러진 연장부를 포함하는 철근과, 정착 갈고리 및 매립 박스 덮개의 무게로 인해 매립형 연결박스의 길이가 제한되는 문제점이 있다.In addition, the conventional buried connection box has a problem that the length of the buried connection box is limited due to the weight of the reinforcing bars including the bent extension, the fixing hook and the buried box cover.
이러한 부분은 지하층 외벽이 먼저 시공되는 슬러리월 공법에서도 동일하게 발생한다.       This is the same in the slurry wall method in which the outer wall of the basement is constructed first.
본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 이음 철근의 일단에 커플러를 설치함으로써 철근을 접고 펴는 과정을 생략하여 철근의 손상을 방지할 수 있도록 하는 전단키를 구비한 철근 이음용 매립 강판을 제공하는데 그 목적이 있다.The present invention is to solve the above problems, by providing a coupler on one end of the joint reinforcing bar to provide a reinforcing steel plate for reinforcing bars with a shear key to avoid the damage of reinforcing bars by eliminating the process of folding and unfolding the rebar Its purpose is to.
또한, 본 발명은 접고 펴는 과정이 없기 때문에 높은 설계강도의 철근을 사용할 수 있으므로, 철근 개수를 줄여 경제성과 시공성을 크게 향상시키는데 다른 목적이 있다.In addition, the present invention can be used because the reinforcement of high design strength because there is no folding and unfolding, there is another object to greatly improve the economics and constructionability by reducing the number of reinforcing bars.
또, 본 발명은 이음 철근의 타단에 정착판을 설치함으로써 벽체 철근에 매립 강판을 고정시킬 때 벽체 횡보강근과 같은 기존 코어 철근과의 간섭을 방지하여 설치를 원활하게 할 수 있도록 하는 전단키를 구비한 철근 이음용 매립 강판을 제공하는데 또 다른 목적이 있다.In addition, the present invention is provided with a shear key for installing a fixing plate at the other end of the joint reinforcing bar to prevent interference with existing core reinforcing bars such as wall lateral reinforcement when fixing the embedded steel plate to the wall reinforcement to facilitate the installation Another object is to provide a buried steel sheet for reinforcing bars.
또, 본 발명은 매립 강판의 전면에 덮개를 없애고 전단키를 적용함으로써 콘크리트 이어치기 시에 불연속성을 제거하고, 신구 콘크리트면의 전단 성능을 향상시키도록 하는 전단키를 구비한 철근 이음용 매립 강판을 제공하는데 또 다른 목적이 있다.In addition, the present invention provides a reinforcing steel plate for reinforcing bars having a shear key to remove the discontinuity at the time of concrete reinforcement, and improve the shear performance of the old and new concrete surface by removing the cover on the front of the embedded steel sheet and applying a shear key. There is another purpose.
또, 본 발명은 기존 기술에서 구부러진 연장부, 정착 갈고리, 그리고 매립 박스 덮개를 제거하여 무게를 줄임으로써 매립강판의 길이를 길게 하여 시공의 효율성을 향상시킬 수 있도록 하는데 또 다른 목적이 있다.In addition, the present invention has another object to improve the construction efficiency by increasing the length of the buried steel sheet by reducing the weight by removing the bent extension, fixing hook, and buried box cover in the existing technology.
상기와 같은 목적을 달성하기 위한 본 발명의 특징은,Features of the present invention for achieving the above object,
코어선행공법이나 슬러리월 공법과 같이 선 시공된 벽체에 슬래브나 보를 연결할 때 사용되는 매립형 연결박스에 있어서, 직사각형태의 판형상으로 형성되고, 길이 방향으로 전단키가 돌출 형성되는 스틸 플레이트와; 일단이 상기 스틸 플레이 트의 전면에 고정되는 커플러와; 상기 커플러의 일단에 이의 일단이 결속되는 이음 철근; 및 상기 이음 철근의 타단에 결속되는 정착판으로 이루어지는 것을 특징으로 한다.An embedded connection box for use in connecting slabs or beams to a pre-constructed wall, such as a core lead method or a slurry wall method, comprising: a steel plate formed in a rectangular plate shape and having a shear key protruding in the longitudinal direction; A coupler, one end of which is fixed to the front of the steel plate; A joint reinforcing bar having one end thereof coupled to one end of the coupler; And a fixing plate which is bound to the other end of the joint reinforcing bar.
여기에서, 상기 커플러는 전면에 캡이 결합되고, 후속 슬래브 또는 보 공정에서 제거된다.Here, the coupler is capped to the front and removed in a subsequent slab or beam process.
여기에서 또, 상기 전단키는 그 단면 형상이 사다리꼴로 형성되되, 상기 스틸 플레이트에서 절곡 형성되어 일방향으로 돌출 형성된다.Here, the shear key is formed in a trapezoidal cross-sectional shape, is bent from the steel plate is formed to protrude in one direction.
여기에서, 상기 전단키는 선시공시 내부 공간에 콘크리트가 유입되는 것을 차단하도록 내부 공간에 밀봉재가 압입되고, 후속 슬래브 또는 보 공정에서 제거된다.Herein, the shear key is press-fitted into the inner space to block concrete from entering the inner space during preliminary construction, and is removed in a subsequent slab or beam process.
여기에서 또, 상기 커플러는 전면에 돌출부가 형성된다.Here, the coupler is formed with a protrusion on the front surface.
여기에서 또, 상기 스틸 플레이트는 상기 커플러의 돌출부가 삽입되도록 이와 대응되는 위치에 복수의 커플러 관통홀이 형성된다.Here, the steel plate is formed with a plurality of coupler through-holes at positions corresponding to the protrusions of the coupler.
여기에서 또, 상기 커플러는 상기 스틸 플레이트의 커플러 관통홀에 상기 돌출부를 삽입한 후 상기 돌출부를 외측으로 가압 변형하여 상기 커플러 관통홀에 고정시킨다.Here, the coupler inserts the protrusion into the coupler through hole of the steel plate and presses the protrusion to the outside to fix the coupler to the coupler through hole.
여기에서 또, 상기 커플러는 상기 스틸 플레이트의 커플러 관통홀에 상기 돌출부를 삽입한 후 상기 돌출부의 외측을 상기 커플러 관통홀에 용접하여 고정시킨다.Here, the coupler inserts the protrusion into the coupler through hole of the steel plate and then welds and fixes the outside of the protrusion to the coupler through hole.
여기에서 또, 상기 커플러는 그 타단이 벽체 거푸집과 면접된다.Here again, the coupler has its other end interviewed with the wall formwork.
상기와 같이 구성되는 본 발명인 전단키를 구비한 철근 이음용 매립 강판에 따르면, 이음 철근의 일단에 커플러를 설치함으로써 철근을 접고 펴는 과정을 생략하여 철근의 손상 방지할 수 있고, 높은 설계강도의 철근을 사용할 수 있으므로 철근 개수를 줄일 수 있다. 또한, 철근 손상을 고려하여 통상 20% 더 배근하는 여유분 철근이 필요하지 않다.According to the buried steel sheet for reinforcing bars with a shear key of the present invention configured as described above, by installing a coupler at one end of the joint reinforcing bar to avoid the process of folding and unfolding the reinforcing bar, it is possible to prevent the damage of the reinforcing bars, high reinforcing bar Can be used to reduce the number of rebars. In addition, in consideration of reinforcing bar damage, a 20% extra bar is not required.
또한, 이음 철근의 타단에 정착판을 설치함으로써 벽체 철근에 매립 강판을 고정시킬 때 벽체 횡보강근과 같은 기존 코어 철근과의 간섭을 방지하여 설치를 원활하게 할 수 있는 이점이 있다.       In addition, by installing a fixing plate at the other end of the reinforcing bar has an advantage that can be smoothly installed by preventing interference with existing core reinforcing bars such as wall lateral reinforcement when fixing the embedded steel plate to the wall reinforcement.
또, 본 발명에 따르면 매립 강판의 전면에 덮개를 없애고 전단키를 적용함으로써 콘크리트 이어치기 시에 불연속성을 제거하고, 신구 콘크리트면의 전단 성능을 향상시킬 수 있는 이점이 있다.In addition, according to the present invention by removing the cover on the front of the buried steel sheet and applying the shear key has the advantage that can eliminate the discontinuity in the concrete splice, and improve the shear performance of the old and new concrete surface.
또, 본 발명에 따르면 기존기술에서 구부러진 연장부, 정착 갈고리, 그리고 매립 박스 덮개를 제거하여 무게를 줄임으로써 매립강판의 길이를 길게하여 시공의 효율성을 향상시킬 수 있는 이점이 있다.In addition, according to the present invention has the advantage of improving the efficiency of the construction by increasing the length of the buried steel sheet by reducing the weight by removing the bent extension, fixing hook, and the buried box cover in the existing technology.
이하, 본 발명에 따른 전단키를 구비한 철근 이음용 매립 강판의 구성을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the configuration of the embedded steel sheet for reinforcing bars with a shear key according to the present invention will be described in detail.
하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략할 것이다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.In the following description of the present invention, if it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted. The following terms are defined in consideration of the functions of the present invention, and may be changed according to the intentions or customs of the user, the operator, and the like. Therefore, the definition should be based on the contents throughout this specification.
도 3은 본 발명에 따른 전단키를 구비한 철근 이음용 매립 강판의 구성을 나타낸 정면 사시도이고, 도 4는 본 발명에 따른 전단키를 구비한 철근 이음용 매립 강판의 구성을 나타낸 배면 사시도이며, 도 5는 본 발명의 일실시예에 따른 전단키를 구비한 철근 이음용 매립 강판중 커플러와 스틸 플레이트의 결합 상태를 나타낸 측단면도이고, 도 6은 도 5에 캡을 결합한 상태를 나타낸 측단면도이며, 도 7은 본 발명의 다른 실시예에 따른 전단키를 구비한 철근 이음용 매립 강판중 커플러와 스틸 플레이트의 결합 상태를 나타낸 측단면도이고, 도 8은 본 발명에 따른 전단키를 구비한 철근 이음용 매립 강판을 이용하여 선시공한 상태를 나타낸 측단면도이며, 도 9는 본 발명에 따른 전단키를 구비한 철근 이음용 매립 강판을 이용하여 후시공한 상태를 나타낸 측단면도이다.Figure 3 is a front perspective view showing the configuration of a steel plate for reinforcing bars with a shear key according to the present invention, Figure 4 is a rear perspective view showing the configuration of a steel plate for reinforcing bars with a shear key according to the invention, Figure 5 Figure 6 is a side cross-sectional view showing a coupling state of the coupler and the steel plate of the embedded steel sheet for reinforcing bar joint having a shear key according to an embodiment of the present invention, Figure 6 is a side cross-sectional view showing a state in which the cap is coupled to Figure 5, Figure 7 Is a side cross-sectional view showing a coupling state of a coupler and a steel plate of a steel plate for reinforcing seam provided with a shear key according to another embodiment of the present invention, and FIG. 8 is used to embed a steel plate for reinforcing seam with a shear key according to the present invention. 9 is a side cross-sectional view showing a pre-installed state, and FIG. 9 shows a post-installed state using a buried steel sheet for reinforcing bars having a shear key according to the present invention. A cross-sectional view.
도 3 내지 도 9를 참조하면, 본 발명에 따른 전단키를 구비한 철근 이음용 매립 강판(100)은, 스틸 플레이트(110)와, 커플러(120)와, 이음 철근(130) 및 정착판(140)으로 구성된다.3 to 9, the embedded steel plate 100 for reinforcing bars having a shear key according to the present invention includes a steel plate 110, a coupler 120, a joint reinforcing bar 130, and a fixing plate 140. It is composed of
먼저, 스틸 플레이트(110)는 직사각형태의 판형상으로 형성되고, 길이 방향으로 전단키(111)가 돌출 형성된다. 여기에서, 전단키(111)는 그 단면 형상이 사다리꼴로 형성되되, 스틸 플레이트(110)에서 절곡 형성되어 일방향으로 돌출 형성된다. 여기에서 또한, 스틸 플레이트(110)는 하기에서 설명할 커플러(120)와 대응되는 위치에 커플러 관통홀(113)이 2단으로 배열된다. 여기에서 또, 전단키(111)는 선시공시 내부 공간에 콘크리트가 유입되는 것을 차단하도록 내부 공간에 밀봉재(115)가 압입되고, 밀봉재(115)는 후속 슬래브 또는 보 공정에서 제거되는 것이 바람직하여 밀봉재(115)를 대신하여 내부 공간을 차단하는 테이프 등이 사용될 수도 있다.First, the steel plate 110 is formed in a rectangular plate shape, the shear key 111 protrudes in the longitudinal direction. Here, the shear key 111 is formed in a trapezoidal cross-sectional shape, bent in the steel plate 110 is formed to protrude in one direction. Here, in the steel plate 110, the coupler through-hole 113 is arranged in two stages at a position corresponding to the coupler 120 to be described later. Here, the shear key 111 is a seal material 115 is pressed into the inner space to prevent the concrete from flowing into the inner space during the pre-installation, the sealing material 115 is preferably removed in a subsequent slab or beam process, so In place of 115, a tape or the like may be used to block the internal space.
그리고, 커플러(120)는 철근을 연결하는 통상의 커플러로 스틸 플레이트(110)의 커플러 관통홀(113)에 고정시키기 위해 전면에 돌출부(121)가 형성된다. 여기에서, 커플러(120)는 콘크리트 타설시 내부로 콘크리트가 인입되지 않도록 캡(123)이 구비되며, 벽체 거푸집(3)에 콘크리트가 타설될 시 타설 완료 후 거푸집 해체 시점에서 철근 연결 부위가 노출되도록 그 타단이 벽체 거푸집(3)과 면접된다.In addition, the coupler 120 has a protrusion 121 formed on the front surface of the coupler 120 to fix the coupler through-hole 113 of the steel plate 110 as a conventional coupler for connecting reinforcing bars. Here, the coupler 120 is provided with a cap 123 so that concrete is not introduced into the concrete during the casting, when the concrete is poured into the wall formwork 3 so that the reinforcing bar connection portion is exposed at the time of form dismantling. The other end is interviewed with the wall formwork 3.
그리고, 커플러(120)를 스틸 플레이트(110)의 커플러 관통홀(113)에 고정시키는 방법을 설명하면 커플러(120)의 돌출부(121)를 커플러 관통홀(113)에 삽입한 후 도 5 및 도 6에 도시된 바와 같이 돌출부(121)를 외측으로 가압하여 "기역자" 형태로 변형시켜 변형부위가 커플러 관통홀(113)의 측면에 고정되도록 하거나 또는 커플러 관통홀(113)에 돌출부(121)를 삽입한 후 도 7에 도시된 바와 같이 돌출부(121)의 외측을 커플러 관통홀(113)에 용접하여 고정시키는 것이 바람직하다.In addition, the method of fixing the coupler 120 to the coupler through hole 113 of the steel plate 110 will be described with reference to FIGS. 5 and 5 after inserting the protrusion 121 of the coupler 120 into the coupler through hole 113. As shown in FIG. 6, the protrusion 121 is pushed outward to deform into a “transducer” shape so that the deformation portion is fixed to the side of the coupler through hole 113 or the protrusion 121 is inserted into the coupler through hole 113. After insertion, the outer side of the protrusion 121 is preferably welded to the coupler through hole 113 and fixed as shown in FIG. 7.
또한, 이음 철근(130)은 커플러(120)의 일단에 이의 일단이 결속된다. 여기에서, 이음 철근(130)은 커플러(120)와 하기에서 설명할 정착판(140)의 체결이 용 이하도록 나사산이 형성될 수도 있다.In addition, one end of the joint reinforcement 130 is coupled to one end of the coupler 120. Here, the connecting reinforcing bar 130 may be threaded to facilitate the coupling of the coupler 120 and the fixing plate 140 to be described below.
또, 정착판(140)은 통상의 원형, 타원형, 각형 중 어느 하나의 정착판으로 이음 철근(130)의 타단에 결속된다.In addition, the fixing plate 140 is bound to the other end of the joint reinforcement 130 by any one of the usual circular, elliptical, square.
이하, 본 발명에 따른 전단키를 구비한 철근 이음용 매립 강판의 설치 과정 및 작용을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings the installation process and action of the embedded steel sheet for reinforcing bar with shear key according to the present invention will be described in detail.
먼저, 커플러(120)와 이음 철근(130)을 상호 결합시키고, 커플러(120)의 돌출부(121)를 커플러 관통홀(113)을 통해 배출시킨 후 상기 돌출부(121)를 가압하여 변형시키거나 또는 용접하여 커플러(120)를 스틸 플레이트(110)에 고정시킨다.First, the coupler 120 and the joint reinforcing bars 130 are mutually coupled to each other, and the protrusion 121 of the coupler 120 is discharged through the coupler through hole 113, and then the protrusion 121 is pressed to deform or By welding, the coupler 120 is fixed to the steel plate 110.
그리고, 이음 철근(130)에 정착판(140)을 결합시킨다. 이때, 이음 철근(130)과 정착판(140)을 먼저 결합시키거나 커플러(120)를 결합시킬 수도 있다.Then, the fixing plate 140 is coupled to the joint reinforcement 130. At this time, the joint reinforcement 130 and the fixing plate 140 may be combined first or the coupler 120 may be coupled.
이러한 상태에서 스틸 플레이트(110)의 전단키(111) 내부에 콘크리트가 충진되는 것을 차단하도록 전단키(111)의 내부 공간에 밀봉재(115)를 압입하여 공간을 밀봉시킨다.In this state, the sealing material 115 is press-fitted into the inner space of the shear key 111 to seal the space to prevent the concrete from being filled in the shear key 111 of the steel plate 110.
상기와 같이 조립이 완료된 철근 이음용 매립 강판(100)의 이음 철근(130)을 벽체 주철근(1)에 결속선을 이용하여 고정시킨 다음, 벽체 주철근(1)의 전면에 벽체 거푸집(3)을 설치 후 벽체 거푸집(3) 내에 콘크리트를 타설하여 양생하여 코어 선 시공한다. 이때, 커플러(120)는 벽체 거푸집(3)에 콘크리트가 타설될 시 철근 연결 부위가 노출되도록 벽체 거푸집(3)과 면접시킨다.After fixing the joint reinforcement 130 of the reinforcing steel plate 100 for the reinforcement of the reinforcing bar assembly as described above to the wall cast iron (1) using a binding line, the wall formwork (3) on the front of the wall cast steel (1) After installation, the concrete is poured into the wall formwork (3) to cure the core line construction. At this time, the coupler 120 is interviewed with the wall formwork 3 so that the reinforcing bar is exposed when concrete is poured into the wall formwork 3.
그런 다음, 콘크리트의 양생이 완료되어 벽체 거푸집(3)을 제거하면 커플러(120)가 노출된다. 이때, 스틸 플레이트(110)의 전단키(111)에 의해 콘크리트 이 어치기시의 불연속성이 제거된다.Then, when curing of the concrete is completed to remove the wall formwork 3, the coupler 120 is exposed. At this time, the discontinuity when the concrete is damaged by the shear key 111 of the steel plate 110 is removed.
그리고, 후속 슬래브 또는 보 공정에서 커플러의 캡(123)을 제거한 후 커플러(120)에 슬래브 또는 보의 주근(5)을 연결하고, 스틸 플레이트(110)의 전단키(111)를 밀봉하고 있는 밀봉재(115)를 제거한 후 슬래브 또는 보 형성을 위해 콘크리트를 후타설한다.In addition, after the cap 123 of the coupler is removed in a subsequent slab or beam process, the main rod 5 of the slab or beam is connected to the coupler 120, and the sealing material sealing the shear key 111 of the steel plate 110 ( 115) After removing, postcast concrete to form slabs or beams.
본 발명은 다양하게 변형될 수 있고 여러 가지 형태를 취할 수 있으며 상기 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다. 하지만 본 발명은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.As those skilled in the art would realize, the described embodiments may be modified in various ways, all without departing from the spirit or scope of the present invention. It is to be understood, however, that the present invention is not limited to the specific forms referred to in the description, but rather includes all modifications, equivalents, and substitutions within the spirit and scope of the invention as defined by the appended claims. Should be.
도 1은 일반적인 매립형 연결박스의 구성을 나타낸 측단면도,1 is a side cross-sectional view showing a configuration of a general buried connection box,
도 2는 일반적인 매립형 연결박스의 구성을 나타낸 사시도,Figure 2 is a perspective view showing the configuration of a general buried connection box,
도 3은 본 발명에 따른 전단키를 구비한 철근 이음용 매립 강판의 구성을 나타낸 정면 사시도,Figure 3 is a front perspective view showing the configuration of the embedded steel sheet for reinforcing bar with shear key according to the present invention,
도 4는 본 발명에 따른 전단키를 구비한 철근 이음용 매립 강판의 구성을 나타낸 배면 사시도,Figure 4 is a rear perspective view showing the configuration of the embedded steel sheet for reinforcing bar with shear key according to the present invention,
도 5는 본 발명에 따른 커플러와 타공망을 스틸 플레이트를 연결하기 이전의 측단면도,Figure 5 is a side cross-sectional view before connecting the steel plate to the coupler and perforated network according to the present invention,
도 6은 본 발명의 일실시예에 따른 커플러와 타공망을 스틸 플레이트를 연결한 후 캡을 채운 측단면도,Figure 6 is a side cross-sectional view of filling the cap after connecting the steel plate to the coupler and the perforated network according to an embodiment of the present invention,
도 7은 본 발명의 일실시예에 따른 전단키를 구비한 철근 이음용 매립 강판의 구성을 나타낸 측단면도,Figure 7 is a side cross-sectional view showing the configuration of a buried steel sheet for reinforcing bars with a shear key according to an embodiment of the present invention,
도 8은 본 발명의 다른 실시예에 따른 커플러와 타공망을 스틸 플레이트를 연결한 후 캡을 채우고 기 배근된 벽체에 설치한 측단면도.Figure 8 is a side cross-sectional view of the coupler and the perforated network in accordance with another embodiment of the present invention after the steel plate is connected to fill the cap and installed on the existing wall.
<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>
1 : 벽체 주철근 3 : 벽체 거푸집1: wall cast iron 3: wall formwork
5 : 슬래브 또는 보의 주근 110 : 스틸 플레이트5: slab or beam freckles 110: steel plate
111 : 전단키 115 : 밀봉재111 shear key 115 sealing material
120 : 커플러 130 : 이음 철근120: coupler 130: joint rebar
140 : 정착판140: fixing plate

Claims (9)

  1. 코어선행공법이나 슬러리월 공법과 같이 선 시공된 벽체에 슬래브나 보를 연결할 때 사용되는 매립형 연결박스에 있어서,In the buried connection box used to connect the slab or beam to the pre-installed wall, such as the core leading method or slurry wall method,
    직사각형태의 판형상으로 형성되고, 길이 방향으로 전단키가 돌출 형성되는 스틸 플레이트와;A steel plate formed in a rectangular plate shape and having a shear key protruding in the longitudinal direction;
    일단이 상기 스틸 플레이트의 전면에 고정되는 커플러와;A coupler, one end of which is fixed to the front of the steel plate;
    상기 커플러의 일단에 이의 일단이 결속되는 이음 철근; 및A joint reinforcing bar having one end thereof coupled to one end of the coupler; And
    상기 이음 철근의 타단에 결속되는 정착판으로 이루어지는 것을 특징으로 하는 전단키를 구비한 철근 이음용 매립 강판.A buried steel sheet for reinforcing bars with shear keys, comprising: a fixing plate bound to the other end of the reinforcing bars.
  2. 삭제delete
  3. 제 1 항에 있어서,The method of claim 1,
    상기 전단키는,The shear key,
    그 단면 형상이 사다리꼴로 형성되되, 상기 스틸 플레이트에서 절곡 형성되어 일방향으로 돌출 형성되는 것을 특징으로 하는 전단키를 구비한 철근 이음용 매립 강판.Its cross-sectional shape is formed in a trapezoidal shape, bent from the steel plate is formed in the steel plate for reinforcing bars having a shear key, characterized in that protruding in one direction.
  4. 삭제delete
  5. 삭제delete
  6. 삭제delete
  7. 제 1 항에 있어서,The method of claim 1,
    상기 커플러는,The coupler is,
    전면에 돌출부가 형성되고, 상기 스틸 플레이트에서 상기 돌출부가 삽입되도록 상기 돌출부와 대응되는 위치에 형성된 커플러 관통홀에 상기 돌출부를 삽입한 후 상기 돌출부를 외측으로 가압 변형하여 상기 커플러 관통홀에 고정시키는 것을 특징으로 하는 전단키를 구비한 철근 이음용 매립 강판.A protrusion is formed on the front surface, and the protrusion is inserted into a coupler through hole formed at a position corresponding to the protrusion so that the protrusion is inserted in the steel plate, and the protrusion is pressed outward to fix the protrusion to the coupler through hole. An embedded steel sheet for reinforcing bar joints having a shear key.
  8. 제 1 항에 있어서,The method of claim 1,
    상기 커플러는,The coupler is,
    전면에 돌출부가 형성되고, 상기 스틸 플레이트에서 상기 돌출부가 삽입되도록 상기 돌출부와 대응되는 위치에 형성된 커플러 관통홀에 상기 돌출부를 삽입한 후 상기 돌출부의 외측을 상기 커플러 관통홀에 용접하여 고정시키는 것을 특징으로 하는 전단키를 구비한 철근 이음용 매립 강판.A protrusion is formed on the front surface, and the protrusion is inserted into a coupler through hole formed at a position corresponding to the protrusion so that the protrusion is inserted in the steel plate, and then fixed by welding the outside of the protrusion to the coupler through hole. An embedded steel sheet for reinforcing bar joints having shear keys.
  9. 삭제delete
KR1020090031957A 2009-04-13 2009-04-13 Buit-in steel plate with shear key for rebar splice KR101080836B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090031957A KR101080836B1 (en) 2009-04-13 2009-04-13 Buit-in steel plate with shear key for rebar splice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090031957A KR101080836B1 (en) 2009-04-13 2009-04-13 Buit-in steel plate with shear key for rebar splice

Publications (2)

Publication Number Publication Date
KR20100113398A KR20100113398A (en) 2010-10-21
KR101080836B1 true KR101080836B1 (en) 2011-11-08

Family

ID=43132993

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090031957A KR101080836B1 (en) 2009-04-13 2009-04-13 Buit-in steel plate with shear key for rebar splice

Country Status (1)

Country Link
KR (1) KR101080836B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239672A (en) * 2015-10-26 2016-01-13 华侨大学 Anti-shearing pulling-resistant connecting element
KR101590892B1 (en) * 2015-03-09 2016-02-02 (주)스틸코리아 Device for connecting reinforcing bar
KR20160073202A (en) 2014-12-16 2016-06-24 주식회사부원비엠에스 Joint part forming apparatus of reinforced concrete and method of placing joint using the same
CN109898713A (en) * 2019-01-04 2019-06-18 西安理工大学 A kind of quick assembling is bolted semi-rigid corrugated shear connector entirely

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101509480B1 (en) * 2013-09-09 2015-04-10 주식회사 정우비엔씨 Coupler protecting cap for connecting steeel reinforcement and coupler constructing method using the same
KR101709858B1 (en) * 2015-07-30 2017-02-23 원광대학교산학협력단 Building Construction Method Using PC Wall With Foundation Structure
CN106436915A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simplified building
CN109025355A (en) * 2018-08-31 2018-12-18 中国建筑第五工程局有限公司 A kind of construction of the Curtain Wall post-install on old brick wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000038840A (en) 1998-07-23 2000-02-08 Taisei Corp Method for vertical placing and jointing for concrete wall
KR200198742Y1 (en) 2000-02-11 2000-10-02 이창남 Slipper type anchoring device for the post tensioning wire
KR100710984B1 (en) 2006-03-02 2007-04-24 (주)대우건설 Flat plate concrete structure having openings reinforced by opening formative assembly

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000038840A (en) 1998-07-23 2000-02-08 Taisei Corp Method for vertical placing and jointing for concrete wall
KR200198742Y1 (en) 2000-02-11 2000-10-02 이창남 Slipper type anchoring device for the post tensioning wire
KR100710984B1 (en) 2006-03-02 2007-04-24 (주)대우건설 Flat plate concrete structure having openings reinforced by opening formative assembly

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160073202A (en) 2014-12-16 2016-06-24 주식회사부원비엠에스 Joint part forming apparatus of reinforced concrete and method of placing joint using the same
KR101590892B1 (en) * 2015-03-09 2016-02-02 (주)스틸코리아 Device for connecting reinforcing bar
CN105239672A (en) * 2015-10-26 2016-01-13 华侨大学 Anti-shearing pulling-resistant connecting element
CN109898713A (en) * 2019-01-04 2019-06-18 西安理工大学 A kind of quick assembling is bolted semi-rigid corrugated shear connector entirely

Also Published As

Publication number Publication date
KR20100113398A (en) 2010-10-21

Similar Documents

Publication Publication Date Title
KR101379305B1 (en) Wall structure manufacturing method using precast front wall panel and precast back wall panel
CN104652654B (en) Assembled shear wall structure
KR100696441B1 (en) Precast Prestressed reinforced concrete bottom plate, bridge having the same, and construction method for the bridge
RU2382143C2 (en) Block of curb for limitation of wall section in soil, element of curb block and method for wall erection in soil
KR100909277B1 (en) Pier foundation with steel pipe and assembly structure
KR101645538B1 (en) Double wall and double wall structure produced by using double wall
KR20060083776A (en) Steel beam with capping shear connector and composite beam using the steel beam
KR101006900B1 (en) Construction Method of Fill-Up Structure for Back-Area of Rigid Structure
CN106703077B (en) Integral underground comprehensive pipe gallery structure of prefabricated assembly
KR101897415B1 (en) Apparatus for forming a cip retaining wall construction method using thereof
JP2009533580A (en) Concrete slab joint anchor
KR101010540B1 (en) Half-precast coping construction method
KR101314081B1 (en) Retaining wall and upeer structure connection method for rahmen structure
JP2012225144A (en) Precast floor slab, joint structure and construction method for the same
JP2005083072A (en) Joint structure and joint construction method for precast concrete slab
JP2008223370A (en) Rigidly connecting structure of corner part
KR102000534B1 (en) Construction method using textile reinforcing panel of high durability for combined usage of permanent form
KR20100013548A (en) Joint of half pc slab
KR20140012805A (en) The bi-prestressed concrete u-type girder and its construction method
KR101618798B1 (en) Structure for fixing deck form
KR20190052390A (en) Structure for reinforcing column using V-shaped ties
KR20090030716A (en) Joint structure for connecting slurry wall and girder/slab and method for constructing girder/slab of underground structures using the same
DK2410096T3 (en) Casing device and method for creating a recess in the casting of a component
KR20040105446A (en) Structures and Methods for Connection between Precast Decks and Prestressed Concrete Girders
KR100850028B1 (en) Construction method using concrete mould for concrete piles cast in position

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140930

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151023

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20161018

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20171025

Year of fee payment: 7