Backfill reinforcement method of soft ground road bridge Download PDF

Info

Publication number
KR101057168B1
KR101057168B1 KR1020110019614A KR20110019614A KR101057168B1 KR 101057168 B1 KR101057168 B1 KR 101057168B1 KR 1020110019614 A KR1020110019614 A KR 1020110019614A KR 20110019614 A KR20110019614 A KR 20110019614A KR 101057168 B1 KR101057168 B1 KR 101057168B1
Authority
KR
South Korea
Prior art keywords
pressure plate
anchor
shift
soil
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
KR1020110019614A
Other languages
Korean (ko)
Inventor
임종명
Original Assignee
주식회사 삼안
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 삼안 filed Critical 주식회사 삼안
Priority to KR1020110019614A priority Critical patent/KR101057168B1/en
Application granted granted Critical
Publication of KR101057168B1 publication Critical patent/KR101057168B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00—Structural or constructional details of bridges
    • E01D19/02—Piers; Abutments ; Protecting same against drifting ice
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00—Independent underground or underwater structures; Retaining walls
    • E02D29/02—Retaining or protecting walls
    • E02D29/0225—Retaining or protecting walls comprising retention means in the backfill

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명은 연약지반 도로 교량의 뒷채움 보강 방법에 관한 것으로, 교대 배면측의 토사를 견고하게 다짐함과 아울러 토사의 다짐시 교대의 손상이 일어나지 않도록 하며, 교대의 지지기반을 확충하여 교대의 밀림을 방지함을 목적으로 한다.
본 발명에 의한 연약지반 도로 교량의 뒷채움 보강 방법은, 교대(1) 후방에 뒷채움 공간(2)을 사이에 두고 이격된 지반(3)의 사면에 숏크리트를 타설하여 기초부(10)를 시공하는 제1단계와; 상기 교대의 배면에 종방향을 따라 2개 이상의 레일(20)을 설치하는 제2단계와; 상기 교대의 후방에 토사를 뒷채움하면서 상기 교대의 레일에 평평한 판상의 가압판(30)을 결합하여 상기 가압판을 가압함으로써 상기 토사를 다지고, 상기 기초부에 상기 가압판의 높이에 맞춰 앵커(40)를 설치한 후, 상기 가압판과 상기 앵커를 연결봉(50)으로 연결하되, 상기 토사를 뒷채움하는 작업과 상기 가압판과 앵커 및 연결봉을 설치하는 작업을 교대로 반복하여 상기 교대의 배면에서 토사를 다단계에 걸쳐 다짐하는 제3단계와; 상기 제3단계 이후 토사를 채워 마감하는 제4단계와; 상기 제3단계는, 상기 교대 후방의 뒷채움 공간에 바닥에서부터 일정 높이로 토사를 뒷채움하는 제3-1단계, 상기 교대의 레일에 상기 가압판을 설치한 후 상기 가압판을 상기 토사 위로 하강시켜 상기 토사를 가압하는 제3-2단계, 상기 기초부에 앵커공을 천공하여 상기 앵커공에 앵커를 설치하는 제3-3단계, 상기 가압판과 상기 앵커의 사이의 토사 위에 연결봉을 올리고 상기 연결봉의 양측을 상기 가압판과 상기 앵커에 각각 연결하는 제3-4단계가 반복되어 상기 가압판에 의해 상기 교대 배면의 토사를 다단계로 다짐하는 것을 특징으로 한다.
The present invention relates to a method of reinforcing the backfill of a bridge on a soft ground road, and firmly compacts the soil on the rear side of the shift and prevents the damage from occurring during the compaction of the soil, and expands the support base of the shift to improve the jungle. It is aimed at preventing.
The backfill reinforcement method of the soft ground road bridge according to the present invention, by placing the shotcrete on the slope of the ground (3) spaced apart from the rear (1) with the backfill space (2) between the construction of the foundation 10 A first step; A second step of installing two or more rails 20 in the longitudinal direction on the rear surface of the shift; Backfilling the earth and sand to the rear of the shift while engaging the flat plate-like pressure plate 30 to the alternating rail to press the pressure plate to compact the earth and sand, and to install the anchor 40 in accordance with the height of the pressure plate in the base portion Afterwards, the pressure plate and the anchor are connected to the connecting rod 50, and the work of backfilling the soil and the operation of installing the pressure plate, the anchor and the connecting rod are alternately repeated to compact the soil at the back of the shift in multiple stages. Performing a third step; A fourth step of filling and finishing the soil after the third step; In the third step, step 3-1 of backfilling the earth and sand from the bottom to a predetermined height in the rear filling space behind the shift, and after installing the pressure plate on the rail of the shift, the pressure plate is lowered above the earth and sand and the sand Step 3-2 to pressurize, step 3-3 to install an anchor in the anchor hole by drilling the anchor hole in the base portion, raising the connecting rod on the soil between the pressing plate and the anchor and both sides of the connecting rod Steps 3 and 4, respectively, connected to the pressure plate and the anchor are repeated, thereby compacting the earth and sand of the alternating rear surface by the pressure plate in multiple stages.

Description

연약지반 도로 교량의 뒷채움 보강 방법{METHOD FOR REINFORCEING ABUTMENT BACK ZONE FORBRIDGE}Backfill reinforcement method of soft ground road bridge {METHOD FOR REINFORCEING ABUTMENT BACK ZONE FORBRIDGE}

본 발명은 연약지반 도로 교량의 뒷채움 보강 방법에 관한 것으로, 더욱 상세하게는 교대 배면측의 토사를 견고하게 다짐함과 아울러 토사의 다짐시 교대의 손상이 일어나지 않도록 하며, 교대의 지지기반을 확충하여 교대의 밀림을 방지할 수 있는 연약지반 도로 교량의 뒷채움 보강 방법에 관한 것이다.
The present invention relates to a method for reinforcing the backfill of a soft ground road bridge, and more specifically, to firmly solidify the soil on the rear side of the shift and prevent damage of the shift during the compaction of the soil. The present invention relates to a method for reinforcing the backfill of soft ground road bridges that can prevent the rolling of shifts.

도로 교량이나 철도 교량 등에서, 교대는 주로 철근 콘크리트로 구성되며, 그 배면에 형성되는 뒷채움부(토공부)는 토사 등으로 구성되는데, 이와 같이 서로 강성이 상이한 재료를 이용하여 시공되므로, 다짐 작업을 수행하더라도 토공부의 침하가 발생하게 되고, 교대와 토공부가 접하는 부분은 쉽게 매몰되는 현상이 발생한다.In road bridges and railway bridges, the shift is mainly composed of reinforced concrete, and the backfill portion (soil excavation portion) formed on the back is composed of earth and sand. Thus, the compaction work is performed using materials having different rigidities. Even if it is performed, settlement of the earthworks occurs, and the portion where the alternation and the earthworks contact each other is easily buried.

좀 더 구체적으로 설명하면, 교량은 교대에 다열 지지말뚝을 설치한 후 말뚝 위로 벽체 교대를 완성한다. 이때 교각이 존재하는 경우에는 교각 상부에 베어링을 설치한 후 주형을 거치하도록 시공하였다.More specifically, the bridge installs a multi-row support pile at the shift and then completes the wall shift over the pile. At this time, if the piers exist, the bearings were installed on the top of the piers and then mounted to mount the molds.

교량은 사하중, 활하중, 교대에 발생하는 흙의 자중 및 토압에 저항하도록 설계가 되므로 교대 구체의 크기가 매우 클 뿐만 아니라 교대 구체가 부동(不動)의 구조물이므로 변위 발생을 허용치 않으며 또한 이러한 상부하중 및 자중을 교대가 지지하기 위하여 다열의 지지말뚝을 사용하게 된다.Since the bridge is designed to resist dead load, live load, earth load and earth pressure on the alternating ground, the alternating sphere is very large and the alternating sphere is a floating structure, which does not allow displacement, The alternating support piles are used to support their own weight.

이러한 교대는 도로 및 하천과 인접되므로 흙의 자중 및 토압을 고려하여 시공함과 동시에 유입되는 침투수로 인하여 발생되는 토압으로 구조의 변위를 일으킬 수 있는 문제점이 있다. 예컨대, 교대가 시공되는 지반이 연약할 경우 강물이나 해수가 지반 내에 침투하여 이 침투수에 의해 교대 뒷채움부의 침하가 발생되고, 뒷채움부의 침하에 의해 교대 및 도로가 붕괴되는 문제점이 있다.Since these shifts are adjacent to roads and rivers, there is a problem that may cause a displacement of the structure due to the earth pressure generated due to the infiltration water introduced at the same time of construction in consideration of the weight and soil pressure of the soil. For example, when the ground on which the shift is constructed is weak, river water or seawater penetrates into the ground, and the submerged portion of the back fill portion is generated by the infiltrating water, and the shift and the road collapse due to the subsidence of the back fill portion.

특히, 교대의 배면측은 토사의 다짐시 다짐 압력이 가해지게 되어 교대가 밀릴 수 있으며, 따라서, 교대의 밀림을 막기 위하여 교대 배면측에서는 큰 압력으로 다짐 작업을 할 수 없으므로 구조적으로 매우 취약하다.
In particular, the rear side of the shift is applied to the compaction pressure during the compaction of the soil, the shift can be pushed, and therefore, in order to prevent the shift of the shift, the rear side of the shift can not be compacted with a large pressure is very structurally weak.

본 발명은 전술한 바와 같은 문제점을 해결하기 위한 것으로, 교대 배면측의 토사를 견고하게 다짐함과 아울러 토사의 다짐시 교대의 손상이 일어나지 않도록 하며, 교대의 지지기반을 확충하여 교대의 밀림을 방지함을 연약지반 도로 교량의 뒷채움 보강 방법을 제공하려는데 목적이 있다.The present invention is to solve the problems as described above, and to firmly tighten the earth and sand on the rear side of the shift, and to prevent the alteration of the shift during the compaction of the earth and to prevent the shift of the shift by expanding the support base of the shift The purpose is to provide a method for reinforcing the backfill of soft bridge road bridges.

전술한 바와 같은 목적을 달성하기 위한 본 발명에 따른 연약지반 도로 교량의 뒷채움 보강 방법은, 교대 후방에 뒷채움 공간을 사이에 두고 이격된 지반의 사면에 숏크리트를 타설하여 기초부를 시공하는 제1단계와; 상기 교대의 배면에 종방향을 따라 2개 이상의 레일을 설치하는 제2단계와; 상기 교대의 후방에 토사를 뒷채움하면서 상기 교대의 레일에 평평한 판상의 가압판을 결합하여 상기 가압판을 가압함으로써 상기 토사를 다지고, 상기 기초부에 상기 가압판의 높이에 맞춰 앵커를 설치한 후, 상기 가압판과 상기 앵커를 연결봉으로 연결하되, 상기 토사를 뒷채움하는 작업과 상기 가압판과 앵커 및 연결봉을 설치하는 작업을 교대로 반복하여 상기 교대의 배면에서 토사를 다단계에 걸쳐 다짐하는 제3단계와; 상기 제3단계 이후 토사를 채워 마감하는 제4단계를 포함하고,Backfill reinforcement method of the soft ground road bridge according to the present invention for achieving the object as described above, the first step of constructing the foundation by placing shotcrete on the slope of the ground spaced between the backfill space between the alternating and ; A second step of installing two or more rails along the longitudinal direction on the rear surface of the shift; After filling the earth and sand on the rear of the shift, the flat plate-like pressure plate is coupled to the shift rail to pressurize the pressure plate, thereby compacting the earth and sand, and installing an anchor according to the height of the pressure plate at the base, A third step of connecting the anchor with a connecting rod, and repeating the work of backfilling the soil and installing the pressing plate, the anchor, and the connecting rod alternately to compact the soil in multiple stages at the rear of the shift; After the third step includes a fourth step of filling and closing the soil,

상기 제3단계는, 상기 교대 후방의 뒷채움 공간에 바닥에서부터 일정 높이로 토사를 뒷채움하는 제3-1단계, 상기 교대의 레일에 상기 가압판을 설치한 후 상기 가압판을 상기 토사 위로 하강시켜 상기 토사를 가압하는 제3-2단계, 상기 기초부에 앵커공을 천공하여 상기 앵커공에 앵커를 설치하는 제3-3단계, 상기 가압판과 상기 앵커의 사이의 토사 위에 연결봉을 올리고 상기 연결봉의 양측을 상기 가압판과 상기 앵커에 각각 연결하는 제3-4단계가 반복되어 상기 가압판에 의해 상기 교대 배면의 토사를 다단계로 다짐하는 것을 특징으로 한다.
In the third step, step 3-1 of backfilling the earth and sand from the bottom to a predetermined height in the rear filling space behind the shift, and after installing the pressure plate on the rail of the shift, the pressure plate is lowered above the earth and sand and the sand Step 3-2 to pressurize, step 3-3 to install an anchor in the anchor hole by drilling the anchor hole in the base portion, raising the connecting rod on the soil between the pressing plate and the anchor and both sides of the connecting rod Steps 3 and 4, respectively, connected to the pressure plate and the anchor are repeated, thereby compacting the earth and sand of the alternating back surface by the pressure plate in multiple stages.

본 발명에 의한 연약지반 도로 교량의 뒷채움 보강 방법에 의하면, 교대의 배면측에서 가압판을 하강시켜 토사를 다짐하고, 상기 가압판이 교대에 연결되어 다짐과 동시에 교대를 지지하므로 교대의 밀림을 막을 수 있다.According to the backfill reinforcement method of the soft ground road bridge according to the present invention, by lowering the pressure plate on the rear side of the shift to compact soil, and the pressure plate is connected to the shift to support the shift at the same time to prevent the shift jungle. .

그리고, 가압판을 통해 지반에 설치된 앵커와 교대를 연결하여 교대의 지지기반을 확보함과 더불어 전단날개를 통해 뒷채움부의 토압이 가해지더라도 교대의 밀림을 방지할 수 있으므로 교량 구조물의 안전성을 확보하고 보수 비용을 절감할 수 있다.In addition, by securing the support base of the shift by connecting the anchor and the shift installed on the ground through the pressure plate, and also prevent the shift of the shift even if the earth pressure of the back filling portion is applied through the shear blades to secure the safety of the bridge structure and repair cost Can reduce the cost.

또한, 가압판의 전단날개에 형성된 배수유도면을 통해 뒷채움부에 침투한 물을 교대의 먼 곳으로 유도하여 물에 의한 지반 침하를 방지하는 효과 등이 있다.
In addition, there is an effect of preventing ground subsidence caused by water by inducing water penetrating the rear filling portion through the drainage guide surface formed in the front wing of the pressure plate to the distant place of the shift.

도 1은 본 발명에 의한 연약지반 도로 교량의 뒷채움 보강 방법의 공정도.
도 2는 본 발명에 의한 연약지반 도로 교량의 뒷채움 보강 방법에 적용된 가압판을 포함하는 요부 발췌 분해 사시도.
1 is a process chart of the backfill reinforcement method of the soft ground road bridge according to the present invention.
Figure 2 is an exploded perspective view of the main portion extract including a pressure plate applied to the backfill reinforcement method of the soft ground road bridge according to the present invention.

도 1에서 보이는 바와 같이 본 발명에 의한 연약지반 도로 교량의 뒷채움 보강 방법은 다음과 같다. 본 발명은 도로 교량의 교대 후방을 뒷채움하는 기술로서 이에 대해서만 구체적으로 설명하고 교대의 시공 방법 등에 대해서는 공지된 것이므로 구체적인 설명을 생략한다.As shown in Figure 1, the backfill reinforcement method of the soft ground road bridge according to the present invention is as follows. The present invention is a technique for backfilling the alternating rear of the road bridge as described only in detail, and the construction method of the alternating is known, so the detailed description thereof will be omitted.

(S10) 기초부 시공.(S10) Foundation construction.

교대(1)의 후방에는 뒷채움 공간(2)이 형성되고, 뒷채움 공간(2)의 후방에는 사면을 갖는 지반(3)이 있다. 본 발명은 교대(1)와 지반(3)을 연결하여 뒷채움이 약하더라도 교대(1)가 지반(3)을 지지기반으로 하여 견고한 설치 상태를 유지할 수 있도록 한 것이며, 사면의 유실을 막고 후술하는 앵커의 견고한 시공을 위하여 상기 사면에 기초부(10)를 시공한다. 기초부(10)는 자체 강도를 통해 상기 사면을 다짐하는 기능과 상기 앵커를 지지할 수 있고 또한 빠른 시공을 위하여 숏크리트의 타설에 의해 이루어진다.The rear filling space 2 is formed behind the alternation 1, and the ground 3 having a slope is located behind the rear filling space 2. The present invention is to connect the shift (1) and the ground (3) so that even if the backfill is weak, the shift (1) to maintain a solid installation state on the ground (3) as a support base, to prevent the loss of the slope to be described later The foundation 10 is constructed on the slope for a solid construction of the anchor. The base portion 10 is capable of supporting the anchor through its own strength and supporting the anchor, and is made by pouring shotcrete for fast construction.

숏크리트를 일정 두께로 사면에 타설하여 기초부(10)를 시공한다.
The shotcrete is poured on the slope with a predetermined thickness to construct the foundation 10.

본 발명은 후술하는 가압판을 교대(1)의 배면에서 눌러 토사를 다짐하며, 토사의 다짐시 교대(1)의 밀림이 일어나지 않도록 가압판을 교대(1)에 배면에 하강 가능하게 연결하며, 이를 위하여 교대(1)의 배면에는 2개 이상의 레일(20)을 종방향으로 설치한다(도 1,2참고).
The present invention presses the pressure plate to be described later on the back of the shift (1) to compact the earth and sand, so that the pressure plate is shifted to the back (1) to the back so that the fall of the shift (1) when compacting the soil, so that Two or more rails 20 are installed in the longitudinal direction on the rear surface of the shift 1 (see FIGS. 1 and 2).

(S20) 토사 뒷채움.(S20) earth and sand backfill.

먼저, 본 발명은 토사를 다단계에 걸쳐 뒷채움하면서 가압판을 통해 저부에 뒷채움된 토사를 가압 다짐하는 것이며, 즉, 토사 뒷채움 - 가압판 가압 다짐이 교대로 반복해서 진행된다.First, the present invention is to pressurize the soil filled in the bottom through the pressure plate while backfilling the soil in multiple stages, that is, the soil sand backfill-pressurized plate press compaction alternately repeated.

교대(1)의 후방의 뒷채움 공간(2)에 바닥에서부터 토사를 일정 높이만큼 뒷채움하여 제1토사층(4-1)을 형성한다.The first soil layer 4-1 is formed by backfilling the earth and sand from the bottom to the backfill space 2 behind the shift 1 by a predetermined height.

제1토사층(4-1)의 뒷채움후 교대(1)의 배면에서 먼 곳은 다짐장비를 이용하여 다짐하고, 교대(1) 배면에 근접되는 곳은 가압판으로 가압 다짐한다.
After backfilling the first soil layer 4-1, the back of the shift 1 is compacted using a compaction equipment, and the position near the back of the shift 1 is compacted with a pressure plate.

(S30) 제1뒷채움층 시공.(S30) Construction of the first backfill layer.

본 발명에 의한 뒷채움층은 토사층, 가압판, 앵커, 연결봉으로 구성되며, 이러한 뒷채움층은 다단으로 형성된다.The backfill layer according to the present invention is composed of a soil layer, a pressure plate, an anchor, a connecting rod, and the backfill layer is formed in multiple stages.

교대(1) 배면의 제1토사층(4-1)을 다짐하기 위하여 가압판(30)을 교대(1)의 배면에 설치하며, 먼저 가압판(30)의 구조에 대해 설명한다.In order to compact the first soil layer 4-1 on the rear surface of the alternation 1, the pressing plate 30 is provided on the rear surface of the alternation 1, and the structure of the pressing plate 30 will be described first.

도 2에서 보이는 바와 같이, 가압판(30)은 평평한 판상의 본체(31), 본체(31)에 종방향으로 형성되며 토사가 채워지는 다수의 채움공(32), 본체(31)의 전방에 형성되며 레일(20)에 슬라이딩 가능하게 결합되는 가이드부(33), 본체(31)보다 두껍게 형성되면서 배면에 곡선의 배수유도면(34a)이 형성되어 본체(31)의 후방에 결합되는 전단날개(34)로 구성된다.As shown in Figure 2, the pressing plate 30 is formed in the front of the main body 31, the flat plate-shaped body 32, a plurality of filling holes 32, which is filled with earth and sand are filled in the earth (31) And the guide portion 33, which is slidably coupled to the rail 20, is formed thicker than the main body 31 is formed with a curved drainage induction surface 34a on the back is coupled to the rear wing of the main body 31 ( 34).

가압판(30)은 콘크리트는 물론 다른 재질로도 제조 가능하고, 또한, 도면에서 하나만 사용된 것으로 도시하였으나, 교대(1)의 크기와 가압판(30)의 취급(제작, 보관, 운반 등)에 따라 2개 이상이 사용될 수 있다.The pressure plate 30 may be made of concrete as well as other materials, and in addition, only one is used in the drawings, but according to the size of the shift 1 and the handling (manufacturing, storage, transportation, etc.) of the pressure plate 30. Two or more may be used.

채움공(32)은 가압판(30)의 가압시 저부에 뒷채움된 토사가 유입되거나 상부에 뒷채움될 토사가 유입되며, 따라서, 가압판(30)과 토사의 결속이 이루어지므로 가압판(30)은 토사의 유실과 교대(1)의 밀림을 막을 수 있다.Filling hole 32 is when the pressure of the pressure plate 30 is filled with the back-filled soil is introduced into the bottom or the soil to be back-filled in the upper flows, and thus, the pressure plate 30 and the soil is bound, so the pressure plate (30) It can prevent the loss and the rolling of the shift (1).

전단날개(34)는 뒷채움된 토사와 지반(3)의 토압에 대항하여 교대(1)의 밀림을 막으며, 가압판(30)의 본체(31) 보다 두꺼운 면적으로 형성되어, 즉, 본체(31)의 위쪽으로 돌출된다.Shear wing 34 prevents the rolling of the shift 1 against the backfilled soil and the earth pressure of the ground 3, and is formed with an area thicker than the body 31 of the pressure plate 30, that is, the body 31 Protrude upward).

전단날개(34)는 가압판(30)의 본체(31)의 후방에 일체로 형성되거나, 끼움부가 구비되어 상기 끼움부를 통해 가압판(30)의 본체(31)에 끼워진 후 볼트 등으로 조립될 수도 있다.The shear blades 34 may be integrally formed at the rear of the main body 31 of the pressure plate 30 or may be assembled with bolts and the like after being fitted to the main body 31 of the pressure plate 30 through the fitting part. .

배수유도면(34a)은 가압판(30) 후방의 물이 교대(1)측으로 흐르지 못하고 교대(1)의 먼 곳으로 유도하기 위하여 하부로 가면서 후방을 향하는 곡선형으로 형성된다.The drainage induction surface 34a is formed in a curved shape toward the rear while going downward to guide the water to the far side of the shift 1 without the water flowing behind the pressure plate 30 alternately 1.

전단날개(34)는 후술하는 연결봉의 연결을 위하여 고정링 등이 형성된다.Shear wing 34 is formed with a fixing ring for the connection of the connecting rod to be described later.

이와 같은 구조의 가압판(30)을 토사와 교대로 반복하여 시공하며, 제1토사층(4-1) 위에 제1가압판(30-1)을 설치한다.The construction of the pressure plate 30 having such a structure is alternately repeated with earth and sand, and the first pressure plate 30-1 is installed on the first soil layer 4-1.

제1가압판(30-1)을 레일(20)에 연결하여 제1토사층(4-1) 위에 안착하고, 다짐장비를 이용하여 제1가압판(30-1)을 눌러 가압한다. 이렇게 되면, 제1가압판(30-1)이 레일(20)을 따라 비틀림없이 안정적으로 하강하면서 제1토사층(4-1)을 가압하여 제1토사층(4-1)이 가압되면서 다짐된다. 제1가압판(30-1)의 가압시 제1토사층(4-1)의 토사가 제1가압판(30-1) 위로 올라오면 제1가압판(30-1)의 가압을 정지할 수 있다.The first pressing plate 30-1 is connected to the rail 20 and seated on the first soil layer 4-1, and pressed by pressing the first pressing plate 30-1 using the compaction equipment. In this case, the first pressing plate 30-1 stably descends along the rail 20 without twisting and pressurizes the first soil layer 4-1, thereby compacting while pressing the first soil layer 4-1. When the pressure of the first pressure plate 30-1 rises on the first earth pressure plate 30-1 of the first earth pressure layer 30-1, the pressure of the first pressure plate 30-1 may be stopped.

이와 같이, 제1가압판(30-1)을 통해 교대(1) 배면에 근접된 곳을 견고하게 다짐한 후, 제1가압판(30-1)의 후방을 재다짐할 수 있다.As described above, after firmly compacting the position close to the rear surface of the alternation 1 through the first pressing plate 30-1, the rear of the first pressing plate 30-1 may be compacted.

앵커를 통해 지반(3)을 보강하기 위하여 지반(3) 내부에 앵커를 설치하며, 지반(3) 내부에 앵커공을 경사지게 천공한 후, 상기 앵커공에 제1앵커(40-1)를 설치한다. 제1앵커(40-1)는 공지된 것이므로 구체적인 구성의 설명을 생략한다.An anchor is installed in the ground 3 to reinforce the ground 3 through the anchor, and after the anchor hole is inclined in the ground 3, a first anchor 40-1 is installed in the anchor hole. do. Since the first anchor 40-1 is well known, a description of a specific configuration is omitted.

이어서, 제1가압판(30-1)과 제1앵커(40-1)을 연결하여 지반(3)을 지지기반으로 하여 교대(1)를 견고하게 설치한다.Subsequently, the first pressing plate 30-1 and the first anchor 40-1 are connected to each other to firmly install the shift 1 on the ground 3 as a support base.

도 2에서처럼, 연결봉(50)은 가압판(30)과 앵커(40)에 각각 연결되며 외주면에 서로 반대 방향의 나사선이 형성된 제1,2봉(51,52), 제1,2봉(51,52)에 나사 결합되어 제1,2봉(51,52)의 길이조절을 통해 가압판(30)과 앵커(40)를 긴장시키는 조임너트(53)로 구성된다.As shown in FIG. 2, the connecting rod 50 is connected to the pressure plate 30 and the anchor 40, respectively, and includes first and second rods 51 and 52 and first and second rods 51 and 52 having threads formed in opposite directions on the outer circumferential surface thereof. 52 is screwed to the tightening nut 53 to tension the pressure plate 30 and the anchor 40 through the length adjustment of the first and second rods (51, 52).

이와 같은 구조의 연결봉(50)을 이용하며, 제1가압판(30-1)과 제1앵커(40-1) 사이에 제1연결봉(50-1)을 연결한 후, 조임너트(53)를 조작하여 제1가압판(30-1)과 제1앵커(40-1)를 긴장시킨다.Using the connecting rod 50 of such a structure, after connecting the first connecting rod 50-1 between the first pressure plate 30-1 and the first anchor 40-1, the tightening nut 53 is The first pressure plate 30-1 and the first anchor 40-1 are tensioned by the manipulation.

이로써, 제1단의 뒷채움층이 완료된다.
Thus, the backfill layer of the first stage is completed.

(S40) 제2뒷채움층 시공.(S40) Construction of the second backfill layer.

제1뒷채움층 위에 제2뒷채움층을 시공하며, 먼저, 제1뒷채움층 위에 토사를 채워 제2토사층(4-2)을 형성하고, 제2토사층(4-2) 위에서 레일(20)에 제2가압판(30-2)을 설치한 후, 제2가압판(30-2)을 눌러 제2토사층(4-2)을 가압 다짐한다.
Construct a second backfill layer on the first backfill layer, and first, fill the soil on the first backfill layer to form a second soil layer 4-2, and then, on the rails 20, on the second soil layer 4-2. After installing the 2nd pressure plate 30-2, the 2nd pressure plate 30-2 is pressed and pressurized and compacted the 2nd soil layer 4-2.

이어서, 제2앵커(40-2), 제2연결봉(50-2)을 설치한다. 제2앵커(40-2)와 제2연결봉(50-2)의 설치 방법은 상기 제1뒷채움층의 제1앵커(40-1)와 제1연결봉(50-2)의 설치방법과 동일하다.
Subsequently, the second anchor 40-2 and the second connecting rod 50-2 are installed. The installation method of the second anchor 40-2 and the second connecting rod 50-2 is the same as the installation method of the first anchor 40-1 and the first connecting rod 50-2 of the first backfill layer. .

(S50) 토사 마감.(S50) earth and sand finish.

설명과 도면에서는 교대(1) 후방이 제1,2뒷채움층에 의해 시공되는 것을 예로 들어 설명한 것이며, 상기 제2뒷채움층의 시공을 완료한 후 상기 제2뒷채움층 위에 토사를 채워 다짐함으로써 마감층(4-3)을 형성한다. 마감층(4-3) 위에는 도로가 포장될 것이다.In the description and drawings, the back of the shift 1 is constructed by the first and second backfill layers as an example, and after finishing the construction of the second backfill layer, the finishing layer is formed by filling the soil on the second backfill layer. (4-3) is formed. The road will be paved over the finishing layer 4-3.

본 발명에 의한 연약지반 도로 교량의 뒷채움 보강 방법에 따르면, 가압판(30)이 교대(1)의 배면에 슬라이딩 가능하게 연결되어, 가압판(30)을 하강시켜 저부의 토사를 가압 다짐할 수 있고, 이때, 가압판(30)이 교대(1)와 레일(20)을 통해 연결되어 교대(1)에는 가압 다짐에 의한 외력이 가해지지 않는다.According to the backfill reinforcement method of the soft ground road bridge according to the present invention, the pressure plate 30 is slidably connected to the rear surface of the shift 1, the pressure plate 30 can be lowered to pressurize the earth and sand of the bottom, At this time, the pressure plate 30 is connected via the alternation 1 and the rail 20 so that the external force due to the pressing compaction is not applied to the alternation 1.

또한, 뒷채움 공간(2)에 채워진 토사의 토압이 교대(1)를 향해 가해지는 경우, 지반(3)에 설치된 앵커(40)와 교대(1)에 설치된 가압판(30)이 연결되어 교대(1)가 지반(3)을 지지기반으로 하여 버팀력을 발생하고, 아울러, 전단날개(34)가 토사의 밀림을 막아 교대(1)의 밀림을 극소화할 수 있다.In addition, when the earth pressure of the soil filled in the backfill space 2 is applied toward the shift 1, the anchor 40 provided on the ground 3 and the pressure plate 30 provided on the shift 1 are connected to the shift 1 ) Generates a support force based on the ground (3) as a support base, and, in addition, the shear blade (34) can minimize the jungle of the shift (1) by preventing the jungle of soil.

한편, 뒷채움 공간에 침투한 물은 전단날개(34)의 배수유도면(34a)의 곡면을 따라 교대(1)로부터 먼 곳으로 유도되어 교대(1) 주변에는 물의 침투량이 적으므로 물에 의한 교대(1) 주변의 연약화를 막을 수 있다.On the other hand, water penetrated into the backfill space is guided away from the shift 1 along the curved surface of the drainage guide surface 34a of the shear blade 34, so that the water permeates around the shift 1 so that the water is shifted by the water. (1) It can prevent the weakening of the surroundings.

1 : 교대, 2 : 뒷채움 공간
3 : 지반,
10 : 기초부, 20 : 레일
30 : 가압판, 40 : 앵커
50 : 연결봉,
1: shift, 2: backfill space
3: ground,
10: foundation portion, 20: rail
30: pressure plate, 40: anchor
50: connecting rod,

Claims (2)

교대(1) 후방에 뒷채움 공간(2)을 사이에 두고 이격된 지반(3)의 사면에 숏크리트를 타설하여 기초부(10)를 시공하는 제1단계와;
상기 교대의 배면에 종방향을 따라 2개 이상의 레일(20)을 설치하는 제2단계와;
상기 교대의 후방에 토사를 뒷채움하면서 상기 교대의 레일에 평평한 판상의 가압판(30)을 결합하여 상기 가압판을 가압함으로써 상기 토사를 다지고, 상기 기초부에 상기 가압판의 높이에 맞춰 앵커(40)를 설치한 후, 상기 가압판과 상기 앵커를 연결봉(50)으로 연결하되, 상기 토사를 뒷채움하는 작업과 상기 가압판과 앵커 및 연결봉을 설치하는 작업을 교대로 반복하여 상기 교대의 배면에서 토사를 다단계에 걸쳐 다짐하는 제3단계와;
상기 제3단계 이후 토사를 채워 마감하는 제4단계와;
상기 제3단계는, 상기 교대 후방의 뒷채움 공간에 바닥에서부터 일정 높이로 토사를 뒷채움하는 제3-1단계, 상기 교대의 레일에 상기 가압판을 설치한 후 상기 가압판을 상기 토사 위로 하강시켜 상기 토사를 가압하는 제3-2단계, 상기 기초부에 앵커공을 천공하여 상기 앵커공에 앵커를 설치하는 제3-3단계, 상기 가압판과 상기 앵커의 사이의 토사 위에 연결봉을 올리고 상기 연결봉의 양측을 상기 가압판과 상기 앵커에 각각 연결하는 제3-4단계가 반복되어 상기 가압판에 의해 상기 교대 배면의 토사를 다단계로 다짐하는 것을 특징으로 하는 연약지반 도로 교량의 뒷채움 보강 방법.
A first step of constructing the foundation portion 10 by placing shotcrete on the slopes of the ground 3 spaced apart from each other with the backfill space 2 interposed therebetween;
A second step of installing two or more rails 20 in the longitudinal direction on the rear surface of the shift;
Backfilling the earth and sand to the rear of the shift while engaging the flat plate-like pressure plate 30 to the alternating rail to press the pressure plate to compact the earth and sand, and to install the anchor 40 in accordance with the height of the pressure plate in the base portion Afterwards, the pressure plate and the anchor are connected to the connecting rod 50, and the work of backfilling the soil and the operation of installing the pressure plate, the anchor and the connecting rod are alternately repeated to compact the soil at the back of the shift in multiple stages. Performing a third step;
A fourth step of filling and finishing the soil after the third step;
In the third step, step 3-1 of backfilling the earth and sand from the bottom to a predetermined height in the rear filling space behind the shift, and after installing the pressure plate on the rail of the shift, the pressure plate is lowered above the earth and sand and the sand Step 3-2 to pressurize, step 3-3 to install an anchor in the anchor hole by drilling the anchor hole in the base portion, raising the connecting rod on the soil between the pressing plate and the anchor and both sides of the connecting rod Step 3-4 is connected to each of the pressure plate and the anchor is repeated to reinforce the backfill of the soft ground road bridge, characterized in that to compact the soil in the back of the shift by the pressure plate in multiple stages.
청구항 1에 있어서, 상기 가압판은 평평한 판상의 본체(31), 상기 본체에 종방향으로 형성되며 토사가 채워지는 다수의 채움공(32), 상기 본체의 전방에 형성되며 상기 레일에 슬라이딩 가능하게 결합되는 가이드부(33), 상기 본체보다 두껍게 형성되면서 배면에 곡선의 배수유도면(24a)이 형성되어 상기 본체의 후방에 결합되는 전단날개(34)를 포함하고,
상기 연결봉은 상기 가압판과 앵커에 각각 연결되며 외주면에 서로 반대 방향의 나사선이 형성된 제1,2봉(51,52), 상기 제1,2봉에 나사 결합되어 상기 제1,2봉의 길이조절을 통해 상기 가압판과 앵커를 긴장시키는 조임너트(53)를 포함하여 이루어진 것을 특징으로 하는 연약지반 도로 교량의 뒷채움 보강 방법.
The method of claim 1, wherein the pressure plate is a flat plate-shaped body 31, a plurality of filling holes 32 formed in the longitudinal direction and the soil is filled, formed in front of the body and slidably coupled to the rail The guide portion 33 is formed to be thicker than the main body, and the drainage induction surface (24a) of the curved surface is formed on the back and comprises a shear blade (34) coupled to the rear of the main body,
The connecting rods are connected to the pressing plate and the anchor, respectively, and the first and second rods 51 and 52 formed with threads in opposite directions on the outer circumferential surface thereof, and screwed to the first and second rods to adjust the length of the first and second rods. Backfill reinforcement method of the soft ground road bridge, characterized in that it comprises a tightening nut (53) for tensioning the pressure plate and the anchor through.
KR1020110019614A 2011-03-04 2011-03-04 Backfill reinforcement method of soft ground road bridge Active KR101057168B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110019614A KR101057168B1 (en) 2011-03-04 2011-03-04 Backfill reinforcement method of soft ground road bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110019614A KR101057168B1 (en) 2011-03-04 2011-03-04 Backfill reinforcement method of soft ground road bridge

Publications (1)

Publication Number Publication Date
KR101057168B1 true KR101057168B1 (en) 2011-08-17

Family

ID=44933367

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110019614A Active KR101057168B1 (en) 2011-03-04 2011-03-04 Backfill reinforcement method of soft ground road bridge

Country Status (1)

Country Link
KR (1) KR101057168B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101159097B1 (en) 2012-03-28 2012-06-25 (주)서현컨스텍 Precast abutment for longitudinal continuous connection and construction method therefor
CN112144340A (en) * 2020-10-13 2020-12-29 福建中设工程咨询有限公司 Prevention and control structure for vehicle bump at bridge head of highway and construction method
CN116254785A (en) * 2023-04-25 2023-06-13 中交二航局第三工程有限公司 Anti-collapse control method for abutment backfilling with sand in reconstruction and extension of bridge abutment
CN117513338A (en) * 2023-11-08 2024-02-06 中铁十局集团有限公司 A digital construction method for backfill hydraulic compactor

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100802338B1 (en) 2005-05-19 2008-02-12 비더씨건설 주식회사 Construction method of fill section using landscape stone
KR100851356B1 (en) 2007-12-20 2008-08-08 이근선 Retaining wall structure and construction method thereof
KR100981258B1 (en) 2009-11-25 2010-09-10 윤정배 The retaining wall block and the construction method of retaining wall with retaining wall block and geogrid

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100802338B1 (en) 2005-05-19 2008-02-12 비더씨건설 주식회사 Construction method of fill section using landscape stone
KR100851356B1 (en) 2007-12-20 2008-08-08 이근선 Retaining wall structure and construction method thereof
KR100981258B1 (en) 2009-11-25 2010-09-10 윤정배 The retaining wall block and the construction method of retaining wall with retaining wall block and geogrid

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101159097B1 (en) 2012-03-28 2012-06-25 (주)서현컨스텍 Precast abutment for longitudinal continuous connection and construction method therefor
CN112144340A (en) * 2020-10-13 2020-12-29 福建中设工程咨询有限公司 Prevention and control structure for vehicle bump at bridge head of highway and construction method
CN116254785A (en) * 2023-04-25 2023-06-13 中交二航局第三工程有限公司 Anti-collapse control method for abutment backfilling with sand in reconstruction and extension of bridge abutment
CN117513338A (en) * 2023-11-08 2024-02-06 中铁十局集团有限公司 A digital construction method for backfill hydraulic compactor

Similar Documents

Publication Publication Date Title
CN103526770B (en) A kind of construction method of high antiseepage anti-floating pile raft structure
CN103958780B (en) Methods of forming cemented retaining walls
CN104018518B (en) The method of prefabricated diaphragm wall and construction outer wall of basement and floor
CN204645075U (en) A kind of urban road soft foundation underground pipeline bracing means
CN102966119B (en) Geogrid reinforced wall and construction method thereof
KR101006900B1 (en) Construction method of backfill reinforcement structure of rigid structure
CN105155558A (en) Combined retaining structure and construction method thereof
CN109750571B (en) Road collapse emergency and permanent retaining integrated structure and construction method
CN106087629A (en) Without conical slope prefabricated baffle plate foam concrete light road bank structure and construction method
CN104790429A (en) Integral prestress reinforced earth retaining wall construction method
KR20120001856A (en) Soft ground surface reinforcement method using geosynthetics and channel
CN109371989A (en) A combined support structure suitable for slope stabilization support and its construction method
KR101117924B1 (en) Complex riverside facility and construction method
KR100923290B1 (en) Bridge structure
CN203741848U (en) Steel tube plate type retaining structure
CN111005278B (en) Rapid repairing and reinforcing method for locally-reinforced embankment
KR100603888B1 (en) Alternating Construction Method of Reinforced Soil by Post Tension
CN108487234B (en) Construction method of cast-in-situ pile plate type platform wall
KR101203289B1 (en) Reinforced retaining wall with curb element and its construction method
CN109355992B (en) Karst area sudden collapse prevention roadbed structure and construction method
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
CN204940310U (en) A kind of combination retaining structure
KR101166127B1 (en) A method of construction for a bridge abutment using poor ground and a bridge abutment structureconstructed by the method
KR102138839B1 (en) Cast-in-place concrete blocks using large scales and revetment methods using them
CN210315650U (en) Anchor rod reinforced composite retaining wall

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

A302 Request for accelerated examination
PA0302 Request for accelerated examination

St.27 status event code: A-1-2-D10-D17-exm-PA0302

St.27 status event code: A-1-2-D10-D16-exm-PA0302

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20140801

Year of fee payment: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

FPAY Annual fee payment

Payment date: 20160728

Year of fee payment: 6

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 6

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

L13-X000 Limitation or reissue of ip right requested

St.27 status event code: A-2-3-L10-L13-lim-X000

U15-X000 Partial renewal or maintenance fee paid modifying the ip right scope

St.27 status event code: A-4-4-U10-U15-oth-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

FPAY Annual fee payment

Payment date: 20170727

Year of fee payment: 7

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 7

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

FPAY Annual fee payment

Payment date: 20180730

Year of fee payment: 8

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 8

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

FPAY Annual fee payment

Payment date: 20190723

Year of fee payment: 9

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 9

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 10

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 11

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 12

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 13

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 14

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 15

U11 Full renewal or maintenance fee paid

Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE)

Year of fee payment: 15

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 16

U11 Full renewal or maintenance fee paid

Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE)

Year of fee payment: 16

P14 Amendment of ip right document requested

Free format text: ST27 STATUS EVENT CODE: A-5-5-P10-P14-NAP-X000 (AS PROVIDED BY THE NATIONAL OFFICE)

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000