KR100950991B1 - Traction machine structure for an elevator and cage assembly - Google Patents

Traction machine structure for an elevator and cage assembly Download PDF

Info

Publication number
KR100950991B1
KR100950991B1 KR1020090077059A KR20090077059A KR100950991B1 KR 100950991 B1 KR100950991 B1 KR 100950991B1 KR 1020090077059 A KR1020090077059 A KR 1020090077059A KR 20090077059 A KR20090077059 A KR 20090077059A KR 100950991 B1 KR100950991 B1 KR 100950991B1
Authority
KR
South Korea
Prior art keywords
plate
hoistway
cage
rope
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020090077059A
Other languages
Korean (ko)
Inventor
최용화
Original Assignee
대성엘리베이터주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대성엘리베이터주식회사 filed Critical 대성엘리베이터주식회사
Priority to KR1020090077059A priority Critical patent/KR100950991B1/en
Application granted granted Critical
Publication of KR100950991B1 publication Critical patent/KR100950991B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/0035Arrangement of driving gear, e.g. location or support
    • B66B11/0045Arrangement of driving gear, e.g. location or support in the hoistway
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/04Riding means, e.g. Shoes, Rollers, between car and guiding means, e.g. rails, ropes
    • B66B7/046Rollers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

본 발명은 엘리베이터의 권상기 설치구조에 관한 것으로써, 특히, 승강로와, 상기 승강로의 내벽에 고정설치되는 빔과, 상기 빔에 고정설치되는 제 1롤러와, 상기 승강로를 상, 하 이동하는 케이지와, 상기 케이지의 상부외측에 고정결합되는 하우징과, 상기 케이지를 상,하 이동시키는 로프를 포함하는 권상기와, 상부에는 제 2롤러가 구비되며 상기 권상기의 상기 로프가 연결되는 균형추를 포함하되, 상기 권상기의 상기 로프의 단부는 상기 빔에 고정설치되고, 상기 권상기 로프는 상기 제 1롤러와 상기 제 2롤러에 걸려있으며, 상기 하우징은 전방과 후방에 각각 배치되는 전판 및 후판과 상기 전판 및 상기 후판의 상부에 설치되는 상판을 포함하며, 상기 전판과 상기 후판 중 적어도 하나에는 상기 권상기가 관통되는 관통공이 각각 형성되어 상기 권상기는 상기 하우징에 고정설치되어, 승강로 벽에 권상기를 설치하지 않아도 되므로 승강로 벽을 뚫지 않아도 되고, 승강로 벽에 앵커 시공을 하지 않아도 되고, 가이드레일을 경량의 가이드레일로 대체 가능하여, 엘리베이터의 설치가 용이해지고, 엘리베이터 설치 기간을 단축시킬 수 있고 설치비용을 줄일 수 있으며, 체대 역할을 하는 하우징에 권상기를 설치하여 설치 과정을 간소화하고 자재 및 비용을 경감할 수 있으며, 혹 늘어날 수도 있는 오버헤드를 최소화할 수 있는 엘리베이터의 권상기 설치구조에 관한 것이다.The present invention relates to an elevator hoisting structure, and in particular, a hoistway, a beam fixed to an inner wall of the hoistway, a first roller fixedly fixed to the beam, and a cage for moving the hoistway up and down; A hoisting machine including a housing fixedly coupled to an upper outer side of the cage, a rope for moving the cage up and down, and a second roller provided at an upper portion thereof, and a balance weight to which the rope of the hoisting machine is connected. The end of the rope of the hoisting machine is fixed to the beam, the hoisting rope is hung on the first roller and the second roller, the housing is the front and rear plates and the front and rear plates respectively disposed in front and rear And an upper plate installed at an upper portion of the upper plate and at least one of the front plate and the rear plate. Since the machine is fixedly installed in the housing, it is not necessary to install the hoist on the hoistway wall, so it does not need to penetrate the hoistway wall, does not need to anchor the hoistway wall, and it is possible to replace the guide rail with a lightweight guide rail. Easier, shorter elevator installation times, lower installation costs, installation of hoisting units in bulky housings to simplify installation, reduce material and costs, and minimize extra overhead The lifting machine installation structure of the elevator which can be provided.

Description

엘리베이터의 권상기 설치구조와 케이지 조립체{Traction machine structure for an elevator and Cage Assembly}Traction machine structure for an elevator and cage assembly

본 발명은 본 출원인에 의해 출원된 한국특허출원 제10-2009-28731호에 대한 개량발명이다.The present invention is an improved invention of Korean Patent Application No. 10-2009-28731 filed by the present applicant.

한국특허출원 제10-2009-28731호는 2009.06.19일에 발송된 의견제출통지서에서 청구항 1내지 3의 특허성을 인정받았다. Korean Patent Application No. 10-2009-28731 has been granted the patentability of claims 1 to 3 in the notice of opinion sent out on June 19, 2009.

본 발명은 한국특허출원 제10-2009-28731호에서 특허성을 인정받은 구성에 대한 개량발명이다.The present invention is an improved invention for the configuration that is recognized in the patent application No. 10-2009-28731.

본 발명은 엘리베이터의 권상기 설치구조에 관한 것으로써, 특히, 승강로와, 상기 승강로의 내벽에 고정설치되는 빔과, 상기 빔에 볼트로 고정설치되는 제 1롤러와, 상기 승강로를 상, 하 이동하는 케이지와, 상기 케이지의 상부외측에 고정결합되는 하우징과, 상기 케이지를 상,하 이동시키는 로프를 포함하는 권상기와, 상부에는 제 2롤러가 구비되며 상기 권상기의 상기 로프가 연결되는 균형추를 포함하되, 상기 권상기의 상기 로프의 단부는 상기 빔에 고정설치되고, 상기 권상기 로프는 상기 제 1롤러와 상기 제 2롤러에 걸려있으며, 상기 하우징은 전방과 후방에 각각 배치되는 전판 및 후판과 상기 전판 및 상기 후판의 상부에 설치되는 상판을 포 함하며, 상기 전판과 상기 후판 중 적어도 하나에는 상기 권상기가 관통되는 관통공이 각각 형성되어 상기 권상기는 상기 하우징에 고정설치되는 엘리베이터의 권상기 설치구조에 관한 것이다.The present invention relates to an elevator hoisting structure, and in particular, a hoistway, a beam fixedly installed on an inner wall of the hoistway, a first roller fixedly bolted to the beam, and the hoistway moving up and down. It includes a cage, a hoist that is fixedly coupled to the upper outer side of the cage, a hoisting machine including a rope for moving the cage up and down, and a second roller is provided on the upper side and a balance weight to which the rope of the hoisting machine is connected. The end of the rope of the hoisting machine is fixed to the beam, the hoisting rope is hung on the first roller and the second roller, the housing is the front and rear plates and the front plate and respectively disposed in front and rear and It includes an upper plate installed on the upper plate, and at least one of the front plate and the rear plate are formed through holes through which the hoist Group, to a hoisting machine of an elevator traction machine mounting structure which is fixed to the housing.

일반적으로, 고층아파트 또는 사무실용 고층건물 등을 건축할 때, 건축물에는 필연적으로 상하 운송수단인 엘리베이터가 설치되고 엘리베이터가 상하 운행하는 승강로가 시공되는데, 이러한 엘리베이터 승강로는 직육면체 형상으로 형성되고, 건물의 각 층에는 상기 승강로와 연통되는 개구부가 형성된다.In general, when building a high-rise apartment or office high-rise building, the building is inevitably installed an elevator, which is a vertical transportation means, and the elevator is a vertical lift, which is formed in a rectangular parallelepiped shape of the building Each layer is formed with an opening in communication with the hoistway.

상기와 같은 승강로(20)에는 도 1a에 도시된 바와 같이 케이지(Cage)(24)와, 균형추(26)가 있고 상기 케이지(24)를 움직이는 권상기(32)에 권취되는 로프(34)와, 케이지(24)나 평형추(26)의 상하운동을 가이드하는 가이드레일(미도시)이 설치되는 한편, 케이지(24)와 제어반을 연결하는 제어케이블, 케이지(24)의 위치를 표시하는 인디게이터류 등이 설치되고, 또한 승강로(20) 각층 개구부(22)에는 도어장치가 설치된다.As shown in FIG. 1A, the hoistway 20 includes a cage 24 and a rope 34 wound around the hoist 32 moving the cage 24 and having a counterweight 26. Guide rails (not shown) for guiding the up and down movement of the cage 24 or the counterweight 26 are installed, while control cables connecting the cage 24 and the control panel and indicators for indicating the position of the cage 24 are provided. Etc. are provided, and a door device is provided at each opening 22 of the hoistway 20.

이와 같은 엘리베이터가 설치되는 승강로 구조는 승강로 상부의 기계실 제공여부에 따라 그 구조가 각각 상이하게 되는데, 이를 도 1a 내지 도 2b를 참조하여 설명하면 다음과 같다.The structure of the hoistway in which the elevator is installed is different depending on whether the machine room is provided at the top of the hoistway, which will be described with reference to FIGS. 1A through 2B.

도 1a는 일반적으로 기계실이 구비된 엘리베이터의 권상기 설치구조를 나타내는 개략적인 사시도이고, 도 1b는 도 1a의 A-A단면도로서, 상기와 같은 승강로 구조 즉, 기계실(30)이 승강로(20) 상부에 설치되는 구조로 종래에 많이 설치되는 대표적인 구조이다.FIG. 1A is a schematic perspective view showing a hoisting installation structure of an elevator equipped with a machine room, and FIG. 1B is a cross-sectional view taken along line AA of FIG. 1A. It is a typical structure that is installed a lot in the conventional structure.

그러나, 이와 같이 승강로 상부에 기계실(30)을 별도로 설치하고, 그 기계실(30)에 권상기(32), 제어반, 조속기 등을 설치하는 구조는 기계실(30) 설치에 따른 건축비 상승 및 일조권, 고도제한, 건물 옥상의 효과적 이용과 건축물 시공시, 항상 기계실을 고려해야 하므로 공간적인 제한이 따르는 문제점이 있다는 단점이 있었다.However, the structure in which the machine room 30 is separately installed in the upper part of the hoistway, and the hoisting machine 32, the control panel, the governor, etc. are installed in the machine room 30 has a construction cost increase, the amount of sunshine, and the high limit according to the machine room 30 installation. Therefore, there is a problem that there is a problem of spatial limitation because the machine room should always be considered in the effective use of the building roof and construction of the building.

따라서, 이를 해결하기 위하여 승강로의 상부에 권상기 등이 설치되는 별도의 기계실을 구성하지 않고 첨부도면 도 2a 및 도 2b에 도시된 바와 같이 승강로상부에 권상기(32)가 승강로 벽에 설치되고, 지지빔(36)에 로프(Rope)를 매달게 됨에 따라 승강로 상부에 별도의 기계실이 요구되지 않는 엘리베이터를 MRL(Machine Room Less Elevator, 기계실 없는 엘리베이터)이라 하며, 이러한 MRL이 확산보급되고 있는 추세이다.Accordingly, in order to solve this problem, the hoist 32 is installed on the hoistway wall in the hoistway as shown in FIGS. 2A and 2B without forming a separate machine room in which the hoist is installed on the hoistway. As the rope is suspended on (36), an elevator that does not require a separate machine room on the upper part of the hoistway is called an MRL (Machine Room Less Elevator).

기계실 없는 엘리베이터의 장점은 다음과 같다. The advantages of an elevator without a machine room are as follows.

(1) 기존의 로프식 및 유압식 엘리베이터의 공간점유를 비교시, 건물내 최상부 또는 승강로 근처에 축조한 기계실 내부에 설치했던 권상기(유압식인 경우는 파워 유닛트), 제어반, 조속기 등의 기계를 승강로 내부에 시공하여 별도의 기계실을 필요로 하지 않는다.(1) When comparing the space occupancy of the existing rope-type and hydraulic elevators, machines such as hoisting machines (power units in the case of hydraulic type), control panels, and governors installed inside the machine room constructed near the top of the building or near the hoistway are included in the hoistway. It does not require a separate machine room for construction.

특히 엘리베이터 부속기기를 일체화 및 소형화하여 엘리베이터 기계실의 기계실 장비를 승강로 내에 설치함으로써 기계실을 시공할 필요가 없어 건물 내 공간을 최대 활용할 수 있어, 획기적인 건물효용도를 도모할 수 있다. In particular, by integrating and minimizing the elevator accessories, the machine room equipment of the elevator machine room can be installed in the hoistway so that there is no need to construct the machine room, thereby making the most of the space in the building, thereby achieving breakthrough building efficiency.

(2) 기존의 로프식 및 유압식 엘리베이터에 필요했던 기계실과 관련된 건축, 설비공사가 불필요하므로, 공사기간 단축과 비용절감뿐만 아니라 건축공사시 편리성을 도모할 수 있다.(2) Since the construction and equipment work related to the machine room, which was required for the existing rope-type and hydraulic elevators, are unnecessary, the construction period and cost can be reduced, as well as convenience in construction work.

(3) 고효율 영구자석식 동기전동기방식을 채택한 기어리스 권상기를 사용하여 전동기 용량을 최소화하여 엘리베이터용의 전력설비와 전력소모의 절감을 도모할 수 있다.(3) The gearless hoist which adopts the high efficiency permanent magnet synchronous motor system can be used to minimize the electric motor capacity and reduce the power equipment and power consumption of the elevator.

(4) 기계실이 없으므로, 건축물 높이 측면에서 제약이 적어 건물 외관의 디자인을 다양화할 수 있다. (4) Since there is no machine room, there are few constraints in terms of building height, so the design of the building exterior can be diversified.

특히 고도제한 등 각종 법규면에서 활용도가 클 뿐만 아니라, 도시의 디자인 측면에서도 시대조류에 부합된다. In particular, it is not only widely used in various legal regulations such as altitude restrictions, but also meets the current trend in terms of urban design.

권상기(Traction Machine)의 설치구조에 따라, 종래기술의 MRL(Machine Room Less Elevator, 기계실 없는 엘리베이터)은 크게 다음과 같이 분류될 수 있다. According to the installation structure of the Traction Machine, the conventional Machine Room Less Elevator (MRL) can be largely classified as follows.

1. 승강로 상부 또는 하부의 승강로 벽에 권상기를 설치하는 구조가 있으며, 이와 같은 구조는 다음과 같은 단점이 있다. 1. There is a structure for installing the hoist on the hoistway wall of the hoistway or lower, such a structure has the following disadvantages.

1) 승강로 벽에 구멍을 내어서 권상기를 설치해야 하므로, 권상기에 부담되는 하중이 건축물에 직접 전달되어, 건축물의 구조에 악영향을 준다. 1) Since the hoist must be installed in the wall of the hoistway, the load on the hoist is transferred directly to the building, which adversely affects the structure of the building.

2) 엘리베이터 설치시 벽에 구멍을 뚫고 앵커 시공을 하여야 하므로, 엘리베이터 설치가 어렵고, 설치 비용도 많이 소요된다. 2) As the elevator is installed, it is difficult to install the elevator because it is necessary to drill a hole in the wall and install the anchor.

3) 승강로 상부 또는 하부에 권상기를 설치하는 공정이 필요하므로, 엘리베이터 설치기간이 길어진다. 3) Since the hoisting machine is required to be installed on the upper or lower part of the hoistway, the elevator installation period becomes longer.

4) 엘리베이터의 작동시, 케이지(또는 카(Car))를 승강로 내부에서 상,하 이동시키는 권상기에서 발생하는 진동이 승강로 벽을 따라 건축물에 전달됨으로써, 소음과 진동에 따른 입주민의 피해가 불가피하다. 4) During operation of the elevator, vibrations generated from the hoist that moves the cage (or car) up and down inside the hoistway are transmitted to the building along the hoistway wall, thereby inevitably damaging residents due to noise and vibration. .

2. 또 다른 방법은 별도의 가이드 레일(Guide Rail)위에 권상기를 설치하는 구조가 있으며, 이와 같은 구조는 다음과 같은 단점이 있다. 2. Another method is to install a hoist on a separate guide rail (Guide Rail), such a structure has the following disadvantages.

1) 권상기 하중을 지탱하기 위해서 승강로 길이에 해당하는 길이를 갖는 별도의 가이드 레일을 승강로에 추가로 설치하여야 한다.1) An additional guide rail having a length corresponding to the length of the hoistway is to be additionally installed on the hoistway to support the hoisting load.

2) 권상기의 하중을 가이드 레일로 지탱하여야 하므로, 가이드 레일의 변형이 야기될 가능성이 있다. 2) Since the load on the hoist must be supported by the guide rail, there is a possibility that the guide rail is deformed.

3) 따라서, 권상기를 설치함으로 인해서 가이드 레일은 튼튼한 것을 사용해야 하므로, 추가적인 재료비와 추가 설치비가 발생한다.3) Therefore, the guide rail should be made of sturdy ones by installing the hoisting machine, thus incurring additional material cost and additional installation cost.

4) 엘리베이터의 기동시, 권상기에서 발생하는 진동이 가이드 레일을 통해 건축물에 전달됨에 따른 입주민들에게 소음과 진동 피해가 불가피하다.4) When the elevator starts up, noise and vibration damage are inevitable to residents because vibration generated from the hoist is transmitted to the building through the guide rail.

본 발명은 전술한 문제를 해결하기 위하여 안출된 것으로, 승강로 벽에 권상기를 설치하지 않아도 되므로 승강로 벽을 뚫지 않아도 되고, 가이드레일을 경량의 가이드레일로 대체 가능하여, 엘리베이터의 설치가 용이해지고, 엘리베이터 설치 기간을 단축시킬 수 있고 설치비용을 줄일 수 있으며, 체대 역할을 하는 하우징에 권상기를 설치하여 혹 늘어날수도 있는 오버헤드를 최소화할 수 있는 엘리베이터의 권상기 설치구조를 제공하는데 그 목적이 있다.The present invention has been made in order to solve the above problems, it is not necessary to install a hoist on the wall of the hoistway, it is not necessary to penetrate the hoistway wall, the guide rail can be replaced with a lightweight guide rail, the installation of the elevator becomes easier, the elevator The purpose of the present invention is to provide an elevator hoisting installation structure which can shorten the installation period and reduce installation cost, and minimize the overhead that may be increased by installing a hoist in a housing serving as a bulk.

전술한 목적을 달성하기 위한 본 발명의 엘리베이터의 권상기 설치구조는, 승강로와, 상기 승강로의 내벽에 고정설치되는 빔과, 상기 빔에 고정설치되는 제 1롤러와, 상기 승강로를 상, 하 이동하는 케이지와, 상기 케이지의 상부외측에 고정결합되는 하우징과, 상기 케이지를 상,하 이동시키는 로프를 포함하는 권상기와, 상부에는 제 2롤러가 구비되며 상기 권상기의 상기 로프가 연결되는 균형추를 포함하되, 상기 권상기의 상기 로프의 단부는 상기 빔에 고정설치되고, 상기 권상기 로프는 상기 제 1롤러와 상기 제 2롤러에 걸려있으며, 상기 하우징은 전방과 후방에 각각 배치되는 전판 및 후판과 상기 전판 및 상기 후판의 상부에 설치되는 상판을 포함하며, 상기 전판과 상기 후판 중 적어도 하나에는 상기 권상기가 관통되는 관통공이 각각 형성되어 상기 권상기는 상기 하우징에 고정설치된다.The lifting device installation structure of the elevator of the present invention for achieving the above object, the lifting roller, the beam is fixed to the inner wall of the hoistway, the first roller is fixed to the beam, and the hoistway to move up and down It includes a cage, a hoist that is fixedly coupled to the upper outer side of the cage, a hoisting machine including a rope for moving the cage up and down, and a second roller is provided on the upper side and a balance weight to which the rope of the hoisting machine is connected. The end of the rope of the hoisting machine is fixed to the beam, the hoisting rope is hung on the first roller and the second roller, the housing is the front and rear plates and the front plate and respectively disposed in front and rear and And a top plate installed on an upper portion of the rear plate, and at least one of the front plate and the rear plate is formed with through holes through which the hoisting machine passes. The hoist is fixed to the housing.

이상에서 설명한 바와 같은 본 발명의 엘리베이터의 권상기 설치구조에 따르면, 다음과 같은 효과가 있다.According to the hoisting machine installation structure of the elevator of the present invention as described above, there are the following effects.

승강로와, 상기 승강로의 내벽에 고정설치되는 빔과, 상기 빔에 고정설치되는 제 1롤러와, 상기 승강로를 상, 하 이동하는 케이지와, 상기 케이지의 상부외측에 고정결합되는 하우징과, 상기 케이지를 상,하 이동시키는 상기 로프를 포함하는 권상기와, 상부에는 제 2롤러가 구비되며 상기 권상기의 상기 로프가 연결되는 균형추를 포함하되, 상기 권상기의 상기 로프의 단부는 상기 빔에 고정설치되고, 상기 권상기 로프는 상기 제 1롤러와 상기 제 2롤러에 걸려있으며, 상기 하우징은 전방과 후방에 각각 배치되는 전판 및 후판과 상기 전판 및 상기 후판의 상부에 설치되는 상판을 포함하며, 상기 전판과 상기 후판 중 적어도 하나에는 상기 권상기가 관통되는 관통공이 각각 형성되어 상기 권상기는 상기 하우징에 고정설치되 승강로 벽에 권상기를 설치하지 않아도 되므로 승강로 벽을 뚫지 않아도 되고, 가이드레일을 경량의 가이드레일로 대체 가능하여, 엘리베이터의 설치가 용이해지고, 엘리베이터 설치 기간을 단축시킬 수 있고 설치비용을 줄일 수 있으며, 체대 역할을 하는 하우징에 권상기를 설치하여 혹시 늘어날수도 있는 오버헤드를 최소화할 수 있다.A hoistway, a beam fixed to the inner wall of the hoistway, a first roller fixedly fixed to the beam, a cage for moving the hoistway up and down, a housing fixedly coupled to an upper outer side of the cage, and the cage It includes a hoisting machine including the rope to move up and down, and the upper portion is provided with a second roller and a balance weight to which the rope of the hoisting machine is connected, the end of the rope of the hoisting machine is fixed to the beam, The hoisting rope is hooked to the first roller and the second roller, and the housing includes a front plate and a rear plate disposed at the front and the rear, respectively, and an upper plate installed at the top of the front plate and the rear plate. At least one of the thick plate is formed with a through hole through which the hoist is penetrated, and the hoist is fixed to the housing to install a hoist on the wall of the hoistway. Since it does not need to penetrate the wall of the hoistway, it is possible to replace the guide rail with a lightweight guide rail, which facilitates the installation of the elevator, shortens the installation period of the elevator, reduces the installation cost, and By installing a hoist, it is possible to minimize the overhead that may be increased.

이하, 본 발명의 바람직한 일실시예를 첨부도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.

참고적으로, 이하에서 설명될 본 발명의 구성들 중 종래기술과 동일한 구성에 대해서는 전술한 종래기술을 참조하기로 하고 별도의 상세한 설명은 생략한다.For reference, among the configurations of the present invention to be described below, the same configuration as the prior art will be referred to the above-described prior art, and a detailed description thereof will be omitted.

도 3은 발명의 바람직한 실시례에 따른 엘리베이터의 권상기 설치구조의 개략도이고, 도 4는 발명의 바람직한 실시례에 따른 엘리베이터의 권상기 설치구조의 사시도이며, 도 5는 발명의 바람직한 실시례에 따른 엘리베이터의 권상기 설치구조의 부분 확대사시도이고, 도 6은 발명의 바람직한 실시례에 따른 엘리베이터와 엘리베이터의 권상기 설치구조의 정면도이고, 도 7은 발명의 바람직한 실시례에 따른 엘리베이터와 엘리베이터의 권상기 설치구조의 측면도이다.Figure 3 is a schematic diagram of the hoisting machine installation structure of the elevator according to a preferred embodiment of the invention, Figure 4 is a perspective view of the hoisting machine installation structure of the elevator according to a preferred embodiment of the invention, Figure 5 is an elevator according to a preferred embodiment of the invention Partial enlarged perspective view of the hoisting installation structure, Figure 6 is a front view of the elevator and the hoisting installation structure of the elevator according to a preferred embodiment of the invention, Figure 7 is a side view of the elevator and the hoisting installation structure of the elevator according to a preferred embodiment of the invention .

도 3 내지 도 7에 도시된 바와 같이, 본 실시예의 엘리베이터의 권상기 설치구조는, 승강로(20)와, 상기 승강로의 내벽(21)에 고정설치되는 빔(30)과, 상기 빔(30)에 고정설치되는 제 1롤러(35)와, 상기 승강로(20)를 상, 하 이동하는 케이지(45)와, 상기 케이지(45)의 상부외측에 고정결합되는 하우징(50)과, 상기 케이지(45)를 상,하 이동시키는 로프(75)를 포함하는 권상기(70)와, 상부에는 제 2롤러(85)가 구비되며 상기 권상기(70)의 상기 로프(75)가 연결되는 균형추(80)를 포함하되, 상기 권상기(70)의 상기 로프(75)의 단부는 상기 빔(30)에 고정설치되고, 상기 권상기(70)의 로프(75)는 상기 제 1롤러(35)와 상기 제 2롤러(85)에 걸려있으며, 상기 하우징(50)은 전방과 후방에 각각 배치되는 전판(51) 및 후판(52)과 상기 전판(51) 및 상기 후판(52)의 상부에 설치되는 상판(53)을 포함하며, 상기 전판(51)과 상기 후판(52) 중 적어도 하나에는 상기 권상기(70)가 관통되는 관통공(미도시)이 각각 형성되어 상기 권상기(70)는 상기 하우징(50)에 고정설치된다.As shown in Fig. 3 to Fig. 7, the hoisting machine installation structure of the elevator of the present embodiment, the hoistway 20, the beam 30 fixed to the inner wall 21 of the hoistway, and the beam 30 The first roller 35 is fixedly installed, the cage 45 for moving the hoistway 20 up and down, the housing 50 fixedly coupled to the upper outer side of the cage 45, and the cage 45 ), A hoisting machine 70 including a rope 75 for moving up and down, and a second roller 85 provided at an upper portion thereof, and a balance weight 80 to which the rope 75 of the hoisting machine 70 is connected. Including, the end of the rope 75 of the hoisting machine 70 is fixed to the beam 30, the rope 75 of the hoisting machine 70 is the first roller 35 and the second roller It is hung on the 85, the housing 50 is the front plate 51 and the rear plate 52 and the upper plate 53 which is installed on the front plate 51 and the rear plate 52 respectively disposed in the front and rear, respectively. Contains In addition, at least one of the front plate 51 and the rear plate 52 is formed with a through hole (not shown) through which the hoist 70 passes, and the hoist 70 is fixed to the housing 50. .

먼저, 본 발명에 의한 엘리베이터의 권상기 설치구조의 구성에 대해 도 3과 도 4를 참고로 하여 자세하게 설명한다.First, the configuration of the hoisting machine installation structure of the elevator according to the present invention will be described in detail with reference to FIGS. 3 and 4.

상기 케이지(45)는 승객 또는 화물이 탑승하는 역할을 하며, 카(Car)라고도 불리기도 한다.The cage 45 serves to carry passengers or cargo and may also be referred to as a car.

상기 케이지의 상부외측(46)에는 후술할 하우징(50)이 고정결합된다.The housing 50, which will be described later, is fixedly coupled to the upper outer side 46 of the cage.

승강로(20)는 승객 또는 화물이 탑승하는 케이지(45)가 상,하로 이동할 수 있는 공간이다.The hoistway 20 is a space in which a cage 45 on which a passenger or cargo boards can move up and down.

상기 승강로(20)에는 가이드 레일(Guide Rail,25)이 설치되는 것이 일반적이다. Guide rails (Guide Rail, 25) is generally installed on the hoistway (20).

상기 가이드 레일(25)은 상기 케이지(45)와 후술할 균형추(80)가 승강기 출입구(미도시)와 평면적 위치를 갖도록 하며, 비상정지장치가 작동할 경우 반력을 공급하기 위해 상기 승강로(20)에 일직선상의 수직으로 설치되는 궤도이다.The guide rail 25 has the cage 45 and the balance weight 80 to be described later to have a plane position with the elevator entrance (not shown), the elevator 20 to supply a reaction force when the emergency stop device is operated. It is a track installed vertically in a straight line.

상기 승강로의 내벽(21)에는 빔(30)이 구비되며, 상기 빔(30)은 상기 승강로 공간의 상측에 수평하게 설치되는 것이 바람직하다. Beam 30 is provided on the inner wall 21 of the hoistway, the beam 30 is preferably installed horizontally above the hoistway space.

상기 승강로의 내벽(21)에 상기 빔(30)을 고정시키는 것은 다음과 같다.Fixing the beam 30 to the inner wall 21 of the hoistway is as follows.

먼저, 상기 승강로(20)의 상호 마주보는 승강로의 내벽(21)의 적당한 위치에 상기 빔의 단부(30a, 30b)를 각각 위치시킨다. First, the end portions 30a and 30b of the beam are respectively positioned at appropriate positions of the inner walls 21 of the hoistway which are mutually opposite to the hoistway 20.

상기 빔의 단부(30a, 30b)를 상기 승강로(20)의 벽에 구멍을 내어 설치하고, 로프소켓(40)를 이용하여 상기 승강로의 내벽(21)에 고정시킨다.The ends 30a and 30b of the beam are installed by drilling holes in the wall of the hoistway 20 and fixed to the inner wall 21 of the hoistway using a rope socket 40.

상기 빔(30)에는 제 1롤러(35)가 구비되며, 상기 제 1롤러(35)는 상기 빔(30), 바람직하게는 상기 빔의 상부(31)에 볼트로 고정설치된다. The beam 30 is provided with a first roller 35, the first roller 35 is bolted to the beam 30, preferably the upper portion 31 of the beam.

상기 제 1롤러(35)에는 후술할 권상기(70)의 로프(75)가 걸리며, 상기 로프(75)가 이동함에 따라서, 상기 제 1롤러(35)는 상기 빔(30)에서 고정설치된 위치에서 회전을 한다.The first roller 35 is caught by the rope 75 of the hoisting machine 70 to be described later, and as the rope 75 moves, the first roller 35 is fixed in the beam 30 at a position. Rotate

상기 케이지의 상부외측(46)에는 하우징(50)이 고정결합되며, 상기 하우징(50)의 역할은 후술할 권상기(70)를 상기 케이지의 상부외측(46)에 설치할 수 있도록 체대 역할을 한다.The housing 50 is fixedly coupled to the upper outer side 46 of the cage, and the role of the housing 50 serves as a body to install the hoisting machine 70 to be described later on the upper outer side 46 of the cage.

이러한 하우징(50)은 양단부가 상기 케이지의 상부외측(46)에 고정결합된다.Both ends of the housing 50 are fixedly coupled to the upper outer side 46 of the cage.

상기 하우징(50)과 상기 케이지(45)의 결합시, 엘리베이터의 유지보수측면에서 볼트로 고정결합하는 것이 바람직하다.When the housing 50 and the cage 45 are coupled, it is preferable that the bolt is fixed on the maintenance side of the elevator.

상기 하우징(50)에 볼트로 고정설치되는 권상기(70)는 권상기의 메인시브(76)와 상기 메인시브(76)에 권취된 로프(75)를 포함하며, 상기 권상기(70)는 상기 케이지(45)가 상기 승강로(20)에서 상,하 이동하도록 구동력을 제공하는 역할을 한다.The hoisting machine 70 fixedly installed to the housing 50 includes a main sheave 76 of the hoisting machine and a rope 75 wound around the main sheave 76, and the hoisting machine 70 includes the cage ( 45 serves to provide a driving force to move up and down in the hoistway 20.

이하에서는 상기 권상기(70)의 로프(75)가 상기 승강로(20)에 고정설치된 빔(30)에 설치되는 구조 및 상기 권상기(70)가 상기 하우징(50)에 고정설치되는 구조에 대해 자세하게 설명한다. Hereinafter, a structure in which the rope 75 of the hoisting machine 70 is installed in the beam 30 fixed to the hoistway 20 and the structure in which the hoisting machine 70 is fixed to the housing 50 will be described in detail. do.

먼저 상기 권상기의 로프(75)가 상기 승강로(20)에 고정설치된 빔(30)에 설치되는 구조는 다음과 같다.First, the structure in which the rope 75 of the hoist is installed in the beam 30 fixed to the hoistway 20 is as follows.

상기 권상기(70)에는 로프(75)가 포함되며, 구체적으로 권상기의 메인시브(76)에 상기 로프(75)가 권취됨은 전술한 바와 같다.The hoisting machine 70 includes a rope 75, and specifically, the rope 75 is wound on the main sheave 76 of the hoisting machine as described above.

상기 권상기의 메인시브(76)에 권취된 상기 로프의 일단부(75a)는 상기 승강로(20)에 고정설치된 상기 빔(30)에 로프소켓(40)로 고정설치된다.One end portion 75a of the rope wound around the main sheave 76 of the hoisting machine is fixed to the beam 30 fixed to the hoistway 20 with a rope socket 40.

이와 같이, 일단부(75a)가 상기 빔(30)에 고정설치된 상기 권상기의 로프(75)는 상기 빔의 상부(31)에 볼트로 고정설치되는 상기 제 1롤러(35)에 걸린다. As such, the rope 75 of the hoisting machine having one end 75a fixed to the beam 30 is caught by the first roller 35 that is bolted to the upper portion 31 of the beam.

상기 제 1롤러(35)와 연결된 상기 권상기 로프(75)는 상기 균형추(80)의 상부에 형성된 제 2롤러(85)에 연결된다. The hoisting rope 75 connected to the first roller 35 is connected to a second roller 85 formed on the balance weight 80.

이와 같이 상기 균형추의 제 2롤러(85)에 연결된 상기 로프의 타단부(75b)는 상기 빔(30)에 로프소켓(40)로 고정설치된다. As such, the other end portion 75b of the rope connected to the second roller 85 of the counterweight is fixed to the beam 30 with a rope socket 40.

상기 권상기(70)의 외주면에는 플랜지(71)가 형성된다. A flange 71 is formed on an outer circumferential surface of the hoist 70.

플랜지(71)에는 복수개의 홀(hole)이 원주방향을 따라 배치되도록 전후방향으로 형성된다. The flange 71 is formed in the front-rear direction so that a plurality of holes are arranged along the circumferential direction.

상기와 같은 홀을 통해 권상기(70)가 하우징(50)에 볼트로 고정설치된다.Through the hole as described above, the hoisting machine 70 is fixed to the housing 50 with bolts.

이하에서는 상기 케이지의 상부외측(46)에 고정결합되는 하우징(50)에 대해서 자세하게 설명한다. Hereinafter, the housing 50 that is fixedly coupled to the upper outer side 46 of the cage will be described in detail.

상기 하우징(50)은 전방과 후방에 각각 배치되는 전판(51) 및 후판(52)과 상기 전판(51) 및 상기 후판(52)의 상부에 설치되는 상판(53)을 포함한다.The housing 50 includes a front plate 51 and a rear plate 52 disposed at the front and the rear, respectively, and an upper plate 53 installed at the top of the front plate 51 and the rear plate 52.

상기 전판(51)과 상기 후판(52) 중 적어도 하나에는 상기 권상기(70)가 관통되는 관통공(미도시)이 각각 형성된다.At least one of the front plate 51 and the rear plate 52 is formed with a through hole (not shown) through which the hoist 70 passes.

바람직하게는 전판(51)과 후판(52)에 모두 관통공이 형성된다.Preferably, the through holes are formed in both the front plate 51 and the rear plate 52.

나아가, 전판(51)과 후판(52)에는 관통공이 하나 더 형성될 수 있다. 이러한 관통공으로 인해, 메인시브(76)와 로프(75) 사이에 슬립이 발생할 경우 상기 관통공에 추가적으로 롤러를 설치하여 마찰력을 향상시킴으로써 슬립이 발생하는 것을 방지할 수 있다.Furthermore, one more through hole may be formed in the front plate 51 and the rear plate 52. Due to such a through hole, when a slip occurs between the main sheave 76 and the rope 75, a slip may be prevented by installing a roller in the through hole to improve frictional force.

또한, 전판(51)에는 상기 관통공 주위에 볼트가 삽입되는 다수개의 홀이 형성된다.In addition, the front plate 51 is formed with a plurality of holes through which the bolt is inserted around the through hole.

전판(51)과 후판(52)은 단면이 "ㄷ"자 형상으로, 상기 전판(51)과 후판(52)은 상부 플랜지와 하부 플랜지, 상기 상부 플랜지와 상기 하부 플랜지를 연결하는 웹(Web:57)으로 이루어진다.The front plate 51 and the rear plate 52 has a cross-section of the letter "C", the front plate 51 and the rear plate 52 is a web connecting the upper flange and the lower flange, the upper flange and the lower flange (Web: 57).

상기 상부 플랜지와 상기 하부 플랜지는 전방 또는 후방을 향하도록 형성되어 있다.The upper flange and the lower flange are formed to face forward or rearward.

또한, 상기 상부 플랜지와 상기 하부 플랜지의 끝단에는 하부 및 상부를 향하도록 절곡된 절곡부(59)가 형성되어 있다.In addition, bent portions 59 bent toward the lower and upper portions are formed at ends of the upper flange and the lower flange.

하우징(50)은 전판(51)과 후판(52)의 양단 및 케이지(45)의 양측에 설치되는 수직빔(65, 66)을 통해 케이지(45)의 상부외측(46)으로부터 이격되도록 설치된다. 이와 같이 권상기(70)가 설치되는 하우징(50)이 케이지(45)로부터 이격되도록 배치되어 권상기(70)로 인해 발생되는 소음이나 진동 등이 케이지(45)에 바로 전달되는 것을 방지할 수 있다.The housing 50 is installed so as to be spaced apart from the upper outer side 46 of the cage 45 through the vertical beams 65 and 66 installed at both ends of the front plate 51 and the rear plate 52 and on both sides of the cage 45. . As such, the housing 50 in which the hoist 70 is installed may be spaced apart from the cage 45 to prevent noise or vibration generated by the hoist 70 from being immediately transmitted to the cage 45.

상기 수직빔(65,66)은 단면이 전체적으로 "ㄷ"자 형상으로, 상기 수직빔(65, 66)은 제1 플랜지와 제2플랜지, 상기 제1플랜지와 상기 제2플랜지를 연결하는 웹으로 이루어진다.The vertical beams 65 and 66 have a cross-sectional shape of “c” as a whole, and the vertical beams 65 and 66 are webs connecting the first flange and the second flange and the first flange and the second flange. Is done.

상기 수직빔(65, 66)의 제1플랜지 및 제2플랜지와 전판(51)과 후판(52)의 웹(57)의 양단에는 홀이 형성되어 수직빔(65, 66)과 전판(51) 및 후판(52)은 볼팅체결된다. Holes are formed at both ends of the first and second flanges of the vertical beams 65 and 66, and the webs 57 of the front plate 51 and the rear plate 52 so that the vertical beams 65 and 66 and the front plate 51 are formed. And the back plate 52 is bolted.

또한, 전판(51) 및 후판(52)의 상부 양측에는 상판(53)이 각각 설치된다.In addition, the upper plate 53 is provided on both upper sides of the front plate 51 and the rear plate 52, respectively.

전판(51) 및 후판(52)의 상부 플랜지와 상판(53)의 전방과 후방에는 각각 홀이 형성되어, 전판(51) 및 후판(52)과 상판(53)은 볼팅체결된다.Holes are formed in front and rear of the upper flange and the upper plate 53 of the front plate 51 and the rear plate 52, respectively, and the front plate 51 and the rear plate 52 and the upper plate 53 are bolted to each other.

이하에서는 권상기(70)가 하우징(50)에 설치되는 구조에 대해 설명하기로 한다.Hereinafter, a structure in which the hoist 70 is installed in the housing 50 will be described.

권상기(70)의 플랜지(71)가 전판(51)의 전방에 배치되도록 하고, 권상기의 메인시브(76)가 전판(51)과 후판(52) 사이에 배치되도록 하며, 권상기(70)의 후방에 형성된 돌출부가 후판(52)에 형성된 관통공에 삽입되도록, 권상기(70)를 전판(51)의 관통공에 삽입한다.The flange 71 of the hoisting machine 70 is disposed in front of the front plate 51, the main sheave 76 of the hoisting machine is arranged between the front plate 51 and the rear plate 52, the rear of the hoisting machine 70 The hoisting machine 70 is inserted into the through hole of the front plate 51 so that the protrusion formed in the back plate is inserted into the through hole formed in the rear plate 52.

이어서, 플랜지(71)와 전판(51)에 형성된 홀을 통해 권상기(70)과 전판(51)을 볼팅체결한다.Subsequently, the winding machine 70 and the front plate 51 are bolted through a hole formed in the flange 71 and the front plate 51.

상기와 같이 설치된 권상기의 메인시브(76)에 로프(75)가 걸린다.The rope 75 is caught by the main sheave 76 of the hoist installed as described above.

본 발명에 의한 케이지 조립체(10)는 다음과 같이 구성된다.Cage assembly 10 according to the present invention is configured as follows.

상기 승강로(20)를 상,하 이동하는 케이지(45)와, 상기 케이지의 상부외측(46)에 고정결합하는 하우징(50)과, 상기 하우징(50)에 볼트로 고정설치되는 권상기(70)를 포함한다.A cage 45 for moving the hoistway 20 up and down, a housing 50 fixedly coupled to the upper outer side 46 of the cage, and a hoisting machine 70 fixed to the housing 50 with bolts. It includes.

본 발명에 의한 케이지 조립체(10)는 상기 케이지의 상부외측(46)에 하우 징(50)이 고정결합된다. In the cage assembly 10 according to the present invention, the housing 50 is fixedly coupled to the upper outer side 46 of the cage.

상기 하우징(50)에는 상기 케이지(45)를 상기 승강로(20)에서 상,하 이동시키는 권상기(70)가 설치되며, 특히 상기 하우징(50)과 상기 권상기는 볼트로 고정설치함으로써, 엘리베이터의 유지보수측면에서 조립과 분해를 용이하게 할 수 있다.The housing 50 is provided with a hoist 70 for moving the cage 45 up and down in the hoistway 20, and in particular, the housing 50 and the hoist are fixed with bolts to maintain the elevator. It is easy to assemble and disassemble from the maintenance side.

상술한 바와 같이, 본 발명의 바람직한 실시예를 참조하여 설명하였지만, 해당기술분야의 당업자는 하기의 특허청구범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 또는 변형하여 실시할 수 있다.As described above, although described with reference to a preferred embodiment of the present invention, those skilled in the art various modifications or variations of the present invention without departing from the spirit and scope of the invention described in the claims below Can be carried out.

이상과 같이, 본 발명에 따른 엘리베이터의 권상기 설치구조는, 엘리베이터가 설치된 건물 뿐만 아니라 엘리베이터가 기존에 설치되지 않은 건물에도 쉽게 적용이 가능하다.As described above, the hoisting installation structure of the elevator according to the present invention can be easily applied not only to the building in which the elevator is installed, but also to the building in which the elevator is not previously installed.

도 1a와 도 1b는 종래기술에 따른 기계실 있는 엘리베이터의 권상기 설치구조의 개략 사시도와 단면도.1A and 1B are schematic perspective and cross-sectional views of a hoist installation structure of a machine room elevator according to the prior art;

도 2a와 도 2b는 종래기술에 따른 기계실 없는 엘리베이터의 권상기 설치구조의 개략 사시도와 단면도.2A and 2B are schematic perspective and cross-sectional views of a hoist installation structure of an elevator without a machine room according to the prior art;

도 3은 발명의 바람직한 실시례에 따른 엘리베이터의 권상기 설치구조의 개략도.3 is a schematic view of a hoisting installation structure of an elevator according to a preferred embodiment of the present invention.

도 4는 발명의 바람직한 실시례에 따른 엘리베이터의 권상기 설치구조의 사시도.Figure 4 is a perspective view of the hoisting machine installation structure of an elevator according to a preferred embodiment of the invention.

도 5는 발명의 바람직한 실시례에 따른 엘리베이터의 권상기 설치구조의 부분 확대사시도.5 is a partially enlarged perspective view of a hoisting installation structure of an elevator according to a preferred embodiment of the present invention.

도 6은 발명의 바람직한 실시례에 따른 엘리베이터와 엘리베이터의 권상기 설치구조의 정면도.6 is a front view of an elevator and an elevator hoist installation structure according to a preferred embodiment of the present invention.

도 7은 발명의 바람직한 실시례에 따른 엘리베이터와 엘리베이터의 권상기 설치구조의 측면도.7 is a side view of an elevator and an elevator hoisting structure according to a preferred embodiment of the present invention.

** 도면의 주요 부분에 대한 부호의 설명 **** Description of symbols for the main parts of the drawing **

10 : 케이지 조립체 20 : 승강로10 cage assembly 20 hoistway

21 : 승강로의 내벽 25 : 가이드 레일21: inner wall of the hoistway 25: guide rail

30 : 빔 30a,30b : 빔의 단부30: beam 30a, 30b: end of the beam

31 : 빔의 상부 35 : 제 1롤러31: upper part of the beam 35: first roller

40 : 로프소켓 40: rope socket

45 : 케이지 46 : 케이지의 상부외측45: cage 46: the upper outer side of the cage

50 : 프레임 65,66 : 수직빔
70 : 권상기 75 : 로프
75a, 75b : 로프의 단부 76 : 권상기의 메인시브
80 : 균형추 85 : 제 2롤러
50 frame 65, 66 vertical beam
70: hoist 75: rope
75a, 75b: end of rope 76: main sheave of hoist
80: counterweight 85: second roller

Claims (1)

승강로;Hoistway; 상기 승강로의 내벽에 고정설치되는 빔;A beam fixed to an inner wall of the hoistway; 상기 빔에 고정설치되는 제 1롤러;A first roller fixed to the beam; 상기 승강로를 상, 하 이동하는 케이지;A cage for moving the hoistway up and down; 상기 케이지의 상부외측에 고정결합되는 하우징;A housing fixedly coupled to an upper outer side of the cage; 상기 케이지를 상,하 이동시키는 로프를 포함하는 권상기;A hoist including a rope for moving the cage up and down; 상부에는 제 2롤러가 구비되며 상기 권상기의 상기 로프가 연결되는 균형추를 포함하되, 상기 권상기의 상기 로프의 단부는 상기 빔에 고정설치되고, 상기 권상기 로프는 상기 제 1롤러와 상기 제 2롤러에 걸려있으며, A second roller is provided at an upper portion thereof, and includes a balance weight to which the rope of the hoisting machine is connected. An end portion of the rope of the hoisting machine is fixed to the beam, and the hoisting rope is connected to the first roller and the second roller. Hanging, 상기 하우징은 전방과 후방에 각각 배치되는 전판 및 후판과 상기 전판 및 상기 후판의 상부에 설치되는 상판을 포함하며,The housing includes a front plate and a rear plate disposed at the front and rear, respectively, and an upper plate installed on the front plate and the rear plate, 상기 전판과 상기 후판 중 적어도 하나에는 상기 권상기가 관통되는 관통공이 형성되어 상기 권상기는 상기 하우징에 고정설치되며,At least one of the front plate and the rear plate is formed with a through hole through which the hoist is penetrated, and the hoist is fixedly installed in the housing. 상기 권상기의 외주면에는 플랜지가 형성되며, 상기 플랜지에는 복수개의 홀이 원주방향을 따라 배치되도록 전후방향으로 형성되어, 상기 권상기가 상기 하우징에 볼트로 고정설치되고, A flange is formed on an outer circumferential surface of the hoisting machine, and a plurality of holes are formed in the front and rear direction so that the plurality of holes are disposed along the circumferential direction, and the hoisting machine is fixed to the housing with bolts. 상기 전판과 상기 후판은 단면이 "ㄷ"자 형상으로, 상기 전판과 상기 후판은 상부 플랜지와 하부 플랜지, 상기 상부 플랜지와 상기 하부 플랜지를 연결하는 웹으로 이루어지며, The front plate and the back plate has a cross-section "C" shape, the front plate and the back plate is made of a web connecting the upper flange and the lower flange, the upper flange and the lower flange, 상기 상부 플랜지와 상기 하부 플랜지의 끝단에는 하부 및 상부를 향하도록 절곡된 절곡부가 형성되어 있고, At the ends of the upper flange and the lower flange is formed a bent portion bent toward the lower and upper, 상기 하우징은 상기 전판과 상기 후판의 양단 및 상기 케이지의 양측에 설치되는 수직빔을 통해 상기 케이지의 상부외측으로부터 이격되도록 설치되며, The housing is installed so as to be spaced apart from the upper outer side of the cage through the vertical beam is installed on both ends of the front plate and the rear plate and both sides of the cage, 상기 수직빔은 단면이 "ㄷ"자 형상으로, 상기 수직빔은 제1 플랜지와 제2플랜지, 상기 제1플랜지와 상기 제2플랜지를 연결하는 웹으로 이루어지고, The vertical beam has a cross-section "c" shape, the vertical beam is made of a web connecting the first flange and the second flange, the first flange and the second flange, 상기 수직빔의 상기 제1플랜지 및 상기 제2플랜지와 상기 전판과 상기 후판의 웹의 양단에는 홀이 형성되어, 상기 수직빔과 상기 전판 및 상기 후판은 볼팅체결되며, Holes are formed at both ends of the web of the first flange and the second flange and the front plate and the rear plate of the vertical beam, and the vertical beam and the front plate and the rear plate are bolted to each other. 상기 전판 및 상기 후판의 상부 플랜지와 상기 상판의 전방과 후방에는 각각 홀이 형성되어, 상기 전판 및 상기 후판과 상기 상판은 볼팅체결되는 엘리베이터의 권상기 설치구조.The upper flange of the front plate and the rear plate and the front and rear of the upper plate, respectively, the hole is formed, the front plate and the rear plate and the upper plate bolting installation structure of the elevator is bolted.
KR1020090077059A 2009-08-20 2009-08-20 Traction machine structure for an elevator and cage assembly Expired - Fee Related KR100950991B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090077059A KR100950991B1 (en) 2009-08-20 2009-08-20 Traction machine structure for an elevator and cage assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090077059A KR100950991B1 (en) 2009-08-20 2009-08-20 Traction machine structure for an elevator and cage assembly

Publications (1)

Publication Number Publication Date
KR100950991B1 true KR100950991B1 (en) 2010-04-02

Family

ID=42219510

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090077059A Expired - Fee Related KR100950991B1 (en) 2009-08-20 2009-08-20 Traction machine structure for an elevator and cage assembly

Country Status (1)

Country Link
KR (1) KR100950991B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105197745A (en) * 2015-09-17 2015-12-30 苏州润吉驱动技术有限公司 Alternating energy-saving elevator traction machine
KR20190050630A (en) * 2017-11-03 2019-05-13 삼성중공업 주식회사 Ship with Anti-rolling Device
KR102204157B1 (en) * 2020-07-27 2021-01-18 주식회사 송산특수엘리베이터 Self-driving type elevator having 4 direction entrance doors
CN114135106A (en) * 2021-12-09 2022-03-04 上海原数建筑设计有限公司 Assembly integrated green building system
CN114634079A (en) * 2022-02-28 2022-06-17 浙江埃克森电梯有限公司 Ultra-thin passenger elevator without machine room

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997011020A1 (en) 1995-09-21 1997-03-27 Kone Oy Traction sheave elevator without machine room
WO2002010048A2 (en) * 2000-07-29 2002-02-07 Alpha Getriebebau Gmbh Elevator car with a driving pulley driving machine integrated therein
KR20050116317A (en) * 2004-06-07 2005-12-12 오티스 엘리베이터 컴파니 Machine room-less elevator system
KR100688362B1 (en) * 2005-11-23 2007-03-02 한진엘리베이터(주) Drive of elevator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997011020A1 (en) 1995-09-21 1997-03-27 Kone Oy Traction sheave elevator without machine room
WO2002010048A2 (en) * 2000-07-29 2002-02-07 Alpha Getriebebau Gmbh Elevator car with a driving pulley driving machine integrated therein
KR20050116317A (en) * 2004-06-07 2005-12-12 오티스 엘리베이터 컴파니 Machine room-less elevator system
KR100688362B1 (en) * 2005-11-23 2007-03-02 한진엘리베이터(주) Drive of elevator

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105197745A (en) * 2015-09-17 2015-12-30 苏州润吉驱动技术有限公司 Alternating energy-saving elevator traction machine
KR20190050630A (en) * 2017-11-03 2019-05-13 삼성중공업 주식회사 Ship with Anti-rolling Device
KR101984908B1 (en) * 2017-11-03 2019-05-31 삼성중공업 주식회사 Ship with Anti-rolling Device
KR102204157B1 (en) * 2020-07-27 2021-01-18 주식회사 송산특수엘리베이터 Self-driving type elevator having 4 direction entrance doors
CN114135106A (en) * 2021-12-09 2022-03-04 上海原数建筑设计有限公司 Assembly integrated green building system
CN114634079A (en) * 2022-02-28 2022-06-17 浙江埃克森电梯有限公司 Ultra-thin passenger elevator without machine room

Similar Documents

Publication Publication Date Title
JP3014952B2 (en) Traction sheave elevator
CA2385569C (en) Rope elevator
KR100950991B1 (en) Traction machine structure for an elevator and cage assembly
JP2016079010A (en) Method for repairing elevator without machinery room
KR20080039285A (en) Elevators with two hoisting chambers on the hoistway
JP4255525B2 (en) Elevator
KR100941955B1 (en) Traction machine structure for an elevator and cage assembly
CN102363486A (en) Underlying elevator without machine room
CN202321877U (en) Lower-built type machine-room-less elevator
JP2001063935A (en) Elevator device
US20020139619A1 (en) Hoistwayless elevator system
KR100964722B1 (en) Traction machine structure for an elevator and cage assembly
KR101998869B1 (en) Heavy Duty Machine Roomless Elevator
KR100923274B1 (en) Elevator hoisting structure and cage assembly
JP2000086126A (en) Traction elevator
KR20100110704A (en) Traction machine structure for an elevator and cage assembly
CN212799229U (en) Traction system of freight elevator
WO2013170439A1 (en) Elevator system
CN102887415B (en) Elevator
JP4195063B2 (en) Elevator
JP5665666B2 (en) Elevator equipment
JP2001335255A (en) Elevator installation construction method, and elevator installation unit
JP2000226169A (en) Elevator installation method
KR100455502B1 (en) Installation structure of elevator traction machine
CN213569008U (en) Main machine arrangement structure of machine-room-less elevator

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20090820

PA0201 Request for examination
PA0302 Request for accelerated examination

Patent event date: 20090820

Patent event code: PA03022R01D

Comment text: Request for Accelerated Examination

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20091125

Patent event code: PE09021S01D

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20100311

GRNT Written decision to grant
PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 20100326

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 20100326

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
FPAY Annual fee payment

Payment date: 20130325

Year of fee payment: 4

PR1001 Payment of annual fee

Payment date: 20130325

Start annual number: 4

End annual number: 4

PC1903 Unpaid annual fee

Termination category: Default of registration fee

Termination date: 20141208

FPAY Annual fee payment

Payment date: 20141209

Year of fee payment: 5

PR0401 Registration of restoration

Patent event code: PR04011E01D

Patent event date: 20141208

Comment text: Registration of Restoration

PR1001 Payment of annual fee

Payment date: 20141209

Start annual number: 5

End annual number: 5

R401 Registration of restoration
LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

Termination category: Default of registration fee

Termination date: 20160209

Termination category: Default of registration fee

Termination date: 20141208