Prior art keywords
coupling
pile
top pile
upper frame
piles
Prior art date
Application number
KR1020090003107A
Other languages
Korean (ko)
Inventor
김형배
임희겸
Original Assignee
베이스토건 주식회사
김형배
임희겸
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 베이스토건 주식회사, 김형배, 임희겸 filed Critical 베이스토건 주식회사
Priority to KR1020090003107A priority Critical patent/KR100945745B1/en
Application granted granted Critical
Publication of KR100945745B1 publication Critical patent/KR100945745B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

PURPOSE: A coupling device of a cast-in-place top pile is provided to increase bearing power and coupling power between multiple top piles. CONSTITUTION: A coupling device(50) of a cast-in-place top pile comprises top piles(4), openings(11), a pair of first joints(14), a pair of second joints(18), and upper coupling bars(10). The top pile is composed of an upper frame(1) and a lower frame(3). A drain hole is formed in the lower frame. The openings are opened in a cross shape. First coupling protrusions(13), in which first coupling holes(12) are formed, are formed in the first joints. Second coupling protrusions(16), in which second coupling holes(15) are formed, are formed in the second joints. U-shaped reinforcing bar holders(19) are formed in the upper coupling bars.

Description

현장타설용 팽이파일의 결합장치{Joint equipment of in the field for ground a top pile} Joint equipment of in the field for ground a top pile}

본 발명은 현장타설용 팽이파일의 결합장치에 관한 것으로, 보다 구체적으로는 팽이파일의 내부로 콘크리트를 타설하게 되면, 다수개가 연결된 팽이파일 간의 사이로 타설되는 콘크리트가 개방부와 개방부에 형성된 제1, 2결합부에 의해 상호 연결되게 되어 다수개의 팽이파일 간의 결합력과 지지력을 증대시킬 수 있는 현장타설용 팽이파일의 결합장치에 관한 것이다.The present invention relates to a coupling device of the in-place casting top pile, and more specifically, when concrete is poured into the top of the top pile, the concrete that is placed between a plurality of connected top piles is formed in the opening part and the opening part. The present invention relates to a coupling device for in-place casting top piles, which is connected to each other by two coupling units and can increase the coupling force and the supporting force between a plurality of top piles.

일반적으로 사용되는 현장타설용 팽이파일은 특허등록번호 제10 - 725068호, 본 출원인의 특허등록번호 제10 - 792161호, 제10 - 840605호나, 특허등록번호 제10 - 798689호, 제10 - 799848호에 도시된 바와 같이 팽이파일의 내측으로 단순히 철근만을 삽입하여 철근을 이용하여 다수개의 팽이파일을 결합하였거나, 고정장치에 다수개의 팽이파일을 삽입하여 다수개의 팽이파일을 결합하였으며, 원형형태의 홈과 돌출부에 핀을 삽입하여 홈과 돌출부를 이용하여 다수개의 팽이파일을 연결하여 사용하였다.Commonly used top casting piles are patent registration Nos. 10-725068, Applicant's Patent Registration Nos. 10-792161, 10-840605 or Patent Registration Nos. 10-798689, 10-799848 As shown in the figure, simply inserting only the reinforcing bar into the inside of the top pile to combine a plurality of top piles using reinforcing bars, or inserting a plurality of top piles into a fixing device to combine a plurality of top piles, and a circular groove A pin was inserted into the protrusion and the protrusion to connect a plurality of top piles using the groove and the protrusion.

하지만, 상기와 같이 단순히 가수개의 팽이파일을 결합할 때, 철근에 의해서만 결합하게 되면 철근의 길이가 한정되어 있어, 다수개의 철근을 별도로 작업자가 다시 결합하여 연결해야만 하는 문제점이 있었다.However, when simply joining the top of the mandrel as described above, the length of the reinforcing bar is limited only by the reinforcing bar, there was a problem that a number of reinforcing bars must be connected to the worker separately.

그리고, 철근으로만 인접한 팽이파일을 결합하였기 때문에, 팽이파일 간의 결합력이 한정되어 인접함 팽이파일이 제대로 고정되지 않는 문제점이 있었다.In addition, since the adjacent top piles are joined only by reinforcing bars, there is a problem that the coupling force between the top piles is limited and the adjacent top piles are not properly fixed.

또한, 팽이파일을 고정장치를 이용하여 결합하게 되면, 팽이파일이 다수개가 연결되지 않아, 인접한 하나의 팽이파일마다 일일이 작업자가 고정장치를 이용하여 다수개의 팽이파일을 고정결합하여야 했기 때문에, 작업자가 다수개의 팽이파일을 고정시키기 위한 작업시간이 많이 소모되었으며, 그에 따른 작업효율이 낮아지고 인건비가 많이 소모되는 문제점이 있었다.In addition, when the top files are combined by using a fixing device, a plurality of top files are not connected, and the worker has to fix the plurality of top files by using the fixing device for each adjacent one. The work time for fixing a plurality of top files was consumed a lot, resulting in a low work efficiency and a lot of labor costs.

덧붙여, 원형형태의 홈과 돌출부를 결합하여 사용하게 되면 원형형태의 팽이파일이 회전하게 되면서, 홈과 돌출부를 핀을 이용하여 결합시킬 때, 작업자가 핀을 삽입하는 홈을 일일이 맞추어야 하는 문제점이 있었다.In addition, when the circular groove and the protrusion are combined to be used, the circular top pile is rotated, and when the groove and the protrusion are combined using the pin, there is a problem that the operator must manually insert the groove into which the pin is inserted. .

아울러, 상기와 같이 단순히 팽이파일을 철근이나 팽이파일의 외부에 형성되는 장치로만 다수개의 팽이파일을 결합하게 되면 팽이파일의 내부로 타설되는 콘크리트 간의 결합이 제대로 이루어지지 않아, 결과적으로 다수개의 팽이파일이 제대로 고정결합되지 않는 문제점이 있었다.In addition, as described above, when the top pile is simply formed by reinforcing bars or a device formed outside of the top pile, the plurality of top piles may not be properly coupled between the concrete placed inside the top pile, resulting in a plurality of top piles. There was a problem that this is not properly fixed.

본 발명인 현장타설용 팽이파일의 결합장치는 상부프레임과 상기 상부프레임의 하측에 형성되되 배수공이 형성된 하부프레임으로 형성된 팽이파일과, 상기 팽이파일에 형성된 상부프레임의 일부가 십자형태로 상호 대향되도록 개방된 개방부와, 상기 상부프레임의 원 중심을 따라 수평방향이나 수직방향으로 대칭되어 형성된 일측의 개방부에 형성되며 제1결합공을 형성한 'ㄴ'자 형상의 제1결합턱이 상호 대칭되어 일측의 개방부에 각각 2개씩 한 조로 형성되는 한 쌍의 제1결합부와, 상기 일측의 개방부에 직각방향으로 대칭되어 형성된 타측의 개방부에 형성되고 제2결합공을 형성한 'ㄴ'자 형상의 제2결합턱이 상호 대칭되어 타측의 개방부에 각각 2개씩 한 조가 한 쌍으로 형성되되 상기 제2결합턱의 하측으로 받침대를 형성한 한 쌍의 제2결합부와, 상기 타측의 개방부에서 돌출되어 철근이 위치되도록 'U'자 형상의 철근거치대가 형성된 상부결합대로 이루어진다.Coupling device of the present place casting top pile is formed on the lower side of the upper frame and the upper frame, but the upper pile formed of a lower frame formed with a drain hole, the opening part so that a part of the upper frame formed in the top pile is opposed to each other in a cross shape. The first opening and the 'b' shaped first coupling jaw formed at one side of the opening formed in the horizontal direction or the vertical direction symmetrically along the circle center of the upper frame and forming the first coupling hole are symmetric with each other. A pair of first coupling parts each formed in a pair of two openings on one side, and a 'b' formed on an opening on the other side formed symmetrically at right angles to the opening on one side and forming a second coupling hole. A pair of second coupling parts having a pair of second coupling jaws having a symmetrical shape and having two pairs of openings on the other side, respectively, and having a pedestal under the second coupling jaw; Protruding from the open portion of the other side is made of an upper coupling bar formed with a 'U' shaped rebar holder so that the rebar is located.

상기에서 살펴본 바와 같이 본 발명의 현장타설용 팽이파일의 결합장치는 다수개의 팽이파일을 배열설치할 때, 팽이파일의 내부로 타설되는 콘크리트가 팽이파일에 형성된 개방부를 통해 인접한 팽이파일의 콘크리트와 결합되어 다수개의 팽이파일이 1차로 결합되며, 또한 팽이파일에 형성된 고정공에 의해 철근이 삽입되어 다수개의 팽이파일이 2차로 결합되고, 팽이파일에 형성된 제1, 2결합부에 의해 다수개의 팽이파일이 3차로 결합되어, 다수개의 팽이파일 간의 결합력이 우수해지는 장점이 있다.As described above, the coupling device for the field casting top pile of the present invention, when installing a plurality of top piles, the concrete poured into the inside of the top pile is coupled with the concrete of the adjacent top pile through the opening formed in the top pile A plurality of top piles are primarily combined, and reinforcing bars are inserted by fixing holes formed in the top piles, and a plurality of top piles are secondarily combined, and a plurality of top piles are formed by the first and second coupling parts formed in the top piles. Coupled to the third, there is an advantage that the bonding force between a plurality of top pile is excellent.

그리고, 상기와 같이 다수개의 팽이파일이 견고하게 고정결합되어 있어, 상기 팽이파일의 상측으로 콘크리트를 2차로 타설하게 되면 2차로 타설되는 콘크리트가 견고하게 지지되어 콘크리트의 지지력을 증가시킬 수 있는 장점이 있다.In addition, since the plurality of top piles are firmly coupled as described above, when the concrete is poured into the upper side of the top of the top pile, the secondly placed concrete is firmly supported to increase the bearing capacity of the concrete. have.

덧붙여, 팽이파일의 내부로 콘크리트를 타설하게 되면, 사용자가 팽이파일을 설치하고자 하는 면적 전체에 각각의 팽이파일이 통합적으로 연결됨으로써, 재하실험시 모든 팽이파일의 면적에 하중이 동일하게 분산되어 무거운 하중을 견딜 수 있는 장점이 있는 유용한 발명이다.In addition, when concrete is poured into the top of the top pile, each top pile is integrally connected to the entire area where the user wants to install the top pile, so that the load is distributed equally to all the top piles during loading test. It is a useful invention with the advantage of withstanding load.

상기와 같은 목적을 달성하기 위한 본 발명의 현장타설용 팽이파일의 결합장치의 구성을 살펴보면 다음과 같다.Looking at the configuration of the coupling device of the field casting top pile of the present invention for achieving the above object as follows.

이하, 첨부된 도면에 의거하여 본 발명의 구성을 상세히 설명하도록 한다.Hereinafter, the configuration of the present invention will be described in detail with reference to the accompanying drawings.

먼저, 상기 현장타설용 팽이파일의 결합장치(50)는 도 1 내지 도 4에 도시된 바와 같이 상부프레임(1)과 상기 상부프레임(1)의 하측에 형성되되 배수공(2)이 형성된 하부프레임(3)으로 형성된 팽이파일(4)과, 상기 팽이파일(4)에 형성된 상부프레임(1)의 일부가 십자형태로 상호 대향되도록 개방된 개방부(11)와, 상기 상부프레임(1)의 원 중심을 따라 수평방향이나 수직방향으로 대칭되어 형성된 일측의 개방부(11a)에 형성되며 제1결합공(12)을 형성한 'ㄴ'자 형상의 제1결합턱(13)이 상호 대칭되어 일측의 개방부(11a)에 각각 2개씩 한 조로 형성되는 한 쌍의 제1결합부(14))와, 상기 일측의 개방부(11a)에 직각방향으로 대칭되어 형성된 타측의 개방부(11b)에 형성되고 제2결합공(15)을 형성한 'ㄴ'자 형상의 제2결합턱(16)이 상호 대칭되어 타측의 개방부(11b)에 각각 2개씩 한 조가 한 쌍으로 형성되되 상기 제2결합턱(16)의 하측으로 받침대(17)를 형성한 한 쌍의 제2결합부(18)와, 상기 타측의 개방부(11b)에서 돌출되어 철근(s)이 위치되도록 'U'자 형상의 철근거치대(19)가 형성된 상부결합대(10)로 이루어진다.First, the coupling device 50 of the field casting top pile is formed on the lower side of the upper frame 1 and the upper frame 1, as shown in Figure 1 to 4 but the lower frame formed with a drain hole (2) The top portion 4 formed of (3), the open portion 11 which is open so that a part of the upper frame 1 formed in the top pile 4 is opposed to each other in a cross shape, and the upper frame 1 of The first coupling jaw 13 having a 'b' shape formed in the open portion 11a formed on one side symmetrically in the horizontal or vertical direction along the center of the circle and forming the first coupling hole 12 is symmetric with each other. A pair of first coupling portions 14 each formed in a pair of two opening portions 11a on one side, and another opening portion 11b symmetrically formed at right angles to the opening portion 11a on one side. 'B' shaped second coupling projections 16 formed in the second coupling holes 15 are symmetrical with each other, and two in each of the open portions 11b of the other side. A pair of jaws are formed in a pair, but a pair of second coupling portion 18, which forms a pedestal 17 to the lower side of the second coupling jaw 16, and protrudes from the opening 11b of the other side (s) ) Is composed of the upper coupling stage 10 is formed a 'U' shaped rebar holder 19 is formed.

그리고, 상기 팽이파일(4)이 다수개가 결합될 때, 상부프레임(1)에 형성된 제1결합부(14)와 제2결합부(18)가 상호 결합되도록 한다.When the plurality of top piles 4 are coupled, the first coupling portion 14 and the second coupling portion 18 formed on the upper frame 1 are coupled to each other.

여기서, 상기 제1결합부(14)의 제1결합공(12)은 제2결합부(18)의 제2결합공(15)과 대응되고 제1결합부(14)의 제1결합턱(13)은 제2결합부(18)의 제2결합턱(16)과 대응되도록 한다.Here, the first coupling hole 12 of the first coupling portion 14 corresponds to the second coupling hole 15 of the second coupling portion 18 and the first coupling jaw of the first coupling portion 14 ( 13 corresponds to the second coupling jaw 16 of the second coupling portion 18.

삭제delete

덧붙여, 상기 상부프레임(1)의 내측으로는 다수개의 돌출부(p)가 더 포함되어 형성되고 하부프레임(3)에는 고정공(b)이 더 포함되어 형성되는 것이 바람직하다.In addition, the inner side of the upper frame 1 is formed with a plurality of protrusions (p) is further formed, it is preferable that the lower frame 3 is further formed with a fixing hole (b).

상기와 같은 구성을 가진 본 발명의 바람직한 실시 예에 따른 작용을 살펴보면 다음과 같다.Looking at the operation according to a preferred embodiment of the present invention having the configuration as described above are as follows.

먼저, 사용자가 연약지반의 공사현장으로 팽이파일(4)들을 이동시킨다.First, the user moves the top piles 4 to the construction site of the soft ground.

그리고, 도 3에 도시된 바와 같이 사용자가 설치하고자 하는 지면에 다수개의 팽이파일(4)들을 배열설치하면서 인접한 팽이파일(4)들을 결합한다.Then, as shown in FIG. 3, the adjacent top piles 4 are coupled while arranging a plurality of top piles 4 on the ground to be installed by the user.

이를 상세히 설명하면, 하나의 팽이파일(4)의 상부프레임(1)에 형성된 제1결합부(14)의 제1결합공(12)과 다른 팽이파일(4)의 제2결합부(18)의 제2결합공(15)을 대응시키면서 각각 "ㄴ"자 형상으로 형성된 제1결합턱(13)과 제2결합턱(16)을 결합한다.In detail, the first coupling hole 12 of the first coupling portion 14 formed in the upper frame 1 of one top pile 4 and the second coupling portion 18 of the other top pile 4 are described. Corresponding to the second coupling hole 15 of the first coupling jaw 13 and the second coupling jaw (16) formed in the "b" shape respectively.

그리고, 양측면으로 형성된 제1결합공(12)과 제2결합공(15)으로 핀(도면에 도시되지 않음)이나 못(도면에 도시되지 않음)과 같은 결합부재(도면에 도시되지 않음)를 삽입하여 두개의 팽이파일(4)을 고정시킨다.Then, a coupling member (not shown) such as a pin (not shown) or a nail (not shown) is formed by the first coupling hole 12 and the second coupling hole 15 formed at both sides. Insert the two top piles (4) to fix it.

삭제delete

또한, 다수개의 팽이파일(4)들 사이로 제2결합턱(16)과 받침대(17)가 상부프레임(1)에서 돌출된 길이만큼 콘크리트(c)가 타설되면서 다수개의 팽이파일(4)들이 상기 팽이파일(4)에 형성된 개방부(11)를 통해 각각의 팽이파일(4)의 내부로 타설되는 콘크리트(c)에 의해 서로 연결되게 되는 것이다.In addition, a plurality of top piles 4 are disposed while the concrete c is poured by the length of the second coupling jaw 16 and the base 17 protruding from the upper frame 1 between the plurality of top piles 4. Through the opening 11 formed in the top pile 4 is to be connected to each other by the concrete (c) is poured into the inside of each top pile (4).

상기와 같은 방법으로 하나의 팽이파일(4)의 제1결합부(14)와 다른 팽이파일(4)의 제2결합부(18)를 상호 결합하면서 사용자가 설치하고자 하는 지면에 다수개의 팽이파일(4)들을 배열설치한다.By combining the first coupling portion 14 of one top pile 4 and the second coupling portion 18 of the other top pile 4 in the same manner as described above, a plurality of top piles on the ground to be installed by the user Arrange and install (4).

그런 후, 상부프레임(1)에 형성된 제2결합부(18)가 형성되어 있는 개방부(11)에 "U"자 형상으로 형성된 철근거치대(19)에 철근(s)을 삽입하여 다수개의 팽이파일(4)들을 고정한다.Then, a plurality of tops are inserted by inserting reinforcing bars s into the reinforcing bar 19 formed in a “U” shape in the opening part 11 in which the second coupling part 18 formed in the upper frame 1 is formed. Secure the files (4).

여기서, 상기 철근거치대(19)에 다수개의 철근(s)이 십자형태로 놓여질 때, 각각의 철근(s)이 겹쳐지지 않도록, 먼저 놓여진 철근(s)이 하측으로 위치하게 되고, 나중에 놓여지는 철근(s)은 먼저 놓여지는 철근(s)의 상측으로 놓여지게 된다.Here, when a plurality of reinforcing bars (s) are placed crosswise on the reinforcing bar 19, the first reinforcing bars (s) placed so as not to overlap each of the reinforcing bars (s), the lower reinforcing bars later (s) is placed on top of the reinforcing bar (s) to be placed first.

또한, 팽이파일(4)의 하부프레임(3)에 형성된 고정공(b)에 철근(s)을 삽입하여 다수개의 팽이파일(4)들을 연결한다.In addition, the reinforcing bars (s) are inserted into the fixing holes (b) formed in the lower frame (3) of the top pile (4) to connect the plurality of top piles (4).

덧붙여, 제1결합부(14) 방향과 제2결합부(18) 방향으로 관통된 고정공(b)에 철근(s)을 삽입할 때, 각각의 고정공(b)이 동일한 공간에 형성되면 고정공(b)에 삽입되는 철근(s)이 겹쳐지게 되는데 이때, 각각의 십자형태로 삽입되는 철근(s)을 억지끼움방식으로 삽입시킬 수도 있으며, 또한, 각각의 철근(s)이 겹쳐지지 않도록, 고정공(b)의 철근(s)을 직경을 계산하여 제1결합부(14) 방향과 제2결합부(18) 방향에 형성된 각각의 고정공(b)의 높이를 조절하여 고정공(b)에 철근(s)을 삽입할 수도 있다,In addition, when the reinforcing bars (s) are inserted into the fixing holes (b) penetrating in the direction of the first coupling portion 14 and the second coupling portion 18, if each fixing hole (b) is formed in the same space Reinforcing bars (s) to be inserted into the fixing hole (b) is overlapped, whereby reinforcing bars (s) inserted in each cross shape may be inserted by interference fit method, and each of the bars (s) do not overlap. The diameter of the reinforcing bar (s) of the fixing hole (b) to adjust the height of each fixing hole (b) formed in the direction of the first coupling portion 14 and the second coupling portion 18 so as to fix the fixing hole It is also possible to insert the reinforcing bar (s) in (b),

그리고, 상기와 같이 철근거치대(19)와 고정공(s)에 삽입되는 철근(s)들을 결속선(도면에 도시되지 않음)과 같은 결합부재(도면에 도시되지 않음)를 이용하여 철근(s)들을 고정하도록 한다.Then, as described above, the reinforcing bars (s) inserted into the rebar holder 19 and the fixing hole (s) by using a coupling member (not shown in the drawing) such as a binding line (not shown) (s) ).

한편, 도 4에 도시된 바와 같이 상기와 같이 다수개의 팽이파일(4)들이 지면에 배열설치되게 되면, 팽이파일(4)의 내부로 콘크리트(c)를 타설한다.On the other hand, as shown in Figure 4 when the plurality of top piles 4 are arranged on the ground, the concrete (c) is poured into the inside of the top pile (4).

그러면, 팽이파일(4) 내부로 타설되는 콘크리트(c)가 팽이파일(4)에 형성된 개방부(11)를 통해 인접한 팽이파일(4)에 타설되는 콘크리트(c)와 결합되면서 일정시간이 지나면 콘크리트(c)가 양생되면서 다수개의 팽이파일(4)들이 상호 콘크리트(c)에 의해 연결되게 된다.Then, when the concrete (c) to be poured into the top pile (4) is coupled with the concrete (c) placed in the adjacent top pile (4) through the opening 11 formed in the top pile (4) As the concrete c is cured, the plurality of top piles 4 are connected to each other by the concrete c.

또한, 상기 팽이파일(4)의 상부프레임(1)에는 돌출부(p)가 형성되어 있어, 팽이파일(4)의 내부로 타설되는 콘크리트(c)와 팽이파일(4)의 밀착력을 우수하게 할 수 있게 된다.In addition, a protrusion p is formed in the upper frame 1 of the top pile 4, so that the adhesion between the concrete c and the top pile 4 poured into the top pile 4 is excellent. It becomes possible.

덧붙여, 상기 하부프레임(3)에는 배수공(2)이 형성되어 있어, 팽이파일(4)의 내부로 타설되는 콘크리트(c)의 수분이 상기 배수공(2)을 통해 배출되게 된다.In addition, the lower frame 3 is formed with a drain hole 2, the moisture of the concrete (c) to be poured into the inside of the top pile 4 is discharged through the drain hole (2).

또한, 팽이파일(4)의 내부로 타설된 콘크리트(c)가 양생되게 되면, 팽이파일(4)들 사이의 공간을 골재(k) 등으로 채우고, 2차로 콘크리트(c)를 타설, 양생하면 되는 것이다.In addition, when the concrete (c) poured into the interior of the top pile (4) is cured, the space between the top piles (4) is filled with aggregate (k), etc. Will be.

아울러, 상기와 같이 사용자가 팽이파일(4)을 설치하고자 하는 면적 전체에 팽이파일(4)을 설치하고, 상기 팽이파일(4)의 내부로 콘크리트(c)를 타설하고 양생시키고, 상기 팽이파일(4)의 상측에서 재하실험을 하게 되면, 상기 팽이파일(4)이 공사현장의 면적 전체에 모두 연결되어 배열설치되어 있어, 팽이파일(4)의 상측으로부터 전해지는 하중을 골고루 분산시킬 수 있음은 물론, 팽이파일(4)의 상측으로부터 전해지는 하중을 골고루 분산시킴으로써, 보다 무거운 하중을 잘 견딜 수 있게 된다.In addition, as described above, the user installs the top pile 4 in the entire area to which the top pile 4 is to be installed, casts and cures the concrete c into the top pile 4, and the top pile When the load test is performed on the upper side of (4), the top piles 4 are all connected and arranged in the entire construction site, so that the load transmitted from the upper side of the top piles 4 can be evenly distributed. Of course, by evenly distributing the load transmitted from the upper side of the top pile 4, it is possible to withstand heavier loads well.

상술한 실시예는 본 발명의 가장 바람직한 예에 대하여 설명한 것이지만, 상기 실시예에만 한정되는 것은 아니며, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 다양한 변형이 가능하다는 것은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어서 명백한 것이다.Although the above-described embodiments have been described with respect to the most preferred examples of the present invention, it is not limited to the above embodiments, and various modifications are possible within the scope without departing from the technical spirit of the present invention. It is evident to those who have knowledge of.

도 1은 본 발명의 현장타설용 팽이파일의 결합장치를 도시한 사시도.1 is a perspective view showing a coupling device of the in-place casting top pile of the present invention.

도 2는 본 발명의 현장타설용 팽이파일의 결합장치를 도시한 평면도.Figure 2 is a plan view showing a coupling device of the in-place casting top pile of the present invention.

도 3은 본 발명의 다수개의 현장타설용 팽이파일의 결합장치를 결합한 결합사시도.Figure 3 is a combined perspective view of the coupling device of a plurality of field casting top piles of the present invention.

도 4는 본 발명의 현장타설용 팽이파일의 결합장치의 사용상태도.Figure 4 is a state of use of the coupling device of the field casting top pile of the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 상부프레임 2 : 배수공1: upper frame 2: drain hole

3 : 하부프레임 4 : 팽이파일3: lower frame 4: top pile

10 : 상부결합대 11 : 개방부10: upper coupling stand 11: opening part

12 : 제1결합공 13 : 제1결합턱12: first coupling hole 13: first coupling jaw

14 : 제1결합부 15 : 제2결합공14: the first coupling portion 15: the second coupling hole

16 : 제2결합턱 17 : 받침대16: second coupling jaw 17: pedestal

18 : 제2결합부 19 : 철근거치대18: second coupling unit 19: rebar support

삭제delete

b: 고정공 c : 콘크리트b: fixing hole c: concrete

k : 골재 p : 돌출부
s : 철근
k: aggregate p: protrusion
s: rebar

삭제delete

50 : 현장타설용 팽이파일의 결합장치50: coupling device of the top pile for site casting

Claims (6)

상부프레임(1)과 상기 상부프레임(1)의 하측에 형성되되 배수공(2)이 형성된 하부프레임(3)으로 형성된 팽이파일(4) 간의 결합력을 증대시키고 팽이파일(4) 내측으로 타설되는 콘크리트(c)의 지지력을 증대시키기 위한 현장타설용 팽이파일의 결합장치에 있어서, Concrete formed in the upper frame 1 and the lower frame 3 formed on the lower side of the upper frame 1 to increase the coupling force between the top pile (4) formed of the lower frame (3) formed with drain holes (2) and poured into the top pile (4) In the coupling device of the in-place casting top pile for increasing the bearing capacity of (c), 상기 팽이파일(4)에 형성된 상부프레임(1)의 일부가 십자형태로 상호 대향되도록 개방된 개방부(11)와, 상기 상부프레임(1)의 원 중심을 따라 수평방향이나 수직방향으로 대칭되어 형성된 일측의 개방부(11a)에 형성되며 제1결합공(12)을 형성한 'ㄴ'자 형상의 제1결합턱(13)이 상호 대칭되어 일측의 개방부(11a)에 각각 2개씩 한 조로 형성되는 한 쌍의 제1결합부(14)와, 상기 일측의 개방부(11a)에 직각방향으로 대칭되어 형성된 타측의 개방부(11b)에 형성되고 제2결합공(15)을 형성한 'ㄴ'자 형상의 제2결합턱(16)이 상호 대칭되어 타측의 개방부(11b)에 각각 2개씩 한 조가 한 쌍으로 형성되되 상기 제2결합턱(16)의 하측으로 받침대(17)를 형성한 한 쌍의 제2결합부(18)와, 상기 타측의 개방부(11b)에서 돌출되어 철근(s)이 위치되도록 'U'자 형상의 철근거치대(19)가 형성된 상부결합대(10)로 이루어진 것에 특징이 있는 현장타설용 팽이파일의 결합장치.A portion of the upper frame 1 formed in the top pile 4 is opened to face each other in a cross shape, and is symmetrically in the horizontal or vertical direction along the circle center of the upper frame 1. The first coupling jaw 13 of the 'b' shape, which is formed at one side of the formed opening 11a and forms the first coupling hole 12, is symmetrical to each other, and each of the two openings 11a is formed at one side of the opening 11a. A pair of first coupling portions 14 formed in a pair and an opening portion 11b on the other side formed symmetrically at right angles to the opening portion 11a on the one side to form a second coupling hole 15 The 'b' shaped second coupling jaw 16 is symmetrical with each other, and a pair of two pairs are formed in each of the open portions 11b on the other side, but the pedestal 17 is located below the second coupling jaw 16. A pair of second coupling portions 18 and a 'U' shaped rebar holder 19 are formed to protrude from the open portion 11b of the other side so that the reinforcing bars s are positioned. The top part of the connecting apparatus for cast-in-place file which is characterized in consisting of a coupling board (10). 제 1항에 있어서, 상기 팽이파일(4)이 다수개가 결합될 때, 상부프레임(1)에 형성된 제1결합부(14)와 제2결합부(18)가 상호 결합되는 것에 특징이 있는 현장타설용 팽이파일의 결합장치.According to claim 1, When the plurality of top piles 4 are coupled, the site characterized in that the first coupling portion 14 and the second coupling portion 18 formed on the upper frame 1 is mutually coupled Coupling device of pour pile top. 제 2항에 있어서, 상기 상부프레임(1)에 형성된 제1결합부(14)의 제1결합공(12)은 제2결합부(18)의 제2결합공(15)과 대응되고 제1결합부(14)의 제1결합턱(13)은 제2결합부(18)의 제2결합턱(16)과 대응되는 것에 특징이 있는 현장타설용 팽이파일의 결합장치.According to claim 2, wherein the first coupling hole 12 of the first coupling portion 14 formed in the upper frame 1 corresponds to the second coupling hole 15 of the second coupling portion 18 and the first The first coupling jaw 13 of the coupling portion 14 is the coupling device of the site pile top pile, characterized in that corresponding to the second coupling jaw (16) of the second coupling portion (18). 삭제delete 제 1항에 있어서, 상기 상부프레임(1)의 내측으로는 다수개의 돌출부(p)가 더 포함되어 형성되는 것에 특징이 있는 현장타설용 팽이파일의 결합장치.The method of claim 1, wherein the inside of the upper frame (1) a plurality of protrusions (p) is further included, the coupling device of the in-place casting top pile. 제 1항에 있어서, 상기 하부프레임(3)에는 고정공(b)이 더 포함되어 형성되는 것에 특징이 있는 현장타설용 팽이파일의 결합장치.According to claim 1, The lower frame (3) is a coupling device of the in-place casting top pile, characterized in that it is formed further comprising a fixing hole (b).
KR1020090003107A 2009-01-14 2009-01-14 Joint equipment of in the field for ground a top pile KR100945745B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090003107A KR100945745B1 (en) 2009-01-14 2009-01-14 Joint equipment of in the field for ground a top pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090003107A KR100945745B1 (en) 2009-01-14 2009-01-14 Joint equipment of in the field for ground a top pile

Publications (1)

Publication Number Publication Date
KR100945745B1 true KR100945745B1 (en) 2010-03-05

Family

ID=42182993

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090003107A KR100945745B1 (en) 2009-01-14 2009-01-14 Joint equipment of in the field for ground a top pile

Country Status (1)

Country Link
KR (1) KR100945745B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101215466B1 (en) * 2011-07-21 2012-12-26 강우진 Construction method of top pile
KR101370102B1 (en) * 2013-03-18 2014-03-06 팽이파일산업 주식회사 Cast-in-place type top-pile and construction process of the same
WO2018186612A1 (en) * 2017-04-05 2018-10-11 (주)삼일이엔씨 Cast-in-situ reinforcing top pile base and construction method therefor

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100725068B1 (en) 2006-06-16 2007-06-12 시지이엔씨주식회사 Compound foundation method of construction using cast in place top base was formed connection groove and this
KR100792161B1 (en) 2007-09-12 2008-01-07 박노환 A top pile for production in field
KR100792162B1 (en) 2007-09-12 2008-01-07 박노환 Constructing method of in field top pile using
KR100874422B1 (en) 2008-03-13 2008-12-17 문형록 Spin-pile with socket connector

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100725068B1 (en) 2006-06-16 2007-06-12 시지이엔씨주식회사 Compound foundation method of construction using cast in place top base was formed connection groove and this
KR100792161B1 (en) 2007-09-12 2008-01-07 박노환 A top pile for production in field
KR100792162B1 (en) 2007-09-12 2008-01-07 박노환 Constructing method of in field top pile using
KR100874422B1 (en) 2008-03-13 2008-12-17 문형록 Spin-pile with socket connector

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101215466B1 (en) * 2011-07-21 2012-12-26 강우진 Construction method of top pile
KR101370102B1 (en) * 2013-03-18 2014-03-06 팽이파일산업 주식회사 Cast-in-place type top-pile and construction process of the same
WO2018186612A1 (en) * 2017-04-05 2018-10-11 (주)삼일이엔씨 Cast-in-situ reinforcing top pile base and construction method therefor
JP2020513075A (en) * 2017-04-05 2020-04-30 サミレンク カンパニー, リミテッド.Samilenc Co., Ltd. Field-placed reinforcement top type pile foundation and its construction method
JP7101407B2 (en) 2017-04-05 2022-07-15 サミレンク カンパニー,リミテッド. On-site placement reinforcement top type pile foundation and its construction method

Similar Documents

Publication Publication Date Title
US20120023847A1 (en) Foundation construction for superstructures
RU2578085C2 (en) Connector for connection of adjacent prefabricated reinforced concrete elements and method for connection of first and second prefabricated reinforced concrete elements
US10808393B2 (en) Method for forming a plurality of beams connected in series
JP4680803B2 (en) Construction method of three-dimensional viaduct structure
JP2005180162A (en) Connecting structure and connecting method of i-type prestressed concrete beam with steel bracket
KR100945745B1 (en) Joint equipment of in the field for ground a top pile
KR100728932B1 (en) Constructing foundation concrete pile of soft soil ground
KR100996728B1 (en) Easily-assemblable top pile for production in field
US20110302880A1 (en) Rebar Sleeve Unit
KR100655654B1 (en) Device for standing in line pc steel wire and pre-stressing method of psc box girder bridge using the same
KR20170071643A (en) Fixing device for perforated drainpipes of tunnel side walls and the construction method of perforated drainpipes therefor
KR20120132660A (en) Pile cap structure
CN102587420B (en) Supporter exchanging method for stage construction basement using cast-in-situ bored piles as separation palisade
KR101779400B1 (en) the setting apparatus for precast concrete structure and the setting method for precast concrete structure using the same
KR100792162B1 (en) Constructing method of in field top pile using
CN214884742U (en) Take prefabricated floor of support connector
KR101824963B1 (en) Hybrid composite girder and construction method therewith
KR20110131593A (en) Support structure for slab foam panel
KR100779772B1 (en) Guide block and construction method for pre-cast member using it
KR20190126549A (en) steel reinforcement fixture
KR101244906B1 (en) Anchor for expansion joint and this construction method with improved structure
CN207017298U (en) Steel plate structure and assembled soil nail wall
KR200345059Y1 (en) A yoke support for slab­mold
JP6638885B2 (en) Concrete assembly structure
KR101687403B1 (en) Connection structure of precast concrete column

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130819

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140225

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee