KR100799336B1 - Non supporting form system for down ward construction and non supporting down ward construction method using the same - Google Patents

Non supporting form system for down ward construction and non supporting down ward construction method using the same Download PDF

Info

Publication number
KR100799336B1
KR100799336B1 KR1020060056957A KR20060056957A KR100799336B1 KR 100799336 B1 KR100799336 B1 KR 100799336B1 KR 1020060056957 A KR1020060056957 A KR 1020060056957A KR 20060056957 A KR20060056957 A KR 20060056957A KR 100799336 B1 KR100799336 B1 KR 100799336B1
Authority
KR
South Korea
Prior art keywords
support
fixed
suspension
formwork
pillar
Prior art date
Application number
KR1020060056957A
Other languages
Korean (ko)
Other versions
KR20070122024A (en
Inventor
염경수
김상곤
송정근
이형재
Original Assignee
주식회사 하모니구조엔지니어링
(주) 씨엠파트너스 건축사사무소
염경수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 하모니구조엔지니어링, (주) 씨엠파트너스 건축사사무소, 염경수 filed Critical 주식회사 하모니구조엔지니어링
Priority to KR1020060056957A priority Critical patent/KR100799336B1/en
Publication of KR20070122024A publication Critical patent/KR20070122024A/en
Application granted granted Critical
Publication of KR100799336B1 publication Critical patent/KR100799336B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/18Devices for suspending or anchoring form elements to girders placed in ceilings, e.g. hangers

Abstract

본 발명은 기둥이 기시공된 상태에서 상층부에서 하층부로 내려가면서 층간 수평구조체를 구축하는데 사용되는 무지주 지지방식의 거푸집 지지체로서 상부의 고정단과 하부의 이동단을 분리구성하여 하부의 이동단만을 하강시킴으로 하강작업의 편리성을 도모한 무지주 역타설 공법용 거푸집 지지체와, 이를 이용하여 공기를 단축하면서 간편한 방법으로 지하 구조체를 시공할 수 있게 된 무지주 역타설 거푸집공법에 관한 것이다.The present invention is a formless support of the unsupported support used to build a horizontal structure between the upper and lower parts from the upper layer to the lower layer in the construction state of the column to separate the fixed end of the upper end and the mobile end of the lower only the lower end of the mobile end The present invention relates to a formless support for an unsupported reverse pouring method, which aims at the convenience of descending work, and an unsupported reverse casting form method that enables construction of an underground structure by a simple method while reducing air by using the same.

본 발명의 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체는 기둥이 기시공된 상태에서 상층부에서 하층부로 내려가면서 층간 수평구조체를 구축하는데 사용되는 무지주 지지방식의 거푸집 지지체로서,Formwork support for the unsupported back-pouring formwork method of the top and bottom separation type support method of the present invention is a formless support of the support system used to build a horizontal interlayer structure going down from the upper layer to the lower layer in the state in which the pillars are constructed,

기둥 상단에 고정 설치되는 고정지지체; 상기 고정지지체에 반복적인 고정 및 풀림이 가능하게 결속되며 기둥과 평행하게 배치되는 제1현수재; 상기 고정지지체 아래로 기둥에의 반복적인 고정 및 풀림이 가능하게 설치되며, 상기 제1현수재의 하단이 결속됨으로 고정지지체에 매달려 지지되는 이동지지체; 각 기둥에 설치된 이동지지체 상호 간을 연결하며, 그 위로 설치되는 층간 수평구조체의 시공을 위한 거푸집을 지지하는 서포트빔; 상기 서포트빔 위로 상향 배치되며, 하단이 서포트빔에 연결 결속되는 제2현수재; 및, 지상 또는 완성된 층간 수평구조체 위에 배치되며, 상기 제2현수재의 상단이 결속됨으로 상기 서포트빔을 매달아 지지하는 하강기;를 포함하여 구성되되,A fixed support fixed to the top of the column; A first suspending member which is coupled to the fixed support to be repeatedly fixed and loosened and arranged in parallel with the pillar; A movable support supported by the fixed support to be repeatedly fixed to and uncoiled under the fixed support, the lower end of the first suspending material being bound to and supported by the fixed support; A support beam connecting the movable support members installed on each pillar and supporting the formwork for the construction of the horizontal structure interlayer installed thereon; A second suspension disposed upwardly above the support beam, and having a lower end connected to the support beam; And a lowering device disposed on the ground or the completed interlayer horizontal structure, and supporting the suspended beam by hanging the upper end of the second suspension material.

상기 고정지지체가 기둥에 고정되면서 이동지지체가 기둥에서 풀려 있고 동시에 상기 하강기가 제2현수재로서 서포트빔을 매달고 있는 상태에서 제1현수재의 고정지지체에의 결속상태를 푼 후 하강기로서 제2현수재를 아래로 연장시키면서 이동지지체와 서포트빔을 하강시키며, 상기 이동지지체와 서포트빔의 하강이 시공할 해당층까지 완료된 상태에서 제1현수재를 고정지지체에 고정 결속하여 이동지지체의 위치를 잡은 후 이동지지체를 기둥에 고정설치하는 것을 특징으로 한다.As the fixed support is fixed to the pillar, the movable support is released from the pillar, and at the same time, the second suspension is released as a descender after the first suspension is released from the support beam as the second suspension suspended by the support beam. While lowering the moving support and the support beam while extending down, the first support is fixed to the fixed support in a state in which the lowering of the movable support and the support beam is completed to the construction floor to move the position of the moving support It is characterized in that the support is fixed to the pillar.

무지주 역타설 거푸집공법, 현수, 브라켓 Unsupported reverse casting formwork, suspension, bracket

Description

상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체 및 이를 이용한 무지주 역타설 거푸집공법{Non supporting form system for down ward construction and non supporting down ward construction method using the same}Formwork support for upright and down-separable support type non-supported reverse casting formwork and non-supported back-pouring formwork using it {Non supporting form system for down ward construction and non supporting down ward construction method using the same}

도 1 내지 도 3은 본 발명에 따른 무지주 역타설 거푸집공법을 도시한 순서도이다.1 to 3 is a flow chart showing the unsupported reverse casting formwork method according to the present invention.

도 4는 본 발명에 따른 무지주 역타설 거푸집공법에서 기둥을 기준으로 거푸집 지지체를 분리하면서 진행되는 하강 계획을 보여주는 도면이다.4 is a view showing a descending plan that proceeds while separating the formwork support on the basis of the pillar in the unsupported reverse casting formwork method according to the present invention.

도 5a 내지 도 5c는 본 발명에 따른 거푸집 지지체에서 고정지지체가 기둥에 설치된 상태를 보여주는 입면도, 평면도 및 사시도이다.5A to 5C are an elevation view, a plan view, and a perspective view showing a state in which a fixed support is installed on a pillar in a form support according to the present invention.

도 6a 내지 도 6c는 본 발명에 따른 거푸집 지지체에서 이동지지체가 기둥에 설치된 상태를 보여주는 입면도, 평면도 및 사시도이다.6A to 6C are an elevation view, a plan view, and a perspective view showing a state in which a moving support is installed in a pillar in a form support according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100: 고정지지체 110: 고정브라켓100: fixed support 110: fixed bracket

120: 고정유니트 130: 현수재고정구120: fixed unit 130: suspension stock fixture

200: 제1현수재 210: 커플러200: first suspension material 210: coupler

300: 이동지지체 310: 이동프레임300: moving support 310: moving frame

320: 이동유니트 330: 연결플레이트320: mobile unit 330: connection plate

400: 서포트빔 500: 보조서포트빔400: support beam 500: auxiliary support beam

600: 제2현수재 700: 하강기600: 2nd suspension material 700: descent

C: 기둥 F: 층간 수평구조체의 시공을 위한 거푸집C: Column F: Formwork for the construction of interlevel horizontal structures

H: 층간 수평구조체H: Interlayer Horizontal Structure

본 발명은 기둥이 기시공된 상태에서 상층부에서 하층부로 내려가면서 층간 수평구조체를 구축하는데 사용되는 무지주 지지방식의 거푸집 지지체로서 상부의 고정단과 하부의 이동단을 분리구성하여 하부의 이동단만을 하강시킴으로 하강작업의 편리성을 도모한 무지주 역타설 공법용 거푸집 지지체와, 이를 이용하여 공기를 단축하면서 간편한 방법으로 지하 구조체를 시공할 수 있게 된 무지주 역타설 거푸집공법에 관한 것이다.The present invention is a formless support of the unsupported support used to build a horizontal structure between the upper and lower parts from the upper layer to the lower layer in the construction state of the column to separate the fixed end of the upper end and the mobile end of the lower only the lower end of the mobile end The present invention relates to a formless support for an unsupported reverse pouring method, which aims at the convenience of descending work, and an unsupported reverse casting form method that enables construction of an underground structure by a simple method while reducing air by using the same.

역타설 공법은 1층 바닥으로부터 점차 지하층 구축을 위한 공사를 진행하면서 경우에 따라서 동시에 지상공사를 병행해 나갈 수 있도록 하는 공법으로서, 지하터파기와 지상공사의 병행으로 공기단축이 가능하고 소음과 진동이 적어 주로 도심지 지하 구조체 공사로 각광받고 있다. The reverse casting method is a method that allows the construction of underground construction from the ground floor on the first floor, and simultaneously works on the ground at the same time. At the same time, it is mainly in the spotlight for the underground structure construction.

역타설 공법에서 지하층의 층간 수평구조체를 콘크리트 구조로 시공하려면 콘크리트 시공을 위한 가설작업(거푸집 및 동바리 설치)이 필수적인데, 통상 지반을 굴토한 후 고른 상태에서 동바리를 세우고 거푸집을 설치한 다음 콘크리트를 타설하는 방법으로 진행된다. 그러나 이와 같은 방법은 콘크리트가 완전히 양생된 후에야 비로소 동바리를 해체한 후 다시 굴토작업에서부터 콘크리트 타설까지 반복하여 진행해야 하는 바, 층간 작업시간이 상당히 소요된다는 문제와 매층마다 반복적인 동바리 설치 및 해체작업의 불편함이 따른다. 이를 개선하고자 무지주 역타설 거푸집공법이 개발되었다.In the reverse casting method, in order to construct the horizontal interlayer structure of the basement into concrete structure, it is essential to install the concrete (installation of formwork and dongbari) for concrete construction. Proceed by pouring. However, this method only needs to be dismantled after the concrete has been completely cured, and then proceeded from the excavation to concrete placement again, which requires considerable time between floors and the repeated installation and dismantling of each group. It is inconvenient. In order to improve this, an unsupported reverse casting formwork was developed.

무지주 역타설 거푸집공법(Non Supporting Top Down method, 이하 NSTD공법이라 함)은 동바리를 세우는 것 대신에 하강기에 매단 철골틀을 설치하여 철골틀이 거푸집을 지지하도록 한 것으로, 점차 철골틀을 아래로 이동시키면서 반복적인 층간 수평구조체를 시공하도록 한 방법이다. 하강기는 시공완료된 1층 층간 수평구조체에 놓이며, 하강기가 놓이는 1층 층간 수평구조체가 철골틀을 직접 지지하게 된다. 그러나, NSTD공법은 기시공된 상태의 층간 수평구조체가 있어야 하므로 1층의 층간수평구조체의 시공에는 이용될 수 없다는 단점이 있다.The Non Supporting Top Down Method (hereinafter referred to as NSTD Method) is a steel frame that supports the formwork by installing a steel frame hanging in a descending place instead of building a swivel, It is a method to construct a repetitive interlayer horizontal structure while moving. The descending machine is placed on the completed one-story interlayer structure, and the one-layer interlayer structure on which the descender is placed directly supports the steel frame. However, the NSTD method has a disadvantage in that it cannot be used for the construction of the interlayer horizontal structure of one layer because there should be an interlayer structure in a pre-installed state.

이와 같은 NSTD공법의 단점을 개선한 것으로, 브라켓 지지방식의 무지주 역타설 거푸집공법(Bracket supported R/C Downward method, 이하 BRD공법이라 함)이 있다. BRD공법은 기둥에 브라켓 형식의 철골틀을 설치하여 브라켓 형식의 철골틀이 층간 수평구조체의 시공하중을 지지하면서 기둥으로 전달되도록 한 공법으로, 최종 층간 수평구조체의 시공하중을 기둥이 지지하므로 1층 층간 구조체의 시공에 도 그대로 적용 가능하게 된다. 그러나, 브라켓 형식의 철골틀은 그 전체가 층간 수평구조체 아래에 배치되어 층간 수평구조체의 시공하중을 기둥으로 전달하는 역할을 하면서 하강하는 구조로 이루어지기 때문에, 층간 수평구조체 시공과정에는 기둥에 긴결하게 결합되어야 하고 하강과정에는 기둥에서 용이한 해체가 이루어져야 하므로 그 과정이 상당히 번거롭다는 불편함을 가지며, 브라켓에서 기둥으로 직접 하중전달이 이루어져 브라켓과 기둥 사이의 유격이 거의 없게 제작되므로 기둥의 수직도가 확보되지 않은 상태에서는 하강작업과 철골틀의 설치가 곤란해지는 문제를 수반한다.As an improvement of the disadvantages of the NSTD method, there is a bracket supported R / C downward method (hereinafter referred to as BRD method). The BRD method is a method in which a bracket-type steel frame is installed on a column so that the bracket-type steel frame can be transferred to the column while supporting the construction load of the interlayer horizontal structure.The first floor is supported by the column. It can be applied as it is to the construction of the interlayer structure. However, since the bracket-type steel frame is made of a structure that descends while the whole is disposed under the horizontal interlayer structure to transfer the construction load of the horizontal interlayer structure to the column, the construction of the horizontal horizontal structure is tightly connected to the column. It should be combined and the dismantling process should be easy to dismantle in the column, so the process is quite cumbersome. The load is transferred directly from the bracket to the column, so that there is almost no play between the bracket and the column. In the state that is not secured is accompanied by the problem that the installation of the descending operation and the steel frame becomes difficult.

본 발명은 상기한 종래의 문제를 개선하고자 안출된 것으로서, 상부의 고정단과 하부의 이동단을 분리구성하여 하부의 이동단만을 하강시킴으로 하강작업의 편리성을 도모한 무지주 역타설 거푸집공법용 거푸집 지지체를 제공하는데 그 목적이 있다.The present invention has been made to improve the above-described conventional problems, by separating the fixed end of the upper end and the lower end of the mobile end by lowering only the moving end to facilitate the unloading backwork formwork formwork The purpose is to provide a support.

본 발명의 다른 목적은 하부의 이동단과 기둥의 유격을 확보할 수 있어 기둥의 수직도가 확보되지 않은 상태에서도 수직도를 흡수하면서 자유롭게 하강작업을 수행할 수 있게 한 무지주 역타설 거푸집공법용 거푸집 지지체를 제공하는 것이다.Another object of the present invention is to secure the clearance between the lower end of the mobile end and the column to absorb the vertical degree even without the vertical degree of the column to freely perform the descent form for the non-inverted formwork It is to provide a support.

본 발명의 또 다른 목적은 공기를 단축하면서 간편한 방법으로 지하 구조체를 시공할 수 있게 된 무지주 역타설 거푸집공법을 제공하는 것이다.Still another object of the present invention is to provide an unsupported reverse casting formwork, which allows construction of underground structures in a simple manner while reducing air.

상기한 목적달성을 위해 본 발명은 기둥이 기시공된 상태에서 상층부에서 하층부로 내려가면서 층간 수평구조체를 구축하는데 사용되는 무지주 지지방식의 거푸집 지지체로서,
기둥 상단에 고정 설치되는 고정지지체; 상기 고정지지체에 반복적인 고정 및 풀림이 가능하게 결속되며 기둥과 평행하게 배치되는 제1현수재; 상기 고정지지체 아래로 기둥에의 반복적인 고정 및 풀림이 가능하게 설치되며, 상기 제1현수재의 하단이 결속됨으로 고정지지체에 매달려 지지되는 이동지지체; 각 기둥에 설치된 이동지지체 상호 간을 연결하며, 그 위로 설치되는 층간 수평구조체의 시공을 위한 거푸집을 지지하는 서포트빔; 상기 서포트빔 위로 상향 배치되며, 하단이 서포트빔에 연결 결속되는 제2현수재; 및, 지상 또는 완성된 층간 수평구조체 위에 배치되며, 상기 제2현수재의 상단이 결속됨으로 상기 서포트빔을 매달아 지지하는 하강기;를 포함하여 구성되되,
상기 고정지지체가 기둥에 고정되면서 이동지지체가 기둥에서 풀려 있고 동시에 상기 하강기가 제2현수재로서 서포트빔을 매달고 있는 상태에서 제1현수재의 고정지지체에의 결속상태를 푼 후 하강기로서 제2현수재를 아래로 연장시키면서 이동지지체와 서포트빔을 하강시키며,
In order to achieve the above object, the present invention provides a formless support of a support system, which is used to build an interlayer horizontal structure while descending from an upper layer to a lower layer in a state in which a column is constructed.
A fixed support fixed to the top of the column; A first suspending member which is coupled to the fixed support to be repeatedly fixed and loosened and arranged in parallel with the pillar; A movable support supported by the fixed support to be repeatedly fixed to and uncoiled under the fixed support, the lower end of the first suspending material being bound to and supported by the fixed support; A support beam connecting the movable support members installed on each pillar and supporting the formwork for the construction of the horizontal structure interlayer installed thereon; A second suspension disposed upwardly above the support beam, and having a lower end connected to the support beam; And a lowering device disposed on the ground or the completed interlayer horizontal structure, and supporting the suspended beam by hanging the upper end of the second suspension material.
As the fixed support is fixed to the pillar, the movable support is released from the pillar, and at the same time, the second suspension is released as a descender after the first suspension is released from the support beam as the second suspension. While lowering the moving support and the support beam,

상기 이동지지체와 서포트빔의 하강이 시공할 해당층까지 완료된 상태에서 제1현수재를 고정지지체에 고정 결속하여 이동지지체의 위치를 잡은 후 이동지지체를 기둥에 고정설치하는 것을 특징으로 하는 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체를 제공한다.Up and down characterized in that the movable support and the support beam is fixed to the column after fixing the position of the movable support by fixedly binding the first suspension to the fixed support in the state to be completed to the floor to be installed Provided is a formwork support for an unsupported reverse casting formwork of a detachable support method.

삭제delete

또한, 본 발명은 기둥위치에서 기초위치까지 천공하여 그라우팅재를 투입한 후 기둥을 관입하여 기초구근을 완성하는 제1단계; 1차 굴토작업을 실시하면서 또는 실시한 후에 기둥에 거푸집 지지체를 설치하는 제2단계; 상기 거푸집 지지체의 서포트빔 위로 거푸집을 설치한 후 콘크리트를 타설 양생하여 층간 수평구조체를 시공하는 제3단계; 2차 굴토작업을 실시하는 제4단계; 상기 거푸집 지지체에서 제1현수재의 고정지지체에의 결속상태를 푼 후 하강기로서 제2현수재를 아래로 연장시키면서 이동지지체와 서포트빔을 하강시키고, 소정 위치에서 제1현수재를 고정지지체에 고정 결속한 후 이동지지체를 기둥에 고정시키는 제5단계; 하강된 이동지지체와 서포트빔 위로 층간 수평구조체를 시공하는 제6단계; 상기 제4단계 내지 제6단계를 반복하여 지하 최하층까지 진행하는 제7단계; 그리고, 기초구근 위까지 굴토한 후 지하 최하층 바닥 높이로 기초를 완성하는 제8단계;를 포함하여 이루어지는 것을 특징으로 하는 무지주 역타설 거푸집공법을 제공한다.In addition, the present invention comprises the first step of drilling the foundation from the column position to the base position and then inserting the grouting material to complete the basic bulb by injecting the pillar; A second step of installing the formwork support on the pillar while or after the first gulting work; A third step of installing the formwork over the support beam of the form support and constructing horizontal interlayer structure by pouring concrete; A fourth step of performing the second gulting work; After releasing the binding state of the first suspension material from the form support to the fixed support, the moving support and the support beam are lowered while extending the second suspension as a descender, and the first suspension is fixedly fixed to the fixed support at a predetermined position. A fifth step of fixing the movable support to the pillar; A sixth step of constructing an interlayer horizontal structure on the lowered movable support and the support beam; A seventh step of repeating the fourth to sixth steps and proceeding to the lowest basement floor; In addition, the eighth step of completing the foundation to the bottom of the basement floor after the excavation up to the base bulb; provides an unsupported back-casting formwork comprising a.

이하, 첨부한 도면 및 바람직한 실시예에 따라 본 발명을 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and preferred embodiments.

도 1 내지 도 3은 본 발명에 따른 무지주 역타설 거푸집공법을 시공 순서에 따라 도시한 순서도로, 도 1은 제1층 바닥의 층간 수평구조체(H)를 시공하는 과정을 보여주며, 도 2는 지하 제1층 바닥의 층간 수평구조체(H)를 시공하는 과정을 보여주며, 도 3은 도 2의 과정을 반복으로 진행하여 지하 제2층 바닥의 층간 수평구조체(H)를 시공하는 과정을 보여준다. 도 4는 도 1 내지 도 3에 따라 시공되는 무지주 역타설 거푸집공법에서 기둥을 기준으로 거푸집 지지체를 분리하면서 진행되는 하강 계획을 보여주는 도면이다. 도 1 내지 도 3에서는 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체를 채택하고 있는데, 이의 구체적인 설치상태는 도 5a 내지 도 6c에 도시하고 있다. 이와 같은 도면들을 참고하여 먼저 무지주 역타설 거푸집공법용 거푸집 지지체를 살펴본 후 무지주 역타설 거푸집공법을 살펴보도록 하겠다. 1 to 3 are flow charts showing the unsupported reverse casting form method according to the construction order according to the present invention, Figure 1 shows the process of constructing the interlayer horizontal structure (H) of the bottom of the first layer, Figure 2 Shows the process of constructing the interlayer horizontal structure (H) of the basement first floor, and FIG. 3 shows the process of constructing the interlayer horizontal structure (H) of the second basement floor by repeating the process of FIG. Shows. Figure 4 is a view showing a descending plan that proceeds while separating the formwork support on the basis of the pillar in the unsupported reverse casting formwork constructed in accordance with Figures 1 to 3. In Figures 1 to 3, the form support for the unsupported reverse casting formwork of the upper and lower separation type support method is adopted, the specific installation state of which is shown in Figures 5a to 6c. With reference to such drawings, firstly, the form support for the unsupported reverse casting formwork will be described, and then, the unsupported reverse casting formwork will be described.

1. 거푸집 지지체1. Formwork support

본 발명에 따른 기둥(C)이 기시공된 상태에서 상층부에서 하층부로 내려가면서 층간 수평구조체(H)를 구축하는데 사용되는 무지주 지지방식의 거푸집 지지체로서, 고정지지체(100), 제1현수재(200), 이동지지체(300), 서포트빔(400)을 필수적인 구성요소로 포함하며, 여기에 보조서포트빔(500)과 제2현수재(600)를 추가적인 구성요소로 포함할 수 있다. 이때, 거푸집 지지체를 구성하는 구성요소들은 강재를 채택하여 충분한 지지력이 확보되도록 한다.As the formwork support of the unsupported support type used to build the interlayer horizontal structure (H) while descending from the upper layer to the lower layer in the state in which the pillar (C) according to the present invention, the fixed support 100, the first suspension 200, the movable support 300, and the support beam 400 may be included as essential components, and the auxiliary support beam 500 and the second suspension material 600 may be included as additional components. At this time, the components constituting the form support to adopt a steel material to ensure a sufficient bearing capacity.

고정지지체(holding support, 100)는 기둥(C) 상단에 고정 설치되는 구성으로, 무지주 역타설 거푸집공법으로 구조체의 공사가 완료될 때까지 동일한 위치에 완전히 고정된 상태에 있게 된다. 상기 고정지지체(100)는 제1현수재(200)에 의해 이동지지체(300)를 매달아 지지하는 역할을 하는 것으로 층간 수평구조체(H) 시공과정에서 거푸집 지지체 중 가장 큰 하중을 부담하게 되며, 고정지지체(100)의 지지력은 최종적으로 기둥(C)에 전달된다.Holding support (holding support 100) is a configuration that is fixed to the top of the column (C), it will be in a completely fixed state in the same position until the construction of the structure is completed by an unsupported reverse casting form. The stationary support 100 serves to suspend and support the movable support 300 by the first suspension 200 to bear the largest load of the form support in the interlayer horizontal structure (H) construction process. The bearing force of the support 100 is finally transmitted to the column (C).

제1현수재(200)는 상기 고정지지체(100)에 반복적인 고정 및 풀림이 가능하게 결속되며, 기둥(C)과 평행하게 배치된다. 제1현수재(200)로는 철근 또는 강봉의 봉형상 부재를 채택함이 이동지지체(300)를 안정적으로 매달아 지지하는데 바람직하며, 커플러(210)에 의한 이음으로 연장되도록 구성할 수 있다. The first suspension member 200 is bound to the fixed support 100 to be repeatedly fixed and loosened, and is disposed in parallel with the pillar C. Adopting rod-shaped members of reinforcing bars or steel rods as the first suspension member 200 is preferable to stably support the moving support 300, and may be configured to extend to a joint by the coupler 210.

다만, 본 발명에서는 하강 작업의 편의를 위해 제1현수재(200)를 보완하여 제2현수재(600)를 마련하고 있는데, 제2현수재(600)는 서포트빔(400)에 접합된 현수재결속구(610)에 연결 결속됨으로 서포트빔(400)을 직접 매달아 지지하는 역할을 하게 된다. 즉, 하강장비의 한계로 봉형상의 부재인 제1현수재(200)를 고정지지체(100)에의 풀림을 유지한 상태에서 천천히 하강시키기는 곤란한 바, 제1현수재(200)가 고정지지체(100)에서 풀린 상태에서는 제2현수재(600)가 이미 시공완료된 층간 수평구조체의 지지를 받으면서 서포트빔(이동지지체에 결합된 상태임)을 매달아 지지하도록 한 것이다. 이에, 현수재결속구(610)에 결속된 제2현수재(600)는 시공 완료되는 층간 수평구조체(H)를 관통하면서 서포트빔(400)에 연결되며, 점진적으로 그 길이를 연장하면 서포트빔(400)과 이동지지체(300)를 지지하면서 하강시키게 된다. 이러한 제2현수재(600)의 역할을 감안한다면 도 1 내지 도 3에서와 같이 제2현수재(600)를 감고 풀기 편한 와이어 형태로 채택하여 하강기(700)에 일체로 결합되도록 구성하는 것이 이용상 편리하겠다. 서포트빔(400)에 접합되는 현수재결속구(610)는 제2현수재(600)와의 결속위치를 고려하여 그 길이를 결정하도록 한다. 도 1 내지 도 3은 현수재결속구(610)와 제2현수재(600)가 시공완료된 층간 수평구조체(H) 위에서 결속되는 형태로서 현수재결속구(610)가 층간 수평구조체(H)를 관통하는 길이를 가지는 예이다. 서포트빔(400)을 보완하는 보조서포트빔(500)이 설치되는 경우에는 현수재결속구(610)를 보조서포트빔(500)의 높이보다 짧은 길이를 가지도록 구성하면 제2현수재(600)를 서포트빔(400)과 거푸집(F) 사이 공간에서 현수재결속구(610)에 결속시킬 수 있을 것이다. 물론 도시하지 않았지만 제2현 수재(600)와 현수재결속구(610)의 결속위치를 층간 수평구조체 두께 내에 잡을 수도 있을 것이다. 다만, 도 1 내지 도 3에서와 같은 경우에는 현수재결속구(610)가 층간 수평구조체(H)보다 돌출되도록 시공되어야 하는데 그 과정에서 현수재결속구(610)가 층간 수평구조체(H)에 구속될 우려가 있는 바, 이를 감안한다면 제2현수재(600)와 현수재결속구(610)의 결속위치를 층간 수평구조체(H) 상부 표면 아래로 잡는 것이 바람직하겠다.However, in the present invention, the second suspension material 600 is provided to supplement the first suspension material 200 for the convenience of the lowering work, and the second suspension material 600 is suspended to the support beam 400. It is connected to the re-binding port 610 and serves to directly support the support beam 400. That is, it is difficult to slowly lower the first suspension member 200, which is a rod-shaped member, while maintaining the looseness to the fixed support member 100 due to the limitation of the lowering equipment, and the first suspension member 200 is fixed support member 100. In the uncoiled state), the second suspension material 600 is supported by hanging the support beam (which is coupled to the movable support) while receiving the support of the already completed interlayer horizontal structure. Thus, the second suspension member 600 bound to the suspension re-binding hole 610 is connected to the support beam 400 while penetrating the interlayer horizontal structure H, which is completed, and gradually extending the length of the support beam ( It will be lowered while supporting the 400 and the moving support (300). Considering the role of the second suspension member 600, as shown in FIGS. 1 to 3, the second suspension member 600 is wound and adopted to form a wire that is easy to loosen to be configured to be integrally coupled to the descender 700. It will be convenient. Suspension binding block 610 bonded to the support beam 400 to determine the length in consideration of the binding position with the second suspension (600). 1 to 3 is a form in which the suspending fastener 610 and the second suspending material 600 are bound on the completed interlayer horizontal structure H, in which the suspending fastener 610 penetrates the interlayer horizontal structure H. This is an example of a length. When the auxiliary support beam 500 is installed to complement the support beam 400, the second suspension material 600 is formed by configuring the suspension re-binding tool 610 to have a length shorter than the height of the auxiliary support beam 500. In the space between the support beam 400 and the die (F) it may be bound to the suspension re-binding holes 610. Of course, although not shown, the binding position of the second suspension member 600 and the suspension member binding hole 610 may be caught within the thickness of the interlayer structure. However, in the case of FIGS. 1 to 3, the suspension re-binding sphere 610 should be constructed to protrude more than the interlayer horizontal structure H. In the process, the suspension re-binding sphere 610 is to be constrained to the interlayer horizontal structure H. If there is a concern, considering this, it is preferable to hold the binding position of the second suspension material 600 and the suspension material binding hole 610 below the upper surface of the interlayer horizontal structure H.

층간 수평구조체(H)가 시공 완료된 후에는 제1현수재(200)와 제2현수재(600)가 층간 수평구조체(H)를 관통하여 배치되면서 층간 수평구조체(H)에 구속되지 않고 자유롭게 이동하게 되므로, 층간 수평구조체(H) 시공과정에서는 제1현수재(200)와 제2현수재(600) 또는 현수재결속구(610)가 완전히 매입되지 않도록 슬리브를 마련해야 할 것이다. After the construction of the interlayer horizontal structure H is completed, the first suspension material 200 and the second suspension material 600 are disposed to penetrate the interlayer horizontal structure H and move freely without being constrained to the interlayer horizontal structure H. Therefore, in the interlayer horizontal structure (H) construction process it will be necessary to provide a sleeve so that the first suspension member 200 and the second suspension member 600 or the suspension member binding hole 610 is not completely embedded.

이동지지체(hanging support, 300)는 상기 고정지지체(100) 아래로 기둥(C)에의 반복적인 고정 및 풀림이 가능하게 설치되어 층간 수평구조체(H)의 시공에 따라 하강이 이루어지면서 그 설치위치가 변경되는 구성으로, 상기 제1현수재(200)의 하단이 결속됨으로 제1현수재(200)에 의해 고정지지체(100)에 매달리게 된다. 상기 이동지지체(300)는 서포트빔(400)과 함께 그 위로 시공되는 층간 수평구조체(H)를 직접 지지하는 역할을 한다. 이로써, 층간 수평구조체(H)의 시공하중은 서포트빔(400)에서 이동지지체(300)로 전달되고 이는 이동지지체(300)에서 제1현수재(200)를 통해 고정지지체(100)로 전달되며, 고정지지체(100)로부터 다시 기둥(C) 으로 전달되는 바, 최종적으로 기둥이 하중을 지지하게 되는 것이다. Moving support (hanging support, 300) is installed to be repeatedly fixed and loosened to the column (C) under the fixed support 100, the installation position is made while descending according to the construction of the inter-layer horizontal structure (H) In a configuration that is changed, the lower end of the first suspension member 200 is bound, so that the first suspension member 200 is suspended from the fixed support 100. The movable support 300 serves to directly support the interlayer horizontal structure H, which is constructed thereon along with the support beam 400. As a result, the construction load of the interlayer horizontal structure (H) is transmitted from the support beam 400 to the movable support 300, which is transferred from the movable support 300 to the fixed support 100 through the first suspension member 200. The bar is transferred back from the fixed support 100 to the column C, and finally the column supports the load.

이와 같은 이동지지체(300)는 기둥(C)을 중심으로 일자형 또는 십자형으로 분리된 2개 또는 4개의 분리체가 연결된 형태로 구성함이 서포트빔(400)을 이동지지체(300)에 연결한 상태로 하강작업을 하는데 기둥을 기준으로 구간별로 나누면서 진행할 수 있어 시공 편의를 위해 바람직하다. 분리체의 연결은 연결플레이트(330)를 이용하여 볼트접합하는 방법으로 처리할 수 있다.The movable support 300 is configured in a form in which two or four separate bodies are separated into a straight or cross shape around the column C, and the support beam 400 is connected to the movable support 300. It is preferable for the convenience of construction because it can be proceeded by dividing by section based on the column. Connection of the separator can be handled by a method of bolting using the connection plate 330.

서포트빔(400)은 각 기둥(C)에 설치된 이동지지체(300) 상호 간을 연결하며, 그 위로 설치되는 층간 수평구조체(H)의 시공을 위한 거푸집(F)을 지지하게 된다. 물론, 서포트빔(400) 위로 설치되는 거푸집(F)은 일반적인 제거형 거푸집이나 데크플레이트와 같은 영구 거푸집 어느 것이라도 무방하다. 이동지지체(300)가 2개 또는 4개의 분리체로 구성되는 경우에는, 상기 서포트빔(400)도 분리된 이동지지체(300)에 대응하여 분리 설치된다.The support beam 400 connects the movable support members 300 installed on the pillars C, and supports the formwork F for construction of the interlayer horizontal structure H installed thereon. Of course, the formwork F installed above the support beam 400 may be any permanent formwork, such as a general formwork or deck plate. When the moving support member 300 is composed of two or four separate members, the support beam 400 is also separately installed to correspond to the separated moving support member 300.

상기 서포트빔(400) 위로는 서포트빔(400)을 연결하는 보조서포트빔(500)을 더 설치하여 층간 수평구조체(H) 시공을 위한 거푸집(F)이 상기 보조서포트빔(500) 위로 설치되도록 구성할 수 있다. 이와 같은 보조서포트빔(500)은 서포트빔(400)을 보완하여 거푸집(F)을 지지하는 역할을 한다. 또한 이동지지체(300)의 상단이 서포트빔(400)보다 위에 위치하게 되는 경우 거푸집(F) 설치시 거푸집(F)과 이동지지체(300) 상호간 간섭이 일어나 거푸집(F) 설치가 곤란할 수 있는데 보조서포트빔(500)의 설치로 이러한 간섭을 흡수할 수 있는 공간을 확보하는 것이 가능해진 다(도 1(f) 참조). 나아가, 보조서포트빔(500)의 설치로 확보된 서포트빔(400)과 거푸집(F) 사이 공간은 제2현수재(600)를 서포트빔에 접합된 현수재결속구(610)의 결속하기 위한 작업공간으로도 활용할 수 있을 것이다.Above the support beam 400, the auxiliary support beam 500 is further installed to connect the support beam 400 so that the formwork F for the construction of the interlayer horizontal structure H is installed on the auxiliary support beam 500. Can be configured. The auxiliary support beam 500 serves to support the formwork F by complementing the support beam 400. In addition, when the upper end of the movable support 300 is located above the support beam 400, when the formwork (F) is installed, the formwork (F) and the movable supporter 300 may interfere with each other, thereby making it difficult to install the formwork (F). The installation of the support beam 500 makes it possible to secure a space capable of absorbing such interference (see FIG. 1 (f)). Furthermore, the space between the support beam 400 and the form F secured by the installation of the auxiliary support beam 500 is a work for binding the second suspension member 600 to the suspension re-binding hole 610 bonded to the support beam. It can also be used as a space.

상기와 같은 구성결과, 고정지지체(100)가 기둥(C)에 고정되고 이동지지체(300)가 기둥(C)으로부터 풀린 상태에서 제1현수재(200)와 고정지지체(100)의 결속상태를 풀면 제1현수재(200)가 하강함과 동시에 이동지지체(300)와 서포트빔(400)의 하강이 이루어지게 되며, 상기 거푸집 지지체의 하강이 시공할 해당층까지 완료된 상태에서 제1현수재(200)를 고정지지체(100)에 고정 결속하면 이동지지체(300)와 서포트빔(400)의 위치가 잡히고 이어 이동지지체(300)를 기둥(C)에 밀착 고정하면 거푸집 지지체 전체의 고정이 이루어지게 된다.As a result of the configuration as described above, the fixed support 100 is fixed to the column (C) and the movable support 300 is released from the column (C) the binding state of the first suspension member 200 and the fixed support 100 When unpacking, the first suspension member 200 descends and at the same time the movable support 300 and the support beam 400 are lowered, and the first suspension member in the state in which the lowering of the form support is completed to the corresponding floor to be constructed ( If the fixed support 200 is fixed to the fixed support 100, the position of the movable support 300 and the support beam 400 is fixed, and then the movable support 300 is tightly fixed to the pillar C so that the entire form support is fixed. do.

특히, 봉형상의 제1현수재(200)와 와이어의 제2현수재(600)를 함께 구비하면, 층간 수평구조체(H) 시공과정에서는 제1현수재(200)가 고정지지체(100)에 고정된 상태로 이동지지체(300)와 서포트빔(400)을 지지하게 되고, 이동지지체(300)와 서포트빔(400)의 하강과정에서는 제2현수재(600)가 하강기(700)에 의존한 상태로 이동지지체(300)와 서포트빔(400)을 지지하게 된다. Particularly, when the rod-shaped first suspension member 200 and the wire-shaped second suspension member 600 are provided together, the first suspension member 200 is fixed to the fixed support member 100 during the interlayer horizontal structure (H) construction process. The supporting member 300 and the support beam 400 are supported in a state in which the second supporting member 600 is dependent on the lowering device 700 in the descending process of the supporting member 300 and the support beam 400. The moving support 300 and the support beam 400 will be supported.

이로써, 층간 수평구조체(H) 시공과정에서 상당한 지지력을 발휘하는 상부의 고정지지체(100)는 항상 설치위치가 고정된 상태에 있게 되므로 안정적인 지지력 확보에 유리하게 되며, 하부의 이동지지체(300) 및 서포트빔(400)만을 하강시키면서 비교적 간편하게 무지주 역타설 거푸집방법으로 매층의 층간 수평구조체(H)를 시공할 수 있게 된다.As a result, the upper fixed support member 100 that exhibits a substantial supporting force in the interlayer horizontal structure H construction process is always in a fixed position so that it is advantageous to secure stable supporting force, and the lower movable support member 300 and While only the support beam 400 is lowered, it is possible to construct the interlayer horizontal structure (H) of each layer by a relatively unsupported reverse casting form method.

도 5a 내지 도 6c에서는 고정지지체(100)와 이동지지체(300) 등 각 구성요소의 구체적인 형태를 보여주고 있다.5A to 6C illustrate specific forms of each component, such as the fixed support 100 and the movable support 300.

본 발명에서 제안하는 고정지지체(100)는 기둥(C)에 수평방향으로 접합 설치되는 고정브라켓(holding bracket, 110); 상기 고정브라켓(110) 위로 기둥(C) 둘레를 둘러싸도록 고정브라켓(110)에 접합 설치되며, 제1현수재(200)가 수직으로 관통하여 통과하는 고정유니트(holding unit, 120); 및, 상기 고정유니트(120)를 통과하도록 배치된 제1현수재(200)의 위치를 고정하는 현수재고정구(130);를 포함하여 구성된다. 이러한 구성 결과, 고정유니트(120)는 고정브라켓(110)으로 고정브라켓(110)은 기둥(C)으로 결속관계가 이어지게 되므로, 고정지지체(100)는 기둥(C)에 안정적으로 정착하게 된다. Fixing support 100 proposed in the present invention is a holding bracket (holding bracket, 110) bonded to the horizontal direction in the column (C); A holding unit 120 which is installed to be fixed to the fixing bracket 110 so as to surround the pillar C around the fixing bracket 110, and the first suspending member 200 vertically passes through the holding bracket 120; And a suspension repositioning fixture (130) for fixing the position of the first suspension (200) disposed to pass through the fixing unit (120). As a result of this configuration, since the fixing unit 120 is a fixed bracket 110, the fixing bracket 110 is connected to the pillar (C), the fixing support 100 is stably fixed to the pillar (C).

고정유니트(120)는 제1현수재(200)의 균형잡힌 배치를 유도하여 제1현수재(200)에 의해 이동지지체(300)가 매달리는 힘의 균일한 분포를 유도하는 구성이며, 본 발명에서는 8각형 평면의 H형 단면을 갖는 형강 제품을 이용하고 있다. 고정브라켓(110)은 고정유니트(120)를 직접 지지하여 그 지지력을 기둥(C)으로 전달하는 역할을 하며, 본 발명에서는 H형강을 이용하면서 그 아래에 브레이스(brace)를 덧붙여 보강하고 있다.The fixed unit 120 is configured to induce a balanced distribution of the first suspension (200) to induce a uniform distribution of the force suspended by the mobile support 300 by the first suspension (200), in the present invention A section steel product having an H-shaped cross section of an octagonal plane is used. The fixing bracket 110 serves to directly support the fixing unit 120 to transfer the supporting force to the pillar C. In the present invention, the fixing bracket 110 adds a brace to the bottom while using the H-shaped steel.

특히, 상기 고정유니트(120)는 제1현수재(200)의 이음에 사용된 커플러(210)보다 큰 직경을 가지는 통공(121)이 형성되어 커플러(210)가 결합된 제1현수 재(200)가 통공(121)을 통과하도록 구성하고 있는데, 이는 제1현수재(200)를 매(每) 하강길이에 맞춰 커플러(210)에 의해 연장하면서 제1현수재(200)의 이음에 사용한 커플러(210)를 제1현수재(200)의 결속에 활용할 수 있도록 고려한 것이다. 이러한 경우에는 현수재고정구(130)로 제1현수재(200) 직경과 커플러(210) 직경 중간 크기의 걸림홈(131)이 형성된 말굽형상의 부재를 채택하도록 한다. 말굽형상의 현수재고정구(130)가 고정유니트(120) 위에서 커플러(210)가 결합된 제1현수재(200) 아래로 끼워지면 커플러(210)가 현수재고정구(130)의 걸림홈(131)에 걸리면서 고정유니트(120) 위에 안착하므로 제1현수재(200)는 고정유니트(120)에 결속하게 되며, 이러한 현수재고정구(130)의 설치 및 해체를 통해 제1현수재(200)의 고정지지체(100)에의 고정 및 풀림을 간편하게 처리할 수 있게 된다. 이때, 상기 고정유니트(120)에 현수재고정구(130)의 폭과 동일한 간격으로 이격하여 배치되는 가이드편(122)을 구비하도록 구성하면, 가이드편(122)이 말굽형상의 현수재고정구(130)의 끼움을 안내하게 될 것이다.In particular, the fixing unit 120 is formed with a through-hole 121 having a diameter larger than the coupler 210 used in the joint of the first suspension member 200, the first suspension member 200 is coupled to the coupler 210 ) Is configured to pass through the through-hole 121, which is a coupler used for the joint of the first suspension (200) while extending the first suspension (200) by the coupler (210) in accordance with the falling length (210) is considered to be utilized in the binding of the first suspension (200). In this case, as the suspension fixture 130, a horseshoe-shaped member having a locking groove 131 having a diameter between the diameter of the first suspension 200 and the diameter of the coupler 210 is adopted. When the horseshoe-shaped suspension fixture 130 is fitted under the first suspension member 200 in which the coupler 210 is coupled on the fixing unit 120, the coupler 210 is engaged with the suspension groove 130 of the suspension fixture 130. The first suspension member 200 is bound to the fixing unit 120 because it is seated on the fixing unit 120 while being caught, and the first suspension member 200 is installed and dismantled. Fixing and loosening to the fixed support 100 can be easily processed. At this time, when the fixing unit 120 is configured to include a guide piece 122 spaced apart at the same interval as the width of the suspension repositioning fixture 130, the guide piece 122 suspended hook fixture 130 ) Will guide the fitting.

본 발명에서 제안하는 이동지지체(300)는 기둥(C)에의 반복적인 고정 및 풀림이 가능하게 기둥(C) 둘레로 둘러싸도록 설치되는 이동프레임(hanging frame, 310);과 상기 이동프레임 아래로 배치되며 제1현수재(200) 하단이 결속되어 매달려지는 이동유니트(hanging unit, 320);를 포함하여 구성된다. 이러한 이동지지체(300)를 채택하는 경우에는 서포트빔(400)을 상기 이동지지체(300)의 이동프레임(310)과 이동유니트(320) 사이에 배치하여 이동프레임(310) 및 이동유니트(320) 와 동시에 결합함으로 이동지지체(300) 상호 간 연결하도록 한다. 그 결과 기둥(C)에서 이동프레임(310)으로 이동프레임(310)에서 서포트빔(400)으로 서포트빔(400)에서 이동유니트(320)로 결속관계가 이어지게 되며, 이동유니트(320)는 제1현수재(200)에 의해 고정지지체(고정유니트)로 이어지므로, 이동지지체(300) 및 서포트빔(400)의 지지력은 고정지지체(100)를 거친 후 기둥(C)으로 전달된다.Moving support 300 proposed in the present invention is a moving frame (hanging frame 310) is installed so as to surround the column (C) to be repeatedly fixed and loosened to the column (C); and disposed below the moving frame And a moving unit (hanging unit 320) in which the lower end of the first suspension member 200 is bound and suspended. In the case of adopting the movable support 300, the support beam 400 is disposed between the movable frame 310 and the movable unit 320 of the movable support 300 to move the movable frame 310 and the movable unit 320. And at the same time to be coupled to each other by the moving support 300. As a result, the binding relationship is continued from the column C to the moving frame 310, the moving frame 310 to the support beam 400, and the support beam 400 to the moving unit 320. Since the suspension member 200 leads to the fixed support (fixed unit), the supporting force of the movable support 300 and the support beam 400 is transmitted to the column C after the fixed support 100 passes.

특히, 도 6a 내지 도 c에서는 이동지지체(300)로 4개의 분리체로 구성된 것을 채택하고 있는데, 도시하고 있는 바와 같이 4개의 분리체는 연결플레이트(330)에 의한 볼트접합 또는 직접 서포트빔(400)에 볼트접합하는 것으로 하나의 이동지지체로 완성할 수 있으며, 하강작업이 이루어지는 경우에는 분리체의 연결상태가 해체된다. 이동지지체(300)의 분리 구성으로 서포트빔(400) 또한 분리된 이동지지체에 대응하여 분리 설치되며, 하강작업은 이동지지체(300)의 분리와 함께 서포트빔(400)도 분리되면서 이루어지게 된다. In particular, in Figures 6a to c adopt a moving support 300 consisting of four separate, as shown, the four separate is a bolted joint or direct support beam 400 by the connecting plate 330 It can be completed by a single moving support by bolting on, and when the descending operation is made, the connection state of the separator is dismantled. The support beam 400 is also separately installed to correspond to the separated moving support as a separate configuration of the movable support 300, and the lowering operation is performed while the support beam 400 is separated along with the separation of the movable support 300.

이동프레임(310)은 기둥(C)과 마주보는 대응면(311)을 구비하면서 상기 대응면(311)에 조임볼트(312)를 결속하도록 구성하고 있으며, 이러한 구성 결과 조임볼트(312)의 조임 및 풀림에 따라 조임볼트(312)를 기둥(C)에 밀착시키거나 떨어지게 위치시킴으로 이동프레임(310)을 기둥(C)에 고정하거나 풀리도록 구성하는 것이 가능해진다. 특히, 이동지지체(300)(이동프레임과 이동유니트)는 기둥(C)과 충분한 유격을 확보하고 있는데, 이는 이동프레임(310)에 조임볼트(312)을 구비함으로 가능해지는 것이다. 이동지지체(300)와 기둥(C) 사이의 유격 확보로 기둥(C)이 수직도를 확보하지 않은 상태에서도 이동지지체(300)는 수평도를 유지하면서 자연스럽 게 하강시킬 수 있게 되며, 나아가 조임볼트(312)의 미세조정으로 정확하지 못한 기둥(C)의 수직도를 흡수하면서 기둥(C)에 고정할 수 있게 된다.The moving frame 310 has a corresponding surface 311 facing the column C and is configured to bind the tightening bolt 312 to the corresponding surface 311. As a result of this configuration, the tightening bolt 312 is tightened. And by loosening the tightening bolts 312 to the column (C) in close contact with or away from it is possible to configure the moving frame 310 to be fixed or released to the column (C). In particular, the moving support 300 (moving frame and the moving unit) has a sufficient clearance with the column (C), which is made possible by providing a fastening bolt 312 in the moving frame (310). By securing the clearance between the movable support 300 and the pillar C, even when the pillar C is not secured vertically, the movable support 300 can be naturally lowered while maintaining horizontality, and further tightened. Fine adjustment of the bolt 312 can be fixed to the column (C) while absorbing the vertical verticality of the column (C).

이동유니트(320)는 상기 고정유니트(120)와 대응하도록 8각형상으로 구성하면서 이동프레임(310)과 대응하도록 4개의 분리체로 구성하고 있다.  The moving unit 320 is composed of four separate bodies to correspond to the moving frame 310 while forming an octagonal shape to correspond to the fixed unit 120.

2. 무지주 역타설 거푸집공법2. Unsupported reverse casting formwork

본 발명에 따른 무지주 역타설 거푸집공법은 통상의 방법과 거의 동일하나, 거푸집 지지체로서 전술한 상부의 고정단(고정지지체)과 하부의 이동단(이동지지체, 서포트빔, 보조서포트빔)으로 분리구성된 것을 채택한다는 점에서 큰 차이가 있다. 본 발명에 따른 무지주 역타설 거푸집공법을 단계적으로 설명한다.The unsupported reverse casting formwork according to the present invention is almost the same as the conventional method, but is separated into the above-mentioned fixed end (fixed support) and the lower movable end (mobile support, support beam, auxiliary support beam) as the form support. There is a big difference in adopting what is constructed. Step-by-step description of the unsupported back-pouring formwork according to the present invention.

(1)제1단계- 도 1(a)(1) First step- FIG. 1 (a)

기둥위치에서 기초위치까지 천공하여 그라우팅재를 투입한 후 기둥(C)을 관입하여 기초구근을 완성한다. Drill the grouting material from the pillar position to the foundation position, and then insert the grout to complete the foundation bulb.

기둥(C)으로는 통상 역타설 공법에 적용되는 어떤 형태의 것도 가능할 것이나, 강재로 이루어진 거푸집 지지체의 안정적인 설치와 용이한 해체를 고려한다면 4면을 구비하는 철골기둥 또는 CFT기둥 형태가 바람직하겠다. 다만, 기둥(C)으로 H형강을 채택하는 경우에는 도 5c 내지 도 6c에서와 같이 거푸집 지지체가 고정되는 위치의 웨브에 T형강을 덧붙여 부분적으로 4면을 구비한 기둥으로 완성할 수도 있을 것이다. The pillar (C) may be of any type normally applied to the reverse casting method, but considering the stable installation and easy disassembly of the formwork support made of steel, a steel pillar or a CFT pillar having four sides is preferable. However, in the case of adopting the H-shaped steel as the column (C), as shown in Figures 5c to 6c by adding the T-shaped steel to the web of the position where the form support is fixed may be partially completed with a column having four sides.

(2)제2단계- 도 1(b) 내지 도 1(f)(2) Second Step-Figs. 1 (b) to 1 (f)

1차 굴토작업을 실시하면서 또는 실시한 후에 기둥(C)에 거푸집 지지체를 설치한다. 거푸집 지지체는 전술하고 있는 고정지지체(100), 제1현수재(200), 이동지지체(300), 서포트빔(400)을 필수적인 구성요소로 하면서 제2현수재(600)와 보조서포트빔(500)을 추가적인 구성요소로 채택할 수 있다.Formwork supports are installed on posts (C) during or after primary gulting. The form support includes the fixed support member 100, the first suspension member 200, the movable support member 300, and the support beam 400, as described above, and the second support member 600 and the auxiliary support beam 500. ) Can be adopted as an additional component.

1차 굴토작업은 외부로 노출된 흙막이벽이 자립하여 충분히 토압을 지지할 수 있을 정도로만 진행한다.The first excavation works only to the extent that the earthen walls exposed to the outside are free to support the earth pressure.

1차 굴토작업과 거푸집 지지체의 설치를 동시에 진행하는 경우에는 먼저 거푸집 지지체의 고정지지체(100)를 기둥(C) 상단에 고정 설치하고(도 1(b)), 이어 1차 굴토작업을 실시하고(도 1(c)), 마지막으로 거푸집 지지체의 이동지지체(300) 및 서포트빔(400)을 기둥(C)에 설치하는(도 1(d) 및 도 1(f)) 과정으로 진행하도록 함이 바람직하다. 이는 고정지지체(100)의 설치를 굴토 전 지상 위에서 이루어지게 하여 작업성의 편리성을 도모하기 위함이다. 물론 이동지지체(300) 및 서포트빔(400)의 설치에는 제1현수재(200)의 설치가 함께 이루어져야 할 것이다.In the case of proceeding with the first gulto work and the form support at the same time, the fixed support 100 of the formwork support is fixed to the top of the column (C) (FIG. 1 (b)), and then the first pitwork work is performed. (FIG. 1 (c)), finally, the moving support 300 and the support beam 400 of the form support are installed on the pillar C (FIG. 1 (d) and FIG. 1 (f)). This is preferred. This is to facilitate the workability by making the installation of the fixed support 100 on the ground before the excavation. Of course, the installation of the first suspension member 200 should be made together with the installation of the movable support 300 and the support beam 400.

거푸집 지지체로 보조서포트빔(500)과 제2현수재(600)를 더 포함하여 구성하는 경우에는 서포트빔(400)의 위로 보조서포트빔(500)을 설치하고(도 1(f)), 서포트빔(400)에는 제2현수재(600)를 연결 결속하기 위한 현수재결속구(610)를 접합하도록 한다(도 1(g)참고). In the case of further comprising the auxiliary support beam 500 and the second suspension member 600 as the form support, the auxiliary support beam 500 is installed above the support beam 400 (FIG. 1 (f)), The beam 400 is bonded to the suspending fastener 610 for connecting and binding the second suspension 600 (see Fig. 1 (g)).

(3)제3단계- 도 1(g) 및 도 1(h)(3) Third Step-FIGS. 1 (g) and 1 (h)

상기 거푸집 지지체의 서포트빔(400) 또는 보조서포트빔(500) 위로 거푸집(F)을 설치한 후(도 1(g) 콘크리트를 타설 양생하여(도 1(h)) 층간 수평구조체(H)를 시공한다. 다만, 제1현수재(200)와 제2현수재(600)가 배치되는 위치에는 슬리브를 마련하여 제1현수재(200)와 제2현수재((600) 또는 현수재결속구(610))가 층간 수평구조체(H)에 구속되지 않도록 한다. After installing the formwork (F) on the support beam 400 or the auxiliary support beam 500 of the form support (Fig. 1 (g) by pouring concrete (Fig. 1 (h)) to the interlayer horizontal structure (H) However, the first suspension member 200 and the second suspension member (600) or the suspension reinforcing fasteners are provided by providing a sleeve at a position where the first suspension member 200 and the second suspension member 600 are disposed. 610) is not constrained to the interlayer horizontal structure (H).

거푸집(F)으로는 일반적인 제거용 거푸집이나 영구용 거푸집 어느 것을 채택해도 무방하다. 물론, 이때의 층간 수평구조체(H)는 흙막이벽을 지지하는 형태로 시공이 이루어진다.As the formwork F, either a general formwork for removal or a permanent formwork may be adopted. Of course, the interlayer horizontal structure (H) at this time is made in the form of supporting the retaining wall.

(4)제4단계- 도 2(a)(4) Fourth Step-Fig. 2 (a)

2차 굴토작업을 실시한다.Carry out the second excavation.

(5)제5단계- 도 2(b)(5) Fifth Step-Fig. 2 (b)

상기 거푸집 지지체의 이동지지체(300)와 서포트빔(보조서포트빔 포함)을 하강시켜 소정 위치 즉, 하층부의 층간 수평구조체(H) 시공위치에 고정한다. 전술하고 있는 바와 같이 거푸집 지지체의 하강작업은 고정지지체(100)가 기둥(C)에 고정되고 이동지지체(300)가 기둥(C)에 풀린 상태에서 제1현수재(200)의 고정지지체(100)에의 결속상태를 풀면서 이루어지고, 거푸집 지지체의 고정작업은 제1현수재(200)를 고정지지체(100)에 다시 고정 결속하여 이동지지체(300)와 서포트 빔(400)을 위치 잡은 후 이동지지체(300)를 기둥(C)에 밀착 고정하면서 이루어진다. 층간 수평구조체(H) 시공을 위한 거푸집(F)으로 제거형 거푸집이 설치된 경우에는 거푸집(F) 또한 하강이 함께 이루어져야 할 것이다.The movable support 300 and the support beam (including the auxiliary support beam) of the form support are lowered and fixed at a predetermined position, that is, the construction position of the interlayer horizontal structure H of the lower layer. As described above, the work of lowering the form support is fixed fixing member 100 of the first suspension member 200 in a state in which the fixed supporting member 100 is fixed to the pillar C and the movable supporting member 300 is loosened to the pillar C. Loosen the binding state to the), and the fixing work of the form support is fixed to the first suspension member 200 to the fixed support 100 again to position the movable support 300 and the support beam 400 and then moved It is made while fixing the support 300 in close contact with the pillar (C). If the formwork is installed as a formwork (F) for the construction of the interlayer horizontal structure (H), the formwork (F) should also be made with the descending.

제2현수재(600)를 더 포함하는 경우에는 완성된 층간 수평구조체(H) 위에서 제2현수재(600)를 서포트빔에 접합된 현수재결속구(610)에 연결 결속하여 제2현수재(600)가 이동지지체(300)와 서포트빔(400)을 매달아 지지하도록 한 상태에서 하강작업을 수행하게 된다. 즉, 제2현수재(600)가 완성된 층간 수평구조체 아래에 있는 구성들(이동지지체, 서포트빔 등)을 잡고 있으면 제1현수재(200)의 고정지지체(100)에의 결속상태를 푼 후 제2현수재(600)를 아래로 연장하면서 이동지지체(300)와 서포트빔(400)을 하강시키는 것이다. 앞서 설명한 바와 같이 제2현수재(600)를 와이어 형태로 하강기(700)와 일체화되도록 구성하면 제2현수재(600)를 감고 풀면서 용이하게 하강작업을 수행할 수 있게 된다. 제2현수재(600)를 이용한 하강작업이 완료되면 제1현수재(200)를 고정지지체(100)에 고정하면서 이동지지체(300)를 기둥(C)에 밀착고정하는 것으로 거푸집 지지체의 고정작업이 진행된다. 이렇게 거푸집 지지체의 고정작업이 완료되면 거푸집 지지체가 기둥(C)에 완전히 지지되므로 제2현수재(600)는 현수재결속구(610)에서 해체한 후 다음 시공에서 반복적으로 사용할 수 있게 된다.In the case where the second suspension member 600 is further included, the second suspension member 600 is connected to the suspension member binding hole 610 bonded to the support beam on the completed interlayer horizontal structure H and the second suspension member ( The descending operation is performed in a state in which 600 is supported to suspend and support the movable support 300 and the support beam 400. That is, when the second suspension member 600 holds the components (moving support member, support beam, etc.) under the completed interlayer horizontal structure, the first suspension member 200 is released from the binding support member 100 to the fixed support member 100. The moving support 300 and the support beam 400 are lowered while extending the second suspension 600. As described above, when the second suspension member 600 is configured to be integrated with the descender 700 in the form of a wire, the second suspension member 600 can be easily wound while unwinding. When the descending work using the second suspension member 600 is completed, the work of fixing the form support by fixing the first support member 200 to the fixed support member 100 by tightly fixing the movable support member 300 to the column C. This is going on. When the fixing support of the form support is completed in this way, since the form support is completely supported by the column C, the second suspension material 600 can be repeatedly used in the next construction after dismantling from the suspension restraint 610.

또한, 이동지지체(300)로 2개 또는 4개의 분리체로 구성된 것을 채택하면 하강작업시에는 분리하여 하강시킬 수 있으며, 도 4는 4개의 분리체로 구성된 이동지지체를 채택하는 경우의 하강계획을 보여주고 있다. 이와 같이 구간별로 구분하여 하강작업이 이루어지는 경우에는 하강작업이 이루어지는 곳에서만 제2현수재(600)와 하강기(700)를 필요하게 되므로 소수(小數)의 장비를 반복적으로 이용할 수 있을 것이다.In addition, if the moving support member 300 is composed of two or four separators are adopted, the lowering can be separated and lowered during the lowering operation, Figure 4 shows the descending plan in the case of adopting the mobile support consisting of four separate members have. As such, when the descending work is divided by section, the second suspension material 600 and the lowering device 700 are required only in the place where the descending work is performed, and thus a small number of devices may be repeatedly used.

(6)제6단계-도 2(c)(6) Sixth step-Fig. 2 (c)

하강된 이동지지체(300)와 서포트빔(400) 위로 새로운 층간 수평구조체(H)를 시공한다. 영구 거푸집을 이용하는 경우에는 이의 설치작업이 함께 이루어진다. A new interlayer horizontal structure (H) is constructed on the lowered movable support member 300 and the support beam 400. If permanent formwork is used, its installation is carried out together.

(7)제7단계- 도 3(a) 내지 도 3(c)(7) Seventh Step- FIGS. 3 (a) to 3 (c)

상기 제4단계 내지 제6단계를 반복하여 지하 최하층까지 진행한다. 이동지지체(300) 및 서포트빔(400)의 하강작업만으로 층간 수평구조체(H)의 시공을 위한 가설작업이 이루어지므로 가설공정을 상당히 단축할 수 있게 된다.The above steps 4 to 6 are repeated to proceed to the basement floor. Since only a descending operation of the movable support 300 and the support beam 400 is carried out for construction of the interlayer horizontal structure H, the construction process can be significantly shortened.

(8)제8단계(8) The eighth step

기초구근 위까지 굴토한 후 지하 최하층 바닥 높이로 기초를 완성한다. 이로써 지하 구조체의 공사가 완료된다.Vulgar up to the foundation bulb and complete the foundation at the basement floor level. This completes the construction of the underground structure.

이상과 같은 본 발명에 따르면, 상부의 고정단과 하부의 이동단을 분리구성하여 하부의 이동단만을 하강시킴으로 하강작업의 편리성을 도모하는 것은 물론 하 부의 이동단과 기둥의 유격을 확보할 수 있어 기둥의 수직도가 확보되지 않은 상태에서도 수직도를 흡수하면서 자유롭게 하강작업을 수행하면서 무지주 역타설 거푸집공법을 진행할 수 있게 된다. 이로써, 공기를 단축하면서 간편한 방법으로 지하 구조체를 시공할 수 있다.According to the present invention as described above, by separating the fixed end of the upper and the lower end of the mobile end by lowering only the moving end of the lowering of the convenience of the lowering operation as well as to secure the clearance between the lower end of the moving end and the column Even if the verticality of the surface is not secured, it can absorb the verticality and freely perform the descending work while performing the unloading reverse casting formwork. As a result, the underground structure can be constructed in a simple manner while shortening the air.

Claims (9)

기둥이 기시공된 상태에서 상층부에서 하층부로 내려가면서 층간 수평구조체를 구축하는데 사용되는 무지주 지지방식의 거푸집 지지체로서,The formless support of the unsupported form used to build the horizontal interlayer structure going from the upper part to the lower part in the state in which the column is constructed, 기둥 상단에 고정 설치되는 고정지지체; A fixed support fixed to the top of the column; 상기 고정지지체에 반복적인 고정 및 풀림이 가능하게 결속되며 기둥과 평행하게 배치되는 제1현수재;A first suspending member which is coupled to the fixed support to be repeatedly fixed and loosened and arranged in parallel with the pillar; 상기 고정지지체 아래로 기둥에의 반복적인 고정 및 풀림이 가능하게 설치되며, 상기 제1현수재의 하단이 결속됨으로 고정지지체에 매달려 지지되는 이동지지체;A movable support supported by the fixed support to be repeatedly fixed to and uncoiled under the fixed support, the lower end of the first suspending material being bound to and supported by the fixed support; 각 기둥에 설치된 이동지지체 상호 간을 연결하며, 그 위로 설치되는 층간 수평구조체의 시공을 위한 거푸집을 지지하는 서포트빔;A support beam connecting the movable support members installed on each pillar and supporting the formwork for the construction of the horizontal structure interlayer installed thereon; 상기 서포트빔 위로 상향 배치되며, 하단이 서포트빔에 연결 결속되는 제2현수재; 및,A second suspension disposed upwardly above the support beam, and having a lower end connected to the support beam; And, 지상 또는 완성된 층간 수평구조체 위에 배치되며, 상기 제2현수재의 상단이 결속됨으로 상기 서포트빔을 매달아 지지하는 하강기;를 포함하여 구성되되,It is disposed on the ground or completed interlayer horizontal structure, the lower end of the second suspension material is bound by the lowering device for hanging the support beam; 상기 고정지지체가 기둥에 고정되면서 이동지지체가 기둥에서 풀려 있고 동시에 상기 하강기가 제2현수재로서 서포트빔을 매달고 있는 상태에서 제1현수재의 고정지지체에의 결속상태를 푼 후 하강기로서 제2현수재를 아래로 연장시키면서 이동지지체와 서포트빔을 하강시키며,As the fixed support is fixed to the pillar, the movable support is released from the pillar, and at the same time, the second suspension is released as a descender after the first suspension is released from the support beam as the second suspension suspended by the support beam. While lowering the moving support and the support beam, 상기 이동지지체와 서포트빔의 하강이 시공할 해당층까지 완료된 상태에서 제1현수재를 고정지지체에 고정 결속하여 이동지지체의 위치를 잡은 후 이동지지체를 기둥에 고정설치하는 것을 특징으로 하는 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체.Up and down characterized in that the movable support and the support beam is fixed to the column after fixing the position of the movable support by fixedly binding the first suspension to the fixed support in the state to be completed to the floor to be installed Formwork support for unsupported reverse casting formwork with detachable support. 제1항에서,In claim 1, 상기 거푸집 지지체의 고정지지체는 The fixed support of the form support 기둥에 수평방향으로 접합 설치되는 고정브라켓;Fixing brackets are bonded to the horizontal installation in the column; 상기 고정브라켓 위로 기둥 둘레를 둘러싸도록 고정브라켓에 접합 설치되며, 제1현수재가 수직으로 관통하여 통과하는 고정유니트;A fixing unit which is attached to the fixing bracket so as to surround the pillar over the fixing bracket, the first suspending member passes vertically through the fixing bracket; 상기 고정유니트를 통과하도록 배치된 제1현수재의 위치를 고정하는 현수재고정구;를 포함하여 구성되는 것을 특징으로 하는 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체.Suspension fixing fixture for fixing the position of the first suspension material disposed to pass through the fixing unit; Form support for upright and down-separable support type in situ formwork method comprising a; 제2항에서,In claim 2, 상기 제1현수재는 봉형상의 부재로 매(每) 하강길이에 따라 커플러에 의한 이음으로 연장되며,The first suspending member is a rod-shaped member and extends to a joint by a coupler according to the falcon descent length, 상기 고정유니트는 제1현수재의 이음에 사용된 커플러보다 큰 직경을 가지는 통공이 형성되어 커플러가 결합된 제1현수재가 통공을 통과하도록 배치되며, The fixing unit has a through hole having a diameter larger than the coupler used in the joint of the first suspension is formed so that the first suspension coupled to the coupler passes through the through hole, 상기 현수재고정구는 제1현수재 직경과 커플러 직경 중간 크기의 걸림홈이 형성된 말굽형상의 부재로 고정유니트 위에서 커플러가 결합된 제1현수재 아래로 끼워지면 커플러가 걸리면서 고정유니트 위에 안착하게 됨으로 제1현수재의 위치를 고정하게 되는 것을 특징으로 하는 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체.The suspension fixture is a horseshoe-shaped member formed with a locking groove having a diameter between the first suspension diameter and the coupler diameter. When the suspension fitting is fitted under the first suspension material with the coupler coupled to the fixing unit, the suspension is caught on the fixing unit. 1. Formwork support for the unsupported reverse casting formwork of the upper and lower separable support system, characterized in that the position of the suspension material is fixed. 제1항 내지 제3항 중 어느 한 항에서,The method according to any one of claims 1 to 3, 상기 서포트빔 위로 서포트빔을 연결하는 보조서포트빔이 더 설치되어 층간 수평구조체 시공을 위한 거푸집이 상기 보조서포트빔 위로 설치되는 것을 특징으로 하는 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체.Formwork for upright and down-separable support type in situ forming method, characterized in that the support beam connecting the support beam is further installed on the support beam, the formwork for the construction of the horizontal interlayer structure is installed on the auxiliary support beam. Support. 제1항 내지 제3항 중 어느 한 항에서,The method according to any one of claims 1 to 3, 상기 거푸집 지지체의 이동지지체는 기둥에의 반복적인 고정 및 풀림이 가능하게 기둥 둘레로 둘러싸도록 설치되는 이동프레임;과 상기 이동프레임 아래로 배치되며 제1현수재 하단이 결속되어 매달려지는 이동유니트;를 포함하여 구성되며,The moving support of the form support is a moving frame is installed to surround the column to be repeatedly fixed and loosened to the pillar; and a moving unit disposed below the moving frame and the first suspension is tied to the hanging; Including, 상기 서포트빔은 상기 이동지지체의 이동프레임과 이동유니트 사이에 배치되어 이동프레임 및 이동유니트와 동시에 결합함으로 각 기둥에 설치된 이동지지체 상호 간을 연결하는 것을 특징으로 하는 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체.The support beam is arranged between the moving frame and the moving unit of the moving support is combined with the moving frame and the moving unit at the same time to connect the support between the movable support installed on each column, characterized in that the support column Formwork support for reverse casting formwork. 제5항에서,In claim 5, 상기 이동프레임은 기둥과 마주보는 대응면을 구비하고 상기 대응면에는 조임볼트가 결속되어 조임볼트의 조임 및 풀림에 따라 조임볼트가 기둥에 밀착하거나 떨어지게 됨으로 이동프레임이 기둥에 고정되거나 풀리게 되며, The movable frame has a corresponding surface facing the pillar and the tightening bolt is coupled to the corresponding surface so that the tightening bolt is in close contact with or falling off the pillar in accordance with the tightening and loosening of the tightening bolt. 상기 이동유니트는 기둥과 유격을 확보하면서 배치되는 것을 특징으로 하는 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체.The moving unit is a form support for the non-inverted reverse casting formwork of the upper and lower separable support method, characterized in that it is disposed while securing the clearance with the column. 제5항에서,In claim 5, 상기 이동지지체는 기둥을 중심으로 일자형 또는 십자형으로 분리된 2개 또는 4개의 분리체가 연결된 것이며,The movable support is connected to two or four separators separated in a straight or cross shape around the pillar, 상기 서포트빔은 분리된 이동지지체에 대응하여 분리 설치되며, The support beam is separated and installed corresponding to the separated moving support, 상기 이동지지체와 서포트빔이 분리된 상태에서 구분하면서 하강이 이루어지는 것을 특징으로 하는 상·하 분리형 지지방식의 무지주 역타설 거푸집공법용 거푸집 지지체.Forming support for the non-supporting back-pouring formwork method of the up and down separating type support method, characterized in that the lowering is made while separating the moving support and the support beam in a separated state. 기둥위치에서 기초위치까지 천공하여 그라우팅재를 투입한 후 기둥을 관입하여 기초구근을 완성하는 제1단계; A first step of perforating the pillar position from the pillar position to the foundation position and then inserting the grouting material into the pillar to complete the foundation bulb; 1차 굴토작업을 실시하면서 또는 실시한 후에 기둥에 제1항의 거푸집 지지체를 설치하는 제2단계; A second step of installing the formwork support of claim 1 on or after the primary gulting work; 상기 거푸집 지지체의 서포트빔 위로 거푸집을 설치한 후 콘크리트를 타설 양생하여 층간 수평구조체를 시공하는 제3단계; A third step of installing the formwork over the support beam of the form support and constructing horizontal interlayer structure by pouring concrete; 2차 굴토작업을 실시하는 제4단계;A fourth step of performing the second gulting work; 상기 거푸집 지지체에서 제1현수재의 고정지지체에의 결속상태를 푼 후 하강기로서 제2현수재를 아래로 연장시키면서 이동지지체와 서포트빔을 하강시키고, 소정 위치에서 제1현수재를 고정지지체에 고정 결속한 후 이동지지체를 기둥에 고정시키는 제5단계;After releasing the binding state of the first suspension material from the form support to the fixed support, the moving support and the support beam are lowered while extending the second suspension as a descender, and the first suspension is fixedly fixed to the fixed support at a predetermined position. A fifth step of fixing the movable support to the pillar; 하강된 이동지지체와 서포트빔 위로 층간 수평구조체를 시공하는 제6단계;A sixth step of constructing an interlayer horizontal structure on the lowered movable support and the support beam; 상기 제4단계 내지 제6단계를 반복하여 지하 최하층까지 진행하는 제7단계; 그리고,A seventh step of repeating the fourth to sixth steps and proceeding to the lowest basement floor; And, 기초구근 위까지 굴토한 후 지하 최하층 바닥 높이로 기초를 완성하는 제8단계;An eighth step of completing the foundation at the bottom of the basement floor after pitting up to the foundation bulb; 를 포함하여 이루어지는 것을 특징으로 하는 무지주 역타설 거푸집공법.The unsupported reverse casting formwork, characterized in that made of a. 삭제delete
KR1020060056957A 2006-06-23 2006-06-23 Non supporting form system for down ward construction and non supporting down ward construction method using the same KR100799336B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060056957A KR100799336B1 (en) 2006-06-23 2006-06-23 Non supporting form system for down ward construction and non supporting down ward construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060056957A KR100799336B1 (en) 2006-06-23 2006-06-23 Non supporting form system for down ward construction and non supporting down ward construction method using the same

Publications (2)

Publication Number Publication Date
KR20070122024A KR20070122024A (en) 2007-12-28
KR100799336B1 true KR100799336B1 (en) 2008-01-30

Family

ID=39139082

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060056957A KR100799336B1 (en) 2006-06-23 2006-06-23 Non supporting form system for down ward construction and non supporting down ward construction method using the same

Country Status (1)

Country Link
KR (1) KR100799336B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012044091A2 (en) * 2010-09-30 2012-04-05 (주)바로건설기술 Device and method for constructing underground structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102184568B1 (en) * 2019-06-10 2020-11-30 현대건설(주) Apparatus for intalling bracket for top-down construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63312437A (en) 1987-06-11 1988-12-20 Taisei Corp Construction of underground structure

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63312437A (en) 1987-06-11 1988-12-20 Taisei Corp Construction of underground structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012044091A2 (en) * 2010-09-30 2012-04-05 (주)바로건설기술 Device and method for constructing underground structure
WO2012044091A3 (en) * 2010-09-30 2012-06-21 (주)바로건설기술 Device and method for constructing underground structure

Also Published As

Publication number Publication date
KR20070122024A (en) 2007-12-28

Similar Documents

Publication Publication Date Title
KR101212240B1 (en) Structure for underground downward extension of structural remodeling and methode thereof
KR101107567B1 (en) For top down methode of rc structure, the connecting devices between beam structure and vertical steel material, the supporting structures of exclusive use, and the construction method using these devices
KR100775767B1 (en) Top-down method using the vertical steel bar for the src column
KR20160000702A (en) Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method
KR100799336B1 (en) Non supporting form system for down ward construction and non supporting down ward construction method using the same
KR101401057B1 (en) Method to build underground structures using the pillars and the stigma and steel beam and slab structures are formed
JP5192251B2 (en) Tower crane support structure and construction method thereof
KR101071245B1 (en) Non support downward method using Steel-PC composite girder and the Steel-PC composite girder
KR101250482B1 (en) Underground slab construction method using wire rope and curing pannel flame
JP6865550B2 (en) How to build silo roof and silo roof structure
KR100679986B1 (en) Structure for plastic slab deck system and Downward construction method using the same
JP2006299660A (en) Temporary receiving construction method and temporary receiving structure
JP5749620B2 (en) Seismic isolation method for existing buildings
CN102116084B (en) Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building
KR200358247Y1 (en) Downward construction structure using bracket support type
KR100507597B1 (en) Formwork supporting apparatus for hanging type formwork system and formwork using the same
KR100650134B1 (en) Early remove support method
KR101106799B1 (en) Construction method of Top-down concrete slab
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
JP2008255636A (en) Construction method for rc girder
KR101657628B1 (en) Top-down method for building undergroud structure using steel pipe
KR101335796B1 (en) Apparatus for supporting form of underground building and method of constructing the underground building using the same
JP2014055454A (en) Structure and method for temporarily supporting foundation
KR101707376B1 (en) Structure for constructing underground structure using composite beams and the construction method thereof
RU190322U1 (en) Device for the construction of multi-storey underground structures

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20130109

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20131224

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150116

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160112

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee