KR100720321B1 - Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system - Google Patents

Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system Download PDF

Info

Publication number
KR100720321B1
KR100720321B1 KR1020050032351A KR20050032351A KR100720321B1 KR 100720321 B1 KR100720321 B1 KR 100720321B1 KR 1020050032351 A KR1020050032351 A KR 1020050032351A KR 20050032351 A KR20050032351 A KR 20050032351A KR 100720321 B1 KR100720321 B1 KR 100720321B1
Authority
KR
South Korea
Prior art keywords
load
vertical
displacement
support
girder
Prior art date
Application number
KR1020050032351A
Other languages
Korean (ko)
Other versions
KR20060110130A (en
Inventor
홍석희
Original Assignee
주식회사 서영엔지니어링
주식회사 한국지오컨설턴트
홍석희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
Application filed by 주식회사 서영엔지니어링, 주식회사 한국지오컨설턴트, 홍석희 filed Critical 주식회사 서영엔지니어링
Priority to KR1020050032351A priority Critical patent/KR100720321B1/en
Publication of KR20060110130A publication Critical patent/KR20060110130A/en
Application granted granted Critical
Publication of KR100720321B1 publication Critical patent/KR100720321B1/en
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=37616108&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR100720321(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans
    • B65H75/34Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
    • B65H75/38Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
    • B65H75/44Constructional details
    • B65H75/4481Arrangements or adaptations for driving the reel or the material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16DCOUPLINGS FOR TRANSMITTING ROTATION; CLUTCHES; BRAKES
    • F16D11/00Clutches in which the members have interengaging parts
    • F16D11/02Clutches in which the members have interengaging parts disengaged by a contact of a part mounted on the clutch with a stationarily-mounted member
    • F16D11/04Clutches in which the members have interengaging parts disengaged by a contact of a part mounted on the clutch with a stationarily-mounted member with clutching members movable only axially
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2403/00Power transmission; Driving means
    • B65H2403/70Clutches; Couplings
    • B65H2403/72Clutches, brakes, e.g. one-way clutch +F204
    • B65H2403/722Gear clutches
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2403/00Power transmission; Driving means
    • B65H2403/90Machine drive
    • B65H2403/94Other features of machine drive
    • B65H2403/941Manually powered handling device
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2551/00Means for control to be used by operator; User interfaces
    • B65H2551/10Command input means
    • B65H2551/13Remote control devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2551/00Means for control to be used by operator; User interfaces
    • B65H2551/10Command input means
    • B65H2551/14Switches; Selectors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/33Hollow or hose-like material

Abstract

본 발명은 지하구조물을 설치하기 위하여 굴착공사를 할때 토사가 붕괴되는 것을 방지하기 위하여 흙막이 구조의 수직벽과 띠장지지에 활용하여 토압이나 수압에 의하여 발생되는 변위와 하중을 설계관리치의 변위와 하중과의 관계를 연동하여 변위량과 하중을 복귀 및 상쇄시키면서 토압이나 수압을 지지하도록 하고, 현장계측치와 설계관리치를 피드백하여 허용치를 벗어날 염려가 있는 경우 재차 유압잭의 스트로크를 자동연동시켜 회복 및 상쇄하거나 또는 철근 콘크리트타설과 철근조립을 위해 설치되는 거푸집의 하부에 설치지지되어 콘크리트타설 및 철근조립중량으로 발생되는 변위량과 하중을 설계관리치의 캡버량과 하중관계에 연동되어 변위량과 하중을 직접 회복 및 상쇄하면서 또한 현장계측지와 설계관리치를 피드백하여 허용치를 벗어날 염려가 있는 경우 재차 유압잭을 삽입하여 스트로크를 자동연동시켜 회복 및 상쇄하면서 콘크리트 구조물을 지지하도록 하기 위한 흙막이벽 및 구조물지지동바리용 싱크로나이즈지지시스템에 관한 것이다.        The present invention utilizes the displacements and loads generated by earth pressure or hydraulic pressure by using the vertical wall and the band support of the earthquake structure to prevent the soil from collapsing during the excavation work to install the underground structure. To support the earth pressure or hydraulic pressure while restoring and canceling the displacement and load by interlocking the relationship, and feedback the site measurement value and the design control value to recover and offset the hydraulic jack by automatically linking the stroke of the hydraulic jack again. Supported under the formwork installed for reinforcing concrete and reinforcing steel reinforcement, the displacement and load generated by concrete placing and reinforcing steel reinforcement are linked to the capber amount and load relationship of the design management value to directly recover and offset the displacement and load. Also, feedback the field measurement site and design management value If the eonal concerned will again for the stroke by inserting yuapjaek the retaining wall and the support structure supporting the system for synchronizing to Shore for supporting a concrete structure with recovery and offset automatically by interlocking.

Description

작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템 및 이의 설치방법{Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system}Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system}
도1은 종래기술로서 레이커스트러트를 1단으로 설치하여 토압을 지지하도록 한 흙막이벽을 보여주는 도면.       1 is a view showing the retaining wall to support the earth pressure by installing a raker strut in one stage in the prior art.
도2는 종래기술인 띠장과 수평버팀대와 중간파일로 이루어진 흙막이벽을 보여주는 도면.       Figure 2 is a view showing the retaining wall made of a prior art belt and the horizontal brace and the intermediate pile.
도3은 종래기술인 버팀대와 띠장으로 이뤄진 흙막이벽의 띠장에 프리스트레스 압축력이 도입된 수평PS 강선이 설치된 보강띠장을 부착하여 보강한 것을 보여주는 도면.       Figure 3 is a view showing that the reinforcing strips attached to the reinforcement bands installed with a horizontal PS steel wire introduced pre-stressing force to the strip of the earth wall made of a brace and the strip of the prior art.
도4는 종래기술로서 버팀대와 띠장으로 이루어진 흙막이벽의 띠장에 다수개의 간격재와 이 간격재에 프리스트레스 압축력이 도입된 PS 강선을 설치한 보강띠장을 설치하여 보강한 것을 보여주는 도면.       Figure 4 is a view showing the reinforcement by installing a reinforcement belt installed with a plurality of spacers and the PS steel wire introduced prestressing compressive force to the spacer of the earth wall made of a brace and the band as a prior art.
도5는 종래기술로서 구체콘크리트를 전체강관지주로 지지하도록 한 것을 보여주는 도면.       5 is a view showing that to support the concrete concrete as a whole steel pipe column in the prior art.
도6은 종래기술로서 교각 기초위에 가설벨트를 설치하고 그 위에 설치되는 구체슬래브를 지지하도록 설치한 것을 보여주는 도면.       Figure 6 is a view showing that the installation to support the concrete slab is installed on the installation of the temporary belt on the piling foundation in the prior art.
도7은 본 발명의 싱크로나이즈레이커거더지지시스템이 수직파일과 띠장을 지지하여 토압에 의한 반력과 변위를 상쇄회복하도록 흙막이벽을 설치한 것을 보여주는 도면.       7 is a view showing that the synchronizer raker girder support system of the present invention supports the vertical pile and the band to install the retaining wall to offset the reaction force and displacement caused by the earth pressure.
도8은 본 발명의 싱크로나이즈지지시스템을 띠장거더에 설치하여 토압에 의한 반력과 변위를 상쇄하도록 흙막이벽을 설치한 것을 보여주는 도면.       8 is a view showing the installation of a retaining wall to offset the reaction force and displacement caused by earth pressure by installing the synchronizer support system of the present invention to the band girders.
도9는 본 발명의 싱크로나이즈지지시스템이 흙막이벽의 토압에 의한 반력과 변위를 상쇄하는 것을 자동으로 연동조절하는 과정을 보여주는 도면.       9 is a view showing a process of automatically interlocking the synchronized support system of the present invention to cancel the reaction force and displacement caused by the earth pressure of the earth wall.
도10은 본 발명의 싱크로나이즈지지시스템이 구체슬래브의 하부에 설치되어 구체콘크리트슬래브에 발생되는 반력과 변위를 상쇄회복제어하는 과정을 보여주는 도면.       FIG. 10 is a view illustrating a process of canceling control of reaction force and displacement generated in a concrete concrete slab by installing the synchronizer support system of the present invention in a lower portion of the concrete slab; FIG.
도11은 본 발명의 싱크로나이즈지지시스템의 수직재의 하부에 설치되는 하중변위연동 및 고정장치에 인장케이블이 설치된 상태를 보여주는 도면.       11 is a view showing a state in which the tension cable is installed in the load displacement interlocking and fixing device installed in the lower portion of the vertical member of the synchronizer support system of the present invention.
도12는 본 발명의 싱크로나이즈지지시스템의 하중변위연동 및 고정장치의 설치, 변위연동, 고정장치를 보여주는 도면.       Figure 12 is a view showing the load displacement interlocking and mounting, displacement interlocking, fixing device of the synchronized support system of the present invention.
도13은 본 발명의 하중변위연동 및 고정장치의 잭하부지지판을 보여주는 도면.       Figure 13 is a view showing the lower jack support plate of the load displacement linkage and fixing device of the present invention.
도14는 본 발명의 하중변위연동 및 고정장치의 잭상부지지판을 보여주는 도면.       Figure 14 is a view showing a jack upper support plate of the load displacement interlocking and fixing device of the present invention.
도15는 도14의 단면 A-A를 보여주는 도면.       Fig. 15 shows a cross section A-A of Fig. 14;
도16은 본 발명의 싱크로나이즈지지시스템을 띠장에 설치하기 위하여 편기된 수직파일에 하중분산쐐기받침판을 설치하여 띠장이 수평으로 설치되게 한 것을 보여주는 도면.       Figure 16 is a view showing the installation of the load-bearing wedge support plate on the vertical piles arranged in order to install the synchronizer support system of the present invention to the belt length so that the band length is horizontally installed.
<도면의 주요부분에 대한 부호의 설명>       <Description of the symbols for the main parts of the drawings>
10 : 흙막이벽 11 : 레이커스트러트        10: retaining wall 11: Raker Strut
12 : 스크류잭 13 : 띠장        12: screw jack 13: strip
14 : 토사 15 : 수직파일        14: earth and sand 15: vertical pile
16 : 터파기선 17 : 레이커지지기초        16: breaker ship 17: raker support base
18 : 브레이싱 19 : 중간파일        18 bracing 19: intermediate file
20 : 수평버팀대 21 : 긴장정착장치        20: horizontal brace 21: tension fixing device
22 : PS 강선 23 : 보강띠장        22: PS steel wire 23: reinforcing band
24 : 간격재 25 : 압축프리스트레스힘         24: Spacer 25: Compression Free Stress
30 : 구조물지지동바리 31 : 구체콘크리트        30: structure supporting bridge 31: concrete concrete
32 : 거푸집 33 : 강관지주        32: formwork 33: steel pipe holder
35 : 종거더        35: bell girder
36 : 횡빔 37 : 교각        36 side beams 37 pier
38 : 기초 39 : 가설벤트        38: foundation 39: hypothesis
40 : 싱크로나이즈지지시스템 41 : 하중전달버팀대        40: synchronized support system 41: load transfer brace
42 : 고정장치 43 : 인장케이블        42: fixing device 43: tension cable
44 : 수직재 45 : 레이커거더        44: vertical 45: raker girder
46 : 띠장거더 47 : 인장력        46: strip girders 47: tensile force
48 : 컴퓨터 49 : 피드백        48: Computer 49: Feedback
50 : 유압실린더 51 : 유압호스        50: hydraulic cylinder 51: hydraulic hose
53 : 하중계        53: load meter
54 : 변위계 55 : 변위회복량        54: displacement meter 55: displacement recovery amount
56 : 연동변위량 57 : 내부반력        56: interlock displacement 57: internal reaction
58 : 아이슬랜드공법 59 : 단계별굴착선        58: Iceland Method 59: Drilling Steps
60 : 하중변위연동 및 고정장치 61 : 스티프너        60: load displacement interlocking and fixing device 61: stiffener
62 : 잭하부지지판 63 : 고장력볼트        62: jack lower support plate 63: high tension bolt
64 : 잭 65 : 잭상부지지판        64: jack 65: jack upper support plate
66 : 인장케이블가이드판 67 : 스프링와샤너트        66: tension cable guide plate 67: spring and nut
70 : 하중분산쐐기받침판 71 : 보강철판        70: load distribution wedge support plate 71: reinforcing steel plate
72 : 하중분산받침목        72: load distribution support
본 발명은 지하구조물을 설치하기 위하여 굴착공사를 할때 토사가 붕괴되는 것을 방지하기 위하여 설치되는 흙막이 구조의 수직벽과 띠장지지에 활용하여 토압이나 수압에 의하여 발생되는 변위와 하중을 설계관리치의 변위와 하중과의 관계를 연동하여 변위량과 하중을 직접복귀 및 상쇄시키면서 토압이나 수압을 지지하도록 하거나 또는 철근콘크리트 타설과 철근조립을 위해 설치되는 거푸집의 하부에 설치지지되어 콘크리트를 타설 및 철근조립 중량으로 발생되는 변위량과 하중을 설계관리치의 캠버량과 하중관계에 연동되어 직접변위량과 하중을 회복 및 상쇄하면서 콘크리트 구조물을 지지하도록 하기 위한 흙막이구조 및 구조물지지동바리용 싱크로나이즈지지시스템에 관한 것이다.        The present invention utilizes the displacement and load generated by earth pressure or water pressure by using the vertical wall and the band support of the earthquake structure which is installed to prevent the earth and sand from collapsing during the excavation work to install the underground structure. In order to support the earth pressure or hydraulic pressure by directly restoring and canceling the displacement and load by linking the relationship between and the load, or to be installed under the formwork installed for reinforcement concrete casting and reinforcing steel reinforcement, The present invention relates to an earth retaining structure and a synchronizer support system for supporting structural structures, in which a displacement and load generated are linked to a camber amount and a load relationship of a design management value while supporting and restoring a direct displacement amount and load.
일반적으로 흙막이구조는 토사굴착면에 연하여 일정한 간격으로 수직파일을 설치하고 토사를 수직으로 굴착하면서 발생되는 토압이나 변위를 지지하기 위하여 상기 수직파일 내측에 일정한 간격을 두고 횡으로 띠장과 직각버팀대를 설치하는데 있어, 그 직각버팀대 대신에 경사(레이커)버팀대를 설치하는 경우에 상기 수직파일의 상부에 설치된 띠장에 레이커거더의 상부와 접하게 설치하면서 일정한 각도를 유지하도록 경사지게 설치하고, 상기 레이커거더의 하부는 터파기선의 굴착면에 기초를 설치한 후에 그 위에 설치하여 수직파일을 직접지지하도록 한다.       In general, the earth block structure is connected to the earth excavation surface to install vertical piles at regular intervals, and to support the earth pressure or displacement generated by excavating the soil vertically, and to support the earth pressure or displacement at a predetermined interval inside the vertical piles and the girdle and the right angle brace In the installation, in the case of installing the inclined (raker) brace instead of the right angle brace, it is installed inclined so as to maintain a constant angle in contact with the upper portion of the raker girder in a band installed on the upper portion of the vertical pile, and the lower portion of the raker girder After the foundation is installed on the excavation surface of the trench, it is installed on it so as to directly support the vertical pile.
상기 설명은 레이커거더를 흙막이 수직파일을 지지하기 위하여 설치되는 기존의 방법을 설명하는 것으로 기존의 레이커거더를 이용한 흙막이 수직파일지지는 1단만 지지할 수 있어, 레이커버팀대거더시스템의 공기단축, 작업공간최대확보 및 공사비대폭절감등의 대단히 높은 효과적인 측면에 비해 그 적용성에는 한계가 있었다.       The above description describes the existing method of installing the raker girder to support the vertical pile of the soil barrier. The vertical pile support of the soil barrier using the existing raker girder can support only one stage. The applicability was limited compared to the very high effective aspects such as maximum security and reduction of construction cost.
이를 극복하기 위하여 상기 시스템을 개발하였다. 상기 시스템은 거더상에 단계별 굴착에 따라 설치되는 수직벽의 횡 띠장 위치와 직각 방향과 일치되는 위치에 거더와 수직재를 용접 또는 볼트연결 설치하고 그 수직재의 끝단부에 하중변위연동 및 고정장치를 설치하고, 그 장치에 접하여 인장케이블을 설치하고, 그 인장케이블은 레이커거더의 양단부에 설치되는 고정장치에 정착한다.       The system was developed to overcome this. The system welds or bolts the girder and the vertical material at a position coinciding with the vertical direction of the transverse band of the vertical wall installed according to the stepwise excavation on the girder, and installs the load displacement linkage and fixing device at the end of the vertical material. The tensioning cable is installed in contact with the device, and the tensioning cable is fixed to fixing devices provided at both ends of the raker girder.
상기 수직재는 토압과 변위의 크기에 따라 그 길이를 변화하는데 그에 연하여 설치되는 인장케이블의 형상은 모멘트 분포도와 유사하게 되는 것을 특징으로 하는 싱크로나이즈 레이커거더 시스템이다.       The vertical member changes its length according to the earth pressure and the magnitude of the displacement, and the shape of the tension cable installed in connection with the vertical member is similar to that of the moment distribution diagram.
흙막이 수직파일을 중심으로 아이슬랜드 공법으로 절취한 후 1단계굴착 한 뒤에 설치한 1단 횡띠장과 상기 중앙부를 절취한 최종 굴착면에 설치되는 기초상에 상기 싱크로나이즈레이커거더지지시스템을 설치지지고정한 다음, 2단계 굴착하여 설치된 2단띠장과 상기 시스템의 1단의 수직재 위치와 일치하여 스크류잭이 부착된 하중전달버팀대를 직접 설치고정한 다음, 상기 1단의 수직재 끝단부에 설치된 하중변위 연동 및 고정장치에 유압잭을 삽입하고, 그 스트로크를 작용하중의 변위 및 하중크기에 따라 설계관리치 및 상기 거더 및 수직재에 부착된 변위계와 하중계의 계측결과를 비교하면서 연동시켜 직접복귀 및 상쇄하도록 하고, 그 스트로크를 연동시킬 때 그에 접하여 설치된 인장케이블은 잭의 반력대 역할을 하면서 인장력이 작용하도록 설치 및 지지하는 싱크로나이즈레이커거더지지시스템이다.       After the first step is excavated after cutting by Icelandic method around the vertical pile of earthen board, the synchronizer raker girder support system is installed and fixed on the foundation installed on the final excavation surface after cutting the central part. In accordance with the two-stage excavation installed in the two-stage excavation and the position of the vertical material of the first stage of the system, directly install and fix the load-carrying brace with the screw jack, and then to the load displacement interlocking and fixing device installed at the end of the vertical Insert the hydraulic jack and interlock the strokes by directly comparing the design management values and the measurement results of the displacement gauges attached to the girders and vertical members with the load gauges according to the displacements and load sizes of the working loads. The tension cable installed adjacent to it acts as a reaction zone for the jack, And a supporting synchronized raker girder support system.
이를 흙막이레이커거더 3단, 4단등으로 여러차례를 굴착하면서 상기 시스템을 반복적으로 설치 및 연동시켜 흙막이벽을 지지하도록 한다.        This excavation several times in the three-stage, four-stage, etc. of the earthquake raker girder to repeatedly install and interlock the system to support the earth walls.
흙막이벽으로 사용하는 경우로서 다른 실시예는 토사굴착면에 연하여 일정한 간격으로 수직파일을 설치하고 토사를 수직으로 굴착하면서 상기 수직파일 내측에 일정한 간격을 두고 횡으로 띠장거더를 설치한 후에 상기 띠장거더의 상당히 폭을 크게한 양단부에는 스크류잭이 부착된 수평버팀대를 설치하여 싱크로나이즈띠장거더지지시스템을 고정하도록 한 후에 상기 띠장거더시스템의 양측단부에 고정장치를 설치하고, 일정한 간격을 두고 수직재를 상기 띠장거더에 용접 또는 볼트연결 설치하되 상기 수직재의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재의 길이를 점차 작게한 수직재를 설치하면서 상기 수직재의 끝단부에 하중변위연동 및 고정장치를 설치한 후에 상기 띠장거더의 양측에 설치된 고정장치에 인장케이블을 정착하면서 상기 인장케이블이 상기 수직재의 하부에 설치된 하중변위연동 및 고정장치에 접하게 설치하여 포물선형의 인장케이블이 설치되도록 하여 외부토압 및 변위크기에따라 하중변위연동 및 고정장치에 유압잭을 삽입하고, 그 잭의 스트로크를 설계관리치 및 실제현장계측치와의 피드백에 따라 연동시켜 흙막이벽의 토압이나 수압을 직접 상쇄 및 회복하도록 하여 수평버팀대를 대폭삭제하는 싱크로나이즈띠장거더지지시스템이다.       Another embodiment is to use the earthen wall as a vertical pile at regular intervals in connection with the earth excavation surface and excavation of the soil vertically while installing the girders horizontally at regular intervals inside the vertical piles At both ends of the girders, the horizontal braces with screw jacks are installed to secure the synchronized belt girders supporting system at both ends of the girders. After installing the welding or bolted connection to the belt girders, while the length of the vertical member is set to the center portion, while the vertical member is gradually reduced to the length of the vertical member installed on both sides, the load displacement interlocking and fixing device is installed at the end of the vertical member. While fixing the tension cable to the fixing device installed on both sides of the strip girders The tension cable is installed in contact with the load displacement interlocking and fixing device installed in the lower part of the vertical member so that the parabolic tension cable is installed, and the hydraulic jack is inserted into the load displacement linking and fixing device according to the external earth pressure and displacement size. It is a synchronizer girder support system that eliminates horizontal braces by directly canceling and restoring earth pressure or water pressure of the retaining wall by interlocking the stroke according to the feedback from the design management value and the actual field measurement value.
또 다른 적용 실시예로서 콘크리트구조물을 설치하기 위한 거푸집의 하부에 설치되어 콘크리트를 타설 및 철근중량으로 발생되는 변위량과 하중을 설계관리치의 캠버량과 하중관계에 연동되어 변위량과 하중을 직접회복 상쇄하면서 콘크리트 구조물을 지지하도록 설치한 구조물지지동바리인 것으로서, 교량의 경우를 예로들어 설명하면, 교각사이의 지반 상에 기초를 설치하고, 그 위에 가설벤트를 설치하고, 상기 가설벤트위에 종거더를 설치한 후에 상기 종거더 위에 일정한 간격을 두 고 횡으로 횡빔을 설치한 후에 그 위에 구체콘크리트슬래브를 형성하기 위한 거푸집을 설치하고,       As another application example, the displacement amount and load generated by placing concrete under the formwork for placing concrete structures and reinforcing steel are directly linked to the camber amount and load relationship of the design management value and directly offset the displacement amount and load. As a structural support bar installed to support a concrete structure, the bridge case is described as an example. A foundation is installed on the ground between the bridges, a temporary vent is installed thereon, and a vertical girder is installed on the temporary vent. Later, after placing the horizontal beam horizontally on the vertical girders at regular intervals, formwork for forming concrete concrete slab thereon,
상기 종거더의 하부에 일정한 간격을 두고 수직재를 용접 또는 볼트연결 설치하되, 상기 수직재의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재의 길이를 점차 작게한 수직재를 설치하고, 상기 수직재의 하부에 하중변위연동 및 고정장치를 설치하도록 한 후에 상기 종거더의 양측에 설치된 고정장치에 인장케이블을 정착하면서 상기 인장케이블이 상기 수직재의 하부에 설치된 하중변위연동 및 고정장치에 접하게 설치하여 포물선형의 인장케이블이 설치되도록 한 후에 상기 레이커거더시스템이나 띠장시스템과 동일한 매카니즘으로 작용하중과 변위를 직접 상쇄 및 회복시키면서 콘크리트를 타설하여 구조물을 설치하도록 하기 위한 싱크로나이즈동바리지지시스템이다.       The vertical member is installed at the lower part of the vertical girder at regular intervals by welding or bolted connection, while the length of the vertical member is extended to the center portion, and the vertical member is gradually installed to reduce the length of the vertical member installed on both sides. After the load displacement interlocking and fixing device is installed, the tension cable is fixed to the fixing devices installed on both sides of the longitudinal girder, and the tension cable is installed to be in contact with the load displacement interlocking and fixing device installed at the lower part of the vertical member to make parabolic tension. After the cable is installed, it is a synchronized moving bridge system to install the structure by pouring concrete while directly canceling and recovering the working load and displacement by the same mechanism as the raker girder system or the strip system.
상기와 같이 싱크로나이즈지지시스템의 레이커거더, 띠장거더 및 동바리 종거더에 직각으로 용접 또는 볼트연결 설치된 수직재의 끝단부에 부착된 하중변위연동 및 고정장치에 유압잭을 삽입하고, 그 장치 끝에 연하여 설치된 인장케이블을 반력대로 이용하여 설계에서 요구되는 변위량과 응력을 도입한 상태의 지지시스템을 설계위치에 설치하면, 이들의 상기 거더상에는 외부하중에 의해 변위와 응력이 작용되고, 이는 상기 제작시에 도입된 설계관리치의 변위와 응력에 의해 직접상쇄하는 매카니즘을 갖도록 하는 것이며, 또한 상기 거더상에는 변위계와 하중계를 설치하여 실제발생변위와 하중의 계측값을 컴퓨터에 연결시켜 설계관리치와 피드백하여 허용치를 벗어날 염려가 있을 경우는 회로적으로 서로 상호연결된 유압실린더를 작동하여 유압잭의 스트로크를 연동시켜 설계관리치내로 조절하도록 직접변위량을 회복하거나 하중을 상쇄하도록 하여 토압등의 외부하중을 지지하도록 하는 흙막이벽의 레이커 거더나 띠장거더 또는 구체콘크리트구조물을 지지하는 동바리에 사용하는 싱크로나이즈지지시스템인 것이다.       Insert the hydraulic jack into the load displacement linkage and fixing device attached to the end of the vertical material installed or welded or bolted at right angles to the raker girder, band girders and the vertical girder of the synchronized support system as described above. When the support system is installed at the design position using the cable as a reaction force and the displacement and stress required in the design are introduced, the displacement and the stress are applied on the girder by the external load, which is introduced at the time of manufacture. It is to have a mechanism that cancels directly by the displacement and stress of the design management value.In addition, a displacement gauge and a load gauge are installed on the girder to connect the measured value of the actual displacement and load to a computer and feed back with the design management value so that it may deviate from the allowable value. If there are, operate hydraulic cylinders that are interconnected with each other. It is used for the raker girder, bandage girder or concrete concrete structure supporting the concrete wall structure to support the external load such as earth pressure by recovering the direct displacement or offsetting the load to interlock the stroke of the jack and adjust it into the design management value. It is a synchronized support system.
본 발명의 목적은 싱크로나이즈지지시스템의 레이커거더, 띠장거더 및 동바리 종거더에 직각으로 용접 또는 볼트연결 설치된 수직재의 끝단부에 부착된 하중변위연동 및 고정장치에 유압잭을 삽입하고, 그 장치 끝에 연하여 설치된 인장케이블을 반력대로 이용하여, 설계에서 요구되는 변위량과 하중을 미리 도입하고, 케이블에는 기존의 압축프리스트레스힘이 도입되는 방법 대신에 인장력이 도입된 시스템을 설계위치에 설치하면, 이 상기 거더상에는 외부하중이 작용하게되며 외부하중에 의한 변위와 하중은 기제작시에 설계에서 요구되어 도입한 캠버와 하중에 의해 직접 회복 및 상쇄하는 매카니즘을 갖는 것이며, 또한 상기 거더상에는 변위계와 하중계의 센서를 부착하여 컴퓨터에 연결시켜 실제계측값과 설계관리치를 피드백하여 허용치를 벗어나거나 또는 벗어날 염려가 있을 경우는 회로적으로 서로 상호 연결된 유압실린더를 작동하여 유압잭의 스트로크를 연동시켜 설계관리치내로 조절하도록 변위량을 직접회복하거나 하중을 직접 상쇄하도록하여 토압등의 외부하중을 지지하도록 하는 흙막이벽의 레이커거더나 띠장거더 또는 구체구조물을 지지하는 동바리 공법에 적용하는 싱크로나이즈지지시스템을 설치하는 방법을 제공하기 위함이다.       An object of the present invention is to insert a hydraulic jack into the load displacement interlocking and fixing device attached to the end of the vertical material installed or welded or bolted at right angles to the raker girder, the band girder and the grouping girder of the synchronized support system, Using the tension cable installed as a reaction force, the displacement and load required in the design are introduced in advance, and a system in which the tension force is applied to the cable in place of the existing compression prestress force is installed at the design position. The external load acts and the displacement and load caused by the external load have a mechanism that directly recovers and cancels by the camber and loads that are required and introduced in the design at the time of manufacture, and the sensor of the displacement gauge and the load gauge is attached to the girder. To the computer and feed back actual measurements and design management If there is a risk of deviating or escaping, the hydraulic cylinders that are interconnected to each other are operated by circuit to interlock the strokes of the hydraulic jack to directly recover the displacement or adjust the load directly to the design control value to support external loads such as earth pressure. It is to provide a method of installing a synchronizer support system applied to a raker girder, a belt girder, or a grouping method for supporting a concrete structure.
종래기술로는 도1과 같이 토사를 수직으로 굴착한 수직벽에 작용하는 토압을 경사지게 설치된 레이커스트러트(11)를 1단으로 설치하여 토압을 지지하도록 한 것으로서, 구조 안전상 1단의 띠장(13)에만 설치하여 지지할 수 밖에 없어 굴착깊이가 극히 제한적이며, 그 적용 굴착 깊이가 깊거나 또는 변위가 크게 발생할 경우 상기 레이커스트러트(11)외에도 추가로 수평버팀대와 중간 파일을 더 설치하여야 하므로 공기증가의 문제와 이로인하여 추가적으로 강재를 설치하여야 하므로 공사비의 증가 및 보조강재를 사용하므로서 여유공간이 협소해지게되어 장비 작업공간의 제약등의 문제점이 상존하고 있다.        In the prior art, as shown in Fig. 1 to support the earth pressure by installing a raker strut 11 inclined to the earth pressure acting on the vertical wall excavated soil vertically in one stage, the first stage belt 13 for structural safety Excavation depth is extremely limited because it can only be installed and supported. If the excavation depth is deep or the displacement is large, the horizontal brace and the intermediate pile must be installed in addition to the raker strut 11 so that the air can be increased. Due to the problems and the need to install additional steel materials, the increase in construction cost and the use of auxiliary steel has become a narrow space, there is a problem such as constraints of the equipment work space.
종래의 굴착공사용 흙막이벽 공사에 보편적으로 많이 사용되는 기술은 도 2와 같이 수직파일(15)의 설치와 이를 지지하기 위하여 횡으로 일정한 간격으로 설치되는 띠장(13)과, 상기 띠장(13)에 2 ~ 4m 간격으로 수평으로 설치되는 버팀대(20)와 이들 버팀대(20)를 지지하도록 중간 파일(19)을 설치하고 가설구조계 안전을 확보하기 위하여 브레이싱(18)을 설치하고, 상기 띠장(13)과 버팀대(20) 사이에 스크류잭(12)을 설치하여 토압을 지지하도록 하는 흙막이벽(10)을 설치한 것이다.       Conventionally used in conventional excavating earth wall construction technology is the installation of the vertical pile 15 as shown in Figure 2 and the belt strip 13 is installed at regular intervals laterally to support it, and the strip sheet 13 Install the intermediate pile 19 so as to support the brace 20 horizontally installed at 2 to 4m intervals and these braces 20, and install the bracing 18 to ensure the safety of the temporary structural system, the belt length 13 And a jack jack 12 is installed between the brace 20 to install the earth wall 10 to support the earth pressure.
상기의 방법으로 설치되는 흙막이벽(10)은 상기 도1에서 언급한바와 같은 문제점인 조밀한 강재배치로 인한 경제성 저하와 장비작업공간의 협소로 인한 공기증가와 토압의 작용에 의한 띠장(13)에 발생되는 변위를 제어할 수 없어 토류벽 주변의 배면 침하등에 의한 민원야기와 흙막이벽(10)의 수직벽이 상호 마주보고있지 않으면 적용이 곤란한 문제가 있다.       The barrier wall 10 installed by the above method has a bandage 13 due to the action of increasing air pressure and earth pressure due to the economical deterioration due to the dense steel arrangement, which is the problem mentioned in FIG. It is difficult to control the displacement generated in the case that the civil petition due to the subsidence of the earth wall and the vertical wall of the retaining wall 10 do not face each other.
상기와 같은 문제점을 다소 해소하기 위하여 도3과 같이 버팀대(20)와 버팀대(20)의 간격을 다소확장하도록 하는 경우에는 상기 도 2와 같이 띠장(13)과 버팀 대(20)를 설치하되 버팀대(20)와 버팀대(20) 사이의 띠장(13)에 별도의 보강띠장(23)을 붙이고, 상기 보강띠장(23)의 양단부에 한쌍으로 설치된 정착장치(21)에 PS강선(22)을 배치한 다음 상기 PS 강선(22)을 긴장 정착하므로서 압축의 프리스트레스힘이 작용하도록 하여 이로인하여 발생되는 편심모멘트로 외력의 모멘트를 상쇄하는 방법이다.        In order to somewhat expand the gap between the brace 20 and the brace 20 as shown in Figure 3 in order to solve the problem as described above, as shown in Figure 2 the band 13 and the brace 20, but the brace Attaching a separate reinforcing band length 23 to the band length 13 between the 20 and the brace 20, and the PS steel wire 22 is disposed in the fixing device 21 installed in pairs at both ends of the reinforcing band length 23. Then, the PS steel wire 22 is tensioned and fixed, so that the prestressing force of the compression acts to offset the moment of external force by the eccentric moment generated thereby.
상기 PS강선(22) 정착위치에서 급격한 모멘트 반전이 이루어져 상기 위치에는 응력집중의 원인이 있고 그 편심모멘트로 인하여 띠장(13)에 발생되는 균등응력 직선분포가 외력에 의하여 발생되는 모멘트의 포물선형 상태와 불일치 함에 따라 띠장(13)에 발생되는 응력상태를 적절히 못하고 변위를 복귀시키지 못하며, 또한 굴착공사의 특징인 각 굴착단계별로 굴착하면서 발생되는 응력과 변위가 단계별로 변화하는데 반해 고정된 편심모멘트에 의해 적절하게 대응하지 못하여 적용성의 한계가 있을뿐만아니라 상기 수직벽의 변위를 적절하게 제어를 할 수 없어 수직벽의 주변배면에 토사의 침하 문제등이 야기되는 문제점이 있다.        The moment of reversal of moment in the PS steel wire 22 anchoring position causes a stress concentration in the position, and the uniform stress linear distribution generated in the strip 13 due to the eccentric moment causes the parabolic state of the moment generated by the external force. Due to the mismatch between the stress state and the displacement generated during the excavation at each excavation stage, which is characteristic of the excavation work, the stress state generated in the strip 13 is not appropriately restored and the displacement is changed step by step. There is a problem in that it does not properly correspond to the limit of the applicability, and the displacement of the vertical wall can not be properly controlled, causing settlement problems of earth and sand on the peripheral surface of the vertical wall.
상기 도3의 방법을 개선한 것이 도4의 기술로서 띠장(13)에 설치된 버팀대(20)의 간격을 보다 넓히기 위하여 보강띠장(23)에 편심이 크게 발생되도록 보강 띠장(23)에 일정한 간격을 두고 간격재(24)를 설치하고, 상기 보강띠장(23)의 양단부에 설치된 정착장치(21)에 PS 강선(22)을 정착하면서 간격재(24)의 하단에 PS 강선(22)이 접하도록 설치한 후에 상기 PS 강선(22)의 양단에서 인장력을 가한 후에 정착장치(21)에 긴장정착하여 PS 강선(22)에 압축력이 도입되고, 그 압축력이 편심모멘트를 발생하도록 하여 외력에 의해 발생하는 모멘트와 상쇄하는 방법으로 서,        The improvement of the method of FIG. 3 is to improve the method of FIG. 4 to increase the spacing of the brace 20 installed in the belt 13, so that the eccentricity is generated in the reinforcing belt 23 so that a large distance is generated. The spacer 24 is installed, and the PS steel wire 22 is in contact with the lower end of the spacer 24 while fixing the PS steel wire 22 to the fixing device 21 installed at both ends of the reinforcing strip length 23. After installation, the tensile force is applied to both ends of the PS steel wire 22, and then it is tension-fixed to the fixing device 21, and a compressive force is introduced into the PS steel wire 22, and the compressive force is generated by an external force by generating an eccentric moment. As a way to offset the moment,
상기 방법의 경우 장경간의 띠장(13) 설치시 외력 모멘트가 상당히 증가하므로 이를 상쇄하기 위해서는 편심모멘트를 크게 발생하여야 함에 따라 상기 보강띠장(23)에 도입되는 프리스트레스힘도 또한 크게하여야 하고, PS강선(22)량 또한 과다하게 사용하여야 하고, 이에따라 사용되는 정착장치(21) 또한 과대하게 소요되며, 별도의 보강띠장(23)을 중첩배치하여야 하므로서 과도하게 사용하는 강재양과 과도한 인장력이 요구되므로 비경제적인 요소와 설치되는 장치의 과대한 중량으로 인하여 현장설치 작업의 효율성 저하와 상기 장치를 제작설치하여 고정됨에따라 프리스트레스의 조절이 안되므로 굴착공사의 특징인 단계별 터파기 및 되메우기에 의하여 발생되는 하중변화에 적절히 대응할 수 없어 그 적용성에 한계가 있으며, 기발생된 수직벽의 변위를 복귀시키지 못하므로 수직벽의 배면 침하를 제어할 수 없는등으로 인하여 민원의 소지가 있는 문제점이 있고, 과도한 편심모멘트 발생을 위해 간격재 길이가 커져 상대적으로 굴착공사 범위가 커져야 하는 문제점이 있다.        In the case of the method, since the external force moment increases considerably when installing the strip length 13 between the long spans, the eccentric moment must be generated largely to offset the prestress force introduced into the reinforcing strip length 23, and the PS steel wire ( 22) The amount is also excessively used, and the fixing device 21 used accordingly is excessively required, and the additional reinforcing band length 23 is required to be superimposed so that an excessive amount of steel and excessive tensile force are required, which is an uneconomical factor. Due to the excessive weight of the installed device, the efficiency of the field installation work is reduced and the prestress cannot be adjusted as the device is manufactured and installed. Therefore, it is appropriate to cope with the load change caused by the stepping and backfilling, which is the characteristic of the excavation work. There is a limit to its applicability, and the displacement of the generated vertical wall There is a problem of civil complaints due to the inability to control the back settlement of the vertical wall, there is a problem in that the excavation work should be relatively large because the length of the spacer is increased to generate excessive eccentric moment.
또한 기존의 슬래브 콘크리트 타설시 슬래브의 하중을 지지할 수 있도록 하는 구조물지지동바리는 도5와 도6에서 설명하는바와 같이 구체슬래브콘크리트(31)의 하부 전체를 강관 지주(33)로 지지하는 구조물전체지지동바리 방식(30)과 가설벤트(39)를 설치하고, 그 위에 종거더(35)와 횡빔(36)을 설치하여 지지하도록 하는 가설벤트(39)에 의한 구조물지지동바리(30) 방식이 있는데, 상기 두가지 모두 지지하도록 하는 강재의 사용량이 많아지며 지지하고자 하는 하부공간에 강관지주(33) 및 가설벤트(39)가 설치되므로 하부공간을 활용할 수 없어 교량건설시 교통우회도 로를 별도로 만들거나 일시적으로 도로를 폐쇄함에 따른 공사비의 추가소요와 민원야기등의 문제점이 있으며, 하천교량의 경우 하천통수단면을 축소하게되므로 원활하게 하천수가 통수될 수 없는 수리학적인 문제가 발생될 수 있으므로 우기시에는 공사를 중지하여야 하는 문제점들이 상존하여 왔다.        In addition, the structure supporting movement bar for supporting the load of the slab in the existing slab concrete casting, as described in Figures 5 and 6, the entire structure for supporting the entire lower part of the concrete slab concrete 31 with the steel pipe support (33) There is a support structure of the structure 30 by means of a temporary vent (39) to install and support the support shaft method (30) and the temporary vent (39), the vertical girders (35) and side beams (36) installed thereon. The amount of steel used to support both of them is increased, and the steel pipe holder 33 and the temporary vent 39 are installed in the lower space to support, so it is not possible to utilize the lower space. There are problems such as additional cost of construction and civil complaints due to the temporary closure of roads, and in the case of river bridges, the surface of the river can be reduced so that the river can flow smoothly. Since no hydraulic problems can occur, there have been problems that have to be suspended during the rainy season.
본 발명은 상기와 같은 문제점을 개선하기 위하여 제안된 것으로서, 흙막이벽 및 구조물지지동바리에 적용된 레이커거더, 띠장거더 또는 종거더에 외부하중 즉 토압, 수압, 타설중량에 의하여 내부하중과 변위가 발생되면, 상기 띠장거더, 레이커거더 및 종거더에 직각으로 용접 또는 볼트연결 설치된 수직재의 종단부에 부착된 하중변위연동 및 고정장치에 유압잭을 삽입하고, 그 장치길이에 접하여 설치된 인장케이블을 반력대로 이용하여 설계에서 요구되는 변위량과 하중을 잭의 스트로크 연동에 의하여 도입되고, 케이블에는 인장력이 도입된 싱크로나이즈지지시스템을 설치위치에 부착하면, 상기 외부하중에 의한 변위를 회복시킴과 동시에 하중을 상쇄하는 매카니즘을 갖는 것이며, 또한, 상기 종거더상에는 변위계와 하중계의 센서를 부착하여 실측계측값을 컴퓨터에 연결시켜 설계관리치를 피드백하여 허용한계를 벗어나거나 또는 벗어난 경우가 있을 경우 회로적으로 상호 연결된 유압잭을 작동시켜 유압잭의 스트로크를 연동시켜 설계관리치내로 변위 및 하중을 관리하도록 하여 상기 띠장거더 및 종거더에 작용하는 변위 및 하중을 상쇄시키면서 다시 원상태로 복귀시키도록 변위회복량만큼 상향으로 작용하도록 하여 토압을 지지하도록 하거나 또는 구체콘크리트구조물을 지지하도록 하는 시스템을 설치하는 방법에 관한 것으로서,        The present invention has been proposed to improve the above problems, when the internal load and displacement is generated by the external load, that is, earth pressure, water pressure, pour weight on the raker girder, strip girders or longitudinal girders applied to the earth wall and the structure support bar The hydraulic jack is inserted into the load displacement interlocking and fixing device attached to the end of the vertical member installed or welded or bolted at right angles to the band girder, the raker girder and the vertical girder, and the tension cable installed in contact with the device length is used as a reaction force. When the displacement and load required in the design are introduced by the jack's stroke linkage, and the cable is equipped with a synchronized support system in which tension is introduced at the installation position, a mechanism for canceling the load and recovering the displacement due to the external load is provided. In addition, on the vertical girder, a displacement gauge and a load gauge sensor are attached. By connecting the actual measurement value to the computer and feeding back the design management value, when there is a deviation or deviation from the allowable limit, the hydraulic jacks are connected to each other to operate the hydraulic jack's stroke to interlock the stroke of the hydraulic jack to manage the displacement and load within the design management value. And a system for supporting earth pressure or supporting concrete concrete structures by acting upward by the amount of displacement recovery to cancel the displacement and load acting on the strip girders and longitudinal girders. As,
상기의 시스템을 이용하여 공사를 시공하면 다단계의 굴착단계를 실행 할 수 있도록 적용깊이를 대폭 증가할 수 있고, 버팀대수를 대폭절감하여 아이슬랜드공법을 적용할 수 있으며, 장비 공간 활용을 극대화하여 공기단축과 자재절감을 통한 공사비의 절감으로 인한 경제성 제고와 띠장과 버팀대로 지지하던 종래의 방식을 보다 효율적으로 적용할 수 있도록 하므로서 강재사용을 최소화하여 경제성을 높이고, 작업 공간을 확보하여 공기를 단축할 수 있도록 하고, 단계별 굴착이나 되메우기에 따른 하중 변화에 피드백하고 콘트롤하면서 하중변화에 따른 변위에 적절하게 대응 할 수 있도록 하는 하중변위연동 및 고정장치의 스트로크를 자동연동도입하여 공사의 성역화를 도모하여 공사의 안정성을 높일 수 있으며, 기 발생된 변위도 부분적으로 복귀시켜 주변배면 침하를 억제 및 회복할 수 있도록 유도하여 도심공사에서 발생할 수 있는 민원야기등을 사전에 차단할 수 있는 경제적이면서 안전성과 효율성을 증가시켰으며, 종래의 방법을 보다 효율적으로 적용할 수 있는 매우 적용성이 넓은 시스템의 시공방법을 제공하는데 있다.       By constructing the construction using the above system, the application depth can be greatly increased to execute the multi-stage excavation stage, and the Icelandic method can be applied by greatly reducing the number of braces, and the equipment space is maximized to shorten the air. It can improve the economic efficiency by reducing construction cost by reducing the cost of materials and materials, and can apply the conventional method supported by the belt and brace more efficiently, thereby minimizing the use of steel materials, increasing the economic efficiency, and reducing the air by securing the working space. It is designed to feed the displacement of the load displacement linkage and the fixing device to feed back and control the load change due to the excavation or backfilling step by step, and to automatically adjust the stroke of the construction. Stability can be increased, and the previously generated displacement is partially restored. In order to prevent and recover the settlement of the surrounding rear surface, it is economical, safety and efficiency that can block civil complaints that may occur in urban construction in advance, and it is very effective to apply conventional methods more efficiently. It is to provide a construction method of a wide range of applicability.
본 발명은 흙막이벽으로 사용할 경우, 토사굴착면에 연하여 일정한 간격으로 수직파일(15)을 설치하고 토사를 수직으로 굴착하면서 발생되는 토압이나 변위를 지지하기 위하여 상기 수직파일(15) 내측에 일정한 간격을 두고 횡으로 띠장(13)과 수평버팀대를 설치하는데 있어, 그 수평버팀대 대신 레이커(경사)버팀 대(45)로 설치하는 경우에는 상기 수직파일(15)의 상부에 설치된 띠장(13)에 레이커거더(45)의 상부와 접하게 설치하면서 일정한 각도를 유지하도록 경사지게 설치하고, 상기 레이커거더(45)의 하부는 최종터파기선(16)의 굴착면에 기초(17)를 설치한 후에, 그 위에 설치하도록 하고,       According to the present invention, when used as an earth wall, the vertical pile 15 is installed at regular intervals in connection with the earth excavation surface, and the vertical pile 15 is fixed inside the vertical pile 15 to support the earth pressure or displacement generated while excavating the soil vertically. In installing the band 13 and the horizontal brace horizontally at intervals, in the case of installing the raker (tilt) brace 45 instead of the horizontal brace to the band 13 installed on the upper portion of the vertical pile 15 It is installed to be inclined to maintain a constant angle while being installed in contact with the upper portion of the raker girder 45, the lower portion of the raker girder 45 after the foundation 17 is installed on the excavation surface of the final breaker line 16, thereon Install it,
상기 레이커거더(45)상에는 단계별 굴착에 따라 설치되는 수직벽(15)의 횡띠장(13) 위치와 직각방향과 일치되는 위치에 수직재(44)를 용접 또는 볼트연결 설치하고, 수직재(44)의 끝단부에 하중변위연동 및 고정장치(60)를 설치하고, 그 장치(60)에 접하여 인장케이블(43)을 설치하고, 그 인장케이블(43)은 레이커거더(45)의 양단부의 고정장치(42)에 정착한다.       On the raker girder 45, the vertical member 44 is welded or bolted and installed at a position coincident with the horizontal direction 13 of the vertical wall 15 of the vertical wall 15 which is installed according to the stepwise excavation, and the vertical member 44 Load displacement interlocking and fixing device 60 is provided at the end, and the tension cable 43 is installed in contact with the device 60, and the tension cable 43 is fixed to both ends of the raker girder 45 ( 42) to settle.
상기 수직재(44)는 토압과 변위의 크기에 따라 그 길이를 변화하는데, 그에 접하여 설치되는 인장케이블(43)의 형상은 모멘트분포도와 유사하게 되어 외력모멘트에 비례하게되므로 소수부재의 사용과 변위스트로크 조절량이 적게되므로 보다 경제적이면서 안전적이고, 효율적인 구조계를 갖는 것을 특징으로 하는 싱크로나이즈지지시스템(40)이다.       The vertical member 44 changes its length according to the earth pressure and the magnitude of the displacement, and the shape of the tension cable 43 which is installed in contact with the vertical member is similar to the moment distribution and is proportional to the external force. The synchronization support system 40 is characterized by having a structure that is more economical, safer and more efficient because of less adjustment.
흙막이 수직파일(15)을 중심으로 아이슬랜드 공법으로 중앙부를 절취한 후 1단계 굴착한뒤 설치한 1단 횡띠장(13)과 상기 중앙부절취된 최종굴착면(16)에 설치된 기초(17)에 상기 싱크로나이즈지지시스템(40)을 설치고정한 다음, 2단계 굴착(59)하여 설치된 2단띠장(13)과 용접 또는 볼트연결된 상기 시스템(40)의 1단수직재(44)위치와 일치하여 스크류잭(12)이 부착된 하중전달버팀대(40)를 직각으로 설치고정한 다음, 상기 1단의 수직재(44) 끝단부에 설치된 하중변위 연동 및 고정장치(60)에 유압잭(64)을 삽입하고, 그 스트로크를 상기 변위 및 하중을 설계관리치와 상기 거더(45) 및 수직재(44)에 부착된 변위계(54)와 하중계(53)의 계측결과를 비교하면서 연동시켜 직접 변위와 하중이 복귀 및 상쇄하도록 하고, 그 스트로크를 연동시킬 때 그에 접하여 설치된 인장케이블(43)은 잭(64)의 반력대 역할을 하면서 인장력이 작용하도록 설치 및 지지하는 싱크로나이즈레이커거더지지시스템이다.       After cutting the central part by the Icelandic method around the vertical pile 15, the first stage transverse length 13 and the foundation 17 installed on the central excavated final excavation surface 16 were installed after the first step excavation. After the installation and fixing of the synchronizer support system 40, the screw jack 12 in accordance with the position of the first stage 44 of the system 40 welded or bolted to the second stage 13 installed by the second stage excavation (59) ) Is fixed to the load transmission brace 40 is attached to the right angle, and then the hydraulic jack 64 is inserted into the load displacement linkage and fixing device 60 installed at the end of the vertical member 44 of the first stage, and the stroke The displacement and load are interlocked with each other by comparing design management values with measurement results of the displacement gauge 54 and the load gauge 53 attached to the girder 45 and the vertical member 44, so that the displacement and load are directly returned and canceled. Tension cable installed in contact with the stroke when interlocking The block 43 is a synchronizer raker girder support system that installs and supports a tension force while acting as a reaction zone of the jack 64.
상기 굴착이 3, 4단계등으로 시행하면서 상기 시스템을 반복적으로 설치 및 연동시켜 흙막이벽을 지지하도록 한다.        The excavation is carried out in three or four stages, such that the system is repeatedly installed and interlocked to support the retaining wall.
또 다른 흙막이벽의 실시예는, 토사굴착면에 연하여 일정한 간격으로 수직파일(15)을 설치하고 토사를 수직으로 굴착하면서 상기 수직파일(15) 내측에 일정한 간격을 두고 횡으로 띠장거더(46)를 설치한 후에 상기 띠장거더(46)의 상당히 넓은 간격을 둔 양단부에 스크류잭(12)이 부착된 수평버팀대(20)를 설치하여 띠장거더(46)를 지지하도록 한 후에 상기 띠장거더(46)의 양측단부에 고정장치(42)를 설치하고, 일정한 간격을 두고 수직재(44)를 띠장거더(46)와 용접 또는 볼트연결하여 설치하되 상기 수직재(44)의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재(44)의 길이를 점차 작게한 수직재(44)를 설치하면서 상기 수직재(44)의 일측단부에 하중변위연동 및 고정장치(60)를 설치한 후에 상기 띠장거더(46)의 양측에 설치된 고정장치(42)에 인장케이블(43)을 고정시킨 후 상기 인장케이블(43)이 상기 수직재(44)의 하부에 설치된 하중변위연동 및 고정장치(60)에 접하게 설치하여 포물선형의 인장케이블(43)이 설치되도록 하여 변위크기에따라 하중변위연동 및 고정장치와 유압잭을 삽입설치하고, 그 잭(64)의 스트로크를 설계관리치와 실제현장계측치 결과를 피드백하여 연동시켜 흙막이벽의 토압을 지지하도록 하여 수평버팀대를 대폭삭감하도록 하는 싱크로나이즈띠장거더지지시스템(40)이다.       Another embodiment of the retaining wall, the vertical pile 15 is installed at regular intervals in connection with the earth excavation surface, and the excavation of the earth and sand vertically while the vertical pile (15) inside the horizontal girders (46) ) And then install the horizontal brace 20 with the screw jack 12 attached to both ends of the girder girder 46 to allow the girder girder 46 to be supported. The fixing device 42 is installed at both ends of the side), and the vertical member 44 is installed by welding or bolting the belt member 46 at regular intervals, while the length of the vertical member 44 is extended at both centers. After installing the load displacement interlocking and fixing device 60 at one end of the vertical member 44 while installing the vertical member 44 gradually decreasing the length of the vertical member 44 to be installed on both sides of the band girders 46 The tension cable (43) to the fixing device (42) installed in the After fixing, the tension cable 43 is installed in contact with the load displacement interlocking and fixing device 60 installed in the lower portion of the vertical member 44 so that the parabolic tension cable 43 is installed so that the load displacement depends on the displacement size. Synchronization belt girder which inserts and installs interlocking and fixing device and hydraulic jack and interlocks the stroke of jack 64 by feeding back design management value and actual field measurement result to support earth pressure of earth wall. Support system 40.
또 다른 적용 실시예로서, 콘크리트 구조물의 설치시 구조물을 지지할 수 있도록 구조물지지동바리(30)에 적용하도록 한 것으로서, 콘크리트구조물을 설치하기 위한 거푸집(32)의 하부에 설치되어 콘크리트를 타설하면서 발생되는 변위량과 하중을 설계관리치의 캠버량과 하중관계에 연동되어 변위량과 하중을 회복 및 상쇄하면서 콘크리트 구조물을 지지하도록 설치한 구조물지지동바리인 것으로서, 교량의 경우를 예로들어 설명하면, 교각(37)사이의 지반 상에 기초(38)를 설치하고, 그 위에 가설벤트(39)를 설치하고, 상기 가설벤트(39)위에 종거더(35)를 설치한 후에 상기 종거더(35) 위에 일정한 간격을 두고 횡으로 횡빔(36)을 설치한 후에 그 위에 구체콘크리트슬래브(34)를 형성하기 위한 거푸집(32)을 설치하고,       As another application embodiment, which is to be applied to the structure support bar (30) to support the structure when installing the concrete structure, it is generated while placing the concrete installed in the lower part of the formwork 32 for installing the concrete structure It is a structure supporting bar installed to support concrete structure while restoring and offsetting displacement amount and load by linking displacement amount and load to the camber amount and load relationship of the design management value. After installing the foundation 38 on the ground between the installation of the temporary vent 39 thereon, and the vertical girders 35 on the temporary vents 39 after a certain interval on the vertical girders 35 After the horizontal beam 36 is installed laterally, formwork 32 for forming the concrete concrete slab 34 is installed thereon.
상기 종거더(35)의 하부에 일정한 간격을 두고 용접 또는 볼트연결한 수직재(44)를 설치하되, 상기 수직재(44)의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재(44)의 길이를 점차 작게한 수직재(44)를 설치하고, 상기 수직재(44)의 하부에 하중변위연동 및 고정장치(60)를 설치하도록 한 후에 상기 종거더(35)의 양측에 설치된 고정장치(42)에 인장케이블(43)을 정착하면서 상기 인장케이블(43)이 상기 수직재(44)의 하부에 설치된 하중변위연동 및 고정장치(60)에 접하게 설치하여 포물선형의 인장케이블(43)이 설치되도록 한 후에 콘크리트를 타설시 발생하는 하중과 변위를 상쇄 및 회복시키거나 실제계측치와 피드백을 통해 설계관리치에 벗어날 염려가 있을 경우 재차 잭을 삽입하고 상기 잭의 스트로크 조절을 컴퓨터와 최종적으로 연동하여 직접제어하면서 구조물을 설치하도록 하기 위한 싱크로나이즈동바리지지시스템(40)이다.       While installing the vertical member 44 welded or bolted at regular intervals to the lower portion of the vertical girder 35, the length of the vertical member 44, while extending the length of the center portion, the length of the vertical member 44 is installed on both sides A gradually smaller vertical member 44 is installed, and a load displacement interlocking and fixing device 60 is installed at the lower portion of the vertical member 44, and then tensioned to the fixing device 42 provided at both sides of the vertical girder 35. While the cable 43 is fixed, the tension cable 43 is installed in contact with the load displacement interlocking and fixing device 60 installed in the lower portion of the vertical member 44 so that the parabolic tension cable 43 is installed, and then concrete If there is a risk of offsetting and restoring the load and displacement generated during casting, or if there is a risk of deviation from the design management value through actual measurement and feedback, insert the jack again and finally control the stroke adjustment of the jack directly with the computer. Standing is synchronized Shore support system 40 for you to install the structure.
상기와 같은 싱크로나이즈지지시스템(40)의 레이커거더(45), 따장거더(46) 및 종거더(54)에 직각으로 용접 또는 볼트연결 설치된 수직재(44)의 끝단부에 부착된 하중변위연동 및 고정장치(60)에 유압잭(64)을 삽입하고, 그 장치(60) 끝에 접하여 설치된 인장케이블(43)을 반력대로 이용하여 설계에서 요구되는 변위량과 하중을 도입한 상태의 시스템(40)을 설계위치에 설치하고, 이를 상기 거더(45,46,54)상에 작용하는 외부하중에 의한 변위회복(55)과 하중을 상쇄하는 매카니즘을 갖는 것이며, 또한 상기 거더상에는 변위계(54)와 하중계(58)을 설치하여 컴퓨터(48)에 연결시켜 설계관리치를 피드백(49)하여 허용치를 벗어나거나 또는 벗어날 염려가 있을 경우 상호 연동된 유압실린더(50)를 작동하여 유압호스(51)를 통해 전달되어 유압잭(64)의 스트로크를 연동(56)시켜 설계관리치내로 직접조절하도록 변위량을 회복(55)하거나 하중을 상쇄(57)하도록 하여 토압등의 외부하중을 지지하도록 하는 흙막이벽의 레이커거더나 띠장거더 또는 구체콘크리트구조물을 지지하고 동바리에 사용하도록 하는 싱크로나이즈지지시스템(40)에 특징이 있다.        Load displacement interlocking and fixing attached to the end of the vertical member 44 welded or bolted at right angles to the raker girder 45, the column girder 46 and the longitudinal girder 54 of the synchronizer support system 40 as described above. Inserting the hydraulic jack 64 into the device 60, using the tension cable 43 installed in contact with the end of the device 60 as a reaction force to design the system 40 in the state of introducing the displacement and load required in the design And a mechanism for canceling the load and the displacement recovery 55 caused by external load acting on the girders 45, 46 and 54, and the displacement gauge 54 and the load gauge 58 on the girders. If the installation is connected to the computer 48 to feed back the design management value 49, or if there is a risk of deviation or deviation from the hydraulic cylinder 50 interlocked by operating through the hydraulic hose 51 is delivered to the hydraulic jack ( Interlock with (56) the stroke of 64). To support and use the rocker girder or strip girders or concrete concrete structures of the retaining wall to support external loads such as earth pressure by recovering the displacement amount (55) or offsetting the load (57) for direct adjustment into the system control value. The synchronization support system 40 is characterized.
이하, 본 발명의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.       Hereinafter, the configuration and operation of the present invention will be described in detail by the accompanying drawings.
도7은 본 발명의 싱크로나이즈지지시스템이 수직파일을 지지하도록 설치된 레이커거더에 설치되어 토압을 지지하도록 흙막이벽을 설치한 것을 보여주는 도면으로서, 토사굴착면에 연하여 일정한 간격으로 수직파일(15)을 설치하고 토사를 수 직으로 굴착하면서 발생되는 토압이나 변위를 지지하기 위하여 상기 수직파일(15) 내측에 일정한 간격을 두고 횡으로 띠장(13)을 설치하고, 상기 수직파일(15)의 상부에 설치된 띠장(13)에 레이커거더(45)의 상부와 접하게 설치하면서 일정한 각도를 유지하도록 하여 레이커거더(45)를 경사지게 설치하고, 상기 레이커거더(45)의 하부는 최종 터파기선(16)의 굴착면에 기초(17)를 설치한 후에, 그 위에 설치하도록 하고,       FIG. 7 is a view showing that the synchronizer support system of the present invention is installed on a raker girder installed to support a vertical pile, and an earth wall is installed to support soil pressure. The vertical pile 15 is connected to a soil excavation surface at regular intervals. In order to support the earth pressure or displacement generated while excavating the soil vertically, the band 13 is installed horizontally at regular intervals inside the vertical pile 15, and installed on the upper portion of the vertical pile 15 Raker girder 45 is inclined to be installed in contact with the upper portion of the raker girder 45 to be inclined, and the lower portion of the raker girder 45 is an excavation surface of the final trench line 16. After installing the foundation (17) in, to be installed thereon,
상기 레이커거더(45)상에 단계별 굴착에 따라 설치되는 수직파일(15)에 횡으로 설치된 띠장(13)과 직각되는 위치에 수직재(44)를 상기 레이커 거더(45)와 용접 또는 볼트연결 설치하고, 수직재(44)의 끝단부에 하중변위연동 및       On the raker girder 45, the vertical member 44 is welded or bolted to the raker girder 45 at a position perpendicular to the band long 13 installed horizontally on the vertical pile 15 installed by the stepwise excavation. At the end of the vertical member 44
고정장치(60)를 설치하고, 상기 장치(60)에 접하여 인장케이블(43)을 설치하되 레이커거더(45)의 양단부에 설치된 고정장치(42)에 정착한다.The fixing device 60 is installed, and the tension cable 43 is installed in contact with the device 60 and fixed to the fixing device 42 installed at both ends of the raker girder 45.
상기 수직재(44)는 토압과 변위의 크기에 따라 그 길이를 다양하게 변화시켜 설치하는데, 상기 다양한 길이로 설치된 수직재(44)에 접하여 설치된 인장케이블(43)의 설치형상은 모멘트크기와 비례하여 설치하므로 외부하중과 변위를 보다 효율적으로 상쇄 및 회복매카니즘을 갖도록 설치한 싱크로나이즈지지시스템(40)이다.      The vertical member 44 is installed varying the length in accordance with the earth pressure and the size of the displacement, the installation shape of the tension cable 43 installed in contact with the vertical member 44 installed in the various length is installed in proportion to the moment size Therefore, the synchronization support system 40 is installed to have a more effective offset and recovery mechanism of the external load and displacement.
흙막이 수직파일(15)을 중심으로 아이슬랜드 공법으로 중앙부를 절취한 후 1단계 굴착한뒤 설치한 1단 횡띠장(13)과 상기 중앙부절취된 최종굴착면인 터파기선(16)에 설치된 기초(17)에 상기 싱크로나이즈지지시스템(40)을 설치고정한 다음, 2단계로 굴착하여 2단계굴착선(59)을 형성한 다음 설치된 2단띠장(13)과 용접 또는 볼트연결된 상기 시스템(40)의 1단 수직재(44)위치와 일치하여 스크류잭(12)이 부착된 하중전달버팀대(41)를 직각으로 설치고정한 다음, 상기 1단의 수직재(44) 끝단부에 설치된 하중변위연동 및 고정장치(60)에 유압잭(64)을 삽입하고, 그 스트로크를 상기 변위 및 하중의 설계관리치와 상기 거더(45) 및 수직재(44)에 부착된 변위계(54)와 하중계(53)의 계측결과를 컴퓨터에 연결시켜 피드백을 통하여 비교하면서 최종적으로 상호연결된 유압잭의 유압실린더를 작동시켜 그 스트로크 크기를 연동시켜 복귀 및 상쇄하도록 하고, 그 스트로크를 연동시킬 때 그에 접하여 설치된 인장케이블(43)을 잭(64)의 반력대 역할을 하면서 상기 케이블에는 인장력이 도입되어 거더에 작용하는 외부하중과 변위를 상쇄 및 회복이 직접 작용하도록 설치 및 지지하는 싱크로나이즈지지시스템이다.      The foundation (17) installed on the first stage horizontal strip (13) and the trench (16), which is the final excavated surface of the central section, are cut after the first stage is excavated and cut in the center part of the soil pile vertical pile (15). And fix the synchronizer support system 40 to the second stage, and excavate in two stages to form a two-stage excavation line 59, and then the first stage of the system 40 welded or bolted to the installed two-stage band 13. In accordance with the position of the vertical member 44, the load-carrying brace 41 to which the screw jack 12 is attached is fixed at a right angle, and the load displacement interlocking and fixing device 60 is installed at the end of the vertical member 44 of the first stage. The hydraulic jack 64 is inserted into the valve, and the stroke is connected to the design management value of the displacement and load and the measurement results of the displacement gauge 54 and the load gauge 53 attached to the girder 45 and the vertical member 44 to the computer. Of the hydraulic jacks finally interconnected The pressure cylinder is operated to link the stroke size to return and cancel the stroke, and when the stroke is interlocked, the tension cable 43 is provided as a reaction zone for the jack 64, and the tension cable is introduced into the girder. It is a synchronizer support system that installs and supports external loads and displacements that act on them.
상기 굴착이 3, 4단계등으로 반복시행하면서 상기 시스템을 반복적으로 설치 및 연동시켜 흙막이벽을 지지하도록 한다.       The excavation is repeatedly carried out in three, four, and the like to repeatedly install and interlock the system to support the retaining wall.
도8은 본 발명의 싱크로나이즈지지시스템을 띠장거더에 설치하여 토압을 지지하도록 흙막이벽을 설치한 것을 보여주는 도면으로서, 토사굴착면에 연하여 일정한 간격으로 수직파일(15)을 설치하고 토사를 수직으로 굴착하면서 상기 수직파일(15) 내측에 일정한 간격을 두고 횡으로 띠장거더(46)를 설치한 후에 상기 띠장거더(46)의 상당히 넓은 간격의 양단부에 스크류잭(12)이 부착된 수평버팀대(20)를 설치하여 띠장거더(46)를 지지하도록 한 후에 상기 띠장거더(46)의 양측단부에 고정장치(42)를 설치하고, 일정한 간격을 두고 수직재(44)를 상기 띠장거더(46)와 용접 또는 볼트연결 설치하되 상기 수직재(44)의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재(44)의 길이를 점차 작게한 수직재(44)를 설치하면서 상기 수직재(44)의 일측단부에 하중변위연동 및 고정장치(60)를 설치한 후에 상기 띠장거더(46)의 양측에 설치된 고정장치(42)에 인장케이블(43)을 정착하면서 상기 인장케이블(43)이 상기 수직재(44)의 하부에 설치된 하중변위연동 및 고정장치(60)에 접하게 설치하여 포물선형의 인장케이블(43)이 설치되도록 하여 하중 및 변위크기에따라 하중변위연동 및 고정장치에 유압잭을 삽입설치하고, 상기 잭(64)의 스트로크를 설계관리치와 실제현장계측치 결과를 피드백하여 연동시켜 흙막이벽의 토압을 지지하도록 하여 수평버팀대를 대폭삭감하도록 하는 싱크로나이즈지지시스템(40)이다.       8 is a view showing the installation of the earthen wall to support the earth pressure by installing the synchronizer support system of the present invention to the band girders, the vertical pile 15 is installed at regular intervals in connection with the earth excavation surface and the soil is vertically The horizontal brace 20 is provided with screw jacks 12 attached to both ends of the girder girders 46 at a wider interval after the installation of the girders 46 laterally at regular intervals inside the vertical pile 15 while being excavated. ) To support the strip girders 46, and then, the fixing devices 42 are installed at both ends of the strip girders 46, and the vertical member 44 is welded to the strip girders 46 at regular intervals. Alternatively, the bolt connection is installed, while the length of the vertical member 44 is extended to the center portion, while the vertical member 44 is gradually installed to reduce the length of the vertical member 44 installed on both sides, and the load displacement at one end of the vertical member 44. peristalsis And the tension cable 43 is installed at the lower portion of the vertical member 44 while the tension cable 43 is fixed to the fixing device 42 installed at both sides of the strip girders 46 after the fixing device 60 is installed. It is installed in contact with the load displacement interlocking and fixing device 60 so that the parabolic tension cable 43 is installed so that the hydraulic jack is inserted into the load displacement interlocking and fixing device according to the load and displacement size, and the jack 64 It is a synchronizer support system 40 which reduces the horizontal brace significantly by supporting the earth pressure of the retaining wall by linking the stroke with the design management value and the actual field measurement result.
도9는 본 발명의 싱크로나이즈지지시스템을 이용하여 흙막이벽의 레이커거더나 띠장거더 및 동바리용 종거더에 발생되는 하중과 변위를 직접제어하는 과정을 보여주는 도면으로서, 상기 도 7과 8, 10에서와 같이 싱크로나이즈지지시스템(40)의 레이커거더(45), 띠장거더(46) 및 종거더(54)에 직각으로 용접 또는 볼트연결 설치된 수직재(44)의 끝단부에 부착된 하중변위연동 및 고정장치(60)에 유압잭(64)을 삽입하고, 그 장치(60) 끝에 접하여 설치된 인장케이블(43)을 반력대로 이용하고 인장케이블에는 인장력(47)이 도입되어 설계에서 요구되는 변위량과 하중을 도입한 상태의 시스템(40)을 설계위치에 설치하고, 이를 상기 거더(45,46,54)상에 작용하는 외부하중에 의한 변위와 하중을 직접변위회복(55)과 하중을 상쇄하는 매카니즘을 갖는 것이며, 또한 상기 거더상에는 변위계(54)와 하중계(58)을 설치하여 컴퓨터(48)에 연결시켜 설계관리치를 피드백(49)하여 허용치를 벗어나거나 또는 벗어날 염려가 있을 경우 상호 연동된 유압실린더(50)를 작동하여 유압호스(51)를 통해 전달되어 유압잭(64)의 스트로크를 연동(56)시켜 설계관리치내로 직접조절하도록 변위량을 회복(55)하거나 하중을 상쇄(57)하도록 하여 토압등의 외부하중을 지지하도록 하는 흙막이벽의 레이커거더나 띠장거더 또는 구체콘크리트구조물을 지지하고 동바리에 사용하도록 하는 싱크로나이즈지지시스템(40)이다.        FIG. 9 is a view showing a process of directly controlling loads and displacements generated in a raker girder, a band girder and a vertical girders of a retaining wall by using the synchronizer support system of the present invention. Similarly, the load displacement interlocking and fixing device attached to the end of the vertical member 44 which is welded or bolted to the raker girder 45, the band girder 46, and the longitudinal girder 54 of the synchronizer support system 40 at right angles ( 60) Insert the hydraulic jack 64, use the tension cable 43 installed in contact with the end of the device 60 as a reaction force and the tension cable 47 is introduced to the tension cable to introduce the displacement and load required in the design The system 40 is installed at a design position, and the displacement and load due to external load acting on the girders 45, 46, and 54 have a direct displacement recovery 55 and a mechanism for canceling the load. Also said girder The displacement gauge 54 and the load gauge 58 are connected to the computer 48 to feed back the design management value 49 to operate the hydraulic cylinder 50 interlocked with each other when there is a risk of deviation or deviation from the allowable value. It is transmitted through the hose 51 to interlock 56 the stroke of the hydraulic jack 64 to recover the displacement amount 55 or offset the load 57 to directly adjust the design management value so as to support external load such as earth pressure. It is a synchronizer support system 40 for supporting the raker girder, the strip girders, or the concrete concrete structure of the retaining wall to be used for the grouping.
도10은 본 발명의 싱크로나이즈지지시스템이 구체슬래브의 하부의 거푸집을 지지하는데 설치되어 구체슬래브에 의해 발생되는 하중과 변위를 제어하는 과정을 보여주는 도면으로서, 콘크리트 구조물의 설치시 작용하는 하중과 변위를 지지할 수 있도록 구조물지지동바리(30)에 적용하도록 한 것으로서, 콘크리트구조물을 설치하기 위한 거푸집(32)의 하부에 설치되어 콘크리트를 타설하면서 발생되는 변위량과 하중을 설계관리치의 캠버량과 하중관계에 연동되어 변위량과 하중을 회복 및 상쇄하면서 콘크리트 구조물을 지지하도록 설치한 구조물지지동바리인 것으로서, 교량의 경우를 예로들어 설명하면, 교각(37)사이의 지반 상에 기초(38)를 설치하고, 그 위에 가설벤트(39)를 설치하고, 상기 가설벤트(39)위에 종거더(35)를 설치한 후에 상기 종거더(35) 위에 일정한 간격을 두고 횡으로 횡빔(36)을 설치한 후에 그 위에 구체슬래브를 형성하기 위한 거푸집(32)을 설치하고,       FIG. 10 is a view illustrating a process in which the synchronizer support system of the present invention is installed to support the formwork at the bottom of the concrete slab to control the load and displacement generated by the concrete slab. It is to be applied to the structure support bar (30) so that it can be supported, it is installed in the lower part of the formwork 32 for installing the concrete structure, the displacement amount and load generated while placing concrete to the camber amount and load relationship of the design management value It is a structure support bar which is interlocked and installed to support a concrete structure while restoring and canceling displacement and load. For example, in the case of a bridge, a base 38 is installed on the ground between the piers 37. After installing the temporary vent 39, the vertical girder 35 is installed on the temporary vent 39, the vertical girder 35 At regular intervals to install the mold 32, for forming a concrete slab thereon after installing a hoengbim 36 in the transverse and,
상기 종거더(35)의 하부에 일정한 간격을 두고 수직재(44)를 용접 또는 볼트연결 설치하되, 상기 수직재(44)의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재(44)의 길이를 점차 작게한 수직재(44)를 설치하고, 상기 수직재(44)의 하부에 하중변위연동 및 고정장치(60)를 설치하도록 한 후에 상기 종거더(35)의 양측에 설치된 고정장치(42)에 인장케이블(43)을 정착하면서 상기 인장케이블(43)이 상기 수직재(44)의 하부에 설치된 하중변위연동 및 고정장치(60)에 접하게 설치하여 포물선형의 인장케이블(43)이 설치되도록 한 후에 상기 도에서 서술된 회복 및 상쇄 매카니즘에 의해 조절하면서 콘크리트를 타설하여 구조물을 설치하도록 하기 위한 싱크로나이즈지지시스템(40)이다.      The vertical member 44 is welded or bolted to the lower part of the vertical girders 35 at regular intervals, and the length of the vertical member 44 is gradually increased while the center of the vertical member 44 is lengthened. A tension cable is provided in the fixing device 42 provided on both sides of the vertical girder 35 after installing the small vertical material 44 and installing load displacement interlocking and fixing device 60 in the lower part of the vertical material 44. While fixing the 43, the tension cable 43 is installed in contact with the load displacement interlocking and fixing device 60 installed in the lower portion of the vertical member 44 so that the parabolic tension cable 43 is installed. Synchronized support system 40 for installing the structure by pouring concrete while adjusting by the recovery and offset mechanism described in the following.
도11은 본 발명의 싱크로나이즈지지시스템의 수직재의 하부에 설치되는 하중변위연동 및 고정장치에 인장케이블이 설치된 상태를 보여주는 도면으로서, 레이커거더(45) 및 띠장거더(46) 또는 종거더(35)의 하부에 각각의 길이로 일정한 간격을 두고 용접 또는 볼트연결 설치된 수직재(44)의 하부에 하중변위연동 및 고정장치(60)를 설치하고, 상기 장치(60)와 접하여 인장케이블(43)을 설치하도록 하여 설계관리치내로 잭의 스트로크를 연동(56)시키면 상기 인장케이블에 인장력이 발생하면서 반력대 역할을 하여 상기 수직재에 회복변위(55)와 상기 수직재(44) 내부에 내부반력(57)이 발생되어 이러한 내부반력과 회복변위량이 띠장거더(46) 또는 종거더(35)에 전달되어 일정량의 변위가 발생된 상기 띠장거더 또는 종거더의 변위를 일정량의 변위회복량만큼 상쇄시켜 띠장거더 또는 종거더와 토압이 평형을 이루도록 하여 전체적으로 안정성을 유지하도록 한 것이다.        11 is a view showing a state in which the tension cable is installed in the load displacement linkage and the fixing device installed in the lower portion of the vertical member of the synchronizer support system of the present invention, the raker girder 45 and the strip girders 46 or longitudinal girder 35 The load displacement interlocking and fixing device (60) is installed at the lower part of the vertical member (44) which is welded or bolted at regular intervals at respective lengths at the lower part of the lower part, and the tension cable (43) is installed in contact with the device (60). By interlocking the stroke of the jack into the design management value (56), a tension force is generated in the tension cable, which acts as a reaction zone, so that the recovery displacement 55 and the internal reaction force 57 are inside the vertical member 44. The internal reaction force and the recovery displacement generated are transmitted to the girders girder 46 or the longitudinal girders 35 to offset the displacement of the girders or the girders where a certain amount of displacement is generated by a predetermined amount of displacement recovery amount. Wale will turn a girder or longitudinal girders and the earth pressure to achieve and maintain a balanced overall stability.
도12는 본 발명의 싱크로나이즈지지시스템의 하중변위연동 및 고정장치를 보여주는 도면으로서, 수직재의 하부에 견고하게 하중변위연동 및 고정장치(60)를 고정연결시키기 위하여, 수직재(44)의 하부에 스티프너(61)를 연결고정시키도록 하고, 상기 스티프너(61)의 하부에 잭하부지지판(62)을 연결 설치하고 잭하부지지판(62)의 하부에 잭(64)을 설치할 수 있는 공간을 확보하기 위하여 하부로 일정한 간격을 두고 잭상부지지판(65)을 설치하되, 상기 잭 상하부지지판(62,65)의 네 모서리부를 고장력볼트(63)와 스프링와샤너트(67)로 상호 연결하면서 상기 수직재(44)와 일체 연결되도록 하고, 상기 잭상부지지판(65)의 하부에 인장케이블(43)을 안내할 수 있는 인장케이블가이드판(66)을 양측에 설치하면서 상기 양측에 설치된 인장케이블가이드판(66)의 사이에 인장케이블(43)을 설치할 때 인장케이블이 밀착접촉되도록 중앙부가 볼록하게 곡률면이 되도록 상기 잭상부지지판(65)을 설치하도록 하고, 상기 잭상하부지지판(62,65)의 사이 공간에 잭을 배치하되, 잭(64)이 잭하부지지판(62)에 부착되도록 설치하고, 설계관리치 만큼 인장케이블(43)을 긴장시켜 잭상부지지판(65)과 잭이 접하도록 변위스트로크(56)을 작동시킨 후, 고장력볼트(63)와 스프링와샤너트(67)로 고정하도록 하여 하중변위연동 및 고정장치를 수직재의 하부에 설치하는 것이다.
상기와 같이 변위스트로크를 작동시켜 잭과 인장케이블을 밀착시킨 후에 상기 인장케이블에 작용하는 하중에 따라 인장케이블에 밀착설치된 상기 잭이 연동되어 지지되도록 하중변환의 정도에 따라 연동되어 지지되도록 하는 고정장치를 말하는 것이다.
Fig. 12 shows the load displacement linkage and fixing device of the synchronizer support system of the present invention, in order to securely connect the load displacement linkage and the fixing device 60 to the lower portion of the vertical member, and to the stiffener at the lower portion of the vertical member 44. In order to secure the connection (61), in order to secure a space to connect the lower jack support plate 62 to the lower portion of the stiffener 61 and to install the jack 64 in the lower jack lower support plate 62 The jack upper support plate (65) is installed at regular intervals to the bottom, and the vertical members (44) while interconnecting the four corners of the jack upper and lower support plates (62, 65) with a high tension bolt (63) and a spring and a nut (67). And a tension cable guide plate 66 installed at both sides of the tension cable guide plate 66 capable of guiding the tension cable 43 at the lower portion of the jack upper support plate 65. Tension between When the cable 43 is installed, the jack upper support plate 65 is installed so that the center portion is convexly curved so that the tension cable is in close contact with the cable 43, and the jack is disposed in the space between the jack upper and lower support plates 62 and 65. , The jack 64 is installed to be attached to the lower jack support plate 62, the tension cable 43 is tensioned by the design management value to operate the displacement stroke 56 so that the jack upper support plate 65 and the jack contact. In order to fix the high-strength bolt 63 and the spring and the shoulder nut 67, the load displacement interlock and the fixing device are installed at the lower part of the vertical member.
Fixing device for operating the displacement stroke as described above to close the jack and the tension cable in close contact with the jack according to the degree of load conversion so that the jack tightly installed on the tension cable according to the load acting on the tension cable is supported. To say.
도13은 본 발명의 하중변위연동 및 고정장치의 잭하부지지판의 유압잭을 고정하는 방법을 보여주는 도면으로서, 잭 상하부지지판(62,65)을 고장력볼트(63)로 설치하여 유압잭설치공간을 조성한 다음, 유압잭을 중앙에 삽입한 다음 잭의 양측으로 설치된 스티프너(61) 중앙에 볼트와 스프링와샤너트(63,67)을 조여 고정시키도록 하는 것이다.       Figure 13 is a view showing a method of fixing the hydraulic jack of the jack lower support plate of the load displacement interlocking and fixing device of the present invention, the jack upper and lower support plates (62, 65) by installing a high tension bolt 63 to create a hydraulic jack installation space , Insert the hydraulic jack in the center and then tighten the bolt and the spring and the nut (63, 67) in the center of the stiffener (61) installed on both sides of the jack to be fixed.
도14는 본 발명의 하중변위연동 및 고정장치의 잭하부지지판을 보여주는 도면으로서, 도 12에서 이미 설명한바와 같이 잭 상, 하부지지판(62,65)을 고장력볼트(63)로 상호 연결하여 수직재(44)에 연결설치한 다음 상기 잭하부지지판(65)의 하부에 인장케이블(43)을 안내할 수 있는 인장케이블가이드판(66)을 양측에 설치하면서 양측에 설치된 상기 인장케이블가이드판(66)의 사이에 인장케이블(43)을 설치할 때 인장케이블을 보다 강하게 밀착접촉되도록 중앙부가 볼록한 곡률면이 되도록 상기 잭하부지지판(65)을 설치한다.       14 is a view showing the lower jack support plate of the load displacement interlocking and fixing device of the present invention, as described above in Figure 12, the jack upper, lower support plates 62, 65 are interconnected with a high tension bolt 63 to the vertical material ( 44 and the tension cable guide plate 66 installed at both sides while installing the tension cable guide plate 66 capable of guiding the tension cable 43 at the lower portion of the lower jack support plate 65. When the tension cable 43 is installed between the jack lower support plate 65 is installed so that the center surface is convex curvature so that the tension cable more tightly contact.
도15는 도14의 단면 A-A를 보여주는 도면으로서, 잭하부지지판(65)의 하부에 인장케이블(43)을 안내할 수 있도록 강판으로 개복박스형태로 부착설치한 다음 상기 박스내에 인장케이블을 설치하도록 한다.        Figure 15 is a view showing a cross-sectional AA of Figure 14, to be installed in the form of a open box with a steel plate so as to guide the tension cable 43 to the lower portion of the lower jack support plate 65 to install the tension cable in the box do.
도16은 본 발명의 싱크로나이즈지지시스템의 띠장을 설치하기 위하여 편기된 수직파일에 하중분산쐐기받침판을 설치하여 띠장이 수평으로 설치되게 한 것을 보여주는 도면으로서, 토사굴착면이 일직선이 아닌 경우에는 토사굴착면을 따라 설치되는 수직파일(15)이 일정한 각도로 편기되어 설치되어 있으므로 상기 편기된 수직파일의 측면에 일정한 간격을 두고 상기 수직파일의 길이방향으로 설치되는 띠장(13,46)은 향후에 설치되는 수직재(44)가 반드시 띠장(13,46)에 직각으로 용접 또는 볼트연결 설치되어야 상기 수직재의 하부에 설치된 하중변위연동 및 고정장치(60)의 변위연동 조절에 의해 외부하중에 의한 변위와 하중을 관리하게되므로 일정한 각도로 편기된 상기 수직파일(15)과 띠장(13,46)사이에 편기된 각도에 의하여 간격이 형성되면 상기 시스템의 변위회복과 하중상쇄가 직접전달이 않되므로 이렇게 형성된 간격내에 하중분산쐐받침판(70)을 설치하여 편기된 각도를 보상해주도록 하여 편기된 수직파일에 직각으로 띠장이 설치되고 상기 띠장에 수직재가 자동적으로 수직설치되도록 하기 위함이다.       FIG. 16 is a view showing that the load-distributing wedge support plate is installed horizontally by installing a load-dispersing wedge support plate on a vertical pile arranged to install the band length of the synchronizer support system of the present invention. Since the vertical pile 15 installed along the surface is knitted and installed at a predetermined angle, the bands 13 and 46 installed in the longitudinal direction of the vertical pile at regular intervals on the side of the knitted vertical pile are installed in the future. The vertical member 44 to be welded or bolted at right angles to the bands 13 and 46 must be installed in the lower part of the vertical member, and the displacement and the load due to the external load by adjusting the displacement linkage of the fixing device 60. Since the gap is formed by the angle between the vertical pile 15 and the band-length (13, 46) knitted in a predetermined angle so that the sheath Since the recovery of displacement and load offset are not directly transmitted, the load dispersion wedge plate 70 is installed within the gap formed to compensate for the biased angle so that the belt is installed at right angles to the knitted vertical pile and the vertical material is This is to automatically install vertically.
상기 하중분산쐐기받침판(70)은 하중흡수분산에 효율적인 침목(72)과 지압에 변형이 않되도록 철판(71)으로 구성된 다각형의 일정한 두께를 갖는 것으로서, 도면에서보는바와 편기된 수직파일에 띠장이 직각으로 설치될 때 수직파일과 띠장에 일정한 간격이 형성되는데 상기 간격에 상기 하중분산쐐받침판을 끼워 띠장에 설치 된 수직재에 설치된 하중변위연동 및 고정장치에 의해 직접하중 상쇄 및 변위회복량이 도입될때에도 아무런 구조적인 영향없이 상기 매카니즘이 수직재를 통하여 거더에 직접 전달될 수 있도록 하기 위함이다.      The load-distributing wedge support plate 70 has a constant thickness of a polygon composed of a sleeper 72 and the iron plate 71 so as not to be deformed to the pressure of the load absorbing dispersion, as shown in the drawing and banded in the vertical pile When installed at right angles, a constant gap is formed between the vertical pile and the band, and the direct load offset and displacement recovery amount are introduced by the load displacement linkage and the fixed device installed on the vertical member installed on the band by sandwiching the load distributing wedge plate in the gap. This is to allow the mechanism to be directly transmitted to the girder through the vertical material without any structural influence.
본 발명은 지하구조물을 설치하기 위하여 굴착공사를 할때 토사가 붕괴되는 것을 방지하기 위하여 흙막이벽으로 활용하여 토압이나 수압에 의하여 발생되는 응력과 변위를 설계관리치와 연동하여 컴퓨터에 미리 입력된 프로그램에 의하여 자동으로 변위량과 외부하중을 도입하여 현장에 설치하고, 기설치된 거더에 작용하는 외력에 의한 변위와 하중을 상쇄시키고 또한 현장계측치와 피드백에 의해 상호연동시켜 재차 내부하중과 변위를 조절하면서 토압을 지지하도록 하거나 또는 콘크리트구조물의 설치를 위한 거푸집의 하부에 설치되어 콘크리트를 타설하면서 발생되는 응력과 변위를 설계관리치와 연동하여 컴퓨터에 미리 입력된 프로그램에 의하여 자동으로 변위량과 내부하중을 도입하여 현장에 설치하고, 이 설치된 거더에 작용하는 외력에 의한 변위와 하중을 상쇄시키면서, 또한 현장계측치와 피드백에 의해 상호연동시켜 재차 내부하중과 변위를 조절하면서 콘크리트 구조물을 지지하도록 하기 위한 흙막이벽 및 구조물지지동바리용 싱크로나이즈지지시스템에 관한 것으로서,        The present invention utilizes as a retaining wall to prevent earth and sand from collapsing during the excavation work to install the underground structure, the stress and displacement generated by the earth pressure or water pressure in conjunction with the design management value in advance in the computer program Automatically introduces displacement and external load to install on site, offsets displacement and load caused by external force acting on existing girder, and interlocks by on-site measurement and feedback to adjust internal load and displacement again. It is installed in the lower part of the formwork for supporting the concrete structure, or the stress and displacement generated when placing concrete, in conjunction with the design management value, automatically introduces the displacement and internal load by the program pre-inputted on the computer. Installed on site, and the external force acting on this installed girder It is related to a retaining wall and a synchronized support system for a structural support bar, to offset the displacement and the load caused by the load, and to support the concrete structure by mutually interlocking by on-site measurement and feedback.
레이커버팀대를 이용하여 다단계로 굴착을 할수 있도록 적용깊이를 확대 할 수 있고, 버팀대수를 대폭절감하므로서 공간 활용을 극대화할 수 있는 등 효율성을 극대화하면서 공기단축과 자재절감을 통한 공사비의 절감으로 인한 경제성 제고를 함과 동시에 띠장과 버팀대로 지지하던 종래의 방식에도 적용할 수 있도록 하므로서 본 발명의 시스템의 호환성을 제고하도록 하고, 강재사용을 최소화하여 경제성을 높힘과 동시에 작업 공간을 확보하여 공기를 단축할 수 있도록 하면서 단계별 굴착이나 되메우기에 따른 하중 변화에 피드백하고 콘트롤하면서 하중변화에 따른 변위에 적절하게 대응 할 수 있도록 하여 보다 안정적으로 공사시공이 성역화하여 진행될 수 있도록 하는 경제적이면서, 시스템의 효율성을 증대시킴과 동시에 종래의 방법에도 적용할 수 있도록 호환성을 갖도록 한 매우 적용성이 넓은 유용한 시스템의 시공방법인 것이다.       It is possible to increase the depth of application for excavation in multiple stages using the lay cover team, maximize the space utilization by greatly reducing the number of props, and maximize the efficiency while reducing the construction cost by reducing the air and materials. In addition to improving the compatibility of the system of the present invention by improving the compatibility of the system of the present invention, while also being able to be applied to the conventional method supported by the belt and brace, and to minimize the use of steel to increase the economical efficiency and at the same time to secure a work space It is possible to feed back and control the load change due to the excavation or backfilling step by step, and to respond to the displacement according to the load change appropriately, thereby increasing the efficiency and economic efficiency of the construction work. And at the same time the conventional method So that one can use to have the compatibility to a very broad applicability of this method of construction useful system.

Claims (16)

  1. 토사굴착면에 연하여 일정한 간격으로 수직파일을 설치하고 토사를 수직으로 굴착하면서 발생되는 토압이나 변위를 지지하기 위하여 상기 수직파일의 내측에 일정한 간격을 두고 횡으로 설치된 띠장과,        A band installed horizontally at regular intervals on the inner side of the vertical pile to support the earth pressure or displacement generated by installing vertical piles at regular intervals in connection with the earth excavation surface, and excavating the soil vertically;
    상기 수직파일의 상부에 설치된 띠장에 레이커거더의 상부와 접하게 설치하면서 일정한 각도를 유지하도록 하여 경사지게 설치된 레이커거더와,        A raker girder inclined to maintain a constant angle while being installed to be in contact with the upper portion of the raker girder on a belt installed at the upper portion of the vertical pile;
    상기 레이커거더의 하부는 최종터파기선의 굴착면에 설치된 기초 위에 설치하고,       The lower part of the raker girder is installed on the foundation installed on the excavation surface of the final breaker ship,
    상기 레이커거더(45)상에는 단계별 굴착에 따라 설치되는 수직파일(15)에 횡으로 설치된 띠장(13)과 직각되는 위치에 상기 레이커거더와 용접 또는 볼트연결 설치된 수직재로서, 상기 수직재의 길이는 토압의 크기와 비례하여 증가 또는 감소하게 수직재를 설치하고,        On the raker girder 45 is a vertical member installed or welded or bolted to the raker girder at a position perpendicular to the band-length 13 horizontally installed on the vertical pile 15 installed in accordance with the stepwise excavation, the length of the vertical member is of earth pressure Install vertical material to increase or decrease in proportion to its size,
    상기 수직재(44)의 끝단부에 설치된 하중변위연동 및 고정장치(60)와,        Load displacement interlocking and fixing device (60) installed at the end of the vertical member (44),
    상기 장치(60)에 접하여 인장케이블(43)을 설치하면서 레이커거더의 양단부에 설치된 고정장치(42)에 상기 인장케이블을 정착하고,       Fixing the tension cable in the fixing device 42 provided on both ends of the raker girder while installing the tension cable 43 in contact with the device 60,
    상기 수직파일(15)을 중심으로 아이슬랜드 공법으로 1단계, 2단계등 다단계로 굴착하면서 각각 횡띠장(13)을 설치하면서, 단계적으로 상기 횡띠장과 상기 거더에 용접 또는 볼트연결 설치된 수직재와 직각으로 스크류잭(12)이 부착된 하중전달버팀대를 힌지연결하고,        While installing the horizontal bands 13 while excavating in multiple stages such as the first step and the second step by the Icelandic method around the vertical pile 15, stepwise at right angles with the vertical members installed or welded to the horizontal bands and the girder. Hinged the load transmission brace with screw jack 12 attached,
    상기 수직재(44) 끝단부에 설치된 하중변위연동 및 고정장치(60)에 유압잭(64)을 삽입하고, 상기 잭의 스트로크를 변위 및 하중 설계관리치와 상기 거더(45) 및 수직재(44)에 부착된 변위계(54)와 하중계(53)의 계측결과를 컴퓨터에 연동시켜 직접복귀 및 상쇄하도록 하고, 상기 유압잭의 스트로크를 인장케이블(43)에 연동시킬 때 잭(64)은 반력대 역할을 하면서 인장력이 작용하도록 하여 흙막이벽을 지지하도록 하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템.       The hydraulic jack 64 is inserted into the load displacement interlocking and fixing device 60 installed at the end of the vertical member 44, and the stroke of the jack is inserted into the displacement and load design management value and the girder 45 and the vertical member 44. The measurement results of the attached displacement gauge 54 and the load gauge 53 are interlocked with a computer to directly return and cancel. The jack 64 acts as a reaction force when the stroke of the hydraulic jack is interlocked with the tension cable 43. An automatic synchronization support system that directly controls and offsets displacements and reaction forces generated by an action load, characterized by supporting tension walls to support the retaining walls.
  2. 토사굴착면에 연하여 일정한 간격으로 수직파일(15)을 설치하고 토사를 수직으로 굴착하면서 상기 수직파일(15) 내측에 일정한 간격을 두고 횡으로 띠장거더(46)를 설치한 후에 상기 띠장거더(46)의 양단부에 스크류잭(12)이 부착된 수평버팀대(20)를 설치하여 띠장거더(46)를 지지하도록 하고,       After installing the vertical pile 15 at regular intervals in connection with the earth excavation surface and excavating the earth and sand vertically, after installing the girders 46 horizontally at regular intervals inside the vertical pile 15, the band girders ( 46 is installed on both ends of the screw jack 12 is attached to the horizontal brace 20 to support the band girders 46,
    상기 띠장거더(46)의 양측단부에 설치된 고정장치(42)와, 일정한 간격을 두고 상기 띠장거더(46)와 용접 또는 볼트로 수직재(44)를 연결 설치하되 상기 수직재(44)의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재(44)의 길이를 점차 작게한 수직재(44)를 설치하고,       The vertical device 44 is connected to the fixing device 42 installed at both ends of the belt girder 46 and the belt girder 46 is welded or bolted at regular intervals, and the length of the vertical material 44 is centered. While installing the vertical member 44 gradually reduced in length of the vertical member 44 installed on both sides,
    상기 수직재(44)의 일측단부에 설치된 하중변위연동 및 고정장치(60)와,       A load displacement interlocking and fixing device (60) installed at one end of the vertical member (44),
    상기 띠장거더(46)의 양측에 설치된 고정장치(42)에 인장케이블(43)을 정착하면서 상기 인장케이블(43)이 상기 수직재(44)의 하부에 설치된 하중변위연동 및 고정장치(60)에 접하게 설치하고,        While the tension cable 43 is fixed to the fixing device 42 installed on both sides of the strip girders 46, the tension cable 43 is connected to the load displacement interlocking and fixing device 60 installed at the lower portion of the vertical member 44. Install it,
    상기 하중변위연동 및 고정장치에 설치된 유압잭의 스트로크를 설계관리치와 실제현장계측치 결과를 컴퓨터에 입력시켜 피드백하여 연동시켜 흙막이벽의 토압을 지지하도록 하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템.       The displacement generated according to the working load characterized in that the stroke of the hydraulic jack installed in the load displacement interlocking device and the fixing device is connected to the computer by feeding the design management value and the actual field measurement result to the feedback to support the earth pressure of the retaining wall. Automatic synchronization support system that controls direct recovery and offset.
  3. 교각(37)사이의 지반 상에 기초(38)를 설치하고, 그 위에 가설벤트(39)를 설치하고,        A foundation 38 is installed on the ground between the piers 37, and a temporary vent 39 is installed thereon.
    상기 가설벤트(39)위에 종거더(35)를 설치한 후에 상기 종거더(35) 위에 일정한 간격을 두고 횡으로 설치된 횡빔(36)과, 상기 횡빔 위에 구체슬래브를 형성하기 위하여 설치된 거푸집(32)과,       After installing the vertical girders 35 on the temporary vents 39, the horizontal beams 36 horizontally installed at regular intervals on the vertical girders 35, and the formwork 32 installed to form a concrete slab on the horizontal beams. and,
    상기 종거더(35)의 하부에 일정한 간격을 두고 수직재(44)를 용접 또는 볼트연결 설치하되, 상기 수직재(44)의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재(44)의 길이를 점차 작게한 수직재(44)를 설치하고,        The vertical member 44 is welded or bolted to the lower part of the vertical girders 35 at regular intervals, and the length of the vertical member 44 is gradually increased while the center of the vertical member 44 is lengthened. Install the small vertical member 44,
    상기 수직재(44)의 하부에 설치된 하중변위연동 및 고정장치(60)와,       Load displacement interlocking and fixing device 60 is installed in the lower portion of the vertical member 44,
    상기 종거더(35)의 양측에 설치된 고정장치(42)에 인장케이블(43)을 정착하면서 상기 인장케이블(43)이 상기 수직재(44)의 하부에 설치된 하중변위연동 및 고정장치(60)에 접하게 설치하고,        While the tension cable 43 is fixed to the fixing device 42 installed on both sides of the vertical girder 35, the tension cable 43 is connected to the load displacement interlocking and fixing device 60 installed at the lower portion of the vertical member 44. Install it,
    상기 종거더에 설치된 하중계와 변위계등의 계측값을 컴퓨터에 연동시켜 계측치, 설계관리치등과 피드백을 통해 자동으로 유압실린더시스템을 작동하여 하중과 변위제어를 하도록 하면서, 상기 거푸집에 콘크리트를 타설하여 교량등의 구체콘크리트 구조물을 설치하도록 하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템.       Placing concrete on the formwork while controlling the load and displacement by operating the hydraulic cylinder system automatically through the measured values, design management values, and feedback by interlocking the measured values such as the load gauge and the displacement meter installed on the vertical girder with a computer. An automatic synchronization support system that controls the direct recovery and offset of displacements and reaction forces generated by a working load characterized by installing concrete concrete structures such as bridges.
  4. 제 1항 내지 제3항중의 어느 한항에 있어서,       The method according to any one of claims 1 to 3,
    상기 싱크로나이즈지지시스템을 컴퓨터에 연동시켜 하중변위 제어를 하는 것은 레이커거더(45), 따장거더(46) 및 종거더(54)에 직각으로 용접 또는 볼트연결 설치된 수직재(44)의 끝단부에 부착된 하중변위연동 및 고정장치(60)에 유압잭(64)을 삽입하고, 그 장치(60) 끝에 접하여 설치된 인장케이블(43)을 반력대로 이용하여 설계에서 요구되는 변위량과 하중을 잭의 스트로크를 조절하여 내부하중과 변위를 미리 도입한 상태의 시스템(40)을 설계위치에 설치하고, 이를 상기 거더(45,46,54)상에 작용하는 외부하중에 의한 변위회복(55)과 하중을 상쇄하는 매카니즘을 갖도록 하며, 상기 거더상에는 변위계(54)와 하중계(58)을 설치하여 컴퓨터(48)에 연결시켜 설계관리치를 피드백(49)하여 허용치를 벗어나거나 또는 벗어날 염려가 있을 경우 상호 연동된 유압실린더(50)를 작동하여 유압호스(51)를 통해 전달되어 유압잭(64)의 스트로크를 재차 연동(56)시켜 설계관리치내로 조절하도록 변위량을 회복(55)하거나 하중을 상쇄(57)하도록 하여 토압등의 외부하중을 지지하도록 하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템.       Controlling the load displacement by interlocking the synchronizer support system with a computer is attached to the end of the vertical member 44 which is welded or bolted at right angles to the raker girder 45, the column girder 46 and the longitudinal girder 54. Insert the hydraulic jack 64 into the load displacement linkage and fixing device 60, and adjust the jack stroke to the displacement and load required in the design by using the tension cable 43 installed in contact with the end of the device 60 as a reaction force. Mechanism for canceling the load and the displacement recovery 55 caused by the external load acting on the girders 45, 46, 54 at the design position of the system 40 with the internal load and the displacement introduced in advance On the girder, a displacement gauge 54 and a load gauge 58 are installed on the girder to be connected to the computer 48 to feed back the design management value 49 so that there is a risk of deviation or deviation from the allowable hydraulic cylinder. 50 ) To be transmitted through the hydraulic hose 51 to re-connect 56 the stroke of the hydraulic jack 64 to recover the displacement amount 55 or to offset the load 57 to adjust to the design management value, such as earth pressure. An automatic synchronization support system that controls the direct recovery and offset of displacements and reaction forces generated by a working load characterized by supporting external loads.
  5. 제 1항내지 제3항중의 어느 한 항에 있어서,       The method according to any one of claims 1 to 3,
    상기 싱크로나이즈지지시스템의 내부하중과 변위는 하중변위연동 및 고정장치에 유압잭을 삽입하고, 상기 잭의 스트로크를 상하로 연동하여 도입시키고, 상기 내부하중과 변위의 도입된 상태를 보존하기 위하여 고장력볼트와 스프링와샤너트로 고정시키며, 상기 내부하중과 변위의 도입시 인장케이블이 반력대 역할을 하여 인장력이 도입되도록 하여 외부하중과 변위를 상쇄하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템.       The internal load and the displacement of the synchronizer support system are inserted into the hydraulic jack into the load displacement linkage and the fixing device, and the stroke of the jack is interlocked up and down to introduce the high tension bolt and the high tension bolt to preserve the introduced state of the internal load and the displacement. It is fixed with spring and shant, and the tension cable acts as a reaction band when the internal load and the displacement are introduced so that the tensile force is introduced to offset the external load and the displacement. Automatic synchronization support system that controls recovery and offset.
  6. 제 1항 내지 제3항중의 어느 한항에 있어서,        The method according to any one of claims 1 to 3,
    상기 수직재의 하부에 연결된 하중변위연동 및 고정장치는 스티프너와 잭하부지지판을 상기 수직재에 연결고정시키도록 하고, 상기 잭하부지지판의 하부에 잭을 설치할 수 있는 공간을 확보하기 위하여 일정한 간격을 두고 잭상부지지판을 설치하되, 상기 잭상,하부지지판의 네모서리부를 고장력볼트와 스프링와샤너트로 상호 연결하고, 상기 잭상부지지판의 하부에 인장케이블을 안내할 수 있는 인장케이블가이드판을 양측에 설치하면서 상기 양측에 설치된 인장케이블가이드판의 사이에 인장케이블을 설치할 때 인장케이블이 밀착접촉되도록 중앙부가 볼록한 곡률면이 되도록 상기 잭상부지지판을 설치하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템.       The load displacement interlocking and fixing device connected to the lower part of the vertical member allows the stiffener and the lower jack support plate to be fixed to the vertical member, and the jack is spaced at regular intervals to secure a space for installing the jack at the lower part of the lower jack support plate. The upper support plate is installed, but the upper and lower corners of the upper support plate are interconnected with a high tension bolt and a spring and a shant, and the tension cable guide plate for guiding the tension cable to the lower part of the upper support plate is installed on both sides. When the tension cable is installed between the tension cable guide plates installed on both sides, the displacement and reaction force generated by the working load, which is characterized by installing the upper jack support plate so that the center cable is a convex curvature surface, the tension cable is in close contact with each other. Automatic synchronization support system that controls recovery and offset.
  7. 제 6항에 있어서,       The method of claim 6,
    상기 인장케이블가이드판은 잭상부지지판의 하부에 인장케이블을 안내할 수 있도록 강판으로 개복박스형태로 부착설치한 다음 상기 박스내에 인장케이블을 설치하여 이탈하지 않도록 한 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템.       The tension cable guide plate is installed in the form of a lap box with a steel plate to guide the tension cable to the lower part of the upper support plate of the jack, and then installs the tension cable in the box so as not to be released according to the characteristic load. Automatic synchronization support system to directly control and offset the displacement and reaction force.
  8. 제 1항 또는 제2항에 있어서,       The method according to claim 1 or 2,
    상기 수직파일과 띠장이 일정한 각도로 편기되어 설치되어 있을 경우에는 상기 수직파일과 상기 띠장에 간격이 형성된 틈내에 삼각형의 일정한 두께를 갖는 하중분산쐐받침판을 삽입설치하여 편기된 각도를 보상해주도록 한 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템.       When the vertical pile and the strip are knitted at a predetermined angle, a load distribution wedge plate having a constant thickness of a triangle is inserted into the gap between the vertical pile and the strip to compensate for the knitting angle. An automatic synchronization support system that controls the direct recovery and offset of displacements and reaction forces generated by the working loads.
  9. 토사굴착면에 연하여 일정한 간격으로 수직파일을 설치하고 토사를 수직으로 굴착하면서 발생되는 토압이나 변위를 지지하기 위하여 상기 수직파일의 내측에 일정한 간격을 두고 횡으로 띠장을 설치하고,        Install vertical piles at regular intervals in connection with the earth excavation surface, and install the bands horizontally at regular intervals inside the vertical piles to support the earth pressure or displacement generated when excavating the soils vertically,
    상기 수직파일의 상부에 설치된 띠장에 레이커거더의 상부와 접하게 설치하면서 일정한 각도를 유지하도록 하여 레이커거더를 경사지게 설치하고,        Raker girder is installed to be inclined to maintain a constant angle in contact with the upper portion of the raker girder in the band installed on the top of the vertical pile,
    상기 레이커거더의 하부는 최종터파기선의 굴착면에 기초를 설치한 후에, 그 위에 설치하도록 하고,       The lower part of the raker girder is to be installed thereon after the foundation is installed on the excavation surface of the final breaker ship,
    상기 레이커거더(45)상에는 단계별 굴착에 따라 설치되는 수직파일(15)에 횡으로 설치된 띠장(13)과 직각되는 위치에 상기 레이커거더와 용접 또는 볼트연결에 의하여 수직재를 설치하고, 그 수직재 길이는 토압의 크기와 비례하여 증가 또는 감소하게 수직재를 설치하고, 수직재(44)의 끝단부에 하중변위연동 및 고정장치(60)를 각각 설치하고,        On the raker girder 45, a vertical member is installed by welding or bolting the raker girder at a position perpendicular to the band long 13 installed horizontally on the vertical pile 15 installed according to the stepwise excavation. The vertical member is installed to increase or decrease in proportion to the size of the earth pressure, and the load displacement interlocking device and the fixing device 60 are installed at the ends of the vertical member 44, respectively.
    상기 장치(60)에 접하여 인장케이블(43)을 설치하고, 상기 인장케이블은 레이커거더(45)의 양단부에 설치된 고정장치(42)에 정착하여 인장케이블(43)의 설치형상은 모멘트분포도와 유사하게 설치하여 싱크로나이즈지지시스템(40)을 설치하고,       The tension cable 43 is installed in contact with the device 60, and the tension cable is fixed to the fixing device 42 installed at both ends of the raker girder 45 so that the installation shape of the tension cable 43 is similar to the moment distribution diagram. Installation to install the synchronizer support system 40,
    상기 수직파일(15)을 중심으로 아이슬랜드 공법으로 1단계, 2단계등 다단계로 굴착하면서 각각 횡띠장(13)을 설치하면서, 단계적으로 상기 횡띠장과 상기 시스템의 거더에 용접 또는 볼트연결 설치된 수직재와 직각으로 스크류잭(12)이 부착된 하중전달버팀대를 힌지연결하고,        While installing the horizontal bands 13 while excavating in multiple stages such as the first step and the second step by the Icelandic method around the vertical pile 15, the vertical bands are welded or bolted to the horizontal bands and the girder of the system step by step. Hinge connection of load transfer brace with screw jack 12 attached at right angles,
    상기 수직재(44) 끝단부에 설치된 하중변위연동 및 고정장치(60)에 유압잭(64)을 삽입하고, 상기 잭의 스트로크를 변위 및 하중 설계관리치와 상기 거더(45) 및 수직재(44)에 부착된 변위계(54)와 하중계(53)의 계측결과를 컴퓨터에 연동시켜 직접복귀 및 상쇄하도록 하고, 상기 유압잭의 스트로크를 인장케이블(43)에 연동시킬 때 잭(64)은 반력대 역할을 하면서 인장력이 작용하도록 하여 흙막이벽을 지지하도록 하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템의 설치방법.       The hydraulic jack 64 is inserted into the load displacement interlocking and fixing device 60 installed at the end of the vertical member 44, and the stroke of the jack is inserted into the displacement and load design management value and the girder 45 and the vertical member 44. The measurement results of the attached displacement gauge 54 and the load gauge 53 are interlocked with a computer to directly return and cancel. The jack 64 acts as a reaction force when the stroke of the hydraulic jack is interlocked with the tension cable 43. A method of installing an automatic synchronization support system for directly restoring and offsetting displacements and reaction forces generated by an action load characterized by a tension force acting to support a retaining wall.
  10. 토사굴착면에 연하여 일정한 간격으로 수직파일(15)을 설치하고 토사를 수직으로 굴착하면서 상기 수직파일(15) 내측에 일정한 간격을 두고 상기 띠장거더(46)와 용접 또는 볼트로 횡으로 띠장거더(46)를 설치한 후에 상기 띠장거더(46)의 양단부에 스크류잭(12)이 부착된 수평버팀대(20)를 설치하여 띠장거더(46)를 지지하도록 하고,       The vertical pile 15 is installed at regular intervals in connection with the earth excavation surface, and the earth pile is vertically excavated, while the vertical pile 15 is spaced at a predetermined interval inside the vertical pile 15 by the welding or bolts. After installing the 46 to install the horizontal brace 20 with the screw jack 12 attached to both ends of the strip girders 46 to support the strip girders 46,
    상기 띠장거더(46)의 양측단부에 고정장치(42)가 설치되고, 일정한 간격을 두고 수직재(44)를 연결 설치하되 상기 수직재(44)의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재(44)의 길이를 점차 작게한 수직재(44)를 설치하고,       Fixing devices 42 are installed at both ends of the strip girders 46, and vertical members 44 are connected at regular intervals, and vertical members 44 are installed at both sides while lengthening the lengths of the vertical members 44. A vertical member 44 having a gradually reduced length of 44 is provided;
    상기 수직재(44)의 일측단부에 하중변위연동 및 고정장치(60)를 설치하고,       Load displacement interlocking and fixing device 60 is installed at one end of the vertical member 44,
    상기 띠장거더(46)의 양측에 설치된 고정장치(42)에 인장케이블(43)을 정착하면서 상기 인장케이블(43)이 상기 수직재(44)의 하부에 설치된 하중변위연동 및 고정장치(60)에 접하게 설치하여 포물선형의 인장케이블(43)이 설치되도록 한 싱크로나이즈지지시스템을 제작하여 현장에 설치하여 외력에 의한 하중과 변위와 기 도입된 설계관리치의 내부하중과 변위가 서로 상쇄 및 회복하고,        While the tension cable 43 is fixed to the fixing device 42 installed on both sides of the strip girders 46, the tension cable 43 is connected to the load displacement interlocking and fixing device 60 installed at the lower portion of the vertical member 44. Synchronize support system to make parabolic tension cable 43 to be installed in contact with each other, and install it on site to offset and recover the internal load and displacement of externally applied load and displacement and the design management value introduced.
    상기 하중변위연동 및 고정장치에 설치된 유압잭의 스트로크를 설계관리치와 실제현장계측치 결과를 피드백하여 연동시켜 흙막이벽의 토압을 지지하도록 하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템의 설치방법.       Direct recovery of displacement and reaction force generated by the working load characterized by supporting the earth pressure of the retaining wall by linking the stroke of the hydraulic jack installed in the load displacement linkage and the fixing device by feeding back the design management value and the actual field measurement result. And a method for installing an automatic synchronization support system to control the offset.
  11. 교각(37)사이의 지반 상에 기초(38)를 설치하고, 그 위에 가설벤트(39)를 설치하고,        A foundation 38 is installed on the ground between the piers 37, and a temporary vent 39 is installed thereon.
    상기 가설벤트(39)위에 종거더(35)를 설치한 후에 상기 종거더(35) 위에 일정한 간격을 두고 횡으로 횡빔(36)을 설치한 후에 그 위에 구체슬래브를 형성하기 위한 거푸집(32)을 설치하고,       After the vertical girders 35 are installed on the temporary vents 39, the horizontal beams 36 are installed horizontally at regular intervals on the vertical girders 35, and then the form 32 for forming a concrete slab is formed thereon. Install it,
    상기 종거더(35)의 하부에 일정한 간격을 두고 수직재(44)를 용접 또는 볼트연결 설치하되, 상기 수직재(44)의 길이를 중앙부는 길게하면서, 양측에 설치되는 수직재(44)의 길이를 점차 작게한 수직재(44)를 설치하고,        The vertical member 44 is welded or bolted to the lower part of the vertical girders 35 at regular intervals, and the length of the vertical member 44 is gradually increased while the center of the vertical member 44 is lengthened. Install the small vertical member 44,
    상기 수직재(44)의 하부에 하중변위연동 및 고정장치(60)를 설치하도록 한 후에,       After installing the load displacement interlocking and fixing device 60 in the lower portion of the vertical member 44,
    상기 종거더(35)의 양측에 설치된 고정장치(42)에 인장케이블(43)을 정착하면서 상기 인장케이블(43)이 상기 수직재(44)의 하부에 설치된 하중변위연동 및 고정장치(60)에 접하게 설치하여 포물선형의 인장케이블(43)이 설치되도록 한 싱크로나이즈지지시스템(40)을 제작하여 현장에 설치하여 발생하는 외력에 의한 하중과 변위와 기 도입된 설계관리치의 내부하중과 변위가 서로 상쇄 및 회복하고,        While the tension cable 43 is fixed to the fixing device 42 installed on both sides of the vertical girder 35, the tension cable 43 is connected to the load displacement interlocking and fixing device 60 installed at the lower portion of the vertical member 44. Synchronized support system 40, which is installed in contact with the parabolic tension cable 43, is installed and installed in the field, and the load and displacement caused by external force and the internal load and displacement of the introduced design control value cancel each other. And recover,
    상기 시스템의 하중계와 변위계등의 계측값을 컴퓨터에 연동시켜 계측치, 설계관리치등과 피드백을 통해 자동으로 유압실린더시스템을 작동하여 하중과 변위제어를 하도록 하면서, 상기 거푸집에 콘크리트를 타설하여 교량등의 구체콘크리트 구조물을 설치하도록 하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템의 설치방법.       By connecting the measured values such as the load gauge and displacement gauge of the system to a computer, the hydraulic cylinder system is automatically operated through the measured values, design management values, and feedback to control the load and displacement. A method of installing an automatic synchronization support system for controlling to directly recover and offset the displacement and reaction force generated according to the working load characterized in that the concrete concrete structure of the installation.
  12. 제 9항 내지 제11항중의 어느 한항에 있어서,       The method according to any one of claims 9 to 11,
    상기 싱크로나이즈지지시스템을 컴퓨터에 연동시켜 하중변위 제어를 하는 것은 레이커거더(45), 따장거더(46) 및 종거더(54)에 직각으로 용접 또는 볼트연결설치된 수직재(44)의 끝단부에 부착된 하중변위연동 및 고정장치(60)에 유압잭(64)을 삽입하고, 그 장치(60) 끝에 접하여 설치된 인장케이블(43)을 반력대로 이용하여 설계에서 요구되는 변위량과 하중을 잭의 스트로크를 조절하여 내부하중과 변위를 미리 도입한 상태의 시스템(40)을 설계위치에 설치하고, 이를 상기 거더(45,46,54)상에 작용하는 외부하중에 의한 변위회복(55)과 하중을 상쇄하는 매카니즘을 갖는 것이며, 또한 상기 거더상에는 변위계(54)와 하중계(58)을 설치하여 컴퓨터(48)에 연결시켜 설계관리치를 피드백(49)하여 허용치를 벗어나거나 또는 벗어날 염려가 있을 경우 상호 연동된 유압실린더(50)를 작동하여 유압호스(51)를 통해 전달되어 유압잭(64)의 스트로크를 재차 연동(56)시켜 설계관리치내로 조절하도록 변위량을 회복(55)하거나 하중을 상쇄(57)하도록 하여 토압등의 외부하중을 지지하도록 하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템의 설치방법.       Controlling the load displacement by interlocking the synchronizer support system with a computer is attached to the end of the vertical member 44 that is welded or bolted at right angles to the raker girder 45, the column girder 46 and the longitudinal girder 54. Insert the hydraulic jack 64 into the load displacement linkage and fixing device 60, and adjust the jack stroke to the displacement and load required in the design by using the tension cable 43 installed in contact with the end of the device 60 as a reaction force. Mechanism for canceling the load and the displacement recovery 55 caused by the external load acting on the girders 45, 46, 54 at the design position of the system 40 with the internal load and the displacement introduced in advance In addition, by installing a displacement gauge 54 and a load gauge 58 on the girder and connected to the computer 48 to feed back the design management value 49, if there is a risk of deviation or deviation from the allowable hydraulic cylinder The 50 is operated to be transmitted through the hydraulic hose 51 so that the stroke of the hydraulic jack 64 is interlocked again 56 to recover the displacement amount 55 or offset the load 57 to adjust the design control value. A method of installing an automatic synchronization support system for directly restoring and offsetting displacements and reaction forces caused by an operating load characterized by supporting external loads such as earth pressure.
  13. 제 9항내지 제11항중의 어느 한 항에 있어서,       The method according to any one of claims 9 to 11,
    상기 싱크로나이즈지지시스템의 내부하중과 변위는 하중변위연동 및 고정장치에 유압잭을 삽입하고, 상기 잭의 스트로크를 상하로 연동하여 도입시키고, 상기 내부하중과 변위의 도입된 상태를 보존하기 위하여 고장력볼트와 스프링와샤너트로 고정시키며, 상기 내부하중과 변위의 도입시 인장케이블이 반력대 역할을 하여 인장력이 도입되도록 하여 외부하중과 변위를 상쇄하는 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템의 설치방법.       The internal load and the displacement of the synchronizer support system are inserted into the hydraulic jack into the load displacement linkage and the fixing device, and the stroke of the jack is interlocked up and down to introduce the high tension bolt and the high tension bolt to preserve the introduced state of the internal load and the displacement. It is fixed with spring and shant, and the tension cable acts as a reaction band when the internal load and the displacement are introduced so that the tensile force is introduced to offset the external load and the displacement. A method of installing an automatic synchronization support system that controls recovery and offset.
  14. 제 9항 내지 제11항중의 어느 한항에 있어서,        The method according to any one of claims 9 to 11,
    상기 수직재의 하부에 연결된 하중변위연동 및 고정장치는 스티프너와 잭하부지지판을 상기 수직재에 연결고정시키도록 하고, 상기 잭하부지지판의 하부에 잭을 설치할 수 있는 공간을 확보하기 위하여 일정한 간격을 두고 잭상부지지판을 설치하되, 상기 잭상,하부지지판의 네모서리부를 고장력볼트와 스프링와샤너트로 상호 연결하고, 상기 잭상부지지판의 하부에 인장케이블을 안내할 수 있는 인장케이블가이드판을 양측에 설치하면서 상기 양측에 설치된 인장케이블가이드판의 사이에 인장케이블을 설치할 때 인장케이블이 밀착접촉되도록 중앙부가 볼록한 곡률면이 되도록 상기 잭상부지지판을 설치하는 것에 특징이 있는 작용하중에 따라 발생되는 변위반력을 회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템의 설치방법.       The load displacement interlocking and fixing device connected to the lower part of the vertical member allows the stiffener and the lower jack support plate to be fixed to the vertical member, and the jack is spaced at regular intervals to secure a space for installing the jack at the lower part of the lower jack support plate. The upper support plate is installed, but the upper and lower corners of the upper support plate are interconnected with a high tension bolt and a spring and a shant, and the tension cable guide plate for guiding the tension cable to the lower part of the upper support plate is installed on both sides. When installing the tension cable between the tension cable guide plate installed on both sides to recover the displacement reaction caused by the action load, characterized in that the upper support plate is installed to be a convex curvature surface in the center so that the tension cable is in close contact Installation method of automatic synchronization support system to control to offset.
  15. 제 14항에 있어서,       The method of claim 14,
    상기 인장케이블가이드판은 잭상부지지판의 하부에 인장케이블을 안내할 수 있도록 강판으로 개복박스형태로 부착설치한 다음 상기 박스내에 인장케이블을 설치하여 이탈하지 않도록 한 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템의 설치방법.       The tension cable guide plate is installed in the form of a lap box with a steel plate to guide the tension cable to the lower part of the upper support plate of the jack, and then installs the tension cable in the box so as not to be released according to the characteristic load. A method of installing an automatic synchronization support system that controls direct recovery and offset of displacements and reaction forces.
  16. 제 9항 또는 제10항에 있어서,       The method according to claim 9 or 10,
    상기 수직파일과 띠장이 일정한 각도로 편기되어 설치되어 있을 경우에는 상기 수직파일과 상기 띠장에 간격이 형성된 틈내에 삼각형의 일정한 두께를 갖는 하중분산쐐받침판을 삽입설치하여 편기된 각도를 보상해주도록 한 것에 특징이 있는 작용하중에 따라 발생되는 변위와 반력을 직접회복 및 상쇄하도록 제어하는 자동싱크로나이즈지지시스템의 설치방법.       When the vertical pile and the strip are knitted at a predetermined angle, a load distribution wedge plate having a constant thickness of a triangle is inserted into the gap between the vertical pile and the strip to compensate for the knitting angle. A method of installing an automatic synchronization support system for controlling the direct recovery and offset of displacement and reaction force generated by a working load characterized by
KR1020050032351A 2005-04-19 2005-04-19 Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system KR100720321B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050032351A KR100720321B1 (en) 2005-04-19 2005-04-19 Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050032351A KR100720321B1 (en) 2005-04-19 2005-04-19 Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0010855U Division KR200390445Y1 (en) 2005-04-19 2005-04-19 Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load

Publications (2)

Publication Number Publication Date
KR20060110130A KR20060110130A (en) 2006-10-24
KR100720321B1 true KR100720321B1 (en) 2007-05-25

Family

ID=37616108

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050032351A KR100720321B1 (en) 2005-04-19 2005-04-19 Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system

Country Status (1)

Country Link
KR (1) KR100720321B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628487A (en) * 2013-11-28 2014-03-12 中冶天工集团有限公司 Circular deep foundation pit retaining wall reverse construction method
WO2015009126A1 (en) * 2013-07-19 2015-01-22 ㈜써포텍 Anti-bending strut for use in construction of temporary earth retaining structure
CN104746520A (en) * 2015-03-03 2015-07-01 南京市测绘勘察研究院有限公司 Shallow-to-deep foundation pit supporting structure and method
CN105569050A (en) * 2015-12-29 2016-05-11 华东交通大学 Design method of angle brace supporting structure for foundation pit with lateral pressures of adjacent boundaries being imbalanced
CN106049504A (en) * 2016-06-12 2016-10-26 青岛海川建设集团有限公司 Construction method for optimizing corner structure of pile-anchor support system of deep foundation pit through space effect
CN106245689A (en) * 2016-08-04 2016-12-21 上海岩土工程勘察设计研究院有限公司 A kind of monitoring method mixing materials for support stake axle power
CN106592599A (en) * 2016-11-29 2017-04-26 上海市基础工程集团有限公司 Device capable of rapidly controlling displacement of foundation pit and construction method thereof
CN110158602A (en) * 2019-06-10 2019-08-23 中交第二航务工程局有限公司 A kind of Soft Clay deep foundation pit support excavation construction structure and construction method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101658390B1 (en) * 2015-08-17 2016-09-21 지엘콘(주) Reinforcement method of culvert
CN106759383A (en) * 2016-12-28 2017-05-31 郑倩 A kind of reverse construction short section borehole wall pouring structure and construction method
CN106592632A (en) * 2016-12-28 2017-04-26 郑倩 Underground supporting structure for reverse construction method and construction method
CN107023043A (en) * 2017-05-26 2017-08-08 中国十七冶集团有限公司 A kind of deep foundation pit supporting construction monitoring and pre-alarming method
CN110158600A (en) * 2019-06-05 2019-08-23 浙江交工集团股份有限公司 A kind of Adjacent Pit synchronizes the construction method of the asynchronous backfill of excavation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030010407A (en) * 2001-07-27 2003-02-05 정란 A fiber reinforced earth retaining wall, a constructing method thereof, and a composite underground wall structure using thereof
KR20030027346A (en) * 2001-09-28 2003-04-07 최춘식 Construction method for installing concrete underground structures
KR20040039523A (en) * 2002-11-02 2004-05-12 한만엽 Bracket and Support for Innovative Prestressed Scaffolding System

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030010407A (en) * 2001-07-27 2003-02-05 정란 A fiber reinforced earth retaining wall, a constructing method thereof, and a composite underground wall structure using thereof
KR20030027346A (en) * 2001-09-28 2003-04-07 최춘식 Construction method for installing concrete underground structures
KR20040039523A (en) * 2002-11-02 2004-05-12 한만엽 Bracket and Support for Innovative Prestressed Scaffolding System

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
공개번호 1020030010407
공개번호 1020030027346
공개특허공보 10-2004-39523

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016528407A (en) * 2013-07-19 2016-09-15 サポーテック カンパニー リミテッド Deflection prevention beam for construction of earth retaining facilities
WO2015009126A1 (en) * 2013-07-19 2015-01-22 ㈜써포텍 Anti-bending strut for use in construction of temporary earth retaining structure
CN105431594A (en) * 2013-07-19 2016-03-23 斯博泰科有限公司 Anti-bending strut for use in construction of temporary earth retaining structure
CN103628487B (en) * 2013-11-28 2016-05-18 中冶天工集团有限公司 Circular deep foundation ditch retaining wall reversed construction method
CN103628487A (en) * 2013-11-28 2014-03-12 中冶天工集团有限公司 Circular deep foundation pit retaining wall reverse construction method
CN104746520A (en) * 2015-03-03 2015-07-01 南京市测绘勘察研究院有限公司 Shallow-to-deep foundation pit supporting structure and method
CN105569050A (en) * 2015-12-29 2016-05-11 华东交通大学 Design method of angle brace supporting structure for foundation pit with lateral pressures of adjacent boundaries being imbalanced
CN106049504A (en) * 2016-06-12 2016-10-26 青岛海川建设集团有限公司 Construction method for optimizing corner structure of pile-anchor support system of deep foundation pit through space effect
CN106245689A (en) * 2016-08-04 2016-12-21 上海岩土工程勘察设计研究院有限公司 A kind of monitoring method mixing materials for support stake axle power
CN106592599A (en) * 2016-11-29 2017-04-26 上海市基础工程集团有限公司 Device capable of rapidly controlling displacement of foundation pit and construction method thereof
CN110158602A (en) * 2019-06-10 2019-08-23 中交第二航务工程局有限公司 A kind of Soft Clay deep foundation pit support excavation construction structure and construction method
CN110158602B (en) * 2019-06-10 2020-09-29 中交第二航务工程局有限公司 Soft soil geological deep foundation pit supporting excavation construction structure and construction method

Also Published As

Publication number Publication date
KR20060110130A (en) 2006-10-24

Similar Documents

Publication Publication Date Title
US6922950B2 (en) Top arch overfilled system
CA2306130C (en) Reinforced retaining wall
KR100543969B1 (en) Composite rigid-frame bridge installing prestressed compound beam to the contral point of the slab of rigid-frame bridge and connecting the beam to the steel member installed in the upper of pole, and construction method thereof
KR100866162B1 (en) Chair-type self-supported earth retaining wall constructing method
US4911585A (en) Wall systems
US6238144B1 (en) Retaining wall and fascia system
CN102720140B (en) Large-span prestress concrete continuous beam deepwater pier construction process
AU2014237379B2 (en) Precast concrete retaining wall
JP2009516109A (en) Temporary earth retaining device
EP2729627B1 (en) Foundation system for bridges and other structures
KR100889273B1 (en) Construction method for rhamen bridge
EP3417115B1 (en) Foundation for a wind mill
US6881012B2 (en) Foundation repair system and method of installation
KR101302743B1 (en) Phc pile and its using the same soil cement wall construction methode
JP4942759B2 (en) Abdomen fixing tool
KR100770574B1 (en) Rhamen bridge having prestressed steel-reinforced concrete composite girder and construction method there of
KR100571102B1 (en) Device of Innovative Prestressed Scaffolding System for Improving Workability
US6988337B1 (en) Means and method for constructing a fully precast top arch overfilled system
JP2009516109A5 (en)
JP2013518199A (en) Construction Method of Steel Composite Girder Bridge {ConstructionMethod SteelCompositeGirderBridge}
KR100634726B1 (en) Form system for construction of underground slab and method for constructing underground slab and breast wall using the same
KR100968048B1 (en) A retaining panel structure and construction method
JP2007321452A (en) Construction method for bridge and bridge structure thereof
KR101182084B1 (en) Method making the prestressed precast girder of Rahmen structure induced a compressive stress by a support with hinge and method constructing Rahmen bridge thereof
CN101725357B (en) Construction method for lower section of underground tunnel

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J204 Invalidation trial for patent
J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20080618

Effective date: 20110422

Free format text: TRIAL NUMBER: 2008100001782; TRIAL DECISION FOR INVALIDATION REQUESTED 20080618

Effective date: 20110422

J2X1 Appeal (before the patent court)

Free format text: INVALIDATION

Free format text: TRIAL NUMBER: 2011200005120; INVALIDATION

J2X2 Appeal (before the supreme court)

Free format text: APPEAL BEFORE THE SUPREME COURT FOR INVALIDATION

Free format text: TRIAL NUMBER: 2011300003520; APPEAL BEFORE THE SUPREME COURT FOR INVALIDATION

J302 Written judgement (patent court)

Free format text: JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20110525

Effective date: 20111103

Free format text: TRIAL NUMBER: 2011200005120; JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20110525

Effective date: 20111103

J221 Remand (intellectual property tribunal)

Free format text: REMAND (INTELLECTUAL PROPERTY TRIBUNAL) FOR INVALIDATION

Free format text: TRIAL NUMBER: 2012130000050; REMAND (INTELLECTUAL PROPERTY TRIBUNAL) FOR INVALIDATION

J303 Written judgement (supreme court)

Free format text: JUDGMENT (SUPREME COURT) FOR INVALIDATION REQUESTED 20111121

Effective date: 20120209

Free format text: TRIAL NUMBER: 2011300003520; JUDGMENT (SUPREME COURT) FOR INVALIDATION REQUESTED 20111121

Effective date: 20120209

J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20120308

Effective date: 20120316

Free format text: TRIAL NUMBER: 2012130000050; TRIAL DECISION FOR INVALIDATION REQUESTED 20120308

Effective date: 20120316

EXTG Extinguishment