KR100711484B1 - Stand-alone construction equipment and construction method of middle-tier steel house using it - Google Patents

Stand-alone construction equipment and construction method of middle-tier steel house using it Download PDF

Info

Publication number
KR100711484B1
KR100711484B1 KR1020050129414A KR20050129414A KR100711484B1 KR 100711484 B1 KR100711484 B1 KR 100711484B1 KR 1020050129414 A KR1020050129414 A KR 1020050129414A KR 20050129414 A KR20050129414 A KR 20050129414A KR 100711484 B1 KR100711484 B1 KR 100711484B1
Authority
KR
South Korea
Prior art keywords
unit
construction
temporary
steel house
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
KR1020050129414A
Other languages
Korean (ko)
Inventor
이승은
Original Assignee
주식회사 포스코
재단법인 포항산업과학연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 포스코, 재단법인 포항산업과학연구원 filed Critical 주식회사 포스코
Priority to KR1020050129414A priority Critical patent/KR100711484B1/en
Application granted granted Critical
Publication of KR100711484B1 publication Critical patent/KR100711484B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/14Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/17Comprising essentially pre-assembled three-dimensional elements, e.g. cubic elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/302Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
    • E04G7/303Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect
    • E04G7/304Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect with tying means for connecting the bars or members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

독립형 가설장치 및 이를 이용한 중층형 스틸하우스 시공방법이 제공된다.Provided is an independent construction apparatus and a method for constructing a middle-tier steel house using the same.

상기 독립형 가설장치는, 일정길이로 된 파이프형상의 바디와, 상기 바디 양 단부에 압착되어 평면상으로 형성된 연결부 및, 상기 연결부에 형성된 체결개구로 구성되어 체결부재로서 연결 조립되는 단위 가설부재; 및, 상기 단위 가설부재들이 조립되어 하나의 작업평면을 구현하는 단위유닛; 을 포함하고 상기 단위 유닛들이 상하 및 좌우에 연속적으로 연결 조립되어 시공되는 상기 스틸하우스를 포위하도록 구성되고, 상기 단위 가설부재의 바디에 고정된 클램핑밴드에 구비된 연결구를 추가로 포함하여 조인트 와이어의 연결을 용이토록 구성되어 있다.The stand-alone hypothesis device comprises a unit hypothesis member consisting of a pipe-shaped body of a predetermined length, a connecting portion formed in a planar shape by being squeezed at both ends of the body, and a fastening opening formed in the connecting portion to be assembled as a fastening member; And a unit unit in which the unit temporary members are assembled to implement one work plane. It comprises a and the unit is configured to surround the steel house is assembled and installed continuously connected up and down and left and right, further comprising a connector provided in the clamping band fixed to the body of the unit temporary member of the joint wire Easy to connect

이와 같은 본 발명에 따르면, 중층형 스틸하우스의 시공 공기를 획기적으로 단축시키며, 단위부재들을 연결하는 단위 유닛들을 조립하여 가설장치를 구성함으로서 가설장치의 설치 및 분해 조립을 용이하게 하는 것은 물론, 특히 단위 가설부재에 끼워진 클램핑밴드의 연결구에 조인트 와이어를 연결하는 구조로서, 가설장치의 조립 견고성이 우수하고, 독립형 가설장치에 의한 본 공사의 지연을 방지하는 개선된 효과를 얻을 수 있다.According to the present invention, it is possible to significantly shorten the construction air of the middle-tier steel house, as well as to facilitate the installation and disassembly and assembly of the temporary apparatus by assembling the unit units connecting the unit members to configure the temporary apparatus. As a structure for connecting the joint wire to the connector of the clamping band fitted to the unit temporary member, it is excellent in the assembly robustness of the temporary apparatus, and can be improved effect to prevent the delay of the construction by the independent temporary apparatus.

스틸하우스, 복층골조, 독립형 가설장치. 중층 스틸하우스, 패널모듈 Steel House, Duplex Frame, Freestanding Temporary Equipment. Middle level steel house, panel module

Description

독립형 가설장치 및 이를 이용한 중층형 스틸하우스 시공방법{Support Device and Method for Constructing Steelhouse using The Same}Stand-alone construction device and construction method of middle-level steel house using the same {Support Device and Method for Constructing Steelhouse using The Same}

도 1은 일반적인 스틸하우스 구조를 도시한 구조도1 is a structural diagram showing a general steel house structure

도 2는 시공된 중층 스틸하우스를 나타낸 사진Figure 2 is a photograph showing a medium-rise steel house constructed

도 3은 종래 가설을 이용한 중층 스틸하우스 시공상태를 도시한 개략도Figure 3 is a schematic diagram showing a state of construction of a middle-tier steel house using a conventional hypothesis

도 4는 본 발명에 따른 독립형 가설장치의 단위 가설부재를 도시한 개략사시도Figure 4 is a schematic perspective view showing a unit temporary member of the stand-alone temporary apparatus according to the present invention

도 5는 본 발명인 독립형 가설장치의 단위 층 유닛을 도시한 사시도5 is a perspective view showing a unit floor unit of the present inventors stand alone provisional apparatus

도 6은 본 발명인 독립형 가설장치를 도시한 사시도Figure 6 is a perspective view of the present invention stand-alone hypothesis

도 7은 본 발명인 독립형 가설장치의 단위 가설부재의 변형예를 도시한 구조도7 is a structural diagram showing a modification of the unit temporary member of the inventors of the independent construction apparatus

도 8은 본 발명인 독립형 가설장치를 이용한 중층형 스틸하우스 시공단계를 도시한 모식도Figure 8 is a schematic diagram showing the construction stage of the middle-tier steel house using the inventor's independent construction device.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1.... 독립형 가설장치 10.... 단위 가설부재1 .... Stand-alone construction 10 .... Unit construction

12.... 가설부재 바디 14.... 연결부12 .... Temporary member body 14 .... Connection

16.... 체결개구 18.... 클램핑밴드16 .... Opening 18 .. Clamping band

20.... 연결구 22.... 조인트 와이어20 .... End Connection 22 .... Joint Wire

본 발명은 독립형 가설장치 및 이를 이용한 중층형 스틸하우스 시공방법에 관한 것이며, 보다 상세히는 기존에 골조 시공후 파이프를 철사 등으로 엮어서 만든 가설설비의 시공이 본 공사를 오히려 지연시키지만, 가설장치가 골조와 연계되지 않는 독립형이므로 본 공사의 연계 시공이 필요없어 본 공사를 지연시키지 않으며, 특히 단위 가설부재에 끼워진 클램핑밴드의 연결구에 조인트 와이어를 연결하는 견고한 구조이므로 작업상 안정성이 우수한 독립형 가설장치 및 이를 이용한 중층형 스틸하우수 시공방법에 관한 것이다.The present invention relates to a stand-alone construction apparatus and a method for constructing a middle-tier steel house using the same. More specifically, the construction of a temporary installation made by weaving pipes with wires after the construction of the existing structure delays the construction, but the construction apparatus is framed. It is a stand-alone type that does not need to be connected to the construction because it does not need to be connected to the construction and does not delay the construction.In particular, it is a stand-alone construction apparatus with excellent stability in operation because it is a rigid structure connecting the joint wire to the connector of the clamping band fitted to the unit construction member. It relates to a method for constructing a middle layer steel howe used.

통상 건물을 시공하는 형태는 철근, 콘크리트 타설을 기본으로 하되, 이와 철골조를 혼합하는 습식 형태와 콘크리트 타설에 따른 여러 공기 지연이나 시공 구조의 복잡함을 피하여 특히 공기를 단축시키는 철골조 구조의 건식 형태가 있다.Normally, the construction of the building is based on reinforcing steel and concrete casting, but there are wet forms of mixing steel frames and dry structures of steel frame structures, which shorten the air, in particular, avoiding the complexity of various air delays or construction structures. .

즉, 철골조 형태의 건물은 H형 강, ㄷ자 형강, 사각보 등의 경량철골들을 기둥이나 보로 삼고 볼트접합이나 용접을 통해 조립식으로 조립 시공하는 것으로,현재에는 소재 취급성을 높이도록 두께 4.5㎜ 이하인 경량형강(輕量型鋼)을 사용하는 경량 철골조 구조물의 기술이 집중적으로 연구 발전되고 있으며, 이와 같은 경량형 강을 이용하는 구조물은 대부분 조립성을 높이고 현장 시공성을 높이기 위하여 패널화되어 있다.In other words, the steel-framed building is a column or beam of light steel frame, such as H-shaped steel, U-shaped steel, square beam, and prefabricated by bolt joining or welding. The technology of lightweight steel frame structures using light steel has been intensively researched and developed. Most of the structures using light steel have been panelized to increase the assemblability and the field construction.

한편, 이와 같은 경량형강을 이용하는 대표적인 조립식 건축물이 스틸하우스이고, 도 1에서는 스틸하우스 특히, 복층의 스틸하우수 골조구조를 도시하고 있다.On the other hand, a typical prefabricated building using such a lightweight steel is a steel house, Figure 1 shows a steel house, in particular, a steel structure of a multi-storey structure.

즉, 도 1 및 도 2에서 도시한 바와 같이, 통상의 스틸하우스(100)는 림조이스트(110)를 다양한 형상 예를 들어, ㄷ자 형강으로 설치하고, 이 림조이스트(110)의 내측에 바닥조이스트(120)를 다수개 설치한다.That is, as shown in Figures 1 and 2, the conventional steel house 100 is a rim joist 110 is installed in various shapes, for example, U-shaped steel, the bottom joist inside the rim joist 110 Install a plurality of 120.

그리고, 상기 림조이스트(110)의 외측에 바닥조이스트와 연접되게 트랙(130)을 설치하며 상기 트랙(130)에 일정간격으로 내력 스터드(140)를 수직 설치한 후 내력 스터드(140)의 상단에 일정간격으로 천정 조이스트(150)를 설치하고 그 상측에 래프트(160)를 설치하여 구성하였다.Then, the track 130 is installed on the outer side of the rim joist 110 in contact with the bottom joist, and the load stud 140 is vertically installed at a predetermined interval on the track 130 at the top of the load bearing stud 140. The ceiling joist 150 was installed at regular intervals and the raft 160 was installed on the upper side thereof.

다음, 상기와 같은 골조의 스틸하우스(100)는 각각의 부재들 사이에 내장재를 삽입하고 외부에 마감재를 부착하여 시공하였다.Next, the steel house 100 of the frame as described above was constructed by inserting the interior material between the respective members and attaching the finishing material to the outside.

한편, 도 2에서는 이와 같은 스틸하우스의 사진을 나타내고 있다.2 shows a picture of such a steel house.

즉, 스틸하우스는 근래 여러층이 적층 시공되는 중층형 스틸하우스의 시공이 증가되고 있는 실정이다.That is, the steel house is a situation that is increasing the construction of the middle-layer steel house is laminated in recent years.

한편, 도 3에서는 종래 스틸하우스 특히, 중층형 스틸하우스의 시공을 도시하고 있다.On the other hand, Figure 3 shows the construction of a conventional steel house, in particular, a middle-tier steel house.

즉, 도 3에서 도시한 바와 같이, 종래의 스틸하우스 특히, 중층 스틸하우스의 시공방법은 도 1과 같이 스틸하우스(100)의 골조시공이 끝난 이후에, 가설재 (200)를 이 스틸하우스 골조(도 1참조)(100)에 연계 지지시키어 설치한다.That is, as shown in Figure 3, in the conventional steel house, in particular, the construction method of the middle-tier steel house after the construction of the steel house 100, as shown in Figure 1, the temporary material 200 is the steel house frame ( It is installed in conjunction with the support (100) (100).

그리고, 가설재(200)에서 작업자가 스틸하우스 골조의 외장작업을 수행하는 선 골조 시공--> 가설재(200) 설치--> 골조 외장시공 의 순으로 중층형 스틸하우스의 시공이 진행되었다.And, in the temporary material 200, the construction of the steel frame in which the worker performs the exterior work of the steel house frame construction-> installation of the temporary material 200-> framed exterior construction construction of the middle-tier steel house in the order.

그러나, 이와 같은 순서의 종래 중층형 스틸하우스 시공에 있어서는, 골조를 먼저 시공하고 가설재를 이에 지지한후 스틸하우스 패널들을 설치하기 때문에, 불완전하게 가설된 가설재(200)상에서 패널조립과 외장마무리 시공등을 하여야 하기 때문에, 안정상 문제가 있다.However, in the conventional middle-tier steel house construction in this order, since the construction of the frame first and supporting the temporary material to install the steel house panels, on the incompletely installed temporary material 200, panel assembly and exterior finishing construction, etc. Since it should be, there is a problem in stability.

특히, 근래 스틸하우스 공법이 3층 이상으로 고층화 되면서 패널에 단열재 및 마감재등이 추가로 부착되어 단위 패널의 중량이 늘어나기 때문에, 종래의 가설재(200)의 형태로는 시공작업이 매우 불안정한 것이고, 시공 공기도 지연되는 것이다.In particular, in recent years, as the steel house method is increased to three or more floors, the insulation and finishing materials are additionally attached to the panel to increase the weight of the unit panel, so that the construction work is very unstable in the form of a conventional temporary material 200. Construction air is also delayed.

한편, 도 3에서 도시한 바와 같이, 종래의 가설재(200)는 파이프(210)들을 철사(220)등으로 역어서 임시적으로 가설하는 것이 대부분이므로, 이의 안정성이나 조립 또는 해체도 어려운 것이고, 단위 유닛 형태가 아니므로 제작이나 스틸하우스 규격에 대응하는 작업 정도에도 많은 문제가 있었다.On the other hand, as shown in Figure 3, the conventional temporary material 200 is most of the temporary temporary construction to reverse the pipes 210 to the wire 220, etc., it is also difficult to assemble or disassemble thereof, unit unit Since it is not a form, there were many problems in manufacturing and working degree corresponding to the steel house standard.

본 발명은 상기와 같은 종래 문제점들을 개선시키기 위하여 안출된 것으로서 그 목적은, 독립형 가설장치를 미리 설치하고, 그 내측으로 스틸하우스의 여러 조립 패널들을 투입하여 중층형 스틸하우스의 조립을 가설장치를 이용하여 신속하고, 안전하게 수행함으로써, 중층형 스틸하우스의 시공 공기를 획기적으로 단축시키며, 단위부재들을 연결하는 단위 유닛들을 조립하여 가설장치를 구성함으로써 가설장치의 설치 및 분해 조립을 용이하게 하는 것은 물론, 특히 단위 가설부재에 끼워진 클램핑밴드의 연결구에 조인트 와이어를 연결하는 구조로서, 가설장치의 조립 견고성이 우수하고, 독립형 가설장치에 의한 본 공사의 지연을 방지하는 독립형 가설장치 및 이를 이용한 중층 스틸하우스 시공방법을 제공하는 데에 있다.The present invention has been made in order to improve the conventional problems as described above, the purpose is to install a stand-alone construction apparatus in advance, by putting several assembly panels of the steel house to the inside of the assembly of the middle-tier steel house using the construction apparatus By doing so quickly and safely, it significantly shortens the construction air of the middle-tier steel house and assembles the unit units connecting the unit members to construct a temporary device, thereby facilitating installation and disassembly of the temporary device. In particular, it is a structure that connects the joint wire to the connector of the clamping band fitted to the unit temporary member, and has excellent assembly robustness, and an independent temporary apparatus to prevent delay of the construction by the independent temporary apparatus and the construction of the middle layer steel house using the same. To provide a way.

삭제delete

상기와 같은 목적을 달성하기 위한 기술적인 일측면으로서 본 발명은, 안쪽으로 투입되는 스틸하우스 패널들을 조립하도록 하여 스틸하우스의 중층 시공을 용이하게 하는 독립형 가설장치에 있어서,
일정길이로 된 파이프형상의 바디와, 상기 바디 양 단부에 압착되어 평면상으로 형성된 연결부 및, 상기 연결부에 형성된 체결개구로 구성되어 체결부재로서 연결 조립되는 단위 가설부재; 및,
상기 단위 가설부재들이 조립되어 하나의 작업평면을 구현하는 단위유닛;
을 포함하고,
상기 단위 유닛들이 상하 및 좌우에 연속적으로 연결 조립되어 시공되는 상기 스틸하우스를 포위하도록 구성되고, 상기 단위 가설부재의 바디에 고정된 클램핑밴드에 구비된 연결구를 추가로 포함하여 조인트 와이어의 연결을 용이토록 구성된 독립형 가설장치를 제공한다.
In one aspect of the present invention as a technical aspect for achieving the above object, in the stand-alone construction apparatus to facilitate the construction of the steel house by assembling the steel house panels put inwards,
A unit temporary member which is composed of a pipe-shaped body having a predetermined length, a connection part that is compressed to both ends of the body and formed in a planar shape, and a fastening opening formed on the connection part to be connected and assembled as a fastening member; And,
A unit unit in which the unit temporary members are assembled to implement one working plane;
Including,
The unit units are configured to enclose the steel house which is continuously assembled and assembled to the upper and lower sides and the left and right, and further includes a connector provided in the clamping band fixed to the body of the unit temporary member for connection of the joint wires. It provides a stand-alone hypothesis configured so.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

이때, 상기 연결부는 절곡되어 파이프들의 간섭을 피하도록 단차를 형성하는것도 바람직하다.In this case, it is also preferable that the connection part is bent to form a step to avoid interference of the pipes.

삭제delete

또한, 기술적인 다른 측면으로서 본 발명은, 스틸하우스 시공위치에 기초를 시공하는 단계;In addition, the present invention as another technical aspect, the step of constructing the base in the steel house construction position;

상기 기초를 포위하도록 제 1항에서 기재한 독립형 가설장치를 시공하는 단계;Constructing a standalone construction apparatus as defined in claim 1 to surround the foundation;

상기 독립형 가설장치를 시공한 후 상기 기초위로 스틸하우스 조립 패널들을 기중기로 투입시키는 단계; 및,Putting the steel house assembly panels onto the foundation after constructing the stand-alone construction apparatus; And,

상기 가설장치를 이용하여 조립되는 패널들을 적어도 2층 이상의 중층으로 조립 신속하게 시공하는 단계;Quickly assembling the panels assembled using the temporary device into at least two or more intermediate layers;

로 구성된 독립형 가설장치를 이용한 중층 스틸하우스 시공방법을 제공한다.Provides a middle-tier steel house construction method using a stand-alone construction device consisting of.

이하, 첨부된 도면에 따라 본 발명을 상세하게 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 4는 본 발명에 따른 독립형 가설장치의 단위 가설부재를 도시한 개략사시도이고, 도 5는 본 발명인 독립형 가설장치의 단위 층 유닛을 도시한 사시도이며, 도 6은 본 발명인 독립형 가설장치를 도시한 사시도이고, 도 7은 본 발명인 독립형 가설장치의 단위 가설부재의 변형예를 도시한 구조도이며, 도 8은 본 발명인 독립형 가설장치를 이용한 중층형 스틸하우스 시공단계를 도시한 모식도이다.4 is a schematic perspective view showing a unit construction member of a standalone construction apparatus according to the present invention, FIG. 5 is a perspective view showing a unit layer unit of the standalone construction apparatus of the present invention, and FIG. 6 is a view of the standalone construction apparatus of the present invention. 7 is a structural diagram showing a modification of the unit temporary member of the independent temporary apparatus of the present invention, Figure 8 is a schematic diagram showing the construction of a middle-tier steel house using the independent temporary apparatus of the present invention.

먼저, 본 발명의 독립형 가설장치(1)는 스틸하우스 뿐만 아니라, 기존 건축물 시공의 외장 공사시 기존의 파이프들을 철사 등으로 역어서 하는 형태를 개선하여 다음에 상세하게 설명하는 단위 가설부재(10)와 단위 유닛(30)의 단위부재들을 조립하여 구성되어 있어 시공이나 사용 및 이동 보관 등의 전체적인 취급을 용이하게 하는 것에 특징이 있다.First, the stand-alone temporary apparatus 1 of the present invention improves the shape of the existing pipes, such as wires, during the exterior construction of the existing building construction as well as the steel house, and the unit temporary member 10 described in detail below. And the unit member of the unit unit 30 is composed by assembling is characterized by facilitating the overall handling, such as construction or use and moving storage.

한편, 근래 콘크리트 타설방식의 습식 시공에 따른 여러 문제들이 제기되면서 연구 개발된 건식 건축물의 시공이 늘고 있는데, 예를 들어 스틸하우스 공업화기술이 알려지고 있다.On the other hand, recently, the construction of dry buildings researched and developed is increasing due to various problems caused by wet construction of concrete pouring method, for example, steel house industrialization technology is known.

이와 같은 스틸하우스 공업화 기술은 패널 공장에서 기후영향을 받지 않고 엄격한 품질관리하에 무소음, 무공해상태에서 조립되는 패널모듈들을 제작하고, 시 공현장에 운반하여 건식으로 신속하게 조립한다.Such steel house industrialization technology produces panel modules assembled in a noiseless and pollution-free state under strict quality control without being influenced by the climate in panel factories, and transported to the construction site for quick assembly.

따라서, 이와 같은 스틸하우스 공업화 기술에 따른 대표적인 건축물인 스틸하우스는 공장생산에 따른 생산체제 확보가 가능하고, 공장생산에 따른 효율적인 생산체제 확보는 물론, 공기단축 및 공사비절감이 가능한 것으로 알려져 있다.Therefore, the steel house, which is a representative building according to the steel house industrialization technology, is capable of securing a production system according to the factory production, securing an efficient production system according to the factory production, and reducing air and reducing construction costs.

한편, 앞에서 설명한 바와 같이, 이와 같은 스틸하우스 공업화 기술로 시공되는 스틸하우스는 신속한 조립 시공이 그 특징인데, 지금까지는 기초위에 골조를 시공하고 이를 지지하는 상태로 후 가설구조를 포위하도록 설치하고, 그 후에 패널등의 외장재를 시공하는 것이므로, 특히 중층 스틸하우스의 시공이 가설구조의 후 시공에 따라 지연되는 것이었다.On the other hand, as described above, the steel house that is constructed by such a steel house industrialization technology is characterized by rapid assembly construction, until now to install the frame on the foundation and to support the post-construction structure in the state to support it, Later, the construction of exterior materials such as panels, the construction of the middle-tier steel house, in particular, was delayed by the post-installation of the temporary structure.

이는, 기존의 대부분의 가설구조가 시공되는 건축물에 연계 지지되는 구조이기 때문이고, 따라서 시공 건축물과는 연계되지 않는 독립형 가설장치(1)가 필요하게 되었다.This is because most existing temporary structures are connected to and supported by a building to be constructed, and therefore, a stand-alone temporary device 1 that is not connected to a construction building is required.

예를 들어, 도 4 내지 도 6에서는 본 발명에 따른 독립형 가설장치(1)를 도시하고 있다.For example, FIGS. 4 to 6 show a stand alone temporary device 1 according to the present invention.

즉, 도 4 및 도 5에서 도시한 바와 같이, 본 발명의 독립형 가설장치(1)는, 안쪽으로 투입되는 스틸하우스 패널들을 조립하도록 하여 스틸하우스의 중층 시공을 용이하게 하는 독립형 가설장치(1)로서, 양 단부에는 체결개구가 형성되는 단위 가설부재(10) 및, 상기 단위 가설부재(10)들이 조립되어 하나의 작업평면을 구현하는 단위유닛(30)을 포함하여 구성된다.That is, as shown in Figures 4 and 5, the stand-alone construction apparatus 1 of the present invention, the stand-alone construction apparatus 1 to facilitate the construction of the steel house by assembling the steel house panels that are put inwards. As the end portion, the unit temporary member 10 is formed with a fastening opening is formed, and the unit temporary member 10 is configured to include a unit unit 30 to implement a work plane.

그리고, 이와 같은 단위 유닛(30)들이 상하 및 좌우에 연속적으로 연결 조립 되어 시공되는 상기 스틸하우스를 포위하도록 설치되는 것이다.In addition, such unit units 30 are installed so as to surround the steel house which is continuously assembled and assembled on the upper and lower sides.

이때, 도 4에서 도시한 바와 같이, 상기 단위 가설부재(10)를 구체적으로 살펴보면, 이와 같은 본 발명의 단위 가설부재(10)는, 바디(12)와, 상기 바디 양 단부에 압착되어 평면상으로 형성된 연결부(14) 및, 상기 연결부(14)에 형성된 상기 체결개구(16)로 구성되어 체결부재 예를 들어, 체결볼트(B)와 너트(N)로서 연결 조립된다.In this case, as shown in FIG. 4, the unit temporary member 10 of the present invention will be described in detail. The unit temporary member 10 of the present invention is compressed to the body 12 and both ends of the body in a plan view. Consists of a connecting portion 14 and the fastening opening 16 formed in the connecting portion 14 is assembled as a fastening member, for example, a fastening bolt (B) and a nut (N).

그리고, 본 발명의 가설부재(10)는 미리 조정된 일정한 길이를 갖고 양단부의 체결개구들이 모여서 하나의 체결볼트와 너트로서 여러개의 바디들이 분기되는 형태로 연결되면서 도 5와 같이 하나의 단위 유닛(30) 즉, 평면상으로 구현되는 하나의 단위 유닛(30)으로 제공된다.And, the temporary member 10 of the present invention has a predetermined length in advance and the fastening openings of both ends are gathered and connected in a form in which several bodies are branched as one fastening bolt and a nut, as shown in FIG. 30) that is, provided as one unit unit 30 implemented in a plane.

또한, 도 6에서 도시한 바와 같이, 이와 같은 단위 유닛(30)들이 전체적으로 평면적으로 사각틀 형태로 조립 시공되어 전체적으로 독립형 가설장치(1)를 구성하는 것이다.In addition, as shown in FIG. 6, such unit units 30 are assembled in a planar rectangular frame as a whole to constitute an independent construction apparatus 1 as a whole.

따라서, 도 6에서 도시한 바와 같이, 본 발명의 독립형 가설장치(1)에서 수직방향으로 층을 구성하면서 다층의 단위 유닛이 구성되고, 이와 같은 단위 층간공간에서 작업자는 다음에 상세하게 설명하듯이 독립형 가설장치(1)의 내부로 투입되는 스틸하우스 조립 패널 모듈들의 층간 조립 시공을 원활하게 하는 것이다.Therefore, as shown in FIG. 6, in the independent construction apparatus 1 of the present invention, a multi-layer unit unit is constructed while constituting layers in the vertical direction. In such unit interlayer spaces, the worker will be described in detail below. It is to facilitate the inter-layer construction of the steel house assembly panel modules that are introduced into the stand-alone construction apparatus (1).

한편, 도 7에서 도시한 바와 같이, 본 발명의 가설부재(10)는 그 양단부 연결부가 절곡형(14')으로 구성되어 단차를 형성하도록 하는 것도 가능하다.On the other hand, as shown in Figure 7, in the temporary member 10 of the present invention it is also possible to form a step by being connected to both ends of the bent form 14 '.

즉, 본 발명의 독립형 가설장치(1)의 구조 강도를 감안할때, 바디인 파이프 의 직경을 굵게 하는 경우에는 도 7과 같이 연결부(14')를 절곡시키어 단차를 줌으로서 바디들간의 접촉시 간섭을 피하도록 하는 것이 바람직하다.That is, in view of the structural strength of the stand-alone construction apparatus 1 of the present invention, when the diameter of the pipe, which is a body, increases, the interference between the bodies is caused by bending the connecting portion 14 'as shown in FIG. It is desirable to avoid.

다음, 도 4에서 도시한 바와 같이, 상기 단위 가설부재(10)의 바디(12)에 고정된 클램핑밴드(18)에 구비된 연결구(20)를 추가로 포함하여 조인트 와이어(22)의 연결을 용이하게 구성될 수 있다.Next, as shown in FIG. 4, the connection of the joint wire 22 is further included by further including a connector 20 provided in the clamping band 18 fixed to the body 12 of the unit temporary member 10. It can be easily configured.

따라서, 조인트와이어(22)의 조인트(22b)를 돌리면 와이어(22a)들이 당겨지면서 바디들을 견고하게 연결할 것인데, 이 와이어는 상기 연결구 체결구에 연결되는 것도 가능할 것이다.Thus, turning the joint 22b of the joint wire 22 will pull the wires 22a and firmly connect the bodies, which may also be connected to the connector fasteners.

다음,도 8에서는 이와 같은 본 발명의 독립형 가설장치(1)를 이용한 스틸하우스 시공방법에 대하여 도시하고 있다.Next, FIG. 8 illustrates a steel house construction method using the stand-alone construction apparatus 1 of the present invention.

즉, 도 8의 ①②와 같이, 충층 스틸하우스(100)가 시공될 위치에 기초(100')를 시공하고, 본 발명의 독립형 가설장치(1)의 단위 가설부재와 단위 유닛을 조립하여 상기 기초를 포위하도록 스틸하우스 보다 먼저 기존과는 반대로 선 시공한다.That is, as shown in ①② of FIG. 8, the foundation 100 'is constructed at the position where the filling layer steel house 100 is to be constructed, and the unit temporary member and the unit unit of the independent temporary apparatus 1 of the present invention are assembled to the foundation. In order to enclose the construction, the construction of the steel house should be carried out before the steel house.

다음, 도 8의 ③과 같이, 본 발명의 독립형 가설장치(1)를 시공한 후 상기 기초(100')위로 스틸하우스 조립 패널 모듈(100")들을 기중기(M)로 투입시키고, 그 다음 도 8의 ④와 같이 가설장치(1)를 이용하여 조립되는 스틸하우스 패널 모듈(100")들을 적어도 2층 이상의 중층으로 신속하게 시공한다.Next, as shown in ③ of Figure 8, after the construction of the stand-alone construction apparatus 1 of the present invention, the steel house assembly panel module (100 ") is put into the crane (M) onto the foundation (100 '), and then the figure Steel house panel modules 100 "assembled using the temporary device 1 as in ④ of 8 are quickly installed in at least two or more intermediate layers.

따라서, 본 발명의 독립형 가설장치(1)를 이용하는 경우 가설장치를 먼저 시공하고, 이를 이용하여 스틸하우스 패널모듈(100")들을 중층으로 조립 시공하기 때문에, 결과적으로는 스틸하우스 복층 시공을 기존에 골조후 가설구조를 세우는 기 존에 비하여 매우 용이한 것이다.Therefore, in the case of using the stand-alone construction apparatus 1 of the present invention, the construction apparatus is constructed first, and then the steel house panel modules 100 "are assembled into the middle layer by using the construction. It is very easy compared to the existing construction of the temporary structure after framing.

이와 같이 본 발명인 독립형 가설장치를 이용한 중층 스틸하우스 시공방법에 의하면, 독립형 가설장치를 미리 설치하고, 그 내측으로 스틸하우스의 여러 조립 패널들을 투입하여 중층형 스틸하우스의 조립을 가설장치를 이용하여 신속하고, 안전하게 수행함으로써, 중층형 스틸하우스의 시공 공기를 획기적으로 단축시키며, 단위부재들을 연결하는 단위 유닛들을 조립하여 가설장치를 구성함으로써 가설장치의 설치 및 분해 조립을 용이하게 하는 것은 물론, 특히 단위 가설부재에 끼워진 클램핑밴드의 연결구에 조인트 와이어를 연결하는 구조로서, 가설장치의 조립 견고성이 우수하고, 독립형 가설장치에 의한 본 공사의 지연을 방지하는 우수한 효과를 제공한다.As described above, according to the method for constructing a middle-tier steel house using the independent temporary apparatus of the present invention, a stand-alone temporary apparatus is installed in advance, and various assembly panels of the steel house are put into the interior to quickly assemble the middle-tier steel house using the temporary apparatus. And by performing safely, it is possible to significantly shorten the construction air of the middle-tier steel house, as well as to facilitate the installation and disassembly and assembly of the temporary apparatus by assembling the unit units connecting the unit members, in particular, the unit As a structure for connecting the joint wire to the connector of the clamping band fitted to the temporary member, it is excellent in the assembly robustness of the temporary apparatus, and provides an excellent effect of preventing the delay of the construction by the independent temporary apparatus.

삭제delete

삭제delete

본 발명은 지금까지 특정한 실시예에 관련하여 도시하고 설명하였지만, 이하의 특허청구범위에 의해 마련되는 본 발명의 정신이나 분야를 벗어나지 않는 한도내에서 본 발명이 다양하게 개조 및 변화될수 있다는 것을 당업계에서 통상의 지식을 가진자는 용이하게 알수 있음을 밝혀두고자 한다.While the invention has been shown and described in connection with specific embodiments so far, it will be appreciated that the invention can be varied and modified without departing from the spirit or scope of the invention as set forth in the claims below. It will be appreciated that those skilled in the art can easily know.

Claims (5)

안쪽으로 투입되는 스틸하우스 패널들을 조립하도록 하여 스틸하우스의 중층 시공을 용이하게 하는 독립형 가설장치에 있어서,In the self-contained temporary apparatus for assembling the steel house panels to be inward to facilitate the construction of the steel house, 일정길이로 된 파이프형상의 바디와, 상기 바디 양 단부에 압착되어 평면상으로 형성된 연결부 및, 상기 연결부에 형성된 체결개구로 구성되어 체결부재로서 연결 조립되는 단위 가설부재; 및, A unit temporary member which is composed of a pipe-shaped body having a predetermined length, a connection part that is compressed to both ends of the body and formed in a planar shape, and a fastening opening formed on the connection part to be connected and assembled as a fastening member; And, 상기 단위 가설부재들이 조립되어 하나의 작업평면을 구현하는 단위유닛; A unit unit in which the unit temporary members are assembled to implement one working plane; 을 포함하고, Including, 상기 단위 유닛들이 상하 및 좌우에 연속적으로 연결 조립되어 시공되는 상기 스틸하우스를 포위하도록 구성되고, 상기 단위 가설부재의 바디에 고정된 클램핑밴드에 구비된 연결구를 추가로 포함하여 조인트 와이어의 연결을 용이토록 구성된 것을 특징으로 하는 독립형 가설장치.The unit units are configured to enclose the steel house which is continuously assembled and assembled to the upper and lower sides and the left and right, and further includes a connector provided in the clamping band fixed to the body of the unit temporary member for connection of the joint wires. Independent temporary device, characterized in that configured so. 삭제delete 삭제delete 제 1항에 있어서, 상기 바디 연결부는 절곡된 것을 특징으로 하는 독립형 가설장치.The self-contained hypothesis device according to claim 1, wherein the body connection part is bent. 스틸하우스 시공위치에 기초를 시공하는 단계;Constructing the foundation at a steel house construction location; 상기 기초를 포위하도록 제 1항에서 기재한 독립형 가설장치를 시공하는 단계;Constructing a standalone construction apparatus as defined in claim 1 to surround the foundation; 상기 독립형 가설장치를 시공한 후 상기 기초위로 스틸하우스 조립 패널들을 기중기로 투입시키는 단계; 및,Putting the steel house assembly panels onto the foundation after constructing the stand-alone construction apparatus; And, 상기 가설장치를 이용하여 조립되는 패널들을 적어도 2층 이상의 중층으로 조립 신속하게 시공하는 단계;Quickly assembling the panels assembled using the temporary device into at least two or more intermediate layers; 로 구성된 것을 독립형 가설장치를 이용한 중층 스틸하우스 시공방법.The construction method of the middle-tier steel house using a stand-alone construction device.
KR1020050129414A 2005-12-26 2005-12-26 Stand-alone construction equipment and construction method of middle-tier steel house using it Active KR100711484B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050129414A KR100711484B1 (en) 2005-12-26 2005-12-26 Stand-alone construction equipment and construction method of middle-tier steel house using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050129414A KR100711484B1 (en) 2005-12-26 2005-12-26 Stand-alone construction equipment and construction method of middle-tier steel house using it

Publications (1)

Publication Number Publication Date
KR100711484B1 true KR100711484B1 (en) 2007-04-24

Family

ID=38182339

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050129414A Active KR100711484B1 (en) 2005-12-26 2005-12-26 Stand-alone construction equipment and construction method of middle-tier steel house using it

Country Status (1)

Country Link
KR (1) KR100711484B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115787991A (en) * 2022-11-18 2023-03-14 中交一公局集团有限公司 bracket device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06173440A (en) * 1992-12-04 1994-06-21 Kajima Corp Multi-purpose unit material
JPH09317185A (en) * 1996-05-30 1997-12-09 Natl House Ind Co Ltd Construction method of housing
JP2001355335A (en) 2000-06-15 2001-12-26 Nippon Light Metal Co Ltd Pipe with connecting member and connected pipe for temporary scaffolding comprising said pipe
JP2002068548A (en) * 2000-08-29 2002-03-08 Minolta Co Ltd Continuous paper carrying device
JP2003268873A (en) 2002-03-13 2003-09-25 Mia:Kk Truss member
JP2004270403A (en) 2003-03-12 2004-09-30 Miyaji Construction & Engineering Co Ltd Lightweight box truss system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06173440A (en) * 1992-12-04 1994-06-21 Kajima Corp Multi-purpose unit material
JPH09317185A (en) * 1996-05-30 1997-12-09 Natl House Ind Co Ltd Construction method of housing
JP2001355335A (en) 2000-06-15 2001-12-26 Nippon Light Metal Co Ltd Pipe with connecting member and connected pipe for temporary scaffolding comprising said pipe
JP2002068548A (en) * 2000-08-29 2002-03-08 Minolta Co Ltd Continuous paper carrying device
JP2003268873A (en) 2002-03-13 2003-09-25 Mia:Kk Truss member
JP2004270403A (en) 2003-03-12 2004-09-30 Miyaji Construction & Engineering Co Ltd Lightweight box truss system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
15268873
16270403

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115787991A (en) * 2022-11-18 2023-03-14 中交一公局集团有限公司 bracket device

Similar Documents

Publication Publication Date Title
US9062448B2 (en) Pivotally erectable structural frame system
JP3782817B1 (en) Structural type and construction method of steel house
KR20170119752A (en) Panelized structural system for building construction
CN101418592A (en) Combined light steel structure house and mounting method thereof
KR100643075B1 (en) Modular prefabricated building and its construction method
JP5362310B2 (en) Unit building
KR100711484B1 (en) Stand-alone construction equipment and construction method of middle-tier steel house using it
JP5312163B2 (en) Unit building
JP2001220818A (en) Steel framework structure
JP4648154B2 (en) Extension method of building and extension building
JP2008223358A (en) Building construction method
JP2007224586A (en) Composite structural building and method of constructing composite structural building
JP4411478B2 (en) Wooden frame unit housing
JP4391041B2 (en) Prefab building
KR102740074B1 (en) A Construction method using PC modulars
JP3955492B2 (en) Unit type building and construction method of unit type building
JP2003074122A (en) Unit building and expansion unit
RU2382154C1 (en) Girderless ceiling
KR100660210B1 (en) Horizontal large space prefabricated building module and its construction method
JP2888736B2 (en) Roof structure
JP4018000B2 (en) Construction method of unit type building
JP4642378B2 (en) building
JP4488267B2 (en) Hut structure and construction method
JP3902847B2 (en) Unit building with balcony
RU33590U1 (en) Building panel and prefabricated panel building

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

T11-X000 Administrative time limit extension requested

St.27 status event code: U-3-3-T10-T11-oth-X000

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 6

FPAY Annual fee payment

Payment date: 20130419

Year of fee payment: 7

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 7

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

FPAY Annual fee payment

Payment date: 20140418

Year of fee payment: 8

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 8

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 9

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 10

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20170412

Year of fee payment: 11

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 11

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 12

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20190411

Year of fee payment: 13

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 13

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 14

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 15

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 16

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 17

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 18

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000